Project Appraisal Document: Caribbean Regional Air Transport Connectivity Project — Haiti (Report No. PAD3422)
Full Description
World Bank Project Appraisal Document for the Haiti component of the Caribbean Regional Air Transport Connectivity Project, an IDA grant of SDR 61.2 million (about US$84 million). Sets out the project's components, results framework and risks for improving the safety and capacity of Haiti's air transport.
Full Document Text
Extracted text from the original document for search indexing.
Public Disclosure Authorized FOR OFFICIAL USE ONLY
Report No: PAD3422
Public Disclosure Authorized
INTERNATIONAL DEVELOPMENT ASSOCIATION
PROJECT APPRAISAL DOCUMENT
ON A
PROPOSED GRANT
IN THE AMOUNT OF SDR 61.2 MILLION
Public Disclosure Authorized
(US$84 MILLION EQUIVALENT)
TO THE
REPUBLIC OF HAITI
FOR A
CARIBBEAN REGIONAL AIR TRANSPORT CONNECTIVITY PROJECT - HAITI
May 6, 2020
Public Disclosure Authorized
Transport Global Practice
Latin America and Caribbean Region
This document is being made publicly available prior to Board consideration. This does not imply a
presumed outcome. This document may be updated following Board consideration and the updated
document will be made publicly available in accordance with the Bank’s policy on Access to Information.
CURRENCY EQUIVALENTS
(Exchange Rate Effective February 29, 2020)
Currency Unit = Haitian Gourdes (HTG)
HTG 88.35 = US$1
US$1 = SDR 0.72818362
FISCAL YEAR
October 1 - September 30
Regional Vice President: Humberto J. Lopez (Acting)
Country Director: Anabela Abreu
Regional Director: Franz R. Drees-Gross
Practice Manager: Bianca Bianchi Alves (Acting)
Task Team Leader(s): Malaika Becoulet, Vickram Cuttaree
ABBREVIATIONS AND ACRONYMS
AAN National Airport Authority (Autorité Aéroportuaire Nationale)
ACC Area Control Center
ACCPAC A Complete and Comprehensive Program for Accounting Control
ADS-B Automatic Dependent Surveillance-Broadcast
AGL Airfield Ground Lighting
AIDC Air Traffic Services Inter-Facility Data Communication
AIM Aeronautical Information Management Transition
AIS Aeronautical Information Services
ALoSP Acceptable Level of Safety Performance
ANSP Air Navigation Service Providers
APV Approach Procedures with Vertical Guidance
ATCT Air Traffic Control Tower
ATFM Air Traffic Flow Management
Baro-VNAV Barometric Vertical Navigation
BCA Centre Artibonite Regional Development Project (P133352)
BRH Central Bank (Banque de la République d’Haïti)
CAA Civil Aviation Authority
CAP IATA three-letter code for Cap-Haïtien Airport
CAR Caribbean
CARICOM Caribbean Community
CATCOP Caribbean Regional Air Transport Connectivity Program
CATCOP-Haiti Caribbean Regional Air Transport Connectivity Project in Haiti
CE Citizen Engagement
CERC Contingent Emergency Response Component
CFR Crash Fire Rescue
CHUD Cap-Haïtien Urban Development Project (P168951)
CNS Communications, Navigation, and Surveillance
CO2 Carbon dioxide
CPF Country Partnership Framework
DCF IATA three-letter code for Canefield Airport (Dominica)
DOM IATA three-letter code for Douglas-Charles Airport (Dominica)
ECCAA Eastern Caribbean Civil Aviation Authority
EI Effective implementation. A measure of the state’s safety oversight
capability, calculated for each critical element, each audit area, or as an
overall measure. The EI is expressed as a percentage.
E&S Environmental and Social
ESCP Environmental and Social Commitment Plan
ESF Environmental and Social Framework
ESMF Environmental and Social Management Framework
ESMP Environmental and Social Management Plan
ESS Environmental and Social Standards
FCV Fragility, Conflict, and Violence
FIRs Flight Information Regions
FM Financial Management
GBV Gender-Based Violence
GDP Gross Domestic Product
GHG Greenhouse Gas
GND Grenada
GoH Government of Haiti
GRM Grievance Redress Mechanism
GRS Grievance Redress Service
IATA International Air Transport Association
IBRD International Bank for Reconstruction and Development
ICAO International Civil Aviation Organization
IDA International Development Association
IDB Inter-American Development Bank
IPF Investment Project Financing
MASA Multilateral Air Services Agreement
MDOD/AMO Delegated Implementing Agencies Model (Maîtrise d’Ouvrage Déléguée or
Assistance à maitrise d’ouvrage)
MDUR Municipal Development and Urban Resilience Project (P155201)
M&E Monitoring and Evaluation
MTPTC Ministry of Public Works, Transportation, and Communication (Ministère de
Travaux Publics, Transport et Communications)
MTR Mid-term Review
NGO Nongovernmental Organization
NPV Net Present Value
OECS Organisation of Eastern Caribbean States
OFNAC National Office of Civil Aviation (Office National de l’Aviation Civile)
OLDI On-Line Data Interchange
O&M Operations and Maintenance
PAIP Pacific Aviation Investment Project
PAP IATA 3-letter code for Port-au-Prince Toussaint Louverture Airport
PBN Performance-Based Navigation
PDO Project Development Objective
PIU Project Implementation Unit
PLR Performance and Learning Review
POM Project Operations Manual
POS Port of Spain
PPSD Project Procurement Strategy for Development
PRGRD Disaster Risk Management and Reconstruction Project (P126346)
PROReV Emergency Bridge Reconstruction and Vulnerability Reduction Project
(P114292)
PRUII Institutions and Infrastructure Emergency Recovery Project (P120895)
RESA Runway End Safety Area
RN3 National Road 3 (Route Nationale 3)
ROT Runway Occupancy Time
SARP Standards and Recommended Practices
SCD Systematic Country Diagnostic
SEA Sexual Exploitation and Abuse
SEO SEO Amsterdam Economics
SEP Stakeholder Engagement Plan
SGBV Sexual and Gender-Based Violence
SH Sexual Harassment
SMS Safety Management System
SNGRD National System for Disaster Risk Management (Système National de
Gestion des Risques et des Désastres)
SOE Statement of Expenditure
SOP Series of Projects
SPN Specific Procurement Notices
STEP Systematic Tracking and Exchanges in Procurement
TOC Terms of Reference
UCE Central Execution Unit (Unité Centrale d’Exécution)
UNDB United Nations Development Business
UNOPS United Nations Office for Project Services
USOAP Universal Safety Oversight Audit Programme
UVF IATA 3-letter code for Hewanorra International Airport (St. Lucia)
VSAT Very Small Aperture Terminal
WB World Bank
WBG World Bank Group
WDR World Development Report
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
TABLE OF CONTENTS
DATASHEET ........................................................................................................................... 1
I. STRATEGIC CONTEXT ...................................................................................................... 9
A. Regional and Country Context.......................................................................................................... 9
B. Sectoral and Institutional Context .................................................................................................. 10
C. Relevance to Higher-Level Objectives ............................................................................................ 13
D. Regional Approach ......................................................................................................................... 14
II. PROJECT DESCRIPTION.................................................................................................. 15
A. Project Development Objective ..................................................................................................... 15
B. Project Components ....................................................................................................................... 15
C. Project Beneficiaries ....................................................................................................................... 17
D. Results Chain .................................................................................................................................. 18
E. Rationale for World Bank Involvement and Role of Partners......................................................... 19
F. Lessons Learned and Reflected in the Project Design .................................................................... 19
III. IMPLEMENTATION ARRANGEMENTS ............................................................................ 20
A. Institutional and Implementation Arrangements .......................................................................... 20
B. Results Monitoring and Evaluation (M&E) Arrangements ............................................................. 21
C. Sustainability................................................................................................................................... 21
IV. PROJECT APPRAISAL SUMMARY ................................................................................... 22
A. Technical and Economic Appraisal ................................................................................................. 22
B. Fiduciary.......................................................................................................................................... 24
C. Legal Operational Policies ............................................................................................................... 25
D. Environmental and Social ............................................................................................................... 25
V. GRIEVANCE REDRESS SERVICES ..................................................................................... 27
VI. KEY RISKS ..................................................................................................................... 28
VII. RESULTS FRAMEWORK AND MONITORING ................................................................... 29
ANNEX 1: Implementation Arrangements and Support Plan .......................................... 48
ANNEX 2: Detailed Project Description .......................................................................... 56
ANNEX 3: Executive Summary for Procurement Plan and PPSD...................................... 61
ANNEX 4: Detailed Economic Analysis ........................................................................... 62
ANNEX 5: Country Risk Profile to Natural Hazards and Climate Change .......................... 70
ANNEX 6: Regional Approach for and Benefits of Developing Air Transport Systems in the
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Caribbean Region.......................................................................................................... 72
ANNEX 7: Port of Spain Declaration of 2014 .................................................................. 74
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
DATASHEET
BASIC INFORMATION
BASIC_INFO_TABLE
Country(ies) Project Name
Haiti Caribbean Regional Air Transport Connectivity Project - Haiti
Project ID Financing Instrument Environmental and Social Risk Classification
Investment Project
P170907 Moderate
Financing
Financing & Implementation Modalities
[ ] Multiphase Programmatic Approach (MPA) [✓] Contingent Emergency Response Component (CERC)
[✓] Series of Projects (SOP) [✓] Fragile State(s)
[ ] Disbursement-linked Indicators (DLIs) [ ] Small State(s)
[ ] Financial Intermediaries (FI) [ ] Fragile within a non-fragile Country
[ ] Project-Based Guarantee [ ] Conflict
[ ] Deferred Drawdown [ ] Responding to Natural or Man-made Disaster
[ ] Alternate Procurement Arrangements (APA)
Expected Approval Date Expected Closing Date
28-May-2020 30-Jun-2026
Bank/IFC Collaboration
No
Proposed Development Objective(s)
The objectives of the Project (PDO) are to: (i) improve operational safety and navigation efficiency of air transport in
the Recipient’s territory; and (ii) increase the climate and disaster resilience of associated infrastructure at the
Recipient’s international airports.
Page 1 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Components
Component Name Cost (US$, millions)
Component 1– PAP and CAP operational safety and navigation efficiency investments 58.00
Component 2–PAP and CAP airfield drainage system improvements 14.00
Component 3 – Institutional strengthening & Project Management 12.00
Component 4 – Contingent Emergency Response 0.00
Organizations
Borrower: Republic of Haiti
Implementing Agency: Central Execution Unit of the Ministry of Public Works (UCE)
PROJECT FINANCING DATA (US$, Millions)
SUMMARY -NewFin1
Total Project Cost 84.00
Total Financing 84.00
of which IBRD/IDA 84.00
Financing Gap 0.00
DETAILS -NewFinEnh1
World Bank Group Financing
International Development Association (IDA) 84.00
IDA Grant 84.00
IDA Resources (in US$, Millions)
Credit Amount Grant Amount Guarantee Amount Total Amount
Haiti 0.00 84.00 0.00 84.00
National PBA 0.00 44.00 0.00 44.00
Page 2 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Regional 0.00 40.00 0.00 40.00
Total 0.00 84.00 0.00 84.00
Expected Disbursements (in US$, Millions)
WB Fiscal Year 2020 2021 2022 2023 2024 2025 2026 2027
Annual 0.00 6.50 9.50 17.00 17.50 15.50 12.50 5.50
Cumulative 0.00 6.50 16.00 33.00 50.50 66.00 78.50 84.00
INSTITUTIONAL DATA
Practice Area (Lead) Contributing Practice Areas
Transport
Climate Change and Disaster Screening
This operation has been screened for short and long-term climate change and disaster risks
SYSTEMATIC OPERATIONS RISK-RATING TOOL (SORT)
Risk Category Rating
1. Political and Governance ⚫ High
2. Macroeconomic ⚫ Moderate
3. Sector Strategies and Policies ⚫ Moderate
4. Technical Design of Project or Program ⚫ Moderate
5. Institutional Capacity for Implementation and Sustainability ⚫ Substantial
6. Fiduciary ⚫ Substantial
7. Environment and Social ⚫ Moderate
8. Stakeholders ⚫ Moderate
9. Other
10. Overall ⚫ Substantial
Page 3 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
COMPLIANCE
Policy
Does the project depart from the CPF in content or in other significant respects?
[ ] Yes [✓] No
Does the project require any waivers of Bank policies?
[ ] Yes [✓] No
Environmental and Social Standards Relevance Given its Context at the Time of Appraisal
E & S Standards Relevance
Assessment and Management of Environmental and Social Risks and Impacts Relevant
Stakeholder Engagement and Information Disclosure Relevant
Labor and Working Conditions Relevant
Resource Efficiency and Pollution Prevention and Management Relevant
Community Health and Safety Relevant
Land Acquisition, Restrictions on Land Use and Involuntary Resettlement Not Currently Relevant
Biodiversity Conservation and Sustainable Management of Living Natural Relevant
Resources
Indigenous Peoples/Sub-Saharan African Historically Underserved Traditional Not Currently Relevant
Local Communities
Cultural Heritage Not Currently Relevant
Financial Intermediaries Not Currently Relevant
NOTE: For further information regarding the World Bank’s due diligence assessment of the Project’s potential
environmental and social risks and impacts, please refer to the Project’s Appraisal Environmental and Social Review
Summary (ESRS).
Legal Covenants
Sections and Description
Page 4 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Schedule 2 Section I A 1, 2, 3 and 4 (Institutional Arrangements)
1. The Recipient shall vest the overall responsibility for the implementation of the Project in MTPTC and ensure
that: (a) MTPTC shall carry out Parts 1, 2 and 3 of the Project in collaboration with AAN and OFNAC; and (b) the
Coordinating Authority shall carry out Part 4 of the Project; all in accordance with the Operational Manual, the ESCP
and the CER Operations Manual, as applicable.
2. The Recipient shall operate and maintain, at all times during the implementation of the Project, the Project
Implementing Unit under the administrative authority of MTPTC, with functions, staffing and resources satisfactory
to the Association, as further detailed in the Operational Manual.
3. The Recipient shall operate and maintain, at all times during the implementation of the Project, AAN and
OFNAC under the administrative authority of MTPTC, with functions, staffing and resources satisfactory to the
Association, as further detailed in the Operational Manual.
4. The Recipient shall ensure that the Project Implementing Unit shall be responsible for the day-to-day
administration, overall planning, coordination, fiduciary (procurement, disbursement, safeguards and financial
management), monitoring, evaluation, reporting, and communication of Project activities; as further detailed in the
Operational Manual.
Sections and Description
Schedule 2 Section I B 1 and 2 (Operational Manual)
1. The Recipient shall carry out the Project in accordance with a manual (the Operational Manual), satisfactory
in form and substance to the Association, which consists of different schedules setting forth rules, methods,
guidelines, specific development plans, standard documents and procedures for the carrying out of the Project,
including the following:
(a) the detailed description of all Project activities, their sequencing and the prospective timetable and
benchmarks in relation thereto;
(b) the Project administrative, financial, accounting, auditing, procurement and disbursement procedures,
including all relevant standard documents;
(c) the monitoring indicators for the Project; and
(d) The grievance mechanisms and the code of ethics and conduct.
2. The Operational Manual shall only be amended from time to time in consultation with, and after approval
of, the Association. In case of any conflict between the terms of the Operational Manual and those of this
Agreement, the terms of this Agreement shall prevail.
Sections and Description
Schedule 2 Section I C 1, 2 and 3 (Implementation Arrangements for Part 4 of the Project (CERC)
1. In order to ensure the proper implementation of contingent emergency response activities under Part 4 of
the Project (“CER Part”), the Recipient shall take the following measures:
(a) prepare and furnish to the Association for its review and approval, an operations manual (“CER Operations
Page 5 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Manual”) which shall set forth detailed implementation arrangements for the CER Part, including: (i) designation of
terms of reference for, and resources to be allocated to, the entity to be responsible for coordinating and
implementing the CER Part (“Coordinating Authority”); (ii) specific activities which may be included in the CER Part,
Eligible Expenditures required therefore (“Emergency Expenditures”), and any procedures for such inclusion; (iii)
financial management arrangements for the CER Part; (iv) procurement methods and procedures for the CER Part;
(v) documentation required for withdrawals of Emergency Expenditures; (vi) environmental and social
management arrangements and instruments applicable to the CER Part, consistent with the provisions of Section E
below; and (vii) any other arrangements necessary to ensure proper coordination and implementation of the CER
Part;
(b) afford the Association a reasonable opportunity to review the proposed CER Operations Manual;
(c) promptly adopt the CER Operations Manual for the CER Part as accepted by the Association and integrate it
as an annex to the Operational Manual;
(d) ensure that the CER Part is carried out in accordance with the CER Operations Manual; provided, however,
that in the event of any inconsistency between the provisions of the CER Operations Manual and this Agreement,
the provisions of this Agreement shall prevail; and
(e) not amend, suspend, abrogate, repeal or waive any provision of the CER Operations Manual without prior
approval by the Association.
2. The Recipient shall, throughout the implementation of the CER Part, maintain the Coordinating Authority,
with adequate staff and resources satisfactory to the Association.
3. The Recipient shall undertake no activities under the CER Part (and no activities shall be included in the CER
Part) unless and until the following conditions have been met in respect of said activities:
(a) the Recipient has determined that an Eligible Crisis or Emergency has occurred, has furnished to the
Association a request to include said activities in the CER Part in order to respond to said Eligible Crisis or
Emergency, and the Association has agreed with such determination, accepted said request and notified the
Recipient thereof; and
(b) the Recipient has prepared and ensured the disclosure of all environmental and social instruments as may
be required for said activities, in accordance with the CER Operations Manual and the ESCP, the Association has
approved all said instruments, and the Recipient has ensured the implementation of any actions which are required
to be taken under said instruments.
Sections and Description
Schedule 2 Section I E 1, 2 and 3 (Environmental and Social Standards)
1. The Recipient shall ensure that the Project is carried out in accordance with the Environmental and Social
Standards, in a manner acceptable to the Association.
2. Without limitation upon paragraph 1 above, the Recipient shall ensure that the Project is implemented in
accordance with the Environmental and Social Commitment Plan (“ESCP”), in a manner acceptable to the
Association. To this end, the Recipient shall ensure that:
(a) the measures and actions specified in the ESCP are implemented with due diligence and efficiency, and as
further specified in the ESCP;
(b) sufficient funds are available to cover the costs of implementing the ESCP;
Page 6 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
(c) policies, procedures and qualified staff are maintained to enable it to implement the ESCP, as further
specified in the ESCP; and
(d) the ESCP or any provision thereof, is not amended, revised or waived, except as the Association shall
otherwise agree in writing and the Recipient has, thereafter, disclosed the revised ESCP.
In case of any inconsistencies between the ESCP and the provisions of this Agreement, the provisions of this
Agreement shall prevail.
2. The Recipient shall:
(a) take all measures necessary on its part to collect, compile, and furnish to the Association through regular
reports, with the frequency specified in the ESCP, and promptly in a separate report or reports, if so requested by
the Association, information on the status of compliance with the ESCP and the management tools and instruments
referred to therein, including resettlement action plans, all such reports in form and substance acceptable to the
Association, setting out, inter alia: (i) the status of implementation of the ESCP; (ii) conditions, if any, which
interfere or threaten to interfere with the implementation of the ESCP; and (iii) corrective and preventive measures
taken or required to be taken to address such conditions; and
(b) promptly notify the Association of any incident or accident related to or having an impact on the Project
which has, or is likely to have, a significant adverse effect on the environment, the affected communities, the public
or workers, including, gender-based violence and violence against minors, in accordance with the ESCP, the
instruments referenced therein and the Environmental and Social Standards.
3. The Recipient shall maintain and publicize the availability of a grievance mechanism, in form and substance
satisfactory to the Association, to hear and determine fairly and in good faith all complaints raised in relation to the
Project, and take all measures necessary to implement the determinations made by such mechanism in a manner
satisfactory to the Association.
Conditions
Type Description
Disbursement Conditions of disbursement: Schedule 2 Section III B.1
1. Notwithstanding the provisions of Section III A above, no withdrawal shall be made:
(a) for payments made prior to the Signature Date; or
(b) under Category (2), for Emergency Expenditures, unless and until the Association is
satisfied, and notified the Recipient of its satisfaction, that all of the following conditions
have been met in respect of said activities:
(i) the Recipient has determined that an Eligible Emergency has occurred, has furnished
to the Association a request to include said activities in the CER Part in order to respond to
said Eligible Crisis or Emergency, and the Association has agreed with such determination,
accepted said request and notified the Recipient thereof;
(ii) the Recipient has ensured that all environmental and social instruments required for
said activities have been prepared and disclosed, and the Recipient has ensured that any
actions which are required to be taken under said instruments have been implemented, all in
accordance with the provisions of Section I.E. of this Schedule 2;
Page 7 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
(iii) the Recipient’s Coordinating Authority has adequate staff and resources, in
accordance with the provisions of Section I.C of this Schedule 2, for the purposes of said
activities; and
(iv) the Recipient has adopted the CER Operations Manual in form, substance and manner
acceptable to the Association and the provisions of the CER Operations Manual remain – or
have been updated in accordance with the provisions of Section I.C. of this Schedule 2 so as
to be appropriate for the inclusion and implementation of said activities under the CER Part.
