17 active operations of funding partners. US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Browse this sector's operations
New commitments in FY2025-26
Approved or obligated, net of reductions; 2 of the 9 funding partners on record report them
Active portfolio at October 18, 2026
9 of 17 active operations report an approved amount
Portfolio at October 18, 2026
A position at the data date: approved is every commitment to date on the operations, cancellations deducted; disbursed to date and undisbursed are as each partner publishes them.
Table 1.Portfolio of active operations at October 18, 2026, US$ millions
| Operations | ApprovedUS$ millions | Disbursed to dateUS$ millions | Undisbursed | |
|---|---|---|---|---|
| Active operations | 17 | 6.69 of 17 reported | 14.212 of 17 reported | Not reported |
Active operations by partner
Table 2.Active unallocated operations by funding partner, US$ millions
| Portfolio of active operations at October 18, 2026 | ||||
|---|---|---|---|---|
| Partner | Active operations | ApprovedUS$ millions | Disbursed to dateUS$ millions | Undisbursed |
| France | 4 | 3.23 of 4 reported | 3.43 of 4 reported | Not reported |
| United States | 4 | 2.8 | 2.9 | Not reported |
| Sweden | 1 | 0.6 | 0.6 | Not reported |
| European Union | 1 | <0.1 | Not reported | Not reported |
| UN agencies' core resources | 1 | Not reported | 0.3 | Not reported |
| UN pooled funds | 3 | Not reported | 7.0 | Not reported |
| Switzerland | 3 | Not reported | Not reported | Not reported |
| All funding partners | 17 | 6.6 | 14.2 | Not reported |
UN agency spending
Money UN agencies spend in Haiti. Most of it comes from the funding partners above, so it is not added to them. Incomplete data: the agency's latest disbursement is dated more than six months before the data date, or its IATI disbursements in 2025 are below half the humanitarian funding OCHA FTS records it received that year. Its figures are then the sums of what it reports.
Table 3.UN agencies, unallocated, US$ millions
| Agency | Disbursed FY2025-26US$ millions | Disbursed FY2026-27to Oct 18US$ millions |
|---|---|---|
| World Food Programmedata to September 2026 | 18.8 | None to date |
| United Nations Development Programmedata to October 2026 | 3.4 | <0.1 |
| International Organization for Migration (IOM)data to March 2026incomplete data | 0.2incomplete data | None to date |
| United Nations Office for Project Servicesdata to November 2025incomplete data | 0.1incomplete data | None to date |
| UN agencies, sum of those reporting | 22.5incomplete data for 2 of 4 agencies | <0.1 |
New commitments and disbursements, FY2016-17 to FY2025-26
Sums of the funding partners that report each year, out of 9. A blank cell: nothing recorded for the partner that year.
Table 4.Disbursements for unallocated by funding partner, US$ millions
| Partner | FY2016-17US$ millions | FY2017-18US$ millions | FY2018-19US$ millions | FY2019-20US$ millions | FY2020-21US$ millions | FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | Ten years |
|---|---|---|---|---|---|---|---|---|---|---|---|
| France | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | 0.7 | 0.3 | 2.4 | |
| United States | 1.6 | 1.9 | 0.2 | 1.2 | 2.2 | 2.9 | 5.4 | 5.2 | 4.9 | 1.8 | |
| UN agencies' core resources | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | 0.3 | |
| European Union | <0.1 | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | |
| Ireland | Not reported | <0.1 | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | |
| Sweden | Not reported | 0.4 | Not reported | Not reported | Not reported | Not reported | Not reported | 0.4 | 0.2 | Not reported | |
| Switzerland | Not reported | Not reported | 0.1 | 0.3 | 0.4 | 0.4 | <0.1 | Not reported | Not reported | Not reported | |
| UN pooled funds | Not reported | Not reported | Not reported | Not reported | Not reported | 1.2 | 5.8 | Not reported | Not reported | Not reported | |
| Sum of partners reporting | 1.6 | 2.3 | 0.3 | 1.4 | 2.6 | 4.5 | 11.2 | 6.3 | 5.4 | 4.5 | |
| Partners reporting, of 9 on record | 2 | 3 | 2 | 2 | 2 | 3 | 3 | 3 | 3 | 3 |
New commitments by partnerFY2016-17 to FY2025-26
Table 5.New commitments for unallocated by funding partner, US$ millions
| Partner | FY2016-17US$ millions | FY2017-18US$ millions | FY2018-19US$ millions | FY2019-20US$ millions | FY2020-21US$ millions | FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | Ten years |
|---|---|---|---|---|---|---|---|---|---|---|---|
| United States | 1.6 | 0.2 | 5.7 | 0.4 | 0.9 | 2.9 | 7.2 | 6.3 | 0.6 | 2.2 | |
