Data / Partner portfolio / World Bank Group / IDA
Resilient connectivity and Urban Transport Accessibility Project
Published title: Resilient connectivity and Urban Transport Accessibility Project
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
The Project Development Objective is to (i) enhance climate-resilient rural connectivity in the South Peninsula, (ii) improve climate-resilient urban accessibility in Cap-Haitien and targeted urban areas, and (iii) enhance institutional capacity in the urban transport sector.
As published by World Bank Projects, in its original language.
Description
Drawing upon its international and regional experience, the Bank is in a strong position to support government in formulating strategies to address complex resilient infrastructure and urban transport management issues. The Project will contribute to improve safe and climate resilient connectivity, urban mobility and accessibility in selected areas and strengthen governance and planning framework.
- Partner
- World Bank Group, IDA
- Sector
- Transport
- Stage
- Under way since May 26, 2022
- Approval
- May 26, 2022
- Closing
- May 31, 2028
- Instrument
- IBRD/IDA financing, IDA
- Undisbursed gap
- 2.2: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Borrower
- Ministry of Finance
- Implementing agency
- Unite Centrale d'execution of Ministry of Transport, Public works and Communications
- Effectiveness
- August 25, 2022
- Departments
- Nord-Est, Sud-Est, Nord, Grande Anse, Nippes
- Last transaction
- September 30, 2026
- Operation ID
- P177210
Life cycle2 stages, 11 dates
Stage history
| Stage | From |
|---|---|
| Approved | May 26, 2022 |
| Under way | May 26, 2022 |
Dated events
| Event | Date | Source |
|---|---|---|
| Appraisal | April 21, 2022 | World Bank Projects |
| Negotiation | April 25, 2022 | World Bank Projects |
| Actual start | May 26, 2022 | IATI |
| Approval | May 26, 2022 | World Bank Projects |
| First commitment | May 26, 2022 | Transactions |
| Effectiveness | August 25, 2022 | World Bank Projects |
| Planned start | September 12, 2022 | IATI |
| First disbursement | February 28, 2023 | Transactions |
| Last disbursement | September 30, 2026 | Transactions |
| Closing date | May 31, 2028 | IATI |
| Completion report due | November 30, 2028 | World Bank Projects |
Undisbursed: US$66.1 million on September 30, 2026, with closing on May 31, 2028. Disbursed in FY2025-26: US$24.0 million.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDA Grant | 120.0 | Institution | World Bank Projects |
Table 2.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 120.0 | IDA Statement of Credits and Grants | 120.0 |
| Disbursed | 51.6 | IDA Statement of Credits and Grants | 44.8 |
| Undisbursed | 66.1 | IDA Statement of Credits and Grants | |
| Total cost | 120.0 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
Changes to the operation0 extensions, emergency component included
- Original closing date
- May 31, 2028
- Closing date extensions
- 0
- Restructurings
- Not reported
- Emergency component
- Contingent emergency response component included (document of May 13, 2022) document
New commitments and disbursements by fiscal year
Table 3.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | |
|---|---|---|---|---|---|
| New commitments | 120.0 | Not reported | Not reported | Not reported | Not reported |
| Disbursements | Not reported | 3.7 | 11.5 | 12.4 | 24.0 |
| Cumulative disbursements | Not reported | 3.7 | 15.2 | 27.6 | 51.6 |
Records and documents
Transactions38 records, May 26, 2022 to September 30, 2026
Table 4.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| May 26, 2022 | Commitment | 120.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| February 28, 2023 | Disbursements | 3.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2023 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2023 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2023 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2023 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2023 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2024 | Disbursements | 1.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 29, 2024 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2024 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2024 | Disbursements | 1.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2024 | Disbursements | 2.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2024 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2024 | Disbursements | 1.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2024 | Disbursements | 1.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2024 | Disbursements | 2.