Page 8 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
I. STRATEGIC CONTEXT
A. Regional and Country Context
1. The proposed operation is part of a Series of Projects (SOPs) for the Caribbean Regional Air Transportation
Project. The other countries in the SOPs are Grenada, Dominica and St. Lucia. Although preparation of the SOPs was
initiated in 2019 prior to the COVID-19 pandemic, they will help support economic recovery by improving air
transportation safety and resilience, which are critical to the economic growth of the islands. The project is set within a
broader international response to the pandemic crisis in Haiti. In addition to this operation, the World Bank is providing
COVID-19 Fast Track Facility financing of US$20 million1 and is reprogramming several projects using Contingency
Emergency Response Components.
2. Haiti remains the poorest country in the Western hemisphere and suffers from recurrent episodes of
institutional and political instability. Haiti is the third-largest Caribbean nation by area and population (11.12 million in
2018) and shares the island of Hispaniola with the Dominican Republic. Haiti benefits from proximity and access to major
markets with favorable trade agreements, a young labor force, a dynamic diaspora, and substantial geographic,
historical, and cultural assets. The country also possesses untapped markets and a pent-up demand for the private sector
to explore, including agribusiness, light manufacturing, and tourism.2 Despite these opportunities, the country’s GDP per
capita was only US$766 in 2017 and 57 percent of the population was considered poor in the same year.3 Historically,
political violence and instability have been both a symptom and a driver of fragility in Haiti. Recurrent episodes of
institutional instability and civil unrest have severely impaired its progress in poverty reduction. The social contract
between the Government of Haiti and its citizens remains weak, as over the past decades there has been little
improvement in living conditions, service provision and enforcement of the rule of law.
3. The lack of land connectivity among the Caribbean island nations and the emergence of the tourism sector as a
key economic pillar means that improved air connectivity is critical for economic growth and shared prosperity in the
region. On average, tourism’s contribution to GDP for the region rose from 12 percent in 2011 to 15.2 percent in 2017,
by when it accounted for 4.3 percent of jobs.4 Almost half of these contributions can be traced to capital investments in
the travel and tourism industry, while a third are linked to tourism-related service industries. Overall, Caribbean origin
and destination air passenger traffic grew 50 percent between 2007 and 2017, from about 40 million to almost 60 million
passengers annually.
4. Given the insularity and geographic location of the islands, air transport connectivity and resilience are
undermined by high levels of exposure to natural hazards, which are exacerbated by climate change. Past extreme
weather events and other natural disasters in the Caribbean Sea region5 (for example, hurricanes, flooding, earthquakes,
and landslides) have exposed the region’s lack of resilient infrastructure that would be capable of continuing to deliver
essential services even when affected by natural disasters. The climate events have further demonstrated the critical
importance of climate/disaster resilient transportation systems—especially air transport—when called to provide
1 The Haiti COVID-19 Response Project (P173811) was approved on April 2, 2020.
2 World Bank’s Country Partnership Framework (CPF) with Haiti for the FY16-21 period. Report No. 98132-HT
3 Haiti has not produced any official poverty data since 2012. Poverty data estimated through a Survey of Well-being via Instant and
Frequent Tracking methodology show that changes in poverty between 2012 and 2017 were only marginal: the predicted poverty rate for
2017 is 57 percent against 58.5 percent in 2012.
4 The World Fact Book. https://www.cia.gov/library/publications/the-world-factbook/.
5 https://www.humanitarianresponse.info/files/documents/files/20191203-ocha-desastres_naturales.pdf.
Page 9 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
immediate lifesaving response in post-disaster situations and to contribute to a speedy economic recovery.
5. Haiti is also among the countries in the world with the highest exposure to multiple natural hazards, and climate
change exacerbates these risks. Over 93 percent of its surface and more than 96 percent of its population are exposed
to two or more hazards.6 The human and economic impacts of disasters have been extremely severe, given Haiti’s
exposure to hazards, the high vulnerability of its infrastructure, and institutional fragility.7 Between 1961 and 2012, the
damages and losses associated with hydro-meteorological events alone amounted, on average, to the equivalent of
almost two percent of annual GDP.8 Climate change is expected to increase the frequency and severity of hydro-
meteorological hazards.9
6. Since February 2019, Haiti’s fiscal, political, and security situation has deteriorated. Weak revenue mobilization
continues to pose severe constraints to public investment, undermining growth and exacerbating the economy’s
vulnerability to shocks. Unproductive expenditures and subsidies, including subsidized prices of fuel products, also
contribute to the Government’s fiscal constraints. Between May 2019 and March 2020, Haiti’s Parliament was unable
to ratify the nominated prime minister, leaving the country without a fully functioning government. Recurrent mass
demonstrations, the uncertain political situation, and persistent security challenges have hampered the country’s
growth and development prospects.
7. The shock of the coronavirus pandemic has further exacerbated the existing challenges in Haiti. The threat of
global recession, disruptions in international trade, supply chains and travel; as well as local containment and mitigation
measures have paralyzed the economic activity including tourism, and adversely affected domestic production in other
sectors. It is expected that COVID-19 will affect growth in several sectors, including tourism, as people refrain from flying,
and remittances decline with the slow-down in global growth. The magnitude of the impact will depend on the length
of the crisis and how quickly the global economy rebounds. As of April 20, 2020, there were 50 confirmed cases of COVID-
19 in Haiti. The risk of local transmission and further imported cases, particularly from the Dominican Republic, is very
high. The latter has reported 7 954 cases and 333 deaths as of May 4, 2020.
B. Sectoral and Institutional Context
8. At the regional level, the airspace is fragmented with no fewer than 10 Air Navigation Service Providers (ANSPs)
in the Eastern Caribbean alone. Poor cohesion of the regional space with no overarching entity providing air traffic
control across the entire airspace leads to increased operational complexity, indirect routings, longer travel times, and
higher costs. Furthermore, the Caribbean is known as a particularly outward-looking region, with external flows greatly
surpassing internal flows, attesting that cross-country benefits of regional connectivity are more likely to accrue with air
transport infrastructure investments targeted at achieving uniform operational requirements across the region.
6 Primarily hurricanes, floods, earthquakes and landslides, but also tsunamis and drought. Haiti Country Risk Profile, World Bank 2018.
7 Between 1961 and 2012, the country experienced more than 180 disasters causing the death of more than 240,000 people. Source:
“Diagnostic on the Economic and Fiscal Impact of Disasters in Haiti”, World Bank 2014.
8 The 2010 earthquake destroyed the equivalent of 120 percent of GDP and Hurricane Matthew resulted in estimated damages and
losses equivalent to around 32 percent of GDP.
9 Climate projections for the Caribbean estimate that temperatures could rise between 0.5 to 2.3 °C by 2060, possibly leading to cyclonic
events of increased duration and intensity. According to the US Climate Change Science Program Climate Change simulations, for each
1°C increase in sea surface temperatures, rainfall caused by hurricanes may rise by 6 to 17 percent and surface wind speeds of the
strongest hurricanes by 1 to 8 percent. In addition, the dry season will likely intensify further with an increase of between 8 percent to 19
percent of the present duration. Likewise, increases in maximum temperatures in recent years have led to greater propensity for extreme
rainfall events and flash floods; this pattern is expected to worsen with the effects of climate change.
Page 10 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
9. Like most Caribbean countries, Haiti is highly dependent upon air transportation. Connectivity by air
transportation is critical to Haiti’s economy given its insularity. In 2011, air transport accounted for 73 percent of Haiti’s
international arrivals and departures. While tourism is relatively small relative to other Caribbean countries, it is growing
and already accounted for 4.2 percent of GDP in 2015.10 Passenger traffic levels at Port-au-Prince’s Toussaint Louverture
Airport (PAP)—Haiti’s main international airport—have been steadily growing in recent years and are expected to
continue growing as the political and social situation in the country stabilizes. From 2014 to 2018, passenger volumes at
PAP have grown by 15 percent, from about 1.35 million to about 1.55 million passengers annually, a compound annual
growth rate of 3.5 percent (Figure 1). Haiti’s second largest airport, Cap-Haïtien International Airport (CAP), has had an
annual average of 152,000 passengers and 92,000 lbs.11 in freight volume in 2018 and 2019.
Figure 1. Port-au-Prince Toussaint Louverture—Passenger Traffic
2,000,000
1,500,000
1,000,000
500,000
-
2014 2015 2016 2017 2018 2019
Annual Pax Q1 Pax
Source: Data provided by Autorité Aéroportuaire Nationale (AAN).
10. However, the existing airport infrastructure and navigation systems at PAP and CAP do not comply with the
international standards on safety oversight, operational, and logistical aspects. Haiti scores 1.78 percent in effective
implementation (EI) of International Civil Aviation Organization (ICAO)’s Standards and Recommended Practices (SARPs)
regarding Air Navigation Services, compared to a global average of 67.42 percent (Figure 2). Haiti’s airports are
characterized by the absence of electronic navigation systems [no Very Small Aperture Terminal (VSAT) or Automatic
Dependent Surveillance-Broadcast (ADS-B)]. The country has been red-flagged between 2012 and 2019 under the
Universal Safety Oversight Audit Programme of ICAO,12 raising significant concerns about Haiti’s ability to properly
oversee airports, aircraft, and air navigation services. Aircraft operational safety is also undermined by the deteriorating
condition of the runway pavement at CAP. The lack of ICAO-required Runway End Safety Areas (RESAs) for both PAP
runway ends and weak and cracked runway pavement at CAP pose a risk of damage to aircraft engines and
undercarriage. The air navigation instrument for approaches at PAP and CAP are non-precision, which limit arrivals in
poor meteorological conditions, resulting in aircraft arrival delays, periodic diversions to alternate airports, and even
flight cancellations. Further, insufficient taxiway infrastructure at PAP results in significant operational challenges and
inefficiencies, such as greater taxiing distances and increased runway occupancy times (ROT). The infrastructure
deficiencies have been particularly apparent in the immediate aftermath of natural disasters (for example, the 2010
earthquake and Hurricane Matthew in 2016) when the airfield and aircraft parking apron infrastructure was insufficient
to accommodate surges in air traffic associated with humanitarian aid flights and other disaster relief air traffic activity.
10 Évaluation des Besoins Post-Cyclone Mathieu, Secteur Tourisme, Ministère du Tourisme, Novembre 2016,
11 Source: Data provided by Autorité Aéroportuaire Nationale (AAN).
12 ICAO, Safety Audit Results, https://www.icao.int/safety/pages/usoap-results.aspx.
Page 11 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Figure 2. Effective Implementation of ICAO SARPs for Selected Countries Versus Global Average
Source: ICAO
11. Both international airports—PAP and CAP—are highly exposed to potential impacts from natural disasters and
climate change. These impacts include extreme temperatures that can increase the risk of buckling of airport runways
and taxiways, and flooding, which can inundate and damage airfield pavements, parked aircrafts, and terminal buildings.
While significant investments have been made over the past decade in these two international airports, infrastructure
deficiencies continue to persist resulting in operational constraints and inefficiencies, safety concerns, and vulnerability
to flooding associated with the annual rainy season, hurricanes, and climate change. CAP suffers from recurrent flooding
due to a lack of appropriate drainage infrastructure to evacuate rainwater. While putting at risk the safety and continuity
of airport operations,13 the improperly designed airport drainage is also thought to be at the core of the recurrent floods
affecting the Balan neighborhood to the east of CAP.). At PAP, the absence of a culvert under the taxiway results in an
increased flood risk to the taxiway, the aprons, and, eventually, the runway and the terminal.
12. The oversight of both regulation and infrastructure and operations management of the Haitian air transport
sector could be improved, particularly in the areas of Crash Fire Rescue, maintenance, climate resilience, wildlife
management, and gender diversity. The Ministry of Public Works, Transport, and Communications (Ministère de
Travaux Publics, Transport et Communications, MTPTC) is the Government of Haiti (GoH)’s central body responsible for
designing, defining, and implementing the air transport policy. It relies on two primary agencies: (i) the National Office
of Civil Aviation (Office National de l’Aviation Civile, OFNAC) in charge of the organization and regulation of air transport,
and (ii) the National Airport Authority (Autorité Aéroportuaire Nationale, AAN), which ensures the planning,
construction, extension, management, and operation of the country's airport facilities. The state of deterioration of
infrastructure, combined with ineffective management and a weak institutional capacity, threatens the short-term
continuity of the logistics chain.
13. In recognition of the strategic importance of both PAP and CAP airports, the MTPTC, OFNAC, and AAN have
recently benefitted from several diagnostic, planning, and investment instruments, including two investments by the
Inter-American Development Bank (IDB) in the sector. These investments include: (i) the Support for Transport Sector in
Haiti IV Project (US$50 million), approved in 2012, which financed the rehabilitation of the PAP runway and airfield
13 Aircraft operations means the airborne movement of aircraft in controlled or uncontrolled airport terminal areas.
Page 12 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ground lighting, and (ii) the Transport and Departmental Connectivity Project (US$225 million), approved in October
2018, which is financing equipment and the construction of a new Air Traffic Control Tower (ATCT) at PAP. By addressing
safety concerns and navigation deficiencies at PAP and CAP the proposed project would complement the IDB’s
investments in Haiti.
14. Haiti lags behind in most areas of gender equality, including access to employment, professional opportunities,
and equal wages, including in the transport sector. In 2018, the female unemployment rate in Haiti was 16.3 percent,
which is above the average of other low-income countries with similar characteristics; however unemployment rates
are also high, and the quality of jobs are low. 14 According to the Haiti Systematic Country Diagnostic (SCD 2015),15
women are 20 percent more likely than men to be unemployed and 6 percent more likely to be employed in the informal
sector. Women represent 7 percent of people employed in the transport and communications sector, and, in the
construction sector, women are only 2 percent of the total workforce.16 Even if there is unavailable data on gender gaps
in employment in the aviation sector in activity, gaps in transport and communications can be considered as a good
proxy. Moreover, studies show that, besides lower participation rates than men, women commonly occupy lower-
skilled, low-wage and less structurally relevant jobs than men, which will directly impact their inclusion in the aviation
sector. 17 Gender norms and beliefs define acceptable roles for women and men in the work force (eg. women should
not work in construction) deepening employment segregation.18
15. Air transportation will be critical for Haiti’s post COVID-19 economic recovery. Having safe and reliable air
transportation will support the COVID-19 recovery efforts and a faster return to growth in Haiti’s tourism industry as
well as other sectors. Haiti’s international airports, PAP and CAP, will play a critical role in receiving emergency
equipment, screening passengers at arrival and departure, and dispatching equipment and medicine to hospitals and
patients.
16. The proposed Caribbean Regional Air Transport Connectivity Project - Haiti (CATCOP-Haiti, the Project), to be
financed by a SDR 61.2 million (US$84 million equivalent) grant from the International Development Association (IDA),
would contribute to enhance air transport connectivity in Haiti by increasing the level of operational safety and
navigation efficiency at PAP and CAP to international standards and by improving resilience of their airfields to natural
hazards/climate change.
C. Relevance to Higher-Level Objectives
17. The proposed Project is aligned with the Country Partnership Framework (CPF) of Haiti for the period FY16-21,19
as updated in the Performance and Learning Review (PLR) dated May 31, 2018. 20 It supports improvements in Area of
Focus 1 (Inclusive Growth), Area of Focus 3 (Resilience) of the CPF and, more specifically, contributes to the achievement
14 International Labour Organization, ILOSTAT database. 2018.
15 Singh, Raju Jan and Mary A. Barton-Dock. 2015. Haiti - Toward a New Narrative: Systematic Country Diagnostic (English). Washington,
DC: World Bank Group, p. 35, http://documents.worldbank.org/curated/en/642131467992805241/Haiti-Toward-a-new-narrative-
systematic-country-diagnostic.
16 International Labour Office. 2016. Women at Work: Trends 2016 (English). Geneva.
17 USAID. (2016). Haiti Gender Assessment. Washington: USAID.
18 USAID. (2016). Op. cit. Washington: USAID
19 The Haiti Country Partnership Framework for the Period FY16-21 (Report No. 98132-HT, dated August 27, 2015) was discussed by the
Board of Executive Directors on September 29, 2015.
20 Performance and Learning Review of the aboved mentioned (Report No. 124812-HT, dated May 31, 2018) was discussed by the Board
of Executive Directors on June 27, 2018.
Page 13 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
of the following objectives: (i) Objective 1 (Enhance Income Opportunities) through improvements in air transport
connectivity, resulting in competitiveness and economic growth, and (ii) Objective 9 (Improve Disaster Prevention and
Strengthen Climate Resilience) by improving the resilience of key airport infrastructure and navigation systems to natural
hazards and by strengthening institutions and the capacity of the GoH to manage the air transport sector.
18. The Project is also aligned with the Port of Spain Declaration (POS) signed by 34 countries including Haiti to
improve air transport connectivity and safety in the Caribbean. The POS Declaration is an important element of air
transport policy, which outlines the priority actions and measures agreed on operational safety, air navigation capability,
and air service market liberalization (Annex 7). The Declaration was signed by 34 countries and territories in the
Caribbean region, including Haiti, in 2014. Paragraph 10 of the POS Declaration illustrates the interlinkage and mutual
dependency amongst Caribbean economies: “delays from one State can negatively affect surrounding States.” It is
another indication that regional cooperation related to air transportation is increasingly recognized as vital to economic
growth and shared prosperity in the region. While the proposed Project’s mission is more limited in scope and scale than
the POS Declaration, it would prioritize investments consistent with its implementation plans. Haiti has its own unique
challenges and priorities in the air transport sector but given the inherent regional nature of air transportation and the
similar characteristics of Caribbean nations, the proposed Project would contribute to addressing common problems
and goals by supporting greater regional cooperation and integration across countries (Annexes 7). The proposed Project
would contribute to promoting harmonization of aviation policy and standards in the Caribbean region, as well as to
advancing Haiti’s compliance with the existing regional agreement.
19. The proposed Project would also assist Haiti in its post-COVID-19 response, 21 by providing additional means to
generate shot-term employment through infrastructure works as it emerges from the lockdown and the associated
economic slow-down. It would also contribute to medium-to-long term recovery, growth, and resilience through better
air transport connectivity to support resumption of economic activity.
D. Regional Approach
20. Series of Projects (SOPs) Objective. The proposed CATCOP-Haiti would be the first project in a SOPs with a regional
approach (CATCOP). In addition to Haiti, three other countries—St. Lucia, Dominica, and Grenada—have agreed to
participate in the CATCOP and all support the common goal of improving regional air transport connectivity and
climate/disaster resilience of associated infrastructure. Emphasis on regional planning, harmonization, and coordination
allows avoidance of “overinvestment” and encourages regional cooperation to achieve air traffic safety standards and
promote an economically viable regional airline industry. The SOPs with multiple borrowers would allow effective
preparation and implementation of each project in the SOPs under a common regional-level strategy.
21. Criteria to participate in the SOPs. The regional strategy under CATCOP SOPs would require basic criteria to
participate, including: (i) an agreement and commitment to elevate compliance with international operational safety
standards (for example, ICAO SARPs) and/or regional air transport agreements such as the POS Declaration; (ii) adequate
leadership to advance the enhancements proposed under the program; (iii) satisfactory monitoring and evaluation
(M&E) arrangements; (iv) commitment to support and participate in common regional training activities; and (v)
commitment to support the common regional procurement activities.
22. In view of the regional approach being deployed in CATCOP-Haiti and the potential cross-country spillover
21 The Haiti COVID-19 Response Project (P173811) was approved on April 2, 2020.
Page 14 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
benefits of project investments, Regional IDA funding resources are being mobilized to support the financing of the
proposed Project. The utilization of Regional IDA funding can be justified based on the following reasons:
a) At this stage, four countries (Dominica, St. Lucia, Grenada, and one fragile state, Haiti) have met the above criteria
and would participate in the CATCOP (Annex 6);
b) Three of the four countries are served by the same regional civil aviation authority—the Eastern Caribbean Civil
Aviation Authority (ECCAA);
c) To be financially viable, regional air service operators, which are critical to improving regional air transport
connectivity, require a “critical mass” of airports in the region to: (i) achieve uniformly high levels of effective
implementation of ICAO SARPs, and (ii) be sufficiently climate/disaster resilient;
d) The proposed Project’s investments are expected to generate significant cross-boundary benefits through a
uniform approach to improving air transport safety and climate/disaster resilience. Moreover, regional planning
and coordination allow avoidance of “overinvestment” and encourage regional cooperation in achieving safety
standards; and
e) All participating countries have agreed on the regional agenda of enhancing regional air transport connectivity
through targeted investments in improving operational safety and oversight of air transport and increasing
climate/disaster resilience.
II. PROJECT DESCRIPTION
A. Project Development Objective
PDO Statement
23. The objectives of the Project (PDO) are to: (i) improve operational safety and navigation efficiency of air transport
in the Recipient’s territory; and (ii) increase the climate and disaster resilience of associated infrastructure at the
Recipient’s international airports.
PDO Level Indicators
24. The Project’s progress towards its PDO will be measured by the following PDO indicators:
25. PDO 1: Improve operational safety and navigation efficiency of air transport.
(i) Targeted upgrade of air navigation systems achieved;
(ii) PAP and CAP runways in compliance with ICAO standards/requirements; and
(iii) Average Runway Occupancy Time (ROT) of airplanes at PAP.
26. PDO 2: Increase the climate/disaster resilience of associated infrastructure at Haiti’s international airports.
(iv) Average number of days per year the discharge exceeds the capacity of the airport drainage system.
