(2017-10) Report of the Special Senate Commission of Inquiry into the PetroCaribe Fund
Summary — The Beauplan commission's investigation into the PetroCaribe fund, covering September 2008 to September 2016 — two presidencies (Préval and Martelly), five governments, and thirteen Council of Ministers resolutions adopted between 20 September 2008 and 6 January 2016. The commission audited each resolution separately, tracing allocations, disbursements, procurement compliance and bidder eligibility, and inspecting selected works on the ground. It records the fund's book value at 30 September 2016 as HTG 110,190,864,999, and finds that BMPAD valued foreign-currency accounts at rates between 70.35 and 107.35 gourdes to the dollar when the BRH reference rate was 65.5368.
Full Document Text
Extracted text from the original document for search indexing.
Page 1 of 656
Composition de la Commission Sénatoriale Spéciale d‟Enquête
Du Fonds PETRO CARIBE
Sénateur Evallière BEAUPLAN, DDS,
Président
Sénateur Nenel CASSY,
Rapporteur
Sénateur Antonio CHERAMY,
Membre
Sénateur Richard Lenine Hervé FOURCAND,
Membre
Sénateur Onondieu LOUIS,
Membre
Page 2 of 656
TABLE DES MATIÈRES
ABREVIATIONS, SIGLES ET ACRONYMES ........................................................................................................... 5
I-
Résumé Exécutif ........................................................................................................................................ 7
II Avant propos .............................................................................................................................................. 10
III
Historique et mise en contexte ............................................................................................................... 12
IV
Déroulement de l’enquête ...................................................................................................................... 16
V
Méthodologie .......................................................................................................................................... 17
VI
Cadre légal ............................................................................................................................................. 18
VII
Accord PETRO CARIBE ........................................................................................................................... 19
VIII
Solutions adoptées aux difficultés rencontrées .................................................................................. 21
IX
Présentation de la loi sur l’État d’Urgence ........................................................................................... 22
X
Procédures de passation des marchés publics ........................................................................................ 24
XI
Présentation du Bureau de Monétisation de Programmes d’Aide au
XII
Examen des états financiers du fonds PETRO CARIBE .......................................................................... 29
Développement(BMPAD) .. 25
XIII Annulation de la dette de PETRO CARIBE ............................................................................................... 45
XIV-
L’évaluation du contrôle interne du fonds PETRO CARIBE ................................................................ 46
XV– Degré du respect des normes .................................................................................................................. 46
XVI
BMPAD gestionnaire du fonds & exécuteur de Projets ...................................................................... 47
XVIII Sommaire des résolutions ..................................................................................................................... 84
XIV RÉSOLUTION DU 20 SEPTEMBRE 2008 AMENDÉE PAR CELLE DU 9 OCTOBRE 2008 ............................. 86
XX RÉSOLUTIONS DU .................................................................................................................................. 116
11 Février 2010 ............................................................................................................................................. 116
24 Août 2010 ................................................................................................................................................. 116
12 Mai 2010 ................................................................................................................................................. 116
XXI Résolution du 24 août 2010 .................................................................................................................. 147
XXII Résolution du 12 Mai 2011 .................................................................................................................. 174
XXIII RÉSOLUTION DU 28 Février 2012 ....................................................................................................... 211
XXIV RÉSOLUTIONS DU 18 juillet 2012......................................................................................................... 235
XXV Résolution du 21 Décembre 2012 ....................................................................................................... 262
XXVI Résolution du11 décembre 2013 ........................................................................................................ 375
XXVII Résolution du 23 juillet 2014 .............................................................................................................. 399
XXVIII Résolution du 10 Septembre 2014 ................................................................................................... 412
XXIX Résolution du 15 Avril 2015 ................................................................................................................ 417
XXX Résolution du 22 Juillet 2015 ................................................................................................................ 449
XXXI Résolution du 6 Janvier 2016 ............................................................................................................... 469
Page 3 of 656
XXXII Ministère du Tourisme ........................................................................................................................ 482
XXXIII. Cas particuliers : ............................................................................................................................... 522
XXXIII Conclusion ......................................................................................................................................... 524
XXXIV RAPPORT FINAL DE L’EVALUATION TECHNIQUE DES PROJETS......................................................... 530
Page 4 of 656
ABREVIATIONS, SIGLES ET ACRONYMES
CEA :
Commission Éthique et Anti-Corruption
CSSE :
Commission Sénatoriale Spéciale d‟Enquête
BMPAD :
Bureau de Monétisation des Programmes d‟Aide au Développement
MEF :
Ministère de l‟Économie et des Finances
MARNDR :
Ministère de l‟Agriculture des Ressources Naturelles et du Développement
Rural
MDE :
Ministère de l‟Environnement
MSPP :
Ministère de la Santé Publique et de la Population
ULCBP :
Unité de Logements et de Construction des Bâtiments Publics
MPCE :
Ministère de la Planification et de la Coopération Externe
MTPTC :
Ministère des Travaux Publics, Transports et Communications
MJSP :
Ministère de la Justice et de la Sécurité Publique
DINEPA :
Direction Nationale de l‟Eau Potable et de l‟Assainissement
CNE :
Centre National des Équipements
SEMANAH :
Service Maritime et de Navigation d‟Haïti
EDH :
Électricité d‟Haïti
MCI :
Ministère du Commerce et de l‟Industrie
MENFP :
Ministère de l‟Éducation Nationale et de la Formation Professionnelle
PNH :
Police Nationale d‟Haïti
UEH :
Université d‟État d‟Haïti
MJSAC :
Ministère de la Jeunesse et des Sports et de l‟Action Civique
LNBTP :
Laboratoire National du Bâtiment et des Travaux Publics
MT :
Ministère du Tourisme
ISPAN :
Institut de Sauvegarde du Patrimoine National
RTNH :
Radio Télévision Nationale d‟Haïti
MAST :
Ministère des Affaires Sociales et du Travail
Page 5 of 656
ABREVIATIONS, SIGLES ET ACRONYMES (SUITE)
FAES :
Fonds d‟Assistance Économique et Sociale
MICT :
Ministère de l‟Intérieur et des Collectivités Territoriales
CSC/CA :
Cour Supérieure des Comptes et du Contentieux Administratif
DAO :
Dossier d‟Appel d‟Offres
CNMP :
Commission Nationale des Marchés Publics
Page 6 of 656
I-
Résumé Exécutif
Les périodes annuelles allant de septembre 2008 à septembre 2016 couvertes par le mandat de
la Commission ont vu deux (2) Chefs d‟Ẻtats se succéder, René Garcia PREVAL et Joseph Michel
MARTELLY. Sous l‟Administration de ces deux (2) Chefs d‟Ẻtats, cinq (5) Gouvernements ayant
à leur tệte cinq (5) Premiers Ministre,s se voyaient installés.
Pour répondre aux catastrophes naturelles : Tempệtes, Ouragans et le séisme du 12 janvier
2010, deux (2) lois d‟Urgence furent votées suivies de trois (3) Arrệtés présidentiels pour instaurer
l‟Ẻtat d‟Urgence sur toute l‟etendue du territoire national et treize (13) Résolutions avec des
Programmes et Projets financés à travers le fonds PETRO CARIBE totalisant la somme de cent dix
milliards cent quatre vingt dix millions huit cent soixante quatre mille neuf cent quatre vingt dix
neuf gourdes (HTG 110,190,864,999).
Les résultats, pourtant, étaient très peu convainquants et donnaient ainsi naissance à des doutes
inquiétants quant à la gestion du fonds PETRO CARIBE.
C‟est pourquoi, trois (3) ans après les premiers décaissements ordonnés par les quatre (4)
premières Résolutions soient un montant de cinq cent quarante cinq millions sept cent quarante
mille huit cent vingt neuf dollars americains (U.S 545,740,829), le Premier Ministre Gary
CONILLE sollicita en 2011, un audit financier. Les résultats ajoutés au scandale financier éclate
lors du procès du Sénateur dominicain Bautista et la déclaration du Président MARTELLY en
visite dans la ville des Cayes annoncant que les caisses de l‟État haitien sont vides, sans oublier les
diverses dénonciations de Corruption de la Presse parlée et écrite tant National qu‟International,
engendraient encore plus de doute, plus de suspicion de mauvaise gestion.
Sans la moindre lumière sur ces suspicions d‟août 2011 à janvier 2016, les Gouvernements
CONILLE, LAMOTHE, PAUL, successivement Premier Ministre ont, a partir de neuf (9) autres
Résolutions, ordonné des décaissements totalisant la somme de un milliard trois cent quatre vingt
seize millions neuf cent vingt cinq mille cinq cent soixante neuf dollars americains (US
1,396,925,569).
C‟est ainsi, qu‟une première Commission fût montée par les honorables Sénateurs dénommée:
« Commission Éthique et Anti-Corruption », présidée par l‟honorable Sénateur Youri LATORTUE
dont les résultats ont suscité une nouvelle enquête. Une seconde Commission fût donc montée.
Elle est dénommée cette fois-ci : « Commission Sénatoriale Spéciale d‟Enquête sur le fonds
PETRO CARIBE » présidée par l‟honorable Sénateur Evalière BEAUPLAN qui, dans un souci
d‟équilibre, s‟est orienté vers d‟autres experts en embauchant un Cabinet d‟Experts-Comptables.
L‟audit effectué couvre les périodes annuelles allant de septembre 2008 à septembre 2016
relatif à l‟examen des états financiers du fonds PETRO CARIBE préparés par BMPAD et soumis à
l‟attention des auditeurs pour examen.
Les anomalies et irrégularités significatives les plus importantes sont relatées dans ce résumé. Ce
sont :
Les états financiers du fonds PETRO CARIBE couvrant les périodes annuelles de
septembre 2008 à septembre 2016 ne reflètent pas la situation financière du fonds. En effet,
ils ont été redressés au cours de plusieurs périodes annuelles pour un montant net cumulé de
Page 7 of 656
cinquante sept milliards deux cent trente et un millions vingt deux mille six cent quarante
sept gourdes (HTG 57,231,022,647)
Les comptes à valeur vénale variable ne sont pas adéquatement évalués. Le BMPAD a
utilisé des taux d‟évaluation différents au 30 septembre 2016, allant de 70.35 à 107.35
gourdes pour un dollar américain, tandis que le taux de référence fourni par la BRH était
65.5368 pour un dollar américain.
Les ressources du fonds utilisées par l‟Ẻtat haïtien sont capitalisées. D‟après le BMPAD
ces directives émanent du MEF sans pour autant nous fournir plus de détails. Le montant
apparaisant aux livres du fonds au 30 septembre 2016 s‟élève à : HTG 110,190,864,999
Le temps de recouvrement des comptes à recevoir provenant de la vente des produits
pétroliers aux compagnies locales démontre que les modalités de paiements ne sont pas
respectées. A titre d‟exemple, la SOGENER doit au fonds PETRO CARIBE un montant de
US 173,984,647 au 30 septembre 2016.
Quant à l‟EDH, le montant de la dette prend sa source à la date du 24 mai 2008 et totalise
au 30 septembre 2016 la somme de US 437,346,841.
Le BMPAD n‟a pas effectué le paiement de la portion cash, c‟est-à-dire la valeur à verser à
la PDVSA à la réception de chaque cargaison. Le dernier paiement remonte à mars 2016 et
accuse un retard de onze (11) versements au 30 septembre 2016 totalisant la somme de
quatre vingt millions six cent trente trois mille vingt dollars américains (US 80,633,024) ou
son équivalent en monnaie locale d‟une valeur de cinq milliards deux cent quatre vingt
quatre millions quatre cent trente mille trois cent soixante sept gourdes (HTG
5,284,430,367) établi au taux de 65.5368 pour un dollar américain.
Le BMPAD puise des ressources du fonds pour les services de gestion fournis. Il n‟existe
aucun mécanisme définissant le mode de calcul et de paiement de ces services. Ce montant
varie d‟une période annuelle à l‟autre.
A titre d‟exemple :
Financement au budget de BMPAD
2016
2015
HTG 413,859,000 131,328,000
Pour la période annuelle 2016, les états financiers du fonds affichent des frais de pénalités
sur commandes en/Spot d‟une valeur matérielle d‟un montant de HTG 18,523,092. Or, en
gestion, toute pénalité découle du non respect d‟une norme ou d‟un engagement
quelconque reflétant ainsi une défaillance administrative, tandis que, la participation du
fonds au financement du budget du BMPAD atriplé, passant de : 131,328,000 à
413,859,000 Gourdes.
Le BMPAD gère des projets dont les ressources sont puisées du fonds de PETRO
CARIBE. Cette fonction est incompatible à sa mission.
Le Gouvernement Bolivarien suite au séisme du 12 janvier 2010 a annulé la dette d‟Haiti
s‟élevant à cette date au montant de U.S 396,073,224 ou son équivalent en monnaie locale
d‟une valeur de HTG 25,957,371,667. L‟annulation de la dette n‟était pas prévue dans
l‟Accord. Cette décision du Gouvernement de la République Bolivarienne devait entraîner
des rentrées de fonds afférentes pour l‟État Haitïen. Étant donné qu‟aucun mécanisme de
gestion n‟est mis en place quant à l‟utilisation du fonds si ce n‟est que par Résolutions, le
Page 8 of 656
montant de l‟annulation de cette dette devait être précisé par une Résolution du Conseil des
Ministres permettant ainsi la rétribution de ces fonds à L‟État Haïtien.
Quant à l‟audit des ressources financières générées par le fonds PETRO CARIBE utilisées à
financer les Programmes et Projets à travers les treize (13) Résolutions adoptées du 20 septembre
2008 au 6 janvier 2016, elles furent l‟objet chacune d‟un audit spécifique identifiant les ressources
allouées, les décaissements effectués, le respect des normes régissant l‟octroi des contrats, les
conditions d‟eligibilité du sousmmisionnaire ajudicataire, la nature du contrat, les décaissements
s‟y rapportant et l‟évaluation physiques de certains travaux sélectionnés à partir des critères
suivants :
Nature des travaux
Montant du contrat
Zones départementales
Chaque Résolution fut l‟objet d‟une conclusion. Les résultats de nos interventions se résument
aussi :
1- Le Certificat de non objection de la CNMP dans la majorité des contrats reçus des
institutions bénéficiaires et analysés n‟est pas obtenu ;
2- L‟approbation de la CSC/CA est parfois mentionneé dans certains contrats, mais n‟existe
pas dans d‟autre ;
3- Certains contrats ne comportent pas de date de signature ;
4- Les documents d‟éligibilité souvent ne sont pas conformes;
5- Les delais d‟exécution des travaux ne sont pas toujours respectés;
6- Les pénalités de retard ne sont prélevées;
7- Les prélèvements de 2% pour le compte de la DGI sont parfois effectués sans aucun
document attestant leurs paiements ou leur restitution à la DGI. Ces prélèvements de 2%
n‟ont pas été effectués dans la majorité des contrats;
8- Des écarts positifs matériels sont constatés au niveau du coût d‟un (1) KM de route entre
deux (2) entrepreneurs évoluant dans le mệme secteur d‟activité et pour la mệme période.
Page 9 of 656
II Avant propos
Fort du mandat qu‟elle avait clairement reçu de l‟Assemblée des Sénateurs de la République , la
Commission Sénatoriale Spéciale d‟Enquête (CSSE) chargée d‟approfondir le rapport d‟enquête
de la Commission Ethique et Anti Corruption sur la gestion du fonds PETRO CARIBE, a
entrepris, à partir d‟une démarche axée sur l‟analyse de documents comptables, financiers,
juridiques et techniques , sur un ensemble d‟auditions , de visite de lieux , d‟évaluation du rapport
de la Commission Ethique et Anti corruption du Senat d‟établir et / ou de rétablir les faits et de
faire ressortir la vérité sur la gestion du fonds PETRO CARIBE dans le cadre de l‟exécution des
programmes liés à ce fonds.
La mission confiée à la CSSE était au départ une réponse apportée par le Bureau du Sénat de la
République au scepticisme suscité par le rapport de la première Commission Ethique et Anticorruption du Grand Corps et s‟inscrivait également dans une logique de justice due à la nation
haïtienne au regard de ses questionnements légitimes quant aux dépenses effectuées à partir du
fonds PETRO CARIBE destiné originellement à l‟amélioration des conditions de vie de la
population haïtienne.
PETROCARIBE dans son essence était porteur d‟espoir. Convention entre les pays de la Caraïbe
et le Venezuela, il offrait de grandes opportunités à ces pays notamment à celui d‟Haïti en leur
permettant d‟acheter du pétrole à des prix préférentiels. Bénéficiaire presque de façon privilégiée
de cette convention, Haïti a pendant longtemps profité des avantages qui lui ont été offerts mais n‟a
pas pu les exploiter au maximum.
Faisant face à un réel déficit de crédibilité, l‟État haïtien par ses gouvernants, s‟est retrouvé sur la
sellette et a fait l‟objet des suspicions dans la conduite du Programme PETRO CARIBE en creusant
l‟écart de considération du peuple par rapport aux détenteurs du pouvoir politique. Guettant
régulièrement des signes annonciateurs de lendemains meilleurs, les citoyens ont été déçus par les
résultats plutôt mitigés du Programme PETRO CARIBE. Une fois de plus les structures
défaillantes de l‟administration haïtienne ont été contre productives et n‟ont jamais pu atteindre la
performance souhaitée et attendue. La corruption, l‟incompétence, le néopolitisme, le laisser aller,
le manque de professionnalisme qui ont caractérisé la mise en œuvre des projets ont interpellé la
conscience des observateurs et analystes du pays qui ont vite fait de lancer des cris d‟alarme et
d‟alerter les consciences sur ce qui prenait l‟allure d‟une véritable banqueroute.
Dès lors, le Sénat de la République se devait de réagir. Codétenteur de la souveraineté nationale
mais encore représentant direct de la population, il revenait à ses Mandatés de poser l‟acte qui
s‟imposait en s‟impliquant dans ce qui était devenu un dossier d‟État et d‟œuvrer aux fins
d‟apporter une réponse aux nombreuses interrogations qui tenaient l‟opinion publique en haleine.
Aussi mettait-il justement sur pied une Commission dont la mission était de faire la lumière sur la
façon dont le fonds PETRO CARIBE a été géré, cette Commission titrée originellement
Commission Ethique et Anti-corruption, allait rapidement et résolument se mettre au travail et
fournir un premier élément de réponse. Mais contre toute attente le rapport élaboré et présenté par
cette Commission allait être contesté et frappé de doute. Il a donc fallu au Sénat de la République
de réagir en fonction es critiques et satisfaire les attentes en prenant en considération les reproches
Page 10 of 656
adressés au rapport. C‟est ainsi qu‟une deuxième Commission allait voir le jour au Sénat de la
République sous l‟appellation de Commission Sénatoriale Spéciale d‟Enquête.
Cette nouvelle Commission était condamnée à réussir. L‟opinion publique n‟était plus encline à la
tolérance, ni à la tergiversation. Se faisant le prolongement de l‟ancienne commission, la nouvelle
qui venait de naître a donc dû se mettre immédiatement à la tache, en s‟inspirant des travaux de son
prédécesseur et en innovant par une approche plus technique basée sur audit financier et comptable
des opérations menées dans le cadre de l‟exécution des programmes affectés au fonds PETRO
CARIBE. Après une évaluation des résultats de la première enquête, la Commission Sénatoriale
Spéciale d‟Enquête a donc repris les investigations en approfondissant les données préalablement
recueillies et en procédant par de nouvelles analyses des dossiers ciblés pour établir un tableau à la
fois comparatif et réccapulatif permettant une conclusion la plus proche de la vérité.
Page 11 of 656
III
Historique et mise en contexte
Le 20 août 2016, la Commission Ethique et Anti-corruption, mise en place par le Sénat de la
République d‟Haïti en vue d‟enquêter sur les accusations et rumeurs relatives aux malversations
dénoncées au sujet de la gestion du programme PETROCARIBE, soumettait , en vertu du mandat
qui lui avait été antérieurement accordé , son rapport relatif à son investigation concernant
l‟utilisation par les Organes et organismes de l‟Etat haïtien du fonds PETRO CARIBE qui est,
rappelons-le, une convention entre les pays de la Caraïbe et le Venezuela offrant de grandes
opportunités à ces pays notamment à Haïti pour leur permettre d‟acheter du pétrole à des prix
préférentiels . Bénéficiaire presque de façon privilégiée de cette convention, Haïti à pendant
longtemps profité des avantages qui lui ont été offerts. Sans parler des effets et retombées de
l‟accord PETRO CARIBE dans l‟économie haïtienne, il importe de souligner que sa gestion n‟a
pas été à la satisfaction de toutes les forces vives de la nation, provoquant des suspicions et
interrogations quant à la façon dont les montants alloués au dit accord ont été utilisés. Des rumeurs
de corruption ont entouré les opérations de PETROCARIBE en Haïti et la population s‟en est émue
à un point tel qu‟il a fallu que le Sénat de la République se soit senti obligé de se saisir d‟un dossier
qui devenait de plus en plus explosif dans la mesure où persistaientt chaque jour des zones
d‟ombres qui mettaient en doute la crédibilité des organes et organismes chargés de sa mise en
application . A mesure que le temps passait, le pays était secoué par des scandales et des révélations
impliquant des personnalités administratives et politiques, ceci ayant pour effet d‟interpeler les
détenteurs de la souveraineté nationale particulièrement les Sénateurs qui suivant l‟écho de la
presse nationale, ont dû intervenir pour calmer le jeu et apporter leur point de vue sur ce dossier qui
était si brûlant.
Il fallait donc intervenir pour faire la lumière sur un sujet qui semblait avoir pris tout le monde de
court, ainsi ce n‟est pas sans raison que le Senat de la République dans le souci de rétablir la
confiance dans les institutions républicaines, d‟établir les responsabilités de ceux et celles qui ont
eu à gérer le fonds de PETROCARIBE , de faire ressortir la vérité, avait décidé de mettre sur pied
une Commission dénommée COMMISSION d‟ETHIQUE ET ANTI CORRUPTION ayant pour
mission:
-
D‟analyser le rapport d‟enquête présenté en aout 2016 par la Commission Ethique et Anticorruption présidée par l‟Honorable Sénateur Youri LATORTUE ;
Approfondir l‟Enquête menée préalablement par la précédente Commission ;
Etendre le cas échéant l‟enquête à d‟autres secteurs, organes et institutions non ciblés dans
la première enquête ;
Confirmer, infirmer ou rétablir les faits présentés dans le premier rapport ;
Si nécessaire procéder a de nouvelles investigations par audit général, contrôle de terrain,
auditions relatives à l‟utilisation des fonds Petr Caribe ;
Présenter un nouveau rapport d‟enquête quant la gestio des fonds Petro Caribe ;
Lancer des invitations et tenir l‟audition des différents acteurs identifiés comme susceptibles
d‟intérêt dans le cadre de l‟enquête ;
Prévoir des interrogatoires additionnels en cas de besoin ;
Etablir des discordances chiffrées et en tenir compte, même s‟il n‟est pas du ressort de la
Commission de faire un audit purement administratif et comptable de PETROCARIBE;
Lancer un inventaire physique des projets jugés d‟intérêt, même si les moyens limités de la
Commission ne lui permettent que d‟analyser un échantillonnage ;
Page 12 of 656
-
Procéder a l‟interprétation de l‟information recueillie ;
-
Formuler un ou plusieurs rapports selon le volume d‟information, la nature de l‟information
et les délais impartis ;
Soumettre le ou les rapports Ŕpréliminaires ou définitifs Ŕ selon ce qui aura été conclu par la
Commission dans le processus d‟appréciation des éléments recueillis et des
recommandations à soumettre a l‟assemblée ;
-
Fort de toutes les considérations qui précèdent, la Commission en fonction d‟un calendrier de
travail et d‟une méthodologie qu‟elle avait elle-même définie s‟était attelée à la tâche qui lui a été
confiée et elle remettait au terme de ses investigations le 20 aout 2016 un rapport qui se voulait
conforme à sa mission et respectueux des lignes préalablement tracées. Cependant, en dépit des
efforts consentis par la Commission pour présenter un travail parfait on avait vite constaté
certaines faiblesses à ce niveau , ces faiblesses d‟ordre méthodologiques, s‟ajoutaient d‟autres
éléments d‟appréciation qui, loin de satisfaire les attentes du Public, ont suscité d‟autres
interrogations. L‟Assemblée tout comme le reste du pays semblait ne pas vouloir accorder le
crédit qu‟il fallait au rapport reprochant à ce dernier un caractère beaucoup trop politique. À cela
s‟ajoutaient les récriminations des personnalités ciblées, interrogées et mise en cause dans l‟enquête
qui s‟étaient rapidement plaint de discriminations et d‟injustices mettant en avant le coté partisan
des enquêteurs. Le mal était donc fait. Il fallait y remédier pour sauvegarder la crédibilité même
du Sénat de la République. Alors que faire sinon que de diligenter une nouvelle investigation
passant par une évaluation exhaustive du premier rapport dans ses tenants et aboutissants.
Il est ici nécessaire de rappeler les grandes lignes de l‟ACCORD PETO CARIBE ET SA MISE EN
ŒUVRE EN HAITI en faisant remarquer qu‟Haïti ne faisait pas partie des pays à avoir initialement
été inclus dans l‟accord énergétique que le Venezuela a initie sous le nom de PETROCARIBE. En
protestation de ce qu‟il avait estimé être l‟éviction du Président Jean Bertrand Aristide, le
Président Hugo Chavez refusera de traiter avec le Gouvernement provisoire Latortue/Boniface qui
succédait au Président Aristide. Ceci ne dérange nullement le gouvernement de transition qui ne
souhaite pas se positionner contre l‟agenda américain, ce dernier voyant d‟un mauvais œil le
rapprochement entre Haïti, Cuba et le Venezuela.
Ce n‟est que le 15 mai 2006 qu‟un accord de coopération énergétique a été signé entre le
Gouvernement bolivarien du Venezuela, sous la présidence d‟Hugo Chavez, et celui de la
République d‟Haïti, sous la présidence de René Préval consacrant l‟adhésion d‟Haïti à PETRO
CARIBE. A travers cet accord, Haïti bénéficie d‟un approvisionnement en produits pétroliers à des
conditions privilégiées de paiement.
Le Bureau de Monétisation des Programmes d‟Aide au Développement (BMPAD) est l‟institution
haïtienne chargé de la mise en œuvre dudit accord. Le BMPAD sert d‟efficacité entre le fournisseur
Petroleos de Venezuela SA (PDVSA) et les compagnies pétrolières locales. Celui-ci fait
l‟acquisition des produits de Venezuela et les vend aux dites compagnies. Ces firmes ont un délai
de trente (30) jours pour payer au BMPAD le total (100%) des montants facturés.
Ces montants sont subdivisés en deux catégories. Dépendant du prix du baril de pétrole sur le
marché mondial, Haïti doit acquitter une portion de sa facture à la livraison. Le solde va alimenter
le fond PETRO CARIBE qui doit servir au lancement des investissements publics économiques et
sociaux. Ces montants provenant des paiements différents constituent un prêt concessionnel, c'estPage 13 of 656
à-dire à long terme, 25 ans, avec un taux d‟intérêt préférentiel de 1% l‟an une période de grâce de
deux ans
avant les premiers remboursements. Depuis 2013, elle a commencé à faire des versements en
remboursement de la dette et des intérêts qui en découlent.
En ce qui concerne, la portion minimale due au Venezuela pour chaque livraison, un délai de 90
jours est accordé en Haïti. Les premiers 30 jours sont libres d‟intérêts tandis qu‟à partir du 31eme
jour des intérêts de 2% commencent à courir sur cette portion payable au plus tard, le 90eme jour
après réception du produit tel que confirmé par le connaissement du bateau transportant le pétrole.
Il est nécessaire de préciser qu‟il ne s‟agit pas d‟un don mais d‟un prêt que les générations futures
devront rembourser intégralement. La dette externe d‟Haïti, qui, depuis la création des institutions
de Breton Woods jusqu'à son effacement en 2004, n‟avait jamais atteint ce niveau, est remontée en
moins de dix ans au double.
Il est envisagé qu‟Haïti devrait pouvoir rembourser une partie de sa dette avec des produits de son
industrie ou de son agriculture. Il est à noter que c‟est à un prix préférentiel que ces produits
doivent être offerts au Venezuela, mais non au prix du marché. La clause qui gouverne cet aspect
de l‟accord indique que « les produits que le Gouvernement de la République Bolivarienne du
Venezuela pourrait acquérir à des prix préférentiels, pourraient inclure des biens et services prévus
par les parties et qui pourraient être affectés par des politiques commerciales des pays riches».
Cet aspect n‟a jamais été soulevé par le Gouvernement Martelly-Lamothe qui a fait la promotion
de cette avenue comme s‟il s‟était agi d‟un marché avantageux et captif qui devrait indirectement
promouvoir la production nationale.
Le Bureau de Monétisation des Programmes d‟Aide au Développement (BMPAD) est une entité
étatique originellement agréée par le Gouvernement Haïtien, en 1985, pour gérer le programme
américain pl-480/Title III. Avec les années, la monétisation de l‟aide en prévenance de divers pays,
tel que le Canada, la France, le Japon parmi d‟autres, lui a aussi été confiée. Il dépend directement
du Ministre de l‟Economie et des Finances et aujourd‟hui est « responsable de la monétisation et
des aides alimentaires, de la gestion des projets découlant de cette aide »
En décembre 2007, Le BMPAD remplace officiellement le Bureau de Monétisation Pl-480 et se
mobilise pour le plein exercice de ses nouvelles responsabilités qui sont de « gérer les produits
pétroliers » en provenance de Venezuela « et leur revente sur le marche national ». Ce bureau a
l‟habitude de la monétisation, ce qu‟il va falloir faire avec le pétrole reçu dans le cade de l‟accord
PETROCARIBE.
Il gère déjà des projets financés par des donneurs et a le savoir-faire en matière d‟aide bilatérale et
multilatérale. De plus, il offre une plateforme idéale pour garder hors du budget national les
revenus de PETROCARIBE.
A ces attributions, s‟ajoute l‟exécution des obligations liées à la gestion directe du Fonds
PETROCARIBE. Le BMPAD exécute et supervise aussi certains des projets finances par ce prêt
mais pas tous. D‟autre part, c‟est lui qui contrôle les revenus, jusqu'à demande de décaissement du
Ministère des Finances.
Page 14 of 656
Le Conseil d‟Administration du BMPAD se compose de sept(7) membres qui, sauf le Directeur
exécutif le Gouverneur de la Banque Centrale, sont exactement les mêmes que ceux qui signent les
résolutions de décaissement en Conseil de Ministres ; car parmi les sept (7) membres de son
Conseil,
six(6) sont des ministres du Gouvernement. Ceci fait du Conseil du BMPAD une extension du
Conseil des Ministres car le Directeur et le Gouverneur sont sur le Conseil a titre d‟observateur.
En plus de faire de la monétisation, le BMPAD Fait de la supervision et agit aussi a l‟occasion,
comme Maitre d‟ouvrage délègue. A date, ses attributions ne sont pas claires mais elles sont
certainement vastes. Le BMPAD exécute les instructions du Ministre des Finances mais aucun
audit n‟a été fait pour établir si tous les virements exécutés par la BMPAD sont tous réellement
accompagnés de lettres d‟autorisation du dit Ministère.
Cette brève présentation de l‟Accord PETROPCARIBE permet de faire ressortir son importance
mais aussi de resituer ce contexte permanent d‟interrogations , de suspicions , d‟accusations de
rumeurs qui ont poussé le Sénat à adopter une nouvelle résolution intervenue en décembre 2016 en
vue de constituer une nouvelle Commission dénommée Commission Sénatoriale Spéciale
d‟Enquête(CSSE) chargée de reprendre l‟enquête menée par la dernière Commission autour de la
gestion du fonds PETRO CARIBE , de l‟approfondir en étendant son mandat d‟investigation a
d‟autres Entités et Organismes tels que ci-dessus cites .
Cette Commission est composée de cinq (5) Membres ainsi constituées :
-
Sénateur Evallière Beauplan, Président
Sénateur Nenel Cassy, Secrétaire rapporteur
Sénateur Onondieu Louis, Membre
Sénateur Antonio Cheramy, membre
Sénateur Herve Fourcan, membre
Page 15 of 656
Déroulement de l‟enquête
IV
Afin d‟atteindre les objectifs poursuivis dans le cadre de cette mission, la Commission a procédé
par l‟intermediaire des auditeurs relevant de la Firme d‟audit à une révision analytique des comptes
apparaissant aux états financiers du fonds PETRO CARIBE, aux moyens des méthodes de
corroboration et des tests de conformité sur les documents (comptables et administratifs) servant de
justificatifs aux opérations effectuées. Ces procédés se fondent sur la révision, ainsi que
l‟application des sondages aux registres comptables. Cette analyse a comporté les étapes suivantes :
Obtention et analyse des treize (13) Résolutions prises en Conseil des Ministres;
Obtention et examen des états financiers du fonds PETRO CARIBE couvrant les
périodes annuelles allant de septembre 2008 à septembre 2016 y compris les relevés et
les conciliations bancaires;
Examen des pièces justificatives supportant la préparation des états financiers;
Vérification du respect de l‟application des procédures de passation de marchés;
Évaluation du contrôle interne de la gestion du fonds PETRO CARIBE;
Évaluation du contrôle de l‟ordre chronologique des chèques émis par le BMPAD ainsi
que la vérification de la réception de ces derniers par les bénéficiaires;
Comparaison des décaissements réels aux affectations prévues;
Examen sur une base d‟échantillonnage des dépenses du fonds PETRO CARIBE
(mandats de paiement, bordereaux de décaissements), pour nous assurer de leur
conformité, de leur utilisation selon les activités prévues, de la présence des pièces
justificatives appropriées et suffisantes, de leur report intégral et de l‟obtention des
autorisations préalables;
Vérification de l‟existence de rapports d‟audits internes et externes ainsi que du suivi
des observations formulées dans ces derniers;
Assurance de l‟exécution physique des travaux exécutés
sur la base d‟un
échantillonnage des sites retenus à partir des critères suivants : Nature des travaux;
Montant des contrats et Zones Géopraphiques Concernées;
Vérification des critères d‟évaluation des contrats selon :
Le respect des règles de passation de marchés;
L‟éligibilité des firmes à fournir des biens et services et la réalisation des
travaux;
Le respect des critères d‟ordre technique;
Le respect des critères d‟ordre financier;
Le libre accès à la commande publique;
L‟égalité de traitement des candidats et transparences des procédures;
Le respect des règles d‟éthique;
La protection des intérêts de l‟État;
L‟efficacité des dépenses publiques;
Le respect de la loi de finance relative au budget d‟investissement;
Ẻmission d‟une opinion sur l‟utilisation des fonds générés dans le cadre de l‟Accord
PETRO CARIBE, sur la situation du solde de ce fonds et enfin, sur la gestion des contrats
financés à partir de ces fonds dans le cadre des treize (13) Résolutions.
Page 16 of 656
V
Méthodologie
La méthodologie adopté peut être résumée par les différentes étapes qui suivent et qui consistent à :
-
Analyser et approfondir les travaux réalisés par la Commission d‟Ethique et d‟Anticorruption de 2016 déjà effectués;
-
Compiler et analyser les documents existants;
-
Vérifier avec les Institutions l‟Authenticité de ces documents;
-
Solliciter la disponibilité des Ministres de l‟Ẻconomie et des Finances (MEF), du MPCEP,
du BMPAD, du MICI, du MCI, du MSPP, du MPTC, du FAES, du MT, etc, pour des
séances de travail à leurs bureaux respectifs puisqu‟ils agissaient comme Maîtres d‟Ouvrage
et qu‟ils disposent les ducuments requis dans le cadre de notre mission;
-
Sélectionner les projets à travers les treize (13) Résolutions sur la base d‟un
échantillonnage selon les critères suivants:
Nature des travaux;
Montant des contrats;
Zones départementales exécutées.
-
Lancer un audit physique des projets jugés d‟intérêt;
-
Exploiter les travaux de la CSCCA sur la situation financière et l‟efficacité des dépenses
publiques.(Vu que la premiere Résolution celle de 20 septembre 2008, a été auditée par
ladite Cour;
-
Vérifier avec la CSC/CA ses rapports d‟audit par rapport aux personnes et institutions
indexées;
-
Solliciter et analyser les documents obtenus (contrats, décomptes, rapports de suivi produits
par les Organismes et Ministères sectoriels bénéficiaires des treize (13) Résolutions,
notamment:
Le Ministère des Travaux Publics, Transport et Communication (MTPTC)
Le Ministère de Santé Publique et de la Population (MSPP)
Le Ministère de l‟Education Nationale et de la formation Professionnelle (MENFP)
Le Ministère de l‟Economie et des Finances (MEF)
Le bureau de Monétisation et des Programmes d‟aide (BMPAD), etc…
-
Analyser les rapports des firmes de supervision;.
-
Formuler une opinion sur les résultats de l‟audit du fonds PETRO CARIBE.
Page 17 of 656
VI
Cadre légal
Nous avons relevé tout un ensemble de textes de loi se rapportant à notre travail.
Les principaux pris en compte, sont les suivants:
o
Les lois organiques des Organisations et Ministères bénéficiaires,
notamment :
Le décret du 13 mars 1987 créant et organisant le Ministère de
l‟Économie et des Finances (MEF);
Le décret du 6 janvier 2016 créant et organisant le Ministère de la
Planification et de la Coopération Externe (MPCE);
Le décret du 18 octobre 1983 créant et organisant le Ministère des
Travaux Publiques Transport et Communications(MTPTC);
La loi du 27 décembre 2007 créant le BMPAD publiée au journal
officiel de la République le Moniteur du 4 janvier 2008 ;
o L‟arrêté du 16 février 2005 portant règlement général de la comptabilité
publique;
o Le décret du 17 mai 2005 portant révision du statut général de la fonction
publique;
o Le décret du 17 mai 2005 portant organisation de la fonction Centrale de
l‟État;
o Le décret du 29 septembre 2005 relatif à l‟impôt sur le revenu;
o La loi du 10 juin 2009 fixant les règles générales relatives aux Marchés
Publics et aux Conventions de Concession d‟Ouvrage de Service Public,
abrogeant le décret du 3 décembre 2004 fixant la réglementation des Marchés
Publics de Services, de Fournitures et de Travaux;
o L‟arrêté du 26 octobre 2009 précisant les modalités d‟application de la loi
fixant les règles relatives aux marchés publics et aux conventions de
Concession d‟Ouvrage de services publics;
o L‟arrêté du 14 juin 2012 fixant les seuils des passations de marchés;
o La loi d‟urgence du 15 avril 2010 portant modification de la loi du 9
septembre 2008 sur l‟État d‟urgence suite au tremblement de terre du 12
janvier 2010;
o L‟arrêté du 5 novembre 2012 déclarant l‟État d‟urgence sur toute l‟étendue du
territoire national suite au passage de la tempête Sandy;
o L‟arrêté du 5 décembre 2012 prolongeant l‟État d‟urgence du 5 novembre
2012;
o La loi du 1er février 2017 sur l‟élaboration et l‟exécution des lois de finance.
Page 18 of 656
VII
Accord PETRO CARIBE
Le PETRO CARIBE est une entité créé le 29 juin 2005, par la République Bolivarienne du
Vénézuela pour la mise en œuvre des politiques et plans énergétiques visant l‟intégration des
peuples de la Caraïbe par le biais de l‟utilisation souveraine des ressources naturelles et
énergétiques au bénéfice direct de leurs citoyens.
Haïti, qui a toujours entretenu des liens étroits d‟amitiés et de coopération avec le
Vénézuela, allait être l‟un des pays bénéficiaires de ce programme en vertu de l‟Accord
communément appelé « Accord de Cooperation Énergetique PETRO CARIBE » signé entre
les deux (2) pays, le 15 mai 2006.
Par cet Accord, le Gouvernement du Vénézuela s‟est engagé à fournir à l‟État Haïtien, sur
une base annuelle et à des conditions de paiements préférentiels, un approvisionnement en produits
pétroliers équivalent à quatorze mille (14,000) barils par jour. Et, le Gouvernement Haïtien de son
côté, a désigné le BMPAD comme entité responsable de l‟achat des produits pétroliers pour les
revendre aux compagnies pétrolières locales, suivant un accord de vente signé le 12 mars 2007,
entre Petroles de Venezuela S.A (PDVSA, compagnie Vénézuélienne et le BMPAD.
Aux termes dudit Accord, les versements relatifs aux intérêts et à l‟amortissement du capital
de la dette contractée par le Gouvernement de la République d‟Haïti pouvant être effectués via des
mécanismes de compensation commerciale, sur requête du Gouvernement de la République
Bolivarienne du Vénézuela.
Sur la base de ces deux (2) contrats : contrat de financement en produits pétroliers et contrat
de gestion des Produits Financiers, l‟État Haïtien fait acquisition des produits pétroliers raffinés du
Vénézuela à des prix préférentiels et les revend aux compagnies pétrolières locales qui disposent
d‟un délai de trente (30) jours pour payer au BMPAD le total des montants facturés.
En retour, l‟État Haïtien honore sa facture vis-à-vis du Venezuela selon des pourcentages
(%) à court et à long terme definis par la PDVSA suivant les cargaisons recues.
Toutefois, toute partie cash non soldée au 31ème jour porte un intérêt annuel de 2%. La
deuxième portion est financée avec un intérêt annuel de 2% sur une période de 15 ans si le prix
FOB du produit pétrolier est de 40.00 US par baril; dans le cas contraire le financement s‟étend sur
une période de 23 ans plus les deux années de grâce, ce qui totalise 25 ans et le taux d‟intérêt
passerait à 1%.
Nous tenons à porter à l‟attention des Membres de la Commission Spéciale d‟Enquête
Sénatoriale qu‟au cours de notre mission, nous avons retracé l‟existence d‟une société dénommée
« Société d‟Investissement Pétion Bolivar SAM »
Les statuts de ladite Société ont été préparés par Maȋtre Salim SOUCAR et déposés au
bureau d‟études du notaire MERCERON.
Elle a pour objet : L‟exploitation et l‟exportation d‟hydrocarbures ainsi que la manufacture
et le raffinage de produits pétroliers et de ses dérivés ; le transport de pétrole brut, de ses dérivés et
Page 19 of 656
de Gaz de Pétrole Liquéfié (GPL) par voie terrestre, maritime, fluviale ou lacustre, tant sur le
territoire national qu‟à l‟étranger au moyen de ses propres navires et à travers la location et/ou
l‟affermage de tous types de bateaux ou d‟autres moyens de transport; l‟importation, l‟exportation ;
le stockage, la distribution et la commercialisation d‟hydrocarbures et de ses dérivés; etc.
Son capital social et de quarante millions de gourdes (HTG40,000,000) et divisé en mille
(1000) actions d‟une valeur nominale de quarante mille gourdes (HTG 40,000) chacune.
L‟Assemblée constituante est composée des personnes dont les noms suivent :
Nom
1-Luis RIVAS
2-L‟État Haïtien
3-Bureau de Monétisation
4-L‟État Haïtien
5-PDV-SA
6-PDV-SA
Fonction
Président du Conseil
Vice-Président représenté par le MAE
Secrétaire Représenté par son DG
Trésorier représenté par le MEF
Conseiller
Conseiller
# d‟actions
------------------------------------------------
Outre son existence, deux (2) points particuliers ont attiré notre attention :
Cette société qualifiée SAM, l‟État Haïtien est partie prenante donc, actionnaire. Or, la
répartition du Capital social n‟est nulle part mentionnée;
Conformément aux prescrits de la loi régissant les sociétés anonymes: il est fait obligation à
toute entité à sa création d‟ouvrir un compte bancaire à la BNC dans lequel un quart (1/4)
du capital social est déposé. L‟ouverture de ce compte est confirmée par l‟émission d‟un
certificat émis par l‟institution financière à cet effet.
Or, le certificat émis par le BNC est de vingt-cinq mille gourdes (HTG 25,000) ce qui
constitue une anomalie dans la formation de cette société eu égard à la législation en vigueur.
L‟avis autorisant la société à fonctionner, signé par le Ministre du Commerce M Wilson
LALEAU porte la date du 29 mai 2012 et, les documents y afférents sont publiés dans le
« Journal officiel de la République d‟Haïti, le Moniteur # 84 du mercredi 30 mai 2012.
Nous n‟avons pas pu déterminer si cette société est opérationnelle ?.
Page 20 of 656
VIII
Solutions adoptées aux difficultés rencontrées
Un groupe de professionnels composé de :
-
Trois (3) Experts-Comptables assistés de cinquante (50) auditeurs (Senior, Intermédiaire
Junior) constituant neuf (9) équipes.
Deux (2) ingénieurs évaluateurs assistés de trois (3) collaborateurs.
Un juriste spécialisé en Crimes Économiques et Financiers a été assigné à l‟exécution de ce
mandat.
Une correspondance du Sénat de la République dûment signée par le Président a été acheminée
aux Responsables des institutions bénéficiaires des ressources du fonds PETRO CARIBE les
informant du choix du Cabinet Noël pour réaliser l‟audit du fonds couvrant la période allant de
septembre 2008 à mars 2016 et de bien vouloir prendre les dispositions afin de mettre un espace
de travail à la disposition des auditeurs.
Donnant suite à cette correspondance, des visites ont eu lieu aux bureaux de certaines
institutions afin de planifier l‟intervention des auditeurs sur place.
La correspondance du Sénateur Onondieu LOUIS a lourdement affecté l‟exécution du mandat
entraînant d‟une part, une retention d‟informations des uns et d‟autre part, la non collaboration
des autres.
Àtitre d‟exemple :
Le Ministre de la Planification a eu à faire comprendre au Président de la Commision
Spéciale d‟Enquête qu‟il mettra à la disposition de la Commission une salle pourvue d‟une
imprimante pour les auditeurs, mais ils doivent être toujours assistés d‟un Sénateur membre de
ladite Commission et si le Sénateur se déplace les auditeurs doivent cesser de travailler. Enfin,
ajouta-t-il, c‟est la décision de son Gouvernement.
Le conseiller juridique du FAES, quant à lui, il a fait remarquer qu‟il n‟incombe pas au Sénat
d‟effectuer un tel travail que cette tậche incombait à la Cour Supérieure des Comptes et du
Contentieux Administratif (CSC/CA).
Pour y remédier, une liste de documents (Contrat, correspondance, décompte, rapport de
supervision etc) lui a été remise et, en retour, il nous a acheminé par l‟intermediaire du Président
de la Commission, une partie des contrats sans les documents de support.
Page 21 of 656
Présentation de la loi sur l‟État d‟Urgence
IX
La Loi sur l‟État d‟Urgence se réfère d‟abord à une situation dans laquelle s‟applique un
régime restrictif de certaines libertés fondamentales et des pouvoirs exceptionnels de l‟Exécutif qui
se justifient par une situation de catastrophe naturelle avérée ou imminente et qui requiert
l‟adoption de mesures urgentes.
Cet État d‟Urgence a une durée c‟est-à-dire, limité dans le temps et peut être instauré sur
tout ou partie du territoire et doit préciser «la nature de l‟évènement, la zone concernée, les
circonstances qui le justifient et la durée de son application».
En d‟autres termes, la loi de l‟Etat d‟Urgence est un mécanisme légal qui donne au pouvoir
exécutif une certaine marge de manœuvre pour prendre rapidement des décisions en vue de
répondre à des situations graves mettant la population immédiatement en péril lorsqu‟une
catastrophe naturelle réelle ou imminente exige, pour protéger les personnes, les biens,
l‟environnement ou les infrastructures. Une action immédiate que les autorités compétentes
estiment ne pas pouvoir se réaliser adéquatement dans le cadre des règles de fonctionnement
habituelles des institutions publiques ou dans le cadre du Plan National de Gestion des Risques et
des Désastres.
En tant qu‟instrument légal, la loi d‟Urgence fait référence non seulement à certaines lois
déjà existantes, décrit les circonstances et la durée de l‟État d‟Urgence mais aussi, prévoit ses
propres mécanismes de contrôle et de restriction.
La loi sur l‟État d‟Urgence du 9 septembre 2008,
-
Cette loi avait deux (2) particularités:
o Elle rendait inopérante les procédures prévues sur les Marchés Publics qui étaient en
vigueur à ce moment-là par le décret du 3 décembre 2004:
o Elle éliminait le contrôle à priori de la CSC/CA.
L‟alinéa 5 de l‟article 7 disposait ainsi : Le Gouvernement passe les contrats qu‟il juge
nécessaires sans les procédures prévues par la réglementation sur les Marchés Publics. De tels
contrats sont applicables sans le visa de la CSC/CA.
Toutefois, elle reconnaissait et exigeait même le pouvoir de contrôle à postériori de la
CSC/CA et celui du Pouvoir Législatif.
Les articles 12 et 13 disposaient ainsi:
Article 12 : Les mesures adoptées pendant l‟État d‟Urgence sont susceptibles de recours
par- devant la CSC/CA;
Article 13 : Le Gouvernement soumet au Corps Législatif, dans les trois mois qui suivent la
fin de l‟État d‟Urgence ou, s‟il n‟est pas en session, à la reprise de ses travaux, un rapport sur la
catastrophe et les différentes mesures adoptées.
Page 22 of 656
La loi sur l‟État d‟Urgence du 15 avril 2010
Cette loi portait amendement à la loi du 9 septembre 2008, en ce qu‟elle reconsidérait les
procédures de passation de Marchés Publics.
L‟article 7 alinéa 5 stipule : « Le Gouvernement passe les contrats selon les
procédures célères prévues par les réglementations sur les Marchés Publics ».
Elle conserve le pouvoir de contrôle à posteriori de la CSC/CA ainsi que celui du Pouvoir
Législatif.
La particularité de cette loi, c‟est qu‟elle a reconsidéré les procédures prévues sur les
Marchés Publics et ceci, non à partir de celles prévues par le décret du 3 décembre 2004, mais à
partir de la toute nouvelle loi fixant les règles générales relatives aux Marchés Publics et aux
Conventions de Concession d‟Ouvrage de Service Public, la loidu 10 juin 2009.
Page 23 of 656
X
Procédures de passation des marchés publics
Afin de fonder notre opinion sur la régularité des Marchés passés dans le cadre des
Programmes et Projets financés par les fonds PETRO CARIBE à travers les treize (13) Résolutions,
nous avons examiné la loi du 10 juin 2009 qui fournit à travers ses articles les grands principes, les
règles générales et les procédures à suivre sur les passations des Marchés Publics.
Cette démarche nous a donc conduit à :
Vérifier si les méthodes de passation de Marchés, d‟évaluation et d‟adjudication ont
été respectées conformément aux dispositions de la loi du 10 juin 2009;
Vérifier si les critères de sélection des soumissionnaires adjudicataires sont respectés
en mettant en exergue le principe de clarté et de transparence de l‟évaluation des
offres ;
Analyser les risques en matière de respect des principes d‟acquisition, de contrôle, de
compétences et en matière de gestion des institutions bénéficiaires;
S‟assurer que la nature et l‟etendue des besoins sont determinées avec précision par
les autorités contractantes avant toute négociationde Gré à Gré ;
Controler les modes de paiement auxquels les marches donnent lieu par référence aux
règlements des marchés publics fixant les montants d‟avance accordées qui ne
peuvent en aucun cas excédés trente pour cent 30% du montant du marché initial.
Page 24 of 656
XI Présentation du Bureau de Monétisation de Programmes d‟Aide au
Développement(BMPAD)
a) Constitution
Le Bureau de Monétisation de Programmes d‟Aide au Développement (BMPAD) est doté
de la personnalité juridique et jouit de l‟Autonomie Administrative et Financière. Il est placé sous
la tutelle du Ministère de l‟Économie et des Finances (MEF) et fonctionne sous l‟égide d‟un
Conseil d‟Administration (CA) de sept (7) Membres, dont six (6) Ministres du Gouvernement et le
Gouverneur de la Banque de la République d‟Haïti (BRH). Le Ministre de l‟Économie et des
Finances (MEF) assure la Présidence dudit Conseil et celui de la Planification et de la Coopération
Externe la Vice-Présidence. La structure d‟exécution du BMPAD comprend quatre (4) Directions,
lesquelles sont: la Direction Générale, la Direction Administrative et Financière, la Direction
d‟Analyse et d‟Évaluation et la Direction Commerciale.
Le BMPAD a été créé par la loi promulguée le 27 décembre 2007 et publiée dans le journal
officiel de la République « Le Moniteur » numéro 2 du 4 janvier 2008 remplaçant ainsi le Bureau
de Gestion PL-480/Titre III, organisme autonome à caractère financier sous tutelle du Ministère de
la Planification et de la Coopération Externe.
Le BMPAD hérite tout au début de tous les biens meubles et immeubles, des actifs nets et
de toutes les obligations du Bureau de Gestion PL-480/Titre III et a pris fonction le 1er février
2009. Cette nouvelle structure a la responsabilité d‟assurer l‟efficacité et la ponctualité des actions
menées pour la Génération, la Programmation, le Décaissement, le Contrôle et l‟Évaluation des
fonds de contrepartie en monnaie locale. Aussi, le BMPAD, organe d‟exécution du Programme, est
géré par un Directeur Général qui assure le Secrétariat Exécutif du Conseil d‟Administration cidessus mentionné.
b) Sa mission
En coordination avec les Organismes Nationaux et Internationaux intéressés, tant publics
que privés, le BMPAD a pour mission de veiller à l‟application des Conventions, Protocoles
d‟Entente, Accords de Don et/ou de Prêt, conclus entre le Gouvernement Haïtien et un donateur ou
bailleur de fonds, dans le cadre des Programmes d‟Aide au Développement à Haïti. Les ressources
générées par la Monétisation sont utilisées pour le financement des Programmes et Projets de
Développement prioritairement dans les secteurs de l‟Agriculture, des Travaux Publics, de la Santé,
de l‟Éducation, de l‟Environnement et Autres.
De manière spécifique, sa mission consiste à:
Poursuivre la mise en œuvre des Accords, Conventions et Protocoles d‟Entente que gérait le
Bureau de Gestion du Programme PL-480/Titre III;
Négocier et signer, avec les fournisseurs, conformément aux dispositions des règlements
internes, les contrats d‟approvisionnement des produits à commercialiser dans le cadre des
conventions, protocoles d‟entente ou accord de don ou de prêts dont le Bureau de
Monétisation assure la gestion;
Page 25 of 656
Recevoir, Entreposer, Commercialiser les produits faisant l‟objet d‟un Accord de don, de
Prêt avec l‟État Haïtien ainsi que toute aide en nature octroyée à la requête et/ou au profit
d‟une Organisation Non Gouvernementale (ONG), d‟une fondation ou d‟une institution à
but non lucratif opérant légalement en Haïti et dont les fonds générés par la Monétisation
sont destinés au financement des Programmes et Projets de Développement Économique et
Social;
Proposer au Conseil des Ministres, en fonction des Orientations Stratégiques, la
Programmation des fonds générés par les activités de Monétisation et les Fonds d‟Aide au
Développement « FAD»;
Assurer le financement et le suivi des Programmes de Développement et des Projets agréés,
leur vérification financière, leurs évaluations économique, sociale, et environnementale, à
partir des fonds disponibles par transfert direct ou Monétisation des aides en nature,
conformément à la Programmation agréée et la procédure en vigueur;
Gérer et allouer, avec les instances responsables des finances publiques désignées à cet effet
selon les dispositions liant l‟État Haïtien et le donateur et bailleur de fonds, les ressources
provenant de la Monétisation des Programmes d‟Aide au Développement à Haïti;
Constituer, selon les besoins, des comités de consultation ou de pilotage pour le suivi des
Conventions, Échanges de lettres, Accords de don ou de Prêt dont la gestion lui est confiée;
Veiller à ce qu‟un pourcentage du fonds de l‟Accord PETRO CARIBE, accessible à l‟État
Haïtien, soit alloué au Fonds de Gestion et de Développement des Collectivités
Territoriales.
(FGDCT)
Page 26 of 656
c) Structure organisationnelle
Selon la loi créant le BMPAD, sa structure comporte une Direction Générale, une Direction
Administrative et Financière, une Direction d‟Analyse et d‟Evaluation et une Direction
Commerciale, une Unité d‟Audit et différents services.
La Direction Générale est chargée d‟exécuter les décisions du Conseil d‟Administration et
de mettre en œuvre le programme d‟activités de l‟organisme approuvé par ledit Conseil.
Elle est dirigée par un Directeur Général, nommé par le Président de la République par
Arrêté
Présidentiel, pris en Conseil des Ministres. En cette qualité, il est d‟office le Secrétaire
Exécutif du Conseil d‟Administration et participe à ses réunions avec voix consultative.
Page 27 of 656
La Direction Administrative et Financière assure l‟administration du bureau ainsi que la
gestion des opérations financières du bureau de Monétisation.
La Direction d‟Analyse et d‟Evaluation étudie et contrôle, dans le cadre des
programmations agréées par le Conseil d‟Administration et selon les procédures en vigueur,
les programmes et projets financés et/ou cofinancés à partir des fonds gérés par le Bureau de
la Monétisation.
La Direction Commerciale est responsable d‟une part, de la négociation avec les partenaires
pour l‟acquisition de produits stratégiques, notamment de produits pétroliers ainsi que leurs
dérivés, de denrées alimentaires, de produits de première nécessité et d‟autre part, de la
réception et de la commercialisation desdits produits avec les agents économiques
nationaux.
d) Attribution du Conseil d‟Administration du BMPAD
Le BMPAD, créé par la Loi du 4 janvier 2008 et placé sous la tutelle du Ministère de
l‟Economie et des Finances (MEF), fonctionne sous l‟égide d‟un Conseil d‟Administration de sept
(7) membres, déjà cités plus haut, ainsi que les rôles assignés au BMPAD.
e) Exécution financière
Pour la gestion financière du Fonds Pétro Caribe, BMPAD a utilisé les comptes courants
suivants:
1) Compte courant numéro 11264711 libellé en gourdes et domicilié à la BRH;
2) Compte courant numéro1660-020244 libellé en gourdes et domicilié à la BNC;
3) Compte courant numéro 1661-018590 libellé en dollar américain et domicilié à la BNC;
4) Compte courant numéro 1661-017504 libellé en dollar américain et domicilié à la BNC;
Pour le fonctionnement de ces dits comptes, les signataires dont les noms suivent ont été
habilités à signer. Deux signatures sont obligatoires pour toutes transactions de décaissement.
Du 2008 au 3 février 2015:
1 – Michael LECORPS – Directeur Général.
2 – Jean Alix NICOLAS - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 3 février 2015 au 20 avril 2016:
1 – Eustache SAINT-LOT – Directeur Général.
2 – Rudy Serge SALOMON - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 20 avril 2016 au 30 septembre 2016
1 – Patrick NORAME – Directeur Général.
2 – Serge Philippe PIERRE - Directeur Général Adjoint.
3 – Evens LAINE - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Page 28 of 656
XII
Examen des états financiers du fonds PETRO CARIBE
Ces états financiers du fonds PETRO CARIBE présentés ci-dessous sont préparés par
le BMPAD et audités par des Experts-Comptables Indépendants, ils sont soumis à notre
attention aux fins d‟analyse
Nous ne faisons qu‟émettre des commentaires découlant de nos constatations d‟audit.
PETRO CARIBE
État de la situation financière du fonds
Au30 septembre 2016
(Exprimé en gourde Haïtienne)
Actif
Notes
2016
2015
Court terme
Liquidités
4
4, 152, 767,004
3, 190, 753,091
43, 723, 619,546
29, 077, 545,362
30, 553,462
21, 371,995
321, 579,882
774, 013,614
110, 190, 864,999
159, 193, 398,507
316, 767,077
628, 910,552
80, 209, 622,913
113, 444, 970,990
5, 687, 458,487
3, 975, 769,431
Autres Comptes à payer
422, 149,440
297, 793,945
Comptes à payer spot
1, 656, 678,202
173, 256,239
Comptes à payer demeurage spot
12, 684,540
1, 645,722
Comptes à payer frais portuaire spot
4, 115,051
115,832
7, 783, 085,720
4, 448, 581,169
Comptes à recevoir
5
Intérêts à recevoir
Autres comptes à recevoir
Avances aux transportateurs de Mazout
Décaissements des treize (13) résolutions
Total de l‟actif
6
Passif
Court terme
Comptes à payer Pétro Caribe
7
Total du passif à court terme
Passif à long terme
Passif à long terme PETRO CARIBE
8
128, 192, 958,819
Retenues sur Contrat
Total du passif à long terme
Total du passif
89, 184, 555,331
2, 145,103
128, 195, 103,922
1, 692,079
89, 186, 247,410
135, 978, 189,642
93, 634, 828,579
23, 215, 208,865
19, 810, 142,411
159, 193, 398,507
113, 444, 970,990
Solde du fonds
Solde du fonds à la fin
Total du passif et du solde du fonds
9
Page 29 of 656
PETRO CARIBE
État des résultats du fonds PETRO CARIBE
Pour la période annuelle se terminant le 30 septembre 2016
(Exprimé en gourde Haïtienne)
Annexes
2016
2015
1
14,166,353,930
39,112,084
7,018,534,803
180,861,371
293,815,584
8,954,611
------------------21,707,632,383
17,418,483,497
-----------------1,168,417,046
137,365,899
316,225,565
14,149,440,138
7,018,534,802
153,293,233
21,321,268,173
17,418,483,497
1,168,417,046
63,518,702
18,650,419,245
Bénéfice brut
386,364,210
621,314,462
Frais de fonctionnement
Financement au budget BMPAD
Frais bancaires
Pénalités sur commande en /Spot
Total des Frais de fonctionnement
413,850,000
25,014,554
18,523,092
457,387,646
131,328,0000
13,667,398
----------------144,995,398
71,023,436 )
476,319,064
Ventes
Carburant
Premium/ ventes de Carburant/ Spot
Produits importés en Spot
Premium Carburant
Autres revenus
Autres revenus /Spot Petro Caribe
Ventes de ritz / Stabilisation de prix
Total deventes
Coût des ventes
Carburant et lubrifiant
Produits importes en Spot
Operation de Blinding
Total du coût des ventes
Surplus ou (Déficit) avant autres revenus
2
2
(
231,241,700
19,271,733,707
Autres revenus
Intérêts sur placement
Gains ou (Pertes) sur change
Total des autres revenus
37,522,238
2,900,608,026
2,938,130,264
28,217,784
2,310,925,316
2,339,143,100
Excédent ou (Déficit) de la période annuelle
2,867,106,828
2,815,462,164
Déjà etabli
Redressement des périodes anterieures
18,156,911,830 (
1,653,230,581
43,714,828,193 )
60,709,508,440
Solde du fonds redréssé
19,810,142,411
16,994,680,247
Solde du fonds à la fin de période annuelle
23,215,208,865
19,810,142,411
Page 30 of 656
PETRO CARIBE
État des flux de trésorerie du fonds
Pour la période annuelle se terminant le 30 septembre 2016
(Exprimé en gourde Haïtienne)
2016
2015
Activites d‟exploitation
2,867,106,828
Excédent de la période annuelle
Changement au niveau des elements d‟actifs
Changrment au niveau des elements de passifs
Liquidite provenant des activites d‟exploitation
(
(
155,040,631,502
135,978,189,641
16,195,335,033
2,815,462,164
)(
)(
110,254,217,898 )
110,254,217,898
13,803,927,157 )
Activites d‟investissement
Acquisition d‟immobilisation
-------------
----------------
Augmentation ou diminution de l‟encaisse
--------------
----------------
Encaisse au début
4,152,767,004
3,190,753,091
Encaisse à la fin
4,152,767,004
3,190,753,091
Page 31 of 656
PETRO CARIBE
Notes afférentes aux états financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
1-Constitution du BMPAD
Le Bureau de Monétisation des Programmes d‟Aide au Développement (BMPAD) est doté
de la personnalité juridique et jouit de l‟autonomie administrative et financière. Il est placé sous la
tutelle du Ministère de l‟Économie et des Finances (MEF) et fonctionne sous l‟égide d‟un Conseil
d‟Administration (CA) de sept (7) membres, dont six (6) Ministres du Gouvernement et le
Gouverneur de la Banque de la République d‟Haïti (BRH). Le Ministre de l‟Économie et des
Finances (MEF) assure la Présidence dudit Conseil et celui de la Planification et de la Coopération
Externe la Vice-Présidence. La structure d‟exécution du BMPAD comprend quatre (4) Directions,
lesquelles sont: la Direction Générale, la Direction Administrative et Financière, la Direction
d‟Analyse et d‟Évaluation et la Direction Commerciale.
Le BMPAD a été créé par la loi promulguée le 27 décembre 2007 et publiée dans le journal
officiel de la République « Le Moniteur » numéro 2 du 4 janvier 2008 remplaçant ainsi le Bureau
de Gestion PL-480/Titre III, organisme autonome à caractère financier sous tutelle du Ministère de
la Planification et de la Coopération Externe.
Le BMPAD hérite tout au début de tous les biens meubles et immeubles, des actifs nets et
de toutes les obligations du Bureau de Gestion PL-480/Titre III et a pris fonction le 1er février
2009. Cette nouvelle structure a la responsabilité d‟assurer l‟efficacité et la ponctualité des actions
menées pour la Génération, la Programmation, le Décaissement, le Contrôle et l‟Évaluation des
fonds de contrepartie en monnaie locale. Aussi, le BMPAD, organe d‟exécution du Programme, est
géré par un Directeur Général qui assure le Secrétariat Exécutif du Conseil d‟Administration cidessus mentionné.
2- Base de préparation des états financiers
Le BMPAD utilise le logiciel ACPACC pour l‟enregistrement quotidien des opérations
financières, le traitement des données comptables et la préparation de ses rapports financiers. Les
transactions réalisées en gourde Haïtienne (HTG) sont comptabilisées dans des comptes spécifiques
et séparées. Il en est de même des transactions réalisées en devise américaine. La monnaie
fonctionnelle est la gourde.
a) États financiers du Fonds PETRO CARIBE
Les états du fonds PETRO CARIBE sont préparés par le chef comptable, vérifiés par le
Directeur Administratif et Financier et approuvés par le Directeur Général. Ils sont présentés par les
deux (2) monnaies ; soit la gourde Haïtienne et dollar Americain.
Pour les périodes annuelles se terminant les 30 septembre 2008 et2009, ils sont présentés en
monnaie locale.
Pour les périodes annuelles se terminant les 30 septembre 2010 à 2012, ils sont présentés en
devise Américaine.
Page 32 of 656
PETRO CARIBE
Notes afférentes aux états financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
2- Base de préparation des états financiers (suite)
a) États financiers du Fonds PETRO CARIBE (suite)
Pour les périodes annuelles se terminant les 30 septembre 2013 à 2016, ils sont présentés en
monnaie locale.
L‟état de l‟évolution des flux de trésorerie du fonds PETRO CARIBE des périodes
annuelles ci-dessous mentionnées ne balance pas ou n‟est pas transmis. Ce sont :
Périodes annuelles
2008 et 2009
2010, 2011, 2012, 2014,
2015 et 2016
Situation
Non transmis
Ne balance pas.
Nous n‟avons pas retracé non plus l‟existence d‟un fonds d‟amortissement de la dette. Ce
fonds doit être créé et alimenté à chaque livraison des produits pétroliers. Le montant devant
alimenter ce compte sera fonction du résultat d‟un calcul actuariel qui prendra en compte, le taux de
rendement assujetti au fonds, la périodicité des remboursements etc.
Nous tenons à signaler que toutes les transactions d‟achat et de vente des produits pétroliers
du fonds PETRO CARIBE sont effectuées en dollar américain. Cependant, suite à un accord entre
le Ministère de l‟Économie et des Finances (MEF) et la Banque de la République d‟Haïti (BRH) en
date du 19 janvier 2012, les transactions de vente sont effectuées à quarante pour cent (40 %) en
dollar américain et soixante pour cent (60 %) en gourde Haïtienne.
b) Base d‟évaluation
Les états financiers du BMPAD sont présentés sur la base du coût historique.
c) Monnaie de présentation
Pour ses opérations, le BMPAD a utilisé la gourde Haïtienne et le dollar américain et a aussi
présenté ses états financiers en utilisant les deux monnaies. Cependant au 30 septembre 2016, les
états financiers sont présentés en gourde Haïtienne, mais les transactions en devise américaine
n‟ont pas été ajustées au taux de la BRH comme l‟exige la norme ISA 21 qui stipule << qu‟une
entité qui utilise deux monnaies, une fonctionnelle et une monnaie étrangère, à la date de la
préparation et de la présentation des états financiers, l‟entité doit convertir, au taux en
vigueur du jour, tous les éléments de sa monnaie étrangère en monnaie fonctionnelle>>. Les
effets du non-respect de cette norme sont relatés dans les sections correspondantes.
Page 33 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
Base de préparation des états financiers (suite)
d) Période financière
La période annuelle utilisée pour le fonds PETRO CARIBE se confond avec la période fiscale du
BMPAD, soit du 1er octobre au 30 septembre de chaque année.
3- Les principales conventions comptables
a)
Estimations de la direction
La préparation des états financiers selon les principes comptables généralement reconnus par
l‟IFAC, oblige la direction à faire des estimations et à poser des hypothèses, qui ont une incidence
sur les montants des actifs et des passifs et sur les informations présentées au sujet des actifs et des
passifs, éventuels à la date de clôture. Ainsi que sur les montants des produits et des charges des
périodes annuelles. Les principales estimations se rapportent à la comptabilisation des comptes à
recevoir et des frais courus. Les chiffres réels pourraient être différents de ces estimations.
b)
Comptabilisation des revenus et des dépenses
Le BMPAD utilise une comptabilité de caisse modifiée pour enregistrer ses opérations
financières relatives au fonds PETRO CARIBE ayant les caractéristiques suivantes :
1- Les revenus sont comptabilisés aux livres à l‟encaissement et sont imputés à la période
annuelle au cours de laquelle ils sont encaissés;
2- Les dépenses sont comptabilisées dès qu‟elles sont réalisées et indépendamment de la date
à laquelle elles sont payées.
3- À la fin de la période annuelle, certains comptes sont régularisés afin de les présenter à
leur bonne valeur.
c)
Base d‟évaluation
Les états financiers du BMPAD sont présentés sur la base du coût historique.
d)
Monnaie de présentation
Pour ses opérations, le BMPAD a utilisé la gourde Haïtienne et le dollar américain et a
aussiprésenté ses étatsfinanciers en utilisant les deux monnaies. Cependant au 30 septembre 2016,
les états financiers sont présentés en gourde Haïtienne, mais les transactions en devise américaine
n‟ont pas étéajustées au taux de la BRH comme l‟exige la norme ISA 21 qui stipule « qu‟une entité
qui utilise deux monnaies, une fonctionnelle et une monnaie étrangère, à la date de la préparation et
de la présentation des états financiers, l‟entité doit convertir, au taux en vigueur du jour, tous les
éléments de sa monnaie étrangère en monnaie fonctionnelle ». Les effets du non-respect de cette
norme sont relatés dans les sections correspondantes.
Page 34 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
3- Les principales conventions comptables (suite)
e)
Période financière
La période annuelle utilisée pour le fonds PETRO CARIBE se confond avec la période fiscale du
BMPAD, soit du 1er octobre au 30 septembre de chaque année.
f)
Estimations de la direction
La préparation des états financiers selon les principes comptables généralement reconnus par
l‟IFAC, oblige la direction à faire des estimations et à poser des hypothèses, qui ont une incidence
sur les montants des actifs et des passifs et sur les informations présentéesau sujet des actifs et des
passifs, éventuels à la date de clôture. Ainsi que sur les montants des produits et des charges des
périodes annuelles. Les principales estimations se rapportent à la comptabilisation des comptes à
recevoir et des frais courus. Les chiffres réels pourraient êtredifférents de ces estimations.
g)
Comptabilisation des revenus et des dépenses
Le BMPAD utilise une comptabilité de caisse modifiée pour enregistrer ses opérations
financières relatives au fonds PETRO CARIBE ayant les caractéristiques suivantes :
1-Les revenus sont comptabilisés aux livres à l‟encaissement et sont imputés à la période
annuelle au cours de laquelle ils sont encaissés;
2-Les dépenses sont comptabilisées dès qu‟elles sont réalisées et indépendamment de la date à
laquelle elles sont payées.
3-À la fin de la période annuelle, certains comptes sont régularisés afin de les présenter à leur
bonne valeur.
4- Liquidités
Le BMPAD n‟a pas retenu le taux de la BRH pour évaluer ces comptes en devise
américaine conformément aux prescrits de la Norme ISA 21, comme le démontre le tableau
ci-dessous.