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2024 | Disbursements | 1.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2025 | Disbursements | 1.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2025 | Disbursements | 1.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2025 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2025 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2025 | Disbursements | 2.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2025 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2025 | Disbursements | 1.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2025 | Disbursements | 1.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2025 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2025 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2026 | Disbursements | 3.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2026 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2026 | Disbursements | 1.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2026 | Disbursements | 1.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2026 | Disbursements | 4.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2026 | Disbursements | 2.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2026 | Disbursements | 1.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2026 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2026 | Disbursements | 4.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms4 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Not reported
Locations5 departments, 9 places named, 18 places with coordinates
| Departments | Nord-Est, Sud-Est, Nord, Grande Anse, Nippes |
| Places named by the source | Arrondissement du Trou du Nord, Departement de Nippes, Fort Liberte, Grandans, Lenbe, Limonade, Okap, Ouanaminthe, Sud-Est |
| Places with coordinates | 18 |
Results indicators30 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| Automated fare collection pilot deployed in one corridor | No | Yes | No | November 3, 2023 |
| Citizens reporting satisfaction with project’s consultation and communication mechanisms, disaggregated by gender | 0.00 | 90.00 | 0.00 | November 3, 2023 |
| Design study for the interventions in the selected corridors delivered | No | Yes | No | November 3, 2023 |
| Direct beneficiaries of improved resilient and accessible street environment in Cap Haitien and targeted urban areas | 0.00 | 180000.00 | 0.00 | November 3, 2023 |
| Drainage improvements of urban-rural mobility infrastructure in selected cities in the South Peninsula | 0.00 | 5.00 | 0.00 | November 3, 2023 |
| Gender action plan for the urban transport sector delivered | No | Yes | Yes | November 28, 2025 |
| Infrastructure investments climate informed in the South Peninsula | 0.00 | 100.00 | 0.00 | November 3, 2023 |
| Intersections improved in selected corridors and downtown in Cap Haitien | 0.00 | 8.00 | 0.00 | November 3, 2023 |
| Length of streets improved with climate-resilient features and better street space sharing in selected corridors in Cap Haitien and other targeted urban areas | 0.00 | 18000.00 | 0.00 | November 3, 2023 |
| National Strategy for urban transport delivered | No | Yes | No | November 3, 2023 |
| Number of participants in transport internship programs hired before the end of the project | 0.00 | 12.00 | 0.00 | November 3, 2023 |
| Person-days of labour intensive works of people from local communities generated by Project activities | 0.00 | 350000.00 | 0.00 | November 3, 2023 |
| Person.days of Labour Intensive Work of women | 0.00 | 60000.00 | Not reported | Not reported |
| Plan for the Renewal fleet mechanism delivered | No | Yes | No | November 3, 2023 |
| Public agents trained on urban mobility planning and management | 0.00 | 60.00 | 4.00 | November 3, 2023 |
| Public agents trained that are women | 0.00 | 30.00 | 1.00 | November 3, 2023 |
| Regulatory framework for urban public transport adopted | No | Yes | No | November 3, 2023 |
| Road infrastructure safety assessment completed | No | Yes | No | November 3, 2023 |
| Road safety data base established and populated | No | Yes | No | November 3, 2023 |
| Roads rehablitated | 0.00 | 200.00 | 0.00 | November 3, 2023 |
| The design of the urban infrastructure investments addresses the specific needs of women | No | Yes | No | Not reported |
| Toolkit and Manual for inclusive and climate-resilient urban transport planning delivered | 0.00 | 2.00 | 0.00 | November 28, 2025 |
| Users satisfied with improved urban transport infrastructure in the selected corridors | 0.00 | 80.00 | 0.00 | November 3, 2023 |
| Women reporting satisfaction | 0.00 | 90.00 | 0.00 | November 3, 2023 |
