HaitiDocs

Data / Partner portfolio / World Bank Group / IDA

Haiti Sustainable Rural and Small Towns Water and Sanitation Project

US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

Objective

The proposed objectives of the Project are to: (i) increase access to improved water supply and sanitation in targeted rural areas and small towns in zones affected by cholera; (ii) strengthen the Recipient’s water and sanitation service delivery mechanism at thedeconcentrated level; and (iii) improve the Recipient’s capacity to respond promptly and effectively to an Eligible Emergency.

As published by World Bank Projects, in its original language.

Description

The Sustainable Rural and Small Towns Water and Sanitation Project for Haiti will: i) increase access to improved water supply and sanitation in targeted rural areas and small towns in zones affected by cholera; ii) strengthen water and sanitation service delivery mechanism at the deconcentrated level; and iii) improve capacity to respond promptly and effectively to an Eligible Emergency. Implementation of this project will involve the following three components: component 1, institutional strengthening, capacity building and project management; component 2, water supply and sanitation; and component 3, contingent emergency response. The project aims to take a first step toward the effective use of government and donor funding, to build capacity, strengthen institutions and set a foundation for achieving longer term

more

financial sustainability of the WSS sector’s overarching structure. The project will promote a shift from a project to a programmatic approach, pilot the deconcentrated strengthening of Regional Water and Sanitation Offices and contribute to the provision of operationally sustainable WSS service delivery to rural and small town populations, allowing for recovery of operational costs, and subsequent scale up beyond the targeted communes. This will include the promotion of a corporate culture favorable to the commercial management of service delivery. In order to eliminate cholera (and all other water and excreta-related diseases) from the Island of Hispaniola, sustainable financing is needed for the sector in Haiti, as well as delivery models that are financially viable and can be rolled out universally. The project will support the Government of Haiti’s first step toward this outcome over the coming decade and thus help the Government of Haiti attract additional Financial and Technical Partners to support its implementation.

Partner
World Bank Group, IDA
Sector
Water and sanitation
Stage
Closed since March 31, 2023
Approval
May 26, 2015
Closing
March 31, 2023
Instrument
IBRD/IDA financing, IDA
Undisbursed gap
−0.9: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
Borrower
Republic of Haiti
Implementing agency
DINEPA,Ministry of Economy and Finance, MEF
Effectiveness
December 16, 2015
Departments
Sud, Nord-Ouest, Grande Anse, Nippes
Last transaction
March 31, 2025
Operation ID
P148970

Implemented through

Life cycle4 stages, 12 dates

Stage history

StageFrom
ApprovedMay 26, 2015
Under wayMay 26, 2015
ClosingMarch 31, 2023
ClosedMarch 31, 2023

Dated events

EventDateSource
Planned startDecember 17, 2014IATI
AppraisalMarch 2, 2015World Bank Projects
NegotiationApril 21, 2015World Bank Projects
Actual startMay 26, 2015IATI
ApprovalMay 26, 2015World Bank Projects
First commitmentMay 26, 2015Transactions
EffectivenessDecember 16, 2015World Bank Projects
First disbursementDecember 31, 2015Transactions
Actual endMarch 31, 2023IATI
Closing dateMarch 31, 2023IATI
Completion report dueOctober 2, 2023World Bank Projects
Last disbursementNovember 30, 2023Transactions

Undisbursed: US$0.0 million on September 30, 2026, with closing on March 31, 2023.

Financing

Table 1.Financing, US$ millions

FinancierAmountUS$ millionsRoleSource
IDA Grant70.0InstitutionWorld Bank Projects

Table 2.Related operations, US$ millions

OperationRelationPartnerStageCommitmentUS$ millions
Sustainable rural and small town water supply and sanitationAdditional financing or child operationWorld Bank GroupClosed20.0

Table 3.Position at the data date by source (stocks), US$ millions

This pageUS$ millionsSourceIATIUS$ millions
Commitment64.2IDA Statement of Credits and Grants64.3
Disbursed65.1IDA Statement of Credits and Grants65.1
Undisbursed0.0IDA Statement of Credits and Grants
Total cost70.0World Bank Projects