Liquidités
Compte Bancaire HTG: BRH # 1112647111
Compte Bancaire HTG: BNC # 1660-020244
Avoir dans les banques locales en monnaie locale
46, 038,148
Compte Bancaire US: BNC # 1661-017504
Compte Bancaire US: BNC # 1661-018590
165,332
Avoir dans les banques locales en devise américaine
Total des liquidités
3, 727,592
1, 260, 199,087
1, 263, 926,679
62.51348
65.5368
2, 878, 004,959
10, 835,366
2, 888, 840,325
4,152,767,004
Page 35 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
4- Liquidités (suite)
Ceci a eu pour effet, au 30 septembre 2016, de sous-évaluer les comptes bancaires en
devise américaine du fonds PETRO CARIBE, entrainant une diminution des liquidités disponibles
d‟une valeur de cent trente-neuf millions cent quatre-vingt-huit mille trente-cinq gourdes (HTG
139,188,035.) et son équivalent en devise américaine d‟une somme de deux millions cent vingttrois mille huit cent quinze dollars américains (U.S 2,123,815). Le tableau ci-dessous démontre la
provenance de l‟écart. Cette correction soulevée à l‟attention de la Commission Spéciale d‟Enquête
du Sénat de la République n‟a été apportée ni aux livres, ni aux états financiers.
Liquidités
Compte Bancaire HTG: BRH #
1112647111
Compte Bancaire HTG: BNC # 1660020244
Avoir dans les banques locales en monnaie locale
Compte Bancaire US: BNC # 1661017504
46, 038,148
Compte Bancaire US: BNC # 1661018590
165,332
Avoir dans les banques locales en devise américaine
Total des liquidités
46, 203,480
Taux B.R.H
3, 727,592
1, 260, 199,087
1, 263, 926,679
65.5368
3, 017, 192,898
65.5368
10, 835,366
3, 028, 028,264
4,291,954,943
Écart constaté : 3,028,028,290 - 2,888,840,325 =139,188,035 : 65.5368 = U.S 2,123,815
5-Comptes à recevoir
Comptes à recevoir
DINASA SA
DNC SA
EDH*
KIMAZOU
SOGENER**
SOL HAITI
TOTAL HAITI SA
Total des comptes à recevoir
U.S
19, 276,717
2, 304,286
437, 346,841
3, 248,814
173, 984,647
3, 064,918
8, 653,212
647, 879,435
Taux utilisé
101.9327
76.2955
63.7537
75.7003
70.3317
94.2368
107.3590
Montant (HTG)
1, 964, 928,552
175, 806,655
27, 882, 487,715
245, 936,489
12, 236, 631,947
288, 828,006
929, 000,182
43,723,619,546
Page 36 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
5- Comptes à recevoir (suite)
Au 30 septembre 2016, les comptes à recevoir en devise américaine du fonds PETRO
CARIBE n‟ont pas été adéquatement évalués. Les taux utilisés pour la conversion en monnaie locale
varient de cent sept gourdes et 35 centimes (HTG 107.35) à soixante-trois gourdes et 75 centimes
pour un dollar américain (HTG 63.75). Le montant des comptes à recevoir qui aurait dû figurer à
l‟état de la situation à cette date totalise la somme de quarante-deux milliards quatre cent quatrevingt millions neuf cent quatre mille cent huit gourdes (HTG 42,490, 980,108). Ce qui entraine une
surévaluation des comptes à recevoir à l‟état de la situation du fonds PETRO CARIBE d‟une valeur
de un milliard deux cent soixante-trois millions six cent soixante-quatorze mille cinq cent quatrevingt-dix gourdes (HTG 1,263,674,590)
Comptes à recevoir
DINASA SA
DNC SA
EDH*
KIMAZOU
SOGENER**
SOL HAITI
TOTAL HAITI SA
Total des comptes à recevoir
U.S
Taux utilisé
19, 276,717
2, 304,286
437, 346,841
3, 248,814
173, 984,647
3, 064,918
8, 653,212
647, 879,435
65.5368
65.5368
65.5368
65.5368
65.5368
65.5368
65.5368
Montant (HTG)
1, 263, 334,347
151, 015,531
28, 662, 312,449
212, 916,873
11, 402, 397,013
200, 864,918
567, 103,824
42, 490, 980,108
Écart constaté 43,723,6119,546- 42,459,944,955 = HTG 1,263,674,591.
Ou
Son équivalent en devise americaine 1,263,674,591 / 65.5368 = U.S 19,281,908.
5-1 Montant à recevoir de l‟Electricité d‟État d‟Haïti (EDH)
La dette de la Compagnie de l‟Électricité D‟État d‟Haïti (EDH) envers le fonds PETRO
CARIBE s‟élève à quatre cent trente-sept millions trois cent quarante-six mille huit cent quarante
et un dollars américains (U.S 437,346,841) et son équivalent en gourde se chiffre à vingt-huit
milliards six cent soixante-deux millions trois cent douze mille quatre cent quarante-neuf gourdes
(HTG 28, 662, 312,449) . Elle se repartit de la manière suivante:
Item
1
1
3
3
2
2
Description
Combustible et transport
Lubrifiant et transport
Mobilisation d‟équipement
Opération et maintenance
Location tanks
Autres dépenses
TOTAL
Montant (US)
346, 975,793
6, 450,030
1, 569,676
71, 347,838
3, 988,255
7, 015,249
437,346,841
Page 37 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
5-1 Montant à recevoir de l‟Electricité d‟État d‟Haïti (EDH) (suite)
Cette dette comporte trois (3) grandes composantes :
5-1-1 La première représente des frais de combustible et de lubrifiant qui demeurent
impayés de juin 2009 au 30 septembre 2016 ainsi que des frais de transport impayés de ces produits
de mai 2008 au 30 septembre 2016. Ces deux (2) montants totalisent la somme de trois cent
cinquante-trois millions quatre cent vingt mille huit cent vingt-trois dollars américains (U.S
353,425,823) ou son équivalent en monnaie locale d‟une valeur vingt-trois milliards cent soixantedeux millions trois cent quatre-vingt-dix-sept mille quatre cent soixante-dix-sept gourdes (HTG
23,162,397,477)
Item
1
1
Description
Combustible et transport
Lubrifiant et transport
TOTAL
Montant (US)
346, 975,793
6, 450,030
353, 425,823
5-1-2 La seconde se rapporte aux locations de tanks et autres dépenses et s‟étend de
décembre 2009 à septembre 2016 et totalise la somme de onze millions trois mille cinq cent quatre
dollars américains (U.S 11,003,504) ou son équivalent en monnaie locale d‟une valeur de sept cent
vingt et un millions cent trente-quatre mille quatre cent quarante un gourdes (HTG 721,134,441).
Item
2
2
Description
Location tanks
Autres dépenses
Total
Montant (US)
3, 988,255
7, 015,249
11, 003,504
5-1-3 Quant à la dernière, elle comporte un volet relatif à la Mobilisation d‟équipements et
Opération de Maintenance se référant à un contrat signé en date du 21 decembre 2009
entre le Directeur Général du BMPAD M.Michael LECORPS et la firme étrangère ESD
ENGINEERING AND SERVICES SRL pour la gestion et l‟entretien des trois (3) centrales
construites par le Vénézuela. Ce contrat ne comporte pas l‟approbation de la Cour Supérieur des
Compte et du Contentieux Administratif (CSC/CA), la non-objection de la Commission Nationale
des Marchés Publics (CNMP) ainsi que la signature du Président du Conseil d‟ Administration du
BMPAD. Dès lors, ce contrat comporte des anomalies graves et est signé en dehors de toutes
Normes. Le montant de ce contrat au 30 septembre 2016 totalise la somme de soixante-douze
millions neuf cent dix-sept mille cinq cent quatorze dollars américains (U.S 72,917,514) ou son
équivalent en monnaie locale d‟une valeur de quatre milliards sept cent soixante-dix-huit millions
sept cent quatre vingt mille cinq cent trente et un gourdes (HTG 4,778,780,531).
Item
3
3
Description
Mobilisation d‟équipement
Opération et maintenance
Total
Montant (US)
1, 569,676
71, 347,838
72,917,514
Page 38 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
5- Comptes à recevoir (suite)
5-2 Comptes à recevoir des Compagnies Pétrolières se répartissent ainsi :
Comptes à recevoir
U.S
DINASA
DNC SA
KIMAZOU
SOGENER**
SOL HAITI
TOTAL HAITI SA
Total des comptes à recevoir des compagnies pétrolières
19, 276,717
2, 304,286
3, 248,814
173, 984,647
3, 064,918
8, 653,212
210, 532,594
Taux utilisé
101.9327
76.2955
75.7003
70.3317
94.2368
107.3590
Montant (HTG)
1, 964, 928,552
175, 806,655
245, 936,489
12, 236, 631,947
288, 828,006
929, 000,182
15, 870, 692,918
Les deux cent dix millions cinq cent trente-deux mille cinq cent quatre-vingt-quatorze
dollars américains de comptes à recevoir des Compagnies Pétrolières locales sont convertis en
monnaie locale au 30 septembre 2016, ayant pour équivalent la somme totale de quinze milliards
huit soixante-dix millions six cent quatre douze mille neuf cent dix-huit gourdes
(HTG15,870,692,918) L‟utilisation du taux inadéquat par le BMPAD pour évaluer ces comptes à
recevoir a eu pour effet de surévaluer le montant de ce compte d‟une valeur de deux milliards
soixante-treize millions soixante mille quatre cent douze gourdes (HTG) 2,073,060,412). Cette
correction fut relatée, mais n‟est pas apportée aux livres du BMPAD, ni aux états financiers,
comme le démontre le tableau ci-dessus:
Comptes à recevoir
U.S
DINASA SA
DNC SA
KIMAZOU
SOGENER**
SOL HAITI
TOTAL HAITI SA
Total des comptes a recevoir des compagnies pétrolières
19, 276,717
2, 304,286
3, 248,814
173, 984,647
3, 064,918
8, 653,212
210, 532,594
Taux utilisé
65.5368
65.5368
65.5368
65.5368
65.5368
65.5368
Montant (HTG)
1, 263, 334,347
151, 015,531
212, 916,873
11, 402, 397,013
200, 864,918
567, 103,824
13, 797, 632,506
Écart constaté 15,870,692,918 Ŕ13, 797, 632,506 = 2,073, 060,412 ou /65.5368 = U.S 31,632,005
Au 30 septembre 2016, selon les livres du BMPAD, les comptes à recevoir de SOGENER
affichent la somme de onze milliards quatre cent deux millions trois cent quatre-vingt-dix-sept
mille treize gourdes (HTG 11,402,397,013) pour des livraisons de diesel d‟avril 2012 au 30
septembre 2016.
Au cours de son audition, Monsieur Jean Marie VORBE a déclaré que ce retard est dû à une
correspondance du Ministre de l‟Économie et des Finances d‟alors, adressée au Gouverneur de la
Banque Centrale lui demandant de surseoir à tout paiement en faveur de la SOGENER. Ce qui a
constitué un accroc à l‟exécution du contrat en vigueur.
Page 39 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
6-Décaissements aux projets des treize (13) Résolutions
Les ressources puisées du fonds PETRO CARIBE pour financer les Programmes et Projets
retenus à travers les treize (13) résolutions prises en Conseil des Ministres par les Cinq (5)
Gouvernements Haïtiens couvrant les périodes annuelles allant de septembre 2008 à septembre
2016, totalisent la somme de cent dix milliards cent quatre-vingt-dix millions huit cent soixantequatre mille neuf cent quatre-vingt-dix-huit gourdes (HTG 110,190,864,998) et se présente ainsi :
#
1
2
3
4
5
6
7
8
9
10
11
12
13
Description
Résolution 20 septembre 2008 amendee par
celle du 9 octobre 2008
Résolution 11 février2010
Résolution 24 août 2010
Résolution 12 mai 2011
Résolution 28 février2012
Résolution 18 juillet2012
Résolution 21 décembre2012
Résolution 11 décembre2013
Résolution 23 juillet2014
Résolution 10 septembre2014
Résolution 15 avril 2015
Résolution 22 juillet2015
Résolution 06 janvier2016
TOTAL
Montant (HTG)
15, 337, 353,284
11, 375, 118,439
6, 774, 774,836
6, 990, 224,601
15, 167, 236,662
6, 895, 178,028
23, 506, 002,193
11, 571, 038,001
4, 154, 955,388
436, 195,861
2, 726, 977,297
4, 930, 352,535
325, 457,871
110,190,864,998
Nous avons constaté que ces valeurs décaissées à l‟exécution de ces treize (13) Résolutions
prises, chacune en Conseil des Ministres couvrant les périodes annuelles allant de septembre 2008
à septembre 2016, sont capitalisées aux livres du fonds PETRO CARIBE et présentées à l‟état de la
situation financière au 30 septembre 2016. Ce traitement comptable appliqué par l‟Administration
du BMPAD s‟exécute selon des directives reçues du Ministère de l‟Économie et des Finances
(MEF). Ce qui démontre d‟une part, qu‟il n‟existe aucun mécanisme defini par l‟État Haïtien pour
l‟utilisation des fonds accumulees dans l‟execution de cet Accord et, d‟autre, ce qui porterait à
croire que l‟État Haïtien compte rembourser cette valeur au fonds. Si tel est le cas, c‟est un
financement obtenu par l‟État Haïtien. Donc, ce montant devrait être assujetti à un taux d‟intérêt.
Toutefois, nous avons également constaté que cette valeur décaissée en devise américaine
n‟a pas été adéquatement évaluée au 30 septembre 2016, ce qui a pour effet de surévaluer la
situation du fonds.
Page 40 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
6- Décaissements aux projets des treize (13) Résolutions (suite)
Le montant cumulé décaissé à travers les treize (13) Résolutions au 30 septembre 2016 en
devise américaine s‟élève à la somme de un milliard cinq cent soixante-dix-sept millions six cent
cinquante-sept mille trois cent quatre-vingt-trois dollars américains (U.S 1,577,657,383) ou son
equivalent en monnaie locale d‟une valeur de cent trois milliards trois cent quatre vingt quatorze
nmillions six cent zeize mille trois cent soixante seize gourdes (HTG 103,394,616,376).
#
1
2
3
4
5
6
7
8
9
10
11
12
13
Description
Résolution 20 septembre 2008
Résolution 11 février2010
Résolution 24 août 2010
Résolution 12 mai 2011
Résolution 28 février2012
Résolution 18 juillet2012
Résolution 21 décembre2012
Résolution 11 décembre2013
Résolution 23 juillet2014
Résolution 10 septembre2014
Résolution 15 avril 2015
Résolution 22 juillet2015
Résolution 06 janvier2016
TOTAL
U.S
Taux/BRH
197, 560,000
65,5368
157, 719,896
65,5368
94, 357,661
65,5368
96, 923,836
65,5368
210, 303,223
65,5368
96, 195,626
65,5368
329, 386,735
65,5368
164, 517,229
65,5368
71, 215,839
65,5368
7, 000,000
65,5368
47, 525,624
65,5368
101, 010,359
65,5368
3, 941,355
65,5368
1, 577, 657,383
(HTG)
12, 947, 450,208
10, 336, 457,280
6, 183, 899,157
6, 352, 078,055
13, 782, 600,265
6, 304, 353,502
21, 586, 952,574
10, 781, 932,733
4, 667, 258,197
458, 757,600
3, 114, 677,315
6, 619, 895,696
258, 303,794
103, 394, 616,376
La surévaluation de l‟actif du fonds est de 110,190,864,998 – 103,394,616,376 = HTG
6,796,248,622Ou
6, 796, 248,622 / 65.5368 =U.S 103, 701,258,
Page 41 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
7-Dette à court terme
La dette à court terme comprend les valeurs non versées suite à la reception des cargaisons
de produits pétroliers allant du 3 mars 2016 au 30 septembre 2016. Ces valeurs non versées
accusent un retardde onze (11) versements et totalisent la somme de quatre vingt millions six cent
trente trois mille vingt quatre dollars americains (US 80,633,024) ou son équivalent en monnaie
locale d‟une valeur de cinq milliards huit cent vingt quatre millions quatre cent trente mille trois
cent soixante sept gourdes (HTG 5,824,430,367) au taux de 65.5368 pour un dollar américain.
Le montant de la dette à court terne au 30 septembre 2016 est de 5,824,430,367
Tandis qu‟aux livres au 30 septembre 2016 le montant nest de ( 5,687,458,487
Donc, une sous- évaluation de la dette à court terme de
)
136,971,880
8-Dette à long terme
Cette dette est remboursable par des versements mensuels se rapportant à la valeur FOB des
cargaisons pétrolières ventilée selon des pourcentages (%) définis par la PDVSAàlong terme.Le
montant de la dette découlant de ce financement totalise au 30 septembre 2016, la somme de un
milliard sept cent quatre vingt quatorze millions trois cent vingt neuf mille cinq cent cent dix neuf
dollars américains (US 1,794,329,255) ou son équivalant en monnaie locale d‟une valeur de cent
dix sept milliards cinq cent quatre vingt quatorze millions cinq cent quatre vingt dix sept mille cinq
cent dix neuf gourdes (HTG 117,594,597,519) au taux de 65.5368 pour un dollar americain
Tandis que le montant figurant aux livres du fonds PETRO CARIBE au 30 septembre 2016 est de
cent vingt huit millards cent quatre vingt douze millions neuf cent cinquante huit mille huit cent dix
neuf gourdes (HTG128, 192, 958,819).
Ẻcart constaté :
Solde aux livres au 30 septembre 20116
HTG `
Moins
Montant réel
Donc, une surévaluation de la dette constatée aux livres
128,192,958,819
117,594,597,388
10,598,361,431
Page 42 of 656
PETRO CARIBE
Notes afférentes aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
9-Solde du fonds PETRO CARIBE
Le solde du fonds PETRO CARIBE affiche au 30 septembre 2016, un montant créditeur
d‟une valeur de vingt-trois milliards deux cent quinze millions deux cent huit mille huit cent
soixante-cinq gourdes (HTG 23,215,208,865) soit ; son équivalant en dollar américain, d‟une
somme de trois cent cinquante-quatre millions deux cent trente et un mille six cent cinquante et un
dollars américains (U.S 354,231,651) au taux de 65.5368 à cette date.
De plus, nous avons également remarqué que les états financiers du fonds PETRO CARIBE
ont été sujets à des multiples redressements affectant des périodes annuelles antérieures pour un
montant total net au 30 septembre 2016, de cinquante-sept milliards deux cent trente et un cent
millions vingt-deux mille six cent quatre sept gourdes (HTG 57,231,022,647.) qui proviennent des
périodes annuelles ci-dessous mentionnées sans aucune note explicative.
Les redressements affectant les différentespériodes annuelles se répartissent ainsi :
Période annuelle
Débiteur
Créditeur
Total
2008
-----------
----------
---------
2009
3,252
---------- (
3,252
2010
-----------
2011
-----------
----------
2012
2,856,587,640
---------- (
2,854,213,837
)
2013
-----------
---------- (
2,854,213,837
)
2014
-----------
2015
2,377,055
)
2,373,803
2,373,803
60,709,508,440
57,855,294,603
1,162,231,582
-----------
56,693,063,021
2016
----------------
537,959,626
57,231,022,647
Total
4,018,822,474
61,249,845,121
57,231,022,647
Nous n‟avons pas eu de la Direction du BMPAD les motifs pour lesquels ces
redressements ont été effectués et nous n‟avons pas non plus le mandat de découvrir les causes.
Page 43 of 656
PETRO CARIBE
Renseignements complementaires aux etats financiers du fonds
Pour la période annuelle se terminant le
30 septembre 2016
(Exprimées en gourde Haitienne)
1- Ventes
Au 30 septembre 2016, selon les livres du BMPAD, le montant du compte “Revenus sur Vente de
Produits Pétroliers” du Fonds Pétro Caribe s‟élève à cent soixante-treize milliards quatre cent
cinquante million huit mille cinq cent soixante-dix gourdes et 58/100 (HTG 173,450,008,570.58) et
se répartit comme suit.
Année
2007-2008
2008-2009
Carburant et
Lubrifiant
12, 389, 085,254.03
11, 930, 076,097.96
2009-2010
6, 287, 414,036.21
2010-2011 23, 636, 721,019.21
2011-2012 24, 731, 526,549.91
2012-2013 28, 014, 117,183.74
2013-2014 26, 059, 506,321.86
2014-2015 17, 418, 483,497.29
2015-2016 14, 166, 353,929.72
TOTAL 164,633,283,889.93
Asphalte
Mazout
Produits Importés
en Spot
26, 742,220.93
141, 766,953.61
32, 986,395.64
12,415,827,474..96
12,500,120,312.32
428,
277,260.75
201,495,570.18 428,277,260.75
Total
1, 168, 417,046.51
7, 018, 534,803.21
8,186,951,849.72
6,320,400,431.85
23,636,721,019.21
24,731,526,549.91
28,014,117,183.74
26,059,506,321.86
18,586,900,543.80
21,184,888,732.93
173,450,008,570.58
2- Coûts des produits vendus
Année
Carburant et
Lubrifiant
2007-2008 12, 389, 085,254.03
2008-2009 11, 930, 076,097.96
2009-2010
6, 287, 414,036.21
2010-2011 23, 636, 721,019.21
2011-2012 24, 731, 526,549.91
2012-2013 28, 014, 117,183.74
2013-2014 26, 059, 506,321.86
2014-2015 17, 418, 483,497.29
2015-2016 14, 149, 440,138.03
TOTAL 164,633,283,889.93
Asphalte
26, 742,220.93
141, 766,953.61
32, 986,395.64
201,495,570.18
Mazout
Produits
Importés en Spot
428, 277,260.75
428,277,260.75
1, 168, 417,046.51
7, 018, 534,803.92
8,186,951,849.72
Total
12,415,827,474..96
12,500,120,312.32
6,320,400,431.85
23,636,721,019.21
24,731,526,549.90
28,014,117,183.74
26,059,506,321.85
18,586,900,543.80
21,184,888,732.93
173,450,008,570.58
Durant notre mission, on a pu remarquer que les montants des factures présentées par
PDVSA et sur lesquelles sont portées la partie “cash portion” et la partie “financed portion” ne
respectent pas toujours le contrat Pétro Caribe qui stipulent que ces parties devraient être de 50%
chacune.
Page 44 of 656
XIII Annulation de la dette de PETRO CARIBE
Suite au séisme du 12 janvier 2010, le Gouvernement de la République Bolivarienne a eu à
annuler la dette de la République d‟Haïti envers la RépubliqueVénézuélienne générée à partir de
l‟Accord PETRO CARIBE. Cette dette se compose d‟une partie à long terme et une partie à court
terme, soit un total de trois cent quatre-vingt-seize millions soixante-treize mille deux cent vingttrois and 64/100 dollars américains trois cent quatre-vingt-seize millions soixante-treize mille deux
cent vingt-quatre dollars américains (US 396, 073,224) ou son équivalent en monnaie locale d‟une
valeur de vingt cinq milliards neuf cent cinquante sept millions trois cent soixante onze mille six
cent soixant sept gourdes (HTG 25,957,371,667), convertie au taux de la BRH au 30 septembre
2016 a HTG 65.5368 pour un dollar americain.L‟ensemble des produits qui ont bénéficié de cette
mesure ont été vendus et les produits encaissés et les montants y relatifs figurent dans les tableaux
suivants.
Item
Carburant
1
Mazout
2
Total dette à court terme
DETTE À COURT TERME
Description
DETTE À LONG TERME
Description
Item
Carburant
1
Asphalte
2
Mazout
3
Total dette à long terme
Total du montant de la dette annulée
Montant (US)
27, 564,721
7, 760,369
35,325,091
Montant (US)
354, 895,130
1, 620,702
4, 232,301
360,748,133
396, 073,224
À deux reprises, le remboursement de la dette fut l‟objet de traitement comptable inadéquat.
Le premier réalisé le 31 mai 2010 et le second le 31 janvier 2014, soit quatre (4) années
plus tard, ils ont tous deux affecté des comptes différents (Voir documents annexés).
Il est à noter que le BMPAD ne tient pas compte que l‟Accord PETRO CARIBE s‟exécuteà
travers une Société Vénézuélienne dénommée «Petroleos de Venezuela S.A. (PDVSA) » dont les
transactions générées sur le sol National sont comptabilisées dans un fonds intitulé fonds PETRO
CARIBE.
Cet Accord, à travers ladite Société, fournit des produits pétroliersà l‟État Haïtien selon
desmodalités de remboursement définies.
Les produits pétroliers sont livrés et vendus et des revenus générés, une partie est
remboursable à court terme et l‟autre partie à long terme selon des pourcentages variables fournis
par la PDVSA, permettant ainsi à l‟État Haïtien d‟utiliser ces fonds selon des conditions
convenues.
L‟annulation de la dette d‟Haïti par l‟État Vénézuélienà travers PETRO CARIBE n‟était pas
prévue dans l‟Accord. Cette décision du Gouvernement de la République Bolivarienned‟annuler la
dette d‟Haïti à l‟égard de l‟État Haïtien devait entrainer des rentrées de fonds afférents pour celuici. Étant donné qu‟aucun mécanisme de gestion n‟est mis en place quant à l‟utilisation du fonds si
ce n‟est que par des Résolutions, le montant de l‟annulation de cette dette devait êtreprécisé par une
Résolution du Conseil des Ministres permettant ainsi la rétribution à l‟État Haïtien et non pas un
virement du montant au solde du fonds, comme c‟est le cas.
Page 45 of 656
XIV-
L‟évaluation du contrôle interne du fonds PETRO CARIBE
Au cours de notre mission, nous n‟avons pas pu obtenir les manuels de procédures régissant
la gestion du fonds et la comptabilisation des opérations. Notre travail s‟est effectué avec le peu
d‟informations fournies. Nous n‟avons pas pu non plus avoir accès aux archives pour évaluer le
niveau de protection et de sécurité utilisé pour la sauvegarde des documents. Cependant, à
certaines de nos questions y relatives, la réponse a été toujours « On est en plein déménagement
et le délai imparti entre l‟avis et la tenue de la mission d‟audit ne leur a pas donné assez de
temps pour une préparation adéquate ».
XV– Degré du respect des normes
Au cours de notre mission, nous avons pu remarquer que le BMPAD, dans la gestion du
Fonds PETRO CARIBE a fait fi de l‟Article 200.4 de la Constitution de 1987 et des lois régissant
les marchés publics en Haïti. Aussi, au niveau de la gestion financière, la Norme 21 de l‟ISA n‟a
pas été prise en compte pour évaluer les comptes du bilan tout au long des années 2008 à 2016.
Il convient aussi de faire remarquer que la loi portant création du BMPAD n‟est pas
spécifique quant au pourcentage des montants d‟un programme à allouer comme contribution aux
frais de fonctionnement dudit organisme.
Au cours de notre mission, nous avons pu remarquer que BMPAD, outre la gestion
financière du Fonds PETRO CARIBE, assure aussi l‟exécution de Projets financés par le Fonds
PETRO CARIBE, ce qui entache son fonctionnement d‟une certaine incompatibilité. Il faut aussi
souligner que ce type d‟activités ne fait pas partie de la mission que la loi a assignéeau BMPAD.
Page 46 of 656
XVI
BMPAD gestionnaire du fonds & exécuteur de Projets
Le BMPAD a bénéficié de l’exécution de trois (3) Projets dans le cadre des Résolutions prises en Conseil des
Ministres. Ces projets sont financés par le Fonds PETRO CARIBE. Il s’agit:
1-du projet “Ban m Limyè Ban m Lavi” (BLBL),
2-du projet du Centre de Stockage de Produits à Lafiteau et
3-du projet de Stabilisation des Prix.
1-Projet “Ban m Limyè Ban m Lavi” (BLBL)
Initialement le projet BLBL a eu comme maître d‟ouvrage le Ministère des Travaux
Publics, des Transports et des Communications (MTPTC). Son exécution a été confiée à BMPAD
et au Bureau du Ministre pour la Sécurité Energétique (BMSE). L‟enveloppe allouée à ce
Programme est de treize millions sept cent quatre-vingt mille dollars américains (US 13,
780,000.00) répartie sur deux Résolutions: Résolution 28 février 2012 Ŕ US 11, 280,000.00 et
Résolution 11 décembre 2013 Ŕ US 2, 500,000.00.
Pour la gestion du projet BLBL, le BMPAD a ouvert un compte HTG à la BNC au numéro
1360-003225 et les signataires du compte sont:
Du2008 au 3 février 2015:
1 – Michael LECORPS – Directeur Général.
2 – Jean Alix NICOLAS - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 3 février 2015 au 20 avril 2016:
1 – Eustache SAINT-LOT – Directeur Général.
2 – Rudy Serge SALOMON - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 20 avril 2016 au 30 septembre 2016
1 – Patrick NORAME – Directeur Général.
2 – Serge Philippe PIERRE - Directeur Général Adjoint.
3 – Evens LAINE - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Deux signatures sont obligatoires pour toutes transactions de retrait sur ce compte.
Page 47 of 656
L‟équivalent du budget de ce Projet est de six cent millions soixante-huit mille gourdes et
00/100 (HTG 600, 068,000.00) dont les dépôts ont été répartis comme suit.
Date
Description
Ouverture du compte BLBL (US 2, 000,000.00 au taux de
21/6/2012 HTG 41.90/US 1.00)
Renflouement du compte BLBL (US 2, 000,000.00 au taux
26/11/2012 de HTG 42.20/US 1.00)
Renflouement du compte BLBL (US 2, 000,000.00 au taux
8/4/2013 de HTG 42.75/US 1.00)
Renflouement du compte BLBL (US 2, 000,000.00 au taux
13/6/2013 de HTG 43.50/US 1.00)
Renflouement du compte BLBL (US 2, 000,000.00 au taux
29/10/2013 de HTG 43.50/US 1.00)
Renflouement du compte BLBL (US 3, 780,000.00 au taux
30/6/2014 de HTG 45.60/US 1.00)
TOTAL
Renflouement du
compte BLBL (HTG)
83, 800,000
84, 400,000
85, 500,000
87, 000,000
87, 000,000
172, 368,000
600, 068,000
Cette enveloppe était destinée à l‟installation de lampadaires à travers les dix (10)
départements du pays. Le Bureau du Ministre de la Sécurité Énergique a été chargé de superviser ce
Projet à travers douze (12) fournisseurs de service qui sont:
1) BUROCAD
2) GPL SOLAR LLC
3) ENSTRAP
4) SUNTECH SOLAR HAÏTI
5) ENERSA
6) ESOLAR HAÏTI
7) MAXITECH S.A.
8) COMPHENER S.A.
9) GREEN SOLAR SPECIALIST
10) GK IMPORT EXPORT S.A.
11) ELMACEN S.A.
12) BESUC SA/SUNTECH SOLAR HAÏTI
Page 48 of 656
2-Projet des lampadaires
Vingt (20) contrats ont été signés avec les firmes suscitées.
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Prestataire de Service
ENSTRAP
MAXITECH S.A.
GPL SOLAR LLC
ESOLAR HAITI
SUNTECH SOLAR HAITI
SUNTECH SOLAR HAITI S.A.
ENERSA
BUROCAD
ESOLAR HAITI
ENSTRAP
COMPHENER
GREEN SOLAR SPECIALIST
ENSTRAP
SUNTECH SOLAR HAITI
BUROCAD
BESUC S.A./SUNTECH SOLAR HAITI
ELMECEN
GK IMPORT EXPORT S.A.
ENERSA
ELMECEN
TOTAL
Montant (HTG)
11, 225,100
12, 372,937
18, 868,200
8, 410,500
1, 881,250
1, 926,400
6, 938,200
17, 783,264
11, 037,600
10, 693,440
4, 949,389
12, 920,000
11, 225,100
3, 715,200
33, 982,751
88, 024,776
89, 100,00
98, 112,00
81, 400,300
44, 520,000
569,086,407.
De ces vingt contrats, six ont été régulièrement passés, c‟est-à-dire il y avait un appel
d‟offres signé par la CNMP et la CSC/CA. Il s‟agit de :
Item
1
2
3
4
5
6
Prestataire de Service
BUROCAD
BESUC S.A./SUNTECH SOLAR HAITI
ELMECEN
GK IMPORT EXPORT S.A.
ENERSA
ELMECEN
TOTAL
Montant (HTG)
33, 982,751
88, 024,776
89, 100,000
98, 112,000
81, 400,300
44, 520,000
435,139,827
Page 49 of 656
Pour les quatorze autres, les contrats ont été signés entre le BMPAD et le fournisseur de
service pour un montant total de cent trente trois miliions neuf cent quarante six mille cinq cent
quatre vingt gourdes (HTG 133, 946,580).
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Prestataire de Service
ENSTRAP
MAXITECH S.A.
GPL SOLAR LLC
ESOLAR HAITI
SUNTECH SOLAR HAITI
SUNTECH SOLAR HAITI S.A.
ENERSA
BUROCAD
ESOLAR HAITI
ENSTRAP
COMPHENER
GREEN SOLAR SPECIALIST
ENSTRAP
SUNTECH SOLAR HAITI
TOTAL
Montant (HTG)
11, 225,100
12, 372,937
18, 868,200
8, 410,500
1, 881,250
1, 926,400
6, 938,200
17, 783,263
11, 037,600
10, 693,440
4, 949,389
12, 920,000
11, 225,100
3, 715,200
133,946,580
Page 50 of 656
Le montant de l‟exécution des travaux pour les fournisseurs de service s‟élève à cinq cent sept
millions cent huit mille sept cent quarante-trois gourdes et 75/100 (HTG 507, 108,743.75) et est
réparti comme suit.
#
Prestataire
1
2
3
ENSTRAP (158L)
BUROCAD (158L)
GPL SOLAR LLC
(260L)
ELMECEN S.A.
(1000L)
ENERSA (1200L)
BESUCO/SUNTECH
S. H. (1200L)
BUROCAD (400L)
ELMECEN S.A.
(600L)
GK IMPORT
EXPORT S.A.
(1200L)
SUNTECH SOLAR
HAITI (28L)
COMPHENER (65L)
ENSTRAP (155L)
ENSTRAP (155L)
ESOLAR HAITI
(105L)
ESOLAR HAITI
(135L)
GREEN SOLAR
(170L)
MAXITECH S.A.
(165L)
SUNTECH SOLAR
HAITI (25L)
SUNTECH SOLAR
HAITI (54L)
ENERSA (108L)
TOTAL
4
5
6
7
8
9
10
11
12
13
14
16
17
18
19
20
9, 504,302
16, 538,435
Caution de
Bonne
Exécution
(HTG)
0
0
Retenue
de
Garantie
(HTG)
510,984
622,414
17, 547,426
0
77, 022,825
43, 858,318
Décompte
HTG)
Acompte
(HTG)
Total
(HTG)
204,394
355,665
10,219,680
17,516,514
943,410
377,364
18,868,200
0
0
0
0
535,370
634,405
77,558,195
44,492,717
81, 843,042
28, 245,613
0
0
1, 558,200
0
1, 760,495
643,973
85,161,737
28,889,586
39, 177,600
0
1, 558,200
890,400
41,626,200
85, 198,008
4, 905,600
4, 844,280
1, 937,712
96,885,600
1, 791,552
4, 602,932
10, 439,343
10, 439,343
0
0
0
0
45,288
173,229
561,255
561,255
38,528
98,988
224,502
224,502
1,875,368
4,875,148
11,225,100
11,225,100
7, 821,765
0
0
168,210
7,989,975
10, 264,968
0
386,316
220,752
10,872,036
11, 369,600
646,000
646,000
258,400
12,920,000
11, 506,832
0
618,647
247,459
12,372,937
1, 749,562
0
94,062
37,625
1,881,250
3, 455,136
6, 452,526
478,829,122
0
0
5,551,600
185,760
346,910
13,656,210
74,304
138,764
9,071,811
3,715,200
6,938,200
507,108,744
Page 51 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 155 Lampadaires solaires dans les communes de Milot
Borgne , Marouge Cavaillon.
Localité
Milot Borgne , Marouge Cavaillon.
Maitre d‟œuvre ENSTRAP
Montant du contrat 11, 225,100 Gourdes ou 264,124.97 US
Date de signature du contrat 8 Novembre 2012
Durée des travaux
Appel d‟offres
10 Semaines
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Patente, Quitus fiscal.
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui
Retenue de bonne exécution
Prélèvement des 2%
NA
oui
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre
11,225,100 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 155 lampadaires dans les communes de Milot
Borgne , Marouge Cavaillon, passe de Gré A Gré , fut signé le 8 Novembre2012, entre le
BMPAD et la Firme ENSTRAP représentée par Gregory SENATUS , sans l‟approbation de
la CSC/CA et non plus l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est de 11, 225,100 Gourdes. Dont le cout moyen d‟un lampadaire est de
72,420 Gourdes, tandis que dans le cadre de ce projet, le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 33,968 Gourdes.
Le montant décaissé est de 10, 219,680 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 52 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 158 Lampadaires solaires .
Localité
Nippes, centre, sud , Artibonite, Nord‟Ouest , L‟ouest
Maitre d‟œuvre ENSTRAP
Montant du contrat 10,693,440.00 Gouirdes
Date de signature du contrat 13 Juillet 2013
Durée des travaux
Appel d‟offres
NA
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Patente, Matricule fiscale, Quitus
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui
Retenue de bonne exécution
Prélèvement des 2%
NA
oui
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre
10, 015,286.4 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 158 lampadaires dans le département des Nippes,
du centre, du sud ,de l‟ Artibonite, du Nord-Ouest , L‟ouest, passe de Gré A Gré , fut signé le
13 juillet 2013, entre le BMPAD et la Firme ENSTRAP représentée par Gregory SENATUS
sans l‟approbation de la CSC/CA et non plus l‟obtention du certificat de non objection de la
CNMP.
Le montant du contrat est de Gourdes. Dont le cout moyen d‟un lampadaire est de 67,680
Gourdes, tandis que dans le cadre de ce projet, le cout moyen d‟un lampadaire d‟une autre
firme est de 37,077 Gourdes. D‟où un ecart de 30,603 Gourdes.
Le montant décaissé est de 10, 219,680 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 53 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 260 lampadaires
Localité Commune de Département du Nord-Ouest
Maitre d‟œuvre GPL Solar LLC
Montant du contrat : 14,514,000.00 Gdes (Contrat) + 4,354,000.00Gdes (Avenant) =
18,868,200.00 Gdes
Date de signature du contrat : 29 Mai 2012
Durée des travaux
12 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
Non
Non
Documents d‟éligibilités fournis :
Non
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
943,401.00 Gdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 377,364 gourdes
Date de démarrage des travaux
28 Juin 2012
Date d‟achèvement des travaux 10 Octobre 2012
Montant total versé au maitre d‟œuvre
18,868,200 Gdes
Commentaires :
Ce contrat de fournitures et d‟installation de 260 lampadaires dans les communes du
Département du Nord-Ouest, passe de Gré A Gré , fut signé le 29 mai 2012, entre le BMPAD
et la Firme GPL Solar LLC dont son représentant n‟est pas identifié , sans l‟approbation de la
CSC/CA et non plus l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 18,868,200 de Gourdes. Dont le cout moyen d‟un lampadaire est de
72,750 Gourdes, tandis que dans le cadre de ce projet, le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 39,673 Gourdes.
Le montant décaissé est de 18,868,200 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 54 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 105 Lampadaires solaires.
Localité
Département des Nippes
Maitre d‟œuvre ESOLAR-Haïti
Montant du contrat 8, 410,500 Gourdes
Date de signature du contrat 17 juin 2013
Durée des travaux
Appel d‟offres
1 mois
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Patente, Matricule fiscale.
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui
Retenue de bonne exécution
Prélèvement des 2%
NA
oui ; 168,210.00 Gourdes
Date de démarrage des travaux
NA
Date d‟achèvement des travaux NA
Montant total versé au maitre d‟œuvre
7,989,975.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 105 lampadaires dans le Département des Nippes,
passe de Gré A Gré , fut signé 17 juin 2013, entre le BMPAD et la Firme ESOLAR-Haïti
représentée par Mr Romel POITEIEN sans l‟approbation de la CSC/CA et non plus
l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 8, 410,500 Gourdes de Gourdes. Dont le cout moyen d‟un
lampadaire est de 80,100 Gourdes, tandis que dans le cadre de ce projet, le cout moyen d‟un
lampadaire d‟une autre firme est de 37,077 Gourdes. D‟où un ecart de 43,023 Gourdes.
Le montant décaissé est de 7,989,975 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 55 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 600 Lampadaires
Localité : L‟ouest
Maitre d‟œuvre ELMECEN S.A
Montant du contrat : 44,520,000.00 Gdes
Date de signature du contrat : 08 Février 2013
Durée des travaux 5 Mois
Appel d‟offres National
Approbation de la CSC/CA Oui
Non objection du CNMP Oui
Documents d‟éligibilités fournis : Quitus, patente, matricule fiscal
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 1,558,200.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 890,400.00 Gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de Libération la retenue de garantie
12 Novembre 2015
Date de la réception définitive des travaux 12 Novembre 2015
Montant total versé au maitre d‟œuvre 41, 626,200.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 600 lampadaires dans le Département de l‟ouest
, passe par un appel d‟offre National , fut signé 08 Février 2013, entre le BMPAD et la Firme
ELMECEN S.A représentée par Mr Steeves CHARLES avec l‟approbation de la CSC/CA
et également l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 44,520,000. Gourdes. Dont le cout moyen d‟un lampadaire est de
74,200 Gourdes, tandis que dans le cadre de ce projet, le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 37,123 Gourdes.
Le montant décaissé est de 41, 626,200 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 56 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 25 Lampadaires
Localité Cornillon, Grand-Bois
Maitre d‟œuvre SUNTECH Solar Haiti
Montant du contrat : 1,881,250.00 Gdes ou US 44,113.47
Date de signature du contrat : 4Janvier 2013
Durée des travaux
3 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
Non
Non
Documents d‟éligibilités fournis :
N/A
Cautionnement fourni pour l‟avance : Chèque de direction No 0368906
Retenue de garantie
Oui ; 94,062.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 37,625.00 Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Date de libération la retenue de garantie 14 Février 2013 et 8 Juin 2013
Date de la réception provisoire des travaux 8 Juin 2013
Date de la réception définitive des travaux 14 Février 2013
Montant total versé au maitre d‟œuvre
1, 881,250.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 25 lampadaires dans la localite de Cornillon,
Grand-Bois , passé de Gre A Gre ,il fut signé le 04 Janvier 2013, entre le BMPAD et la
Firme SUNTECH SOLAR HAITI représentée par Joseph Pierre LOUIS sans l‟approbation
de la CSC/CA et sans l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 1,881,250 . Gourdes. Dont le cout moyen d‟un lampadaire est de
75,250 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 38,173 Gourdes.
Le montant décaissé est de 1,881,250 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 57 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 54 Lampadaires
Localité : Sud‟Est
Maitre d‟œuvre SUNTECH Solar Haiti
Montant du contrat : 3,715,200.00 Gdes ou US 88,231.52
Date de signature du contrat : 17 Aout 2012
Durée des travaux
4 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
N/A
N/A
Documents d‟éligibilités fournis :
Patente
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 185,760.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
NA
Oui ; 74,304.00 Gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de libération la retenue de garantie 7 Janvier 2013 / 17 Juin 2015
Montant total versé au maitre d‟œuvre
3,715,200.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 54 lampadaires dans le département du Sud-est, il
fut signé le 17 Aout 2012, entre le BMPAD et la Firme SUNTECH SOLAR HAITI
représentée par Joseph Pierre LOUIS sans l‟approbation de la CSC/CA et sans l‟obtention
du certificat de non objection de la CNMP.
Le montant du contrat est 3,715,200. Gourdes. Dont le cout moyen d‟un lampadaire est de
68,800 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 31,723 Gourdes.
Le montant décaissé est de 3,715,200 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 58 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 108 Lampadaires
Localité : Dix départements
Maitre d‟œuvre ENERSA
Montant du contrat : 6,938,200.00 Gdes ou 163,803.68 US
Date de signature du contrat : 12 Juillet 2012
Durée des travaux
N/A
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
N/A
N/A
Documents d‟éligibilités fournis :
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ;
346,910.00 Gourdes
Retenue de bonne exécution
N/A
Prélèvement des 2%
138,764.00 Gourdes
Oui ;
Date de démarrage des travaux
Date d‟achèvement des travaux
25 Juillet 2012
22 Sept 2012
Date de libération la retenue de garantie 24 Aout 2015
Montant total versé au maitre d‟œuvre
6,938,200.00 Gourdes ou US 163,803.68.00
Commentaires :
Ce contrat de fournitures et d‟installation de 108 lampadaires dans les 10 Départements, il fut
signé le 12 Juillet 2012, entre le BMPAD et la Firme ENERSA représentée par Jean Renel
NOEL sans l‟approbation de la CSC/CA et sans l‟obtention du certificat de non objection
de la CNMP.
Le montant du contrat est 6,938,200. Gourdes. Dont le cout moyen d‟un lampadaire est de
64,243 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 27,166 Gourdes.
Le montant décaissé est de 6,938,200 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 59 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 135 Lampadaires
Localité : L‟Ouest et Nord-Ouest
Maitre d‟œuvre ESOLAR Haïti
Montant du contrat : 11,037,600.00 Gdes
Date de signature du contrat : N/A
Durée des travaux
10 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CA N/A
Non objection du CNMP
N/A
Documents d‟éligibilités fournis :
Patente, quitus, matricule fiscal
Cautionnement fourni pour l‟avance Lettre de garantie de la capitale Bank
Retenue de garantie
Oui ; 386,316.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 220,752.00 Gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de libération de la retenue de garantie 28 Février 2013
Montant total versé au maitre d‟œuvre
10,872,036.00
Gdes
Commentaires :
Ce contrat de fournitures et Ce contrat de fournitures et d‟installation de 135 lampadaires dans
les départements de l‟OUEST et Nord-OUEST ,il ne comporte pas de date de signature, et fut
signé entre le BMPAD et la Firme ESOLAR HAITI représentée par Romel POITEVIEN
sans l‟approbation de la CSC/CA et sans l‟obtention du certificat de non objection de la
CNMP.
Le montant du contrat est de 11,037,600. Gourdes. Dont le cout moyen d‟un lampadaire est de
81,760 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 44,683 Gourdes.
Le montant décaissé est de 10,872,036 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 60 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 155 Lampadaires
Localité : Maniche, Campérin, Saint-Louis du Nord, Bohon, Jn Rabel, Palace d‟ario, Cap
Haïtien
Maitre d‟œuvre ENSTRAP
Montant du contrat : 11,225,110.00 Gdes
Date de signature du contrat : 25 Janvier 2013
Durée des travaux 1 Mois
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
N/A
N/A
Documents d‟éligibilités fournis : Quitus, patente, matricule fiscal
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 561,255.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 225,502.00 Gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de Libération de la retenue de garantie 29 Mai 2015
Montant total versé au maitre d‟œuvre
11,225,110.00 Gourde ou US 255,813.81
Taux
43.88
Commentaires :
Ce contrat de fournitures et d‟installation de 155 lampadaires dans le département Maniche,
Campérin, Saint-Louis du Nord, Bohon, Jn Rabel, Palace d‟ario, Cap Haïtien,il fut signé le 25
Janvier 203, entre le BMPAD et la Firme ENSTRAP représentée par Gregory SENATUS
sans l‟approbation de la CSC/CA et sans l‟obtention du certificat de non objection de la
CNMP.
Le montant du contrat est 11,225,110. Gourdes. Dont le cout moyen d‟un lampadaire est de
72,420 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 35,343 Gourdes.
Le montant décaissé est de 11,225,110 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 61 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 158 Lampadaires
Localité : Grand-Anse
Maitre d‟œuvre
BUROCAD
Montant du contrat : 13,736,250.00 Gdes + 4, 047, 013.75 Gdes ou US 2,064,094.99
Date de signature du contrat : N/A
Durée des travaux
12 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CANon
Non objection du CNMP Non
Documents d‟éligibilités fournis :
Non
Cautionnement fourni pour l‟avance Oui
Retenue de garantie
Oui ;622,414.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 355,665.00 Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Date de libération la retenue de garantie
Montant total versé au maitre d‟œuvre
17,516,514.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 158 lampadaires dans le Departement de la
Grand‟Anse, ce contrat ne comporte pas de date , il fut signe entre le BMPAD et la Firme
BUROCAD représentée par Bernard SCHETTINI sans l‟approbation de la CSC/CA et sans
l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 17,783,264. Gourdes. Dont le cout moyen d‟un lampadaire est de
112,552 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 75,475 Gourdes.
Le montant décaissé est de 17,516,514.00 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 62 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux :Installation de 165 Lampadaires dans la localité du Nord, Artibonite
Localité : Nord Artibonite
Maitre d‟œuvre MAXITECH S.A
Montant du contrat : 12,372,937.50 Gdes ou US 290,726.40
Date de signature du contrat : 28 Décembre 2012
Durée des travaux
5 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CA N/A
Non objection du CNMP
N/A
Documents d‟éligibilités fournis :
Patente, quitus
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 618,647.00 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 247,459.00 Gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Montant total versé au maitre d‟œuvre
12,372,937.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 165 lampadaires dans le Département du nord ,de
l‟Artibonite, Passé de Gré à Gré , il fut signe le 28 Décembre 2012, entre le BMPAD et la
Firme MAXITECH représentée par Cantave Jacques MENDES sans l‟approbation de la
CSC/CA et sans l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 12,372,937 Gourdes. Dont le cout moyen d‟un lampadaire est de
74,997 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 37,910 Gourdes.
Le montant décaissé est de 12,372,937.00 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 63 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 170 Lampadaires
Localité : Baie de Hène, Mont-Archer, Gantier, Lakou de Real, Lakou Badio Lakou
Souvenance, Lakou Kanpèch
Maitre d‟œuvre Green Solar Specialist
Montant du contrat : 12,920,000.00 Gdes ou US 296,813.81
Date de signature du contrat : 27 Mars 2013
Durée des travaux 1 Mois
Appel d‟offres Restreint
Approbation de la CSC/CA
Non objection du CNMP
N/A
N/A
Documents d‟éligibilités fournis : Quitus, patente, matricule fiscal
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 646,000 gourdes
Retenue de bonne exécution
Prélèvement des 2%
oui ; 646,000 gourdes
Oui ; 247,459 gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de Libération la retenue de garantie 3 Juin 2015
Montant total versé au maitre d‟œuvre
11,369,600.00 Gdes
Commentaires :
Ce contrat de fournitures et d‟installation de 170 lampadaires dans la localité Baie de Hène,
Mont-Archer, Gantier, Lakou de Real, Lakou Badio Lakou Souvenance, Lakou Kanpèch ,
Passé par un appel d‟offre restreint , il fut signé le 27 Mars 2013, entre le BMPAD et la
Firme GREEN SOLAR SPECIALIST représentée par Wedsky CYPRIEN GARRAND sans
l‟approbation de la CSC/CA et sans l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 12,920,000 Gourdes. Dont le cout moyen d‟un lampadaire est de
746,000 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 38,923 Gourdes.
Le montant décaissé est de 12,920,000 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 64 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 400 Lampadaires
Localité Grand ‟Anse
Maitre d‟œuvre
BUROCAD
Montant du contrat : 33, 982,750.80 Gdes
Date de signature du contrat : 5 Février 2013
Durée des travaux
4 Mois
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
N/A
Documents d‟éligibilités fournis : Quitus, patente, matricule fiscal
Cautionnement fourni pour l‟avance
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 643,973 gourdes
Date de démarrage des travaux
5 Avril 2013
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
28, 889,586 Gdes (Déduction faite pour la DGI)
Commentaires :
Ce contrat de fournitures et d‟installation de 400 lampadaires dans Le Département de la
Grand‟Anse .Passé de Gré a Gré , il fut signé le 05 Février 2013, entre le BMPAD et la
Firme BUROCAD représentée par Bernrd SCHETTINI avec l‟approbation de la CSC/CA et
sans l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 33,982,751 Gourdes. Dont le cout moyen d‟un lampadaire est de
84,957 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 47,880 Gourdes.
Le montant décaissé est de 28,889,586 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 65 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 1000 Lampadaires
Localité Nord, Nord-Ouest
Maitre d‟œuvre EL MECEN S.A
Montant du contrat : 89,100,000.00 Gdes ou US1,986,941.04
Date de signature du contrat : 29 Avril 2014
Durée des travaux
4 Mois
Appel d‟offres Restreint
Approbation de la CSC/CA
Non objection du CNMP
Oui
Oui
Documents d‟éligibilités fournis : Quitus, patente, matricule fiscal
Cautionnement fourni pour l‟avance Une lettre de garantie de la Unibank
Retenue de garantie
Oui
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 535,370 gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
77,558,595.00 Gdes
Commentaires :
Ce contrat de fournitures et d‟installation de 1000 lampadaires dans Le Département du Nord
et du Nord-Ouest .Passé par un appel d‟offre restreint, il fut signé le 29 Avril 2014, entre le
BMPAD et la Firme ELMECEN représentée par Steve CHARLES avec l‟approbation de la
CSC/CA et également l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 89,100,000 Gourdes. Dont le cout moyen d‟un lampadaire est de
89,100 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 52,023 Gourdes.
Le montant décaissé est de 77,558,195 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 66 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Travaux d‟installation de 1200 Lampadaires dans les départements de
l‟Artibonite et du centre
Localité : Départements de l‟Artibonite et du Centre
Maitre d‟œuvre GK Import, Export S.A
Montant du contrat : 98,112,000.00 Gdes
Date de signature du contrat : 7 Février 2013
Durée des travaux
3Mois
Appel d‟offres Gré à gré
Approbation de la CSC/CA Oui
Non objection du CNMP Oui
Documents d‟éligibilités fournis :
Quitus, patente
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 4, 844,280 gourdes
Retenue de bonne exécution
Prélèvement des 2%
4, 905,600.00 Gdes
Oui ; 1,937,712 gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
21 Mars 2013
21 Juin 2013
Date de libération la retenue de garantie 12 Octobre 2013
Montant total versé au maitre d‟œuvre
94,947,888.00 Gdes
Commentaires :
Ce contrat de fournitures et d‟installation de 1200 lampadaires dans Le Département de
l‟Artibonite et du Centre .Passé de Gré a Gré , il fut signé le 07 Fevrier 2013, entre le
BMPAD et la Firme GK IMPORT, EXPORT représentée Farah BLAIN avec l‟approbation
de la CSC/CA et également l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 98,112,000 Gourdes. Dont le cout moyen d‟un lampadaire est de
81,760 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 44,683 Gourdes.
Le montant décaissé est de 96,885,600 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 67 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 1200 Lampadaires
Localité : Sud et Sud „Est
Maitre d‟œuvre BESUCO S.A / SUNTECH Solar Haïti
Montant du contrat : 88,024,776.00 Gdes ou US 2,064,094.99
Date de signature du contrat : 11 Janvier 2013
Durée des travaux
4 Mois et 2 Semaines
Appel d‟offres National
Approbation de la CSC/CA Oui
Non objection du CNMP Oui
Documents d‟éligibilités fournis :
Matricule fiscal
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 1,558200 gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 1,760,495 gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
10 Avril 2013
10 Aout et deux semaines
Date de libération la retenue de garantie 19 Octobre 2019
Montant total versé au maitre d‟œuvre 85,161,737
Gdes
Commentaires :
Ce contrat de fournitures et d‟installation de 1200 lampadaires dans Le Département du Sud et
Sud‟Est .Passé ar un appel d‟offre National , il fut signé le 11 Janvier 2013, entre le BMPAD
et la Firme BESUCO SA et SUNTECH SOLAR HAITI avec l‟approbation de la CSC/CA et
également l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 88,024,776 Gourdes. Dont le cout moyen d‟un lampadaire est de
73,354 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 36,277 Gourdes.
Le montant décaissé est de 85,161,737 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 68 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 28 Lampadaires
Localité : Les quartiers défavorisés
Maitre d‟œuvre SUNTECH Solar Haïti
Montant du contrat : 1, 926,400.00 Gdes
Date de signature du contrat : 6 Septembre 2012
Durée des travaux
3 Semaines
Appel d‟offres Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
N/A
N/A
Documents d‟éligibilités fournis :
Patente
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui ; 45,228 gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui ; 38,528 gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de libération la retenue de garantie 7 Janvier 2012 / 22 Juin 2015
Montant total versé au maitre d‟œuvre
1, 875,368.00 Gdes
Commentaires :
Ce contrat de fournitures et d‟installation de 28 lampadaires dans Les quartiers défavorisés.
Passé de Gré à Gré , il fut signé le 06 septembre 2012, entre le BMPAD et la Firme
SUNTECH SOLAR HAITI sans l‟approbation de la CSC/CA et ni l‟obtention du certificat
de non objection de la CNMP.
Le montant du contrat est 1,926,400 Gourdes. Dont le cout moyen d‟un lampadaire est de
68,800 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 31,723 Gourdes.
Le montant décaissé est de 1,875,368 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 69 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 158 Lampadaires solaires .
Localité
Nippes, centre, sud , Artibonite, Nord‟Ouest , L‟ouest
Maitre d‟œuvre ENSTRAP
Montant du contrat 10,693,440.00 Gourdes
Date de signature du contrat 13 Juillet 2013
Durée des travaux
Appel d‟offres
NA
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Patente, Matricule fiscale, Quitus
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui ; 510,984 GOURDES
Retenue de bonne exécution
Prélèvement des 2%
NA
oui ; 204,394 gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre
10, 219,680.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 158 lampadaires dans Le département de
Nippes, centre, sud , Artibonite, Nord-Ouest , L‟ouest .Passé de Gré à Gré , il fut signé le 13
juillet 2013, entre le BMPAD et la ENSTRAP représenté par Gregory SENATUS sans
l‟approbation de la CSC/CA et ni l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 10, 693,440 Gourdes. Dont le cout moyen d‟un lampadaire est de
67,680 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 30,603 Gourdes.
Le montant décaissé est de 10, 219,680 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 70 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 65 Lampadaires solaires dans les communes de
savanettes et de Mont-Organisé.
Localité
Savanette et de Mont-Organise
Maitre d‟œuvre COMPHENER S.A
Montant du contrat 4, 949,389.25 Gourdes ou 116,058.34 US
Date de signature du contrat 11 Janvier 2013
Durée des travaux
Appel d‟offres
21 Jours
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Patente, Matricule fiscale.
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui ; 173,229 gourdes
Retenue de bonne exécution
Prélèvement des 2%
247,469.46 Gourdes
oui ; 98,988 gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre
4, 875,148.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 65 lampadaires dans la localité Savanettes et
Mont-Organisé .Passé de Gré à Gré , il fut signé le 11 janvier 2013, entre le BMPAD et la
firme COMPHENER S.A représenté par Jovenel MOISE sans l‟approbation de la CSC/CA
et ni l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 4, 949,389 Gourdes. Dont le cout moyen d‟un lampadaire est de
76,144 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 39,067 Gourdes.
Le montant décaissé est de 4, 875,148 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
Page 71 of 656
Maitre d‟ouvrage
BMPAD
Description des travaux : Installation de 1200 Lampadaires dans le département Nord Est
Nippes
Localité Nord est Nippes
Maitre d‟œuvre Energies Renouvelable S.A
Montant du contrat 81, 400,430.00 Gourdes
Date de signature du contrat 15 Septembre 2013
Durée des travaux
Appel d‟offres
69 Semaines
Restreint
Approbation de la CSC/CA
Oui
Non objection du CNMP
oui
Documents d‟éligibilités fournis
Patente, Matricule fiscale.
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui ; NA
Retenue de bonne exécution
Prélèvement des 2%
NA
oui ; 634,405.00 gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre
44, 492,717.00 Gourdes
Commentaires :
Ce contrat de fournitures et d‟installation de 1200 lampadaires dans les départements Nord
‟Est et Nippes. Passé par un appel d‟offre restreint , il fut signé le 15 Septembre 2013, entre
le BMPAD et la firme ENERSA représenté par Jean Romel NOEL avec l‟approbation de la
CSC/CA et également l‟obtention du certificat de non objection de la CNMP.
Le montant du contrat est 81, 400,300 Gourdes. Dont le cout moyen d‟un lampadaire est de
67,834 Gourdes dans le cadre de ce projet. Tandis que le cout moyen d‟un lampadaire d‟une
autre firme est de 37,077 Gourdes. D‟où un ecart de 30,757 Gourdes.
Le montant décaissé est de 44, 492,717 Gourdes.
Les 2 % à prélever pour le compte de la DGI ont été effectués et versés.
.
Page 72 of 656
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Prestataire de Service
Montant
(HTG)
ENSTRAP
MAXITECH S.A.
GPL SOLAR LLC
ESOLAR HAITI
SUNTECH SOLAR HAITI
SUNTECH SOLAR HAITI S.A.
ENERSA
BUROCAD
ESOLAR HAITI
ENSTRAP
COMPHENER
GREEN SOLAR SPECIALIST
ENSTRAP
SUNTECH SOLAR HAITI
BUROCAD
BESUC S.A./SUNTECH SOLAR
HAITI
ELMECEN
GK IMPORT EXPORT S.A.
ENERSA
ELMECEN
TOTAL
11, 225,100.
12, 372,937.
18, 868,200.
8, 410,500.
1, 881,250.
1, 926,400.
6, 938,200.
17, 783,264.
11, 037,600.
10, 693,440.
4, 949,389.
12, 920,000.
11, 225,100.
3, 715,200.
33, 982,751.
88, 024,776.
89, 100,000.
98, 112,000.
81, 400,300.
44, 520,000
569,086,407.
155
165
260
105
25
28
108
158
135
158
65
170
155
54
400
1200
Coût moyen
d’un
lampadaire
(HTG)
72,420
74,987
72,570
80,100
75,250
68,800
64,243
112,552
81,760
67,680
76,144
76,000
72,420
68,800
84,957
73,354
1000
1200
1200
600
89,100
81,760
67,834
74,200
Nombre de
lampadaires
De ces vingt contrats, six ont été régulièrement passés, c‟est-à-dire il y avait un appel
d‟offres signé par la CNMP et la CSC/CA. Il s‟agit de :
Item
1
2
3
4
5
6
Prestataire de Service
BUROCAD
BESUC S.A./SUNTECH SOLAR HAITI
ELMECEN
GK IMPORT EXPORT S.A.
ENERSA
ELMECEN
TOTAL
Montant (HTG)
33, 982,751
88, 024,776
89, 100,000
98, 112,000
81, 400,300
44, 520,000
435,139,827
Page 73 of 656
Pour les quatorze autres, les contrats ont été signés entre le BMPAD et le fournisseur de
service pour un montant total de cent trente-trois millions neuf cent quarante-six mille cinq cent
quatre-vingt gourdes (HTG 133, 946,580).
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Prestataire de Service
ENSTRAP
MAXITECH S.A.
GPL SOLAR LLC
ESOLAR HAITI
SUNTECH SOLAR HAITI
SUNTECH SOLAR HAITI S.A.
ENERSA
BUROCAD
ESOLAR HAITI
ENSTRAP
COMPHENER
GREEN SOLAR SPECIALIST
ENSTRAP
SUNTECH SOLAR HAITI
TOTAL
Montant (HTG)
11, 225,100.00
12, 372,937.50
18, 868,200.00
8, 410,500.00
1, 881,250.00
1, 926,400.00
6, 938,200.00
17, 783,263.75
11, 037,600.00
10, 693,440.00
4, 949,389.25
12, 920,000.00
11, 225,100.00
3, 715,200.00
133,946,580.50
Page 74 of 656
Les frais de gestion transférés par le BMPAD au Bureau du Ministre du Secteur Énergétique
s‟élèvent à un montant de vingt-huit millions huit cent trente-cinq mille six cent cinquante-deux gourdes
et 68/100 (HTG 28, 835,652.68). Le BMPAD a transféré sur son compte de fonctionnement vingt
millions vingt-sept mille quatre cent vingt-sept gourdes et 32/100 (HTG 20,027,427.32) comme
contribution du Programme à son budget de fonctionnement et cinq cent soixante-deux mille quatre cent
deux gourdes et 00/100 (HTG 562,402.00) ont été utilisées pour payer certains frais de déplacement et
autres pour la cellule du Ministère des Travaux Publics du Transport et des Communications. Le total
des frais liés à la gestion de ce Programme est de quarante-neuf millions quatre cent vingt-cinq mille
quatre
cent
quatre-vingt-deux
gourdes
(HT
G49,
425,42).
Page 75 of 656
Les fonds du Programme ont été gérés à partir d‟un compte d‟épargne-chèque qui générait des
intérêts créditeurs totalisant trois cent douze mille cent quatre-vingt-neuf gourdes et 14/100 (HTG
312,189.14). Parallèlement, les frais bancaires s‟élèvent à trente-neuf mille cent deux et 53/100 (HTG
39,102.53). Le tableau qui suit donne une image des ressources et des utilisations des fonds du
Programme.
Ban m Limyè Ban m Lavi - BLBL
Etats des Ressources et des Utilisations
Cumul des Années 2012 au 30 septembre 2016
Exprimé en HTG
Ressources
Equivalent des US 13, 780,000.00 déposés au compte BNC
Intérêts créditeurs
Total ressources disponibles
Montant
600, 068,000
312,189
Total
600,380,189
Utilisations
Coûts des projets exécutés à partir des fournisseurs de service
Frais de gestion BMSE
Financement Budget BMPAD
Frais de gestion Cellule Technique MTPTC
Frais bancaires
Droit de timbre spécial/paiement à la DGI
TOTAL UTILISATIONS
Solde du Fonds du Programme
507, 108,743
28, 835,652
20, 027,427
562,402
39,102
135
556,573,464
43, 806,724
Au 30 septembre 2016, le montant du solde de fonds dudit Programme se trouve au compte ouvert à
cette fin à la BNC.
Page 76 of 656
Le tableau ci-dessous décrit les fournisseurs de service dont les retenues de garantie n‟ont pas
été libérées pour les raisons qui y sont évoquées.
Item
1
2
Prestataire de
Service
ESOLAR
HAITI
Montant
(HTG)
4, 949,389.25
Retenue de garantie
non libérée à 100%
Non. Pas de document
relatif à la libération des
retenues de garantie
Non. Pas de document
relatif à la libération des
30% des retenues de
garantie
Non. Pas de document
relatif à la libération des
30% des retenues de
garantie
Libérée à 70%
33, 982,750.80
Projet non terminé
8, 410,500.00
BUROCAD
17, 783,263.75
3
4
5
6
ESOLAR
HAITI
COMPHENER
BUROCAD
11, 037,600.00
ENERSA
81, 400,300.00
7
ELMECEN
TOTAL
44, 520,000.00
202,083,803.80
Non. Pas de document
relatif à la libération des
retenues de garantie
Non
Balance
La totalité du montant des
retenues de garantie:
420,525.00
Montant initial:
13, 736,250.00
+ Avenant 4: 47,013.75
266,748.96
165,564.00
74,240.84
Projet non terminé
Balance des travaux:
HTG1, 784,094.36
Retenue de garantie:
HTG1, 609,932.82
Caution de bonne exécution:
HTG 1, 699,137.54
Total: 5, 093,164.72
1, 586,012.18
667,880.00
Page 77 of 656
3-Centre de Stockage de Produits à Lafiteau
Pour la gestion et l‟exécution du projet Centre de Stockage de Produits à Lafiteau, le
BMPAD s‟est servi de son compte de fonctionnement en monnaie locale, domicilié à la BNC au
numéro 1660020244. Les signataires du compte sont:
Du 2008 au 3 février 2015:
1 – Michael LECORPS – Directeur Général.
2 – Jean Alix NICOLAS - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 3 février 2015 au 20 avril 2016:
1 – Eustache SAINT-LOT – Directeur Général.
2 – Rudy Serge SALOMON - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable
Du 20 avril 2016 au 30 septembre 2016
1 – Patrick NORAME – Directeur Général.
2 – Serge Philippe PIERRE - Directeur Général Adjoint.
3 – Evens LAINE - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Ce projet d‟une enveloppe de US 6, 024,732.31, a été répartie à travers les Résolutions comme suit:
Résolution 21 décembre 2012:
US 4,000, 000.00
Résolution 15 avril 2015 (désaffectation)): US (2, 261,118.96)
Résolution 15 avril 2015:
US 1,261, 119.00
Résolution 22 juillet 2015:
US 3,024, 732.27
Cette enveloppe était destinée à la clôture et à la construction du Centre de Stockage de Produits
à Lafiteau. La firme ARCHIVOLT S.A. a été chargée de l‟étude et de la supervision des travaux de
construction. Les trois (3) firmes suivantes ont été retenues, appert appel d‟offres, pour l‟exécution du
projet. Il s‟agit de
1) ARCHIVOLT S.A.
2) EXECO S.A. et
3) MVF CONSTRUCTION.
Page 78 of 656
Six (6) contrats et un accord de partenariat ont été signés pour l‟exécution du Centre de Stockage de
Lafiteau.
Item
1
2
3
4
5
6
7
Prestataire de Service
ARCHIVOLT S.A. (Etudes)
EXECO S.A. (Construction)
ARCHIVOLT S.A. (Supervision)
EXECO S.A. (Construction/Travaux additionnels)
ARCHIVOLT S.A. (Supervision)
MVF CONSTRUCTION (Clôture)
Laboratoire National des Bâtiments et des
Travaux Publics
(il s‟agit d‟un accord de partenariat)
TOTAL
Montant (HTG)
4, 351,424
149, 969,133
9, 448,055
43, 998,926
2, 859,930
9, 946,205
2, 029,654
222,603,328
Les six contrats ont été régulièrement passés et exécutés suivant les normes.
Nous avons pu obtenir les justificatifs de deux (2) décaissements: l‟un de HTG 16, 975,270 et
l‟autre de HTG 20, 898,750. Le premier est relatif à des achats de matériel d‟ameublement et le second
est relatif à des achats de véhicules.
Nous avons pu retrouver aussi les justificatifs pour des dépenses relatives à la cérémonie de la
pose de la première pierre pour un montant HTG 71,847.32
Somme toute, les utilisations des fonds de ce Projet s‟élèvent à HTG 261, 195,596
Nous avons pu obtenir les documents relatifs au taux de change utilisé pour l‟équivalence en
gourde haïtienne. Toutefois, il se situe entre HTG 43.90 et HTG 56.00 pour US 1.00.
B) Stabilisation des Prix
Pour la gestion du projet de la Stabilisation des Prix, le BMPAD a ouvert un compte HTG à la
Capital Bank au numéro 1764989. Les signataires du compte sont:
Du2008 au 3 février 2015:
1 – Michael LECORPS – Directeur Général.
2 – Jean Alix NICOLAS - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 3 février 2015 au 20 avril 2016:
1 – Eustache SAINT-LOT – Directeur Général.
2 – Rudy Serge SALOMON - Directeur Général Adjoint.
3 – Hénock JOURDAIN - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Du 20 avril 2016 au 30 septembre 2016
1 – Patrick NORAME – Directeur Général.
2 – Serge Philippe PIERRE - Directeur Général Adjoint.
3 – Evens LAINE - Directeur Financier et Administratif.
4 - Guecheline FLEURANTIN – Chef Comptable.
Ce projet a été initialement budgétisé pour (US 25, 000,000.00) lors de la Résolution du 21
décembre 2012 et réduit à US 20, 000,000.00 lors de la Résolution du 13 mars 2013. De cette
Page 79 of 656
enveloppe, US 16, 228,522.22 ont été décaissés et la balance, soit US 3,771,477.78 a été désaffectée par
la Résolution du 15 avril 2015.
Cette enveloppe était destinée au Programme de stabilisation des prix qui consiste à garder les
prix des produits de première nécessité à un niveau relativement bas.
Ce Projet n‟a pu être audité vu que nous n‟avons pas eu accès à ces documents.
Page 80 of 656
Conclusion
Les états financiers du fonds PETRO CARIBE couvrant les périodes annuelles allant de
septembre 2008 à septembre 2016 sont préparées par BMPAD. Ils sont soumis à notre attention aux fins
d‟analyse. Les résultats de notre travail nous portent à soulever les points suivants :
Les états financiers du fonds PETRO CARIBE couvrant les périodes annuelles de 2008 à
septembre 2016 ne reflètent pas la situation financière du fonds. En effet, ils ont été redressés au cours
de plusieurs périodes annuelles pour un montant net cumulé de cinquante sept milliards deux cent trente
et un millions vingt deux mille six cent quarante sept gourdes (HTG 57,231,022,647). IL faut noter que
la Commission n‟a pas retrouvé l‟autorisation obligatoire du conseil d‟administration du BMPAD qui
devrait l‟habiliter à opérer ces redressements, elle a déduit que la direction générale du BMPAD a agi
selon son propre gré et a ainsi été en contradiction avec les règlements du BMPAD.
