HaitiDocs

Data / Partner portfolio / Partners / European Union

European Commission - Directorate-General for International Partnerships

European Union. 78 active operations. US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

New commitments in FY2025-26

US$121.8 million

On 38 operations

Disbursed in FY2025-26

US$43.9 million

On 45 operations

Active portfolio at October 18, 2026

US$1,201.5 million

78 of 78 active operations report an approved amount

New commitments and disbursements, FY2016-17 to FY2025-26

New commitments, US$ millions
FY2016-17, US$49.8 million5016-17FY2017-18, US$335.1 million33517-18FY2018-19, US$16.5 million1718-19FY2019-20, US$47.0 million4719-20FY2020-21, US$120.0 million12020-21FY2021-22, US$72.5 million7321-22FY2022-23, US$28.4 million2822-23FY2023-24, US$49.4 million4923-24FY2024-25, US$99.0 million9924-25FY2025-26, US$121.8 million12225-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$49.8 million5016-17FY2017-18, US$335.1 million33517-18FY2018-19, US$16.5 million1718-19FY2019-20, US$47.0 million4719-20FY2020-21, US$120.0 million12020-21FY2021-22, US$72.5 million7321-22FY2022-23, US$28.4 million2822-23FY2023-24, US$49.4 million4923-24FY2024-25, US$99.0 million9924-25FY2025-26, US$121.8 million12225-26FY2026-27, none (to Oct 18)noneto Oct 1826-27
Disbursements, US$ millions
FY2016-17, US$0.9 million0.916-17FY2017-18, US$37.9 million3817-18FY2018-19, US$8.5 million918-19FY2019-20, US$41.6 million4219-20FY2020-21, US$6.5 million720-21FY2021-22, US$7.5 million821-22FY2022-23, US$3.7 million422-23FY2023-24, US$21.3 million2123-24FY2024-25, US$41.9 million4224-25FY2025-26, US$43.9 million4425-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$0.9 million0.916-17FY2017-18, US$37.9 million3817-18FY2018-19, US$8.5 million918-19FY2019-20, US$41.6 million4219-20FY2020-21, US$6.5 million720-21FY2021-22, US$7.5 million821-22FY2022-23, US$3.7 million422-23FY2023-24, US$21.3 million2123-24FY2024-25, US$41.9 million4224-25FY2025-26, US$43.9 million4425-26FY2026-27, none (to Oct 18)noneto Oct 1826-27

Table 1.New commitments and disbursements by fiscal year (flows), US$ millions

FY2016-17US$ millionsFY2017-18US$ millionsFY2018-19US$ millionsFY2019-20US$ millionsFY2020-21US$ millionsFY2021-22US$ millionsFY2022-23US$ millionsFY2023-24US$ millionsFY2024-25US$ millionsFY2025-26US$ millionsFY2026-27to Oct 18US$ millions
New commitments49.8335.116.547.0120.072.528.449.499.0121.8None to date
Operations474578122619380
Disbursements0.937.98.541.66.57.53.721.341.943.9None to date
Operations26444572418450

All operations since 2009: commitments US$1,223.7 million, disbursements US$217.9 million, reported for 93 and 63 of 109 operations.

Portfolio at October 18, 2026

A position at the data date: approved is every commitment to date on the operations, cancellations deducted; disbursed to date and undisbursed are as each partner publishes them.

Table 2.Portfolio of active operations at October 18, 2026, US$ millions

OperationsApprovedUS$ millionsDisbursed to dateUS$ millionsUndisbursed
Active operations781,201.5199.149 of 78 reportedNot reported

Operations

Active operations (78)

78 operations. Approved to date (stock): US$1,201.5 million. Disbursed in FY2025-26 (flow): US$43.6 million, reported for 39 of 78.

Table 3.Active operations, US$ millions

Not published for any operation in this table: undisbursed balance.

