Multilateral development bank. 11 active operations. US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

New commitments in FY2025-26

US$67.2 million

On 4 operations

Disbursed in FY2025-26

US$139.9 million

On 15 operations

Active portfolio at October 18, 2026

US$945.9 million

11 of 11 active operations report an approved amount

New commitments and disbursements, FY2016-17 to FY2025-26

New commitments, US$ millions
FY2016-17, US$47.5 million4816-17FY2017-18, US$110.0 million11017-18FY2018-19, US$35.0 million3518-19FY2019-20, US$173.5 million17319-20FY2020-21, US$210.0 million21020-21FY2021-22, US$283.5 million28321-22FY2022-23, US$137.9 million13822-23FY2023-24, US$−6.7 million-723-24FY2024-25, US$124.4 million12424-25FY2025-26, US$67.2 million6725-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$47.5 million4816-17FY2017-18, US$110.0 million11017-18FY2018-19, US$35.0 million3518-19FY2019-20, US$173.5 million17319-20FY2020-21, US$210.0 million21020-21FY2021-22, US$283.5 million28321-22FY2022-23, US$137.9 million13822-23FY2023-24, US$−6.7 million-723-24FY2024-25, US$124.4 million12424-25FY2025-26, US$67.2 million6725-26FY2026-27, none (to Oct 18)noneto Oct 1826-27
Disbursements, US$ millions
FY2016-17, US$31.7 million3216-17FY2017-18, US$32.8 million3317-18FY2018-19, US$28.1 million2818-19FY2019-20, US$47.2 million4719-20FY2020-21, US$74.6 million7520-21FY2021-22, US$82.0 million8221-22FY2022-23, US$48.3 million4822-23FY2023-24, US$131.4 million13123-24FY2024-25, US$127.3 million12724-25FY2025-26, US$139.9 million14025-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$31.7 million3216-17FY2017-18, US$32.8 million3317-18FY2018-19, US$28.1 million2818-19FY2019-20, US$47.2 million4719-20FY2020-21, US$74.6 million7520-21FY2021-22, US$82.0 million8221-22FY2022-23, US$48.3 million4822-23FY2023-24, US$131.4 million13123-24FY2024-25, US$127.3 million12724-25FY2025-26, US$139.9 million14025-26FY2026-27, none (to Oct 18)noneto Oct 1826-27

Table 1.New commitments and disbursements by fiscal year (flows), US$ millions

FY2016-17US$ millionsFY2017-18US$ millionsFY2018-19US$ millionsFY2019-20US$ millionsFY2020-21US$ millionsFY2021-22US$ millionsFY2022-23US$ millionsFY2023-24US$ millionsFY2024-25US$ millionsFY2025-26US$ millionsFY2026-27to Oct 18US$ millions
New commitments47.5110.035.0173.5210.0283.5137.9−6.7124.467.2None to date
Operations53273842940
Disbursements31.732.828.147.274.682.048.3131.4127.3139.9None to date
Operations777101214141413150

All operations since 1989: commitments US$2,272.6 million, disbursements US$1,600.1 million, reported for 57 and 55 of 59 operations.

Portfolio at October 18, 2026

A position at the data date: approved is every commitment to date on the operations, cancellations deducted; disbursed to date and undisbursed are as each partner publishes them.

Table 2.Portfolio of active operations at October 18, 2026, US$ millions

OperationsApprovedUS$ millionsDisbursed to dateUS$ millionsUndisbursedUS$ millions
Active operations11945.9392.7543.5

Operations

Active operations (21)

21 operations. Approved to date (stock): US$945.9 million. Disbursed in FY2025-26 (flow): US$134.9 million. 10 operations counted with their parent operation.

Table 3.Active operations, largest undisbursed balance first, US$ millionsAn operation marked “counted with” is an additional financing whose source books its money under the parent operation: its amounts are in the parent’s row and in the totals once.