| Women satisfied | 0.00 | 90.00 | Not reported | Not reported |
| that are women | 0.00 | 7.00 | 0.00 | November 3, 2023 |
| Economic opportunities in Cap-Haitien accessible by public transport in less than 60 minutes | 35.00 | 90.00 | 35.00 | November 3, 2023 |
| Municipal Public Transport Unit in Cap Haitien is operational and staffed | No | Yes | No | March 23, 2023 |
| People benefited from improved climate-resilient rural roads in the South peninsula | 0.00 | 226800.00 | 0.00 | November 3, 2023 |
| Citizens reporting satisfaction with project's consultation and communication mechanisms, disaggregated by gender | 0.00 | 90.00 | 0.00 | Not reported |
Ratings6 ratings
| Rating | Value | Date |
|---|---|---|
| ISR Financial Management | Moderately Satisfactory | August 5, 2026 |
| ISR Monitoring and Evaluation | Satisfactory | August 5, 2026 |
| ISR Overall Implementation Progress (IP) | Satisfactory | August 5, 2026 |
| ISR Procurement | Moderately Satisfactory | August 5, 2026 |
| ISR Progress towards achievement of PDO | Satisfactory | August 5, 2026 |
| ISR Project Management | Satisfactory | August 5, 2026 |
Contract awards61 awards
| Supplier | Date | Method | Amount |
|---|---|---|---|
| Transport et Construction (T & C) | April 7, 2026 | RFB | 11,802,473.15 USD |
| Kalton Design | March 23, 2026 | RFB | 4,580,537.5 USD |
| Ingeco S. A. (Ingénierie & Construction S. a) | March 23, 2026 | RFB | 3,722,078.82 USD |
| Bureau d'Ingénierie et d'Expertise Nationale (BIEN) | February 11, 2026 | RFB | 1,257,242.15 USD |
| MULENG | February 11, 2026 | RFB | 1,978,640.64 USD |
| ENCAUSA | February 3, 2026 | RFB | 1,695,761.2 USD |
| Ceforex Construction | February 3, 2026 | RFB | 445,129.25 USD |
| AZER Construction | February 3, 2026 | RFB | 1,050,439.13 USD |
| ENCAUSA | February 3, 2026 | RFB | 681,758 USD |
| GG-ETEX Construction | February 3, 2026 | RFB | 741,528.96 USD |
| CONST, ETUDE, Plan et Supervision CEPS | February 3, 2026 | RFB | 600,403.44 USD |
| Noteco (Nouvelle Technique de Construction) | February 3, 2026 | RFB | 779,438.92 USD |
| Université d'État d'Haïti (UEH) | December 23, 2025 | CDS | 450,000 USD |
| AC&A S. A. | December 12, 2025 | QCBS | 3,450,000 HTG |
| AC&A S. A. | December 12, 2025 | QCBS | 374,800 USD |
| SD Construction | November 17, 2025 | RFB | 9,650,657.61 USD |
| ALDA Construction & Design S. A. | September 23, 2025 | RFB | 1,028,649.85 USD |
| GAI-Construction | September 23, 2025 | RFB | 1,475,500 USD |
| ETUDE, Plan, Construction, EPCOS | September 23, 2025 | RFB | 400,367.25 USD |
| GARTEC | September 23, 2025 | RFB | 2,750,000 USD |
| Études, Constructions, Travaux, Infrastructures (ECOTI) | September 23, 2025 | RFB | 1,017,859.5 USD |
| BECOS Plus | September 23, 2025 | RFB | 313,500 USD |
| Envergure Construction | September 23, 2025 | RFB | 765,950 USD |
| Bureau d'ETUDE et de Construction (BECO) | September 23, 2025 | RFB | 808,742.95 USD |
| Beaubrun Contractor | July 23, 2025 | RFB | 1,565,226.72 USD |
| SD Construction | July 23, 2025 | RFB | 2,708,123.86 USD |
| GENIE Consult | June 12, 2025 | RFB | 988,174 USD |
| Embellissement Plan Construction (EPC) | June 12, 2025 | RFB | 980,700 USD |
| Bureau D Etudes et D Exécution D Haiti, BEEH | June 3, 2025 | RFB | 1,383,470 USD |
| GG-ETEX Construction | June 3, 2025 | RFB | 499,962 USD |
| Gecotech | June 3, 2025 | RFB | 1,257,000 USD |
| AB Construction | June 3, 2025 | RFB | 2,011,120 USD |
| Gecotech | June 3, 2025 | RFB | 2,188,000 USD |
| Embellissement Plan Construction (EPC) | June 3, 2025 | RFB | 2,584,260 USD |
| DM Consultance | May 30, 2025 | QCBS | 30,789,900 HTG |
| Institut de Formation et de Services (IFOS) | October 24, 2024 | CQS | 214,275 USD |
| Unite Caribbean SAS | October 24, 2024 | CQS | Not reported |
| AB Construction | May 2, 2024 | RFB | 937,900 USD |
| BECAM | May 2, 2024 | RFB | 758,000 USD |
| Envergure Construction | May 2, 2024 | RFB | 727,250 USD |
| Gecotech | May 2, 2024 | RFB | 841,380 USD |
| MULENG | January 24, 2024 | RFB | 2,087,578.66 USD |
| MVF Plus Construction | December 1, 2023 | RFB | 536,718.77 USD |
| Colagene Construction | November 3, 2023 | RFB | 394,700 USD |
| L&C Architecture & Construction | November 3, 2023 | RFB | 229,250 USD |
| TUDES, Constructions, Travaux, Infrastructures (ECOTI) | November 3, 2023 | RFB | 873,475.05 USD |
| Etirha Construction | November 3, 2023 | RFB | 435,030 USD |
| Bureau D Etudes et D Excution D Haiti, BEEH | November 3, 2023 | RFB | 449,600 USD |
| ENCAUSA | November 3, 2023 | RFB | 501,970 USD |
| Cochaplus (Cabinet Dtudes, de Construction et de Supervision) | November 3, 2023 | RFB | 375,487.81 USD |
| GG-ETEX Construction | November 3, 2023 | RFB | 774,120 USD |