Food security and agricultural productivity in the Northeast, component 2Agriculture and food securityJul 202913.65.45.4
Stage
Under way
Instrument
Not reported
Start
January 2, 2026
Effectiveness
Not reported
Closing
July 1, 2029
Disbursed as of
December 16, 2025
Implementing agency
Not reported
Commitment
13.6
Disbursed
5.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 16, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-54382
Urbayiti, technical secretariat, coordination and support for local governanceMultisectorApr 202717.015.93.6
Stage
Under way
Instrument
Not reported
Start
January 22, 2018
Effectiveness
Not reported
Closing
April 23, 2027
Disbursed as of
December 17, 2025
Implementing agency
Not reported
Commitment
17.0
Disbursed
15.9
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 17, 2025
IATI identifier
XI-IATI-EC_INTPA-2018-PCC-394068
Strengthening and modernization of the General Customs AdministrationGovernance and securityMar 203010.23.23.2
Stage
Under way
Instrument
Not reported
Start
March 16, 2026
Effectiveness
Not reported
Closing
March 15, 2030
Disbursed as of
March 26, 2026
Implementing agency
Not reported
Commitment
10.2
Disbursed
3.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
March 26, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-54001
PMSAN II program estimateAgriculture and food securityApr 20286.58.12.9
Stage
Under way
Instrument
Not reported
Start
August 19, 2024
Effectiveness
Not reported
Closing
April 3, 2028
Disbursed as of
July 17, 2026
Implementing agency
Not reported
Commitment
6.5
Disbursed
8.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
July 17, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-28843
Local civil society organizations for the reintegration of migrantsGovernance and securityJan 20283.22.42.4
Stage
Under way
Instrument
Not reported
Start
July 30, 2026
Effectiveness
Not reported
Closing
January 29, 2028
Disbursed as of
July 1, 2026
Implementing agency
Not reported
Commitment
3.2
Disbursed
2.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
July 1, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-80730
Resilient and inclusive schools for a sustainable future in the North-EastEducationJan 20295.72.32.3
Sector
Education
Stage
Under way
Instrument
Not reported
Start
July 24, 2026
Effectiveness
Not reported
Closing
January 23, 2029
Disbursed as of
August 5, 2026
Implementing agency
Not reported
Commitment
5.7
Disbursed
2.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 5, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-76819
Support to judicial hubs and non-formal judicial mechanismsGovernance and securityMar 20273.33.52.2
Stage
Under way
Instrument
Not reported
Start
March 1, 2024
Effectiveness
Not reported
Closing
March 1, 2027
Disbursed as of
August 20, 2026
Implementing agency
Not reported
Commitment
3.3
Disbursed
3.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 20, 2026
IATI identifier
XI-IATI-EC_INTPA-2023-PC-27942
Access to inclusive education in areas affected by the 2021 earthquakeEducationJul 20275.43.62.0
Sector
Education
Stage
Under way
Instrument
Not reported
Start
July 2, 2024
Effectiveness
Not reported
Closing
July 2, 2027
Disbursed as of
December 12, 2025
Implementing agency
Not reported
Commitment
5.4
Disbursed
3.6
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 12, 2025
IATI identifier
XI-IATI-EC_INTPA-2024-PC-26391
Strengthening the governance and steering of the education systemEducationNov 20283.41.91.9
Sector
Education
Stage
Under way
Instrument
Not reported
Start
December 2, 2025
Effectiveness
Not reported
Closing
November 1, 2028
Disbursed as of
December 11, 2025
Implementing agency
Not reported
Commitment
3.4
Disbursed
1.9
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 11, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-26383
Improving teaching conditions, basic educationEducationApr 20283.31.81.8
Sector
Education
Stage
Under way
Instrument
Not reported
Start
April 17, 2026
Effectiveness
Not reported
Closing
April 16, 2028
Disbursed as of
April 29, 2026
Implementing agency
Not reported
Commitment
3.3
Disbursed
1.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
April 29, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-43705
Integrated territorial development of the Northeast, component 1, local governanceAgriculture and food securityJul 20296.21.61.6
Stage
Under way
Instrument
Not reported
Start
January 2, 2026
Effectiveness
Not reported
Closing
July 1, 2029
Disbursed as of
December 18, 2025
Implementing agency
Not reported
Commitment
6.2
Disbursed
1.6
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 18, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-54381
For an inclusive TVET aligned with employmentEducationApr 20282.42.01.5
Sector
Education
Stage
Under way
Instrument
Not reported
Start
May 1, 2024
Effectiveness
Not reported
Closing
April 30, 2028
Disbursed as of
August 24, 2026
Implementing agency
Not reported
Commitment
2.4
Disbursed
2.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 24, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-26409
Construction works for the Saint Raphaël bypassTransportFeb 202717.91.31.3
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
October 16, 2025
Effectiveness
Not reported
Closing
February 13, 2027
Disbursed as of
December 10, 2025
Implementing agency
Not reported
Commitment
17.9
Disbursed
1.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
April 16, 2026
IATI identifier
XI-IATI-EC_INTPA-2025-PC-37254
Intégration des jeunes et réduction de la violence communautaireSocial protectionSep 20283.82.01.3
Stage
Under way
Instrument
Not reported
Start
March 1, 2025
Effectiveness
Not reported
Closing
September 1, 2028
Disbursed as of
July 2, 2026
Implementing agency
Not reported
Commitment
3.8
Disbursed
2.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
July 2, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-37410
Sustainable peasant food production, processing and marketingAgriculture and food securityJan 20276.56.61.2
Stage
Under way
Instrument
Not reported
Start
