Cap Haitien Urban Development Project
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
The Project Development Objective is to improve selected urban infrastructure and public spaces to support a more livable and resilient Cap-Haitien city-region.
As published by World Bank Projects, in its original language.
Description
The development objective of Cap-Haitien Urban Development Project for Haiti is to improve selected urban infrastructure and public spaces to support a more livable and resilient Cap-Haitien city-region. This project has four components. 1) The first component, Urban Infrastructure Investment, aims to support the government of Haiti (GoH) to carry out large urban infrastructure investments; and neighborhood upgrading investments, including the preparation of required feasibility studies, environmental and social studies, detailed designs, construction works and construction supervision. 2) The second component, Capacity Building,aims to support the GoH to carry out infrastructure planning, technical studies and activities under Component 1 by strengthening its capacity and the capacity of the Municipality to maintain urban infrastructure investments. 3) The third component, Contingent Emergency
more
Response, aims to finance provision of support upon occurrence of an eligible emergency. 4) The fourth component, Project Management and Implementation Support, aims to finance costs related to Project management and implementation as needed by the project implementation unit.
- Partner
- World Bank Group, IDA
- Sector
- Governance and security
- Stage
- Under way since March 6, 2020
- Approval
- March 6, 2020
- Closing
- March 31, 2027
- Instrument
- IBRD/IDA financing, IDA
- Undisbursed gap
- 0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Borrower
- Republic of Haiti
- Implementing agency
- Ministry of Public Works, Transport and Communications
- Effectiveness
- April 23, 2020
- Departments
- Nord
- Last transaction
- September 30, 2026
- Operation ID
- P168951
Life cycle3 stages, 13 dates
Stage history
| Stage | From |
|---|---|
| Planned | April 25, 2019 |
| Approved | March 6, 2020 |
| Under way | March 6, 2020 |
Dated events
| Event | Date | Source |
|---|---|---|
| Concept review | April 25, 2019 | World Bank Projects |
| Disclosure | May 24, 2019 | World Bank Projects |
| Planned start | September 27, 2019 | IATI |
| Appraisal | December 9, 2019 | World Bank Projects |
| Negotiation | December 25, 2019 | World Bank Projects |
| Actual start | March 6, 2020 | IATI |
| Approval | March 6, 2020 | World Bank Projects |
| First commitment | March 6, 2020 | Transactions |
| Effectiveness | April 23, 2020 | World Bank Projects |
| First disbursement | October 31, 2020 | Transactions |
| Last disbursement | September 30, 2026 | Transactions |
| Closing date | March 31, 2027 | IATI |
| Completion report due | September 30, 2027 | World Bank Projects |
Undisbursed: US$26.8 million on September 30, 2026, with closing on March 31, 2027. Disbursed in FY2025-26: US$11.0 million.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDA Grant | 56.0 | Institution | World Bank Projects |
Table 2.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 56.0 | IDA Statement of Credits and Grants | 56.0 |
| Disbursed | 28.3 | IDA Statement of Credits and Grants | 24.5 |
| Undisbursed | 26.8 | IDA Statement of Credits and Grants | |
| Total cost | 56.0 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
Changes to the operation0 extensions, at least 1 restructuring, emergency component included
- Original closing date
- March 31, 2027
- Closing date extensions
- 0
- Restructurings
- at least 1
- June 29, 2026, Level 2, approved by management (document of June 29, 2026) restructuring paper
- Emergency component
- Contingent emergency response component included (document of June 29, 2026) restructuring paper
New commitments and disbursements by fiscal year
Table 3.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2019-20US$ millions | FY2020-21US$ millions | FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | |
|---|---|---|---|---|---|---|---|
| New commitments | 56.0 | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported |
| Disbursements | Not reported | 3.1 | 0.8 | 1.5 | 2.4 | 9.5 | 11.0 |
| Cumulative disbursements | Not reported | 3.1 | 3.9 | 5.4 | 7.8 | 17.3 | 28.3 |
Records and documents
Transactions39 records, March 6, 2020 to September 30, 2026