Emergency Resilient Agriculture for Food Security ProjectAgriculture and food securityJan 2029202.0115.283.947.4
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 17, 2022
Effectiveness
May 12, 2022
Closing
January 31, 2029
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
202.0
Disbursed
115.2
Undisbursed
83.9
Undisbursed gap
2.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P177072
Last changed
October 9, 2026
Resilient Corridors ProjectTransportJan 203280.01.078.51.0
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 12, 2025
Effectiveness
February 2, 2026
Closing
January 30, 2032
Disbursed as of
September 30, 2026
Implementing agency
Central Execution Unit,Ministry of Public Works, Transport and Communication
Commitment
80.0
Disbursed
1.0
Undisbursed
78.5
Undisbursed gap
0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
November 30, 2025
Operation ID
P510851
Caribbean Regional Air Transport Connectivity Project - HaitiTransportDec 202796.024.471.111.2
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 28, 2020
Effectiveness
August 27, 2020
Closing
December 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Central Execution Unit of the Ministry of Public Works (UCE)
Commitment
96.0
Disbursed
24.4
Undisbursed
71.1
Undisbursed gap
0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P170907
Last changed
October 9, 2026
Resilient connectivity and Urban Transport Accessibility ProjectTransportMay 2028120.051.666.124.0
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 26, 2022
Effectiveness
August 25, 2022
Closing
May 31, 2028
Disbursed as of
September 30, 2026
Implementing agency
Unite Centrale d'execution of Ministry of Transport, Public works and Communications
Commitment
120.0
Disbursed
51.6
Undisbursed
66.1
Undisbursed gap
2.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P177210
Haiti Strengthening Public Financial Management ProjectGovernance and securityFeb 203060.02.060.71.0
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 4, 2025
Effectiveness
June 18, 2025
Closing
February 28, 2030
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
60.0
Disbursed
2.0
Undisbursed
60.7
Undisbursed gap
−2.7: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P180384
Decentralized Sustainable and Resilient Rural Water and Sanitation ProjectWater and sanitationJun 202980.026.354.17.6
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 17, 2023
Effectiveness
July 10, 2023
Closing
June 29, 2029
Disbursed as of
September 30, 2026
Implementing agency
DINEPA
Commitment
80.0
Disbursed
26.3
Undisbursed
54.1
Undisbursed gap
−0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P178188
Resilient Productive Landscapes IIAgriculture and food securityDec 202950.04.647.64.6
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 28, 2025
Effectiveness
September 16, 2025
Closing
December 28, 2029
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Agriculture, Natural Resources, and Rural Development (MARNDR),Ministry of Environment
Commitment
50.0
Disbursed
4.6
Undisbursed
47.6
Undisbursed gap
−2.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P504222
Adaptive Social Protection for Increased Resilience ProjectSocial protectionFeb 2029100.068.027.29.5
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 9, 2021
Effectiveness
April 21, 2021
Closing
February 28, 2029
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Social Affairs and Labor
Commitment
100.0
Disbursed
68.0
Undisbursed
27.2
Undisbursed gap
4.7: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P174111
Cap Haitien Urban Development ProjectGovernance and securityMar 202756.028.326.811.0
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 6, 2020
Effectiveness
April 23, 2020
Closing
March 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Works, Transport and Communications
Commitment
56.0
Disbursed
28.3
Undisbursed
26.8
Undisbursed gap
0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P168951
Private Sector Jobs and Economic Transformation (PSJET)Finance and private sectorMay 202751.425.323.54.8
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 28, 2021
Effectiveness
December 15, 2021
Closing
May 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Ministry of the Economy and Finance
Commitment
51.4
Disbursed
25.3
Undisbursed
23.5
Undisbursed gap
2.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P173743
Last changed
October 9, 2026
Strengthening DRM and Climate Resilience ProjectGovernance and securityMar 202750.545.83.912.7
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 16, 2019