Les comptes à valeur vénale variable ne sont pas adéquatement évalués. Le BMPAD a utilisé
des taux d‟évaluation différents au 30 septembre 2016, allant de 70.35 à107.35 gourdes pour un dollar
américain, tandis que le taux de référence fourni par la BRH était 65.5368 pour un dollar américain.
Les ressources du fonds utilisées par l‟Ẻtat Haïtien sont capitalisées. D‟après le BMPAD ces
directives émanent du MEF sans pour autant nous fournir plus de détails. Le montant apparaisant aux
livres du 30 septembre 2016 s‟élève à : HTG 110,190,864,999.
Le temps de recouvrement des comptes à recevoir provenant de la vente des produits pétroliers
aux compagnies locales démontre que les modalités de paiements ne sont pas respectées. A titre
d‟exemple, la SOGENER doit au fonds PETRO CARIBE un montant de US 173,984,647 au 30
septembre 2016.
Quant à l‟EDH, le montant de la dette prend sa source a la date du 24 mai 2008 et totalise au 30
septembre 2016 la somme de US 437,346,841.
Le BMPAD n‟a pas effectué le paiement de la portion cash, c‟est-à-dire la valeur à verser à la
PDVSA à la réception de chaque cargaison. Le dernier paiement remonte à mars 2016 et accuse un
retard de onze (11) versements au 30 septembre 2016 totalisant la somme de quatre vingt millions six
cent trente trois mille vingt dollars américains (US 80,633,024) ou son équivalent en monnaie locale
d‟une valeur de cinq milliards deux cent quatre vingt quatre millions quatre cent trente mille trois cent
soixante sept gourdes (HTG 5,284,430,367) établi au taux de 65.5368 pour un dollar américain.
Page 81 of 656
Le BMPAD puise des ressources du fonds pour les services de gestion fournis. Il n‟existe aucun
mécanisme définissant le mode de calcul et de paiement de ces services. Ce montant varie d‟une période
annuelle à l‟autre.
A titre d‟exemple :
2016
Financement au budget de BMPAD
HTG 413,859,000
2015
131,328,000
Pour la période annuelle 2016, les états financiers du fonds affichent des frais de pénalités sur
commandes en/Spot d‟une valeur matérielle d‟un montant de HGT 18, 523,092. Or, en gestion, toute
pénalité découle du non respect d‟une norme ou d‟un engagement quelconque reflétant ainsi une
défaillance administrative, tandis que, la participation du fonds au financement du budget du BMPAD a
triplé, passant de : 131,328,000 à 413,859,000 Gourdes.
.
Le BMPAD gère des projets dont les ressources sont puisées du fonds de PETRO CARIBE.
Cette fonction est incompatible à sa mission.
Le Gouvernement Bolivarien suite au séisme du 12 janvier 2010 a annulé la dette d‟Haiti
s‟élevant à cette date au montant de U.S 396,073,224 ou son équivalent en monnaie locale d‟une valeur
de HTG 25,957,371,667. L‟annulation de la dette n‟était pas prévue dans l‟Accord.Cette décision du
Gouvernement de la République Bolivarienne devait entraîner des rentrées de fonds afférentes pour
l‟État Haitïen. Étant donné qu‟aucun mécanisme de gestion n‟est mis en place quant à l‟utilisation du
fonds si ce n‟est que par Résolutions, le montant de l‟annulation de cette dette devait être précisé par
une Résolution du Conseil des Ministres permettant ainsi la rétribution de ces fonds à L‟État Haïtien.
Page 82 of 656
PRÉSENTATION ET ANALYSE DES DOSSIERS COMPLETS DE
GESTION DU FONDS PETRO CARIBE PAR :
GOUVERNEMENT, RÉSOLUTIONS ET CONTRATS
Page 83 of 656
XVIII Sommaire des résolutions
L‟audit financier se porte uniquement sur les Programmes et Projets financés par les fonds
PETROCARIBE mentionnés à travers les treize (13) Résolutions prises par les cinq (5) Gouvernements
Haïtiens, couvrant les périodes annuelles allant de septembre 2008 à mars 2016. Les fonds alloués à
travers ces Résolutions totalisent la somme de un milliard sept cent cinq millions quatre cent vingt-trois
mille cent quatre-vingt-un U.S 1, 705, 423,181 dollars américains et.00/100 centimes et se présentent
ainsi :
Description
#
U.S
Moniteur résolution
du 20 septembre 2008
amendée par celle du 9 octobre 2008
2 Moniteur résolution du 11 février 2010
3 Moniteur résolution du 24 août 2010
4 Moniteur résolution du 12 mai 2011
5 Moniteur résolution du 28 février 2012
6 Moniteur résolution du 18 juillet 2012
7 Moniteur résolution du 21 Décembre 2012
8 Moniteur résolution du 11 Décembre 2013
9 Moniteur résolution du 23 juillet 2014
10 Moniteur résolution du 10 septembre 2014
11 Moniteur résolution du 15 avril 2015
12 Moniteur résolution du 22 juillet 2015
13 Moniteur résolution du 6 janvier 2016
Total des ressources allouées
1
197,560.000
157, 719,896
94, 597,098
96, 923,836
210, 303,223
96, 195,626
329, 386,735
164, 517,229
71, 215,839
7, 000,000
47, 525,624
174, 308,966
58, 169,109
1, 705, 423,181
Page 84 of 656
Institutions Bénéficiaires
L‟analyse des treize (13) Résolutions ainsi que les documents recueillis ont permis de
compléter la planification antérieurement élaborée et aussi identifier les différentes Institutions
Bénéficiaires des fonds PETROCARIBE ayant été l‟objet de nos interventions. Ce sont :
$
$
$
$
$
$
$
$
Montant des
Programmes et
Projets
30,518,881
16,114,671
82,861,671
4,781,257
62,649,305
41,203,187
352,640,873
603,078,791
$
$
$
$
$
$
$
8,500,000
1,942,635
107,897,762
1,000,000
41,404,949
6,539,102
32,432,697
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
11,090,111
7,983,172
787,000
4,623,222
485,441
596,598
10,822,303
12,960,000
57,426,380
19,550,000
6,319,149
7,877,090
14,186,301
20,048,419
123,993,562
5,608,651
7,500,000
1,705,423,181
Institutions
Bureau de Monétisation d‟Aide au Développement (BMPAD)
Ministère de l‟Économie et des Finances (MEF)
Ministère de l‟Agriculture
(MARNDR)
MDE
Ministère de la Santé Publique et de la Population (MSPP)
ULCBP
Ministère de la Planification et de la Coopération Externe (MPCE)
Ministère des Transports de la Planification et de la
Télécommunications (MTPTC)
Ministère de la Justice et de la Sécurité Publique (MJSP)
DINEPA
CNE
SEMANAH
EDH
Ministère de l‟Industrie et du Commerce (MCI)
Ministère de l‟Éducation Nationale et de la Formation Professionnelle
(MENFP)
Police Nationale d‟Haïti ( PNH)
Université d‟État d‟Haïti (UEH)
LNBTP
MT
ISPAN
MJSAC
MAST
Primature
FAES
MICT
MPCE Ŕ UCLBP
MJSP Ŕ PNH
MAST Ŕ FAES
MEF Ŕ BMPAD
Inconnu
MPCE Ŕ MT
MINISTERES
Total
Page 85 of 656
XIV RÉSOLUTION DU 20 SEPTEMBRE 2008
AMENDÉE PAR CELLE DU 9 OCTOBRE 2008
Page 86 of 656
GOUVERNEMENT PREVAL – PIERRE LOUIS
Page 87 of 656
Mise en contexte :
En l‟espace d‟un mois, Haïti a été frappée par quatre cyclones : une tempête tropicale, Fay, puis trois
ouragans Gustav, Hanna et Ike. Fay, violente tempête tropicale, avec des vents allant jusqu‟à 75km/h, a
atteint la côte sud le 16 août 2008. Elle a traversé le pays d‟Est en Ouest, en passant par les
départements du Centre et de l‟Ouest. L‟ouragan Gustav, de catégorie 1, avec des vents d‟une vitesse
maximum de 150km/h, a ensuite frappé Haïti le 26 août 2008. Il a traversé la péninsule du Grand Sud et
sa côte nord, touchant les départements du Sud- Est, de l‟Ouest, des Nippes, du Sud et de la Grande
Anse. L‟ouragan Hanna, avec des vents d‟une vitesse maximum de 116km/h, a provoqué de fortes
pluies sur tout le pays les 2 et 3 septembre, et a entraîné d‟énormes dommages aux Gonaïves, dans le
département de l‟Artibonite. Enfin, le troisième ouragan, Ike, est passé au nord d‟Haïti le 8 septembre et
a provoqué de fortes pluies partout dans le pays, et en particulier dans le département du Nord.»
Ces ouragans ont provoqué des dégâts majeurs dans quatre départements du Sud, Nippes, Sud-est,
Grande Anse et des inondations dans le département de l‟Artibonite, principalement aux Gonaïves et à
Grande Saline. La capitale, Port-au-Prince, a été quasiment isolée des autres départements avec la
destruction de certains ponts dont celui de Montrouis dans le département de l‟Artibonite et celui de
Mirebalais dans le département du Centre, et le débordement de l‟Étang de Miragoâne dans les
Nippes. La côte Sud, quant à elle, était totalement inaccessible.
Les réponses du gouvernement :
Face à l‟ampleur du sinistre, le Gouvernement a soumis au Parlement un Avant-projet de loi sur l‟Etat
d‟Urgence. Le Parlement a accordé le bénéfice de l‟urgence au projet de loi qui a été voté rapidement, le
8 septembre 2008, permettant ainsi au Président de la République de prendre un arrêté décrétant l‟Etat
d‟urgence sur tout le territoire national le 10 septembre 2008.
Dans ce contexte, le Parlement Haïtien votera la première loi d‟urgence qui assouplit les contraintes de
passation de marché afin de permettre au Gouvernement d‟intervenir rapidement pour soulager les
populations sinistrées. Cette loi votée le 8 Septembre 2008, est publiée le 10 septembre de la même
année. Elle ne fait pas obligation au Gouvernement d‟obtenir l‟approbation de la Cour Supérieure des
Comptes et du Contentieux Administratif (CSC/CA) pour la ratification des contrats, quoiqu‟elle
maintienne que ces contrats ne soient pas dispensés du contrôle de cette dernière à posteriori.
Les principaux ministères (Agriculture, Education, Justice, Intérieur, Santé, Travaux publics)
directement impliqués dans la mise en œuvre des interventions ont élaboré des plans d‟action pour la
relance de la production nationale, la réhabilitation des infrastructures, notamment routières, scolaires,
sanitaires et judiciaires.
La résolution du 20 septembre 2008 :
L‟instauration de l‟Etat d‟urgence a habilité le Conseil des Ministre, le 20 septembre 2008, à prendre sa
première résolution. Il s‟agit de la résolution du 20 Septembre 2008, pour le montant de USD
197,500,000.00. Dans cette toute première résolution, la rubrique « Achat d‟équipement
pour CNE » n‟existe pas. Il y avait donc aucun montant prévu à cet effet.
Page 88 of 656
La résolution du 9 octobre 2008 :
La résolution du 9 octobre a modifié celle du 20 septembre 2008. Il y a eu des changements dans la
distribution des fonds tout en conservant le montant initial de $ 197 560 000. Les fonds désaffectés a
certains projets ont permis d‟allouer $ 80,000,000 pour le CNE : Équipement $ 60,000,000 et
fonctionnement $20,000,000.00.
Objectifs du programme d‟urgence :
Le programme visait une reprise de l‟économie rudement touchée par les intempéries. Il prévoyait aussi
d‟assurer le lien entre les actions de premiers secours, engagées par le gouvernement sur les fonds du
trésor public, et les phases de relèvement immédiat, de réhabilitation et de reconstruction. De façon
spécifique, il s‟agissait :
1) De continuer à apporter une assistance humanitaires aux victimes des cyclones ;
2) D‟assainir les villes et de prendre des mesures sanitaires pour éviter la propagation des
épidémies.
3) De créer des emplois dans les zones touchées, tout en protégeant les bassins versants, et de
faciliter la recapitalisation des exploitations agricoles ;
4) D‟entreprendre les activités (acquisition d‟intrants, d‟outils et d‟équipements agricoles)
encourageant la relance de la production agricole et fournir un appui direct aux unités de
production et de transformation de produits agricoles
5) De fournir un appui aux communes, pour la mise en œuvre des projets effet rapide sur
l‟économie locale ;
6) De rétablir et/ou reconstruire les différents types d‟infrastructures endommagées et/ou détruites
par les cyclones.
Ordonnateurs concernés :
1) Michel Duvivier PIERRE-LOUIS, Ex Premier Ministre
2) Daniel DORSAINVIL, Ex Ministre des Finances
3) Jean Max BELLERIVE, Ex Ministre de la Planification et de la Coopération Externe (MPCE)
4) Gerald JEAN BAPTISTE, Ministre des Travaux Publics Transport et Communication
(MTPTC).
5) Jonas GUE, Ex Ministre de l‟Agriculture des Ressources Naturelles et du Développent Rural
(MARNDR)
6) Gerald GERMAIN, Ex Ministre des Affaires Sociales et du Travail (MAST)
Page 89 of 656
7) Marie Lorence Jocelyn LASSEGUE, Ex Ministre de la Condition Féminine et aux Droits de la
Femme.
8) Marie Josée-Georges GARNIER, Ex Ministre du Commerce et de l‟Industrie (MCI)
9) Michael LECORP, Ex Directeur Général du Bureau de Monétisation des Programmes d‟Aide au
Développement (BMPAD)
10) Jude CELESTIN, Ex Directeur Général du Centre National des Equipement (CNE)
La répartition des fonds par Ministère:
Ministères
MTPTC
MARNDR
MENFP
MICT
MJSP
MSPP
PRIMATURE
ACTIVITES
Acquisition d'équipement
Assainissement
Réhabilitation des
infrastructures hydrauliques
Réhabilitation inf. électriques
Rétablissement réseau routier
Relance de la production
agricole
Rentrées scolaires
Appui aux communes
Approvisionnement en eau et
nourriture
Autres appuis humanitaires
Réh. prison Comm. et
tribunaux
Sante
Intervention diverses
Total
MONTANT
PROJET
80 000 000,
2 750 000,00
REPARTITION
%
6 800 000,00
2 000 000,00
93 550 000,00
47,35%
36 750 000,00
36 750 000,00
18,60%
27 375 000,00
17 750 000,00
27 375 000,00
13,86%
550 000,00
19 550 000,00
9,90%
2 000 000,00
2 000 000,00
1,01%
5 375 000,00
12 960 000,00
197,560,000
5 375 000,00
12 960 000,00
197 560 000
2,72%
6,56%
100,00%
2 000 000,00
1 250 000,00
Le Conseil des Ministres vote la résolution du 20 janvier2008 en vue de permettre à l‟Etat haïtien de
répondre, en principe, aux ravages causés par le passage de plusieurs cyclones sur Haïti. Comme
indiqué dans le tableau ci-dessous, le Ministère des travaux Publics a eu le gros lot avec 93,550,000 $
pour 5 projets (47,35%), le Ministère de l‟Agriculture avec son projets sur la relance de la production
agricole (18,6%), le Ministère de l‟éducation faisant face au dilemme de la rentrée des classes (13,8%).
La redistribution de certains fonds :
Outre la répartition susmentionnée, plusieurs ministères ont distribué une partie de leur fonds à d‟autres
Ministères ou organismes autonomes.
Page 90 of 656
La Primature a distribué les fonds suivants :
Ministère bénéficiaire en $
Ministère des Finances
Ministère du Commerce
Ministère du Tourisme
Total en $ USD
Entités bénéficiaires en
Gourdes
Ministère Condition Féminine
Ministère de l‟Environnement
Ministère des Travaux Publics
Ministère de la Culture
FAES
UEH
CNIGS
Total en Gourdes
Montants
3 000 000
1 000 000
1 000 000
5 000 000
Monnaie
USD
USD
USD
5 000 000
11 995 852
99 049 156
10 000 000
10 000 000
22 000 000
15 427 500
173 472 508
Gourdes
Gourdes
Gourdes
Gourdes
Gourdes
Gourdes
Gourdes
Gourdes
Le Ministère de l‟Intérieur a procèdé à la redistribution suivante :
Entités bénéficiaires
Ministère des Affaires Sociales
FAES
BMPAD
Total en Gourdes
Montants
33 241 160
319 114 994
388 921 408
741 277 562
Monnaie
Gourdes
Gourdes
Gourdes
Gourdes
Le Ministère de l‟Ȇducation Nationale a procédé à la redistribution suivante :
Entités bénéficiaires
FAES
PNCS
Université Publique du Sud
Université Publique du Nord
Université Publique de
l'Artibonite
Total en Gourdes
Montants
319 000 000
40 000 000
8 000 000
8 000 000
Monnaie
Gourdes
Gourdes
Gourdes
Gourdes
14 000 000
Gourdes
389 000 000
Gourdes
Le Ministère de la Santé Publique a distribué de son coté :
Entités bénéficiaires
Montants
FAES
61 500 000
Total en Gourdes
61 500 000
Le Ministère de la Justice a distribué :
Entités bénéficiaires
Montants
Monnaie
Gourdes
Gourdes
Monnaie
Page 91 of 656
FAES
Total en Gourdes
60 000 000
60 000 000
Gourdes
Gourdes
Il est noté que le FAES et le BMPAD interviennent comme Maitres d‟Ouvrages délégués des ministères
concernés.
Décaissements : 100%
Le Fonds PETROCARIBE n‟est pas intégré au Budget de la République à cette époque. La résolution
du 20 Septembre 2008 est exécutée par le BMPAD à travers des transferts du compte du BMPAD aux
comptes des différents ministères sectoriels sur ordre du Ministère des Finances. Tous les fonds prévus
par la résolution du 9 octobre 2008 ont été décaissés.
Le degré d‟avancement : 100% selon les rapports
Pour déterminer le degré d‟achèvement des projets de cette résolution, nous nous contentons de
rapporter les chiffres produits par les ministères sectoriels concernés :
USD
ACTIVITE
Acquisition
d'équipement
Appui aux
communes
Approvisionnement
en eau et nourriture
Assainissement
Autres appuis
humanitaires
Intervention
diverses
Reh prison. Comm
et tribunaux
Réhabilitation des
infrastructures
hydrauliques
Réhabilitation inf.
électriques
Relance de la
production agricole
Rentrées scolaires
Rétablissement
réseau routier
Sante
14 eme mois
Total
MONTANT PROJET
USD
%
%
MONTANT
PROJET
Désaffectation
REVISES
DÉC.
DÉC.
AVANC.
0,00
-80 000 000
80 000 000
80 000 000
100 %
100%
17 750 000
17 750 000
100 %
100%
17 750 000
2 250 000
1 000 000
1 250 000
1 250 000
100 %
100%
3 750 000
1 000 000
2 750 000
2 750 000
100 %
100%
550 000
550 000
100 %
100%
12 960 000
12 960 000
100 %
100%
2 000 000
2 000 000
2 000 000
100 %
100%
2 000 000
2 000 000
2 000 000
100 %
100%
550 000
17 960 000
5 000 000
7 000 000
200 000
6 800 000
6 800 000
100 %
100%
56 750 000
20 000 000
36 750 000
36 750 000
100 %
100%
37 375 000
10 000 000
27 375 000
27 375 000
100 %
100%
2 000 000
2 000 000
100 %
100%
100 %
100%
2 000 000
24 375 000
23 800 000
19 000 000
23 800 000
5 375 000
0
5 375 000
0
197,560,000
0
197,560,000.00
197,560,000.00
Page 92 of 656
Le renforcement du CNE :
La résolution du 9 octobre 2008 a prévu une enveloppe de 80,000,000 $ destiné au renforcement du
Centre National des Equipements (Acquisition d‟équipement : 60,000,000.00$ et fonctionnement :
20,000,000.00 $). Il faut souligner, suivant les déclarations de l‟EX directeur de la BMPAD Michael
Lecorps, la copie de la résolution du 9 octobre n‟a été acheminée au MEF qu‟en date du 9 janvier 2009.
Aucune copie dudit procès verbal n‟avait été rendue disponible au BMPAD avant cette date.
L‟intégralité des fonds a été décaissée par le BMPAD :
1eme décaissement
2eme décaissement
3eme décaissement
4eme décaissement
Date
27-sept.-08
30-oct.-08
30-déc.-08
9-janv.-09
Total
# ordre
5
24
26
29
Montant
22 805 000,00
21 000 000,00
8 988 362,00
27 206 638,00
80, 000, 000,00
% Déc.
29%
26%
11%
34%
100%
N.B : Le 27 septembre 2008, le BMPAD a transféré 23,800,000 $ à titre du 14eme mois tel que prévu
par la résolution du 10 septembre 2008. Cet item fut retiré lors de la résolution du 20 octobre 2008 et
réaffecté de la façon suivante :
Renforcement CNE
22,805,000.00
Santé
995,000.00
Total
23,800,000.00
Il est à noter que ces faits furent confirmés par l‟Ex DG du BMPAD Mr Michael LECORP, l‟Ex
Ministre des TPTC Gerald JEAN BAPTISTE et par le rapport de vérification de la CSCCA.
Des contrats de gré à gré pour acquisition d‟équipements ont été signés avec des compagnies
locales totalisant USD 59,618,511.00:
DATE
9 octobre 2008
9 octobre 2008
9 octobre 2008
9 octobre 2008
30 décembre 2008
30 décembre 2008
30 décembre 2008
Total
FOURNISSEUR
CIE HAITIENNE DE
MOTEURS
SOGED
AUTOMECA
HAYTRAC
AUTOMECA
AUTOPLAZA
HAYTRAC
CONTRAT
MONTANT
CONTRAT
5 495 000,00
CONTRAT
CONTRAT
CONTRAT
AVENANT
CONTRAT
AVENANT
4 055 036,00
10 622 000,00
9 816 300,00
15 453 000,00
4 010 000,00
10 167 175,00
59, 618 ,511.00
Page 93 of 656
Suivant les documents présentés par l‟EX Ministre des TPTC, tous les équipements commandés
ont été livrés au CNE:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
TYPE
Asphalt Paver Caterpillar
Bouteur
Buildozer D65EX-15EO
Buildozer D85EX-15EO
Camion a Benne Basculante 12m3
Camion à Benne Basculante 18m3
Camion à carburant 16000 litres
Camion à eau 15000 litres
Camion de 16 à 18 m3
Excavatrice case CX 290B
Excavatrice PC200LC-8
Excavatrice PC220LC-8
Extension 20 Pieds
Light Tower Model RL 4000
Low Boy de 100 Tonnes
Marteau Piqueur
Motor Grader Caterpillar Model 140H
New Wheel Loader Caterpillar Model 966H
Niveleuse
Tractor Caterpillar Model DR11
Vibratory s Compactor Caterpillar Model CS76XT
Wheel Loader case 921E
Wheel Loader WA 320-6
Total
Quantité
1
4
10
5
71
27
10
18
81
2
10
10
4
15
1
4
5
16
10
4
26
2
4
340
Source : Rapport d‟inventaire des matériels CNE, Cellule technique, mars 2011.
Conclusion de la CSCCA dans son « Rapport de vérification de tous les comptes utilises dans le
programme d‟urgence 2008 doté de $ 197,560,000 » :
La gestion du Ministère des Travaux Publics Transport et Communication
Domicilié à la BRH, le compte en dollar américain intitulé « Réhabilitation des infrastructures
équipements a été ouvert en date du 29 septembre 2008 et répondant au numéro 111057182. Il reçoit les
fonds destinés à l‟acquisition d‟équipement au profit de CNE.
Le Trésor Public a viré 80,000,000 $ USD sur ce compte, les dépenses réelles du MTPTC en vue de
l‟acquisition d‟un lot de 340 équipements, pour un montant de 59,988,835.00 $ USD. En outre, des
transferts de fonds ont eu lieu au profit des comptes courants suivants du CNE, Cpte USD 111057395,
Cpte HTG # 121251282 et Cpte USD # 111057405 soient respectivement 17,037,320.00 $ USD,
990,334.15 $ USD et 1,972,311.33 $ USD.
Page 94 of 656
La CSCCA ne constate aucune irrégularité tant pour les dépenses de 59,988,835.00 $ effectuées pour
l‟acquisition des équipements dont bénéficie le CNE que pour les transferts de fonds aux comptes du
CNE totalisant 19,999,975.48$ par les responsables du MTPTC. Ces fonds permettaient à cette
institution de fonctionner dans le cadre des travaux de réhabilitation des routes.
La gestion du Centre National des Equipement
Selon le rapport d‟inventaire soumis à notre appréciation par la direction technique du CNE, un lot de
340 équipements se trouve au CNE après leurs acquisitions par le MTPTC.
La CSCCA ne relève aucune irrégularité dans la gestion de ces équipements par les Responsables du
CNE. Ils sont conformes à la liste provenant du MTPTC corroborée avec celle du CNE.
La CSCCA ne relève aucune irrégularité pour les dépenses réelles effectuées par les responsables de ce
compte, car les dépenses sont appuyées par des justificatifs respectant les normes légales.
Conclusions de la CSCCA sur le projet de la relance agricole :
La CSCCA ne constate aucune faute de gestion, ni autres indices particuliers qui pourraient
engager les responsabilités civiles ou pénales des responsables de l‟Administration Centrale du
Ministère de l‟Agriculture dans la gestion du fonds de 36,750,000.00 $ dont le dit ministère en a
bénéficié dans le cadre du programme d‟urgence 2008. En effet, les dépenses réelles du ministère tant
en dollars américains pour une valeur de 11,549,841.67 $ USD et celles en gourdes pour un montant de
894,562,924,70 Gourdes sont complètement justifiées selon les normes constituant les fondements
légaux de la vérification. De même, aucune irrégularité n‟entache le volet de la vérification de
l‟inventaire des biens acquis et livres successivement au Ministère et à l‟ODVA.
Conclusion générale du rapport post séisme de la CSC/CA
Le rapport de la CSCCA a présenté la conclusion suivante :
La CSCCA a procédé à la vérification des comptes utilisés dans le cadre du programme
d‟urgence 2008 financé par les fonds PétroCaribe pour une valeur de 197,560,000$. En effet, 49
comptes courants ont été utilisés dans le cadre de ce programme soit : quinze (15) libellés en USD, dix
sept (17) comptes en gourde.
Enfin, à l‟exception du constat physique des équipements acquis au profit du Centre National
des Equipements par le Ministère des Travaux Publics Transport et Communication, et de la visite des
projets réalisés par le Ministère de l‟Agriculture des Ressources Naturelles et du Développement rural,
la Commission de la Cour, pour les autres projets et réalisation effectués dans le cadre du dit
programme, a fondé son jugement sur les états d‟avancement des travaux ou projets tels que fournis par
les ministères ou autres institutions étatiques dans leurs rapports respectifs.
A l‟exception des observations présentées aux paragraphes ci-dessus, la Commission est d‟avis
que les fonds du Programme d‟urgence ont été, à tous égares importants, utilisés aux fins prévues et
dans laquelle des désaffectations ont été opérées sans pour autant entrainer des modifications de
l‟enveloppe des ressources financières allouées.
Page 95 of 656
Les ressources allouées à l‟application de cette Résolution du 9 octobre 2008, qui a conservé
l‟enveloppe des ressources financières allouées dans la Résolution du 20 septembre 2008, ont été
puisées des fonds générés par l‟Accord PETRO CARIBE pour un montant de cent quatre-vingt-dix-sept
millions cinq cent soixante mille dollars américains (U.S 197,560,000.00) réparti d‟une part, à des
Institutions Bénéficiaires et, d‟autre part, affecté à des Programmes et Projets identifiés dans les zones
qui ont été touchées.
Dans le cadre de cette Résolution prise, le Gouvernement d‟alors était ainsi composé:
Prénom
Nom
Fonction
Daniel
Paul Antoine
Ulrick
Joël Desrosiers
Charles
Evans
Alex
Jean Max
Gérald
Duvivier PierreLouis
Dorsainvil
Bien-Aimé
Nicolas
Jean-Pierre
Manigat
Lescouflair
Larsen
Bellerive
Jean-Baptiste
Jonas
Geu
Jean Marie
Gérald
Germain
Germain
Marie L. Jocelyn
Lassègue
Marie Josée
Joseph
Garnier G
Jasmin
Michèle
Première Ministre
Ministre de L‟E.F
Ministre de l‟I.C.T
Ministre des A.E.C
Ministre de l‟E.N.F.P
Ministre des H.É
Ministre de la J.S
Ministre de la S.P.P.
Ministre de la P.C.E
Ministre des T.P.T.C
Ministrede
l‟A.R.N.D.R
Ministre de l‟E
Ministre des A.S.T
Ministre de la
C.F.D.F
Ministre du C.I
Ministre D.R.P
Ces deux (2) Résolutions sont donc présentées dans les tableaux qui suivent :
Institution
Nature du projet
PRIMATURE
Interventions diverses et
frais de gestion
Coordination
Coordination
Coordination
Coordination
Total
MJSP
Localité
Montant Du
Project
No
déc.
Montant à
décaisser
12, 960,000.00
Ouest
Ouest
Ouest
Ouest
12,960,000.00
Réhabilitation des Prisons
et des Commissariats de
police et tribunaux
Montant décaissé
1,620,000.00
1,080,000.00
5,000,000.00
5,260,000.00
12,960,000.00
15
22
23
25
0
2,000,000.00
Page 96 of 656
Réhabilitation des Prisons
et des Commissariats
Réhabilitation des Prisons
et des Commissariats
Total
2,000,000.00
1,000,000.00
13
1,000,000.00
20
2,000,000.00
0
MSPP
Santé
Affectation du 14eme
Mois
5,375,000.00
4,380,000.00
9
Total
5,375,000.00
MARNDR
Relance de la Production
Agricole
Relance de la Production
Agricole
Relance de la Production
Agricole
Relance de la Production
Agricole
Relance de la Production
Agricole
Total
MEF
4,380,000.00
995,000.00
36,750,000.00
36,750,000.00
14ième Mois de salaire aux
agents de la fonction
publique
14ième Mois
8,000,000.00
10
7,000,000.00
16
10,000,000.00
17
11,750,000.00
36,750,000.00
27
23,800,000.00
5
0
Total
(23,800,000.
00)
23,800,000.00
MENFP
Rentrée Scolaire
Rentrée Scolaire
Rentrée Scolaire
Rentrée Scolaire
Total
27,375,000.00
7,450,000.00
10,000,000.00
9,925,000.00
27,375,000.00
4
12
19
27,375,000.00
0
MICT
Appui aux Communes
Appui aux Communes
Approvisionnement en
Eau et Nourriture
Autres Appui
Humanitaires
Total
MTPTC
19,550,000.00
19,550,000.00
Réhabilitation des
infrastructures
Hydrauliques
Réhabilitation des
infrastructures d'Eau
Potable
17,750,000.00
2
1,250,000.00
7
550,000.00
8
19,550,000.00
0
13,550,000.00
1,000,000.00
18
Page 97 of 656
Réhabilitation des
infrastructures d'Eau
Potable
Sous total
1,000,000.00
13,550,000.00
Réhabilitation des
Infrastructures Electriques
Réhabilitation des
Infrastructures Electriques
Réhabilitation des
Infrastructures Electriques
2,000,000.00
14
4,000,000.00
21
800,000.00
28
6,800,000.00
Réhabilitation des
infrastructures Routières
Assainissement
2,000,000.00
2,750,000.00
13,550,000.00
Rétablissement réseaux
routier
Equipement
Equipement
Equipement
CNE
2,000,000.00
Sous Total
Total
11
3
6
13,550,000.00
0
80,000,000.00
21,000,000.00
8,988,362.00
27,206,638.00
24
26
29
Sous total
TOTAL
80,000,000.00
57,195,000.00
22,805,000.
00
197,560,000
197,560,000
0
Décaissements :
La Résolution du 9 octobre 2008 amendant celle du 20 septembre 2008 fut exécutée par le
BMPAD à travers des transferts de fonds effectués sur les comptes des différents Ministères.
1-PRIMATURE
La Primature qui a bénéficié d‟une enveloppe de douze millions neuf cent soixante mille
dollars américains (US12, 960,000). Ce montant fut versé en quatre (4) virements au compte portant
le numéro 11105741, domicilié à la BRH. L‟analyse des documents nous a permis de constater
l‟utilisation de ces fonds de la façon suivante :
Ressources allouées
U.S 12,960,000
Virements à des Ministères
MEF
3,000,000
MCI
1,000,000
MT
1,000,000
U.S 5, 000,000
Page 98 of 656
Décaissements effectués sur le compte
Alimentation du Compte # 111257054 en monnaie locale
Total des montants utilisés
59,638
7, 900,000
12, 959,638
-Décaissements effectués à partir de ce compte :
Acquisition d‟un matériel roulant
Frais de transport d‟un container
Frais de publicité
Frais bancaires
Total des décaissements effectués à partir de ce compte
U.S 39,500
10,000
10,000
138
59,638
3-Alimentation du compte 111257054 en monnaie locale
U.S 7,900.000
Le montant fut converti en monnaie locale et fut transféré au compte de la Primature
portant le # 111257054 et a été utilisé de la façon suivante :
Alimentation du compte 111257054
Conversion des U.S 7, 900,000.00 x 40.142148
HTG
Virements effectués à des institutions en monnaie locale :
Ministère de la Condition Féminine et aux Droits de la
Femme (MCFDF)
Ministère de l‟Environnement
Ministère
des
Travaux
Publics
Transport
et
Communicat(MTPTC)
Ministère de la Culture (MC)
Fonds d‟Assistance Economique et Sociale (FAES)
Université d‟État d‟Haïti
Centre National de l‟Intervention Géo-Spatiale (CNIGS)
Total des virements effectués à des institutions en monnaie locale
317,122,973
5,000,000
11,995,852
99,049,157
10,000,000
10,000,000
22,000,000
15,427,500
173,472,509
Du montant servant à alimenter le compte déduction faite des valeurs transférées à aux
différentes institutions, le solde de ce compte devait afficher un montant totallisant la somme de cent
quarante trois millions siz cent cinquante mille quatre cent soixantre trois gourdes
(HTG 143, 650,468)
2-Ministère de la Justice et de la Sécurité Publique (MJSP)
Ce Ministère détient un compte en monnaie locale domicilié à la Banque de la République d‟Haïti
(BRH) portant le numéro 1112566833 et intitulé Programme d‟Urgence. Le compte a été alimenté en
deux (2) virements d‟une valeur chacune de un million de dollars américains (U.S 1, 000,000). Ces
valeurs ont été converties à quarante gourdes (HTG 40.00) pour un dollar américain.
Des quatre-vingt millions de gourdes (HTG 80, 000,000) créditées à ce compte, soixante millions
de gourdes (HTG 60, 000,000) furent transférées au compte du Fonds d‟Assistance Économique et
Sociale (FAES). Le solde soit les vingt millions (HTG 20, 000,000) restant furent utilisées par
l‟Institution pour ses dépenses diverses.
Page 99 of 656
Le Ministère de la Justice et de la Sécurité Publique n‟a pas donné suite à la correspondance du
Sénat de la République et nous n‟avons retracé aucun rapport transmis supportant les dépenses
diverses, seulement une note retracée dans le rapport de la CSC/CA relatant que suite au séisme, un
procèsŔverbal avait été dressé par le juge de Paix de la section Sud de Port-au-Prince Me Gabriel
AMBOISE sur demande du Directeur des Affaires Judiciaires Me Moline LOUIS-JEUNE LR, en
présence de certains membres du Cabinet du Ministre Paul-Denis.
Les conclusions du procès-verbal de constat ont fait état du Bâtiment du Ministère qui a été
complétement détruit et pulvérisé. Donc, les pièces justificatives ainsi que les rapports ne sont plus
disponibles.
Page 100 of 656
3-Ministère de la Santé Publique et de la Population (MSPP)
Des cinq millions trois cent soixante-quinze mille dollars américains (U.S 5,375,000) alloués à ce
Ministère, un montant de quatre millions trois cent quatre-vingt mille dollars américains (U.S 4,
380,000) fut versé en un seul virement et crédité au compte portant le # 111256871 pour une valeur
équivalent de cent soixante quatorze millions cent soixantemille neuf cent cinquante huit gourdes
(HTG 174, 160,958)
Ce montant fut utilisé de la façon suivante :
Virement à FAES
Dépenses diverses effectuées à partir de ce compte
Total des décaissements
61, 500,000
112, 660,958
174, 160,958
Nous avons pu vérifier le transfert d‟une valeur de soixante et un millions cinq cent mille
gourdes (HTG 61, 500,000) effectué sur le compte de FAES portant le # 111257102/ intitulé
FAES ?GOH.POST Désastre domicilié à la BRH.
Quant au montant des dépenses diverses qui se chiffre à cent douze millions six cent soixante
mille neuf cent cinquante gourdes (HTG 112, 660,958), nous avons noté seulement cette
correspondance du Ministre d‟alors M Alex LARSEN, en date du 1er décembre 2010, adressée au
Président de la CSC /CA évoquant la perte des documents suite à l‟effondrement du bâtiment du
MSPP.
Page 101 of 656
4-Ministère de l‟Agriculture des Ressources Naturelles et du Développement Rural (MARNDR)
Le MARNDR a bénéficié dans le cadre de la mise en œuvre de la résolution du 9 octobre amendant
celle du 20 septembre 2008,à titre de « Relance de la Production Agricole », d‟un montant de trentesix millions sept cent cinquante mille dollars américains (U.S 36, 750,000) crédité au compte portant
le numéro 111056947 domicilié à la BRH. Ce montant fut versé en quatre (4) virements bancaires par
le Bureau de Monétisation des Programmes d‟Aide au Développement (BMPAD), après avis du
Ministère de l‟Économie et des Finances (MEF) et utilisé de la manière suivante:
Dépenses effectuées à partir de ce compte
Virements à des comptes internes
Total des décaissements
11, 549,842
25,199,950
36, 749,792
Les dépenses effectuées à partir de ce compte furent l‟objet d‟analyse dans le rapport de la
CSC/CA relatif à la vérification de tous les comptes utilisés dans le Programme d‟Urgence de 2008
dont nous prenons le soin de citer.
Il relate les virements effectués sur les comptes internes que nous avons retracés et confirme
leur conformité.
Ce rapport confirme également que les dépenses effectuées en monnaie locale par l‟Institution
bénéficiaire d‟‟une valeur de huit cent quatre-vingt-quatorze millions cinq cent soixante-deux mille
neuf cent quatre Ŕvingt-dix gourdes (HTG 894,562,990) sont conformes.
Page 102 of 656
D‟autres équipements sont aussi acquis et distribués comme le démontre le tableau ci-dessous.
Acomptes non prélevés et non versés à la DGI
Firme
Contrats
Coût
Montant 2%
Bien acquis
d‟acquisition US non prélevé
Universal
4 véhicules
127,200
2,544
Hinoto SA
26 véhicules
844,095
13,055
Haytrac Lot : 4 équipements
2,594,900
41,577
Compagnie Haïtienne de
4 bus, 2 camions citernes
810,110
9,721
Moteur
et 8 L tonnes
Total
4, 376,305
66,897
Liste des équipements acquis et distribués Programme d‟Urgence 2008
Matériels
Terex Light Tover LR4000
Bus
Camions citernes
Backoe Loaders
New Wheel Loaders
PRD Pipe
Manufacturing Systems
Metal Culvert machine
Bulldozer
Moto Grader
PKG Generator sit
Rotovator Agri
Charrues reversible plow M.
3635
Charrues reversible plow M.
3645
Nissan Patrol
Land Cruiser LWB
Land Cruiser Pick-Up
Acquis
(A)
8
4
2
2
2
1
Quantité
Distribués
Disponibles
(B)
(A & B)
8
0
2
2
2
0
2
0
2
0
1
0
Institutions
Bénéficiaires
CNE
ODVA
ODVA
ODVA
ODVA
ODVA
20
tonnes
2
2
1
50
30
20
tonnes
2
2
1
50
30
0
ODVA
0
0
0
0
0
ODVA
ODVA
ODVA
ODVA
ODVA
10
10
0
ODVA
4
2
24
0
-4
4
2
20
----------ODVA
Observations
Transféré
à CNE
Transféré
à CNE
CNE : Centre National des Equipements
ODVA : Organisme de Développement de la Vallée de l‟Artibonite.
Nous avons effectué une visite au MARNDR afin de nous assurer que les biens disponibles sont
toujours au Ministère ou obtenir un document attestant leur distribution.
Page 103 of 656
5-Ministère de l‟Économie et des Finances (MEF)
Le Ministère de l‟Économie et des Finances (MEF), dans le cadre des Programmes et Projets
de 2008, sous la rubrique quatorzième (14ième) mois de salaires aux agents de la fonction publique, a
bénéficié d‟une enveloppe de vingt-trois millions huit cent mille dollars américains (U.S 23,
800,000.00). Ce montant fut versé en une seul virement suivant l‟ordre de decaissement du BMPAD
le 27 septembre 2008.Cependant, dans une autre résolution pris en Conseil des Ministres le 9 octobre
2008, ce montant fut désaffecté du projet du MEF et affecté au projet du MTPTC pour l‟achat
d‟équipements au bénéfice du CNE. Un montant de vingt-deux millions huit cent mille dollars
américains (US 22, 805,000.) fut versé au compte du CNE portant le numéro111057182 en provenant
du compte 111004153 du trésor public.
Le Ministère de l‟Économie et des Finances (MEF) a également bénéficié de la Primature,
d‟une subvention de trois millions de dollars américains (US 3, 000,000.)
De ce montant, deux millions six cent mille dollars américains (US 2,600,000) ont été utilisés
pour l‟exécution du contrat de vente, entre la société Equipement Leasing LLC représentée par
Robert Lay ISAKON et le titulaire du Ministère Daniel DORSAINVIL pour l‟acquisition de
bâtiments modulaires préfabriqués incluant accessoires et équipements. Les modalités de paiements
n‟ont pas été respectés et l‟inventaire des biens n‟a pas pu se réaliser malgré la requête du Ministère
de la Jeunesse et des Sports en date 23 décembre 2008 (REF : MJSAC / 08 / 09 / 12 Ŕ 525) (Voir
contrat et note de débit au compte du bénéficiaire en annexe).
Page 104 of 656
6-Ministère de l‟Éducation Nationale et de la Formation Professionnelle (MENFP)
Le MENFP a bénéficié d‟une enveloppe d‟un montant de vingt-sept millions trois cent soixantequinze mille dollars américains (U.S 27, 375,000.00) au titre« Rentrée Scolaire ». Cette somme fut
versée par des virements en trois tranches. Elle fut destinée à la réhabilitation d‟infrastructures
scolaires et autres activités, déposée au compte du Ministère portant le numéro 111056844 et
transférée dans un autre compte du Ministère libellé en monnaie locale portant le numéro 111256857.
Virement au compte en devise au compte 111056844
Virement au compte 111256857 en monnaie locale
U.S 27, 375,000
1,092,852,730
Les documents afférents à ces opérations ne nous sont pas parvenus, donc
nous n‟avons pas eu l‟opportunité de les analyser. Toutefois, elles furent
l‟objet d‟un audit de la CSC/CA, que nous prenons soin de noter.
Il fut utilisé de la façon suivante :
Virements effectués à FAES
Virements au Programme Nationale des Cantines Scolaires
Appui à l‟Université du Sud
Appui à l‟Université du Nord
Appui à l‟Université de l‟Artibonite
Dépenses effectuées à partir de ce compte
Total des emplois
Solde du compte 111256857
319,000,000
40,000,000
8,000,000
8,000,000
14,000,000
703, 796,021
1, 092,796,021
56,709
Page 105 of 656
7-Ministère de l‟Intérieur et des Collectivités Territoriales (MICT)
Le Ministère de l‟Intérieur et des Collectivites Territoriales a bénéficié d‟un montant de dix neuf
millions cinq cent cinquante mille dollars americains (U.S 19,550,000), pour l‟exécution de trois (3)
Projets financés par les Fonds PETRO CARIBE à travers ladite Résolution amandée.
Ce montant fut décaissé en trois (3) virements aux comptes ci-dessous mentionnés, ouverts à la
BRH le 29 septembre 2008, ce sont :
Projet
Compte
Appui aux Communes
111056882
Approvisionnement en eau et nourriture 111056923
Autres appuis humanitaires
111056909
Total
Montant
17,750,000
1,250,000
550,000
19,550,000
Transfert du compte 111056882 (17,749,996 x 39.8894)
Avis de la BRH
Total des ressources
708,036,690
560
708,037,240
Emplois
Transfert FAES
Transfert BMPAD
Total
319,114,994
388,921,408
708,036,402
Selon un protocole d‟accord signé en septembre 2008, entre le MICT désigné le Coordonnateur
et le BMPAD et FAES diségné Organisme Exécutant du Projet « Appui aux Communes », le
montant alloué au financement se chiffrait à sept cent dix millions gourdes (710,000,000) pour des
Projets identifiés par les Mairies, les Députes et les Sénateurs.
FAES fut confié d‟intervenir dans soixante quatre (64) Commununes situées dans les
Départements du Nord, du Nord-Ouest, du Nord-Est, du Centre et du Sud-Est;
BMPAD fut confié d‟intervenir dans soixante seize (76) Communes situées dans les Départements
de l‟Ouest, de l‟Artibonite, du Sud, des Nippes et de la Grande Anse.
Ces Projets ne furent pas l‟objet de notre intervention vu que les documents ne nous ont pas été
acheminés.
L‟enveloppe d‟une valeur d‟un million deux cent cinquante mille dollars americains (U.S
1,250,000) fut convertie et utilisée pour l‟achat de denrées et matériels de premières nécéssités,
de kits alimentaires et de filtres d‟eau. Le rapport de la CSC/CA relate que certaines dépenses ne
sont supportées par aucune pièce justificative adéquate. Donc, ce rapport merite un suivi
Ressources
Virement du compte 111056923 (1, 249,996 x 39.8894)
49,861,590
Page 106 of 656
9-Ministère des Travaux Publics Transport et Communications (MTPTC)
Le MTPTC a bénéficié des ressources provenant des fonds de PETRO CARIBE pour l‟exécution de
quatre (4) Projets. Ce sont :
Réhabilitation des infrastructures
Total des ressources allouées
Hydrauliques
Electriques
Routiers
Assainissement
2, 000,000
6, 800,000
2, 000,000
2, 750,000
13, 550,000
Cette valeur fut versée aux comptes du Ministère en sept (7) virements. Les dépenses afférentes à ces
projets n‟ont pu être vérifiées vu que les documents n‟ont pas été fournis
Page 107 of 656
10-Centre National des Équipements (CNE)
Le Centre National des Équipements dans le cadre de l‟exécution de la Résolution d‟Urgence du
9octobre 2008 amendant celle du 20 septembre 2008, a bénéficié d‟une enveloppe d‟une valeur de
cinquante-sept millions cent quatre-vingt-quinze mille dollars américains (U.S 57, 195,000.00). À cet
effet, afin de recevoir ce montant, un compte en dollars américains domicilié à la BRH a été ouvert en
date du 29 septembre 2008, portant le numéro 111057182. En date du 26 mai 2009, un montant
additionnel de vingt-deux millions huit cent cinq mille dollars américains (U.S 22, 805,000.00),
provenant du Ministère de l‟Économie et des Finances (MEF) fut versé à ce compte portant le total à
quatre-vingt millions de dollars américains (U.S 80, 000,000.00)
Montant des ressources allouées :
Ressources allouées
Ordre de décaissement #24
Ordre de décaissement #26
Ordre de décaissement #29
Virement en date du 25-05-2009
Total des resources
21,000,000.00
8,988,362.00
27,206,638.00
22,805,000.00
80,000,000.00
Ces Resoources furent utilisées de la façon suivante :
Acquisition d‟équipements (Voir liste)
Frais bancaires
Virement au compte # 111057395
Virement au compte # 121251282
Virement au compte # 111057405
Total des employs
Solde du compte
59,988,561.00
274.00
17,037,320.00
990,344.15
1,972,311.33
79,988,810.48
11,189.52
Date
Maître d‟œuvre
Description
Coût en US
Page 108 of 656
d‟acquisition
9 Ŕ Octobre Ŕ 2008 Compagnie
Haïtienne de
Moteurs S.A.
40 camions à benne
basculante 12-14m3
7camions a benne 18m3
5 Light Tower
4,420,000
9 Ŕ Octobre Ŕ 2008 HAYTRAC
Bull Dozer, Wheel
Loader, Dump trick
9,816,300
9 Ŕ Octobre Ŕ 2008 AUTOMECA
4 WHEEL Loader
15 Bulldozer
20 Excavatrice
840,000
5,282,500
4,499,500
9 Ŕ Octobre Ŕ 2008 SOGED
2 Excavatrice
2 Wheel Loader
20 camions à benne
Total
Date
d‟acquisition
30 décembre 2008
30 décembre 2008
30 décembre 2008
30 décembre 2008
Total
Maître d‟œuvre
Description
1,015,000
60,000
485,356
605,680
2,964,000
29,988,336
Coût en US
Compagnie
Haïtienne de
Moteurs S.A.
10 Light Tower
1 Lowboy de 10 tonnes
120,000
190,000
HAYTRAC
10 Niveleuses
10 Wheel Loader
20 Vibratory Compactor
caterpillar
1 asphalt paver caterpillar
2,682,000
3,588,330
3,613,000
18 camions à eau de
15,000 litres
10 camions à carburant
16,000 litres
2,565,000
4 bouteurs
4 marteaux piqueurs
81 camions 16-18m3
2,280,000
2,238,000
10,935,000
Auto-Plaza
AUTOMECA
283,845
1,445,000
29,940,175
Page 109 of 656
Ces deux (2) commandes totalisent la somme de cinquante-neuf millions neuf cent vingt-huit mille cinq
cent onze dollars américains (U.S 59,928,511) et répartie de la façon suivants.
1
2
Total
Commandes en date du
30-10-08
31-12-10
Compagnie Haïtienne de
Moteurs S.A
5, 495,000
310,000
Haytrac
9,816,300
10,167,175
Auto Plaza
--------
4,010,000
10,622,000
4,055,036
15,453,000
----------
26,075,000
4,055,036
29,988,336
29,940,175
59,928,511
Automeca
Soged
Total
5, 805,000
19,983,475
4,010,000
Page 110 of 656
Le renforcement du CNE :
La résolution du 9 octobre 2008 a prévu une enveloppe de 80,000,000 $ destiné au renforcement du
Centre National des Equipements (Acquisition d‟équipement : 60,000,000.00$ et fonctionnement :
20,000,000.00 $). Il faut souligner, suivant les déclarations de l‟EX directeur de la BMPAD Michael
Lecorps, la copie de la résolution du 9 octobre n‟a été acheminée au MEF qu‟en date du 9 janvier 2009.
Aucune copie dudit procès verbal n‟avait été rendue disponible au BMPAD avant cette date.
L‟intégralité des fonds a été décaissée par le BMPAD :
Date
27-sept.-08
30-oct.-08
30-déc.-08
9-janv.-09
1eme décaissement
2eme décaissement
3eme décaissement
4eme décaissement
# ordre
5
24
26
29
Montant
22 805 000
21 000 000
8 988 362
27 206 638
80 000 000
% Dec.
29%
26%
11%
34%
100%
N.B : Le 27 septembre 2008, le BMPAD a transféré 23,800,000 $ à titre du 14eme mois tel que prévu
par la résolution du 10 septembre 2008. Cet item fut retiré lors de la résolution du 20 octobre 2008 et
réaffecté de la façon suivante :
Renforcement CNE
22,805,000
Sante
995,000
Total
23,800,000
Il est à noter que ces faits furent confirmés par l‟Ex DG du BMPAD Mr Michael LECORP, l‟Ex
Ministre des TPTC Gerald JEAN BAPTISTE et par le rapport de vérification de la CSCCA.
Des contrats de gré à gré pour acquisition d‟équipements ont été signés avec des compagnies
locales totalisant USD 59,618,511.00 :
DATE
9 octobre 2008
9 octobre 2008
9 octobre 2008
9 octobre 2008
30 décembre 2008
30 décembre 2008
30 décembre 2008
Total
FOURNISSEUR
CIE HAITIENNE DE
MOTEURS
SOGED
AUTOMECA
HAYTRAC
AUTOMECA
AUTOPLAZA
HAYTRAC
CONTRAT
MONTANT
CONTRAT
5 495 000
CONTRAT
CONTRAT
CONTRAT
AVENANT
CONTRAT
AVENANT
4 055 036
10 622 000
9 816 300
15 453 000
4 010 000
10 167 175
59,618,511
Page 111 of 656
Suivant les documents présentés par l‟EX Ministre des TPTC, tous les équipements commandés
ont été livrés au CNE:
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
TYPE
Asphalt Paver Caterpillar
Bouteur
Buildozer D65EX-15EO
Buildozer D85EX-15EO
Camion a Benne Basculante 12m3
Camion à Benne Basculante 18m3
Camion à carburant 16000 litres
Camion à eau 15000 litres
Camion de 16 à 18 m3
Excavatrice case CX 290B
Excavatrice PC200LC-8
Excavatrice PC220LC-8
Extension 20 Pieds
Light Tower Model RL 4000
Low Boy de 100 Tonnes
Marteau Piqueur
Motor Grader Caterpillar Model 140H
New Wheel Loader Caterpillar Model 966H
Niveleuse
Tractor Caterpillar Model DR11
Vibratory s Compactor Caterpillar Model CS76XT
Wheel Loader case 921E
Wheel Loader WA 320-6
Total
Quantité
1
4
10
5
71
27
10
18
81
2
10
10
4
15
1
4
5
16
10
4
26
2
4
340
Source : Rapport d‟inventaire des matériels CNE, Cellule technique, mars 2011.
Conclusion de la CSCCA dans son « Rapport de vérification de tous les comptes utilises dans le
programme d‟urgence 2008 doté de $ 197,560,000 » :
La gestion du Ministère des Travaux Publics Transport et Communication
Domicilié à la BRH, le compte en dollar américain intitulé « Réhabilitation des infrastructures
équipements a été ouvert en date du 29 septembre 2008 et répondant au numéro 111057182. Il reçoit les
fonds destinés à l‟acquisition d‟équipement au profit de CNE.
Le Trésor Public a viré USD 80,000,000 sur ce compte, les dépenses réelles du MTPTC en vue de
l‟acquisition d‟un lot de 340 équipements, pour un montant de 59,988,835.00 $ USD. En outre, des
transferts de fonds ont eu lieu au profit des comptes courants suivants du CNE, Cpte USD 111057395,
Cpte HTG # 121251282 et Cpte USD # 111057405 soient respectivement USD 17,037,320, USD
990,334.15 et USD 1,972,311.33.
Page 112 of 656
La CSCCA ne constate aucune irrégularité tant pour les dépenses de $ 59,988,835.00 effectuées pour
l‟acquisition des équipements dont bénéficie le CNE que pour les transferts de fonds aux comptes du
CNE totalisant 19,999,975.48$ par les responsables du MTPTC. Ces fonds permettaient à cette
institution de fonctionner dans le cadre des travaux de réhabilitation des routes.
Relance de la production agricole :
La résolution du 9 octobre 2008 a prévu une enveloppe de 36,750,000 $ USD pour la relance de la
production agricole. Ce montant a été complètement transféré au Ministère de l‟Agriculture suivant le
calendrier suivant :
Montant
Date
#
ordre
Marché
%
Décaissé
Montant marché
36 750 000,00
Avance de démarrage
8-oct.-08
10
2eme décaissement
10-oct.-08
16
3eme décaissement
20-oct.-08
17
3eme décaissement
30-déc.-08
27
Total
0,00
Ce fonds est affecté de la manière suivante : (En USD)
Déc.
8 000 000,00
21,8%
7 000 000,00
19,0%
10 000 000,00
27,2%
11 750 000,00
32,0%
36 750 000,00 100,0%
Ressources
36 750 000,00
Virement/MEF
Emplois:
Acquisition de Tracteurs (incluant frais de transport)
Acquisition de véhicules
Acquisition autres équipements
Frais de voyage à l'étranger
Frais de visibilité
Frais bancaire
Dépenses réelles
Transfert de fonds/Cpte 111256950/Change en
gourde
Transfert de fonds/Cpte 121210946/Change en
gourde
Total dépenses réelles et transfert de fonds
Solde
6 882 202,70
1 781 205,20
2 841 492,93
17 321,24
10 000,00
17 619,50
11 549 841,57
25 000 000,00
199 950,00
-36 749 791,57
208,43
Source rapport du programme d'urgence 2008, Ministère de l'Agriculture.
Page 113 of 656
Les équipements suivants furent acquis et distribués :
Quantités
Matériels
Terex Light Tower Model
RL4000
Bus
Camion citerne
Backoe Losders
New Wheel Loaders
PRD Pipe Manufacturing
système
Metal Culvert machine
Buldozer
Moto grader
PKG generator set
Rotovator Agri
Charrue reversible
plow/model3635
Charrue reversible
plow/model3645
Nissan Patrol
Land Cruiser LWB
Land cruiser Pick up
Institutions
bénéficiaires
Achetées
Distribuées
Disponible
au MARNDR
8
4
2
2
2
8
2
2
2
2
0
2
0
0
0
CNE
ODVA
ODVA
ODVA
ODVA
1
20 tonnes
2
2
1
50
1
20 tonnes
1
2
1
5
0
0
1
0
0
45
CNE
CNE
ODVA
ODVA
ODVA
ODVA
30
8
22
ODVA
10
4
2
24
2
0
0
4
8
4
2
20
ODVA
ODVA
Source rapport du programme d'urgence 2008, Ministère de l'Agriculture :
Les 25,000,000.00 $ furent convertis en gourdes et affectés de la manière suivante :
Ressources
Virement/MEF (Cpte US #
111056947/(25,000,000 US en Gourdes)
Emplois:
Protection des berges et curage des rivières
Réhabilitation d'infrastructure agricole
Pistes agricoles
Correction de ravines
Acquisition de semences
Acquisition d'outils aratoires
Aviculture
Pêche et aquaculture
Elevage caprin
Elevage bovin
Sante animale
Frais de gestion du programme
1 001 917 000,00
110 640 250,00
159 210 000,00
16 500 000,00
237 510 000,00
111 305 740,00
106 509 000,00
27 102 238,40
9 000 504,00
28 300 000,00
11 962 000,00
6 162 840,00
51 425 283,05
Page 114 of 656
Autres activités
Taxes impayées
Dépenses réelles du MARNDR
Transf de fonds ODVA
Transt Cpte 121210946
Total
Solde en septembre 2009
19 372 234,00
-437 170,75
894 562 918,70
75 000 000,00
25 000 000,00
994 562 918,70
7 354 081,30
Source rapport du programme d'urgence 2008, Ministère de l'Agriculture :
Colusions de la CSCCA sur le projet de la relance agricole :
La CSCCA ne constate aucune faute de gestion, ni autres indices particuliers qui pourraient
engager les responsabilités civiles ou pénales des responsables de l‟Administration Centrale du
Ministère de l‟Agriculture dans la gestion du fonds de 36,750,000.00 $ dont le dit ministère en a
bénéficié dans le cadre du programme d‟urgence 2008. En effet, les dépenses réelles du ministère tant
en dollars américains pour une valeur de 11,549,841.67 $ USD et celles en gourdes pour un montant de
894,562,924,70 Gourdes sont complètement justifiées selon les normes constituant les fondements
légaux de la vérification. De même, aucune irrégularité n‟entache le volet de la vérification de
l‟inventaire des biens acquis et livres successivement au Ministère et à l‟ODVA.
Conclusion de la Comission
La Commission n‟a pu retenir aucun charge suffisante à propos de Madame Michele D. Pierre
Louis, premier ministre et Monsieur Daniel Dorsainvil, ex Ministre de l‟économie et des finances, car
au cours de leur audition des documents qu‟ils ont présentés et les arguments développés ont permis à
lever le voile sur l‟ensemble des opérations qu‟ils ont accomplis pendant leur mandat .Néanmoins
l‟analyse approfondie des dossiers soumis à l‟appréciation de la commission ont permis de déceler
quelques négligences administratives qui n‟ont pas d‟impact fondamental sur la totalité des opérations
qui les concernent. Ainsi, la commission estime qu‟à part ces anomalies dans les procédures qui
n‟affectent pas les leurs gestions, il n‟y a rien qui puisse les pousser à indexer les personnalités cidessus citées, d‟autant que la CSC/CA avait auditée la gestion de ce gouvernement et que ses
conclusions on été positives en leur faveur.
Page 115 of 656
XX
RÉSOLUTIONS DU
11 Février 2010
24 Août 2010
12 Mai 2010
Page 116 of 656
GOUVERNEMENT PREVAL –
BELLERIVE :(Novembre 2009 a mai 2011)
Page 117 of 656
Mise en Contexte
Le Premier Ministre Jean Max BELLERIVE est le troisième Premier Ministre à prendre
fonction depuis l‟élection de René Garcia Préval pour son deuxième mandat comme Président d‟Haïti.
Il arrive après les Premiers Ministres Jacques Edouard Alexis et Michelle Duvivier Pierre Louis dont les
termes ont pris respectivement fin le 5 septembre 2008 et le 30 octobre 2009.
Jean Max BELLERIVE est confirmé par le Parlement Haïtien comme Premier Ministre le 11
Novembre 2009. Il occupa à la fois le poste de Premier Ministre et de Ministre de la Planification et de
la Coopération Externe. Il défendra l‟extension de 3 mois dont le Président Préval et lui bénéficient,
repoussant leur départ au mois de mai 2011, au lieu de Février 2011.
Ensuite, Jean Max BELLERIVE demeurera comme Premier Ministre du nouveau Président
Michel Martelly jusqu‟au 18 Octobre 2011. Même après cette ultime date, avait continué de poursuivre
une vie politique discrète mais active devenant officiellement un des conseillers du Président Martelly.
Monsieurr BELLEIVE a occupé le poste de Chef de Cabinet du président provisoire de
Jocelerme PRIVERT durant la transition à la fin de mandat du président Joseph Michel Martelly.
Composition de l‟Administration PREVAL/BELLERIVE.
Il est composé des Ministres suivants :
Prénom
Nom
Fonction
Jean Max
BELLERIVE
1er Ministre et Ministre de la
Planification et de la Coopération
Externe
Mme. Marie Michèle
REY
Ministre affaires étrangères et cultes
Mr. Yves
CHRISTALLIN
Mr. Gerald
GERMAIN
Affaires sociales (Jusqu‟au 2 septembre
2010)
Affaires sociales Installéle 6 Septembre
2010
Agronome Joanas
GUE
Agriculture et ressources naturelles
Mme. Jocelyne Colimon
FETHIERE
Commerce industrie
Mme. Marjorie
MICHEL
Condition Féminine
Mme. Marie Laurence
JOCELYNE
Communication et culture
Mr. Ronald
BAUDIN
Economie et finances
Mr. Joël Desrosiers
JEAN PIERRE
Education National
Page 118 of 656
Mr. Jean-Marie
GERMAIN
Environnement
R.P Edwin
PARAISON
Haïtien vivant a l‟étranger
Mr. Paul Antoine
BIEN-AIME
Intérieur et Collectivités Territoriales
Mr. Evans
LESCOUFLAIR
Jeunesse et sports
Mr. Paul
DENIS
Justice et sécurité Nationale
Mr. Alex
LARSEN
Sante publique et population
Mr. Patrick
DELATOUR
Tourisme
Mr. Jacques
GABRIEL
Travaux publics, transport et
communication
Ministre Titulaire
Mr. Jasmin
JOSEPH
Bureau du ministre Délégué auprès du
premier Ministre Charge des relations
avec le parlement (BMCRP)
Remarque:
Les dix premiers participants à l‟ancien gouvernement Pierre-Louis sont reconduits. Monsieur Jean
Max BELLERIVE, Premier Ministre et en même temps, Ministre de la Planification va être le témoin
de la plus grande catastrophe qu‟a connu le pays depuis son indépendance en 1804, celle du
tremblement
de
terre
du
12
janvier
2010.
Il était 16h53, le 12 janvier 2010, quand une secousse de magnitude 7 sur l‟échelle de Richter a
semé le chaos en Haïti.
Retour sur ces évènements tragiques :
Une magnitude extrêmement forte et un épicentre à la fois très proche de la capitale et très près de la
surface de la terre, toutes les conditions étaient réunies pour une catastrophe de grande ampleur.
Page 119 of 656
Le bilan
Lors d‟une réunion avec des dirigeants des pays d‟Amérique latine et des Caraïbes, le président René
Préval a déclaré que :
« Le bilan du séisme qui a frappé le pays le 12 janvier pourrait s‟établir à 300,000 morts. Plus de
200,000 cadavres ont été récupérés dans les rues, sans compter ceux qui se trouvent toujours sous les
décombres. Le séisme a détruit plus de 250,000 habitations et laissé 1,5 millions de personne sans abris
à Port-au-Prince ».
Alors que de nombreuses habitations modestes se sont effondrées, d‟autres édifices gouvernementaux
de construction plus solide sont également détruits , comme le Palais national, le ministère des
Finances, le ministère des Travaux publics, le ministère de la Communication et de la Culture, le
ministère de l‟intérieur, le Parlement , le Palais de justice, l‟École normale supérieure, l‟École
Nationale des Infirmières, l‟Université de l‟Agence universitaire de la Francophonie (AUF), la prison
centrale et la Direction générale des impôts. Le siège de la Mission des Nations unies pour la
stabilisation en Haïti est également en partie détruit ;. Le plus grand hôtel de la ville, l‟Hôtel Montana, a
également été demoli par le séisme.
La facture très lourde pour le pays :
Le tremblement de terre qui a frappé Haïti pourrait être la catastrophe naturelle la plus meurtrière de
l‟histoire moderne. Le tsunami qui avait touché l‟océan indien en 2004 avait fait plus de 200 000 morts,
Les dégâts provoqués par le séisme de magnitude 7 sur l‟échelle de Richeter sont évalués à 14 milliards
de dollars, selon une estimation de la Banque interaméricaine de développement.
Les réponses du gouvernement :
Le gouvernement haïtien, totalement dépassé par l‟ampleur de la catastrophe
L‟administration publique haïtienne étant la première des victimes avec l‟effondrement de la plupart des
édifices publiques, dont le Palais National, le Ministère de l‟Intérieure, etc.., ce qui réduit presqu‟à
néant la capacité d‟intervention du gouvernement dans les heures qui ont suivi le tremblement de terre.
Le gouvernement haïtien sollicite l‟aide internationale.
Bien avant le séisme du 12 janvier 2010, Haïti dépendait majoritairement de l‟aide internationale pour
financer les projets et programmes du gouvernement ainsi que son budget. L‟aide des bailleurs
bilatéraux et multilatéraux représentait une ressource beaucoup plus importante que les recettes internes
de l‟Etat.
Avec le tremblement de terre, cette situation s‟est largement aggravée.
Pour faire face à la situation critique post-seisme, l‟aide internationale apportée à Haïti s‟est divisée en
deux catégories : l‟aide d‟urgence, concentrée sur les efforts de secours humanitaire, et l‟aide à la
reconstruction, destinée à financer la reconstruction et le développement à long terme.
Cependant, de même que l‟aide octroyée à Haïti avant le tremblement de terre, la majorité de cette
assistance a contourné les structures de l‟Etat haïtien pour aboutir directement aux mains de
Page 120 of 656
contractants privés, des Organisations Non Gouvernementales (ONG), les agences bilatérales et
multilatérales, et d‟autres instances non étatiques.
Seulement 1% de l‟aide d‟urgence a été fourni au gouvernement d‟Haïti et en ce qui a trait à l‟aide à la
reconstruction, les bailleurs bilatéraux ont décaissé 7% et les bailleurs multilatéraux 23% en faveur du
gouvernement en utilisant des systèmes nationaux.
Lancement de la CIRH
La Commission Intérimaire pour la Reconstruction d'Haïti (CIRH) a été créée au lendemain du
séisme, à la faveur de la Loi sur l'Etat d'Urgence du 19 avril 2010. Selon l‟article 14 de cette dite loi, la
CIRH doit « mettre en œuvre le plan de développement d‟Haïti soumis par le gouvernement. » et
« donne son approbation à des propositions de projets évalués en fonction de leur conformité à ce
plan ». En outre, elle « élabore et sollicite des projets » et « décide de la recevabilité des soumissions
externes ».
Elle est composée de vingt neuf (29) membres dont treize (13) étrangers et est créée pour une durée de
dix-huit (18) mois.
Création du Cadre de Coopération de l'Aide Externe au Développement (CAED)
Le 26 novembre 2012, le gouvernement MARTELLY - LAMOTHE a procédé à la création du
Cadre de Coopération de l'Aide Externe au Développement (CAED) intégré au Ministère de la
Planification et de la Coopération Externes chargée de gérer les fonds promis par la communauté
internationale. Cette structure est supposée remplacer la CIRH.
Le gouvernement entame la reconstruction grâce à PETRO CARIBE
Face à « la fatigue » et aux difficultés financières des bailleurs de fonds traditionnels d‟Haïti,
le Venezuela est devenu ces dernières années l‟un de ses principaux donateurs par le biais de son
programme PETRO CARIBE, de fourniture, de produits pétroliers à des conditions
préférentielles.
L‟Etat d‟urgence décrété le 16 janvier et renouvelé le 31 janvier 2010.
Face à l‟ampleur des dégâts, le Gouvernement a décrété successivement l‟Etat d‟urgence en date du 16
janvier 2010 sur toute l‟étendue du territoire national pour une période 15 jours et renouvelé le 31
janvier 2010 en vue de répondre à l‟urgence immédiate permettant d‟apporter secours à la population en
grande difficulté, sauver les vies qui peuvent être sauvées et faciliter la reprise des activités. Ces arrêtés
décrétant l‟état d‟urgence sont inspirés de la loi d‟urgence de 2008.
La loi d‟urgence du 15 avril 2010
Vu l‟ampleur des travaux de reconstruction, des immeubles effondrés à démolir, des tonnes de débris à
transporter et des immeubles à reconstruire, les deux périodes de 15 jours autorisées par la loi d‟urgence
de 2008 ne suffisaient pas. Le gouvernement a dû faire appel au Parlement pour une extension plus
longue. C‟est ainsi que le 15 avril 2010, le Parlement haïtien a voté une nouvelle loi d‟urgence
abrogeant celle du 10 septembre 2008. Cette loi accorde une extension de 18 mois en référence à son
article 16 :
Page 121 of 656
« En référence à l‟article 5 de la présente Loi, les autorités centrales sont autorisées à prolonger l‟Etat
d‟Urgence déclaré sur toute l‟étendue du territoire national le 16 janvier 2010 et renouvelé le 31 janvier
2010 pour une période ne dépassant pas dix-huit (18) mois ».
L‟article 7.5 permet d‟appliquer les procédures célères :
Pendant l‟Etat d‟urgence, le gouvernement est habilité à : « Passer les contrats qu‟il juge nécessaire
selon les procédures célères prévues par la réglementation des marchés publics »
Irrégularités constatées :
a) La loi d‟urgence d‟avril 2010 est en contradiction avec la loi du 10 juin 2009 sur les
marchés publics dans ses articles 34.1 et 34.2.
La loi d‟urgence d‟avril 2010, dans son article 16 (disposition transitoire) valide les arrêtés du
Gouvernement déclarant l‟Etat d‟urgence sur toute l‟étendue du territoire. Cette loi est en contradiction
avec la loi du 10 juin 2009 sur les procédures célères qui détermine les conditions dans lesquelles des
marchés peuvent être traités par cette façon.
L‟article 34.1 et 34.2 écartent toute possibilité d‟intégrer un projet dans une zone non touchée par le
séisme :
Art 34-1 Le marché est passé de gré à gré ou par entente directe: … dans les cas d’urgence due à des
circonstances imprévisibles ou de force majeure ne permettant pas de respecter les délais prévus
dans la procédure d’appel d’offres;
Art 34.2 En aucun cas, l’autorité contractante ne peut invoquer l’urgence… dans le but de se
dérober à son obligation de recourir à la concurrence »
Conclusion
Après deux fautes successives des parlementaires, la Commission est en droit de poser ces questions :
Était-ce une erreur matérielle des Parlementaires de se référer au décret du 3 décembre 2004
plutôt que la loi du 10 juin 2009 ?
Pourquoi valider la démarche du gouvernement à vouloir décréter l‟état d‟urgence sur toute
l‟étendue du territoire ?
Les Résolutions :
Le Gouvernement PREVAL-BELLERIVE a signé trois (3) résolutions pour un montant initial global de
USD 365,504,364.34 (45 projets). Toute fois, après désaffectation de $ USD 16,502,970.56 et un (1)
projet, le montant global révisé est de $ USD 349,001,393.78 pour 44 projets.
