Productive Infrastructure Program V
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
The project objective is to contribute to the sustainable economic development of Northern Haiti. The specific objective is to create formal employment in the North and Northeast Departments of Haiti by providing the necessary conditions for the establishment of firms in the Parc Industriel de Caracol (PIC) and ensuring its adequate management and long term sustainability.
As published by IDB projects dataset, in its original language.
- Sector
- Water and sanitation
- Stage
- Under way since November 10, 2021
- Approval
- November 3, 2021
- Closing
- November 22, 2027
- Instrument
- Grant, Sovereign Guaranteed
- Effectiveness
- Not reported
- Last transaction
- November 30, 2025
- Operation ID
- HA-L1143
Life cycle2 stages, 8 dates
Stage history
| Stage | From |
|---|---|
| Approved | November 3, 2021 |
| Under way | November 10, 2021 |
Dated events
| Event | Date | Source |
|---|---|---|
| Approval | November 3, 2021 | IDB projects dataset |
| First commitment | November 3, 2021 | Transactions |
| Signing | November 10, 2021 | IDB projects dataset |
| Planned start | November 22, 2022 | IATI |
| Actual start | December 15, 2022 | IATI |
| First disbursement | December 31, 2022 | Transactions |
| Last disbursement | November 30, 2025 | Transactions |
| Closing date | November 22, 2027 | IATI |
Disbursed in FY2025-26: US$12.7 million.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDB | 65.0 | Institution | IDB projects dataset |
Table 2.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 65.0 | IDB projects dataset | 65.0 |
| Disbursed | 33.7 | IATI | 33.7 |
| Undisbursed | Not reported | ||
| Total cost | 65.0 | IDB projects dataset |
Each amount is given as the source publishes it, converted to US$. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
This page uses IDB projects dataset for the commitment and IATI for disbursements.
Changes to the operationnot reported
- Original closing date
- Not reported
- Closing date extensions
- Not reported
- Restructurings
- Not reported
- Emergency component
- Not reported
New commitments and disbursements by fiscal year
Table 3.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2021-22US$ millions | FY2022-23US$ millions | FY2023-24US$ millions | FY2024-25US$ millions | FY2025-26US$ millions | |
|---|---|---|---|---|---|
| New commitments | 65.0 | Not reported | Not reported | Not reported | Not reported |
| Disbursements | Not reported | 2.0 | 9.6 | 9.3 | 12.7 |
| Cumulative disbursements | Not reported | 2.0 | 11.6 | 21.0 | 33.7 |
Records and documents
Transactions7 records, November 3, 2021 to November 30, 2025
Table 4.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| November 3, 2021 | Commitment | 65.0 | IDB projects dataset | commitment at approval date |
| December 31, 2022 | Disbursements | 2.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| November 30, 2023 | Disbursements | 7.6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| July 31, 2024 | Disbursements | 2.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| November 30, 2024 | Disbursements | 0.6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| December 31, 2024 | Disbursements | 8.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| November 30, 2025 | Disbursements | 12.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
Terms5 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- 20 Other official flows, excluding export credits
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 4 Multilateral outflows
- Humanitarian
- Not reported
Locations1 place named
| Departments | Not reported |
| Places named by the source | Haiti, 5, AVENUE CHARLES SUMMER, PORT-AU-PRINCE |
| Places with coordinates | 0 |
Results indicators130 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| Additional studies and supervision for flood prevention works of Trou du Nord River bank | Not reported | 1.00 | 0.20 | December 31, 2025 |
| Ambulance purchased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Amount billed monthly to tenants that is collected by the entity in charge of the PIC's management | Not reported | 100.00 | 0.00 | Not reported |
| Annual rental payments made by PIC's tenants or firms | Not reported | 4.10 | 0.00 | Not reported |
| Average time it takes PIC tenants to resolve non-compliance gender issues according to PIC's rules and regulations in effect | Not reported | 3.00 | 3.00 | Not reported |
| Complaints filed by PIC workers that have been resolved or that are being investigated by the entity in charge of the PIC | Not reported | 100.00 | 100.00 | Not reported |
| Compost facility inside de PIC built | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Conception and construction of a propane gas station | Not reported | 1.00 | 0.00 | December 31, 2023 |
