Port-au-Prince Water and Sanitation Project III

US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.

Objective

The general objective of the project is to improve the quality of life and sanitary conditions of the population of Port-au-Prince and rural communities through the provision of sustainable water and sanitation services. The specific objectives are to: (i) improve water and sanitation coverage, quality of service, and hygiene practices in Port-au-Prince; (ii) improve water coverage and hygiene in rural areas affected by Hurricane Matthew and in OREPA Ouest; (iii) improve the financial sustainability of CTE-MRPP; and (iv) achieve an effective regulation of the sector by DINEPA and the deconcentration of the OREPA Ouest

As published by IDB projects dataset, in its original language.

Partner
IDB Group, IDB
Sector
Water and sanitation
Stage
Under way since December 4, 2017
Approval
October 25, 2017
Closing
December 20, 2026
Instrument
Grant, Sovereign Guaranteed
Effectiveness
Not reported
Last transaction
September 30, 2026
Operation ID
HA-L1103
Life cycle2 stages, 8 dates

Stage history

StageFrom
ApprovedOctober 25, 2017
Under wayDecember 4, 2017

Dated events

EventDateSource
ApprovalOctober 25, 2017IDB projects dataset
First commitmentOctober 25, 2017Transactions
SigningDecember 4, 2017IDB projects dataset
Planned startJuly 18, 2018IATI
Actual startDecember 24, 2018IATI
First disbursementDecember 31, 2018Transactions
Last disbursementSeptember 30, 2026Transactions
Closing dateDecember 20, 2026IATI

Disbursed in FY2025-26: US$13.2 million.

Financing

Table 1.Financing, US$ millions

FinancierAmountUS$ millionsRoleSource
IDB65.0InstitutionIDB projects dataset

Table 2.Position at the data date by source (stocks), US$ millions

This pageUS$ millionsSourceIATIUS$ millions
Commitment65.0IDB projects dataset65.0
Disbursed62.4IATI62.4
UndisbursedNot reported
Total cost65.0IDB projects dataset

Each amount is given as the source publishes it, converted to US$. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source

This page uses IDB projects dataset for the commitment and IATI for disbursements.

Changes to the operationnot reported
Original closing date
Not reported
Closing date extensions
Not reported
Restructurings
Not reported
Emergency component
Not reported

New commitments and disbursements by fiscal year

Disbursements, US$ millions
FY2017-18, not reportedn.r.17-18FY2018-19, US$1.7 million218-19FY2019-20, US$4.0 million419-20FY2020-21, US$15.6 million1620-21FY2021-22, US$6.9 million721-22FY2022-23, US$9.3 million922-23FY2023-24, US$5.6 million623-24FY2024-25, US$6.2 million624-25FY2025-26, US$13.2 million1325-26FY2017-18, not reportedn.r.17-18FY2018-19, US$1.7 million218-19FY2019-20, US$4.0 million419-20FY2020-21, US$15.6 million1620-21FY2021-22, US$6.9 million721-22FY2022-23, US$9.3 million922-23FY2023-24, US$5.6 million623-24FY2024-25, US$6.2 million624-25FY2025-26, US$13.2 million1325-26

Table 3.New commitments and disbursements by fiscal year (flows), US$ millions

FY2017-18US$ millionsFY2018-19US$ millionsFY2019-20US$ millionsFY2020-21US$ millionsFY2021-22US$ millionsFY2022-23US$ millionsFY2023-24US$ millionsFY2024-25US$ millionsFY2025-26US$ millions
New commitments65.0Not reportedNot reportedNot reportedNot reportedNot reportedNot reportedNot reportedNot reported
DisbursementsNot reported1.74.015.66.99.35.66.213.2
Cumulative disbursementsNot reported1.75.721.328.237.543.049.262.4