January 1, 2024
Effectiveness
Not reported
Closing
January 1, 2027
Disbursed as of
June 2, 2026
Implementing agency
Not reported
Commitment
6.5
Disbursed
6.6
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
June 2, 2026
IATI identifier
XI-IATI-EC_INTPA-2023-PC-27421
Technical assistance for the Multisectoral Food Security ProgramAgriculture and food securityOct 20293.01.81.0
Stage
Under way
Instrument
Not reported
Start
October 14, 2024
Effectiveness
Not reported
Closing
October 14, 2029
Disbursed as of
August 21, 2026
Implementing agency
Not reported
Commitment
3.0
Disbursed
1.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-28842
62 more active operations
Access to justice and protection of rights in displacement contextsGovernance and securityNov 20271.60.80.8
Stage
Under way
Instrument
Not reported
Start
November 30, 2025
Effectiveness
Not reported
Closing
November 29, 2027
Disbursed as of
November 25, 2025
Implementing agency
Not reported
Commitment
1.6
Disbursed
0.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 25, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-37409
Operating grant to BON N.11 (2026-2027)MultisectorSep 20270.90.70.7
Stage
Under way
Instrument
Not reported
Planned start
June 18, 2026
Effectiveness
Not reported
Closing
September 29, 2027
Disbursed as of
June 26, 2026
Implementing agency
Not reported
Commitment
0.9
Disbursed
0.7
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 26, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-76089
Project to support youth integration and the reduction of community violence (PAIR)Governance and securityDec 20264.34.20.7
Stage
Under way
Instrument
Not reported
Start
March 1, 2023
Effectiveness
Not reported
Closing
December 30, 2026
Disbursed as of
June 11, 2026
Implementing agency
Not reported
Commitment
4.3
Disbursed
4.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 11, 2026
IATI identifier
XI-IATI-EC_INTPA-2022-PC-24191
Operating grant to BON N.10 (2025-2026)Governance and securityOct 20260.70.60.6
Stage
Closing
Instrument
Not reported
Start
October 1, 2025
Effectiveness
Not reported
Closing
October 1, 2026
Disbursed as of
October 14, 2025
Implementing agency
Not reported
Commitment
0.7
Disbursed
0.6
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
October 14, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-65897
Protecting rights, restoring dignity for greater resilienceGovernance and securityMay 20281.00.50.5
Stage
Under way
Instrument
Not reported
Start
May 6, 2026
Effectiveness
Not reported
Closing
May 5, 2028
Disbursed as of
May 27, 2026
Implementing agency
Not reported
Commitment
1.0
Disbursed
0.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
May 27, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-76270
Technical assistance contract for the PAIESC programGovernance and securityApr 20281.50.80.5
Stage
Under way
Instrument
Not reported
Start
July 18, 2024
Effectiveness
Not reported
Closing
April 18, 2028
Disbursed as of
August 21, 2026
Implementing agency
Not reported
Commitment
1.5
Disbursed
0.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-17864
Expertise support contract for strengthening democratic governanceMultisectorJun 20280.80.40.4
Stage
Under way
Instrument
Not reported
Start
June 21, 2026
Effectiveness
Not reported
Closing
June 20, 2028
Disbursed as of
July 10, 2026
Implementing agency
Not reported
Commitment
0.8
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
July 10, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-85103
AMCC+ Haiti program estimateEnvironment and disaster riskDec 20261.81.70.4
Stage
Under way
Instrument
Not reported
Start
June 24, 2022
Effectiveness
Not reported
Closing
December 1, 2026
Disbursed as of
June 26, 2026
Implementing agency
Not reported
Commitment
1.8
Disbursed
1.7
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 26, 2026
IATI identifier
XI-IATI-EC_INTPA-2022-PCC-425721
Reforestation and Green Energy, Initiative for an Ecological LifeEnvironment and disaster riskMay 20261.21.10.4
Stage
Closing
Instrument
Not reported
Start
December 2, 2023
Effectiveness
Not reported
Closing
May 31, 2026
Disbursed as of
October 21, 2025
Implementing agency
Not reported
Commitment
1.2
Disbursed
1.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
October 21, 2025
IATI identifier
XI-IATI-EC_INTPA-2023-PC-34906
Initiative for nature and the optimization of ecological values (INOVEE)Environment and disaster riskApr 20261.51.40.4
Stage
Closing
Instrument
Not reported
Start
December 2, 2023
Effectiveness
Not reported
Closing
April 30, 2026
Disbursed as of
December 11, 2025
Implementing agency
Not reported
Commitment
1.5
Disbursed
1.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 11, 2025
IATI identifier
XI-IATI-EC_INTPA-2023-PC-34766
Support measures for the National Route 3 worksMultisectorAug 20270.60.40.4
Stage
Under way
Instrument
Not reported
Start
December 19, 2025
Effectiveness
Not reported
Closing
August 18, 2027
Disbursed as of
December 24, 2025
Implementing agency
Not reported
Commitment
0.6
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 24, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-37272
Operationalisation of the Humanitarian-Development-Peace NexusHumanitarianSep 20291.10.40.4
Stage
Under way
Instrument
Not reported
Start
December 2, 2025
Effectiveness
Not reported
Closing
September 2, 2029
Disbursed as of
December 22, 2025
Implementing agency
Not reported
Commitment
1.1
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 22, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-62069
Support for coordinating the Integrated Territorial Development programAgriculture and food securityFeb 20302.30.30.3
Stage
Under way
Instrument
Not reported
Start
September 1, 2026
Effectiveness
Not reported
Closing
February 28, 2030
Disbursed as of
September 4, 2026
Implementing agency
Not reported
Commitment
2.3
Disbursed
0.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
September 4, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-54384
Support Program for Emerging Initiatives (PAIESC), program estimateGovernance and securityApr 20284.82.70.3