Effectiveness
August 7, 2019
Closing
March 31, 2027
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Interior and Territorial Communities
Commitment
50.5
Disbursed
45.8
Undisbursed
3.9
Undisbursed gap
0.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2026
Operation ID
P165870
Promoting a more Equitable, Sustainable and Safer EducationEducationJun 2028Counted with P174707Counted with P174707Counted with P174707Not reported
Sector
Education
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 7, 2022
Effectiveness
May 19, 2022
Closing
June 15, 2028
Disbursed as of
Not reported
Implementing agency
Ministère de l’Education et Formation Professionnelle; MENFP
Commitment
90.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P176406
Promoting a more Equitable, Sustainable and Safer EducationEducationJun 2028Counted with P174707Counted with P174707Counted with P174707Not reported
Sector
Education
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 2, 2026
Effectiveness
September 8, 2026
Closing
June 15, 2028
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
60.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P513985
Last changed
October 9, 2026
Emergency resilient agriculture for food security, additional financingSocial protectionJan 2029Counted with P177072Counted with P177072Counted with P177072Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
February 6, 2023
Effectiveness
June 5, 2023
Closing
January 31, 2029
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P179799
Emergency Resilient Agriculture for Food Security ProjectAgriculture and food securityJan 2029Counted with P177072Counted with P177072Counted with P177072Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 8, 2026
Effectiveness
September 9, 2026
Closing
January 31, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P515942
Last changed
October 9, 2026
Adaptive Social Protection for Increased Resilience ProjectSocial protectionFeb 2029Counted with P174111Counted with P174111Counted with P174111Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 24, 2025
Effectiveness
October 30, 2025
Closing
February 28, 2029
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P505752
Last changed
October 9, 2026
5 more active operations
AF Strengthening Primary Health Care and SurveillanceHealthDec 2026Counted with P167512Counted with P167512Counted with P167512Not reported
Sector
Health
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 16, 2022
Effectiveness
October 31, 2022
Closing
December 31, 2026
Disbursed as of
Not reported
Implementing agency
Ministère de la Santé Publique et de la Population,UNITE DE GESTION DE PROJET (UGP)
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178755
Additional Financing - Haiti Caribbean Air Transport Connectivity ProjectTransportDec 2027Counted with P170907Counted with P170907Counted with P170907Not reported
Sector
Transport
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 5, 2023
Effectiveness
January 31, 2024
Closing
December 31, 2027
Disbursed as of
Not reported
Implementing agency
Central Execution Unit of the Ministry of Public Works (UCE)
Commitment
12.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P181119
AF Strengthening DRM and Climate Resilience ProjectGovernance and securityMar 2027Counted with P165870Counted with P165870Counted with P165870Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 26, 2022
Effectiveness
October 24, 2022
Closing
March 31, 2027
Disbursed as of
Not reported
Implementing agency
Ministry of Interior and Local authorities
Commitment
11.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178747
Haiti Resilient Productive Landscapes Additional FinancingAgriculture and food securityNov 2024Counted with P162908Counted with P162908Counted with P162908Not reported
Stage
Closing
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 19, 2020
Effectiveness
February 23, 2021
Closing
November 30, 2024
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development (MARNDR),Ministry of Environment
Commitment
7.8
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P175176
Strengthening DRM and Climate Resilience ProjectGovernance and securityMar 2027Counted with P165870Counted with P165870Counted with P165870Not reported
Stage
Under way
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 24, 2025
Effectiveness
June 26, 2025
Closing
March 31, 2027
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.5
Disbursed
Not reported
Undisbursed
Not reported
Operation ID
P509418
Last changed
October 9, 2026
Closed and stopped operations (66)

