Published title: Haiti - Urban Community Driven Development Project / PRODEPUR

US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

Objective

To improve access to, and satisfaction with: (i) basic and social infrastructure and services, including housing repair, reconstruction and community infrastructure improvements needed as a result of the Emergency; and (ii) income-generating opportunities for residents of selected disadvantaged urban areas.

As published by World Bank Projects, in its original language.

Description

The Urban Community Driven Development Project (PRODEPUR) development objective for Government of Haiti (GoH) is to improve access to and satisfaction with: (a) basic and social infrastructures and services, and (b) income-generating opportunities for residents of targeted disadvantaged urban areas. This objective will be achieved through a participatory process in which CBOs propose, select, implement, and maintain subprojects. The key indicators for this project will include: (a) increased access to water in disadvantaged urban areas that selected such subprojects (that is, water kiosks, standpipes, community cisterns, rainwater capture, and so forth); (b) increased access to sanitation in disadvantaged urban areas that selected such subprojects (that is, garbage collection, solid waste disposal, recycling, composting, sanitary blocks, and so forth); and (c)

more

increased access to rehabilitated street and drainage infrastructure in disadvantaged urban areas that selected such subprojects (that is, clear and rehabilitated drainage canals, ditches, rehabilitated street and/or footpaths, and so forth). There are three components to the project. The first component of the project community subproject funding, management, and support will finance: (a) small-scale socioeconomic infrastructure and productive/income-generating subprojects; and (b) contracting of service providers. The first component of the project capacity building and technical assistance will finance: (a) training-of-trainer events; (b) capacity-building and technical assistance; (c) workshops with service providers to harmonize practices to accompany Community-Based Organization (CBO) and Project Development Councils in carrying out the activities under Component 1; (d) training of Bureau de Monetisation staff in order to effectively supervise overall project implementation; (e) various consultant services; and (f) policy dialogue to engage GoH and other relevant stakeholders on a medium to long term national strategy to facilitate the mainstreaming of the urban community-driven development (CDD) approach and mechanisms. The third component of the project administration, supervision, and monitoring and evaluation will finance incremental costs associated with project implementation, administration, supervision, and monitoring and evaluation by the Bureau de Monetisation through its project coordination unit, which operates under the oversight of the ministry of economy and finance.

Partner
World Bank Group, IDA
Sector
Water and sanitation
Stage
Closed since December 31, 2016
Approval
June 3, 2008
Closing
December 31, 2016
Instrument
IBRD/IDA financing, IDA
Undisbursed gap
1.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Borrower
Ministry of Finance
Implementing agency
BMPAD
Effectiveness
October 27, 2008
Departments
Artibonite, Ouest, Centre, Nord
Last transaction
June 30, 2017
Operation ID
P106699
Life cycle5 stages, 14 dates

Stage history

StageFrom
PlannedOctober 29, 2007
ApprovedJune 3, 2008
Under wayJune 3, 2008
ClosingDecember 31, 2016
ClosedDecember 31, 2016

Dated events

EventDateSource
Concept reviewOctober 29, 2007World Bank Projects
DisclosureNovember 9, 2007World Bank Projects
AppraisalMarch 11, 2008World Bank Projects
NegotiationApril 15, 2008World Bank Projects
Planned startMay 29, 2008IATI
Actual startJune 3, 2008IATI
ApprovalJune 3, 2008World Bank Projects
First commitmentJune 3, 2008Transactions
EffectivenessOctober 27, 2008World Bank Projects
First disbursementMay 31, 2011Transactions
Actual endDecember 31, 2016IATI
Closing dateDecember 31, 2016IATI
Last disbursementJune 30, 2017Transactions
Completion report dueOctober 31, 2017World Bank Projects

Undisbursed: US$0.0 million on September 30, 2026, with closing on December 31, 2016.

Financing

Table 1.Financing, US$ millions

FinancierAmountUS$ millionsRoleSource
IDA Guarantee30.0CofinancierWorld Bank Projects
Local Communities1.0CounterpartWorld Bank Projects
IDA Grant15.7InstitutionWorld Bank Projects

Table 2.Related operations, US$ millions

OperationRelationPartnerStageCommitmentUS$ millions
Housing Reconstruction - Urban Community Driven Development Additional FinancingAdditional financing or child operationWorld Bank GroupClosed30.0
Urban Community Driven Development Project - AFAdditional financing or child operationWorld Bank GroupClosed7.5

Table 3.Position at the data date by source (stocks), US$ millions

This pageUS$ millionsSourceIATIUS$ millions
Commitment52.9IDA Statement of Credits and Grants53.0
Disbursed51.1IDA Statement of Credits and Grants51.1
Undisbursed0.0IDA Statement of Credits and Grants
Total cost46.7World Bank Projects

