HaitiDocs

Data / Partner portfolio / Partners

IDB Group

Multilateral development bank. 33 active operations. US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

New commitments in FY2025-26

US$100.0 million

On 1 operation

Disbursed in FY2025-26

US$132.0 million

On 14 operations

Active portfolio at October 18, 2026

US$1,223.7 million

33 of 33 active operations report an approved amount

New commitments and disbursements, FY2016-17 to FY2025-26

New commitments, US$ millions
FY2016-17, US$27.4 million2716-17FY2017-18, US$185.8 million18617-18FY2018-19, US$463.4 million46318-19FY2019-20, US$125.8 million12619-20FY2020-21, US$134.8 million13520-21FY2021-22, US$227.9 million22821-22FY2022-23, US$22.7 million2322-23FY2023-24, US$250.6 million25123-24FY2024-25, US$87.9 million8824-25FY2025-26, US$100.0 million10025-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$27.4 million2716-17FY2017-18, US$185.8 million18617-18FY2018-19, US$463.4 million46318-19FY2019-20, US$125.8 million12619-20FY2020-21, US$134.8 million13520-21FY2021-22, US$227.9 million22821-22FY2022-23, US$22.7 million2322-23FY2023-24, US$250.6 million25123-24FY2024-25, US$87.9 million8824-25FY2025-26, US$100.0 million10025-26FY2026-27, none (to Oct 18)noneto Oct 1826-27
Disbursements, US$ millions
FY2016-17, US$127.2 million12716-17FY2017-18, US$148.4 million14817-18FY2018-19, US$98.1 million9818-19FY2019-20, US$70.5 million7119-20FY2020-21, US$191.9 million19220-21FY2021-22, US$163.2 million16321-22FY2022-23, US$140.0 million14022-23FY2023-24, US$156.1 million15623-24FY2024-25, US$184.0 million18424-25FY2025-26, US$132.0 million13225-26FY2026-27, none (to Oct 18)noneto Oct 1826-27FY2016-17, US$127.2 million12716-17FY2017-18, US$148.4 million14817-18FY2018-19, US$98.1 million9818-19FY2019-20, US$70.5 million7119-20FY2020-21, US$191.9 million19220-21FY2021-22, US$163.2 million16321-22FY2022-23, US$140.0 million14022-23FY2023-24, US$156.1 million15623-24FY2024-25, US$184.0 million18424-25FY2025-26, US$132.0 million13225-26FY2026-27, none (to Oct 18)noneto Oct 1826-27

Table 1.New commitments and disbursements by fiscal year (flows), US$ millions

FY2016-17US$ millionsFY2017-18US$ millionsFY2018-19US$ millionsFY2019-20US$ millionsFY2020-21US$ millionsFY2021-22US$ millionsFY2022-23US$ millionsFY2023-24US$ millionsFY2024-25US$ millionsFY2025-26US$ millionsFY2026-27to Oct 18US$ millions
New commitments27.4185.8463.4125.8134.8227.922.7250.687.9100.0None to date
Operations12151715141913221810
Disbursements127.2148.498.170.5191.9163.2140.0156.1184.0132.0None to date
Operations343025232622191616140

All operations since 1961: commitments US$4,927.2 million, disbursements US$2,843.1 million, reported for 824 and 117 of 828 operations.

Portfolio at October 18, 2026

A position at the data date: approved is every commitment to date on the operations, cancellations deducted; disbursed to date and undisbursed are as each partner publishes them.

Table 2.Portfolio of active operations at October 18, 2026, US$ millions

OperationsApprovedUS$ millionsDisbursed to dateUS$ millionsUndisbursed
Active operations331,223.7683.719 of 33 reportedNot reported

Agencies

Each agency name opens its page.

Table 3.IDB Group by agency, US$ millions

AgencyActive operationsDisbursed FY2025-26US$ millionsDisbursed FY2026-27to Oct 18US$ millions
IDB32132.0None to date
IDB Invest1Not reportedNone to date
All agencies, sum of those reporting33132.0None to date
Other agencies1 agency
AgencyActive operationsDisbursed FY2025-26Disbursed FY2026-27to Oct 18
IDB Lab0Not reportedNone to date

Operations

Active operations (33)

33 operations. Approved to date (stock): US$1,223.7 million. Disbursed in FY2025-26 (flow): US$132.0 million, reported for 14 of 33.

Table 4.Active operations, US$ millions

Not published for any operation in this table: undisbursed balance.

Transport and Departmental ConnectivityIDB, TransportJan 2027225.0174.129.2
Partner
IDB Group, IDB
Sector
Transport
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 3, 2018
Effectiveness
Not reported
Closing
January 21, 2027
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
225.0
Disbursed
174.1
Undisbursed
Not reported
Last transaction
September 30, 2026
Operation ID
HA-L1104
Last changed
October 16, 2026
Rural Productivity and Connectivity Program with a Territorial ApproachIDB, Agriculture and food securityMar 202860.039.519.6
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 1, 2021
Effectiveness
Not reported
Closing
March 31, 2028
Disbursed as of
May 31, 2026
Implementing agency
Not reported
Commitment
60.0
Disbursed
39.5
Undisbursed
Not reported
Last transaction
May 31, 2026
Operation ID
HA-J0002
Last changed
October 16, 2026
Water supply, sanitation and hygiene project in urban, periurban and rural areasIDB, Water and sanitationApr 2028125.080.614.1
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 6, 2018
Effectiveness
Not reported
Closing
April 22, 2028
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
125.0
Disbursed
80.6
Undisbursed
Not reported
Last transaction
September 30, 2026
Operation ID
HA-L1135
Last changed
October 16, 2026
Port-au-Prince Water and Sanitation Project IIIIDB, Water and sanitationDec 202665.062.413.2
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 25, 2017
Effectiveness
Not reported
Closing
December 20, 2026
Disbursed as of
September 30, 2026
Implementing agency
Not reported
Commitment
65.0
Disbursed
62.4
Undisbursed
Not reported
Last transaction
September 30, 2026
Operation ID
HA-L1103
Last changed
October 16, 2026
Productive Infrastructure Program VIDB, Water and sanitationNov 202765.033.712.7
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 3, 2021
Effectiveness
Not reported
Closing
November 22, 2027
Disbursed as of
November 30, 2025
Implementing agency
Not reported
Commitment
65.0
Disbursed
33.7
Undisbursed
Not reported
Last transaction
November 30, 2025
Operation ID
HA-L1143
Tackling food insecurity through safety net for vulnerable populationsIDB, Social protectionJan 203150.028.510.9
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 8, 2023
Effectiveness
Not reported
Closing
January 5, 2031
Disbursed as of
December 31, 2025
Implementing agency
Not reported
Commitment
50.0
Disbursed
28.5
Undisbursed
Not reported
Last transaction
December 31, 2025
Operation ID
HA-J0007
Support to the Haiti Education Sector Plan (SHESP)IDB, EducationAug 202750.047.18.2
Partner
IDB Group, IDB
Sector
Education
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 4, 2021
Effectiveness
Not reported
Closing
August 18, 2027
Disbursed as of
March 31, 2026
Implementing agency
Not reported
Commitment
50.0
Disbursed
47.1
Undisbursed
Not reported
Last transaction
March 31, 2026
Operation ID
HA-L1102
Improving Electricity AccessIDB, EnergyDec 202631.528.07.8
Partner
IDB Group, IDB
Sector
Energy
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 13, 2019
Effectiveness
Not reported
Closing
December 10, 2026
Disbursed as of
May 31, 2026
Implementing agency
Not reported
Commitment
31.5
Disbursed
28.0
Undisbursed
Not reported
Last transaction
May 31, 2026
Operation ID
HA-L1140
Solid Waste Management in Northern HaitiIDB, Water and sanitationDec 202733.517.55.0
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 19, 2018
Effectiveness
Not reported
Closing
December 10, 2027
Disbursed as of
July 31, 2026
Implementing agency
Not reported
Commitment
33.5
Disbursed
17.5
Undisbursed
Not reported
Last transaction
July 31, 2026
Operation ID
HA-L1106
Support to Haiti Education Governance (SHEG)IDB, EducationOct 202920.04.94.9
Partner
IDB Group, IDB
Sector
Education
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
May 22, 2024
Effectiveness
Not reported
Closing
October 8, 2029
Disbursed as of
May 31, 2026
Implementing agency
Not reported
Commitment
20.0
Disbursed
4.9
Undisbursed
Not reported
Last transaction
May 31, 2026
Operation ID
HA-J0009
Strengthening Public Management to Improve Service DeliveryIDB, Governance and securityDec 202755.037.52.6
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 2, 2019
Effectiveness
Not reported
Closing
December 14, 2027
Disbursed as of
May 31, 2026
Implementing agency
Not reported
Commitment
55.0
Disbursed
37.5
Undisbursed
Not reported
Last transaction
May 31, 2026
Operation ID
HA-L1131
Curriculum Reform Support ProjectIDB, EducationDec 20296.02.22.2
Partner
IDB Group, IDB
Sector
Education
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 24, 2025
Effectiveness
Not reported
Closing
December 29, 2029
Disbursed as of
June 30, 2026
Implementing agency
Not reported
Commitment
6.0
Disbursed
2.2
Undisbursed
Not reported
Last transaction
June 30, 2026
Operation ID
HA-J0013
Project to Support Private Sector Development through Investment PromotionIDB, Industry, trade and tourismJun 202617.58.91.3
Partner
IDB Group, IDB
Stage
Closing
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 18, 2019
Effectiveness
Not reported
Closing
June 30, 2026
Disbursed as of
December 31, 2025
Implementing agency
Not reported
Commitment
17.5
Disbursed
8.9
Undisbursed
Not reported
Last transaction
December 31, 2025
Operation ID
HA-L1133
Strengthening the foundations of digital transformation of public managementIDB, Governance and securityJul 202916.00.40.4
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 21, 2024
Effectiveness
Not reported
Closing
July 11, 2029
Disbursed as of
April 30, 2026
Implementing agency
Not reported
Commitment
16.0
Disbursed
0.4
Undisbursed
Not reported
Last transaction
April 30, 2026
Operation ID
HA-J0010
Community-based Program to Foster Human SecurityIDB, Social protectionOct 2030110.017.2Not reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 26, 2024
Effectiveness
Not reported
Closing
October 10, 2030
Disbursed as of
August 31, 2025
Implementing agency
Not reported
Commitment
110.0
Disbursed
17.2
Undisbursed
Not reported
Last transaction
August 31, 2025
Operation ID
HA-J0008
Rebuilding Access to Essential Health ServicesIDB, HealthDec 2032100.0Not reportedNot reported
Partner
IDB Group, IDB
Sector
Health
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 8, 2025
Effectiveness
Not reported
Closing
December 29, 2032
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
100.0
Disbursed
Not reported
Undisbursed
Not reported
Last transaction
October 8, 2025
Operation ID
HA-J0012
Last changed
October 16, 2026
17 more active operations
Program to Strengthen Safety Nets for Vulnerable PopulationsIDB, Social protectionMay 202860.052.5Not reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 28, 2022
Effectiveness
Not reported
Closing
May 15, 2028
Disbursed as of
July 31, 2025
Implementing agency
Not reported
Commitment
60.0
Disbursed
52.5
Undisbursed
Not reported
Last transaction
July 31, 2025
Operation ID
HA-J0005
Youth socioeconomic inclusion through income support and protectionIDB, Social protectionNot reported43.9Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 8, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
43.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-J0011
Natural Disaster Mitigation Program IIIDB, Agriculture and food securityAug 202642.042.0Not reported
Partner
IDB Group, IDB
Stage
Closing
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 14, 2015
Effectiveness
Not reported
Closing
August 5, 2026
Disbursed as of
October 31, 2022
Implementing agency
Not reported
Commitment
42.0
Disbursed
42.0
Undisbursed
Not reported
Last transaction
October 31, 2022
Operation ID
HA-L1097
Last changed
October 16, 2026
Curriculum Reform Support ProjectIDB, EducationNot reported23.7Not reportedNot reported
Partner
IDB Group, IDB
Sector
Education
Stage
Approved
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
September 24, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
23.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1061
Support to the Haiti Education Sector Plan 2.0IDB, EducationApr 202915.03.5Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Under way
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 9, 2023
Effectiveness
Not reported
Closing
April 4, 2029
Disbursed as of
November 30, 2024
Implementing agency
Not reported
Commitment
15.0
Disbursed
3.5
Undisbursed
Not reported
Last transaction
November 30, 2024
Operation ID
HA-J0006
Solengy Haiti: Co-Loan for Solar PV SolutionsIDB Invest, EnergyNot reported3.03.0Not reported
Sector
Energy
Stage
Under way
Instrument
Not reported
Start
December 13, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
December 13, 2024
Implementing agency
Not reported
Commitment
3.0
Disbursed
3.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 13, 2024
Operation ID
14715-01
Additional solar photovoltaic capacity to replace fossil fuelIDB, EnergyNot reported2.5Not reportedNot reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Under way
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
November 6, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1060
Action Plan C&DIDB, Sector not identifiedNot reported1.0Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 6, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1342
Strengthening social protection and labor marketsIDB, Social protectionNot reported0.6Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 24, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1338
Prioritization and Capacity Building to Re-build Access to HealthIDB, HealthNot reported0.4Not reportedNot reported
Partner
IDB Group, IDB
Sector
Health
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 19, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1336
Support for the strengthening of the airport sectorIDB, TransportNot reported0.4Not reportedNot reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 28, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1346
Strengthening Social Protection CoordinationIDB, Social protectionNot reported0.4Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 15, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1329
Program to create digital opportunities through AI (ProAI)IDB, CommunicationsNot reported0.3Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 27, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1339
Support to Sustainable Rural and Agricultural DevelopmentIDB, Agriculture and food securityNot reported0.3Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 16, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1341
A new strategy for agricultural water management to face climate change impactIDB, Agriculture and food securityNot reported0.3Not reportedNot reported
Partner
IDB Group, IDB
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 9, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1327
Preparation and supervision support to the Haiti Systems Transformation GrantIDB, EducationNot reported0.2Not reportedNot reported
Partner
IDB Group, IDB
Sector
Education
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 26, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1340
Support to the execution and preparation of rural electrification projectsIDB, EnergyNot reported0.2Not reportedNot reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Under way
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 29, 2025
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1348
Planned operations (1)

1 operation. Approved to date (stock): not reported. Disbursed in FY2025-26 (flow): none.

