Objective
The project Development Objective (PDO) is to (i) reduce urban flooding in the city of Cap-Haitien, (ii) improve access to quality municipal infrastructure in selected municipalities in the Cap-Haitien metropolitan area, and (iii) support the Republic of Haiti's capacity to respond to an Eligible Emergency.
As published by World Bank Projects, in its original language.
Description
The project development of Municipal Development and Urban Resilience Project for Haiti is to (i) reduce urban flooding and enhance resilience in the city of Cap-Haïtien; and (ii) improve the capacity of six municipalities in the Cap-Haïtien metropolitan area to plan, finance and deliver basic municipal services and management. There are three components in this project. 1) The first component, Vulnerability Reduction and Climate Resilient Urban Infrastructure, aims to build resilience and reduce the effects of climate change by investing in flood mitigation infrastructure through an integrated watershed management approach that will reduce recurrent flooding in Cap-Haïtien. It has the following two subcomponents. (i)Integrated Management of the Urban Ravines; and (ii) Investments in Flood Mitigation Management along the Rivière Haut
more
du Cap and addressing the challenges of Bassin Rhodo. 2) The second component, Municipal Investment Support, Capacity Building and Strategic Planning, aims to support the targeted municipalities to enable them to plan, finance, and manage resilient infrastructure, deliver local services in urban areas through a combination of investment support and capacity building initiatives, and ensure that local plans are developed and implemented in accordance with a coherent strategic metropolitan development framework and the risk profile of each targeted municipality. This component is divided into three sub-components as follows: (i) Urban Development Grant for Improvement of Local Infrastructure and Service Delivery; (ii) Institutional strengthening and capacity building for municipalities; and (iii) Support to Strengthen Spatial Management and Land Use Planning. 3) The third component, Contingent Emergency Response, aims to finance the implementation of emergency infrastructure reconstruction, rehabilitation and associated studies (Emergency Response Activities). 4) The fourth component, Project Management and Implementation Support, aims to finance the costs associated with strengthening and developing the institutional capacity for project management, coordination, implementation, and monitoring and evaluation, as well as costs associated with supporting the project implementing agencies.
- Partner
- World Bank Group, World Bank
- Sector
- Governance and security
- Stage
- Closed since December 26, 2025
- Approval
- June 20, 2017
- Closing
- December 26, 2025
- Instrument
- IBRD/IDA financing, Grants
- Undisbursed gap
- 5.9: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Borrower
- Republic of Haiti
- Implementing agency
- Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications
- Effectiveness
- January 18, 2018
- Departments
- Nord
- Last transaction
- June 30, 2026
- Operation ID
- P155201
Implemented through
- World Food Programme, US$0.6 million, matched by amount and date
Life cycle4 stages, 14 dates
Stage history
| Stage | From |
|---|---|
| Planned | Date not reported |
| Under way | February 7, 2014 |
| Closing | December 26, 2025 |
| Closed | December 26, 2025 |
Dated events
| Event | Date | Source |
|---|---|---|
| Actual start | February 7, 2014 | IATI |
| Planned start | February 7, 2014 | IATI |
| Concept review | July 13, 2015 | World Bank Projects |
| Disclosure | November 17, 2015 | World Bank Projects |
| Appraisal | May 4, 2017 | World Bank Projects |
| Negotiation | May 24, 2017 | World Bank Projects |
| Approval | June 20, 2017 | World Bank Projects |
| First commitment | June 20, 2017 | Transactions |
| Effectiveness | January 18, 2018 | World Bank Projects |
| First disbursement | August 31, 2018 | Transactions |
| Actual end | December 26, 2025 | IATI |
| Closing date | December 26, 2025 | IATI |
| Completion report due | June 29, 2026 | World Bank Projects |
| Last disbursement | June 30, 2026 | Transactions |
Undisbursed: US$1.8 million on September 30, 2026, with closing on December 26, 2025. Disbursed in FY2025-26: US$−0.0 million.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDA Grant | 48.4 | Institution | World Bank Projects |
| Strategic Climate Fund Grant | 7.0 | Trust fund | World Bank Projects |
Table 2.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 53.1 | IDA Statement of Credits and Grants | Not reported |
| Disbursed | 45.4 | IDA Statement of Credits and Grants | 53.6 |
| Undisbursed | 1.8 | IDA Statement of Credits and Grants | |
| Total cost | 55.4 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
Changes to the operation2 extensions, 3 restructurings, emergency component included
- Original closing date