World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source

Changes to the operationnot reported
Original closing date
Not reported
Closing date extensions
Not reported
  • Extended from March 31, 2014 to June 30, 2015 (document of August 24, 2014) document
Restructurings
Not reported
Emergency component
Not reported

New commitments and disbursements by fiscal year

Disbursements, US$ millions
FY2007-08, not reportedn.r.07-08FY2010-11, US$1.9 million210-11FY2011-12, US$8.4 million811-12FY2012-13, US$11.9 million1212-13FY2013-14, US$8.4 million813-14FY2014-15, US$4.0 million414-15FY2015-16, US$7.7 million815-16FY2016-17, US$2.6 million316-17FY2007-08, not reportedn.r.07-08FY2010-11, US$1.9 million210-11FY2011-12, US$8.4 million811-12FY2012-13, US$11.9 million1212-13FY2013-14, US$8.4 million813-14FY2014-15, US$4.0 million414-15FY2015-16, US$7.7 million815-16FY2016-17, US$2.6 million316-17

Table 4.New commitments and disbursements by fiscal year (flows), US$ millions

FY2007-08US$ millionsFY2010-11US$ millionsFY2011-12US$ millionsFY2012-13US$ millionsFY2013-14US$ millionsFY2014-15US$ millionsFY2015-16US$ millionsFY2016-17US$ millions
New commitments15.730.0Not reportedNot reported7.5Not reportedNot reported−0.3
DisbursementsNot reported1.98.411.98.44.07.72.6
Cumulative disbursementsNot reported8.216.628.536.940.848.651.1

The running total starts at the opening balance of US$6.2 million.