Stage
Under way
Instrument
Not reported
Start
May 22, 2025
Effectiveness
Not reported
Closing
April 22, 2028
Disbursed as of
August 28, 2026
Implementing agency
Not reported
Commitment
4.8
Disbursed
2.7
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 28, 2026
IATI identifier
XI-IATI-EC_INTPA-2025-PC-37453
Communication activities for the EU DelegationMultisectorDec 20260.40.40.3
Stage
Under way
Instrument
Not reported
Start
December 26, 2024
Effectiveness
Not reported
Closing
December 26, 2026
Disbursed as of
June 26, 2026
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
June 26, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-48959
Technical assistance services for the AMCC+ programEnvironment and disaster riskJun 20261.71.40.2
Stage
Closing
Instrument
Not reported
Start
January 1, 2023
Effectiveness
Not reported
Closing
June 29, 2026
Disbursed as of
April 22, 2026
Implementing agency
Not reported
Commitment
1.7
Disbursed
1.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
April 22, 2026
IATI identifier
XI-IATI-EC_INTPA-2022-PC-9128
Revitalization and visibility of the cultural sector (REVIV)MultisectorFeb 20280.50.40.1
Stage
Under way
Instrument
Not reported
Start
February 1, 2025
Effectiveness
Not reported
Closing
February 1, 2028
Disbursed as of
June 29, 2026
Implementing agency
Not reported
Commitment
0.5
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 29, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-37256
Technical support, partner consultationMultisectorNov 20250.10.10.1
Stage
Closing
Instrument
Not reported
Start
November 1, 2024
Effectiveness
Not reported
Closing
November 1, 2025
Disbursed as of
August 13, 2026
Implementing agency
Not reported
Commitment
0.1
Disbursed
0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-45371
Sustainable agricultural development, nutrition and food securityAgriculture and food securityOct 20262.21.80.1
Stage
Closing
Instrument
Not reported
Start
October 1, 2023
Effectiveness
Not reported
Closing
October 1, 2026
Disbursed as of
December 15, 2025
Implementing agency
Not reported
Commitment
2.2
Disbursed
1.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 15, 2025
IATI identifier
XI-IATI-EC_INTPA-2023-PC-27455
Supervision of works on RN3 and bypasses of HincheTransportJul 20283.62.3<0.1
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
October 1, 2020
Effectiveness
Not reported
Closing
July 1, 2028
Disbursed as of
January 23, 2026
Implementing agency
Not reported
Commitment
3.6
Disbursed
2.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
January 23, 2026
IATI identifier
XI-IATI-EC_INTPA-2020-PCC-416403
Construction and supervision of the drainage systems of Cayes and JérémieGovernance and securityAug 20260.10.1<0.1
Stage
Closing
Instrument
Not reported
Start
October 4, 2024
Effectiveness
Not reported
Closing
August 7, 2026
Disbursed as of
August 27, 2026
Implementing agency
Not reported
Commitment
0.1
Disbursed
0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 27, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-42703
Technical support to the Delegation in organizing a national seminarMultisectorJul 2026<0.1<0.1<0.1
Stage
Closing
Instrument
Not reported
Start
May 21, 2026
Effectiveness
Not reported
Closing
July 20, 2026
Disbursed as of
August 7, 2026
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 7, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-83983
Flood risk study - land and access to the FTP centerMultisectorMay 2026<0.1<0.1<0.1
Stage
Closing
Instrument
Not reported
Start
April 6, 2026
Effectiveness
Not reported
Closing
May 20, 2026
Disbursed as of
August 26, 2026
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 26, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-76832
Program to support the national transport policyTransportDec 2030256.6Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
April 23, 2010
Effectiveness
Not reported
Closing
December 23, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
256.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 19, 2023
IATI identifier
XI-IATI-EC_INTPA-2009-ACT-D-21608-01
Haitian State Reform Support Program (SBC-II)Budget support and debtApr 2029174.3Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
April 10, 2018
Effectiveness
Not reported
Closing
April 9, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
174.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 3, 2024
IATI identifier
XI-IATI-EC_INTPA-2017-ACT-D-39148-00
SBC-II Budget support componentBudget support and debtApr 2027139.995.6Not reported
Stage
Under way
Instrument
Not reported
Start
April 10, 2018
Effectiveness
Not reported
Closing
April 10, 2027
Disbursed as of
March 12, 2025
Implementing agency
Not reported
Commitment
139.9
Disbursed
95.6
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
March 12, 2025
IATI identifier
XI-IATI-EC_INTPA-2018-PCC-397120
URBAYITI Urban governance and resilienceMultisectorDec 203055.1Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
December 7, 2017
Effectiveness
Not reported
Closing
December 7, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
55.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 13, 2026
IATI identifier
XI-IATI-EC_INTPA-2017-ACT-D-38982-00
Multisectoral SAN Program - 11th EDFMultisectorDec 202754.7Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
November 20, 2017
Effectiveness
Not reported
Closing
December 20, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
54.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
March 25, 2025
IATI identifier
XI-IATI-EC_INTPA-2016-ACT-D-39097-00
ASIST (Support to the Infrastructure and Transport Services Sector)TransportSep 203148.2Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
March 23, 2021
Effectiveness
Not reported
Closing
September 23, 2031
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
48.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 7, 2026
IATI identifier
XI-IATI-EC_INTPA-2020-ACT-D-41848-00
Rehabilitation of Route RN3, Saint Raphael-DondonTransportFeb 202842.6Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