World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source

Changes to the operation2 extensions, at least 4 restructurings, emergency component included
Original closing date
September 30, 2021
Closing date extensions
2
  • Extended from September 30, 2021 to September 30, 2022 (document of August 31, 2021)
  • Extended from September 30, 2022 to March 31, 2023 (document of October 31, 2022)
Restructurings
at least 4
Emergency component
Contingent emergency response component included (document of October 21, 2016) document

New commitments and disbursements by fiscal year

Disbursements, US$ millions
FY2014-15, not reportedn.r.14-15FY2015-16, US$5.4 million515-16FY2016-17, US$3.5 million416-17FY2017-18, US$9.1 million917-18FY2018-19, US$8.2 million818-19FY2019-20, US$6.5 million719-20FY2020-21, US$17.0 million1720-21FY2021-22, US$8.8 million921-22FY2022-23, US$6.5 million722-23FY2023-24, US$<0.1 million<0.123-24FY2024-25, not reportedn.r.24-25FY2014-15, not reportedn.r.14-15FY2015-16, US$5.4 million515-16FY2016-17, US$3.5 million416-17FY2017-18, US$9.1 million917-18FY2018-19, US$8.2 million818-19FY2019-20, US$6.5 million719-20FY2020-21, US$17.0 million1720-21FY2021-22, US$8.8 million921-22FY2022-23, US$6.5 million722-23FY2023-24, US$<0.1 million<0.123-24FY2024-25, not reportedn.r.24-25

Table 4.New commitments and disbursements by fiscal year (flows), US$ millions

FY2014-15US$ millionsFY2015-16US$ millionsFY2016-17US$ millionsFY2017-18US$ millionsFY2018-19US$ millionsFY2019-20US$ millionsFY2020-21US$ millionsFY2021-22US$ millionsFY2022-23US$ millionsFY2023-24US$ millionsFY2024-25US$ millions
New commitments50.0Not reported20.0Not reportedNot reportedNot reportedNot reportedNot reported−4.1Not reported−1.7
DisbursementsNot reported5.43.59.18.26.517.08.86.5<0.1Not reported
Cumulative disbursementsNot reported5.49.018.026.232.749.758.565.065.1Not reported

