Strengthening DRM and Climate Resilience Project
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
The Project Development Objective is to improve: (i) early warning and emergency evacuation capacity in selected municipalities in high climate risk-prone areas; (ii) the provision of and accessibility to safe havens; and (iii) the GoH’s capacity to respond to an eligible emergency.
As published by World Bank Projects, in its original language.
Description
The development objective of Strengthening Disaster Risk Management and Climate Resilience Project for Haiti is to improve: (i) early warning and emergency evacuation capacity in selected municipalities in high climate risk-prone areas, and (ii) the provision of and accessibility to safe havens. This project has four components. 1) The first component, Strengthening Disaster Preparedness and Emergency Response Capacity and Promoting Building Regulation and Resilient Construction Practices, comprises two sub-components: (i) Strengthening Disaster Preparedness, and Emergency Response Capacity, and Disaster Risk Data Management, and (ii) Promoting Building Regulations and Resilient Construction Practices at the Local Level. 2) The second component, Construction and Rehabilitation of Safe Havens aims to finance: (a) the construction, reconstruction and/or rehabilitation of selected emergency shelters or safe
more
havens, including those in schools, community centers, markets, and roadside annexes, and the reinforcement of small road infrastructure acting as emergency walkways leading to safe havens, prioritized according to the methodology; (b) the provision of improved basic services to these safe havens (compliant with climate change mitigation approaches); (c) technical studies, including relevant engineering designs, technical audits, social and environmental safeguard instruments, and shelter activation and closure operating procedures for selected investments; (d) training, technical assistance and communication activities aimed at achieving social mobilization and coordination of safe haven's investments among all stakeholders participating in the Project; and (e) monitoring and supervision of works. 3) The third component, Contingent Emergency Response, aims to finance the implementation of emergency works, rehabilitation, and associated assessments in the event of a natural disaster. 4) The fourth component, Project Management and Implementation Support, aims to finance the costs related to overall project management and implementation support.
- Partner
- World Bank Group, IDA
- Sector
- Governance and security
- Stage
- Under way since May 16, 2019
- Approval
- May 16, 2019
- Closing
- March 31, 2027
- Instrument
- IBRD/IDA financing, IDA
- Undisbursed gap
- 0.8: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Borrower
- Republic of Haiti
- Implementing agency
- Ministry of Interior and Territorial Communities
- Effectiveness
- August 7, 2019
- Departments
- Sud, Nord-Ouest, Nord, Grande Anse, Nippes
- Last transaction
- September 30, 2026
- Operation ID
- P165870
Implemented through
- International Organization for Migration (IOM), US$4.0 million, World Bank contract award
Life cycle3 stages, 13 dates
Stage history
| Stage | From |
|---|---|
| Planned | July 30, 2018 |
| Approved | May 16, 2019 |
| Under way | May 16, 2019 |
Dated events
| Event | Date | Source |
|---|---|---|
| Concept review | July 30, 2018 | World Bank Projects |
| Disclosure | September 27, 2018 | World Bank Projects |
| Planned start | December 12, 2018 | IATI |
| Appraisal | March 27, 2019 | World Bank Projects |
| Negotiation | April 9, 2019 | World Bank Projects |
| Actual start | May 16, 2019 | IATI |
| Approval | May 16, 2019 | World Bank Projects |
| First commitment | May 16, 2019 | Transactions |
| Effectiveness | August 7, 2019 | World Bank Projects |
| First disbursement | January 31, 2020 | Transactions |
| Last disbursement | September 30, 2026 | Transactions |
| Closing date | March 31, 2027 | IATI |
| Completion report due | September 30, 2027 | World Bank Projects |
Undisbursed: US$3.9 million on September 30, 2026, with closing on March 31, 2027. Disbursed in FY2025-26: US$12.7 million.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDA Grant | 50.5 | Institution | World Bank Projects |
Table 2.Related operations, US$ millions
| Operation | Relation | Partner | Stage | CommitmentUS$ millions |
|---|---|---|---|---|
| AF Strengthening DRM and Climate Resilience Project | Additional financing or child operation | World Bank Group | Under way | 11.0 |
| Strengthening DRM and Climate Resilience Project | Additional financing or child operation | World Bank Group | Under way | 4.5 |
Table 3.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 50.5 | IDA Statement of Credits and Grants | 50.5 |
| Disbursed | 45.8 | IDA Statement of Credits and Grants | 42.6 |
| Undisbursed | 3.9 | IDA Statement of Credits and Grants | |
| Total cost | 35.0 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
Changes to the operation2 extensions, at least 1 restructuring, emergency component included
- Original closing date
- April 30, 2025
- Closing date extensions
- 2
- Extended from April 30, 2025 to October 30, 2026 (document of April 30, 2025)
- Extended from October 30, 2026 to March 31, 2027 (document of July 31, 2026)
- Restructurings
- at least 1