66 operations. Approved to date (stock): US$1,326.7 million, reported for 46 of 48. Disbursed in FY2025-26 (flow): US$5.0 million, reported for 4 of 48. 18 operations counted with their parent operation.

Table 4.Closed and stopped operations, US$ millionsAn operation marked “counted with” is an additional financing whose source books its money under the parent operation: its amounts are in the parent’s row and in the totals once.

Haiti Rural Accessibility & Resilience ProjectTransportMay 20252018Closed135.0130.50.6
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 31, 2018
Effectiveness
September 4, 2018
Closing
May 30, 2025
Disbursed as of
September 30, 2026
Implementing agency
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
Commitment
135.0
Disbursed
130.5
Undisbursed
0.6
Undisbursed gap
3.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
January 31, 2026
Operation ID
P163490
Last changed
October 9, 2026
Infrastructure & Institutions Emergency RecoveryTransportJun 20182010Closed102.3100.50.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 18, 2010
Effectiveness
April 23, 2010
Closing
June 29, 2018
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Works, Transport and Communications, Unité Centrale d'Exécution,Unite de coordination de Projet du Ministere des Finances
Commitment
102.3
Disbursed
100.5
Undisbursed
0.0
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
April 30, 2020
Operation ID
P120895
Last changed
October 9, 2026
Resilient Corridors ProjectTransportMay 2031Not reportedStoppedNot reportedNot reportedNot reported
Sector
Transport
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
Not reported
Effectiveness
May 14, 2025
Closing
May 29, 2031
Disbursed as of
Not reported
Implementing agency
Ministere des Travaux Publics, Transports et Communication,Unite Centrale d'Execution
Commitment
100.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P504115
Disaster Risk Management and ReconstructionTransportJun 20202011Closed71.866.80.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 1, 2011
Effectiveness
April 3, 2012
Closing
June 30, 2020
Disbursed as of
September 30, 2026
Implementing agency
Unite de Coordination de Projet - Ministry of Interior and Local Authorities,Unite de Coordination et Execution - Ministry of Public Works
Commitment
71.8
Disbursed
66.8
Undisbursed
0.0
Undisbursed gap
5.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
July 31, 2022
Operation ID
P126346
Last changed
October 9, 2026
Education for All Project - Phase IIEducationJun 20182011Closed70.064.40.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 1, 2011
Effectiveness
April 3, 2012
Closing
June 30, 2018
Disbursed as of
September 30, 2026
Implementing agency
Ministère de l'Education Nationale et de la Formation Professionnelle,Ministère de l'Education Nationale et de la Formation Professionnelle
Commitment
70.0
Disbursed
64.4
Undisbursed
0.0
Undisbursed gap
5.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
December 31, 2018
Operation ID
P124134
Last changed
October 9, 2026
Haiti Sustainable Rural and Small Towns Water and Sanitation ProjectWater and sanitationMar 20232015Closed64.265.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 26, 2015
Effectiveness
December 16, 2015
Closing
March 31, 2023
Disbursed as of
September 30, 2026
Implementing agency
DINEPA,Ministry of Economy and Finance, MEF
Commitment
64.2
Disbursed
65.1
Undisbursed
0.0
Undisbursed gap
−0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
March 31, 2025
Operation ID
P148970
Last changed
October 9, 2026
Haiti Economic Governance Reform OperationEnergyMar 20062005Closed61.061.20.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 6, 2005
Effectiveness
January 10, 2005
Closing
March 31, 2006
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
61.0
Disbursed
61.2
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P089873
Last changed
October 9, 2026
Haiti Community Driven Development (CDD) Project / PRODEPAgriculture and food securityJun 20132005Closed60.862.80.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 28, 2005
Effectiveness
December 8, 2005
Closing
June 30, 2013
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
60.8
Disbursed
62.8
Undisbursed
0.0
Undisbursed gap
−2.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P093640
Last changed
October 9, 2026
Dropped-HT basic educationEducationMar 20062009Stopped55.00.5Not reported
Sector
Education
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
August 16, 2009
Effectiveness
Not reported
Closing
March 2, 2006
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
55.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P007324
Haiti COVID-19 ResponseHealthNov 20252020Closed55.053.80.3
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 2, 2020
Effectiveness
April 15, 2020
Closing
November 30, 2025
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Health and the Population,UNITE DE GESTION DE PROJET (UGP)
Commitment
55.0
Disbursed
53.8
Undisbursed
0.3
Undisbursed gap
0.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P173811
Urban Community Driven Development Project / PRODEPURWater and sanitationDec 20162008Closed52.951.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 3, 2008
Effectiveness
October 27, 2008
Closing
December 31, 2016
Disbursed as of
September 30, 2026
Implementing agency
BMPAD
Commitment
52.9
Disbursed
51.1
Undisbursed
0.0
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