| Coordination | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Drainage network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Electrical network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Emergency works for the closure of the PIC | Not reported | 1745.00 | 1641.00 | December 31, 2023 |
| Employees in middle or supervisory positions who are Haitians | Not reported | 12.00 | 0.00 | December 31, 2025 |
| Employees with middle or supervisory positions in new firms/tenants at the PIC that are Haitian women | Not reported | 5.00 | 0.00 | December 31, 2025 |
| Existing canteens rehabilitated Fulfilling EDGE Certification V 3.0 conditions | Not reported | 1.00 | 0.40 | December 31, 2024 |
| Firefighter truck purchased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Flood prevention works of the Trou-du-Nord Riverbank built | Not reported | 4.20 | 0.00 | December 31, 2025 |
| Floor supervisors employed by current tenants in the PIC who are Haitian women | Not reported | 20.00 | 0.00 | Not reported |
| Guidelines identifying curricula for training based on employers’ needs assessments and learning pathways developed | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Haitian workers employed in formal jobs by PIC's tenants | Not reported | 14199.00 | 2500.00 | Not reported |
| Hazardous solid waste produced within the PIC that is adequately stored (long term storage facility) | Not reported | 100.00 | 0.00 | December 31, 2025 |
| Hazardous waste storage facility (250 sq. m.) built | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Hydraulic equipment purchased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Industrial buildings for international tenants (12,000 sq. m.) built fulfilling EDGE Certification V 3.0 conditions | Not reported | 2.00 | 0.40 | December 31, 2024 |
| Industrial wastewater produced by the PIC that is adequately treated (water samples comply with maximum biochemical oxygen demand of <30mg/L and absence of toxic chemicals) | Not reported | 100.00 | 0.00 | December 31, 2025 |
| Industrial water network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Infrastructure for reception of pretreated sludges (dewatered, nonhazardous) from industrial wastewater constructed | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Internal road expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Lactation equipment installed in rooms specifically designated for lactating mothers. | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Management plans related to PIC services management implemented | Not reported | 4.00 | 0.00 | December 31, 2024 |
| New canteens built fulfilling EDGE Certification V 3.0 conditions | Not reported | 2.00 | 0.00 | December 31, 2025 |
| New employees hired by PIC tenants that were trained and certified in basic socioemotional and employability skills | Not reported | 75.00 | 0.00 | Not reported |
| New equipment installed at the health center localized at PIC entrance | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Occupancy ratio of new buildings in the PIC by tenants or firms | Not reported | 100.00 | 0.00 | Not reported |
| PIC Gender action plan developed and finalized | Not reported | 1.00 | 0.00 | December 31, 2025 |
| PIC employees trained and certified in gender awareness | Not reported | 75.00 | 0.00 | December 31, 2025 |
| PIC tenants’ skill needs assessments and barriers for training identified for new hires and current employees | Not reported | 1.00 | 0.00 | December 31, 2024 |
| PIC tenants’ workers, supervisors and management employees training sessions on gender issues realized | Not reported | 1.00 | 0.00 | December 31, 2025 |
| PIC's annual operating margin (revenues /operation and maintenance expenses) | Not reported | 149.00 | 0.00 | Not reported |
| Plan for PIC Management implemented | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Plan for procedures for grievance mechanisms, communication plan and stakeholder’s engagement updated and implemented. | Not reported | 1.00 | 0.20 | December 31, 2025 |
| Potable and industrial water treatment plant improved and in operation | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Potable water network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Potable water supplied to the PIC with sufficient quality (water samples comply with maximum iron of <0.3mg/L and manganese pf <0.05mg/L mineral content). | Not reported | 100.00 | 0.00 | December 31, 2025 |
| Rehabilitation of existing buildings including study and supervision | Not reported | 10.00 | 0.00 | December 31, 2024 |
| Selected PIC employees trained and certified for delivering training to their colleagues in basic socioemotional and employability skills | Not reported | 75.00 | 0.00 | December 31, 2025 |