Records and documents

Transactions69 records, June 3, 2008 to June 30, 2017

Table 5.Transactions, US$ millions

DateMeasureAmountUS$ millionsSourceMethod
June 3, 2008Commitment15.7IDA Statement of Credits and Grantscredit original principal at board approval
October 26, 2010Commitment30.0IDA Statement of Credits and Grantscredit original principal at board approval
June 20, 2014Commitment7.5IDA Statement of Credits and Grantscredit original principal at board approval
June 30, 2017Commitment−0.2IDA Statement of Credits and Grantscancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation)
June 30, 2017Commitment−0.1IDA Statement of Credits and Grantscancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation)
June 30, 2017Commitment−0.0IDA Statement of Credits and Grantscancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation)
April 30, 2011Disbursements6.2IDA Statement of Credits and Grantscumulative at first snapshot (opening balance)
May 31, 2011Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2011Disbursements1.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2011Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
October 31, 2011Disbursements2.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
October 31, 2011Disbursements1.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2011Disbursements0.7IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2011Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2011Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2011Disbursements1.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
February 29, 2012Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2012Disbursements0.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2012Disbursements0.8IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2012Disbursements0.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2012Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2012Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
October 31, 2012Disbursements2.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
October 31, 2012Disbursements0.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2012Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2012Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2012Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
January 31, 2013Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
February 28, 2013Disbursements0.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2013Disbursements2.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2013Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2013Disbursements0.7IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2013Disbursements1.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2013Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
August 31, 2013Disbursements2.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2013Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2013Disbursements<0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2013Disbursements0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2013Disbursements1.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
January 31, 2014Disbursements1.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2014Disbursements2.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2014Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2014Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
August 31, 2014Disbursements1.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2014Disbursements1.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2014Disbursements1.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2015Disbursements0.7IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2015Disbursements1.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2015Disbursements0.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2015Disbursements0.7IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2015Disbursements1.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
January 31, 2016Disbursements1.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2016Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2016Disbursements0.8IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2016Disbursements1.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2016Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
August 31, 2016Disbursements0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2016Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2016Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
October 31, 2016Disbursements0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2016Disbursements1.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2016Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2016Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
February 28, 2017Disbursements<0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2017Disbursements<0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2017Disbursements<0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2017Disbursements−0.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2017Disbursements−0.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2017Disbursements<0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
Terms4 of 6 reported
Finance type
110 Standard grant
Flow type
Not reported
Aid type
C01 Project-type interventions
Tied status
5 Untied
Collaboration type
2 Multilateral inflows
Humanitarian
Not reported
Locations4 departments, 11 places named, 22 places with coordinates
DepartmentsArtibonite, Ouest, Centre, Nord
Places named by the sourceCap-Haitien, Cite Soleil, Dondon, Gonaives, Hinche, Martissant, Milot, Mirebalais, Port-au-Prince, Republic of Haiti, Saint-Marc
Places with coordinates22
Results indicators20 indicators
IndicatorBaselineTargetLatest valueDate of latest value
Cumulative number of housing repair and reconstruction works financed through grants and completed1906.001906.001906.00December 31, 2016
Health facilities constructed, renovated, and/or equipped (number)0.005.005.00December 31, 2016
Number of corridors repaired99.00108.00108.00December 31, 2016
Number of eligible CBOs joining COPRODEPs0.001173.001218.00December 31, 2016
Number of people in urban areas provided with access to Improved Water Sources under the project47150.0063650.0061501.00December 31, 2016
Percent of municipal governments successfully proposing and implementing subprojects in coordination with CBOs100.00100.00100.00December 31, 2016
Percent of prioritized projects submitted by women?s CBOs13.0015.0013.00December 31, 2016
Percent of subprojects completed in a timely manner74.0085.0069.02December 31, 2016
Percent of subprojects successfully implemented, operated, and maintained (as per technical audits)0.0070.0070.00December 31, 2016
Percent of women holding membership in COPRODEP?s executive committee24.0030.0024.00December 31, 2016
Roads rehabilitated, Non-rural0.0016.0022.28December 31, 2016