- December 31, 2023
- Closing date extensions
- 2
- Extended from December 31, 2023 to March 31, 2025 (document of October 31, 2023)
- Extended from March 31, 2025 to December 26, 2025 (document of March 31, 2025)
- Restructurings
- 3
- October 29, 2020 (document of October 29, 2020) restructuring paper
- September 25, 2023, Level 2, approved by management (document of September 25, 2023) restructuring paper
- March 7, 2025, Level 2, approved by management (document of March 7, 2025) restructuring paper
- Emergency component
- Contingent emergency response component included (document of December 9, 2025) document
New commitments and disbursements by fiscal year
Table 3.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2016-17US$ millions | FY2017-18US$ millions | FY2018-19US$ millions | FY2019-20US$ millions | FY2020-21US$ millions | FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | |
|---|---|---|---|---|---|---|---|---|---|---|
| New commitments | 55.4 | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | Not reported | −2.3 | Not reported |
| Disbursements | Not reported | 0.8 | 2.5 | 3.7 | 25.5 | 3.3 | 3.1 | 1.8 | 4.7 | −0.0 |
| Cumulative disbursements | Not reported | 0.8 | 3.3 | 7.0 | 32.5 | 35.8 | 38.9 | 40.7 | 45.5 | 45.4 |
Records and documents
Transactions71 records, June 20, 2017 to June 30, 2026
Table 4.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| June 20, 2017 | Commitment | 48.4 | IDA Statement of Credits and Grants | credit original principal at board approval |
| June 20, 2017 | Commitment | 7.0 | World Bank Projects | trust funds in the Projects API financier list, not in the IDA statement, at the board approval date |
| March 31, 2025 | Commitment | −2.3 | IDA Statement of Credits and Grants | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2018 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2018 | Disbursements | 1.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2019 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2019 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2019 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2019 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2019 | Disbursements | 1.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2020 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2020 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2020 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2020 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2020 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2020 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2020 | Disbursements | 11.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2021 | Disbursements | 2.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2021 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2021 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2021 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2021 | Disbursements | 7.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2021 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2021 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2021 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2021 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2021 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2022 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2022 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2022 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2022 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2022 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2022 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2022 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2022 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2022 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2022 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2023 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2023 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2023 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2023 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2023 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2023 | Disbursements | −0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2023 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2024 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 29, 2024 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2024 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2024 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2024 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2024 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2024 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2024 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2024 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2025 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2025 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2025 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2025 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2025 | Disbursements | −0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2025 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2026 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2026 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2026 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2026 | Disbursements | −0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2026 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2026 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms4 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Not reported