B. Project Components
Page 15 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
27. The proposed Project would include four components. Total cost of the Project is US$84 million.
28. Component 1: PAP and CAP operational safety and navigation efficiency investments (Total Cost: US$58
million). This component would finance infrastructure and equipment at Haiti’s two international airports—PAP and
CAP—aimed at improving aircraft operating conditions in compliance with international safety standards as per the
requirements of the ICAO SARPs and OFNAC (Annex 6) and improving navigation/taxiing efficiency to better
accommodate existing air traffic volumes and air traffic surges associated with post-disaster relief flights. This
component would finance inter alia:
(i) Civil works, including: (i) PAP taxiway and apron expansion; (ii) CAP runway rehabilitation and airfield ground
lighting installation; (iii) PAP RESAs construction; and (d) CAP ATCT replacement;
(ii) Purchase and installation of equipment to upgrade and modernize air traffic monitoring and control capacity
in compliance with international standards and requirements and with the regional air navigation plans: (i)
Automatic Dependent Surveillance-Broadcast (ADS-B), and (ii) communication and surveillance technology for
the new CAP ATCT; and
(iii) Consulting and non-consulting services for corresponding supervision activities, associated technical studies as
needed, including for relevant social and environmental safeguards instruments.
29. The civil works to be financed under Component 1 would integrate climate/disaster resilience measures through
appropriate choice of materials and design of enhanced drainage features. Likewise, for all equipment purchases, the
investments would incorporate resilient designs (for example, elevated power generator and storm-resistant tower cab
for the new CAP ATCT). As such, Component 1 would contribute to the overall climate/disaster resilience and
sustainability of Haiti’s two primary airports.
30. The civil works will also be implemented according to best COVID-19-informed construction site practices and
overall worksite safety management.
31. Component 2: PAP and CAP airfield drainage system improvements (Total Cost: US$14 million). These
investments seek to reduce the risk of airfield flooding associated with the annual rainy season, hurricanes, and climate
change at PAP and CAP by increasing the drainage capacity at both airfields and thus improving their climate/disaster
resilience. This component would finance inter alia:
(i) Civil works, including PAP and CAP airfield drainage system and flood management improvements. Investments
would be located within the perimeter of each airport. At PAP, culverts would be integrated in the design of the
proposed taxiway; and
(ii) Consulting and non-consulting services for corresponding supervision activities, associated technical studies as
needed, including for relevant social and environmental safeguards instruments.
32. Component 3: Institutional strengthening and project management (Total Cost: US$12 million). This component
aims to: (i) strengthen the institutional capacity of the MTPTC, AAN, and OFNAC to manage, operate, and oversee airport
operations and their development through a combination of TA activities and training; (ii) provide technical assistance
(TA) to assess the capabilities, needs, and opportunities for the use of Unmanned Aircraft Systems (UAS) in Haiti to define
the associated legal framework, as well as to support the GoH in the identification and development of potential
logistic and supply chains; and (iii) finance project implementation support. With respect to institutional capacity, the
focus would be on enhancing: (i) aircraft operational safety and associated air transport sector regulatory oversight; (ii)
the quality of airport management, operations, and maintenance; (iii) capacity for improving climate/disaster resilience
and gender diversity in the aviation sector by analyzing the recruitment, retention and promotion barriers that women
Page 16 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
face and informing the development of a Gender Action Plan (GAP) to promote women’s employment in medium level
jobs in the sector ; and (iv) capacity for adapting to a COVID-19 environment, including trainings for best COVID-informed
construction site practices and overall worksite safety management both at the ministerial level and for Haitian
construction contractors. In support of this, the Project would finance consulting and non-consulting services plus the
provision of goods.
33. Component 4: Contingent Emergency Response (Total Cost: US$0 million). Due to the high risk of catastrophic
events in Haiti, the proposed Project would include a contingent component for rapid response in the event of an eligible
emergency, subject to the request of the GoH. This component would provide immediate response to an eligible
emergency, as needed. Such components, which include triggers and conditions for the use of funds, are included in
most investment projects in Haiti, in keeping with the recommendations of the 2011 World Development Report:
Conflict, Security, and Development,22 and with the World Bank’s operational experience in Haiti when responding to
catastrophic natural events.
C. Project Beneficiaries
34. Primary Project beneficiaries include air travelers, airline companies, and air service providers. The Project
would benefit air travelers (around 1.5 million annually) to and from Haiti, which include, among others: (i) tourists; (ii)
travelers visiting friends and relatives; (iii) public administration and business travelers; (iv) seasonal workers, recipients
of education, training, and specialized health services; and (v) recipients of medical emergency services. They would
benefit from safer aircraft operations, fewer flight disruptions due to inclement weather, and possibly increased air
service. The following would also be direct beneficiaries of Project activities: (i) passenger and freight air service
providers; (ii) perishable goods importers/exporters; (iii) spare part importers; and (iv) the tourism industry. Likewise,
they would benefit from safer aircraft operations and fewer disruptions due to inclement weather.
35. Another key Project beneficiary would be the GoH, especially its ministries and agencies responsible for air
transport infrastructure and services. The GoH would benefit from new and upgraded air traffic control equipment and
targeted staff training. Further MTPTC, OFNAC, and AAN would benefit from investments in institutional strengthening.
National and regional administrative bodies, as well as personnel involved in air transport management, would also
benefit from the implementation of activities dedicated to strengthening regulatory and operational oversight in
participating countries. The proposed Project has a strong focus on increasing women’s participation in the aviation
sector. The Project would benefit women through training for female professionals in the air transport sector and
promote the recruitment of new female trainees.
36. Indirect beneficiaries are the entire population of Haiti, as well as the neighboring Caribbean island nations that
have substantial economic and cultural ties with Haiti. Given the vital importance of air transport infrastructure to an
island nation, the entire population of Haiti would benefit from: (i) safer air connectivity, and (ii) the economic
development opportunities that would arise from more reliable international flights, particularly with regard to tourism.
Further, given Haiti’s vulnerability to climate change and natural disasters, and the unique importance of air transport
infrastructure in recovery and relief efforts, the Project would provide broad societal benefits in this regard through
enhancing the resilience and capacity of CAP and PAP.
22 The World Bank, 2011, 2011 World Development Report: Conflict, Security, and Development,
https://siteresources.worldbank.org/INTWDRS/Resources/WDR2011_Full_Text.pdf.
Page 17 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
D. Results Chain
37. Addressing four key challenges in the air transport sector has been identified as crucial to improve operational
safety and navigation efficiency of air transport in Haiti; and increase the climate and disaster resilience of associated
infrastructure. These are: (i) the inadequacy of the air navigation systems; (ii) the noncompliance of airfield
infrastructure; (iii) the operational inefficiencies at PAP and (iv) the high vulnerability of airports infrastructure to
flooding associated with the annual rainy season, hurricanes, and climate change. The Theory of Change below (Figure
3) illustrates the links between the proposed interventions and their expected contribution to specific outcomes and
impacts.
Figure 3. Theory of Change Chain for CATCOP-Haiti
Activities Outputs PDO Outcomes Longer-Term
Objectives
✓ PAP taxiway system and aircraft
parking apron expanded
PDO 1: Improve operational
✓ CAP runway rehabilitated and
PAP and CAP air safety and navigation efficiency of
Airfield Ground Lighting system
transport safety air transport
installed
✓ Targeted upgrade of air
✓ Improve regional air
and navigation ✓ PAP RESAs constructed transport
efficiency navigation systems
✓ CAP ATCT replacement connectivity and
Investments constructed ✓ PAP and CAP runways in resilience
compliance with ICAO
✓ ADS-B for PAP and CAP ✓ Improving Effective
✓ Infrastructure identified as standards/requirements
Implementation of
climate resilient ✓ Average Runway Occupancy
ICAO SARPs
Time (ROT) of airplanes at
✓ Aviation Sector Strategy prepared ✓ Enhance regional
PAP
✓ Gap analysis of regulatory collaboration in air
oversight transport
Institutional ✓ Wildlife Management Plan ✓ Strengthen reliability
Strengthening prepared and implemented PDO 2: Increase the and oversight of
✓ Analysis of recruitment barriers climate/disaster resilience of Haiti’s air transport
and training to recruit more associated infrastructure at Haiti’s sector
women in UCE, OFNAC, and AAN international airports ✓ Improve disaster
✓ Trained staff in Haiti and in the ✓ Average number of days per prevention and
region year the discharge exceeds strengthen climate
the capacity of the airport resilience
✓ CAP airfield drainage system ✓ Enhance income
drainage system
partially enlarged and 4 culverts opportunities
PAP and CAP
built
Airfield Drainage
✓ PAP airfield drainage and flood
System
management enhanced (with an
Improvements
optimized length of drainage
system)
Critical assumption
Passenger air-traffic levels continue to grow as the political and social
situation in the country stabilizes
Page 18 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
E. Rationale for World Bank Involvement and Role of Partners
38. The World Bank is in a strong position to support the Caribbean region through the proposed CATCOP SOP
based on its vast experience in supporting aviation worldwide, including in small and vulnerable economies. World
Bank-financed aviation projects include regulatory reforms and capacity building for sector oversight, investment
financing in infrastructure at airports, air traffic control, and technical advice on a variety of topics (for example, safety
and security, sector analysis, and reform). The World Bank’s engagement in Haiti’s airport sector adds value in several
ways, including: (i) bringing worldwide expertise in air transport connectivity, safety, and resilience; (ii) promoting
harmonization of practice and sector coordination across the region, leveraging existing capacity to deliver a regional
project and capitalize on and maximize synergies; and (iii) sharing best practices in climate/disaster resilient solutions.
The World Bank’s expertise has played a key role in helping the GoH identify the optimal investments needed to support
targeted development objectives and would contribute to supporting the GoH in preparing and implementing the
Project efficiently and effectively.
39. Maximizing Finance for Development approach. The project is not envisaged to mobilize private financing directly
as the project focuses on resilience and safety improvement as well as rehabilitation of the existing assets managed by
the public entity. Therefore, public sector financing is the appropriate vehicle for this. However, these activities will
support activities to create an enabling environment for attracting private financing on airport operation in the future.
40. Role of partners. In the specific context of Haiti, the proposed Project fits within a coordinated sectorial effort,
complementing activities financed by the World Bank and the IDB by focusing on improving aircraft operational safety
and climate/disaster resilience of air transport and associated infrastructure. It would be coordinated closely with Haiti’s
key partners in the aviation sector to ensure complementarity by considering previous, ongoing, and planned airport
investments by the GoH, the IDB, and other partners. As referenced above, these include substantial recent investments
financed by the IDB, which, in partnership with the GoH, developed a master plan for PAP in 2013 and recently completed
a PAP runway rehabilitation and widening project (the US$50 million Transport Sector in Haiti IV Project). In October
2018, the IDB approved the US$225 million Transport and Departmental Connectivity Project, which is financing
equipment and the construction of a new ATCT for PAP. The Project also fits within a coordinated territorial initiative in
Cap-Haïtien, complementing existing operations, including the approved IDA-financed Cap-Haïtien Urban Development
Project (CHUD, P168951). The works required to improve the drainage system at CAP directly benefit the airport but
also indirectly benefit the SoS road, the urban areas Balan and La Petite Anse, and the surrounding area of Bassin Rhodo
targeted under CHUD. The CHUD includes rehabilitation of the SoS road (south of the airport) and the construction of
an outlet culvert from the airport under the Route National 3 (RN3) to the sea.
F. Lessons Learned and Reflected in the Project Design
41. The design of the proposed CATCOP SOP builds upon the lessons learned from previous regional programs such
as the Pacific Aviation Investment Project (PAIP) in Kiribati (P128093), Timor-Leste (P128151), Tonga (P128094), and
Tuvalu (P128095). The design of the CATCOP SOP is based on the idea of replicating common solutions and lessons
learned across countries with a common objective and framework. The lessons learned from the PAIP demonstrated
that the introduction of regional Communications, Navigation, and Surveillance (CNS) systems created regional spillover
benefits. ADS-B is being deployed for all CATCOP airports and this would help upgrade air traffic safety across the region.
Further, it would encourage other non-participating countries to do the same.
Page 19 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
42. The proposed Project’s institutional arrangements reflect best practice models from other small countries and
lessons learned from other projects investing in large public infrastructure. Due to the acute lack of local specialized
capacity in Haiti to operate international airports capable of meeting ICAO safety and security standards, Unite Centrale
d’Execution of the Ministry of Public Works (UCE-MTPTC) would contract, by effectiveness, a Delegated Implementing
Agency (MDOD/AMO) covering the implementation of Components 1, 2, and 3. The contracts would include local staff
development. The contracts would also include TA to support AAN and OFNAC with the implementation of the transition
plan at the end of the Project.
43. The proposed Project incorporates lessons learned from the ongoing and closed IDA-financed projects in Haiti
(Haiti Infrastructure and Institutions Emergency Recovery Project, P120895; Disaster Risk Management and
Reconstruction Project, P126346; and Center and Artibonite Regional Development Project, P133352) by considering
the following in its design and preparation: (i) to identify a few technically simple investments with limited environmental
and social impacts, which can be delivered in the short term and produce visible results for the population; (ii) to
elaborate a contingency plan to ensure continued implementation support in periods of severe fragility and insecurity;
and (iii) to incorporate resilience as a crosscutting theme. The Project’s design also incorporates lessons identified in the
Performance and Learning Review of the FY16-21 CPF (2018), such as the need to continue to include emergency
components (CERCs) in investment projects, and the need to prioritize simple project design and streamlined
implementation arrangements.
III. IMPLEMENTATION ARRANGEMENTS
A. Institutional and Implementation Arrangements
44. The proposed Project would be implemented by, and under the fiduciary responsibility of the MTPTC through its
Project implementation Unit (PIU), the Central Execution Unit (UCE-MTPTC), and its technical directorates (OFNAC and
AAN). UCE is familiar with the World Bank’s fiduciary and safeguards policies and procedures. It has implemented and is
currently implementing a number of projects financed by the World Bank, and has the capacity to manage additional
funds.23 The UCE-MTPTC has a decentralized office in Cap-Haïtien which supports the implementation of both the
Municipal Development and Urban Resilience Project (MDUR, P155201) and the Cap-Haïtien Urban Renewal Project
(CHUD, P168951).
45. A Delegated Implementing Agencies model (Maîtrise d’Ouvrage Déléguée or Assistance à Maîtrise D’ouvrage,
MDOD/AMO) would be used and contracted by grant effectiveness. The MDOD/AMO would complement the PIU’s
capacity with the specialized technical skills necessary to help procure and control the quality of the provision of works,
goods, and studies to be financed under Components 1, 2, and 3. For those activities, the MDOD/AMO would be
delegated the responsibility of preparation of procurement documentation and for monitoring the activities under the
oversight of UCE-MTPTC.
46. AAN and OFNAC, as the main beneficiaries of the Project’s TA activities under Component 3, have been closely
involved in project preparation and would continue to play a key role during implementation. During preparation, AAN
23 The closed Emergency Bridge Reconstruction and Vulnerability Reduction Project (PROReV, P114292) and the Institutions and
Infrastructure Emergency Recovery Project (PRUII, P120895), and the ongoing Disaster Risk Management and Reconstruction Project
(PRGRD, P126346), the Centre Artibonite Regional Development Project (BCA, P133352), the Municipal Development and Urban
Resilience Project (MDUR, P155201), and the Haiti Rural Accessibility & Resilience Project (RARP, P163490).
Page 20 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
and OFNAC supported UCE-MTPTC and the World Bank’s team in identifying key challenges and priority investments
and in designing activities for project support. During implementation, they would continue to be consulted throughout
the conceptualization and implementation of Project activities and would play a key overseeing role in the
implementation of the activities as detailed in the Project Operations Manual (POM).
47. The proposed Project would be implemented using the institutional framework, procurement, financial
management (FM), and disbursement arrangements in place under the previous IDA-financed projects, all of which have
demonstrated substantial results.
48. The World Bank would provide implementation support on a regular basis, based on an implementation support
plan detailed in Annex 1. This plan would be complemented by contingency measures that would ensure continuation
of implementation support in situations with access restrictions and elevated security risks.
B. Results Monitoring and Evaluation (M&E) Arrangements
49. Joint supervision missions by the GoH and the World Bank would monitor the status of Project outcomes,
safeguards, and compliance with legal covenants. A dedicated M&E staff member in the UCE-MTPTC would monitor all
indicators through a dedicated M&E system, including project outputs and outcomes, communications and awareness-
raising activities, environmental and social safeguards activities, and the activities of the Grievance Redress Mechanism
(GRM). Detailed progress reports would be submitted to the World Bank on a semiannual basis. The reports would
include information on disbursements, FM, procurement, social and environmental safeguards, overall implementation
progress as well as an updated annual plan of works and activities. A Mid-Term Review (MTR) would be conducted no
later than three years after the first disbursement. The Project may also leverage innovative technology to enhance
monitoring and evaluation capacity.
C. Sustainability
50. The GoH has demonstrated a strong commitment to and ownership of the Project. As referenced above
(paragraph 13), substantial recent investments and progress have been made over the past few years. The separation
of the regulator (OFNAC) from the operator (AAN) has already put the country on the path towards sustainability and a
preliminary Airport Master Plan for PAP has been developed in 2013. Although the GoH’s commitment to the Project is
not likely to waver, the Project’s design specifically addresses the two key risk factors to sustainability: lack of technical
and financial capacity of the GoH to operate and maintain airport infrastructure and equipment.
51. The Project would contribute to reducing the risk of physical damage to the targeted airport infrastructure if an
adverse natural event were to occur and, as a result, to lowering future operational costs. ToRs for the design of
infrastructure would require providers to actively incorporate operations and maintenance (O&M) constraints into
infrastructure design, including climate resilience aspects. The use of locally sourced materials, low-maintenance
materials, and low-maintenance construction practices would be encouraged whenever possible. A detailed
maintenance strategy or plan would also be required as one of the deliverables for each investment and equipment
financed by the Project.
52. Institutional strengthening and training activities would improve efficiency of the airport management and
maintenance and of the skilled local staff to manage aviation infrastructure, which would ensure sustainability of the
Project’s achievements. The human capacity constraints would be alleviated through a matrix of activities tailored to
Page 21 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
suit Haiti’s specific needs, as follows: (i) purchase of equipment would include on-the-job training and end-of-contract
transfer of TA; (ii) specialized TA (MDOD/AMO) for the entire duration of the Project; and (iii) extensive training
programs, including staff secondment and other regional twinning initiatives.
IV. PROJECT APPRAISAL SUMMARY
A. Technical and Economic Appraisal
Technical Appraisal
53. The design of the works to be financed by the proposed Project would apply international engineering standards
and build upon lessons learned under past and ongoing IDA-financed operations in Haiti supporting transport
infrastructure construction and rehabilitation, including best practices on climate/disaster resilience measures and
environmental sustainability.
54. While the works under Components 1 and 2 are relatively straightforward from a technical perspective, CAP
runway rehabilitation would have to be implemented carefully and in close coordination with the airlines given that CAP
has only one runway. To avoid the economic losses associated with closing the airport for an extended period of time,
the runway rehabilitation works would likely need to be conducted only at night following a consistent schedule so that
airlines can operate with minimal disruption to services. Strict protocols for clearing, cleaning, and inspecting the runway
area each morning before opening would need to be followed to ensure operational safety. Further, rapid curing/drying
pavement materials would need to be used given the need to keep the runway operational during the period of
rehabilitation works with due consideration for using materials that are resistant to climate impacts such as extreme
temperatures.
55. An upgrade of the drainage system at CAP would lead to increased discharge capacity, and consequently increased
discharges. To protect the airport against flood hazard, the sequence of works is crucial. The discharge capacity
downstream (outside) the airport would be improved first as part of the CHUD project (i.e., prior to increasing the
discharge capacity inside the airport and upstream (outside) the airport).
56. The ADS-B equipment to be deployed is well understood and has been used successfully around the world. This
very effective, low-cost technology solution would improve aircraft monitoring and surveillance capabilities and
significantly improve situational awareness of both pilots and air traffic controllers. Its deployment in Haiti requires only
that one (or more) simple ground station(s) is(are) installed to receive the signal and relay to monitors in each ATCT and
that Haiti-based aircraft are equipped with an ADS-B transmitter. Since well over a decade, all jetliner aircraft have been
equipped with ADS-B and it will become compulsory for all aircraft in the United States and Europe by 2020. Since many
smaller aircraft still need to be equipped with ADS-B, budget has been included under the Project to equip the estimated
12 Haiti-based aircrafts.
57. Project Implementation Readiness. Several technical documents were prepared during project preparation to
improve project implementation readiness. ToRs for the MDOD/AMO has been finalized and the tender would be
launched in May 2020. The launch of the tender for the ADS-B is expected in July 2020 and the launch of the tenders for
the construction of PAP taxiway and the rehabilitation of CAP runway are expected in February 2021. The POM manual
has been finalized and approved. Aiming to strengthen UCE/MTPTC’s capacity to absorb the CATCOP-Haiti project, TORs
Page 22 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
are being developed for: (i) a Project team leader; (ii) an accountant (central office); (iii) a procurement assistant; (iv) an
M&E and communication specialist; and (v) an additional environmental and social specialist at UCE.