Page 122 of 656
Il s‟agit des résolutions suivantes :
DATE
MONTANT
DECAISSEMENT
PROJETS
RESTANTS
INITIAL
DESAFF.
REVISÉ
$
%
14
163 103 048,00
5 383 151,82
157 719 896,18
157 719 896,18
100%
102 684 804,90
8 327 143,44
94 357 661,46
94 357 661,46
100%
99 716 511,44
365 504 364,34
2 792 675,30
16 502 970,56
96 923 836,14
349 001 393,78
96 923 836,14
349 001 393,78
100%
100%
11 fév.2010
24 août
2010
12 mai
2011
TOTAL
13
17
44
Ces résolutions sont prises sous l‟égide de la loi d‟urgence 2010 visant en priorité la reconstruction
des infrastructures affectées par le séisme du 12 janvier 2010.
Les arrêtés décrétant l‟Etat d‟urgence donnent au gouvernement la possibilité de mobiliser les fonds
publics, notamment le fonds PetroCaribe, permettant d‟identifier les projets, de signer des contrats de
gré à gré ou appel d‟offres restreint.
Décaissement
Le taux décaissement des projets de ces trois résolutions est de 100%.
Répartition des projets par secteur d‟activité :
SECTEURS
ACQ D'EQUIPEMENT
EAU & ASSAINISSEMENT
EDIFICE PUBLIC
EDUCATION
ENERGIE
GESTION PUBLIQUE
HABITAT
INFRASTRUCTURE ROUTIERE
MARCHE
RENOVATION URBAINE
SANTE
SPORT
TOTAL
PROJETS
3
2
2
1
1
1
2
24
2
4
1
1
44
MONTANT
REVISÉ
6 554 000,00
20 750 000,00
17 500 000,00
2 032 352,77
6 469 050,00
3 000 000,00
33 561 905,00
225 564 418,00
3 700 000,00
22 169 668,00
3 200 000,00
4 500 000,00
349 001 393,77
%
2%
6%
5%
1%
2%
1%
10%
65%
1%
6%
1%
1%
100%
Page 123 of 656
Les infrastructures routières ont eu le pactole avec 225.5 millions de dollars (65%) de l‟enveloppe
globale contre 10% alloué à la construction de logements sociaux et seulement 5% à la reconstruction
des édifices publiques.
Répartition des projets par zone géographique :
REGION
MONTANT
REVISES
58 235 637,29
11 791 952,25
1 500 000,00
15 926 450,00
21 831 472,00
37 025 927,44
13 715 991,94
20 483 189,60
146 390 773,25
20 400 000,00
1 700 000,00
349 001 393,77
PROJETS
Artibonite
Centre
Grand Anse
National
Nippes
Nord
Nord est
Nord'Ouest
Ouest
SUD
Sud Est
Total
4
3
1
4
1
5
5
1
17
2
1
44
%
17%
3%
0.4%
5%
6%
11%
4%
6%
42%
6%
0.5%
100%
TABLEAUX RECAPUTULATIFS ET FICHES SIGNALETIQUES DES
PROJETS PAR RESOLUTION
Résolution du 11 Février 2010
Institutions
Nature du Projet
Localité
Montant
du
Projet
Montant
décaissé
No
Déc.
Montant à
décaisser
UEH
Renforcement de l'Université d'Etat
d'Haïti
2,958,333
Renforcement de l'Université d'Etat d'Haïti
Ouest
569,476
525
Renforcement de l'Université d'Etat d'Haïti
Ouest
433,452
120
Renforcement de l'Université d'Etat d'Haïti
Ouest
6,422
139
Renforcement de l'Université d'Etat d'Haïti
Ouest
39,396
553
Renforcement de l'Université d'Etat d'Haïti
Ouest
983,607
834
Total
MSPP
2,958,333
Total
925,980
3,223,885
Réhabilitation de l'hopital de l'UEH
Réhabilitation de l'hopital de l'UEH
2,032,353
Ouest
3,200,000
3,223,885
3,200,000
177-1
23,885
Page 124 of 656
MPCE
Hébergement Post Tremblement de
Terre du 12 Janvier 2010
11,561,905
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
2,750,000
109
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
5,000,000
40
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
588,556
244
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
802,780
280
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
352,829
295
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
270,500
57
Hébergement Post Tremblement de Terre
du 12 Janvier 2010
National
1,797,240
198
Sous total
11,561,905
-
11,561,905
Réhabilitation Urbaine à Lascahobas et à
Mirebalais
Réhabilitation Urbaine à Lascahobas et à
Mirebalais
Réhabilitation Urbaine à Lascahobas et à
Mirebalais
3,279,452
Centre
1,361,805
49
Centre
1,917,647
194
Sous total
3,279,452
3,279,452
-
14,841,357
-
Total
14,841,357
MEF
3,600,000
Acquisition de cent véhicules tout terrain
3,600,000
Total
LNBTP
3,600,000
Acquisition d'équipement
51
3,600,000
-
787,000
Acquisition d'équipement pour le
laboratoire national du batiment et des
travaux publics (LNBTP)
?
749,417
65
Acquisition d'équipement pour le
laboratoire national du batiment et des
travaux publics (LNBTP)
?
37,583
90
Total
787,000
787,000
-
CNE
Acquisition d'équipement
8,426,450
Acquisition d'équipement pour le Centre
National des équipements
2,167,000
Acquisition d'équipement pour le Centre
National des équipements
Ouest
173,700
48
Page 125 of 656
Acquisition d'équipement pour le Centre
National des équipements (CNE-MTPCT)trois fardiers (loboy), 3 camions (tracteur),3
concasseuses
Ouest
1,003,900
166
Acquisition d'équipement pour le Centre
National des équipements
Ouest
92,400
74
Acquisition d'équipement pour le Centre
National des équipements
Ouest
128,100
78
Acquisition d'équipement pour le Centre
National des équipements
Ouest
184,800
66-1
Acquisition d'équipement pour le Centre
National des équipements
Ouest
584,100
45
Sous total
2,167,000
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
2,167,000
6,259,450
Ouest
220,168
75
Ouest
2,495,782
47
Ouest
173,460
117
Ouest
10,310
582
Ouest
182,190
43
Ouest
897,000
44
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Ouest
490,000
52
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Ouest
208,110
59
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Ouest
217,000
61
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Ouest
727,363
66-1
Ouest
305,568
77
Ouest
86,000
217
Ouest
246,500
342
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Acquisition d'équipement pour le Service
d'Entretien des équipements urbains
(SEEUR-MTPTC)
Sous total
6,259,450
6,259,450
-
8,426,450
8,426,450
-
Total
MTPTC
129,266,023
Page 126 of 656
22,101,938
Construction de 15 Ponts
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
107,847
292
2,312,391
36
70,074
41
706,216
42
560,927
46
12,445
54
626,900
64
529,295
79
224,371
80
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
330,585
92
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
250,000
97
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
269,323
98
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
606,750
110
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
687,136
113
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
266,910
115
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
299,073
121
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
44,659
125
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
297,238
131
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
44,474
132
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
3,350
137
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Page 127 of 656
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
297,308
153
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
509,600
156
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
86,518
159
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
779,060
173
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
201,612
175
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
47,366
176
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
416,845
178
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
460,191
180
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
263,366
184
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
35,679
195
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
345,800
200
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
6,633
203
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
259,164
205
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
809,374
210
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
753,538
215
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
31,694
221
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
133,876
225
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
35,036
228
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
252,438
229
Page 128 of 656
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
250,546
233
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
157,265
248
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
429,728
250
578,684
254
443,650
260
156,725
271
57,035
273
447,803
289
49,549
305
559,030
307
207,992
340
254,614
341
503,625
344
722,332
437
70,116
450
161,330
471
156,725
496
42,870
504
288,204
512
84,005
513
118,588
542
176,554
544
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Page 129 of 656
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Construction de 15 Ponts dans le NordOuest
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
Carrefour
Joffre/Portde-Paix
109,682
599
109,460
647
169,890
143
3,317
165
26,284
94
124,688
107
47,841
188
Sous total
22,101,938
MTPTC
Rehabilitation du Tronçon
Frecyneau/Saint-Marc/Bigot (Gonaïves)
Rehabilitation du Tronçon de RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
20,483,190
1,618,748
41,542,397
Frecyneau/
SaintMarc/
Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
10,290,529
37
722,048
53
3,609,438
58
125,157
63
2,592,320
70
1,198,818
83
191,551
89
1,433,409
93
87,280
101
133,009
111
2,579,971
116
Page 130 of 656
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Réhabilitation Tronçon RN1
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
1,093,153
122
192,683
124
170,575
130
2,477,482
138
46,683
146
114,141
147
2,125,221
152
189,639
160
1,243,708
174
1,280,015
182
293,832
187
132,032
196
1,773,260
218
1,808,879
223
1,122,578
236
4,137,208
104-2
248,756
123
Page 131 of 656
Réhabilitation Tronçon RN1
Frecyneau/
SaintMarc/Bigot
(Gonaïves)
Sous total
MTPTC
129,025
41,542,397
Réhabilitation de la route MiragoanePetite Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
114-1
41,542,397
-
21,831,472.0
0
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
5,566,294
38
2,114
67
524,190
68
717,460
69
21,981
73
55,981
76
379,632
88
Petite
Rivière de
Nippes
Petite
Rivière de
Nippes
99,572
99
573,279
108
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Petite
Rivière de
Nippes
913,630
112
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Petite
Rivière de
Nippes
2,871,315
118
Petite
Rivière de
Nippes
48,331
126
Petite
Rivière de
Nippes
44,621
128
Petite
Rivière de
Nippes
1,355,479
136
Petite
Rivière de
Nippes
59,991
142
Petite
Rivière de
Nippes
1,184,688
145
Petite
Rivière de
Nippes
112,410
155
Petite
Rivière de
Nippes
1,764,009
170
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Rehabilitation de la route Miragoane-petite
Riviere de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Page 132 of 656
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Réhabilitation de la route Miragoane-Petite
Rivière de Nippes
Rehabilitaton de la route Miragoane - Petite
Riviere de Nippes
Petite
Rivière de
Nippes
97,690
181
Petite
Rivière de
Nippes
112,410
185
Petite
Rivière de
Nippes
94,410
186
Petite
Rivière de
Nippes
1,518,109
204
Petite
Rivière de
Nippes
82,450
216
Petite
Rivière de
Nippes
1,559,816
220
Petite
Rivière de
Nippes
82,750
226
Petite
Rivière de
Nippes
106,750
230
Petite
Rivière de
Nippes
1,501,586
251
Petite
Rivière de
Nippes
64,350
290
Petite
Rivière de
Nippes
66,980
343
Petite
Rivière de
Nippes
82,750
345
Petite
Rivière de
Nippes
166,444
384
Sous Total
MTPTC
21,831,472
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Rehabilitation de Rues au Cap Haitien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
21,831,472
-
7,390,216.00
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
CapHaitien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
367,124
62
207,117
72
283,518
82
7,028
400
325,986
56
474,743
103
304,564
127
430,134
141
321,681
162
Page 133 of 656
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Réhabilitation de Rues au Cap Haïtien
Rehabilitation des rues du Cap Haitien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
Cap
Haïtien
Sous total
MTPTC
7,390,216.00
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
Sous total
MTPTC
Meyotte à
la route de
Frères
747,342
193
544,878
211
706,338
237
227,912
303
1,396,021
39
7,390,216
-
2,220,000
50
4,380,119
55
6,857,960
157
82,500
274
968,130
279
992,459
336
220,273
361
243,750
416
2,000,000
750
431,577
96
Meyotte à
la route de
Frères
81,250
371
Meyotte à
la route de
Frères
1,271,101
376
Meyotte à
la route de
Frères
636,344
764
Meyotte à
la route de
Frères
300,000
148
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
Meyotte à
la route de
Frères
23,500,000
Réhabilitation du Tronçon de Route
Carrefour Kanz/ Camp Perrin
164
23,500,000.0
0
Réhabilitation du Tronçon FematheFrères
Réhabilitation du Tronçon Femathe-Frères
Via Soisson……
1,045,830
20,685,462
2,814,538
12,900,000.0
0
Page 134 of 656
Réhabilitation du Tronçon de Route
Réhabilitation du Tronçon de Route
Carrefour
Kanz/Camp
Perrin
Carrefour
Kanz/Camp
Perrin
2,236,194
35
3,544,237
149
Réhabilitation du troncon de route
:Carrefour Kanz/ camp perrin
Carrefour
Kanz/Camp
Perrin
2,875,869
201
Réhabilitation du Tronçon de Route
Carrefour
Kanz/Camp
Perrin
3,924,671
60
Carrefour
Kanz/Camp
Perrin
319,029
374
Réhabilitation du Tronçon de Route
Sous total
12,900,000
12,900,000
-
Total
129,266,023
124,832,736
4,433,286
TOTAL
163,103,048
157,719,896
5,383,151
Page 135 of 656
Revue de passation des marchés
Résolution du : 11 février 2010
No
Maitre
d'œuvre
Maitre
d'ouvrage
1
V&F
S.A.
MTPTC
2
Ingenieria
ESTRELLA
MTPTC
3
Groupe des
Travaux de
Construction
MPCE
Description
des
travaux
Contrat d'exécution
des travaux de la route
Miragoane/ Petite
Rivière de Nippes
Réhabilitation du
tronçon carrefour
Freycineau/St-Marc,
Bigot/Gonaives
Travaux de rénovation
du tronçon
Fermathe/Frères
Contrat
Appel d'offres
Date
de
signature
Montant
3/02/10
8/08/12
Non daté
27, 831,472.26 US (C)
3, 286, 014.97 US (Av. 1)
1, 000,000 US (Av. 2)
Gonaives
N/A
… 2010
Fort Jacques
…
décembre
2012
Localité
Miragoane
Gré
à
gré
Restreint
Ouvert
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Oui
Non
Non
Oui
51, 452,645.35 US
Oui
Non
Non
Oui
47, 612,854.00 US
Oui
Oui
Non
Oui
Page 136 of 656
Revue de la gestion des contrats
Résolution du : 11 Février 2010
Maitre
d'œuvre
Maitre
d'ouvrage
Description
des
travaux
1
V&F
Construction
S.A.
MTPTC
Exécution des travaux
route Miragoane/Petite
rivière de Nippes
2
Ingenieria
ESTRELLA
3
Groupe des
Travaux de
Construction
No
Contrat
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
5, 566,294.45
US
# Ord 38
Non constaté
Non
Non
36 mois
21, 831,472.00
US
51, 452,645.35 US
10,
290,529.07
US
Non constaté
N/A
189,970.
45 us
12 mois
41, 542,397.00
US
47, 612,854 US
N/A
Non constaté
N/A
N/A
42 mois
21,002,462
Date
de
signature
Montant
3/02/10
8/08/12
Non daté
27, 831,472.26 US (C)
3, 286, 014.97 US (Av. 1)
1, 000,000 US (Av. 2)
MTPTC
Réhabilitation du
tronçon carrefour
Freycineau/ StMarc/Bigot/ Gonaïves
N/A
….2010
MPCE
Travaux de rénovation
du tronçon
Fermathe/Frères
… Décembre
2012
Avance
de
démarrage
Page 137 of 656
FICHES SIGNALETIQUES DE CONTRATS, ANALYSES ET COMMENTAIRES
TRANSITOIRES
La Résolution du 11 Février 2010 comprend quatorze (14)
Projets. De ce nombre,
quatre (4)Contrats de travaux ont été reçus des institution bénéficiaires et ont été retenus aux
fins d‟analyse en tenant compte des critères précédemment énoncés.
1-Exécution des travaux de réhabilitation de la route Miragoâne/ Petite Rivière de Nippes(23 km)
Maître d‟ouvrage :
MTPTC
Description des travaux : Exécution des travaux de réhabilitation de la route Miragoâne/ Petite
Rivière de Nippes
Localité
Miragoâne
Maitre d‟œuvre V&F Construction S.A
Montant du contrat $32, 117,487.23 US (Incluant avenant # 1 et # 2)
Date de signature du contrat
3 Février 2010
Durée des travaux 36 Mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Patente, Quitus, Matricule fiscal
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
NA
Retenue de bonne exécution
Prélèvement des 2%
NA
N/A
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
30 mai 2013
Page 138 of 656
Montant total versé au maitre d‟œuvre
U.S 21, 831,472.00
Commentaires :
Quant à ce contrat ayant pour description : « Exécution des travaux de réhabilitation de la route
Miragoane/Petite Rivière de Nippes ». Le montant alloué en US dans la Résolution est le suivant :
-
Résolution 11février 2010 est de
21,831,472
Total
21,831,472
Le décaissement se répartit ainsi :
-
Résolution 11février 2010 est de us
21,831,472
Total
21,831,472
Passé Gré à Gré, sans non plus le certificat de non objection de la CNMP. Ce Contrat est signé le 3
février 2010 pour un
montant de US 27,831,427 auquel s‟ajoutent deux (2)
autres montants
provenant de deux (2) avenants, le premier pour un montant de U.S 3,286,015 et le second pour un
montant de U.S 1,000,000 ce qui a porté le montant du Contrat lié au Projet de réhabilitation de la
route de Miragoane/Petite Rivière de Nippes à U.S 32,117,486.
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs constatant un état
d‟avancement des travaux de 80% relaté au tableau « Résumé des évaluations physiques des travaux
#16 page … Le montant total décaissé est de US 21,831,472 représentant 67,97 % des travaux . Le
coût d‟un Km figurant dans ce contrat est estimé à US 1,221,064 tandis que, pour la même période le
coût d‟un Kilomètre d‟une autre firme, évoluant dans le même secteur d‟activité dont les specifités
des travaux sont similaires degagés le cout d‟un km à 952,827. Les travaux de réhabilitation de la
route Freycineau /St Marc-Bigot /Gonaives en est un exemple d‟où un écart positif de US 268,237 par
Km. La Commission a donc déduit qu‟il y a eu à ce niveau une surfacturation et que les travaux ont
été volontairement et à dessein surestimés .
La durée des travaux était de trente-six (36) mois, ils furent achevés le 30 mai 2016. Toutefois, nous
n‟avons pas eu les procès-verbaux de reception provisoire ainsi que ceux de de réception définitive
Quant au matricule fiscal retracé dans le dossier, il a été émis le 13 janvier 2011 et le quitus
fiscal le 11 janvier 2013, alors que le contrat fut signé le 3 février 2010. Ce qui doit encore être
souligné comme une anomalie grave
susceptible d‟être considérée comme étant un acte
Page 139 of 656
volontaire de tromper et de passer outre les exigences de la procédure prévue en la matière.
Les 2% à prélever pour le compte de la DGI n‟ont pas été effectués.
Pour l‟avenant No1 :
-
-Jacques Rousseu ,Ing Ministre des TPTC
-
Jean-Marie VORBE ,Ing PDG de V&F Construction S.A
-
Marie Carmelle Jean Marie ,Ministre de l‟économie et des finances
Pour l‟avenant No2_
-
-Jacques Rousseu ,Ing Ministre des TPTC
-
Jean-Marie VORBE ,Ing PDG de V&F Construction S.A
-
Marie Carmelle Jean Marie ,Ministre de l‟économie et des finances
-
Nonie H. Mathieu ,Président de la CSC/CA
Page 140 of 656
2-Réhabilitation du tronçon carrefour Freycineau/Saint-Marc, Bigot/Gonaïves(54km)
Maitre d‟ouvrage : MTPTC
Description des travaux :
Réhabilitation du tronçon carrefour Freycineau/Saint-Marc,
Bigot/Gonaïves,Carrefour Joffre
Localité : Gonaïves
Maître d‟œuvre : Ingenieria ESTRELLA
Montant du contrat : U.S 51, 452,645.53
Date de signature du contrat : N/A
Durée des travaux
: 12 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : non signé
Non objection du CNMP : non signé
Documents d‟éligibilités fournis : Quitus, patente, matricule fiscale
Avance de démarrage:
20 %;
10, 240, 529.07 US; #37
Retenue de garantie : NA
Retenue de bonne exécution
: NA
Prélèvement des 2% : Non prélevé
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux : N/A
Page 141 of 656
Commentaires :
Quant
à
ce
contrat :
«Réhabilitation
du
tronçon
Carrefour
Freycineau/Saint
Marc,
Bigot/Gonaives », le montant alloué à ce Projet dans la Résolution est de U.S 41, 542,397. Il fut signé
entre l‟État Haïtien représenté par Jacques GABRIEL Ministre des TPTC, et Ronald BAUDIN Ministre
de l‟Économie et des Finances(MEF) et le Mandataire du Groupement Ingenieria Estrella et EATT,Jose
Alejandro ADAMES. Ce Contrat ne comporte pas de date de signature et se chiffre à U.S
51,452,645, mais dans l‟exécution des travaux additionnels, une date a été relaté faisant mention de la
date de signature du contrat, soit 28/01/10. Ce qui a amène la commission à conclure qu‟il y a au sujet
de ce dossier une volonté manifeste de tromper l‟attention et d‟user d‟un subterfuge pour l‟addition d‟un
montant devant servir à d‟autres fins que celles de l‟exécution du contrat .
Le montant total décaissé s‟élève donc à U.S 66,115,884.
Ayant pour description « Réhabilitation du tronçon », les montants alloués en US sont les suivants :
-
Résolution 11 février 2010 est de
41,542,397
-
Résolution 24 août 2010 est de
14,000,000
-
Résolution 28 février 2012 est de
19,750,000
-
Résolution 28 février 2012 est de
7,450,000 (Travaux additionnels)
Total
82,742,397
Les décaissements se répartissent ainsi en US :
-
Résolution 11 février 2010 est de
41,542,397
-
Résolution 24 août 2010 est de
6,902,286
-
Résolution 28 février 2012 est de
17,671,201
-
Résolution 28 février 2012 est de
7,074,815 (Travaux additionnels)
Total
73,190,699
Ce contrat initial fut l‟objet d‟un avenant pour des travaux additionnels apparaissant dans la Résolution
du 28 février 2012, d‟un montant de U.S 7,450,000 . Ce contrat est donc traité pour des travaux
additionnels dans la catégorie des contrats pris comme échantillon dans la Résolution du 12 mai 2011.
Ainsi, ce montant pour des travaux additionnels porte le coût de ce projet à US 73,190,699.
Page 142 of 656
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs constatant l‟état des travaux
et est chiffré à 68.66 %, relaté au tableau « Résumé des évaluations physiques des tableaux #28 page….
Le montant est de 73,190,699 représentant 124.66 % des travaux. Le coût d‟un kilomètre figurant dans
le contrat initial est estimé à US 952,827 . Cela signifie qu‟au moment de la signature du contrat il y
avait une sur évaluation du montant prévu et qu‟ainsi la firme ait pu exécuter les travaux avec le montant
avance sur le contrat.
Page 143 of 656
3-Travaux de rénovation du tronçon Fermathe/Frères(26.5 km)
Maitre d‟ouvrage : MPCE
Description des travaux : Travaux de rénovation du tronçon Fermathe/Frères
Localité
Fort Jacques
Maitre d‟œuvre Groupe de travaux et de construction (GTC)
Montant du contratUS 47, 612,854
Date de signature du contrat
Durée des travaux
Appel d‟offres
Non daté (Décembre 2012)
42 Mois
Gré à gré
Approbation de la CSC/CA Oui
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Avance de démarrage:
N/A;
N/A;
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui
Retenue de bonne exécution Non
Prélèvement des 2%
Oui
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre
Commentaires :
Ayant pour description : « Travaux de rénovation du tronçon Fermathe/Frères », les
montants alloués en US dans les Résolutions sont les suivants :
-
Résolution 11 Février 2010 est de
23,500,000
-
Résolution 12 Mai 2011 est de
2,000,000
-
Résolution du 22 Juillet 2015 est de
1,680,000
Total
27,180,000
Les décaissements se repartissent ainsi en US :
Page 144 of 656
-
Résolution 11 Février 2010 est de
20,685,461
-
Résolution 12 Mai 2011 est de
317,000
Total
21,002,461
Passé Gré à Gré et signé entre l‟Ẻtat Haïtien et la firme GTC pour un montant de US
47,612,854, ce contrat qui ne comporte pas de date signature , le mois de décembre
2012 pourtant est mentionné et a obtenu étrangement l‟approbation de la Présidente de la
Cour Supérieure des Compte et du Contentieux Administratif (CSC/CA) en la personne
de Nonie Mathieu.
Le montant total décaissé est de US 21,002,961.81 représentant 44.11 % du coût
des travaux.
Le coût d‟un kilomètre figurant dans ce contrat est estimé à US
1,796,711.47, tandis que, le coût d‟un kilomètre pour une autre firme, évoluant dans le
même secteur d‟activité durant le mệme période, exécutant des travaux Petite-Rivière de
Nippes/Petit Trou est estimé à US 995,153 d‟où un écart positif de US 801,558.47 par
Km. Il est evident qu‟il a eu surfacturation au profit de tiers vu que l‟ecart constaté. De
plus Il n‟a pas eu le certificat de non objection du CNMP.
Pour les prélèvements des 2% pour le compte de la DGI, ils ont été effectues.
Cependant , aucun documentne prouve qu‟ils ont été versés.
Les personnalités signataires sont :
-
Laurent LAMOTHE , Ministre MPCE
-
Yvon COLES, Diresteur Général de la firme GTC
Conclusion
L‟analyse de l‟ échantillon a soulèver à l‟attention de la Commission les anaoamlies
suivantes:
-
Les ressources allouées à l‟exécution des travaux à travers les différentes
Résolutions ne sont guères respectées. Or, selon les principes et les règles de l‟art,
tout Projet de construction est assujétti à une étude préalable de faisabilité
permettant ainsi de déterminer son coût, sa durée d‟exécution et les qualifications
à exiger des soumissionnaires adjudicataires. Un Projet bien étudié ne devrait pas
Page 145 of 656
avoir d‟avenant sauf pour les travaux additionnels.
-
Des avenants aux contrats entrainent des augmentations du coût initial de 15% à
30%.
-
Des contrats sont signés et approuvés par la CSC/CA et les Autorités Haïtiennes,
alors qu‟ils ne comportent pas de date de signature.
-
Des documents requis au contrat ne concordent pas à l‟exercice au cours duquel
le contrat a été signé.
L‟analyse de ces quatre (4) contrats puisés de ce lot de quatorze (14) nous a
permis de constater des anomalies graves qui requièrent qu‟un audit exhautif des
contrats financés et exécutés à travers cette Résolution du 11 février 2010 soit effectué
dans le meilleur délai et, que des directives soient prises, afin que les Maîtres
d‟Ouvrage puissent fournir, tous les documents requis pour la réalisation d‟une telle
mission. .
Ces faits tels qu‟ils sont etablis demontrent que le l‟Ex Ministre
Jacques
GABRIEL n‟a pas agi avec le professionnalisme et le serieux que lui commandait la
defense des interets de la republique. Ce rapport vient confirmer les conclusions du
premier qui avait indexe Monsieur GABRIEL et reccommandé que l‟action publique
soit mis en mouvement contre le citoyen Jacques GABRIEL pour concussion,
forfairure et detournement de fonds publics.
Page 146 of 656
XXI Résolution du 24 août 2010
Page 147 of 656
Page 148 of 656
Résolution du 24 Août 2010:
C‟est la deuxième Résolution prise sous l‟Administration PREVAL/BELLERIVE après celle
du 11 février 2010.
Le Gouvernement dirigé par le Premier Ministre Jean-Max Joseph BELLERIVE était ainsi
composé :
Prénom
Mme. Marie Michèle
Mr. Yves
Nom
REY
CHRISTALLIN
Mr. Gerald
GERMAIN
Agronome Joanas
Mme. Jocelyne Colimon
Mme. Marjorie
Mme. Marie Laurence
Mr. Ronald
Mr. Joël Desrosiers
Mr. Jean-Marie
R.P Edwin
Mr. Paul Antoine
Mr. Evans
Mr. Paul
Mr. Jean ŔMax Joseph
Mr. Alex
Mr. Patrick
Mr. Jacques
GUE
FETHIERE
MICHEL
JOCELYNE
BAUDIN
JEAN PIERRE
GERMAIN
PARAISON
BIEN-AIME
LESCOUFLAIR
DENIS
BELLERIVE
LARSEN
DELATOUR
GABRIEL
Fonction
Ministre affaires étrangères et cultes
Affaires sociales (Jusqu‟au 2 septembre
2010)
Affaires sociales Installéle 6 Septembre
2010
Agriculture et ressources naturelles
Commerce industrie
Condition Féminine
Communication et culture
Economie et finances
Education National
Environnement
Haïtien vivant a l‟étranger
Intérieur et Collectivités Territoriales
Jeunesse et sports
Justice et sécurité Nationale
Planification et coopération Externe
Sante publique et population
Tourisme
Travaux publics, transport et
communication
Ministres non-titulaires :
Mr J. Jasmin
Joseph
Bureau du ministre Délégué auprès
du premier Ministre Charge des
relations avec le parlement
(BMCRP)
Les décaissements autorisés à partir de cette Résolution étaient orientés vers les Projets
d‟infrastructure et de reconstruction.
Page 149 of 656
Liste des Projets
1. Réhabilitation route Laboule 12
2. Construction Pont Hyppolite
3. Construction Rue Espagnol CODEV
4. Adoquinage des rues d‟Ouanaminthe
5. Réhabilitation des rues à Fort-Liberté
6. Réhabilitation de la route Baie de l'Acul / Milot
7. Construction Bigot-Carrefour Joffre
8. RN1 Marchand
9. Biennac rue Clervaux
10. Construction réseau électrique
11. Drainage Nord'Est
12. Gestion des Débris
13. Hasco-La Saline Base Navale/ Port-au-Prince
TOTAL
Montant US
7,200,000
5,000,000
1,544,061
3,000,000
2,000,000
17,400,000
14,000,000
6,680,180
3,600,000
6,500,000
1,000,000
10,000,000
25,000,000
102,924,241
De cette liste de projets inscrits dans ladite Résolution, un ensemble de contrats ont été
accordé à des firmes et des montants assez significatifs se trouvaient donc décaissés.
Page 150 of 656
Résolution du 24 Août 2010
Institutions
MTPTC
Nature du Projet
Localité
Rehabilitation route
Laboule 12
Montant
du Projet
Montant
décaissé
No
décaissement
Montant à
decaisser
7,200,000
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
347,896
134
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
269,439
179
272,368
95
169,316
129
Kenscoff
Kenscoff
Kenscoff
392,640
151
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
694,361
167
Kenscoff
352,420
192
Kenscoff
522,193
202
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
(1,524,496)
212-1
Kenscoff
1,524,496
212
Kenscoff
120,814
214
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
287,193
219
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
167,558
227
Kenscoff
286,927
241
469,997
246
2,792
267
(2,792)
267-1
Kenscoff
Kenscoff
Kenscoff
Kenscoff
363,024
363
Kenscoff
185,882
424
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
Rehabilitation route Laboule
12/ Kenscof/Ouest
689,835
281-1
(363,024)
281
Kenscoff
Page 151 of 656
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
(288,547)
463
288,547
463
Kenscoff
Rehabilitation route Laboule
12/ Kenscof/Ouest
Kenscoff
1,319,589
Rehabilitation route Laboule
12/ Kenscof/Ouest
85
Sous Total
7,200,000
MTPTC
Construction Pont
Hyppolite
651,571
5,000,000
Construction Pont Hyppolite
Cap Haitien
Construction Pont Hyppolite
Cap Haitien
Construction Pont Hyppolite
6,548,429
15,495
133
36,109
150
1,045,000
385
444,069
436
76,191
583
3,348,847
600
34,289
728
Cap Haitien
Construction Pont Hyppolite
Cap Haitien
Construction Pont Hyppolite
Cap Haitien
Construction Pont Hyppolite
Cap Haitien
Construction Pont Hyppolite
Cap Haitien
Sous total
5,000,000
MTPTC
Construction Rue Espagnol
CODEV
5,000,000
0
1,544,061
Ounaminthe
Construction Rue Espagnol
CODEVI (Ouanaminthe)
Construction Rue Espagnol
CODEVI (Ouanaminthe)
251,573
369
143,576
301
Ounaminthe
Construction Rue Espagnol
CODEVI (Ouanaminthe)
Ouanaminte
Construction Rue Espagnol
CODEVI (Ouanaminthe)
Ouanaminte
607,079
255
510,867
191-1
30,966
691
Sous total
0
1,544,061
MTPTC
Adoquinage des rues de
Ouanaminthe
Adoquinage des rues
d‟Ouanaminthe
1,544,061
3,000,000
Ouanaminte
273,672
154
Page 152 of 656
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
Adoquinage des rues
d‟Ouanaminthe
Adoquinage des rues
d‟Ouanaminthe
Ouanaminte
317,387
168
112,597
274
Ouanaminte
523,970
161,855
231
243
101,305
245
89,919
256
192,576
110,044
90,861
133,654
283
291
357
359
53,638
546
172,132
508
Ouanaminte
361,385
635
87,667
423
159,655
319
Ouanaminte
Sous total
3,000,000
MTPTC
Réhabilitation des rues à
Fort-Liberté
Réhabilitation des rues à
Fort-Liberté
2,942,317
57,683
2,000,000
Fort-Liberté
Adoquinage des rues à FortLiberté
Adoquinage des rues à FortLiberté
Adoquinage des rues à FortLiberté
Fort-Liberté
Adoquinage des rues à FortLiberté
Adoquinage des rues à FortLiberté
Fort-Liberté
Adoquinage des rues à FortLiberté
Adoquinage des rues à FortLiberté
Fort-Liberté
62,245
470
158,817
575
129,117
607
406,208
632
336,085
711
207,901
760
261,862
778
73,563
509
Fort-Liberté
Fort-Liberté
Fort-Liberté
Fort-Liberté
Page 153 of 656
Adoquinage des rues à FortLiberté
Fort-Liberté
124,765
545
Sous total
2,000,000
MTPTC
Réhabilitation de la route
Baie de l'Acul / Milot
239,436
17,400,000
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Rehabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Rehabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
1,760,564
4,817,028
140
541,883
385
665,033
645,632
461,982
331,425
625
779
737
759
24,165
771
571,527
510
412,228
586
334,262
161
235,050
240
404,293
249
290,146
261
239,962
266
213,180
293
139,244
298
732,967
306
348,747
328
589,235
348
183,769
379
499,460
472
248,729
483
605,211
557
362,040
601
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Acul/ Milot
Page 154 of 656
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Réhabilitation de la route
Baie de l'Acul / Milot
Acul/ Milot
1,372,712
1,029,846
602
653
584,818
654
515,424
738
Acul/ Milot
Total
17,400,000
MTPTC
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
17,400,000
-
14,000,000
Gonaives
54,031
665
233,163
352
1,164,609
268
729,537
269
94,997
262
317,399
257
626,193
807
672,379
881
192,504
767
322,288
605
136,216
684
1,986,161
84-1
179,986
144-1
192,822
346
Gonaives
Gonaives
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Gonaives
Construction BigotCarrefour Joffre
Gonaives
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Gonaives
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Construction BigotCarrefour Joffre
Gonaives
Construction BigotCarrefour Joffre
Gonaives
Gonaives
Gonaives
Gonaives
Gonaives
Gonaives
Gonaives
Sous total
14,000,000
MTPTC
RN1 Marchand
6,902,286
7,097,714
6,680,180
RN1 Marchand
Gonaives
RN1 Marchand
Gonaives
RN1 Marchand
Gonaives
RN1 Marchand
Gonaives
RN1 Marchand
Gonaives
630,549
171
347,099
183
236,085
317
1,725,920
104-2
792,843
114-2
Page 155 of 656
RN1 Marchand
Gonaives
RN1 Marchand
Gonaives
RN1 Marchand
Gonaives
907,969
119-1
1,382,124
84-1
657,590
144-1
Sous total
6,680,180
6,680,180
-
MTPTC
3,600,000
Biennac rue Clervaux
Gonaives
Biennac rue Clervaux
365,134
144-1
664,945
84-1
471,563
163
255,884
731
551,385
775
518,218
318
223,205
505
60,440
172
Gonaives
Biennac rue Clervaux
Gonaives
Biennac rue Clervaux
Gonaives
Biennac rue Clervaux
Biennac rue Clervaux
Gonaives
Biennac rue Clervaux
Gonaives
Biennac rue Clervaux
Gonaives
Biennac rue Clervaux
Gonaives
Sous total
EDH
3,600,000
Construction réseau
électrique
Construction réseau
électrique Trou du Nord,
Terrier
Rouge, Fort-Liberté,
Centrale électrique Carrefour
Chevry
3,110,774
489,226
6,500,000
Fort-Liberté,
Trou du Nord
6,469,050
81
Total
6,500,000
6,469,050
30,950
?
Drainage Nord'Est
Nord-Est
1,000,000
Drainage Nord'Est
Nord-Est
502,898
432
Nord-Est
497,102
873
Drainage Nord'Est
Sous total
1,000,000
1,000,000
-
Gestion des Débris
?
10,000,000
Gestion des Débris
?
Gestion des Débris
?
700,821
86
3,589,017
87
Page 156 of 656
Gestion des Débris
?
Gestion des Débris
?
Gestion des Débris
?
Gestion des Débris
?
Sous total
?
10,000,000
Hasco-La Saline Base
Navale/ Port-au-Prince
2,424,107
91
1,640,458
100
1,470,084
102
175,514
158
10,000,000
-
25,000,000
Hasco-La Saline Base
Navale/ Port-au-Prince
Port-au-Prince
Hasco-La Saline Base
Navale/ Port-au-Prince
Port-au-Prince
Hasco-La Saline Base
Navale/ Port-au-Prince
Port-au-Prince
12,710,712
1,722,198
10,567,091
Sous total
25,000,000
Total
Solde à
transférer
Désafectation
15 Avril 2015
102,924,241
169
252
135
25,000,000
94,357,661
-
8,566,580
239,436
8,327,143
Page 157 of 656
La Résolution du 24 Août 2010 comprend treize (13) Projets. De ce nombre, nous avons reçu
huit (8) projets lesquels ont fait l‟objet de notre intervention. De ce fait, huit (8) projets ont
été retenus aux fins d‟analyse, dont six (6) sont traités dans celle-ci et deux (2) sont traités
dans les Résolutions suivantes et se répartissent ainsi :
Un (1) Projet dans la Résolution du 11 Février 2010
1- Réhabilitation du tronçon carrefour Freycineau/St-Marc, Bigot/Gonaives
Un Projet dans la Résolution du 12 mai 2011
2- Réhabilitation de la route Kenscoff (Tronçon)
Page 158 of 656
Revue de passation des marchés
Résolution du : 24 août 2010
Contrat
Maitre
d'œuvre
Maitre
d'ouvrage
Description
Des
travaux
1.
Wenling
Hongyuan
engineering
Co. LTD.
MTPTC
Contrat d'exécution des
travaux de construction
du pont Hyppolite et
Avenant #1
Cap-Haitien
2.
V&F
construction
S.A
MTPTC
Réhabilitation de la route
Kenscoff(Tronçon)
Laboule 12 /Kenscoff
Kenscoff
23
Septembre
2010
3.
V&F
construction
S.A.
MTPTC
L'Acul à
Carrefour
Barrière Battant
7/02/11
3/12/12
14/02/14
29/09/14
4.
LGL
S.A.
MTPTC
L'Acul à
Carrefour
Barrière Battant
21/02/11
03/12/12
Non daté
5.
LGL
S.A.
MTPTC
Barrière
Battant/Milot
20
Décembre
2013
6.
V&F
construction
S.A
MTPTC
Barrière
Battant/Milot
Non
7.
Ingenieria
ESTRELLA
MTPTC
8.
Ingenieria
ESTRELLA
MTPTC
No
Réhabilitation et
construction des 24,2 Km
de route reliant la baie de
l'Acul à Carrefour
Barrière Battant (RN3)
Contrat de supervision
des 24,2 Km de route
reliant la baie de l'acul a
Carrefour barrière
Battant (RN3)
Contrat de supervision
des travaux de
réhabilitation de la route
Barriere Battant-Milot
Travaux de réhabilitation
de la route Barrière
Battant-Milot
(2.9 KM)
Travaux de réhabilitation
des rues à Ouanaminthe
rue: Codévie (370 ML)
rue Liberté (1127 ML)
Réhabilitation du tronçon
carrefour Freycineau/StMarc, Bigot/Gonaives
Localité
Date
de
signature
27 avril
2011 (C.)
25 Aout
2013 (Av.)
Appel d'offres
Montant
7, 098,335.65 +
Avenant 1:
1,669, 494.99 US =
8, 767,830.64 US
258, 309,389.60
Gourdes+
82,434,067
Gourdes
24, 085,142.14 US
Avenant
8, 636,546.16 US
--------------1, 671,310.00 US +
(Av. 1) :
655,372.28 US
+ (Av.2) :
722,648.25 US
Gré
à
gré
Restreint
Ouvert
Approbation
CSC/CA
Oui
Oui
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Non
Oui
Oui
Non
Non
Oui
Oui
Non
Non
Oui
Oui
Oui
Non
Oui
Oui
Oui
Non
Oui
117, 178,900
Gourdes
Oui
Non
Non
Oui
Ouanaminthe
13 Mai
2011(C)
12,Nov
2012
2, 554,336.09 US +
(Av. 1) :
394,117.19 US
Oui
Non
Non
Gonaives
N/A
… 2010
51, 452,645.35 US
Oui
Non
Oui
6, 959,625.00
Gourdes
Non
Non
Page 159 of 656
Revue de la gestion des contrats
Résolution du : 24 août 2010
No
1.
2.
Maitre
d'œuvre
Wenling
Hongyuan
Traffic
engineering Co
LTD.
V&F
construction
S.A.
Maitre
d'ouvrage
Description
des
travaux
Contrat
Cautionnemen
t sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
Date
de
signature
Montant
Avance
de
démarrage
MTPTC
Contrat d'exécution des
travaux de construction du
pont Hyppolite et Avenant
#1
27 avril
2011(C.)
25 Aout 2013
(Av.)
7, 098,335.65 +
Avenant 1,
1, 669,494.99 US =
8, 767,830.64 US
Non constaté
Non constaté
lors de l'analyse
du contrat
Non constaté
Non
17 mois
4, 999,999.49
US
MTPTC
Réhabilitation de la route
Kenscoff(Tronçon)
Laboule 12 /Kenscoff
23 Septembre
2010
51,661,893.96
Gourdes
Non
Non
Non
4 Mois
6, 548,429.22
US
MTPTC
Réhabilitation et
construction des 24,2 Km
de route reliant la baie de
l'acul a Carrefour Barrière
Battant (RN3)
7/02/11
3/12/12
14/02/14
29/09/14
4,817,028.42
US
Non constaté
lors de
l‟analyse du
contrat
Non
Oui
15 mois
13 mois
10 mois
15 mois
MTPTC
Contrat de supervision des
24,2 Km de route reliant la
baie de l'acul a Carrefour
Barrière Battant (RN3)
21/02/11
03/12/12
Non daté
1, 671,310.00 US +
(Av. 1) :
655,372.28 US +
(Av.2) :
722,648.25 US
Non constaté
Non constaté
lors de
l‟analyse du
contrat
Non
Oui
18 mois
9 mois
10 mois
20 Décembre
2013
6, 959,625.00
Gourdes
Non constaté
Non constaté
lors de
l‟analyse du
contrat
Non
constaté
Non
6 Mois
Non
117, 178,900
Gourdes
Non constaté
Non constaté
Non
Non
6 Mois
258, 309,389.60
Gourdes +
82,434,067 Gourdes
24, 085,142.14 US
+ (Av.1)
8, 636,546.16 US
-------------------
3.
V&F
construction
S.A.
4.
LGL
S.A.
5.
LGL
S.A.
MTPTC
6.
V&F
construction
S.A.
MTPTC
7.
Ingenieria
ESTRELLA
MTPTC
Travaux de réhabilitation
des rues à Ouanaminthe
rue: Codévie (370 ML) rue
Liberté (1127 ML)
13 Mai
2011(C )
12 Nov
12(Av.)
2, 554,336.09 US +
(Av. 1) :
394,117.19 US
510,867.22
US
Non constaté
lors de l'analyse
du contrat
Non constaté
Non
6 mois
1, 544,061.34
US
8.
Ingenieria
ESTRELLA
MTPTC
Réhabilitation du tronçon
carrefour Freycineau/ StMarc/Bigot/ Gonaïves
N/A
….2010
51, 452,645.35 US
10,
290,529.07
US
N/A
N/A
189,970.45
US
12 mois
6,902,286.04
US
Contrat de supervision des
travaux de réhabilitation
de la route Barriere
Battant-Milot
Travaux de réhabilitation
de la route Barrière
Battant-Milot (2.9 KM)
Page 160 of 656
1- Maitre d‟ouvrage :
MTPTC
Description des travaux :
Contrat d'exécution des travaux de construction du pont
Hyppolite au Cap-Haitien et Avenant No1
Localité
Cap-Haitien
Zone couverte par la résolution
Maitre d‟œuvre
Oui
Non
Wenling Hongyuan Trafic Engeneering C LTC
Montant du contrat U.S 7, 098,335.65US et Avenant No1 :1, 669,494.99US :
Total :
8,767,830.64 US
Date de signature du contrat
27 avril 2011
Durée des travaux
17 mois
Appel d‟offres
Restreint
Approbation de la CSC/CA
Oui
Non objection du CNMP
Documents d‟éligibilités fournis
Non
Quitus, Patente
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
NA
Retenue de bonne exécution
NA
Prélèvement des 2%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
Montant total versé au maitre d‟œuvre
27 Septembre 2014
US 5,000,000 (résolu 24 août 2010)
455,088 (11 Décembre 2013)
Commentaires :
Page 161 of 656
D‟un appel d‟offre restreint, ce contrat se chiffre à US 7, 098,335.65 et US 1, 669,494.99, de
l‟avenant no1 approuvé par la CSC/CA, paraphé par Nonie MATHIEU présidente de la
CSC/CA et signé le 25 Août 2013 par les mêmes signataires du contrat.
Ce contrat fut signé en date du 27 avril 2011, mentionné dans l‟avenant entre l‟Etat haïtien
représenté par Jacques GABRIEL Ing. Ministre des TPTC, et Zhendong DONG directeur de
Projet de l‟Entreprise WENLING HONGYUAN TRAFIC ENGINEERING.
On n‟a pas trouvé de certificat de non objection de la CNM P ni de pièces relatives aux
prélèvements de 2% pour la DGI.
Quant à ce contrat ayant pour description « Contrat d‟exécution des travaux de construction
du pont Hyppolite », les montants alloués en US dans les Résolutions sont les suivants :
-
Résolution du 24 août 2010 est de
5,000,000
-
Résolution du 11 décembre 2013 est de
1,000,000
Total
6,000,000
Les décaissements se répartissent ainsi en US :
-
Résolution du 24 août 2010 est de
5,000,000
-
Résolution du 11 décembre 2013 est de
455,088
Total
5,455,088
Le contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs constatant
un état davancement des travaux de 82.25% relaté au tableau « Résumé des évaluations
physiques des travaux #30. Le montant total décaissé est US 5,455,088 représentant 62,21%
du coût des travaux.
Page 162 of 656
2-Maitre d‟ouvrage : MTPTC
Description des travaux : Réhabilitation de la route Kenscoff/Tronçon Laboule 12 (10,4
Km) Travaux complémentaires sur le tronçon Laboule 12/Kenscoff (2,35 Km)
LocalitéKenscoff
Maitre d‟œuvre
V&F construction S.A
Montant du contrat
258, 309,389.60 Gourdes(US 6,474,000) + 82,434,067Gourdes
(2,046,744.46 US) = 340,743,456.60 Gourdes (US 8,520,745.60)
Date de signature du contrat
Durée des travaux
Appel d‟offres
23/09/2010 et 13 mai 2011
4 mois et 5 mois
Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
NA
NA
Documents d‟éligibilités fournis
Quitus fiscal, patente, matricule fiscale
Avance de démarrage : 20% ; 51, 661, 893.96 Gourdes ;
# 85
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie NA
Retenue de bonne exécution
NA
Prélèvement des 2%
N/A
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
23 Janvier 2011
Montant total versé au maitre d‟œuvreUS 6, 548,429.23 (résolu 24/08/2010) US 1,
937,849.36 (résolu 12/05/2012) = US 8, 486,278.59.
Commentaires :
Page 163 of 656
Passé de Gré à Gré et sans l‟approbation de la CSC/CA au contrat, ni du certificat de nonobjection de la CNMP. Ces contrats : « Réhabilitation de la route Kenscoff/Tronçon
Laboule 12 (10,4 Km) et les travaux complémentaires (2,35 Km) » se chiffrent
respectivement à contrat
258, 309,389.60 Gourdes et 82,434,067Gourdes, et furent signé
par l‟État haitien représenté par Jacques GABRIEL Ministre des TPTC , et Jean Marie
VORBE le Président Directeur Général deV&F Construction S.A.
On n‟a trouvé aucune pièces relatives aux prélèvements de 2% d‟acompte pour la DGI, ni les
5% de retenue de garantie de bonne exécution des travaux.
Quant à ce contrat: « Réhabilitation de la route Kenscoff/Tronçon Laboule 12
(10,4 Km) et les travaux complémentaires sur le tronçon (2,35 Km) », les montants alloués
en US dans les Résolutions sont les suivants :
-
Résolution du 24 août 2010 est de
7,200,000
-
Résolution du 12 mai février 2011 est de
2,100,000
Total
9,300,000
Les décaissements se répartissent ainsi en US :
-
Résolution du 24 août 2010 est de
6,548,429
-
Résolution du 12 mai 2010 est de
1,937,849
Total
8,486,278
Le montant total décaissé est US 8,486,278.59 représentant 99% du coût des travaux.
Le coût d‟un Km figurant dans ces deux contrats est estimé respectivement à 24,837,441
Gourdes et 35,929,390 Gourdes, tandis que, pour la même période, soit mai 2011 pour des
travaux de spécificités similaires, et pour cette même firme, le coût d‟un Km est estimé à
13,791,180 Gourdes et de 22,138,210 Gourdes.
3-Maitre d‟ouvrage : MTPTC
Page 164 of 656
Description des travaux : Réhabilitation et entretien des 24,2 km de route reliant la
baie de l‟acul à carrefour barrière bâtant(RN3)/Travaux de Réhabilitation de la
route Barrière Battant/Milot (2,9 km)
Localité : l‟Acul à carrefour barrière bâtant
Maitre d‟œuvre : V&F CONSTRUCTION S.A
Montant du contrat : 24, 085,142.14$ US et Avenant1=8, 636,546.00$ US
Date de signature du contrat : 7 Février 2011
Durée des travaux : 15 mois
Appel d‟offres : Gré à Gré
Approbation de la CSC/CA : Non-signé
Non objection du CNMP : Non-signé
Documents d‟éligibilités fournis: matricule fiscal : 003-055-277-9
Avance de démarrage : Pourcentage= 20% ; Montant= $ 4, 817, 028.42 ; Ord. de déc.=
140
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie :
5%
Retenue de bonne exécution : Non constatée
Prélèvement des 2% :
Non constaté
Date de démarrage des travaux : non-mentionné
Date d‟achèvement des travaux :22 mai 2012
Montant total versé au maitre d‟œuvre : US 19,555,106.11
Commentaires
Page 165 of 656
Quant à ce contrat de réhabilitation et d‟entretien de la route Baie de L‟Acul / Carrefour
RN3 (Barrière Battant), il fut signé par l‟État représenté par Jacques GABRIEL Ministre
des TPTC, Ronald BAUDIN Ministre de l‟ Économie et des Finances et le PDG deV&F
Construction S.A Jean Marie VORBE.Il se chiffre d‟un montant US 32,721,688(Contrat
+ Avenant).
De graves anomalies ont été constaté a propos de ce contrat : Passé de Gré à Gré et
sans l’approbation de la CSC/CA , ni de certificat de non-objection de la CNMP.
On n‟a trouvé aucune pièce relative aux prélèvements de 2% d‟acompte de DGI.
Les montants alloués en US dans les Résolutions sont les suivants :
-
Résolution du 24 août 2010 est de
17,400,000
Résolution du 28 février 2010 est de
3,000,000
Résolution du 11 décembre 2010 est de 3,000,000
Total
21,400,000
Les décaissements se répartissent ainsi en US :
-
Résolution du 24 août 2010 est de
17,400,000
Résolution du 28 février 2012 est de
1,433,499
Résolution du 11 décembre 2013 est de
721,607
Total
19,555,106
4-Maitre d‟ouvrage :
MTPTC
Description des travaux : Supervision des 24.2 KM de route reliant la Baie de
Page 166 of 656
l'acul à Carrefour Barrière Battant RN3
Localité
: Carrefour Barriere Battant RN3
Maitre d‟œuvre : LGL S.A
Montant du contrat : 1,671,310.00 US et Avenant No1 : 655,372.28 US et Avenant No
2 : 722,648.25 US. Total : 3, 049,330.25 US
Date de signature du contrat : 21 Février 2011 et Avenant No1 ; 3 Decembre 2012 No
2 :14 Fevrier 2014
Durée des travaux : 18 mois et Avenant No1, 9 mois et Avenant No2, 10 mois et
Avenant No3 Total : 37 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : Oui
Non objection du CNMP
: Non
Documents d‟éligibilités fournis
:
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : Oui
Retenue de bonne exécution
: Non
Prélèvement des 2% : Non
Date de démarrage des travaux : Avenant No2 :13 Juillet 2013
Date d‟achèvement des travaux : Avenant No 2 : 13 Mai 2014
Montant total versé au maitre d‟œuvre :
Commentaires :
Quant à ce contrat de supervision de réhabilitation et d‟entretien de la route Baie de
Page 167 of 656
L‟Acul Ŕ Barrière Battant. Il fut signé entre l‟État Haïtien représenté par Jacques
ROUSSEAU Ministre des TPTC, Nonie MATHIEU Présidente de la CSC/CA et
Bernard CHANCY Directeur Général de LGL SA.
Le MTPTC n‟a pas fourni le contrat de cette supervision, ni de l‟avenant no 1. Par
contre, on a pu déterminer certaines informations à partir de l‟avenant no2 mis à la
disposition de la commission.
Il s‟agit :
-
Le montant initial du contrat de la supervision est de 1, 671,310 US signé en date
du
21 février 2011 pour une durée de 18 mois.
-
Le montant de l‟avenant no 1 est de 655,372 US signé le 13 décembre 2012 pour
une durée de 9 mois.
-
Le montant de l‟avenant no 2 est de 722,648.25 US. Cet avenant n‟est pas daté. Il
a été pris pour une durée de 10 mois.
Passé de Gré à Gré, ce contrat de supervision a subi deux prolongations, pour un montant
total de US 3, 049,330 (incluant les avenants).
Les deux avenants totalisent donc le montant de 1, 378,020.53 US. Ce qui représente
82,45 % du montant total du contrat. Ce qui constitue une anomalie assez grave dans la
gestion de ce contrat vu que selon la loi regissant cette matière, les avenannts ne peuvent
pas depasser 30% du montant initial.
Les personnalités signataires des avenants :
-
Jacques Rousseau , Ministre des TPTC
-
Bernard Chancy :Directeur Generl de LGL.SA
Page 168 of 656
5-Maitre d‟Ouvrage :
MTPTC
Description des travaux : Supervision des travaux de réhabilitation de la route Barrière Battant Milot
Localité : Barrière battant Milot
Maitre d‟œuvre
LGL S.A
Montant du contrat : 6,959,625.00 Gourdes
Date de signature du contrat
20 Décembre 2013
Durée des travaux
6 mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
Documents d‟éligibilités fournis
Oui
Non
Oui, Quitus, Patente
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui
Retenue de bonne exécution
N/A
Prélèvement des 2%
Date de démarrage des travaux
Date d‟achèvement des travaux
Non constaté
N/A
N/A
Commentaires :
Quant à ce contrat de supervision des travaux de réhabilitation de la route Barrière Battant/ Milot. Il
fut signé entre l‟Etat haïtien représenté par Jacques ROUSSEAU Ing. Ministre des TPTC, Nonie
MATHIEU présidente de la CSC/CA, et Bernard CHANCY Directeur Général LGTL SA. Ce contrat
est signé le 20 décembre 2013 et se chiffre à 6,959,625 Gourdes.
Le décaissement de ce contrat de supervision est inclus dans le cadre du projet Baie de L‟AculMilot.Ce contrat n‟a pas reçu la non objection du CMNP et l‟acompte de 2% de la DGI n‟a pas été
Page 169 of 656
prélevé.
6-Maitre d‟ouvrage :
MTPTC
Description des travaux : Travaux de réhabilitation de la route Barrière Battant –Milot (2.9km)
Localité
: Milot
Maitre d‟œuvre : V&F Construction S.A
Montant du contrat : 117, 178,900.00 Gourdes ou US 2,899,743
Date de signature du contrat : Non mentionnée, mais selon l‟avenant#2, la date du contrat est : 7
février 2011
Durée des travaux : 6 mois
Appel d‟offres : Gré à Gré
Approbation de la CSC/CA : Signé
Non objection du CNMP
: Non signé
Documents d‟éligibilités fournis
: Oui
Cautionnement fourni pour l‟avance : N/A
Retenue de garantie : N/A
Retenue de bonne exécution
: N/A
Prélèvement des 2% : N/A
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux : N/A
Montant total versé au maitre d‟œuvre : US19, 555,105.79
Commentaires :
Pour ce contrat d‟exécution des travaux de réhabilitation de la route Barrière Battant-Milot (2,9
KM). Il fut signé entre l‟État Haïtien représenté par Jacques ROUSSEAU Ing. Ministre des
TPTC, Marie Camelle JEAN-MARIE Ministre de l‟Économie et des Finances, et Jean Marie
Page 170 of 656
VORBE signataire de V&F Construction. Il se chiffre à 117,178,900 Gourdes.
Passé de gré à gré, approuvé par la CSC/CA, mais sans avis de non objection de la CNMP.
Les décaissements relatif au dit contrat est inclus dans les décaissements
du Projet de
« Réhabilitation et d‟Entretien de la Route Baie de L‟acul / Carrefour RN3 (Barrière
Battant/Milot) » effectués dans les Résolutions 24 août 2010, 28 Février 2012 et 11 décembre
2013 respectivement pour les montantsUS 17, 400,000.00,US 1, 433,499.11 et US 721,606.79.
Ce projet fût l‟objet de deux contrats signés par la même firme, l‟un exécuté sur la route Baie de
l‟Acul à carrefour Barrière Battant et l‟autre sur la route Barrière Battant à Milot.
Page 171 of 656
7-Travaux de réhabilitation des rues à Ouanaminthe Rue Codevi (370 ML) Rue Liberté
Maitre d‟ouvrage :
MTPTC
Description des travaux :
Travaux de réhabilitation des rues à Ouanaminthe Rue Codevi
(370 ML) Rue Liberté
Localité
Ouanaminthe
Maitre d‟œuvre
Ingenieria Estrella
Montant du contrat : 2,554,336.09 US et Avenant No 1 394,117.19 US
Date de signature du contrat
13 Mai 2011 et Avenant 12 Novembre 2012
Durée des travaux
6 mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Non signé
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
Avance de démarrage :
Non
20% ; $ 510, 867.22 ; #191
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
NA
Retenue de bonne exécution
NA
Prélèvement des 2%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
Montant total versé au maitre d‟œuvre :
Non daté ( Novembre 2011)
US1, 544,061.34
Commentaires :
Passé de Gré à Gré, sans l‟approbation de la CSC/CA et sans non plus le certificat de non
Page 172 of 656
objection de la CNMP, le contrat est signé le 13 Mai 2011 et l‟avenant no 1, 12 Novembre
2012.
Le montant du contrat est 2,554,336.09 US et le montant de l‟avenant No 1 est
394,117.19 US. Le montant de l‟avance est de 510,867.22 US et le numéro d‟ordre de
décaissement est 191.
La durée des travaux est de (6) six mois, ils furent achevés en Novembre 2011. Nous n‟avons
pas eu les procès verbaux de réception provisoire ainsi que ceux de réception définitive.
Quant à ce contrat ayant pour description : « Travaux de réhabilitation des rues à
Ouanaminthe Rue Codevi (370 ML) Rue Liberté », le montant alloué en US
dans la
Résolution est le suivant :
-
Résolution du 24 août 2010 est de
1,544,061
Total
1,544,061
Le décaissement est ainsi répartit en US :
-
Résolution du 24 août 2010 est de
Total
1,544,061
1,544,061
Le montant total décaissé est de US 1,544,061 représentant 52% du coût des travaux.
Les personnalités signataires pour le contrat initial sont :
-
Jacques GABRIEL, Ing Ministre des TPTC
-
Manuel ESTRELLA, Ing. Président Ingenieria Estralla S.A
-
Ronald BAUDIN, Ministre de l‟Economie et des Finances
Et l‟avenant No 1 :
-
Jose Alejandro ADAMES, Ing. Mandataire Ingenieria Estrella S.A
-
Mr Jacques ROUSSEAU, Ing Travaux Publics, Transports et Communications.
-
Marie Carmelle JEAN MARIE, Ministre de l‟économie et des finances (Contrat)
Page 173 of 656
XXII Résolution du 12 Mai 2011
Page 174 of 656
Résolution du 12 Mai 2011:
Concernant cette Résolution, elle était prise sous l‟Administration PREVAL /BELLERIVE.
Elle constitue la 2ième Résolution prise sous cette Administration.
Le Gouvernement dirigé par le Premier Ministre Jean Max Joseph BELLERIVE était ainsi
composé :
Prénom
Marie Michèle
Yves Gerald
Nom
REY
CHRISTALLIN
Fonction
Affaires étrangères et cultes
Affaires sociales (Jusqu‟au 2 septembre 2010)
Joanas
Jocelyne Colimon
Marjorie
Marie Laurence
Ronald
Joël Desrosiers
Jean-Marie
R.P Edwin
Paul Antoine
Evans
Paul
Jean ŔMax Joseph
Alex
Patrick
Jacques
GERMAIN
GUE
FETHIERE
MICHEL
JOCELYNE
BAUDIN
JEAN PIERRE
GERMAIN
PARAISON
BIEN-AIME
LESCOUFLAIR
DENIS
BELLERIVE
LARSEN
DELATOUR
GABRIEL
Affaires sociales (Installéle 6 Septembre 2010)
Agriculture et ressources naturelles
Commerce industrie
Condition Féminine
Communication et culture
Economie et finances
Education National
Environnement
Haïtien vivant a l‟étranger
Intérieur et Collectivités Territoriales
Jeunesse et sports
Justice et sécurité Nationale
Planification et coopération Externe
Sante publique et population
Tourisme
Travaux publics, transport et communication
Page 175 of 656
Ministres non-titulaires :
J. Jasmin
Joseph
Bureau du ministre Délégué auprès
du premier Ministre Charge des
relations avec le parlement (BMCRP)
Le tableau qui suit présente les différents décaissements ordonnés à partir de la liste des
Projets sélectionnés par Résolution. Sur cette liste, un membre de 17 Projets figuraient et
englobaient des travaux d‟infrastructure et de construction.
Page 176 of 656
#
Liste des Projets
Montant US
1
Construction du Marché Public de Jacmel
1,700,000
2
Construction du Marché Public de la Ville de l'Arcahaie
2,000,000
3
4
8,000,000
3,500,000
10,750,000
7
Rénovation Urbaine Hinche
Rénovation Urbaine limbé
Démoloition/ Enlèvement et Gestion de Décombres/
Débris dans le périmètre de Port-au-Prince ou dans
Tout Autre Zone Indiquée par le Gouvernement
Réhabilitation Route Hasco/ La Saline/ Base Navale
Amiral Kilik
Construction de 1500 maisons et d'infrastructures a Morne à Cabri (Voir no 2 au
tableau resume)
8
Appui a la restructuration du système de passport
3, 000,000
9
Construction de la Route Carrefour Kanz/ Camp Perrin
7,500,000
5
6
7,000,000
22,000,000
10 Travaux de Construction sur la Route Carrefour Puilboreau/ Marmelade
3,735,711
11 Expropriation Cayes/Jeremie
1,500,000
12 Entretien du troncon Petion-Ville /Laboule 12
1,930,800
13 Travaux Complémentaires sur le Tronçon Laboule 12 / Kenscoff
2,100,000
14 Travaux Complémentaire a Mirebalais
1,000,000
15 Réhabilitation de la villa d'accueil
2,500,000
16 Construction du ministere de l'interieur
15,000,000
17 Construction de parcs sportifs
4,500,000
18 Réhabilitation tronçon fermathe-frère via soisson, Duplan, Girardeau, Meyotte…
2,000,000
Total
99,716,511
De ce nombre de 18 Projets inscrits dans la Résolution du 12 mai 2011, plusieurs contrats se
sont vus accordés à des Firmes et pour lesquels plusieurs décaissements ont été effectués.
Page 177 of 656
Résolution du 12 Mai 2011
Institutions
Nature du Projet
Localité
Montant
du Projet
Montant
décaissé
No
décaissement
Montant
à
décaisser
MPCE
Construction du Marché
Public de Jacmel
Construction du Marché
Public de Jacmel
Construction du Marché
Public de Jacmel
1,700,000
Sud Est
800,000
900,000
Sud Est
338
190
Sous total
1,700,000
Construction du Marché
Public de la Ville de
l'Arcahaie
Construction du Marché
Public de la Ville de
l'Arcahaie
Construction du Marché
Public de la Ville de
l'Arcahaie
Construction du Marché
Public de la Ville de
l'Arcahaie
1,700,000
-
2,000,000
Ouest
900,000
278
Ouest
1,000,000
197
Ouest
100,000
235
Sous total
2,000,000
2,000,000
-
Rénovation Urbaine Hinche
8,000,000
Rénovation Urbaine Hinche
(Financement Partiel)
Hinche
Renovation urbaine de
Hinche (Financement Partiel)
Hinche
2,411,052
282
5,588,948
208
Sous total
8,000,000
8,000,000
-
Rénovation Urbaine limbé
3,500,000
Renovation Urbaine limbé
(Financement partiel)
Renovation Urbaine limbé
(Financement partiel)
Limbé
738,778
425
Limbé
2,761,222
209
Sous total
Sous total
Démoloition/ Enlèvement et
Gestion de Décombres/
Débris dans le périmètre de
Port-au-Prince ou dans
Tout Autre Zone Indiquée
par le Gouvernement
Ouest
3,500,000
3,500,000
10,750,000
10,750,000
-
199
Page 178 of 656
-
Sous total
Réhabilitation Route
Hasco/ La Saline/ Base
Navale
Amiral Kilik
?
Construction de 1500
maisons et
d'infrastructures a Morne à
Cabri (Voir no 2 au tableau
resume)
Total
MTPTC
Appui à la Restructuration du
Système de Passeport
Ouest
253
7,000,000
7,000,000
-
22,000,000
22,000,000
206
-
3,000,000
3,000,000
189
-
858,100
239
National
Construction de la Route
Carrefour Kanz/ Camp
Perrin
Construction de la Route
Carrefour Kanz/ Camp Perrin
Construction de la Route
Carrefour Kans/ Camp Perrin
CampPerrin
CampPerrin
Construction de la Route
Carrefour Kans/ Camp Perrin
CampPerrin
Construction de la Route
Carrefour Kans/ Camp Perrin
CampPerrin
7,500,000
4,141,900
1,563,652
232
374
936,348
475
Sous total
MTPTC
7,500,000
Travaux de Construction
sur la Route Carrefour
Puilboreau/ Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
3,735,711
86,609
536
Marmelade
29,716
573
Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
-
Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
7,500,000
32,056
584
65,154
606
Marmelade
1,697,624
213
Marmelade
110,164
222
41,816
633
Marmelade
Page 179 of 656
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Marmelade
MTPTC
687
490
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Marmelade
Travaux de Construction sur
la Route Carrefour
Puilboreau/ Marmelade
Marmelade
83,314
238
1,176,666
404
11,579
511
Expropriation
Cayes/Jeremie
Entretien du troncon
Petion-Ville /Laboule 12
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
Entretien du troncon PetionVille /Laboule 12
Kenscoff
3,735,711
3,735,711
1,500,000
1,500,000
224
-
1,524,496
212-1
(202,301)
267-1
(689,835)
281-1
689,835
281
42,845
463
202,301
267
49,430
302
(42,845)
463
213,848
463-1
-
1,930,800
Kenscoff
1,930,800
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
8,605
378,703
Sous total
MTPTC
648
Marmelade
Sous total
MTPTC
13,705
Marmelade
1,787,775
143,025
2,100,000
Kenscoff
Kenscoff
205,093
(370,410)
267-1
463
Page 180 of 656
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Kenscoff
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Kenscoff
370,410
463
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Kenscoff
487,953
463-1
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Kenscoff
274,952
463-1
Travaux Complémentaires
sur le Tronçon Laboule 12 /
Kenscoff
Kenscoff
606,827
613
Sous total
363,024
2,100,000
1,937,849
281
162,151
?
Travaux Complémentaire a
Mirebalais
Mirbalais
1,000,000
512,500
234
487,500
?
Rehabilitation de la villa
d'accueil
?
2,500,000
2,500,000
207
0
?
Construction du ministere
de l'interieur
Ouest
15,000,000
15,000,000
207
0
MPCE
Construction de parcs
sportifs
National
4,500,000
4,500,000
207
-
MTPTC
Rehabilitation tronçon
fermathe-frère via soisson,
Duplan, Girardeau,
Meyotte…
Frères
2,000,000
-
2,000,000
99,716,511
96,923,836
2,792,675
TOTAL
Page 181 of 656
La Résolution du 12 mai 2011comprend dix-huit (18) Projets. De ce nombre, nous avons
reçu six (6) Projets lesquels ont fait l‟objet de notre intervention. De ce fait, six (6) projets
ont été retenus aux fins d‟analyse, dont trois (3) sont traités dans celle-ci et deux (2) sont
traités initialement dans les Résolutions suivantes répartissent ainsi :
Un dans la Résolution du 18 juillet 2012 :
1- Aménagement d‟infrastructure sportive et gazonnage.
2- Supervision d‟Aménagement d‟infrastucture sportive et gazonnage.
Un (1) dans la Résolution du 11 février 2010 :
1- Travaux de réhabilitation du tronçon Fermathe Frères via Soisson, Girardeau,
Meyotte et des collectivités reliant la principale à la rue Métellus, à Thomassin 25
et à Fermathe 45 Meyotte/Route de Frères.
Trois (3) dans la Résolution du 12 mai 2011 :
1- Travaux de construction d‟entretien périodique de la route carrefour
Puilboreau/Marmelade
2- Travaux d‟entretien de la route Kenscoff (Pétion-Ville/Laboule 12)
3- Réhabilitation de la route Kenscoff (Tronçon Laboule 12/Kenscoff)
Page 182 of 656
Revue de passation des marchés
Résolution du : 12 Mai 2011
No
Maitre
d'œuvre
Maitre
d'ouvrage
1
V&F
Construction
S.A/
TECINA
MTPTC
2
V&F
Construction
S.A
MTPTC
11
SECOSA et
J&J
Construction
MPCE
4
V&F
Construction
S.A
MTPTC
5
Groupe de
travaux et
construction
MTPTC
6
Consortium
AcamcaDisconsa
Construction
MPCE
Description
des
travaux
Travaux de construction
d'entretien périodique de la
route Carrefour PuilboreauMarmelade
Travaux d'entretien de la
route de Kenscoff (Troncon
Petion-Ville/Laboule 12)
Aménagement
d'infrastructure sportive et
gazonnage.
Réhabilitation de la route de
Kenscoff (Tronçon,
Laboule12 Kenscoff)
Travaux de réhabilitation du
tronçon Fermathe/Frères via
Soisson, Girardeau Meyotte
et des collectivités reliant la
principale à la rue Metellus à
Thomassin 25 et à Fermathe
45, Meyotte à route Frères
Construction du marché
public de Jacmel
Contrat
Localité
Date
de
signature
Montant
Gré
à
gré
Marmelade
(Nord)
19 Avril 2011
5, 320,465.43 US
ou
215, 000,000.00
Gourdes
Oui
Pétion-Ville/
Laboule12
18 Avril 2011
1, 918,773.00 US
ou
77, 230,610.00
Gourdes
National
6/09/11,
5/06/15,
26/09/11,
7/08/15,
12/05/11
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Non
Non Signé
Oui
Non
Non Signé
Non
Appel d'offres
10,150,023
Phase 2 +
7,852,851.98
Gazonage,
+ 500,250.00
Supervision
+ 500,145.63
Avenant
----(Phase 1)
Restreint
Ouvert
Oui
Oui
Oui
Non
Oui
Oui
Signé
Oui
Oui
Non
Oui
Non
Non
Oui
Oui
Non
Oui
Kenscoff
23 Septembre
2010
258, 309,390.00
Gourdes
Oui
Non
Non Signé
Oui
Fort-Jacques
Non mentionné
47, 612,854
US
Oui
Oui
Non Signé
Oui
Jacmel
13 Octobre 2010
2,400,000.00 US
Oui
Non signé
Non
Oui
Page 183 of 656
Revue de la gestion des contrats
Résolution du : 12 Mai 2011
No
Maitre
d'œuvre
Maitre
d'ouvrage
1
V&F
Construction
S.A
MTPTC
2
V&F
Construction
S.A
MTPTC
11
SECOSA et
J&J
Construction
(Supervision)
MPCE
4
V&F
Construction
S.A
MTPTC
5
Group de
Travaux et de
construction
(GTC)
MPCE
6
Consortium
AcamcaDisconsa
Construction
MPCE
Description
Des
travaux
Travaux de construction
d'entretien périodique de la
route carrefour
Puil-boreau/Marmelade
Travaux d'entretien de la
route de Kenscoff (tronçon
Petion-Ville/Laboule 12)
Aménagement
d'infrastructure sportive et
gazonnage.