| European Union | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | <0.1 | |
| France | Not reported | Not reported | Not reported | Not reported | Not reported | 0.3 | 2.8 | Not reported | Not reported | Not reported | |
| Sweden | 0.6 | Not reported | Not reported | Not reported | Not reported | Not reported | 0.6 | Not reported | Not reported | Not reported | |
| Switzerland | Not reported | Not reported | 1.3 | 0.8 | Not reported | 0.2 | Not reported | Not reported | Not reported | Not reported | |
| Sum of partners reporting | 2.1 | 0.2 | 7.0 | 1.2 | 0.9 | 3.4 | 10.6 | 6.3 | 0.6 | 2.2 | |
| Partners reporting, of 9 on record | 2 | 1 | 2 | 2 | 1 | 3 | 3 | 1 | 1 | 2 |
Operations
Active operations (45)
45 operations, 17 of them of funding partners. Funding partners, approved to date (stock): US$6.6 million, reported for 9 of 17. Disbursed in FY2025-26 (flow): US$2.8 million, reported for 5 of 17.
Table 6.Active operations, largest commitment first, US$ millions
Not published for any operation in this table: undisbursed balance.
Protection and Assistance to Vulnerable Haitian Women and Children MigrantsMar 20277.53.1
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- March 30, 2023
- Effectiveness
- Not reported
- Closing
- March 29, 2027
- Disbursed as of
- December 31, 2024
- Implementing agency
- Not reported
- Commitment
- 7.5
- Disbursed
- 3.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
IATI - Last transaction
- December 31, 2024
- IATI identifier
Community projectDec 20265.44.9
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- April 1, 2017
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- September 30, 2026
- Implementing agency
- Not reported
- Commitment
- 5.4
- Disbursed
- 4.9
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
- Last changed
- October 8, 2026
Support to the CCI sector (Cultural and Creative Industries)Oct 20262.42.7
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- June 16, 2023
- Effectiveness
- Not reported
- Closing
- October 30, 2026
- Disbursed as of
- December 31, 2025
- Implementing agency
- Not reported
- Commitment
- 2.4
- Disbursed
- 2.7
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- December 31, 2025
- IATI identifier
Procurement support services to offices and overseas field missionsFeb 20262.02.4
- Partner
- United States, USAID
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Haiti share
- 8% of a 27.1 multi-country award
- Start
- June 19, 2019
- Effectiveness
- Not reported
- Closing
- February 18, 2026
- Disbursed as of
- September 30, 2025
- Implementing agency
- Not reported
- Commitment
- 2.0
- Disbursed
- 2.4
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2025
- Operation ID
- 7200AA19M00003
- Last changed
- October 16, 2026
Inclusive economyDec 20261.41.2
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- September 16, 2022
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- October 12, 2026
- Implementing agency
- Not reported
- Commitment
- 1.4
- Disbursed
- 1.2
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- October 12, 2026
- IATI identifier
- Last changed
- October 16, 2026
Phase 2 of comm. assistanceDec 20311.31.3
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- April 1, 2017
- Effectiveness
- Not reported
- Closing
- December 31, 2031
- Disbursed as of
- June 30, 2026
- Implementing agency
- Not reported
- Commitment
- 1.3
- Disbursed
- 1.3
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
PIMS-10212 GEF SGP 8th Operational Phase (Part 1) HAITIOct 20281.1Not reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- October 16, 2024
- Effectiveness
- Not reported
- Closing
- October 16, 2028
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- 1.1
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
Outsourcing of administrative tasks related to the receipt of visa applicationsNov 20261.00.2
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- November 12, 2025
- Effectiveness
- Not reported
- Closing
- November 11, 2026
- Disbursed as of
- March 31, 2026
- Implementing agency
- Not reported
- Commitment
- 1.0
- Disbursed
- 0.2
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- March 31, 2026
- IATI identifier
Accelerator Lab – HaitiDec 20250.80.8
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- June 1, 2020
- Effectiveness
- Not reported
- Closing
- December 31, 2025
- Disbursed as of
- January 31, 2026
- Implementing agency
- Not reported
- Commitment
- 0.8
- Disbursed
- 0.8
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
