PHARES: Proposed and Selected Localities, 8 October 2020 edition
- Dated edition of a rolling list: ANARSE republished it as the window progressed, so the editions read as a sequence rather than as one document.
- Records the pipeline inherited at launch: Mont-Organize, Capotille and Vallieres under construction via UNDP; Borgne, Pilate, Plaisance, Anse-a-Galets, Pointe-a-Raquette, Anse-a-Pitre and Thiotte in negotiation from the December 2018 tender.
- Sites served by EDH are annexed as INELIGIBLE, and the program rule is that EDH operating generation, distribution or commercial service disqualifies a site regardless of how regular the service is.
- Localities proposed by more than one bidder are evaluated competitively at the full-proposal stage.
- Scanned document with no text layer; searchable here only because the text was recovered by OCR.
The first edition to carry window-one results. Five bidders are named with the localities each proposed: SKDK (1), Enerside Energy (5), FRIEM (1), Chantiers d'Haïti (6) and EarthSpark International (23), plus a further single-locality proposal. The inherited UNDP and December-2018 pipeline carries over unchanged from the September edition.
Every edition shares a structure: the inherited pipeline first, then the window's succinct proposals, then the localities selected to submit full proposals, with EDH-served sites listed in annex as ineligible. That annex matters as much as the selections: the program's own rule is that a site where EDH operates generation, distribution or commercial service is ineligible regardless of how regular that service is, so the annex is where the off-grid frontier was drawn.
Full Document Text
Extracted text from the original document for search indexing.
How to cite
Autorité Nationale de Régulation du Secteur de l'Énergie (ANARSE); Ministère des Travaux Publics, Transports et Communications (MTPTC), PHARES: Proposed and Selected Localities, 8 October 2020 edition, https://anarse.gouv.ht/wp-content/uploads/2020/09/PPHARES-Point-de-situation-sur-les-sites-Version-du-08-octobre-2020.pdf