Data / Partner portfolio / World Bank Group / IDA
Haiti Community Driven Development (CDD) Project / PRODEP
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
Building on the successful experience of the PCF-funded CDD pilot, the proposed project would scale-up the direct transfer of public resources to local community organizations in poor rural and peri-urban communities, by: (i) improving their access to basic social and economic infrastructure and support income-generating activities by financing small-scale investments proposed, implemented and managed by community organizations; and (ii) improving governance and building social capital of communities by increasing citizen participation and transparency in open decision-making processes. Key indicators for the project would be (i) total resources transferred to OCBs over the life of the project; (ii) change in access to basic services as a function of subprojects implemented by OCBs; (iii) cost-effectiveness of infrastructure investments, compared with traditional service delivery mechanisms, and (iv) cost-benefit of productive subprojects.
As published by World Bank Projects, in its original language.
Description
The Community Driven Development Project for Haiti will scale-up the direct transfer of public resources to local community organizations in poor rural and peri-urban communities. The project consists of the following components: Component 1) will finance, in some 55-65 targeted communes of rural and peri-urban Haiti. It will also earmark resources for the hiring of technical assistance service providers to mobilize community organizations (OCBs) in the targeted communes and train them in preparation and subsequent execution for subproject investments. Component 2) will finance: (i) training-of trainers events in basic management, administration, accounting and financial management; (ii) periodic regional and national exchanges; (iii) workshops for MDODs and their associated field offices; (iv) training for staff in order to effectively supervise overall
more
project implementation; (v) various consultant services including possible preparation of future operation and assessment of ways in which the Haitian Diaspora might be mobilized; and (vi) policy dialogue to engage the Government of Haiti and other stakeholders on a medium to long-term national strategy to facilitate the mainstreaming of community-driven development. Component 3) finance incremental costs associated with project implementation.
- Partner
- World Bank Group, IDA
- Stage
- Closed since June 30, 2013
- Approval
- July 28, 2005
- Closing
- June 30, 2013
- Instrument
- IBRD/IDA financing, IDA
- Undisbursed gap
- −2.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Effectiveness
- December 8, 2005
- Departments
- Nord-Est, Sud, Centre, Ouest, Sud-Est, Grande Anse, Nord, Nippes, Artibonite, Nord-Ouest
- Last transaction
- November 30, 2013
- Operation ID
- P093640
Life cycle5 stages, 14 dates
Stage history
| Stage | From |
|---|---|
| Planned | February 3, 2005 |
| Approved | July 28, 2005 |
| Under way | July 28, 2005 |
| Closing | June 30, 2013 |
| Closed | June 30, 2013 |
Dated events
| Event | Date | Source |
|---|---|---|
| Concept review | February 3, 2005 | World Bank Projects |
| Disclosure | February 8, 2005 | World Bank Projects |
| Appraisal | May 23, 2005 | World Bank Projects |
| Negotiation | June 14, 2005 | World Bank Projects |
| Planned start | July 21, 2005 | IATI |
| Actual start | July 28, 2005 | IATI |
| Approval | July 28, 2005 | World Bank Projects |
| First commitment | July 28, 2005 | Transactions |
| Effectiveness | December 8, 2005 | World Bank Projects |
| First disbursement | June 30, 2011 | Transactions |
| Actual end | June 30, 2013 | IATI |
| Closing date | June 30, 2013 | IATI |
| Last disbursement | September 30, 2013 | Transactions |
| Completion report due | December 30, 2013 | World Bank Projects |
Undisbursed: US$0.0 million on September 30, 2026, with closing on June 30, 2013.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| Borrower/Recipient | 2.3 | Counterpart | World Bank Projects |
| IDA Grant | 38.0 | Institution | World Bank Projects |
Table 2.Related operations, US$ millions
| Operation | Relation | Partner | Stage | CommitmentUS$ millions |
|---|---|---|---|---|
| Community-Driven Development (CDD) Additional Financing | Additional financing or child operation | World Bank Group | Closed | 8.0 |
| Rural Community Driven Development - Additional Financing II | Additional financing or child operation | World Bank Group | Closed | 15.0 |
Table 3.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | |
|---|---|---|
| Commitment | 60.8 | IDA Statement of Credits and Grants |
| Disbursed | 62.8 | IDA Statement of Credits and Grants |
| Undisbursed | 0.0 | IDA Statement of Credits and Grants |
| Total cost | 40.3 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. Amounts by source
Changes to the operationnot reported
- Original closing date
- Not reported
- Closing date extensions
- Not reported
- Restructurings
- Not reported
- Emergency component
- Not reported
New commitments and disbursements by fiscal year
Table 4.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2004-05US$ millions | FY2008-09US$ millions | FY2009-10US$ millions | FY2010-11US$ millions | FY2011-12US$ millions | FY2012-13US$ millions | FY2013-14US$ millions | |
|---|---|---|---|---|---|---|---|
| New commitments | 38.0 | 8.0 | 15.0 | Not reported | Not reported | Not reported | −0.2 |
| Disbursements | Not reported | Not reported | Not reported | 1.5 | 9.2 | 4.1 | −0.0 |
| Cumulative disbursements | Not reported | Not reported | Not reported | 49.5 | 58.7 | 62.8 | 62.8 |
The running total starts at the opening balance of US$48.0 million.