Delivery of critical governmental functions through specialistsSep 20260.70.5
- Partner
- United States, USAID
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Haiti share
- 2% of a 31.5 multi-country award
- Start
- September 2, 2021
- Effectiveness
- Not reported
- Closing
- September 30, 2026
- Disbursed as of
- June 30, 2026
- Implementing agency
- Not reported
- Commitment
- 0.7
- Disbursed
- 0.5
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- June 30, 2026
- Operation ID
- 720AAD21N00001
- Last changed
- October 16, 2026
Act Church of Sweden CSO agreement 2023-2027Dec 20270.60.6
- Partner
- Sweden
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Haiti share
- 6% of a 10.3 multi-country award
- Start
- March 16, 2023
- Effectiveness
- Not reported
- Closing
- December 31, 2027
- Disbursed as of
- October 28, 2024
- Implementing agency
- Not reported
- Commitment
- 0.6
- Disbursed
- 0.6
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
IATI - Last transaction
- October 28, 2024
- IATI identifier
HTI008N ACJR Hurricane Melissa-HaitiMay 20260.60.5
- Partner
- Care Nederland
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- November 12, 2025
- Effectiveness
- Not reported
- Closing
- May 11, 2026
- Disbursed as of
- December 28, 2025
- Implementing agency
- Not reported
- Commitment
- 0.6
- Disbursed
- 0.5
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
IATI - Last transaction
- December 28, 2025
- IATI identifier
Support for strengthening the national disaster risk management systemDec 20260.50.4
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- January 1, 2025
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- September 30, 2026
- Implementing agency
- Not reported
- Commitment
- 0.5
- Disbursed
- 0.4
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
Support to the CCI sector (Cultural and Creative Industries)Oct 20260.40.4
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- December 1, 2023
- Effectiveness
- Not reported
- Closing
- October 30, 2026
- Disbursed as of
- December 31, 2025
- Implementing agency
- Not reported
- Commitment
- 0.4
- Disbursed
- 0.4
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- December 31, 2025
- IATI identifier
Support to the CCI sector (Cultural and Creative Industries)Oct 20260.30.3
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- January 10, 2024
- Effectiveness
- Not reported
- Closing
- October 30, 2026
- Disbursed as of
- August 31, 2026
- Implementing agency
- Not reported
- Commitment
- 0.3
- Disbursed
- 0.3
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- August 31, 2026
- IATI identifier
PIMS-10051 Haiti - NBSAP and 7th NRNov 20270.30.3
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- May 24, 2024
- Effectiveness
- Not reported
- Closing
- November 24, 2027
- Disbursed as of
- September 30, 2026
- Implementing agency
- Not reported
- Commitment
- 0.3
- Disbursed
- 0.3
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
29 more active operations
PIMS-9878 biodiversity finance plan HaitiFeb 20280.30.3
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- March 4, 2024
- Effectiveness
- Not reported
- Closing
- February 28, 2028
- Disbursed as of
- September 30, 2026
- Implementing agency
- Not reported
- Commitment
- 0.3
- Disbursed
- 0.3
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
Hydrochlorofluorocarbon phase-out plan (Phase II)Dec 20270.2<0.1
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- January 1, 2025
- Effectiveness
- Not reported
- Closing
- December 31, 2027
- Disbursed as of
- October 12, 2026
- Implementing agency
- Not reported
- Commitment
- 0.2
- Disbursed
- <0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- October 12, 2026
- IATI identifier
- Last changed
- October 16, 2026
Reopening of airport and restoration of trade infrastructureDec 20250.10.1
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- December 1, 2024
- Effectiveness
- Not reported
- Closing
- December 31, 2025
- Disbursed as of
- January 31, 2025
- Implementing agency
- Not reported
- Commitment
- 0.1
- Disbursed
- 0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
Preparing and promoting stabilization programmeFeb 20260.10.1
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- December 1, 2024
- Effectiveness
- Not reported
- Closing
- February 28, 2026
- Disbursed as of
- June 30, 2025
- Implementing agency
- Not reported
- Commitment
- 0.1
- Disbursed
- 0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
Environmental Support Services Contract (ESSE II)Sep 2029<0.1<0.1
- Partner