June 22, 2026
Effectiveness
Not reported
Closing
February 22, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
42.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
March 15, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-14629
Binational cooperation in the fields of trade and the environmentTransportMar 202928.7Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
March 6, 2012
Effectiveness
Not reported
Closing
March 6, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
28.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 22, 2023
IATI identifier
XI-IATI-EC_INTPA-2011-ACT-D-23228-00
Reduction of food and nutrition insecurityAgriculture and food securityAug 202928.53.0Not reported
Stage
Under way
Instrument
Not reported
Start
August 23, 2024
Effectiveness
Not reported
Closing
August 22, 2029
Disbursed as of
August 26, 2024
Implementing agency
Not reported
Commitment
28.5
Disbursed
3.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 26, 2024
IATI identifier
XI-IATI-EC_INTPA-2024-PC-28841
Strengthening and modernization of the General Customs AdministrationGovernance and securityMay 203025.7Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
August 19, 2024
Effectiveness
Not reported
Closing
May 5, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
February 9, 2026
IATI identifier
XI-IATI-EC_INTPA-2021-ACT-62644
Integrated territorial development of Northeast HaitiAgriculture and food securityMay 203224.9Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
August 19, 2024
Effectiveness
Not reported
Closing
May 8, 2032
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
24.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 3, 2024
IATI identifier
XI-IATI-EC_INTPA-2021-ACT-62838
Support for taxation, territorial governance, and financial governanceBudget support and debtApr 202722.29.8Not reported
Stage
Under way
Instrument
Not reported
Start
July 13, 2018
Effectiveness
Not reported
Closing
April 9, 2027
Disbursed as of
December 13, 2024
Implementing agency
Not reported
Commitment
22.2
Disbursed
9.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 13, 2024
IATI identifier
XI-IATI-EC_INTPA-2018-PCC-399023
Education to live together - Education to live together (I)EducationNov 202821.3Not reportedNot reported
Sector
Education
Stage
Under way
Instrument
Not reported
Start
November 17, 2023
Effectiveness
Not reported
Closing
November 17, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
21.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
February 20, 2026
IATI identifier
XI-IATI-EC_INTPA-2023-ACT-61477
Multisectoral program for resilience and recovery of social servicesSocial protectionJul 203117.0Not reportedNot reported
Stage
Approved
Instrument
Not reported
Planned start
January 1, 2031
Effectiveness
Not reported
Closing
July 16, 2031
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
17.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
September 5, 2025
IATI identifier
XI-IATI-EC_INTPA-2021-ACT-63062
Governance of the infrastructure and transport services sectorTransportMar 203116.6Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
September 20, 2018
Effectiveness
Not reported
Closing
March 20, 2031
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
16.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 19, 2025
IATI identifier
XI-IATI-EC_INTPA-2017-ACT-D-40610-00
Works for stormwater management and protection of ravinesMultisectorJul 202712.9Not reportedNot reported
Stage
Approved
Instrument
Not reported
Start
May 4, 2026
Effectiveness
Not reported
Closing
July 4, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
April 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-27374
Recovery after the 2021 earthquake, resilient agriculture and school feedingAgriculture and food securityJan 202811.8Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
December 15, 2021
Effectiveness
Not reported
Closing
January 31, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
11.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 15, 2021
IATI identifier
XI-IATI-EC_INTPA-2021-ACT-60741
Technical and vocational training ecosystem in OuanamintheEducationNov 202811.0Not reportedNot reported
Sector
Education
Stage
Approved
Instrument
Not reported
Start
September 16, 2024
Effectiveness
Not reported
Closing
November 16, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
11.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 26, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-26317
Multisectoral food and nutrition security program (Phase 2)Agriculture and food securityDec 203110.6Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
December 16, 2021
Effectiveness
Not reported
Closing
December 16, 2031
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 14, 2020
IATI identifier
XI-IATI-EC_INTPA-2020-ACT-D-42529-00
Last changed
October 16, 2026
Support measures for project cycles No. 2Governance and securityDec 20308.9Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
March 25, 2019
Effectiveness
Not reported
Closing
December 25, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 13, 2018
IATI identifier
XI-IATI-EC_INTPA-2018-ACT-D-41635-00
Education to live together - Education to live together (part II)EducationMay 20328.7Not reportedNot reported
Sector
Education
Stage
Under way
Instrument
Not reported
Start
November 12, 2024
Effectiveness
Not reported
Closing
May 2, 2032
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 3, 2024
IATI identifier
XI-IATI-EC_INTPA-2021-ACT-62643
Sustainable agricultural production and responses to malnutritionAgriculture and food securityMar 20308.4Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
September 14, 2022
Effectiveness
Not reported
Closing
March 8, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
September 14, 2022
IATI identifier
XI-IATI-EC_INTPA-2022-ACT-D-44447-00
Pilot program to support emerging civil society initiativesGovernance and securityMay 20307.1Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
May 13, 2021
Effectiveness