58. Climate Adaptation Co-Benefits. Resilience is a central feature of design solutions identified for the investments
and technical studies under Component 1 (use of climate-resilient and environmentally optimized designs and
materials), and for the institutional strengthening activities designed under Component 3. The Project would also focus
on integrating climate resilience and disaster risk mitigation specifically for the airfield at both airports under Component
2. The hydraulic sizing of the drainage system at the engineering design stage will use hydro-meteorological data based
on climate change projections and most recent rainfall data collected under the Haiti Strengthening Hydro-Met Services
Project (P148259) and the Municipal Development and Urban Resilience Project (P155201). Specific adaptation co-
benefits per component include:
a) Component 1: Civil works to be financed would be designed to incorporate climate/disaster resilient features to
the extent it is economically and technically feasible. Climate adaptation investments would include enhancing
the resilience of the new ATCT at CAP (for example, elevating the power generator and using storm resistant
windows in the tower cab) and using airfield pavement materials suitable for high-temperature environments.
b) Component 2: This component is designed for mainstreaming adaptation measures in infrastructure design and
for improving resilience of the selected drainage system to climate change impacts. Component 2 would
contribute to improving airfield drainage and flood management features to reduce the risk of flooding events
on the airfield and in the terminal buildings. These could include, but are not limited to, expanded drainage
canals, overflow retention ponds in areas distant from airfield pavements and terminal buildings, and sump
pumps in critical locations. These investments aim to improve airport resilience by reducing the risk of airfield
and terminal flooding associated with the annual rainy season, hurricanes, and climate change.
c) Component 3: This component would include climate resilience building such as activities designed to: (i) develop
training for maintenance/resilient infrastructure and climate change adaptation measures, and (ii) strengthen
the capacity of the GoH for airport asset management and maintenance.
Economic Appraisal
59. The proposed Project is economically viable and expected to improve operational safety and navigation
efficiency of air transport, and to increase the climate/disaster resilience of associated infrastructure at Haiti’s two
main international airports. It would deliver substantial economic benefits to Haiti’s society as any material
enhancement or degradation of air services for island nations like Haiti would have significant and rapid economic and
social consequences given air transport is their primary means of economic and cultural connectivity to the rest of the
world. Accordingly, failure to adequately address the operational safety deficiencies at Haiti’s international airports
would likely result in a steady withdrawal of both domestic and international air services. The economic costs that a loss
of such connectivity would entail would impact the entire Haitian economy, not just the regions of Port-au-Prince and
Cap-Haïtien. The loss of or curtailment of airline services would affect the entire society throughout the country,
including the flows of tourism, remittances, labor, goods, services, knowledge, and investments. The major economic
benefits of the Project’s investments are summarized below:
(i) Capacity increase at PAP: The Project would contribute to: (a) reduced airline operating costs through
lower fuel burn and crew costs associated with reduced aircraft taxiing time and arrival/departure queuing (also
reduced carbon emissions) on a daily basis; and (b) reduced risk of airline service reductions during apron
rehabilitation by providing new remote apron area through: (i) increased runway throughput by constructing a
Page 23 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
new taxiway system (i.e., a partial parallel taxiway and two additional perpendicular taxiways connecting the
runway to the aircraft apron) that would reduce runway occupancy times; and (ii) increased capacity for a greater
number of aircrafts to simultaneously load/unload passengers and cargo by constructing an additional aircraft
parking apron. In the long run, these investments would significantly improve PAP’s ability to fill its critical and
unique role as the primary gateway for movement of people and goods in/out of the country in a post-disaster
scenario and reduce the risk of loss of life and human suffering post disaster by accommodating surges in
humanitarian and other relief flight activity.
(ii) Runway rehabilitation at CAP: This investment would reduce: (a) the risk of aircraft accidents/incidents
due to deterioration of the runway and associated loss of life; and (b) risk of airport closure due to major
pavement failure and associated economic loss to the region and country.
(iii) Resilience improvement at PAP and CAP: These activities would reduce the risk of airport closure for both
PAP and CAP due to airfield flooding risk reduction. They would eventually contribute to enhanced national and
regional resilience to natural disaster and an associated reduced risk of loss of life and human suffering after a
disaster by ensuring the availability of functional airports during emergency operations.
(iv) Air Traffic Safety-enhancement: The benefits of the abovementioned investments (PAP taxiway
improvements, PAP and CAP drainage improvements, CAP runway rehabilitation) are expected to be significantly
complemented by safety improvements from the rest of investments planned under the Project, which are
focused on enhancing operational safety at targeted airports. These include: (i) the construction of RESAs, (ii) the
replacement of CAP ATCT; and (iii) the ADS-B installation. These improvements would further reduce the risk of
aircraft accidents/incidents and associated loss of life.
60. A cost-benefit analysis (CBA) shows that the Project is economically viable. Considering the total project cost of
US$84 million and the quantified benefits of the PAP taxiway improvement and the CAP runway rehabilitation, the
Project has a net present value (NPV) of US$3 million and an internal rate of return (IRR) of 7 percent. These benefits
are expected to be significantly complemented by other investments mentioned above, even though it is difficult to
quantify these in monetary terms. Details of the economic evaluation can be found in Annex 4.
61. In addition to climate change adaptation (i.e., reducing vulnerability to climate risks), the Project would
contribute to climate change mitigation by reducing greenhouse gas emissions. The Project would result in a reduction
in GHG emissions at PAP due to the taxiway system enhancements, which provide an operational savings of about five
minutes per aircraft turnaround. Specifically, the proposed taxiway improvements for PAP are anticipated to reduce
aircraft-related GHG emissions by about 95 kilograms of CO2 per aircraft turnaround. At current demand levels, this
represents a reduction of about 1.25 million kilograms of CO2 annually. These GHG emissions reductions are based on
the jet fuel consumption savings associated with reduced aircraft arrival and departure delays (due to lower runway
occupancy times) and reduced taxiing distances.
B. Fiduciary
Financial Management
62. The Project’s financial management (FM) would be managed by the existing coordinating unit, UCE-MTPTC, which
is currently responsible for this function for other IDA-financed projects (Annex 1). An institutional capacity diagnostic
Page 24 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
of UCE-MTPTC has been carried out by the United Nations Office for Project Services (UNOPS) in order to identify current
and future obstacles to the implementation of the World Bank portfolio and to set out relevant mitigation measures and
recommended actions. In addition to these measures and actions, UCE-MTPTC will need to put in place adequate
supervision and monitoring procedures for delegated activities in order to ensure that Project activities and investments
are satisfactorily implemented and accounted for.
Procurement
63. Procurement would be carried out in accordance with the Procurement Regulations and the World Bank’s
Systematic Tracking and Exchanges in Procurement (STEP) system. The STEP system would be used to prepare, clear,
and update the procurement plans and conduct procurement transactions for the Project.
64. The World Bank’s standard procurement documents would be used for all contracts that are subject to
international competitive procurement. When approaching the national market, GoH procurement procedures may be
used in accordance with the National Procurement Arrangements (paragraph 5.3) of the Procurement Regulations. This
would be specified in the Procurement Plan tables in STEP. When the GoH uses its own national open competitive
procurement arrangements, as set forth in the 2009 law outlining general rules relating to public contracts and public
service concession agreements, such arrangements would be subject to paragraph 5.4 of the Procurement Regulations
and the conditions included in the Grant Agreement. When national procurement arrangements other than national
open competitive procurement arrangements are applied by the GoH, such arrangements would be subject to paragraph
5.5 of the Procurement Regulations.
65. The Project Implementation Unit in the Ministry of Public Works, UCE-MTPTC, would have the overall
responsibility to carry out procurement activities. A procurement capacity assessment of UCE-MTPTC has been
conducted and it revealed that the unit has experience with GoH and World Bank procedures for implementing IDA-
financed projects. The unit has a manual of procedures in place that has been revised and updated for use for the
proposed Project. The main challenge identified during the assessment is the additional workload in UCE-MTPTC and
the limited human resources available on the procurement and technical side. The assessment also noted the lack of
delegation in the decision-making mechanism, the absence of an appropriate filing system, the non-publication of
contracts awarded, and the lack of internal and external oversight on procurement activities. To mitigate the risk, the
following measures are proposed: (i) review of workload distribution between the two procurement staff; (ii)
appointment of a procurement assistant to help with administrative tasks and filing; (iii) strengthening of the technical
team; (iv) preparation of an appropriate procurement plan with anticipation of some key contracts; (v) conduct of a
procurement audit annually during the project life; and (vi) training of the procurement specialists and technical experts
on World Bank Procurement Regulations and on contract management.
.C. Legal Operational Policies
.
Triggered?
Projects on International Waterways OP 7.50 No
Projects in Disputed Areas OP 7.60 No
.
D. Environmental and Social
Page 25 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
66. The proposed Project is one of the first in Haiti to apply the World Bank’s Environmental and Social Framework
(ESF). The ESF represents a shift in the approach, scope, and content of risk management throughout the project
lifecycle. Based on an assessment of the proposed CATCOP-Haiti’s activities and considering contextual factors such as
project location and institutional capacity, the proposed Project presents a moderate environmental and social risk. The
proposed activities are site-specific and geographically confined, no physical or economic resettlement is anticipated,
and the works focus on medium-scale construction or rehabilitation works.
67. As of Project appraisal, six of the ESF’s 10 Environmental and Social Standards (ESS) are relevant. They are: ESS1
(Assessment and Management of Environmental and Social Risks and Impacts), ESS2 (Labor and Working Conditions),
ESS3 (Resource Efficiency and Pollution Prevention and Management), ESS4 (Community Health and Safety), ESS6
(Biodiversity Conservation and Sustainable Management of Living Natural Resources), and ESS10 (Stakeholder
Engagement and Information Disclosure).
68. An analysis of the Project’s potential environmental and social risks and impacts is outlined in the Stakeholder
Engagement Plan (SEP). Such analysis identified the following potential risks and impacts: (i) risks linked to waste
management; (ii) possible impacts on the communities from the construction activities, including the increase of dust
and noise, and the labor influx; (iii) community health and safety risks, particularly related to traffic management and
road safety; and (iv) the risk linked to the capacity of the UCE-MTPTC to prepare and implement the Project according
to the ESF, given the Project’s tight deadline, the fragile status of the governance structures, and the security challenges,
which may hinder timely implementation and supervision of environmental and social measures. Mitigation measures
are mentioned in the SEP and ESCP.
69. A more detailed and site-specific analysis of the Project’s potential risks and impacts and their respective
mitigation measures will be outlined in two Environmental and Social Management Plans (ESMPs) for PAP and CAP once
the Project’s design documents and relevant technical feasibility studies are finalized. The ESCP and SEP have been
finalized and disclosed: (i) on MTPTC’s website on February 7, 2020 24, and (ii) on the World Bank’s website on January
29, 2020. Consultations took place on February 10, 2020. The Labor Management Procedure (LMP) has been finalized
and will be disclosed before approval of the Grant by the World Bank’s Board of Directors. TA will address wildlife strikes
and wildlife management, which were raised by the stakeholders as a critical operational safety concern. The relevant
requirements of the ESF will apply, as appropriate to the nature of the risks and impacts arising from the TA. Terms of
reference, work plans, or other documents that define the TA scope and outputs will be drafted to maintain consistency
with the ESF.
70. Citizen Engagement. The proposed Project builds upon, and further deepens, earlier initiatives implemented in
Haiti under previous IDA-financed projects for citizen engagement, project monitoring, and transparency. The SEP
identifies the stakeholders, the means to ensure effective project communication with each stakeholder group, and
indicators to monitor its implementation. During project preparation, consultations were held with direct stakeholders
to gather feedback and inform the proposed design and the prioritization of investments. The proposed Project
emphasizes open and recurring two-way consultations throughout implementation and relies on robust Grievance
Redress Mechanisms (GRMs) for project workers and for all other stakeholders. The Project’s GRMs will quarterly report
and record all salient issues or grievances; and UCE will ensure timely follow-up and tracking of grievances to their
resolution. The Project will track the percentage of grievances adequately responded to and/or resolved within the
stipulated service standards as part of the SEP implementation.
24 https://www.mtptc.gouv.ht/accueil/publications/appels-d-offre.html
Page 26 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
71. The Project would contribute to closing gender employment gaps in the aviation sector. For all CATCOP airport
operators and regulators, training will be provided on improving gender diversity in recruiting and staff development
activities. The Project will support the increase of women’s participation in the aviation sector through several activities
related to: (i) carrying out an analysis of the recruitment, retention, and promotion barriers for women in the aviation
sector in Haiti and development and implementation of a Gender Action Plan by UCE-MTPTC under Component 3 on
Institutional Capacity; (ii) providing training for female professionals in the air transport sector and recruitment of new
female trainees; and (iii) developing a nondiscrimination and equal opportunity policy under the Human Resources
Department of UCE-MTPTC. To this end, the Project will support the full training requirements of new female recruits,
including all costs associated with sending them to specialized, accredited international training programs (which for air
traffic control typically lasts about two to four months followed by two to four years of on-the-job training). As a result,
the Project expects to increase the percentage of women working in the aviation sector, mainly in medium-skilled jobs,
including air traffic controllers, supervisors, and public safety and security screening staff. Additionally, specific programs
would be developed to significantly increase the share of female air traffic controllers and public safety and security
screening staff.
72. The Project recognized that infrastructure works could increase risk factors for Sexual Exploitation and Abuse
(SEA) and Sexual Harassment (SH) in the workplace. A risk assessment was conducted using the gender-based violence
(GBV) tool, and the Project ranks low for the GBV risk. The tool considers the country and project context to assess
different GBV risk factors. According to data from the Demographic and Health Survey 2016-201725, prevalence of
domestic sexual violence in women between 15-49 years old is above the regional average, and there is no legislation
on domestic violence, marital rape, or sexual harassment. In terms of context-related risks, sexual violence, poverty, and
gender inequality are critical for women’s vulnerability to HIV/AIDs.26 HIV/AIDS transmission rates are higher among
transient communities, such as men who work in the construction industry and workers who regularly cross the border
with the Dominican Republic.27 The Haitian National Policy has a Sexual and Gender-Based Violence (SGBV) unit that
remains under-resourced and understaffed. Thus, survivors of rape and other sexual violence face obstacles in seeking
legal justice, as well as accessing protective services.28 In terms of the Project-related risks, the infrastructure works
related to the airport will happen in a delimited area, where there will be a high absorption capacity with easy access to
monitor works; whilst the Project’s response strategy will be linked to the GRM, where survivors will be able to register
complaints in a confidential manner. The Project will complement the results from the GBV tool with information derived
from the stakeholder consultation to define the final risk level.
V. GRIEVANCE REDRESS SERVICES
73. Communities and individuals who believe that they are adversely affected by a World Bank-supported project
may submit complaints to existing project-level GRMs or the World Bank’s Grievance Redress Service (GRS). The GRS
ensures that complaints received are promptly reviewed in order to address project-related concerns. Project-affected
communities and individuals may submit their complaint to the World Bank’s independent Inspection Panel, which
determines whether harm occurred, or could occur, as a result of World Bank noncompliance with its policies and
25 Institut Haïtien de l’Enfance (IHE) et ICF. 2018. Enquête Mortalité, Morbidité et Utilisation des Services (EMMUS-VI 2016-2017) Pétion-
Ville, Haïti, et Rockville, Maryland, USA : IHE et ICF.
26 Marchand, Hélène. 2011. "Violence, Inégalités de Genre et Vulnérabilité des Femmes au VIH/SIDA en Haïti." Mémoire présenté à la
Faculté des Études supérieures de l'Université Laval dans le cadre du programme de maîtrise en santé communautaire pour l'obtention du
grade de maître ès Sciences (M.Sc.).
27 USAID. 2016. USAID/Haiti gender assessment. Washington, DC: USAID.
28 Haiti 2018 Human Rights Report. https://www.justice.gov/eoir/page/file/1159756/download
Page 27 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
procedures. Complaints may be submitted at any time after concerns have been brought directly to the World Bank's
attention, and World Bank management has been given an opportunity to respond. For information on how to submit
complaints to the World Bank’s corporate GRS, please visit http://www.worldbank.org/en/projects-
operations/products-and-services/grievance-redress-service. For information on how to submit complaints to the World
Bank’s Inspection Panel, please visit www.inspectionpanel.org.
VI. KEY RISKS
74. The overall project risk has been identified as Substantial due to the fragile political and governance context, as
well as the weak implementation capacity of government counterparts. Key risks to achieving results and their respective
mitigation measures are discussed below.
(i) Political and governance risk is rated “High.” Political uncertainty and potential instability in Haiti have the potential
to create bottlenecks and delays in implementation of the proposed Project. The country experienced serious social
unrest in February, June, and September 2019, which virtually paralyzed economic activity for several weeks.
Political and governance risk would be partially mitigated through dialogue and close collaboration with government
entities, proactive engagement by the World Bank as issues arise, as well as periodic evaluations to adapt to
changing context. The task team would provide close implementation support and adjust interventions and
implementation strategies (including the use of third parties, ICT-based supervision, and M&E architecture) as
needed.
(ii) Institutional capacity for implementation and sustainability risk is rated “Substantial.” There is a shortage of
skilled technical and managerial staff in the sector. The establishment of the MDOD/AMO to provide procurement
and technical support, strengthened by international specialists, is intended to partially mitigate this risk. The
MDOD/AMO is expected to be on board by the Grant’s effectiveness. Further mitigation would be through the
substantial capacity development, training program and technical assistance to strengthen the operational capacity
of the PIU for project management and supervision. Furthermore, the Project would pay particular attention to
maintenance requirements during the design of infrastructure and purchase of equipment in order to minimize
sustainability risks. COVID-19 presents additional implementation challenges, such as smaller construction crews to
carry out infrastructure works. These will be mitigated through: (i) the preparation of an organized and flexible
works schedule to mitigate construction delays and ensure income generation in a safe and secure work
environment; and (ii) ensuring best COVID-informed construction site practices, overall worksite safety
management and enforcement of rules on use of personal protective equipment to reduce the incidence of COVID-
19 transmission.
(iii) Fiduciary risk is rated “Substantial.” The UCE-MTPTC already manages the fiduciary aspects of four other IDA-
financed projects, but the increased volume of work with the proposed Project, would increase the financial
management and procurement risks. Based on the current performance of the unit, the main risks include (i)
insufficient FM and procurement staffing and constrained capacity; (ii) delays in finalizing the accounting system
upgrade; and (iii) unsatisfactory or delayed documentation of expenditures from third parties. To mitigate these
risks, the UCE-MTPTC would: (i) increase FM staffing; (ii) engage and train skilled FM and procurement professionals;
(iii) address systemic FM issues; and (iv) set in place a more efficient mechanism for contract management..
Page 28 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
VII. RESULTS FRAMEWORK AND MONITORING
Results Framework
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
Project Development Objectives(s)
The objectives of the Project (PDO) are to: (i) improve operational safety and navigation efficiency of air transport in the Recipient’s territory; and (ii)
increase the climate and disaster resilience of associated infrastructure at the Recipient’s international airports.
Project Development Objective Indicators
RESULT_FRAME_TBL_ PD O
Indicator Name DLI Baseline Intermediate Targets End Target
1 2 3
Improve operational safety and navigation efficiency of air transport
Targeted upgrade of air navigation Electronic navigation system
Non-precision navigation Navigation systems
systems achieved at CAP and PAP Contract signed ADS-B implemented in place (ADS-B implemented
system: No VSAT or ADS-B upgraded at CAP and PAP
(Text) and operational)
PAP and CAP runways in
compliance with ICAO SARPs No No No Yes Yes
(Yes/No)
Average Runway Occupancy Time
7.50 7.50 7.50 5.00 5.00
(ROT) of airplanes at PAP (Minutes)
Increase the climate/disaster resilience of associated infrastructure at Haiti’s int'l airports
Average number of days per year
the discharge exceeds the capacity
20.00 20.00 10.00 0.00 0.00
of the airport drainage system at
PAP and CAP (Days)
Page 29 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
RESULT_FRAME_TBL_ PD O
Indicator Name DLI Baseline Intermediate Targets End Target
1 2 3
Average number of days per
year the discharge exceeds the
10.00 10.00 10.00 0.00 0.00
capacity of the airport drainage
system at PAP (Days)
Average number of days per
year the discharge exceeds the
10.00 10.00 10.00 0.00 0.00
capacity of the airport drainage
system at CAP (Days)
PDO Table SPACE
Intermediate Results Indicators by Components
RESULT_FRAME_TBL_ IO
Indicator Name DLI Baseline Intermediate Targets End Target
1 2 3
Component 1: PAP and CAP operational safety and navigation efficiency investments
Length of PAP taxiway system built
0.00 500.00 1,000.00 1,200.00 1,460.00
(Meter(m))
Additional aircraft parking apron
0.00 15,000.00 20,100.00 24,000.00 26,100.00
built at PAP (Square Meter(m2))
Length of CAP runway rehabilitated
(Meter(m)) 0.00 1,000.00 2,000.00 2,450.00 2,450.00
Airfield Ground Lighting (AGL) for
the CAP runway is installed and No No No Yes Yes
operational (Yes/No)
PAP RESAs implemented and
consistent with ICAO SARPs No No No Yes Yes
(Yes/No)
Constructed CAP Air Traffic Control
No No No Yes Yes
Tower (ATCT) in compliance with
Page 30 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
RESULT_FRAME_TBL_ IO
Indicator Name DLI Baseline Intermediate Targets End Target
1 2 3
ICAO SARPs (Yes/No)
ADS-B for CAP and PAP installed
No No Yes Yes Yes
and operational (Yes/No)
Share of infrastructure activities
identified as climate resilient 0.00 100.00 100.00 100.00 100.00
(Percentage)
Component 2: PAP and CAP airfield drainage system improvements
Length of PAP drainage system
3,850.00 3,850.00 3,150.00 2,450.00 2,450.00
(Meter(m))
New culverts built at CAP (Number) 0.00 0.00 2.00 4.00 4.00
Component 3: Institutional strengthening & Project Management
Aviation sector strategy prepared
(Yes/No) No No Yes Yes
Wildlife management plan
prepared and implemented for PAP No No No Yes Yes
and CAP airports (Yes/No)
OFNAC safety inspectors trained by
a certified agency (Number) 0.00 5.00 20.00 40.00 50.00
Rescue Coordination Center staff
trained by a certified agency 0.00 5.00 20.00 40.00 50.00
(Number)
Regional training programs
attended by AAN and OFNAC 0.00 1.00 2.00 3.00 5.00
(Number)
Grievances adequately responded
to and/or resolved within the
0.00 100.00 100.00 100.00 100.00
stipulated service standards
(Percentage)
Share of women hired in medium-
0.00 5.00 10.00 10.00 15.00
skill jobs by UCE-MTPC, OFNAC and
Page 31 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
RESULT_FRAME_TBL_ IO
Indicator Name DLI Baseline Intermediate Targets End Target
1 2 3
AAN (Percentage)
Share of women included in the
0.00 10.00 15.00 20.00 30.00
medium-skills training (Percentage)
People with Enhanced Access to
Transportation Services (Number) 0.00 0.00 1,900,000.00 1,900,000.00
Semi-annual meetings held with
stakeholders to discuss their
suggestions and related actions 0.00 2.00 4.00 7.00 12.00
taken by the Project (Number)
IO Table SPACE
UL Table SPACE
Monitoring & Evaluation Plan: PDO Indicators
Methodology for Data Responsibility for Data
Indicator Name Definition/Description Frequency Datasource
Collection Collection
Haiti currently has a non- MDOD/AMO The MDOD/AMO
precision navigation system consultant’s Consultant will compile
(instruments) and is the only trimestral the information of the
CATCOP participating Project physical progress of
country without an progress the air navigation
Targeted upgrade of air navigation electronic navigation Semiannual reports system's UCE
systems achieved at CAP and PAP system. The project seeks to based on the subcomponents that
upgrade the navigation Supervision will be measured by the
system by implementing consultant’s Supervision Consultant
Automatic Dependent monthly according to the
Surveillance-Broadcast for progress methodology that will
Haiti’s international airports reports. be determined as per
Page 32 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
(PAP and CAP), [including its contract. The
receiver antenna(s), compiled information
consoles for each ATCT, and will be presented in
equipping Haiti-based their trimestral Project
aircraft], allowing progress report.
continuous aircraft position
reports and improving
situational awareness for air
traffic controllers and pilots.