Records and documents

Transactions38 records, October 25, 2017 to September 30, 2026

Table 4.Transactions, US$ millions

DateMeasureAmountUS$ millionsSourceMethod
October 25, 2017Commitment65.0IDB projects datasetcommitment at approval date
December 31, 2018Disbursements1.7IATIIATI disbursement (transaction type 3), paid to another organization
August 31, 2019Disbursements0.1IATIIATI disbursement (transaction type 3), paid to another organization
December 31, 2019Disbursements2.3IATIIATI disbursement (transaction type 3), paid to another organization
June 30, 2020Disbursements0.1IATIIATI disbursement (transaction type 3), paid to another organization
July 31, 2020Disbursements0.1IATIIATI disbursement (transaction type 3), paid to another organization
August 31, 2020Disbursements1.5IATIIATI disbursement (transaction type 3), paid to another organization
October 31, 2020Disbursements5.4IATIIATI disbursement (transaction type 3), paid to another organization
December 31, 2020Disbursements0.3IATIIATI disbursement (transaction type 3), paid to another organization
January 31, 2021Disbursements0.8IATIIATI disbursement (transaction type 3), paid to another organization
March 31, 2021Disbursements2.5IATIIATI disbursement (transaction type 3), paid to another organization
April 30, 2021Disbursements1.1IATIIATI disbursement (transaction type 3), paid to another organization
May 31, 2021Disbursements1.2IATIIATI disbursement (transaction type 3), paid to another organization
June 30, 2021Disbursements0.7IATIIATI disbursement (transaction type 3), paid to another organization
August 31, 2021Disbursements0.6IATIIATI disbursement (transaction type 3), paid to another organization
September 30, 2021Disbursements3.1IATIIATI disbursement (transaction type 3), paid to another organization
February 28, 2022Disbursements0.7IATIIATI disbursement (transaction type 3), paid to another organization
April 30, 2022Disbursements0.3IATIIATI disbursement (transaction type 3), paid to another organization
May 31, 2022Disbursements3.7IATIIATI disbursement (transaction type 3), paid to another organization
June 30, 2022Disbursements2.1IATIIATI disbursement (transaction type 3), paid to another organization
November 30, 2022Disbursements0.9IATIIATI disbursement (transaction type 3), paid to another organization
December 31, 2022Disbursements2.9IATIIATI disbursement (transaction type 3), paid to another organization
April 30, 2023Disbursements0.4IATIIATI disbursement (transaction type 3), paid to another organization
May 31, 2023Disbursements0.4IATIIATI disbursement (transaction type 3), paid to another organization
June 30, 2023Disbursements0.2IATIIATI disbursement (transaction type 3), paid to another organization
August 31, 2023Disbursements4.5IATIIATI disbursement (transaction type 3), paid to another organization
February 29, 2024Disbursements1.5IATIIATI disbursement (transaction type 3), paid to another organization
March 31, 2024Disbursements0.2IATIIATI disbursement (transaction type 3), paid to another organization
May 31, 2024Disbursements3.5IATIIATI disbursement (transaction type 3), paid to another organization
August 31, 2024Disbursements0.3IATIIATI disbursement (transaction type 3), paid to another organization
December 31, 2024Disbursements0.7IATIIATI disbursement (transaction type 3), paid to another organization
January 31, 2025Disbursements0.1IATIIATI disbursement (transaction type 3), paid to another organization
February 28, 2025Disbursements0.9IATIIATI disbursement (transaction type 3), paid to another organization
April 30, 2025Disbursements4.5IATIIATI disbursement (transaction type 3), paid to another organization