Locations1 department, 9 places named, 16 places with coordinates
| Departments | Nord |
| Places named by the source | Acul du Nord, Bassin, Haut du Cap, Limonade, Milot, Plaine du Nord, Quartier Morin, RiviEre Haut du Cap, Rivière Haut du Cap |
| Places with coordinates | 16 |
Results indicators55 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| Availability of a flood risk management plan for the city of Cap Haitien | No | Yes | No | December 14, 2023 |
| Cities with improved livability, sustainability, and/or management | 0.00 | 6.00 | 6.00 | December 14, 2023 |
| Contingent Emergency Response Operations Manual developed and adopted | No | Yes | Yes | June 6, 2023 |
| Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days | 0.00 | 80.00 | 50.00 | December 14, 2023 |
| Kilometers of urban ravines dredged and stabilized | 0.00 | 5.00 | 2.60 | December 14, 2023 |
| Non-structural Measures Plan developed and implemented | Not developed | Prioritized measures implemented | Implementation started | December 14, 2023 |
| Number COVID-19 personal protection equipment kits distributed to civil protection committees | 0.00 | 3100.00 | 3500.00 | June 6, 2023 |
| Number of communes in which hand-washing station were installed | 0.00 | 43.00 | 43.00 | June 6, 2023 |
| Number of municipal staff trained and provided with on the job support | 0.00 | 800.00 | 825.00 | June 6, 2023 |
| Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year | 0.00 | 6.00 | 6.00 | June 6, 2023 |
| Number of municipalities with fully functional City Hall/administration buildings | 0.00 | 3.00 | 2.00 | June 6, 2023 |
| Reduction in the flooded areas of Cap Haitien | 0.00 | 48.00 | 20.00 | December 14, 2023 |
| Roads rehabilitated - non-rural | 000000 | 1.00 | 0.00 | January 1, 1900 |
| Roads rehabilitated - rural | 000000 | 0.00 | 0.00 | January 1, 1900 |
| Roads rehablitated | 0.00 | 6.50 | 4.10 | December 14, 2023 |
| Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU | 0.00 | 100.00 | 100.00 | December 14, 2023 |
| Number of beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 193,935.00 | 211,914.00 | December 31, 2023 |
| Number of beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 193935.00 | 211914.00 | December 31, 2023 |
| People benefiting from reduced flood risk in Cap Haitien | 0.00 | 15618.00 | 9974.00 | March 31, 2025 |
| People benefiting from reduced flood risk in Cap Haitien | 0.00 | 10842 | 15482 | December 16, 2025 |
| People provided with improved urban living conditions | 0.00 | 60000.00 | 26407.00 | March 31, 2025 |
| People provided with improved urban living conditions | 0.00 | 60,000.00 | 60000 | December 16, 2025 |
| People provided with improved urban living conditions - Female (RMS requirement) | 000000 | 17500.00 | 0.00 | January 1, 1900 |
| Women beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 96967.00 | 105957.00 | December 29, 2023 |
| Availability of a flood risk management plan for the city of Cap Haitien | No | Yes | No | December 29, 2023 |
| Availability of a flood risk management plan for the city of Cap Haitien | No | Yes | Yes | December 15, 2025 |
| Cities with improved livability, sustainability, and/or management | 0.00 | 6.00 | 6 | March 31, 2025 |
| Cities with improved livability, sustainability, and/or management | 0.00 | 6.00 | 6.00 | March 31, 2025 |
| Contingent Emergency Response Operations Manual developed and adopted | No | Yes | Yes | December 29, 2023 |
| Contingent Emergency Response Operations Manual developed and adopted | No | Yes | Yes | December 29, 2023 |
| Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days | 0.00 | 80.00 | 50.00 | March 31, 2025 |
| Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days | 0.00 | 80.00 | 100 | March 31, 2025 |
| Kilometers of urban ravines dredged and stabilized | 0.00 | 5.00 | 2.60 | March 31, 2025 |
| Kilometers of urban ravines dredged and stabilized | 0.00 | 3.00 | 3 | December 15, 2025 |
| Non-structural Measures Plan developed and implemented | Not developed | Prioritized measures implemented | Prioritized measures implemented | March 31, 2024 |
| Non-structural Measures Plan developed and implemented | Not developed | Prioritized measures implemented | Implementation started | March 31, 2024 |