Table 5.Planned operations, US$ millions

Not published for any operation in this table: commitment, disbursements, undisbursed balance.

Strengthening Institutional Capacity to Address Gender-Based ViolenceIDB, Social protectionNot reportedNot reportedPlanned
Partner
IDB Group, IDB
Stage
Planned
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
Not reported
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1349
Closed and stopped operations (794)

794 operations. Approved to date (stock): US$3,703.6 million, reported for 791 of 794. Disbursed in FY2025-26 (flow): none.

Table 6.Closed and stopped operations, US$ millions

Not published for any operation in this table: undisbursed balance.

Expansion of safety nets for vulnerable populations affected by CoronavirusIDB, Social protectionAug 20242021Closed70.070.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 23, 2021
Effectiveness
Not reported
Closing
August 18, 2024
Disbursed as of
June 30, 2024
Implementing agency
Not reported
Commitment
70.0
Disbursed
70.0
Undisbursed
Not reported
Last transaction
June 30, 2024
Operation ID
HA-J0001
Program for Rehabilitation of Basic Economic InfrastructureIDB, Finance and private sectorNot reported2003Closed70.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 12, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
70.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0093
Support for Haiti's Transport Sector VIDB, TransportFeb 20222015Closed65.052.5
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 28, 2015
Effectiveness
Not reported
Closing
February 16, 2022
Disbursed as of
December 31, 2022
Implementing agency
Not reported
Commitment
65.0
Disbursed
52.5
Undisbursed
Not reported
Last transaction
December 31, 2022
Operation ID
HA-L1098
Local Development ProgramIDB, Social protectionNot reported2003Closed65.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 12, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
65.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0079
Urban Rehabilitation ProgramIDB, Social protectionDec 20192005Closed62.612.4
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 6, 2005
Effectiveness
Not reported
Closing
December 11, 2019
Disbursed as of
December 31, 2015
Implementing agency
Not reported
Commitment
62.6
Disbursed
12.4
Undisbursed
Not reported
Last transaction
December 31, 2015
Operation ID
HA-L1002
Safety Nets for Vulnerable People Affected by CoronavirusIDB, Social protectionAug 20222020Closed60.060.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 8, 2020
Effectiveness
Not reported
Closing
August 5, 2022
Disbursed as of
December 31, 2021
Implementing agency
Not reported
Commitment
60.0
Disbursed
60.0
Undisbursed
Not reported
Last transaction
December 31, 2021
Operation ID
HA-L1145
Support for Transport SectorIDB, TransportNov 20192011Closed55.055.3
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 7, 2011
Effectiveness
Not reported
Closing
November 13, 2019
Disbursed as of
May 31, 2018
Implementing agency
Not reported
Commitment
55.0
Disbursed
55.3
Undisbursed
Not reported
Last transaction
May 31, 2018
Operation ID
HA-L1054
Infrastructure ProgramIDB, TransportAug 20172011Closed55.055.7
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 25, 2011
Effectiveness
Not reported
Closing
August 23, 2017
Disbursed as of
September 30, 2015
Implementing agency
Not reported
Commitment
55.0
Disbursed
55.7
Undisbursed
Not reported
Last transaction
September 30, 2015
Operation ID
HA-L1055
Productive Infrastructure Program IIIIDB, Social protectionSep 20192014Closed55.078.8
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 11, 2014
Effectiveness
Not reported
Closing
September 30, 2019
Disbursed as of
May 31, 2017
Implementing agency
Not reported
Commitment
55.0
Disbursed
78.8
Undisbursed
Not reported
Last transaction
May 31, 2017
Operation ID
HA-L1091
Agricultural and Agroforestry Technological Innovation Program - PITAGIDB, Agriculture and food securityJun 20252017Closed55.054.4
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 1, 2017
Effectiveness
Not reported
Closing
June 30, 2025
Disbursed as of
May 31, 2024
Implementing agency
Not reported
Commitment
55.0
Disbursed
54.4
Undisbursed
Not reported
Last transaction
May 31, 2024
Operation ID
HA-L1107
Drinking Water and Sanitation Sector ReformIDB, Water and sanitationNot reported1998Closed54.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 12, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
54.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0014
Support for Transport Sector IIIDB, TransportJul 20202012Closed53.055.7
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 10, 2012
Effectiveness
Not reported
Closing
July 16, 2020
Disbursed as of
December 31, 2018
Implementing agency
Not reported
Commitment
53.0
Disbursed
55.7
Undisbursed
Not reported
Last transaction
December 31, 2018
Operation ID
HA-L1058
Drainage Port-Au-Prince IIIDB, Water and sanitationNot reported1986Closed51.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 5, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
51.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0057
Fiscal Sustainability IIIDB, Governance and securityJul 20102010Closed50.050.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
April 28, 2010
Effectiveness
Not reported
Closing
July 27, 2010
Disbursed as of
July 31, 2010
Implementing agency
Not reported
Commitment
50.0
Disbursed
50.0
Undisbursed
Not reported
Last transaction
July 31, 2010
Operation ID
HA-L1034
Support for Haiti's Reconfiguration of the Education SectorIDB, EducationAug 20192010Closed50.081.6
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 22, 2010
Effectiveness
Not reported
Closing
August 24, 2019
Disbursed as of
June 30, 2018
Implementing agency
Not reported
Commitment
50.0
Disbursed
81.6
Undisbursed
Not reported
Last transaction
June 30, 2018
Operation ID
HA-L1049
Support to the Implementation of the Education Plan and ReformIDB, EducationJan 20202011Closed50.068.5
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 23, 2011
Effectiveness
Not reported
Closing
January 31, 2020
Disbursed as of
December 31, 2017
Implementing agency
Not reported
Commitment
50.0
Disbursed
68.5
Undisbursed
Not reported
Last transaction
December 31, 2017
Operation ID
HA-L1060
Productive Infrastructure ProgramIDB, Social protectionDec 20202012Closed50.050.6
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 13, 2012
Effectiveness
Not reported
Closing
December 30, 2020
Disbursed as of
June 30, 2021
Implementing agency
Not reported
Commitment
50.0
Disbursed
50.6
Undisbursed
Not reported
Last transaction
June 30, 2021
Operation ID
HA-L1076
Increasing Access to Quality EducationIDB, EducationFeb 20232012Closed50.079.3
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 28, 2012
Effectiveness
Not reported
Closing
February 27, 2023
Disbursed as of
June 30, 2023
Implementing agency
Not reported
Commitment
50.0
Disbursed
79.3
Undisbursed
Not reported
Last transaction
June 30, 2023
Operation ID
HA-L1077
Support for Haiti's Transportation Sector IIIIDB, TransportMar 20232013Closed50.037.0
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 20, 2013
Effectiveness
Not reported
Closing
March 2, 2023
Disbursed as of
April 30, 2021
Implementing agency
Not reported
Commitment
50.0
Disbursed
37.0
Undisbursed
Not reported
Last transaction
April 30, 2021
Operation ID
HA-L1079
Support for Transport Sector IVIDB, TransportFeb 20232014Closed50.050.3
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 12, 2014
Effectiveness
Not reported
Closing
February 1, 2023
Disbursed as of
December 31, 2021
Implementing agency
Not reported
Commitment
50.0
Disbursed
50.3
Undisbursed
Not reported
Last transaction
December 31, 2021
Operation ID
HA-L1089
Investment Sector LoanIDB, Governance and securityNot reported1996Closed50.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 11, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0046
Emergency & Economic Recovery Program IIIDB, Social protectionNot reported1995Closed50.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 29, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0050
Rural and Secondary RoadsIDB, TransportNot reported1997Closed50.0Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
March 5, 1997
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
50.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0075
Transport Infrastructure Rehabilitation ProgramIDB, TransportMar 20132005Closed50.076.9
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 29, 2005
Effectiveness
Not reported
Closing
March 6, 2013
Disbursed as of
January 31, 2012
Implementing agency
Not reported
Commitment
50.0
Disbursed
76.9
Undisbursed
Not reported
Last transaction
January 31, 2012
Operation ID
HA0087
Pont-Sonde-Mirebalais Highways and Access RoadsIDB, TransportNot reported1990Closed48.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
February 14, 1990
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
48.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0049
475 more operations
Road Maintenance & Rehab. National ProgramIDB, TransportNot reported1995Closed45.0Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
February 8, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
45.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0041
Agricultural IntensificationIDB, Agriculture and food securityNot reported2003Closed41.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 12, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
41.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0016
Productive Infrastructure Program IVIDB, Social protectionNot reported2015Stopped41.0Not reported
Partner
IDB Group, IDB
Stage
Stopped
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 14, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
41.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1101
Productive Infrastructure Program IIIDB, Social protectionOct 20182013Closed40.539.6
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 16, 2013
Effectiveness
Not reported
Closing
October 31, 2018
Disbursed as of
November 30, 2018
Implementing agency
Not reported
Commitment
40.5
Disbursed
39.6
Undisbursed
Not reported
Last transaction
November 30, 2018
Operation ID
HA-L1081
Temporary Social Safety Net and Skills for YouthIDB, Social protectionJun 20242018Closed40.040.8
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 7, 2018
Effectiveness
Not reported
Closing
June 30, 2024
Disbursed as of
July 31, 2024
Implementing agency
Not reported
Commitment
40.0
Disbursed
40.8
Undisbursed
Not reported
Last transaction
July 31, 2024
Operation ID
HA-L1137
Emergency and Economic Recuperation Program (EERP)IDB, Social protectionNot reported1995Closed40.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
January 11, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
40.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0011
Sewer System Port-Au-PrinceIDB, Water and sanitationNot reported1978Closed38.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 7, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
38.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0019
Sustainable Coastal Tourism ProgramIDB, Industry, trade and tourismApr 20242014Closed36.036.2
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 11, 2014
Effectiveness
Not reported
Closing
April 21, 2024
Disbursed as of
April 30, 2024
Implementing agency
Not reported
Commitment
36.0
Disbursed
36.2
Undisbursed
Not reported
Last transaction
April 30, 2024
Operation ID
HA-L1095
Port-au-Prince Water and Sanitation Project IIIDB, Water and sanitationFeb 20222013Closed35.536.6
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 19, 2013
Effectiveness
Not reported
Closing
February 4, 2022
Disbursed as of
February 28, 2022
Implementing agency
Not reported
Commitment
35.5
Disbursed
36.6
Undisbursed
Not reported
Last transaction
February 28, 2022
Operation ID
HA-L1075
Institutional Transformation and Modernization Program of the Energy Sector IIDB, EnergyAug 20112011Closed35.035.0
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 25, 2011
Effectiveness
Not reported
Closing
August 30, 2011
Disbursed as of
August 31, 2011
Implementing agency
Not reported
Commitment
35.0
Disbursed
35.0
Undisbursed
Not reported
Last transaction
August 31, 2011
Operation ID
HA-L1065
Port Au Prince Water and Sanitation ProjectIDB, Water and sanitationNot reported2010Closed35.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
July 21, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
35.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1021
Natural Disaster Mitigation Program in Priority Watersheds IIDB, Environment and disaster riskDec 20162009Closed30.029.7
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 16, 2009
Effectiveness
Not reported
Closing
December 31, 2016
Disbursed as of
July 31, 2016
Implementing agency
Not reported
Commitment
30.0
Disbursed
29.7
Undisbursed
Not reported
Last transaction
July 31, 2016
Operation ID
HA-L1041
Support to the Shelter Sector Response PlanIDB, Social protectionJul 20202010Closed30.029.9
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
April 28, 2010
Effectiveness
Not reported
Closing
July 31, 2020
Disbursed as of
May 31, 2021
Implementing agency
Not reported
Commitment
30.0
Disbursed
29.9
Undisbursed
Not reported
Last transaction
May 31, 2021
Operation ID
HA-L1048
Program to Support Transportation Sector DevelopmentIDB, TransportFeb 20132010Closed29.029.0
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 21, 2010
Effectiveness
Not reported
Closing
February 23, 2013
Disbursed as of
September 30, 2012
Implementing agency
Not reported
Commitment
29.0
Disbursed
29.0
Undisbursed
Not reported
Last transaction
September 30, 2012
Operation ID
HA-L1046
Emergency and Economic Recuperation Program (EERP)IDB, Sector not identifiedNot reported1995Closed28.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
January 11, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
28.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1125
Ennery-Quinte Agricultural Intensification ProjectIDB, Agriculture and food securityNov 20142005Closed27.127.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 20, 2005
Effectiveness
Not reported
Closing
November 20, 2014
Disbursed as of
November 30, 2014
Implementing agency
Not reported
Commitment
27.1
Disbursed
27.0
Undisbursed
Not reported
Last transaction
November 30, 2014
Operation ID
HA-L1009
Land tenure security program in rural areasIDB, Agriculture and food securityApr 20192012Closed27.027.6
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
April 25, 2012
Effectiveness
Not reported
Closing
April 10, 2019
Disbursed as of
July 31, 2018
Implementing agency
Not reported
Commitment
27.0
Disbursed
27.6
Undisbursed
Not reported
Last transaction
July 31, 2018
Operation ID
HA-L1056
Institutional Strengthening and Reform of the Transport Sector IIIDB, TransportSep 20152015Closed27.027.0
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
May 20, 2015
Effectiveness
Not reported
Closing
September 19, 2015
Disbursed as of
September 30, 2015
Implementing agency
Not reported
Commitment
27.0
Disbursed
27.0
Undisbursed
Not reported
Last transaction
September 30, 2015
Operation ID
HA-L1099
Social Investment Help FundIDB, Social protectionNot reported1996Closed27.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 13, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
27.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0037
Technology Transfer to Small Farmers ProgramIDB, Agriculture and food securityNot reported2011Closed25.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
August 31, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1025
Fiscal Reform and GovernanceIDB, Governance and securityApr 20082005Closed25.025.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 20, 2005
Effectiveness
Not reported
Closing
April 22, 2008
Disbursed as of
March 31, 2008
Implementing agency
Not reported
Commitment
25.0
Disbursed
25.0
Undisbursed
Not reported
Last transaction
March 31, 2008
Operation ID
HA-L1001
Financial Sector Reform Support ProgramIDB, Governance and securitySep 20122006Closed25.024.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 6, 2006
Effectiveness
Not reported
Closing
September 22, 2012
Disbursed as of
March 31, 2009
Implementing agency
Not reported
Commitment
25.0
Disbursed
24.5
Undisbursed
Not reported
Last transaction
September 29, 2010
Operation ID
HA-L1008
Rehabilitation of Road Infrastructure for Integration of the TerritoryIDB, TransportMar 20172007Closed25.0100.0
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 20, 2007
Effectiveness
Not reported
Closing
March 16, 2017
Disbursed as of
February 28, 2017
Implementing agency
Not reported
Commitment
25.0
Disbursed
100.0
Undisbursed
Not reported
Last transaction
February 28, 2017
Operation ID
HA-L1019
Fiscal Sustainability IIDB, Governance and securityNov 20092009Closed25.025.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 26, 2009
Effectiveness
Not reported
Closing
November 8, 2009
Disbursed as of
September 30, 2009
Implementing agency
Not reported
Commitment
25.0
Disbursed
25.0
Undisbursed
Not reported
Last transaction
September 30, 2009
Operation ID
HA-L1029
Water Management Program in the Artibonite BasinIDB, Agriculture and food securityFeb 20212013Closed25.024.8
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 27, 2013
Effectiveness
Not reported
Closing
February 4, 2021
Disbursed as of
July 31, 2021
Implementing agency
Not reported
Commitment
25.0
Disbursed
24.8
Undisbursed
Not reported
Last transaction
July 31, 2021
Operation ID
HA-L1087
Southern Roads Construction Leogane CayesIDB, TransportNot reported1975Closed25.0Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 16, 1975
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0010
Public Finance ReformIDB, Governance and securityNot reported2003Closed25.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 19, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
25.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0092
Support to the Education Plan and Reform - IVIDB, EducationApr 20222014Closed24.026.7
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 26, 2014
Effectiveness
Not reported
Closing
April 6, 2022
Disbursed as of
November 30, 2020
Implementing agency
Not reported
Commitment
24.0
Disbursed
26.7
Undisbursed
Not reported
Last transaction
November 30, 2020
Operation ID
HA-L1080
Organization & Rationalization Health SectorIDB, HealthNot reported1998Closed22.5Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 12, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
22.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0045
Rehabilitation of Road Infrastructure for Integration of the TerritoryIDB, TransportNot reported2008Closed22.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
February 21, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
22.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1007
South Road Segment Leogane-AquuinIDB, TransportNot reported1973Closed22.2Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 2, 1973
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
22.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0001
Institutional Transformation and Modernization Program of the Energy Sector IIIIDB, EnergySep 20132013Closed22.022.0
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 26, 2013
Effectiveness
Not reported
Closing
September 28, 2013
Disbursed as of
September 30, 2013
Implementing agency
Not reported
Commitment
22.0
Disbursed
22.0
Undisbursed
Not reported
Last transaction
September 30, 2013
Operation ID
HA-L1083
Vocational TrainingIDB, EducationDec 20132005Closed22.022.0
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
May 31, 2005
Effectiveness
Not reported
Closing
December 24, 2013
Disbursed as of
November 30, 2013
Implementing agency
Not reported
Commitment
22.0
Disbursed
22.0
Undisbursed
Not reported
Last transaction
November 30, 2013
Operation ID
HA0017
Support to Reconstruction of Education InfrastructureIDB, EducationMar 20122009Closed20.520.5
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 24, 2009
Effectiveness
Not reported
Closing
March 13, 2012
Disbursed as of
March 31, 2012
Implementing agency
Not reported
Commitment
20.5
Disbursed
20.5
Undisbursed
Not reported
Last transaction
March 31, 2012
Operation ID
HA-L1040
Supplementary Financing for the Peligre Hydroelectric PlantIDB, EnergyApr 20192011Closed20.020.3
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 14, 2011
Effectiveness
Not reported
Closing
April 20, 2019
Disbursed as of
April 30, 2019
Implementing agency
Not reported
Commitment
20.0
Disbursed
20.3
Undisbursed
Not reported
Last transaction
April 30, 2019
Operation ID
HA-L1038
Program to Establish a Partial Credit Guarantee Fund for Enterprise DevelopmentIDB, Finance and private sectorMay 20202010Closed20.019.3
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 29, 2010
Effectiveness
Not reported
Closing
May 9, 2020
Disbursed as of
July 31, 2019
Implementing agency
Not reported
Commitment
20.0
Disbursed
19.3
Undisbursed
Not reported
Last transaction
July 31, 2019
Operation ID
HA-L1050
Emergency Program in Response to Hurricane MatthewIDB, TransportOct 20192016Closed20.019.8
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 13, 2016
Effectiveness
Not reported
Closing
October 30, 2019
Disbursed as of
May 31, 2021
Implementing agency
Not reported
Commitment
20.0
Disbursed
19.8
Undisbursed
Not reported
Last transaction
May 31, 2021
Operation ID
HA-L1130
Water and Sanitation for Intermediate Cities (II)IDB, Water and sanitationNot reported2009Closed20.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
September 30, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1013
Support for Haiti's Reconfiguration of the Education SectorIDB, EducationNot reported2011Closed20.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 17, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
