FY2024-2025 Annual Public Procurement Plan, UCLBP

FY2024-2025 Annual Public Procurement Plan, UCLBP

Summary — Annual public procurement plan filed by the Unité de Construction de Logements et de Bâtiments Publics (UCLBP) on the CNMP standard form for fiscal year 2024-2025. It lists 5 planned contracts: four pick-up vehicles (supplies, mixed funds), the construction of the Petit-Goâve town hall and its supervision (works and intellectual services, Treasury investment budget), a training line (supplies) and rural housing construction (works). The largest line is the town hall construction at 335,000,000.00 gourdes. No total is printed.
Key Findings
Full Description

The plan covers fiscal year 2024-2025 and lists 5 planned contracts, all with launch in August 2025 and signature in September 2025. The acquisition of four pick-up vehicles is financed by mixed funds (FM) at 20,000,000.00 HTG under AORN, no CNMP a-priori control, Pétion-Ville, 2 months. The construction of the Petit-Goâve town hall is financed by the Treasury investment budget (TI) at 335,000,000.00 HTG by direct agreement (GRGR), a-priori control marked Oui, 18 months. The supervision of the town hall works is planned at 35,000,000.00 HTG as intellectual services by direct agreement (GRGR), control Oui, 18 months. A training line is planned at 12,500,000.00 HTG under DEPX, control Non, 3 months.

Rural housing construction is financed by TI at 13,500,000.00 HTG under DECO, control Non, Petit-Goâve, 3 months. The budget reference printed on every line, 11126 9527, is stated in a note to be the UCLBP account number at the BRH. A second note explains that the Petit-Goâve town hall project was transferred to the UCLBP after works launched under another contracting authority stopped in January 2019 because of design-study problems, and that direct agreement was chosen for the works and supervision contracts on that basis, with supporting documents to follow. The form is signed by the Directeur exécutif a.i.

Sectors
Geography
Time Coverage
2024-10 — 2025-09
Full Document Text

Extracted text from the original document for search indexing.

Qu he Va RP PLAN ANNUEL DE PASSATION DE MARCHÉS PUBLICS (MARCHÉ DE SERVICES, DE FOURNITURES, DE TRAVAUX ET DE PRESTATIONS INTELLECTUEËLES) EXERCICE FISCAL 2024 /2025 NOM DE L'INSTITUTION : UNITÉ DE CONSTRUCTION DE LOGEMENTS ET DE BATIMENTS PUBLICS N.B : LE TABLEAU DOIT ÊTRE REMPLI PAR ORDRE DE PRIORITÉ CHRONOLOGIQUE SOURCE DE CODE MONTANT DES NATURE MOOE DE PÉRIODE CONTRÔL DÉLAI SET DU EE Ce ET OS CES PR PROGRAMMATION DES DÉPENS paul ÿ PROJET DE MARCHÉ ornée | nérérence | Grédéertunité | GFT | 4ôpo | MENT | srenarure | DELA PESATIO Fonds propees 1PP | DUPROIET monétaire) (1} P) «3 ns DU MARCHÉ | CNMP: (Mots) Fonds externes 1 FE {21 OUT/KON Fonds mixtes : FM VF VE ME VE PR RS RS ÉEÉEÉEREREEE Acquisition de trois E Acquisition de 43} Pick-up 8 quatre (4) véhicules 20, 000,000.00 Septembre Pétion-vile Pick-up 111269527 HTG 2025 Construction de la Mairie de Petit-Goâve 335, 000,000.00 T Aout Septembre Petit-Goëve | 18 mois [ TI 111269527 HTG 2025 2025 Supervision des travaux de construction de 35, 000,000.00 n 2025 F1 CURE de ES ETES T 111269527 13, 500,000.00 Aout Septembre Petit-Gaàve | 3 mols HTG 2025 2025 Construction de logement en milieu rural 13, 500,000.00 T DECO Aout Septembre Petit-Godve (nsc | 3 | en 2025 2025 pu | CRRNIBNRNE À N/B: 1. 11126 9527 est le numéro de compte de l'Unité de Construction de Logements et Bâtiments Publics {UCLBP) logé à la BRH. 2. Le projet de construction de la Mairie de Petit-Goâve a été transféré à l’UCLBP pour sa mise en œuvre. Initialement lancé sous la maîtrise d'ouvrage d’une autre institution, les travaux avaient progressé jusqu’en Janvier 2019 avant d’être interrompus en raison de problèmes techniques majeurs liés aux études de conception. Ces insuffisances ont compris la faisabilité du projet et empêché la poursuite des travaux dans des conditions optimales. Le choix de gré à gré est une nécessité opérationnelle, après une analyse approfondie, cette option s’est vue comme la meilleure solution pour corriger les défauts des études initiales ; garantir une exécution fluide ; répondre à l’urgence et pallier les défaillances de l’entreprise initiale, L'UCLBP vous fera parvenir ultérieurement l'ensemble des éléments justificatifs avec les dossiers du projet. 3. Les projets 02 et 03 ont les mêmes justifications. Jacques € Dirécteur éfécutif a.i f

How to cite

Unité de Construction de Logements et de Bâtiments Publics (UCLBP), FY2024-2025 Annual Public Procurement Plan, UCLBP, https://cnmp.gouv.ht/