| Number COVID-19 personal protection equipment kits distributed to civil protection committees | 0.00 | 3100.00 | 3500.00 | December 29, 2023 |
| Number COVID-19 personal protection equipment kits distributed to civil protection committees | 0.00 | 3,100.00 | 3,500.00 | December 29, 2023 |
| Number of communes in which hand-washing station were installed | 0.00 | 43.00 | 43.00 | December 29, 2023 |
| Number of communes in which hand-washing station were installed | 0.00 | 43.00 | 53 | December 29, 2023 |
| Number of municipal staff trained and provided with on the job support | 0.00 | 800.00 | 825.00 | December 29, 2023 |
| Number of municipal staff trained and provided with on the job support | 0.00 | 800.00 | 825.00 | December 29, 2023 |
| Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year | 0.00 | 6.00 | 6.00 | March 31, 2025 |
| Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year | 0.00 | 6.00 | 6.00 | December 15, 2025 |
| Number of municipalities with fully functional City Hall/administration buildings | 0.00 | 3.00 | 2.00 | March 31, 2025 |
| Number of municipalities with fully functional City Hall/administration buildings | 0.00 | 3.00 | 2.00 | December 15, 2025 |
| Reduction in the flooded areas of Cap Haitien | 0.00 | 48.00 | 20.00 | March 31, 2025 |
| Reduction in the flooded areas of Cap Haitien | 0.00 | 28.00 | 28 | December 15, 2025 |
| Roads rehablitated | 0.00 | 6.50 | 4.10 | March 31, 2025 |
| Roads rehablitated | 0.00 | 6.50 | 8.1 | December 15, 2025 |
| Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU | 0.00 | 100.00 | 100.00 | March 31, 2025 |
| Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU | 0.00 | 100.00 | 100.00 | December 15, 2025 |
| Number of beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 193935.00 | 211914.00 | December 14, 2022 |
| People benefiting from reduced flood risk in Cap Haitien | 0.00 | 15618.00 | 9974.00 | December 14, 2023 |
| People provided with improved urban living conditions | 0.00 | 60000.00 | 26407.00 | December 14, 2023 |
Ratings8 ratings
| Rating | Value | Date |
|---|---|---|
| ICR outratingind | Substantial | June 29, 2026 |
| ICR overallrating | Moderately Satisfactory | June 29, 2026 |
| ISR Financial Management | Moderately Unsatisfactory | December 8, 2025 |
| ISR Monitoring and Evaluation | Satisfactory | December 8, 2025 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | December 8, 2025 |
| ISR Procurement | Moderately Satisfactory | December 8, 2025 |
| ISR Progress towards achievement of PDO | Satisfactory | December 8, 2025 |
| ISR Project Management | Moderately Satisfactory | December 8, 2025 |
Contract awards30 awards
| Supplier | Date | Method | Amount |
|---|---|---|---|
| Université d'État d'Haïti (UEH) | October 30, 2025 | CDS | 49,500 USD |
| Campus Henry Christophe de l'Université d'Etat d'Haïti (CHCL/UEH) | August 19, 2024 | DIR | 538,780 USD |
| Haiti Print & Sign | July 29, 2024 | RFQ | 12,072.5 USD |
| Pan American Devel. Foundation-PADF | January 15, 2024 | CDS | 4,021,227.1 USD |
| Newhomedepot | January 12, 2024 | RFQ | 134,881 USD |
| Name not shown | August 3, 2023 | INDV | 87,500 USD |
| SD Construction | February 15, 2023 | DIR | 2,592,344.73 USD |
| RTOS, Business Coaching Technology and More | December 5, 2022 | RFQ | 61,127.73 USD |
| V3 Companies of Illinois Ltd. | November 11, 2022 | QCBS | 10,536,595 HTG |
| V3 Companies of Illinois Ltd. | November 11, 2022 | QCBS | 376,354 USD |
| Royale Construction S.A | August 30, 2022 | RFB | 1,057,552.39 USD |
| Name not shown | August 30, 2022 | RFB | 505,740.61 USD |
| Centre Agronimique Tropical pour la Recherche et l'Ducation (CATIE) | February 24, 2022 | CQS | 800,000 USD |
| Ingenieria de Obras Zaragoza S. L. (Ingeobras) | February 24, 2022 | CQS | Not reported |
| United Nations Office Project Services (UNOPS) | January 5, 2021 | DIR | 14,528,863 USD |
| BG Ingnieurs Conseils | January 5, 2021 | DIR | 176,130 CHF |
| United Nations World Food Programme (WFP) | October 20, 2020 | UN | 18,858,000 USD |
| Bureau d'Ingnierie et d'Expertise Nationale (BIEN) | September 30, 2020 | DIR | 32,000 USD |
| BG Ingénieurs Conseils | September 10, 2020 | QCBS | 427,440 CHF |
| Technique Industrie Agriculture S.A. (Tecina) | December 2, 2019 | RFB | 681,966.71 USD |
| SD Construction | December 2, 2019 | RFB | 480,709.24 USD |
| Technique Industrie Agriculture S.A. (Tecina) | December 2, 2019 | RFB | 441,367.14 USD |
| Groupe TRAME S. A. | December 2, 2019 | RFB | 657,895.55 USD |
| Groupe TRAME S. A. | December 2, 2019 | RFB | 634,355.9 USD |
| MVF Plus Construction | December 2, 2019 | RFB | 447,058.88 USD |
| Firme de Construction et de Service Agricole (Ficosa) | December 2, 2019 | RFB | 589,402.25 USD |
| Pan American Development Foundation (PADF) | September 23, 2019 | QBS | 546,516,000.54 HTG |
| Elmecen S.A. | September 20, 2019 | RFB | 350,700 USD |
| Institut de Formation et de Services, S,A. | September 19, 2019 | QBS | 2,033,705.46 USD |