- December 18, 2023 (document of December 18, 2023) restructuring paper
- Emergency component
- Contingent emergency response component included (document of April 1, 2025) document
New commitments and disbursements by fiscal year
Table 4.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2018-19US$ millions | FY2019-20US$ millions | FY2020-21US$ millions | FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | |
|---|---|---|---|---|---|---|---|---|
| New commitments | 35.0 | Not reported | Not reported | 11.0 | Not reported | Not reported | 4.5 | Not reported |
| Disbursements | Not reported | 1.2 | 1.9 | 7.4 | 3.0 | 10.8 | 8.9 | 12.7 |
| Cumulative disbursements | Not reported | 1.2 | 3.1 | 10.5 | 13.5 | 24.2 | 33.2 | 45.8 |
Records and documents
Transactions75 records, May 16, 2019 to September 30, 2026
Table 5.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| May 16, 2019 | Commitment | 35.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| May 26, 2022 | Commitment | 11.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| March 24, 2025 | Commitment | 4.5 | IDA Statement of Credits and Grants | credit original principal at board approval |
| January 31, 2020 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2020 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2020 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2020 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2021 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2021 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2021 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2021 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2021 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2021 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2021 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2021 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2022 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2022 | Disbursements | 1.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2022 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2022 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2022 | Disbursements | 2.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2022 | Disbursements | 1.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2022 | Disbursements | −0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2022 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2023 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2023 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2023 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2023 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2023 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2023 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2023 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2023 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2023 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2023 | Disbursements | 2.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2024 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 29, 2024 | Disbursements | 1.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2024 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2024 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2024 | Disbursements | 1.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2024 | Disbursements | 2.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2024 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2024 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2024 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2024 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2024 | Disbursements | 2.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2025 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2025 | Disbursements | 1.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2025 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2025 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2025 | Disbursements | 2.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2025 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2025 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2025 | Disbursements | 1.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2025 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2025 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2026 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2026 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2026 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2026 | Disbursements | 1.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2026 | Disbursements | −1.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2026 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2026 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2026 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2026 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2026 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2026 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2026 | Disbursements | 2.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2026 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2026 | Disbursements | <0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2026 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2026 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2026 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2026 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms4 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Not reported