Table 4.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| March 6, 2020 | Commitment | 56.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| October 31, 2020 | Disbursements | 2.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2021 | Disbursements | 1.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2022 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2022 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2022 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2022 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2022 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2022 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2023 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2023 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2023 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2023 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2023 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2024 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 29, 2024 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2024 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2024 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2024 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2024 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2024 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2025 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2025 | Disbursements | 5.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2025 | Disbursements | 1.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2025 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2025 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2025 | Disbursements | 1.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2025 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2025 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2026 | Disbursements | 2.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2026 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2026 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2026 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2026 | Disbursements | 1.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2026 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2026 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2026 | Disbursements | 1.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms4 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Not reported
Locations1 department, 2 places named, 4 places with coordinates
| Departments | Nord |
| Places named by the source | Cap Haitien, Quartier Morin |
| Places with coordinates | 4 |
Results indicators19 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| Baseline study conducted | No | Yes | Yes | February 2, 2024 |
| Detailed designs for integrated urban upgrading developed | 0.00 | 100.00 | 25.00 | February 2, 2024 |
| Gender gap monitored | No | Yes | Yes | February 2, 2024 |
| Increase in the number of people accessing enhanced public spaces | 0.00 | 70.00 | 0.00 | February 2, 2024 |
| Km of non-motorized transport infrastructure constructed/rehabilitated | 0.00 | 12.53 | 0.00 | February 2, 2024 |
| Km of roads rehabilitated or expanded | 0.00 | 14.35 | 0.00 | February 2, 2024 |
| Km of roads/pedestrian paths with improved street lighting | 0.00 | 10.00 | 0.00 | February 2, 2024 |
| Number of Urban Management Initiatives (UMI) implemented | 0.00 | 3.00 | 0.00 | February 2, 2024 |
| Number of community meetings chaired by the local authorities | 0.00 | 28.00 | 0.00 | February 2, 2024 |
| Number of meetings held with women's focus groups to discuss their inputs to the design of the urban infrastructure investments | 0.00 | 10.00 | 9.00 | June 30, 2023 |
| Semi-annual community meetings held to discuss the decisions and/or actions taken based on feedback from key project stakeholders (Number) | 0.00 | 28.00 | 12.00 | June 30, 2023 |
| of which are women | 0.00 | 60.00 | 0.00 | February 2, 2024 |
| New or rehabilitated urban public spaces | 0.00 | 24000.00 | 0.00 | February 2, 2024 |
| People directly benefiting from resilient urban infrastructure and public space improvements | 0.00 | 73500.00 | 0.00 | February 2, 2024 |
| People protected against flood risk | 0 | 3000 | 0 | Not reported |
| Time saved to go from National Road 1 to National Road 3 | 0.00 | 30.00 | 0.00 | February 2, 2024 |
| People benefiting from improved access to sustainable transport infrastructure and services | 0 | Not reported | 0 | January 1, 1900 |
| Reduction of flooded areas in Cap - Haitien | 0 | 20 | 0 | Not reported |
| disaggregated by gender (women) | 0.00 | 36750.00 | 0.00 | February 2, 2024 |
Ratings6 ratings
| Rating | Value | Date |
|---|---|---|
| ISR Financial Management | Moderately Satisfactory | August 3, 2026 |
| ISR Monitoring and Evaluation | Satisfactory | August 3, 2026 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | August 3, 2026 |
| ISR Procurement | Moderately Satisfactory | August 3, 2026 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | August 3, 2026 |
| ISR Project Management | Moderately Satisfactory | August 3, 2026 |
Contract awards42 awards
| Supplier | Date | Method | Amount |
|---|---|---|---|
| M & L Construction | July 24, 2026 | RFB | 720,347.95 USD |
| CNIGS | June 25, 2026 | CDS | 22,813,616 HTG |