| BRLI | March 8, 2019 | CDS | 463,440.25 EUR |
Funds passed on157 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2026 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2026 | −0.2 |
| HAITI | Disbursement | March 31, 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2026 | −0.0 |
| HAITI | Disbursement | February 28, 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | February 28, 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2026 | <0.1 |
| HAITI | Disbursement | January 31, 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2025 | <0.1 |
| HAITI | Disbursement | December 31, 2025 | <0.1 |
| HAITI | Expenditure | November 30, 2025 | <0.1 |
| HAITI | Disbursement | November 30, 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2025 | −0.1 |
| HAITI | Disbursement | September 30, 2025 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2025 | 0.2 |
| HAITI | Disbursement | August 31, 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2025 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2025 | 0.2 |
| HAITI | Disbursement | July 31, 2025 | <0.1 |
| HAITI | Disbursement | June 30, 2025 | 0.7 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2025 | 0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2025 | 0.2 |
| HAITI | Disbursement | May 31, 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2025 | 0.6 |
| HAITI | Disbursement | April 30, 2025 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Commitment | March 31, 2025 | −2.2 |
| HAITI | Disbursement | March 31, 2025 | <0.1 |
| HAITI | Disbursement | February 28, 2025 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | February 28, 2025 | 0.4 |
| HAITI | Disbursement | January 31, 2025 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2025 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2024 | <0.1 |
| HAITI | Disbursement | December 31, 2024 | <0.1 |
| HAITI | Disbursement | November 30, 2024 | 0.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2024 | 0.7 |
| HAITI | Disbursement | October 31, 2024 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2024 | 0.9 |
| HAITI | Disbursement | August 31, 2024 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2024 | 0.4 |
| HAITI | Disbursement | June 30, 2024 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2024 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2024 | 0.6 |
| HAITI | Disbursement | May 31, 2024 | <0.1 |
| HAITI | Expenditure | May 31, 2024 | <0.1 |
| HAITI | Expenditure | April 30, 2024 | <0.1 |
| HAITI | Disbursement | April 30, 2024 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2024 | 0.1 |
| HAITI | Disbursement | March 31, 2024 | 0.1 |
| HAITI | Expenditure | February 29, 2024 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | February 29, 2024 | 0.1 |
| HAITI | Disbursement | February 29, 2024 | <0.1 |
| HAITI | Disbursement | January 31, 2024 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2024 | 0.1 |
| HAITI | Expenditure | January 31, 2024 | <0.1 |
| HAITI | Expenditure | December 31, 2023 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2023 | 0.6 |
| HAITI | Disbursement | December 31, 2023 | −0.2 |
| HAITI | Disbursement | November 30, 2023 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2023 | −0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2023 | 0.2 |
| HAITI | Disbursement | October 31, 2023 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2023 | 0.3 |
| HAITI | Disbursement | August 31, 2023 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2023 | 0.6 |
| HAITI | Disbursement | July 31, 2023 | 0.1 |
| HAITI | Expenditure | June 30, 2023 | −0.0 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2023 | 0.3 |
| HAITI | Disbursement | May 31, 2023 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2023 | 0.6 |
| HAITI | Disbursement | April 30, 2023 | 0.2 |
| HAITI | Expenditure | March 31, 2023 | <0.1 |
| HAITI | Expenditure | February 28, 2023 | <0.1 |
| HAITI | Expenditure | February 28, 2023 | −0.0 |
| HAITI | Expenditure | January 31, 2023 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2022 | 0.5 |
| HAITI | Expenditure | December 31, 2022 | −0.0 |
| HAITI | Disbursement | December 31, 2022 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2022 | 0.6 |
| HAITI | Expenditure | November 30, 2022 | −0.0 |
| HAITI | Disbursement | November 30, 2022 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2022 | 0.3 |
| HAITI | Expenditure | October 31, 2022 | −0.0 |
| HAITI | Disbursement | October 31, 2022 | 0.1 |
| HAITI | Expenditure | September 30, 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2022 | 0.4 |
| HAITI | Expenditure | August 31, 2022 | <0.1 |
| HAITI | Disbursement | August 31, 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2022 | 0.2 |
| HAITI | Disbursement | July 31, 2022 | <0.1 |
| HAITI | Expenditure | June 30, 2022 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2022 | 0.8 |