Réhabilitation de la route de
Kenscoff (tronçon)
Laboule 12/Kenscoff)
Travaux de réhabilitation du
tronçon Fermathe/Frères via
Soisson, Girardeau, Meyottte
et des collectivités reliant la
principale à Thomassin 25 et
à Fermathe 45, Meyotte à
route Frères.
Construction du marché public
de Jacmel
Contrat
Date
de
signature
Montant
19 Avril 2011
5, 320,465.00 US ou
215, 000,000.00
Gourdes
18 Avril 2011
6/09/11,
5/06/15,
26/09/11,
7/08/15,
12/05/11
1, 918,773.00 US ou
77, 230,610.00
Gourdes
10,150,023
Phase 2 +
7,852,851.98
Gazonage,
+ 500,250.00
Supervision
+ 500,145.63 Avenant
--------(Phase 1)
Avance
de
démarrage
NA
Cautionnement
sur avance
de
démarrage
Non constaté lors
de l'analyse du
contrat
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
NA
NA
4 Mois
3, 735,711.00
US
NA
NA
4 Mois
1, 787,775.00
US
5, 895,449.28
US
NA
Non constaté lors
de l'analyse du
contrat
Non
Non constaté lors
de l‟analyse du
contrat
Non
Non
12 mois
6 mois
N/A
6 mois
-----
23 Septembre
2010
258, 309,390
Gourdes
NA
NA
NA
NA
4 Mois
1, 937,850.00
US
Non mentionné
47, 612,854.00
US
NA
Non constaté lors
de l'analyse du
contrat
NA
NA
42 Mois
0.00 US
Non contaaté
Non contaaté
Non contaaté
Non
2 mois
2,303,455 US
13 Octobre 2010
2,400,000.00 US
Page 184 of 656
1-Travaux de construction d‟entretien périodique de la route Carrefour PuilboreauMarmelade
Maitre d‟ouvrage :
MTPTC
Description des travaux :
route
Localité
Travaux de construction d‟entretien périodique de la
Carrefour Puilboreau-Marmelade
Marmelade (Nord)
Maitre d‟œuvre V&F Construction S.A / TECINA S.A
Montant du contrat
215, 000,000.00 Gourdes ou US 5, 320,465.23 US
Date de signature du contrat
19 Avril 2011
Durée des travaux 4 Mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP Non
Documents d‟éligibilités fournis
Non
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
Non constaté lors de l‟analyse du contrat
Retenue de bonne exécution
N/A
Prélèvement des 2%
N/A
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
19 Aout 2011
Montant total versé au maitre d‟œuvre 3, 735,711.44 US (12 Mai 2011)
Commentaires :
Ce contrat inscrit dans la Résolution du 12 mai 2011, dans le cadre de notre mission ayant
pour description : « Travaux de Construction d‟Entretien Périodique de la Route Carrefour
Puilboreau/Marmelade ».
Page 185 of 656
Passé gré à gré, sans approbation de la CSC/CA et sans non plus le certificat de non
objection du CNMP, ce contrat est signé le 19 Avril 2011 pour un montant de 215,
000,000.00 Gourdes ou 5, 320,465.23 US.
La durée prévue pour la réalisation des travaux était de (4) quatre mois, ils furent
achevés19 Aout 2011. Aucune patente et quitus n‟ont été trouvés. Nous n‟avons pas eu les
procès-verbaux de réception provisoire ainsi que ceux de réception définitive.
Les 2% à prélever pour le compte de la DGI n‟ont pas été effectués.
le montant alloué en US dans la Résolution est la suivante :
-
Résolution du 12 mai 2011 est de
3,735,711.43
Total
3,735,711.43
Le décaissement est ainsi répartit en US :
-
Résolution du 12 mai 2011 est de
3,735,711.43
Total
3,735,711.43
Le montant total décaissé est US3,735,711.43 représentant 70.21% du coût des travaux.
Le d‟un Km figurant dans ce contrat est estimé à 15,357,143 Gourdes/Km, tandis que, pour
la même firme, et pendant la même période le coût d‟un Km est 13,791,180 GourdesKm,
soit un écart positif de 1,565,963 Gourdes/KM.
Les personnalités signataires sont:
-
Jacques GABRIEL, Ministre TPTC
-
Ronald BAUDIN, Ministre MEF
-
Michel Ange BERRET, Mandataire du groupement V&F et TECINA
Page 186 of 656
2-Travaux d‟Entretien de la Route de Kenscoff Tronçon Pétion-ville
Maitre d‟ouvrage :
MTPTC
Description des travaux : Travaux d‟Entretien de la Route de Kenscoff Tronçon Pétionville/Laboule 12)
Localité
Pétion-ville/ Laboule
Maitre d‟œuvre V&F Construction S.A
Montant du contrat 1, 918,772.92 US ou 77, 230,610.00 Gourdes
Date de signature du contrat 18 Avril 2011
Durée des travaux
4 Mois
Appel d‟offres Restreint
Approbation de la CSC/CA Non signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis: Quitus émis (12 mai 2010); Patente (12 janvier 2009);
Matricule fiscal (25 septembre 2007)
Avance de démarrage : N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie Non constaté
Retenue de bonne exécution
Non mentionné
Prélèvement des 2%
Non mentionné dans le contrat
Date de démarrage des travaux N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 1, 787,775.09 US (12 Mai 2011)
Page 187 of 656
Commentaires :
Quant à ce contrat : « Travaux d‟Entretien de la Route de Kenscoff Tronçon Pétionville »,retenu suivant un appel d‟offre restreint, il fut signé le 18 avril 2011 pour un
montant de 77,230,610 Gourdes ou US 1,918,772.92, sans l‟approbation de la CSCA t le
certificat de non objection de la CNMP.
La durée des travaux était de (4) quatre mois. La date d‟achèvement des travaux n‟est pas
mentionnée, nous n‟avons pas eu les procès-verbaux de réception provisoire ainsi que ceux
de réception définitive.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Le montant alloué en US dans la Résolution est la suivante :
-
Résolution du 12 mai 2011 est de
1,930,000
Total
1,930,000
Le décaissement serépartit ainsien US :
-
Résolution du 12 mai 2011 est de
1,787,775
Total
1,789,775
Le montant total décaissé est US 1,787,775 représentant 93.17% du coût des
travaux. Le d‟un Km figurant dans ce contrat est estimé à 13,791,180 Gourdes par Km,
tandis que, pour la même firme, et pour la même période le coût d‟un Km est 15,357,143
Gourdes par Km, soit un écart négatif de 1,565,963 Gourdes/Km.
Les personnalités signataires sont:
-
Jacques GABRIEL, Ministre des TPTC ;
-
Jean Marie VORBE, PDG de V & F Construction S.A
-
Ronald BAUDIN, Ministre de l‟Économie et des Finances
Page 188 of 656
3-Aménagement d‟infrastructures sportives Phase I
Maitre d‟ouvrage : MPCE
Description des travaux : Aménagement d‟infrastructures sportives Phase I
Localité : Nationale
Maitre d‟œuvre : Supervision–Etudes Constructions S.A (SECOSA)
Montant du contrat
Date de signature du contrat
Durée des travaux
Appel d‟offres
: 12 Mai 2011 (Contrat), 07 Juillet 2015
: 6 mois
: Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
: signé et scellé
: Non-signé
Documents d‟éligibilités fournis
: Oui
Cautionnement fourni pour l‟avance : non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: Non constaté
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux : 5 Décembre 2015
Montant total versé au maitre d‟œuvre : U S 25,617,683.
Page 189 of 656
Commentaires :
Passé Gré à Gré, sans approbation de la CSC/CA et sans non plus le certificat de non
objection du CNMP, Il fut signé le 12 Mai 2011. La durée des travaux était de (6) six mois
et, les travaux furent achevés le 5 Décembre 2015. Le matricule fiscal et le quitus fiscal
sont absents du dossier, ainsi que le procès-verbal de la réception provisoire et celui de la
réception définitive.
Des pages sont manquantes au contrat . La page des articles 3, 4, 5 n‟est pas retrouvée
dans la copie du contrat, cela nous empêche de déterminer le montant du contrat
(Phase I). Le total du montant décaissé dans le Projet « Aménagement d‟infrastructures
sportives », inclus plusieurs contrats dont la phase I et II, le gazonnage des 14 parcs
sportifs, la supervision et l‟avenant de la phase I.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués
Quant à ce contrat ayant pour description « Aménagement d‟Infrastructure Sportives et
Gazonnage de quatorze (14) parcs ». Il fut exécuté en trois (3) phases :
Le contrat initial
Le contrat de supervision
Le contrat de gazonnage
Ce contrat est signé par :
-
Jean Emile LAFERIERE, Président Directeur Général de la SECOCA
-
Jean Max BELLERIVE, Ministre de la Planification et de la Coopération Externe.
-
Paraphé et scellé par la CSC/CA
Cet avenant est signé par :
-
Jean Emile LAFERIERE, Président Directeur Général de la SECOCA
-
Yves Germain JOSEPH, Ministre de la Planification et de la Coopération
Externe.(MPCE)
Page 190 of 656
6-Contrat de Gazonnage Synthétique de 14 stades Sportifs
Maitre d‟ouvrage : MPCE
Description des travaux : Contrat de Gazonnage Synthétique de 14 stades Sportifs
Localité : Nationale
Maitre d‟œuvre : SupervisionŔEtudes Construction S.A (SECOSA)
Montant du contrat : 387, 145,603.60 Gourdes ou 7, 852,851.98 US (Tx =49,3Gourdes pr 1$ us)
Date de signature du contrat
Durée des travaux
Appel d‟offres
05 Juin 2015
: 6 mois
: Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
: Signé et Scellé
: Signé et Scellé
Documents d‟éligibilités fournis
: Oui
Cautionnement fourni pour l‟avance : non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: N/A
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux : 5 Décembre 2015
Montant total versé au maitre d‟œuvre : (Commentaires)
Ce contrat est signé par :
-
Jean Emile LAFERIERE, Directeur général de la SECOSA
-
Yves Germain JOSEPH, Ministre de la Planification et de la Coopération Externe
-
Paraphé et scellé par la CSC/CA
Page 191 of 656
7-Réhabilitation de la route kenscoff (Tronçon Laboule 12/ Kenscoff)
Maitre d‟ouvrage : MTPTC
Description des travaux : Réhabilitation de la route kenscoff (Tronçon Laboule 12/ Kenscoff)
Localité
Kenscoff
Maitre d‟œuvre
V&F construction S.A
Montant du contrat
258, 309,389.60 Gourdes
Date de signature du contrat
Durée des travaux
23 Septembre 2012
4 Mois
Appel d‟offres
Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
N/A
N/A
Documents d‟éligibilités fournis :
Quitus fiscal, patente, matricule fiscale
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
N/A
Prélèvement des 2%
5, 166,187.78 Gourdes
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre: US 8,486,279
Commentaires :Voir Résolution 24 Août 2010
8-Maitre d‟ouvrage :
MPCE
Page 192 of 656
Description des travaux :
Localité
Construction du marché public de Jacmel
Jacmel
Maitre d‟œuvre La consortium Amaca-Disconsa Construction
Montant du contrat U.S 2, 400,000
Date de signature du contrat :13 Octobre 2010
Durée des travaux
2 mois
Appel d‟offres Gré à Gré
Approbation de la CSC/CA : Oui
Non objection du CNMP : Non signé
Documents d‟éligibilités fournis :N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie N/A
Retenue de bonne exécution
N/A
Prélèvement des 2%
N/A
Date de démarrage des travaux N/A
Date d‟achèvement des travaux
Montant total versé au maitre d‟œuvre :
N/A
US 2, 303,455.00
Commentaires :
Quant à ce Contrat ayant pour description, « Constuction du marché public de Jacmel », il
fut signé entre l‟État Haïtien représenté par Jean ŔMax BELLERIVE Ministre de la
Planification et de la Coopération Externe, et Manuel Adriano
AMARANTE DIEZ
représentant du Consortium Amca-Disconsa Constructions.Il est signé le 13 Octobre 2010
et se chiffre US 2,400,000.
Il convient de préciser que l‟article 7 dudit contrat a fait mention d‟une avance de U.S
Page 193 of 656
600,000 versé à l‟ entrepreneur, ce qui représente 25% du montant du contrat, mais le
Maitre d‟Ouvrage a versé une somme de U.S 900,000 (numéro orde de décaissement :338/
Résolution 12 mai 2011 et 28 février 2012 en date du 20 septembre 2012).
Passé de Gré à Gré, avec l‟approbation de la CSC/CA et sans le certificat de la nonobjection de la CNMP. La durée était de deux (2) mois. Aucune patente et quitus n‟ont été
transmis.
Les 2% à prélever pour le compte de la DGI n‟ont pas été effectués.
Les montants alloués en US dans les Résolutions sont les suivants :
-
Résolution du 12 mai 2011 est de
1,700,000
-
Résolution du 28 février 2012 est de
400,000
-
Résolution du 21 décembre 2012 est de
2,000,000
Total
4,100,000
Les décaissements se répartissent ainsi en US :
-
Résolution du 12 mai 2011 est de
1,700,000
-
Résolution du 28 février 2012 est de
100,000
-
Résolution du 21 décembre 2012 est de
503,455
Total
2,303,455
Les personnalités signataires sont :
-
Jean ŔMax BELLERIVE, Ministre de la Planification et de la Coopération Externe
-
Manuel Adriano AMARANTE DIEZ, représentant du Consortium Amca-Disconsa
Constructions.
-
Paraphé et scellé par la CSC/CA
Ce contrat a été signé bien que les ressources ont été disponibles.
Page 194 of 656
Irrégularités :
Critères d‟analyse :
Basés sur une recherche consistant à savoir si les projets ont eu un lien avec la reconstruction
des zones affectées par le séisme ou non. Deux critères ont été pris en compte:
1) La position géographique du projet devant trouver dans le périmètre des zones
touchées par le séisme.
2) L‟objet du projet devant viser la reconstruction des infrastructures endommagée
par le séisme (route endommagée, école, hôpital, démolition, déplacement des débris,
hébergement, édifice public, etc)
En fonction de ces critères, ces irrégularités sont identifiées :
Des projets dans des zones non touchées par le séisme
Cette première répartition nous montre que plusieurs départements qui n‟ont ressentis aucun
effet du séisme ont pu quand même bénéficier d‟une forte allocation de $167 652 698,52 (22
projets), représentant 48% de l‟enveloppe globale. (Voir Annexe 1)
Des projets n‟ayant rien à voir avec l‟urgence post séisme :
Outre les 22 projets totalisant 167 652 698,52 $ (48%) situant hors périmètre du séisme, il
existe encore 11 autres pour un total de 92 77 987,48 (27%) figurant dans les zones du
séisme, mais n‟ayant rien à voir avec l‟urgence post séisme visant en priorité la
reconstruction les infrastructures endommagées. Comme par exemple :
-
Acquisition de 100 véhicules tout terrain pour la PNH d‟un montant de 3,600,000$.
-
Construction de parc sportif dans dix communes pour un montant de 4,500,000$.
-
Réhabilitation route Miragoâne Ŕ Petite Rivière de Nippes $ 21,831,472 qui est une
nouvelle route.
-
Etc…
La réalisation de ces projets sous l‟égide de la loi d‟urgence 2010 viole l‟article 34.1 et 34.2
de la loi du 10 juin 2009 sur les marchés publics traitant des procédures célères :
-
Art 34-1 Le marché est passé de gré à gré ou par entente directe: … dans les cas
d’urgence due à des circonstances imprévisibles ou de force majeure ne
permettant pas de respecter les délais prévus dans la procédure d’appel d’offres;
-
34.2 « En aucun cas, l’autorité contractante ne peut invoquer l’urgence… dans
le but de se dérober à son obligation de recourir à la concurrence »
Dans le cadre de ces 33 projets, il n‟y a ni circonstance imprévisible, ni force majeure.
Page 195 of 656
En conclusion,
Violation de la loi du 1u juin 2009 sur les procédures célères :
33 projets totalisant 260,530,686 $ (74%) n‟ont aucun lien avec l‟urgence post séisme.,
soit ils ne se trouvent pas dans les zones affectées par le séisme, soit l‟objet du projet ne
concorde pas avec la reconstruction de ces dites zones.
La Commission a constaté que ces projets violent les articles 34.1 et 34.2 de la loi du 10
juin 2009 sur les marchés publics ainsi que l‟article 7.5 de la loi d‟urgence d‟avril 2010.
La Commission pense que le gouvernement déclare l‟Etat d‟urgence sur toute l‟étendue
du territoire national plutôt que la partie affectée par le séisme dans l‟unique but de
contourner la loi du 10 juin 2009 sur les passations de marchés public.
Analyse des contrats signés par le Gouvernement Bellerive
Tous les contrats sont signés sous l‟emprise de la loi d‟urgence du 17 avril 2010 afin de
faciliter les travaux de reconstruction dans les zones affectées. L‟état d‟urgence a été prévu
initialement pour un mois et proroger, en vertu de l‟article 16, par arrêté présidentiel, pour
une durée de 18 mois complémentaires jusqu‟au mois d‟octobre 2011.
L‟article7 alinéa 5 de cette loi d‟urgence renvoie aux procédures célères prévues par la loi du
10 juin 2009 sur la Passation de Marchés Publics.
Critères d‟analyse :
L‟objectif poursuivi par cette analyse a été de vérifier la conformité des contrats aux normes
et pratiques de bonnes gouvernances dans l‟attribution des marchés publics et de la
sauvegarde des intérêts de l‟Etat.
L‟analyse des contrats a été faite à la lumière des critères suivants :
1) Le respect des règles de passation des marchés publics
a) L‟éligibilité des firmes à fournir des biens et services et la réalisation des travaux
- Respect des critères d‟ordre techniques (Quitus fiscal, Patente, Matricule fiscal,
Nbre d‟année d‟expérience, expérience spécifique, Signataire non représentatif, etc…)
- Respect des critères d‟ordre financiers. (Capacité financière de la firme à fournir
les biens et service ou la réalisation des travaux)
b) Le libre accès à la commande publique par la mise en concurrence des entreprises.
Donner à tous les soumissionnaires une chance de soumettre une offre.
Pour les contrats tombant sur le coup d‟une loi d‟urgence, il était important de s‟assurer le
respect des articles 33 exigeant que le « nombre de candidats admis à soumissionner doit
assurer une concurrence réelle »
Page 196 of 656
c) L‟égalité de traitement des candidats et transparences des procédures.
La Commission s‟est assurée de l‟absence dans le dossier d‟appel d‟offre de tout critère
discriminatoire en conformité aux articles 19-1 et 20-1 de la loi La loi du 10 juin 2009 sur
les marchés publics.
2) Respect de règles d‟éthique
La Commission s‟est assurée également du respect des règles d‟éthiques ou l‟absence de tout
acte de corruption tel que défini par la loi du 12 mars 2014 portant prévention et répression
de la corruption en son article 5 :
La Commission a vérifié en particulier ces actes suivants :
I „abus de fonction,
la surfacturation,
le trafic d'influence,
le népotisme,
la passation illégale de marchés publics,
3) La protection des intérêts de l‟Etat
La Commission s‟est assurée de la présence de garanties suffisantes en cas de non exécution
des travaux et en cas de résiliation de contrat.
4) L‟efficacité des dépenses publiques.
La Commission s‟est assurée que tout projet est précédé d‟une étude qui répond à un besoin
réel et bénéficiant d‟un rendement proportionnel aux sommes décaissées.
Echantillon
La Commission a analysé quarante et un (41) contrats dont six (6) ont été attribués suivant
une procédure d‟appel d‟offres restreint et trente-cinq (35) contrats de gré à gré.
Les contrats attribués sous la rubrique d‟appel d‟offres restreint
Il convient de rappeler les dispositions de la loi du 10 juin 2009 sur l‟appel d‟offres restreint :
art 33.- L’appel d’offres est dit restreint, lorsque seuls peuvent remettre des offres les
candidats qui y ont été invités par l’autorité contractante. Le nombre de candidats
admis à soumissionner doit assurer une concurrence réelle. Il est ensuite procédé comme en
matière d’appel d’offres ouvert, ainsi qu’il est indiqué aux articles 29 et 29-1 de la présente
loi1.
art 33-1.- Il ne peut être recouru à la procédure de l’appel d’offres restreint que lorsque les
biens, les travaux ou les services, de par leur nature extrêmement complexe ou spécialisée, ne
sont disponibles qu’auprès d’un nombre limité d’entrepreneurs, de fournisseurs ou
de prestataires de services. Le recours à la procédure de l’appel d’offres restreint est motivé
sur la base des critères pré établis par la Commission Nationale des Marchés Publics.
Page 197 of 656
L’autorité contractante qui décide d’y recourir en fait une demande de non-objection
avant de passer le marché.
La Commission a analysé six (6) contrats d‟appel d‟offres restreints portant la signature de
l‟ex-Premier Ministre Jean-Max BELLERIVE conclus avec les entreprises suivantes :
Nbre de
contrats Montant
Firmes d'exécution
Nature projet
Constructora HADOM S.
A.
Palais Législatif
1
Construcciones Y Disenos Développement
résidentiel
R.M. N. S.A.
Bowenfield (Phase I et I)
2
Développement résidentiel Fort
ROFI S.A.
National (Phase I, II, et III)
3
6
33 765 366,08
135 309 218,65
178 951 296,90
348 025 881,63
Irrégularités :
Outre les critères énumérés ci-dessus, les documents d‟appel d‟offres (DAO) tiennent compte
des critères suivants :
Le nombre d‟années d‟expérience fixé à cinq ans.
Le nombre de contrats déjà exécutés dont le plus bas coût est estimé à cent million
Dollars américains (USD 100,000,000.00).
Il en résulte de l‟analyse de la Commission que le Ministère de la Planification et de la
Coopération Externe ne respecte pas les règles de passation de marché public.
Les raisons sont les suivantes :
Inéligibilité de la firme haïtienne Constructura HADOM SA n‟ayant pas
respecté les 5 années d‟expérience
La Firme haïtienne CONSTRUCTURA HADOM S.A, adjudicataire du marché de
construction du Palais Législatif pour un montant de $ USD 33,765,66.08 , a été créée le 28
juillet 2010 (Réf . Moniteur du 13 septembre 2010). Au moment de la signature du contrat par
l‟ex -Premier Ministre, Jean- Max BELLERIVE, le 8 novembre 2010, elle avait près de trois
(3) mois d‟existence. Donc, elle ne répond pas au critère des cinq (5) années d‟expérience tel
qu‟énoncé dans le DAO. Pour l‟attribution de ce marché, le Comité d‟Evaluation des Offres
était constitué de : Hervé DAY, Michel CONTENT et Lionel GRAND‟PIERRE.
Ce processus d‟Appel d‟offre viole l‟article 19 de la loi du 10 juin 2009 exigeant le respect
par les firmes des critères d‟ordre techniques. Cet article s‟exprime ainsi :
« Tout candidat qui possède les capacités techniques nécessaires à l’exécution d’un marché
public ou d’une convention de concession d’ouvrage de service public, y compris
l’expérience dans l’exécution de contrats analogues, peut participer aux procédures de
passation de marchés publics et de convention de concession d’ouvrage de service public. Il
doit justifier ses capacités techniques telles que définies dans les dossiers d’appel d’offres. »
Page 198 of 656
Inéligibilité de la firme dominicaine CONSTRUCTIONES Y DISENOS
R.M.N.S.A n‟a pas respecté les 5 années d‟expérience
La Firme dominicaine CONSTRUCTIONES Y DISENOS R.M.N.S.A, adjudicataire du
marché rénovation urbaine et développement résidentiel de Bowenfield pour un montant
global de $ USD135,309,218.65 , a été créée le 29 mai 2006 et a signé deux (2) contrats
(phase I et II) avec l‟ex- Premier Ministre, Jean-Max BELLERIVE, le 8 novembre 2010. Par
conséquent, elle avait moins de cinq (5) années d‟expérience contrairement à l‟un des critères
d‟éligibilité du DAO. Pour l‟attribution de ce marché, le Comité d‟Evaluation des Offres
était constitué de : Hervé DAY, Michel CONTENT et Lionel GRAND‟PIERRE.
Ce processus d‟Appel d‟offre viole l‟article 19 de la loi du 10 juin 2009 exigeant le respect
par les firmes des critères d‟ordre techniques.
Absence de libre concurrence dans l‟attribution des 3 marchés
Le processus d‟appel d‟offres restreint dans l‟attribution des trois (3) marchés : Palais
législatif, Bowenfield et Fort National ne favorisait pas la libre concurrence. Parmi les quatre
(4) firmes invitées à soumissionner : une (SECOSA) n‟y avait pas répondu; deux d‟entr‟elles
(HADOM S.A ET CONSTRUCCIONES Y DISENOS S.A) n‟étaient pas qualifiées en
référence au critère des cinq (5) années d‟expérience requis et la dernière (ROFI S.A), bien
que qualifiée, compte tenu de l‟inobservation du critère d‟expérience pour les deux (2) autres
firmes soumissionnaires avait de fait concouru seule.
Ces processus d‟appel d‟Offre violent l‟article 33 de la loi du 10 juin 2009 sur les procédures
célères qui exigent que « … Le nombre de candidats admis à soumissionner doit assurer une
concurrence réelle ».
La Commission estime que le critère d’expérience de travaux dont le plus bas coût est de 100
millions de dollars constitue une mesure discriminatoire pour les firmes haïtiennes au profit
des firmes dominicaines.
Ce critère permet au MPCE de mettre à l’ écart les firmes haïtiennes dans sa pré-sélection.
Cette attitude est contraire aux articles 19-1 et 20-1 de la loi du 10 juin 2009 sur les marchés
publics qui empêchent d‟inclure dans le DAO des critères discriminatoires.
L‟article 19.1 s‟exprime ainsi :
« Lors de la définition des capacités techniques requises, l‟autorité contractante ne doit pas
prendre de dispositions pouvant faire obstacle à l‟accès des petites et moyennes entreprises a
la commande publique, sans préjudice des critères de qualité »
L‟article 20.1 s‟exprime ainsi :
« Lors de la définition des capacités financières requises, l‟autorité contractante ne doit pas
prendre de dispositions pouvant faire obstacle à l‟accès des petites et moyennes entreprises a
la commande publique. »
Page 199 of 656
Position de M. Jean Max BELLERIVE
De cette dernière assertion, Mr Jean Max BELLERIVE s‟est défendu au cours de son
audition par devant la Commission pour faire comprendre que les firmes haïtiennes étaient
disqualifiées, car elles n‟avaient pas encore à l‟époque l‟expertise nécessaire pour exécuter
ces genres de travaux.
Non respect de l‟article 53 de la loi du 10 juin 2009 exigeant l‟ouverture des plis
30 minutes après leurs réception.
Les membres du Comité d‟Ouverture des Plis et d‟Evaluation des Offres ont pris trois (3)
jours pour l‟ouverture des plis. Ceci constitue un accroc à la législation haïtienne sur les
marchés publics (ref article 53 de la loi du 10 juin 2009) qui prévoit que les dossiers de
soumission soient ouverts en séance publique, au plus trente (30) minutes après la réception
des plis.
Article 53 de la loi du 10 Juin 2009 se lit comme suit :
« La séance d„ouverture des Plis est publique et doit intervenir trente minutes au plus
après l‟heure limite du dépôt des offres »
Absence de demande de non objection telle qu‟exigée par l‟article 33.1 de la loi
du 10 juin 2009.
La Commission d‟Enquête n‟a pas retrouvé dans la documentation mise à sa disposition la
preuve d‟une quelconque demande de non-objection sollicitée de la Commission Nationale
des Marchés Publics (CNMP), en violation à l‟article 33.1 sur les marchés publics.
N.B : Ces faits sont rapportés dans le rapport de la Commission d‟Audit instaurée par l‟Ex
Premier Ministre Gary CONILLE ainsi que celui de la Commission Sénatoriale Anticorruption de 2016.
Les contrats attribués sous la rubrique de gré à gré
Il importe de souligner les prescrits de la loi du 10 juin 2009 sur le marché de gré à gré :
Art 34- Le marché est passé de gré à gré ou par entente directe lorsque l’autorité contractante
engage, sans appel à la concurrence, les discussions qui lui paraissent utiles, avec un
entrepreneur, fournisseur ou prestataire de services identifié à l’avance.
Art 34-1 Le marché est passé de gré à gré ou par entente directe: lorsque les besoins ne
peuvent être satisfaits que par une prestation nécessitant l’emploi d’un brevet d’invention,
Page 200 of 656
d’une licence ou de droits exclusifs détenus par un seul entrepreneur, un seul fournisseur ou
un seul prestataire ; dans les cas d’urgence due à des circonstances imprévisibles ou de
force majeure ne permettant pas de respecter les délais prévus dans la procédure
d’appel d’offres; dans le cas d’urgence motivés ou l’ autorité contractante doit faire exécuter
un marché en lieu et place de l’ entrepreneur, du fournisseur ou du prestataire défaillant ;
pour des fournitures, services ou travaux qui complètent ceux ayant fait l’objet d’ un premier
marché exécuté par le même titulaire à la condition que le marché initial ait été passé selon la
procédure d’appel d offres, que le marché complémentaire porte sur des fournitures, services
ou travaux qui ne figurent pas dans le marché initialement conclu mais qui sont devenus
nécessaires, à la suite d’ une circonstance imprévue et extérieure aux parties, et que ces
fournitures, services ou travaux ne peuvent être techniquement ou économiquement séparés
du marché principal.
Art 34-2 En aucun cas, l’autorité contractante ne peut invoquer l’urgence pour justifier
son retard, son imprévoyance, sa négligence ou uniquement dans le but de se dérober
à son obligation de recourir à la concurrence.
Art 34-3 Le marché de gré à gré ne peut être passé qu’avec des entrepreneurs, fournisseurs
ou prestataire de services qui acceptent de se soumettre à un contrôle des prix spécifiques
durant l’exécution des prestations. Le marché précise les obligations comptables
auxquelles le titulaire du marché est soumis et notamment l’obligation de présenter ses
bilans, comptes de résultats, ainsi que sa comptabilité analytique d’exploitation ou, à défaut
de celle-ci, tout document de nature à permettre l’établissement des coûts de revient.
Echantillon
La Commission a analysé trente-cinq (35) contrats de gré à gré portant la signature de l‟exPremier Ministre Jean-Max BELLERIVE conclus avec les entreprises suivantes :
Firmes d‟exécutions
Nbre de contrats
Beca Engeneering
1
CONSORTIO MMC Renter
1
Consortium Tropic Build World Wide holding llc. /
JRD construction S. A
1
CONSTRUCTORA ADOM
1
GI Consultant
1
Gilbert Chenet
1
Groupe IBI-DAA
1
Grupo SITA (SRL)
1
GTC (Groupe travaux et Construction)
1
Milfort Augustin Compagnie
13
RHT PLAZA S.A.
1
SADA CONSTRUCTION
2
SECOSA (Supervision, évaluation et construction
S.A.)
9
Turbo Consulting
1
Total
35
Montant
($ USD)
6 142 109,76
2 360 000,00
2 995 400,00
5 000 000,00
3 500 000,00
250 000,00
7 717 550,00
3 575 000,00
1 025 000,00
5 735 698,69
4 350 000,00
7 168 000,00
33 594 304,17
129 000,00
83 542 062,62
Page 201 of 656
Irrégularités :
La Commission a identifié les irrégularités suivantes :
Des projets dans des zones non touchées par le séisme
Des quarante et un contrats engagés par le Premier Ministre Bellerive, vingt-trois
contrats, quoiqu‟engagés de gré à gré grâce aux exceptions de la loi d‟urgence,
concernent des communes qui n‟ont pas été touchées par le séisme. Comme dans le
rapport Conille, la Commission a constaté que des communes qui figurent parmi les
bénéficiaires de marchés publics traités avec les dérogations de la loi d‟urgence, sans avoir
subi les dommages du tremblement.
Il s‟agit de contrats pour les communes de Pignon, de Ranquitte, de Saint Raphael, du Limbé,
de la Grande Rivière du Nord, de Hinche, de Maissade, d‟Ennery, de Saint Michel De
L‟Attalaye, de Cote de Fer et de Zone Frontalière. De plus, des contrats pour 10 autres
communes, n‟ont pu être identifiés.
Même si la loi d‟urgence d‟avril 2010 telle que votées par le Parlement donne un cheque en
blanc au Gouvernement, Cependant, la loi du 10 juin 2009, dans les procédures célères
empêchent l‟utilisation abusive de l‟urgence.
En faisant passer les projets du Cap Haitien, des Gonaives, de Hinche, etc.. dans le cadre de
l‟urgence, le gouvernement a violé la loi du 10 juin 2009 relative aux procédures célères
(Ref : articles 34.1 et 34.2)
Des projets n‟ayant rien à voir avec l‟urgence post séisme.
La Commission a déjà présenté une liste de projets dont l‟objet n‟a rien à voir avec la
reconstruction des infrastructures endommagées par le séisme.
En plus, la Commission considère donc que si l‟exécution de certains projets est mise en
route plusieurs années après les évènements qui leur ont fait bénéficier du statut contractuel
allégé de la loi d‟urgence, c‟est qu‟ils ne tenaient pas réellement de l‟urgence; ou encore,
c‟est qu‟il y avait manifestement une volonté de les faire passer pour urgent tandis qu‟ils ne
l‟étaient pas.
Ces projets constituent une violation flagrante de l‟article 34.1 de la loi du 10 juin 2009 sur
les passations de marchés publics s‟exprimant ainsi :
« Le marché est passé de gré à gré ou par entente directe: …; dans les cas d’urgence due à
des circonstances imprévisibles ou de force majeure ne permettant pas de respecter les
délais prévus dans la procédure d’appel d’offres;… ».
Ces projets violent également l‟article 34.2 qui s‟exprime ainsi :
Page 202 of 656
« Art 34-2 En aucun cas, l’autorité contractante ne peut invoquer l’urgence … dans
le but de se dérober à son obligation de recourir à la concurrence.
Contrats signés par M. Bellerive 24 heures avant sa démission le 13 mai 2011.
Seize (16) pour un montant total de USD 28.256.194,81 ont été signés le 12 mai 2011 par
l‟ex - Premier Ministre Jean-MAX BEL LERIVE, soit vingt-quatre (24) heures avant sa
démission le 13 mai 2011 donnée au Président René PREVAL.
S‟il n‟y pas un problème d‟ordre légal, il se pose quand même un problème d‟ordre éthique
d‟engager un nouveau gouvernement.
Contrats signés par M. Bellerive après la publication de l‟arrêté nommant son
successeur
Cinq (5) contrats pour un montant total de USD11.243.023.00ont été signés par l‟ex Premier
Ministre Jean-Max BELLERIVE du 7 au 12 octobre 2011, tandis que l‟arrêté de nomination
de son successeur a déjà été publié (Moniteur-Supplément # 140 du 7 octobre 2011).
Un premier Ministre démissionnaire et en plus l‟arrêté de nomination de son successeur déjà
publié, on ne voit de bon œil la nécessité d‟engager son successeur.
Les quatorze (14) contrats restant sont principalement accordés à la société en nom collectif
Milfort Augustin & Co., formée de Jocelin Milfort et Jackson Augustin, connue comme J&J
Construction; ils ont été signés entre janvier 2011 jusqu‟à Aout 2011.
Les intérêts de l‟Etat ne sont pas garantis en cas de résiliation
La Commission a noté qu‟il existe, dans la majorité des contrats de gré à gré, une clause de
résiliation de plein droit sans responsabilité aucune pour l‟entrepreneur quoi que le motif de
résiliation ne soit pas imputable au maître d‟ouvrage(MPCE). A titre d‟exemple, la clause cidessous figure dans la plupart des contrats :
« Le présent contrat sera résilié de plein droit et sans indemnité, cette liste n’étant pas
limitative, dans les cas suivants : Non accomplissement de l’une ou de plusieurs obligations
de l’entrepreneur, après une mise en demeure préalable; Défaillance technique et
administrative de l’entrepreneur. »
C‟est une violation de l‟article 88-2 de la loi du 10 juin 2009 sur la Passation des Marchés
Publics qui se lit comme suit :
«Le contrat fixe les cas, les conditions et les modes de calculs des indemnités à verser à l‟une
ou à l‟autre des parties suivant les causes entraînant la résiliation ou la caducité du marché »
Qualité des signataires
La Commission s‟étonne de constater que le Ministère du Plan ait été le seul à négocier et à
signer tous ces contrats, sans exception alors que différents Ministères sectoriels tel les
Travaux Publics, l‟Education Nationale et les Affaires Sociales qui quoique concernés, aient
été mis à l‟écart.
Page 203 of 656
Ce n‟est pas dans les attributions du Ministère de la Planification de signer au nom de tous les
ministères sectoriels. Ce qui crée un véritable problème de suivi des contrats par ces
différents ministères.
Absence de supervision des grands travaux de l‟Etat par les Ministères sectoriels.
De plus, aucune instance de l‟Etat (Ministère des Travaux Publics, Transports et
Communication) n‟a été mise à contribution dans la supervision des grands travaux de
construction financés pendant la période d‟urgence, alors que l‟Etat dispose de l‟expertise
adéquate pour ce faire. Au contraire, l‟Etat a décaissé des fonds considérables en faveur des
entreprises privées pour une tâche qu‟il pouvait accomplir.
N.B : Ces assertions sont présentées dans le rapport Conille et ainsi celui de la
Commission Anti-corruption de 2016.
J & J CONSTRUCTION
Plus d‟une douzaine de contrats ont signé en 2011 avec la société en nom collectif Milfort
Augustin & Co., formée de Jocelin Milfort et Jackson Augustin, connue comme J&J
Construction. A ces faits.
La Commission a identifié les irrégularités suivantes :
Irrégularités :
Les contrats signés avec J & J Construction sont entachés de nullité
Lorsque les contrats ci-dessus répertoriés ont été octroyés, la Société J&J n‟existait pas. Une
annonce parue le 24 décembre 2010 dans Le Nouvelliste se lit comme suit :
« Le Nouvelliste – Petites Annonce/Dissolution de la Société en nom collectif J&J
Construction :
« 2010-12-24/Le Cabinet Augustave informe le public en général et les intéressés en
particulier que la société en nom collectif J&J Construction ayant pour raison sociale
''Milfort-Augustin et Co'' dont le capital social est de cent mille gourdes (100.000.00
Gourdes) administrée par les sociétaires Josselin Milfort et Jackson Augustin est dissoute par
acte de dissolution daté du 27 septembre 2010 et déposé en l'étude du notaire Jean A.
Lamothe le huit novembre 2010. Pour le Cabinet : Margarette B, AUGUSTAVE, AV. Gérald
AUGUSTAVE, AV »
De plus, le signataire Hérode Thelusma, représentant J&J Construction n‟avait aucun mandat
pour représenter la compagnie. Aucun document à cet effet n‟est retrouvé dans les dossiers,
aucune référence, aucun moyen de le rejoindre même pour un suivi.
Pour la Commission il s‟agit d‟un montage visant à faciliter des décaissements irréguliers en
faveur d‟un groupe proche de la structure d‟octroi de marchés organisée par l‟ancien Premier
Ministre Bellerive.
Page 204 of 656
Surfacturation
L‟analyse d‟un échantillonnage de contrats de J&J Construction a révélé que cette firme a été
employée pour faire de la supervision des chantiers principalement accordés à la firme
SECOSA.
No
1
2
3
4
5
6
7
Contrats
Lycée National de St Raphael
Lycée National de Ranquitte
Lycée National de Maissade
Lycée National de Pignon
Avenant Lycée National de
Pignon
(Avenant 99.16% valeur
contrat/un avenant ne peut pas
aller au-delà de 30%)
Lycée National de Gressier
Lycée National de CercaCarvajal
Nouveau Lycée National de
Hinche
Firme de
Supervision
J &J Const.
J &J Const.
J &J Const.
J &J Const.
Montant
Montant
Contrat
Taux de
Contrat
d'exécution
Supervision
supervision
(SECOSA)
46 485 885,00 5 650 000
12,2%
48 485 885,00 5 000 000
10,3%
36 105 931,36 4 000 000
11,1%
55 463 488,00 5 600 000
10,1%
J &J Const. 55 000 000,00
J &J Const. 55 463 488,00 5 600 000
148 457
J &J Const.
665,00 21 000 000
10,1%
14,1%
J &J Const. 60 463 488,00
505 925
830,36
Le pourcentage alloué pour la supervision est aussi supérieur à ce qui est généralement
pratiqué dans l‟industrie, soit au-dessus de 10% de la valeur du contrat entre le maitre
d‟ouvrage et l‟entrepreneur.
SECOSA
Du clientélisme
SECOSA (Supervision, évaluation et construction S.A.) a bénéficié d‟une enveloppe de 33.5
millions de dollars pour un total de 9 projets. Son enveloppe représente 40% du portefeuille
de contrats de gré à gré signé par le Premier Ministre Bellerive.
la firme SECOSA a d‟abord signé un contrat de gré à gré d‟une valeur de US $13,000,000.00
pour l‟érection de diverses infrastructures sportives. En sus de ce contrat, elle a encore signé
un nouveau contrat pour l‟aménagement d‟infrastructures sportives dans dix communes, pour
un montant de US $4,450,000.00.
En plus de ces deux contrats, la firme SECOSA a signé plusieurs contrats de construction
d‟école dans plusieurs villes de province et de rénovation urbaine.
Page 205 of 656
Irrégularités
La plupart des projets exécutés par SECOSA n‟ont rien à voir avec l‟urgence
post seisme.
Ce sont pour la plupart des infrastructures sportive et de construction d‟école dans des zones
non touchées par le séisme.
Absence de certificat de non objection.
Aucun certificat de non objection n‟a été ni sollicité ni obtenu du CNMP;
Contrats non accompagnés de devis estimatif
Les devis estimatifs ne sont pas disponibles (Cas des deux contrats signés pour la
construction d‟infrastructures sportives) tels exigés par l‟article 34.3 de la loi du 10 juin 2009.
Lieu d‟exécution non identifié
Une analyse d‟un contrat dont bénéficie la SECOSA relatif à l‟aménagement des
infrastructures sportives dans dix(10) communes, pour un montant de quatre millions quatre
cent cinquante mille dollars américains (U.S. $4,450,000.-), a conduit la Commission a
questionner l‟objet dudit contrat, la nature des infrastructures, leur emplacement ou leur
localisation (Quelles Communes ? Quel (s) Département (s)) ?
Non respect des limites fixées pour un Avenant
L‟Avenant de 55 millions de gourdes pour la construction du Lycée de Pignon équivalent à
99% de la valeur du contrat initial viole de manière flagrante l‟article 21 de l‟Arrêté du 26
octobre 2009 précisant les modalités d‟application de la loi du 10 juin 2009 fixant la limite
d‟un Avenant à 30% du contrat initial.
L‟article 21 de l‟arrêté du 26 octobre 2009 s‟exprime ainsi :
« L‟Augmentation ou la réduction de la masse des fournitures, travaux ou service y compris
les prestations intellectuelles, résultant d‟une ou de plusieurs avenants ne doit en aucun cas
être supérieur à trente pour cent (30%) du montant du marché initial, après application des
éventuelles clauses d‟actualisation et de révision. »
Page 206 of 656
Conclusion:
Pour tous les cas suscités, la Commission estime qu‟il y a suffisamment matière à mettre en
accusation les personnalités suivantes :
1- l‟ancien Premier Ministre et ex Ministre de la Planification et de la Cooperation
Externe Jean Max BELLERIVE
2- L‟Ex Ministre des Tavaux Publics Transports et Communication Jacques GABRIEL
3- L‟Ex Directeur General du BMPAD Michael LECORPS
pour violation de la loi sur les marchés publics en de multiples occasions, .
Voici un résumé de ces principales violations :
Signature de plusieurs contrats n‟ayant aucun lien avec l‟urgence post séisme en
violation de l‟article 7.5 de la loi d‟urgence d‟avril 2010 et des articles 34.1 et 34.2 de
la loi du 10 juin 2009 sur les procédures célères.
Signature des contrats engageant l‟État avec des firmes n‟ayant pas réunies les
conditions d‟éligibilités (Constructura HADOM, CONSTRUCTIONES Y DISENOS
R.M.N.S.A et J & J Construction) en violation de l‟article 19 de la loi sur les marchés
publics.
Mise en place du processus d‟appel d‟offre ne favorisant pas la libre concurrence, en
violation de l‟article 33 de la loi du 10 juin 2009 sur les procédures célères.
Mise en place d‟un processus d‟Appel d‟Offres discriminant les firmes haïtiennes au
profit firmes dominicaines en violation des articles 19-1 et 20-1 de la loi du 10 juin
2009.
Non sollicitation et non obtention de certificat de non objection de la CNMP en
violation de l‟article 33.1. de la loi du 10 juin 2009.
Mise en place de processus d‟Appel d‟offres restreints autorisant l‟ouverture des plis
après trois jours en violation de l‟article 53 de la loi du 10 juin 2009 exigeant
l‟ouverture des plis au plus tard 30 minutes après leurs réception.
L‟attribution de 22 contrats de gré à gré sur un total de 35 aux firmes SECOSA et J&J
Construction représente des faveurs, du clientélisme. Dans cette catégorie de contrat,
on retrouve des irrégularités suivantes :
- Des contrats non accompagnés de devis estimatif
- Lieu d‟exécution non identifié (Contrat signé avec SECOSA pour l‟aménagement
d‟infrastructure sportive dans 10 communes : (US 4,450,000)
- Nullité des contrats signés avec J&J Construction (société dissoute au moment de
la signature des contrats)
Page 207 of 656
-
Surfacturation de certains contrats de supervision avec J&J Construction (Ex
contrat de supervision de la construction du Lycée de Cerca Cavajal : 14.1% alors
la norme du secteur est de 10%)
Signature d‟un Avenant de 55 millions de gourdes (99% du marché initial) pour la
construction du Lycée de Pignon dépassant largement le plafond fixé à 30% du
marché initial en violation de l‟article 21 de l‟Arrêté du 26 octobre 2009 précisant les
modalités d‟application de la loi du 10 juin 2009.
Signature d‟une quarantaine de contrats au nom des différents ministères sectoriels.
Ce qui ne rentre pas dans les attributions du Ministre de la Planification.
L‟absence dans certains contrats de clause garantissant les intérêts de l‟Etat en cas
d‟arrêt des travaux ou d‟annulation de contrat. Ce qui constitue une violation de
l‟article 88-2 de la loi du 10 juin 2009.
Pour toutes ces violation répétées de la loi du 10 juin 2009 sur les marchés publics, Monsieur
Jean Max Bellerive doit être mise en accusation pour :
1) Abus de fonction (Article 5.5)
2) Surfacturation (Article 5.8)
3) Trafic d‟influence. (Article 5.9)
4) Népotisme (Article 5.10)
5) Passation illégale des marchés publics, (Article 5.12)
En conformité avec la loi du 12 mars 2014 portant prévention et répression de la corruption
dans les articles 5.5, 5.8, 5.9, 5.10 et 5.12.
En conformité avec la loi du 1er février 2017 sur l‟Elaboration et l‟Exécution des Lois de
finance dans son article 98 définissant la responsabilité pénale des ordonnateurs ayant
commis des fautes de gestion.
En conformité avec le Décret du 17 mai 2005 portant révision du statut général de la fonction
publique dans ses articles 178 et 181 sur les fautes de gestions commises par un
fonctionnaire.
En conformité avec l‟Arrêté du 16 février 2005 portant règlement général de la comptabilité
dans article 21 sur la responsabilité des ordonnateurs.
Page 208 of 656
Annexes complémentaires :
Annexe1 : Liste des projets dans des zones géographiques non touchées par le séisme
REGION
DATE
MONTANT
PROJET
RESOLUTON ACTIVITES
REVISES
%
TOTAL DES 3 RESOLUTIONS
349 001 393,77 100%
Artibonite
11-févr.-10
Reh RN1 / ST Marc/ Bigot (Gonaives)
41 542 397,00
12%
Artibonite
24-août-10
Biemac / Rue Clerveau
3 110 774,46
1%
Artibonite
24-août-10
Const. rte Biggot/Carrefour Joffre
6 902 286,04
2%
Artibonite
24-août-10
Rn1 / Marchand
6 680 179,79
2%
Centre
20-mai-11
Travaux complémentaires à Mirebalais
512 500,25
0%
Centre
11-févr.-10
Reh urbaine Lascahobas / Mirebalais
3 279 452,00
1%
Centre
20-mai-11
renovation urbaine de Hinche
8 000 000,00
2%
Grand Anse
20-mai-11
Exp Cayes / Jeremie
1 500 000,00
0%
National
20-mai-11
Cont de Parc sportif (dans 10 communes)
4 500 000,00
1%
NORD
24-août-10
Const Pont Hyppolite Cap Haitien
5 000 000,00
1%
Nord
24-août-10
Reh. de la Rte baie de l'Acul / Milot
17 400 000,00
5%
Nord
20-mai-11
Const Rte Pilboreau / Marmelade
3 735 711,44
1%
Nord
11-févr.-10
Reh urbaine au CAP
7 390 216,00
2%
Nord
20-mai-11
Rénovation urbaine Limbe
3 500 000,00
1%
Nord est
24-août-10
Const. réseau elect dans le nord est
6 469 050,00
2%
Nord est
24-août-10
Adoquinage des rues a Fort Liberte
1 760 563,76
1%
Nord est
24-août-10
Adoquinage des rues a Ouanaminthe
2 942 316,84
1%
Nord est
24-août-10
Construction rue Espagnol CODEVI
1 544 061,34
0%
Nord est
24-août-10
Drainage Nord est
1 000 000,00
0%
Nord'Ouest
11-févr.-10
Const. de 15 ponts dans le Nord'Ouest
20 483 189,60
6%
SUD
11-févr.-10
Réhabilitation carrefour Kanz / Camperin
12 900 000,00
4%
SUD
20-mai-11
Const Rte Carrefour Kans / Camperin
7 500 000,00
2%
167 652 698,52
48%
Page 209 of 656
Annexe2 : Liste des projets dans des zones géographiques touchées par le séisme, mais
n’ayant rien à voir avec l’objet des résolutions.
REGION
RESOLUTON
TOTAL DES 3
RESOLUTIONS
ACTIVITE
REVISES
%
349 001 393,77
100%
Nippes
11-févr.-10 Rehabilitation Rte Miragoane - Pte Riv
21 831 472,00
6%
Ouest
11-févr.-10 Acq de 100 vehicule Tout terrain
3 600 000,00
1%
Ouest
11-févr.-10 Acq d'equioement pour le Lab Nle
787 000,00
0%
Ouest
20 685 461,81
6%
Ouest
11-févr.-10 Reh trancon Fermathe Frere
Reh Hasco / La Saline / Base navale /
24-août-10 PAP
25 000 000,00
7%
Ouest
24-août-10 Reh Rte Laboule12 Kenscoff
6 548 429,22
2%
Ouest
20-mai-11 Entretien trancon PV Labouble 12
1 787 775,08
1%
Ouest
20-mai-11 Reh Rte Hasco / La Saline
7 000 000,00
2%
Ouest
20-mai-11 Travaux complem Laboule 12 / Kenscoff
1 937 849,37
1%
Ouest
20-mai-11 Const marche public de l'Archaie
2 000 000,00
1%
Sud Est
20-mai-11 Const Marche public de Jacmel
1 700 000,00
0%
92 877 987,48
27%
Page 210 of 656
GOUVERNEMENT MARTELLY -CONNILLE
XXIII RÉSOLUTION DU 28 Février 2012
Page 211 of 656
Résolution du 28 Février 2012.
Installé presque six (6) mois après la prestation de serment du Président Michel
Joseph MARTELLY, Gary CONILLE fut le Premier Ministre ratifié par le Parlement après le
rejet de trois (3) Premier Ministres désignés.
Le Gouvernement présidé par le Premieer Ministre Gary CONILLE est ainsi
composé de :
Prénom
Mr Laurent S.
Nom
LAMOTHE
Mr François Richel
LAFAILLE
Agr.Hebert
DOCTEUR
Mr Ralph Ricardo
THEANO
Fonction
Ministre affaires étrangères et
cultes
Affaires sociales
Agriculture et ressources
naturelles
Mr.Wilson
LALEAU
Commerce industrie
Mme Yanick
MEZIL
Condition Féminine
Mr Choiseul
HENRIQUEZ. Décédé le 11 Communication et culture
Novembre 2011
Mr Pierre Raymond
Communication et culture.
DUMAS.Installé 12
Décembre 2012
Mr André Lemercier
Georges
Economie et finances
Mr. Reginald
PAUL
Education National
Mr. Joseph Ronald
TOUSSAINT
Environnement
Mr Daniel
SUPLICE
Présidence, chargés des Haïtien
vivant à l‟étranger
Mr. Thierry
MAYARD-PAUL
Intérieur et Collectivités
Territoriales et défense
Mr. René Jean
ROOSEVELT
Jeunesse et sports
Mr. Josué
Pierre-Louis Démissionné le Justice et sécurité Nationale.
22 novembre 2011.le
premier ministre
Mr. Pierre Michel
assural’interimat.
Justice et sécurité Nationale
BRUNACHE. Installe le 12
décembre 2011
Mr. Jude Herve
DAY
Planification et coopération
Externe
Dr Florence Duperval
GUILLAUME
Sante publique et population
Mme. Stéphanie Balmir VILDROUIN
Tourisme
Ing. Jacques
ROUSSEAU
Travaux publics, transport et
communication
Ministres Délégué auprès du PM :
Bureau du ministre Délégué
auprès du premier Ministre
Charge des relations avec le
parlement (BMCRP)
Page 212 of 656
Résolution du 28 Février 2012
Sur l‟Administration MARTELLY/CONILLE, une seule Résolution a été donc prise en
conseil des Ministres le 28 Février 2012, qui d‟ailleurs porte la signature du Ministre de
l‟Agriculture des Ressources Naturelles et du Développement Rural, Monsieur Hebert
DOCTEUR.
Cette Résolution fut motivée par diverses raisons telles : La nécessité de construire
des marchés publics et des ponts, de renforcer les infrastructures sportives du pays, de
réhabiliter certains wharfs, piste d‟atterrissage, route et rue du pays, un ensembre de
Programmes et Projets ont été donc visés dans cette Résolution pour un montant de US
234,956,000 des fonds générés par PETRO CARIBE
Dans ce tableau, sont présentées la liste des institutions concernées, la nature des
projets, la localité, les montant à décaisser.
Résolution du 28 Février 2012
Liste des Projets
1-Renforcement PNH
Montant US
3,000,000
2- Projet d'électrification
11,280,000
3-Sous-programme de lutte contre la pauvreté et l'exclusion sociale
30,000,000
4-Sous-projet de rénovation urbaine de la ville de Jacmel
20,000,000
5-Rénovation urbaine de Gonaïves (phase1) (14km)
5,000,000
6-Construction du Marché Public de Jacmel
400,000
7-Rénovation urbaine de St Marc
5,000,000
8-Sous-programme d'infrastructures Sportives
6,200,000
9-Réhabilitation du Wharf de Petit-Goave
2,300,000
10-Réhabilitation du Wharf de Jérémie
2,700,000
11-Construction du Marché Public de la Ville de l'arcahaie
2,000,000
12-Travaux additionnels sur Frecyneau/St Marc
13-Réhabilitation RN1: Carrefour Frecyneau (St-Marc)-Bigot (Gonaïves)
14-Réhabilitation et entretien de la route Baie de l'Acul
7,450,000
19,750,000
15-Hébergement Post Tremblement de Terre du 12 Janvier 2010
16-Appui au fonctionnement du CNE
1,183,272
8,000,000
17-Par Industriel Morne à Cabri
10,000,000
3,000,000
Page 213 of 656
18-Construction de la route Miragoane-Petit-Trou de Nippes
13,000,000
19-Sous-programme de réhabilitation et d'entretien d'infrastructures de
transport et d'équipements urbains
14,000,000
20-Réhabilitation route Carrefour 44/Cote de fer (36km)
21-Fonds d'exportation pour les projets à financement PETRO CARIBE et
autres
12,500,000
22-Réhabilitation route de Frères
23-Réhabilitation de Rues au Cap Haïtien
3,500,000
1,012,500
24-Support au SMCRS
10,000,000
25-Réhabilitation du système d'irrigation de la plaine du Cul de sac
8,000,000
26-Réhabilitation des infrastructures de Drainage de la Rouyonne/Léogane
27-Réhabilitation de la route Hasco/Boulevard la Saline /base navale Amiral
Killick
8,000,000
6,000,000
28-Projet pilote sécurité sociale
3,000,000
29-Alphabétisation
6,000,000
30-Réhabilitaion de la piste D'atterissage de Jéremie
31-Construction de 15 Pont dans le Nord Ouest
3,000,000
863,500
TOTAL
4,000,000
230,139,272
Page 214 of 656
Résolution du 28 Février 2012
Institutions
PNH
Nature du Projet
Localité
National
Total
BMPAD
3,000,000
3,000,000
Projet d'electrification
Projet d'electrification par
lampadares solaires
Montant
decaissé
No
déc.
Montant à
décaisser
3,000,000
Renforcement PNH
Renforcement des Capacités
de la Police Nationale (PNH)
Montant du
Projet
380
3,000,000
-
11,280,000
National
11,280,000
11,280,000
275
National
15,000,000
285
National
1,209,741
284
National
1,644,815
299
National
123,957
300
National
5,278,107
327
National
947,867
358
National
4,721,893
381
-
Total
MAST/
FAES
Sous-programme de lutte
contre la pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre la pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre à pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre à pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre à pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre à pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre à pauvreté et
l'exclusion sociale
Sous-programme de lutte
contre la pauvreté et
l'exclusion sociale
30,000,000
Total
MPCE
30,000,000
Sous-projet de rénovation
urbaine de la ville de
Jacmel
Sous-projet de rénovation
urbaine de la ville de Jacmel
28,926,380
20,000,000
Jacmel
Sous total
1,073,620
332
16,131,432
20,000,000
16,131,432
3,868,568
Rénovation urbaine de
Gonaïves (phase1) (14km)
Rénovation urbaine de
Gonaïves (phase1) (14km)
Gonaïves
3,897,999
335
Rénovation urbaine de
Gonaïves
554,640
378
5,000,000
Page 215 of 656
Gonaïves (phase1) (14km)
Rénovation urbaine de
Gonaïves (phase1) (14km)
Gonaïves
547,361
5,000,000
427
5,000,000
-
Sous total
Construction du Marché
Public de Jacmel
Construction du Marché
Public de Jacmel
Construction du Marché
Public de Jacmel
400,000
338
Jacmel
100,000
Jacmel
300,000
400,000
478
400,000
-
Sous total
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
Rénovation urbaine de St
Marc
5,000,000
St Marc
St Marc
1,514,409
339
St Marc
1,004,063
367
St Marc
191,145
485
St Marc
1,386,054
517
St Marc
300,000
533
St Marc
494,886
363-1
St Marc
109,443
626
5,000,000
Sous-programme
d'infrastructures Sportives
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
5,000,000
-
6,200,000
Ouest
459,567
349
Ouest
3,552,508
355
Ouest
229,783
408
Ouest
229,783
460
Ouest
1,091,219
523
Page 216 of 656
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
Ouest
229,783
558
Sous-programme
d'infrastructures Sportives
(sports pour Changement)
Ouest
102,805
580
6,200,000
5,895,449
2,300,000
341,549
486
Réhabilitation du Wharf de
Petit-Goave
PetitGoave
Réhabilitation du Wharf de
Petit-Goave
PetitGoave
670,434
530
Réhabilitation du Wharf de
Petit-Goave
PetitGoave
579,920
597
Réhabilitation du Wharf de
Petit-Goave
PetitGoave
103,831
705
Réhabilitation du Wharf de
Petit-Goave
PetitGoave
83,770
792
Réhabilitation du Wharf de
Petit-Goave
PetitGoave
520,496
377
2,300,000
Réhabilitation du Wharf de
Jérémie
2,300,000
-
2,700,000
Réhabilitation du Wharf de
Jérémie
Jéremie
763,121
433
Rehabilitation du Wharf de
Jeremie
Jéremie
203,854
858
Réhabilitation du Wharf de
Jérémie
Jéremie
548,590
541
Réhabilitation du Wharf de
Jérémie
Jéremie
479,356
622
Réhabilitation du Wharf de
Jérémie
Jéremie
705,079
524
Sous total
2,700,000
Construction du Marché
Public de la Ville de
l'arcahaie
Construction du Marché
Public de la Ville de
l'arcahaie
Construction du Marché
Public de la Ville de
l'arcahaie
Sous total
304,551
2,700,000
-
2,000,000
Arcahaie
400,000
457
Arcahaie
1,600,000
278
2,000,000
2,000,000
-
Page 217 of 656
Travaux additionnels sur
Frecyneau/St Marc
7,450,000
Travaux additionnels sur
Frecyneau/St Marc
St Marc
560,952
429
Travaux additionnels sur
Frecyneau/St Marc
St Marc
731,920
263
St Marc
4,035,283
265
St Marc
262,068
494
St Marc
571,906
535
St Marc
136,738
581
St Marc
78,600
731
St Marc
300,118
814
St Marc
279,658
790
St Marc
117,573
852
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Travaux additionnels sur
Frecyneau/St Marc
Sous total
7,450,000
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
7,074,815
375,185
19,750,000
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)
Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
2,112,383
288
59,970
294
164,214
315
621,095
316
2,237,364
350
Page 218 of 656
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Réhabilitation RN1:
Carrefour Frecyneau (StMarc)-Bigot (Gonaïves)
Sous total
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
2,448,873
368
1,331,932
669
801,225
672
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
193,179
729
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
1,221,104
731
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
3,068,495
572
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
1,278,741
515
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
598,588
297
817,953
817
716,083
503
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
Carrefour
Frecyneau
(St-Marc)Bigot
(Gonaïves)
19,750,000
Réhabilitation et entretien
de la route Baie de l'Acul
17,671,201
2,078,799
3,000,000
Page 219 of 656
Réhabilitation et entretien de
la route Baie de
l'Acul/Barrière
Battant/Milot(RN3)
Réhabilitation et entretien de
la route Baie de
l'Acul/Barrière
Battant/Milot(RN3)
Réhabilitation et entretien de
la route Baie de
l'Acul/Barrière
Battant/Milot(RN3)
Baie de
l'Acul/
Barrière
Battant/
Milot
Baie de
l'Acul/
Barrière
Battant/
Milot
Baie de
l'Acul/
Barrière
Battant/
Milot
3,000,000
Hébergement Post
Tremblement de Terre du
12 Janvier 2010
Hébergement Post
Tremblement de Terre du 12
Janvier 2010
National
1,566,501
295
1,183,272
-
National
4,000,000
347
8,000,000
-
10,000,000
Ouest
8,000,000
10,000,000
Construction de la route
Miragoane-Petit-Trou de
Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
1,433,499
286
Sous total
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
815
4,000,000
Par Industriel Morne à
Cabri
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
849,961
National
8,000,000
Par Industriel Morne à Cabri
797
8,000,000
Total
MTPTC
205,955
1,183,272
1,183,272
Appui au fonctionnement
du CNE
CNE
726
1,183,272
Sous total
Appui au fonctionnement du
CNE
Appui au fonctionnement du
CNE
377,584
333
8,000,000
2,000,000
13,000,000
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
82,750
484
3,071,287
522
2,535,191
259
Page 220 of 656
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
Réhabilitation de la route
Miragoane-Petite Rivière de
Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes( lot1: MiragoanePetite Rivière de Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes( lot1: MiragoanePetite Rivière de Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes( lot1: MiragoanePetite Rivière de Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
Construction de la route
Miragoane-Petit-Trou de
Nippes (lot1: MiragoanePetite Rivière de Nippes
MiragoanePetite
Rivière de
Nippes
MiragoanePetite
Rivière de
Nippes
Sous total
13,000,000
440,770
264
866,386
296
82,750
304
1,837,967
370
345,499
384
345,486
585
67,110
415
2,940,809
434
82,750
435
93,470
559
88,750
801
12,880,974
119,026
Sous-programme de
réhabilitation et d'entretien
d'infrastructures de
transport et d'équipements
urbains
Sous-programme de
réhabilitation et d'entretien
d'infrastructures de transport
et d'équipements urbains
National
10,000,000
287
Sous-programme de
réhabilitation et d'entretien
d'infrastructures de transport
et d'équipements urbains
National
4,000,000
365
14,000,000
Page 221 of 656
14,000,000
Sous total
Réhabilitation route
Carrefour 44/Cote de fer
(36km)
Réhabilitation route
Carrefour 44/Cote de fer
(36km)
-
12,500,000
Sud-Est
12,500,000
12,500,000
Sous total
Inonnu
14,000,000
Fonds d'exportation pour
les projets à financement
petrocaribe et autres
360
12,500,000
-
4,000,000
Fonds d'exportation pour les
projets à financement
petrocaribe et autres
National
1,778,322
272
Fonds d'exportation pour les
projets à financement
petrocaribe et autres
National
2,221,679
258
4,000,000
Sous total
4,000,000
-
Réhabilitation route de
Frères
Réhabilitation route de
Frères
Petion ville
971,715
405
Réhabilitation route de
Frères
Petion ville
582,651
697
3,500,000
3,500,000
Sous total
Réhabilitation de Rues au
Cap Haïtien
Réhabilitation de Rues au
Cap Haïtien
1,945,634
1,012,500
Nord
1,012,500
1,012,500
Sous total
400
1,012,500
-
10,000,000
Support au SMCRS
Support au SMCRS
1,554,366
Ouest
Sous total
10,000,000
10,000,000
10,000,000
270
-
Réhabilitation du système
d'irrigation de la plaine du
Cul de sac
Ouest
8,000,000
7,828,162
276
171,838
Réhabilitation des
infrastructures de
Drainage de la
Rouyonne/Léogane
Ouest
8,000,000
7,828,162
277
171,838
Page 222 of 656
Réhabilitation de la route
Hasco/Boulevard la Saline
/base navale Amiral Killick
6,000,000
Réhabilitation de la route
Hasco/Boulevard la Saline
/base navale Amiral Killick
Ouest
1,867,573
329
Réhabilitation de la route
Hasco/Boulevard la Saline
/base navale Amiral Killick
Ouest
2,000,000
521
Réhabilitation de la route
Hasco/Boulevard la Saline
/base navale Amiral Killick
Ouest
2,000,000
752
Sous total
projet pilote sécurité
sociale
National
5,867,573
3,000,000
3,000,000
132,427
351
Alphabétisation
National
386,904
453
Alphabétisation
National
1,770,902
420
Alphabétisation
National
1,677,632
789
Sous total
-
6,000,000
Alphabétisation
TOTAL
6,000,000
6,000,000
3,835,437
2,164,563
Rehabilitaion de la piste
D'atterissage de Jéremie
3,000,000
-
3,000,000
Construction de 15 Pont
dans le Nord Ouest
863,500
-
863,500
210,303,223
19,836,049
230,139,272
Page 223 of 656
La Résolution du 28 février 2012 comprend trente-et-un (31) Projets. De ce nombre, nous
avons reçu onze (11) projets lesquels ont fait l‟objet de notre intervention. De ce fait, onze
(11) projets ont été retenus aux fins d‟analyse et sont traités dans les Résolutions suivantes et
se répartissent ainsi :
Quatre (4) dans la Réslution du 24 aout 2010 :
1- Travaux de réhabilitation de la route Barrière Battant/Milot (2.9 km)
2- Réhabilitation et construction des 24.2 Km de route reliant la base de l‟Acul à
carrefour Barrière Battant.
3- Contrat de supervision des travaux de réhabilitation de la route Barrière
Battant/Milot
4- Contrat de supervision des 24.2 Km de route reliant la baie de l‟Acul à carrefour
Barrière Battant.
Trois (3) dans la Résolution du 11 février 2011 :
1- Contrat d‟exécution des travux de la route Miragoane/Petite Rivière de Nippes.
Deux (2) dans la Résolution du18 juillet 2012 :
1- Aménagement d‟infrastructure sportive et gazonnage.
2- Supervisiond‟infrastructure sportive et gazonnage.
Page 224 of 656
Revue de passation des marchés
Résolution du : 28 Février 2012
Contrat
Maitre
d'œuvre
Maitre
d'ouvrage
Description des travaux
1
Ingenieria
ESTRELLA
MTPTC
2
Ingenieria
ESTRELLA
3
4
No
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Oui
Signé
Oui
Appel d'offres
Gré
à
gré
Approbation
CSC/CA
Localité
Date de
signature
Montant
Contrat d'exécution pour la
réalisation des travaux de réalisation
de la route de Frères
Pétion-Ville
22 Octobre
2012
84, 671,765
Gourdes
MPCE
Rénovation Urbaine de la ville des
Gonaïves
Gonaives
20 Octobre
2011
17, 308,638 Us
Oui
Oui
Non signé
Non
Ingenieria
ESTRELLA
MPCE
Travaux de réhabilitation d'urgence
des routes urbaines de St Marc
Phase 2
Saint-Marc
Décembre
2012
7, 531,907 US
Oui
Oui
Non signé
Non
Consortium
Amaca
Disconsa
Construction
MPCE
Reconstruction de la route menant
au nouveau marché public de Jacmel
(1,3km)
Jacmel
…Nov
2012
1,625,066 US
Oui
Oui
Non signé
Oui
Restreint
Oui
Ouvert
Page 225 of 656
Revue de la gestion des contrats
Résolution du : 28 Février 2012
Maitre
d'ouvrage
Description
des
travaux
Contrat
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
84, 671,765
Gourdes
Non
Non
Oui
18 Mois
1, 554,366.10
Gourdes
No
Maitre
d'œuvre
1
Ingenieria
ESTRELLA
MTPTC
Contrat d'exécution pour la
réalisation des travaux de
réalisation de la route de
Frères
2
Ingenieria
ESTRELLA
MPCE
Rénovation Urbaine de la
ville des Gonaives
20 Octobre
2011
17, 308,638
US
Non
Oui
Non
24 Mois
5, 000,000
US
3
Ingenieria
ESTRELLA
MPCE
Travaux de réhabilitation
d'urgence des routes
urbaines de St Marc Phase 2
Non
7, 531,907
US
Non
Oui
Non
24 Mois
5, 000,000
US
4
Consortium
Amaca
Disconsa
Construction
MPCE
Reconstruction de la route
menant au nouveau marché
public de Jacmel (1,3km)
…Nov 2012
1,625,066 US
Non
Constaté
Non
Non
12 mois
1,035,979 US
Date
de
signature
Montant
22 Octobre
2012
Avance
de
démarrage
406,266.5 US
Page 226 of 656
1- Contrat d‟exécution pour la réalisation des travaux de réhabilitation de la route deFrères
Maitre d‟ouvrage :
MTPTC
Description des travaux :
Contrat d‟exécution pour la réalisation des travaux de
réhabilitation de la route de frères
Localité
Route frères
Maitre d‟œuvre
Ingénierie Estrella S.A
Montant du contrat : 84, 671,765.50 Gourdes
Date de signature du contrat
22 OCT 2012
Durée des travaux
18 mois
Appel d‟offres
Restreint
Approbation de la CSC/CA
Signé et scellé
Non objection du CNMP
Signé et scellé
Documents d‟éligibilités fournis
Quitus fiscal émis le 07 Mai 2012.
Cautionnement fourni pour l‟avance
Non constaté lors de l‟analyse du contrat
Retenue de garantie4,233,433.87 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
5%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
NA
Montant total versé au maitre d‟œuvre : Résolution 28 Févier 2012 : US 1, 554,366.00
Commentaires :
Passé par Appel d‟Offres Restreint et signé entre l‟État Haïtien et la Firme INGENIERA
ESTRELLA S.A pour un montant de 84, 671,765.50 gourdes en vertue de l‟article 16 du Cahier
des clauses administratives particulieres (CCAP), puis révisé pour des travaux supplémentaires
estimé à 25,398,925.15 gourdes, ce contrat en date du 22 Octobre 2012, a bénéficié l‟avis de la
Présidente de la Cour Supérieure des Comptes et du Contentieux Administratif (CSC/CA) et
obtenu le certificat de non-objection de la Commission Nationale des Marchés Publics(CNMP).