November 30, 2025Disbursements0.3IATIIATI disbursement (transaction type 3), paid to another organization
December 31, 2025Disbursements4.6IATIIATI disbursement (transaction type 3), paid to another organization
August 31, 2026Disbursements0.3IATIIATI disbursement (transaction type 3), paid to another organization
September 30, 2026Disbursements8.0IATIIATI disbursement (transaction type 3), paid to another organization
Terms5 of 6 reported
Finance type
110 Standard grant
Flow type
20 Other official flows, excluding export credits
Aid type
C01 Project-type interventions
Tied status
5 Untied
Collaboration type
4 Multilateral outflows
Humanitarian
Not reported
Locations1 place named
DepartmentsNot reported
Places named by the sourceHaiti, ANGLE RUE METELLUS ET ROUTE IBO L L ,NO 4 P TION-VILLE, PETION-VILLE
Places with coordinates0
Results indicators90 indicators
IndicatorBaselineTargetLatest valueDate of latest value
% de femmes qui travaillent dans des kiosques nouveaux ou réhabilités dans la zone de Carrefour et au Centre-VilleNot reported35.0035.00December 31, 2022
% de femmes qui utilisent des serviettes hygiéniques pendant leur période de menstruationNot reported75.0075.00December 31, 2019
% de ménages qui ont des installations pour le lavage des mains, y compris du savonNot reported15.006.00December 31, 2019
Accords de subvention au CTE pour la facture de l’EdH singésNot reported1.001.00December 31, 2019
Agences du CTE-RMPP dotées de materiel et du personelNot reported2.000.00December 31, 2020
Armoires électriques et d'automatismes rehabilitésNot reported2.000.00December 31, 2021
Bâtiment du CTE de Ouanaminthe construitNot reported1.000.00December 31, 2019
CTE-RMPP doté du personelNot reported1.001.00December 31, 2022
Campagne de communication et de marketing pour améliorer l'hygiène menstruelle réaliséeNot reported1.000.00December 31, 2020
Campagnes d'assainissement et d'hygiène réalisées dans 8 Sections communales de l'OREPA Ouest réaliséesNot reported4.000.00December 31, 2021
Campagnes de communication et de marketing dans les zones urbaines du projet pour améliorer la connectivité au réseau d'eau potable, l'access a l'assainissement et l'hygiène , executéesNot reported1.001.00December 31, 2021
Conduites de distribution installéesNot reported5000.006480.00December 31, 2021
Conduites structurantes et de refoulement installéesNot reported8000.005252.00December 31, 2021
Connexions installés au niveau des ménagesNot reported10000.000.00December 31, 2022
Contats par résultats signés (APP)Not reported1.000.00December 31, 2020
Contrat d'approvisionnement en combustible signéNot reported1.001.00December 31, 2019
Contrat de supervision des grands travaux signéNot reported1.001.00December 31, 2019
Contrats d'appui à l'OREPA Ouest pour la supervision technique et APD travaux rurauxNot reported2.000.00December 31, 2020
Contrats d'assistance technique, sociale et opérationnelle pour l'amélioration de la desserte en eau dans les quartiers dévaforisés de la RMPP signésNot reported3.003.00December 31, 2020
Contrats de consultations d'appui à la DINEPA pour la regulation et le suivi des APP signésNot reported1.000.00December 31, 2020
Indice de recouvrement du CTE-RMPP (% de paiement des factures)Not reported71.0049.40December 31, 2022
Kiosques construits ou réhabilitésNot reported30.000.00December 31, 2021
La DINEPA et l'OREPA Ouest et ses structures dotées du materiel et de personelNot reported2.002.00December 31, 2022
Mini réseau (30 ménages/mini réseau) condominaux installésNot reported140.000.00December 31, 2022