MDOD/AMO The MDOD/AMO
The indicator measures
Consultant’s Consultant will compile
implementation of the
quarterly the information of the
Runaway End Safety Areas
project physical progress of
(RESAs) at PAP and
progress the runways
rehabilitation of the CAP
reports improvements that will
runway, including (a) milling
based on the be measured by the
and repaving the full length
Supervision Supervision Consultant
of the runway; and (b)
consultant’s according to the
installation of Airfield Once (Upon
monthly methodology that will
Ground Lighting (AGL) for completing
PAP and CAP runways in compliance with progress be determined as per UCE
the runway. Construction of the project
ICAO SARPs reports. its contract. The
ICAO-required Runway End investment)
compiled information
Safety Areas (RESAs) for
OFNAC (the will be presented in
both PAP runway ends
regulator) their quarterly project
would improve operational
will assess th progress report.
safety and comply with ICAO
e compliance OFNAC (the regulator)
SARPs. Rehabilitation of the
of the will assess the
CAP runway will help
infrastructur compliance of the
comply with ICAO SARPs for
e with ICAO infrastructure with
runway pavement
SARPs. ICAO SARPs .
conditions.
Page 33 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ROT means the amount of
time that each aircraft The MDOD/AMO
occupies the runway. The Consultant will assess
target is to reduce the PAP on a semiannual basis
average Runway Occupancy the ROT at PAP based
Time (ROT) per arrival- on the traffic data
Information
departure cycle by at least provided by the AAN's
from the
2.5 minutes. Construction of traffic control. AAN will
Average Runway Occupancy Time (ROT) Semiannual airport traffic UCE
additional taxiways and ensure the daily
of airplanes at PAP control
aircraft parking apron will collection of this data
center (AAN)
reduce ROT thereby through a specific
increasing runway capacity, internal process.They
reduce delays (and GHG will report it in their
emissions), and improve quarterly Project
PAP’s ability to handle post- Progress report.
disaster spikes in air traffic
volume.
The capacity of a drainage The
system is defined by the MDOD/AMO Consultan
cross section of the drainage t will assess on an
channels, the slope, the annual basis the
alignment, possible AAN average number of
structures, and the information days per year the
Average number of days per year the revetment. If the actual on the discharge exceeds the
Annual UCE
discharge exceeds the capacity of the discharge exceeds the drainage capacity of the airport
airport drainage system at PAP and CAP capacity, inundation follows. system for drainage system for
The function of a drainage each airport. each airport, based on
system is to discharge water the data provided by
in a controlled manner. The the AAN.
availability of the discharge AAN will ensure
system is defined by the the collection of this
rate (or the number of days information through
Page 34 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
per year for both PAP and a daily field
CAP) the capacity is observation and
sufficient to discharge water report in their
in controlled manner. quaterly Project
progress report.
The capacity of a drainage
The MDOD/AMO
system is defined by the
Consultant will assess
cross section of the drainage
on an annual basis the
channels, the slope, the
average number of
alignment, possible
days per year the
structures, and the
discharge exceeds the
revetment. If the actual AAN
capacity of the airport
discharge exceeds the information
drainage system for
Average number of days per year the capacity, inundation follows. on the
Annual PAP, based on the data UCE
discharge exceeds the capacity of the The function of a drainage drainage
provided by AAN.
airport drainage system at PAP system is to discharge water system for
AAN will ensure
in a controlled manner. The PAP.
the collection of this
availability of the discharge
information through
system is defined by the
a daily field observation
rate (or the number of days
and report in their
per year) the capacity is
quaterly Project
sufficient to discharge water
progress report.
in a controlled manner.
The capacity of a drainage AAN The MDOD/AMO
system is defined by a.o. the information Consultant will assess
Average number of days per year the cross section of the drainage on the on an annual basis the
Annual UCE
discharge exceeds the capacity of the channels, the slope, the drainage average number of
airport drainage system at CAP alignment, possible system at days per year the
structures, and the CAP discharge exceeds the
revetment. If the actual capacity of the airport
Page 35 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
discharge exceeds the drainage system for
capacity, inundation follows. CAP, based on the data
The function of a drainage provided by AAN.
system is to discharge water AAN will ensure
in a controlled manner. The the collection of this
availability of the discharge information through
system is defined by the a daily field observation
rate (or the number of days and report in their
per year) the capacity is quaterly Project
sufficient to discharge water progress report.
in controlled manner.
ME PDO Table SPACE
Monitoring & Evaluation Plan: Intermediate Results Indicators
Methodology for Data Responsibility for Data
Indicator Name Definition/Description Frequency Datasource
Collection Collection
Physical progress of the
The indicator measures the taxiway system
construction of a partial Supervision construction will be
parallel taxiway and two consultant’s measured by the
Semiannua
additional exit taxiways. monthly Supervision Consultant, UCE
Length of PAP taxiway system built l
They would significantly progress according to the
improve aircraft flow and reports methodology that will
enhance reduce aircraft be determined as per
(Runway Occupancy Time) its contract.
The indicator measures Supervision Physical progress of
Semiannua
Additional aircraft parking apron built at construction of additional consultant’s the additional aircraft UCE
l
PAP aircraft parking apron that monthly parking apron will be
together with the additional progress measured by the
Page 36 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
taxiways would eliminate reports Supervision Consultant
significant bottlenecks and according to the
inefficiencies in aircraft methodology that will
movements, reduce aircraft be determined as per
CO2 emissions, improve its contract.
aircraft operating safety,
and would allow to
accommodate spikes in
relief flights (passenger and
cargo) in post-disaster
periods.
The indicator tracks the
progress of milling and Physical progress of the
repaving the full length of runway rehabilitation
Supervision
the runway and helps will be measured by the
consultant’s
comply with ICAO standards Semiannua Supervision Consultant
monthly UCE
Length of CAP runway rehabilitated for runway pavement l according to the
progress
conditions. The runway methodology that will
reports
pavement at CAP is be determined as per
deteriorated and is its contract.
becoming increasingly
unsafe.
The indicator measures the Physical progress of
installation and operational Supervision the AGL installation will
status of the AGL for the consultant’s be measured by the
Semiannua
Airfield Ground Lighting (AGL) for the CAP CAP runway that will be monthly Supervision Consultant UCE
l
runway is installed and operational implemented with the progress according to the
runway rehabilitation. The reports methodology that will
AGL is a system of runway be determined as per
lighting that provides an its contract.
Page 37 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
enhanced visibility for the
aircrafts in their approach
for landing and allows the
airport to operate at night.
The installation of AGL will
highly improve the safety of
operations at CAP.
The indicator measures the
construction of RESAs at
PAP. The ICAO SARPs Physical progress of
require a 150-m RESA the RESAs construction
Supervision
including a 60-m paved strip will be measured by the
consultant’s
starting from the end of the Semiannua Supervision Consultant
PAP RESAs implemented and consistent monthly UCE
runway, and a 90-m surface l according to the
with ICAO SARPs progress
surrounding the runway, methodology that will
reports.
suitable for reducing the risk be determined as per
of damage to airplanes in its contract.
the event of an undershoot,
overshoot, or excursion
from the runway.
The indicator measures the
Construction of a new CAP Physical progress of the
ATCT in a location and ATCT construction will
Supervision
height to provide be measured by the
consultant’s
unobstructed visibility for Semiannua Supervision Consultant
Constructed CAP Air Traffic Control Tower monthly UCE
the full length of the CAP l according to the
(ATCT) in compliance with ICAO SARPs progress
runway. The ATCT can methodology that will
reports
accommodate instruments be determined as per
for air control but must also its contract.
provide good visibility
conditions to the controller.
Page 38 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
The indicator measures the
installation of ADS-B at CAP
and PAP. The Automatic
dependent surveillance—
broadcast (ADS-B) is a
surveillance technology in
which an aircraft
determines its position via
satellite navigation and
periodically broadcasts it,
Physical progress of the
enabling it to be tracked.
installation and
Such a system brings many
Supervision commissioning of the
benefits for operation and
consultant’s ADS-B will be measured
safety. It will notably Semiannua
ADS-B for CAP and PAP installed and monthly by the Supervision UCE
enhance navigation l
operational progress Consultant according to
efficiency and improve
reports. the methodology that
pilots and controllers'
will be determined as
visibility. I will also increase
per its contract.
operational capacity at the
airport by providing many
operational features that
will help maximize the use
of the runway
infrastructure. Moreover by
allowing a more efficient
operation, it allows to
reduce flight times and thus
contributes in reducing fuel
consumption and pollution.
The indicator will track that Semiannua Supervision During the conception
Share of infrastructure activities identified UCE
all the project activities that l consultant’s phase of each
as climate resilient
will improve the airport progress infrastructure compone
Page 39 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
infrastructure will integrate reports. nt, the
climate-resilient measures MDOD/AMO Consultan
and that these measures t will review the
will be completed during the proposed designs and
work phase. The following specifications to ensure
activities will be tracked that all infrastructure
with this indicator: (a) PAP components integrate
taxiway, (b) PAP apron, (c) adequate climate
PAP RESAs, (d) PAP paved resilience measures.
stopways, (e) CAP ATCT, (f) Completion of all
CAP drainage system, (g) designs with climate
PAP drainage system, (h) resilience measures will
CAP runway. represent a value of
50% of the indicator.
Within this 50%, the
MDOD/AMO will
establish a ponderation
of each component in
order to track the
progress of
the integration of
climate resilience
measures in each
component design.
During work phase, the
MDOD/AMO
Consultant will review
the Supervision
consultant's monthly
reports and lead
periodic field
inspections to
Page 40 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
guarantee that the
climate resilient
measures are correctly
integrated.Completion
of civil works with
climate resilience
measures will represent
a value of 50% of the
indicator. Within this
50%, the MDOD/AMO
will establish a
ponderation of each
component in order to
track the progress of
integration of climate
resilience measures in
each component
realization.
The MDOD/AMO will
inform UCE about this
specific indicator in its
trimestral project
progress reports.
The current PAP drainage Physical progress of
system does not have an Supervision the drainage system
optimal configuration. The consultant’s improvement at PAP
Semiannua
Project would improve the monthly will be measured by the UCE
Length of PAP drainage system l
water evacuation route by progress Supervision Consultant
constructing a direct reports. according to the
connection to the methodology that will
evacuation point. This be determined as per
Page 41 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
optimization will, therefore, its contract.
result in a reduction in total
length of the current
drainage system.
Physical progress of the
The indicator will track the
construction will be
realization of new culverts Supervision
measured by the
at CAP in order to improve consultant’s
Semiannua Supervision Consultant
the existing drainage monthly UCE
New culverts built at CAP l according to the
system: 3 existing culverts (1 progress
methodology that will
east, 1 west, 1 north) will be reports
be determined as per
replaced by 4 larger culverts
its contract.
(2 east, 1 west, 1 north).
The MDOD/AMO
Consultant will monitor
the implementation of
this activity and
determine the
methodology to
An Aviation Sector Strategy MDOD/AMO
measure the physical
guiding sector priorities and Consultant’s
progress, as part of the
investments for the next 20 Semiannua trimestral
overall project schedule UCE
Aviation sector strategy prepared years. This strategy will form l project
management. They will
an essential framework for progress
inform the UCE through
institutional strengthening reports.
the quarterly project
activities.
report. The indicator
will take the value "yes"
once the deliverable
has been formally
accepted.
Page 42 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
The indicator measures the
preparation and
implementation of the
Wildlife Management Plan,
which will leverage
established practices and
lessons learned at existing The MDOD/AMO
CATCOP airports, as well as Consultant will monitor
international best practices. the elaboration of the
Wildlife Management
Wildlife Management Plan Plan and determine the
will be elaborated with a methodology to
focus on reducing runway measure the physical
MDOD/AMO
incursions by wildlife and progress of this activity,
Consultant’s
reducing bird strikes by as part of the overall
Semiannua trimestral
Wildlife management plan prepared and aircraft on landing and project UCE
l project
implemented for PAP and CAP airports takeoff, which was raised as schedule. They will
progress
a critical operational safety inform the UCE through
reports.
concern. The indicator will their quarterly project
follow the preparation and report. The indicator
implementation of the Plan, will be considered as
which will leverage "yes" once the
established practices and implementation of
lessons learned at existing physical measures is
CATCOP airports, as well as fully completed.
international best practices.
At the completion of the
indicator, the following
actions will have been
implemented:
- Wildlife management risk
analysis
Page 43 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
- Identification and design of
mitigation measures
- Implementation of the
Plan
- Training of AAN and
OFNAC staff on Wildlife
Management Plan
Implementation
UCE and OFNAC will
Trimestral establish a training plan
OFNAC safety inspectors
project for OFNAC staff. They
require periodic certified
progress will monitor
OFNAC safety inspectors trained by a training from Boeing and Annual UCE
reports and the implementation of
certified agency Airbus. The indicator
OFNAC this plan and report
measures the number of
training plan. through their quarterly
OFNAC inspectors trained.
l project report.
The MDOD/AMO
MDOD/AMO
Consultant will
Consultant’s
establish a training plan
project
The indicator measures for OFNAC and ANN
progress
Rescue Coordination Center staff trained number of staff trained for Annual staff. They will monitor UCE
reports and
by a certified agency the operation of the Rescue the implementation of
ANN and
Coordination Center. this plan and report
OFNAC
through their quarterly
training plan.
project report
The indicator measures the MDOD/AMO The MDOD/AMO
participation of ANN and Consultant’s Consultant will
Regional training programs attended by Annual UCE
OFNAC in regional capacity project establish a training plan
AAN and OFNAC
building trainings. Indicator progress for OFNAC and ANN
target based on an reports and staff. They will monitor
Page 44 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
hypothesis of at least one ANN and the implementation of
training per year during the OFNAC this plan and report
implementation. training plan. through their
quarterly project
report.
In its monthly reports,
the Supervision
consultant will inform
on the grievances
received, the
appropriate response
given and the response
time. The Stakeholder
Engagement Plan
stipulates the services
Supervision standards for the GRM.
The indicator will track the consultant’s The MDOD/AMO will
Grievances adequately responded to
correct operation of the Trimestral monthly verify in the supervision UCE
and/or resolved within the stipulated
Grievance Redress progress consultant monthly
service standards
Mechanism. reports reports that the GRM is
correctly functioning,
according to these
requirements. The
expected value for the
indicator is 100% once
the GRM is in place.
The MDOD/AMO
consultant will report
on this indicator in their
quarterly report.
Page 45 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
The project will analyze
recruitment, retention and
promotion barriers for As stipulated in the
women to participate in the Operation Manual of
aviation sector. Women will the Project, the UCE
be part of a training will establish
program to get skills as trimestral report to
UCE trimestr
traffic controllers, inform the Bank on the
al project
Share of women hired in medium-skill supervisors, and public Annually project progress. This UCE
progress
jobs by UCE-MTPC, OFNAC and AAN safety and security report will include a
reports
screening staff and to section on Human
improve their potential for Ressources. The UCE
being hired at UCE-MTPC, will inform in this
OFNAC and ANN. section on the progress
100% of the women trained of this indicator.
and accredited as traffic
controllers will be employed
to perform within OFNAC.
The MDOD/AMO
The project will finance
Consultant will
training by a certified
establish a training plan
agency for ANN and OFNAC
for OFNAC and ANN
capacity building for
staff.
development of medium
They will monitor
skills, including those Semiannua
Share of women included in the medium- MDOD/AMO the implementation of UCE
related to air traffic l
skills training this plan,
controllers, supervisors, and
disaggregating the
public safety and security
share of women
screening staff. The
participating in the
indicator will measure how
medium-skills
many women will
training, and report
participate in this training.
through their quarterly
Page 46 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
project report.
Number of passengers per
year that experience AAN
improved access to aviation at the end database: N
Airlines & OFNAC
People with Enhanced Access to infrastructure and services of the umber of OFNAC
database
Transportation Services that have been built or project passengers
rehabilitated through the per year
project.
Minutes of
the
Number of meeting minutes stakeholders
documenting the discussion meetings
Semi-annual meetings held with Semi- Collected as part of
on decisions and/or actions which will be UCE-MTPTC
stakeholders to discuss their suggestions annual project M&E.
taken based on shared with
and related actions taken by the Project
stakeholders' focus group's the public on
feedback. UCE's
website.
ME IO Table SPACE
Page 47 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 1: Implementation Arrangements and Support Plan
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
Project Institutional and Implementation Arrangements
1. Project implementation would be the responsibility of MTPTC. All Project activities would be implemented by UCE-
MTPTC. The technical, fiduciary, and safeguards team at UCE-MTPTC has significant experience in the implementation of
World Bank-financed operations. The unit currently has a project coordinator, two procurement specialists, one financial
management specialist, four technical staff, five safeguards specialists, and an assistant project coordinator/M&E
specialist. UCE-MTPTC also has a local office in Cap-Haïtien that is currently supporting the implementation of the MDUR
Project. As previously outlined, given the nature and technical scope of the Project, an MDOD/AMO would complement
UCE for the implementation of Components 1 and 2, and for coordinating the activities for Component 3, under the
oversight of UCE-MTPTC, AAN, and OFNAC.
2. MDOD/AMO. The MDOD/AMO is expected to be contracted by effectiveness. The MDOD/AMO would
complement the PIU’s capacity with the specialized technical skills necessary to help procure and control the quality of
the provision of works, goods, and studies to be financed under Components 1, 2, and 3. For those activities, the
MDOD/AMO would be delegated the responsibility of preparation of the procurement process and for monitoring the
activities, under the oversight of UCE-MTPTC. The MDOD/AMO is thus expected to support the PIU in the areas of
procurement, contract management, reporting, safeguards, and M&E. The MDOD/AMO would include an appropriate
number of pavement engineers, aviation specialists, navigation experts, and experienced air traffic technicians to ensure
the effective management and monitoring of the activities to be financed under the Project. The MDOD/AMO would be
selected based on the eligibility criteria and selection process agreed with the World Bank, which are described in detail
in the POM.
3. Strengthening of UCE-MTPTC capacity. To be able to correctly absorb Project activities, UCE-MTPTC capacity would
need to be strengthened by hiring additional technical and supervision staff as further outlined below. The following
staffing needs have been identified as required to be able to absorb the technical, safeguards, and fiduciary needs of the
Project: (i) Project team leader; (ii) accountant (central office); (iii) a procurement assistant; and (vi) M&E and
communication specialist. An additional environmental and social specialist would be hired.
Financial Management
4. A Financial Management (FM) assessment was conducted in accordance with OP/BP for IPF and in line with the
Financial Management Manual for World Bank Investment Project Financing (IPF) Operations (OPCS5.05-DIR.01, issued
February 10, 2017).
5. The FM risk for this Project is deemed “Substantial.” The FM function would be carried out by an existing
coordination unit, UCE-MTPTC, under the Ministry of Public Works, Transport, and Communications, which currently
undertakes this function in other IDA-financed projects, as mentioned above. The increased volume of work related to
new projects assigned to this unit without adjusting their capacities poses challenges that would affect the ability to
maintain acceptable FM arrangements. An institutional capacity diagnostic has been carried out by UNOPS to identify
current and future obstacles to the implementation of the World Bank portfolio and to set out relevant mitigation
Page 48 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
measures and recommended actions.
6. Overall fiduciary responsibility would rely on UCE-MTPTC. UCE-MTPTC would need to put in place adequate
supervision and monitoring procedures for delegated activities to ensure that Project activities and investments are
satisfactorily implemented and accounted for.
7. As a result of this assessment and based on the current performance of the PIU, the main FM risks include: (i)
insufficient FM staffing; (ii) accounting software is not up-to-date and financial reports are prepared in auxiliary systems
(Excel datasheets); and (iii) operationalizing the recommendations included in the institutional capacity diagnostic
prepared by UNOPS.
8. In order to manage the FM risks, the following measures need to be taken: (i) recruit an additional accountant
dedicated to the Project; (ii) update the accounting software to allow reporting according to the World Bank’s format;
and (iii) implement an action plan that addresses recommendations included in the institutional capacity diagnostic
prepared by UNOPS.
Financial Management Arrangements
9. Organization and Staffing. FM staff currently include one FM specialist and three accountants, all of them
supporting all World Bank projects implemented by UCE-MTPTC. Two of these three accountants were hired in August
2019. An additional accountant would need to be recruited to help manage the additional workload. An FM training is
expected to take place once this additional staff is incorporated to reinforce knowledge of the World Bank´s policies and
procedures.
10. Budgeting Arrangements. The Project would be financed entirely with IDA grant proceeds, without government
counterpart funding. UCE-MTPTC would be responsible for planning Project activities and preparing the annual
operational plan and budget, to be approved by the World Bank before the end of the fiscal year and monitored
periodically through the overall and fiduciary supervision and Project progress and financial reports (biannual interim
unaudited financial reports and annual audits). The budget process is detailed in the POM. The annual operational plan
and budget would be prepared specifying activities by Project components and subcomponents, and would also include
detailed information on operational costs, which would also be reviewed and approved by the World Bank.
11. Accounting System. UCE-MTPTC uses the ACCPAC accounting system for the accounting of the IDA projects under
implementation. However, this system has not been updated in prior years and has limited functionality, specifically in
terms of financial reporting. The actual version of the system does not allow for the preparation of financial reports
according to the World Bank’s requirements. These reports are prepared using an auxiliary system (Excel datasheets).
Once the new version of the system is in place, the PIU would need to ensure that relevant users are trained to keep track
of and report the proposed Project’s expenditures in accordance with the World Bank’s FM requirements.
12. Financial Reporting. For existing projects implemented by UCE-MTPTC, interim unaudited financial reports (IFRs)
are not regularly prepared and transmitted on a timely basis to the World Bank. The recruitment of an additional FM
specialist would alleviate this problem. IFRs would be prepared and submitted biannually to the World Bank no later than
45 days after the end of each fiscal semester. Format and content are detailed in the POM under terms acceptable to the
World Bank. IFR would allow the World Bank to monitor disbursements, financial, and budgetary project information.
Page 49 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
13. Internal Control and Auditing. As part of the overall implementation arrangements, a POM has been prepared and
adopted by UCE-MTPTC, and describes, among other things, specific financial management arrangements and internal
control procedures. Specific mechanisms to control and safeguard the proposed Project’s financial information and assets
has been incorporated in the POM, including detailed eligibility criteria and procedures to select and engage the
MDOD/AMO. Adequate supervision and monitoring procedures for delegated activities under Components 1 and 2 is also
included in this manual to ensure that Project activities and investments are timely and satisfactorily implemented and
accounted for.
14. External Audit. Annual audits on Project financial statements and eligibility of expenditures would be performed
in accordance with World Bank policy, under terms of reference and by an independent auditor acceptable to the World
Bank.
15. FM Supervision. The World Bank would conduct at least two FM supervisions per year. FM performance and
compliance would also be monitored through the review of biannual IFR and yearly audit reports.
Disbursements
16. The main disbursement method used by the proposed Project would be the advance of funds. Project funds would
be advanced in US dollars to a designated dedicated account at the Central Bank of Haiti (Banque de la République d’Haïti,
BRH) and it would be managed by UCE-MTPTC. Advanced funds would be documented by UCE-MTPTC to account for
grant proceeds and replenish the designated account using Statement of Expenditure (SOE), as agreed upon with the
World Bank (Figure 1A.1).
17. The reimbursement method, payment disbursements, and special commitments would be available for the Project
and included in the Disbursement and Financial Information Letter.
Figure 1A.1. Funds Flow and Disbursement Arrangements
Page 50 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Procurement
18. Procurement for works, goods, non-consulting, and consulting services to be financed by the credit would follow
the procedures specified in the “World Bank Procurement Regulation of Goods, Works and Non-Consulting Services”
under “World Bank Procurement Regulations for Borrowers under Investment Project Financing” dated July 1, 2016,
revised August 1, 2018, and the World Bank’s Anti-Corruption Guidelines: “Guidelines on Preventing and Combatting
Fraud and Corruption,” revised in June 2016.
19. The procuring entity as well as bidders, and service providers, i.e., suppliers, contractors, and consultants shall
observe the highest standard of ethics during the procurement and execution of contracts financed under the Project in
accordance with paragraph 3.32 and Annex IV of the Procurement Regulations.
20. The Recipient shall prepare and submit to the World Bank a General Procurement Notice (GPN) and the World
Bank would arrange for publication of the GPN on the United Nations Development Business (UNDB) online and on the
World Bank’s external website. The Recipient may also publish it in at least one national newspaper.
21. The STEP system would be used to prepare, clear, and update the Procurement Plans and for procurement
transactions. This textual part, along with the Procurement Plan tables in STEP, constitute the Procurement Plan for the
Project.
22. The Recipient shall publish the Specific Procurement Notices (SPN) for all goods, works, non-consulting services,
and the Requests for Expressions of Interest on their free-access websites, if available, and in at least one newspaper of
national circulation in the Recipient’s country, and in the official gazette. For open international procurement selection
of consultants using an international shortlist, the Recipient shall also publish the SPN in UNDB online and, if possible, in
an international newspaper of wide circulation; and the World Bank arranges for the simultaneous publication of the SPN
on its external website.
23. The World Bank’s standard procurement documents would be used for all contracts that are subject to
international competitive procurement. For procurement in the national market, the GoH’s procurement procedures may
be used in accordance with the National Procurement Arrangements (paragraph 5.3) of the Procurement Regulations.
This would be specified in the Procurement Plan tables in STEP. When the GoH uses national open competitive
procurement arrangements, as set forth in the 2009 law specifying the general rules relating to public contracts and
public service concession agreements, such arrangements would be subject to paragraph 5.4 of the Procurement
Regulations and the conditions included in the Grant Agreement. National procurement arrangements, other than
national open competitive procurement arrangements applied by the GoH, would be subject to paragraph 5.5 of the
Procurement Regulations.
24. The recruitment of civil servants as individual consultants or as part of the team of consulting firms would abide by
the provisions of paragraph 3.23 (d) of the Procurement Regulations.
25. Procurement Assessment: The Project Implementation Unit in the MTPTC, UCE-MTPTC, would have the overall
responsibility of carrying out procurement activities. A procurement capacity assessment of the UCE has been conducted
and revealed that the UCE has strong experience in the World Bank and GoH’s procedures for implementing World Bank-
financed projects. The unit has a manual of procedures in place that need to be revised and used for this Project. UCE-
Page 51 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
MTPTC is currently implementing four projects financed by the World Bank, and in addition to the CATCOP-Haiti, UCE-
MTPTC is implementing the recently approved CHUD. The two new projects would bring considerable additional workload
to the already existing one. For many years, UCE-MTPTC was staffed by only one experienced procurement specialist who
is also acting as deputy coordinator. Recently, UCE-MTPTC hired a second procurement specialist who, although new to
the World Bank’s procedures, has some experience with IDB projects. The two procurement specialists would share the
workload and work closely to share experience. In addition, the assessment found the following weaknesses: (i) delays in
the implementation of and poor quality of reporting; (ii) absence of an appropriate filing system; (iii) noncompliance with
the procurement framework; and (iv) no internal or external oversight of procurement activities. To mitigate the risks,
the following measures are proposed: (i) appoint a procurement assistant to help on the administrative tasks and filing;
(ii) strengthen the technical team with an MDOD/AMO; (iii) prepare a comprehensive and detailed procurement plan;
(iv) use MDOD/AMO to complement the preparation of procurement packages and, in particular, advise on technical
requirements and conduct the evaluation of bids/proposals for activities; (vi) conduct a procurement audit annually
during the Project’s life; and (vii) train the procurement specialists and technical experts on the World Bank’s
Procurement Regulations and contract management.
26. Operational Costs. Operational costs financed by the Project would be incremental expenditures, including office
supplies, vehicle operation and maintenance costs, communication costs, rental expenditures, utilities expenditures,
consumables, transport and accommodation, per diem, supervision costs, and salaries of locally contracted support staff.
Such services’ needs would be procured using the procurement procedures specified in the POM accepted and approved
by the World Bank.
27. Filing and Record Keeping. The Procurement Procedures Manual sets out the detailed procedures for maintaining
and providing readily available access to Project procurement records, in compliance with the loan agreement. The
implementing agency would assign one person who would be responsible for maintaining the records. A logbook of
contracts with a unique numbering system shall be maintained.
28. Contingent Emergency Response Component. The procurement arrangements applicable under Component 4,
the Contingent Emergency Response Component, shall be described in the Emergency Operation Manual, which shall be
prepared by the Recipient and agreed with the World Bank in due time to ensure that it is in place before the occurrence
of any potential emergency that would require using this subcomponent.
29. Project Procurement Strategy for Development. To determine the adequate and optimal procurement strategy
for the best market response, the Borrower has prepared the PPSD with the support of the World Bank and a summary
has been added in Annex 3.
30. Procurement Methods and Thresholds. Thresholds for procurement methods and prior review are shown below.
Table 1A.1. Thresholds for Procurement Methods and Prior Review
Expenditure Category World Bank Prior Review or as Indicated in the Procurement Plan
1. Works All contracts estimated at US$5,000,000 and above
2. Goods and non-consultant services All contracts estimated at US$1,000,000 and above
3. Consultant services All Terms of Reference
All contracts estimated at US$500,000
All contracts for individual consultant estimated at US$200,000 and
above
Page 52 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
31. Procurement Risk Rating. The proposed Project’s Procurement Risk prior to the proposed mitigation measures is
“High.” The risk can be reduced to a residual rating of “Substantial” upon consideration of successful implementation of
the mitigation measures. The risks and mitigation measures are listed in the table below.
Table 1A.2. Procurement Risks and Mitigation Measures
Risk Description Description of Mitigation Risk Owner
Heavy workload and delays Appropriate share of workload between the two procurement UCE/MTPTC
in Project implementation specialists
Hire a procurement assistant to help on administrative tasks and filing
Strengthen the technical team of UCE in Port-au-Prince
Poor quality of deliverables Train the procurement staff and technical experts on contract UCE-MTPTC and
of contractors and management WB
consultants Use a MDOD/AMO to support the procurement processes
Loss of documents - Provide detailed descriptions on documents filings UCE/MTPTC
Archiving system File hard copies and use STEP procurement for electronic filing
Noncompliance with the Train the procurement staff and technical experts on the procurement UCE-MTPTC and
procurement framework framework WB
Annual procurement audit
32. Procurement Plan. The procurement plan has been prepared and would be updated in agreement with the World
Bank team annually or as required to reflect the actual project implementation needs and improvements in institutional
capacity.
Implementation Support Plan
33. The implementation support plan is built around extensive implementation support provided by the World Bank’s
technical and operational support staff, including experts in aviation, airport management, and hydraulic and pavement
engineers with a strong background in building resilient infrastructure. It would consist of regular missions jointly with
the Recipient, video-conference meetings as well as periodic fiduciary compliance reviews.
34. Given the fragile and volatile institutional context in which the Project would be implemented, the Project would
require dedicated implementation support and continuous assessment of whether the changing circumstances in the
national and local context call for adjusting project implementation arrangements and/or design, including the use of
third parties, ICT-based supervision. An MTR would be conducted after approximately 36 months of implementation to
review performance in depth, based on progress and studies commissioned for the MTR, and to make any adjustments
to the Project. In addition to the MTR, the team would conduct yearly reviews of the Project’s progress to assess whether
any adjustments of the Project design or implementation models are needed.
35. It is projected that a total of 22 implementation support missions would be required over the life of the proposed
Project. Beyond the startup of the proposed Project, these are intended to take place every four months. Key areas of
focus for the first months of Project implementation include:
a. Monitoring of procurement for: (i) the MDOD/AMO estimated to be contracted by Project effectiveness;
(ii) the design contract for the major activities under Components 1 and 2, including contracts for the
Page 53 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
construction of the taxiway at PAP and the rehabilitation of the runway at CAP to be signed by December
2020; and (iii) the contract for the ADS-B equipment at both airports to be signed by January 2021.
b. Ensuring that UCE-MTPTC will hire a procurement assistant (the ToRs are being finalized and the contracts
are expected to be signed by project approval).
c. Ensuring that all Project implementation requirements needed to allow for disbursements are in place
(for example, establishment of designated account and specimen of signatures).
d. Conduct all required training to ensure that newly recruited staff is knowledgeable of World Bank fiduciary
and ESF requirements.
e. Enhancing UCE capacity for adapting to a COVID-19 environment, including trainings for best COVID-
informed construction site practices and overall worksite safety management both at the ministerial
level and for Haitian construction contractors
f. Coordination with main partners (IDB) to ensure synergies with other planned and ongoing projects.
36. A coordination committee between CATCOP participating countries is expected to be put in place to oversee the
implementation and harmonization of trainings to be carried out under the Project. The coordination committee would
be formed as soon as CATCOP projects are approved for all participating countries.
37. The following mix of skills and resource needs are estimated:
Table 1A.3. Implementation Support (for the duration of the Project)
Skill Needs Number of Staff Number of Trips Comments
Weeks
TTL 70 Based in country 8 implementation support missions during the first year;
6 the following years + technical visits to solve
bottlenecks, as needed.
Co-TTL 70 15 4 implementation support missions during the first year;
3 the following years + technical visits to solve
bottlenecks, as needed.
Aviation specialist 25 12 Twice-a-year missions, routine support, as needed.
Airport specialist 30 8 Twice-a-year missions, routine support, as needed.
Procurement 50 Based in country Twice-a-year missions, routine support, as needed.
Hydraulic engineer 30 12 Twice-a-year missions, routine support, as needed.
Financial management 50 Based in country Twice-a-year missions, routine support, as needed.
Pavement engineer 30 12 Twice-a-year missions, routine support, as needed.
Environmental safeguards 50 15 Twice-a-year missions, routine support, as needed.
Social safeguards 50 8 Twice-a-year missions, routine support, as needed.
Program assistant 30 Based in country Support as needed for mission planning, etc.
Legal 2 0 Staff weeks if needed
Disbursement 2 0
Monitoring and Evaluation
Joint supervision missions by the GoH and the World Bank would monitor the status of Project outcomes, safeguards,
and legal covenant compliance. A dedicated monitoring and evaluation (M&E) staff would be located in the UCE-MTPTC.
A dedicated Project M&E system that would be strengthened would capture Project outputs and outcomes,
communication and awareness raising activities, environmental and social safeguards activities, and the activities of the
Page 54 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Grievance Redress Mechanism (GRM). Detailed progress reports would be prepared by the UCE-MTPTC on a semiannual
basis and submitted to the World Bank no later than 45 days after the end of the period. These detailed progress reports
should indicate the progress made under the different components of the proposed Project and measure performance
against the results indicators established in the Results Framework.
Page 55 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 2: Detailed Project Description
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
1. The proposed Project would include four components: (i) PAP and CAP operational safety and navigation efficiency
investments; (ii) PAP and CAP airfield drainage system improvements; (iii) institutional strengthening and project
management; and (iv) contingent emergency response. Total Project cost is estimated at US$84 million.
2. Component 1: PAP and CAP operational safety and navigation efficiency investments (Total Cost: US$58 million).
Component 1 would support infrastructure and equipment at Haiti’s two key (international) airports—PAP and CAP—
with the aim of enhancing the safety of air transport operations in compliance with international standards (ICAO SARPs
and OFNAC requirements), and airfield capacity standards to accommodate air traffic, including in post-disaster relief
efforts. This component would finance inter alia:
(i) Civil works, including: (i) PAP taxiway and apron expansion; (ii) CAP runway rehabilitation and airfield
ground lighting installation; (iii) PAP RESAs construction; and (d) CAP ATCT replacement;
(ii) Purchase and installation of equipment to upgrade and modernize air traffic monitoring and control
capacity in compliance with international standards and requirements and with the regional air navigation
plans: (i) Automatic Dependent Surveillance-Broadcast (ADS-B), and (ii) communication and surveillance
technology for the new CAP ATCT; and
(iii) Consulting and non-consulting services for corresponding supervision activities, associated technical
studies as needed, including for relevant social and environmental safeguards instruments.
(iv)
3. The civil works to be financed under Component 1 would integrate climate/disaster resilience measures to the
maximum extent practicable (for example, through appropriate choice of materials and design of enhanced drainage
features). Likewise, for all equipment purchases, the investments would incorporate resilient designs to the maximum
extent practicable (for example, elevated power generator and storm-resistant tower cab for the new CAP ATCT). As
such, Component 1 would contribute to the overall climate/disaster resilience and sustainability of Haiti’s two primary
airports. With the exception of one or more ADS-B antenna(s), all Component 1 investments would be located within the
perimeter of each airport. The civil works will also be implemented according to best COVID-19-informed construction
site practices and overall worksite safety management.
4. CAP runway rehabilitation: Rehabilitating the CAP runway is a high-priority project due to the runway’s poor and
deteriorating condition. There are numerous cracks evident along the entire length of the runway and airlines have
complained about deteriorating and weak pavement, especially in the touchdown zone on the Runway 5 end. As such,
to comply with ICAO standards for runway pavement conditions and improve aircraft operational safety (by reducing risk
of damage to the aircraft undercarriage associated with weak and cracked pavement conditions), the following
investments are anticipated: (a) milling and repaving the full length of the runway; and (b) installation of Airfield Ground
Lighting (AGL) for the runway.
5. PAP taxiway and aircraft parking apron expansion: The construction of additional taxiways and aircraft parking
apron would eliminate significant bottlenecks and inefficiencies in aircraft movements, reduce aircraft CO2 emissions,
improve aircraft operating safety, and allow PAP to better accommodate major air traffic demand surges associated with
Page 56 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
post-disaster relief flights. Specifically, this subcomponent would finance (a) the construction of a partial parallel taxiway
of approximately 1,100 meters in length (the width of the existing aircraft parking apron) at a 172.5-meter centerline-to-
centerline separation from the runway, (b) three additional connector taxiways linking the aircraft parking apron to the
runway and the new parallel taxiway, and (c) reparation and new aircraft parking apron with approximate dimensions of
90 x 290 meters. See below for a conceptual illustration and additional discussion of these improvements.
6. Constructing PAP RESAs: Construction of ICAO-required Runway End Safety Areas (RESAs) for both PAP runway
ends would improve operational safety and comply with ICAO SARPs. The new RESA for each runway end would
contribute to mitigate the risk to aircraft and of potential associated fatalities associated with runway excursions by
providing 60 meters of paved stopway from the runway end and reinforcing the grounds for at least another 90 meters
(for a total of 150 meters from the runway end). These improvements would contribute to reduce the risk of aircraft fire
or other damage in case of undershooting or overshooting the runway during a landing or overshooting during an aborted
takeoff.
7. Constructing a CAP Air Traffic Control Tower (ATCT), replacement and installation of communication and
surveillance technology: Deployment of a replacement ATCT at CAP would enhance the safety of aircraft operations by
replacing the current temporary ATCT, which does not currently provide full line of sight to both runway ends. A new
ATCT that is both location and height compliant with ICAO SARPs would be financed along with the installation of
associated communication and surveillance technology. According to ICAO SARPs, an ATCT must provide unobstructed
visibility to both runway ends, the aircraft movement areas, and ideally to most of the security perimeter. The Project
aims to finance a basic ATCT, including associated installation of communication and surveillance technology, in a location
and at a height required to meet the ICAO visibility requirements. Implementation would also contribute to Haiti’s efforts
to abide by the POS signed in 2014. The existing temporary ATCT would be maintained until the full completion of the
work. The new ATCT would be equipped with portable power generators to ensure continuous operation, including during
power outages. To improve the resilience of the ATCT during flooding events, these power generators would be placed
securely on an elevated platform rather than at ground level where flooding events could render them inoperable.
Additionally, the ATCT cab would incorporate storm-resistant features to the maximum extent practicable.
8. ADS-B for PAP and CAP: Implementing Automatic Dependent Surveillance-Broadcast for PAP and CAP, including
receiver antenna(s), consoles for each ATCT, and equipping Haiti-based aircraft would contribute to improving aircraft
operations safety by allowing continuous position reports of most aircraft thereby greatly improving situational
awareness for air traffic controllers and pilots.
9. Component 2: PAP and CAP airfield drainage system Improvements (Total Cost: US$14 million). These
investments seek to reduce the risk of airfield flooding associated with the annual rainy season, hurricanes, and climate
change at PAP and CAP and thus improve their climate/disaster resilience. This component would finance inter alia:
(i) Civil works, including: (a) CAP drainage system improvement; and (b) PAP airfield drainage improvements
and flood management. Investments would be located within the perimeter of both airports, and
(ii) Consulting and non-consulting services for corresponding supervision activities, associated technical
studies, as needed, including for relevant social and environmental safeguards instruments.