La durée des travaux était de 18 mois. Cependant les documents fournis par le MPCE ne
contiennent pas de correspondance, de retenue, de remboursement, de prélèvement et de
paiement.
Quant à ce projet, les montants alloués en US dans la Résolution sont les suivants :
- Résolution 28 Février 2012 est de 3,500,000
-
Resolution 6 Janvier 2016
384,625
Page 227 of 656
Total
3,884,625
Les décaissements se répartissent ainsi en US :
-
Résolution 28 Février 2012
1,554,366
-
Resolution 6 Janvier 2016
---
Total
1,554,366
Le montant total décaissé est US 1,554,366 représentant 79,55% du coût des travaux.
Les personnes signataires sont :
- José Alejandro ADAMES BENITEZ, Estrella
-
Marie Carmelle JEAN-MARIE, Ministre de l‟Economie et des Finances
-
Mr Jacques ROUSSEAU, ING Ministre MTPTC
Le montant total décaissé en tenant compte des facture (1, 2,3) s‟eleve a 84, 668,677.35 Gourdes
alors qu‟on a retrouvé un montant de : 1, 554,366 US ou 67, 352,164.64 Gourdes dans la
resolution du 28 Fevrier 2012 qui represente le decaissement total de ce projet. De plus on ne peut
pas determiner le cout d‟un Km dans un projet car on n‟a pas mentionné le nombre de Kilomètre
a éxecuter. Le contrat a seulement indiqué des tronçons de route à rehabiliter.
Page 228 of 656
2-Maitre d‟ouvrage : MPCE
Description des travaux : Rénovation Urbaine de la ville des Gonaïves (14 Km)
Localité
: Gonaïves
Maitre d‟œuvre : INGENIERA ESTRELLA
Montant du contrat : U.S 17, 308,638.25
Date de signature du contrat : 20 Octobre 2011
Durée des travaux : 24 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé et scellé
Non objection du CNMP
: non mentionné
Documents d‟éligibilités fournis
: N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : Oui
Retenue de bonne exécution
: N/A
Prélèvement des 2% : N/A
Date de démarrage des travaux : Non mentionné
Date d‟achèvement des travaux : N/A
Commentaires :
Passé de Gré à Gré et signé ente l‟Etat Haïtien et la Firme Estrella pour un montant de U.S 17,
308,638.25, ce contrat en date du 20 Octobre 2011, a bénéficié d‟un paraphe et d‟un sceau de la
Cour Supérieure des Comptes et du Contentieux Administratif.
La durée des travaux était de 24 mois. Cependant les documents fournis par MPCE ne contiennent
pas de correspondance, de retenue, de remboursement, de prélèvement, et de paiement ; et le contrat
de supervision.
Ce projet ayant pour description : « Rénovation Urbaine de la ville des Gonaïves », les montants
alloués en US dans les Résolutions sont les suivants :
- Résolution 28 Février 2012 est de
5,000,000
-
Résolution 21 Décembre 2012 est de 6,000,000
-
Résolution 11 Décembre 2013 est de 9,250,000
Total
20,250,000
Page 229 of 656
Les décaissements se répartissent ainsi en US :
-
Résolution 28 Février 2012 est de
-
Résolution 21 Décembre 2012 est de 6,000,000
-
Résolution 11 Décembre 2013 est de 7,619,171
Total
5,000,000
18,619,171
Les personnalités signataires sont :
-
Mr Jude Hervé DAY, Ministre Planification Coopérative Externe
-
ING. J. Alejandro ADAMES B., Directeur Projet Haïti pour Estrella
Le montant total decaissé est de 18,619,171 US representant 107.57 % des travaux. Le cout d‟un Km
figurant dans ce contrat est estimé à 1,236,331 US ,tan dis que pour la meme periode , En Fevrier 2011
(Le cout d‟un Km pour un autre firme exécutant la route baie de l‟Acul ŔBarriere Battant est estimé a
995,254 US, d‟où un ecart positi f de 241,0778 par Kilomètre).
N.B : Ce contrat a été bien signé avant que les ressources ont été disponibles.
Page 230 of 656
3-Maitre d‟ouvrage :
MPCE
Description des travaux : Travaux de réhabilitation d'urgence des routes urbaines
de St Marc (Phase2)
Localité : St Marc
Maitre d‟œuvre : Ingenieria Estrella
Montant du contrat : US 7, 531,907
Date de signature du contrat : Non mentionné (…Décembre 2012)
Durée des travaux : 24 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : Oui
Non objection du CNMP
: Non
Documents d‟éligibilités fournis
: N /A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : Oui
Retenue de bonne exécution
: Non
Prélèvement des 2% : Non
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux : N/A
Montant total versé au maitre d‟œuvre : U.S 8,619,030
Commentaires :
Passé de Gré à Gré et signé entre l‟État Haïtien et la Firme INGENIERA ESTRELLA pour
un montant de U.S 7, 531,907, ce contrat qui ne comporte pas de date précise où il est
seulement fait mention du mois de Décembre 2012, a bénéficié de l‟avis de la Présidente de
la Cour Supérieure des Comptes et du Contentieux Administratif (CSC/CA)
La durée des travaux était de 24 mois. Cependant les documents fournis par MPCE ne
contiennent pas les décomptes, les retenues de garantie, l‟avance de démarrage et les de
prélèvement et de 2% effectués pour le compte de la DGI.
Ce projet ayant pour description : «Travaux de réhabilitation d'urgence des routes
urbaines de St-Marc (Phase2) », les montants alloués en US dans les Résolutions sont les
suivants :
- Résolution 28 Février 2012 est de
5,000,000
-
Résolution 21 Décembre 2012 est de 1,000,000
-
Résolution 11 Décembre 2013 est de 3,000,000
Page 231 of 656
Total
9,000,000
Les décaissements se répartissent ainsi en US :
-
Résolution 28 Février 2012 est de
-
Résolution 21 Décembre 2012 est de 1,000,000
-
Résolution 11 Décembre 2013 est de 2,619,030
Total
5,000,000
8,619,030
Le montant total décaissé est US 8,619,030 représentant 107,57 % .
Les personnalités signataires sont :
- José Alejandro ADAMES BENITEZ, Estrella
-
Laurent Salvador LAMOTHE, Ministre de la Planification et de Coopération
Externe.
Ce contrat fait mention de la phase 2, toutefois on a pas mis à notre disposition le contrat
de la phase 1 . Le montant total décaissé dans le cadre de ce projet est de 8, 619,030 US .
On n‟a pas mentionné dans le contrat Phase 2 le nombre de Kilomètre à exécuter, on a
seulement cité les tronçons de routes à réhabiliter, ce qui nous empêche de déterminer le
coût d‟un Kilomètre de route
Page 232 of 656
4-Maitre d‟ouvrage :
MPCE
Description des travaux :
Reconstruction de la route menant au nouveau marché
public de Jacmel (1.3 km)
Localité
Jacmel
Maitre d‟œuvre
La consortium Amaca-Disconsa Construction
Montant du contrat
U.S 1, 625,066.00
Date de signature du contrat
Novembre 2012
Durée des travaux 12 mois
Appel d‟offres
Gré à gré
Approbation de la CSC/CA
Signé
Non objection du CNMP Non signé
Avance de démarrage :
25% ;
US 406,266.50 ;
Cautionnement fourni pour l‟avance
Retenue de garantie
#478
Non constaté lors de l‟analyse du contrat
385,953 US
Retenue de bonne exécution
NA
Prélèvement des 2%
NA
Date de démarrage des travaux
Date d‟achèvement des travaux
NA
N/A
Montant total versé au maitre d‟œuvre U.S 1,035,979.00
Commentaires :
Du montant versé comme avance de démarrage (U.S 406, 266.5) on a prélevé 5% de ce
montant soit U.S 385,953 versé comme retenue de garantie
Passé de Gré à Gré, avec l‟approbation de la CSC/CA et sans non plus le certificat de non
objection de la CNMP. Ce contrat « Reconstruction de la route menant au marché public
de Jacmel (1.3 km) »,fut signé entre l‟État Haïtien représenté par Laurent Salvador
LAMOTHE Ministre de la Planification et de la Coopération Externe, et Nonie MATHIEU
Présidente de la CSC/CA, et Manuel Adriano représentant Consortium Amaca-Disconsa
Constructions. Ce Contrat ne comporte pas de date précise (…Novembre 2012) et se
chiffre à U.S 1, 625,066.
La durée des travaux était de 12 mois.
Page 233 of 656
Les personnalités signataires sont :
Laurent Salvador LAMOTHE , Ministre de la planification et de la coopération externe
Manuel ADRIANO , représentant Consortium Amaca-Disconsa Constructions.
Quant à ce Contrat de « Reconstruction de la route menant au marché public de Jacmel
(1.3 km) », les montants alloués e US dans les Résolutions sont les suivants :
- La résolution du 28 février 2012 est de
400,000
-
La résolution du 21 décembre 2012 est de
2,000,000
Total
2,400,000
Les décaissements se répartissent ainsi en US :
-
La résolution du 28 février 2012 est de
300,000
-
La résolution du 21 décembre 2012 est de
735,979
Total
1,035,979
Le montant total décaissé est US 1, 035,979 représentant 63, 75 % du coût des travaux.
Le cout d‟un Km figurant dans ce contrat est estimé à 1,250,051 tandis qu‟en Décembre
2012 ,le cout d‟un Km d‟une autre firme évoluant dans le même secteur d‟activité pour la
route petite rivière/petit trou de nippeS est estimé à 995,153 US pour des travaux dont les
les specificités, D‟où un écart positif de 254,898 par Km.
Cas Particuliers : Relativement à cette resolution, un cas particulier a retenu
l‟attention de la commission. C‟est celui de Monsieur Hébert Docteur, ex Ministre
de l‟Agriculture et des Ressources Naturelles.
Selon les termes exposés par le Sénateur Youri LATORTUE dans son rapport
d‟enquête, confirmés et éclaircis par les faits à partir des propos même de l‟Agronome Hébert
DOCTEUR lors de son audition, par devant la Commission, il apparait clairement que suite à
la démission du Premier Ministre Gary CONILLE, le ministre de l‟Agriculture Herbert
Docteur a signé une Résolution en lieu et place de ce dernier, alors qu‟il n‟avait reçu aucun
mandat formel pour le faire ; acte d‟ailleurs que Monsieur Conille avait contesté par la suite.
Au cours de son audition Monsieur Docteur tout en reconnaissant qu‟il n‟avait pas eu en sa
possession un document officiel l‟autorisant à signer ladite Résolution, il a dit avoir agi ainsi
pour rendre service et faciliter les choses. Les autres Ministres du Gouvernement ajouta-t-il,
avaient approuvé verbalement son acte.
Face à ce cas, la Commission constate que monsieur Docteur avait agi de manière
irresponsable en commettant ouvertement un acte d‟usurpation de titre en violation flagrante
des articles 27 et 218 du code pénal haïtien. En signant la Résolution du 24 février 202 en
dehors d‟une délégation expresse de pouvoir, ni un mandat officiel du premier Ministre
démissionnaire Gary CONILLE, Monsieur Docteur s‟expose à des sanctions prévues par la
loi.
Page 234 of 656
GOUVERNEMENT MARTELLY - LAMOTHE
XXIV RÉSOLUTIONS DU 18 juillet 2012
Page 235 of 656
Après la démission de Garry Conille, Laurent Lamothe est désigné le 1er mars 2012 au poste
de Premier ministre par le président Martelly. La désignation de Laurent Lamothe comme
premier ministre est finalement approuvée le 10 avril 2012 au Sénat par 19 voix sur 29 (3
contre, 7 abstentions)9. Il sera officiellement investi le 16 mai 2012.
Lors de ce mandat, l‟objectif de son gouvernement est de reconstruire le pays suite
aux séismes de 2010.
En septembre 2013, le gouvernement Lamothe met en place un programme de démocratie
participative, le « Gouvenman lakay» (« le gouvernement chez vous »), dans lequel les
membres du gouvernement se déplacent à tour de rôle dans les différents départements du
pays et s‟engagent sur des actions concrètes suite à des échanges publics.
En avril 2014, le gouvernement Lamothe procède à son plus grand remaniement ministériel
avec l‟arrivée de 10 nouveaux ministres, dont 9 femmes. À cette occasion, la ministre de
l‟économie et des finances Marie Carmelle Jean-Marie, qui avait claqué la porte du ministère
un an auparavant, revient occuper son poste resté vacant.
Pour des raisons personnelles, il présentait sa démission le 14 décembre 2014 au
président Michel Martelly.
La composition du gouvernement Martelly Lamothe:
Postes ministeriels
Titulaires
Periodes
Ministre des Affaires Étrangères et des
Cultes
Laurent Lamothe
16 mai 2012-7 aout
2012
Pierre Richard
CASIMIR
7 aout 2012-4 avril
2014
Duly Brutus
4 avril 2014
Ronsard St-Cyr
16 mai 2012-7 aout
2012
Josepha Raymond
Joseph
7 aout 2012-4avril 2014
Charles Jean Jacques
25 janv 2013-
Ministre de l'Agriculture des ressources
naturelles et du Développement Rural
Thomas Jacques
17 mai 2012
Ministre délégué auprès du Premier
Ministre chargé des relations avec le
Parlement
Ralf Theano
16 mai 2012-4 avril
2014
Ministre délégué auprès du Premier
Ministre chargé des Droit de l'Homme et de
la lutte contre la pauvreté extrême
Marie Carmelle Rose
Anne Auguste
16 mai 2012-
Ministre à la Condition Féminine et aux
Yanick Mézil
16 mai 2012-
Ministre des Affaires Sociales et du Travail
Page 236 of 656
Droits des Femmes
Ministre de la Culture
Ministre de la Communication
Ministre de l‟Éducation nationale et de la
Formation professionnelle
Ministre de l‟Économie et des Finances
Ministre de l‟Intérieur et des Collectivités
Territoriales
Ministre de la Justice et de la Sécurité
Publique
Jean-Marie Dupuy
16 mai 2012-23 janv
2013
Josette Darguste
23 janv 2013-3 avril
2014
Monique Rocourt
3 avril 2014-
Ady Jean Gardy
16 mai 2012-24 janv
2013
Regine Godefroy
24 janv 2012-11 avril
2013
Josette Darguste
13 avril 2013-3 avril
2014
Rudu Heriveaux
3 avril 2014
Réginald Paul
16 mai 2012-7 aout
2012
Vanneur Pierre
7 aout 2012-3 avril
2014
Nesmy Manigat
3 avril 2014
Marie Carmelle Jean
Marie
8 mai 2012-11 avril
2013
Wilson Laleau
13 avril 2013-3 avril
2014
Marie Carmelle Jean
Marie
3 avril 2014-18 janv
2015
Thierry Mayard-Paul
16 mai 2012-7 aout
2012
Ronsard St-Cyr
7 aout 2012-23 janv
2013
David Bazil
23 janv 2013-3 avril
2014
Reginald Delva
3 avril 2014
Jean Renel Sanon
16 mai 2012-
Page 237 of 656
Ministre de la Santé Publique et de la
Population
Florence Duperval
Guillaume
16 mai 2012-
Ministre du Tourisme
Stéphanie Balmir
Villedrouin
16 mai 2012-
Ministre des Travaux Public, Transports,
Énergie et Communications
Jacques Rousseau
16 mai 2012-
Ministre de la Planification et de la
coopération externe
Josépha Raymond
Gauthier
16 mai 2012-10 aout
2012
Laurent Lamothe
10 aout 2012-
Ministre du Commerce et de l‟Industrie
Wilson Laleau
16 mai 2012
Ministre de l‟Environnement
Joseph Ronald
Toussaint
16 mai 2012-7 aout
2012
Jean Wilmond Hilaire
7 aout 2012-23 janv
2013
Jean Francois Thomas
23 janv 2013
Daniel Supplice
16 mai 2012-23 janv
2013
Berenice Phidelia
23 janv 2013-11 juin
2013
Pierre Richard
Casimir ai
11 juin 2013-4 avril
2014
Francois Guillaume
4 avril 2014 -
Jean Roosevelt Rene
16 mai 2012-23 janv
2013
Ministre des Haïtiens vivant à l‟étranger
Ministre de la Jeunesse, des Sports et de
l‟Action Civique
Magalie Racine
Ministre Delegué aupres du Premier chargé
de la Paysannerie
Marie Mimose Felix
16 mai 2012-
Ministre Delegué aupres du Premier
Ministre chargé du renforcement des Partis
Politiques
Patrick Sully Joseph
3 avril 2014 -
Ministre Délégué auprès du Premier
Ministre chargé de la sécurité énergétique
Rene Jean-Jumeau
Juillet 2012-
Page 238 of 656
Le contexte :
La poursuite de la reconstruction post séisme
Le gouvernement Martelly-Lamothe hérite de plusieurs résolutions prises par les
gouvernements Bellerive et Conille sous l‟égide des arrêtés présidentiels de janvier et d‟avril
2010 décrétant l‟état d‟urgence sur toute l‟étendue du territoire national jusqu‟au mois
d‟octobre 2011.
La plupart des travaux prévus par les résolutions prises par les gouvernements Conille et
Bellerive ont été exécutés par Lamothe.
Etat d‟urgence suite au passage de l‟ouragan Sandy
Les dégâts causés par l'ouragan Sandy laissent un grand nombre d'agriculteurs dans la
plus grande insécurité alimentaire.
Alors qu‟Haïti peine à se relever des dégâts occasionnés par le passage de la tempête Isaac en
août 2012 et du terrible tremblement de terre de janvier 2010, l'ouragan Sandy laisse lui aussi
son lourd bilan. En effet, Sandy s'est abattu sur Haïti la nuit du 24 octobre 2012 et a déversé
en moins de 24 heures plus de 50 cm d'eau de pluie. L'ouest du pays a été le plus touché, dont
Port-au-Prince.
L'ouragan a causé inondations et glissements de terrain. Un bilan fait état de 50 à 100 morts,
18 blessés et 15 personnes portées disparues. 200.000 personnes ont dû être relogées.
Derrière ces chiffres se cachent aussi les lourdes conséquences humaines des dégâts
matériels.
120 millions de dollars de pertes agricoles :
L'ouragan Sandy a en effet détruit 70% des récoltes dans le sud d'Haïti et causé de lourdes
pertes de bétail, selon les chiffres du ministère de l'Agriculture. «Les pertes agricoles sont
estimées à 120 millions de dollars». Des destructions qui viennent aggraver une situation
alimentaire déjà explosive.
Selon le ministère de l'Agriculture, de nombreux agriculteurs pauvres n'auront tout
simplement «rien à manger» à cause des dommages causés par la tempête. Les dégâts
concernent notamment des cultures d'avocats, de fruits de l'arbre à pain, de maïs et de vétiver,
une plante utilisée en parfumerie.
Les réponses du gouvernement :
Le gouvernement fait appel à la solidarité internationale.
Page 239 of 656
Face à cette catastrophe, le Premier ministre haïtien, Laurent Lamothe, a lancé un appel à la
solidarité internationale lors d'un conseil de gouvernement. Le chef du gouvernement a jugé
la situation «effrayante» et poussé son équipe à agir «vite»: «Nous n'avons sans doute pas
tous les moyens, cependant nous devons montrer beaucoup de volonté.».
Le gouvernement entame la reconstruction grâce à PetroCaribe
Encore une fois, le gouvernement haïtien va puiser dans les ressources des fonds PetroCaribe
pour entamer la reconstruction du pays suite aux dégâts des ouragans Isaac et Sandy.
Le gouvernement décrète l‟Etat d‟urgence le 30 octobre 2012 sur toute l‟étendue
du territoire national.
Le Président Michel Joseph Martelly et le Premier Ministre, Laurent Salvador Lamothe, ont
décidé de décréter l‟État d‟urgence sur toute l‟étendue du territoire national, pour une période
d‟un mois, à compter de la publication de l‟Arrêté en date du 30 Octobre 2012.
Selon Ady Jean Gardy, le Ministre de la Communication, l‟État d‟urgence est déclaré en
fonction de la gravité de la situation résultant du passage de Sandy sur l‟ensemble du pays, et
sur la base des articles 19, 24 et 136 de la Constitution. Cette décision prend en compte la loi
du 15 avril 2010 portant modification du Décret loi du 9 septembre 2008.
Selon le Ministre Ady Jean Gardy, la déclaration de l‟État d‟urgence a été prise dans la soirée
du 30 Octobre 2012, d‟un commun accord avec l‟ensemble des Ministres du Gouvernement.
Le renouvellement de l‟Etat d‟urgence jusqu‟au 5 janvier 2013
Face à l‟ampleur des travaux de reconstruction, le gouvernement a décidé de renouveler
l‟Etat d‟urgence pour un mois supplémentaire jusqu‟au 5 janvier 2013. Ce renouvellement est
réalisé en accord avec l‟article 5 de la loi d‟urgence de 2010 qui se lit ainsi :
« L‟Etat d‟Urgence déclaré par les Autorités vaut pour une période maximale d‟un mois à
l‟expiration de laquelle il peut être renouvelé pour une autre période d‟un mois. Au-delà de
deux mois, l‟Etat d‟Urgence peut être renouvelé avec l‟assentiment du Corps Législatif pour
une autre période déterminée en fonction de l‟ampleur de la catastrophe »
Les arrêtés du gouvernement de déclarer l‟état d‟urgence sur toute l‟étendue du territoire
l‟autorise à faire appel aux procédures célères prévues par la loi du 10 juin 2009 sur les
marchés publics.
L‟article 7.5 de la loi d‟urgence d‟avril 2010 se lit ainsi :
Page 240 of 656
Pendant l‟Etat d‟urgence, le gouvernement est habilité à : « Passer les contrats qu‟il juge
nécessaire selon les procédures célères prévues par la réglementation des marchés
publics ».
Les résolutions :
Les résolutions signées par le gouvernement Lamothe :
Le Gouvernement Martelly-Lamothe a signé cinq (5) résolutions pour un montant initial
global de USD 891.9 millions de dollars (188 projets). Toute fois, après désaffectation de $
USD 223.1 millions de dollars et un (39) projet, le montant global révisé est de 668.8
millions de dollars pour 149 projets.
L‟objectif principal de ces résolutions est la reconstruction des infrastructures affectées par le
séisme du 12 janvier 2010 et par l‟ouragan Sandy.
Il s‟agit des résolutions suivantes :
PROJETS
DATE
RESTANTS
26
18 juil 2012
63
21 déc. 2012
45
11 déc. 2013
14
23 juil 2014
1
10 sept. 2014
149
TOTAL
INITIAL
130 000 000,00
379 500 000,00
210 967 319,33
141 778 568,00
29 697 201,29
891 943 088,62
MONTANT
DESAFF.
REVISE
33 304 374,20 96 695 625,80
50 113 264,96 329 386 735,04
46 450 090,46 164 517 228,87
70 562 728,62 71 215 839,38
22 697 201,29
7 000 000,00
223 127 659,53 668 815 429,09
DECAISSEMENT
$
%
96 195 625,80 99%
329 386 735,04 100%
164 517 228,97 100%
71 215 839,38 100%
7 000 000,00 100%
668 315 429,19 100%
La résolution signée par le gouvernement Conille dont l‟exécution est assurée
par Lamothe
En plus des USD$ 668,315,429.20 votées directement par le Gouvernement MartellyLamothe. Ce dernier hérite la résolution du Gouvernement de Garry Conille, votée juste après
la démission de ce dernier.
MONTANT
DATE
RESTANT
INITIAL
28 février 2012 29
231 956 000,00
29
231 956 000,00
MONTANT
DESAF.
21 652 777,32
21 652 777,32
MONTANT
REVISE
210 303 222,68
210 303 222,68
DECAISSEMENTS
$
%
210 303 222,68 100%
210 303 222,68 100%
Ce qui à son gouvernement un portefeuille de projets sous gestion totalisant 878 618 651,87 $
USD.
Page 241 of 656
Le gouvernement Lamothe fait également le suivi des contrats signés par le
gouvernement Préval Bellerive.
De plus, le Gouvernement Martelly-Lamothe fait le suivi de nombreux contrats hérités de
l‟Administration Préval-Bellerive.
Il faut cependant noter que c‟est durant son administration que les travaux liés à la
reconstruction ont réellement commencé.
Décaissement
Le taux de décaissement des projets de ces six résolutions est de 100%.
Analyse des résolutions :
Répartition des projets par secteur d‟activité :
NBRE DE MONTANTS
PROJETS REVISES
9
24 399 660,33
1
485 440,98
SECTEURS
AGRICOLE
CULTURE
EAU
&
ASSAINISSEMENT
6
ECONOMIE
4
EDIFICE PUBLIC
6
EDUCATION
ENERGIE
ENVIRONNEMENT
GESTION PUBLIQUE
HABITAT
INFR
AEROPORTUAIRE
INFRASTRUCTURE
ROUTIERE
MARCHE
PORT
RENOVATION
URBAINE
SANTE
SECURITE
SOCIAL
SPORT
TOURISME
Total
4
4
1
7
5
%
3,60%
0,10%
10 942 635,31
1,60%
23 924 697,57
3,60%
42 004 179,60
6,30%
6 636 817,28
1,00%
18 730 000,00
2,80%
1 901 846,49
0,30%
79 873 946,91
11,90%
38 801 928,58
5,80%
2
12 231 690,60
1,80%
51
2
1
209 267 272,00
5 342 314,13
1 000 000,00
31,30%
0,80%
0,10%
21
4
6
8
5
2
149
72 030 670,03
32 141 346,07
14 590 111,13
62 727 907,84
9 260 055,43
2 523 222,20
668 815 742,44
10,80%
4,80%
2,20%
9,40%
1,40%
0,40%
100,00%
Page 242 of 656
Une plus grande diversification :
Comme constaté, il y a une plus grande diversification des projets sous l‟air MartellyLamothe. Tous les secteurs de la vie nationale sont donc touchés. Les infrastructures
routières qui représentaient 65% des projets du Gouvernement Bellerive tombent à 31%.
Cette forte baisse est constatée au profit de la gestion publique (11.9%), la rénovation urbaine
(10.8%) et le social (9.4%).
Répartition des projets par zone géographique :
REGION
Artibonite
Centre
Grand Anse
National
Nippes
Nord
Nord est
Nord Ouest
Ouest
Sud
Sud Est
Total
PROJETS
9
5
7
38
4
18
1
3
44
11
9
149
REVISES
29 768 200,85
23 746 554,97
17 765 019,51
243 399 944,73
16 311 036,69
29 134 698,47
2 879 410,23
8 025 752,61
217 142 872,26
45 524 339,25
35 117 912,87
668 815 742,44
%
4,50%
3,60%
2,70%
36,40%
2,40%
4,40%
0,40%
1,20%
32,50%
6,80%
5,30%
100,00%
Tous les départements sont représentés. Cependant la plus grande partie est toujours attribuée
au département de l‟Ouest avec une enveloppe de 217.1 millions de dollars (32.5%), suivi des
projets nationaux (36.4%).
Page 243 of 656
Résolution du: 18 Juillet 2012
La Résolution du 18 Juillet 2012 fut la première Résolution prise en conseil des Ministres
sous l‟Administration de MARTELLY/LAMOTHE, dans une série de cinq (5) Résolutions.
Laurent Salvador LAMOTHE, en guise de rappel succéda à Gary CONILLE. Son
gouvernement était composé de :
Prénom
Laurent S.
Nom
Pierre Richard
Mr.Duly
Ronsard
Fonction
LAMOTHE /16 mai 2012-7aout
2012
Affaires étrangères et cultes
CASIMIR / 7 Aout 2012- 4 avril
2014
BRUTUS / Du 4 avril 2014
ST CYR / du 16 mai 20127aout2012
Affaires sociales
Josepha Raymond
Charles
Thomas
Wilson
Yanick
Ady
Régine
Rudy
Jean- marie
Josette
Monique
Jean Rodolphe
Lerner
Marie Carmelle
Wilson
Marie Carmelle
Reginald
JOSEPH/ du7aout 2012-25 janvier
2013
JEAN-JACQUES/du 25 janv 2013
JACQUES/ du 17 mai 2012
LALEAU/ rescape du gvt conille du
16 mai2012
MEZIL/ du 16 mai 2012(rescape du
gouv.Conille
JEAN GARDY/du 16 mai 2012-24
janv 2013
GODEFROY/24 jan 2012-11avril
2013.
HERIVEAUX /du 3 avril 2014
DUPUY/ 16 mai 2012-23 janv2013
DARJUSTE/23 janv2013-3
avril2014
Rocourt-du 3 avril 2014
JOAZIL/16 mai 2012-3 avril 2014
RENAUD/du 2 avril 2014
JEAN ŔMARIE/8mai 201211avril2013
LALEAU/13avril2013-3 avril 2014
JEAN ŔMARIE/du 3 avril 2014
Jean Vilmond
Paul (rescape du gouv.de conille) 16
mai 2012-7aout2012
Pierre/du 7 aout 2012-3 avril 2014
Nesmy
Joseph Ronald
MANIGAT/ du 3 avril 2014
TOUSSAINT/16 mai2012-7aout
Mr Jean Vilmond
HILAIRE/du 7 aout2012-23janv
2013
Agriculture et ressources naturelles
Commerce et de l‟industrie
Condition Féminine
Communication et culture
Culture
Défense
Economie et des finances
Education National
Environnement
Jean Francois
Daniel
Bernice
THOMAS/du 23 janv 2013
SUPPLICE/16 mai2012-23janv2013
Phidelia/23 janv2013-11juin 2013
GUILLAUME/du4 avril 2014
Haïtiens Vivant l‟étranger
Page 244 of 656
Francois
Thierry
Ronsard
David
MAYARD-PAUL/du 16 mai 2012-7
aout2012
SAINT CYR/du 7aout2012-23
janv2013
BAZIL/ du 23 janvier2013-3avril
2014
Intérieur, collectivités Territoriales et
défense
Reginald
Jean Roosevelt
DELVA /du 3 avril 2014
RENE/du 16 mai2012-23janv2013
Magalie
RACINE/23 janv2013-3 avril2014
Himmler
REBU/du 3 avril 2014
Jean Renel
Josépha Raymond
Marie Mimose
SANON/du 16 mai 2012
GAUTHIER/du 16mai 201210aout2012
LAMOTHE/du 10aout 2012
ROUSSEAU/(rescapé gvt conille)
du 16 mai 2012
FELIXE/du 16 mai 2012
Marie Carmelle Rose Anne
AUGUSTE/du 16mai 2012
Ralph
THEANO/du 16 mai 2012-2 avril
2014.la position créer lors du
remaniement ministériel du 2 avril
2014
JOSEPH/du 3 avril 2014. position
créée lors du remaniement
ministériel du 2 avril 2014
JEAN-JUMEAU.
Position Créer en juillet 2012
Laurent
Jacques
Patrick sully
Rene
Jeunesse et sports
Justice et sécurité National
Planification et coopération Externe
Travaux publics, transport et
communication
Bureau du ministre délégué auprès du
premier ministre charge de la
paysannerie
Bureau du ministre délégué auprès du
premier Ministre Charge des Droits de
l‟homme et de la lutte contre pauvreté
extrême
Bureau du ministre délégué auprès du
premier Ministre Charge des relations
avec le parlement(BMCRP)
Ministre délégué auprès du premier
Ministre Charge du renforcement avec
les partis politiques
Ministre délégué auprès du premier
Ministre Charge de la sécurité
Energique
Comme toutes les autres précédemment prises, la Résolution du 18 juillet 2012 fut elle aussi
justifiée par la nécessité de dôter le pays d‟infrastructures.
Les Projets émanant de cette Résolution sont les suivants.
Liste des projets
Nature du Projet
1.
Montant US
Appui a l'ULCBP
4,000,000
2. Rehabilitation de la route Borgne-Petit-Bourg de Borgne
1,000,000
3. Rehabilitation des routes et des Système de drainage du centre de ville de Port -au-Prince
10,000,000
Page 245 of 656
4.
Travaux de protection de la ville de la grande Rivière du Nord contre les Crues de la
Grande Rivière du Nord
2,000,000
5.
Travaux de protection de la ville de la ville de Borgne contre les Crues de la Rivière du
Borgne
1,000,000
6. Motocyclettes pour la DCPR
500,000
7. Renforcement PNH
5,000,000
8. Rénovation Urbaine
2,000,000
9. Rénovation urbaine de Hinche
4,000,000
10. Rénovation urbaine des Cayes
3,270,000
11. Rénovation Urbaine de a Grande Rivière du Nord
1,000,000
12. Rénovation Urbaine Ennery
2,000,000
13. Rénovation urbaine et Développement résidentiel Morne à Cabri (financement partiel)
27,000,000
14. Aménagement des Places Publiques
5,000,000
15. Rénovation urbaine de Limbé
2,000,000
16. Rénovation et Aménagement d'Infrastructures sportives
5,163,457
17. -programme de réhabilitation et de Construction d'infrastructure Sanitaires
500,000
18. Réaménagement de Carrefour Desruisseaux
2,000,000
19. Réalisation des études des bâtiments publics
4,000,000
20. Electrification de la ville de Marchand Dessalines
1,230,000
21. Construction Ministère
20,000,000
22. Protection Sociale et Intervention
6,000,000
23. Protection des villes de la cote Sud contre les risques d'inondation et des intempéries
3,500,000
24. Rehabilitation Rex(Financement partiel)
5,000,000
TOTAL
117,163,457
La Résolution du 18 Juillet 2012 était arrivée dans un contexte marqué par les révélations fracasantes
de mauvaise gestion des contrats relatés dans le rapport de la Comission d‟audit formée par le bureau
du Premier Ministre Gary CONILLE.
Ainsi, dans cette Résolution il est précisé que des dispositions doivent être prises pour que les
programmes et projets soient pris en compte à travers la loi des finances.
Page 246 of 656
Institution
Nature du Projet
Localité
ULCBP
Appui a l'ULCBP
Petion
Ville
Petion
Ville
Total
4,000,000
Rehabilitation de la route
Borgne-Petit-Bourg de
Borgne
Rehabilitation de la route
Borgne-Petit-Bourg de
Borgne
No
déc.
Montant à
décaisser
2,178,000
309
1,795,775
375
Rehabilitation des routes et
des Systeme de drainage du
centre de ville de Port -auPrince
Port-auPrince
Travaux de protection de
la ville de la grande Rivière
du Nord contre les Crues
de la Grande Rivière du
Nord
Travaux de protection de la
ville de la grande Rivière du
Nord contre les Crues de la
Grande Rivière du Nord
633,200
633,200
366,800
10,000,000
-
10,000,000
Grande
Rivière du
Nord
2,000,000
Borgne
2,000,000
1,000,000
1,000,000
Motocyclettes pour la
DCPR
-
372
1,000,000
-
500,000
Delmas
458,500
500,000
Renforcement PNH
314
1,000,000
Sous total
Sous total
770
1,000,000
2,000,000
Motocyclettes pour la DCPR
26,225
2,000,000
Sous Total
Travaux de protection de
la ville de la ville de Borgne
contre les Crues de la
Rivière duBorgne
Travaux de protection de la
ville de la ville de Borgne
contre les Crues de la
Rivière du Borgne
3,973,775
1,000,000
PetitBourg de
Borgne
Sous total
PNH
Montant
décaissé
4,000,000
Appui a l'ULCBP
MTPTC
Montant
du Projet
458,500
353
41,500
5,000,000
Page 247 of 656
Renforcement des capacités
de la police Nationale (PNH)
Renforcement de la Police
Nationale (PNH)/achat de 50
motocyclettes Yamaha
250cc blanc et bleu
Renforcement de la Police
Nationale (PNH)
Renforcement de la Police
Nationale (PNH)
Renforcement de la Police
Nationale (PNH)
Renforcement de la Police
Nationale (PNH)/Achat de
20 vehicules Nissan et
Motors apollo
Renforcement de la Police
Nationale (PNH)/MJSP
National
458,500
574
National
1,281,226
595
National
36,096
610
National
1,946,395
754
National
299,226
870
National
861,505
891
5,000,000
Rénovation Urbaine
Rénovation des routes du
Village Artistique Nouailles
de Croix des Bouquets
(financement partiel)
Rénovation des routes du
Village Artistique Nouailles
de Croix des Bouquets
(financement partiel)
Rénovation des routes du
Village Artistique Nouailles
de Croix des Bouquets
(financement partiel)
1,278,804
322
Croix des
Bouquets
702,806
354
Croix des
Bouquets
18,390
885
2,000,000
-
4,000,000
Hinche
4,000,000
4,000,000
Rénovation urbaine des
Cayes
Sous total
108,005
Croix des
Bouquets
2,000,000
Rénovation urbaine des
Cayes
4,891,995
2,000,000
Sous total
Rénovation urbaine de
Hinche
Adoquinage
deHinche/Rénovation
urbaine de Hinche
556
National
Total
MPCE
9,047
308
4,000,000
-
3,270,000
Cayes
3,270,000
3,270,000
3,270,000
312
-
Page 248 of 656
Rénovation Urbaine de a
Grande Rivière du Nord
Rénovation Urbaine de a
Grande Rivière du Nord
1,000,000
Grande
Rivière
du Nord
Sous total
1,000,000
313
1,000,000
1,000,000
-
2,000,000
551,708
325
Rénovation Urbaine
Ennery
Rénovation Urbaine Ennery
(financement Partiel)
Ennery
Rénovation urbaine Ennery
(financement partiel)
Ennery
718,405
334
Rénovation urbaine Ennery
(financement partiel)
Ennery
542,631
418
Rénovation urbaine Ennery
(financement partiel)
Ennery
187,256
465
Sous total
2,000,000
Rénovation urbaine et
Développement résidentiel
Morne à Cabri
(financement partiel)
Rénovation urbaine et
Développement résidentiel
Morne à Cabri (financement
partiel)
-
27,000,000
Morne à
Cabri
Sous total
26,709,662
27,000,000
Aménagement des Places
Publiques
330
26,709,662
290,338
5,000,000
Réhabilitation/Construction
et Aménagement des Places
Publiques
(phase1)(financement partiel)
Ouest
711,971
538
Réhabilitation/Construction
et Aménagement des Places
Publiques (phase1)
(financement partiel)
Ouest
373,326
734
Ouest
230,666
749
Ouest
175,383
765
Ouest
443,740
812
Réhabilitation/Construction
et Aménagement des Places
Publiques (phase1)
(financement partiel)
Réhabilitation/Construction
et Aménagement des Places
Publiques (phase1)
(financement partiel)
Réhabilitation/Construction
et Aménagement des Places
Publiques (phase1)
(financement partiel)
Sous total
2,000,000
5,000,000
1,935,085
3,064,915
Page 249 of 656
Rénovation urbaine de
Limbé
2,000,000
Rénovation urbaine de Limbé
(financement partiel)
Limbé
1,222,286
337
Renovation Urbaine Limbé
(Financement partiel)
Limbé
443,506
425
Sous Total
2,000,000
334,208
Rénovation et
Aménagement
d'Infrastructures sportives
Réhabilitation/Construction
et Aménagement
d'Infrastructures sportives
(phase1) (financement
partiel)
National
5,000,000
5,000,000
331
Rénovation Gymnasium
Vincent
Port-auPrince
163,457
163,457
362
5,163,457
5,163,457
5,163,457
Total
MSPP
1,665,792
Santé
Sous-programme de
rehabilitation et de
Construction d'infrastructure
Sanitaires
-
500,000
?
Total
437,158
500,000
872
437,158
62,842
INCONNU
Réaménagement de
Carrefour Desruisseaux
Réaménagement de
Carrefour Desruisseaux
(financement partiel)
Réaménagement de
Carrefour Desruisseaux
(financement partiel)
Réaménagement de
Carrefour Desruisseaux
(financement partiel)
Réaménagement de
Carrefour Desruisseaux
(financement partiel)
2,000,000
Miragoa
ne
712,684
323
Miragoa
ne
507,500
428
Miragoa
ne
507,500
459
Miragoa
ne
99,317
497
Sous Total
2,000,000
Realisation des etudes des
batiments publics
Realisation des etudes des
batiments publics
(financement partiel)
1,827,001
172,999
4,000,000
?
4,000,000
4,000,000
4,000,000
310
-
Page 250 of 656
Electrification de la ville de
Marchand Dessalines
Electrification de la ville de
Marchand Dessalines
1,230,000
Marcha
nd
Dessali
nes
Sous total
1,230,000
Construction Ministère
Construction Ministère des
Affaires Etrangères
(financement partiel)
construction Ministère du
Commerce et de l'Industrie
(financement partiel)
construction Ministère du
Commerce et de l'Industrie
(financement partiel)
construction Ministère du
Commerce et de l'Industrie
(financement partiel)
Construction Ministère des
Affaires Etrangères
(financement partiel)
Construction Ministere du
Commerce et de l'industrie
(Financement partiel)
Construction Ministere des
affaires Etrangeres
(Financement Partiel)
311
1,230,000
-
20,000,000
Ouest
10,000,000
320
Ouest
10,000,000
321
Ouest
5,000,000
519
Ouest
5,000,000
527
Ouest
10,000,000
529
Ouest
(10,000,00
0)
321-1
Ouest
(10,000,00
0)
320-1
Sous total
20,000,000
Protection Sociale et
Intervention
20,000,000
-
6,000,000
Protection Sociale dans les
zones Urbaines
?
4,000,000
4,000,000
326
Intervention en matière
d'habitat dans le quartier de
Jalousie
Jalousi
e
2,000,000
2,000,000
487
6,000,000
6,000,000
Sous Total
Protection des villes de la
cote Sud contre les risques
d'inondation et des
intempéries
Protection des villes de la
cote Sud contre les risques
d'inondation et des
intempéries
Sud
Rehabilitation
Rex(Financement partiel)
3,500,000
-
579
2,000,000
Sous Total
Total
1,230,000
Portauprince
3,500,000
2,000,000
1,500,000
5,000,000
-
5,000,000
36,730,000
35,057,001
TOTAL
Page 251 of 656
117,163,457
96,195,626
20,967,832
La Résolution du 18 juillet 2012 comprend vingt-quatre(24) Projets. De ce nombre, nous
avons reçu onze (11) projets lesquels ont fait l‟objet de notre intervention. De ce fait, onze
(11) projets ont été retenus aux fins d‟analyse et sont traités dans les Résolutions suivantes et
se répartissent ainsi :
Page 252 of 656
Revue de passation des marchés
Résolution du : 18 juillet 2012
Contrat
No
1
2
Maitre
d'œuvre
SECOSA et
J&J
Construction
CEEPCO
Maitre
d'ouvrage
MPCE
MPCE
Description des
travaux
Aménagement
d'infrastructure
sportive et
gazonnage.
Réhabilitation de
la place publique
Occide Jeanty
Localité
National
Ouest
Date de
signature
6/09/11,
5/06/15,
26/09/11,
7/08/15,
12/05/11
Novembre
2012
Appel d'offres
Montant
US
10,150,023
Phase 2 +
7,852,851.98
Gazonage,
+ 500,250.00
Supervision
+ 500,145.63
Avenant
----(Phase 1)
2, 997,774.00
Gré
à
gré
Restreint
Ouvert
Approbation
CSC/CA
Non
objection
du
CNMP
Oui
Oui
Non
Oui
Oui
Signé
Oui
Oui
Non
Oui
Non
Non
Oui
Oui
Non
Oui
Oui
Non Signé
Document
d'éligibilité
Patente,
Quitus
etc…
Oui
Oui
Page 253 of 656
Revue de la gestion des contrats
Résolution du : 18 juillet 2012
Contrat
No
1
2
Maitre
d'œuvre
SECOSA et
J&J
Construction
CEEPCO
Maitre
d'ouvrage
Description
des
travaux
Avance
de
démarrage
Cautionnement
sur avance de
démarrage
Date
de
signature
Montant
US
MPCE
Aménagement
d'infrastructure
sportive et
gazonnage.
6/09/11,
5/06/15,
26/09/11,
7/08/15,
12/05/11
10,150,023
Phase 2 +
7,852,851.98
Gazonage,
+ 500,250.00
Supervision
+ 500,145.63
Avenant
----Phase 1
Non
Non constaté lors de
l‟analyse du contrat
MPCE
Réhabilitation de la
place publique
Occide Jeanty
Novembre
2012
2, 997,774.00
Non
Non constaté lors
de l'analyse du
contrat
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
decaissé
Non
Non
12 mois
6 mois
N/A
6 mois
-----
5, 895,449.28
US
Non
Non
non
1, 935,085.22
US
Page 254 of 656
1-Aménagement d‟infrastructures sportives Phase I
Maitre d‟ouvrage : MPCE
Description des travaux : Aménagement d‟infrastructures sportives Phase I
Localité : Nationale
Maitre d‟œuvre : SupervisionŔEtudes Constructions S.A (SECOSA)
Montant du contrat : ------------ (Phase I) ; 500,145.63 US (Av.1)
Date de signature du contrat
Durée des travaux
Appel d‟offres
: 12 Mai 2011 (Contrat), 07 Juillet 2015
: 6 mois
: Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
: signé et scellé
: Non-signé
Documents d‟éligibilités fournis
: Oui
Cautionnement fourni pour l‟avance : non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: Non constaté
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux : 5 Décembre 2015
Montant total versé au maitre d‟œuvre : 25,617,683.00 US
Commentaires :
Quant à ce Projet « Aménagement d‟infrastructures sportives et gazonnage de 14 parcs sportifs »,
dont les contrats sont les suivants : Aménagement d‟infrastructures sportives (Phase I et II), la
supervision de la première phase et celui du gazonnage.
Passé de Gré à Gré, sans l‟approbation de la CSC/CA et sans non plus le certificat de non objection
du CNMP, ce contrat est signé le 12 Mai 2011 et on n‟a pu déterminer le montant du contrat (Phase I)
en raison de la page manquante de la copie du contrat.
La durée des travaux était de (6) six mois, ils furent achevés le 5 Décembre 2015. On n‟a pas
mentionné le matricule fiscal et le quitus fiscal dans le contrat. Toutefois, nous n‟avons pas eu les
procès-verbaux de réception provisoire ainsi que ceux de réception définitive.
Page 255 of 656
La page des articles 3, 4, 5 n‟est pas retrouvée dans la copie du contrat, cela nous empêche de
déterminer le montant du contrat
(Phase I). Le total du montant décaissé dans le projet <
Aménagement d‟infrastructures sportives > inclus plusieurs contrats dont la phase I et II, le
gazonnage des 14 parcs sportifs, la supervision et l‟avenant de la phase I.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Les montants alloués en US dans ce Projet sont les suivants :
- Résolution du 12 Mai 2011 est de
4,500,000
- Resolution 28 fevrier est de
6,200,000
- Résolution du 18 Juillet 2012 est de
5,000,000
- Résolution du 11 Décembre 2013 est de
3,000,000
- Résolution du 23 juillet 2014 est de
2,000,000
- Résolution du 15 Avril 2015 est de
8,200,000
- Résolution du 22 Juillet est de
6,061,527
Total
34,961,527
Les décaissements se répartissent ainsi
- Résolution du 12 Mai 2011 est de
- Résolution 28 février est de
- Résolution du 18 Juillet 2012 est de
- Résolution du 11 Décembre 2013 est de
- Résolution du 23 juillet 2014 est de
- Résolution du 15 Avril 2015 est de
- Résolution du 22 Juillet est de
Total
4,500,000
5,895,449
5,000,000
3,000,000
596,598
2,138,473
4,487,163
25,617,683
Ce contrat est signé par :
- Jean Emile LAFERIERE, Président Directeur Général de la SECOSA
-
Jean Max BELLERIVE, Ministre de la Planification et de la Coopération Externe.
-
Paraphé et scellé par la CSC/CA
Cet avenant est signé par :
- Jean Emile LAFERIERE, Président Directeur Général de la SECOSA
-
Yves Germain JOSEPH, Ministre de la Planification et de la Coopération Externe
Page 256 of 656
2-Supervision Aménagement Infrastructure de Sport (Phase I)
Maitre d‟ouvrage : MPCE
Description des travaux :
Supervision Aménagement Infrastructure de Sport (Phase I)
Localité : Nationale
Maitre d‟œuvre : J et J Construction
Montant du contrat : 500,250.00 US
Date de signature du contrat 26 Septembre 2011
Durée des travaux
Appel d‟offres
: N/A
: Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
: Signé et Scellé
: N/A
Documents d‟éligibilités fournis
: Non
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: Non mentionné
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux : N/A
Montant total versé au maitre d‟œuvre : N/A
Commentaires :
Passé Gré à Gré, avec l‟approbation de la CSCCA et sans le certificat de non-objection
de la CNMP, ce contrat est signé 26 Septembre 2011 pour un montant US500,250.00.
Ce contrat de supervision est signé par :
-
Hérode THELUSMA Ing, représentant de la firme J&J Construction
-
Jean Max BELLERIVE, Ministre de la Planification et de la Coopération Externe
-
Paraphé et scellé par la CSC/CA
Page 257 of 656
3-Aménagement d‟infrastructure sport II
Maitre d‟ouvrage : MPCE
Description des travaux : Aménagement d‟infrastructure de sport II
Localité : Nationale
Maitre d‟œuvre : SupervisionŔEtudes-Construction S.A (SECOSA)
Montant du contrat : 10, 150,023.31 US
Date de signature du contrat
Durée des travaux
Appel d‟offres
: 6 Septembre 2011
: 12 mois
: Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
: signé et scellé
: non-signé
Documents d‟éligibilités fournis
: N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: N/A
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux : 6 Septembre 2012
Montant total versé au maitre d‟œuvre : N/A
Les personnalités signataires sont:
- Jean Emile LAFERIERE, Directeur général de la SECOCA
-
Jean Max BELLERIVE, Ministre de la Planification et de la Coopération Externe.
-
Paraphé et scellé par la CSC/CA
Page 258 of 656
4-Contrat de Gazonnage Synthétique de 14 stades Sportifs
Maitre d‟ouvrage : MPCE
Description des travaux : Contrat de Gazonnage Synthétique de 14 stades Sportifs
Localité : Nationale
Maitre d‟œuvre : SupervisionŔEtudes Construction S.A (SECOSA)
Montant du contrat : 387, 145,603.60 Gourdes ou 7, 852,851.98 US (Tx =49,3Gourdes pr 1$ us)
Date de signature du contrat 05 Juin 2015
Durée des travaux
Appel d‟offres
: 6 mois
: Gré à Gré
Approbation de la CSC/CA
Non objection du CNMP
: Signé et Scellé
: Signé et Scellé
Documents d‟éligibilités fournis
: Oui
Cautionnement fourni pour l‟avance : non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: N/A
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux : 5 Décembre 2015
Montant total versé au maitre d‟œuvre : (Commentaires)
Ce contrat est signé par :
-
Jean Emile LAFERIERE, Directeur général de la SECOSA
-
Yves Germain JOSEPH, Ministre de la Planification et de la Coopération Externe
-
Paraphé et scellé par la CSC/CA
Page 259 of 656
5-Travaux de réhabilitation de la « Place publique Occide Jeanty »
Maitre d‟ouvrage :
MPCE
Description des travaux :
Localité
Travaux de réhabilitation de la « Place publique Occide Jeanty »
Port-au-Prince
Maitre d‟œuvre
CEEPCO Haïti S.A
Montant du contrat
U.S 2, 997,774 et un avenant U.S 899,332 (juin 2014)
Date de signature du contrat
Durée des travaux
Appel d‟offres
Pas de date (Novembre 2012)
Non mentionné
Gré à gré
Approbation de la CSC/CA Signé
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
Quitus émis le 04 Aout 2010,
Patente émis le 03 Décembre 2012,
Matricule Fiscale émis le 10 juin 2010.
Cautionnement fourni pour l‟avance
Non constaté lors de l‟analyse du contrat
Retenue de garantie Oui
Retenue de bonne exécution
Prélèvement des 2%
Oui
NA
Date de démarrage des travaux
Après l‟apposition des signatures pour les 2 parties
Date d‟achèvement des travaux
NA
Ce contrat inscrit dans la résolution du 18 juillet 2012 dans le cadre de notre mission avait pour
description : « Réhabilitation de la place Occide Jeanty », le montant alloué était de U.S 1,935,085.
Passé de Gré à Gré, avec approbation de la CSC /CA, ne compte pas de date précise se chiffre à U.S
2, 997,774.00, fait mention du mois de Novembre 2012, considère pourtant l‟arreté du 5 Decembre
2012. Du montant du contrat s‟ajoute un avenant de date aussi imprécise de valeur additionnelle
U.S899,332.20, ce qui a porté le montant du contrat lié à ce projet à U.S 3,897,106.20.
La durée des travaux n‟était pas mentionnée.
Le montant total des décaissements se répartit ainsi en US:
- Résolution du 18 juillet 2012 est de
1,935,085
-
Résolution du 21 decembre 2012 est de
854,365
-
Résolution du 15 Avril 2015 est de
699,455
-
Résolution du 22 juillet 2015est de
93,620
Total
3,582,525
Page 260 of 656
Les personnalités signataires sont :
- Laurent Salvador LAMOTHE, Ministre de la Planification et de la Coopération Externe.
-
Harold CHARLES, Président CEEPCO HAITI S.A
Page 261 of 656
XXV Résolution du 21 Décembre 2012
Page 262 of 656
Résolution du 21 Décembre 2012
Elle est la deuxième Résolution prise sous l‟Administration MARTELLY-LAMOTHE.
Elle survenait suite au passage du cyclone Sandy .Elle comprtait un ensemble de Projet
d‟urgence liés en en la circonstance
Composition du gouvernement Martelly-Lamothe.
Il est composé des ministres suivants :
Prénom
Nom
Laurent S.
Fonction
LAMOTHE /16 mai 2012-7aout 2012
Pierre Richard
CASIMIR / 7 Aout 2012- 4 avril 2014
Duly
Ronsard
ST CYR / du 16 mai 2012-7aout2012
Josepha Raymond
JOSEPH/ du7aout 2012-25 janvier 2013
Charles
BRUTUS / Du 4 avril 2014
Affaires sociales
JEAN-JACQUES/du 25 janv 2013
Thomas
JACQUES/ du 17 mai 2012
Wilson
Affaires étrangères et cultes
LALEAU/ rescape du gvt conille du 16
mai2012
Yanick
Agriculture et ressources
naturelles
Commerce et de l‟industrie
Condition Féminine
MEZIL/ du 16 mai 2012(rescape du
gouv.Conille
Ady
Regine
Rudy
Jean- marie
Josette
Monique
Jean Rodolphe
Lerner
JEAN GARDY/du 16 mai 2012-24 janv
2013
GODEFROY/24 jan 2012-11avril
2013.
HERIVEAUX /du 3 avril 2014
Culture
DUPUY/ 16 mai 2012-23 janv2013
DARJUSTE/23 janv2013-3 avril2014
Rocourt-du 3 avril 2014
JOAZIL/16 mai 2012-3 avril 2014
Marie Carmelle
Reginald
Jean Vilmond
Nesmy
Défense
RENAUD/du 2 avril 2014
.Marie Carmelle
Wilson
Communication et culture
Economie et des finances
JEAN ŔMARIE/8mai 2012-11avril2013
LALEAU/13avril2013-3 avril 2014
JEAN ŔMARIE/du 3 avril 2014
Paul (rescape du gouv.de conille) 16
mai 2012-7aout2012
Pierre/du 7 aout 2012-3 avril 2014
Joseph Ronald
MANIGAT/ du 3 avril 2014
TOUSSAINT/16 mai2012-7aout
Jean Vilmond
Jean Francois
HILAIRE/du 7 aout2012-23janv 2013
THOMAS/du 23 janv 2013
Education National
Environnement
Page 263 of 656
Daniel
Bernice
Francois
Thierry
Ronsard
David
SUPPLICE/16 mai2012-23janv2013
Phidelia/23 janv2013-11juin 2013
GUILLAUME/du4 avril 2014
MAYARD-PAUL/du 16 mai 2012-7
aout2012
SAINT CYR/du 7aout2012-23
janv2013
BAZIL/ du 23 janvier2013-3avril 2014
Haïtiens Vivant l‟étranger
Intérieur, collectivités
Territoriales et défense
Reginald
DELVA /du 3 avril 2014
Jean Roosevelt
Jeunesse et sports
RENE/du 16 mai2012-23janv2013
Magalie
RACINE/23 janv2013-3 avril2014
Himmler
REBU/du 3 avril 2014
Jean Renel
Josépha Raymond
Laurent
Jacques
SANON/du 16 mai 2012
GAUTHIER/du 16mai 201210aout2012
LAMOTHE/du 10aout 2012
ROUSSEAU/ (rescapé gvt conille) du
16 mai 2012
Marie Mimose
FELIXE/du 16 mai 2012
Marie Carmelle Rose Anne
AUGUSTE/du 16mai 2012
Ralph
THEANO/du 16 mai 2012-2 avril
2014.la position créer lors du
remaniement ministériel du 2 avril 2014
Patrick sully
JOSEPH/du 3 avril 2014. position créé
lors du remaniement ministériel du 2
avril 2014
Rene
JEAN-JUMEAU.
Position Créer en juillet 2012
Justice et sécurité National
Planification et coopération
Externe
Travaux publics, transport et
communication
Bureau du ministre délégué auprès
du premier ministre charge de la
paysannerie
Bureau du ministre délégué auprès
du premier Ministre Charge des
Droits de l‟homme et de la lutte
contre pauvreté extrême
Bureau du ministre délégué auprès
du premier Ministre Charge des
relations avec le
parlement(BMCRP)
Ministre délégué auprès du premier
Ministre Charge du renforcement
avec les partis politiques
Ministre délégué auprès du premier
Ministre Charge de la sécurité
Energique
Page 264 of 656
Résolution du 21 Décembre 2012
Liste des projets
Nature du Projet
Montant US
1.
Réhabilitation de la route Petit Trou de Nippes/Petite rivière de Nippes
9,000,000
2.
3.
4.
Amélioration de la route Ennery-Cap Haïtien/MTPTC
Réhabilitation de rues au Cap Haïtien
Construction de l'Aeoport International des Cayes
5,500,000
4,500,000
8,000,000
5.
6.
Rehabilitation des Places Publiques
Route Cayes-Jéremie
3,000,000
4,000,000
7.
Réhabilitation des la Route du Canapé-vert
Sous Programme De Réhabilitation Et D'entretien D'infrastructures De
Transport
Réhabilitation et Entretien de rues dans la zone Métropolitaine de Port-auPrince (Réparation de nids de poule)
3,000,000
8.
9.
10. Construction du Pont sur la rivière gauche sur la route Jacmel-La Vallée
12,000,000
17,000,000
11. Construction de la route Jacmel-La Vallée de Jacmel (20) Kms
5,000,000
9,000,000
12. Construction du Pont sur la rivière Marigot/Peredo
13. Construction du Pont Roseaux
14. Construction du Pont Voldrogue
15. Construction Pont sur la rivière Haut du Cap
16. Dragage des Exutoires et de la Baie de Port-au-Prince
17. Construction route entrée Minoterie à la nouvelle zone industrielle
18. Construction de l'Aéoport International de l'Ile-à-Vache
19. Construction Viaduc Delmas-Nazon
4,500,000
4,500,000
4,000,000
3,200,000
12,500,000
6,000,000
5,000,000
8,000,000
20. Appui au Développement du secteur de l'énergie
21. Réparation du Port des Cayes
22. Construction du marche public de fontamara
23. Réparation matériel et équipement lourds
24. Renovation urbaine Ennery Rue toussaint Louverture 3 KM
25. Rénovation urbaine de Gonaïve (phase 1) (14 Km)
26. Rénovation urbaine dans le Nords-Ouest
27. Projet de Développement Territorial
28. Hébergement Port Tremblement de Terre du 12 Janvier 2010
35,000,000
2,700,000
6,500,000
29. Construction du Wharf de la Ville de Jérémie
30. Construction du marché public de la Ville de Jacmel
Construction d'infrastructure Socio-Communautaires au Wharf de Jérémie à
31. Cité Soleil
32. Rénovation Urbaine de Hinche
33. Rénovation urbaine de Limbé
1,200,000
2,000,000
34. Renovation Saint Marc Phase 1
35. Réaménagement Place Carrefour Desruisseaux
36. Rénovation Urbaine à Lascahobas et Mirebalais
37. Rehabilitation de la route cerca cavajal (13 KM)
1,000,000
500,000
5,000,000
9,000,000
1,500,000
300,000
6,000,000
7,000,000
5,000,000
10,000,000
5,000,000
5,000,000
2,000,000
Page 265 of 656
Rénovation et Réhabilitation des routes du Village Artistiques de Noailles à
38. Croix des Bouquets.
39. Sous-projet de rénovation urbaine de Jacmel/MPCE/MT
40. Des shelters pour besoin d'intervention d'urgence
1,500,000
8,000,000
5,400,000
41. Renforcement des capacités de la police Nationale (PNH)
42. Construction et Réhabilitation d'Hôpitaux
43. Programme de Protection Sociale
44. L'aménagement des Bassins Vesants dans le Département de l'Ouest (La
Rouyonne, Petit Goâve) /MARNDR
45. Rehabilitation du systeme d'irigation de Latannerie (Phase 1:Etude) et
operationnalisation 2014
46. Recalibrage et Dragage du Chenal Salee Floodway sur 4 Km
47. Appui a la Mecanisation Agricole
48. Appui à la création et à la gestion des entreprises
Drainage et Protection de la ville de Ouanaminthe contre les crues de la
49.
rivière Massacre
50. Ile a vache
51. Ecole Hôtelière et Touristique
52. Equipement de Navigation Maritime
53. Fonds d'expropriation pour les projets à financement Petrocaribe et autres
5,000,000
20,000,000
5,000,000
54. Remise en état et construction des SAEP
55. Construction du Centre de Formation Professionnelle de Pignon
Implantation de sites et services pour un développement ordonné de
56. l'Habitant (Urbanisation)
57. Construction de Silos de stockage pour sécurité alimentaire
2,000,000
1,000,000
58. Construction gare routière du Sud a gressier
59. Rehabilitation de la route Carrefour 44 a cote de fer
Mis en Place des structures de gestion et d'opération dans le domaine de la
60. lotterie et des jeux de hasards
1,000,000
10,000,000
61. Mise en place de 9 centre de transit pour les enfants de rue
62. Construction Wharf de Petit Goave
1,500,000
500,000
63. Construction du Campus Universitaire du Sud
Construction Pont (60 ML) Sur la riviere des Barres reliant Saint louis du
64. Nord et Anse a Foleur
65. Construction Viaduc Marine Haitienne
8,000,000
66. Programme de stabilisation des Prix
20,000,000
4,000,000
1,000,000
5,000,000
5,000,000
3,000,000
3,000,000
8,200,000
985,000
1,000,000
7,500,000
3,500,000
4,000,000
2,515,000
2,000,000
4,500,000
TOTAL
376,500,000
Plusieurs Ministères se voient attribués des montrant significatifs notammement le
MTPTC,MARNDR,MSPP.
Page 266 of 656
Institution
Nature du Projet
MTPTC
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Résolution du 21 Decembre 2012
Montant du
Localité
Projet
Montant decaissé
Montant à
decaisser
9,000,000
Construction de la route
Miragoane- Petit Trou de
Nippes ( lot 1: MiragoanePetite Riviere de Nippes)
Nippes
524,270
488
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Nippes
202,812
576
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Nippes
109,053
596
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Nippes
7,712,434
401
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Nippes
8,492
883
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Nippes
124,145
560
Réhabilitation de la route
Petit Trou de Nippes/Petite
rivière de Nippes
Nippes
318,793
736
Sou total
9,000,000
Amélioration de la route
Ennery-Cap
Haïtien/MTPTC
Sous total
No
decaissement
9,000,000
0
5,500,000
Amélioration de la route
Ennery-Cap Haïtien/MTPTC
Nord
2,238,294
451
Amélioration de la route
Ennery-Cap Haïtien/
Nord
809,043
480
Amélioration de la route
Ennery-Cap Haïtien /
Nord
2,419,990
399
Amélioration de la route
Ennery-Cap Haïtien/
Nord
32,673
721
5,500,000
5,500,000
0
Page 267 of 656
Rehabilitation de rues au
Cap Haitien
4,500,000
Rehabilitation de rues au
Cap Haitien
Nord
1,116,778
400
Réhabilitation de Rues au
Cap Haïtien/MTPTC
Nord
109,459
518
Réhabilitation de Rues au
Cap Haïtien/MTPTC
Nord
98,638
629
Réhabilitation de Rues au
Cap Haïtien/MTPTC
Nord
388,389
663
Réhabilitation de Rues au
Cap Haïtien/MTPTC
Nord
2,390,633
421
Réhabilitation de Rues au
Cap Haïtien/MTPTC
Nord
239,247
671
Réhabilitation de Rues au
Cap Haïtien/MTPTC
Nord
Sous total
156,857
4,500,000
Construction de l'Aeoport
International des Cayes
681
4,500,000
0
8,000,000
Construction de l'Aeoport
International des Cayes
Sud
6,609,246
396
Construction de l'Aeoport
International des Cayes
Sud
469,559
552
Construction de l'Aéoport
International des Cayes
Sud
12,551
624
Construction de l'Aéoport
International des Cayes
Sud
26,511
675
Construction de l'Aéoport
International des Cayes
Sud
20,934
675
Construction de l'Aéoport
International des Cayes
Sud
21,532
700
Construction de l'Aéoport
International des Cayes
Sud
32,393
746
Construction de l'aeroport
international des cayes
Sud
29,756
763
Contruction de l'Aéoport
International des Cayes
Sud
19,967
724
8,000,000
Réhabilitation des Places
Publiques
Réhabilitation des Places
Publiques
7,242,449
757551.36
3,000,000
Ouest
479,146
476
Page 268 of 656
Réhabilitation des Places
Publiques
Ouest
854,366
655
Réhabilitation des Places
Publiques
Ouest
414,823
657
Réhabilitation des Places
Publiques
Ouest
484,709
658
Réhabilitation des Places
Publiques
Ouest
191,092
616
Réhabilitation des Places
Publiques
Ouest
426,313
477
Réhabilitation des Places
Publiques
Ouest
129,395
757
3,000,000
2,979,842
20157.87
4,000,000
Route Cayes-Jéremie
Route Cayes-Jéremie
Grand'Anse
612,500
491
Route Cayes-Jéremie
Grand'Anse
231,635
514
Route Cayes-Jéremie
Grand'Anse
150,638
526
Route Cayes-Jéremie
Grand'Anse
468,091
603
Route Cayes-Jéremie
Grand'Anse
188,002
725
Route Cayes-Jéremie
Grand'Anse
122,500
863
Route Cayes-Jéremie
Grand'Anse
554,134
660
Route Cayes-Jéremie
Grand'Anse
1,000,000
489
Sous total
4,000,000
Réhabilitation des la Route
du Canapé-vert
3,327,500
672500
3,000,000
Réhabilitation de la Route du
Canapé-vert
Ouest
498,865
492
Réhabilitation de la Route du
Canapé-vert
Ouest
654,795
506
Réhabilitation de la Route du
Canapé-vert
Ouest
147,915
539
Réhabilitation de la Route du
Canapé-vert
Ouest
839,305
540
Page 269 of 656
Réhabilitation de la Route du
Canapé-vert
Ouest
603,055
598
Réhabilitation de la Route du
Canapé-vert
Ouest
71,026
651
Réhabilitation de la Route du
Canapé-vert
Ouest
185,040
430
3,000,000
Sous Programme De
Réhabilitation Et
D'entretien
D'infrastructures De
Transport
3,000,000
0.01
12,000,000
Sous Programme De
Réhabilitation Et D'entretien
D'infrastructures De
Transport
National
3,644,647
493
Sous Programme De
Réhabilitation Et D'entretien
D'infrastructures De
Transport
National
843,616
604
7,511,737
Sous total
12,000,000
Réhabilitation et Entretien
de rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
383
12,000,000
0
17,000,000
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
1,973,119
498
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
2,150,692
620
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
2,272,727
617
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
2,468,368
568
Page 270 of 656
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
2,018,779
406
Réhabilitation et Entretien de
rues dans la zone
Métropolitaine de Port-auPrince (Réparation de nids
de poule)
Ouest
3,382,828
677
Sous total
2,733,485
17,000,000
Construction du Pont sur
la rivière gauche sur la
route Jacmel-La Vallée
520
17,000,000
0.010000002
5,000,000
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
161,610
550
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
338,706
627
Contruction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
39,321
661
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
545,940
668
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
2,170,693
398
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
879,214
563
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
16,019
642
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
41,631
644
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
44,941
700
Page 271 of 656
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
43,034
719
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
598,862
720
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
41,055
746
Construction du Pont sur la
rivière gauche sur la route
Jacmel-La Vallée
Sud Est
78,972
763
Sous total
5,000,000
Construction de la route
Jacmel-La Vallée de
Jacmel (20) Kms
Construction de la route
Jacmel-La Vallée de Jacmel
(20) Kms
Construction de la route
Jacmel-La Vallée de Jacmel
(20) Kms
Construction de la route
Jacmel-La Vallée de Jacmel
(20) Kms
Construction de la route
Jacmel-La Vallée de Jacmel
(20) Kms
Construction de la route
Jacmel-La Vallée de Jacmel
(20) Kms
5,000,000
0
9,000,000
Sud Est
424,750
554
Sud Est
1,772,164
555
Sud Est
640,470
590
Sud Est
633,435
630
Sud Est
5,512,885
440
Sous total
9,000,000
Construction du Pont sur
la rivière Marigot/Peredo
8,983,704
16295.87
4,500,000
Construction pont sur la
riviere Marigot /peredo
Sud Est
159,305
551
Construction pont sur la
riviere Marigot /peredo
Sud Est
1,111,444
565
Construction pont sur la
riviere Marigot /peredo
Sud Est
36,843
688
Construction pont sur la
riviere Marigot /peredo
Sud Est
440,314
763
Construction pont sur la
riviere Marigot /peredo
Sud Est
2,139,409
392
Construction pont sur la
riviere Marigot /peredo
Sud Est
45,225
644
Page 272 of 656
Construction pont sur la
riviere Marigot /peredo
Sud Est
38,065
700
Construction pont sur la
riviere Marigot /peredo
Sud Est
40,325
719
Construction pont sur la
riviere Marigot /peredo
Sud Est
438,160
720
Construction pont sur la
riviere Marigot /peredo
Sud Est
50,911
746
Sous-total
4,500,000
Construction du Pont
Roseaux
4,500,000
0
4,500,000
Construction du Pont
Roseaux
Grand'Anse
1,111,444
562
Construction du pont
Roseaux
Grand'Anse
1,085,747
803
Construction du pont
Roseaux
Grand'Anse
2,117,471
393
Sous-total
4,500,000
Construction du Pont
Voldrogue
4,314,662
185337.91
4,000,000
Construction du Pont
Voldrogue
Grand'Anse
1,111,444
564
Construction du Pont
Voldrogue
Grand'Anse
439,696
667
Construction du Pont
Voldrogue
Grand'Anse
550,928
727
Construction Pont
Voldrogue
Grand'Anse
171,513
803
Construction Pont
Voldrogue
Grand'Anse
1,726,419
394
Sous-total
4,000,000
Construction Pont sur la
rivière Haut du Cap
4,000,000
0
3,200,000
Construction Pont sur la
rivière Haut du Cap
Nord
535,774
851
Construction Pont sur la
rivière Haut du Cap
Nord
540,904
411
Construction Pont sur la
rivière Haut du Cap
Nord
112,702
591
Construction Pont sur la
rivière Haut du Cap
Nord
829,374
708
Page 273 of 656
Sous-total
3,200,000
Dragage des Exutoires et
de la Baie de Port-auPrince
2,018,753
1181246.56
12,500,000
Dragage des Exutoires et de
la Baie de Port-au-Prince
Ouest
3,352,859
578
Dragage des Exutoires et de
la Baie de Port-au-Prince
Ouest
1,550,233
619
Dragage des Exutoires et de
la Baie de Port-au-Prince
Ouest
7,489,453
391
Dragage des exutoires et de
la Baie de Port-au-Prince
Ouest
107,455
683
Sous-total
12,500,000
Construction route entrée
Minoterie à la nouvelle
zone industrielle
12,500,000
0
6,000,000
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
1,034,668
588
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
1,723,391
640
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
2,467,904
444
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
61,698
587
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
20,566
626
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
20,566
650
Page 274 of 656
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
Construction route entrée
Minoterie à la nouvelle zone
industrielle Lafito (7 kms à 4
voies)
Ouest
Sous-total
630,074
6,000,000
Construction de l'Aéoport
International de l'Ile-àVache
659
656
5,979,433
20566.87
5,000,000
Construction de l'Aéoport
International de l'Ile-à-Vache
Sud
6,069
623
Construction de l'Aéoport
International de l'Ile-à-Vache
Sud
20,409
723
Construction de l'Aéoport
International de l'Ile-à-Vache
Sud
4,881,286
397
Construction de l'Aéoport
International de l'Ile-à-Vache
Sud
23,909
675
Construction de l'Aéoport
International de l'Ile-à-Vache
Sud
22,779
700
Construction de l'Aéoport
International de l'Ile-à-Vache
Sud
34,790
746
Sous-total
5,000,000
Construction Viaduc
Delmas-Nazon
4,989,242
10758.04
8,000,000
Construction Viaduc
Delmas-Nazon
Ouest
279,673
631
Construction Viaduc
Delmas-Nazon
Ouest
353,921
699
Construction viaduc delmas
Nazon
Ouest
1,175,232
763
Construction viaduc delmas
Nazon
Ouest
4,147,095
389
Construction viaduc delmas
Nazon
Ouest
2,044,080
698
Sous-total
EDH
20,566
8,000,000
Appui au Développement
du secteur de l'énergie
8,000,000
0
35,000,000
Page 275 of 656
Appui au Développement du
secteur de l'énergie
National
22,542,254
403
Appui au Développement du
secteur de l'énergie
National
8,424,255
473
Appui au Développement du
secteur de l'énergie
National
2,334,162
673
Appui au Développement du
secteur de l'énergie
National
103,187
639
Appui au Développement du
secteur de l'énergie
National
409,707
702
Appui au Développement du
secteur de l'énergie
National
1,122,334
713
Sous total
MTPTC
35,000,000
Réparation du Port des
Cayes
Réparation du Port des
Cayes
Réparation du Port des
Cayes
Réparation du Port des
Cayes
Réparation du Port des
Cayes
Réparation du Port des
Cayes
34,935,899
64101.1
2,700,000
Sud
.