Nombre de CTEs de la DINEPA qui fonctionnent conformément au cadre institutionnel de régulation et de planificationNot reported10.0027.00December 31, 2023
Nombre de connexions domicilaires et commerciales actives au CTE-RMPPNot reported68200.0048867.00December 31, 2022
Nombre de foyers ayant acces a l´eau potable a domicileNot reported178400.0094052.00December 31, 2022
Nombre de nouveaux foyers ayant accès à un service d'assainissement et de higiene amélioréNot reported2500.000.00December 31, 2021
Nombre de nouveaux foyers ayant accès à un service d'eau amélioréNot reported4000.000.00December 31, 2021
Nombre de structures de l´OREPA Ouest qui fonctionnent conformément au cadre institutionnel de regulation et de planificationNot reported1.001.00December 31, 2020
Nombre d’heures par jour d’alimentation des ménages à partir d’une connexion du CTE-RMPPNot reported12.006.00December 31, 2022
OREPA NORD dotée de matériel et de personnel pour aquérir l'elégibilité du projet HA-L1135Not reported1.001.00December 31, 2019
OREPA Ouest dotée de bâtiment et materiel roulantNot reported1.002.00December 31, 2020
Outil de planification rural developéNot reported1.000.00December 31, 2021
Points d'eau construites ou rehabilitésNot reported10.004.00December 31, 2021
Pourcentage de foyer ayant accès à un service d'eau amélioréNot reported44.000.00December 31, 2022
Pourcentage de ménages ayant accès à l’eau potable via un kiosqueNot reported6.001.70December 31, 2022
Production durable d’eau par le CTE-RMPPNot reported183000.0087787.00December 31, 2022
Ratio d’exploitation du CTE-RMPP (ratio des revenus d’exploitation annuels contre dépenses d’exploitation annuellesNot reported1.321.01December 31, 2022
Réseau d'eau potable construites ou rehabilitéesNot reported2.000.00December 31, 2021
Réservoirs réhabilités ou construitsNot reported2.000.50December 31, 2021
Travaux d'amélioration du service réalisés par le CTENot reported2.003.00December 31, 2021
Études pour réalisation de petits travaux d'amélioration des SAEP réaliséesNot reported2.000.00December 31, 2020
% de femmes qui travaillent dans des kiosques nouveaux ou réhabilités dans la zone de Carrefour et au Centre-VilleNot reported35.0035.00December 31, 2022
% de femmes qui utilisent des serviettes hygiéniques pendant leur période de menstruationNot reported75.0075.00December 31, 2019
% de ménages qui ont des installations pour le lavage des mains, y compris du savonNot reported15.006.00December 31, 2019
Accords de subvention au CTE pour la facture de l’EdH singésNot reported1.001.00December 31, 2019
Agences du CTE-RMPP dotées de materiel et du personelNot reported2.000.00December 31, 2020
Armoires électriques et d'automatismes rehabilitésNot reported2.000.00December 31, 2021
Audits et supervisions réalisésNot reported1.001.00December 31, 2022
Bâtiment du CTE de Ouanaminthe construitNot reported1.000.00December 31, 2019
CTE-RMPP doté du personelNot reported1.001.00December 31, 2022
Campagne de communication et de marketing pour améliorer l'hygiène menstruelle réaliséeNot reported1.000.00December 31, 2020
Campagnes d'assainissement et d'hygiène réalisées dans 8 Sections communales de l'OREPA Ouest réaliséesNot reported4.000.00December 31, 2021
Campagnes de communication et de marketing dans les zones urbaines du projet pour améliorer la connectivité au réseau d'eau potable, l'access a l'assainissement et l'hygiène , executéesNot reported1.001.00December 31, 2021
Conduites de distribution installéesNot reported5000.006480.00December 31, 2021
Conduites structurantes et de refoulement installéesNot reported8000.005252.00December 31, 2021
Connexions installés au niveau des ménagesNot reported10000.000.00December 31, 2022