Records and documents
Transactions26 records, July 28, 2005 to November 30, 2013
Table 5.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| July 28, 2005 | Commitment | 38.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| January 29, 2009 | Commitment | 8.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| May 27, 2010 | Commitment | 15.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| November 30, 2013 | Commitment | −0.1 | IDA Statement of Credits and Grants | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2013 | Commitment | −0.1 | IDA Statement of Credits and Grants | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2011 | Disbursements | 8.0 | IDA Statement of Credits and Grants | cumulative at first snapshot (opening balance) |
| April 30, 2011 | Disbursements | 37.7 | IDA Statement of Credits and Grants | cumulative at first snapshot (opening balance) |
| April 30, 2011 | Disbursements | 2.2 | IDA Statement of Credits and Grants | cumulative at first snapshot (opening balance) |
| June 30, 2011 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2011 | Disbursements | 1.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2011 | Disbursements | 2.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 29, 2012 | Disbursements | 2.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2012 | Disbursements | 1.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2012 | Disbursements | 1.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2012 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2012 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2012 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2012 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2012 | Disbursements | 1.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2013 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2013 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2013 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2013 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2013 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2013 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2013 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms4 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Not reported
Locations10 departments, 57 places named, 114 places with coordinates
| Departments | Nord-Est, Sud, Centre, Ouest, Sud-Est, Grande Anse, Nord, Nippes, Artibonite, Nord-Ouest |
| Places named by the source | Anse Rouge, Anse-a-Pitres, Anse-a-Veau, Aquin, Bahon, Baie de Henne, Bainet, Baraderes, Bassin Bleu, Belladere, Belle-Anse, Boucan Carre, Capotille, Carice, Carrefour Saut d'Eau, Cavaillon, Cerca la Source, Chantal, Corail, Cornillon, Cote de Fer, Desdunes, Dessalines, Ennery, Fond Verrettes, Grand Gosier, Grande Saline, Gros Morne, Jean-Rabel, L'Asile, La Chapelle, La Vallee de Jacmel, Lascahobas, Maissade, Maniche, Marigot, Marmelade, Mirebalais, Mont Organise, Ouanaminthe and 17 more |
| Places with coordinates | 114 |
Results indicators22 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| 10 CADECs allocating funds from other development programs. | 0 | 10 | Not Yet | June 30, 2013 |
| 75% of CBO members have attended at least one training event. | 0 | 75% | 87% | June 30, 2013 |
| 80% of subprojects are implemented within 6 months. | 0 | 80% | 87 | June 30, 2013 |
| 90% of CADEC members have attended at least two training events. | 0 | 90% | 100% | June 30, 2013 |
| Amount of Project funds disbursed within the Project timeframe. | 0 | US$61 million | US$ 58.7 million | June 30, 2013 |
| Component 1- # of subprojects: (a) 4050 proposed, (b) 2900 approved, (c) 2020 start implementation, and (d) 2010 completed. | (a): 0 (b): 0 (c): 0 (d): 0 | # of subprojects: (a) 4050 (b) 2900 (c) 2020 d) 2010 | (a) 10,202 (b) 1685 (c) 11 (d) 1668 | June 30, 2013 |
| Component 1- 100 new CBOs created as a result of the Project. | 0 | 100 | 238 | June 30, 2013 |
| Component 1- 59 CADECs following democratic and open meeting procedures as detailed in the Project Operational Manual. | (a): 0 (b): 0 (c): 0 (d): 0 | 59 | 59 | June 30, 2013 |
| Component 1--30% of CBO and 15% of CADEC members of the executive committee are women. | 0/0 | 30/15 | 43% CBOs, 26% CADECs | June 30, 2013 |
| Component 1-75% of subprojects with adequate O&M arrangements implemented. | 0 | 75% | 45% | June 30, 2013 |
| Component 2 - 460 training events for CBOs, CADECs. | 0 | 360 | 4030 | June 30, 2013 |
| Component 3 MIS provides complete quarterly reports within 30 days after the end of the quarter. | Not reported | Yes | Not yet, and data from first two years of implementation is incomplete. | June 30, 2013 |
| Health facilities constructed, renovated, and/or equipped (number) | 0.00 | 0.00 | 28.00 | June 30, 2013 |
| Improved community water points constructed or rehabilitated under the project | 0.00 | 0.00 | 444.00 | June 30, 2013 |
| Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions. | 0.00 | 0.00 | 294.00 | June 30, 2013 |
| Roads rehabilitated, Rural | 0.00 | 0.00 | 892.00 | June 30, 2013 |
| 1.2 million residents in 59 Municipalities of the Project area improved their access to basic social and economic infrastructure and/or benefits of productive subprojects. | 41% of residents have access to potable water less than 15 minutes away from their homes (Baseline Dec 08). | 1.2 million residents in 59 Municipalities | 1.2 million residents in 59 Municipalities | June 30, 2013 |
| 20-point change in Social Capital Index, reflecting greater citizen participation in resource allocation decisions. | Not reported | 20% | Not yet available | June 30, 2013 |
| 3500 CBOs in the 59 Municipalities are officially constituted and participating in CADECs. | 139 (as of end of LICUS pilot Grant) | 3,500 | 3819 | June 30, 2013 |
| 60% of the adult population in the 59 Municipalities expresses to be aware of PRODEP and its objectives/activities/ means of access. | 20.6 (per Dec 2008 baseline survey). | 60% | 55% | June 30, 2013 |
| 75% of productive/ income-generating subprojects within the 59 Municipalities are operational and are being maintained 12 months after completion. | 0 | 75% | 82% | June 30, 2013 |
| In 59 Municipalities CBO have successfully managed the direct transfers for community subprojects | 3 (at the end of the PCF and LICUS-funded pilot grants) | 59 communes with 59 CADECs fully operational | 59 | June 30, 2013 |
Ratings27 ratings
| Rating | Value | Date |
|---|---|---|
| IEG bankqualityofsupervision | Satisfactory | October 16, 2014 |
| IEG borrowcompliance | Moderately Unsatisfactory | October 16, 2014 |
| IEG borrowimplementation | Moderately Satisfactory | October 16, 2014 |
| IEG evaltype | ES | October 16, 2014 |
| IEG evaluation_riskdo | High | October 16, 2014 |
| IEG icrquality | Satisfactory | October 16, 2014 |
| IEG mequality | Substantial | October 16, 2014 |
| IEG outcome | Moderately Satisfactory | October 16, 2014 |
| IEG overallbankperf | Satisfactory | October 16, 2014 |
| IEG overallborrowperf | Moderately Satisfactory | October 16, 2014 |
| ICR bankqualityentry | Not Rated | December 30, 2013 |
| ICR banksupervision | Not Rated | December 30, 2013 |
| ICR banksupervision | Substantial | December 30, 2013 |
| ICR banksupervision | Moderately Satisfactory | December 30, 2013 |
| ICR borrgovt | Moderately Satisfactory | December 30, 2013 |
| ICR borrimplegency | Moderately Satisfactory | December 30, 2013 |
| ICR borroverall | Moderately Satisfactory | December 30, 2013 |
| ICR completion_riskdo | Substantial | December 30, 2013 |
| ICR outratingind | Moderately Satisfactory | December 30, 2013 |
| ICR overallrating | Moderately Satisfactory | December 30, 2013 |
| ISR Counterpart Funding | Satisfactory | June 26, 2013 |
| ISR Financial Management | Moderately Unsatisfactory | June 26, 2013 |
| ISR Monitoring and Evaluation | Moderately Unsatisfactory | June 26, 2013 |
| ISR Overall Implementation Progress (IP) | Satisfactory | June 26, 2013 |
| ISR Procurement | Satisfactory | June 26, 2013 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | June 26, 2013 |
| ISR Project Management | Moderately Unsatisfactory | June 26, 2013 |
Identifiers8 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | 44000-P093640 | IATI |
| IDA credit or grant | IDAH1810 | IDA Statement of Credits and Grants |
| IDA credit or grant | IDAH4450 | IDA Statement of Credits and Grants |
| IDA credit or grant | IDAH5850 | IDA Statement of Credits and Grants |
| World Bank loan | IDA-H1810 | World Bank Projects |
| World Bank loan | IDA-H4450 | World Bank Projects |
| World Bank loan | IDA-H5850 | World Bank Projects |
| World Bank project | P093640 | Operation record |
Where sources differ2 fields
| Field | Source | Value | Used |
|---|---|---|---|
| Commitment | IDA Statement of Credits and Grants | US$60.8 million | ✓ |
| Commitment | World Bank Projects | US$38.0 million | |
| Status | World Bank Projects | Closed | ✓ |
| Status | IATI | Active |
Partner documents27 documents
- Record on projects.worldbank.org, projects.worldbank.org
- Haiti - Community Driven Development (cdd) Project / Prodep, October 16, 2014, documents.worldbank.org
- Haiti - Community-Driven Development Project, December 18, 2013, documents.worldbank.org
- Haiti - Haiti Community Driven Development (CDD) Project / PRODEP : P093640 - Implementation Status Results Report : Sequence 20, June 26, 2013, documents.worldbank.org
- Haiti - Haiti Community Driven Development (CDD) Project / PRODEP : P093640 - Implementation Status Results Report : Sequence 19, January 10, 2013, documents.worldbank.org
- Haiti - Haiti Community Driven Development (CDD) Project / PRODEP : P093640 - Implementation Status Results Report : Sequence 18, June 6, 2012, documents.worldbank.org
- Haiti - Haiti Community Driven Development (CDD) Project / PRODEP : P093640 - Implementation Status Results Report : Sequence 17, January 31, 2012, documents.worldbank.org
- Haiti - Community-Driven Development (CDD) Project : restructuring (Vol. 1 of 2) : Main report, January 4, 2012, documents.worldbank.org
- Haiti - Community-Driven Development (CDD) Project : restructuring (Vol. 2 of 2) : Data sheet, January 4, 2012, documents.worldbank.org
- Haiti - Haiti Community Driven Development (CDD) Project / PRODEP : P093640 - Implementation Status Results Report : Sequence 16, July 27, 2011, documents.worldbank.org
- Haiti - Haiti Community Driven Development (CDD) Project / PRODEP : P093640 - Implementation Status Results Report : Sequence 15, February 7, 2011, documents.worldbank.org
- Financing Agreement for IDA Grant H585-HT Conformed, June 10, 2010, documents.worldbank.org
- Haiti - Second Additional Financing for Community Driven Development Project, May 10, 2010, documents.worldbank.org
- Évaluation environnementale, April 1, 2010, documents.worldbank.org
- Financing Agreement Grant H445-HT Conformed, February 12, 2009, documents.worldbank.org
- Haiti - Additional Financing for Haiti Community-Driven Development (CDD) Project : environmental report, January 1, 2009, documents.worldbank.org
- Haiti - Community-Driven Development (CDD) Project : additional financing, December 22, 2008, documents.worldbank.org
- Haiti - Community Driven Development Project : procurement plan, September 7, 2006, documents.worldbank.org
- Haiti - Multi-Sector Project, August 25, 2006, documents.worldbank.org
- Development Grant Agreement, H181-HT Conformed, September 9, 2005, documents.worldbank.org
- Announcement of World Bank Approves Thirty-Eight Million Dollars Grant to Support Community-Driven Development in Haiti on July 28, 2005, July 27, 2005, documents.worldbank.org
- Haiti - Community Driven Development Project, July 6, 2005, documents.worldbank.org
- Haïti – Projet de développement conduit par les communautés : évaluation environnementale, June 1, 2005, documents.worldbank.org
- Haiti - Community Driven Development Project, May 13, 2005, documents.worldbank.org
- Haiti - Community Driven Development Project, May 10, 2005, documents.worldbank.org
- Haiti - Community Driven Development Project, January 27, 2005, documents.worldbank.org
- Haiti - Community Driven Development Project, January 27, 2005, documents.worldbank.org
Procurement notices (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sources
- IATI record (d-portal): terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |
Cite this page
HaitiDocs. Haiti Community Driven Development (CDD) Project / PRODEP. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP093640