| Organisation de Gestion de la Destination Nord Hati (OGDNH) | June 24, 2026 | DIR | 399,800 USD |
| Laboratoire National du Batiment et des Travaux Publics (LNBTP) | April 15, 2026 | DIR | 10,719,293.34 HTG |
| Electricit D'Hati | April 14, 2026 | DIR | 24,303,982 HTG |
| Geo Society, Ingénierie Environnementale et Géomatique | March 31, 2026 | DIR | 1,198,737.75 USD |
| SD Construction | February 2, 2026 | DIR | 87,243.6 USD |
| HT-360 Consortium S. A. (HT-Beton) | November 24, 2025 | DIR | 70,870.17 USD |
| M & L Construction | April 8, 2025 | RFB | 2,000,205.08 USD |
| Enatec S. A. | April 8, 2025 | RFB | 372,489.3 USD |
| L & C Architecture & Construction | April 8, 2025 | RFB | 644,286.26 USD |
| Coamco Haïti S. A. | February 13, 2025 | RFB | 15,996,686.33 USD |
| Matiere SAS | February 13, 2025 | RFB | 5,755,492 USD |
| Eccomar S. A. | February 13, 2025 | RFB | Not reported |
| Matiere SAS | February 13, 2025 | RFB | Not reported |
| Coamco Haïti S. A. | February 13, 2025 | RFB | Not reported |
| LEMAY Co Inc. | September 11, 2024 | CDS | 788,030.64 USD |
| Smith Warner International Limited | September 11, 2024 | CDS | Not reported |
| Le Groupe Geninov | September 11, 2024 | CDS | Not reported |
| EXP. International Services Inc. | September 11, 2024 | CDS | Not reported |
| Name not shown | October 23, 2023 | CDS | 15,000 USD |
| Organisation de Gestion de la Destination Nord Hati (OGDNH) | November 8, 2022 | DIR | 900,000 USD |
| EXP. International Services Inc. | August 5, 2022 | CDS | 17,755,350.58 Gourde hatienne |
| EXP. International Services Inc. | August 5, 2022 | CDS | 1,073,510.19 USD |
| Le Groupe Geninov | August 5, 2022 | CDS | Not reported |
| Name not shown | May 2, 2022 | INDV | 4,000 USD |
| Name not shown | January 28, 2022 | INDV | 38,000 USD |
| Centre d'Étude et de Coopération Internationale (CECI) | December 13, 2021 | QBS | 6,287,817.44 USD |
| Centre d'Étude et de Coopération Internationale (CECI) | December 13, 2021 | QBS | 131,644,058.07 HTG |
| Paul Désilus et Associés - Cabinet d'Experts Comptables | August 16, 2021 | LCS | 3,023,331 HTG |
| Insuco Haiti S. A. | July 19, 2021 | QCBS | 710,695.13 USD |
| We Architects | July 19, 2021 | QCBS | Not reported |
| Creocean | July 19, 2021 | QCBS | Not reported |
| Ingenieros/Economistas/Planificadores (Ac&a) | July 5, 2021 | QCBS | 29,800,487.75 HTG |
| Ingenieros/Economistas/Planificadores (Ac&a) | July 5, 2021 | QCBS | 175,000 USD |
| We Architects | July 5, 2021 | QCBS | Not reported |
| Guynemer Développement Groupe | July 5, 2021 | QCBS | Not reported |
| JESCA Solutions LLC | June 4, 2021 | CQS | 201,910.16 USD |
| Name not shown | April 30, 2021 | INDV | 14,062.5 USD |
| CSI Ingenieros S. A. | March 22, 2021 | QCBS | 610,750 USD |
| CSI Ingenieros S. A. | March 22, 2021 | QCBS | 8,999,000 HTG |
| AC&A | March 22, 2021 | QCBS | Not reported |
Funds passed on36 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2026 | 0.7 |
| Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2026 | 0.8 |
| Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2026 | 0.9 |
| Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2026 | 0.5 |
| Ministry of Public Works, Transport and Communications | Disbursement | February 28, 2026 | 2.0 |
| Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2025 | 0.6 |
| Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2025 | 0.3 |
| Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2025 | 1.3 |
| Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2025 | 0.8 |
| Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2025 | 0.5 |
| Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2025 | 1.6 |
| Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2025 | 5.5 |
| Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2025 | 0.5 |
| Ministry of Public Works, Transport and Communications | Disbursement | February 28, 2025 | 0.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2025 | 0.2 |
| Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2024 | 0.2 |
| Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2024 | 0.2 |
| Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2024 | 0.3 |
| Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2024 | 0.3 |
| Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2024 | 0.6 |
| Ministry of Public Works, Transport and Communications | Disbursement | February 29, 2024 | 0.4 |
| Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2024 | 0.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2023 | 0.2 |
| Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2023 | 0.6 |
| Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2023 | 0.2 |
| Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2023 | 0.7 |
| Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2023 | 0.4 |
| Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2022 | 0.2 |
| Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2022 | 0.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2022 | 0.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2022 | 0.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2022 | 0.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2022 | 0.4 |
| Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2021 | 1.1 |
| Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2020 | 2.0 |
| Ministry of Public Works, Transport and Communications | Commitment | March 31, 2020 | 56.0 |
Identifiers5 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | 44000-P168951 | IATI |
| IDA credit or grant | IDAD5630 | IDA Statement of Credits and Grants |
| Public investment program line | 11141-1-25-31-12 | Public investment program |
| World Bank loan | IDA-D5630 | World Bank Projects |
| World Bank project | P168951 | Operation record |
Partner documents83 documents
- Record on projects.worldbank.org, projects.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 13, August 3, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, August 3, 2026, documents.worldbank.org
- Resettlement Completion report Cap Haitien Urban Development Project (P168951), July 8, 2026, documents.worldbank.org
- Environmental and Social Management Plan (ESMP) Cap Haitien Urban Development Project (P168951), July 7, 2026, documents.worldbank.org
- Disclosable Restructuring Paper - Cap Haitien Urban Development Project - P168951, June 29, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, May 28, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, May 26, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, May 5, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, April 9, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, April 7, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, April 6, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P168951 - Cap Haitien Urban Development Project - Audited Financial Statement, February 28, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, January 27, 2026, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 12, December 22, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, December 19, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, December 18, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, December 1, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 11, September 16, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, April 17, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P168951 - Cap Haitien Urban Development Project - Audited Financial Statement, March 28, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 10, February 14, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 10, February 14, 2025, documents.worldbank.org
- Haïti - Projet de Développement Urbain au Cap-Haïtien (CHUD) : Huitième Mission de Supervision - 15 au 22 Novembre 2024 , November 22, 2024, documents.worldbank.org
- Environmental and Social Management Plan (ESMP) Cap Haitien Urban Development Project (P168951), August 28, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 9, August 9, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, July 18, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, June 20, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, May 28, 2024, documents.worldbank.org
- Environmental and Social Management Plan (ESMP) Cap Haitien Urban Development Project (P168951), May 28, 2024, documents.worldbank.org
- Haïti - Projet de Développement Urbain au Cap-Haïtien (CHUD) : Septieme Mission de Supervision - 20 -24 Mai 2024, May 24, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P168951 - Cap Haitien Urban Development Project - Audited Financial Statement, March 26, 2024, documents.worldbank.org
- Resettlement Plan Cap Haitien Urban Development Project (P168951), March 14, 2024, documents.worldbank.org
- Environmental and Social Management Plan (ESMP) Cap Haitien Urban Development Project (P168951), March 14, 2024, documents.worldbank.org
- Resettlement Plan Cap Haitien Urban Development Project (P168951), March 14, 2024, documents.worldbank.org
- Resettlement Plan Cap Haitien Urban Development Project (P168951), March 14, 2024, documents.worldbank.org
- Environmental and Social Management Plan (ESMP) Cap Haitien Urban Development Project (P168951), February 22, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 08, February 12, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, October 7, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 07, August 4, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P168951 - Cap Haitien Urban Development Project - Audited Financial Statement, March 31, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 06, January 9, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, November 16, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, October 25, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 05, June 27, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, May 26, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P168951 - Cap Haitien Urban Development Project - Audited Financial Statement, March 29, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 04, December 20, 2021, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 03, June 9, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, March 5, 2021, documents.worldbank.org
