World Bank Group

Multilateral development bank. 22 active operations. US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

New commitments in FY2025-26

US$134.3 million

On 7 operations

Disbursed in FY2025-26

US$173.3 million

On 21 operations

Active portfolio at October 18, 2026

US$1,307.1 million

21 of 22 active operations report an approved amount

New commitments and disbursements, FY2016-17 to FY2025-26

New commitments, US$ millions
FY2016-17, US$209.5 million21016-17FY2017-18, US$153.9 million15417-18FY2018-19, US$158.2 million15818-19FY2019-20, US$177.0 million17719-20FY2020-21, US$238.0 million23820-21FY2021-22, US$397.0 million39721-22FY2022-23, US$135.5 million13522-23FY2023-24, US$−3.9 million-423-24FY2024-25, US$169.3 million16924-25FY2025-26, US$134.3 million13425-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$209.5 million21016-17FY2017-18, US$153.9 million15417-18FY2018-19, US$158.2 million15818-19FY2019-20, US$177.0 million17719-20FY2020-21, US$238.0 million23820-21FY2021-22, US$397.0 million39721-22FY2022-23, US$135.5 million13522-23FY2023-24, US$−3.9 million-423-24FY2024-25, US$169.3 million16924-25FY2025-26, US$134.3 million13425-26FY2026-27, none (to Oct 18)noneto Oct 1826-27
Disbursements, US$ millions
FY2016-17, US$66.9 million6716-17FY2017-18, US$84.9 million8517-18FY2018-19, US$100.0 million10018-19FY2019-20, US$146.3 million14619-20FY2020-21, US$145.2 million14520-21FY2021-22, US$114.4 million11421-22FY2022-23, US$89.5 million8922-23FY2023-24, US$168.7 million16923-24FY2024-25, US$173.9 million17424-25FY2025-26, US$173.3 million17325-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$66.9 million6716-17FY2017-18, US$84.9 million8517-18FY2018-19, US$100.0 million10018-19FY2019-20, US$146.3 million14619-20FY2020-21, US$145.2 million14520-21FY2021-22, US$114.4 million11421-22FY2022-23, US$89.5 million8922-23FY2023-24, US$168.7 million16923-24FY2024-25, US$173.9 million17424-25FY2025-26, US$173.3 million17325-26FY2026-27, none (to Oct 18)noneto Oct 1826-27

Table 1.New commitments and disbursements by fiscal year (flows), US$ millions

FY2016-17US$ millionsFY2017-18US$ millionsFY2018-19US$ millionsFY2019-20US$ millionsFY2020-21US$ millionsFY2021-22US$ millionsFY2022-23US$ millionsFY2023-24US$ millionsFY2024-25US$ millionsFY2025-26US$ millionsFY2026-27to Oct 18US$ millions
New commitments209.5153.9158.2177.0238.0397.0135.5−3.9169.3134.3None to date
Operations1110913713651470
Disbursements66.984.9100.0146.3145.2114.489.5168.7173.9173.3None to date
Operations131316282323202021210

All operations since 1962: commitments US$3,743.0 million, disbursements US$2,602.7 million, reported for 138 and 117 of 186 operations.

Portfolio at October 18, 2026

A position at the data date: approved is every commitment to date on the operations, cancellations deducted; disbursed to date and undisbursed are as each partner publishes them.

Table 2.Portfolio of active operations at October 18, 2026, US$ millions

OperationsApprovedUS$ millionsDisbursed to dateUS$ millionsUndisbursed
Active operations221,307.121 of 22 reported558.717 of 22 reportedNo total630.6, 14 of 22 ops

Agencies

Each agency name opens its page.

Table 3.World Bank Group by agency, US$ millions

AgencyActive operationsUndisbursed, activeDisbursed FY2025-26US$ millionsDisbursed FY2026-27to Oct 18US$ millions
IDA21No total543.5, 11 of 21 ops139.9None to date
World Bank9No total87.2, 3 of 9 ops33.4None to date
IFC2Not reportedNot reportedNone to date
All agencies, sum of those reporting22No total630.6, 14 of 22 ops173.3None to date
Other agencies1 agency
AgencyActive operationsUndisbursed, activeDisbursed FY2025-26Disbursed FY2026-27to Oct 18
World Bank trust funds0Not reportedNot reportedNone to date

Funds passed through UN agencies

The UN agencies below report receiving these amounts from World Bank Group for Haiti. The amounts are already counted in the World Bank Group figures above and are not added to them. Each agency's figure is the one it publishes: the amount received, or the amount committed where it publishes no receipt. It can differ from the payments to the agency in World Bank Group records.

Table 4.World Bank Group funds received by UN agencies, US$ millions

AgencyFY2025-26US$ millionsFY2026-27to Oct 18US$ millionsSince 2020US$ millions
World Food Programme−0.1None to date3.0
UNICEFNot reportedNone to date1.5
International Organization for Migration (IOM)Not reportedNone to date0.0

Operations

Active operations (32)

32 operations. Approved to date (stock): US$1,307.1 million, reported for 21 of 22. Disbursed in FY2025-26 (flow): US$168.6 million, reported for 15 of 22. 10 operations counted with their parent operation.

Table 5.Active operations, largest undisbursed balance first, US$ millionsAn operation marked “counted with” is an additional financing whose source books its money under the parent operation: its amounts are in the parent’s row and in the totals once.