- United States, USAID
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Haiti share
- 1% of a 7.1 multi-country award
- Start
- September 12, 2024
- Effectiveness
- Not reported
- Closing
- September 11, 2029
- Disbursed as of
- April 30, 2025
- Implementing agency
- Not reported
- Commitment
- <0.1
- Disbursed
- <0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- April 30, 2025
- Operation ID
- 7200AA24M00015
- Last changed
- October 16, 2026
Verification of expenditure for programme estimate FED/2024/447-398 - 2025 to 2026May 2027<0.1Not reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- April 28, 2026
- Effectiveness
- Not reported
- Closing
- May 31, 2027
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- <0.1
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
IATI - Last transaction
- April 27, 2026
- IATI identifier
Monitoring, Evaluation, and Learning Services Activity (MEL Services Actvitiy)Dec 2027<0.1<0.1
- Partner
- United States, USAID
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Haiti share
- 0% of a 14.1 multi-country award
- Start
- December 5, 2022
- Effectiveness
- Not reported
- Closing
- December 4, 2027
- Disbursed as of
- June 30, 2025
- Implementing agency
- Not reported
- Commitment
- <0.1
- Disbursed
- <0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- June 30, 2025
- Operation ID
- 72065623C00002
- Last changed
- October 16, 2026
Support to Haiti ElectionNot reportedNot reported0.1
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- October 1, 2025
- Effectiveness
- Not reported
- Closing
- Not reported
- Disbursed as of
- October 1, 2025
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- 0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- October 1, 2025
- IATI identifier
Support for the evaluation of the SAQNot reportedNot reported<0.1
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- November 19, 2025
- Effectiveness
- Not reported
- Closing
- Not reported
- Disbursed as of
- November 19, 2025
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- <0.1
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- November 19, 2025
- IATI identifier
Programme contributions to Swiss NGOsNot reportedNot reportedNot reported
- Sector
- Unallocated
- Stage
- Approved
- Instrument
- Not reported
- Approval
- Not reported
- Effectiveness
- Not reported
- Closing
- Not reported
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
- Last changed
- October 9, 2026
Personal and administrative costsNot reportedNot reportedNot reported
- Sector
- Unallocated
- Stage
- Approved
- Instrument
- Not reported
- Approval
- Not reported
- Effectiveness
- Not reported
- Closing
- Not reported
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
- Last changed
- October 9, 2026
Personal and administrative costsNot reportedNot reportedNot reported
- Sector
- Unallocated
- Stage
- Approved
- Instrument
- Not reported
- Approval
- Not reported
- Effectiveness
- Not reported
- Closing
- Not reported
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
- Last changed
- October 9, 2026
Support to the CCI sector (Cultural and Creative Industries)Oct 2026Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- September 1, 2022
- Effectiveness
- Not reported
- Closing
- October 30, 2026
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
Community assistanceDec 2031Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- April 1, 2017
- Effectiveness
- Not reported
- Closing
- December 31, 2031
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- Partner documents
IATI record (d-portal) - IATI identifier
Accelerator Lab HaitiDec 2025Not reportedNot reported
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- June 1, 2020
- Effectiveness
- Not reported
- Closing
- December 31, 2025
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
National Dialogue for an inclusive economyDec 2026Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- September 16, 2022
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- Partner documents
IATI record (d-portal) - IATI identifier
PIMS-9878 biodiversity finance plan HaitiFeb 2028Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- March 4, 2024
- Effectiveness
- Not reported
- Closing
- February 28, 2028
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- Partner documents
IATI record (d-portal) - IATI identifier
PIMS-10051 Haiti - NBSAP and 7th NRNov 2027Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- May 24, 2024
- Effectiveness
- Not reported
- Closing
- November 24, 2027