Contats par résultats signés (APP)Not reported1.000.00December 31, 2020
Contrat d'approvisionnement en combustible signéNot reported1.001.00December 31, 2019
Contrat de supervision des grands travaux signéNot reported1.001.00December 31, 2019
Contrats d'appui à l'OREPA Ouest pour la supervision technique et APD travaux rurauxNot reported2.000.00December 31, 2020
Contrats d'assistance technique, sociale et opérationnelle pour l'amélioration de la desserte en eau dans les quartiers dévaforisés de la RMPP signésNot reported3.003.00December 31, 2020
Contrats de consultations d'appui à la DINEPA pour la regulation et le suivi des APP signésNot reported1.000.00December 31, 2020
Formations et échanges avec opérateurs régionaux réaliséesNot reported1.000.00December 31, 2022
Indice de recouvrement du CTE-RMPP (% de paiement des factures)Not reported71.0049.40December 31, 2022
Kiosques construits ou réhabilitésNot reported30.000.00December 31, 2021
La DINEPA et l'OREPA Ouest et ses structures dotées du materiel et de personelNot reported2.002.00December 31, 2022
Mini réseau (30 ménages/mini réseau) condominaux installésNot reported140.000.00December 31, 2022
Nombre de CTEs de la DINEPA qui fonctionnent conformément au cadre institutionnel de régulation et de planificationNot reported10.0027.00December 31, 2023
Nombre de connexions domicilaires et commerciales actives au CTE-RMPPNot reported68200.0048867.00December 31, 2022
Nombre de foyers ayant acces a l´eau potable a domicileNot reported178400.0094052.00December 31, 2022
Nombre de nouveaux foyers ayant accès à un service d'assainissement et de higiene amélioréNot reported2500.000.00December 31, 2021
Nombre de nouveaux foyers ayant accès à un service d'eau amélioréNot reported4000.000.00December 31, 2021
Nombre de structures de l´OREPA Ouest qui fonctionnent conformément au cadre institutionnel de regulation et de planificationNot reported1.001.00December 31, 2020
Nombre d’heures par jour d’alimentation des ménages à partir d’une connexion du CTE-RMPPNot reported12.006.00December 31, 2022
OREPA NORD dotée de matériel et de personnel pour aquérir l'elégibilité du projet HA-L1135Not reported1.001.00December 31, 2019
OREPA Ouest dotée de bâtiment et materiel roulantNot reported1.002.00December 31, 2020
Outil de planification rural developéNot reported1.000.00December 31, 2021
Points d'eau construites ou rehabilitésNot reported10.004.00December 31, 2021
Pourcentage de foyer ayant accès à un service d'eau amélioréNot reported44.000.00December 31, 2022
Pourcentage de ménages ayant accès à l’eau potable via un kiosqueNot reported6.001.70December 31, 2022
Production durable d’eau par le CTE-RMPPNot reported183000.0087787.00December 31, 2022
Ratio d’exploitation du CTE-RMPP (ratio des revenus d’exploitation annuels contre dépenses d’exploitation annuellesNot reported1.321.01December 31, 2022
Réseau d'eau potable construites ou rehabilitéesNot reported2.000.00December 31, 2021
Réservoirs réhabilités ou construitsNot reported2.000.50December 31, 2021
Travaux d'amélioration du service réalisés par le CTENot reported2.003.00December 31, 2021
Unité d'exécution dotée du materielNot reported1.001.00December 31, 2022
Unité d´exécution dotée du personnelNot reported1.001.00December 31, 2022
Études pour réalisation de petits travaux d'amélioration des SAEP réaliséesNot reported2.000.00December 31, 2020
Funds passed on61 transactions
ReceiverTransactionDateUS$ millions
DINEPA de l'AssainissementDisbursementSeptember 30, 20268.0
TEMPO ConstructionDisbursementAugust 31, 20260.3
DINEPA de l'AssainissementDisbursementDecember 31, 20254.6