20.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1027
Artibonite Valley- Phase IIIDB, Agriculture and food securityNot reported1982Closed19.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 30, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
19.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0029
Basic Education ProgramIDB, EducationNot reported1998Closed19.4Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 30, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
19.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0038
Support to the Haiti Education Sector Plan 2.0IDB, EducationNot reported2023Closed19.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 9, 2023.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
November 9, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
19.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1059
Water and Sanitation for Intermediate Cities (II)IDB, Water and sanitationJun 20192009Closed19.019.2
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 30, 2009
Effectiveness
Not reported
Closing
June 1, 2019
Disbursed as of
October 31, 2017
Implementing agency
Not reported
Commitment
19.0
Disbursed
19.2
Undisbursed
Not reported
Last transaction
October 31, 2017
Operation ID
HA-L1039
Rural Productivity and Connectivity Program with a Territorial ApproachIDB, Agriculture and food securityNot reported2021Closed18.3Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 1, 2021.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 1, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
18.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1050
Rehabilitation of Electricity Distribution System in Port au PrinceIDB, EnergyJun 20182006Closed18.115.8
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 6, 2006
Effectiveness
Not reported
Closing
June 19, 2018
Disbursed as of
June 30, 2017
Implementing agency
Not reported
Commitment
18.1
Disbursed
15.8
Undisbursed
Not reported
Last transaction
June 30, 2017
Operation ID
HA-L1014
Rural Supply Chain Development ProgramIDB, Agriculture and food securityJan 20172006Closed17.817.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 24, 2006
Effectiveness
Not reported
Closing
January 31, 2017
Disbursed as of
January 31, 2017
Implementing agency
Not reported
Commitment
17.8
Disbursed
17.5
Undisbursed
Not reported
Last transaction
January 31, 2017
Operation ID
HA-L1003
Primary EducationIDB, EducationNot reported1995Closed17.6Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
17.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0028
Private Sector Development through Investment PromotionIDB, Industry, trade and tourismApr 20202012Closed17.521.7
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 5, 2012
Effectiveness
Not reported
Closing
April 9, 2020
Disbursed as of
July 31, 2019
Implementing agency
Not reported
Commitment
17.5
Disbursed
21.7
Undisbursed
Not reported
Last transaction
July 31, 2019
Operation ID
HA-L1078
Emergency Road Rehabilitation Program in Response to Hurricane SandyIDB, TransportAug 20162012Closed17.517.5
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 18, 2012
Effectiveness
Not reported
Closing
August 24, 2016
Disbursed as of
November 30, 2015
Implementing agency
Not reported
Commitment
17.5
Disbursed
17.5
Undisbursed
Not reported
Last transaction
November 30, 2015
Operation ID
HA-L1086
Swine RepopulationIDB, Agriculture and food securityNot reported1983Closed17.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 15, 1983
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
17.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0061
Additional Cofinancing for Rehabilitation Basic Economic Infrastructure ProgramIDB, Finance and private sectorNot reported2007Closed16.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 27, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
16.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1005
Rehabilitation of Peligre Transmission LineIDB, EnergyNot reported2014Closed16.0Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 17, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
16.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1030
II Aditional Cofinancing Rehabilitation Basic Economic Infrastructure ProgramIDB, Finance and private sectorNot reported2008Closed15.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 18, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1008
Productive Infrastructure Program IIIIDB, Social protectionNot reported2016Closed15.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
March 3, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1035
Rural Water and Sanitation ProgramIDB, Water and sanitationMay 20192006Closed15.012.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 20, 2006
Effectiveness
Not reported
Closing
May 11, 2019
Disbursed as of
May 31, 2015
Implementing agency
Not reported
Commitment
15.0
Disbursed
12.5
Undisbursed
Not reported
Last transaction
May 31, 2015
Operation ID
HA-L1007
Port-au-Prince Water and Sanitation ProjectIDB, Water and sanitationJan 20222010Closed15.014.1
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 21, 2010
Effectiveness
Not reported
Closing
January 22, 2022
Disbursed as of
February 28, 2017
Implementing agency
Not reported
Commitment
15.0
Disbursed
14.1
Undisbursed
Not reported
Last transaction
February 28, 2017
Operation ID
HA-L1044
Technology Transfer to Small FarmersIDB, Agriculture and food securityApr 20192011Closed15.015.9
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 31, 2011
Effectiveness
Not reported
Closing
April 11, 2019
Disbursed as of
August 31, 2017
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.9
Undisbursed
Not reported
Last transaction
August 31, 2017
Operation ID
HA-L1059
Emergency Response for the Containment of CholeraIDB, HealthDec 20132010Closed15.014.9
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 15, 2010
Effectiveness
Not reported
Closing
December 20, 2013
Disbursed as of
November 30, 2013
Implementing agency
Not reported
Commitment
15.0
Disbursed
14.9
Undisbursed
Not reported
Last transaction
November 30, 2013
Operation ID
HA-L1062
Institutional Strengthening and Reform of the Agriculture Sector IIDB, Agriculture and food securitySep 20122012Closed15.015.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
May 30, 2012
Effectiveness
Not reported
Closing
September 1, 2012
Disbursed as of
August 31, 2012
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Last transaction
August 31, 2012
Operation ID
HA-L1074
Institutional Strengthening and Reform of the Agriculture Sector IIIDB, Agriculture and food securityOct 20132013Closed15.015.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 12, 2013
Effectiveness
Not reported
Closing
October 2, 2013
Disbursed as of
September 30, 2013
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Last transaction
September 30, 2013
Operation ID
HA-L1082
Institutional Strengthening and Reform of the Water & Sanitation SectorIDB, Water and sanitationAug 20142014Closed15.015.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
May 28, 2014
Effectiveness
Not reported
Closing
August 19, 2014
Disbursed as of
August 31, 2014
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Last transaction
August 31, 2014
Operation ID
HA-L1090
Artisanal Fisheries Development ProgramIDB, Agriculture and food securityJul 20232015Closed15.015.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 24, 2015
Effectiveness
Not reported
Closing
July 31, 2023
Disbursed as of
April 30, 2022
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Last transaction
April 30, 2022
Operation ID
HA-L1096
Productive Infrastructure Program IIIIDB, Social protectionNot reported2014Stopped15.0Not reported
Partner
IDB Group, IDB
Stage
Stopped
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 11, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1036
Agriculture and Industry Development ProgramIDB, Agriculture and food securityNot reported1982Closed15.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 10, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
15.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0042
CodeviIDB Invest, Industry, trade and tourismNot reported2022Closed15.015.0
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 2, 2022.
Instrument
Not reported
Start
December 2, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
December 2, 2022
Implementing agency
Not reported
Commitment
15.0
Disbursed
15.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 2, 2022
Operation ID
13683-01
Institutional Strengthening and Reform of the Water and Sanitation Sector IIDB, Water and sanitationNot reported2014Closed14.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
May 28, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
14.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1032
Rehabilitation of the Electricity Distribution System in Port-au-PrinceIDB, EnergyFeb 20182010Closed14.014.2
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 21, 2010
Effectiveness
Not reported
Closing
February 16, 2018
Disbursed as of
June 30, 2017
Implementing agency
Not reported
Commitment
14.0
Disbursed
14.2
Undisbursed
Not reported
Last transaction
June 30, 2017
Operation ID
HA-L1035
Modernization of Agricultural Health Public ServicesIDB, Agriculture and food securityJul 20242014Closed14.014.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 23, 2014
Effectiveness
Not reported
Closing
July 2, 2024
Disbursed as of
September 30, 2021
Implementing agency
Not reported
Commitment
14.0
Disbursed
14.0
Undisbursed
Not reported
Last transaction
September 30, 2021
Operation ID
HA-L1094
Additional Financing Artibonite IIIDB, Agriculture and food securityNot reported1990Closed13.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 12, 1990
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
13.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0078
Reinforcement of transmission lines and road infrastructure rehabilitationIDB, EnergyNot reported2010Closed12.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
November 8, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1022
Strengthening Public Resource ManagementIDB, Governance and securitySep 20072007Closed12.512.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 1, 2007
Effectiveness
Not reported
Closing
September 20, 2007
Disbursed as of
September 30, 2007
Implementing agency
Not reported
Commitment
12.5
Disbursed
12.5
Undisbursed
Not reported
Last transaction
September 30, 2007
Operation ID
HA-L1017
Supplemental Financing for the Agricultural Intensification ProgramIDB, Agriculture and food securityJun 20132007Closed12.512.1
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 20, 2007
Effectiveness
Not reported
Closing
June 25, 2013
Disbursed as of
June 30, 2013
Implementing agency
Not reported
Commitment
12.5
Disbursed
12.1
Undisbursed
Not reported
Last transaction
June 30, 2013
Operation ID
HA-L1021
Strengthening Public Finance Management IIIDB, Governance and securityMay 20082008Closed12.512.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
April 30, 2008
Effectiveness
Not reported
Closing
May 29, 2008
Disbursed as of
May 31, 2008
Implementing agency
Not reported
Commitment
12.5
Disbursed
12.5
Undisbursed
Not reported
Last transaction
May 31, 2008
Operation ID
HA-L1023
Péligre Hydroelectric Plant Rehabilitation ProgramIDB, EnergyDec 20162008Closed12.532.3
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 2, 2008
Effectiveness
Not reported
Closing
December 30, 2016
Disbursed as of
September 30, 2019
Implementing agency
Not reported
Commitment
12.5
Disbursed
32.3
Undisbursed
Not reported
Last transaction
September 30, 2019
Operation ID
HA-L1032
Economic and Social FundIDB, Social protectionNot reported1991Closed12.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
March 28, 1991
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
12.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0081
Institutional Transformation and Modernization Program of the Energy Sector IIIDB, EnergyJul 20122012Closed12.012.0
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 6, 2012
Effectiveness
Not reported
Closing
July 26, 2012
Disbursed as of
July 31, 2012
Implementing agency
Not reported
Commitment
12.0
Disbursed
12.0
Undisbursed
Not reported
Last transaction
July 31, 2012
Operation ID
HA-L1073
Institutional Strengthening and Reform of the Transport Sector IIDB, TransportAug 20142014Closed12.012.0
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
May 28, 2014
Effectiveness
Not reported
Closing
August 26, 2014
Disbursed as of
August 31, 2014
Implementing agency
Not reported
Commitment
12.0
Disbursed
12.0
Undisbursed
Not reported
Last transaction
August 31, 2014
Operation ID
HA-L1088
Primary & College Education Expansion & ImprovementIDB, EducationNot reported1985Closed11.9Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 25, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
11.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0031
Business Development and Training Services Program for InvestmentIDB, Finance and private sectorDec 20172011Closed11.03.9
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 2, 2011
Effectiveness
Not reported
Closing
December 31, 2017
Disbursed as of
December 31, 2021
Implementing agency
Not reported
Commitment
11.0
Disbursed
3.9
Undisbursed
Not reported
Last transaction
December 31, 2021
Operation ID
HA-L1057
Agricultural and agroforestry technological innovation program (PITAG)IDB, Agriculture and food securityNot reported2018Closed10.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
June 22, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1041
Community Stands Hygiene and Drinking WaterIDB, HealthNot reported1979Closed10.7Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 13, 1979
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0036
Support for Reconfiguration of the Education SectorIDB, EducationNot reported2011Closed10.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
May 18, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1024
Agricultural and Agroforestry Technological Innovation Program - PITAGIDB, Agriculture and food securityNot reported2017Closed10.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
November 1, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1038
Support to the Haiti Education Sector Plan 2.0IDB, EducationNot reported2023Closed10.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 9, 2023.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
November 9, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1055
Support Human Resource Management in Public SectorIDB, Governance and securityAug 20162006Closed10.09.9
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 13, 2006
Effectiveness
Not reported
Closing
August 3, 2016
Disbursed as of
July 31, 2016
Implementing agency
Not reported
Commitment
10.0
Disbursed
9.9
Undisbursed
Not reported
Last transaction
July 31, 2016
Operation ID
HA-L1018
Rural Water and Sanitation Program (II)IDB, Water and sanitationNot reported2010Closed10.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
April 28, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1014
Enlargement Port Au Prince II StageIDB, TransportNot reported1972Closed10.0Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 7, 1972
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
10.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0006
PlastechIDB Invest, Industry, trade and tourismNot reported2018Closed10.010.0
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 16, 2018.
Instrument
Not reported
Start
November 16, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
November 16, 2018
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 16, 2018
Operation ID
12397-01
Distributeurs Nationaux S.A.IDB Invest, Sector not identifiedNot reported2009Closed10.010.0
Stage
ClosedRecorded as active with no closing date; the last transaction is dated August 4, 2009.
Instrument
Not reported
Start
August 4, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
August 4, 2009
Implementing agency
Not reported
Commitment
10.0
Disbursed
10.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
August 4, 2009
Operation ID
HA2732A-02
Integrated Project Education Rural DevelopmentIDB, EducationNot reported1977Closed9.6Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 7, 1977
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
9.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0012
Industrial/Farming Develop. ProjectIDB, Agriculture and food securityNot reported1977Closed9.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 15, 1977
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
9.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0020
Sustainable Management Upper Watersheds South Western Haiti-Macaya National ParkIDB, Environment and disaster riskNot reported2013Closed9.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
July 31, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
9.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1023
Plastech IIIIDB Invest, Industry, trade and tourismNot reported2022Closed9.09.0
Stage
ClosedRecorded as active with no closing date; the last transaction is dated July 8, 2022.
Instrument
Not reported
Start
July 8, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
July 8, 2022
Implementing agency
Not reported
Commitment
9.0
Disbursed
9.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
July 8, 2022
Operation ID
14064-01
Rural Potable Water Pochep IIIDB, Water and sanitationNot reported1985Closed8.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 15, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0022
Haiti Counterpart Funds Idb & Ibrd.IDB, Sector not identifiedNot reported1981Closed8.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Loan
Lending window
Sovereign Guaranteed
Approval
March 18, 1981
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
8.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0052
Institutional strengthening of the Statistical and Informatics Institute (IHSI)IDB, Governance and securityAug 20232017Closed8.04.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 25, 2017
Effectiveness
Not reported
Closing
August 7, 2023
Disbursed as of
July 31, 2023
Implementing agency
Not reported
Commitment
8.0
Disbursed
4.5
Undisbursed
Not reported
Last transaction
July 31, 2023
Operation ID
HA-L1126
Rehabilitation of the Peligre Transmission LineIDB, EnergyDec 20192014Closed7.77.8
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 17, 2014
Effectiveness
Not reported
Closing
December 27, 2019
Disbursed as of
November 30, 2020
Implementing agency
Not reported
Commitment
7.7
Disbursed
7.8
Undisbursed
Not reported
Last transaction
November 30, 2020
Operation ID
HA-L1100
Enlargement Port Au PrinceIDB, TransportNot reported1975Closed7.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
September 11, 1975
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0009
Institutional Strengthening and Reform of the Transport Sector IIDB, TransportNot reported2014Closed7.0Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
May 28, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1033
Country Irrigation Development Riviere BlancheIDB, Agriculture and food securityNot reported1978Closed7.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 25, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
7.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0021
Co-financing for the Vocational Training ProgramIDB, EducationNot reported2006Closed6.7Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 6, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
6.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1001
Improving Electricity AccessIDB, EnergyNot reported2019Closed6.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 13, 2019.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
November 13, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
6.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1045
Rural Health ServicesIDB, HealthNot reported1975Closed6.3Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 13, 1975
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
6.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0002
Reahab Road ProjectIDB, TransportNot reported1980Closed5.8Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 20, 1980
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0053
WINECO 2IDB Invest, EnergyNot reported2021Closed5.75.7
Sector
Energy
Stage
Closed
Instrument
Not reported
Start
June 29, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
June 29, 2021
Implementing agency
Not reported
Commitment
5.7
Disbursed
5.7
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 29, 2021
Operation ID
12165-01
Clinton-Bush Haiti Fund Grant OperationsIDB Lab, Sector not identifiedNot reported2013Closed5.7Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 2, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1029
Southern Roads Construction (Miragoane-Aquin)IDB, TransportNot reported1978Closed5.2Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
February 23, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0043
Expansion & Improvement Drinking Water Port Au PrinceIDB, Water and sanitationNot reported1970Closed5.1Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 16, 1970
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0003
Emergency Response for the Containment of CholeraIDB, Water and sanitationNot reported2010Closed5.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 15, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1021
Support to the Implementation of Education Plan and ReformIDB, EducationNot reported2011Closed5.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 14, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1026