| HAITI | Disbursement | June 30, 2022 | 0.2 |
| HAITI | Expenditure | May 31, 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | April 30, 2022 | 0.3 |
| HAITI | Expenditure | April 30, 2022 | <0.1 |
| HAITI | Disbursement | April 30, 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2022 | 0.2 |
| HAITI | Expenditure | March 31, 2022 | <0.1 |
| HAITI | Disbursement | March 31, 2022 | <0.1 |
| HAITI | Expenditure | February 28, 2022 | <0.1 |
| HAITI | Disbursement | February 28, 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | February 28, 2022 | 0.1 |
| HAITI | Expenditure | January 31, 2022 | 0.1 |
| HAITI | Disbursement | January 31, 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2022 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2021 | 0.2 |
| HAITI | Expenditure | December 31, 2021 | <0.1 |
| HAITI | Disbursement | December 31, 2021 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2021 | 0.7 |
| HAITI | Expenditure | November 30, 2021 | <0.1 |
| HAITI | Expenditure | October 31, 2021 | 0.1 |
| HAITI | Expenditure | September 30, 2021 | <0.1 |
| HAITI | Disbursement | September 30, 2021 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2021 | 0.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2021 | 0.7 |
| HAITI | Disbursement | August 31, 2021 | 0.2 |
| HAITI | Expenditure | August 31, 2021 | <0.1 |
| HAITI | Disbursement | July 31, 2021 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2021 | 0.3 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2021 | 7.8 |
| HAITI | Disbursement | June 30, 2021 | 0.2 |
| HAITI | Expenditure | May 31, 2021 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2021 | 0.5 |
| HAITI | Disbursement | May 31, 2021 | 0.1 |
| HAITI | Expenditure | April 30, 2021 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2021 | 0.8 |
| HAITI | Expenditure | March 31, 2021 | <0.1 |
| HAITI | Disbursement | March 31, 2021 | 0.2 |
| HAITI | Expenditure | February 28, 2021 | <0.1 |
| HAITI | Disbursement | February 28, 2021 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | February 28, 2021 | 0.1 |
| HAITI | Expenditure | January 31, 2021 | <0.1 |
| HAITI | Disbursement | January 31, 2021 | 0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | January 31, 2021 | 2.7 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | December 31, 2020 | 11.9 |
| HAITI | Disbursement | December 31, 2020 | 0.2 |
| HAITI | Expenditure | November 30, 2020 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2020 | 0.1 |
| HAITI | Disbursement | October 31, 2020 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2020 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2020 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2020 | 0.9 |
| HAITI | Disbursement | June 30, 2020 | 0.4 |
| HAITI | Expenditure | June 30, 2020 | 0.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | June 30, 2020 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | March 31, 2020 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | October 31, 2019 | 1.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | September 30, 2019 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2019 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | July 31, 2019 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | May 31, 2019 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | November 30, 2018 | 1.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Disbursement | August 31, 2018 | 0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Commitment | June 30, 2017 | 48.4 |
Identifiers5 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | XI-IATI-WBTF-P155201 | IATI |
| IDA credit or grant | IDAD2200 | IDA Statement of Credits and Grants |
| Public investment program line | 11141-1-25-31-10 | Public investment program |
| World Bank loan | IDA-D2200 | World Bank Projects |
| World Bank project | P155201 | Operation record |
Where sources differ3 fields
| Field | Source | Value | Used |
|---|---|---|---|
| Closing date | World Bank Projects | December 26, 2025 | ✓ |
| Closing date | IATI | June 26, 2026 | |
| Commitment | IDA Statement of Credits and Grants | US$53.1 million | ✓ |
| Commitment | World Bank Projects | US$55.4 million | |
| Status | World Bank Projects | Closed | ✓ |
| Status | IATI | Active |
Partner documents119 documents
- Project Appraisal Document, documents.worldbank.org
- Financing Agreement, documents.worldbank.org
- Agreement, documents.worldbank.org
- Agreement, documents.worldbank.org
- Project Information Document, documents.worldbank.org
- Agreement, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Completion and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Record on projects.worldbank.org, projects.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project , June 26, 2026, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 18, December 9, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, October 22, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 17, June 24, 2025, documents.worldbank.org