June 30, 2017
Operation ID
P106699
Last changed
October 9, 2026
Employment generatioSocial protectionApr 19971995Closed49.145.70.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 11, 1995
Effectiveness
July 13, 1995
Closing
April 30, 1997
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
49.1
Disbursed
45.7
Undisbursed
0.0
Undisbursed gap
3.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P041583
Last changed
October 9, 2026
Emergency economic RAgriculture and food securityDec 19951994Closed40.040.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 20, 1994
Effectiveness
December 23, 1994
Closing
December 31, 1995
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
40.0
Disbursed
40.3
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P031828
Last changed
October 9, 2026
HT Education For All Adaptable Program Grant Phase 1EducationMay 20122007Closed36.637.50.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 26, 2007
Effectiveness
September 28, 2007
Closing
May 31, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
36.6
Disbursed
37.5
Undisbursed
0.0
Undisbursed gap
−1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P099918
Last changed
October 9, 2026
Dropped-HT ECON & SOC fund IIGovernance and securityNot reported2007Stopped35.0Not reportedNot reported
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 16, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P052269
AF Infrastructure & Institutions Emergency RecoveryTransportJun 20182012ClosedCounted with P120895Counted with P120895Counted with P120895
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 27, 2012
Effectiveness
February 5, 2013
Closing
June 29, 2018
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P130749
Additional financing, strengthening agriculture public services IIAgriculture and food securityMar 20222017ClosedCounted with P126744Counted with P126744Counted with P126744
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 14, 2017
Effectiveness
November 7, 2017
Closing
March 31, 2022
Disbursed as of
Not reported
Implementing agency
Ministry of Agriculture, Natural Resources and Rural Development
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163081
AF Haiti COVID-19 ResponseHealthNov 20252022ClosedCounted with P173811Counted with P173811Counted with P173811
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 23, 2022
Effectiveness
October 31, 2022
Closing
November 30, 2025
Disbursed as of
Not reported
Implementing agency
Ministry of Public Health and the Population,UNITE DE GESTION DE PROJET (UGP)
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178296
AF Haiti Rural Accessibility & Resilience ProjectTransportMay 20252020ClosedCounted with P163490Counted with P163490Counted with P163490
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 18, 2020
Effectiveness
August 7, 2020
Closing
May 29, 2025
Disbursed as of
Not reported
Implementing agency
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
Commitment
33.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P173281
Emergency Development Policy OperationGovernance and securitySep 20112010Closed30.030.60.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
August 5, 2010
Effectiveness
August 23, 2010
Closing
September 30, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
30.0
Disbursed
30.6
Undisbursed
0.0
Undisbursed gap
−0.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P118239
Housing Reconstruction - Urban Community Driven Development Additional FinancingIndustry, trade and tourismDec 20162010ClosedCounted with P106699Counted with P106699Counted with P106699
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
October 26, 2010
Effectiveness
February 21, 2011
Closing
December 31, 2016
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
30.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P121833
AF Rural Accessibility & Resilience ProjectTransportMay 20252022ClosedCounted with P163490Counted with P163490Counted with P163490
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 17, 2022
Effectiveness
June 15, 2022
Closing
May 29, 2025
Disbursed as of
Not reported
Implementing agency
Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
Commitment
30.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P178419
Haiti Transport and Territorial Development ProjectTransportJul 20132006Closed27.228.10.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 11, 2006
Effectiveness
December 13, 2006
Closing
July 30, 2013
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
27.2
Disbursed
28.1
Undisbursed
0.0
Undisbursed gap
−1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P095523
Last changed
October 9, 2026
HT- first health projectHealthMar 20011990Closed26.328.40.0
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 16, 1990
Effectiveness
June 20, 1990
Closing
March 31, 2001
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
26.3
Disbursed
28.4
Undisbursed
0.0
Undisbursed gap
−2.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007311
Last changed
October 9, 2026
RD MAINT & RHBTransportDec 20011995Closed26.325.10.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 23, 1995
Effectiveness
July 13, 1995
Closing
December 31, 2001
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
26.3
Disbursed
25.1
Undisbursed
0.0
Undisbursed gap
1.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007318
Last changed
October 9, 2026
41 more operations