National Program of Flood Early WarningIDB, Environment and disaster riskDec 20122005Closed5.04.5
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 19, 2005
Effectiveness
Not reported
Closing
December 20, 2012
Disbursed as of
December 31, 2012
Implementing agency
Not reported
Commitment
5.0
Disbursed
4.5
Undisbursed
Not reported
Last transaction
December 31, 2012
Operation ID
HA-L1005
Institutional Strengthening for Environmental ManagementIDB, Environment and disaster riskDec 20132005Closed5.04.7
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 21, 2005
Effectiveness
Not reported
Closing
December 27, 2013
Disbursed as of
December 31, 2013
Implementing agency
Not reported
Commitment
5.0
Disbursed
4.7
Undisbursed
Not reported
Last transaction
December 31, 2013
Operation ID
HA-L1006
Irrigation Rehabilitation System Agricultural Develop: ArtiboniteIDB, Agriculture and food securityNot reported1976Closed5.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
August 5, 1976
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
5.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0018
Strengthening of Economic Governance InstitutionsIDB, Governance and securityNov 20122005Closed5.05.0
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
June 21, 2005
Effectiveness
Not reported
Closing
November 17, 2012
Disbursed as of
June 30, 2012
Implementing agency
Not reported
Commitment
5.0
Disbursed
5.0
Undisbursed
Not reported
Last transaction
June 30, 2012
Operation ID
HA0082
BarbancourtIDB Invest, EnergyNot reported2023Closed5.05.0
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 21, 2023.
Instrument
Not reported
Start
November 21, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
November 21, 2023
Implementing agency
Not reported
Commitment
5.0
Disbursed
5.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 21, 2023
Operation ID
14545-01
Climate Proofing of Agriculture in the Center-Artibonite Loop AreaIDB, Environment and disaster riskNot reported2015Closed4.5Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 14, 2015.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 14, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1031
Leopard Haiti FundIDB Lab, Finance and private sectorNot reported2012Closed4.5Not reported
Stage
Closed
Instrument
Equity
Lending window
Non-Sovereign Guaranteed
Approval
June 13, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-Q0004
Sustainable and Innovative Rural Water, Sanitation and Hygiene (SIRWASH)IDB Lab, Water and sanitationNot reported2020Closed4.5Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 10, 2020.
Instrument
Container
Lending window
Non-Sovereign Guaranteed
Approval
December 10, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-O1691
DelimartIDB Invest, EnergyNot reported2019Stopped4.54.5
Sector
Energy
Stage
Stopped
Instrument
Not reported
Start
October 23, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
October 23, 2019
Implementing agency
Not reported
Commitment
4.5
Disbursed
4.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
October 23, 2019
Operation ID
12485-01
Support 3 Projects under ExecutionIDB, Sector not identifiedNot reported1986Closed4.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Loan
Lending window
Sovereign Guaranteed
Approval
August 13, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0077
Increasing Employment Opportunities through WillbesIDB Lab, Industry, trade and tourismNot reported2013Closed4.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
March 27, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1069
Riviere Blanche Irrigation & Agriculture DevelopmentIDB, Agriculture and food securityNot reported1986Closed4.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
February 14, 1986
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0068
Air Transport Safety InitiativeIDB Lab, TransportNot reported2000Closed4.0Not reported
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 13, 2000
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC0007032
Economic Emergency Recuperation ProgramIDB, Social protectionNot reported1995Closed4.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 11, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9304411
Haiti Smart Meter ProjectIDB Invest, Sector not identifiedNot reported2024Stopped4.04.0
Stage
Stopped
Instrument
Not reported
Planned start
October 10, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
October 10, 2024
Implementing agency
Not reported
Commitment
4.0
Disbursed
4.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
October 10, 2024
Operation ID
14835-01
Improving economic opportunities of vulnerable youthIDB Lab, EducationNot reported2011Closed4.0Not reported
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 12, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
4.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1035
West Indies Energy Company S.A.IDB Invest, Sector not identifiedNot reported2014Closed3.83.8
Stage
Closed
Instrument
Not reported
Start
April 8, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
April 8, 2014
Implementing agency
Not reported
Commitment
3.8
Disbursed
3.8
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
April 8, 2014
Operation ID
HA2773A-01
Support to the Implementation of the Education Plan and ReformIDB, EducationNot reported2013Closed3.7Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 9, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1034
Northern Economic Pole Business Accelerator ProgramIDB, Finance and private sectorDec 20172012Closed3.53.3
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 7, 2012
Effectiveness
Not reported
Closing
December 30, 2017
Disbursed as of
January 31, 2017
Implementing agency
Not reported
Commitment
3.5
Disbursed
3.3
Undisbursed
Not reported
Last transaction
January 31, 2017
Operation ID
HA-L1068
Access (formerly HTV)IDB Invest, Sector not identifiedNot reported2011Closed3.53.5
Stage
ClosedRecorded as active with no closing date; the last transaction is dated March 22, 2011.
Instrument
Not reported
Start
March 22, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
March 22, 2011
Implementing agency
Not reported
Commitment
3.5
Disbursed
3.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
March 22, 2011
Operation ID
HA2748A-01
Support to the Implementation of Education Plan and ReformIDB, EducationNot reported2013Closed3.5Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 9, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1032
Sustainable Land Management of the Upper Watersheds of South Western HaitiIDB, Environment and disaster riskNot reported2009Closed3.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
September 23, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1002
Country Development Southern Peninsula L'asIDB, Agriculture and food securityNot reported1980Closed3.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 20, 1980
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0023
Action Plan C and D CountriesIDB, Governance and securityNot reported1997Closed3.1Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 1, 1997
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9704497
Mango as an opportunity for long-term economic growthIDB Lab, Agriculture and food securityNot reported2010Closed3.1Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
June 2, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1034
"Learning by doing" to build back a better HaitiIDB Lab, Social protectionNot reported2010Closed3.0Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 21, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1032
Institutional Transformation and Modernization of the Energy Sector IIIIDB, EnergyNot reported2013Closed3.0Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
June 26, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1027
New Technologies and Institutional Capacity Building in the Government of HaitiIDB, Governance and securityJan 20152010Closed3.02.9
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
July 21, 2010
Effectiveness
Not reported
Closing
January 27, 2015
Disbursed as of
January 31, 2015
Implementing agency
Not reported
Commitment
3.0
Disbursed
2.9
Undisbursed
Not reported
Last transaction
January 31, 2015
Operation ID
HA-L1051
Pilot of the One Laptop per Child ModelIDB, EducationNot reported2008Closed3.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
February 6, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1093
Improving Child Survival and Building Blocks for Social Safety NetsIDB, HealthNot reported2009Closed3.0Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 2, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1116
TC Loan for DecentralizationIDB, Governance and securityNot reported1996Stopped3.0Not reported
Partner
IDB Group, IDB
Stage
Stopped
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
February 21, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0060
Emergency Tuition Waiver Program SupportIDB, EducationNot reported2022Closed3.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated January 27, 2022.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
January 27, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
3.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1052
Creating Alliances in Cocoa for Improved Access and OrganizationIDB Lab, Agriculture and food securityNot reported2013Closed2.9Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 23, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1049
Battery Energy Storage System to maximize the use of surplus energyIDB, EnergyNot reported2021Closed2.7Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 16, 2021.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 16, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1048
A roof for my country: emergency and social inclusionIDB Lab, EducationNot reported2010Closed2.6Not reported
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 21, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1031
Public Health Services (ha-0045)IDB, HealthNot reported1989Closed2.5Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 13, 1989
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8803323
Sustainable energy access projects with private sector participationIDB, EnergyNot reported2022Closed2.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 14, 2022.
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
December 14, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1053
Improving Child Survival and Building Blocks for Social Safety NetsIDB, HealthOct 20152009Closed2.52.5
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 2, 2009
Effectiveness
Not reported
Closing
October 28, 2015
Disbursed as of
June 30, 2015
Implementing agency
Not reported
Commitment
2.5
Disbursed
2.5
Undisbursed
Not reported
Last transaction
June 30, 2015
Operation ID
HA-L1042
Inst. Strengthening Banque Republique D'haitiIDB, Governance and securityNot reported1996Closed2.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
December 11, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0091
Drinking Water Port Au Prince II StageIDB, Water and sanitationNot reported1975Closed2.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
February 28, 1975
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0007
Haitian Emergency Liquidity Program (HELP)IDB Lab, Finance and private sectorNot reported2010Closed2.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
June 2, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1033
Scaling Up the Smallholder Alliance for Sorghum (SMASH)IDB Lab, Agriculture and food securityNot reported2015Closed2.0Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 29, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1050
AIC - Developing Insurance Solutions for HaitiIDB Lab, Finance and private sectorNot reported2012Closed2.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
March 8, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1072
Sustainable Energy for HaitiIDB, EnergyNot reported2013Closed2.0Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 22, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1183
The Haiti Impact Facility (HIF)IDB Lab, Sector not identifiedNot reported2021Closed2.0Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 18, 2021.
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
November 18, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1295
Haiti MIF StrategyIDB Lab, Finance and private sectorNot reported2013Closed2.0Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 24, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1030
Financing for Micro and SMEs through Formal Financial IntermediariesIDB Lab, Sector not identifiedNot reported2004Closed2.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
October 13, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-L1078
Private Training Market InitiativeIDB Lab, EducationNot reported1999Closed2.0Not reported
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 13, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
2.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9708259
Inst. Strengthening for Tax AdministrationIDB, Governance and securityNot reported1995Closed1.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 20, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9509045
Vetiver Forward: Digital Innovation for a Fair and Sustainable Value ChainIDB Lab, Agriculture and food securityNot reported2020Closed1.9Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 22, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1268
Co-financing - Rural Chains Program - Animal & Plant Health ProtectionIDB, Agriculture and food securityNot reported2009Closed1.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 14, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1015
Reconstruction of the Faculty of Science at the Université d’État d’HaitiIDB Lab, Sector not identifiedNot reported2014Closed1.9Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
February 10, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1035
Strengthening the Coffee Value ChainIDB Lab, Agriculture and food securityNot reported2011Closed1.9Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1042
Managing human-biodiversity interface in the Southern Marine Protected AreasIDB, Environment and disaster riskNot reported2017Closed1.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
August 30, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1036
Feasib., Hydroelec. Project la ChapelleIDB, EnergyNot reported1980Closed1.8Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 29, 1980
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8001159
Developing the North Department as a Tourism DestinationIDB Lab, Industry, trade and tourismNot reported2010Closed1.7Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
August 4, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1037
Inst. Strengt., Oficina Minas y EnergiaIDB, EnergyNot reported1984Closed1.6Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 28, 1984
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8308076
Institutional Strengthening of the OdvaIDB, Agriculture and food securityNot reported1982Closed1.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 30, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8210148
Improving the Haitian Artisan Sector's Capacity to Respond Global Market DemandIDB Lab, Finance and private sectorNot reported2012Closed1.6Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
November 14, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1046
Feasibility Studies, Agricultural RoadsIDB, TransportNot reported1980Closed1.6Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 30, 1980
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7902077
Streng.primary & Normal Education SystemIDB, EducationNot reported1985Closed1.5Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 26, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8506026
Improve education qualityIDB Lab, EducationNot reported2015Closed1.5Not reported
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 14, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1054
Support for the preparation of operationIDB, Water and sanitationNot reported2010Closed1.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 9, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1103
Artibonite 4C Hydroelectric Project - StudiesIDB, EnergyNot reported2012Closed1.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 22, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1150
Technical and Environmental Studies National Road Rehabilitation 1IDB, TransportNot reported2013Closed1.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 6, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1177
Reloadly: Bridging the Digital Divide in the Caribbean and Latin AmericaIDB Lab, Finance and private sectorNot reported2022Stopped1.5Not reported
Stage
Stopped
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
August 25, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-L1163
FINCA Haiti Financial Inclusion PartnershipIDB Invest, Finance and private sectorNot reported2021Closed1.51.5
Stage
Closed
Instrument
Not reported
Start
December 6, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
December 6, 2021
Implementing agency
Not reported
Commitment
1.5
Disbursed
1.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 6, 2021
Operation ID
12001-02
Sigora Haiti Microutility ProjectIDB Invest, EnergyNot reported2019Closed1.51.5
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated February 5, 2019.
Instrument
Not reported
Start
February 5, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
February 5, 2019
Implementing agency
Not reported
Commitment
1.5
Disbursed
1.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
February 5, 2019
Operation ID
12190-01
Revitalization of the cacao and coffee sectors in the Grand’AnseIDB Lab, Agriculture and food securityNot reported2017Stopped1.5Not reported
Stage
Stopped
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 13, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1234
Support Preparation of Water & Sanitation Investment Program in Cap HaitienIDB, Water and sanitationNot reported2015Closed1.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 31, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1212
Action Plan C&DIDB, Sector not identifiedNot reported2021Closed1.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 4, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1286
Pilot Case in Productive Communal AreasIDB, Finance and private sectorNot reported2012Closed1.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 4, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1151
Support to the sustainable operation of the Peligre Electric power systemIDB, EnergyNot reported2021Closed1.3Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 10, 2021.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 10, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1300
Improvement Teaching Agriculture - MedicineIDB, EducationNot reported1966Closed1.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
November 17, 1966
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0026
Study, Factory for Electrical GenerationIDB, EnergyNot reported1984Closed1.2Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 19, 1984
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8205131
Haiti Social Investment FundIDB Invest, Sector not identifiedNot reported2010Closed1.21.2
Stage
Closed
Instrument
Not reported
Start
November 23, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
November 23, 2010
Implementing agency
Not reported
Commitment
1.2
Disbursed
1.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 23, 2010
Operation ID
HA2749A-01
Legal/Regulatory Reform Electric SectorIDB Lab, EnergyNot reported1996Closed1.2Not reported
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 11, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9509136
Preparation of third investment program in drinking water and sanitationIDB, Water and sanitationNot reported2015Closed1.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 25, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1214
Creating Alliances in Cocoa for Improved Access and OrganizationIDB Lab, Agriculture and food securityNot reported2015Closed1.1Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 15, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1037
Ayiti Blue Ocean Plastics SolutionIDB Lab, Water and sanitationNot reported2019Closed1.1Not reported
Stage
Closed
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
September 18, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1043
Preparation of the rural development program with watershed approachIDB, Agriculture and food securityNot reported2019Closed1.1Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 3, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1247
Inst. Strengthening for Customs AdministrationIDB, Sector not identifiedNot reported1995Closed1.1Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 20, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.1
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9509061
Action Plan C&DIDB, Sector not identifiedNot reported2024Closed1.0Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated January 2, 2024.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 2, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1326
Capitalization Fund for textile sector SMEsIDB Lab, Finance and private sectorNot reported2009Stopped1.0Not reported
Stage
Stopped
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 14, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1024