| Selected PIC employees who are trained and certified in supervisory and leadership skills | Not reported | 75.00 | 0.00 | December 31, 2025 |
| Sewerage network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Sexual harassment and SGBV complaints in the transport system servicing PIC that have been resolved or that are being investigated by the entity in charge of the PIC | Not reported | 100.00 | 100.00 | Not reported |
| Solid waste produced within the PIC that is adequately disposed (in a sanitary landfill or composted) | Not reported | 100.00 | 100.00 | December 31, 2025 |
| Subsidy to PIC operational and maintenance costs | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Supervision contract for PIC extension signed and executed as per RFP | Not reported | 1.00 | 1.00 | December 31, 2024 |
| Supervision contract for construction/rehabilitation of canteens executed as per RFP | Not reported | 1.00 | 1.00 | December 31, 2025 |
| Supervision contract for flood prevention works of Trou du Nord River Bank executed as per RFP | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Supervision contract for water and sanitation infrastructures executed as per RFP | Not reported | 1.00 | 0.00 | December 31, 2024 |
| System for operationalizing PIC’s pipeline of talent designed and operating | Not reported | 1.00 | 0.00 | December 31, 2023 |
| System for the evaluation of training’s pertinence, quality and effectiveness designed and operating | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Tenants in the PIC that are in compliance with updated PIC rules and regulations on a yearly basis | Not reported | 90.00 | 100.00 | Not reported |
| Training program of trainers to deliver basic, socio-emotional and employability skills program to current workers developed and delivered | Not reported | 2.00 | 0.00 | December 31, 2025 |
| Training program on basic and socioemotional skills delivered to job seekers developed and delivered | Not reported | 5.00 | 0.00 | December 31, 2025 |
| Training program on middle management and line supervisory skills developed and delivered | Not reported | 5.00 | 0.00 | December 31, 2025 |
| Trainings related to ESHS aspects (transportation, solid waste management, first aid, natural disaster etc.) implemented | Not reported | 2.00 | 0.00 | December 31, 2025 |
| Updated environmental, social, health, and security (ESHS) system developed and implemented | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Water truck purschased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Works for Mouchinette CGIS (Financial compensation to HA-L1106 project) | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Additional studies and supervision for flood prevention works of Trou du Nord River bank | Not reported | 1.00 | 0.20 | December 31, 2025 |
| Ambulance purchased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Amount billed monthly to tenants that is collected by the entity in charge of the PIC's management | Not reported | 100.00 | 0.00 | Not reported |
| Annual rental payments made by PIC's tenants or firms | Not reported | 4.10 | 0.00 | Not reported |
| Average time it takes PIC tenants to resolve non-compliance gender issues according to PIC's rules and regulations in effect | Not reported | 3.00 | 3.00 | Not reported |
| Complaints filed by PIC workers that have been resolved or that are being investigated by the entity in charge of the PIC | Not reported | 100.00 | 100.00 | Not reported |
| Compost facility inside de PIC built | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Conception and construction of a propane gas station | Not reported | 1.00 | 0.00 | December 31, 2023 |
| Coordination | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Drainage network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Electrical network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Emergency works for the closure of the PIC | Not reported | 1745.00 | 1641.00 | December 31, 2023 |
| Employees in middle or supervisory positions who are Haitians | Not reported | 12.00 | 0.00 | December 31, 2025 |
| Employees with middle or supervisory positions in new firms/tenants at the PIC that are Haitian women | Not reported | 5.00 | 0.00 | December 31, 2025 |
| Existing canteens rehabilitated Fulfilling EDGE Certification V 3.0 conditions | Not reported | 1.00 | 0.40 | December 31, 2024 |
| Firefighter truck purchased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Flood prevention works of the Trou-du-Nord Riverbank built | Not reported | 4.20 | 0.00 | December 31, 2025 |
| Floor supervisors employed by current tenants in the PIC who are Haitian women | Not reported | 20.00 | 0.00 | Not reported |
| Guidelines identifying curricula for training based on employers’ needs assessments and learning pathways developed | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Haitian workers employed in formal jobs by PIC's tenants | Not reported | 14199.00 | 2500.00 | Not reported |