| GALEO Construction | November 3, 2023 | RFB | 463,750 USD |
| Innociat | November 3, 2023 | RFB | 211,801 USD |
| Ingeco S. A. (Ingnierie & Construction S. a) | November 3, 2023 | RFB | 2,037,090 USD |
| Transport et Construction (T & C) | November 3, 2023 | RFB | 392,920 USD |
| Sodeco S. A. | August 16, 2023 | RFB | 585,019.5 USD |
| Noteco (Nouvelle Technique de Construction) | August 16, 2023 | RFB | 807,008.97 USD |
| Ceforex Construction | August 16, 2023 | RFB | 416,735 USD |
| ALDA Construction & Design S. A. | August 16, 2023 | RFB | 323,529.24 USD |
| Bureau Dtudes et Excution des Projets de Construction (MC Beepco) | August 16, 2023 | RFB | 690,000 USD |
| Cornelus Construction et Rparation | August 16, 2023 | RFB | 697,788 USD |
Funds passed on35 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | June 30, 2026 | 2.1 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | May 31, 2026 | 4.4 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | April 30, 2026 | 1.9 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | March 31, 2026 | 1.7 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | February 28, 2026 | 0.6 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | January 31, 2026 | 3.8 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | December 31, 2025 | 1.0 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | November 30, 2025 | 0.3 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | October 31, 2025 | 1.4 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | September 30, 2025 | 1.7 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | August 31, 2025 | 0.8 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | July 31, 2025 | 0.1 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | June 30, 2025 | 2.1 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | May 31, 2025 | 0.3 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | April 30, 2025 | 0.7 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | March 31, 2025 | 0.2 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | February 28, 2025 | 1.2 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | January 31, 2025 | 1.5 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | November 30, 2024 | 1.1 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | October 31, 2024 | 2.6 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | September 30, 2024 | 1.6 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | August 31, 2024 | 1.9 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | July 31, 2024 | 0.2 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | June 30, 2024 | 2.9 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | May 31, 2024 | 1.2 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | April 30, 2024 | 0.7 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | February 29, 2024 | 0.4 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | January 31, 2024 | 1.7 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | December 31, 2023 | 0.4 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | November 30, 2023 | 0.3 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | October 31, 2023 | 0.2 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | September 30, 2023 | 0.6 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | July 31, 2023 | 0.1 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Disbursement | February 28, 2023 | 3.0 |
| Unite Centrale d'execution of Ministry of Transport, Public works and Communications | Commitment | May 31, 2022 | 120.0 |
Identifiers5 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | 44000-P177210 | IATI |
| IDA credit or grant | IDAE0440 | IDA Statement of Credits and Grants |
| Public investment program line | 11141-1-25-31-98 | Public investment program |
| World Bank loan | IDA-E0440 | World Bank Projects |
| World Bank project | P177210 | Operation record |
Partner documents49 documents
- Record on projects.worldbank.org, projects.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, October 5, 2026, documents.worldbank.org
- Resettlement Plan Resilient connectivity and Urban Transport Accessibility Project (P177210), September 10, 2026, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 8, August 5, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, July 15, 2026, documents.worldbank.org