Additional financing, maternal and child health through integrated servicesHealthSep 20202017ClosedCounted with P123706Counted with P123706Counted with P123706
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 14, 2017
Effectiveness
January 24, 2018
Closing
September 30, 2020
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163313
POWER VEnergyJan 19991989Closed23.225.50.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 27, 1989
Effectiveness
January 16, 1990
Closing
January 31, 1999
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
23.2
Disbursed
25.5
Undisbursed
0.0
Undisbursed gap
−2.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007300
Last changed
October 9, 2026
Haiti Economic Governance Reform Operation IIGovernance and securityDec 20092007Closed23.024.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 30, 2007
Effectiveness
July 31, 2007
Closing
December 30, 2009
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
23.0
Disbursed
24.1
Undisbursed
0.0
Undisbursed gap
−1.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P100564
Economic Reconstruction and Growth Development Policy CreditGovernance and securityJun 20142013Closed20.020.40.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 18, 2013
Effectiveness
August 29, 2013
Closing
June 30, 2014
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
20.0
Disbursed
20.4
Undisbursed
0.0
Undisbursed gap
−0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
September 30, 2013
Operation ID
P127208
Haiti Fiscal and Social Resilience Development Policy FinancingGovernance and securityJun 20202018Closed20.020.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 20, 2018
Effectiveness
September 26, 2018
Closing
June 30, 2020
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
20.0
Disbursed
20.0
Undisbursed
0.0
Last transaction
September 30, 2018
Operation ID
P162452
Sustainable rural and small town water supply and sanitationWater and sanitationMar 20232017ClosedCounted with P148970Counted with P148970Counted with P148970
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 14, 2017
Effectiveness
December 4, 2017
Closing
March 31, 2023
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163194
Disaster Risk Management and Reconstruction Additional FinancingTransportJun 20202017ClosedCounted with P126346Counted with P126346Counted with P126346
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 8, 2017
Effectiveness
November 6, 2017
Closing
June 30, 2020
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P163199
HT Emergency Bridge Reconst & Vulnerab Reduction ProjectTransportMay 20152008Closed19.919.40.0
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 18, 2008
Effectiveness
March 31, 2009
Closing
May 31, 2015
Disbursed as of
September 30, 2026
Implementing agency
BMPAD,CIAT,UCE,Unite Centrale d'Execution,Unite Centrale d'Execution
Commitment
19.9
Disbursed
19.4
Undisbursed
0.0
Undisbursed gap
0.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
September 30, 2016
Operation ID
P114292
Last changed
October 9, 2026
P au Prince WTRWater and sanitationJun 19991989Closed19.520.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 27, 1989
Effectiveness
February 14, 1990
Closing
June 30, 1999
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
19.5
Disbursed
20.5
Undisbursed
0.0
Undisbursed gap
−1.0: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007292
Last changed
October 9, 2026
Emergency Recovery and Disaster ManagementSocial protectionDec 20112005Closed19.119.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 6, 2005
Effectiveness
June 1, 2005
Closing
December 31, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
19.1
Disbursed
19.3
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P090159
Last changed
October 9, 2026
Cultural Heritage Preservation and Tourism Sector Support ProjectSocial protectionJul 20222014Closed19.117.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 19, 2014
Effectiveness
October 6, 2014
Closing
July 29, 2022
Disbursed as of
September 30, 2026
Implementing agency
Unite Technique d'Execution
Commitment
19.1
Disbursed
17.3
Undisbursed
0.0
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
January 31, 2024
Operation ID
P144614
Last changed
October 9, 2026
Improving public financial management and statistical informationGovernance and securityJun 20252017Closed19.117.51.1
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 24, 2017
Effectiveness
July 7, 2017
Closing
June 30, 2025
Disbursed as of
September 30, 2026
Implementing agency
UCP - MEF
Commitment
19.1
Disbursed
17.5
Undisbursed
1.1
Undisbursed gap
0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P157531
Last changed
October 9, 2026
Forest & parks TA (TAL)Agriculture and food securityDec 20011996Closed15.514.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 17, 1996
Effectiveness
August 29, 1997
Closing
December 31, 2001
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
15.5
Disbursed
14.5
Undisbursed
0.0
Undisbursed gap
0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007326
Last changed
October 9, 2026
Dropped-sustain intens of AGAgriculture and food securityJan 20032000Stopped15.00.4Not reported
Stage
Stopped
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 1, 2000
Effectiveness
Not reported
Closing
January 28, 2003
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
June 30, 2020
Operation ID
P007315
Rural Community Driven Development - Additional Financing IIAgriculture and food securityJun 20132010ClosedCounted with P093640Counted with P093640Counted with P093640