Emergency Resilient Agriculture for Food Security ProjectIDA, Agriculture and food securityJan 2029202.0115.283.947.4
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 17, 2022
Effectiveness
May 12, 2022
Closing
January 31, 2029
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
202.0
Disbursed
115.2
Undisbursed
83.9
Undisbursed gap
2.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P177072
Last changed
October 9, 2026
Resilient Corridors ProjectIDA, TransportJan 203280.01.078.51.0
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 12, 2025
Effectiveness
February 2, 2026
Closing
January 30, 2032
Disbursed as of
September 30, 2026
Implementing agency
Central Execution Unit,Ministry of Public Works, Transport and Communication
Commitment
80.0
Disbursed
1.0
Undisbursed
78.5
Undisbursed gap
0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
November 30, 2025
Operation ID
P510851
Caribbean Regional Air Transport Connectivity Project - HaitiIDA, TransportDec 202796.024.471.111.2
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 28, 2020
Effectiveness
August 27, 2020
Closing
December 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Central Execution Unit of the Ministry of Public Works (UCE)
Commitment
96.0
Disbursed
24.4
Undisbursed
71.1
Undisbursed gap
0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P170907
Last changed
October 9, 2026
Resilient connectivity and Urban Transport Accessibility ProjectIDA, TransportMay 2028120.051.666.124.0
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 26, 2022
Effectiveness
August 25, 2022
Closing
May 31, 2028
Disbursed as of
September 30, 2026
Implementing agency
Unite Centrale d'execution of Ministry of Transport, Public works and Communications
Commitment
120.0
Disbursed
51.6
Undisbursed
66.1
Undisbursed gap
2.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P177210
Promoting a more Equitable, Sustainable and Safer EducationWorld Bank, EducationJun 2028165.684.161.816.6
Sector
Education
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
June 25, 2021
Effectiveness
November 2, 2021
Closing
June 15, 2028
Disbursed as of
September 30, 2026
Implementing agency
Ministry of National Education and Professional Training
Commitment
165.6
Disbursed
84.1
Undisbursed
61.8
Undisbursed gap
19.7: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P174707
Last changed
October 9, 2026
Haiti Strengthening Public Financial Management ProjectIDA, Governance and securityFeb 203060.02.060.71.0
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 4, 2025
Effectiveness
June 18, 2025
Closing
February 28, 2030
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
60.0
Disbursed
2.0
Undisbursed
60.7
Undisbursed gap
−2.7: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P180384
Decentralized Sustainable and Resilient Rural Water and Sanitation ProjectIDA, Water and sanitationJun 202980.026.354.17.6
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 17, 2023
Effectiveness
July 10, 2023
Closing
June 29, 2029
Disbursed as of
September 30, 2026
Implementing agency
DINEPA
Commitment
80.0
Disbursed
26.3
Undisbursed
54.1
Undisbursed gap
−0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P178188
Resilient Productive Landscapes IIIDA, Agriculture and food securityDec 202950.04.647.64.6
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 28, 2025
Effectiveness
September 16, 2025
Closing
December 28, 2029
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Agriculture, Natural Resources, and Rural Development (MARNDR),Ministry of Environment
Commitment
50.0
Disbursed
4.6
Undisbursed
47.6
Undisbursed gap
−2.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P504222
Adaptive Social Protection for Increased Resilience ProjectIDA, Social protectionFeb 2029100.068.027.29.5
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 9, 2021
Effectiveness
April 21, 2021
Closing
February 28, 2029
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Social Affairs and Labor
Commitment
100.0
Disbursed
68.0
Undisbursed
27.2
Undisbursed gap
4.7: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P174111
Cap Haitien Urban Development ProjectIDA, Governance and securityMar 202756.028.326.811.0
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 6, 2020
Effectiveness
April 23, 2020
Closing
March 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Works, Transport and Communications
Commitment
56.0
Disbursed
28.3
Undisbursed
26.8
Undisbursed gap
0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P168951
Private Sector Jobs and Economic Transformation (PSJET)IDA, Finance and private sectorMay 202751.425.323.54.8
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 28, 2021
Effectiveness
December 15, 2021
Closing
May 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Ministry of the Economy and Finance
Commitment
51.4
Disbursed
25.3
Undisbursed
23.5
Undisbursed gap
2.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P173743
Last changed
October 9, 2026
Strengthening Primary Health Care and SurveillanceWorld Bank, HealthDec 202690.061.213.08.1
Sector
Health
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
May 16, 2019
Effectiveness
August 28, 2019
Closing
December 31, 2026
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Health and Population,Project Management Unit
Commitment
90.0
Disbursed
61.2
Undisbursed
13.0
Undisbursed gap
15.9: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P167512
Last changed
October 9, 2026
Renewable Energy for AllWorld Bank, EnergyJun 202750.112.312.38.4
Sector
Energy
Stage
Under way
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
October 25, 2017
Effectiveness
July 23, 2018
Closing
June 30, 2027
Disbursed as of
September 30, 2026
Implementing agency
MTPTC Energy Cell,Ministry of Public Works, Transportation and Communication
Commitment
50.1
Disbursed
12.3
Undisbursed
12.3
Undisbursed gap
25.4: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P156719
Strengthening DRM and Climate Resilience ProjectIDA, Governance and securityMar 202750.545.83.912.7
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 16, 2019
Effectiveness
August 7, 2019
Closing
March 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Interior and Territorial Communities
Commitment
50.5
Disbursed
45.8
Undisbursed
3.9
Undisbursed gap
0.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P165870
Promoting a more Equitable, Sustainable and Safer EducationIDA, EducationJun 2028Counted with P174707Counted with P174707Counted with P174707Not reported
Sector
Education
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 7, 2022
Effectiveness
May 19, 2022
Closing
June 15, 2028
Disbursed as of
Not reported
Implementing agency
Ministère de l’Education et Formation Professionnelle; MENFP
Commitment
90.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P176406
Promoting a more Equitable, Sustainable and Safer EducationIDA, EducationJun 2028Counted with P174707Counted with P174707Counted with P174707Not reported
Sector
Education
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 2, 2026
Effectiveness
September 8, 2026
Closing
June 15, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
60.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P513985
Last changed
October 9, 2026
16 more active operations
Emergency resilient agriculture for food security, additional financingIDA, Social protectionJan 2029Counted with P177072Counted with P177072Counted with P177072Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
February 6, 2023
Effectiveness
June 5, 2023
Closing
January 31, 2029
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P179799
Emergency Resilient Agriculture for Food Security ProjectIDA, Agriculture and food securityJan 2029Counted with P177072Counted with P177072Counted with P177072Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 8, 2026
Effectiveness
September 9, 2026
Closing
January 31, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P515942
Last changed
October 9, 2026
Additional Financing: Haiti Renewable Energy For AllWorld Bank, EnergyJun 202719.6Not reportedNot reportedNot reported
Sector
Energy
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
October 18, 2024
Effectiveness
April 22, 2025
Closing
June 30, 2027
Disbursed as of
Not reported
Implementing agency
MTPTC Energy Cell,Ministry of Public Works, Transportation and Communication
Commitment
39.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P181584
Adaptive Social Protection for Increased Resilience ProjectIDA, Social protectionFeb 2029Counted with P174111Counted with P174111Counted with P174111Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 24, 2025
Effectiveness
October 30, 2025
Closing
February 28, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P505752
Last changed
October 9, 2026
AF Strengthening Primary Health Care and SurveillanceIDA, HealthDec 2026Counted with P167512Counted with P167512Counted with P167512Not reported
Sector
Health
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 16, 2022
Effectiveness
October 31, 2022
Closing
December 31, 2026
Disbursed as of
Not reported
Implementing agency
Ministère de la Santé Publique et de la Population,UNITE DE GESTION DE PROJET (UGP)
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178755
Haiti Modern Energy Services For AllWorld Bank, EnergyApr 202815.7Not reportedNot reportedNot reported
Sector
Energy
Stage
Under way
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
October 25, 2017
Effectiveness
February 5, 2018
Closing
April 30, 2028
Disbursed as of
Not reported
Implementing agency
MTPTC - Ministry of Public Works, Transport and Communications
Commitment
15.7
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P154351
Additional Financing - Haiti Caribbean Air Transport Connectivity ProjectIDA, TransportDec 2027Counted with P170907Counted with P170907Counted with P170907Not reported
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 5, 2023
Effectiveness
January 31, 2024
Closing
December 31, 2027
Disbursed as of
Not reported
Implementing agency
Central Execution Unit of the Ministry of Public Works (UCE)
Commitment
12.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P181119
AF Strengthening DRM and Climate Resilience ProjectIDA, Governance and securityMar 2027Counted with P165870Counted with P165870Counted with P165870Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 26, 2022
Effectiveness
October 24, 2022
Closing
March 31, 2027
Disbursed as of
Not reported
Implementing agency
Ministry of Interior and Local authorities
Commitment
11.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178747
Haiti Resilient Productive Landscapes Additional FinancingIDA, Agriculture and food securityNov 2024Counted with P162908Counted with P162908Counted with P162908Not reported
Stage
Closing
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 19, 2020
Effectiveness
February 23, 2021
Closing
November 30, 2024
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment
Commitment
7.8
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P175176
Renewable Energy for AllWorld Bank, EnergyNot reported7.1Not reportedNot reportedNot reported
Sector
Energy
Stage
Approved
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
October 30, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P510191
Additional Financing Haiti Renewable Energy for AllWorld Bank, EnergyJun 20272.9Not reportedNot reportedNot reported
Sector
Energy
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
September 30, 2020
Effectiveness
December 10, 2020
Closing
June 30, 2027
Disbursed as of
Not reported
Implementing agency
MTPTC Energy Cell,Ministry of Public Works, Transportation and Communication
Commitment
6.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P174736
CBC Haiti ClimateIFC, Sector not identifiedNot reported4.54.5Not reportedNot reported
Stage
Under way
Instrument
Loan
Lending window
Loan
Approval
December 20, 2024
Effectiveness
March 27, 2025
Closing
Not reported
Disbursed as of
February 28, 2025
Implementing agency
Not reported
Commitment
4.5
Disbursed
4.5
Undisbursed
Not reported
Last transaction
February 28, 2025
Operation ID
49332
Strengthening DRM and Climate Resilience ProjectIDA, Governance and securityMar 2027Counted with P165870Counted with P165870Counted with P165870Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 24, 2025
Effectiveness
June 26, 2025
Closing
March 31, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.5
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P509418
Last changed
October 9, 2026
Solengy HaitiIFC, EnergyNot reported3.03.0Not reportedNot reported
Sector
Energy
Stage
Under way
Instrument
Loan
Lending window
Loan
Approval
December 5, 2024
Effectiveness
March 14, 2025
Closing
Not reported
Disbursed as of
December 20, 2024
Implementing agency
Not reported
Commitment
3.0
Disbursed
3.0
Undisbursed
Not reported
Last transaction
December 20, 2024
Operation ID
49360
JSDF Haiti: Promoting the Productive Inclusion of Persons with DisabilitiesWorld Bank, Social protectionDec 20272.81.0Not reported0.5
Stage
Under way
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
November 21, 2023
Effectiveness
April 26, 2024
Closing
December 31, 2027
Disbursed as of
Not reported
Implementing agency
Ministry of Social Affairs and Labor
Commitment
2.8
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
March 31, 2026
Operation ID
P179038
Haiti Contingent Emergency Response ProjectWorld Bank, Sector not identifiedJun 2032Not reportedNot reportedNot reportedNot reported
Stage
Approved
Instrument
World Bank product line RR
Approval
October 14, 2026
Effectiveness
Not reported
Closing
June 30, 2032
Disbursed as of
Not reported
Implementing agency
Central Execution Unit; Ministry of Public Works, Transport and Communications
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P517388
Last changed
October 16, 2026
Planned operations (1)

1 operation. Approved to date (stock): not reported. Disbursed in FY2025-26 (flow): none.

Table 6.Planned operations, US$ millions

Not published for any operation in this table: commitment, disbursements, undisbursed balance.

Health Optimization and Preparation for Pandemic EmergenciesWorld Bank, HealthDec 20322026Planned
Sector
Health
Stage
Planned
Instrument
IBRD/IDA financing
Lending window
Grants
Planned approval
December 22, 2026
Effectiveness
April 15, 2027
Closing
December 31, 2032
Disbursed as of
Not reported
Implementing agency
Ministry of Public Health and Population
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P512436
Closed and stopped operations (183)

183 operations. Approved to date (stock): US$2,435.8 million, reported for 117 of 163. Disbursed in FY2025-26 (flow): US$4.7 million, reported for 6 of 163. 20 operations counted with their parent operation.

Table 7.Closed and stopped operations, US$ millionsAn operation marked “counted with” is an additional financing whose source books its money under the parent operation: its amounts are in the parent’s row and in the totals once.