- Haïti - Projet de Développement Municipal et de Résilience Urbaine (MDUR) : Dix-Septième Mission d’Appui à la Mise en Œuvre - du 19 au 22 Mai 2025 , May 22, 2025, documents.worldbank.org
- Official Documents- Corrigendum revising the withdrawal table to the Financing Agreement for D2200-HT.pdf, March 27, 2025, documents.worldbank.org
- Official Documents- Third Amendment to the Financing Agreement and Third Amendment to the Grant Agreement for Grant D2200-HT and Grant TF0A4926-HT.pdf, March 12, 2025, documents.worldbank.org
- Disclosable Restructuring Paper - Municipal Development and Urban Resilience Project - P155201, March 7, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, February 21, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 16, December 24, 2024, documents.worldbank.org
- Haïti - Projet de Développement Urbain au Cap-Haïtien (CHUD) : Seizième Mission d'Appui à la Mise en Œuvre - du 15 au 22 Novembre 2024 , November 22, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, July 9, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 15, June 28, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, June 9, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, April 16, 2024, documents.worldbank.org
- Haïti - Projet de Développement Municipal et de Résilience Urbaine (MDUR) : Quinzième Mission d'Appui à la Mise en Œuvre - du 8 au 12 Avril, 2024 , April 12, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, February 27, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, January 8, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 14, December 30, 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Revised Environmental, Social, Industrial Safety and Occupational Health Management Plan , December 18, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, November 30, 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 1 of 2) : Resettlement Plan Summary for Treatment of Terrier Ravine , October 1, 2023, documents.worldbank.org
- Disclosable Restructuring Paper - Municipal Development and Urban Resilience Project - P155201, September 25, 2023, documents.worldbank.org
- Restructuring Integrated Safeguards Data Sheet - Municipal Development and Urban Resilience Project - P155201, September 5, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 13, June 20, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, June 8, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, April 25, 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental and Social Management Plan for Sub-project Reprofiling Works of the Pont Du Pont Area Zanguy Canal in the Town of the Limonade Commune , April 1, 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Brief Resettlement Plan for Construction of the Buildings of the Morin, Milot and Plaine du Nord Town Halls , April 1, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, March 31, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, January 16, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 12, December 20, 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental and Social Management Plan for Treatment of Ravine Zetrier (Carrefour 0-L at Bassin Rhodo), December 1, 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 1 of 2) : Brief Resettlement Plan for the Treatment of the Zetrier Ravine (Section Carrefour Rue 0-L at Bassin Rhodo), December 1, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, November 1, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, October 18, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, September 15, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 11, June 27, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, June 6, 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Brief Resettlement Plan, May 31, 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Environmental and Social Management Plan for Construction of Three Town Halls in Quartier Morin, Milot and Plaine du Nord, May 31, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, May 4, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, April 24, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, March 16, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 10, December 20, 2021, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 09, June 14, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, March 31, 2021, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 2 of 2) : Plan d’Action de Reinstallation Bassin Rhodo, January 1, 2021, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Etude d’Impact Environnemental et Social, January 1, 2021, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 1 of 2) : Plan d’Action de Reinstallation : Traitement des Ravines Belle Hotesse et Zetriye, January 1, 2021, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 08, December 18, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, November 30, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, November 24, 2020, documents.worldbank.org