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 27, 2010
Effectiveness
July 29, 2010
Closing
June 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P118139
Additional Financing to Haiti Statistical Capacity Building ProjectGovernance and securityJun 20252018ClosedCounted with P157531Counted with P157531Counted with P157531
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 31, 2018
Effectiveness
August 22, 2018
Closing
June 30, 2025
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P164093
Cholera Emergency Response ProjectHealthMar 20142011Closed14.715.00.0
Sector
Health
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 18, 2011
Effectiveness
February 7, 2011
Closing
March 30, 2014
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
14.7
Disbursed
15.0
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P120110
Last changed
October 9, 2026
Haiti Business Development and Investment ProjectIndustry, trade and tourismNov 20212013Closed13.813.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 21, 2013
Effectiveness
November 11, 2013
Closing
November 30, 2021
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Commerce and Industry
Commitment
13.8
Disbursed
13.3
Undisbursed
0.0
Undisbursed gap
0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
April 30, 2024
Operation ID
P123974
Last changed
October 9, 2026
HT 3rd Econ. Governance Reform OperationGovernance and securityDec 20102009Closed12.512.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 8, 2009
Effectiveness
January 12, 2010
Closing
December 31, 2010
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
12.5
Disbursed
12.5
Undisbursed
0.0
Operation ID
P117944
Transport and Territorial Development Additional FinancingTransportJul 20132009ClosedCounted with P095523Counted with P095523Counted with P095523
Sector
Transport
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 8, 2009
Effectiveness
January 11, 2010
Closing
July 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P114059
Education for All Project - Additional FinancingEducationMay 20122010ClosedCounted with P099918Counted with P099918Counted with P099918
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
May 27, 2010
Effectiveness
July 15, 2010
Closing
May 31, 2012
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P121193
Haiti Digital Acceleration ProjectCommunicationsDec 20252020Closed11.59.91.1
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
October 9, 2020
Effectiveness
November 26, 2020
Closing
December 31, 2025
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Public Works, Transport and Communications
Commitment
11.5
Disbursed
9.9
Undisbursed
1.1
Undisbursed gap
0.5: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Last transaction
May 31, 2026
Operation ID
P171976
Last changed
October 9, 2026
ECON & SOC fundSocial protectionJun 19981991Closed11.011.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 17, 1991
Effectiveness
May 21, 1991
Closing
June 30, 1998
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
11.0
Disbursed
11.0
Undisbursed
0.0
Operation ID
P007321
Last changed
October 9, 2026
HT Electricity ProjectEnergyAug 20132006Closed9.910.30.0
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
August 3, 2006
Effectiveness
July 31, 2007
Closing
August 31, 2013
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
9.9
Disbursed
10.3
Undisbursed
0.0
Undisbursed gap
−0.4: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P098531
Last changed
October 9, 2026
Industrial restructuring & developmentIndustry, trade and tourismMar 20001989Closed8.79.60.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
December 5, 1989
Effectiveness
August 2, 1990
Closing
March 31, 2000
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
8.7
Disbursed
9.6
Undisbursed
0.0
Undisbursed gap
−0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P007309
Last changed
October 9, 2026
Haiti Catastrophe InsuranceFinance and private sectorDec 20102007Closed8.79.00.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 8, 2007
Effectiveness
July 31, 2007
Closing
December 31, 2010
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
8.7
Disbursed
9.0
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P104690
Last changed
October 9, 2026
Community-Driven Development (CDD) Additional FinancingAgriculture and food securityJun 20132009ClosedCounted with P093640Counted with P093640Counted with P093640
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 29, 2009
Effectiveness
April 21, 2009
Closing
June 30, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P114775
Urban Community Driven Development Project - AFWater and sanitationDec 20162014ClosedCounted with P106699Counted with P106699Counted with P106699
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 20, 2014
Effectiveness
November 7, 2014
Closing
December 31, 2016
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P149116
Haiti Emergency Recovery and Disaster Management (Additional Financing)Social protectionDec 20112008ClosedCounted with P090159Counted with P090159Counted with P090159
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 31, 2008
Effectiveness
September 5, 2008
Closing
December 31, 2011
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P106689
HT - meeting teacher needs for EFAGovernance and securityJun 20122008Closed5.95.90.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