Haiti Rural Accessibility & Resilience ProjectIDA, TransportMay 20252018Closed135.0130.50.6
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 31, 2018
Effectiveness
September 4, 2018
Closing
May 30, 2025
Disbursed as of
September 30, 2026
Implementing agency
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
Commitment
135.0
Disbursed
130.5
Undisbursed
0.6
Undisbursed gap
3.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
January 31, 2026
Operation ID
P163490
Last changed
October 9, 2026
Improving Maternal and Child Health through Integrated Social ServicesWorld Bank, HealthSep 20202013Closed113.989.40.3
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
May 21, 2013
Effectiveness
September 12, 2013
Closing
September 30, 2020
Disbursed as of
September 30, 2026
Implementing agency
Fonds d'Assistance Economique et Sociale (FAES),Institut Haïtien de Statistique et d’Informatique,Ministry of Public Health and Population (MSPP)
Commitment
113.9
Disbursed
89.4
Undisbursed
0.3
Undisbursed gap
24.2: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P123706
Last changed
October 9, 2026
Infrastructure & Institutions Emergency RecoveryIDA, TransportJun 20182010Closed102.3100.50.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 18, 2010
Effectiveness
April 23, 2010
Closing
June 29, 2018
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Works, Transport and Communications, Unité Centrale d'Exécution,Unite de coordination de Projet du Ministere des Finances
Commitment
102.3
Disbursed
100.5
Undisbursed
0.0
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
April 30, 2020
Operation ID
P120895
Last changed
October 9, 2026
Resilient Corridors ProjectIDA, TransportMay 2031Not reportedStoppedNot reportedNot reportedNot reported
Sector
Transport
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
Not reported
Effectiveness
May 14, 2025
Closing
May 29, 2031
Disbursed as of
Not reported
Implementing agency
Ministere des Travaux Publics, Transports et Communication,Unite Centrale d'Execution
Commitment
100.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P504115
Relaunching agriculture, strengthening agriculture public services IIWorld Bank, Agriculture and food securityMar 20222011Closed82.869.70.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
December 1, 2011
Effectiveness
April 3, 2012
Closing
March 31, 2022
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
82.8
Disbursed
69.7
Undisbursed
0.0
Undisbursed gap
13.1: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
March 31, 2023
Operation ID
P126744
Last changed
October 9, 2026
Providing an Education of Quality (PEQH)World Bank, EducationJan 20232016Closed82.169.00.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
November 10, 2016
Effectiveness
March 7, 2017
Closing
January 30, 2023
Disbursed as of
September 30, 2026
Implementing agency
Ministry of National Education and Professional Training (MENFP)
Commitment
82.1
Disbursed
69.0
Undisbursed
0.0
Undisbursed gap
13.1: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
March 31, 2024
Operation ID
P155191
Last changed
October 9, 2026
Disaster Risk Management and ReconstructionIDA, TransportJun 20202011Closed71.866.80.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 1, 2011
Effectiveness
April 3, 2012
Closing
June 30, 2020
Disbursed as of
September 30, 2026
Implementing agency
Unite de Coordination de Projet - Ministry of Interior and Local Authorities,Unite de Coordination et Execution - Ministry of Public Works
Commitment
71.8
Disbursed
66.8
Undisbursed
0.0
Undisbursed gap
5.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
July 31, 2022
Operation ID
P126346
Last changed
October 9, 2026
Education for All Project - Phase IIIDA, EducationJun 20182011Closed70.064.40.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 1, 2011
Effectiveness
April 3, 2012
Closing
June 30, 2018
Disbursed as of
September 30, 2026
Implementing agency
Ministère de l'Education Nationale et de la Formation Professionnelle,Ministère de l'Education Nationale et de la Formation Professionnelle
Commitment
70.0
Disbursed
64.4
Undisbursed
0.0
Undisbursed gap
5.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
December 31, 2018
Operation ID
P124134
Last changed
October 9, 2026
Port au Prince Neighborhood Housing ReconstructionWorld Bank, Industry, trade and tourismDec 20162011Closed65.0Not reportedNot reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
May 4, 2011
Effectiveness
July 28, 2011
Closing
December 31, 2016
Disbursed as of
Not reported
Implementing agency
BMPAD
Commitment
65.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P125805
Haiti Sustainable Rural and Small Towns Water and Sanitation ProjectIDA, Water and sanitationMar 20232015Closed64.265.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 26, 2015
Effectiveness
December 16, 2015
Closing
March 31, 2023
Disbursed as of
September 30, 2026
Implementing agency
DINEPA,Ministry of Economy and Finance, MEF
Commitment
64.2
Disbursed
65.1
Undisbursed
0.0
Undisbursed gap
−0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
March 31, 2025
Operation ID
P148970
Last changed
October 9, 2026
Haiti Economic Governance Reform OperationIDA, EnergyMar 20062005Closed61.061.20.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 6, 2005
Effectiveness
January 10, 2005
Closing
March 31, 2006
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
61.0
Disbursed
61.2
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P089873
Last changed
October 9, 2026
Haiti Community Driven Development (CDD) Project / PRODEPIDA, Agriculture and food securityJun 20132005Closed60.862.80.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 28, 2005
Effectiveness
December 8, 2005
Closing
June 30, 2013
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
60.8
Disbursed
62.8
Undisbursed
0.0
Undisbursed gap
−2.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P093640
Last changed
October 9, 2026
HT - AF to Providing an Education of QualityWorld Bank, EducationJan 20232019Closed18.0Not reportedNot reported
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
May 16, 2019
Effectiveness
August 7, 2019
Closing
January 30, 2023
Disbursed as of
Not reported
Implementing agency
Ministère d’Education et Formation Professionnelle; MENFP
Commitment
57.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P165507
Rebuilding Energy Infrastructure and AccessWorld Bank, EnergyAug 20202012Closed55.742.60.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
September 27, 2012
Effectiveness
February 6, 2013
Closing
August 31, 2020
Disbursed as of
September 30, 2026
Implementing agency
EDH,MTPTC, UCP Energie
Commitment
55.7
Disbursed
42.6
Undisbursed
0.0
Undisbursed gap
13.1: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
July 31, 2022
Operation ID
P127203
Last changed
October 9, 2026
Dropped-HT basic educationIDA, EducationMar 20062009Stopped55.00.5Not reported
Sector
Education
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
August 16, 2009
Effectiveness
Not reported
Closing
March 2, 2006
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
55.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P007324
Haiti COVID-19 ResponseIDA, HealthNov 20252020Closed55.053.80.3
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 2, 2020
Effectiveness
April 15, 2020
Closing
November 30, 2025
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Health and the Population,UNITE DE GESTION DE PROJET (UGP)
Commitment
55.0
Disbursed
53.8
Undisbursed
0.3
Undisbursed gap
0.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P173811
Municipal Development and Urban Resilience ProjectWorld Bank, Governance and securityDec 20252017Closed53.145.41.8
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
June 20, 2017
Effectiveness
January 18, 2018
Closing
December 26, 2025
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications
Commitment
53.1
Disbursed
45.4
Undisbursed
1.8
Undisbursed gap
5.9: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P155201
Last changed
October 9, 2026
Urban Community Driven Development Project / PRODEPURIDA, Water and sanitationDec 20162008Closed52.951.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 3, 2008
Effectiveness
October 27, 2008
Closing
December 31, 2016
Disbursed as of
September 30, 2026
Implementing agency
BMPAD
Commitment
52.9
Disbursed
51.1
Undisbursed
0.0
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2017
Operation ID
P106699
Last changed
October 9, 2026
Employment generatioIDA, Social protectionApr 19971995Closed49.145.70.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 11, 1995
Effectiveness
July 13, 1995
Closing
April 30, 1997
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
49.1
Disbursed
45.7
Undisbursed
0.0
Undisbursed gap
3.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P041583
Last changed
October 9, 2026
Emergency economic RIDA, Agriculture and food securityDec 19951994Closed40.040.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 20, 1994
Effectiveness
December 23, 1994
Closing
December 31, 1995
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
40.0
Disbursed
40.3
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P031828
Last changed
October 9, 2026
HT Education For All Adaptable Program Grant Phase 1IDA, EducationMay 20122007Closed36.637.50.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 26, 2007
Effectiveness
September 28, 2007
Closing
May 31, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
36.6
Disbursed
37.5
Undisbursed
0.0
Undisbursed gap
−1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P099918
Last changed
October 9, 2026
Dropped-HT ECON & SOC fund IIIDA, Governance and securityNot reported2007Stopped35.0Not reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 16, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P052269
AF Infrastructure & Institutions Emergency RecoveryIDA, TransportJun 20182012ClosedCounted with P120895Counted with P120895Counted with P120895
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 27, 2012
Effectiveness
February 5, 2013
Closing
June 29, 2018
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P130749
Additional financing, strengthening agriculture public services IIIDA, Agriculture and food securityMar 20222017ClosedCounted with P126744Counted with P126744Counted with P126744
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 14, 2017
Effectiveness
November 7, 2017
Closing
March 31, 2022
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163081
AF Haiti COVID-19 ResponseIDA, HealthNov 20252022ClosedCounted with P173811Counted with P173811Counted with P173811
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 23, 2022
Effectiveness
October 31, 2022
Closing
November 30, 2025
Disbursed as of
Not reported
Implementing agency
Ministry of Public Health and the Population,UNITE DE GESTION DE PROJET (UGP)
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178296
158 more operations
AF Haiti Rural Accessibility & Resilience ProjectIDA, TransportMay 20252020ClosedCounted with P163490Counted with P163490Counted with P163490
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 18, 2020
Effectiveness
August 7, 2020
Closing
May 29, 2025
Disbursed as of
Not reported
Implementing agency
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
Commitment
33.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P173281
Emergency Development Policy OperationIDA, Governance and securitySep 20112010Closed30.030.60.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
August 5, 2010
Effectiveness
August 23, 2010
Closing
September 30, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
30.0
Disbursed
30.6
Undisbursed
0.0
Undisbursed gap
−0.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P118239