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
Reopening of airport and restoration of trade infrastructureDec 2025Not reportedNot reported
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- December 1, 2024
- Effectiveness
- Not reported
- Closing
- December 31, 2025
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
Preparing and promoting stabilization programmeFeb 2026Not reportedNot reported
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- December 1, 2024
- Effectiveness
- Not reported
- Closing
- February 28, 2026
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
PIMS-10212 GEF SGP 8th Operational Phase (Part 1) HAITIOct 2028Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- October 16, 2024
- Effectiveness
- Not reported
- Closing
- October 16, 2028
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- Partner documents
IATI record (d-portal) - IATI identifier
Support for strengthening the national disaster risk management systemDec 2026Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- January 1, 2025
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
Hydrochlorofluorocarbon phase-out plan (Phase II)Dec 2027Not reportedNot reported
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- January 1, 2025
- Effectiveness
- Not reported
- Closing
- December 31, 2027
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
Setting up nutrition-sensitive safety netsDec 2028Not reported44.5
- Partner
- United Nations, World Food Programme
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Start
- January 1, 2024
- Effectiveness
- Not reported
- Closing
- December 31, 2028
- Disbursed as of
- September 30, 2026
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- 44.5
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- September 30, 2026
- IATI identifier
- Last changed
- October 8, 2026
The Operation of a Visa Application CentreNov 2025Not reportedNot reported
- Sector
- Unallocated
- Stage
- Closing
- Instrument
- Not reported
- Start
- November 13, 2020
- Effectiveness
- Not reported
- Closing
- November 12, 2025
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Commitment
- Not reported
- Disbursed
- Not reported
- Undisbursed
- Not reported
- Records at the source
- IATI record (d-portal)
- IATI identifier
Setting up nutrition-sensitive safety netsDec 2028Not reported0.3
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Approval
- January 1, 2024
- Effectiveness
- Not reported
- Closing
- December 31, 2028
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- March 31, 2026
- Operation ID
- core:IATI:XM-DAC-41140-HT03.01.022.URT1
Inclusive economyDec 2026Not reported1.9
- Partner
- UN pooled funds, Peacebuilding Fund
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Approval
- September 16, 2022
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- December 31, 2022
- Operation ID
- pooled:peacebuilding-fund:IATI:XM-DAC-41114-OUTPUT-00129460
Phase 2 of comm. assistanceDec 2031Not reported0.1
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Approval
- April 1, 2017
- Effectiveness
- Not reported
- Closing
- December 31, 2031
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- December 31, 2021
- Operation ID
- pooled:un-multi-partner-trust-funds:IATI:XM-DAC-41114-OUTPUT-00116969
Community projectDec 2026Not reported5.0
- Sector
- Unallocated
- Stage
- Under way
- Instrument
- Not reported
- Approval
- April 1, 2017
- Effectiveness
- Not reported
- Closing
- December 31, 2026
- Disbursed as of
- Not reported
- Implementing agency
- Not reported
- Records at the source
- IATI record (d-portal)
- Last transaction
- December 31, 2022
- Operation ID
- pooled:un-multi-partner-trust-funds:IATI:XM-DAC-41114-OUTPUT-00127577
Closed and stopped operations (157)
157 operations, 125 of them of funding partners. Funding partners, approved to date (stock): US$103.5 million, reported for 109 of 125. Disbursed in FY2025-26 (flow): US$1.6 million, reported for 1 of 125.
Sources
- OCHA FTS: terms of use set by the publisher
- Partner documents: terms of use set by the publisher
- IATI: terms of use set by the publisher
- IATI: terms of use set by the publisher
- USAspending: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| fts:2021:summary_gap | October 18, 2026 |
| Exchange rates (Federal Reserve, IMF) | October 18, 2026 |
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| USAspending | October 18, 2026 |
| OCHA FTS, 2010 to 2026 | October 18, 2026 |
Cite this page
HaitiDocs. Unallocated. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/sectors/unallocated