- Environmental and Social Impact Assessment Cap Haitien Urban Development Project (P168951), January 25, 2021, documents.worldbank.org
- Environmental and Social Management Framework (ESMF) Cap Haitien Urban Development Project (P168951), January 25, 2021, documents.worldbank.org
- Resettlement Framework Cap Haitien Urban Development Project (P168951), January 25, 2021, documents.worldbank.org
- Labor Management Procedures Cap Haitien Urban Development Project (P168951), January 25, 2021, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) Cap Haitien Urban Development Project (P168951), January 25, 2021, documents.worldbank.org
- Environmental and Social Commitment Plan (ESCP) Cap Haitien Urban Development Project (P168951), January 25, 2021, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 02, December 14, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, October 1, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, August 31, 2020, documents.worldbank.org
- Disclosable Version of the ISR - Cap Haitien Urban Development Project - P168951 - Sequence No : 01, June 9, 2020, documents.worldbank.org
- Environmental and Social Impact Assessment Cap Haitien Urban Development Project (P168951), May 28, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, April 30, 2020, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) Cap Haitien Urban Development Project (P168951), March 24, 2020, documents.worldbank.org
- Environmental and Social Management Framework (ESMF) Cap Haitien Urban Development Project (P168951), March 24, 2020, documents.worldbank.org
- Resettlement Framework Cap Haitien Urban Development Project (P168951), March 24, 2020, documents.worldbank.org
- Official Documents- Financing Agreement for Grant D563-HT (Closing Package), March 22, 2020, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Grant D563-HT, March 22, 2020, documents.worldbank.org
- Labor Management Procedures Cap Haitien Urban Development Project (P168951), March 5, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, February 18, 2020, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) - Cap Haitien Urban Development Project - P168951, February 13, 2020, documents.worldbank.org
- Appraisal Environmental and Social Review Summary (ESRS) - Cap Haitien Urban Development Project - P168951, February 13, 2020, documents.worldbank.org
- Haiti - Cap-Haitien Urban Development Project, February 13, 2020, documents.worldbank.org
- Environmental and Social Commitment Plan (ESCP) - Cap Haitien Urban Development Project - P168951, February 13, 2020, documents.worldbank.org
- ESCP Cap Haitien Urban Development Project (P168951), February 13, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P168951- Cap Haitien Urban Development Project - Procurement Plan, December 10, 2019, documents.worldbank.org
- Project Information Document - Cap Haitien Urban Development Project - P168951, December 9, 2019, documents.worldbank.org
- Environmental and Social Commitment Plan (ESCP) - Cap Haitien Urban Development Project - P168951, December 3, 2019, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) - Cap Haitien Urban Development Project - P168951, December 3, 2019, documents.worldbank.org
- Appraisal Environmental and Social Review Summary (ESRS) - Cap Haitien Urban Development Project - P168951, December 3, 2019, documents.worldbank.org
- Environmental and Social Management Framework (ESMF) Cap Haitien Urban Development Project (P168951), November 26, 2019, documents.worldbank.org
- Resettlement Framework Cap Haitien Urban Development Project (P168951), November 26, 2019, documents.worldbank.org
- Concept Environmental and Social Review Summary (ESRS) - Cap Haitien Urban Development Project - P168951, June 13, 2019, documents.worldbank.org
- Concept Project Information Document (PID) - Cap Haitien Urban Development Project - P168951, May 24, 2019, documents.worldbank.org
Procurement notices (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sources
- Partner documents: terms of use set by the publisher
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- Public investment program: terms of use set by the publisher
- World Bank procurement notices: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| Public investment program | October 18, 2026 |
| World Bank procurement notices | October 11, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |
Cite this page
HaitiDocs. Cap Haitien Urban Development Project. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP168951