Bringing Higher Value Apparel Manufacturing to HaitiIDB Lab, Industry, trade and tourismNot reported2012Closed1.0Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 6, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1063
Expansion of financial services to secondary citiesIDB Lab, Finance and private sectorDec 20122009Closed1.01.0
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
September 15, 2009
Effectiveness
Not reported
Closing
December 27, 2012
Disbursed as of
December 31, 2012
Implementing agency
Not reported
Commitment
1.0
Disbursed
1.0
Undisbursed
Not reported
Last transaction
December 31, 2012
Operation ID
HA-L1111
Establishment of a CFE within the Fédération Le Levier networkIDB Lab, Finance and private sectorNot reported2016Closed1.0Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
February 3, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1055
Capitalization Fund for textile sector SMEsIDB Lab, Finance and private sectorNot reported2009Stopped1.0Not reported
Stage
Stopped
Instrument
Equity
Lending window
Non-Sovereign Guaranteed
Approval
October 14, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-Q0001
Equity strengthening of ACME for the expansion of financial services to MSEsIDB Lab, Finance and private sectorNot reported2012Closed1.0Not reported
Stage
Closed
Instrument
Equity
Lending window
Non-Sovereign Guaranteed
Approval
June 13, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-Q0003
Support for Watershed Management Plans for Preventive Disaster Risk ManagementIDB, Water and sanitationNot reported2009Closed1.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 9, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1091
Technical Assistance for National Program of Flood Early Warning SystemIDB, Environment and disaster riskNot reported2009Closed1.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 9, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1096
Water Availability and Integrated Water Resources Management in Northern HaitiIDB, Water and sanitationNot reported2013Closed1.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 19, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1179
Accelerating Innovation for Haitian MSMEsIDB Lab, Finance and private sectorNot reported2021Stopped1.0Not reported
Stage
Stopped
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
November 19, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1292
SECCI: Emergency Program for Solar GenerationIDB, EnergyNot reported2010Closed1.0Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
March 1, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1019
Support for Haiti's Reconfiguration of the Education SectorIDB, EducationNot reported2011Closed1.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 6, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1026
Subprogram Industry Credit Global LoanIDB, Industry, trade and tourismNot reported1971Closed1.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 7, 1971
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0005
Revolving Line of Credit:Exp Capital GoodsIDB, Industry, trade and tourismNot reported1980Closed1.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Loan
Lending window
Sovereign Guaranteed
Approval
November 24, 1980
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0055
Program to Support Hiv/Aids StrategyIDB, HealthNot reported2001Closed1.0Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 28, 2001
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC0109021
Institutional Strengthening of the DagIDB, EducationNot reported1977Closed1.0Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 7, 1977
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7704209
Appliance and Multi-Industries, S.A.IDB Invest, Sector not identifiedNot reported1997Stopped1.01.0
Stage
Stopped
Instrument
Not reported
Start
December 1, 1997
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
December 1, 1997
Implementing agency
Not reported
Commitment
1.0
Disbursed
1.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 1, 1997
Operation ID
HA1005A-01
JAJ Depot et GravelIDB Invest, Sector not identifiedNot reported2014Closed1.01.0
Stage
Closed
Instrument
Not reported
Start
December 19, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
December 19, 2014
Implementing agency
Not reported
Commitment
1.0
Disbursed
1.0
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
December 19, 2014
Operation ID
HA2782A-01
Establishment Potable Water AgencyIDB Lab, Water and sanitationNot reported1998Closed1.0Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
August 12, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9708465
Institutional Strengthening InitiativesIDB, Governance and securityNot reported2002Closed1.0Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 18, 2002
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
1.0
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC0201093
Action Plan C&DIDB, Sector not identifiedNot reported2022Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 21, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1298
Action Plan for C and D CountriesIDB, Sector not identifiedNot reported2016Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 22, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1222
Institutional Strengthening of the MagIDB, Agriculture and food securityNot reported1983Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 15, 1983
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8302359
Action Plan C&DIDB, Sector not identifiedNot reported2017Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 3, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1233
Action Plan for C & DIDB, Sector not identifiedNot reported2018Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 2, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1256
Action Plan C&DIDB, Sector not identifiedNot reported2023Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 2, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1317
Improvement of Sediment Management in the Peligre ReservoirIDB, Agriculture and food securityNot reported2016Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 13, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1206
Potable Water Sector ReformIDB, Water and sanitationNot reported1996Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 3, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9603087
Scaling the Delivery of Clean Energy through Diaspora Engagement and AgIDB Lab, EnergyNot reported2015Closed0.9Not reported
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 21, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1052
Action Plan C&DIDB, Sector not identifiedNot reported2019Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 2, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1263
Sustainable ecological sanitation services for impoverished urban populationsIDB Lab, Water and sanitationNot reported2016Closed0.9Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 30, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1058
Action Plan C&DIDB, Sector not identifiedNot reported2020Closed0.9Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 2, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1272
Program, Rural Roads ProjectIDB, TransportNot reported1989Closed0.9Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 20, 1989
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.9
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8803307
Creating Sustainable Recycling Businesses in Bel Air, Port Au PrinceIDB Lab, Finance and private sectorNot reported2009Closed0.8Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 27, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1017
Support for the Reconstruction of the Toussaint Louverture AirportIDB, TransportNot reported2011Closed0.8Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 3, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1134
Creation of a Human financing model for higher educationIDB Lab, EducationNot reported2011Closed0.8Not reported
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 18, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1030
Carte Avantage Santé-Expansion of Basic Healthcare Services to Low-income PopuIDB Lab, HealthNot reported2013Closed0.8Not reported
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 4, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1048
Mobilization of Remittances through Microfinance InstitutionsIDB Lab, Finance and private sectorNot reported2004Closed0.8Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 28, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-M1003
Support to Portfolio Execution, Supervision, Monitoring, and PerformanceIDB, Sector not identifiedNot reported2022Closed0.8Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 14, 2022.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 14, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1310
Institutional Strengthening of OdvaIDB, Agriculture and food securityNot reported1976Closed0.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 5, 1976
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7610224
Support for the Competitive Position of Haitian CoffeesIDB Lab, Agriculture and food securityNot reported2005Closed0.8Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
August 3, 2005
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1004
Haiti's Northern Development Corridor - Implementation of ICESIDB, Social protectionNot reported2013Closed0.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 20, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1186
Gender Equality As An Engine Of Economic GrowthIDB, Social protectionNot reported2019Closed0.8Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated August 1, 2019.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 1, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-T3474
Transport Infrastructure Data and Laboratory ServicesIDB, TransportNot reported2012Closed0.8Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 17, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1158
Promotion of Economic Opportunities in Rural AreasIDB Lab, Finance and private sectorNot reported2008Closed0.8Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 17, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1010
Increasing Access to Sustainable Energy Technologies Using Remittances as a SourIDB Lab, Finance and private sectorNot reported2011Closed0.8Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 25, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1038
Institutional capacity building to promote private investmentIDB, Industry, trade and tourismNot reported2012Closed0.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 2, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1153
Cloud-Based Maternal Health Care for Women at the Last MileIDB Lab, HealthNot reported2018Stopped0.8Not reported
Sector
Health
Stage
Stopped
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 6, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1259
Services to youth of the public labor intermediation serviceIDB, Social protectionNot reported2019Closed0.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 17, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1270
Development of innovative solutions to improve the drinking water supplyIDB, Water and sanitationNot reported2020Closed0.8Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 19, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-T3598
Training Reform TransitionIDB, EducationNot reported1999Closed0.8Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 5, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.8
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9804495
Urban Initiatives for Port-Au-PrinceIDB, Social protectionNot reported1999Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 13, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9712490
Strengten. of the Planification SystemsIDB, Governance and securityNot reported1979Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 23, 1979
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7802087
Program to Develop Alternative Dispute Resolution MechanismsIDB Lab, Governance and securityNot reported2005Closed0.7Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
August 10, 2005
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1005
MOKAFE, A Cup of Hope Coffee ProjectIDB Lab, Agriculture and food securityDec 20192015Closed0.70.4
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 10, 2015
Effectiveness
Not reported
Closing
December 11, 2019
Disbursed as of
April 30, 2016
Implementing agency
Not reported
Commitment
0.7
Disbursed
0.4
Undisbursed
Not reported
Last transaction
April 30, 2016
Operation ID
HA-L1113
Comprehensive analysis of the management of the water resources supplyIDB, Water and sanitationNot reported2017Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 21, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1239
Agricultural Credit Subprogram Global LoanIDB, Agriculture and food securityNot reported1971Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Grant
Lending window
Sovereign Guaranteed
Approval
October 7, 1971
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA0004
Fish Development ProgramIDB, Environment and disaster riskNot reported1977Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 7, 1977
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7602213
Connectivity: Broadband Infrastructure for Economic Development and TraIDB, Governance and securityNot reported2010Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 3, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1138
Fostering Cooperation for Economic Development on the Haiti/DRIDB Lab, Finance and private sectorNot reported2009Closed0.7Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
March 17, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-M1128
Improving remittance services and promoting investmentsIDB Lab, Finance and private sectorNot reported2009Closed0.7Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 18, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1020
Support for the Reform of Revenue InstitutionsIDB, Governance and securityNot reported2003Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 17, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC0210058
Bndai Institutional StrenghtheningIDB, Finance and private sectorNot reported1982Closed0.7Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 10, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8211196
Secured Transactions ReformIDB Lab, Sector not identifiedNot reported1995Closed0.7Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
November 29, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.7
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9505449
Sustainable and Innovative Rural Water, Sanitation and Hygiene (SIRWASH)IDB, Water and sanitationNot reported2022Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 9, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1290
Support to the Implementation of the Education Plan and ReformIDB, EducationNot reported2014Closed0.6Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
July 2, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1034
Sustainable and Innovative Rural Water, Sanitation and Hygiene - SIRWASHIDB, Water and sanitationNot reported2020Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 10, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-T3712
Studies & Design, Rural Potable WaterIDB, Water and sanitationNot reported1985Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 3, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8507389
Cul-De-Sac Valley Agricult. DevelopmentIDB, Agriculture and food securityNot reported1978Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 25, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7704142
Inst.strength.of Telecom. D'haiti S.a.m.IDB, CommunicationsNot reported1977Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 30, 1977
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7609011
Inclusive Business in the value chain of an Industrial ParkIDB Lab, Finance and private sectorNot reported2011Closed0.6Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 15, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1041
Equity strengthening of ACME for the expansion of financial services to MSEsIDB Lab, Finance and private sectorNot reported2012Closed0.6Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
June 13, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1043
CP:Fraternité- Development and implementation of financial products for housingIDB Lab, Finance and private sectorMay 20152010Closed0.61.2
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2010
Effectiveness
Not reported
Closing
May 9, 2015
Disbursed as of
May 31, 2015
Implementing agency
Not reported
Commitment
0.6
Disbursed
1.2
Undisbursed
Not reported
Last transaction
May 31, 2015
Operation ID
HA-S1009
Support to the Design of the HA-L1035 ProgramIDB, EnergyNot reported2009Closed0.6Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 8, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1080
Support to the Institutional Reform of the Agricultural Sector IIIIDB, Agriculture and food securityNot reported2014Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 3, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1197
Execution of the water and sanitation portfolioIDB, Water and sanitationNot reported2023Closed0.6Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated September 13, 2023.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 13, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1319
Support for the Execution and Preparation of Transport ProjectsIDB, TransportNot reported2024Closed0.6Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
ClosedRecorded as active with no closing date; the last transaction is dated August 27, 2024.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 27, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1328
Weight Control Program for VehiclesIDB, TransportNot reported1973Closed0.6Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 2, 1973
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7308019
Land Administration Reform ProgramIDB, Agriculture and food securityNot reported1996Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 17, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9601239
Action Plan for C and D CountriesIDB, Sector not identifiedNot reported2012Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 25, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1174
Action Plan for C and D CountriesIDB, Sector not identifiedNot reported2014Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 7, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1200
Action Plan for C and D CountriesIDB, Sector not identifiedNot reported2013Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 7, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1184
Action Plan for C and D CountriesIDB, Sector not identifiedNot reported2015Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 7, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1210
Expansion of Savings Opportunities for Remittance RecipientsIDB Lab, Finance and private sectorNot reported2014Closed0.6Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 18, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1051
CP:Le Levier- Development and implementation of financial products for housingIDB Lab, Finance and private sectorNot reported2010Closed0.6Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-S1011
Support for Design EDH's Mid Term Investment PlanIDB, EnergyNot reported2007Closed0.6Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 18, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1058
Support to Private Sector Investment and Export IndustryIDB, Industry, trade and tourismNot reported2010Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 26, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1089
Leadership Program at Municipal and Community Level in Northern Haiti – Phase IIIDB, Sector not identifiedNot reported2016Closed0.6Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 17, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.6
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1215
Action Plan for C and D CountriesIDB, Governance and securityNot reported2011Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 1, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1146
Artesan DevelopmentIDB, Industry, trade and tourismNot reported1978Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 7, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7605168
Institutional Strengthening to Increase the Technical Capacity of the GoHIDB, Environment and disaster riskNot reported2013Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 5, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1182
Execution of the sanitation and hygiene project in urban and rural areasIDB, Water and sanitationNot reported2019Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 14, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1264
Rethinking social protection and social inclusionIDB, Social protectionNot reported2023Closed0.5Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 1, 2023.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 1, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1314
Fuego del Sol Haiti SA, Ultra-Efficient Biomass CombustionIDB Lab, Environment and disaster riskNot reported2022Closed0.5Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 1, 2022.
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
December 1, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1054
Scaling Up Affordable and Reliable Mesh-Grids in rural HaitiIDB Lab, EnergyNot reported2023Closed0.5Not reported
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 14, 2023.