Records and documents

Transactions51 records, May 26, 2015 to March 31, 2025

Table 5.Transactions, US$ millions

DateMeasureAmountUS$ millionsSourceMethod
May 26, 2015Commitment50.0IDA Statement of Credits and Grantscredit original principal at board approval
June 14, 2017Commitment20.0IDA Statement of Credits and Grantscredit original principal at board approval
April 30, 2023Commitment−4.1IDA Statement of Credits and Grantscancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation)
March 31, 2025Commitment−1.6IDA Statement of Credits and Grantscancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation)
March 31, 2025Commitment−0.1IDA Statement of Credits and Grantscancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation)
December 31, 2015Disbursements1.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2016Disbursements4.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2016Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2017Disbursements1.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2017Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2017Disbursements1.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2017Disbursements2.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2017Disbursements3.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2018Disbursements2.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
August 31, 2018Disbursements1.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
January 31, 2019Disbursements4.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
January 31, 2019Disbursements2.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2019Disbursements2.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2019Disbursements3.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2020Disbursements3.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2020Disbursements2.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2020Disbursements2.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2021Disbursements0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2021Disbursements1.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2021Disbursements5.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2021Disbursements0.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2021Disbursements2.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2021Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2021Disbursements1.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2021Disbursements1.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2021Disbursements3.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2021Disbursements2.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2022Disbursements1.6IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2022Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2022Disbursements1.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2022Disbursements0.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
September 30, 2022Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2022Disbursements0.9IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2022Disbursements0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
December 31, 2022Disbursements1.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
February 28, 2023Disbursements0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
March 31, 2023Disbursements0.2IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
April 30, 2023Disbursements1.7IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2023Disbursements1.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
June 30, 2023Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
July 31, 2023Disbursements0.3IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
October 31, 2023Disbursements0.4IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2023Disbursements0.1IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
November 30, 2023Disbursements−0.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2024Disbursements−0.5IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
May 31, 2024Disbursements−0.0IDA Statement of Credits and Grantsdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
Terms4 of 6 reported
Finance type
110 Standard grant
Flow type
Not reported
Aid type
C01 Project-type interventions
Tied status
5 Untied
Collaboration type
2 Multilateral inflows
Humanitarian
Not reported
Locations4 departments, 5 places named, 8 places with coordinates
DepartmentsSud, Nord-Ouest, Grande Anse, Nippes
Places named by the sourceDEpartement de Nippes, Département de Nippes, Grandans, Nord-Ouest, Sud
Places with coordinates8
Results indicators36 indicators
IndicatorBaselineTargetLatest valueDate of latest value
A fecal sludge management service chain for rural areas and small towns is definedNYYMarch 31, 2023