- Official Documents- Amendment and Restatement of Financing Agreement and Grant Agreement for Grant D2200-HT and SCF-PPCR Grant TF0A4926, November 5, 2020, documents.worldbank.org
- Official Documents- Amendment and Restatement of the Financing Agreement for Grant D2200-HT, November 5, 2020, documents.worldbank.org
- Disclosable Restructuring Paper - Municipal Development and Urban Resilience Project - P155201, October 29, 2020, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 07, October 22, 2020, documents.worldbank.org
- Restructuring Integrated Safeguards Data Sheet - Municipal Development and Urban Resilience Project - P155201, October 7, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, September 28, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, September 9, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, September 2, 2020, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment (Vol. 2 of 2) : Cadre de Gestion Environnementale et Sociale pour les Activités d’Urgence en Réponse Liée à la COVID-19, August 4, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, July 31, 2020, documents.worldbank.org
- Haiti P155201 - MDUR Audit Statements as of Sept. 2019, May 24, 2020, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 06, April 14, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, December 17, 2019, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 05, September 27, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, August 19, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, June 19, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, May 1, 2019, documents.worldbank.org
- Haiti P155201 - MDUR Audit Statements as of Sept. 2018, April 21, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, April 9, 2019, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 04, March 28, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, March 19, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, January 31, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, January 31, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, January 31, 2019, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Plan de Gestion Environnementale et Sociale, December 1, 2018, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 03, September 3, 2018, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 02, May 15, 2018, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 01, October 12, 2017, documents.worldbank.org
- Official Documents- Supplemental Letter Ref. Financial and Economic Data for Grant D2200-HT (Closing Package), June 29, 2017, documents.worldbank.org
- Minutes of Meeting of the Executive Directors of the Bank and IDA and the Boards of Directors of IFC and MIGA held on June 20, 2017 and record approvals June 16 thru 20, June 20, 2017, documents.worldbank.org
- Official Documents- Financing Agreement for Grant D2200-HT (Closing Package), June 9, 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project, June 7, 2017, documents.worldbank.org
- Appraisal Project Information Document-Integrated Safeguards Data Sheet - Municipal Development and Urban Resilience Project - P155201, May 22, 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment (Vol. 1 of 2) : Cadre de gestion environnementale et sociale, March 1, 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : resettlement plan : Cadre de politique de reinstallation, March 1, 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : environmental assessment : Composante 2 : investissements en matière de réduction de la vulnérabilité et pour des infrastructures urbaines résilientes au climat pour Ville de Cap-Haïtien, August 19, 2016, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : resettlement plan : Termes de reference recrutement d’un consultant chargé du plan de réinstallation - Composante 2 : Investissements en matière de réduction de la vulnérabilité, August 19, 2016, documents.worldbank.org
- Integrated Safeguards Data Sheet (Concept Stage) - Municipal Development and Urban Resilience Project - P155201, November 19, 2015, documents.worldbank.org
- Project Information Document (Concept Stage) - Municipal Development and Urban Resilience Project - P155201, November 10, 2015, documents.worldbank.org
Procurement notices (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sources
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- Public investment program: terms of use set by the publisher
- World Bank procurement notices: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| Public investment program | October 18, 2026 |
| World Bank procurement notices | October 18, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |
Cite this page
HaitiDocs. Municipal Development and Urban Resilience Project. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP155201