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1057
Water Entrepreneurship in Rural HaitiIDB Lab, Water and sanitationNot reported2023Closed0.5Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 13, 2023.
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
December 13, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1058
Establishment of a CFE within the Fédération Le Levier networkIDB Lab, Finance and private sectorNot reported2016Stopped0.5Not reported
Stage
Stopped
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
February 3, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1108
Training in Credit AdministrationIDB Lab, Sector not identifiedNot reported1980Closed0.5Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 16, 1980
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1114
State enterprise Le Minoterie D'haitiIDB Lab, Agriculture and food securityNot reported1982Closed0.5Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
February 11, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1116
Inst.strengt. of Ateliers-Ecoles de CampIDB Lab, Sector not identifiedNot reported1989Closed0.5Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
April 7, 1989
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1118
Small Projects Financing Program: InstitIDB Lab, Agriculture and food securityNot reported1990Stopped0.5Not reported
Stage
Stopped
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
June 8, 1990
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1120
Institutional Strengthening of CmscsIDB Lab, HealthNot reported1989Closed0.5Not reported
Sector
Health
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
November 13, 1989
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1121
Building a Resilient Vetiver Value ChainIDB Lab, Agriculture and food securityJun 20182017Closed0.50.5
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
June 15, 2017
Effectiveness
Not reported
Closing
June 30, 2018
Disbursed as of
June 30, 2018
Implementing agency
Not reported
Commitment
0.5
Disbursed
0.5
Undisbursed
Not reported
Last transaction
June 30, 2018
Operation ID
HA-L1129
Acceso Haiti: A New Model to Add Value to Smallholder Farmer ProductionIDB Lab, Agriculture and food securityNot reported2021Closed0.5Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
April 19, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1148
Support for the Creation of Anti-Corruption BureauIDB, Governance and securityNot reported2004Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 12, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1003
Rural Supply Chain Market Linkage ServicesIDB, Agriculture and food securityNot reported2006Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 29, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1043
Support to the Presidential commission on Education ReformIDB, EducationNot reported2008Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 5, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1098
Support for the Implementation of the Education PlanIDB, EducationNot reported2010Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 15, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1131
Haiti Investment Forum 2011IDB, Industry, trade and tourismNot reported2011Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 11, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1148
Sustainable Energy for HaitiIDB, EnergyNot reported2013Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 22, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1176
Sustainable Energy for HaitiIDB, EnergyNot reported2013Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 22, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1178
Road Infrastructure Rehabilitation and Urban Trasnportation ImprovementIDB, TransportNot reported2014Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 4, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1198
Enhancement of the E-Government Unit ServicesIDB, Governance and securityNot reported2014Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 19, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1202
Water Availability in the Southern CoastIDB, Water and sanitationNot reported2015Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 19, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1207
Support to the Execution of Transport ProjectsIDB, TransportNot reported2016Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 13, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1228
Support to the Definition of Rural Roads ProjectsIDB, TransportNot reported2017Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 18, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1236
Support to the Preparation of Productive Infrastructure Program VIDB, Water and sanitationNot reported2020Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 1, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1273
Assessing Fragility for Resilience and Long-Run GrowthIDB, Sector not identifiedNot reported2021Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 20, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1293
Support to the execution of transport sector projectsIDB, TransportNot reported2022Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
ClosedRecorded as active with no closing date; the last transaction is dated October 11, 2022.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 11, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1303
Program for Strengthening the Fiscal Management of State-Owned EnterprisesIDB, Governance and securityNot reported2022Closed0.5Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 5, 2022.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 5, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1311
Scaling Up Affordable and Reliable Mesh-Grids in rural HaitiIDB Lab, EnergyNot reported2023Closed0.5Not reported
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated July 21, 2023.
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 21, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1322
Water Entrepreneurship in Rural HaitiIDB Lab, Water and sanitationNot reported2023Closed0.5Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated October 19, 2023.
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 19, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1324
ESPWA - Space to prepare Entrepreneurship RoadIDB Lab, Finance and private sectorNot reported2024Closed0.5Not reported
Stage
ClosedRecorded as active with no closing date; the last transaction is dated October 10, 2024.
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 10, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1333
GEF Emergency Program for Solar Power Generation and LightingIDB, EnergyNot reported2010Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
March 16, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1018
Integrated Control for Neglected Tropical Diseases in Port au PrinceIDB, HealthNot reported2011Closed0.5Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 28, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1024
FINCA Haiti S.A.IDB Invest, Sector not identifiedNot reported2014Closed0.50.5
Stage
Closed
Instrument
Not reported
Start
November 21, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
November 21, 2014
Implementing agency
Not reported
Commitment
0.5
Disbursed
0.5
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
November 21, 2014
Operation ID
HA2787A-01
Strengthening of Airport SecurityIDB Lab, TransportNot reported2006Closed0.5Not reported
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 31, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1006
Supervision of Public WorksIDB, Social protectionNot reported1985Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 9, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8402084
Preparation of Rural Water and Sanitation Feasibility StudiesIDB, Water and sanitationNot reported2005Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 13, 2005
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1030
On-Line Networks for Culture, Tourism and CommerceIDB Lab, CommunicationsNot reported2003Closed0.5Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 18, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1001
PROADAPT - Scaling Up the Smallholder Alliance for SorghumIDB Lab, Environment and disaster riskNot reported2015Closed0.5Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 29, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1057
Job Creation for Small-Scale Agricultural Producers through the Carifresh FruitIDB Lab, Sector not identifiedNot reported2009Stopped0.5Not reported
Stage
Stopped
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 4, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1112
Support for Planning, Programming and Monitoring Based on ResultsIDB, Governance and securityNot reported2008Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 5, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1053
Irrigation infrastructure information systemIDB, Agriculture and food securityNot reported2016Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 7, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1219
Creation of a mixed economy society for the management of public servicesIDB, Water and sanitationNot reported2017Closed0.5Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 13, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.5
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1237
Strength.,public Health & Coloniz. Dept.IDB, HealthNot reported1975Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 13, 1975
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7509063
Capacity Building for Sustainable Management of the Flood Early Warning SystemIDB, Environment and disaster riskNot reported2012Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 17, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1156
Coastal Marine ProtectionIDB, Environment and disaster riskNot reported1998Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
February 4, 1998
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9610446
Energy Efficiency for Caribbean Water and Sanitation CompaniesIDB, Water and sanitationNot reported2008Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 29, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-T1605
Bioenergy Action PlanIDB, EnergyNot reported2010Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 26, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1077
Labor Union Training Program/JamaicaIDB, EducationNot reported1994Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 26, 1994
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9407314
Support to Haiti's Transport Portfolio ManagementIDB, TransportNot reported2018Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 13, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1249
Turistic Development ProjectIDB, Industry, trade and tourismNot reported1973Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 6, 1973
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7312028
Microfinance Strengthening of the "Caisses Populaires"IDB Lab, Finance and private sectorNot reported2004Closed0.4Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 10, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1002
Support to Preparation of Operation HA-L1090IDB, Water and sanitationNot reported2014Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 21, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1194
Support for Institutional Strengthening in the Transport SectorIDB, TransportNot reported2015Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 3, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1204
Strengthening of the PIC's Environmental, Health and Safety CapacityIDB, Environment and disaster riskNot reported2015Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 18, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1209
Support to Improving Electricity AccessIDB, EnergyNot reported2019Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 27, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1243
Ayiti Blue Ocean Plastics SolutionIDB Lab, Water and sanitationNot reported2019Closed0.4Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 18, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1266
Developing a roadmap to tackle healthcare prioritiesIDB, HealthNot reported2023Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
ClosedRecorded as active with no closing date; the last transaction is dated August 28, 2023.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 28, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1313
Support to the procurement and fiduciary systemsIDB, Sector not identifiedNot reported2023Closed0.4Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 13, 2023.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 13, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1316
Managerial Tax Administration TrainingIDB, Governance and securityNot reported1993Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 19, 1993
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9205255
Leopard Haiti FundIDB Lab, Finance and private sectorNot reported2012Closed0.4Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
June 13, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1045
Enhancing Women's Economic Opportunities and SafetyIDB, Social protectionNot reported2016Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 3, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1221
Strength.textile SubsectorIDB Lab, Finance and private sectorNot reported1999Closed0.4Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 13, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9901031
Master Plan for Rehabilitation and Management of the Trutier SiteIDB, Water and sanitationNot reported2010Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 11, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1136
Public Sector Support Border Economic Development in the Dominican-Haitian and DIDB, Industry, trade and tourismNot reported2015Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 23, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-T2668
DKDRIDB Invest, Sector not identifiedNot reported2011Closed0.40.4
Stage
Closed
Instrument
Not reported
Start
February 25, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
February 25, 2011
Implementing agency
Not reported
Commitment
0.4
Disbursed
0.4
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
February 25, 2011
Operation ID
HA2750A-01
Promoting Micro Entrepreneurship in the Urban SlumsIDB Lab, Finance and private sectorNot reported2008Closed0.4Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 18, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1009
Sustainable Mobility Plan & Preinvestment projects for Haiti's Northern CorridorIDB, Social protectionNot reported2013Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 12, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1196
Improving Export and Import processes and developing an e-customs modelIDB, Industry, trade and tourismNot reported2015Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 23, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1213
Strengthening Public Management for Improved Service DeliveryIDB, Governance and securityNot reported2018Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 8, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1254
Caribbean Tourism Career AcceleratorIDB Lab, Industry, trade and tourismNot reported2021Closed0.4Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
May 20, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1280
Battery energy storage system to maximize the use of surplus energyIDB, EnergyNot reported2021Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 16, 2021.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 16, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1302
Registration and labor intermediation services for persons with disabilityIDB, Social protectionNot reported2022Closed0.4Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated September 16, 2022.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 16, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1308
Socio-emotional support to children in contexts of insecurityIDB, EducationNot reported2024Closed0.4Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated August 2, 2024.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 2, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1335
Projects for Hygiene & Potable WaterIDB, Water and sanitationNot reported1979Closed0.4Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 13, 1979
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.4
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7804017
Expanding the Psychometric Credit-scoring Tool to HaitiIDB Lab, Finance and private sectorNot reported2012Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 30, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1047
Codeva Institutional StrenghtheningIDB Lab, Agriculture and food securityNot reported1985Stopped0.3Not reported
Stage
Stopped
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
February 21, 1985
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1117
Feasibility Study of Cash Transfer Program in the Education SectorIDB, EducationNot reported2012Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 23, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1163
Support Societe D'epargne Et de CreditIDB Lab, Sector not identifiedNot reported1995Closed0.3Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
July 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1123
Support to the Project for Support to the Haiti Education Sector Plan (SHESP)IDB, EducationNot reported2021Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated May 19, 2021.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 19, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1281
Feasibil.studies for Industrial ParksIDB, Industry, trade and tourismNot reported1984Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 6, 1984
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC8106264
Reconstruction of the Faculty of Science at the Université d’État d’HaitiIDB Lab, Social protectionNot reported2020Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 24, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1283
Mitigating the Social Impacts of the Caracol Industrial ParkIDB, Finance and private sectorNot reported2013Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 24, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1181
Support Fonds Haitien D'aide a la FemmeIDB Lab, Social protectionNot reported1995Closed0.3Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
July 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1122
CP-Marigot Development and implementation of financial products for housing forIDB Lab, Finance and private sectorMay 20152010Closed0.30.6
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2010
Effectiveness
Not reported
Closing
May 9, 2015
Disbursed as of
May 31, 2015
Implementing agency
Not reported
Commitment
0.3
Disbursed
0.6
Undisbursed
Not reported
Last transaction
May 31, 2015
Operation ID
HA-S1008
Policy and Strategy for Integrated Watershed ManagementIDB, Water and sanitationNot reported2006Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 14, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1039
Third phase of the Household Survey 1-2-3 to Create the baseline for the PRSPIDB, Governance and securityNot reported2007Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 19, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1056
Feasibility Studies for a Second Landfill in Port-au-PrinceIDB, Water and sanitationNot reported2007Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 12, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1060
Business Competitiveness and Cluster SupportIDB, Finance and private sectorNot reported2008Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 17, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1076
Fiduciary Support for the Partial Credit Guarantee FundIDB, Finance and private sectorNot reported2010Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 6, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1132
Support to the Reconstruction of Hotels in Port-au-PrinceIDB Lab, Industry, trade and tourismNot reported2011Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
May 23, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1143
Truitier Informal Recycler Inclusion ProgramIDB, Water and sanitationNot reported2012Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 17, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1166
Improvement of Solid Waste Management in the Northern Region of HaitiIDB, Water and sanitationNot reported2015Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 9, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1216
Private Schooling and School Choice - Phase 2IDB, EducationNot reported2018Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 24, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1252
Preparation of the water, sanitation and hygiene in urban and rural areasIDB, Water and sanitationNot reported2018Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 6, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1253
Structuring of the public-private partnership modality for landfill managementIDB, Water and sanitationNot reported2018Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 30, 2018
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1258
Promoting Foreign Direct Investment to HaitiIDB, Industry, trade and tourismNot reported2019Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 29, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1261