Not reported
Closing
May 13, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 14, 2020
IATI identifier
XI-IATI-EC_INTPA-2020-ACT-D-42531-00
Global Climate Change Alliance + (GCCA+) / HaitiEnvironment and disaster riskDec 20296.7Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
December 1, 2020
Effectiveness
Not reported
Closing
December 1, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
6.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
May 21, 2024
IATI identifier
XI-IATI-EC_INTPA-2019-ACT-D-42152-00
Support Measures for the EU-Haiti PartnershipMultisectorJun 20314.0Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
June 23, 2023
Effectiveness
Not reported
Closing
June 23, 2031
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 20, 2022
IATI identifier
XI-IATI-EC_INTPA-2023-ACT-61461
Supervision of works on RN3 St Raphael-DondonTransportFeb 20293.4Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
March 22, 2026
Effectiveness
Not reported
Closing
February 22, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
September 29, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-62613
Support for emergency interventionsTransportJan 20262.82.5Not reported
Sector
Transport
Stage
Closing
Instrument
Not reported
Start
December 5, 2018
Effectiveness
Not reported
Closing
January 5, 2026
Disbursed as of
December 10, 2018
Implementing agency
Not reported
Commitment
2.8
Disbursed
2.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
December 8, 2025
IATI identifier
XI-IATI-EC_INTPA-2018-PCC-401368
URBAYITI - water and sanitationWater and sanitationJan 20271.81.7Not reported
Stage
Under way
Instrument
Not reported
Start
December 13, 2018
Effectiveness
Not reported
Closing
January 1, 2027
Disbursed as of
August 21, 2020
Implementing agency
Not reported
Commitment
1.8
Disbursed
1.7
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 21, 2020
IATI identifier
XI-IATI-EC_INTPA-2018-PCC-398762
Last changed
October 16, 2026
Supervision of works for stormwater managementMultisectorOct 20281.1Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
June 24, 2026
Effectiveness
Not reported
Closing
October 24, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
April 30, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-27379
Addendum No. 1 to the Service contract NDICI RRP INTPA/2025/487-545HumanitarianMar 20300.6Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
June 23, 2026
Effectiveness
Not reported
Closing
March 22, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 12, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-85966
Supervision of works on RN3 and bypasses of HincheTransportJul 20280.4Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
October 1, 2020
Effectiveness
Not reported
Closing
July 1, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
July 23, 2024
IATI identifier
XI-IATI-EC_INTPA-2020-PC-41567
Supervision of works on the customs buildingIndustry, trade and tourismMar 20270.40.2Not reported
Stage
Under way
Instrument
Not reported
Start
January 28, 2016
Effectiveness
Not reported
Closing
March 1, 2027
Disbursed as of
October 11, 2019
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
October 11, 2019
IATI identifier
XI-IATI-EC_INTPA-2015-PCC-357893
Mid-term and final evaluations of the URBAYITI programMultisectorJun 20260.30.2Not reported
Stage
Closing
Instrument
Not reported
Start
June 25, 2021
Effectiveness
Not reported
Closing
June 30, 2026
Disbursed as of
September 6, 2022
Implementing agency
Not reported
Commitment
0.3
Disbursed
0.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
September 6, 2022
IATI identifier
XI-IATI-EC_INTPA-2021-PC-5182
Activity under preparation: Study for the construction of the Tiburon bridgeTransportFeb 20250.2<0.1Not reported
Sector
Transport
Stage
Closing
Instrument
Not reported
Start
February 5, 2024
Effectiveness
Not reported
Closing
February 5, 2025
Disbursed as of
February 21, 2024
Implementing agency
Not reported
Commitment
0.2
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-33264
Activity under preparation: Study for the construction of the Acul bridgeTransportFeb 20250.2<0.1Not reported
Sector
Transport
Stage
Closing
Instrument
Not reported
Start
February 5, 2024
Effectiveness
Not reported
Closing
February 5, 2025
Disbursed as of
February 21, 2024
Implementing agency
Not reported
Commitment
0.2
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
August 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2024-PC-33261
Evaluations of the national transport policy support programTransportSep 20260.20.1Not reported
Sector
Transport
Stage
Closing
Instrument
Not reported
Start
May 10, 2017
Effectiveness
Not reported
Closing
September 10, 2026
Disbursed as of
November 17, 2017
Implementing agency
Not reported
Commitment
0.2
Disbursed
0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
November 17, 2017
IATI identifier
XI-IATI-EC_INTPA-2017-PCC-385109
Verification of expenditures under the AMCC+ programme estimate contractEnvironment and disaster riskApr 20270.1Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
September 4, 2023
Effectiveness
Not reported
Closing
April 4, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 4, 2023
IATI identifier
XI-IATI-EC_INTPA-2023-PC-30924
Verification of expenditures under the grant contractTransportJan 2027<0.1Not reportedNot reported
Sector
Transport
Stage
Under way
Instrument
Not reported
Start
July 21, 2026
Effectiveness
Not reported
Closing
January 8, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
<0.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
July 21, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-83074
Verification of expenditure for programme estimate FED/2024/447-398 - 2025 to 2026UnallocatedMay 2027<0.1Not reportedNot reported
Stage
Under way
Instrument
Not reported
Start
April 28, 2026
Effectiveness
Not reported
Closing
May 31, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
<0.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
April 27, 2026
IATI identifier
XI-IATI-EC_INTPA-2026-PC-75888
Planned operations (10)