Locations5 departments, 6 places named, 12 places with coordinates
| Departments | Sud, Nord-Ouest, Nord, Grande Anse, Nippes |
| Places named by the source | Departement de Nippes, Grandans, Nord, Nord-Ouest, Republic of Haiti, Sud |
| Places with coordinates | 12 |
Results indicators19 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| Number of CCPCs with a refreshed training and improved competencies in emergency planning and management – Minimum with a Level 2 certification | 0.00 | 100.00 | 90 | October 15, 2026 |
| Number of hands-on training sessions for workers in the housing sector (“chantier-écoles”) completed | 0.00 | 140.00 | 80.00 | April 5, 2024 |
| Number of persons trained to apply resilient construction techniques. | 1,717.00 | 2,800.00 | 2917 | October 15, 2026 |
| Number of rehabilitated or improved DGPC’s Emergency Operation Centers by the project | 0.00 | 8.00 | 0.00 | April 5, 2024 |
| Number of safe havens constructed/ rehabilitated by the project benefitting from gender friendly infrastructure design | 0.00 | 17.00 | 5.00 | April 5, 2024 |
| Number of safe havens constructed/rehabilitated by the project | 0.00 | 21.00 | 6 | October 15, 2026 |
| Percentage of beneficiaries reporting satisfaction with project activities. | 0.00 | 90.00 | 95 | October 15, 2026 |
| Percentage of grievances appropriately addressed within the project GRM deadlines. | 0.00 | 90.00 | 83 | October 15, 2026 |
| Share of municipalities in risk-prone areas with an improved emergency preparedness and response capability | 0.00 | 70.00 | 100 | October 15, 2026 |
| Share of women leadership in the shelter management committees for each “safe-haven” constructed/ rehabilitated by the project | 0.00 | 30.00 | 30 | October 15, 2026 |
| Share of women participation in the shelter management committees for each “safe-haven” constructed/ rehabilitated by the project | 0.00 | 30.00 | 36 | October 15, 2026 |
| Development of protocols for National Early Warning Service and Communication System for Hydromet events approved and adopted. | No | Yes | Yes | October 15, 2026 |
| Increase in the number of people living in flood-risk areas who have access to a safe haven. | 0.00 | 70,000.00 | 10,686 | October 15, 2026 |
| Number of CCPCs with excellent competencies in emergency planning and management, in high climate risk-prone areas - Level 1 certification | 0.00 | 10.00 | 20 | October 15, 2026 |
| Number of persons with increased knowledge to build climate and seismic resilient rural houses trained by the project | 0.00 | 3,100.00 | 3,433 | October 15, 2026 |
| Number of hands-on training sessions for workers in the housing sector (“chantier-Ecoles”) completed | 0.00 | 140.00 | 140 | October 15, 2026 |
| Number of rehabilitated or improved DGPC's Emergency Operation Centers by the project | 0.00 | 8.00 | 8 | October 15, 2026 |
| Increase the number of females living in flood-risk areas who have access to a safe haven. | 0.00 | 35000.00 | 2589.00 | April 5, 2024 |
| Percentage of female persons with increased knowledge to build climate and seismic resilient rural houses trained by the project | 0.00 | 3.00 | Not reported | Not reported |
Ratings6 ratings
| Rating | Value | Date |
|---|---|---|
| ISR Financial Management | Moderately Unsatisfactory | June 11, 2026 |
| ISR Monitoring and Evaluation | Satisfactory | June 11, 2026 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | June 11, 2026 |
| ISR Procurement | Moderately Satisfactory | June 11, 2026 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | June 11, 2026 |
| ISR Project Management | Moderately Satisfactory | June 11, 2026 |
Contract awards34 awards
| Supplier | Date | Method | Amount |
|---|---|---|---|
| Societe d’Ingenierie et Reconstruction d’Infrastructure Sociale en Haiti | January 18, 2024 | DIR | 46,618.03 USD |
| Sunauto S.A | January 12, 2024 | RFQ | 8,610,000 HTG |
| Innovative Display Solutions | December 18, 2023 | RFQ | 192,000 USD |
| Total Tech | December 12, 2023 | RFQ | 4,361 USD |
| Total Tech | December 12, 2023 | RFQ | 23,982 USD |
| Total Tech | December 12, 2023 | RFQ | 5,200 USD |
| Royale Construction | June 19, 2023 | RFB | 869,828.11 USD |
| CECOM Consultants | April 24, 2023 | QCBS | 5,635,050 USD |
| Name not shown | April 24, 2023 | QCBS | 4,286,758.8 USD |
| Techniplan SRL | April 24, 2023 | QCBS | Not reported |
| Name not shown | April 10, 2023 | INDV | 9,000 USD |
| Name not shown | March 27, 2023 | INDV | 15,000 USD |
| Data Solution & System | November 17, 2022 | CQS | 75,000 USD |
| Name not shown | November 17, 2022 | RFQ | 1,288,238.73 HTG |
| Name not shown | November 15, 2022 | CDS | 60,000 USD |
| SOCOSIG | October 21, 2022 | CDS | 60,637.5 USD |
| NAOMIS | October 21, 2022 | CDS | Not reported |
| SOCOSIG | October 21, 2022 | CDS | Not reported |
| Bureau d'Ingenierie et de Construction (BICO) | October 19, 2022 | DIR | 379,190 USD |
| International Organization for Migration (IOM) | June 15, 2022 | DIR | 7,200,000 USD |
| Groupe pour l'Inclusion, la Recherche et l'Appui au Developpement d'Haiti et Caritas Haiti | May 3, 2022 | RFB | 98,534,513.1 HTG |
| Societe d'Information en Communication Sociale et Economique (SIKSE) | May 3, 2022 | RFB | 155,285,769.28 HTG |
| Accounting & Finance Corp. (Acfinco) | April 28, 2022 | QCBS | 7,900,000 HTG |
| Name not shown | April 25, 2022 | INDV | 17,500 USD |
| Societe d'Information en Communication Sociale et Economique (SIKSE) | March 25, 2022 | RFB | 155,285,769.28 HTG |
| Groupe pour l'Inclusion, la Recherche et l'Appui au Developpement d'Haiti et Caritas Haiti | March 25, 2022 | RFB | 98,534,513.1 HTG |
| Societe d'Information en Communication Sociale et Economique (SIKSE) | March 25, 2022 | RFB | Not reported |
| Groupe pour l'Inclusion, la Recherche et l'Appui au Developpement d'Haiti et Caritas Haiti | March 25, 2022 | RFB | Not reported |
| Name not shown | March 7, 2022 | INDV | 3,500 USD |
| Name not shown | January 14, 2022 | INDV | 3,000 USD |
| Pan American Development Foundation (PADF) | November 26, 2021 | QCBS | 8,418,773.95 USD |
| Bureau d'Ingenierie et de Construction (BICO) | September 7, 2021 | DIR | 347,169.55 USD |
| We Working for Enrironment S.A | November 17, 2020 | QCBS | 1,341,952.79 USD |
| Name not shown | August 10, 2020 | INDV | 115,276 USD |
Funds passed on69 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| Ministry of Interior and Territorial Communities | Disbursement | June 30, 2026 | 1.7 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2026 | <0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2026 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2026 | 0.4 |
| Ministry of Interior and Territorial Communities | Disbursement | April 30, 2026 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | March 31, 2026 | 0.6 |
| Ministry of Interior and Territorial Communities | Disbursement | March 31, 2026 | 1.0 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2026 | −1.7 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2026 | 1.9 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2026 | 1.0 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2026 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2026 | 0.4 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2025 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2025 | 0.7 |
| Ministry of Interior and Territorial Communities | Disbursement | November 30, 2025 | 1.2 |
| Ministry of Interior and Territorial Communities | Disbursement | October 31, 2025 | 1.0 |
| Ministry of Interior and Territorial Communities | Disbursement | October 31, 2025 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | September 30, 2025 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | August 31, 2025 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | June 30, 2025 | 2.8 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2025 | 0.5 |
| Ministry of Interior and Territorial Communities | Disbursement | April 30, 2025 | 0.5 |
| Ministry of Interior and Territorial Communities | Disbursement | March 31, 2025 | 0.1 |
| Ministry of Interior and Territorial Communities | Commitment | March 31, 2025 | 4.5 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2025 | 1.5 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2025 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2024 | 2.2 |
| Ministry of Interior and Territorial Communities | Disbursement | November 30, 2024 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | October 31, 2024 | 0.6 |
| Ministry of Interior and Territorial Communities | Disbursement | September 30, 2024 | 0.7 |
| Ministry of Interior and Territorial Communities | Disbursement | August 31, 2024 | 0.7 |
| Ministry of Interior and Territorial Communities | Disbursement | June 30, 2024 | 2.3 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2024 | 1.3 |
| Ministry of Interior and Territorial Communities | Disbursement | April 30, 2024 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | March 31, 2024 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | February 29, 2024 | 1.8 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2024 | 0.5 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2023 | 2.6 |
| Ministry of Interior and Territorial Communities | Disbursement | November 30, 2023 | 0.5 |
| Ministry of Interior and Territorial Communities | Disbursement | October 31, 2023 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | September 30, 2023 | 0.5 |
| Ministry of Interior and Territorial Communities | Disbursement | August 31, 2023 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | June 30, 2023 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2023 | 0.6 |
| Ministry of Interior and Territorial Communities | Disbursement | March 31, 2023 | 0.4 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2023 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2023 | <0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2022 | 0.8 |
| Ministry of Interior and Territorial Communities | Disbursement | November 30, 2022 | −0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | August 31, 2022 | 1.1 |
| Ministry of Interior and Territorial Communities | Disbursement | June 30, 2022 | 2.7 |
| Ministry of Interior and Territorial Communities | Commitment | May 31, 2022 | 11.0 |
| Ministry of Interior and Territorial Communities | Disbursement | May 31, 2022 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | April 30, 2022 | 0.4 |
| Ministry of Interior and Territorial Communities | Disbursement | March 31, 2022 | 1.7 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2022 | 0.5 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2021 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | November 30, 2021 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | October 31, 2021 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | August 31, 2021 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | June 30, 2021 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | April 30, 2021 | 0.1 |
| Ministry of Interior and Territorial Communities | Disbursement | February 28, 2021 | 0.4 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2021 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | December 31, 2020 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | October 31, 2020 | 0.3 |
| Ministry of Interior and Territorial Communities | Disbursement | September 30, 2020 | 0.2 |
| Ministry of Interior and Territorial Communities | Disbursement | January 31, 2020 | 1.0 |
| Ministry of Interior and Territorial Communities | Commitment | May 31, 2019 | 35.0 |
Identifiers9 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | 44000-P165870 | IATI |
| IDA credit or grant | IDAD4720 | IDA Statement of Credits and Grants |
| IDA credit or grant | IDAE0450 | IDA Statement of Credits and Grants |
| IDA credit or grant | IDAE4370 | IDA Statement of Credits and Grants |
| Public investment program line | 1216-1-12-54-14 | Public investment program |
| World Bank loan | IDA-D4720 | World Bank Projects |
| World Bank loan | IDA-E0450 | World Bank Projects |
| World Bank loan | IDA-E4370 | World Bank Projects |
| World Bank project | P165870 | Operation record |
Partner documents86 documents
- Record on projects.worldbank.org, projects.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P165870 - Strengthening DRM and Climate Resilience Project - Audited Financial Statement, September 25, 2026, documents.worldbank.org
- Disclosable Restructuring Paper - Strengthening DRM and Climate Resilience Project - P165870, June 30, 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, June 23, 2026, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 14, June 11, 2026, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 13, December 11, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P165870 - Strengthening DRM and Climate Resilience Project - Audited Financial Statement, December 1, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, June 3, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 12, May 21, 2025, documents.worldbank.org
- Official Documents- Letter on Extension of Closing Date for the Financing Agreements for Grant D472-HT and Grant E045-HT.pdf, April 17, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, April 17, 2025, documents.worldbank.org
- Official Documents- Financing Agreement for the Second Additional Financing for Grant E437-HT.pdf, April 2, 2025, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for the Second Additional Financing for Grant E437-HT.pdf, April 2, 2025, documents.worldbank.org
- Haiti - Strengthening Disaster Risk Management and Climate Resilience Project : Additional Financing, April 1, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, April 1, 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, March 7, 2025, documents.worldbank.org
- Project Information Document-Integrated Safeguards Data Sheet - Strengthening DRM and Climate Resilience Project - P165870, March 6, 2025, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 11, November 12, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, October 22, 2024, documents.worldbank.org
- Haïti - Projet de Gestion des Risques et de Résilience aux Aléas Climatiques (PGRAC) : Trésîmes Mission de Supervision - 26 au 27 Septembre 2024 , September 27, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, September 3, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, August 5, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, June 28, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, June 13, 2024, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 10, May 23, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P165870 - Strengthening DRM and Climate Resilience Project - Audited Financial Statement, March 31, 2024, documents.worldbank.org
- Household Vulnerability and Preparedness for Disasters in Haiti , February 9, 2024, documents.worldbank.org
- Official Documents- Second Amendment to the Financing Agreement for Grant D472-HT.pdf, February 6, 2024, documents.worldbank.org
- Official Documents- Amendment to the Financing Agreement for Grant E045-HT.pdf, February 6, 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, January 12, 2024, documents.worldbank.org
- Disclosable Restructuring Paper - Strengthening DRM and Climate Resilience Project - P165870, December 18, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, November 16, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 09, November 9, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, September 5, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, August 14, 2023, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 08, May 1, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P165870 - Strengthening DRM and Climate Resilience Project - Audited Financial Statement, March 31, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, March 8, 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, November 2, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 07, November 2, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, October 21, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P165870 - Strengthening DRM and Climate Resilience Project - Audited Financial Statement, September 26, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, September 15, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, August 22, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, August 18, 2022, documents.worldbank.org