- Haiti - Projet de Connectivité Resiliente et d’Accessibilité du Transport Urbain (RUTAP) : Mission d'Appui à la Mise en Œuvre - du 3 au 10 Juin 2026 , June 10, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, June 9, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, May 15, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P177210 - Resilient connectivity and Urban Transport Accessibility Project - Audited Financial Statement, March 24, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, February 25, 2026, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 7, February 2, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, November 4, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, October 21, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 6, July 21, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, July 17, 2025, documents.worldbank.org
- Haiti - Projet de Connectivité Resiliente et d’Accessibilité du Transport Urbain : Mission de Supervision - 13 au 25 juin 2025, June 25, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, May 2, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P177210 - Resilient connectivity and Urban Transport Accessibility Project - Audited Financial Statement, February 17, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, January 24, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 5, December 17, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, December 2, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, August 6, 2024, documents.worldbank.org
- Resettlement Plan Resilient connectivity and Urban Transport Accessibility Project (P177210), July 22, 2024, documents.worldbank.org
- Resettlement Plan Resilient connectivity and Urban Transport Accessibility Project (P177210), July 22, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 4, June 27, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P177210 - Resilient connectivity and Urban Transport Accessibility Project - Audited Financial Statement, March 23, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, February 26, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 03, December 12, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 03, November 8, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, October 12, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, July 12, 2023, documents.worldbank.org
- Haïti - Projet de Connectivité Resiliente et d’Accessibilité du Transport Urbain : Mission de Supervision - du 5 au 13 Juin 2023 , June 13, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 02, April 29, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, April 25, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, April 20, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, April 11, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, March 22, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, January 9, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P177210- Resilient connectivity and Urban Transport Accessibility Project - Procurement Plan, December 20, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Resilient connectivity and Urban Transport Accessibility Project - P177210 - Sequence No : 01, September 3, 2022, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Grant E044-HT.pdf, June 24, 2022, documents.worldbank.org
- Official Documents- Financing Agreement for Grant E044-HT.pdf, June 24, 2022, documents.worldbank.org
- Minutes of a Meeting of the Executive Directors of the Bank and the Boards of Directors of IFC and MIGA on May 26, 2022 and Record of Approvals May 25 thru 26, May 26, 2022, documents.worldbank.org
- Haiti - Resilient Connectivity and Urban Transport Accessibility Project, May 13, 2022, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) Resilient connectivity and Urban Transport Accessibility Project (P177210), May 9, 2022, documents.worldbank.org
- Environmental and Social Commitment Plan (ESCP) Resilient connectivity and Urban Transport Accessibility Project (P177210), April 28, 2022, documents.worldbank.org
- Project Information Document - Resilient connectivity and Urban Transport Accessibility Project - P177210, April 19, 2022, documents.worldbank.org
- Concept Project Information Document (PID) - Resilient connectivity and Urban Transport Accessibility Project - P177210, November 15, 2021, documents.worldbank.org
- Concept Environmental and Social Review Summary (ESRS) - Resilient connectivity and Urban Transport Accessibility Project - P177210, November 10, 2021, documents.worldbank.org
Procurement notices (2)
- Procurement Notices, projects.worldbank.org
- Contract Awards, projects.worldbank.org
Sources
- Partner documents: terms of use set by the publisher
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- Public investment program: terms of use set by the publisher
- World Bank procurement notices: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| Public investment program | October 18, 2026 |
| World Bank procurement notices | October 18, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |