PHARES: Proposed and Selected Localities, September 2020 edition
- Dated edition of a rolling list: ANARSE republished it as the window progressed, so the editions read as a sequence rather than as one document.
- Records the pipeline inherited at launch: Mont-Organize, Capotille and Vallieres under construction via UNDP; Borgne, Pilate, Plaisance, Anse-a-Galets, Pointe-a-Raquette, Anse-a-Pitre and Thiotte in negotiation from the December 2018 tender.
- Sites served by EDH are annexed as INELIGIBLE, and the program rule is that EDH operating generation, distribution or commercial service disqualifies a site regardless of how regular the service is.
- Localities proposed by more than one bidder are evaluated competitively at the full-proposal stage.
- Scanned document with no text layer; searchable here only because the text was recovered by OCR.
The baseline edition. It records only the mini-grid pipeline inherited at launch: Mont-Organisé, Capotille and Vallières under construction through UNDP, and Borgne, Pilate, Plaisance, Anse-à-Galets, Pointe-à-Raquette, Anse-à-Pitre and Thiotte in negotiation from the December 2018 concession tender. No window-one bidder or locality appears yet, so this is the picture immediately before the program's first competitive results.
Every edition shares a structure: the inherited pipeline first, then the window's succinct proposals, then the localities selected to submit full proposals, with EDH-served sites listed in annex as ineligible. That annex matters as much as the selections: the program's own rule is that a site where EDH operates generation, distribution or commercial service is ineligible regardless of how regular that service is, so the annex is where the off-grid frontier was drawn.
Full Document Text
Extracted text from the original document for search indexing.
How to cite
Autorité Nationale de Régulation du Secteur de l'Énergie (ANARSE); Ministère des Travaux Publics, Transports et Communications (MTPTC), PHARES: Proposed and Selected Localities, September 2020 edition, https://anarse.gouv.ht/wp-content/uploads/2020/09/PHARES-Point-de-situation-sur-les-sites-24-septembre-2020.pdf