109,192
685
Sud
655,403
861
Sud
263,117.45
????
Sud
263,117.45
782
Sud
649,310
402
2,700,000
1,677,022
1022978.13
Réparation du Port des
Cayes
MPCE
Construction du marche
public de fontamara
6,500,000
Construction du marche
public de fontamara
Ouest
29,731
722
Construction du marche
public de fontamara
Ouest
3,716,377
443
Construction du marche
public de fontamara
Ouest
118,924
587
Construction du marche
public de fontamara
Ouest
29,731
628
Construction du marche
public de fontamara
Ouest
29,731
650
Construction du marche
public de fontamara
Ouest
29,731
659
Construction du marche
public de fontamara
Ouest
29,731
722
Page 276 of 656
Construction du marche
public de fontamara
Ouest
59,462
784
Construction du marche
public de fontamara
Ouest
59,462
819
Sous total
CNE
6,500,000
Réparation matériel et
équipement lourds
4,102,880
2397120.12
1,500,000
Réparation matériel et
équipement lourds (Mise en
place de l'usine de
concassage et d'asphalte
plant)
National
721,311
856
Réparation matériel et
équipement lourds (Mise en
place de l'usine de
concassage et d'asphalte
plant)
National
750,000
413
Sous total
1,500,000
1,471,311
28688.52
MPCE
Renovation urbaine
Ennery Rue toussaint
Louverture 3 KM
Renovation urbaine Ennery
Rue toussaint Louverture 3
KM
Renovation urbaine Ennery
Rue toussaint Louverture 3
KM
300,000
Artibonite
94,246
465
Artibonite
205,754
626
Sous total
300,000
Rénovation urbaine de
Gonaïve (phase 1) (14 Km)
300,000
0
6,000,000
Rénovation urbaine de
Gonaïve (phase 1) (14 Km)
Artibonite
1,411,917
495
Rénovationvurbaine de
Gonaïves (phase 1) (14 Km)
Artibonite
2,345,934
561
Rehabilitation Urbaine de
Gonaives (Phase 1) (14km)
Artibonite
2,086,156
626
Renovation Urbaine de
Gonaives (Phase 1) (14km)
Artibonite
155,993
427
6,000,000
Rénovation urbaine dans le
Nords-Ouest
6,000,000
0
7,000,000
Page 277 of 656
Rénovation urbaine dans le
Nords-Ouest (11.7 Kms
Port-de-Paix et Môle St
Nicolas)
Nord Ouest
831,777
516
Rénovation urbaine dans le
Nords-Ouest (11.7 Kms
Port-de-Paix et Môle St
Nicolas)
Nord Ouest
407,639
547
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
182,805
643
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
168,524
646
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
278,242
670
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
193,065
791
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
113,924
793
Rénovation urbaine dasn le
Nord-Ouest(11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
91,388
836
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
53,062
674
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
400,000
802
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
243,739
618
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
202,664
649
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
59,340
758
Rénovation urbaine dans le
Nord-Ouet (11.7 Kms Portde-Paix et Môle St Nicolas)
Nord Ouest
214,640
718
7,000,000
3,440,808
3559191.7
Page 278 of 656
Projet de Développement
Territorial
5,000,000
Projet de Développement
Territorial
National
11,010
531
Projet de Développement
Territorial
National
1,241,098
532
Projet de Développement
Territorial
National
5,417
593
Projet de Développement
Territorial
National
5,405
614
Projet de Développement
Territorial
National
5,405
615
Projet de Développement
Territorial
National
669,075
637
Projet de Développement
Territorial
National
1,822,015
461
Projet de Développement
Territorial
National
183,709
478
Projet de Développement
Territorial
National
890,869
507
Projet de Développement
Territorial
National
124,497
587
Projet de Développement
Territorial
National
Sous-total
41,499
5,000,000
MPCEULCBP
Hébergement Port
Tremblement de Terre du
12 Janvier 2010
MTPTC
Construction du Wharf de
la Ville de Jérémie
National
10,000,000
5,000,000
0
5,000,000
569
Construction du Wharf de la
Ville de Jérémie
Grand
Anse
112,393
858
Construction du Wharf de la
Ville de Jérémie
Grand
Anse
380,233
589
Construction du Wharf de la
Ville de Jérémie
Grand
Anse
432,200
664
Construction du marché
public de la Ville de Jacmel
Construction du marché
public de la Ville de Jacmel
5000000
1,200,000
1,200,000
MPCE
628
924,826
275174.25
2,000,000
Sud-Est
1,153,481
592
Page 279 of 656
85,953
Sous total
MPCE
2,000,000
Construction
d'infrastructure SocioCommunautaires au
Wharf de Jérémie à Cité
Soleil
478
1,239,434
760565.75
5,000,000
Construction d'infrastructure
Socio-Communautaires au
Wharf de Jérémie à Cité
Soleil
Ouest
106,030
611
Construction d'infrastructure
Socio-Communautaires au
Wharf de Jérémie à Cité
Soleil
Ouest
4,372,645
442
Construction d'infrastructure
Socio-Communautaires au
Wharf de Jérémie à Cité
Soleil
Ouest
521,325
478
Sous total
5,000,000
Rénovation Urbaine de
Hinche
Rénovation Urbaine de
Hinche
Rénovation Urbaine de
Hinche
Rénovation Urbaine de
Hinche
5,000,000
0
5,000,000
Centre
1,246,669
612
Centre
636,466
899
Centre
2,652,136
441
Sous total
5,000,000
4,535,271
571,683
Sous total
Rénovation urbaine de
Limbé
Nord
2,000,000
Sous total
Renovation Saint Marc
Phase 1
Artibonite
1,000,000
Réaménagement Place
Carrefour Desruisseaux
Nippe
500,000
Rénovation Urbaine à
Lascahobas et Mirebalais
464728.54
621
1428316.69
626
0
101,500
679
398500
1,000,000
5,000,000
Rénovation Urbaine à
Lascahobas et Mirebalais
Centre
4,508,136
458-1
Renovation Ubaine a
Lascahobas et Mirebalais
Centre
491,864
686
Page 280 of 656
Sous total
5,000,000
Rehabilitation de la route
cerca cavajal (13 KM)
Réhabilitation de la route
Colladère-Cerca-Cavajal (13
Kms)
Réhabilitation de la route
Colladère-Cerca-Cavajal (13
Kms)
5,000,000
0
9,000,000
Centre
41,355
722
Centre
1,020,889
747
Centre
1,042,903
634
Centre
4,962,541
439
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Centre
165,418
587
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Centre
41,355
628
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Centre
41,355
650
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Centre
41,355
659
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Centre
41,355
722
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Centre
82,709
784
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Réhabilitation de la route
Colladère-Cerca-Cavajal (15
Kms)
Sous total
9,000,000
Rénovation et
Réhabilitation des routes
du Village Artistiques de
Noailles à Croix des
Bouquets.
7,481,232
1518767.94
1,500,000
Rénovation et Réhabilitation
des routes du Village
Artistiques de Noailles à
Croix des Bouquets.
Ouest
224,137
732
Rénovation et Réhabilitation
des routes du Village
Artistiques de Noailles à
Croix des Bouquets
Ouest
338,915
806
Rénovation et Réhabilitation
des routes du Village
Artistiques de Noailles à
Croix des Bouquets
Ouest
702,806
645
Renovation et Rehabilitation
des du Village Artistiques de
Noailles a Croix des
Bouquets
Ouest
234,143
885
Page 281 of 656
Sous total
MPCE/MT
1,500,000
Sous-projet de rénovation
urbaine de
Jacmel/MPCE/MT
Sous-projet de rénovation
urbaine de
Jacmel/MPCE/MT
Sous-projet de rénovation
urbaine de
Jacmel/MPCE/MT
Sous-projet de rénovation
urbaine de
Jacmel/MPCE/MT
Sous-projet de rénovation
urbaine de
Jacmel/MPCE/MT
Sud-Est
1,700,000
800
Sud-Est
701,754
431
Sud-Est
1,206,897
462
Sud-Est
2,000,000
636
8,000,000
Des shelters pour besoin
d'intervention d'urgence
5,608,651
2391349.06
5,400,000
Des shelters pour besoin
d'intervention d'urgence
National
309,735
819
Des shelters pour besoin
d'intervention d'urgence
National
1,282,531
438
Sous total
MJSP
0
8,000,000
Sous total
ULCB
1,500,000
5,400,000
Renforcement des
capacités de la police
Nationale (PNH)
Renforcement des capacités
de la police Nationale
(PNH)
Renforcement des capacités
de la police Nationale
(PNH)
1,592,266
3807733.74
5,000,000
National
4,519,251
380
National
480,749
556
5,000,000
5,000,000
0
MSPP
Construction et
Réhabilitation d'Hôpitaux
20,000,000
Construction et
Réhabilitation d'Hôpitaux
Ouest
258,105
549
Construction et
Réhabilitation d'Hôpitaux
Ouest
2,500,000
570
Construction et
Réhabilitation d'Hôpitaux
Ouest
1,500,101
577
Construction et
Réhabilitation d'Hôpitaux
Ouest
1,315,490
594
Construction et
Réhabilitation d'Hôpitaux
Ouest
2,800,000
412
Page 282 of 656
Construction et
Réhabilitation d'Hôpitaux
Ouest
Sous total
?
Programme de Protection
Sociale
National
11,626,304
785
20,000,000
20,000,000
0
5,000,000
5,000,000
571
0
MARNDR
L'aménagement des
Bassins Vesants dans le
Département de l'Ouest
(La Rouyonne, Petit
Goâve) /MARNDR
4,000,000
L'aménagement des Bassins
Vesants dans le Département
de l'Ouest (La Rouyonne,
Petit Goâve) /MARNDR
Ouest
1,702,611
638
L'aménagement des Bassins
Vesants dans le Département
de l'Ouest (La Rouyonne,
Petit Goâve) /MARNDR
Ouest
1,965,517
464
L'aménagement des Bassins
Vesants dans le Département
de l'Ouest (La Rouyonne,
Petit Goâve) /MARNDR
Ouest
331,872
742
Sous total
4,000,000
Rehabilitation du systeme
d'irigation de Latannerie
(Phase 1:Etude) et
operationnalisation 2014
4,000,000
0
1,000,000
Rehabilitation du systeme
d'irigation de Latannerie
(Phase 1:Etude) et
operationnalisation 2014
Nord
492,529
464
Rehabilitation du systeme
d'irigation de Latannerie
(Phase 1:Etude) et
operationnalisation 2014
Nord
495,496
742
1,000,000
Recalibrage et Dragage du
Chenal Salee Floodway sur
4 Km
988,024
11975.76
5,000,000
Page 283 of 656
Recalibrage et Dragage du
Chenal Salee Floodway sur
4 Km
Ouest
3,849
716
Recalibrage et Dragage du
Chenal Salee Floodway sur
4 Km
Ouest
4,827,586
464
Recalibrage et Dragage du
Chenal Salee Floodway sur
4 Km
Ouest
168,565
548
Sous total
5,000,000
Appui a la Mecanisation
Agricole
Appui a la Mecanisation
Agricole
National
1,239,000
419
Appui a la Mecanisation
Agricole
National
1,242,157
464
Appui a la Mecanisation
Agricole
National
1,867,882
548
650,961
742
5,000,000
Appui à la création et à la
gestion des entreprises
0
Appui à la création et à la
gestion des entreprises
National
2,456,140
452
Appui àla création et à la
gestion des entreprises
National
364,502
906
3,000,000
Drainage et Protection de
la ville de Ouanaminthe
contre les crues de la
rivière Massacre
2,820,642
179357.74
3,000,000
Drainage et Protection de la
ville de Ouanaminthe contre
les crues de la rivière
Massacre
Nord Est
1,264,399
609
Drainage et Protection de la
ville de Ouanaminthe contre
les crues de la rivière
Massacre
Nord Est
1,615,012
449
Sous total
?
5,000,000
3,000,000
Sous total
MDE
0
5,000,000
Sous total
MCI
5,000,000
3,000,000
120589.77
8,200,000
Ile a vache
Ile a vache
2,879,410
Sud
2,050,000
543
Page 284 of 656
Ile à Vache
Sud
3,000,000
707
Ile à Vache
Sud
919,696
828
Ecole Hôtelière et
Touristique
SEMANAH
8,200,000
5,969,696
985,000
400,000
706
182,232
608
National
375,111
417
National
442,657
641
National
Equipement de Navigation
Maritime
Equipement de Navigation
Maritime (Construction de 4
phrases : 1 à Pointe à
Baquette (Jacmel) 1 à Port à
Gravois (Port-salut), 2 à
Tortue Est et TortueOuest
(Ile de la Tortue)
Equipement de Navigation
Maritime (Construction de 4
phrases : 1 à Pointe à
Baquette (Jacmel) 1 à Port à
Gravois (Port-salut), 2 à
Tortue Est et TortueOuest
(Ile de la Tortue)
Equipement de Navigation
Maritime (Construction de 4
phrases : 1 à Pointe à
Baquette (Jacmel) 1 à Port à
Gravois (Port-salut), 2 à
Tortue Est et TortueOuest
(Ile de la Tortue)
DINEPA
Fonds d'expropriation
pour les projets à
financement Petrocaribe et
autres
585,000.00
1,000,000
National
Sous total
MINISTERES
2,230,304.35
National
Remise en état et
construction des SAEP
1,000,000
1,000,000
0
7,500,000
7,500,000
534
0
2,000,000
Remise en état et
construction des SAEP (
Nord, Sud'Est, Nippes,
Artibonite, Centre, Sud,
Ouest, Nord -Ouest, Grand
Anse)
National
956,720
567
Remise en état et
construction des SAEP (
Nord, Sud'Est, Nippes,
Artibonite, Centre, Sud,
Ouest, Nord -Ouest, Grand
Anse)
National
985,915
414
2,000,000
1,942,635
57364.69
Page 285 of 656
MENFP
Construction du Centre de
Formation Professionnelle
de Pignon
1,000,000
Construction du Centre de
Formation Professionnelle
de Pignon
Nord
427,817
652
Construction du Centre de
Formation Professionnelle
de Pignon
Nord
378,570
469
Construction du Centre de
Formation Professionnelle
de Pignon
Nord
115,873
816
Sous total
UCLBP
BMPAD
Implantation de sites et
services pour un
développement ordonné de
l'Habitant (Urbanisation)
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
National
1,000,000
922,260
3,500,000
3,500,000
23,117
National
12,500
National
57,112
Construction de Silos de
stockage pour sécurité
alimentaire
National
67,970
Construction de Silos de
stockage pour sécurité
alimentaire
National
3,866
Construction de Silos de
stockage pour sécurité
alimentaire
National
47,831
Construction de Silos de
stockage pour sécurité
alimentaire
National
28,436
National
33,674
National
32,431
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
886
4,000,000
National
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
77740.37
566
Page 286 of 656
0
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
Construction de Silos de
stockage pour sécurité
alimentaire
National
7,885
National
38,852
National
17,448
National
21,684
National
17,329
National
3,202
National
967,543
358,003
Sous total
4,000,000
1,738,881
2261118.97
MTPTC
Construction gare routière
du Sud a gressier
Ouest
1,000,000
500,000
479
500000
MTPTC
Rehabilitation de la route
Carrefour 44 a cote de fer
Sud
10,000,000
10,000,000
537
0
MEF
Mis en Place des structures
de gestion et d'operation
dans le domaine de la
lotterie et des jeux de
hasards
National
2,515,000
2,514,671
407
328.64
ULCBP
Mise en place de 9 centre
de transit pour les enfants
de rue
National
1,500,000
-
1500000
MTPTC
Construction Wharf de
Petit Goave
Ouest
500,000
-
500000
MPCE
Construction du Campus
Universitaire du Sud
Sud
8,000,000
-
8000000
MTPTC
Construction Pont (60 ML)
Sur la riviere des Barres
reliant Saint louis du Nord
et Anse a Foleur
Construction Pont (60 Ml)
Sur la riviere des Barres
reliant Saint louis du Nord et
Anse a Foleur
2,000,000
Nord Ouest
691,978
395
Page 287 of 656
Construction Pont (60 Ml)
Sur la riviere des Barres
reliant Saint louis du Nord et
Anse a Foleur
Nord Ouest
Sous toal
1,062,713
2,000,000
1,754,691
3,408,932
MTPTC
Construction Viaduc
Marine Haitienne
Ouest
4,500,000
MEF/BMPAD
Programme de stabilisation
des Prix
National
20,000,000
474
245309.3
390
1091067.59
(37,879,560)
54,108,083
Sous total
20,000,000
16,228,522
3771477.76
TOTAL
376,500,000
329,386,735
47113264.98
Page 288 of 656
Revue de passation des marchés
Résolution du : 21 Décembre 2012
No
Maitre
d'œuvre
Maitre
d'ouvrage
Description des travaux
Localité
Contrat
Date
de
signature
10 Octobre
2012
27 Décembre
2012,
17 Mars 2014
1
V&F
S.A.
MTPTC
Réhabilitation route du
Canapé-vert
Canapé-Vert
2
Ingenieria
ESTRELLA
MTPTC
Amélioration de la route
Ennery/Cap-Haitien
Nord
MTPTC
Construction Pont Roseaux
Jérémie
Illisible
MTPTC
Travaux de reconstruction
d‟urgence du Pont Blue Hill
sur la Rivière Haut du Cap
Nord
MTPTC
Réparation Port des cayes
3
4
5
Wenling
Hongyuan Traffic
Engineering Co
LTD.
Wenling
Hongyuan Traffic
Engineering Co
LTD
Ingenieria
ESTRELLA
Appel d'offres
Montant
196, 045,071.36
Gourdes
9, 818,245.42 US,
Avenant
2, 029,262.12 US
Gré
à
gré
Restreint
Ouvert
Approbation
CSC/CA
Non
objection
du CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Oui
Signé
Signé
Oui
Oui
Signé
Non Signé
Non
8, 469,855.83
US
Oui
Signé
Non
Oui
20 Décembre
2012
2, 163,615.39
US
Oui
Signé
Signé
Oui
Cayes
27 Décembre
2012
Non date(Av.)
2, 597,238.17 US(C.)
2,578,994.13 US(Av.)
Oui
Signé
Non Signé
Oui
Marigot
27 Décembre
2012(C)
26 Novembre
2014(Av)
8, 557,634.36 US (C.) +
Avenant 1,
2, 178,341.87 US
Oui
Signé
Non
Oui
P-au-P
27 Décembre
2012
16, 588, 378,41 US
+Avenant
4, 914,363.30 US
Oui
Signé
Non signé
Oui
Nippes
27 Décembre
2012
30, 849,937.91
US
Oui
Signé
Non
Oui
Bon-Repos
Non
Oui
Non
Signé
Non Signé
Oui
Martissant
Novembre 2012
Oui
Signé
Non Signé
Oui
6
White Co.
LTD
MTPTC
Contrat d'exécution des
travaux de construction
d'urgence du pont de la
rivière grande à
Marigot/Peredo
7
Ingenieria
ESTRELLA
MTPTC
Constructruction Viaduc
Delmas-Nazon
8
V&F Construction
S.A
MTPTC
9
ETRAMEC
S.A.
MSPP
10
IBT, LLC
MSPP
11
Bernard Mevs
Projet
MEDISHARE
MSSP
Construction d'un centre de
traumatologie de niveau I
Delmas,
Ouest
7 Février 2013
5, 000,000
US
Oui
Non
Non
Non
12
Ingenieria
ESTRELLA
MPCE
Contrat de Construction
d'Abris au niveau des
Département de la
République
National
20 Novembre
2012
5, 400,132
US
Oui
Signé
Non Signé
Non
Réhabilitation construction
tronçon Petite Rivière/ Petit
Trou de Nippes
Réhabilitation de l'Hôpital de
Bon Repos (Phase 1)
Construction Hôpital Simbi
Continental de Martissant
37, 769,321.20
Gourdes
6, 000,404.3
US
Page 289 of 656
Revue des passations des marchés (Suite)
Résolution du : 21 Décembre 2012
Contrat
No
Maitre d'œuvre
Maitre
d'ouvrage
Appel d'offres
Localité
Date de
signature
Montant
Gré
à
gré
Description des travaux
Restreint
Ouvert
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Signé
Non Signé
Oui
Non
Non
Oui,
13
CSA Central/
Inc.
MPCE
Contrat de supervision de
réhabilitation de la route
Cerca-Cavajal
Colladère
Décembre
2012
1, 044,745.45
US
Oui
14
Hongyuan
Construction
Company
MPCE
Réhabilitation de la route
Cerca-Cavajal
Colladère
Decembre
2012
9 septembe
2015(Av.)
20, 894,909.00 US +
2, 703, 776.73 US (Av.)
Oui
15
Ingenieria
ESTRELLA
MTPTC
Construction d'urgence d'un
Viaduc sur la Route Rails
Tronçon 1
Route des
rails
22 Décembre
2012
13, 635,729.63
US
Oui
Signé
Non Signé
Oui
16
HL-Construction
S.A.
MPCE
Contrat de Réhabilitation
de la Route de Minoterie
Minoterie
Décembre
2012
10, 391, 175 US
Oui
Signé
Non Signé
Non
Minoterie
Décembre
2012
519,559
US
Oui
Signé
Non Signé
Oui
Ile à Vache
27 Décembre
2014
Oui
Signé
Non Signé
Oui
Port-auPrince
20 Décembre
2012
19, 525,143
US
18, 411,135
US (c )+ 5,517,257 US
(av )
Oui
Signé
Non Signé
Oui
Port-auPrince
Novembre
2010
2, 195, 053.30
US
Oui
Signé
Non,
Non
Oui,
Oui
La Vallée,
Jacmel
…Décembre
2012
23, 212,146.00
US
Oui
Oui
Non
Oui
15, 647,900 US
Oui
Non Signé
Non
782,395 US
Oui
Signé
Non Signé
Oui
17
18
29
CSA Central/
Inc.
Ingenieria
ESTRELLA
Société Technique
de Construction
(SOTECH)
MPCE
MTPTC
MPCE
20
Groupe
TRAME
MPCE
21
SECOSA
MPCE
22
23
IBT,
LLC
CSA Central/
Inc.
MPCE
MPCE
Contrat de Supervision des
Travaux de Réhabilitation de
la Route de Minoterie
Construction de l'aérogare de
l'Ile à Vache (Cayes)
Construction d'infrastructure
socio-communautaire à Cité
Soleil
Supervision d'infrastructure
socio-communautaire à Cité
Soleil
Travaux de réhabilitation
d'urgence de la route Jacmel,
La Vallée 19 km
Construction du Marché
Public de Fontamara
Supervision du Marché
Public de Fontamara
Fontamara
Fontamara
Novembre
2012
Novembre
2012
Signé,
Non
Signé
(Av.)
Oui
24
IBT,
LLC
MPCE
Contrat de Construction de
Lycée Alexandre Pétion
PortauPrince
26 Novembre
2012
7, 696,012.00 US et
384,800 US (Sup.)
Oui
Signé
Non Signé
Non
25
IBT,
LLC
MPCE
Contrat de Construction du
Lycée Toussaint Louverture
Port-auPrince
Novembre
2012
8, 029,900.00 US et
401, 495 US
(Supervision)
Oui
Signé
Non Signé
Non
Page 290 of 656
Revue de passation des marchés (Suite2)
Résolution du : 21 Décembre 2012
Contrat
No
26
27
28
29
Maitre d'œuvre
Ingenieria
ESTRELLA
General
Construction et
distribution S.A
General
Construction et
distribution S.A
Wenling hongyuan
Traffic
Engineering
CO.LTD
Maitre
d'ouvrage
Appel d'offres
Localité
Date de
signature
Montant
Gré
à
gré
Description des travaux
Restreint
Ouvert
Approbation
CSC/CA
Non
objection
du CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Signé
Non Signé
Non
MPCE
Construction du local
CIMO
Delmas
20 Novembre
2012
4, 233,950.60
US
Oui
MPCE
Construction de la place
publique de l‟aeroport
Delmas
… Novembre
2012
1,795,000 US
Oui
Oui
Non
Oui
MPCE
Construction de la place
publique de l‟aeroport
(phase 2)
Delmas
7 avril 2015
1,257,428 US
Oui
Oui
Non
Oui
MTPTC
Construction du pont sur la
rivière gauche
Jacmel
27 Decembre
2012(C ) + 26
Decembre 2014
( AV)
8,682,772 US+
2,074,238 US
Oui
Oui
Non
Oui
Nippes
27 Dec
2012+2Dec
2014(av)
2,621,350 US
+782,398 US
Oui
Oui
Non
Oui
Nippes
5 mai 2015
19,971,599 Gourdes
Oui
Oui
Non
Oui
30
EGIS
INTERNATIONA
L-COMPAC
MTPTC
31
EGIS
INTERNATIONA
L-COMPAC
MTPTC
Contrat de supervision des
travaux de rehabilitation
d‟urgence du tronçon petit
rivière petit trou de nippes
Contrat #2 de supervision
des travaux de
rehabilitation d‟urgence du
tronçon petit rivière petit
trou de nippes
Page 291 of 656
Revue de la gestion des contrats
Résolution du: 21 Décembre 2012
No
Maitre d'œuvre
Maitre
d'ouvrage
Description
des
travaux
Contrat
Date
de
signature
10 Octobre
2012
27 Décembre
2012,
17 Mars 2014
Montant
196,045,071.36
Gourdes
9, 8188,245.42 US,
+Avenant
2, 029,262.12 US
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée des
travaux
Montant
décaissé
Non
Non
Oui
6 Mois
3, 000,000.00
US
Oui
Non
Non
Non
6 Mois
5, 500,000.00
US
Avance
de
démarrage
39,209,014
Gourdes
1
V&F
S.A.
MTPTC
Réhabilitation route du
Canapé-Vert
2
Ingenieria
ESTRELLA
MTPTC
Amélioration de la route
Ennery-Cap-Haitien
3
Wenling Hongyuan
Traffic engineering
Co LTD
MTPTC
Construction Pont Roseaux
Illisible
8, 469,885.83
US
Oui
Non
Non
Oui
10 mois
4, 314,662.09
US
4
Wenling Hongyuan
Traffic Engineering
Co LTD
MTPTC
Travaux de réconstruction
d‟urgence du Pont Blue Hill
sur la rivière Haut du Cap
20 Décembre
2012
2, 163,615.39
US
Non
Non
Non
Non
10 Mois
2, 018,753.44
US
5
Ingenieria
ESTRELLA
MTPTC
Réparation Port des cayes
27 Décembre
2012
Non date (Av.)
2, 597,238.17 US(C.)
2, 578, 994.13 US(Av.
649,309
Non
Non
Oui
6
White Co.
LTD
MTPTC
Contrat d'exécution des
travaux de construction
d'urgence du pont de la
rivière grande à Marigot
27 Décembre
2012 (c ) +26
Novembre
2014 (av)
8, 557,634.32 US (C.)
+ Avenant 1,
2, 178,391.87 US
Non
Non constaté
lors de l‟analyse
du contrat
Non constaté
Oui
10 mois,
Avenant 20
mois
4,500,000.00
US
7
Ingenieria
ESTRELLA
MTPTC
Construction viaduc
Delmas-Nazon
27 Décembre
2012
16, 588,378.41 US
+Avenant
4, 914,364.38 US
11,330,787
us
Non
Non
Oui
18 Mois, 5
Mois
8, 000,000.00
US
8
V& F
S.A.
MTPTC
Réhabilitation route Petit
trou de Nippes/Petite Rivière
de Nippes.
27 Décembre
2012
30, 849,737.91
US
Oui
Non
Non
Oui
18 Mois +12
mois +9 mois+
12 mois
9, 000,000.00
US
9
ETRAMEC
S.A.
MSPP
Réhabilitation de l'hôpital de
bon repos (Phase 1)
Non
37, 769,321.20
Gourdes
Oui
Non
Non
Oui
6 Mois
258,104.70 US
10
IBT, LLC
MSPP
Construction Hôpital Simbi
continental de Martissant
Novembre
2012
6, 000,404.3
US
Oui
Oui
Oui
12 Mois
1, 500,101.08
US
11
Bernard Mevs
Projet
MEDISHARE
MSPP
Construction d'un centre de
traumatologie de niveau I
27 février 2013
5, 000,000.00
US
Oui
Non
Non
Non
1, 315,489.75
US
12
Ingenieria
ESTRELLA
MPCE
Contrat de construction
d'Abris au niveau des
départements de la
République
20 Novembre
2012
5, 400,132
US
Oui
Non
Non
12 Mois
1, 592,266.28
US
Garantie
Bancaire #
8801400003228
Non constaté
lors de l'analyse
du contrat
Non
13 Mois
(Contrat) +
6 mois (Av.)
1, 677,021.87
US
Page 292 of 656
Revue de la gestion des contrats (Suite)
Résolution du: 21 Décembre 2012
No
Maitre d'œuvre
Maitre
d'ouvrage
Description
des
travaux
MPCE
Contrat
Montant
Avance
de démarrage
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Décembre 2012
1, 044,745.45
US
Oui
Non
Non
Non
24 Mois
20, 894,909.00 US +
2, 703, 776.73 US
(Av.)
Oui
Non
Non
Oui
24 Mois
Date
De
signature
Contrat de supervision de
réhabilitation de la route
Cerca-Cavajal
Montant
décaissé
13
CSA Central/
Inc.
14
Hongyuan
Construction
Company
MPCE
Réhabilitation de la route
Cerca-Cavajal
22 Mars 2013
9 septembe
2015(Av.)
15
Ingenieria
ESTRELLA
MTPTC
Construction d'urgence d'un
viaduc sur la route rails
tronçon 1
22 Décembre
2012
13, 635,730
US
3,408,932 US
Non
Non
Oui
23 Mois
3, 408,932.11
US
16
HL-Construction
S.A.
MPCE
Réhabilitation de la route de
Minoterie
Décembre 2012
10, 391,175
US
Oui
Non
Non
Non
24 Mois
5, 999, 999
US
Décembre 2012
519,559
US
Oui
Non
Non
Non
24 Mois
Non
Oui
Non
Non
Non
24 Mois
4, 989,247 US
Non
Non
Non
Non
24 Mois
17
18
19
CSA
Central
INC.
Ingenieria
ESTRELLA
Société Technique
de Construction
(SOTECH)
MPCE
MTPTC
MPCE
20
Groupe
TRAME
MPCE
21
SECOSA
MPCE
22
IBT, LLC
MPCE
23
IBT, LLC
MPCE
24
IBT, LLC
25
HL-Construction
S.A
Contrat de supervision des
travaux de réhabilitation de
la route de Minoterie
Construction de l'aérogare
de l'ile à vache (cayes)
Construction d'infrastructure
socio-communautaire à Cité
Soleil
Supervision d'infrastructure
socio-communautaire à Cité
Soleil
Travaux de réhabilitation
d'urgence de la route La
Vallée 19 km
Construction du marché
public de Fontamara
27 Décembre
20 Décembre
2012
19, 525,145
US
18, 411,135
US + 5,517,257 US
(AV )
7, 481,232.06
US
5, 000,000.00
US
Novembre 2010
2, 195, 053.30
US
Non
Non constaté
Non constaté
Non
constaté
Non
Décembre 2012
23, 212,146.00 US
5,803,036 US
Non constaté lors
de l'analyse du
contrat
Non
Non
24 mois
8, 983,704 US
Novembre 2012
75, 647,900
US
Oui
Non
Non
Non
Non
4, 102,880
US
Contrat de construction du
lycée Alexandre Petion
26 Novembre
2012
7,696,012 us +384,800
us
N/A
Oui
Oui
MPCE
Contrat de Construction du
Lycée Toussaint Louverture
Novembre 2012
8, 029,900.00 US+
401,495 us
Oui
Non
Non
Non
MPCE
Contrat de Réhabilitation de
la Route de Minoterie
Décembre 2012
10, 391, 175 US
Non
Non
Non
Oui
Non
N/A (C)
18 mois
(Sup)
N/A (C)
18 mois
(Sup.)
24 Mois
101,544.57 US
105,950.07
US
5.999,999.00
US
Page 293 of 656
Revue de la gestion des contrats (Suite 2)
Résolution du: 21 Décembre 2012
No
26
27
28
Maitre d'œuvre
Ingenieria
ESTRELLA
General
Construction et
distribution S.A
General
Construction et
distribution S.A
Maitre
d'ouvrage
Description
des
travaux
MPCE
Contrat
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
500,000.00
US
Date
De
signature
Montant
Avance
de
démarrage
Construction du local du
Corps d'intervention et de
maintien de l'Ordre (CIMO)
20 Novembre
2012
4, 233,950.60
US
Non
Non
Non
Non
Non
MPCE
Construction de la place
publique de l‟aeroport
… Novembre
2012
1,795,000 US
448,750
Non constaté
Non constaté
Oui
N/A
MPCE
Construction de la place
publique de l‟aeroport
(phase 2)
7 avril 2015
1,257,428 US
---
Non constaté
Non constaté
----
----
MTPTC
Construction du pont sur la
rivière gauche
27 Decembre
2012(C ) + 26
Decembre 2014
( AV)
8,682,772 US+
2,074,238 US
Oui
Non constaté
Non constaté
Oui
20 Mois
27 Dec
2012+2Dec
2014(av)
2,621,350 US
+782,398 US
N/A
N/A
N/A
N/A
17 mois +
6 mois
5 mai 2015
19,971,599 Gourdes
N/A
N/A
N/A
N/A
6 mois
29
Wenling hongyuan
Traffic Engineering
CO.LTD
30
EGIS
INTERNATIONALCOMPAC
MTPTC
31
EGIS
INTERNATIONALCOMPAC
MTPTC
Contrat de supervision des
travaux de rehabilitation
d‟urgence du tronçon petit
rivière petit trou de nippes
Contrat #2 de supervision
des travaux de rehabilitation
d‟urgence du tronçon petit
rivière petit trou de nippes
841,135 US
5,000,000 US
Page 294 of 656
1-Travaux de rénovation urbaine et de construction d‟infrastructure sociocommunautaires à
Mirebalais
Maître d‟ouvrage :
MPCE
Description des travaux : Travaux de rénovation urbaine et de construction d‟infrastructure
sociocommunautaires à mirebalais
Localité
: Centre
Maître d‟œuvre Groupe des Travaux et de Construction (GTC)
Montant du contrat U.S 18, 981,625.
Date de signature du contrat 20 Décembre 2012
Durée des travaux 26 mois
Appel d‟offresgré à gré
Approbation de la CSC/CA Signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
quitus fiscal, patente
Avance de démarrage: N/A; N/A; N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie NA
Retenue de bonne exécution
Prélèvement des 2%
NA
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
NA
Montant total versé au maitre d‟œuvre US 18,490,347
Commentaires :
Ayant pour description : « Rénovation urbaine et construction d‟infrastructure sociocommunautaire à Mirebalais », les montants alloués en US dans les Résolutions sont les
suivants :
Page 295 of 656
-
Résolution 21 Décembre 2012 est de
5,000,000
-
Résolution 11 Décembre 2013 est de
3,000,000
-
Résolution 15 Avril 2015 est de
4,951,433
-
Résolution 22 Juillet 2015 est de
4,000,000
Total
16,951,433
Les décaissements se répartissent ainsi en US :
-
Résolution 21 Décembre 2012 est de
5,000,000
-
Résolution 11 Décembre 2013 est de
2,730,051
-
Résolution 15 Avril 2015 est de
4,951,433
-
Résolution 22 Juillet 2015 est de
2,529,410
Total
15,210,895 selon les informations fournies
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateus constatant un
état d‟avancement des travaux de 35% relaté au tableau, « Résumé des évaluations
physiques des travaux de 35% relaté au tableau « Résumé des évaluations physiques des
travaux #37 page… Le montant total décaissé est de US 15,210,895 représentant 80.13%.
L‟anomalie relevée à propos de ce contrat est qu‟il ne comporte pas le certificat de non
objection du CNMP obligatoire même en periode d‟urgence. Entre autres aucun document
ne prouve le prélèvement des 2% pour le compte de la DGI.
Page 296 of 656
Page 297 of 656
2-Maitre d‟ouvrage
MPCE
Description des travaux : Construction du marché publique de Fontamara
Localité : Fontamara
Maitre d‟œuvre : IBT/LLC
Montant du contrat : 15, 647,900.00 US
Date de signature du contrat ….Novembre 2012
Durée des travaux
Appel d‟offres
N/A
Gré à Gré
Approbation de la CSC/CA
Signé et scellé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis :
N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
Non
Retenue de bonne exécution
Prélèvement des 2%
Non
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 8, 009,818.00
Commentaires :
Quant à ce contrat ayant pour description « Construction du marché public de Fontamara »
Les montants alloués en us dans les Résolution sont les suivants :
Résolution du 21 Décembre 2012 ,
6,500,000
Résolution du 15 Avril 2015 ,
8,222,000
Résolution du 22 Juillet 2015 ,
4,974,035
Total
19,696,035
Les décaissements se répartissent ainsi en US :
Résolution du 21 Décembre 2012 ,
4,102,879
Résolution du 15 Avril 2015 ,
3,247,965
Résolution du 22 Juillet 2015 ,
658,973
Total
8,009,817 (Selon les informations fournies)
Le montant total décaissé est de US 8,009,817.88 représentant 51 % du coût des travaux.
Passé de gré à gré et approuvé par la cours supérieure des comptes et du contentieux
Page 298 of 656
administratif.
La date de la signature du contrat est incomplète .Les 2% d‟acomptes de la DGI ne sont
pas prélevés ,le cautionnement n‟est pas constaté lors de l‟analyse du contrat et les
documents d‟éligibilités n‟ont pas été fournis. Ce contrat ne comporte pas une durée.
Les personnes signataires sont :
Laurent Salvador LAMOTHE, Ministre de la planification et de la coopération externe
Gianfranco FIORENZA, Directeur Général
Nonie MATHIEU, Présidente de la CSC/CA
Page 299 of 656
3- Maitre d‟ouvrage
MPCE
Description des travaux : Construction d‟infrastructure socio-communautaire
Localité Port-au-Prince
Maitre d‟œuvre Société technique de construction (SOTECH)
Montant du contrat 23, 928,392.42 = 18, 411,135.00 US et U.S 5, 517,257.42 avenant
Date de signature du contrat : 20 Décembre 2012, l‟avenant porte la mention février 2014
Durée des travaux : 24 mois
Appel d‟offres : Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP : Non signé
Documents d‟éligibilités fournis : Patente (16/01/13), Quitus (16/01/2013), Matricule
fiscale (000-045-839-3)
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Non
Retenue de bonne exécution
Prélèvement des 2%
Oui
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 14,279,220
Quant à ce contrat ayant pour description « Construction d‟infrastructure sociocommunautaire » à cité soleil Les montants alloués en US dans la resolutions sont les
suivantes :
-
Résolution du 21 Décembre 2012 est de
5,000,000
-
Résolution du 11 Décembre 2013 est de
4,500,000
-
Résolution du 15 Avril 2015 est de
9,000,000
-
Résolution du 22 Juillet 2015 est de
5,000,000
-
Total
23,500,000
-
Les décaissements se répartissent ainsi en US
Résolution du 21 Décembre 2012 est de
5, 000,000
Résolution du 11 Décembre 2013 est de
4, 490,677
Résolution du 15 Avril 2015 est de
1, 812,872
Résolution du 22 Juillet 2015 est de
2, 975,670
Total
14, 279,219
Page 300 of 656
Passé de gré à gré et approuvé par la Cour supérieure des comptes et du contentieux
administratif et sans avoir la non objection de la CNMP. Ce contrat est signé le 20
novembre 2012 pour un montant de U.S 18, 411,135.00 auquel s‟ajoute un (1) avenant de
U.S 5, 517,257.42, ce qui a porté le montant du contrat lié au projet à U.S 23, 928,392.
Les 2% d‟acomptes de la DGI n‟ont pas été prélevés, le cautionnement n‟est pas constaté
lors de l‟analyse du contrat et les documents d‟éligibilités n‟ont pas été fournis
Les personnes signataires sont:
Laurent Salvador LAMOTHE, Ministre du MPCE
Frank Romain Junior, Direction des opérations SOTECH
Nonie MATHIEU ,Présidente de la CSC/CA
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs constatant un
état d‟avancement des travaux de 94% relaté au tableau « Résumé des évaluations
physiques des travaux #6 page …. Le montant total décaissé est de US 14,279,219.97
représentant 59% des travaux.
Page 301 of 656
4- Maitre d‟ouvrage : MTPTC
Description des travaux : « Contrat 2 » de supervision des travaux de
réhabilitation/construction d‟urgence du tronçon Petite Rivière-Petit Trou de Nippes
Localité : Nippes
Maitre d‟œuvre : EGIS International-Compac
Montant du contrat : 19, 971,599.40 Gourdes
Date de signature du contrat : 5 mai 2015
Durée des travaux : 6 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : Signé
Non objection du CNMP : Non
Documents d‟éligibilités fournis
: Patente et Quitus
Avance de démarrage : Pourcentage : 25% ;
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : Non constaté
Retenue de bonne exécution
: Non constaté
Prélèvement des 2% : Non constaté
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: 30 octobre 2015
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre :
Ce contrat #2 de supervision des travaux de „‟Réhabilitation / construction d‟urgence du Tronçon Petite
Rivière-Petit-Trou de Nippes‟‟ est signé le 5 mai 2015 entre l‟Etat haïtien représenté par Jacques
ROUSSEAU, Ministre des TPTC, et Albert GUILHEM, chef mission EGIS International, paraphé et
scellé par la CSC/CA. Il se chiffre à 19, 971,599 Gourdes.
La patente et le quitus du contrat #1 de la supervision a été émis respectivement le 27 octobre 2014 et le
23 octobre 2014.
Les 2% d‟acomptes de la DGI n‟ont pas été prélevés, le cautionnement n‟est pas constaté lors de
l‟analyse du contrat et les documents d‟éligibilités n‟ont pas été fournis
Page 302 of 656
Les personnalités signataires sont :
Jacques ROUSSEAU , Ing Ministre des TPTC
Albert Guilhem ,Chef de mission Egis International-Compac
Vu et approuvé par la CSC/CA
Ce contrat a été signé bien que les ressources ont été disponibles.
Page 303 of 656
5- Maitre d‟ouvrage : MTPTC
Description des travaux : Contrat de supervision des travaux de
réhabilitation/construction d‟urgence du tronçon Petite Rivière-Petit Trou de Nippes
Localité : Nippes
Maitre d‟œuvre : EGIS International-Compac
Montant du contrat : 2, 621,350 us (contrat) ; 782,397.90 (Av. #1)
Date de signature du contrat : 27 décembre 2012 (contrat), 02 déc. 2014 (Av.1)
Durée des travaux : 17 mois (contrat) ; 6 mois (Av.1)
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé
Non objection du CNMP : non
Documents d‟éligibilités fournis
:
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : non constaté
Retenue de bonne exécution
: non constaté
Prélèvement des 2% : non constaté
Date de démarrage des travaux : non constaté
Date d‟achèvement des travaux
: 30 avril 2015
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre :
Commentaires :
Quant à ce contrat de supervision des travaux de „‟Réhabilitation / construction d‟urgence du
Tronçon Petite Rivière-Petit Trou de Nippes‟‟, la firme de supervision EGIS International n‟a
pas fourni de documents d‟éligibilité lors de la signature du contrat de supervision en date du
27 déc. 2012. On n‟a pas retrouvé de patente et de quitus annexé dans ce dit contrat. Par
contre, elle a fourni ces documents lors de la signature de l‟avenant #1 au contrat de
supervision #1 en date du 02 déc. 2014. On retrouvé une patente émise le 27 octobre2014 et
un quitus émis le 23 octobre 2014. Les 2% d‟acomptes de la DGI n‟ont pas été prélevés ,le
cautionnement n‟est pas constaté lors de l‟analyse du contrat et les documents d‟éligibilités
n‟ont pas été fournis
Page 304 of 656
Les personnalités signataires sont :
1- Pour le contrat de supervision :
- Jacques Rousseau, Ministre des TPTC
- Albert GUILHEM, chef de mission EGIS International
- Marie Carmelle JEAN-MARIE, Ministre de l‟économie et des finances
- Nonie MATHIEU, Présidente de la CSC/CA
2- Pour l‟avenant #1 au contrat de supervision :
- Jacques Rousseau, Ministre des TPTC
- Albert GUILHEM, chef de mission EGIS International
- Paraphé et scellé par la CSC/CA
Page 305 of 656
6-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de construction d'abris au niveau des départements de la
République
Localité : Fontamara
Maitre d‟œuvre : Ingenieria Estrella
Montant du contrat 5, 400,132.00 US
Date de signature du contrat 20 Novembre 2012
Durée des travaux : N/A
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA :
Oui
Non objection du CNMP Non
Documents d‟éligibilités fournis : NON
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 1, 592,266.26 US (21 Décembre 2012)
Commentaires :
Quant à ce contrat ayant pour description : Contrat de construction d‟abris au niveaux des
départements de la République .
Les montants alloués en US dans les résolution sont les suivants :
Résolution du 21 décembre est de 5,000,000
Total
5,000,000
Les décaissements se répartissent ainsi en US.
Résolution du 21 décembre est de 1,592,266
Total
1,592,266
Le montant total décaissé est de US 1,592,266 représentant 29,48 du coût des travaux
Les documents fournis par le MPCE ne comportent pas de correspondance, De retenues de
remboursements, de prélèvement et de paiements. Les 2% d‟acomptes de la DGI n‟ont pas été
prélevés, le cautionnement n‟est pas constaté lors de l‟analyse du contrat et les documents
Page 306 of 656
d‟éligibilités n‟ont pas été fournis .
La durée des travaux est de douze (12) mois toutefois, nous n‟avons pas eu les procès-verbaux de
réception provisoire ainsi que ceux de réception définitive
Les personnes signataires sont:
Laurent Salvador LAMOTHE, Ministre de la planification et de la coopération externe
Ing J. Alejandro ADAMES B. Directeur du projet Haïti. Ingenieria Estrella
Nonie MATHIEU, Présidente de la CSC/CA
Page 307 of 656
7-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de construction du lycée Toussaint Louverture
Localité (Ouest) P-au-P
Maitre d‟œuvre IBT, LLC
Montant du contrat 8,029,900 US
Date de signature du contrat : ……… Novembre 2012 (Date incomplète)
Durée des travaux
Appel d‟offres
N/A
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
Mai 2014
Montant total versé au maitre d‟œuvre US 3,581,904.10
Commentaires :
Passé de gré à gré et approuvé par la cours supérieure des comptes et du contentieux
administratif et sans le certificat de non objection du CNMP, ce contrat est signé le 20
novembre 2012 pour un montant de U.S 4,233,950.60 .
Les personnes signataires du contrat:
-
Laurent Salvador LAMOTHE Ministre du MPCE
-
Gian Franco Fiorenza Directeur General
-
Nonie MATHIEU : Présidente de la CSC/CA
Quant à ce contrat ayant pour description « Contrat de construction du lycée Toussaint Louverture » .Les
montants alloués en US dans les resolutions suivants :
Résolution du 21 Décembre 2012 ,
5,000,000.00
Résolution du 11 Décembre 2013 ,
2,000,000.00
Page 308 of 656
Résolution du 15 Avril 2015 ,
5,444,708.00
Résolution du 22 Juillet 2015
1,816,428.00
Total
14,361,136.00
Les décaissements se répartissent en US :
Résolution du 21 Décembre 2012 ,
105,950.07
Résolution du 11 Décembre 2013 ,
1,516,458.11
Résolution du 15 Avril 2015 ,
873,180.00
Résolution du 22 Juillet 2015
1,176,316.00
Total
3,581,904.18 (D‟apres les informations fournies)
Le montant total décaissé est de US 3,581,904 .18 représente 45% du coût des travaux.
Une analyse comparative nous a permis de relater les faits suivants
Ces travaux à savoir le lycée Toussaint Louverture et Alexandre Pétion ont été exécutés par le même
maitre d‟œuvre
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs constatant un écart
d‟avancement des travaux de 70% relaté au tableau «Résumé des évaluation physiques des travaux» #4
page …… Le montant du contrat est de 8,029,900 pour une superficie de 8,400 m2 Soit US 956 par m2 .
Quant au lycée Alexandre Pétion
-Le montant du contrat est de : US 7,696,012 pour une superficie de 9,400 m2 soit US 819 par m2
-Un écart de US 137 (956 US-819 US) a été constaté entre la construction de ces deux immeubles
exécutés pas la même firme
8-Maitre d‟ouvrage
MPCE
Page 309 of 656
Description des travaux : Contrat de supervision des travaux d'infrastructures sociocommunautaire dans le quartier défavorisé (Wharf Jérémie)
Localité Port-au-Prince
Maitre d‟œuvre
Groupe de Trame
Montant du contrat 2,195,053.50 US
Date de signature du contrat : (……Novembre 2012)
Durée des travaux
Appel d‟offres
N/A
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Quitus (06 novembre au 6 février), Patente (06/11/2012),
Matériel fiscale (000-045-839-3)
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
Oui
N/A
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Montant total versé au maitre d‟œuvre
Commentaires :
Quant à ce Contrat de supervision des travaux d'infrastructures socio- communautaire, il fut signé
entre l‟Etat haïtien représenté par Laurent Salvador LAMORTHE et la firme Groupe TRAME
représenté par Elisabeth CORDON, Présidente Directeur Général. Les décaissements sont inclus
dans les décaissements du contrat des travaux d'infrastructures sociocommunautaires. La date de la
signature du contrat n‟est pas complete. Les 2% d‟acomptes de la DGI n‟ont pas été prélevés ,le
cautionnement n‟est pas constaté lors de l‟analyse du contrat et les documents d‟éligibilité n‟ont pas
été fournis et aucune garantie Bancaire n‟est constatée.
Les personnes signataires sont :
Laurent Salvador LAMOTHE, Ministre du MPCE
Elisabeth CORDON Président Directeur Général
Nonie MATHIEU, Président de CSC/CA
9-Maitre d‟ouvrage
MSPP
Page 310 of 656
Description des travaux : Réhabilitation de l'hôpital de bon repos (Phase 1)
Localité
Bon repos
Maitre d‟œuvre ETRAMEC S.A
Montant du contrat 37,769,321.20 Gourdes
Date de signature du contrat Non daté
Durée des travaux
Appel d‟offres
2013
6 mois
Gré à Gré
Approbation de la CSC/CA
Signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Patente (25/01/2013), Quitus (19 septembre 2012) Matricule
Fiscal (# 000-962-066-2)
Cautionnement fourni pour l‟avance Garantie Bancaire, Capital Bank valable pour 90 jours 25 Juin
date de prise effet
Avance de démarrage: Pourcentage : 30% ; Montant : 11, 330, 796.36 Gourdes ; Ord de déc. #549
Retenue de garantie Non
Retenue de bonne exécution
Prélèvement des 2%
Non
679,847.76 Gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
8 Avril 2014
15 Octobre 2014
Montant total versé au maitre d‟œuvre
Commentaires :
Ce contrat ayant pour description « Réhabilitation de l‟hôpital de bon Repos (Phase 1 »,Inscrit
sous la rubrique construction et réhabilitation d‟hôpitaux incluant d‟autres projets.
Les montants alloués en US pour la rubrique dans les Résolutions sont les suivants :
Résolution du 21 Décembre 2012 est de 20,000,000
Résolution du 11 Décembre 2013 est de 8,500,000
Total
28,500,000
On n‟a pas retracé les pièces justificatives pouvant vérifier le quatrième décaissement représentant
10% du montant. On a retracé les pièces justificatives pour les 2% d‟accomptes de la DGI, soit
226,615.93 Gourdes.
On n‟a pas retracé les pièces justificatives pour trois (3) autres acomptes de la DGI.
Page 311 of 656
.Approuvé par la CSC/CA
Florence Duperval Guillaume , Ministre du MSPP
Ernst Fortune Président Directeurde Etramec SA
Quant à ce contrat de Réhabilitation de l'hôpital de bon repos (Phase 1, il fut signé entre l‟Etat
haïtien représenté par le titulaire du MSPP, Florence Duperval GUILLAAUME et la firme
ETRAMEC. Passé de gré à gré et approuvé par la Cour Supérieure des Comptes et du Contentieux
Administratif CSCCA, sans le certificat de non objection de la CNMP.sans la retenue de Garantie.
Les décaissements se repartissent aussi en US
-
Resolution du 21 Decembre 2012 est de
258,104
-
Resolution du 11 Decembre 2013 est de
497,480
Total
755,584
Le montant totla decaisé de US 755,584 représente 90% du coût des travaux.
Page 312 of 656
10-Supervision des travaux de construction de Marché de Fontamara
Maitre d‟ouvrage
MPCE
Description des travaux : Supervision des travaux de construction de Marché de Fontamara
Localité : Fontamara
Maitre d‟œuvre : CSA Central INC
Montant du contrat 782,395 US
Date de signature du contrat : …….Novembre 2012
Durée des travaux
25 mois
Appel d‟offres :
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP : Non
Documents d‟éligibilités fournis : Patente (2012- 2013) Quitus (20 décembre 2012)
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
C‟est un contrat de Supervision des travaux de construction de Marché de Fontamara signé
entre l‟Etat haïtien représenté par le titulaire du MPCE, Laurent Salvador LAMOTHE et la
firme CSA CENTRAL INC passé de gré à gré et approuvé par la Cour Supérieure des
Comptes et du Contentieux Administrative (CSCCA).
Les décaissements sont inclus dans le contrat des travaux de construction de Marché de
Fontamara.
La date de la signature du contrat est incomplète .
Les personnes signataires sont :
Laurent Salvador LAMOTHE, Ministre du MPCE
Natacha BREA, Administrateur de projet
Nonie MATHIEU, Présidente de la de CSCCA
Les 2% d‟acomptes de la DGI n‟ont pas été prélevés ,le cautionnement n‟est pas constaté
lors de l‟analyse du contrat et les documents d‟éligibilité n‟ont pas été fournis
11-Maitre d‟ouvrage
MPCE
Page 313 of 656
Description des travaux : Supervision des travaux de reconstruction du lycée
Toussaint Louverture
Localité Port-au-Prince
Maitre d‟œuvre CSA Central INC
Montant du contrat 401,495.00 US
Date de signature du contrat (Novembre 2012)
Durée des travaux
Appel d‟offres
18 mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Patente (22 /11/2012), Matricule Fiscale
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
Commentaires :
Quant à ce Contrat deSupervision des travaux de reconstruction du lycée Toussaint
Louverture, il fut signé entre l‟état haïtien représenté par Laurent Salvador LAMORTHE
et la firme CSA Central INC représenté par Natacha BREA.Passé de gré à gré, approuvé
par la CSCCA et sans le certificat de non objection du CNMP.
Les décaissements sont inclus dans le contrat des travaux de reconstruction du lycée
Toussaint Louverture.La matricule fiscale est illisible, Il n‟y a de Quitus
La date du contrat n‟est pas complète.
Les décaissements relatifs à ce projet sont liés a ceux de construction du Lycée Toussaint
Louverture
Les personnes signataires sont contrat:
Laurent Salvador LAMOTHE, Ministre du MPCE
Natacha BREA, Administrateur de projet
Nonie MATHIEU, Présidente de la CSC/CA
Les 2% d‟acomptes de la DGI n‟ont pas été prélevés ,le cautionnement n‟est pas constaté
lors de l‟analyse du contrat et les documents d‟éligibilité n‟ont pas été fournis
Page 314 of 656
12-Maitre d‟ouvrage : MTPCE
Description des travaux : Travaux d‟entretien périodique de la route canapé vert (Fernand
et la rue aubran)
Localité
Canapé vert
Maitre d‟œuvre Vorbe et fils Construction (S.A)
Montant du contrat 196,045,071.36 Gourdes
Date de signature du contrat 10 /10/2012
Durée des travaux
Appel d‟offres
6 mois
Gré à gré
Approbation de la CSC/CA
Non objection du CNMP
Signé
Signé
Documents d‟éligibilités fournis
Patente, Quitus
Avance de démarrage : Pourcentage : 20%, Montant : 39, 209, 014.26 Gourdes ; Ord. de
déc : N/A
Cautionnement fourni pour l‟avance : Non Constaté lors de l‟analyse du contrat
Retenue de garantie
5%
Retenue de bonne exécution
N/A
Prélèvement des 2% N/A
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
10 avril 2013
Montant total versé au maitre d‟œuvre 3, 590,264.61
Commentaires :
Quant à ce contrat ayant pour description :Travaux d‟entretien periodique de la route
Canapé-vert (Fernand et la rue aubran).Les montants alloué en US dans les Résolutions
sont les suivants :
Résolution du 21 décembre 2012 est de
3,000,000
Résolution du 11 décembre 2013 est de
750,000
Total
3,750,000
Quant à ce contrat Travaux d‟entretien périodique de la route canapé vert ( Fernand et la rue
Aubran ), il fut signé entre l‟état haïtien représenté par le titulaire du MPCE, Laurent
Salvador LAMOTHE et la firme V&F CONSTRUCTION S.A ,representé par Jean Marie
VORBE .Passé de gré à gré ,il est approuvé par la Cour Supérieure des Comptes et du
Contentieux Administratif et a obtenu la non objection de la CNMP . Ce contrat est signé
Page 315 of 656
le 10 octobre 2012 pour un montant de 196, 045,071.36 gourdes au taux moyen de la BRH
du mois correspondant à la date de signature du contrat soit 42.3568 Gourdes pour $ US
1.
Dans le contrat on n‟a pas prélevé les 2% de la DGI. Les documents fournis par le MPCE
ne comportent pas de correspondance, de remboursements, de prélèvements et de
paiements
Le contrat est signé par :
Jacques ROUSSEAU, Ministre de TPTC
Marie Carmelle JEAN MARIE, Ministre de l‟économie des finances
Nonie MATHIEU : Présidente de CSC/CA
Jean Marie VORBE Président Directeur
Paraphe et signé par la CNMP
Le montant total décaissé est de US 3,590,265 représentant 77,56 % du coût des travaux .
On ne peut pas déterminer le coût d‟un KM dans le projet car on n‟a pas mentionné le
nombre de Km à exécuter dans le contrat. On a seulement précisé la distance d‟une rue à
une autre (Rue Fernand et Rue Aubran).
Les decaissements se repartissent ainsi :
Résolution du 21 Décembre 2012 est de
3,000,000
Résolution du 11 Décembre 2013 est de
590,265
Total
3,590,265
Page 316 of 656
13-Maitre d‟ouvrage : MPCE
Description des travaux : Construction du local CIMO
Localité
Delmas (Ouest)
Maitre d‟œuvre Ingéniera Estrela
Montant du contrat 5, 168,532.12 Gourdes (4, 233,950.60 + Avenant 934,481.52) Montant alloué
prévu dans la résolution est :
Date de signature du contrat
Durée des travaux
Appel d‟offres
20 Nov. 2012 l‟avenant porte la mention juillet 2014
N/A
Gré à gré
Approbation de la CSC/CA
signé
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
N /A
Prélèvement des 2%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre
U.S 2, 425,573
Commentaires :
Quant à ce contrat de Construction du local CIMO , il fut signé entre l‟Etat haïtien représenté par le
titulaire du MPCE, Laurent Salvador LAMOTHE et la firme Ingéniera Estrella. Passé de gré à gré et
approuvé par la cours supérieure des comptes et du contentieux administratif et sans le certificat de
non objection du CNMP, ce contrat est signé le 20 novembre 2012 pour un montant de U.S
4,233,950.60, auquel s‟ajoute un (1) avenant de U.S 934,481.52. Ce qui a porté le montant du contrat
lié au projet de Construction du local CIMO à U.S 5, 168,532.12. Ce contrat n‟a pas de durée et les
2% de la DGI n‟ont pas été prélevés
Les personnes signataires sont :
-
Laurent Salvador LAMOTHE, Ministre de la planification et de la coopération externe
-
Alejandro ADAMES B. Directeur de projets/ Haiti
-
Paraphée, Président de la CSC/CA
-
Page 317 of 656
Les montant s alloués en US dans la resolution sont les suivants :
Resolution du 21 Decembre 2012 : 5,000,000.00
Résolution du 23 Juillet 2014 :
6,000,000.00
Total
11,000,000.00
Les décaissements se répartissent ainsi en US :
Total
Résolution du 21 Décembre 2012 :
500,000
Résolution du 23 Juillet 2014 :
1,925,573
2,425,573 (Selon les informations fournies)
Nb :
1 - Le montant alloué dans la résolution du 21 Décembre 2012 représentant 5,000,000 US concerne les
projets de développement territorial dont la « Construction du Bâtiment CIMO » en bénéficie 500,000 US.
2-Le montant alloué dans la résolution du 23 Juillet 2014 représentant 6, 000,000 US concerne l‟appui à la
PNH ,dont la construction du bâtiment CIMO en bénéficie 1,925,573.33 US
3-Le montant total décaissé est de 2, 425,573.33 US représentant 46% du coût des travaux.
Page 318 of 656
14-Maitre d‟ouvrage
MSPP
Description des travaux : Construction de l‟hôpital Simbi continental de Martissant.
Localité
Martissant
Maitre d‟œuvre IBT, LLC
Montant du contrat 6, 000,404.30 US
Date de signature du contrat
Durée des travaux
Appel d‟offres
……Novembre 2012
Douze (12) mois
Gré a gré 25
Approbation de la CSC/CA
Oui
Non objection du CNMP
Non
Avance de démarrage : Pourcentage : 25% ; Montant : 1,500, 101.08 US ; Ord. de déc. 577
Documents d‟éligibilités fournis :
Quitus fiscal (2 juillet 2013), Patente (2012-2013),
Matricule fiscal (000-048-915-0)
Cautionnement fourni pour l‟avance : Garantie bancaire no 8801400003228
Retenue de garantie 5%
Retenue de bonne exécution
Prélèvement des 2%
5%
66,184.56
Date de démarrage des travaux
N /A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre 5, 190,349.45 US (U.S1, 500,101.08 21 ; décembre 2012,
U.S 1, 809,127.08 ; 11 décembre 2013, 1,88121.29 ; 22 juillet 2015)
Commentaires :
Quant au contrat de « Construction de l‟hôpital Simbi Continental de Martissant. »Il fut signé
entre l‟état haïtien représenté par le titulaire du MSPP, Florence Duperval GUILLAUME et
Gianfranco FIORENZA , Directeur Général IBT,LLC ,mais
ne comporte pas de date de
signature.
Passé de gré à gré, il a été approuvé par la Cour Supérieure des Comptes et du Contentieux
Administratif CSC/CA, representée par la presidente Nonie MATHIEU, mais il n‟a pas obtenu
le certificat de la non-objection de la CNMP.
Les montants alloués en US dans les resolutions sont les suivants
-
Résolution du 11 décembre 2013
8,500,000
-
Résolution du 21 décembre 2012
20,000,000
-
Résolution du 22 juillet 2015
12,000,000
Total
40,500,000
Page 319 of 656
Les décaissements se repartissent aussi en US :
Résolution du 11 Decembre 2013
1,809,127
Résolution du 21 Decembre 2012
1,500,101
Resolution du 22 Juillet 2015
1,881,121
Total
5,190,349(Selon les informations fournies)
NB- Le montant alloué dans la resolution du :
Concerne les projets de « Construction et rehabilitation d‟hopitaux» dont la construction de
l‟hopital Simbi Continental de Martissant en bénéficie un montant de US 1,500,101.08 .
-
11 Decembre 2013 , representant 8,500,000 concerne construction et rehabilitation
d‟hopitaux /Hopital d‟Etat d‟haiti/MSPP dont la construction de l‟hopital simbi
continental de Martissant en benefice 1,809,127 US.
-
22 Juillet 2015 ,representant 12,000,000 US concerne « la construction et rehabilitation
d‟hopitaux » dont la construction de l‟hopital Simbi continental en bénéfice 1,881,121
US.
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingenieurs évaluateurs constatant un état
d‟avancement des travaux de 69% relaté au tableau « Résumé des evaluations physique des
travaux #2 ,page …. Le montant total decaissé est de 5,190,349 US représentant 86.4 % du coût
des travaux.
De plus cette même société a eu à négocier un autre contrat de la même valeur que celui-ci soit le
montant de US 6,000,404 pour la construction de l‟hôpital sans fil .Dans ce contrat de
construction il est fait mention a son article 1,que la réalisation des travaux sera effectuée à simbi
Continental Martissant 25 #53 en face Palmera ,Plaza. Les décaissements se rapportant à ce
contrat n‟ont pas été identifiés vu que les documents ne nous pas été acheminés
Les personnalités signataires sont :
Florence Duperval Guillaume Ministre du MSPP
GianFranco Florenza ,Directeur General de IBT
Page 320 of 656
15-Maitre d‟ouvrage :
MPCE
Description des travaux :
Construction de la place publique de l‟Aéroport (phase 2)
Localité
Delmas
Maitre d‟œuvre
la Générale Construction et Distribution S.A
Date de signature du contrat : 07 avril 2015
Appel d‟offres
Gré à gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
Oui
Documents d‟éligibilités fournis
Quitus, Patente
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
NA
Retenue de bonne exécution
NA
Prélèvement des 2%
NA
Date d‟achèvement des travaux
07 octobre 2015
Montant total versé au maitre d‟œuvre
US 1, 916,818.07 / US841, 135.00 (résolu 21
décembre 2012) US 248,220.00 (15 avril 2015) US 827,463.07 (22 juillet 2015)
Commentaires :
Passé gré à gré, avec approbation de la CSC/CA et avec l‟avis de non objection de la
CNMP. Ce contrat est signé le 07 avril 2015 pour un montant US 1, 257,428.07. Ce projet
est exécuté en deux phases répartis en deux contrats. Le décaissement relatif à ce contrat
(phase 2) est inclus dans le décaissement du contrat (phase1) effectué dans les résolutions
21 décembre 2012, 15 avril 2015 et 22 juillet 2015 respectivement pour les US 841,135.00,
UDS 248,220.00 et US 827,463.02.
Les 2% à prélever pour le compte de la DGI n‟ont pas été effectués.
Pour ce contrat phase 2 de construction de la place publique de l‟Aéroport (place Hugo
Chavez), le montant alloué a ce projet dans la résolution est de US 3, 000,000.00. Ce
montant ne concerne pas seulement ce contrat .Il est ventilé à la réalisation autres places
publiques.Il est à noter que cette phase 2 n‟a pas été prevue au contrat inital
Les personnalités signataires du contrat sont :
Yves Germain JOSEPH, Ministre PCE
Patrice MILFORT, Directeur Général de la Générale Construction et Distribution SA
Paraphé et scellé par la CNMP
Paraphé et scellé par la CSC/CA
Page 321 of 656
16-Maitre d‟ouvrage
MTPTC
Description des travaux : Execution des travaux de reconstruction d'urgence
du pont bleu Hill sur la riviere Haut du Cap
Localité Cap-Haitien
Maitre d‟œuvre Wenling Hongyuan Traffic Engineering Co.LTD
Montant du contrat 2,163,615.39 US
Date de signature du contrat : 02 Décembre 2012
Durée des travaux
Appel d‟offres
10 mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non
Documents d‟éligibilités fournis
Quitus fiscal (18 juin 2012), Patente
(30/12/2011), Matricule fiscale (000-564-192-7)
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Non
Retenue de bonne exécution
Prélèvement des 2%
Non
Non
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre
2, 018,753.44 US (Résolution 21 Décembre
2012)
Commentaires :
Quant à ce contrat ayant pour description :Exécution des travaux de
construction d‟urgence du pont Hill sur la rivière Haut du Cap
Les montants alloués en US dans la résolution sont les suivants :
Résolution du 21 Décembre 2012 est de
3,200,000
Total
3,200,000
Quant à ce contrat d‟Exécution des travaux de reconstruction d'urgence du pont
bleu Hill sur la rivière Haut du Cap
Les documents fournis par le MTPTC ne comportent pas de correspondance de
prélèvement, de remboursement, de retenue et de paiement.
La durée des travaux était de dix mois, toutes fois nous n‟avons pas eu les procèsverbaux de réception provisoire ainsi que ceux de réception définitive.
Page 322 of 656
Les personnes signataires sont :
Jacques Rousseau : Ing Ministre des MTPTC
M Wang WENTIAN : Representation de wenling Honguyan Traffic Engineering
Co. LTD
Nonie MATHIEU, Présidente de la CSCCA
Marie Carmelle JEAN-MARIE : Ministre de l‟Économie des Finances
Les décaissements se répartissent ainsi en US
- Résolution du 21 Décembre 2012 est de 2, 018,753
Total
2, 018,753
Le montant décaissé est de 2, 018,753 représentant 93% du montant des travaux
17-Maitre d‟ouvrage :
MPCE
Page 323 of 656
Description des travaux :
Construction de la place publique de l‟Aéroport (Contrat
initial)
Localité
Delmas
Maitre d‟œuvre
La générale construction et distribution SA
Montant du contrat : US 1, 795,000.00
Date de la signature du contrat : … Novembre 2012
Durée des travaux
N/A
Appel d‟offres
Gré a gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
Non
Documents d‟eligibilité fournis: Quitus, Patente,Matricule fiscale
Avance de démarrage : Pourcentage : 25% ; Montant : 448, 750.00 ; Ord. de déc. 477
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
5%
Retenue de bonne exécution
N/A
Prélèvement des 2%
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
US 1, 916,818.07
Commentaires :
Quant à ce contrat ayant pour description « Construction de la place publique
de l‟aeroport (Contrat inital) » Les montants alloués en US dans les Résolutions sont les
suivants :
-Résolution du 21 Decembre 2012 US 3,000,000
- Resolution du 15 Avril 2015
US 2,313,365
-Résolution du 22 Juillet 2015
US 2,065,145
Total
7,378,510
Passé de Gré à gré et la date de la signature du contrat est en Novembre 2012 ,avec
l‟approbation de la CSC/CA et avoir la non opjection de la CNMP .Le montant du contrat
s‟élève à US 1,795,000
Les personnalités signataires sont :
Laurent Salvador LAMOTHE ,Ministre du MPCE
Patrice MILFORT ,Directeur Géneral de la General Construction et Distribution S.A
Page 324 of 656
Nonie H. MATHIEU ,Présidente de la CSC/CA
Deux avenants de 15% chacun sont apportés à ce contrat. Le premier par Le Ministre de la
planification, Monsieur Laurent Salvador LAMOTHE, Le deuxieme par le Ministre, Yves
Germain Joseph.