10. PAP airfield drainage improvements: Implementing airfield drainage improvements by leveraging the civil works
associated with the new taxiway system and RESAs would improve PAP’s climate resilience. This would include, but is
not limited to, expanded drainage canals, overflow retention ponds in areas distant from airfield pavements, and sump
Page 57 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
pumps in critical locations.
11. CAP drainage system improvement:
• Improvement of the East-West River System (US$1.7 million):
- Deepening and widening the existing ditch (up to 1 meter below current bottom level and up to 20 meters
wide);
- Dredging a new ditch (~15 meters wide) between the entrance of river Any to the drainage system parallel to
the runway;
- Replacing the existing fences in river Any at the eastern entrance and western exit of the airport by larger
versions;
- Replacing the existing culvert under the maintenance road east of the runway by two large culverts. One
culvert would be connected to the east-west ditch, the other culvert to the new ditch and the drainage system
parallel to the runway; and
- Replacing the existing culvert under the maintenance road west of the runway with a larger version.
• Improvement of the South-North Drainage System (US$4.7 million):
- Deepening and widening the existing ditch (~2 meters below surface level and ~15 meters wide), and
connecting the abovementioned new ditch to it;
- Deepening and widening the existing 350-meter long canal north of the runway (~2 meters below surface
level and ~15 meters wide); and
- Replacing the current culvert of the maintenance road north of the runway by a larger version (~15 meters
wide).
Image 1A.1. Conceptual Illustration of PAP Airfield Safety and Capacity Investments
New taxiways
New aircraft apron
Paved Runway Strip (1st 60 meters) and Runway End Safety Area (additional 90 meters)
Page 58 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Image 1A.2. Conceptual Illustration of CAP Airfield Safety and Capacity Investments
Existing Air Traffic Control Tower (to be replaced)
Runway rehabilitation
12. Component 3: Institutional strengthening and project management (Total Cost: US$12 million). This component
aims to: (i) strengthen the institutional capacity of the MTPTC, AAN, and OFNAC to manage, operate, and oversee airport
operations and their development through a combination of TA activities and training; (ii) provide TA to assess the
capabilities, needs, and opportunities for the use of Unmanned Aircraft Systems (UAS) in Haiti, to define the associated
legal framework as well as to launch a pilot operational framework; and (iii) finance Project implementation support.
With respect to institutional capacity, the focus would be on enhancing: (i) aircraft operational safety and associated air
transport sector regulatory oversight; (ii) the quality of airport management, operations, and maintenance; and (iii)
capacity for improving climate/disaster resilience and gender diversity in the aviation sector. In support of this, the Project
would finance consulting and non-consulting services plus the provision of goods.
13. Institutional strengthening activities would include: (i) a gap analysis of OFNAC regulatory oversight; (ii) a gap
analysis of AAN operations and financial management; (iii) OFNAC aviation safety inspector training; (iv) Rescue
Coordination Center equipment upgrades and staff training; (v) implementation of an Airport Operations Center with
joint AAN/OFNAC staffing; (vi) preparation of an aviation sector strategy to guide Haiti’s aviation sector investments and
management priorities for the next 10 years; and (vii) TA to improve airspace regulation and legal framework in order to
Page 59 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ensure safe UAS-based transport operations (for example, drones). The proposed Project would also support: (i) ICAO
SARP’s compliance screening for all CATCOP airports at the beginning and end of the Project; (ii) air traffic control skills
enhancement training; (iii) Crash Fire Rescue skills enhancement training; (iv) climate/disaster resilience best practices
and skills training; (v) wildlife management plan development and implementation for all CATCOP airports; (vi) analysis
of recruitment, retention, and promotion barriers for women to participate in the aviation sector; (vii) development of
gender action plans, accompanied by organizational gender diversity training and programs development for all airport
operators and regulators (including programs targeted at significantly increasing the share of female air traffic controllers
and public safety and security screening staff); and (iv) capacity building for adapting to a COVID-19 environment,
including trainings for best COVID-informed construction site practices and overall worksite safety management both at
the ministerial level and for Haitian construction contractors.
14. Project Management: Project implementation activities would include supporting the overall management,
supervision, fiduciary control, and monitoring and evaluation (M&E) of the Project, and the associated staff within the
Project Implementation Unit (PIU). This would include financing to: (i) hire specialized staff or consultants for Project
implementation; (ii) carry out the Project’s M&E activities; (iii) carry out Project reporting and audits; (iv) conduct capacity
building activities (including the MDOD/AMO) linked to project implementations in areas such as procurement,
safeguards, M&E, communication, citizen engagement, technical and financial management; and (v) cover operating
costs.
15. Component 4: Contingent emergency response (Total Cost: US$0 million). Due to the high risk of catastrophic
events in Haiti, the proposed Project would include a contingent component for rapid response in the event of an eligible
emergency, subject to the request of the GoH. This component would provide immediate response to an eligible
emergency, as needed. Such components, which include triggers and conditions for the use of funds, are included in most
investment projects in Haiti, in keeping with the recommendations of the 2011 World Development Report: Conflict,
Security, and Development, and with the World Bank’s operational experience in Haiti when responding to natural
catastrophic events.
Page 60 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 3: Executive Summary for Procurement Plan and PPSD
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
1. The CATCOP-Haiti Project in the amount of US$84 million can be broken down into four components: (i) PAP and
CAP operational safety and navigation efficiency investments (US$58 million), (ii) PAP and CAP airfield drainage
system Improvements (US$14 million), (iii) Institutional Strengthening and Project Management (US$12 million), (iv)
contingency emergency interventions (US$0). The major activities and contracts of the Project are part of
Components 1 and 2. These activities mainly consist of works and equipment purchases. These components total
US$70 million, or 87 percent of the Project's CATCOP-Haiti budget.
2. To determine the adequate and optimal procurement strategy for the best market response, a PPSD has been
prepared to adequately consider, among others, the operational context, past experiences, and market situation.
As a result, the following assessments and decisions were made:
• The operational context related to political instability, administrative and decision-making procedures, natural
hazards, and exchange rate fluctuations may have a significant impact on the implementation of activities
and/or their cost. Part of these risks can be mitigated through the experience that the Project Implementation
Unit—the Unité Centrale d’Exécution (UCE)—has acquired over time in the implementation of World Bank-
financed projects.
• The UCE has limited capacity to implement the CATCOP-Haiti Project. It would, therefore, be reinforced by a
TA to expand its capacity to manage the technical complexity of the planned interventions and the tight
schedule ahead. To do so, the UCE would recruit a Delegated Implementing Agencies model (Maîtrise
d’Ouvrage Déléguée or Assistance à Maîtrise d’Ouvrage MDOD/AMO), which would have a proven
international track record in airport management.
• Market analysis has highlighted the limited capacity of local companies for the implementation of works and
the supply of specialized equipment. Works and equipment contracts would, therefore, be opened to
international tenders.
3. In addition, the PPSD identified three activities with significant risk-budget profiles, estimated at around US$54.5
million. These activities are: (i) the construction of a new taxiway system and aircraft parking apron expansion,
drainage, and construction of runway end safety areas (RESA) at PAP; (ii) runway rehabilitation and installation of
Airfield Ground Lighting (AGL), including generator for AGL, and improvement of the existing drainage system at
CAP; and (iii) the design and construction of a fully equipped Air Traffic Control Tower (ATCT), including generator,
at CAP. To mitigate procurement risks associated with these contracts, it is envisaged to use turnkey contracts for
each of these activities (design-build contracts). This would, among other things, improve compliance with norms
and standards in the sector.
Page 61 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 4: Detailed Economic Analysis
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
1. The improved safety and resilience at Haiti’s two major international airports would clearly deliver substantial
economic benefits to the country as any material enhancement or degradation of air services for island nations like Haiti
would have significant and rapid economic and social consequences given air transport is their primary means of
economic and cultural connectivity to the rest of the world. Accordingly, failure to adequately address the operational
safety deficiencies at Haiti’s international airports would likely result in a steady withdrawal of both domestic and
international air services. The economic costs that a loss of such connectivity would entail would impact the entire Haitian
economy, not just the regions of Port-au-Prince and Cap-Haïtien. The loss of or curtailment of airline services would affect
the entire society throughout Haiti, including the flows of tourism, remittances, labor, goods, services, knowledge, and
investments.
Major economic benefits of the project
Capacity increase at PAP
2. The Project would enhance PAP’s ability to serve as the country’s primary port of entry/exit in the immediate
aftermath of disasters when humanitarian and other relief flight activity dramatically increases. After the 2010
earthquake and Hurricane Matthew in 2016, PAP was unable to accommodate the surge in flight activity due to
inadequate runway and aircraft parking capacity. This resulted in many flights being diverted to other countries or
cancelled altogether. In some situations, inadequate runway capacity was the critical factor preventing aid flights from
landing, while in others it was lack of parking space for aircraft. Accordingly, the Project would address this by: (a)
constructing a new taxiway system (i.e., a partial parallel taxiway and two additional perpendicular taxiways connecting
the runway to the aircraft apron) that would reduce runway occupancy times thereby increasing runway throughput; and
(b) constructing additional aircraft parking apron to allow more aircraft to simultaneously load/unload passengers and
cargo.
3. In the short term, these investments would contribute to: (a) reduced airline operating costs through lower fuel
burn and crew costs associated with reduced aircraft taxiing time and arrival/departure queuing (also reduced carbon
emissions) on a daily basis; and (b) reduced risk of airline service reductions during apron rehabilitation by providing new
remote apron area. In the long run, these investments would significantly improve PAP’s ability to fill its critical and unique
role as the primary (and perhaps only) gateway for movement of people and goods in/out of the country in a post-disaster
scenario and reduce a risk of loss of life and human suffering post disaster by accommodating surges in humanitarian and
other relief flight activity.
Runway rehabilitation at CAP
4. The Project would address the greatest concern expressed by airport management and the airlines—the poor and
deteriorating condition of the runway. This concern, if not quickly addressed, may soon result in air service reductions
or elimination by airlines serving international destinations (for example, American Airlines’ service to Miami) given the
safety risks associated with aircraft landing or departing on a runway with poor pavement quality (for example, the risk
of loose pavement debris entering a jet engine or damage to aircraft landing gear). If not addressed in the longer term,
the runway could reach a point of failure necessitating closure of the runway (and, therefore, the airport) for a period of
weeks or months while emergency repairs are made. In both scenarios, the economic consequences would be substantial
Page 62 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
for Cap-Haïtien, as well as for Haiti overall given it is the country’s second-largest city.
5. The support provided by the proposed Project would reduce: (a) risk of aircraft accidents/incidents and associated
loss of life; and (b) risk of airport closure due to major pavement failure and associated economic loss to the region and
country.
Resilience improvement at PAP and CAP
6. The proposed Project would also address another significant concern at CAP and PAP—the risk of severe flooding
resulting in airport closure—through the improvement of the drainage systems at both PAP and CAP. The Project would
reduce the probability of severe airfield flooding and the duration of such an event. The improvement of the existing
drainage systems and river passage through the airport is part of a greater strategy to enhance the economic and social
development of Cap-Haïtien. Increased resiliency for Cap-Haïtien, especially with respect to flood risk reduction, is critical
to the development of the city.
7. In the short term, this investment would reduce the risk of airport closure for both PAP and CAP due to airfield
flooding risk reduction, and would eventually contribute to enhanced national and regional resilience to natural disasters
and reduce the risk of loss of life and human suffering post disaster by ensuring the availability of functional airports
during emergency operations.
Air traffic safety enhancement
8. The benefits of the abovementioned investments (PAP taxiway improvements, PAP and CAP drainage
improvements, CAP runway rehabilitation) are expected to be significantly complemented by safety improvements from
the rest of investments planned under the Project, which are focused on enhancing operational safety at targeted
airports. These include: (i) the construction of RESAs; (ii) the replacement of CAP Air Traffic Control Tower (ATCT); and
(iii) the ADS-B installation. These would contribute to further reduce the risk of aircraft accidents/incidents and associated
loss of life.
9. The table below summarizes the proposed Project’s direct impacts as well as the associated economic benefits.
Table A4.1. Project’s Direct Impact and Economic Benefits
Outputs Direct Impact Economic Benefits
Component 1: PAP PAP
PAP and CAP Air • Improved aircraft operational safety by reducing • Reduced loss of life associated with natural disasters
Transport Safety and the risk of aircraft incidents or crashes through through increased ability to accommodate surges in
Navigation Efficiency RESAs and improving situational awareness for humanitarian and other relief flight activity
Investments controllers and pilots through ADS-B • Reduced airline operating costs through lower fuel
• Improved capacity to accommodate air traffic burn and crew costs associated with reduced aircraft
PAP: Taxiway & apron surges associated with post-disaster relief flights taxiing time and arrival/departure queuing (also
expansion, RESAs, through: (a) an expanded taxiway system to reduced carbon emissions)
ADS-B reduce runway occupancy times; and (b) • Reduced risk of short-term airline service reductions
increasing aircraft parking apron capacity to during apron rehabilitation by providing new remote
CAP: Runway
allow more simultaneous unloading of aircraft apron area
rehabilitation,
• Reduced aircraft taxiing distances and • New AAN revenue opportunity associated with airlines
Replacement ATCT,
associated arrival/departure delays and carbon parking aircraft overnight at the new remote apron
ADS-B
emissions by implementing an expanded positions
Page 63 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
taxiway system which would reduce runway • Reduced risk of aircraft accidents/incidents through
occupancy times investments in an improved taxiway system, RESAs,
• Facilitated needed repairs/upgrades to existing ADS-B, and improved wildlife management
aircraft parking apron by providing remote (Component 3)
aircraft parking positions during the • Reduced risk of long-term airline service reductions
construction period and improve odds of airline service growth by
• Increased airline confidence in serving PAP by increasing compliance with ICAO SARPs, improving
increasing compliance with ICAO SARPs, aircraft operational safety, improving efficiency of
improving aircraft operational safety, improving airside operations, improving airfield climate resilience
efficiency of airfield operations, and improving (Component 2), and improving airport
airfield climate resilience (Component 2) management/operations (Component 3)
CAP CAP
• Improved aircraft operational safety at CAP by • Reduced risk of aircraft accidents/incidents through
reducing the risk of aircraft incidents or crashes improved runway pavement, new ATCT, ADS-B, and
through improving runway pavement improved wildlife management (Component 3)
conditions; providing an ICAO-compliant Air • Increased ability to accommodate humanitarian and
Traffic Control Tower (ATCT) with improved other relief flight activity in the immediate aftermath
equipment and runway visibility; and improving of natural disasters
situational awareness for controllers and pilots • Reduced risk of a short to medium-term airport
through ADS-B closure due to sudden catastrophic runway pavement
• Increased airline confidence in serving CAP and failure through a preventative full runway
reduce the risk of airlines curtailing service by rehabilitation
resolving high-profile concerns about poor • Reduced risk of temporary airport closures due to
runway pavement conditions and increasing ATCT damage through improving its resilience
compliance with ICAO SARPs • Reduced risk of airline service reductions due to
• Improved the ability of CAP to continue concerns about runway pavement conditions
providing air services after a natural disaster • Improved odds of airline service growth by resolving
through: (i) airfield drainage/resilience high-profile concerns about poor runway pavement
enhancements and associated reduced risk of conditions, increasing compliance with ICAO SARPs,
airfield flooding (Component 2); and (ii) and improving airport management/operations
enhanced climate/disaster resilience of the (Component 3)
ATCT
Component 2: PAP PAP
PAP & CAP Airfield • Improved airport climate/disaster resilience • Reduced risk of airport closure due to airfield flooding
Drainage through airfield drainage enhancements and CAP
Improvements associated reduced risk of airfield flooding • Reduced risk of airport closure due to airfield flooding
CAP • Enhanced economic development potential for Cap-
PAP: Upgraded • Improved airport climate/disaster resilience Haïtien by helping address high-profile flooding risks
airfield drainage through airfield drainage enhancements and for the city
associated reduced risk of airfield flooding
CAP: Rehabilitated
• Improved Cap-Haïtien climate/disaster
and expanded airfield
resilience (by integrating and coordinating on-
drainage
airport and off-airport drainage improvement
projects)
Component 3: • Improved AAN/OFNAC management and • Improved airport financial performance due to
Technical Assistance operational skills through capacity building enhanced AAN and OFNAC management and
investments operational skills and improved decision-making focus
AAN/OFNAC Capacity
• Improved decision-making focus and quality of and quality
Building; Aviation
AAN/OFNAC through preparation of an Aviation • Reduced risk of aircraft accidents/incidents through
Sector Strategy;
Sector Strategy preparation of a Wildlife Management Plan
• Improved climate/disaster resilience of airports
Page 64 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Wildlife Management • Improved aircraft operational safety through
Plan preparation of a Wildlife Management Plan
• Improved the integration of climate/disaster
resilience into planning, design, and operation
of airports
Gender Action Plan • Improved gender inclusion among airport • Improved gender inclusion in air transport sector
operators and regulators
Cost-Benefit Analysis
10. The analysis follows a standard incremental cost-benefit analysis (CBA) methodology in compliance with World
Bank Operational Policy (OP) 10.04. The analysis focuses on the benefits associated with the PAP taxiway improvements
as well as the benefits associated with the CAP runway rehabilitation. The PAP taxiway improvements would deliver
substantial and quantifiable economic benefits on reduced airline operating costs through lower fuel burn and crew costs
associated with reduced aircraft taxiing time and arrival/departure queuing. The detailed methodology is summarized
below. The benefits from reduced airport closures in CAP due to (i) flooding and (ii) runway repairs that interrupt the
flight schedule, result directly from the proposed runway rehabilitation.
PAP taxiway improvements
11. The PAP taxiway improvements yield two key benefits: (i) reduced aircraft taxiing distance and time for arrivals and
departures due to the two additional runway entrance/exit taxiways and associated reduced back-taxiing on the runway;
and (ii) reduced aircraft delays due to the runway capacity enhancement gains from reducing average runway occupancy
time (ROT). The ROT is estimated to be reduced by 2.8 minutes for arrivals and 0.5 minutes for departures, which
translates to a capacity gain of almost 10 operations per hour (from 16 to 25.5 operations per hour). At current demand
levels, this translates to delay savings of approximately 1.5 minutes per aircraft turnaround. The following tables
summarize the expected aircraft operating time savings (delay and taxiing) associated with the CATCOP-Haiti taxiway
improvements.
Table A4.2. Departure Runway Occupancy Time Analysis
Baseline With Project Unit
Taxi distance 1,280 1,075 meters
Taxi speed 24 24 kph
Taxi time 3.20 2.69 minutes
Runway clearance time 0.67 0.67 minutes
Total 3.87 3.35 minutes
Saving 0.51 minutes
Table A4.3. Arrival Runway Occupancy Time Analysis
Baseline With Project Unit
Taxi distance 1,130 204 meters
Taxi speed 24 24 kph
Taxi time 2.83 0.51 minutes
Page 65 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
Landing rollout time 0.83 0.83 minutes
Total 3.66 1.34 minutes
Saving 2.32 minutes
Table A4.4. Average Operational Time Saving per Flight
Time (minutes)
Aircraft arrival savings 4.0
Airspace delay 1.2
Taxiing 2.3
Aircraft departure savings 0.8
Departure delay 0.3
Taxiing 0.5
Aircraft turnaround 4.3
12. These operational time savings translate in a monetary term as airline cost savings and passenger time savings. The
following assumptions are used:
• Airline direct operating cost per block minute of US$74.2029
• Passenger time value of US$49 per hour30
• Annual airport operation of 26,112 (both arrival and departure)
• Average 66 passengers per flight
13. With the above assumptions, the taxiway improvement would generate the following annual economic benefits:
Table A4.5. Annual Economic Benefits of Taxiway Improvement
Airline cost savings (US$) 3.8 million
Passenger time savings (US$) 3.0 million
Total annual savings (US$) 6.8 million
CAP runway rehabilitation
Airport closure days
14. Based on recent experience, the airport closure due to flooding is assumed to be on average one day per year
without the Project. Rehabilitating the runway is expected to reduce this airport closure by half a day.31 In the with-Project
scenario, the benefit of limiting airport closure due to flooding from one day to half a day per year is accounted for after
Project completion (from 2025 onwards).
29 Airlines for America. U.S. Passenger Carrier Delay Costs (database). https://www.airlines.org/dataset/per-minute-cost-of-delays-to-u-s-
airlines/.
30 Airlines for America. U.S. Passenger Carrier Delay Costs (database). https://www.airlines.org/dataset/per-minute-cost-of-delays-to-u-s-
airlines/.
31 In previous years, flooding has led to CAP closing for up to a week, but this was partially due to flood consequences outside of the runway.
Page 66 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
15. The current condition of the runway would need continuous repairs. Without the project, starting in 2024, an
airport closure of one full day per year would be needed to repair the runway from overuse. This number is expected to
increase annually, by one day, reaching 20 days of airport closure due to runway repairs by 2043. Given the current
condition of the runway, this assumption is very conservative.
Airport closure costs
16. For the purpose of this analysis, the airport closure costs for passengers and cargo flights have been considered.
The client provided passenger and cargo data for the years 2018 and 2019, and the team conservatively assumed these
numbers to remain stable over the Project evaluation horizon.