- Official Documents- Financing Agreement for Additional Financing Grant E045-HT.pdf, August 4, 2022, documents.worldbank.org
- Official Documents- Amendment to the Financing Agreement for Grant D472-HT.pdf, August 4, 2022, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Additional Financing Grant E045-HT.pdf, August 4, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, July 27, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, July 15, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, July 8, 2022, documents.worldbank.org
- Strengthening Haiti’s Resilience to Multiple Disaster Risks in a Volatile Context : Investments in Diverse Capacities Improve Resilience to Multiple Concurrent Hazards , May 31, 2022, documents.worldbank.org
- Supporting Recovery and Resilience in St. Vincent and the Grenadines : Addressing Compound Hazards Through Strengthened Resilient Recovery and Emergency Preparedness and Response Activities , May 31, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, May 25, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, May 16, 2022, documents.worldbank.org
- Haiti - Strengthening Disaster Risk Management and Climate Resilience Project, May 4, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, May 3, 2022, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 06, April 28, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, March 10, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, January 12, 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, January 5, 2022, documents.worldbank.org
- Haiti - Strengthening DRM and Climate Resilience Project : Environmental Assessment : Environmental and Social Management Framework for the Conditional Emergency Response Component, November 24, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, November 10, 2021, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 05, October 21, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, July 22, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P165870 - Strengthening DRM and Climate Resilience Project - Audited Financial Statement, March 31, 2021, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 04, March 16, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, February 9, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, February 8, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, February 4, 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, December 18, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, November 26, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, November 6, 2020, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 03, September 10, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, July 22, 2020, documents.worldbank.org
- Haiti - Strengthening DRM and Climate Resilience Project : Environmental Assessment : Plan de Gestion Environnementale et Sociale, May 1, 2020, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 02, February 27, 2020, documents.worldbank.org
- Disclosable Version of the ISR - Strengthening DRM and Climate Resilience Project - P165870 - Sequence No : 01, August 21, 2019, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Grant D472-HT (Closing Package), June 5, 2019, documents.worldbank.org
- Official Documents- Financing Agreement for Grant D427-HT (Closing Package), June 5, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P165870- Strengthening DRM and Climate Resilience Project - Procurement Plan, April 26, 2019, documents.worldbank.org
- Haiti - Strengthening Disaster Risk Management and Climate Resilience Project, April 25, 2019, documents.worldbank.org
- Project Information Document-Integrated Safeguards Data Sheet - Strengthening DRM and Climate Resilience Project - P165870, March 27, 2019, documents.worldbank.org
- Haiti - Strengthening DRM and Climate Resilience Project : Environmental Assessment : Cadre de Gestion Environnemental et Social, January 8, 2019, documents.worldbank.org
- Haiti - Strengthening DRM and Climate Resilience Project : Resettlement Plan : Cadre de Politique de Réinstallation, January 8, 2019, documents.worldbank.org
- Concept Project Information Document-Integrated Safeguards Data Sheet - Strengthening DRM and Climate Resilience Project - P165870, September 27, 2018, documents.worldbank.org
Procurement notices (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sources
- Partner documents: terms of use set by the publisher
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- Public investment program: terms of use set by the publisher
- World Bank procurement notices: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| Public investment program | October 18, 2026 |
| World Bank procurement notices | October 11, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |
Cite this page
HaitiDocs. Strengthening DRM and Climate Resilience Project. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP165870