Volume of construction debris cleared in Project neighborhoods42800.0041747.0042800.00December 31, 2016
Increased access to rehabilitated street and drainage infrastructure in disadvantaged urban areas that selected such subprojects (i.e., cleared and rehabilitated drainage canals, ditches, etc.)26.4035.4045.78December 31, 2016
Increased access to sanitation in disadvantaged urban areas that selected such subprojects (i.e., garbage collection, solid waste disposal, recycling, composting, sanitary blocks, etc.).27.9133.4430.03December 31, 2016
Increased access to social infrastructure and services in disadvantaged urban areas that selected such subprojects (daycare centers, primary schools, secondary schools, health clinics, job training56.4366.4373.64December 31, 2016
Increased access to water in disadvantaged urban areas that selected such subprojects (i.e., water kiosks, standpipes, community cisterns, rainwater capture, etc.).74.3376.7086.34December 31, 2016
Percent of beneficiaries for whom the majority of expected subproject results, as defined by beneficiaries at the start of the project, were achieved (as per results from community evaluation forms)0.0085.000.00December 31, 2016
Residents that have returned to neighborhoods upon completion of housing reconstruction and repair works or receiving a rental grant0.008844.008844.00December 31, 2016
Number of productive/income generating subprojects fully operational.493.00650.00501.00December 30, 2016
Percentage of productive/income generating subprojects that are self-sustaining six months after being fully operational.15.0016.0012.06December 30, 2016
Ratings28 ratings
RatingValueDate
IEG bankqualityofsupervisionModerately SatisfactoryMarch 30, 2018
IEG borrowcomplianceModerately SatisfactoryMarch 30, 2018
IEG borrowimplementationModerately UnsatisfactoryMarch 30, 2018
IEG evaltypeESMarch 30, 2018
IEG evaluation_riskdoHighMarch 30, 2018
IEG icrqualityModestMarch 30, 2018
IEG mequalityModestMarch 30, 2018
IEG outcomeModerately SatisfactoryMarch 30, 2018
IEG overallbankperfModerately SatisfactoryMarch 30, 2018
IEG overallborrowperfModerately SatisfactoryMarch 30, 2018
ICR bankqualityentryNot RatedOctober 31, 2017
ICR banksupervisionSubstantialOctober 31, 2017
ICR banksupervisionNot RatedOctober 31, 2017
ICR banksupervisionModerately SatisfactoryOctober 31, 2017
ICR borrgovtModerately SatisfactoryOctober 31, 2017
ICR borrimplegencyModerately SatisfactoryOctober 31, 2017
ICR borroverallModerately SatisfactoryOctober 31, 2017
ICR completion_riskdoSubstantialOctober 31, 2017
ICR outratingindModerately SatisfactoryOctober 31, 2017
ICR overallratingModerately SatisfactoryOctober 31, 2017
ISR Financial ManagementModerately SatisfactoryJune 4, 2017
ISR Monitoring and EvaluationModerately SatisfactoryJune 4, 2017
ISR Overall Implementation Progress (IP)Moderately SatisfactoryJune 4, 2017
ISR Overall Safeguards RatingModerately SatisfactoryJune 4, 2017
ISR Overall Safeguards RatingModerately SatisfactoryJune 4, 2017
ISR ProcurementModerately SatisfactoryJune 4, 2017
ISR Progress towards achievement of PDOModerately SatisfactoryJune 4, 2017
ISR Project ManagementSatisfactoryJune 4, 2017
Funds passed on76 transactions
ReceiverTransactionDateUS$ millions
BMPADCommitmentJune 30, 2017−0.2
BMPADDisbursementJune 30, 2017<0.1
BMPADCommitmentJune 30, 2017−0.1
BMPADCommitmentJune 30, 2017−0.0
BMPADDisbursementMay 31, 2017−0.0
BMPADDisbursementMay 31, 2017−0.0
BMPADDisbursementMay 31, 2017<0.1
BMPADDisbursementMarch 31, 2017<0.1
BMPADDisbursementFebruary 28, 2017<0.1
BMPADDisbursementDecember 31, 20160.3
BMPADDisbursementNovember 30, 20161.4
BMPADDisbursementNovember 30, 20160.3
BMPADDisbursementOctober 31, 20160.5
BMPADDisbursementSeptember 30, 20160.2
BMPADDisbursementSeptember 30, 20160.3
BMPADDisbursementAugust 31, 20160.5
BMPADDisbursementJuly 31, 20160.6
BMPADDisbursementJuly 31, 20161.1
BMPADDisbursementApril 30, 20160.8
BMPADDisbursementMarch 31, 20160.6
BMPADDisbursementJanuary 31, 20161.9
BMPADDisbursementDecember 31, 20151.1
BMPADDisbursementNovember 30, 20150.7
BMPADDisbursementJuly 31, 20150.9
BMPADDisbursementApril 30, 20151.1
BMPADDisbursementMarch 31, 20150.7
BMPADDisbursementDecember 31, 20141.3
BMPADDisbursementSeptember 30, 20141.0
BMPADDisbursementAugust 31, 20141.2
BMPADDisbursementJune 30, 20140.2
BMPADCommitmentJune 30, 20147.5
BMPADDisbursementJune 30, 20140.1
BMPADDisbursementApril 30, 20142.5
BMPADDisbursementJanuary 31, 20141.6
BMPADDisbursementDecember 31, 20131.4
BMPADDisbursementNovember 30, 20130.5
BMPADDisbursementSeptember 30, 2013<0.1
BMPADDisbursementSeptember 30, 20130.3
BMPADDisbursementAugust 31, 20132.3
BMPADDisbursementJuly 31, 20130.1
BMPADDisbursementJune 30, 20131.2
BMPADDisbursementJune 30, 20130.7
BMPADDisbursementMay 31, 20130.6
BMPADDisbursementApril 30, 20132.1
BMPADDisbursementFebruary 28, 20130.9
BMPADDisbursementJanuary 31, 20130.1
BMPADDisbursementDecember 31, 20120.2
BMPADDisbursementDecember 31, 20120.3
BMPADDisbursementNovember 30, 20120.1
BMPADDisbursementOctober 31, 20122.0
BMPADDisbursementOctober 31, 20120.9
BMPADDisbursementSeptember 30, 20120.1
BMPADDisbursementJuly 31, 20120.1
BMPADDisbursementJuly 31, 20120.4
BMPADDisbursementMarch 31, 20120.8
BMPADDisbursementMarch 31, 20120.9
BMPADDisbursementFebruary 29, 20120.6
BMPADDisbursementDecember 31, 20111.0
BMPADDisbursementDecember 31, 20110.2
BMPADDisbursementNovember 30, 20110.2
BMPADDisbursementNovember 30, 20110.7
BMPADDisbursementOctober 31, 20111.2
BMPADDisbursementOctober 31, 20112.2
BMPADDisbursementSeptember 30, 20110.3
BMPADDisbursementJune 30, 20111.0
BMPADDisbursementMay 31, 20110.6
BMPADDisbursementApril 30, 20110.2
BMPADDisbursementMarch 31, 20110.9
BMPADDisbursementFebruary 28, 20110.2
BMPADDisbursementJanuary 31, 20110.8
BMPADCommitmentOctober 31, 201030.0
BMPADDisbursementSeptember 30, 20100.9
BMPADDisbursementJune 30, 20100.4
BMPADDisbursementSeptember 30, 20090.5
BMPADDisbursementJuly 31, 20092.4
BMPADCommitmentJune 30, 200815.7
Identifiers8 identifiers
SystemIdentifierSource
IATI identifier44000-P106699IATI
IDA credit or grantIDAH3940IDA Statement of Credits and Grants
IDA credit or grantIDAH6210IDA Statement of Credits and Grants
IDA credit or grantIDAH9730IDA Statement of Credits and Grants
World Bank loanIDA-H3940World Bank Projects
World Bank loanIDA-H6210World Bank Projects
World Bank loanIDA-H9730World Bank Projects
World Bank projectP106699Operation record
Where sources differ2 fields
FieldSourceValueUsed
CommitmentIDA Statement of Credits and GrantsUS$52.9 million✓
CommitmentWorld Bank ProjectsUS$15.7 million
StatusWorld Bank ProjectsClosed✓
StatusIATIActive
Partner documents43 documents
Procurement notices (2)

Sources

Data as of October 18, 2026
SourceRead on
IATIOctober 18, 2026
IATIOctober 18, 2026
IDA Statement of Credits and GrantsOctober 18, 2026
World Bank ProjectsOctober 18, 2026
World Bank documentsOctober 18, 2026
Cite this page

HaitiDocs. Urban Community Driven Development Project / PRODEPUR. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP106699