| Hazardous solid waste produced within the PIC that is adequately stored (long term storage facility) | Not reported | 100.00 | 0.00 | December 31, 2025 |
| Hazardous waste storage facility (250 sq. m.) built | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Hydraulic equipment purchased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Industrial buildings for international tenants (12,000 sq. m.) built fulfilling EDGE Certification V 3.0 conditions | Not reported | 2.00 | 0.40 | December 31, 2024 |
| Industrial wastewater produced by the PIC that is adequately treated (water samples comply with maximum biochemical oxygen demand of <30mg/L and absence of toxic chemicals) | Not reported | 100.00 | 0.00 | December 31, 2025 |
| Industrial water network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Infrastructure for reception of pretreated sludges (dewatered, nonhazardous) from industrial wastewater constructed | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Internal road expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Lactation equipment installed in rooms specifically designated for lactating mothers. | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Management plans related to PIC services management implemented | Not reported | 4.00 | 0.00 | December 31, 2024 |
| New canteens built fulfilling EDGE Certification V 3.0 conditions | Not reported | 2.00 | 0.00 | December 31, 2025 |
| New employees hired by PIC tenants that were trained and certified in basic socioemotional and employability skills | Not reported | 75.00 | 0.00 | Not reported |
| New equipment installed at the health center localized at PIC entrance | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Occupancy ratio of new buildings in the PIC by tenants or firms | Not reported | 100.00 | 0.00 | Not reported |
| PIC Gender action plan developed and finalized | Not reported | 1.00 | 0.00 | December 31, 2025 |
| PIC employees trained and certified in gender awareness | Not reported | 75.00 | 0.00 | December 31, 2025 |
| PIC tenants’ skill needs assessments and barriers for training identified for new hires and current employees | Not reported | 1.00 | 0.00 | December 31, 2024 |
| PIC tenants’ workers, supervisors and management employees training sessions on gender issues realized | Not reported | 1.00 | 0.00 | December 31, 2025 |
| PIC's annual operating margin (revenues /operation and maintenance expenses) | Not reported | 149.00 | 0.00 | Not reported |
| Plan for PIC Management implemented | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Plan for procedures for grievance mechanisms, communication plan and stakeholder’s engagement updated and implemented. | Not reported | 1.00 | 0.20 | December 31, 2025 |
| Potable and industrial water treatment plant improved and in operation | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Potable water network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Potable water supplied to the PIC with sufficient quality (water samples comply with maximum iron of <0.3mg/L and manganese pf <0.05mg/L mineral content). | Not reported | 100.00 | 0.00 | December 31, 2025 |
| Rehabilitation of existing buildings including study and supervision | Not reported | 10.00 | 0.00 | December 31, 2024 |
| Selected PIC employees trained and certified for delivering training to their colleagues in basic socioemotional and employability skills | Not reported | 75.00 | 0.00 | December 31, 2025 |
| Selected PIC employees who are trained and certified in supervisory and leadership skills | Not reported | 75.00 | 0.00 | December 31, 2025 |
| Sewerage network expanded | Not reported | 0.90 | 0.00 | December 31, 2024 |
| Sexual harassment and SGBV complaints in the transport system servicing PIC that have been resolved or that are being investigated by the entity in charge of the PIC | Not reported | 100.00 | 100.00 | Not reported |
| Solid waste produced within the PIC that is adequately disposed (in a sanitary landfill or composted) | Not reported | 100.00 | 100.00 | December 31, 2025 |
| Subsidy to PIC operational and maintenance costs | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Supervision contract for PIC extension signed and executed as per RFP | Not reported | 1.00 | 1.00 | December 31, 2024 |
| Supervision contract for construction/rehabilitation of canteens executed as per RFP | Not reported | 1.00 | 1.00 | December 31, 2025 |
| Supervision contract for flood prevention works of Trou du Nord River Bank executed as per RFP | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Supervision contract for water and sanitation infrastructures executed as per RFP | Not reported | 1.00 | 0.00 | December 31, 2024 |