17. The daily shutdown cost for passengers was calculated by multiplying the daily passenger numbers by the total
cost per passenger of US$112. This value has been established based on several individual studies and includes the
passengers’ value of time (based on average wage rates) as well as the cost for missed appointments and resulting
financial losses (possibly carried by insurance companies).32
18. The daily shutdown costs related to delayed pickup and delivery of cargo were calculated by multiplying daily cargo
volumes with the cost of delay of US$0.83 per kg per hour. This value by kilogram is as a weighted average of a typical
cargo load of varying priorities.33
Table A4.6. Inputs for Calculation of Airport Closure Costs Due to Flooding and Runway Repairs
Passenger Costs Cargo Costs Airport Closure34
Year Passengers Cost per passenger Passenger cost Cargo per day Cargo cost With Without
per day per day (USD) per day (USD) (kg) per day Project Project
(USD) (days) (days)
2020 507 112 56,933 139 916 1 1
2021 507 112 56,933 139 916 1 1
2022 507 112 56,933 139 916 1 1
2023 507 112 56,933 139 916 1 1
2024 507 112 56,933 139 916 1 1
2025 507 112 56,933 139 916 1 2
2026 507 112 56,933 139 916 0.5 3
2027 507 112 56,933 139 916 0.5 4
2028 507 112 56,933 139 916 0.5 5
2029 507 112 56,933 139 916 0.5 6
2030 507 112 56,933 139 916 0.5 7
32 DeLanghe, K.S., et al. "Economic effects and costs of a temporary shutdown of an airport—Review and case study." Proceedings of the
13th World Conference on Transportation Research Society, Rio de Janeiro, Brazil. 2013 (accessed February 11, 2020), http://www. wctrs.
leeds. ac. uk/wp/wp-content/uploads/abstracts/rio/general/1621. Pdf.
33 Liu, Yulin, Mogeng Yin, and Mark Hansen. 2016. "Estimating Costs of Flight Delay for Air Cargo Operations." Institute of Transportation
Studies,University of California, Berkeley.
http://www.icrat.org/icrat/seminarContent/2016/presentations/67/ICRAT_2016_Presentation_file_67.pdf
34 Total airport closure days are the sum of airport closure days due to flooding and due to runway repair, as described in section “Airport
closure” above.
Page 67 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
2031 507 112 56,933 139 916 0.5 8
2032 507 112 56,933 139 916 0.5 9
2033 507 112 56,933 139 916 0.5 10
2034 507 112 56,933 139 916 0.5 11
2035 507 112 56,933 139 916 0.5 12
2036 507 112 56,933 139 916 0.5 13
2037 507 112 56,933 139 916 0.5 14
2038 507 112 56,933 139 916 0.5 15
2039 507 112 56,933 139 916 0.5 16
2040 507 112 56,933 139 916 0.5 17
2041 507 112 56,933 139 916 0.5 18
2042 507 112 56,933 139 916 0.5 19
2043 507 112 56,933 139 916 0.5 20
Results
19. The results show that the economic benefits of the PAP taxiway improvement and CAP runway rehabilitation surpass
the total investment cost and prove that the project is economically feasible. Considering the whole Project cost of
US$84 million and the quantified benefits of the PAP taxiway improvement and the CAP runway rehabilitation, the
Project has a net present value (NPV) of US$3 million and an internal rate of return (IRR) of 7 percent.
20. The NPV and IRR have been calculated with the above savings and the following assumptions:
• Discount rate of 6 percent
• 20-year project period based on useful life of taxiway investment (i.e., 20 years of operation until major
maintenance required)
• ICAO-required aircraft-aircraft separations remain the same over the period of the Project
• PAP aircraft fleet mix and overall demand levels remain consistent over the period of the Project
• CAP passenger and freight volumes remain consistent over the period of the Project
21. While the economic benefits of the PAP taxiway improvement and the CAP runway rehabilitation already show
that the entire Project is economically feasible, the other investments would further provide additional benefits and make
the Project more viable. However, quantifying the full economic benefits resulting from the Project is exceedingly difficult
given that it is not easy to quantify a reduced risk associated with aircraft operational safety, climate change/disaster
resilience due to the limited availability of the data. Also, it is almost impossible to estimate benefits of enhanced
connectivity between Haiti and other regions as well as availability for humanitarian functions such as medical evacuation,
air-sea rescue operations, or humanitarian relief.
Table A4.7. Annual Flows of Costs and Benefits (US$)
Year Costs Benefits Net
2020 - - -
2021 2,000,000 - (2,000,000)
Page 68 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
2022 5,250,000 - (5,250,000)
2023 26,000,000 - (26,000,000)
2024 29,250,000 6,909,844 (22,340,156)
2025 21,500,000 6,967,692 (14,532,308)
2026 - 7,025,541 7,025,541
2027 - 7,083,389 7,083,389
2028 - 7,141,237 7,141,237
2029 - 7,199,085 7,199,085
2030 - 7,256,933 7,256,933
2031 - 7,314,781 7,314,781
2032 - 7,372,630 7,372,630
2033 - 7,430,478 7,430,478
2034 - 7,488,326 7,488,326
2035 - 7,546,174 7,546,174
2036 - 7,604,022 7,604,022
2037 - 7,661,870 7,661,870
2038 - 7,719,719 7,719,719
2039 - 7,777,567 7,777,567
2040 - 7,835,415 7,835,415
2041 - 7,893,263 7,893,263
2042 - 7,951,111 7,951,111
2043 - 8,008,960 8,008,960
Total 84,000,000 149,188,038 65,188,038
NPV 63,796,383 66,774,677 2,978,294
IRR 7%
Page 69 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 5: Country Risk Profile to Natural Hazards and Climate Change
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
1. Haiti ranks as one of the countries in the world with the highest exposure to multiple natural hazards. With 96
percent of its population living at risk,35 the most intense natural hazards are seismic (for example, earthquakes,
landslides) and hydro-meteorological (for example, cyclones, flooding, droughts). Seismic hazards are associated with the
interaction of the Caribbean and North American tectonic plates, which converts Haiti into a seismically active zone.
Hydro-meteorological hazards are related to the precipitation caused by northern polar fronts, tropical cyclones, and
waves, the Inter-Tropical Convergence Zone, and convective-orographic activity. El Niño/El Niño-Southern Oscillation
episodes have tended to delay the arrival of the rainy season, create drought conditions, and increase the number and
intensity of cyclones. Other secondary hazards impacting Haiti include landslides, torrential debris flows, soil liquefaction,
and tsunamis.
2. High levels of poverty together with severe environmental degradation and the presence of settlements in low-
lying areas and floodplains are key contributing factors toward the country’s vulnerability. According to the 2014 Poverty
Assessment, almost 70 percent of Haiti’s population is either poor or vulnerable to falling into poverty, and nearly 75
percent of households are economically impacted by at least one shock each year.36 This translates into precarious living
conditions for the majority of the population, drastically decreasing their coping abilities and resilience to the impact of
adverse natural events, further enhancing the vicious circle of poverty, environmental degradation, rapid urbanization,
and vulnerability. Currently, more than 60 percent of Haiti’s population live in urban areas. The high population density
(average up to 35,400/km2 in Haiti, and higher in Port-au-Prince) coupled with unregulated construction, weak social and
economic public infrastructure, lack of land-use planning, and unstable governance, further aggravates the extensive
social vulnerability.
3. Additionally, Haiti suffers from significant governance issues that further increase its vulnerability to natural
hazards. Haiti’s long history of political instability has greatly weakened its institutions and governance mechanisms which
contributes to, among other things, serious fiscal, regulatory, and planning issues. The lack of political stability has a
significant impact on the continuity and effectiveness of the National System for Disaster Risk Management (Système
National de Gestion des Risques et des Désastres, SNGRD), in particular, its risk management components. Even though
the 2001 National Plan for DRM established the SNGRD, the country still lacks the necessary legal framework and norms
to effectively reduce risk and manage disasters at the national and local levels. The National Plan set up the basis for
handling emergency and preparedness operations under the Technical Directorate of the Civil Protection. However, no
line ministry is officially responsible for managing risks, such as identifying and reducing risks. Finally, this critical lack of
norms, responsibility, and understanding of risks triggers inadequate resource allocations; the very limited resources are
allocated only at the national level, leaving the regional and local level without any means to prepare for, or respond to,
disasters or to reduce and manage risk.
4. The combined effects of exposure to natural hazards, high vulnerability, institutional fragility, and weaknesses and
35 Dilley, Maxx, Robert S. Chen, Uwe Deichmann, Arthur L. Lerner-Lam, Margaret Arnold, Jonathan Agwe, Piet Buys, Oddvar Kjevstad,
Bradfield Lyon, and Gregory Yetman. 2005. Natural disaster hotspots: A global risk analysis (English). Washington, DC: World Bank.
http://documents.worldbank.org/curated/en/621711468175150317/Natural-disaster-hotspots-A-global-risk-analysis.
36 World Bank. 2014. Investing in people to fight poverty in Haiti: Reflections for evidence-based policy making (English). Washington, DC:
World Bank Group. http://documents.worldbank.org/curated/en/222901468029372321/Reflections-for-evidence-based-policy-making.
Page 70 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
the lack of adequate resources invested in the sector have often resulted in catastrophic impacts of natural hazards in
Haiti. Between 1971 and 2013, Haiti’s economy was subjected to climate disasters almost every year which had adverse
effects on growth. The country has a higher number of disasters per square kilometer than the average smaller Caribbean
country (see Table A5.1).
5. Recent disasters in Haiti confirm an increasing level of vulnerability facing its hard-won development gains. On
average, based on the analysis of historical data from 1976 to 2012, annual losses and damages associated with hydro-
meteorological events are estimated at an amount equivalent to 1.95 percent of the GDP. However, as assets are created
and concentrated, losses associated with adverse natural events are increasing. This was demonstrated in August and
September of 2008 with the passage of Hurricanes Fay, Gustav, Hanna, and Ike (herein referred to as FGHI) during a three-
week period, resulting in damage and losses equivalent to 15 percent of the country’s GDP. Less than two years later, on
January 12, 2010, an earthquake killed 220,000 people, displaced 1.5 million people, and triggered damages and losses
equivalent to 120 percent of GDP. In 2016, Hurricane Matthew hit the southern peninsula causing damages and losses
equivalent 32 percent of GDP.
Table A5.1. Frequency and Impact of Natural Disasters, 1971-2014 in Selected Countries37
Frequency and
Impact of Number Disasters/Land
Total
Natural of Surface Disasters/Population Deaths/Population
Disasters/Year Damage/GD
Disasters, 1971- Natural (thousand square (millions) (millions)
P (ratio)
2014 Disasters km)
Country/Group
Haiti 137 3.1 5.0 13 23,427 1.78
Haiti (excluding
2010 136 3.1 4.9 13 1,855 0.22
earthquake)
Dominican
60 1.4 1.2 6 311 0.05
Republic
Jamaica 34 0.8 3.1 13 102 —
Nicaragua 66 1.5 0.5 11 2,363 0.33
Honduras 70 1.6 0.6 9 3,298 0.40
El Salvador 51 1.2 2.5 8 687 0.34
Guatemala 82 1.9 0.8 5 1,754 0.12
Costa Rica 58 1.3 1.1 12 72 0.04
Panama 46 1.0 0.6 12 80 0.01
Other Caribbean
129 2.9 0.3 30 86 0.19
States
6. Climate change is expected to exacerbate the risk of hydro-meteorological hazards by increasing the frequency
and/or intensity of extreme events, further increasing Haiti’s vulnerability. Climate projections for the Caribbean estimate
that temperatures could rise from 1.2°C to 2.3°C by 2100, with a median increase of 2.0°C during the 21st century.38 In
addition to claiming human lives, climate-related hazards may also take a heavy toll on all sectors of the Haitian economy
and set back hard-won development gains.
37 EM-DAT: The OFDA/CRED International Disaster Database 2015.
38 Dilley et al, Global Hotspot Study, World Bank, 2005.
Page 71 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 6: Regional Approach for and Benefits of Developing Air Transport Systems in the Caribbean Region
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project
1. CATCOP is a SOP which aims to improve Caribbean region air transport connectivity by enhancing air transport
sector operational safety, oversight, and climate/disaster resilience. The SOP approach is based on basic criteria to
participate in the Program, including: (a) agreement and commitment to elevate compliance with international safety
standards (for example, ICAO SARPs) and regional air transport agreements such as the POS Declaration and/or CARICOM
Multilateral Air Services Agreement (MASA; (b) adequate leadership to move forward the regional air transport
connectivity and climate/disaster resilience enhancements proposed under the Program; (c) commitment to support and
participate in the common regional training activities; and (d) commitment to support the common regional procurement
activities. In addition to Haiti, three other countries—St. Lucia, Dominica, and Grenada—have agreed to participate in the
SOP. While each country participating in CATCOP has its own unique challenges and priorities, given the inherent regional
nature of air transportation and the similar characteristics of Caribbean nations, there are many common problems and
goals across the countries (see Annex 7). CATCOP has been structured to allow each participating country to address its
unique situation using appropriately customized delivery/contractual mechanisms under a framework that is still regional
in nature.
2. Regional Activities of CATCOP. Given the common air transport challenges in the Caribbean region, several
CATCOP activities would be handled in a regional manner, including:
(i) Measuring improvements in compliance with operational safety standards would be handled in the same
manner for each participating country using the same methodology and same team. ICAO SARPs
compliance screening would be completed for each country at the beginning and end of the Project to
provide a quantitative measure of safety enhancement at each airport and in each country.
(ii) Air Traffic Control skills enhancement training would be conducted jointly for all CATCOP countries with
special “breakout” training modules for any unique country-specific needs.
(iii) Climate/disaster resilience best practices training and skills development would be conducted jointly for
all English-speaking CATCOP countries (Dominica, Grenada, and St. Lucia). A separate French-language
training course would be conducted in Haiti.
(iv) CFR skills enhancement training would be conducted jointly for all English-speaking CATCOP countries
(Dominica, Grenada, and St. Lucia). A separate French-language training course would be conducted in
Haiti.
(v) Wildlife management plans would be developed and implemented for each airport in CATCOP leveraging
the existing practices already in place in St. Lucia and Grenada, and expanding to include state-of-the-art
international best practices. A common approach to wildlife management in the region would facilitate
sharing of best practices, training, and tools/technology. Wildlife management training would also be
offered for all English-speaking CATCOP countries with a separate French-language course in Haiti.
(vi) Gender diversity in recruitment and retention programs would be developed for each government
agency participating in CATCOP using a common analytical framework and tailored action plans. At a
minimum, programs would be developed to significantly increase the share of female air traffic
controllers and public safety and security screening staff. Gender diversity training would be conducted
jointly for all English-speaking countries with a separate French-language course in Haiti.
Page 72 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
3. Broader Regional Benefits of CATCOP. Given the nature of air transportation and the planned improvements, there
would be broader benefits for the entire region, including:
(i) Improved capability of CATCOP countries to accommodate diverted flights and emergency landings due
to operational safety and capability upgrades. This would provide pilots, air traffic controllers, and
airlines more options when dealing with challenging weather or any type of emergency situation.
(ii) Enhanced situational awareness for pilots of any ADS-B equipped aircraft flying in the vicinity of any of
the CATCOP countries, even those not landing or taking off in one of the countries, due to ADS-B
receiver antenna installations in each country.
(iii) Improved capability of CATCOP countries to support post-disaster relief flights. This may be most
relevant for Haiti supporting the Dominican Republic in the event of a natural disaster impacting its
main airports. However, it could also be relevant for the islands neighboring Dominica, Grenada, and St.
Lucia in the event of a natural disaster disabling their airport(s).
(iv) Improved operating environment for regionally based airlines due to improved operational safety and
capability at the CATCOP airports.
(v) Regional training going beyond the CATCOP countries. Non-CATCOP countries in the Caribbean region
would be permitted to participate in the CATCOP-sponsored training programs related to air traffic
control, climate/disaster resilience best practices, CFR, wildlife management, and gender diversity in
recruitment/retention.
(vi) In the case of St. Lucia, Grenada, and Dominica, enhanced capacity of the regional civil aviation
regulator (ECCAA). ECCAA skills/capacity would be enhanced through its participation in CATCOP
activities, which would directly benefit the other OECS nations for which it serves as the civil aviation
regulator.
Page 73 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
ANNEX 7: Port of Spain Declaration of 2014
COUNTRY: Haiti
Caribbean Regional Air Transport Connectivity Project - Haiti
1. The “Port of Spain Declaration” (POS Declaration) of 2014 is one of the regional aviation-related agreements that
clearly demonstrates the commitment of countries in the Caribbean region to work together to improve regional air
transport connectivity. It resulted from the Fifth North American, Central American, and Caribbean Directors of Civil
Aviation Meeting held in Port of Spain, Trinidad and Tobago, on April 28-30, 2014. The meeting was convened by the
International Civil Aviation Organization (ICAO) North American, Central American and Caribbean Regional Office, with
the participation of officials representing 34 states and overseas territories as well as nine international organizations.
2. The POS Declaration is a commitment by 34 states and territories, including all current CATCOP countries, to
achieve a series of operational safety and air navigation improvement targets, including improving Effective
Implementation (EI) of ICAO SARPs,39 reducing fatality risk for aircraft accidents, increasing rates of airport certification,
and reducing regional CO2 emissions (see below for the full list of agreed targets). Haiti signed the POS Declaration and
ECCAA signed it on behalf of Dominica, Grenada, and St. Lucia, as well as the other Organisation of Eastern Caribbean
States (OECS) members for whom it serves as the civil aviation regulator.
3. The 2014 POS Declaration included a commitment to achieving the following goals:
Regional Safety Targets
a. Safety Oversight
i. 80 percent Effective Implementation (EI) regional average by December 2016
ii. No state in the region to have EI of ICAO USOAP Critical Element 3 (CAA Staff) and Critical Element 4
(Inspector Competency) below 70 percent by December 2016
b. Accidents
i. Using 2010 as the baseline, reduce fatality risk for accidents in the CAR Region for Part 121 or like
commercial air transport operations by 50 percent by the year 2020
c. Runway Excursions
i. Reduce runway excursions by 20 percent relative to the 2007-12 regional average by December 2016
d. Aerodrome Certification
i. 48 percent of international aerodromes in the CAR Region to be certified by December 2016
e. State Safety Programme (SSP)/Safety Management System (SMS) Implementation
i. 60 percent of states to have SSP—implemented, service provider SMS safety performance indicators
accepted, and an initial Acceptable Level of Safety Performance (ALoSP) established by December 2016
ii. 60 percent of service providers to have Phase 1 of their SMS implemented with a minimum of Reactive
Phase functional risk management procedures by December 2016
Regional Air Navigation Targets
a. Approach: Performance-Based Navigation (PBN)
i. 80 percent of instrument approach runways to have Approach Procedures with Vertical Guidance
(APV) with Barometric Vertical Navigation (Baro VNAV) implemented by service providers and users by
39 Effective Implementation of ICAO SARPs measures the rate of implementation of ICAO SARPs.
Page 74 of 75
The World Bank
Caribbean Regional Air Transport Connectivity Project - Haiti (P170907)
December 2016
b. Air Traffic Flow Management (ATFM)
i. 100 percent of Flight Information Regions (FIRs) within which all Area Control Centers (ACCs) to have
ATFM measures available by December 2018
c. Aeronautical Information Management Transition (AIM)
i. 100 percent of Aeronautical Information Services (AIS) to implement AIM Roadmap—Phase 1 required
elements by December 2016
d. Ground-Ground Digital Coordination/Transfer
i. 50 percent of FIRs within which all applicable ACCs to have implemented at least one interface to use
Air Traffic Services Inter-Facility Data Communication (AIDC)/On-line Data Interchange (OLDI) with
neighboring ACCs by December 2016
e. Environmental Benefit
i. Reduce regional CO2 emissions by 40,000 tons per year through PBN implementation by December
2016
• While CATCOP’s mission is more limited in scope and scale than the POS Declaration, it is aligned with the guiding
principles of the POS (for example, the importance of a regional approach to improving air transportation) and its goals
related to improving aircraft operational safety, air navigation efficiency, and environmental performance. Specifically,
the following CATCOP investments are aligned with its goals:
Table A8.1. List of Investments for Each Participating Country
Investments CATCOP Country (Airport)
ADS-B to improve navigation safety and contribute to a harmonized All countries
airspace
ILS to improve aircraft operational safety and environmental Dominica (DOM), St. Lucia (UVF), Grenada (GND)
performance
Runway pavement rehabilitation to improve aircraft operational safety Haiti (CAP) and St. Lucia (UVF)
and ICAO SARPs effective implementation (EI)
RESAs to improve aircraft operational safety and ICAO SARPs EI Haiti (PAP), St. Lucia (UVF), Grenada (GND)
ATCT improvements to improve aircraft operational safety and ICAO Haiti (CAP), Dominica (DCF)
SARPs EI
Taxiway system expansion to improve aircraft operational safety and Haiti (PAP)
environmental performance (i.e., reduce GHG emissions)
CFR improvements to improve aircraft operational safety and ICAO Dominica (DOM), St. Lucia (UVF), Grenada (GND)
SARPs EI
CFR training to improve aircraft operational safety All countries
ATC training to improve aircraft operational safety All countries
Wildlife management programs and training to improve aircraft All countries
operational safety and ICAO SARPs EI
Aeronautical chart updates to improve aircraft operational safety and St. Lucia (UVF), Dominica (DOM), and Grenada (GND)
ICAO SARPs EI
Page 75 of 75