10 operations. Approved to date (stock): not reported. Disbursed in FY2025-26 (flow): none.

Table 4.Planned operations, US$ millions

Not published for any operation in this table: commitment, disbursements, undisbursed balance.

Technical assistance service for the AMCC+ programEnvironment and disaster riskJan 20262023Planned
Stage
Planned
Instrument
Not reported
Start
January 1, 2023
Effectiveness
Not reported
Closing
January 1, 2026
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2022-PC-22537
Activity under preparation: PIBEL-EnergieEnvironment and disaster riskJan 20262024Planned
Stage
Planned
Instrument
Not reported
Start
January 1, 2024
Effectiveness
Not reported
Closing
January 1, 2026
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2024-PC-34764
Activity under preparation: Supervision of the archive center worksTransportDec 20252024Planned
Sector
Transport
Stage
Planned
Instrument
Not reported
Start
December 15, 2024
Effectiveness
Not reported
Closing
December 15, 2025
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2024-PC-37816
Activity under preparation: Implementation of a continuing training planTransportDec 20262024Planned
Sector
Transport
Stage
Planned
Instrument
Not reported
Start
December 15, 2024
Effectiveness
Not reported
Closing
December 15, 2026
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2024-PC-37817
PMRS C1, local organizations with communitiesSocial protectionAug 20262026Planned
Stage
Planned
Instrument
Not reported
Start
August 3, 2026
Effectiveness
Not reported
Closing
August 3, 2026
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2026-PC-62143
Technical support to the Franco-Haitian Chamber of Commerce and IndustryMultisectorMay 20262026Planned
Stage
Planned
Instrument
Not reported
Start
May 18, 2026
Effectiveness
Not reported
Closing
May 18, 2026
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2026-PC-82524
Activity under preparation: PMRS C2 - community nexus fundSocial protectionSep 20302026Planned
Stage
Planned
Instrument
Not reported
Start
September 1, 2026
Effectiveness
Not reported
Closing
September 1, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2026-PC-85185
Activity under preparation: PMRS C3 - restart of basic servicesSocial protectionSep 20302026Planned
Stage
Planned
Instrument
Not reported
Start
September 1, 2026
Effectiveness
Not reported
Closing
September 1, 2030
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2026-PC-86388
PAPJAZZ GREEN, awareness days, eco-responsible festivalGovernance and securityFeb 20272026Planned
Stage
Planned
Instrument
Not reported
Start
August 31, 2026
Effectiveness
Not reported
Closing
February 27, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2026-PC-89345
Management of obstetric emergencies through an operating theaterGovernance and securityFeb 20272026Planned
Stage
Planned
Instrument
Not reported
Start
August 31, 2026
Effectiveness
Not reported
Closing
February 28, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2026-PC-89453
Closed and stopped operations (21)