Housing Reconstruction - Urban Community Driven Development Additional FinancingIDA, Industry, trade and tourismDec 20162010ClosedCounted with P106699Counted with P106699Counted with P106699
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
October 26, 2010
Effectiveness
February 21, 2011
Closing
December 31, 2016
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
30.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P121833
AF Rural Accessibility & Resilience ProjectIDA, TransportMay 20252022ClosedCounted with P163490Counted with P163490Counted with P163490
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 17, 2022
Effectiveness
June 15, 2022
Closing
May 29, 2025
Disbursed as of
Not reported
Implementing agency
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
Commitment
30.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178419
Resilient Productive LandscapesWorld Bank, Agriculture and food securityNov 20242018Closed28.922.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
March 1, 2018
Effectiveness
July 10, 2018
Closing
November 30, 2024
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment
Commitment
28.9
Disbursed
22.3
Undisbursed
0.0
Undisbursed gap
6.6: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
December 31, 2025
Operation ID
P162908
Last changed
October 9, 2026
Haiti Transport and Territorial Development ProjectIDA, TransportJul 20132006Closed27.228.10.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 11, 2006
Effectiveness
December 13, 2006
Closing
July 30, 2013
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
27.2
Disbursed
28.1
Undisbursed
0.0
Undisbursed gap
−1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P095523
Last changed
October 9, 2026
HT- first health projectIDA, HealthMar 20011990Closed26.328.40.0
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 16, 1990
Effectiveness
June 20, 1990
Closing
March 31, 2001
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
26.3
Disbursed
28.4
Undisbursed
0.0
Undisbursed gap
−2.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007311
Last changed
October 9, 2026
RD MAINT & RHBIDA, TransportDec 20011995Closed26.325.10.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 23, 1995
Effectiveness
July 13, 1995
Closing
December 31, 2001
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
26.3
Disbursed
25.1
Undisbursed
0.0
Undisbursed gap
1.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007318
Last changed
October 9, 2026
Power III (SDR-23.1)World Bank, EnergyNot reported1982Closed26.024.90.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Approval
July 6, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
26.0
Disbursed
24.9
Undisbursed
0.0
Undisbursed gap
1.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007287
Last changed
October 9, 2026
HT Center and Artibonite Regional DevelopmentWorld Bank, TransportAug 20202014Closed25.315.50.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
May 19, 2014
Effectiveness
October 6, 2014
Closing
August 31, 2020
Disbursed as of
September 30, 2026
Implementing agency
Unite Centale d'Execution (UCE),Unite Technique d'Execution (UTE)
Commitment
25.3
Disbursed
15.5
Undisbursed
0.0
Undisbursed gap
9.8: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2021
Operation ID
P133352
Last changed
October 9, 2026
Sogebank Sr LoanIFC, Finance and private sectorNot reported2014Closed25.025.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
July 1, 2014
Effectiveness
September 8, 2015
Closing
Not reported
Disbursed as of
December 30, 2014
Implementing agency
Not reported
Commitment
25.0
Disbursed
25.0
Undisbursed
Not reported
Last transaction
December 30, 2014
Operation ID
34672
Additional financing, maternal and child health through integrated servicesIDA, HealthSep 20202017ClosedCounted with P123706Counted with P123706Counted with P123706
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 14, 2017
Effectiveness
January 24, 2018
Closing
September 30, 2020
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163313
POWER VIDA, EnergyJan 19991989Closed23.225.50.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 27, 1989
Effectiveness
January 16, 1990
Closing
January 31, 1999
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
23.2
Disbursed
25.5
Undisbursed
0.0
Undisbursed gap
−2.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007300
Last changed
October 9, 2026
Haiti Economic Governance Reform Operation IIIDA, Governance and securityDec 20092007Closed23.024.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 30, 2007
Effectiveness
July 31, 2007
Closing
December 30, 2009
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
23.0
Disbursed
24.1
Undisbursed
0.0
Undisbursed gap
−1.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P100564
Haiti Education for All Multi Donor Trust FundWorld Bank trust funds, EducationFeb 20172010Closed22.1Not reportedNot reported
Sector
Education
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
April 16, 2010
Effectiveness
Not reported
Closing
February 9, 2017
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
22.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 30, 2020
Operation ID
TF071417
Power IV-aWorld Bank, EnergyNot reported1984Closed22.126.70.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Approval
November 20, 1984
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
22.1
Disbursed
26.7
Undisbursed
0.0
Undisbursed gap
−4.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007291
Last changed
October 9, 2026
Haiti Education for All Fast-Track Initiative Catalytic FundWorld Bank, EducationOct 20152009Closed22.022.1Not reported
Sector
Education
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
December 11, 2009
Effectiveness
July 15, 2010
Closing
October 31, 2015
Disbursed as of
Not reported
Implementing agency
Ministry of National Education and Vocational Training
Commitment
22.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P114174
Fourth highwaysWorld Bank, TransportNot reported1975Closed20.020.00.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
June 5, 1975
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
20.0
Disbursed
20.0
Undisbursed
0.0
Operation ID
P007273
Last changed
October 9, 2026
TRNSPRT VIIWorld Bank, Governance and securityNot reported1987Closed20.022.40.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
February 3, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
20.0
Disbursed
22.4
Undisbursed
0.0
Undisbursed gap
−2.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007295
Last changed
October 9, 2026
ECON RECOV CRDWorld Bank, Sector not identifiedNot reported1987Closed20.021.20.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
March 24, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
20.0
Disbursed
21.2
Undisbursed
0.0
Undisbursed gap
−1.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007307
Last changed
October 9, 2026
Economic Reconstruction and Growth Development Policy CreditIDA, Governance and securityJun 20142013Closed20.020.40.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 18, 2013
Effectiveness
August 29, 2013
Closing
June 30, 2014
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
20.0
Disbursed
20.4
Undisbursed
0.0
Undisbursed gap
−0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
September 30, 2013
Operation ID
P127208
Haiti Fiscal and Social Resilience Development Policy FinancingIDA, Governance and securityJun 20202018Closed20.020.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 20, 2018
Effectiveness
September 26, 2018
Closing
June 30, 2020
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
20.0
Disbursed
20.0
Undisbursed
0.0
Last transaction
September 30, 2018
Operation ID
P162452
Sustainable rural and small town water supply and sanitationIDA, Water and sanitationMar 20232017ClosedCounted with P148970Counted with P148970Counted with P148970
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 14, 2017
Effectiveness
December 4, 2017
Closing
March 31, 2023
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163194
Disaster Risk Management and Reconstruction Additional FinancingIDA, TransportJun 20202017ClosedCounted with P126346Counted with P126346Counted with P126346
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 8, 2017
Effectiveness
November 6, 2017
Closing
June 30, 2020
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163199
HT Emergency Bridge Reconst & Vulnerab Reduction ProjectIDA, TransportMay 20152008Closed19.919.40.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 18, 2008
Effectiveness
March 31, 2009
Closing
May 31, 2015
Disbursed as of
September 30, 2026
Implementing agency
BMPAD,CIAT,UCE,Unite Centrale d'Execution,Unite Centrale d'Execution
Commitment
19.9
Disbursed
19.4
Undisbursed
0.0
Undisbursed gap
0.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
September 30, 2016
Operation ID
P114292
Last changed
October 9, 2026
P au Prince WTRIDA, Water and sanitationJun 19991989Closed19.520.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 27, 1989
Effectiveness
February 14, 1990
Closing
June 30, 1999
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
19.5
Disbursed
20.5
Undisbursed
0.0
Undisbursed gap
−1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007292
Last changed
October 9, 2026
Emergency Recovery and Disaster ManagementIDA, Social protectionDec 20112005Closed19.119.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 6, 2005
Effectiveness
June 1, 2005
Closing
December 31, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
19.1
Disbursed
19.3
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P090159
Last changed
October 9, 2026
Cultural Heritage Preservation and Tourism Sector Support ProjectIDA, Social protectionJul 20222014Closed19.117.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 19, 2014
Effectiveness
October 6, 2014
Closing
July 29, 2022
Disbursed as of
September 30, 2026
Implementing agency
Unite Technique d'Execution
Commitment
19.1
Disbursed
17.3
Undisbursed
0.0
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
January 31, 2024
Operation ID
P144614
Last changed
October 9, 2026
Rural DEVT II (SDR-1World Bank, Agriculture and food securityNot reported1983Closed19.120.60.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
August 23, 1983
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
19.1
Disbursed
20.6
Undisbursed
0.0
Undisbursed gap
−1.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007289
Last changed
October 9, 2026
Improving public financial management and statistical informationIDA, Governance and securityJun 20252017Closed19.117.51.1
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 24, 2017
Effectiveness
July 7, 2017
Closing
June 30, 2025
Disbursed as of
September 30, 2026
Implementing agency
UCP - MEF
Commitment
19.1
Disbursed
17.5
Undisbursed
1.1
Undisbursed gap
0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P157531
Last changed
October 9, 2026
Support for Girls Access to Secondary EducationWorld Bank trust funds, Governance and securityMay 20242018Closed18.6Not reportedNot reported
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
April 13, 2018
Effectiveness
Not reported
Closing
May 7, 2024
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
18.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
April 30, 2024
Operation ID
TF073053
Urban DEVT I (SDR-19World Bank, MultisectorNot reported1983Closed17.719.80.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
March 22, 1983
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
17.7
Disbursed
19.8
Undisbursed
0.0
Undisbursed gap
−2.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007288
Last changed
October 9, 2026
HRF Grant for Strengthening Governance in Education and Water SectorsWorld Bank, EducationDec 20152014Closed17.6Not reportedNot reported