Strengthening the Foundations of the Digital Transformation of Public ManagementIDB, Governance and securityNot reported2023Closed0.3Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 11, 2023.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 11, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1315
Clinton Bush Haiti Fund AdminIDB Lab, Sector not identifiedNot reported2013Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 2, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1028
Institutional Strengthening of Micro Credit National S.A.IDB Lab, Finance and private sectorNot reported2002Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 6, 2002
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC0206035
Water Policy FormulationIDB, Agriculture and food securityNot reported1997Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
February 4, 1997
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9601247
Basic EducationIDB, EducationNot reported1996Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 20, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9605314
Institutional Strengthening to SogebankIDB Lab, Finance and private sectorNot reported1999Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
January 4, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9810020
Private Participation Electric SectorIDB Lab, EnergyNot reported1999Closed0.3Not reported
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
May 13, 1999
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9903024
CarifreshIDB Invest, Sector not identifiedNot reported2009Closed0.30.3
Stage
ClosedRecorded as active with no closing date; the last transaction is dated June 2, 2009.
Instrument
Not reported
Start
June 2, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
June 2, 2009
Implementing agency
Not reported
Commitment
0.3
Disbursed
0.3
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
June 2, 2009
Operation ID
HA2734A-01
Emergency Shelter Provision for Earthquake-Affected Port-Au-Prince, HaitiIDB Lab, Social protectionNot reported2010Closed0.3Not reported
Stage
Closed
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
November 8, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1004
Institutional Strengthening of the Ministry of Public WorksIDB, TransportNot reported2008Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 16, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1055
Support Societe D'epargne Et de CreditIDB Lab, Finance and private sectorNot reported1995Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
SP9501257
Pluvial Sewerage in Port-Au-PrinceIDB, Water and sanitationNot reported1978Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 7, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7808035
Building a Resilient Vetiver Value ChainIDB Lab, Agriculture and food securityNot reported2017Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
June 15, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1230
Enhancement of the Remittances Services to and within Rural HaitiIDB Lab, Finance and private sectorNot reported2006Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 11, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1007
Expand Production of Crop Seeds & PlantIDB Lab, Finance and private sectorNot reported1995Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
SP9502370
1st Stage, Pluvial Sewerage ProjectIDB, Water and sanitationNot reported1974Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
July 25, 1974
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7407085
National Artesan ProgramIDB Lab, Sector not identifiedNot reported1981Closed0.3Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
August 18, 1981
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1115
Institutional Strengthening of FhafIDB Lab, Sector not identifiedNot reported1988Closed0.3Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 13, 1988
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1119
Expansion of financial services to secondary citiesIDB Lab, Finance and private sectorNot reported2009Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 15, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-S1005
Job Creation for Small-Scale Agricultural Producers through the Carifresh FruitIDB Lab, Finance and private sectorNot reported2009Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 4, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-S1006
Institutional strengthening of FINCA for the improvement of financial servicesIDB Lab, Finance and private sectorNot reported2010Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-S1010
Quality Mechanisms in Vocational TrainingIDB, EducationNot reported2004Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 2, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1014
Support for Port-au-Prince Electrical Distribution Rehabilitation ProgramIDB, EnergyNot reported2006Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 28, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1040
Support for the Haitian ParliamentIDB, Governance and securityNot reported2007Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 9, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1045
Support to training of trainers for the TVET systemIDB, EducationNot reported2008Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 17, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1066
Strengthening the Internal Debt Sustainability Analysis UnitIDB, Governance and securityNot reported2009Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 10, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1083
Support for Preparation of Civil Registry ProjectIDB, Governance and securityNot reported2009Stopped0.3Not reported
Partner
IDB Group, IDB
Stage
Stopped
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 10, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1114
Strategic Plan for Solid Waste Management in Four Intermediate CitiesIDB, Water and sanitationNot reported2010Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 25, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1119
Measuring and monitoring ecosystem services in protected areasIDB, Environment and disaster riskNot reported2017Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 1, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1232
Implementation of the quality assurance system and the action plan (ECDAN)IDB, EducationNot reported2019Closed0.3Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 6, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1251
Informing growth and development policymaking through research initiativesIDB, Sector not identifiedNot reported2020Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 8, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1277
Acceso Haiti: A New Model to Add Value to Smallholder Farmer ProductionIDB Lab, Agriculture and food securityNot reported2021Closed0.3Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 19, 2021
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1284
Potable Water ProgramIDB, Water and sanitationNot reported1996Closed0.3Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 24, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.3
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9603178
Support private sector involvement in programmatic approach to develop the NorthIDB, Finance and private sectorNot reported2010Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 9, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1141
Program of Agricul. & Industrial CreditIDB, Finance and private sectorNot reported1971Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 7, 1971
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7110034
Deepening of Financial Services to MicroenterpriseIDB Lab, Finance and private sectorNot reported2004Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 6, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1003
MOKAFE, A Cup of Hope Coffee ProjectIDB Lab, Agriculture and food securityNot reported2015Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 10, 2015
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-S1013
Support Fonds Haitien D'aide a la FemmeIDB Lab, Social protectionNot reported1995Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
SP9501249
Leadership Program at Municipal and Community Level in Northern Haiti - Phase IIDB, Sector not identifiedNot reported2014Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 6, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1199
Diagnostic of citizen security and justice institutions and experiencesIDB, Governance and securityNot reported2024Closed0.2Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated October 11, 2024.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 11, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1331
CP-Kotelam Development and implementation of financial products for housing forIDB Lab, Finance and private sectorAug 20152010Closed0.20.4
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
December 14, 2010
Effectiveness
Not reported
Closing
August 8, 2015
Disbursed as of
August 31, 2015
Implementing agency
Not reported
Commitment
0.2
Disbursed
0.4
Undisbursed
Not reported
Last transaction
August 31, 2015
Operation ID
HA-S1012
Emergency Assistance in Response to Tropical Storm JeanneIDB, Social protectionNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 22, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1016
Policy and Forestry Action Plan for HaitiIDB, Environment and disaster riskNot reported2006Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 20, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1046
Support for the preparation National Tourism ProgramIDB, Industry, trade and tourismNot reported2009Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 9, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1090
Support for Design EDH's Mid Term Investment PlanIDB, EnergyNot reported2007Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 18, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1094
Emergency Assistance Due to Hurricane GustavIDB, Environment and disaster riskNot reported2008Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 15, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1099
Emergency Assistance Due to Hurricane HannaIDB, Environment and disaster riskNot reported2008Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 15, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1100
Support to maritime fishing developmentIDB, Agriculture and food securityNot reported2009Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
April 30, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1101
Emergency response to earthquakeIDB, Environment and disaster riskNot reported2010Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
January 14, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1125
Support to the Education Sector Plan and IDB ProgramIDB, EducationNot reported2011Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 8, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1147
Identification of strategies for reducing maternal and neonatal mortalityIDB, HealthNot reported2019Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 18, 2019
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1241
Support to the Sustainable Development of the Electricity SectorIDB, EnergyNot reported2020Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Energy
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 3, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1275
Strengthening Public Management for Improved Service Delivery IIIDB, Governance and securityNot reported2022Closed0.2Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated December 1, 2022.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 1, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1304
Technical assistance for national and learning assessmentsIDB, EducationNot reported2022Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated November 4, 2022.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 4, 2022
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1305
Support to the Haiti Education Sector Plan 2.0 Program DevelopmentIDB, EducationNot reported2023Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
ClosedRecorded as active with no closing date; the last transaction is dated October 6, 2023.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 6, 2023
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1325
Data-Driven Support for the StrategyIDB, Sector not identifiedNot reported2024Closed0.2Not reported
Partner
IDB Group, IDB
Stage
ClosedRecorded as active with no closing date; the last transaction is dated August 27, 2024.
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 27, 2024
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1334
Preparation of Full-Sized GEF ProjectIDB, Environment and disaster riskNot reported2008Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Investment grant
Lending window
Sovereign Guaranteed
Approval
September 5, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-X1009
Government's digital transformation to address the post-COVID-19 contextIDB, Governance and securityNot reported2020Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 7, 2020
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-T3708
Institutional Strengthening of the CamepIDB, Water and sanitationNot reported1976Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 6, 1976
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7503081
Support Faes in Design of Mgmt Ops Syst.IDB, Governance and securityNot reported1995Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 22, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9502388
Potable Water Prog.-Preinvestment StudyIDB, Water and sanitationNot reported1996Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 24, 1996
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC9604423
Procurement Capacity Building ProgramIDB, Sector not identifiedNot reported2013Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 11, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1190
Feasibility, Road Construction ProjectIDB, TransportNot reported1978Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
June 15, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7605134
INDEPCO: Haiti Emergency Allocation Request (HESARIDB Lab, Sector not identifiedNot reported2010Closed0.2Not reported
Stage
Closed
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
March 9, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1002
Mitigating the Environmental Impacts of the PIC in the Caracol BayIDB, Environment and disaster riskNot reported2014Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 19, 2014
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1180
Haiti's Northern Development Corridor - Implementation of ICESIDB, Social protectionNot reported2013Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 20, 2013
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1185
Creation of an innovation and entrepreneurship ecosystemIDB, Finance and private sectorNot reported2017Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 26, 2017
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1235
Construction of Rural Centers of HealthIDB, HealthNot reported1981Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Health
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 18, 1981
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7901152
Institutional Strengthening of ACMEIDB Lab, Finance and private sectorNot reported2003Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
August 26, 2003
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC0302007
Support for the Execution of Loan 1010/SF-HAIDB, Water and sanitationNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
August 9, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1009
Technical Assistance to Support the Execution of Loan 1490/SF-HAIDB, Agriculture and food securityNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 3, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1010
Training Program in AdministrationIDB, Industry, trade and tourismNot reported1979Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
October 17, 1979
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7707237
Preparation of the Land Tenure Regularization ProgramIDB, Agriculture and food securityNot reported2011Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
March 23, 2011
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1142
Pluvial Sewerage of Port-Au-PrinceIDB, Water and sanitationNot reported1978Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
December 7, 1978
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
TC7808100
Financing for Micro and SMEs through Formal Financial IntermediariesIDB Lab, Finance and private sectorNot reported2004Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
October 13, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
RG-M1030
Small Projects Financing Program: InstitIDB Lab, Agriculture and food securityNot reported1990Stopped0.2Not reported
Stage
Stopped
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
June 8, 1990
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
SP8802078
Carifresh IIIIDB Invest, Agriculture and food securityNot reported2016Closed0.20.2
Stage
Closed
Instrument
Not reported
Start
October 5, 2016
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
October 5, 2016
Implementing agency
Not reported
Commitment
0.2
Disbursed
0.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
October 5, 2016
Operation ID
11934-02
Carifresh IIIDB Invest, Sector not identifiedNot reported2012Closed0.20.2
Stage
Closed
Instrument
Not reported
Start
April 18, 2012
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
April 18, 2012
Implementing agency
Not reported
Commitment
0.2
Disbursed
0.2
Undisbursed
Not reported
Records at the source
IATI record (d-portal)
IATI
Last transaction
April 18, 2012
Operation ID
HA2764A-01
State enterprise Le Minoterie D'haitiIDB Lab, Agriculture and food securityNot reported1982Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
February 11, 1982
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
SP8105068
FHAF:HAITI-Emergency Especial Allocation Request (HESAR)IDB Lab, Sector not identifiedNot reported2010Closed0.2Not reported
Stage
Closed
Instrument
Investment grant
Lending window
Non-Sovereign Guaranteed
Approval
April 7, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-G1013
Expand Production of Crop Seeds & PlantIDB Lab, Sector not identifiedNot reported1995Closed0.2Not reported
Stage
Closed
Instrument
Loan
Lending window
Non-Sovereign Guaranteed
Approval
July 25, 1995
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-L1124
Promotion of Community Tourism in the North Department of HaitiIDB Lab, Industry, trade and tourismNot reported2007Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
December 18, 2007
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1012
Competitiveness and Profitability of Fruit-processing MicroenterprisesIDB Lab, Agriculture and food securityNot reported2008Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
September 22, 2008
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1016
Support to the competitiveness of quality coffee value chain in ThiotteIDB Lab, Agriculture and food securityNot reported2009Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 16, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1021
Support to the competitiveness of quality coffee value chain in BaptisteIDB Lab, Agriculture and food securityNot reported2009Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
April 16, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1022
Business Plan CompetitionIDB Lab, Finance and private sectorNot reported2009Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
July 22, 2009
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1023
Institutional strengthening of FHAPMEIDB Lab, Finance and private sectorNot reported2010Closed0.2Not reported
Stage
Closed
Instrument
Technical cooperation
Lending window
Non-Sovereign Guaranteed
Approval
March 17, 2010
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-M1026
Facilitation of Basic Economic Infrastructure ProgramIDB, Governance and securityNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
February 17, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1004
Updating of Road Inventory and ClassificationIDB, TransportNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Transport
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
November 19, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1006
Support for Urban RehabilitationIDB, Social protectionNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 13, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1013
Targetting the Urban PoorIDB, Social protectionNot reported2004Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 20, 2004
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1015
A Response to Gender Based ViolenceIDB, Social protectionNot reported2005Closed0.2Not reported
Partner
IDB Group, IDB
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
May 10, 2005
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1020
Enhancing Readiness to Learn Initiatives for Haitian ChildrenIDB, EducationNot reported2006Closed0.2Not reported
Partner
IDB Group, IDB
Sector
Education
Stage
Closed
Instrument
Technical cooperation
Lending window
Sovereign Guaranteed
Approval
September 15, 2006
Effectiveness
Not reported
Closing
Not reported
Disbursed as of
Not reported
Implementing agency
Not reported
Commitment
0.2
Disbursed
Not reported
Undisbursed
Not reported
Records at the source
IDB project page
Operation ID
HA-T1038