Ingenierie Moderne et Construction IMCODisbursementNovember 30, 20250.3
DINEPA de l'AssainissementDisbursementApril 30, 20254.5
Ingenierie Moderne et Construction IMCODisbursementFebruary 28, 20250.9
Societe Technique de ConstructionDisbursementJanuary 31, 20250.1
Viva Rio...Pan American DevelopmentDisbursementDecember 31, 20240.1
EF ConstructionDisbursementDecember 31, 20240.2
TEMPO ConstructionDisbursementDecember 31, 20240.2
TEMPO ConstructionDisbursementDecember 31, 20240.3
Technique Industrie AgricultureDisbursementAugust 31, 20240.1
Technique Industrie AgricultureDisbursementAugust 31, 20240.2
DINEPA de l'AssainissementDisbursementMay 31, 20243.5
Groupe D ETUDE et de Constructions SADisbursementMarch 31, 20240.2
Haiti Hydraulique Organisation SADisbursementFebruary 29, 20241.0
Groupe D ETUDE et de Constructions SADisbursementFebruary 29, 20240.5
DINEPA de l'AssainissementDisbursementAugust 31, 20234.5
TEMPO ConstructionDisbursementJune 30, 20230.2
Societe Technique de ConstructionDisbursementMay 31, 20230.3
Technique Industrie AgricultureDisbursementMay 31, 20230.1
EF ConstructionDisbursementApril 30, 20230.4
Groupe D ETUDE et de Constructions SADisbursementDecember 31, 20221.6
United Nations Childrens Fund JMDisbursementDecember 31, 20221.3
Name not shownDisbursementNovember 30, 20220.9
Societe Technique de ConstructionDisbursementJune 30, 20220.2
Entreprises D Amenagement et D ExpertiseDisbursementJune 30, 20221.1
Haiti Hydraulique Organisation SADisbursementJune 30, 20220.7
TEMPO ConstructionDisbursementJune 30, 20220.1
DINEPA de l'AssainissementDisbursementMay 31, 20223.7
TEMPO ConstructionDisbursementApril 30, 20220.1
Societe Technique de ConstructionDisbursementApril 30, 20220.2
EF ConstructionDisbursementFebruary 28, 20220.4
EF ConstructionDisbursementFebruary 28, 20220.4
DINEPA de l'AssainissementDisbursementSeptember 30, 20213.1
Technique Industrie AgricultureDisbursementAugust 31, 20210.6
TEMPO ConstructionDisbursementJune 30, 20210.7
Name not shownDisbursementMay 31, 20210.6
Societe Technique de ConstructionDisbursementMay 31, 20210.5
Groupe D ETUDE et de Constructions SADisbursementApril 30, 20210.4
TEMPO ConstructionDisbursementApril 30, 20210.4
TEMPO ConstructionDisbursementApril 30, 20210.3
DINEPA de l'AssainissementDisbursementMarch 31, 20212.5
Name not shownDisbursementJanuary 31, 20210.8
Name not shownDisbursementDecember 31, 20200.3
DINEPA de l'AssainissementDisbursementOctober 31, 20202.7
DINEPA de l'AssainissementDisbursementOctober 31, 20202.7
Martech ConstructionDisbursementAugust 31, 20200.1
Name not shownDisbursementAugust 31, 20200.7
MSC Trading S.ADisbursementAugust 31, 20200.7
Name not shownDisbursementJuly 31, 20200.1
Name not shownDisbursementJuly 31, 2020<0.1
Sunauto S.ADisbursementJuly 31, 2020<0.1
Name not shownDisbursementJune 30, 2020<0.1
Name not shownDisbursementJune 30, 2020<0.1
Name not shownDisbursementJune 30, 2020<0.1
Name not shownDisbursementJune 30, 2020<0.1
DINEPA - 4353GR-HA - USDDisbursementDecember 31, 20192.3
Name not shownDisbursementAugust 31, 2019<0.1
Name not shownDisbursementAugust 31, 2019<0.1
DINEPA - 4353GR-HA - USDDisbursementDecember 31, 20181.7
Identifiers4 identifiers
SystemIdentifierSource
IATI identifierXI-IATI-IADB-HA-L1103IATI
IDB operationHA-L1103Operation record
Public investment program line1114-1-12-54-14Public investment program
Public investment program line1114-2-22-50-56Public investment program
Partner documents36 documents
Procurement notices (37)

Sources

Data as of October 18, 2026
SourceRead on
IATIOctober 18, 2026
IATIOctober 18, 2026
IDB projects datasetOctober 18, 2026
Public investment programOctober 18, 2026