A national programming mechanism for deconcentrated WSS service delivery is operationalized, as evidenced by tools in place0.005.005.00March 31, 2023
CAEPAs that include at least 20 percent female representation in project area0.0070.00129.00March 31, 2023
Communities where DINEPA and MSPP local structures have jointly been trained or collaborated in water supply, hygiene promotion andsanitation themes and activities0.0023.0023.00March 15, 2023
DINEPA acknowledged a gender action planNYYMarch 31, 2023
DINEPA conducts an annual joint Government/ partners sector reviewNYYMarch 31, 2023
Departments covered by WSS baseline information0.0010.0010.00March 31, 2023
Grievances registered related to delivery of project benefits addressed (%)0.00100.00100.00March 15, 2023
Households with latrine built during project implementation and of which use is verified0.001900.005449.00March 31, 2023
Improved community water points constructed or rehabilitated under the project0.00135.00133.00March 31, 2023
Latrine blocks for public institutions or spaces constructed or rehabilitated with management and maintenance arrangements in placein zones affected by Hurricane Matthew0.000.0024.00March 15, 2023
Latrine blocks for public institutions or spaces constructed or rehabilitated with management and maintenance arrangements in placeunder the project0.0070.0051.00March 15, 2023
New piped household water connections that are resulting from the project intervention0.007750.006576.00March 31, 2023
Number of OREPAs among the 4 existing ones that have installed an accounting system which facilitates the consolidation of financial information at the central level.0.002.001.00March 15, 2023
Number of OREPAs among the 4 existing ones, using the baseline developed under the project to prioritize.0.004.004.00March 31, 2023
Number of handwashing facilities built in the context of COVID-19 awareness campaign0.00995.001095.00March 31, 2023
Number of hospitals and health centers whose water supply system was repaired under the COVID-19 emergency0.0015.007.00March 31, 2023
People benefitting from consolidation work (small repairs and expansions) in zones affected by Hurricane Matthew0.00270000.00270019.00March 15, 2023
People trained to improve hygiene behavior/sanitation practices under the project0.0095000.00981255.00March 15, 2023
Students and teachers benefitting from improved sanitation facilities in public schools under the project0.0030000.0019351.00March 31, 2023
DINEPA's system in place to respond to major emergenciesNYYMarch 31, 2023
Direct project beneficiaries0.00618000.00601518.00March 31, 2023
Number of people in rural areas and small towns provided with access to Improved Water Sources under the project0.00588000.00570558.00March 31, 2023
People provided with access to "improved sanitation facilities under the proj.0.0030000.0030960.00March 31, 2023
Piped water systems managed sustainably by a Professional Operator (PO) under the project0.0024.0017.00March 15, 2023
Priority cholera communes targeted under the project0.007.007.00March 31, 2023
Required functions deconcentrated to targeted OREPA0.006.006.00March 15, 2023
Latrine blocks for public institutions or spaces constructed or rehabilitated with management and maintenance arrangements in place in zones affected by Hurricane Matthew0.00Not reported24.00January 1, 1900
Latrine blocks for public institutions or spaces constructed or rehabilitated with management and maintenance arrangements in place under the project0.0070.0051.00March 31, 2023
Female beneficiaries0.000.0050.00May 17, 2018
Number of people in rural areas provided with access to Improved Water Sources in zones affected by Hurricane Matthew0.00320000.00342339.00March 31, 2023
Number of people provided with access to improved water sources under the project except in the areas affected by Hurricane Matthew0.00197000.00152319.00March 31, 2023
People in rural areas provided with access to "improved sanitation facilities" - female0.0015000.0015000.00March 31, 2023
People provided with access to "improved sanitation facilities” under the proj.0.0030000.0030960.00March 15, 2023
Project beneficiaries in localities on the border with the DR including bi-national markets0.0034000.0039665.00March 31, 2023
Project beneficiaries of small repairs of water systems in the context of COVID-19 emergency0.0071000.0075900.00March 15, 2023
Ratings14 ratings
RatingValueDate
IEG bankqualityofsupervisionModerately SatisfactoryFebruary 6, 2024
IEG evaltypeESFebruary 6, 2024
IEG icrqualitySubstantialFebruary 6, 2024
IEG mequalitySubstantialFebruary 6, 2024
IEG outcomeModerately SatisfactoryFebruary 6, 2024
IEG overallbankperfModerately SatisfactoryFebruary 6, 2024