Sector
Education
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
June 30, 2014
Effectiveness
Not reported
Closing
December 31, 2015
Disbursed as of
Not reported
Implementing agency
Ministry of Education and Vocational Training
Commitment
17.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P147166
POWER IIWorld Bank, EnergyNot reported1979Closed16.516.50.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Approval
April 17, 1979
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
16.5
Disbursed
16.5
Undisbursed
0.0
Operation ID
P007280
Last changed
October 9, 2026
E-Power S.A.IFC, Sector not identifiedNot reported2010Closed16.016.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
December 19, 2010
Effectiveness
December 15, 2009
Closing
Not reported
Disbursed as of
July 1, 2009
Implementing agency
Not reported
Commitment
16.0
Disbursed
16.0
Undisbursed
Not reported
Last transaction
July 1, 2009
Operation ID
27274
POWER IWorld Bank, EnergyNot reported1976Closed16.016.00.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Approval
June 17, 1976
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
16.0
Disbursed
16.0
Undisbursed
0.0
Operation ID
P007275
Last changed
October 9, 2026
Forest & parks TA (TAL)IDA, Agriculture and food securityDec 20011996Closed15.514.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 17, 1996
Effectiveness
August 29, 1997
Closing
December 31, 2001
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
15.5
Disbursed
14.5
Undisbursed
0.0
Undisbursed gap
0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007326
Last changed
October 9, 2026
Digicel HaitiIFC, CommunicationsNot reported2006Closed15.015.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
May 15, 2006
Effectiveness
June 16, 2006
Closing
Not reported
Disbursed as of
May 31, 2006
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Last transaction
May 31, 2006
Operation ID
24919
Highway V/portsWorld Bank, TransportNot reported1978Closed15.015.00.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
May 18, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
0.0
Operation ID
P007278
Last changed
October 9, 2026
Dropped-sustain intens of AGIDA, Agriculture and food securityJan 20032000Stopped15.00.4Not reported
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 1, 2000
Effectiveness
Not reported
Closing
January 28, 2003
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P007315
Rural Community Driven Development - Additional Financing IIIDA, Agriculture and food securityJun 20132010ClosedCounted with P093640Counted with P093640Counted with P093640
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 27, 2010
Effectiveness
July 29, 2010
Closing
June 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P118139
Additional Financing to Haiti Statistical Capacity Building ProjectIDA, Governance and securityJun 20252018ClosedCounted with P157531Counted with P157531Counted with P157531
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 31, 2018
Effectiveness
August 22, 2018
Closing
June 30, 2025
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P164093
Port Lafito, S.A.IFC, TransportNot reported2014Closed15.015.0Not reported
Sector
Transport
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
July 8, 2014
Effectiveness
September 30, 2014
Closing
Not reported
Disbursed as of
September 18, 2014
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Last transaction
September 18, 2014
Operation ID
34593
AF for Haiti Education for All Project Phase IIWorld Bank, EducationJun 20182014Closed14.8Not reportedNot reported
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
June 25, 2014
Effectiveness
Not reported
Closing
June 30, 2018
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
14.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P147608
Cholera Emergency Response ProjectIDA, HealthMar 20142011Closed14.715.00.0
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 18, 2011
Effectiveness
February 7, 2011
Closing
March 30, 2014
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
14.7
Disbursed
15.0
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P120110
Last changed
October 9, 2026
Highways VIWorld Bank, TransportNot reported1982Closed14.013.50.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
April 1, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
14.0
Disbursed
13.5
Undisbursed
0.0
Undisbursed gap
0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007285
Last changed
October 9, 2026
Haiti Business Development and Investment ProjectIDA, Industry, trade and tourismNov 20212013Closed13.813.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 21, 2013
Effectiveness
November 11, 2013
Closing
November 30, 2021
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Commerce and Industry
Commitment
13.8
Disbursed
13.3
Undisbursed
0.0
Undisbursed gap
0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
April 30, 2024
Operation ID
P123974
Last changed
October 9, 2026
Marriott HaitiIFC, Industry, trade and tourismNot reported2013Closed13.313.3Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
June 13, 2013
Effectiveness
June 12, 2014
Closing
Not reported
Disbursed as of
June 21, 2013
Implementing agency
Not reported
Commitment
13.3
Disbursed
13.3
Undisbursed
Not reported
Last transaction
June 21, 2013
Operation ID
32421
Haiti Post-Disaster Partial Credit Guarantee Program Support ProjectWorld Bank, Finance and private sectorJun 20152010Closed12.50.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
Grants
Approval
December 14, 2010
Effectiveness
February 22, 2011
Closing
June 30, 2015
Disbursed as of
September 30, 2026
Implementing agency
Fonds de Développement Industriel, FDI
Commitment
12.5
Disbursed
0.3
Undisbursed
0.0
Undisbursed gap
12.2: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
July 31, 2015
Operation ID
P121391
Last changed
October 9, 2026
HT 3rd Econ. Governance Reform OperationIDA, Governance and securityDec 20102009Closed12.512.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 8, 2009
Effectiveness
January 12, 2010
Closing
December 31, 2010
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
12.5
Disbursed
12.5
Undisbursed
0.0
Operation ID
P117944
Transport and Territorial Development Additional FinancingIDA, TransportJul 20132009ClosedCounted with P095523Counted with P095523Counted with P095523
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 8, 2009
Effectiveness
January 11, 2010
Closing
July 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P114059
Education for All Project - Additional FinancingIDA, EducationMay 20122010ClosedCounted with P099918Counted with P099918Counted with P099918
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 27, 2010
Effectiveness
July 15, 2010
Closing
May 31, 2012
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P121193
Haiti Digital Acceleration ProjectIDA, CommunicationsDec 20252020Closed11.59.91.1
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
October 9, 2020
Effectiveness
November 26, 2020
Closing
December 31, 2025
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Works, Transport and Communications
Commitment
11.5
Disbursed
9.9
Undisbursed
1.1
Undisbursed gap
0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P171976
Last changed
October 9, 2026
ECON & SOC fundIDA, Social protectionJun 19981991Closed11.011.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 17, 1991
Effectiveness
May 21, 1991
Closing
June 30, 1998
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
11.0
Disbursed
11.0
Undisbursed
0.0
Operation ID
P007321
Last changed
October 9, 2026
PORTS IWorld Bank, TransportNot reported1981Closed11.09.30.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
March 26, 1981
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
11.0
Disbursed
9.3
Undisbursed
0.0
Undisbursed gap
1.7: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007283
Last changed
October 9, 2026
Eurasian Minerals Inc.IFC, Sector not identifiedNot reported2010Closed10.310.3Not reported
Stage
Closed
Instrument
Equity
Lending window
Equity
Approval
January 13, 2010
Effectiveness
March 12, 2010
Closing
Not reported
Disbursed as of
February 19, 2010
Implementing agency
Not reported
Commitment
10.3
Disbursed
10.3
Undisbursed
Not reported
Last transaction
February 19, 2010
Operation ID
27409
Leopard HaitiIFC, Finance and private sectorNot reported2012Closed10.010.0Not reported
Stage
Closed
Instrument
Equity
Lending window
Equity
Approval
February 29, 2012
Effectiveness
August 10, 2012
Closing
Not reported
Disbursed as of
March 30, 2012
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
Not reported
Last transaction
March 30, 2012
Operation ID
31244
Codevi IIIFC, Industry, trade and tourismNot reported2014Closed10.010.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
June 27, 2014
Effectiveness
April 15, 2015
Closing
Not reported
Disbursed as of
December 22, 2014
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
Not reported
Last transaction
December 22, 2014
Operation ID
34687
Northern highwayWorld Bank, TransportNot reported1974Closed10.010.00.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
May 16, 1974
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
0.0
Operation ID
P007272
Last changed
October 9, 2026
Rural development IWorld Bank, Agriculture and food securityNot reported1976Closed10.010.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
December 28, 1976
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
0.0
Operation ID
P007276
Last changed
October 9, 2026
Education IIWorld Bank, EducationNot reported1978Closed10.010.00.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Approval
February 21, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
0.0
Operation ID
P007277
Last changed
October 9, 2026
Supplemental EGRO-II Development Policy GrantWorld Bank, Governance and securityDec 20082008ClosedNot reported10.0Not reported
Stage
Closed
Instrument
Special financing
Lending window
Other
Approval
May 29, 2008
Effectiveness
June 27, 2008
Closing
December 31, 2008
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P112133
Strengthening Agriculture Public Services IIWorld Bank, Agriculture and food securityNot reported2011Stopped10.0Not reportedNot reported
Stage
Stopped
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
June 9, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P123756
HT Electricity ProjectIDA, EnergyAug 20132006Closed9.910.30.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
August 3, 2006
Effectiveness
July 31, 2007
Closing
August 31, 2013
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
9.9
Disbursed
10.3
Undisbursed
0.0
Undisbursed gap
−0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P098531
Last changed
October 9, 2026
Education III (SDR-8World Bank, EducationNot reported1982Closed9.09.20.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Approval
November 30, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
9.0
Disbursed
9.2
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007286
Last changed
October 9, 2026
Industrial restructuring & developmentIDA, Industry, trade and tourismMar 20001989Closed8.79.60.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 5, 1989
Effectiveness
August 2, 1990
Closing
March 31, 2000
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
8.7
Disbursed
9.6
Undisbursed
0.0
Undisbursed gap
−0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007309
Last changed
October 9, 2026
Haiti Catastrophe InsuranceIDA, Finance and private sectorDec 20102007Closed8.79.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 8, 2007
Effectiveness
July 31, 2007
Closing
December 31, 2010
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
8.7
Disbursed
9.0
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P104690
Last changed
October 9, 2026
Community-Driven Development (CDD) Additional FinancingIDA, Agriculture and food securityJun 20132009ClosedCounted with P093640Counted with P093640Counted with P093640
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 29, 2009
Effectiveness
April 21, 2009
Closing
June 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P114775
Education IV-aWorld Bank, EducationNot reported1985Closed7.910.30.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Approval
May 7, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
7.9
Disbursed
10.3
Undisbursed
0.0
Undisbursed gap
−2.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007290
Last changed
October 9, 2026
Urban Community Driven Development Project - AFIDA, Water and sanitationDec 20162014ClosedCounted with P106699Counted with P106699Counted with P106699
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 20, 2014
Effectiveness
November 7, 2014
Closing
December 31, 2016
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P149116
Haiti Emergency Recovery and Disaster Management (Additional Financing)IDA, Social protectionDec 20112008ClosedCounted with P090159Counted with P090159Counted with P090159
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 31, 2008
Effectiveness
September 5, 2008
Closing
December 31, 2011
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P106689
Industrial creditWorld Bank, Finance and private sectorNot reported1981Closed6.75.70.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
April 14, 1981
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
6.7
Disbursed
5.7
Undisbursed
0.0
Undisbursed gap
1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007282
Last changed
October 9, 2026
Water supply IWorld Bank, Water and sanitationNot reported1977Closed6.66.60.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
December 13, 1977
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
6.6
Disbursed
6.6
Undisbursed
0.0
Operation ID
P007279
Last changed
October 9, 2026
HT - meeting teacher needs for EFAIDA, Governance and securityJun 20122008Closed5.95.90.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 29, 2008
Effectiveness
September 26, 2008
Closing
June 30, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
5.9
Disbursed
5.9
Undisbursed
0.0
Undisbursed gap
0.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P106621
Last changed
October 9, 2026
Education IWorld Bank, EducationNot reported1976Closed5.55.50.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Approval
February 24, 1976
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
5.5
Disbursed
5.5
Undisbursed
0.0
Operation ID
P007274
Last changed
October 9, 2026
HT Strengthening Hydro-Met ServicesWorld Bank, Water and sanitationOct 20202015Closed5.0Not reportedNot reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
June 26, 2015
Effectiveness
October 19, 2015
Closing
October 30, 2020
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR)
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P148259
ACME HaitiIFC, Finance and private sectorNot reported2016Closed5.0Not reportedNot reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
May 25, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IFC project page
Operation ID
34631
BUH HaitiIFC, Finance and private sectorNot reported2018Stopped5.0Not reportedNot reported
Stage
Stopped
Instrument
Loan
Lending window
Loan
Approval
December 13, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IFC project page
Operation ID
39665
SLGP RSF SogesolIFC, Finance and private sectorNot reported2018Closed5.0Not reportedNot reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated March 24, 2021.
Instrument
Guarantee
Lending window
Guarantee
Approval
April 12, 2018
Effectiveness
August 3, 2026
Closing
Not reported
Disbursed as of
March 24, 2021
Implementing agency
Not reported
Commitment
5.0
Disbursed
0.0
Undisbursed
Not reported
Last transaction
March 24, 2021
Operation ID
42221
Last changed
October 18, 2026
Sustaining Conservation & Protected Area Management Project (GEF)World Bank, Environment and disaster riskDec 20012002Stopped5.0Not reportedNot reported
Stage
Stopped
Instrument
Global Environment Facility project
Lending window
Other
Approval
November 14, 2002
Effectiveness
Not reported
Closing
December 31, 2001
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P066915
HT (AF) Electricity Loss Reduction ProjectIDA, EnergyAug 20132009ClosedCounted with P098531Counted with P098531Counted with P098531
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 8, 2009
Effectiveness
December 15, 2009
Closing
August 31, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P112164
HT SPF Rural Water and Sanitation ProjectWorld Bank, Water and sanitationNov 20132008Closed5.04.6Not reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
November 25, 2008
Effectiveness
Not reported
Closing
November 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P114936
HT Rural Water and Sanitation ProjectIDA, Water and sanitationDec 20112007Closed5.05.20.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 30, 2007
Effectiveness
August 1, 2007
Closing
December 31, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
5.0
Disbursed
5.2
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P089839
Last changed
October 9, 2026
Strengthening the Management of Agriculture Public Services (GFRP)IDA, Agriculture and food securityAug 20142009Closed4.95.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 25, 2009
Effectiveness
October 13, 2009
Closing
August 31, 2014
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
4.9
Disbursed
5.1
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P113623
Last changed
October 9, 2026
HT: Emergency School Reconstruction ProjectIDA, EducationMay 20122009Closed4.75.00.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 5, 2009
Effectiveness
June 25, 2009
Closing
May 31, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
4.7
Disbursed
5.0
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P115261
Last changed
October 9, 2026
SogebankIFC, Finance and private sectorNot reported2009Closed4.04.0Not reported
Stage
Closed
Instrument
Equity
Lending window
Equity
Approval
May 21, 2009
Effectiveness
September 25, 2009
Closing
Not reported
Disbursed as of
June 23, 2009
Implementing agency
Not reported
Commitment
4.0
Disbursed
4.0
Undisbursed
Not reported
Last transaction
June 23, 2009
Operation ID
26167
WillbesIFC, Industry, trade and tourismNot reported2014Closed4.04.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
April 1, 2014
Effectiveness
December 23, 2015
Closing
Not reported
Disbursed as of
July 1, 2015
Implementing agency
Not reported
Commitment
4.0
Disbursed
4.0
Undisbursed
Not reported
Last transaction
July 1, 2015
Operation ID
30350
Ayiti LeasingIFC, Finance and private sectorNot reported2018Closed4.04.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
December 6, 2018
Effectiveness
September 23, 2019
Closing
Not reported
Disbursed as of
March 8, 2019
Implementing agency
Not reported
Commitment
4.0
Disbursed
4.0
Undisbursed
Not reported
Last transaction
March 8, 2019
Operation ID
41185
ForestryWorld Bank, Agriculture and food securityNot reported1982Closed3.94.20.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
June 3, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
3.9
Disbursed
4.2
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007284
Last changed
October 9, 2026
Agric rehab-hurricanWorld Bank, Agriculture and food securityNot reported1981Closed3.12.80.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
March 17, 1981
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
3.1
Disbursed
2.8
Undisbursed
0.0
Undisbursed gap
0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007281
Last changed
October 9, 2026
FCS RE Hansae HaitiIFC, Industry, trade and tourismNot reported2017Closed3.03.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Loan
Approval
June 15, 2017
Effectiveness
February 7, 2018
Closing
Not reported
Disbursed as of
June 16, 2017
Implementing agency
Not reported
Commitment
3.0
Disbursed
3.0
Undisbursed
Not reported
Last transaction
June 16, 2017
Operation ID
38364
SLGP Agri SogesolIFC, Finance and private sectorNot reported2022ClosedNot reportedNot reportedNot reported
Stage
Closed
Instrument
Guarantee
Lending window
Guarantee
Planned start
March 29, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
45991
JSDF Grant for Emergency Community Cash for Work ProjectWorld Bank, Social protectionMar 20122010Closed2.83.0Not reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
September 29, 2010
Effectiveness
Not reported
Closing
March 31, 2012
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.8
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P123205
Second Additional Financing Infra & Instit Emergency RecoveryIDA, Governance and securityJun 20182016ClosedCounted with P120895Counted with P120895Counted with P120895
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 10, 2016
Effectiveness
March 15, 2017
Closing
June 29, 2018
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P156049
TALWorld Bank, Governance and securityNot reported1987Closed2.82.90.0
Stage
Closed
Instrument
IBRD/IDA financing
Approval
April 28, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
2.8
Disbursed
2.9
Undisbursed
0.0
Undisbursed gap
−0.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007308
Last changed
October 9, 2026
Caribbean Bottling Company S.A.IFC, Sector not identifiedNot reported2019Closed2.52.5Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated June 24, 2019.
Instrument
Loan
Lending window
Loan
Approval
June 14, 2019
Effectiveness
December 18, 2019
Closing
Not reported
Disbursed as of
June 24, 2019
Implementing agency
Not reported
Commitment
2.5
Disbursed
2.5
Undisbursed
Not reported
Last transaction
June 24, 2019
Operation ID
40610
Inclusion of persons with disabilities in social protection programsWorld Bank, Social protectionJun 20212018Closed2.32.3Not reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
June 28, 2018
Effectiveness
October 5, 2018
Closing
June 30, 2021
Disbursed as of
Not reported
Implementing agency
Office of the Secretary of State for the Integration of the Persons with Disabilities
Commitment
2.3
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2022
Operation ID
P145468
Governance Technical Assistance GrantIDA, Governance and securitySep 20092005Closed1.92.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 7, 2005
Effectiveness
December 19, 2005
Closing
September 30, 2009
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
1.9
Disbursed
2.1
Undisbursed
0.0
Undisbursed gap
−0.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P093936
Last changed
October 9, 2026
Household Development Agent PilotWorld Bank, Social protectionDec 20142011Closed1.53.3Not reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
February 7, 2011
Effectiveness
Not reported
Closing
December 31, 2014
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P121690
Avian influenza control and human influenza emergency prepardness and controlIDA, Agriculture and food securityJun 20122008Closed1.31.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 14, 2008
Effectiveness
April 6, 2009
Closing
June 30, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
1.3
Disbursed
1.3
Undisbursed
0.0
Operation ID
P111667
Last changed
October 9, 2026
Port-au-Prince Area Community Driven Development Pilot Project (PCF) / PRODEPAPWorld Bank, Governance and securityApr 20092006Closed1.3Not reportedNot reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Other
Approval
November 22, 2006
Effectiveness
Not reported
Closing
April 30, 2009
Disbursed as of
Not reported
Implementing agency
PL-480 Management Office
Commitment
1.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P100811
LICUS grant WB-UN/MINUSTAH Martissant road rehabilitation projectWorld Bank, TransportJun 20102008Closed0.9Not reportedNot reported
Sector
Transport
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
February 22, 2008
Effectiveness
Not reported
Closing
June 30, 2010
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P116936
HT-School Feeding Program (TF056944 DGF)World Bank, EducationAug 20072006Closed0.6Not reportedNot reported
Sector
Education
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Other
Approval
July 27, 2006
Effectiveness
Not reported
Closing
August 31, 2007
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P101975
MicroCredit National, S.A.IFC, Finance and private sectorNot reported1998Closed0.50.5Not reported
Stage
Closed
Instrument
Equity
Lending window
Equity
Approval
June 11, 1998
Effectiveness
December 17, 1999
Closing
Not reported
Disbursed as of
September 14, 1999
Implementing agency
Not reported
Commitment
0.5
Disbursed
0.5
Undisbursed
Not reported
Last transaction
September 14, 1999
Operation ID
8561
Emergency program for solar power generation and lightingWorld Bank, EnergyNot reported2010Closed0.5Not reportedNot reported
Sector
Energy
Stage
Closed
Instrument
World Bank product line GM
Lending window
Other
Approval
May 17, 2010
Effectiveness
June 25, 2010
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P120914
Haiti Statistical Capacity Building in Education GrantWorld Bank, EducationOct 20202017Closed0.50.5Not reported
Sector
Education
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
June 2, 2017
Effectiveness
Not reported
Closing
October 30, 2020
Disbursed as of
Not reported
Implementing agency
The World Bank
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
January 31, 2021
Operation ID
P161160
Haiti GDP rebasingWorld Bank, Governance and securityMay 20202018Closed0.4Not reportedNot reported
Stage
Closed
Instrument
Recipient-executed trust fund grant
Lending window
Grants
Approval
March 7, 2018
Effectiveness
Not reported
Closing
May 31, 2020
Disbursed as of
Not reported
Implementing agency
Institut Haïtien de Statistique et d'Informatique
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P166319
HT Economic Governance TAG IIIDA, Governance and securityJun 20112006Closed0.40.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 20, 2006
Effectiveness
August 16, 2007
Closing
June 30, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.5
Undisbursed
0.0
Operation ID
P095371
Last changed
October 9, 2026
Interim highway projWorld Bank, TransportNot reported1962Closed0.40.40.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
November 2, 1962
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.4
Undisbursed
0.0
Operation ID
P007271
Last changed
October 9, 2026
Haiti Biodiversity Protection Enabling ActivityWorld Bank, Environment and disaster riskNot reported1998Stopped0.3Not reportedNot reported
Stage
Stopped
Instrument
Global Environment Facility project
Lending window
Other
Approval
June 24, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P069835
ED VWorld Bank, Governance and securityNot reported1991Stopped0.0Not reported0.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Fully cancelled
Approval
June 11, 1991
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Operation ID
P007316
Last changed
October 9, 2026
Forstry & environIDA, Agriculture and food securityMar 19991991Stopped0.00.30.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Fully cancelled
Lending window
IDA
Approval
September 24, 1991
Effectiveness
Not reported
Closing
March 31, 1999
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Last transaction
June 30, 2020
Operation ID
P007322
Last changed
October 9, 2026
HT TAP IIIDA, Governance and securityJun 20021996Stopped0.0Not reported0.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Fully cancelled
Lending window
IDA
Approval
September 17, 1996
Effectiveness
March 17, 1997
Closing
June 30, 2002
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Operation ID
P041971
Last changed
October 9, 2026
Haiti COVID-19 Response and Resilience Development Policy OperationIDA, Governance and securityJul 20212020StoppedNot reportedNot reported0.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Terminated; the IDA statement first reports it on September 30, 2021
Lending window
IDA
Approval
June 29, 2020
Effectiveness
August 31, 2021
Closing
July 31, 2021
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Last transaction
September 30, 2021
Operation ID
P171474
Last changed
October 9, 2026
Highway maintenanceWorld Bank, TransportNot reported1956ClosedNot reportedNot reportedNot reported
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Approval
May 7, 1956
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007270
T A I-87MWorld Bank, Sector not identifiedNot reported1986StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007293
Tree PLNT/FRSTRY-90LWorld Bank, Sector not identifiedNot reported1987StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007294
Rural DEVT III-89RWorld Bank, Sector not identifiedNot reported1986StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007296
Urban II-90SWorld Bank, Sector not identifiedNot reported1986StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007297
IND CREDIT-87LWorld Bank, Sector not identifiedNot reported1987StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007298
Basic & VOC EDUC-91LWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007299
AGR SCTR--89LWorld Bank, Sector not identifiedNot reported1987StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007301
Irrigatn CREDIT-90SWorld Bank, Sector not identifiedNot reported1986StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007302
Public INVST. I-90SWorld Bank, Sector not identifiedNot reported1987StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007303
Rural RDS-92SWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007304
IND SCTR CREDIT-93SWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007305
IND REACTIVATN-87LWorld Bank, Sector not identifiedNot reported1987StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1987
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007306
STRCTRL ADJ CRD-89LWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007312
Envirnmntl SCTR CRD-91SWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007313
T.A. credit II-89LWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007314
POWER VIWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007317
SAC II-92SWorld Bank, Sector not identifiedNot reported1988StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007319
AG DEVT-93SWorld Bank, Sector not identifiedNot reported1989StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1989
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007320
Private SCTR devWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007323
Education VIWorld Bank, Sector not identifiedNot reported1996StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007325
Land tenure (TA) (97L)World Bank, Sector not identifiedNot reported1993StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1993
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007327
SAC (93L)World Bank, Sector not identifiedNot reported1992StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1992
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007328
Health and nutritionWorld Bank, Sector not identifiedNot reported1999StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007329
WTR supply & sanitatWorld Bank, Sector not identifiedNot reported1999StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P007330
ERC IIWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P039785
SECAL & TACWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P040167
Solid wasteWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P040173
ERC/SAC IIIWorld Bank, Sector not identifiedNot reported1999StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P041825
PSM/TAC IIIWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P042149
FIS II-99SWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P043357
Institutional strengthening of the Participatory Environment Action PlanningWorld Bank trust funds, Environment and disaster riskApr 20021996ClosedNot reported0.4Not reported
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
June 27, 1996
Effectiveness
Not reported
Closing
April 16, 2002
Disbursed as of
June 30, 2020
Implementing agency
Not reported
Commitment
Not reported
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 30, 2020
Operation ID
P048195
Basic infrastructureWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P049923
Major TRUNK RD rehabWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P051709
FDI IIIWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P052612
Micro.ENT.&rural devWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P052742
Urban community dev.World Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P054229
Urban road renewalWorld Bank, Sector not identifiedNot reported1998StoppedNot reportedNot reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Approval
June 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P054230
IDF Haiti environmental action planningWorld Bank trust funds, Governance and securityJul 19981998ClosedNot reportedNot reportedNot reported
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
July 26, 1998
Effectiveness
Not reported
Closing
July 27, 1998
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Operation ID
P090441
HT - Improving Health SurveillanceWorld Bank trust funds, HealthOct 20112009ClosedNot reported0.1Not reported
Sector
Health
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
April 29, 2009
Effectiveness
Not reported
Closing
October 11, 2011
Disbursed as of
June 30, 2020
Implementing agency
Not reported
Commitment
Not reported
Disbursed
0.1
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 30, 2020
Operation ID
P104400
Haiti Institutional Strengthening for Donor Project ImplementationWorld Bank trust funds, Governance and securityMay 20112008ClosedNot reportedNot reportedNot reported
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
July 31, 2008
Effectiveness
Not reported
Closing
May 9, 2011
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
Operation ID
P107447
Haiti Housing Community Reconstruction SupportWorld Bank trust funds, Social protectionAug 20142011ClosedNot reported0.2Not reported
Stage
ClosedRecorded as active; the publisher reports the activity finalised.
Instrument
Not reported
Start
March 18, 2011
Effectiveness
Not reported
Closing
August 13, 2014
Disbursed as of
June 30, 2020
Implementing agency
Not reported
Commitment
Not reported
Disbursed
0.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 30, 2020
Operation ID
P124983
AF GPE to Haiti Education for All Project - Phase IIWorld Bank, EducationJun 20182013ClosedCounted with P124134Counted with P124134Counted with P124134
Sector
Education
Stage
Closed
Instrument
Recipient-executed trust fund grant
Approval
June 29, 2013
Effectiveness
Not reported
Closing
June 30, 2018
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P132756
Resilient Productive LandscapesWorld Bank, Agriculture and food securityNov 20242018StoppedCounted with P162908Counted with P162908Counted with P162908
Stage
Stopped
Instrument
Global Environment Facility project
Approval
March 1, 2018
Effectiveness
July 10, 2018
Closing
November 30, 2024
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment
Commitment
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P165551

Active operations by sector

Table 8.Active operations by sector, US$ millions

Portfolio of active operations at October 18, 2026
SectorActive operationsApprovedUS$ millionsDisbursed to dateUS$ millionsUndisbursedUS$ millions
Transport4296.077.1215.8
Agriculture and food security4252.0119.8131.5
Governance and security5166.576.291.3
Education3165.684.161.8
Social protection4102.869.0No total27.2 for 1 of 2
Energy698.415.3No total12.3 for 1 of 6
Health290.061.213.0
Water and sanitation180.026.354.1
Finance and private sector151.425.323.5
Sector not identified24.54.5Not reported
All active operations221,307.1558.7No total630.6 for 14 of 22

Funding flows, FY2022-23, US$ millions

Disbursements, FY2022-23, US$ millions
Funding partnerChannelExecuting agencyImplementerSectorWorld Bank Group to Recipient government: US$90.1 million (borrower)Recipient government to Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution: US$21.7 million (borrower)Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution to Transport: US$21.7 million (borrower)Recipient government to Ministère de la Santé Publique et de la Population (MSPP): US$19.7 million (borrower)Ministère de la Santé Publique et de la Population (MSPP) to Health: US$19.7 million (borrower)Recipient government to Ministry of National Education and Vocational Training (MENFP): US$18.1 million (borrower)Ministry of National Education and Vocational Training (MENFP) to Education: US$18.1 million (borrower)Recipient government to Ministry of Public Works, Transport and Communications (MTPTC): US$8.7 million (borrower)Recipient government to DINEPA,Ministry of Economy and Finance, MEF: US$6.5 million (borrower)DINEPA,Ministry of Economy and Finance, MEF to Water and sanitation: US$6.5 million (borrower)Ministry of Public Works, Transport and Communications (MTPTC) to Transport: US$4.9 million (borrower)Recipient government to Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications: US$3.1 million (borrower)Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications to Governance and security: US$3.1 million (borrower)Recipient government to Ministry of Agriculture, Natural Resources and Rural Development (MARNDR): US$3.1 million (borrower)Ministry of Agriculture, Natural Resources and Rural Development (MARNDR) to Agriculture and food security: US$3.1 million (borrower)Recipient government to Ministry of Social Affairs and Labour (MAST): US$3.0 million (borrower)Ministry of Social Affairs and Labour (MAST) to Social protection: US$3.0 million (borrower)Recipient government to Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment: US$2.8 million (borrower)Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment to Agriculture and food security: US$2.8 million (borrower)World Bank Group to Recipient government: US$2.7 million (through an executing agency, World Bank contract award)Recipient government to Ministry of Economy and Finance (MEF): US$2.6 million (borrower)Ministry of Economy and Finance (MEF) to Finance and private sector: US$2.6 million (borrower)Recipient government to Ministère de l'Intérieur et des Collectivités Territoriales (MICT): US$2.2 million (through an executing agency, World Bank contract award)Ministère de l'Intérieur et des Collectivités Territoriales (MICT) to International Organization for Migration (IOM): US$2.2 million (through an executing agency, World Bank contract award)Ministry of Public Works, Transport and Communications (MTPTC) to Communications: US$1.8 million (borrower)Ministry of Public Works, Transport and Communications (MTPTC) to Governance and security: US$1.5 million (borrower)International Organization for Migration (IOM) to Environment and disaster risk: US$1.0 million (estimated share of the agency’s spending)Recipient government to Ministry of the Interior and Local Government (MICT): US$0.8 million (borrower)Ministry of the Interior and Local Government (MICT) to Governance and security: US$0.8 million (borrower)International Organization for Migration (IOM) to Humanitarian: US$0.7 million (estimated share of the agency’s spending)Recipient government to Ministry of Public Health and Population (MSPP): US$0.6 million (through an executing agency, World Bank contract award)Ministry of Public Health and Population (MSPP) to Other implementers (1 organization): US$0.6 million (through an executing agency, World Bank contract award)Ministry of Public Works, Transport and Communications (MTPTC) to Energy: US$0.5 million (borrower)International Organization for Migration (IOM) to Unallocated: US$0.3 million (estimated share of the agency’s spending)International Organization for Migration (IOM) to Governance and security: US$0.2 million (estimated share of the agency’s spending)World Bank Group: US$92.8 millionWorld Bank Group 92.8Recipient government: US$92.8 millionRecipient government 92.8Ministère de l'Intérieur et des Collectivités Territoriales (MICT): US$2.2 millionMinistère de l'Intérieur et des… (MICT) 2.2Ministry of Public Health and Population (MSPP): US$0.6 millionMinistry of Public Health and Population (MSPP) 0.6Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution: US$21.7 millionUnite Centrale d' Execution of the Ministry of… 21.7Ministère de la Santé Publique et de la Population (MSPP): US$19.7 millionMinistère de la Santé Publique et de la… (MSPP) 19.7Ministry of National Education and Vocational Training (MENFP): US$18.1 millionMinistry of National Education and… (MENFP) 18.1Ministry of Public Works, Transport and Communications (MTPTC): US$8.7 millionMinistry of Public Works, Transport and… (MTPTC) 8.7DINEPA,Ministry of Economy and Finance, MEF: US$6.5 millionDINEPA,Ministry of Economy and Finance, MEF 6.5Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications: US$3.1 millionMinistry of Interior and Local… 3.1Ministry of Agriculture, Natural Resources and Rural Development (MARNDR): US$3.1 millionMinistry of Agriculture, Natural… (MARNDR) 3.1Ministry of Social Affairs and Labour (MAST): US$3.0 millionMinistry of Social Affairs and Labour (MAST) 3.0Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment: US$2.8 millionMinistry of Agriculture, Natural Resources and… 2.8Ministry of Economy and Finance (MEF): US$2.6 millionMinistry of Economy and Finance (MEF) 2.6International Organization for Migration (IOM): US$2.2 millionInternational Organization for Migration (IOM) 2.2Ministry of the Interior and Local Government (MICT): US$0.8 millionMinistry of the Interior and Local… (MICT) 0.8Other implementers (1 organization): US$0.6 millionOther implementers (1 organization) 0.6Transport: US$26.6 millionTransport 26.6Health: US$19.7 millionHealth 19.7Education: US$18.1 millionEducation 18.1Water and sanitation: US$6.5 millionWater and sanitation 6.5Agriculture and food security: US$5.9 millionAgriculture and food security 5.9Governance and security: US$5.3 millionGovernance and security 5.3Social protection: US$3.0 millionSocial protection 3.0Finance and private sector: US$2.6 millionFinance and private sector 2.6Communications: US$1.8 millionCommunications 1.8Environment and disaster risk: US$0.0 millionEnvironment and disaster risk 0.0Humanitarian: US$0.0 millionHumanitarian 0.0Energy: US$0.5 millionEnergy 0.5Unallocated: US$0.0 millionUnallocated 0.0
Funding partner to channel
Funding partnerChannelWorld Bank Group to Recipient government: US$92.8 million (borrower, through an executing agency, World Bank contract award)World Bank Group: US$92.8 millionWorld Bank Group 92.8Recipient government: US$92.8 millionRecipient government 92.8
Channel to implementer
ChannelImplementerRecipient government to Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution: US$21.7 million (borrower)Recipient government to Ministère de la Santé Publique et de la Population (MSPP): US$19.7 million (borrower)Recipient government to Ministry of National Education and Vocational Training (MENFP): US$18.1 million (borrower)Recipient government to Other (5): US$9.0 million (borrower, through an executing agency, World Bank contract award)Recipient government to Ministry of Public Works, Transport and Communications (MTPTC): US$8.7 million (borrower)Recipient government to DINEPA,Ministry of Economy and Finance, MEF: US$6.5 million (borrower)Recipient government to Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications: US$3.1 million (borrower)Recipient government to Ministry of Agriculture, Natural Resources and Rural Development (MARNDR): US$3.1 million (borrower)Recipient government to Ministry of Social Affairs and Labour (MAST): US$3.0 million (borrower)Recipient government: US$92.8 millionRecipient government 92.8Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution: US$21.7 millionUnite Centrale d'… 21.7Ministère de la Santé Publique et de la Population (MSPP): US$19.7 millionMinistère de la… (MSPP) 19.7Ministry of National Education and Vocational Training (MENFP): US$18.1 millionMinistry of… (MENFP) 18.1Ministry of Public Works, Transport and Communications (MTPTC): US$8.7 millionMinistry of… (MTPTC) 8.7DINEPA,Ministry of Economy and Finance, MEF: US$6.5 millionDINEPA,Ministry of… 6.5Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications: US$3.1 millionMinistry of Interior… 3.1Ministry of Agriculture, Natural Resources and Rural Development (MARNDR): US$3.1 millionMinistry of… (MARNDR) 3.1Ministry of Social Affairs and Labour (MAST): US$3.0 millionMinistry of… (MAST) 3.0Other (5): US$9.0 millionOther (5) 9.0
Implementer to sector
ImplementerSectorUnite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution to Transport: US$21.7 million (borrower)Ministère de la Santé Publique et de la Population (MSPP) to Health: US$19.7 million (borrower)Ministry of National Education and Vocational Training (MENFP) to Education: US$18.1 million (borrower)DINEPA,Ministry of Economy and Finance, MEF to Water and sanitation: US$6.5 million (borrower)Ministry of Public Works, Transport and Communications (MTPTC) to Transport: US$4.9 million (borrower)Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications to Governance and security: US$3.1 million (borrower)Ministry of Agriculture, Natural Resources and Rural Development (MARNDR) to Agriculture and food security: US$3.1 million (borrower)Ministry of Social Affairs and Labour (MAST) to Social protection: US$3.0 million (borrower)Other (4) to Agriculture and food security: US$2.8 million (borrower)Other (4) to Finance and private sector: US$2.6 million (borrower)Ministry of Public Works, Transport and Communications (MTPTC) to Other (5): US$2.3 million (borrower)Other (4) to Other (5): US$2.0 million (estimated share of the agency’s spending)Ministry of Public Works, Transport and Communications (MTPTC) to Governance and security: US$1.5 million (borrower)Other (4) to Governance and security: US$0.8 million (borrower)Other (4) to Governance and security: US$0.2 million (estimated share of the agency’s spending)Transport: US$26.6 millionTransport 26.6Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution: US$21.7 millionUnite Centrale d'… 21.7Ministère de la Santé Publique et de la Population (MSPP): US$19.7 millionMinistère de la… (MSPP) 19.7Health: US$19.7 millionHealth 19.7Ministry of National Education and Vocational Training (MENFP): US$18.1 millionMinistry of… (MENFP) 18.1Education: US$18.1 millionEducation 18.1Ministry of Public Works, Transport and Communications (MTPTC): US$8.7 millionMinistry of… (MTPTC) 8.7DINEPA,Ministry of Economy and Finance, MEF: US$6.5 millionDINEPA,Ministry of… 6.5Water and sanitation: US$6.5 millionWater and sanitation 6.5Agriculture and food security: US$5.9 millionAgriculture and food… 5.9Governance and security: US$5.3 millionGovernance and security 5.3Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications: US$3.1 millionMinistry of Interior… 3.1Ministry of Agriculture, Natural Resources and Rural Development (MARNDR): US$3.1 millionMinistry of… (MARNDR) 3.1Ministry of Social Affairs and Labour (MAST): US$3.0 millionMinistry of… (MAST) 3.0Social protection: US$3.0 millionSocial protection 3.0Finance and private sector: US$2.6 millionFinance and private… 2.6Other (4): US$6.3 millionOther (4) 6.3Other (5): US$2.3 millionOther (5) 2.3

Three charts, one per pair of columns, on one scale. Tap a box or band to light its financing in all three and read its figures under the chart; tap it again to open its page.

Band width is proportional to the amount. Point at a band or box for its amount and shares, click to trace it through the chart, and double-click to open its records or page.

Executing agency: a government body that contracted a UN agency with World Bank or IDB financing.

Lighter bands with a dashed edge are estimates. Money a UN agency files from the partner on an activity goes to that activity’s sector, as reported; the rest is spread over the agency’s spending by sector that year, all funders together. Estimates are in no table or total.

The partner’s box adds US$92.8 million from its operations’ positive nets for the year; the partner’s disbursements for the year come to US$89.5 million, after US$3.3 million from operations whose net for the year is negative.

Spelling variants of one organization are shown as one box (name variants). Where a record does not give the type of receiving organization, it is taken from other records by fixed rules (rules); each band names the rule applied.

Funding partner to channel2 flows
FromToUS$ millionsReceiver known from
World Bank GroupRecipient government90.1borrower
World Bank GroupRecipient government2.7through an executing agency, World Bank contract award
Channel to executing agency2 flows
FromToUS$ millionsReceiver known from
Recipient governmentMinistère de l'Intérieur et des Collectivités Territoriales (MICT)2.2through an executing agency, World Bank contract award
Recipient governmentMinistry of Public Health and Population (MSPP)0.6through an executing agency, World Bank contract award
Channel to implementer11 flows
FromToUS$ millionsReceiver known from
Recipient governmentUnite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution21.7borrower
Recipient governmentMinistère de la Santé Publique et de la Population (MSPP)19.7borrower
Recipient governmentMinistry of National Education and Vocational Training (MENFP)18.1borrower
Recipient governmentMinistry of Public Works, Transport and Communications (MTPTC)8.7borrower
Recipient governmentDINEPA,Ministry of Economy and Finance, MEF6.5borrower
Recipient governmentMinistry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications3.1borrower
Recipient governmentMinistry of Agriculture, Natural Resources and Rural Development (MARNDR)3.1borrower
Recipient governmentMinistry of Social Affairs and Labour (MAST)3.0borrower
Recipient governmentMinistry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment2.8borrower
Recipient governmentMinistry of Economy and Finance (MEF)2.6borrower
Recipient governmentMinistry of the Interior and Local Government (MICT)0.8borrower
Executing agency to implementer2 flows
FromToUS$ millionsReceiver known from
Ministère de l'Intérieur et des Collectivités Territoriales (MICT)International Organization for Migration (IOM)2.2through an executing agency, World Bank contract award
Ministry of Public Health and Population (MSPP)Other implementers (1 organization)0.6through an executing agency, World Bank contract award
Implementer to sector14 flows
FromToUS$ millionsReceiver known from
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'ExecutionTransport21.7borrower
Ministère de la Santé Publique et de la Population (MSPP)Health19.7borrower
Ministry of National Education and Vocational Training (MENFP)Education18.1borrower
DINEPA,Ministry of Economy and Finance, MEFWater and sanitation6.5borrower
Ministry of Public Works, Transport and Communications (MTPTC)Transport4.9borrower
Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and CommunicationsGovernance and security3.1borrower
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR)Agriculture and food security3.1borrower
Ministry of Social Affairs and Labour (MAST)Social protection3.0borrower
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of EnvironmentAgriculture and food security2.8borrower
Ministry of Economy and Finance (MEF)Finance and private sector2.6borrower
Ministry of Public Works, Transport and Communications (MTPTC)Communications1.8borrower
Ministry of Public Works, Transport and Communications (MTPTC)Governance and security1.5borrower
Ministry of the Interior and Local Government (MICT)Governance and security0.8borrower
Ministry of Public Works, Transport and Communications (MTPTC)Energy0.5borrower

Humanitarian funding recorded by OCHA FTS

Table 9.Humanitarian funding reported to OCHA FTS, calendar year, US$ millions

2020US$ millions2022US$ millions2023US$ millions2024US$ millions2025US$ millions2026US$ millions
Humanitarian funding14.43.38.12.02.021.9

Sources

Data as of October 18, 2026
SourceRead on
fts:2021:summary_gapOctober 18, 2026
IATIOctober 18, 2026
IATIOctober 18, 2026
IDA Statement of Credits and GrantsOctober 18, 2026
IFC Finances OneOctober 18, 2026
Public investment programOctober 18, 2026
World Bank procurement noticesOctober 18, 2026
World Bank ProjectsOctober 18, 2026
OCHA FTS, 2010 to 2026October 18, 2026
Cite this page

HaitiDocs. World Bank Group. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/partners/world-bank-group