Operations 1 to 500 of 794 are listed, largest commitment first. Next operations

Active operations by sector

Not published for any operation in this table: undisbursed balance.

Table 7.Active operations by sector, US$ millions

Portfolio of active operations at October 18, 2026
SectorActive operationsApprovedUS$ millionsDisbursed to dateUS$ millions
Water and sanitation4288.5194.3
Social protection6264.998.2
Transport2225.4174.1
Education6114.957.8
Agriculture and food security4102.681.5
Health2100.4Not reported
Governance and security271.037.9
Energy437.231.0
Industry, trade and tourism117.58.9
Sector not identified11.0Not reported
Communications10.3Not reported
All active operations331,223.7683.7

Funding flows, FY2016-17, US$ millions

New commitments, FY2016-17, US$ millions
Funding partnerChannelImplementerSectorIDB Group to Recipient government: US$20.0 million (implementer named on the operation)Recipient government to Ministry of Public Works, Transport and Communications (MTPTC): US$20.0 million (implementer named on the operation)Ministry of Public Works, Transport and Communications (MTPTC) to Transport: US$20.0 million (implementer named on the operation)IDB Group to Type of receiving organization not reported: US$6.7 million (no receiver named)Type of receiving organization not reported to Not traced, IDB Group: US$6.7 million (no receiver named)Not traced, IDB Group to Agriculture and food security: US$2.2 million (no receiver named)Not traced, IDB Group to Environment and disaster risk: US$2.1 million (no receiver named)Not traced, IDB Group to Sector not identified: US$1.5 million (no receiver named)Not traced, IDB Group to Transport: US$1.0 million (no receiver named)IDB Group to Type of receiving organization not reported: US$0.5 million (implementer named on the operation)Type of receiving organization not reported to Receiver’s name not published: US$0.5 million (implementer named on the operation)Receiver’s name not published to Agriculture and food security: US$0.5 million (implementer named on the operation)IDB Group to Other: US$0.2 million (implementer named on the operation)Other to Carifresh S.A.: US$0.2 million (implementer named on the operation)Carifresh S.A. to Agriculture and food security: US$0.2 million (implementer named on the operation)IDB Group: US$27.4 millionIDB Group 27.4Recipient government: US$20.0 millionRecipient government 20.0Type of receiving organization not reported: US$7.2 millionType of receiving organization not reported 7.2Other: US$0.2 millionOther 0.2Ministry of Public Works, Transport and Communications (MTPTC): US$20.0 millionMinistry of Public Works, Transport and… (MTPTC) 20.0Not traced, IDB Group: US$6.7 millionNot traced, IDB Group 6.7Receiver’s name not published: US$0.5 millionReceiver’s name not published 0.5Carifresh S.A.: US$0.2 millionCarifresh S.A. 0.2Transport: US$21.0 millionTransport 21.0Agriculture and food security: US$2.8 millionAgriculture and food security 2.8Environment and disaster risk: US$2.1 millionEnvironment and disaster risk 2.1Sector not identified: US$1.5 millionSector not identified 1.5
Funding partner to channel
Funding partnerChannelIDB Group to Recipient government: US$20.0 million (implementer named on the operation)IDB Group to Type of receiving organization not reported: US$7.2 million (no receiver named, implementer named on the operation)IDB Group to Other: US$0.2 million (implementer named on the operation)IDB Group: US$27.4 millionIDB Group 27.4Recipient government: US$20.0 millionRecipient government 20.0Type of receiving organization not reported: US$7.2 millionType of receiving… 7.2Other: US$0.2 millionOther 0.2
Channel to implementer
ChannelImplementerRecipient government to Ministry of Public Works, Transport and Communications (MTPTC): US$20.0 million (implementer named on the operation)Type of receiving organization not reported to Not traced, IDB Group: US$6.7 million (no receiver named)Type of receiving organization not reported to Receiver’s name not published: US$0.5 million (implementer named on the operation)Other to Carifresh S.A.: US$0.2 million (implementer named on the operation)Recipient government: US$20.0 millionRecipient government 20.0Ministry of Public Works, Transport and Communications (MTPTC): US$20.0 millionMinistry of… (MTPTC) 20.0Type of receiving organization not reported: US$7.2 millionType of receiving… 7.2Not traced, IDB Group: US$6.7 millionNot traced, IDB Group 6.7Receiver’s name not published: US$0.5 millionReceiver’s name not… 0.5Other: US$0.2 millionOther 0.2Carifresh S.A.: US$0.2 millionCarifresh S.A. 0.2
Implementer to sector
ImplementerSectorMinistry of Public Works, Transport and Communications (MTPTC) to Transport: US$20.0 million (implementer named on the operation)Not traced, IDB Group to Agriculture and food security: US$2.2 million (no receiver named)Not traced, IDB Group to Environment and disaster risk: US$2.1 million (no receiver named)Not traced, IDB Group to Sector not identified: US$1.5 million (no receiver named)Not traced, IDB Group to Transport: US$1.0 million (no receiver named)Receiver’s name not published to Agriculture and food security: US$0.5 million (implementer named on the operation)Carifresh S.A. to Agriculture and food security: US$0.2 million (implementer named on the operation)Transport: US$21.0 millionTransport 21.0Ministry of Public Works, Transport and Communications (MTPTC): US$20.0 millionMinistry of… (MTPTC) 20.0Not traced, IDB Group: US$6.7 millionNot traced, IDB Group 6.7Agriculture and food security: US$2.8 millionAgriculture and food… 2.8Environment and disaster risk: US$2.1 millionEnvironment and… 2.1Sector not identified: US$1.5 millionSector not identified 1.5Receiver’s name not published: US$0.5 millionReceiver’s name not… 0.5Carifresh S.A.: US$0.2 millionCarifresh S.A. 0.2

Three charts, one per pair of columns, on one scale. Tap a box or band to light its financing in all three and read its figures under the chart; tap it again to open its page.

Band width is proportional to the amount. Point at a band or box for its amount and shares, click to trace it through the chart, and double-click to open its records or page.

The partner’s box adds US$27.4 million from its operations’ positive nets for the year; the partner’s new commitments for the year come to US$27.4 million.

Spelling variants of one organization are shown as one box (name variants). Where a record does not give the type of receiving organization, it is taken from other records by fixed rules (rules); each band names the rule applied.

Funding partner to channel4 flows
FromToUS$ millionsReceiver known from
IDB GroupRecipient government20.0implementer named on the operation
IDB GroupType of receiving organization not reported6.7no receiver named
IDB GroupType of receiving organization not reported0.5implementer named on the operation
IDB GroupOther0.2implementer named on the operation
Channel to implementer4 flows
FromToUS$ millionsReceiver known from
Recipient governmentMinistry of Public Works, Transport and Communications (MTPTC)20.0implementer named on the operation
Type of receiving organization not reportedNot traced, IDB Group6.7no receiver named
Type of receiving organization not reportedReceiver’s name not published0.5implementer named on the operation
OtherCarifresh S.A.0.2implementer named on the operation
Implementer to sector7 flows
FromToUS$ millionsReceiver known from
Ministry of Public Works, Transport and Communications (MTPTC)Transport20.0implementer named on the operation
Not traced, IDB GroupAgriculture and food security2.2no receiver named
Not traced, IDB GroupEnvironment and disaster risk2.1no receiver named
Not traced, IDB GroupSector not identified1.5no receiver named
Not traced, IDB GroupTransport1.0no receiver named
Receiver’s name not publishedAgriculture and food security0.5implementer named on the operation
Carifresh S.A.Agriculture and food security0.2implementer named on the operation

Humanitarian funding recorded by OCHA FTS

Table 8.Humanitarian funding reported to OCHA FTS, calendar year, US$ millions

2020US$ millions
Humanitarian funding0.7

Sources

Data as of October 18, 2026
SourceRead on
fts:2021:summary_gapOctober 18, 2026
IATIOctober 18, 2026
IATIOctober 18, 2026
IDB projects datasetOctober 18, 2026
Public investment programOctober 18, 2026
OCHA FTS, 2010 to 2026October 18, 2026
Cite this page

HaitiDocs. IDB Group. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/partners/idb-group