ICR outratingindModerately SatisfactoryOctober 2, 2023
ICR overallratingModerately SatisfactoryOctober 2, 2023
ISR Financial ManagementModerately UnsatisfactoryMarch 30, 2023
ISR Monitoring and EvaluationModerately SatisfactoryMarch 30, 2023
ISR Overall Implementation Progress (IP)Moderately UnsatisfactoryMarch 30, 2023
ISR ProcurementModerately UnsatisfactoryMarch 30, 2023
ISR Progress towards achievement of PDOModerately SatisfactoryMarch 30, 2023
ISR Project ManagementModerately UnsatisfactoryMarch 30, 2023
Contract awards75 awards
SupplierDateMethodAmount
Universal MotorsMarch 27, 2023DIR238,000 USD
Name not shownMarch 24, 2023CDS23,000 USD
Name not shownJanuary 18, 2023CDS10,800 USD
Gardere Experts-Comptables et Conseillers en GestionSeptember 13, 2022CDS106,553.89 USD
BEASCOAugust 19, 2022DIR59,900.59 USD
Experts Conseils et AssociesJuly 1, 2022LCS7,133,900 HTG
Mwater FoundationJune 7, 2022CDS123,675.52 USD
BUREC SAApril 20, 2022DIR580,000 USD
Name not shownApril 4, 2022RFBNot reported
Name not shownApril 4, 2022RFBNot reported
Name not shownApril 4, 2022RFBNot reported
Name not shownApril 4, 2022RFBNot reported
DELVA ConstructionSeptember 27, 2021RFQ6,801,916.4 HTG
MultimotorsAugust 21, 2021RFQ1,209,000 HTG
L'Institut de Formation et de Service SA (IFOS SA)June 18, 2021CDS1,179,763.75 Gourde hatienne
Name not shownJune 9, 2021INDV116,850 USD
CECOM Consultants SAJune 2, 2021QCBS19,765,139 HTG
Vision des Ingenieurs Applique en Technique de Construction et Hydraulique (Viatech)May 20, 2021RFQ17,335,280 HTG
PECOS ConstructionMay 17, 2021RFQ18,086,143.4 HTG
IMCOMay 3, 2021RFQ4,474,683.75 HTG
IMCOMay 3, 2021RFQ8,677,040.61 HTG
Plan ConsultMay 3, 2021RFB84,955,870 HTG
Techniplan SRLMarch 26, 2021QCBS299,175 USD
CECOM Consultants SAMarch 26, 2021QCBSNot reported
VBV ConstructionMarch 15, 2021RFQ20,900,000 HTG
BK ConstructionMarch 15, 2021RFQ2,040,876 HTG
Unite de Recherche en Geoscience (URGEO)March 3, 2021NPO129,862 USD
Societe de GENIE Conseil S.A.January 15, 2021CDS132,644.4 EUR
Societe de GENIE Conseil S.A.January 15, 2021CDS6,060,726 Gourde hatienne
Sinamec Occinal Librice & CoDecember 28, 2020RFQ13,116,400 HTG
Name not shownDecember 24, 2020RFQ323,154.28 USD
Bureau ETUDE et de ConstructionDecember 17, 2020RFQ113,958,834.07 HTG
BECAJDecember 17, 2020RFQ79,681 USD
FICOSADecember 17, 2020RFQ767,095.83 USD
BECAJDecember 17, 2020RFQ122,415.5 USD
Haiti Hydraulique Organisation (H2O)December 15, 2020RFB1,515,295 USD
RAZELDecember 15, 2020RFB740,795,360.25 HTG
Name not shownDecember 14, 2020INDV12,845 USD
Name not shownDecember 12, 2020DIR11,985 USD
GENIE Conseil S.A.November 27, 2020CDS115,490 EUR
GENIE Conseil S.A.November 27, 2020CDS27,047,521.4 Gourde hatienne
Name not shownNovember 27, 2020RFQ3,034,786.09 HTG
Ces GroupNovember 23, 2020RFQ108,923 USD
SOHECOOctober 19, 2020RFB172,734,407.42 HTG
Gretco S.A.October 19, 2020RFBNot reported
AQUAITYSeptember 29, 2020DIR193,755.24 USD
Plan ConsultSeptember 10, 2020RFB114,779,043.58 HTG
SOCOASeptember 3, 2020RFQ9,915,864.44 HTG
Bureau d'ETUDE et d'Execution des Travaux en GENIE Civil (Beetgec)September 3, 2020RFQ11,809,285.39 HTG
Incatema Consulting & Engineering, S.L.September 3, 2020RFB149,740,427.78 HTG
Corps Professionnel en Ingnierie Construction (CPIC)September 3, 2020RFQ9,620,493.08 HTG
Name not shownJune 30, 2020INDV2,049,500 Gourde hatienne
Name not shownApril 14, 2020CDS22,000 USD
United Nations Children's Fund (UNICEF)April 2, 2020UN2,014,178 USD
North Water Rezo DloJanuary 21, 2020CDS79,652 USD
Foratech Environnement S.A.November 29, 2019DIR1,644,350 HTG
Bucotech ConstructionOctober 4, 2019RFQ25,831,967.74 HTG
Societe Caraibeenne Etudes et de Construction (SOCAP S.A.)September 2, 2019RFQ8,865,070.3 HTG
Bureau d’Étude et de Construction (BECO)September 2, 2019RFQ8,837,574.1 HTG
Bureau des Ingénieurs pour la Reconstruction d’Haïti (BIRHA)September 2, 2019RFQ6,559,928.86 HTG
Societe Caraibeenne Etudes et de Construction (SOCAP S.A.)July 26, 2019RFQ23,157,108.8 HTG
Societe Caraibeenne Etudes et de Construction (SOCAP S.A.)July 26, 2019RFQ267,495.77 USD
Gardere Experts-Comptables et Conseillers en GestionJuly 9, 2019CDS236,306.5 USD
Perfecta S.A.June 21, 2019DIR136,884 USD
Name not shownDecember 26, 2018QCBS3,256,247.7 HTG
Name not shownDecember 6, 2018RFQ10,330,400 HTG
Name not shownNovember 30, 2018RFQ4,837,500 HTG
ETRECOSeptember 24, 2018QCBS22,203,200 HTG
Name not shownMay 24, 2018DIR6,638,625 HTG
Incatema Consulting & Engineering, S.L.April 9, 2018RFB148,650,661.08 HTG
Incatema Consulting & Engineering, S.L.April 9, 2018RFB121,138,276.16 HTG
SOHECOMarch 26, 2018RFB119,854,081.28 HTG
A & R ConstructionMarch 26, 2018RFB129,606,585.99 HTG
SOHECOMarch 26, 2018RFB95,477,167.14 HTG
Comite Protos Haiti (CPH)March 1, 2018QCBS6,431,063 HTG
Funds passed on51 transactions
ReceiverTransactionDateUS$ millions
DINEPA; Ministry of Economy and Finance, MEFCommitmentMarch 31, 2025−0.1
DINEPA; Ministry of Economy and Finance, MEFCommitmentMarch 31, 2025−1.6
DINEPA; Ministry of Economy and Finance, MEFDisbursementMay 31, 2024−0.5
DINEPA; Ministry of Economy and Finance, MEFDisbursementMay 31, 2024−0.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementNovember 30, 2023−0.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementNovember 30, 20230.1
DINEPA; Ministry of Economy and Finance, MEFDisbursementOctober 31, 20230.4
DINEPA; Ministry of Economy and Finance, MEFDisbursementJuly 31, 20230.3
DINEPA; Ministry of Economy and Finance, MEFDisbursementJune 30, 20230.1
DINEPA; Ministry of Economy and Finance, MEFDisbursementMay 31, 20231.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementApril 30, 20231.7
DINEPA; Ministry of Economy and Finance, MEFCommitmentApril 30, 2023−4.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementMarch 31, 20230.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementFebruary 28, 20230.5
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20221.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementNovember 30, 20220.5
DINEPA; Ministry of Economy and Finance, MEFDisbursementNovember 30, 20220.9
DINEPA; Ministry of Economy and Finance, MEFDisbursementSeptember 30, 20220.9
DINEPA; Ministry of Economy and Finance, MEFDisbursementSeptember 30, 20220.1
DINEPA; Ministry of Economy and Finance, MEFDisbursementJune 30, 20221.1
DINEPA; Ministry of Economy and Finance, MEFDisbursementApril 30, 20220.1
DINEPA; Ministry of Economy and Finance, MEFDisbursementMarch 31, 20221.6
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20212.1
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20213.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementSeptember 30, 20211.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementSeptember 30, 20211.3
DINEPA; Ministry of Economy and Finance, MEFDisbursementJuly 31, 20210.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementJuly 31, 20212.4
DINEPA; Ministry of Economy and Finance, MEFDisbursementJune 30, 20210.6
DINEPA; Ministry of Economy and Finance, MEFDisbursementApril 30, 20215.5
DINEPA; Ministry of Economy and Finance, MEFDisbursementMarch 31, 20211.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementMarch 31, 20210.5
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20202.4
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20202.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementJune 30, 20203.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20193.5
DINEPA; Ministry of Economy and Finance, MEFDisbursementJuly 31, 20192.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementJanuary 31, 20194.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementJanuary 31, 20192.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementAugust 31, 20181.9
DINEPA; Ministry of Economy and Finance, MEFDisbursementJune 30, 20182.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20173.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementNovember 30, 20172.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementJuly 31, 20171.4
DINEPA; Ministry of Economy and Finance, MEFCommitmentJune 30, 201720.0
DINEPA; Ministry of Economy and Finance, MEFDisbursementJune 30, 20170.2
DINEPA; Ministry of Economy and Finance, MEFDisbursementMarch 31, 20171.3
DINEPA; Ministry of Economy and Finance, MEFDisbursementNovember 30, 20160.6
DINEPA; Ministry of Economy and Finance, MEFDisbursementMay 31, 20164.4
DINEPA; Ministry of Economy and Finance, MEFDisbursementDecember 31, 20151.0
DINEPA; Ministry of Economy and Finance, MEFCommitmentMay 31, 201550.0
Identifiers6 identifiers
SystemIdentifierSource
IATI identifier44000-P148970IATI
IDA credit or grantIDAD0680IDA Statement of Credits and Grants
IDA credit or grantIDAD2010IDA Statement of Credits and Grants
World Bank loanIDA-D0680World Bank Projects
World Bank loanIDA-D2010World Bank Projects
World Bank projectP148970Operation record
Where sources differ2 fields
FieldSourceValueUsed
CommitmentIDA Statement of Credits and GrantsUS$64.2 million✓
CommitmentWorld Bank ProjectsUS$70.0 million
StatusWorld Bank ProjectsClosed✓
StatusIATIActive
Partner documents90 documents
Procurement notices (2)

Sources

Data as of October 18, 2026
SourceRead on
IATIOctober 18, 2026
IATIOctober 18, 2026
IDA Statement of Credits and GrantsOctober 18, 2026
World Bank procurement noticesOctober 18, 2026
World Bank ProjectsOctober 18, 2026
World Bank documentsOctober 18, 2026
Cite this page

HaitiDocs. Haiti Sustainable Rural and Small Towns Water and Sanitation Project. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP148970