April 29, 2008
Effectiveness
September 26, 2008
Closing
June 30, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
5.9
Disbursed
5.9
Undisbursed
0.0
Undisbursed gap
0.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P106621
Last changed
October 9, 2026
HT (AF) Electricity Loss Reduction ProjectEnergyAug 20132009ClosedCounted with P098531Counted with P098531Counted with P098531
Sector
Energy
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
September 8, 2009
Effectiveness
December 15, 2009
Closing
August 31, 2013
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P112164
HT Rural Water and Sanitation ProjectWater and sanitationDec 20112007Closed5.05.20.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
January 30, 2007
Effectiveness
August 1, 2007
Closing
December 31, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
5.0
Disbursed
5.2
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P089839
Last changed
October 9, 2026
Strengthening the Management of Agriculture Public Services (GFRP)Agriculture and food securityAug 20142009Closed4.95.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 25, 2009
Effectiveness
October 13, 2009
Closing
August 31, 2014
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
4.9
Disbursed
5.1
Undisbursed
0.0
Undisbursed gap
−0.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P113623
Last changed
October 9, 2026
HT: Emergency School Reconstruction ProjectEducationMay 20122009Closed4.75.00.0
Sector
Education
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
March 5, 2009
Effectiveness
June 25, 2009
Closing
May 31, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
4.7
Disbursed
5.0
Undisbursed
0.0
Undisbursed gap
−0.3: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P115261
Last changed
October 9, 2026
Second Additional Financing Infra & Instit Emergency RecoveryGovernance and securityJun 20182016ClosedCounted with P120895Counted with P120895Counted with P120895
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
November 10, 2016
Effectiveness
March 15, 2017
Closing
June 29, 2018
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
World Bank project page
Operation ID
P156049
Governance Technical Assistance GrantGovernance and securitySep 20092005Closed1.92.10.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 7, 2005
Effectiveness
December 19, 2005
Closing
September 30, 2009
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
1.9
Disbursed
2.1
Undisbursed
0.0
Undisbursed gap
−0.1: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Operation ID
P093936
Last changed
October 9, 2026
Avian influenza control and human influenza emergency prepardness and controlAgriculture and food securityJun 20122008Closed1.31.30.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
July 14, 2008
Effectiveness
April 6, 2009
Closing
June 30, 2012
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
1.3
Disbursed
1.3
Undisbursed
0.0
Operation ID
P111667
Last changed
October 9, 2026
HT Economic Governance TAG IIGovernance and securityJun 20112006Closed0.40.50.0
Stage
Closed
Instrument
IBRD/IDA financing
Lending window
IDA
Approval
June 20, 2006
Effectiveness
August 16, 2007
Closing
June 30, 2011
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.5
Undisbursed
0.0
Operation ID
P095371
Last changed
October 9, 2026
Forstry & environAgriculture and food securityMar 19991991Stopped0.00.30.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Fully cancelled
Lending window
IDA
Approval
September 24, 1991
Effectiveness
Not reported
Closing
March 31, 1999
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Last transaction
June 30, 2020
Operation ID
P007322
Last changed
October 9, 2026
HT TAP IIGovernance and securityJun 20021996Stopped0.0Not reported0.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Fully cancelled
Lending window
IDA
Approval
September 17, 1996
Effectiveness
March 17, 1997
Closing
June 30, 2002
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Operation ID
P041971
Last changed
October 9, 2026
Haiti COVID-19 Response and Resilience Development Policy OperationGovernance and securityJul 20212020StoppedNot reportedNot reported0.0
Stage
Stopped
Instrument
IBRD/IDA financing
Cancellation
Terminated; the IDA statement first reports it on September 30, 2021
Lending window
IDA
Approval
June 29, 2020
Effectiveness
August 31, 2021
Closing
July 31, 2021
Disbursed as of
September 30, 2026
Implementing agency
Ministry of Economy and Finance
Commitment
0.0
Disbursed
0.0
Undisbursed
0.0
Last transaction
September 30, 2021
Operation ID
P171474
Last changed
October 9, 2026

Active operations by sector

Table 5.Active operations by sector, US$ millions

Portfolio of active operations at October 18, 2026
SectorActive operationsApprovedUS$ millionsDisbursed to dateUS$ millionsUndisbursedUS$ millions
Transport4296.077.1215.8
Agriculture and food security4252.0119.8131.5
Governance and security5166.576.291.3
Social protection3100.068.027.2
Water and sanitation180.026.354.1
Finance and private sector151.425.323.5
Education2Not reportedNot reportedNot reported
Health1Not reportedNot reportedNot reported
All active operations11945.9392.7543.5

Flows through IDA, FY2025-26, US$ millions

No funding flows through IDA are reported for FY2025-26.

Sources

Data as of October 18, 2026
SourceRead on
IATIOctober 18, 2026
IATIOctober 18, 2026
IDA Statement of Credits and GrantsOctober 18, 2026
Public investment programOctober 18, 2026