| System for operationalizing PIC’s pipeline of talent designed and operating | Not reported | 1.00 | 0.00 | December 31, 2023 |
| System for the evaluation of training’s pertinence, quality and effectiveness designed and operating | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Tenants in the PIC that are in compliance with updated PIC rules and regulations on a yearly basis | Not reported | 90.00 | 100.00 | Not reported |
| Training program of trainers to deliver basic, socio-emotional and employability skills program to current workers developed and delivered | Not reported | 2.00 | 0.00 | December 31, 2025 |
| Training program on basic and socioemotional skills delivered to job seekers developed and delivered | Not reported | 5.00 | 0.00 | December 31, 2025 |
| Training program on middle management and line supervisory skills developed and delivered | Not reported | 5.00 | 0.00 | December 31, 2025 |
| Trainings related to ESHS aspects (transportation, solid waste management, first aid, natural disaster etc.) implemented | Not reported | 2.00 | 0.00 | December 31, 2025 |
| Updated environmental, social, health, and security (ESHS) system developed and implemented | Not reported | 1.00 | 0.00 | December 31, 2025 |
| Water truck purschased and delivered to UTE | Not reported | 1.00 | 0.00 | December 31, 2024 |
| Works for Mouchinette CGIS (Financial compensation to HA-L1106 project) | Not reported | 1.00 | 0.00 | December 31, 2025 |
Funds passed on13 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| Bureau D Ingenierie et D Expertise | Disbursement | November 30, 2025 | 0.1 |
| Ministere de L Economie et des Finances | Disbursement | November 30, 2025 | 11.5 |
| Technique Industrie Agriculture | Disbursement | November 30, 2025 | 1.0 |
| Coamco Haiti S.A. | Disbursement | December 31, 2024 | 0.2 |
| Technique Industrie Agriculture | Disbursement | December 31, 2024 | 0.5 |
| Ministere de L Economie et des Finances | Disbursement | December 31, 2024 | 8.0 |
| Technique Industrie Agriculture | Disbursement | November 30, 2024 | 0.3 |
| Coamco Haiti S.A. | Disbursement | November 30, 2024 | 0.3 |
| Ministere de L Economie et des Finances | Disbursement | July 31, 2024 | 2.0 |
| VF Construction SA | Disbursement | November 30, 2023 | 1.2 |
| Coamco Haiti S.A. | Disbursement | November 30, 2023 | 2.9 |
| Technique Industrie Agriculture | Disbursement | November 30, 2023 | 3.5 |
| Ministere de L Economie et des Finances | Disbursement | December 31, 2022 | 2.0 |
Identifiers3 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | XI-IATI-IADB-HA-L1143 | IATI |
| IDB operation | HA-L1143 | Operation record |
| Public investment program line | 1112-1-12-52-31 | Public investment program |
Partner documents14 documents
- Haiti. Proposal for nonreimbursable financing for the Productive Infrastructure Program V.pdf, iadb.org
- Hait. Propuesta de financiamiento no reembolsable para el Programa de Infraestructura Productiva V.pdf, iadb.org
- Productive Infrastructure Program V.pdf, iadb.org
- Programa de Infraestructura Productiva V.pdf, iadb.org
- Accord - Programme dInfrastructure Productive V.pdf, iadb.org
- HA-L1143 First period Jan-Jun 2022 - Public Report.PDF, iadb.org
- HA-L1143 First period Jan-Jun 2023 - Public Report.PDF, iadb.org
- HA-L1143 First period Jan-Jun 2024 - Public Report.PDF, iadb.org
- HA-L1143 First period Jan-Jun 2025 - Public Report.PDF, iadb.org
- HA-L1143 Second period Jan-Dec 2021 - Public Report.PDF, iadb.org
- HA-L1143 Second period Jan-Dec 2022 - Public Report.PDF, iadb.org
- HA-L1143 Second period Jan-Dec 2023 - Public Report.PDF, iadb.org
- HA-L1143 Second period Jan-Dec 2024 - Public Report.PDF, iadb.org
- HA-L1143 Second period Jan-Dec 2025 - Public Report.PDF, iadb.org
Procurement notices (19)
- IDB_Procurement_Notices.xlsx, iadb.org
- HA-L114397871SP.pdf, iadb.org
- HA-L1143P1104445SP.pdf, iadb.org
- HA-L1143P1198663SP.pdf, iadb.org
- HA-L1143P1215049SP.pdf, iadb.org
- HA-L1143P2047196SP.pdf, iadb.org
- HA-L1143P2047197SP.pdf, iadb.org
- HA-L1143P2073772SP.pdf, iadb.org
- HA-L1143P2104681SP.pdf, iadb.org
- HA-L1143P2104682SP.pdf, iadb.org
- HA-L1143P2104683SP.pdf, iadb.org
- HA-L1143P2105949SP.pdf, iadb.org
- HA-L1143P2108856SP.pdf, iadb.org
- HA-L1143P2121497SP.pdf, iadb.org
- HA-L1143P2121498SP.pdf, iadb.org
- HA-L1143P709787SP.pdf, iadb.org
- HA-L1143P710396SP.pdf, iadb.org
- HA-L1143P860102SP.pdf, iadb.org
- IDB_Project_Procurement_Contract_Awards_Data.xlsx, iadb.org
Sources
- Partner documents: terms of use set by the publisher
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDB project page: terms of use set by the publisher
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- Public investment program: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDB projects dataset | October 18, 2026 |
| Public investment program | October 18, 2026 |