21 operations. Approved to date (stock): US$22.2 million, reported for 15 of 21. Disbursed in FY2025-26 (flow): US$0.3 million, reported for 6 of 21.

Table 5.Closed and stopped operations, US$ millions

Not published for any operation in this table: undisbursed balance.

Sustainable agriculture and school feeding in Grande AnseAgriculture and food securityJul 20252022Closed11.811.3
Stage
Closed
Instrument
Not reported
Start
February 1, 2022
Effectiveness
Not reported
Closing
July 14, 2025
Disbursed as of
June 4, 2025
Implementing agency
Not reported
Commitment
11.8
Disbursed
11.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 4, 2025
IATI identifier
XI-IATI-EC_INTPA-2021-PCC-431021
Supervision and control of works on the Lascahobas Belladère roadTransportFeb 20182012Closed5.15.3
Sector
Transport
Stage
ClosedRecorded as active; the closing date passed on February 1, 2018 and the last transaction is dated November 8, 2018.
Instrument
Not reported
Start
November 19, 2012
Effectiveness
Not reported
Closing
February 1, 2018
Disbursed as of
February 21, 2018
Implementing agency
Not reported
Commitment
5.1
Disbursed
5.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
November 8, 2018
IATI identifier
XI-IATI-EC_INTPA-2012-PCC-298032
Construction works for the Ouanaminthe Customs HouseGovernance and securityJan 20202018Closed3.60.6
Stage
ClosedRecorded as active; the closing date passed on January 29, 2020 and the last transaction is dated February 26, 2019.
Instrument
Not reported
Start
June 14, 2018
Effectiveness
Not reported
Closing
January 29, 2020
Disbursed as of
February 26, 2019
Implementing agency
Not reported
Commitment
3.6
Disbursed
0.6
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
February 26, 2019
IATI identifier
XI-IATI-EC_INTPA-2017-PCC-382278
Operating grant to BON n.8 - fiscal year 2023/24MultisectorSep 20242023Closed0.60.7
Stage
Closed
Instrument
Not reported
Start
October 1, 2023
Effectiveness
Not reported
Closing
September 30, 2024
Disbursed as of
November 24, 2025
Implementing agency
Not reported
Commitment
0.6
Disbursed
0.7
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 24, 2025
IATI identifier
XI-IATI-EC_INTPA-2023-PC-26712
Together for women IIGovernance and securityDec 20242023Closed0.40.4
Stage
Closed
Instrument
Not reported
Start
January 1, 2023
Effectiveness
Not reported
Closing
December 31, 2024
Disbursed as of
August 22, 2025
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 17, 2025
IATI identifier
XI-IATI-EC_INTPA-2022-PC-22661
Legal and social intervention for detainees in pretrial detentionGovernance and securityNov 20252023Closed0.40.4
Stage
Closed
Instrument
Not reported
Start
January 15, 2023
Effectiveness
Not reported
Closing
November 13, 2025
Disbursed as of
February 9, 2026
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
March 18, 2026
IATI identifier
XI-IATI-EC_INTPA-2022-PC-24131
Technical support on the launch of the new Multi-sector ProgramMultisectorSep 20252025Closed<0.1<0.1
Stage
Closed
Instrument
Not reported
Start
May 30, 2025
Effectiveness
Not reported
Closing
September 28, 2025
Disbursed as of
November 28, 2025
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 28, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-57254
Road Safety Audit RN3 Hinche - Barrière BattantTransportMar 20262025Closed<0.1<0.1
Sector
Transport
Stage
Closed
Instrument
Not reported
Start
November 22, 2025
Effectiveness
Not reported
Closing
March 21, 2026
Disbursed as of
May 13, 2026
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
May 13, 2026
IATI identifier
XI-IATI-EC_INTPA-2025-PC-63682
Awareness days on protection, eco-responsible PaPJazzEnvironment and disaster riskFeb 20242024Closed<0.1<0.1
Stage
Closed
Instrument
Not reported
Start
January 26, 2024
Effectiveness
Not reported
Closing
February 9, 2024
Disbursed as of
March 15, 2024
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
May 28, 2024
IATI identifier
XI-IATI-EC_INTPA-2024-PC-36827
AT formulation ''Governance and steering in the DDE NE ''MultisectorAug 20252024Closed<0.1<0.1
Stage
Closed
Instrument
Not reported
Start
November 17, 2024
Effectiveness
Not reported
Closing
August 1, 2025
Disbursed as of
October 8, 2025
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
October 8, 2025
IATI identifier
XI-IATI-EC_INTPA-2024-PC-38518
Surveys and interviews for the formulation of the Haut Plateau Central projectAgriculture and food securityFeb 20242023Closed<0.1<0.1
Stage
Closed
Instrument
Not reported
Start
November 30, 2023
Effectiveness
Not reported
Closing
February 15, 2024
Disbursed as of
April 10, 2024
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
May 21, 2024
IATI identifier
XI-IATI-EC_INTPA-2023-PC-32176
Support for formulating the Resilient and Productive Territories programMultisectorJul 20242024Closed<0.1<0.1
Stage
Closed
Instrument
Not reported
Start
May 21, 2024
Effectiveness
Not reported
Closing
July 21, 2024
Disbursed as of
July 26, 2024
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
July 26, 2024
IATI identifier
XI-IATI-EC_INTPA-2024-PC-41148
Development of the legal framework for the creation of a TVET center in CODEVIEducationSep 20252025Closed<0.1<0.1
Sector
Education
Stage
Closed
Instrument
Not reported
Start
June 28, 2025
Effectiveness
Not reported
Closing
September 16, 2025
Disbursed as of
November 14, 2025
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 14, 2025
IATI identifier
XI-IATI-EC_INTPA-2025-PC-59643
Technical commitment to pay late-payment interest on the prefinancingMultisectorJun 20242024Closed<0.1<0.1
Stage
Closed
Instrument
Not reported
Start
May 29, 2024
Effectiveness
Not reported
Closing
June 29, 2024
Disbursed as of
May 29, 2024
Implementing agency
Not reported
Commitment
<0.1
Disbursed
<0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
May 29, 2024
IATI identifier
XI-IATI-EC_INTPA-2024-PC-41301
Empower rural women in Pichon for resilient agricultureEnvironment and disaster riskDec 20232023Closed−0.0Not reported
Stage
Closed
Instrument
Not reported
Start
December 2, 2023
Effectiveness
Not reported
Closing
December 2, 2023
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
−0.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Last transaction
March 25, 2024
IATI identifier
XI-IATI-EC_INTPA-2023-PC-34791
Prevention, surveillance and response to cholera and durable solutionsHumanitarianOct 20172014ClosedNot reportedNot reported
Stage
ClosedRecorded as active; the closing date passed on October 31, 2017 and no transaction is recorded.
Instrument
Not reported
Start
May 8, 2014
Effectiveness
Not reported
Closing
October 31, 2017
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2014-ACT-D-37425-00
ECHO/-CR/EDF/2015/01000 - Responding El Niño effects in the CaribbeanHumanitarianDec 20202015ClosedNot reportedNot reported
Stage
ClosedRecorded as active; the closing date passed on December 30, 2020 and no transaction is recorded.
Instrument
Not reported
Start
December 4, 2015
Effectiveness
Not reported
Closing
December 30, 2020
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2015-ACT-D-38852-00
ECHO/-CR/EDF/2015/01000 - Responding El Niño effects in the CaribbeanHumanitarianDec 20202015ClosedNot reportedNot reported
Stage
ClosedRecorded as active; the closing date passed on December 30, 2020 and no transaction is recorded.
Instrument
Not reported
Start
December 4, 2015
Effectiveness
Not reported
Closing
December 30, 2020
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2015-ACT-D-38852-01
ECHO/-CR/EDF/2017/01000 - Responding to Hurricane MatthewHumanitarianJun 20222017ClosedNot reportedNot reported
Stage
ClosedRecorded as active; the closing date passed on June 30, 2022 and no transaction is recorded.
Instrument
Not reported
Start
January 25, 2017
Effectiveness
Not reported
Closing
June 30, 2022
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2017-ACT-D-40180-00
Works and supplies contract for the archiving centerTransportDec 20242024ClosedNot reportedNot reported
Sector
Transport
Stage
Closed
Instrument
Not reported
Start
December 15, 2024
Effectiveness
Not reported
Closing
December 15, 2024
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2024-PC-37815
Purchase of equipment for patching (point-à-temps)TransportApr 20252024ClosedNot reportedNot reported
Sector
Transport
Stage
Closed
Instrument
Not reported
Start
December 22, 2024
Effectiveness
Not reported
Closing
April 22, 2025
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI identifier
XI-IATI-EC_INTPA-2024-PC-37818

Active operations by sector

Not published for any operation in this table: undisbursed balance.

Table 6.Active operations by sector, US$ millions

Portfolio of active operations at October 18, 2026
SectorActive operationsApprovedUS$ millionsDisbursed to dateUS$ millions
Transport14421.46.3
Budget support and debt3336.3105.4
Multisector15148.618.6
Agriculture and food security12124.428.5
Governance and security1372.218.7
Education861.111.6
Social protection220.72.0
Environment and disaster risk613.05.7
Water and sanitation11.81.7
Humanitarian21.70.4
Industry, trade and tourism10.40.2
Unallocated1<0.1Not reported
All active operations781,201.5199.1

Flows through European Commission - Directorate-General for International Partnerships, FY2025-26, US$ millions

No funding flows through European Commission - Directorate-General for International Partnerships are reported for FY2025-26.

Sources

Data as of October 18, 2026
SourceRead on
Exchange rates (Federal Reserve, IMF)October 18, 2026
IATIOctober 18, 2026
IATIOctober 18, 2026
Public investment programOctober 18, 2026
Cite this page

HaitiDocs. European Commission - Directorate-General for International Partnerships. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/partners/european-union/european-commission-directorate-general-for-international-partnerships