On a constaté un autre contrat appelé phase 2, signé par MonsieurYves Germain Joseph,
alors Ministre de la Planification et de la coopération Externe pour un montant de 1,
257,428.07. Il est à noter que pour réaliser une deuxième phase d‟un projet, le contrat initial
doit prévoir qu‟une deuxième phase est à réaliser
Les décaissements de repartissent ainsi en US :
Résolution du 21 Décembre 2012
US
841,135
Résolution du 15 Avril 2015
US
248,220
Résolution du 22 Juillet 2015
US
827,463
Total
1,916,818 (Selon les informations fournies)
Le montant total décaissé est de US 1,916,818 représentant 54% du coût des travaux
18-Maitre d‟ouvrage
MSPP
Description des travaux : Subvention à la construction d‟un centre de traumatologie de
niveau I
Page 325 of 656
Localité
DELMAS
Maitre d‟œuvre BERNARD MEVS ( Projet medishare)
Montant du contrat 5, 000,000.00 US
Date de signature du contrat le 27/02/13
Durée des travaux
Appel d‟offres
N/A
Gré à gré
Approbation de la CSC/CA
Non signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
N/A
Cautionnement fourni pour l‟avance N/A
Retenue de garantie N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux N/A
Date d‟achèvement des travaux N /A
Montant total versé au maitre d‟œuvre 6, 315,489.75 (1, 315,489.75 ; 21 décembre 2012,
5000,000.00 ; 23 juillet 2014)
Commentaires :
Quant à ce contrat ayant pour description « Subvention à la construction d‟un centre de
traumatologie de niveau I » Inscrit sous la rubrique « Construction et réhabilitation
hôpitaux incluant d‟autres projets de construction d‟hôpitaux » . Nous avons retracé deux
protocoles d‟accords pour cette subvention signé le même jour, le 7 Février 2013 . L‟un
pour 5,000,000 US et l‟autre pour 4,500,000 US
Les montant alloués en US pour la rubrique dans les résolutions suivantes :
-
Résolution du 21 Décembre est de
20,000,000
-
Résolution du 23 Juillet 2014 est de
5,000,000
Total
25,000,000
Quant à ce contrat « Subvention à la construction d‟un centre de traumatologie de niveau
I », il fut
signé entre l‟état haïtien représenté par le titulaire du MSPP, Dr florence
Guillaume, Ministre de la Santé Publique et la firme projet Medishare for Haïti
(BERNARD MEVS). Passé de gré à gré et non approuvé par la cours supérieure des
comptes et du contentieux administratif et sans le certificat de non objection de la CNMP.
ce contrat est signé le 27 février 2012 pour un montant U.S 5,000,000.00.
Le montant total décaissé est de U.S 6, 315,489.75 supérieur au montant initial du contrat
qui a un écart de U.S 1, 315,489.75.
Page 326 of 656
Les personnes signataires sont :
DR Florence D. GUIlAUME, ministre de la Santé Publique et de la Population.
MR Joel Edouard VORBE, Représentant Projet Medishare Haiti.
Les décaissements se répartissent aussi en US
- Résolution du 21 Décembre est de
- Résolution du 23 Juillet 2014 est de
Total
20,000,000
5,000,000
25,000,000
Les décaissements se répartissent ainsi en US
- Résolution du 21 décembre 2012 est de
- Résolution du 23 Juillet 2014 est de
Total
1,315,490
5,000,000
6,315,490
Le montant total décaissé est de US 6,315,490 représentant 126,30% du montant des
travaux
Ce contrat ayant pour description : « Construction de la route menant au marché
public de Jacmel », a été reçu du Maitre d‟ouvrage et analysé.
19-Maitre d‟ouvrage
MTPTC
Description des travaux : Construction de l'aérogare de l'ile à
vache
Localité
Ile à vache(Cayes)
Maitre d‟œuvre Ingenieria Estrella
Page 327 of 656
Montant du contrat 19, 525,143.21 US ou 820, 056,014.80 Gourdes
Date de signature du contrat 27 Décembre 2012
Durée des travaux
Appel d‟offres
24 Mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non
Documents d‟éligibilités fournis
Quitus fiscal émis le 07 mai 2012
Avance de démarrage : Pourcentage : 25% ; Montant : 4, 881, 285.80
US ; Ord. de déc. 397
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du
contrat
Retenue de garantie 5%
Retenue de bonne exécution
N/A
Prélèvement des 2%
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre 4, 989,241.96 US (21
Décembre 2012)
Commentaires :
Passé gré à gré, sans le certificat de non objection du CNMP, ce
contrat est signé le 27 Décembre 2012 pour un montant de 19,
525,143.21 US ou 820, 056,014.80 Gourdes. La durée des travaux était
de 24 mois .Toutefois, nous n‟avons pas eu les procès-verbaux de
réception provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 07 mai
2012.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Les personnes signataires sont :
Jacques ROUSSEAU, Ing Ministre des Travaux publics transport et
communications
José A. ADAMES, Ing. Directeur Estrella Haïti
Nonie MATHIEU, Présidente de la CSC/CA
Page 328 of 656
Marie Carmelle JEAN-MARIE, Ministre de l‟Economie et des
Finances.
20-
Quant à ce contrat de Construction de l'aérogare de l'ile à vache,le
Mait
montant alloué en US dans les resolution est le suivant :
re
Resolution 21 Decembre 2012 ,
5,000,000
d‟ou
Total
5,000,000
vrag
Les decaissements ainsi en US :
e
Resolution 21 Decembre 2012 ,
4,989,241.96
MPC
Total
4,989,241.96
E
Desc
ripti
on
des
trava
ux :
Trav
aux
de
réha
bilita
tion
d‟ur
genc
e de
la
route
Jacm
el la
vallé
e de
jacm
el 19
km
Local
Page 329 of 656
ité
Jacm
el
Mait
re
d‟œu
vre
SEC
OSA
Mont
ant
du
contr
at
23,
212,1
46.00
US
Date
de
signa
ture
du
contr
at
.........
déce
mbre
2012
(
Date
inco
mplet
)
Duré
e des
Page 330 of 656
trava
ux
32
mois
Appe
l
d‟offr
es
Gré à
Gré
Appr
obati
on de
la
CSC/
CA
Oui
Non
objec
tion
du
CNM
P
Non
signé
Docu
ment
s
d‟élig
ibilité
s
fourn
is
On a
émis
la
Page 331 of 656
paten
te le
06
févrie
r
2012,
le
quitu
s est
émis
le 31
janvi
er
2012.
Avan
ce de
déma
rrage
:
25%,
US
5,803
,
036.5
0;
#440
Cauti
onne
ment
fourn
i
pour
l‟ava
nce
Non
const
Page 332 of 656
até
lors
de
l‟anal
yse
du
contr
at
Reten
ue de
garan
tie
oui
Reten
ue de
bonn
e
exécu
tion
N/A
Prélè
veme
nt
des
2%
N/A
Date
de
déma
rrage
des
trava
ux
N/A
Date
d‟ach
Page 333 of 656
èvem
ent
des
trava
ux
N/A
Mont
ant
total
versé
au
maitr
e
d‟œu
vre
15,
483,7
04.13
US
Com
ment
aires
:
Quan
t à ce
contr
at «
Trava
ux de
réhab
ilitati
on
d‟urg
ence
Page 334 of 656
de la
route
Jacm
el la
vallé
e de
Jacm
el 19
km »,
les
mont
ants
allou
és à
ce
projet
en
US
dans
la
résol
ution
sont
les
suiva
nts :
Résol
ution
21
Dece
mbre
2012
est
de :
9,000
Page 335 of 656
,000
Résol
ution
11
Dece
mbre
2013
est
de :
3,000
,000
Résol
ution
23
Juille
t
2014
est
de :
3,500
,000
Total
15,50
0,000
Les
décai
ssem
ents
se
repart
issent
ainsi
en
US :
Page 336 of 656
Résol
ution
21
Dece
mbre
2012
est
de :
8,983
,704
Résol
ution
11
Dece
mbre
2013
est
de :
3,000
,000
Résol
ution
23
Juille
t
2014
est
de :
3,500
,000
Total
15,48
4,704
Passé
Page 337 of 656
gré à
gré,
sans
le
certif
icat
de
non
objec
tion
de la
CNM
P, ce
contr
at a
une
date
inco
mplèt
e et
se
chiffr
eà
23,
212,1
46.00
US.
Ce
contr
at se
retro
uve
égale
ment
dans
Page 338 of 656
la
résol
ution
du 11
déce
mbre
2013
pour
un
mont
ant
de 3,
000,0
00.00
US
et
celle
de du
23
juillet
2014
pour
un
mont
ant
de 3,
500,0
00
US.
Le
mont
ant
total
décai
ssé
Page 339 of 656
s‟élè
ve
donc
à 15,
483,7
04.13
US.
Le
mont
ant
allou
é
dans
la
résol
ution
du 11
Déce
mbre
2013
est de
3,
000,0
00
US,
et
celui
allou
é au
23
juillet
2014
est de
3,
500,0
Page 340 of 656
00
US,
totali
sant
un
mont
ant
de
15,
500,0
00
US
pour
les
trois
résol
ution
s.
Le
mont
ant
de
l‟ava
nce
de
déma
rrage
est de
5,
803,0
36
US
tandi
s que
celui
Page 341 of 656
décai
ssé
est de
5,
512,8
84.68
US.
De ce
dit
mont
ant
qui
est de
5,
803,0
36
US.
on
extrai
t les
5%
de la
reten
ue de
garan
tie.
La
durée
des
trava
ux
était
de 10
mois
.Tout
Page 342 of 656
efois,
nous
n‟avo
ns
pas
eu les
procè
sverba
ux de
récep
tion
provi
soire
ainsi
que
ceux
de
récep
tion
défini
tive.
Quan
t au
quitu
s
fiscal
retrac
é
dans
le
dossi
er, il
a été
émis
Page 343 of 656
le 18
juin
2012
et la
paten
te le
30
déce
mbre
2011.
Les 2
%à
préle
ver
pour
le
comp
te de
la
DGI
n‟ont
pas
été
effect
ués
Les
Pers
onna
lités
signa
taire
s
sont
:
Page 344 of 656
Laure
nt
Salva
dor
LAM
OTH
E,
Minis
tre du
MPC
E
JeanEmill
e
LAF
ERIE
RE,
PDG
SEC
OSA
Noni
e
MAT
HIE
U,
Prési
dente
de la
CSC/
CA
Ce
contr
at fut
l‟obje
t de
Page 345 of 656
l‟éval
uatio
n
d‟une
équip
e
d‟ing
énieu
rs
évalu
ateur
s
const
atant
un
état
d‟ava
ncem
ent
des
trava
ux de
42%
relaté
au
table
au
« Rés
umé
des
évalu
ation
s
physi
ques
Page 346 of 656
des
trava
ux
#18
page
…..
Le
mont
ant
total
décai
ssé
est de
US
15,48
3,704
.13
repré
senta
nt
66,70
des
trava
ux .
21-Maitre d‟ouvrage : MTPCE
Description des travaux : Contrat de supervision des travaux de Réhabilitation de la
route Colladère Cerca-Cavajal
Localité
Colladère
Maitre d‟œuvre SCA Central INC
Montant du contrat 1,044,745.45 US
Page 347 of 656
Date de signature du contrat
Durée des travaux
Appel d‟offres
……Décembre 2012 (Incomplète)
24 mois
Gré à gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
Patente émise le 22 Novembre 2012, Quitus émis le
20 décembre 2012.
Cautionnement fourni pour l‟avance Non Constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
5%
Prélèvement des 2% N/A
Date de démarrage des travaux
02 Avril 2013
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
Commentaires :
Passé gré à gré, sans le certificat de non objection du CNMP, ce contrat est signé en
Décembre 2012, date incomplète, pour un montant de 1, 044,745.45 US. La durée des
travaux était de 24 mois. Toutefois, nous n‟avons pas eu les procès-verbaux de réception
provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 20 décembre 2012 et la
patente le 22 Novembre 2012.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Le montant décaissé pour la supervision est inclus dans celui décaissé pour les travaux de
réhabilitation.
Les personnalités signataires sont :
Le contrat est signé par :
Laurent Salvador LAMOTHE ,Ministre de la Planification et de la Cooperation Externe
Natacha BREA Administrateur de projet
Nonie Mathieu ,Présidente de la CSC/CA
Page 348 of 656
Page 349 of 656
22-Maitre d‟ouvrage
MTPTC
Description des travaux : Contrat d'exécution des travaux d'amélioration d'urgence
de la RN1 Tronçon-Gonaïves-Ennery-Cap-Haitien (90KMS)
Localité Cap-Haitien (Entretien)
Maitre d‟œuvre Ingenieria Estrella
Montant du contrat U.S 9, 818,245.24 et montant de l‟avenant 2, 029,262.12 US = U.S11,
847,507.54
Date de signature du contrat 27 Décembre 2012
Durée des travaux 6 mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Commentaires :
Pour ce contrat pris comme échantillon et ayant pour description : Exécution des travaux
d‟Amélioration d‟urgence de la RN1, tronçon Gonaïves-Ennery-Cap Haïtien (90), les
montants alloués dans les resolution sont les suivants
Résolution 21 Decembre 2012 est de
5,500,000
Resolution 11 Decembre 2013 est de
500,000
Total
6,000,000
Les decaissements se repartissent ansi en US.
Résolution 21 Decembre 2012 est de :
5,500,000
Resolution 11 Decembre 2013
467,097
Total
:
5,967,097 (Selon les informations fournies)
Passé de Gré à Gré, et signé entre l‟Etat Haïtien représenté par Jacques ROUSSEAU,
Ministre des TPTC et Marie Carmelle JEAN MARIE Ministre de l‟Economie et des
Page 350 of 656
Finances.
La durée des travaux était de 6 mois et les 2% à prélever pour le compte de la DGI n‟ont
pas été effectués.
Le contrat est signé par :
Jacques ROUSSEAU, Ministre de TPTC
Jose A. ADAMES, Ing Directeur Estrella Haïti
Nonie MATHIEU Présidente de CSC/CA
Marie Carmelle Jean-Marie, Ministre de l‟Economie et des finances
Ce contrat fut l‟objet de l‟évaluation physique d‟une équipe d‟ingénieurs évaluateurs
constatant un état d‟avancement des travaux de 24% relaté au tableau Résumé des
évaluations physiques des travaux #29 page ….. Le montant total décaissé est de US
5,967,097 représentant 50.36 % des travaux
23-Maitre d‟ouvrage
MTPTC
Page 351 of 656
Description des travaux : Contrat exécution de travaux de construction du pont sur la
rivière grande a Marigot
Localité Marigot
Maitre d‟œuvre Wenling Hongyuan Traffic Engineering Co.LTD
Montant du contrat : 8,557,634.32 US ou 359,420,641.44 Gourdes + Avenant
2,178,391.87 US ou 101,295,221.93 Gourdes = 10,736,026.19 US ou 460,715,913.37
Gourdes.
Date de signature du contrat : 27 Décembre 2012 et Avenant 26 Novembre 2014
Durée des travaux
Appel d‟offres
Le contrat : 10 mois, L‟avenant : 20 mois
Gré à Gré
Approbation de la CSC/CA
Signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Quitus, Patente, Matricule fiscal
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
Oui
Retenue de bonne exécution
Prélèvement des 2%
Non
Non
Date de démarrage des travaux
N/A, Mais pour l‟avenant 24 Juin 2013
Date d‟achèvement des travaux
N/A, Mais pour l‟avenant 28 Février 2015
Montant total versé au maitre d‟œuvre
5, 929,220.00 US
Commentaires :
Quant à ce contrat d‟exécution de travaux de construction du pont sur la rivière grande à
Marigot .Les montants alloués en US dans les résolutions sont les suivants :
Résolution 21 Décembre 2012 est de : 4,500,000
Résolution 11 Décembre 2013 est de : 1,500,000
Résolution 15 Avril 2015 est de :
335,111
Résolution 22 Juillet 2015 est de :
335,111
Total
6,670,222
Les décaissements se repartissent ainsi :
Page 352 of 656
Résolution 21 Décembre 2012 est de : 4,500,000
Résolution 11 Décembre 2013 est de : 1,402,102
Résolution 15 Avril 2015 est de :
-
Résolution 22 Juillet 2015 est de :
27,118
Total
5,929,220
Ce contrat fut l‟objet de l‟évaluation physique d‟une équipe d‟ingénieurs évaluateurs
constatant un état d‟avancement des travaux de 90.11% relaté au tableau « Résumé des
évaluations physiques des travaux #21 page ….» Le montant total décaissé est de : US
5,929,220 représentant 55,23% du coût des travaux.
Passé gré à gré, avec l‟approbation de la CSC/CA et sans le certificat de la non-objection
du CNMP, ce contrat est signé le 27 Décembre 2012 et l‟avenant no1 le 26 Novembre
2014, le montant du contrat est de 8, 557,634.32 US ou 359, 420,641.44 Gourdes et le
montant de l‟avenant est 2, 178,391.87 US ou 101,295,221.93 Gourdes.
La durée des
travaux est de 10 mois ,mais passé à 20 mois, en 28 février 2015. Toutefois, nous n‟avons
pas eu les procès-verbaux de réception provisoire ainsi que ceux de réception définitive.
Quant au quitus « A et B » retracé dans le dossier, il a été émis le 18 Juin 2012, et la
patente le 30 Décembre 2011 alors, celle-ci n‟est pas à jour par rapport à la date de la
signature du contrat.
Les personnalités signataires sont:
Jacques Rousseau : Ing Ministre des TPTC
M. Wang WENTIAN : Représentant de wenling Honguyan Traffic Engineering LTD
Nonie MATHIEU : Présidente de la CSC/CA
Marie Carmelle JEAN-MARIE : Ministre de l‟Economie des Finances
24-Maitre d‟ouvrage
MTPTC
Page 353 of 656
Description des travaux : Exécution des travaux de réhabilitation du port des cayes
Localité Cayes
Maitre d‟œuvre Ingenieria Estrella
Montant du contrat 2, 597,238.17 US ; et un avenant No 1 qui a pour effet de réduire le
coût initial du contrat 2, 578,994.13 US
Date de signature du contrat 27 Décembre 2012, tandis que l‟Avenant No1 ne comporte
pas de daté.
Durée des travaux
13 mois + 6 mois= 19 mois, durée passée de 13 à 19 mois, soit un
délai additionnel de 6 mois.
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Signé .
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Quitus Fiscal émis le 7 mai 2012
Avance de démarrage : 25% ; US 649, 309.54 ; #402
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
Oui
Retenue de bonne exécution
Prélèvement des 2%
N/A
Oui
Date de démarrage des travaux
27 Février 2013 et Avenant 25 Avril 2014
Date d‟achèvement des travaux
24 Avril 2014 et 31 Octobre 2014 pour l‟avenat
Montant total versé au maitre d‟œuvre : 1, 677,021.75 US
Commentaires :
Quant à ce contrat d‟Exécution des travaux de réhabilitation du port des cayes, le montant
alloué en US dans la résolution est le suivants :
Résolution 21 Décembre 2012 est de 2,700,000
Total
2,700,000
Le décaissement est en US :
Résolution 21 Décembre 2012 est de
1,677,022
Page 354 of 656
Total
1,677,022 (Selon les informations fournies)
Le montant total décaissé est de 1,677,022 représentant 65,02% des travaux
Passé gré à gré, sans le certificat de non objection de la CNMP, ce contrat est signé le 27
Décembre 2012 pour un montant de 2, 597,238.17 US auquel est remplacé par un avenant
qui a pour effet de réduire le montant initial à 2,578,994.13 US .
L‟avenant ne comporte pas de date.
La durée des travaux était de 13 mois, elle est passée à 19 mois, soit un délai additionnel de
6 mois. Toutefois, nous n‟avons pas eu les procès-verbaux de réception provisoire ainsi que
ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 07 mai 2012.
Les 2 % à prélever pour le compte de la DGI ont été effectués.
Les personnalités signataires du contrat initial sont :
Jacques ROUSSEAU ,Ing Ministre MTPTC
Jose A.ADAMES Ing Directeur ESTRELLA Haiti
Nonie Mathieu ,Presidente de la CSC/CA
Marie Carmelle JEAN-MARIE, Ministre de l‟Economie et des Finances.
L‟Avenant est signé par :
Jacques ROUSSEAU ,Ing. Ministre MTPTC
Jose A.ADAMES, Ing. Directeur ESTRELLA Haiti
Nonie Mathieu , Présidente de la CSC/CA
25-Maitre d‟ouvrage
MTPTC
Page 355 of 656
Description des travaux : Exécution travaux de construction d'urgence de viaduc de
carrefour aéroport et Martin Luther King
Localité
Delmas (Carrefour de l‟aéroport Martin Luther King)
Maitre d‟œuvre INGENIERA ESTRELLA
Montant du contrat U.S 21,502.742.85 US Incluant Avenant # 1
Date de signature du contrat 27 Décembre 2012
Durée des travaux
Appel d‟offres
23 mois Incluant Avenant #1
Gré à Gré
Approbation de la CSC/CA
Signé scellé
Non objection du CNMP Non
Avance de
Poucentage %
Montant
25%
4,147,094.61
demarrage
Documents d‟éligibilités fournis
Quitus fiscal émis le 07 mai 2012.
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Avance de démarrage : 30% ; US 11, 330, 796.36 ; #549
Retenue de garantie N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
23 Mai 2013, Selon l‟Avenant No1
Date d‟achèvement des travaux N/A
Montant total versé au maitre 21,585,528.48 US (8,000,000.00 ;21 Décembre 2012 ;
3,715,416 ; 22 Juillet 2015 ; 5,969,417 ; 15 Avril ; 3,900,695 ; 11 Décembre 2013.
Commentaires :
Ce contrat inscrit dans la résolution du 21decembre 2012 pris dans le cadre de notre
mission avait pour description « Construction d‟un viaduc du carrefour de l‟Aéroport ».
Les montants alloués en US dans la resolution sont les suivants :
-
Résolution 21 Décembre 2012 est de 8,000,000
-
Résolution 11 Décembre 2013 est de 4,000,000
-
Résolution 15 Avril 2015 Est de :
10,709,660
-
Résolution 22 Juillet 2015 est de :
4,740,243
Total
27,449,903
Les décaissements se répartissent aussi en US :
Résolution 21 Décembre 2012 est de
8,000,000
Page 356 of 656
Resolution11 Décembre 2013 est de
3,900,695.27
Résolution du 15 Avril 2015 est de
5,969,417
Résolution 22 Juillet 2014 est de
3,715,416
Total
21,585,528.27
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs
constatant un état d‟avancement des travaux 97.85 relaté au tableau « Résumé des
évaluations physiques des travaux #8 page …….. Le montant total décaissé est de :
US 21,585 ,528.27 représentant 100.38% de coût des travaux.
Passé de Gré à Gré, sans le certificat non objection de la CNMP, ce contrat est signé le 27
décembre 2012 pour un montant de U.S 16, 588,378.41 auquel s‟ajoute un avenant pour le
montant de U.S 4, 914,364.30, ce qui a porté le montant du contrat lié à ce projet à U.S
21, 502,742.85.
La durée des travaux était de 23 mois, ils furent achevés le 30 Avril 2015, toutefois nous
n‟avons pas eu les procès-verbaux de réception provisoire ainsi que ceux de réception
définitive.
Les 2% prélevé pour le compte de la DGI, n‟ont pas été effectués.
Les travaux de ce viaduc sont constituées des éléments suivants :
Description
Coût estimatif
Travé (1)
US 2,000,000
Voies collatérales 3 Km a 2,000,000 chacun
6,000,000
Drainage et Ramblais
2,000,000
Rampe d‟accès et décoration
1,500,000
Autres
1,000,000
Total
13,000,000
Tandis que, le coût de ce projet est de US 21,502,743 d‟où une surfacturation de US
8,502,743.
Page 357 of 656
Les personnalités contrat signataires sont :
José A. ADAMES, ING Directeur Estrella Haïti
Jacques ROUSSEAU, Ministre TPTC
Marie Carmelle JEAN MARIE, Ministre de l‟Economie et des Finances.
Nonie MATHIEU, Présidente de la CSC/CA
Page 358 of 656
26-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de Construction du Lycée Alexandre Pétion
Localité Port-au-Prince
Maitre d‟œuvre IBT, LLC
Montant du contrat U.S 7, 696,012.00
Date de signature du contrat 26 novembre 2012
Durée des travaux
Appel d‟offres
N/A
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
NA
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
Oui
Retenue de bonne exécution
Prélèvement des 2%
Oui
Oui
Date de démarrage des travaux
Non mentionne
Date d‟achèvement des travaux
26 fevrier 2013
Montant total versé au maitre d‟œuvre : US 3,519,511.50
Commentaires :
Quant à ce contrat ayant pour description « Contrat de construction du lycée Alexandre
Pétion»
Les montants alloués en US dans les résolution sont les suivants.
Résolution du 21 decembre 2012,
5,000,000.00
Résolution du 11 decembre 2013, U.S 2,000,000.00
Résolution du 15 Avril 2015, U.S
4,562,018.00
Résolution du 22 juillet 2015, U.S
4,349,963.00
Total
15,911,981.00
Les décaissements se répartissent ainsi en US :
Résolution du 21 decembre 2012,
101,544
Résolution du 11 decembre 2013, U.S 1,869,539.50
Résolution du 15 Avril 2015, U.S
212,056.00
Résolution du 22 juillet 2015, U.S
1,427,762
Total
3,519,511.50 (Selon les informations fournies)
Page 359 of 656
Passé de Gré à Gré et signé le 26 Novembre 2012 entre l‟Etat Haïtien et la Firme IBT,
LLC pour un montant de U.S 7, 696,012 avec l‟approbation de la CSC/CA, considère
pourtant l‟arreté du 5 Decembre 2012. La durée des travaux n‟était pas mentionnée.
Le montant total des decaissement s‟élève à U.S 3,610,902,repartit ainsi :
Les personnalités signataires sont :
Laurent Salvador LAMOTHE, Ministre de la Planification et de la Cooperation Externe.
Gianfranco FIORENZA, Directeur General.
Ce contrat fut l‟objet d‟evaluation d‟une equipe d‟ingenieurs evaluateurs constatant l‟etat
d‟avancement des travaux de 76% relaté au tableau « Résumé des évaluation physiques des
travaux» Le montant total décaissé est de US 3,519,511.50 representant 46% du coût des
travaux
.
Page 360 of 656
27-Maitre d‟ouvrage : MTPCE
Description des travaux : Réhabilitation de la route Colladère Cerca-Cavajal
Localité
Colladère
Maitre d‟œuvre Hongyuan Construction Company Limited
Montant du contrat 20, 894,909.00 US +Avenant 2, 703,776.73 US = 23, 598,685.73
Date de signature du contrat
Durée des travaux
Appel d‟offres
……Décembre 2012 (Incomplète) et Avenant 09 Septembre 2015
24 mois
Gré à gré
Approbation de la CSC/CA
Oui et non signé pour l‟avenant
Non objection du CNMP
Non signé et non signe pour l‟avenant
Documents d‟éligibilités fournis Quitus émis le 18 juin 2012 ; Patente émis le 30 décembre 2011.
Avance de démarrage : 25% ; 5, 223, 727.25 Gourdes ; #430
Cautionnement fourni pour l‟avance Non Constate lors de l‟analyse du contrat
Retenue de garantie
oui
Retenue de bonne exécution
N/A
Prélèvement des 2% N/A
Date de démarrage des travaux
02 Avril 2013
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 7, 481,232.06 US (21 Décembre 2012)
Commentaires :
Quant à ce contrat Réhabilitation de la route Colladère Cerca-Cavajal, le montant alloué à ce
projet en US dans les Résolutions sont les suivants :
Résolution 21 Décembre 2012 est de :
9,000,000
Résolution 11 Décembre 2013 est de
2,750,000
Résolution 6 Janvier 2016 est de :
2,586,538
Total
14,336,538
Page 361 of 656
Passé gré à gré, sans le certificat de non objection de la CNMP, ce contrat est signé en
décembre 2012 dont la date est incomplète. Mais, la signature de l‟entrepreneur porte la date du
22 février 2013 pour un montant de 20, 894,909.00 US auquel s‟ajoute un autre montant d‟un
avenant de 2, 703,776.73 US .Ce qui a porté le montant du contrat lié au projet de Réhabilitation
de la route Colladère Cerca-Cavajal a 23, 598,685.73 US. A signaler qu‟à la date de signature du
maitre d‟œuvre , le 23 fevrier 2013 on était plus en periode d‟urgence
La durée des travaux était de 24 mois .Toutefois, nous n‟avons pas eu les procès-verbaux de
réception provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 18 juin 2012 et la patente le 30
décembre 2011..
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués et versés.
De plus, il est à noter que :
a) le Contrat initial signé par monsieur Laurent Salvador Lamothe, ministre de la planification et
de la coopertaion externe avait prévu la rehabilitation de treize (13) km de route pour un montant
de 20.894,909 dollars Américains.
b) L‟avenant apporté à ce contrat par monsieur Yves Germain Joseph en date du 9 septembre
2015, alors ministre de la planificaion et de la cooperation externe avait precisé que le montant du
contrat initiale était alloué pour la réhabilitation de quinze (15) km de route au lieu de (13) km et
que cet avenant était adopté dans le but de rectifier cette anomalie.
c) Etonnement, la commisison a constaté que dans cet avenant, le ministre Yves Germain Joseph,
en dépit de cette rectification, a decaissé un montant de deux millions sept cent trois mille sept
cent soixante seize et soixante treize centimes ( 2,703,776.73 US) dollars pour les deux (2)
autres km de route en question. Ce qui implique que le projet accuse en final 17 km de route.
d) Contre toute attente, sur évaluation technique, il est constaté que cette route ne mesure en
réalité que 10.5 km ; et qu‟ainsi les 6.5 km supplémentaires n‟existent pas physiquement et qu‟ils
ont été ajoutés au contrat qu‟à d‟autres fins.
Page 362 of 656
Les personnalités signataires du contrat initial sont :
-
Laurent Salvador LAMOTHE ,Ministre du MPCE
-
Dong Zheng DONG ,Directeur de projet
-
Nonie Mathieu ,Presidente de la CSC/CA
L‟avenant No1 au contrat est signé par :
-
Yves Germain JOSEPH , Ministre de la PCE
-
Dong Zheng DONG ,Directeur de projets
Page 363 of 656
28-Maitre d‟ouvrage
MPCE
Description des travaux : Supervision des travaux de reconstruction du lycée Alexandre Pétion
Localité Port-au-Prince
Maitre d‟œuvre CSA Central INC
Montant du contrat 384,800.60 US
Date de signature du contrat (Novembre 2012)
Durée des travaux
Appel d‟offres
18 mois
Gré à Gré
Approbation de la CSC/CA
Signé sans scellé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Patente émis le 22 novembre 2012 ,
Quitus émis le 20 Décembre 2012
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Commentaires :
Ce contrat inscrit dans la résolution du 21 décembre 2012 pris dans le cadre de notre mission
avait pour description : Supervision des travaux de reconstruction du Lycée Alexandre Pétion.
Passé de Gré à Gré et signé entre l‟Etat Haïtien et la Firme CSA CENTRAL INC pour un
montant de U.S 384,800.60, ce contrat qui ne comporte pas de date précise, fait seulement
mention du mois de Novembre 2012, il a bénéficié la signature de la Présidente de la CSC/CA
en la personne Nonie MATHIEU.
Les décaissements relatifs à ce projet sont liés à ceux de Construction du Lycée Alexandre
Pétion.
Les personnalités signataires sont :
Laurent Salvador LAMOTHE, Ministre de la Planification et de Coopération Externe.
Natacha BREA, Administrateur de projet
Page 364 of 656
29-Maitre d‟ouvrage
MTPTC
Description des travaux : Travaux d'exécution reconstruction pont sur la rivière
roseau
Localité Grand Anse
Maitre d‟œuvre Wenling Hongyuan Traffic Engineering Co.LTD
Montant du contrat 8, 469,885.83 US ou 355, 735,204.86 gourdes
Date de signature du contrat Illisible
Durée des travaux
Appel d‟offres
10 mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Avance de démarrage : 25% ;
US 2, 117, 471.46 ; #393
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
oui
Retenue de bonne exécution
Prélèvement des 2%
Oui
Non
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
5, 118,950.43
Commentaires :
Passé gré à gré, sans le certificat de non objection de la CNMP, ce contrat ne
comporte pas de date et se chiffre à 8, 469,885.83 US ou 355, 735,204.86 gourdes.
La durée des travaux était de 10 mois .Toutefois, nous n‟avons pas eu les procèsverbaux de réception provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 18 juin 2012 et la
patente le 30 décembre 2011.Les documents d‟éligibilités ne sont pas fournis
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués et versés.
Les personnalités signataires sont :
-
Jacques Rousseau : Ing. Ministre de MTPTC
-
Miwang WENTIAN : L‟entrepreneur de wenling Honguyan Traffic Engineering
LTD
Page 365 of 656
-
Nonie MATHIEU : Présidente de la CSC/CA
-
Marie Carmelle JEAN-MARIE : Ministre de l‟économie et des Finances
Quand à ce contrat ayant pour description « Travaux d‟exécution de la reconstruction du
pont sur la rivière roseau » .Les montants alloués en US dans les resolutions sont les
suivants :
Résolution du 21 Decembre 2012 : 4,500,000
Resolution du 11 Decembre 2013 1,000,000
Total
5,500,000
Les deaissements se repartissent ainsi en US :
Résolution du 21 Decembre 2012 :
4,314,662
Résolution du 11 Décembre 2013 :
804,288
Total
5,118,950
Le montant total décaissé est de US 5,118,950.34 représentant 60% du coût des travaux.
Ce pont est doté de 6 través et son coût estimatif est de US 7,800 tandisque le montant de
ce contrat est de US 8,469.886 . d‟où une surfacturation de US 669,868.
Page 366 of 656
30-Maitre d‟ouvrage : MTPTC
Description des travaux : Construction d‟urgence d‟un viaduc sur la route des rails tronçon 1
Maitre d‟œuvre ESTRELLA
Montant du contrat 13, 635,729.63 US ou 572, 700,644.46 Gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
27 Décembre 2012
18 Mois
Gré à gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
Quitus (Date 7 mai 2012)
Avance de démarrage :
US 3, 408,932.41 ; #390
25% ;
Cautionnement fourni pour l‟avance Non Constate lors de l‟analyse du contrat
Retenue de garantie
Oui
Retenue de bonne exécution
NA
Prélèvement des 2% N/A
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 3, 408,932.41 US (Résolution du 21 Décembre 2012)
Commentaires :
Quant à ce contrat ayant pour description « Contrat d‟urgence d‟un viaduc rail,les montants
alloués en US dans les résolutions sont les suivantes :
Résolution du 21 Décembre 2012 est de 4,500,000
Résolution du 11 Décembre 2013 est de 1,000,000
Total
5,000,000
Il fut signé entre l‟Etat Haïtien représenté par le titulaire du MTPTC Jacques ROUSSEAU et la
firme INGENIERA ESTRELLA
Passé gré à gré, sans le certificat de non objection du CNMP, ce contrat est signé le 27
Décembre 2012 pour un montant de 13, 635,729.63 US ou 572, 700,644.46 GDS. La durée des
travaux était de 18 mois .Toutefois, nous n‟avons pas eu les procès-verbaux de réception
Page 367 of 656
provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 07 mai 2012.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Les personnalités signataires sont :
Jacques ROUSSEAU ,Ing Ministre MTPTC
Jose A.ADAMES Ing Directeur ESTRELLA Haiti
Nonie Mathieu ,Presidente de la CSC/CA
Marie Carmelle JEAN-MARIE, Ministre de l‟economie et des finances.
Les decaissements se repartissent ainsi en US.
Résolution du 21 Décembre 2012
3,408,932
Total
3,408,932
Ce contrat fut l‟objet de l‟évaluation d‟une équipe d‟ingénieurs évaluateurs constatant un état
d‟avancement de 36,87 % relaté au tableau « Résumé des évaluations physiques des travaux #3
Page ……» Le montant total décaissé est de 3,408,932 représentant 24,99% du coût des travaux
Il s‟avère difficile d‟évaluer le coût estimatif de ce projet vu la voie collatérale n‟est pas précisée
toutefois ,le coût d‟un projet similaire est estimé à US 9,000,000 ,tandis que le contrat signé pour
l‟exécution de ce projet est de US 13,635,730. D‟où une surfacturation d‟environ US 4,635,730
Page 368 of 656
31-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de réhabilitation de la route de Minoterie
Localité
Minoterie (Ouest)
Maitre d‟œuvre H.L CONSTRUCTION S.A
Montant du contrat 10,391,175.00 US
Date de signature du contrat
Durée des travaux
Appel d‟offres
Décembre 2012 (La date est incomplète)
24 Mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non
Avance de démarrage :
25%
Documents d‟éligibilités fournis
la patente est émise le 22 Novembre 2012
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie NA
Retenue de bonne exécution
N/A
Prélèvement des 2%
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre 5, 979,433.13 US
Commentaires :
Quant à ce contrat ayant pour description « Contrat de réhabilitation de la route
Minoterie », Les montants alloués en US dans Résolution sont suivantes.
Résolution du 21 Décembre 2012 de
6, 000,000
Total
6, 000,000
Les décaissements sont aussi en US
Résolution du 21 Décembre 2012 de
5, 979,433.13
Total
5, 979,433.13 (Selon les informations fournies)
Le montant total décaissé est de US 5, 979,434.13 représentant 57.54% du coût des
Page 369 of 656
travaux. Le coût d‟un Km figurant dans ce contrat est estimé à 1, 484,454 tandis que ,pour
le même mois le coût d‟un Km d‟une autre firme évoluant dans le même secteur ,pour la
route petite rivière-petit trou dont les spécificités des travaux sont similaires est estimé à
US 995,153 .D‟où un écart positif de US 489,301 par Km.
Passé gré à gré avec l‟approbation de la CSC/CA, sans le certificat de non objection
de la CNMP, ce contrat est signé en Décembre 2012, date incomplète, pour un montant
de 10, 391,175.00 US. La durée des travaux était de 24 mois .Toutefois, nous n‟avons pas
eu les procès-verbaux de réception provisoire ainsi que ceux de réception définitive.
Quant à la patente retracée dans le dossier, elle a été émise le 22 Novembre
2012.Cependant, le quitus, il n‟a pas été constaté lors de l‟analyse du contrat.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Les personnes signataires sont :
Laurent Salvador LAMOTHE, Ministre du MPCE
Herve LEROUGE, Président directeur General
Nonie MATHIEU, Presidente de la CSC/CA
Page 370 of 656
32-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de supervision des travaux réhabilitation de la route
de Minoterie (7 km)
Localité
Minoterie (Ouest)
Maitre d‟œuvre CSA CENTRAL INC
Montant du contrat 519,558.72 US
Date de signature du contrat
Durée des travaux
Appel d‟offres
Décembre 2012 (La date est incomplète)
24 Mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non
Avance de démarrage 25%
Documents d‟éligibilités fournis
la patente est émise le 22 Novembre 2012
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie NA
Retenue de bonne exécution
N/A
Prélèvement des 2%
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Montant total versé au maitre d‟œuvre
Commentaires :
Quant à ce contrat de Construction de supervision de la route de Minoterie, le montant
alloué à ce projet dans la résolution est de 6, 000,000.00 US.
Passé gré à gré, sans le certificat de non objection de la CNMP, ce contrat est signé en
Décembre 2012, date incomplète, pour un montant de 519,558.72 US. La durée des travaux
était de 24 mois .Toutefois, nous n‟avons pas eu les procès-verbaux de réception provisoire
ainsi que ceux de réception définitive.
Quant à la patente retracée dans le dossier, elle a été émise le 22 Novembre
2012.Cependant, le quitus n‟a pas été constaté lors de l‟analyse du contrat.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Les décaissements relatifs à ce projet sont liés à ceux de construction de la route minoterie
Page 371 of 656
Les personnes signataires sont :
Laurent Salvador LAMOTHE, Ministre du MPCE
Natacha BREA, Administrateur de projet
Nonie MATHIEU, Presidente de la CSC/CA
Page 372 of 656
33-Maitre d‟ouvrage
MTPTC
Description des travaux : Construction du pont sur la rivière gauche.
Localité
Jacmel
Maître d‟œuvre : Wenling Hongyuan Traffic Engineering Co. Ltd
Montant du contrat U.S8, 682,772.00 et avenant 2, 074,238.36
Date de signature du contrat 27 Décembre 2012 ; Avenant 26 novembre 2014
Durée des travaux
Appel d‟offres
20 Mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non
Documents d‟éligibilités fournis
Quitus fiscal mis le 18 Juin 2012, Matricule fiscale
émis le 30 décembre 2011
Avance de démarrage:
25% ;
US 2,170, 693
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie oui
Retenue de bonne exécution
N/A
Prélèvement des 2%
Date de démarrage des travaux
24 juin 2013
Date d‟achèvement des travaux 28 février 2015
Commentaires :
Passé Gré à Gré sans le certificat de non objection de la CNMP, ce Contrat a
bénéficié l‟avis de la Présidente de la CSC/CA; Signé le 27 décembre 2012 pour un
montant de U.S 8, 682,772.00 auquel s‟ajoute un avenant en date du 26 Novembre 2014
pour un montant de U.S 2, 074,238.36 ; ce qui a porté le montant de ce Contrat à U.S 10,
757,010.36. La durée des travaux était de 20 mois, ils furent achevés le 28 Février
2015.Toutefois nous n‟avons pas eu les procès-verbaux de réception provisoire ainsi que
ceux de réception définitive.
Les personnes signataires sont :
Jacques ROUSSEAU, ING Ministre des Travaux Publics Transports et Communications.
Marie Carmelle JEAN- MARIE, Ministre de l‟Economie et des Finances
M. Wang Wentian, Wenling Hongyuan Traffic Engineering Co.Ltd
Page 373 of 656
Quant à ce contrat ayant pour description « Construction du Pont sur la rivière gauche »
Les montant alloués en US dans les résolutions sont les suivants :
Résolution du 21 Décembre 2012
5,000,000
Résolution du 11 Décembre 2013
2,000,000
Résolution du 22 Juillet 2015
3,126,963
Total
12,430,418
Les décaissements se répartissent ainsi en US
Résolution du 21 Décembre 2012
5, 000,000
Résolution du 11 Décembre 2013
1, 884,011
Résolution du 22 Juillet 2015
1, 522,831
Total
8, 406,842
Le montant total décaissé est de US 8,406,842.74 représentant 78% du coût des travaux
Ce pont est doté de six(6) través et d‟une longueur total de 180 mètres. Le coût estimatif de
ce projet est estimé a 7,800 tandis que le montant du contrat esrt de : US 8,682,772 d‟où
une surfacturation de US 882,772
Page 374 of 656
XXVI Résolution du11 décembre 2013
Page 375 of 656
Résolution du: 11 Décembre 2013
Durée de la résolution d‟urgence du Résolution du11 Décembre 2013:
Durée de la résolution d‟urgence du 11 Décembre 2013.
Pouvoir des autorités.
Gouvernement Martelly –Lamothe.
Cette Résolution a été prise toujours dans la necessité de poursuivre les travaux d‟infrastructure .
Les decaissements autorisés par cette Résolution étaient dirigés vers de projets, qui dans leur grande
majorité devraient être executés par le MTPTC en qualité de maitre d‟ouvrage.
Composition du gouvernement Martelly-Lamothe.
Il est composé des ministres suivants :
Prénom
Nom
Mr Laurent S.
LAMOTHE /16 mai 2012-7aout 2012
Mr. Pierre Richard
CASIMIR / 7 Aout 2012- 4 avril 2014
Affaires étrangères et cultes
Mr.Duly
Mr Ronsard
BRUTUS / Du 4 avril 2014
ST CYR / du 16 mai 2012-7aout2012
Affaires sociales
Mme Josepha Raymond
JOSEPH/ du7aout 2012-25 janvier 2013
Mr Charles
Agr.Thomas
Mr Wilson
JEAN-JACQUES/du 25 janv 2013
JACQUES/ du 17 mai 2012
LALEAU/ rescape du gvt conille du 16
mai2012
MEZIL/ du 16 mai 2012(rescape du
gouv.Conille
JEAN GARDY/du 16 mai 2012-24 janv 2013
GODEFROY/24 jan 2012-11avril
2013.
HERIVEAUX /du 3 avril 2014
Mme yanick
Ady
Mme regine
Fonction
Agriculture et ressources naturelles
Commerce et de l‟industrie
Condition Féminine
Communication et culture
Rudy
Mr.Jean- marie
Mme Josette
Mme Monique
DUPUY/ 16 mai 2012-23 janv2013
DARJUSTE/23 janv2013-3 avril2014
Rocourt-du 3 avril 2014
Culture
Mr Jean Rodolphe
JOAZIL/16 mai 2012-3 avril 2014
Défense
Mr.Lerner
Mme .Marie Carmelle
RENAUD/du 2 avril 2014
JEAN ŔMARIE/8mai 2012-11avril2013
LALEAU/13avril2013-3 avril 2014
JEAN ŔMARIE/du 3 avril 2014
Mr Wilson
Mme Marie Carmelle
Mr Reginald
Mr Jean Vilmond
Paul(rescape du gouv.de conille)16 mai 20127aout2012
Pierre/du 7 aout 2012-3 avril 2014
Mr Nesmy
Mr Joseph Ronald
MANIGAT/ du 3 avril 2014
TOUSSAINT/16 mai2012-7aout
Mr Jean Vilmond
HILAIRE/du 7 aout2012-23janv 2013
Jean Francois
THOMAS/du 23 janv 2013
Economie et des finances
Education National
Environnement
Page 376 of 656
Mr .Daniel
SUPPLICE/16 mai2012-23janv2013
Phidelia/23 janv2013-11juin 2013
GUILLAUME/du4 avril 2014
Mme Bernice
Mr.Francois
Mr.Thierry
Haïtiens Vivant l‟étranger
MAYARD-PAUL/du 16 mai 2012-7
aout2012
SAINT CYR/du 7aout2012-23 janv2013
BAZIL/ du 23 janvier2013-3avril 2014
Intérieur, collectivités Territoriales
et défense
Mr reginald
Mr Jean Roosevelt
DELVA /du 3 avril 2014
RENE/du 16 mai2012-23janv2013
Jeunesse et sports
Mme Magalie
RACINE/23 janv2013-3 avril2014
Mme Himmler
REBU/du 3 avril 2014
Mr. Jean Renel
Mme Josépha Raymond
SANON/du 16 mai 2012
GAUTHIER/du 16mai 2012-10aout2012
LAMOTHE/du 10aout 2012
Justice et sécurité National
Planification et coopération
Externe
ROUSSEAU/(rescapé gvt conille) du 16 mai
2012
FELIXE/du 16 mai 2012
Travaux publics, transport et
communication
Bureau du ministre délégué auprès du
premier ministre charge de la
paysannerie
Bureau du ministre délégué auprès du
premier Ministre Charge des Droits
de l‟homme et de la lutte contre
pauvreté extrême
Bureau du ministre délégué auprès du
premier Ministre Charge des relations
avec le parlement(BMCRP)
Ministre délégué auprès du premier
Ministre Charge du renforcement
avec les partis politiques
Ministre délégué auprès du premier
Ministre Charge de la sécurité
Energique
Mr.Ronsard
Mr.David
Mr Laurent
Ing. Jacques
Mme marie Mimose
Mme Marie Carmelle Rose
Anne
AUGUSTE/du 16mai 2012
Mr. Ralph
THEANO/du 16 mai 2012-2 avril 2014.la
position créer lors du remaniement ministériel
du 2 avril 2014
JOSEPH/du 3 avril 2014. position créer lors
du remaniement ministériel du 2 avril 2014
Patrick sully
Mr Rene
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
JEAN-JUMEAU.
Position Créer en juillet 2012
Résolution du 11 Décembre 2013
Liste des Projets
Amélioration de la route Ennery-Cap Haitien
Sous Programme de Rehabilitation et d'entretien d'Infrastructures
de Transport
Rehabilitation de la route du Canape Ŕvert
Bouche twou /rehabilitation urbaine a P-au-P (petion ville)
Rehabilitation de Rues au Cap Haitien et environs
Dragage des Executoires de la Baie de Port-au-Prince
Travaux de Protection de la Ville de la Grande riviere du Nord
contre les crues de la riviere
Construction Pont Hyppolite / Cap Haitien
Construction du Viaduc Delmas-Nazon
Construction Pont sur la Riviere Gauche sur la route Jacmel/la
Vallee
Construction Pont sur la Riviere Marigot / Peredo
Montant US
500,000
6,500,000
750,000
13,000,000
2,500,000
5,000,000
1,000,000
1,000,000
4,000,000
2,000,000
1,500,000
Page 377 of 656
12.
Rehabilitation de la route Baie de l'Acul / Barriere battant
1,000,000
13.
14.
Construction du Pont Voldrogue
Construction du Pont de Roseaux
Augmentation de la capacite de generation electrique / Carrefour
1
3,429,818
1,000,000
15.
16.
10,000,000
9,250,000
17.
18.
Rehabilitation urbaine des Gonaives
Construction d'infrastructure Socio-communautaire au Wharf de
Jeremie a cite soleil
Renovation urbaine a Mirebalais et a Lascahobas
19.
Lycee Toussaint Louverture
2,000,000
20.
Lycée Alexandre Petion
2,000,000
21.
Renovation urbaine de la Ville de Saint Marc
3,000,000
22.
Developpement Territorial
8,000,000
23.
24.
25.
Rehabilitation urbaine aux Cayes
Rehabilitation urbaine a Grande Riviere du Nord
Renovation urbaine de Port-de-Paix
2,000,000
750,000
5,000,000
26.
Infrastructures Sportives phase
3,000,000
27.
28.
Renovation Urbaine de Jeremie
Apui au secteur de l'Energie (Banm limyè banm lavi)
5,000,000
2,500,000
29.
30.
Rehabilitation du Wharf de Petit Goave
Renovation et Rehabilitation des Routes du Village Artistiques de
Noailles
Travaux de rehabilitation d'urgence Route de Jacmel La vallée 19
KM
31.
4,500,000
3,000,000
500,000
1,000,000
3,000,000
1,500,000
32.
33.
34.
35.
Appui a la PNH
Programme de lutte contre la pauvrete
Finalisation de la Construction des Complexes Administratifs et
Socioculturels(CASC)
Recalibrage et Dragage du Chenal Salee Floodway sur 4 Km
36.
Projets Petro Caribe / Appui a la Mecanisation Agricole
2,000,000
37.
3,000,000
38.
Achat d'Engrais
Appui au Fonctionnement de l'Unité de Construction de
Logements et de Batiments Publics(UCLBP)
39.
40.
Projet d'assainissement (financement des activites SMCRS)
Protection de l'Environnement
2,000,000
28,500,000
2,000,000
4,000,000
4,000,000
Page 378 of 656
2,000,000
45.
Restauration Palais Sans-Souci de l'Institut de Sauvegarde du
Patrimoine National(ISPAN)
Construction et Rehabilitation d'Hopitaux / Hopital d'Etat
d'Haiti/MSPP
Developpement des Infrastructures de l'Ile a Vache
Construction de Batiments et de Logements publics
Projets Petro Caribe / Amenagement des bassins versants dans le
departement de l'Ouest
46.
Rehabilitation Wharf de Jéremie
47.
Construction Viaduc Marine Haitienne
1,000,000
48.
49.
50.
Rehabilitation route de freres
Construction du Pont sur la rivière des barres
Adoquinage des rues a fort Liberté
1,250,000
750,000
537,500
51.
Rehabilitation route Colladère Cerca Cavajal
2,750,000
52.
Renovation Urbaine a Hinche
Construction de depots pouvant sevir d'abris provisoire / Un
depot par departement
Reabilitation du systeme d'irrigation de Latannerie
2,000,000
41.
42.
43.
44.
53.
54.
55.
1,000,000
8,500,000
10,000,000
19,000,000
1,000,000
500,000
3,500,000
1,000,000
Appui a la RTNH
TOTAL
500,000
210,967,318
Les decaissements relatifs à ces projets sont présentés dans le tableau qui suit :
Résolution du 11 Décembre 2013
Institution
s
MTPTC
Nature du
Projet
Amélioration de la route
Ennery-Cap Haitien
Artibonite
Sous Programme de
Rehabilitation et
d'entretien
d'Infrastructures de
Transport
National
Rehabilitation de la route
du Canape –vert
Rehabilitation de la route du
Canape Ŕvert
Rehabilitation de la route du
Canape Ŕvert
Sous-total
Localité
Montant du
Projet
Montant
décaissé
No déc.
Montant à
décaisser
500,000
467,097
412
32,903
6,500,000
6,500,000
676
-
228,263
662
362,002
666
750,000
Ouest
Ouest
750,000
590,265
159,735
Page 379 of 656
Bouche twou
/rehabilitation urbaine a Pau-P (petion ville)
Bouche twou /rehabilitation
urbaine a P-au-P (petion
ville)
Bouche twou /rehabilitation
urbaine a P-au-P (petion
ville)
Bouche twou /rehabilitation
urbaine a P-au-P (petion
ville)
Bouche twou /rehabilitation
urbaine a P-au-P (petion
ville)
13,000,000
Ouest
Nord
Nord
Nord
Ouest
Ouest
717,306
773
12,148,692
851,308
828,408
682
442,619
849
1,228,973
?
2,500,000
-
3,631,223
683
1,198,901
740
5,000,000
4,830,124
169,876
1,000,000
1,000,000
703
-
1,000,000
455,088
728
544,912
192,374
763
142,025
789
1,637,377
822
574,089
826
993,336
884
238,108
887
123,386
904
Nord
Nord
4,000,000
Ouest
Ouest
Ouest
Ouest
Ouest
Ouest
Ouest
4,000,000
Construction Pont sur la
Riviere Gauche sur la
route Jacmel/la Vallee
743
5,000,000
Sous-total
Sous-total
934,412
2,500,000
2,500,000
Construction du Viaduc
Delmas-Nazon
Construction du Viaduc
Delmas-Nazon
Construction du Viaduc
Delmas-Nazon
Construction du Viaduc
Delmas-Nazon
701
Ouest
Sous-total
Travaux de Protection de
la Ville de la Grande
riviere du Nord contre les
crues de la riviere
Construction Pont
Hyppolite / Cap Haitien
Construction du Viaduc
Delmas-Nazon
Construction du Viaduc
Delmas-Nazon
Construction du Viaduc
Delmas-Nazon
Construction du Viaduc
Delmas-Nazon
879,802
Ouest
13,000,000
Dragage des Executoires de
la Baie de Port-au-Prince
Dragage des Executoires de
la Baie de Port-au-Prince
Dragage des Executoires de
la Baie de Port-au-Prince
677
Ouest
Sous-total
Rehabilitation de Rues au
Cap Haitien et environs
Rehabilitation de Rues au
Cap Haitien et environs
Rehabilitation de Rues au
Cap Haitien et environs
Rehabilitation de Rues au
Cap Haitien et environs
9,617,172
3,900,695
99,305
2,000,000
Page 380 of 656
Construction Pont sur la
Riviere Gauche sur la route
Jacmel/la Vallee
Construction Pont sur la
Riviere Gauche sur la route
Jacmel/la Vallee
Construction Pont sur la
Riviere Gauche sur la route
Jacmel/la Vallee
Sud Est
Construction Pont sur la
Riviere Gauche sur la route
Jacmel/la Vallee
Sud Est
Construction Pont sur la
Riviere Gauche sur la route
Jacmel/la Vallee
Sud Est
Sous-total
2,000,000
BMPAD
763
128,342
843
41,120
848
954,505
860
35,527
869
1,884,012
115,988
1,500,000
Sud Est
Sud Est
Sud Est
Sud Est
Sud Est
Sud Est
Sous-total
41,785
763
412,221
763
121,261
844
40,283
848
748,094
860
38,458
869
1,500,000
1,402,103
97,897
1,000,000
721,607
779
278,393
3,429,818
809,882
803
2,619,936
1,000,000
804,288
850
195,712
2,248,050
776
7,751,950
827
Nord
Construction du Pont
Voldrogue
Grand Anse
Construction du Pont de
Roseaux
Grand Anse
Augmentation de la
capacite de generation
electrique / Carrefour 1
Augmentation de la capacite
de generation electrique
/Carrefour 1
Augmentation de la capacite
de generation electrique /
Carrefour 1
681,822
Sud Est
Sud Est
Rehabilitation de la route
Baie de l'Acul / Barriere
battant
763
Sud Est
Construction Pont sur la
Riviere Gauche sur la route
Jacmel/la Vallee
Construction Pont sur la
Riviere Marigot / Peredo
Construction Pont sur la
Riviere Marigot / Peredo
Construction Pont sur la
Riviere Marigot / Peredo
Construction du Pont sur la
Riviere Marigot/Peredo
Construction du Pont sur la
Riviere Marigot/Peredo
Construction du Pont sur la
Riviere Marigot/Peredo
Construction du Pont sur la
Riviere Marigot/Peredo
42,695
10,000,000
Ouest
Ouest
10,000,000
10,000,000
-
MPCE
Rehabilitation urbaine des
Gonaives
Renovation urbaine de
Gonaives
9,250,000
Artibonite
1,172,950
695
Page 381 of 656
Renovation Urbaine des
Gonaives (Phase 1)
Renovation urbaine des
Gonaives (Phase 1)
Projet Petro Caribe/
Renavation urbaine des
Gonaives
Renovation urbaine des
Gonaives
Renovation urbaine des
Gonaives
Renovation Urbaine des
Gonaives
Rehabilitation urbaine des
Gonaives
Rehabilitation urbaine des
Gonaives
Rehabilitation urbaine des
Gonaives (Route
Soukri/Souvenance)
Renovation urbaine de
Gonaives
Artibonite
Artibonite
Artibonite
Artibonite
Artibonite
Artibonite
Artibonite
Artibonite
751
175,439
753
459,236
766
1,810,456
780
130,279
855
33,476
882
184,006
809
439,707
788
7,619,171
S
3,422,810
678
105,363
764
962,506
794
Ouest
Ouest
4,490,678
9,322
3,000,000
Centre
Renovation urbaine a
Mirebalais et a Lascahobas
Centre
Renovation urbaine a
Mirebalais et a Lascahobas
Centre
3,000,000
Lycee Toussaint
Louverture
Lycee Toussaint Louverture
1,012,232
Ouest
Renovation urbaine a
Mirebalais et a Lascahobas
Lycee Toussaint Louverture
730
4,500,000
Renovation urbaine a
Mirebalais et a Lascahobas
Lycee Toussaint Louverture
1,212,789
Artibonite
4,500,000
Lycee Toussaint Louverture
696
Artibonite
9,250,000
Construction
d'infrastructure Sociocommunautaire au Wharf
de Jeremie a cite soleil
Construction d'infrastructure
Socio-communautaire au
Wharf de Jeremie a cite
soleil
Construction d'infrastructure
Socio-communautaire au
Wharf de Jeremie a cite
soleil
Construction d'infrastructure
Socio-communautaire au
Wharf de Jeremie a cite
soleil
988,602
508,136
686
1,084,995
764
1,136,921
810
2,730,051
269,949
2,000,000
Ouest
Ouest
Ouest
Ouest
63,570
689
42,380
784
936,218
787
453,100
819
Page 382 of 656
Lycee Toussaint Louverture
Ouest
21,190
2,000,000
Lycée Alexandre Petion
Lycée Alexandre Petion
Lycée Alexandre Petion
Lycée Alexandre Petion
Ouest
Ouest
Ouest
Ouest
Ouest
Sous total
Renovation urbaine de la
Ville de Saint Marc
Renovation urbaine de la
Ville de Saint Marc
Renovation urbaine de la
Ville de Saint Marc
Renovation urbaine de la
Ville de Saint Marc
2,000,000
Artibonite
Artibonite
Artibonite
3,000,000
Renovation urbaine dela
ville Dessalines
/developpement territorial
Saint-Marc,
Gonaives &
Marchand
Dessalines
Developpement Territorial
(Construction Lycee Chantal
et Roche a Bateau)
Chantal &
Roche a Bateau
Developpement Territorial
Developpement Territorial
(Renovation urbaine des rues
de Gros Morne
60,927
689
40,618
784
1,035,007
786
712,679
819
20,309
722
1,869,540
456,183
780
1,662,163
695
500,683
739
2,619,030
380,970
507,284
695
566,307
704
41,132
735
268,263
710
535,373
717
206,377
733
3,091,772
751
1,003,526
655,273
768
DGB/ASIP/
800
No:01176 du
7 Février
2014
29,605
795
Ennery
Saut d'eau
Trou du Nord
Gros Morne
Developpement Territorial
Developpement Territorial/
Rehabilitation du lycee de
Mirebalais
130,461
8,000,000
Developpement Territorial
Developpement Territorial
(Drainage et Betonnage de la
rue Poudriere, Trou du Nord)
483,542
3,000,000
Sous total
Developpement Territorial
(Supervision de la
Rehabilitation de la route de
Minoterie)
Developpement Territorial
(Rehabilitation d'une partie
du reseau routier d'Ennery)
Develppement Territorial
(Supervision construction
Lycee Saut d'eau)
1,516,458
2,000,000
Lycée Alexandre Petion
Lycée Alexandre Petion
722
Mirebalais
Page 383 of 656
Developpement Territorial
(Construction de la route de
la 5eme section communale
de Saint-Marc par le
Ministere de la defense
Developpement Territorial
(Construction de la route de
la 5eme section communale
de Saint-Marc par le
Ministere de la defense
Developpement Territorial/
Constructionn de la route de
penetration a partir du
Carrefour Dutreuil, Petite
Riviere de l'Artibonite
Developpement Territorial
(installation de 49
lampadaires solaires)
Developpement Territorial
(Construction places
publiques a Lajeune et
Savannette)
Developpement Territorial
(Projet de Construction du
Lycee Philippe Barthelemy
de Carice
Saint Marc
Rehabilitation urbaine aux
Cayes
Rehabilitation urbaine aux
Cayes
Rehabilitation urbaine aux
Cayes
Rehabilitation urbaine aux
Cayes
MPCE
Renovation urbaine de
Port-de-Paix
Renovation urbaine de Portde-Paix
Renovation urbaine de Portde-Paix
565,786
799
43,860
798
95,550
804
16,440
823
105,263
817
Carrefour
Dutreuil-Petite
Riviere de
l'Artibonite
Pestel & Corail
Pignon
Carice
116,776
8,000,000
Sud
Sud
Cayes
Nord
762
7,958,236
41,764
2,000,000
Sud
Sous total
Rehabilitation urbaine a
Grande Riviere du Nord
772
Saint Marc
Sous Total
MTPTC
109,649
292,026
808
1,000,000
709
72,412
830
2,000,000
1,364,438
635,562
750,000
742,958
712
2,737,939
751
92,315
764
7,042
5,000,000
Nord-Ouest
Nord-Ouest
Sous total
5,000,000
2,830,254
2,169,746
3,000,000
MPCE
Infrastructures Sportives
phase
Sous programme
d‟infrastructures sportives
Sous programme
d'infrastructures sportives
National
National
1,500,000
756
180,597
819
DGB/ASIP/
800
No:01176 du
7 Février
2014
National
1,319,403
Page 384 of 656
Sous total
3,000,000
Renovation Urbaine de
Jeremie
Renovation Urbaine de
Jeremie
Renovation Urbaine de
Jeremie
Renovation Urbaine de
Jeremie
Grand Anse
Grand Anse
Grand Anse
National
BMPAD
MTPTC
Rehabilitation du Wharf de
Petit Goave
Ouest
Renovation et
Rehabilitation des Routes
du Village Artistiques de
Noailles
Ouest
Renovation et Rehabilitation
des Routes du Village
Artistiques de Noailles
Ouest
Sous total
MJSP
Appui a la PNH
MPCE
Programme de lutte contre la
pauvrete
Finalisation de la
Construction des Complexes
Administratifs et
Socioculturels(CASC)
751
3,325,486
853
3,583,861
2,500,000
2,500,000
755
-
500,000
123,510
792
376,490
684,455
885
70,466
893
3,000,000
1,416,139
754,921
245,079
3,000,000
DGB/ASIP/
800
No:01176 du
7 Février
2014
115,200
690
147,251
796
1,016,447
769
221,102
818
-
1,500,000
National
National
National
National
Sous total
FAES
195,175
Sud Est
Appui a la PNH
Appui a la PNH
764
5,000,000
1,000,000
Appui a la PNH / Acquisition
d'un vehicule aerien de
surveillance et accessoires
Appui a la PNH / Acquisition
de fourniture de gaz
lacrymogenes
63,200
1,000,000
Renovation et Rehabilitation
des Routes du Village
Artistiques de Noailles
Travaux de rehabilitation
d'urgence Route de Jacmel
La vallée 19 KM
-
5,000,000
Apui au secteur de
l'Energie (Banm limyè
banm lavi)
MPCE
3,000,000
1,500,000
1,500,000
28,500,000
28,500,000
-
National
National
2,000,000
1,985,267
692
-
715
Page 385 of 656
Finalisation de la
Construction des Complexes
Administratifs et
Socioculturels(CASC)
National
14,407
Total
MARNDR
2,000,000
Recalibrage et Dragage du
Chenal Salee Floodway sur
4 Km
Recalibrage et Dragage du
Chenal Salee Floodway sur 4
Km
Recalibrage et Dragage du
Chenal Salee Floodway sur 4
Km
Projets Petro Caribe /
Appui a la Mecanisation
Agricole
Achat d'Engrais
UCLBP
UCLBP
Appui au Fonctionnement
de l'Unité de Construction
de Logements et de
Batiments Publics(UCLBP)
Projet d'assainissement
(financement des activites
SMCRS)
Projet d'assainissement
(financement des activites
SMCRS)
Projet d'assainissement
(financement des activites
SMCRS)
Projet d'assainissement
(assainissement par le
SMCRS)
Projet d‟assainissement
(financement des activites
SMCRS)
Sous total
1,999,674
326
4,000,000
Artibonite
2,248,403
716
Artibonite
1,751,597
4,000,000
4,000,000
-
2,000,000
340,030
742
1,659,970
3,000,000
3,000,000
838
-
4,000,000
2,000,000
744
2,000,000
975,846
741
364,474
761
93,895
774
565,786
832
National
National
National
2,000,000
National
National
National
National
Total
MDE
862
2,000,000
Protection de
l'Environnement
2,000,000
-
2,000,000
Protection de
l‟Environnement (Drainage
et Protection de la ville
d‟Ouanaminthe contre les
crues de la riviere Massacre)
Ouanaminthe
Protection de
l‟Environnement (Drainage
et Protection de la ville
d‟Ouanaminthe contre les
crues de la riviere Massacre)
Ouanaminthe
2,000,000
1,000,000
745
901,846
781
1,901,846
98,154
Page 386 of 656
ISPAN
Restauration Palais SansSouci de l'Institut de
Sauvegarde du Patrimoine
National(ISPAN)
MSPP
Construction et
Rehabilitation d'Hopitaux /
Hopital d'Etat
d'Haiti/MSPP
Artibonite
1,000,000
National
Construction et
Rehabilitation d'Hopitaux /
Hopital de Bon Repos/MSPP
National
MT
UCLBP
Construction de Batiments
et de Logements publics
National
Sous total
Rehabilitation Wharf de
Jéremie
Construction Viaduc Marine
Haitienne
Rehabilitation route de freres
MPCE
1,809,127
811
241,081
901
8,500,000
6,704,188
1,795,812
10,000,000
2,123,222
897
15,000,000
714
82,246
777
7,876,778
19,000,000
15,082,246
1,000,000
163,623
3,917,754
Ouest
Grand Anse
Ouest
Ouest
Construction du Pont sur la
rivière des barres
Sud
Adoquinage des rues a fort
Liberté
Nord Est
Rehabilitation route
Colladère Cerca Cavajal
Renovation Urbaine a
Hinche
805
19,000,000
Construction de Batiments et
de Logements publics
MTPTC
256,399
Sud
National
MARNDR
785
National
Construction de Batiments et
de Logements publics
Projets Petro Caribe /
Amenagement des bassins
versants dans le
departement de l'Ouest
4,397,581
514,559
National
Sous total
Developpement des
Infrastructures de l'Ile a
Vache
748
8,500,000
Construction et
Rehabilitation d'Hopitaux /
Hopital d'Etat d'Haiti/MSPP
Construction et
Rehabilitation d‟Hopitaux
(Hopital Simbi Continental
de Martissant)/MSPP
Construction et
Rehabilitation
d'Hopitaux/MSPP
485,441
Centre
Centre
742
836,377
500,000
-
500,000
1,000,000
-
1,000,000
1,250,000
-
1,250,000
750,000
-
750,000
537,500
-
537,500
2,750,000
-
2,750,000
2,000,000
-
2,000,000
Page 387 of 656
National
BMPAD
Construction de depots
pouvant sevir d'abris
provisoire / Un depot par
departement
Reabilitation du systeme
d'irrigation de Latannerie
?
MARNDR
Reabilitation du systeme
d'irrigation de la plaine du
cul de sac
Ouest
RTNH
TOTAL
Appui a la RTNH
National
3,500,000
-
1,000,000
-
1,000,000
-
500,000
-
210,967,318
164,517,229
3,500,000
46,450,089
Page 388 of 656
La Résolution du 11 décembre 2013 comprend , Cinquante cinq (55) projets, de ce nombre trente (30) ont été retenus
aux fins d‟analyse et sont traités initialement dans les Résolutions suivantes qui se répartissent ainsi :
Un seul (1) Projetdans la Résolution du 11 février 2010 :
1- Rénovation urbaine Mirebalais et Lascahobas.
Cinq (5) Projets dans la Résolution du 24 aout 2010 :
1- Construction du Pont Hyppolite au Cap-Haitien
2- Réhabilitation et construction de 24,2 Km de route reliant la baie de l‟Acul à Barrière Battant.
3- Supervision de la route reliant la baie de l‟Acul à carrefour Barrière Battant (24,2 Km)
4- Réhabilitation de la route Barrière Battant/Milot
5- Supervision de la route Barrière Battant/Milot
Un (1) seul Projet dans la Résolution du 28 février 2012 :
1- Réhabilitation des travaux de la route Frères.
Deux (2) Projets dans la Résolution du 18 juillet 2012 :
1- Aménagement d‟infrastructures sportives et gazonnages des 14 parcs sportifs.
2- Supervision d‟Aménagement d‟infrastructures sportives et gazonnages des 14 parcs sportifs.
Vingt (20) Projets dans la Résolution du 21 décembre 2012 :
1- Contrat de supervision des travaux reconstruction du Lycée Alexandre Pétion
2- Contrat de construction du Lycée Alexandre Pétion
3- Supervision des Travaux du Pont sur la rivière Grande à Jacmel
4- Contrat d'exécution des travaux de construction d'urgence du pont de la rivière gauche
5- Contrat d'exécution des travaux de construction d'urgence du pont de la rivière grande à Marigot
6- Supervision des travaux de construction d'urgence du pont de la rivière grande à Marigot
7- Contrat de construction du Lycée Toussaint Louverture
8- Supervision des travaux de reconstruction du Lycée Toussaint Louverture
9- Construction d'urgence d'un viaduc su la route des rails
10- Réhabilitation de la route Minoterie
11- Construction d'infrastructure socio-communautaire du Wharf de Jérémie Cité Soleil
12- Réhabilitation route Coladere Cerca Cavajal
13- Construction de l'hôpital Simbi Continental Martissant
14- Travaux de réhabilitation d'urgence des routes urbaine de St-Marc
15- Exécution de construction d'urgence d'un viaduc de carrefour de l'aéroport martin Luther King
16- Travaux de réhabilitation route Jacmel La Vallée (19 km)
17- Réhabilitation de l'hôpital Bon Repos (Phase 1)
18- Réhabilitation urbaine de la ville des Gonaïves
19- Travaux périodique de la route de Canapé-Vert
20- Exécution et reconstruction pont sur la rivière Roseau
Page 389 of 656
Revue de passation des marchés
Résolution : 11 décembre 2013
Description
des
travaux
No
Maitre d'œuvre
Maitre
d'ouvrage
1
C.S.A Central Inc.
MPCE
2
IBT, LLC
MPCE
3
CECOM
Consultant
MTPTC
4
White Co.
LTD
MTPTC
5
White Co.
LTD
MTPTC
6
CECOM
Consultant
MTPTC
7
IBT, LLC
MPCE
8
C.S.A Central Inc.
MPCE
9
J&J
Construction
MPCE
10
Groupe des
Travaux de
Construction
MPCE
11
ESTRELLA
MTPTC
12
Représentation
S.A
MARNDR
13
HL Construction
MPCE
14
Société Technique
de Construction
(SOTECH)
MPCE
Construction d'infrastructure
socio-communautaire à Cité Soleil
15
Hongyuan
Construction
Company
MPCE
Réhabilitation de la route CercaCavajal
Contrat de supervision des travaux
reconstruction du Lycée
Alexandre Pétion
Contrat de construction du Lycée
Alexandre Pétion
Supervision des Travaux du Pont
sur la rivière Gauche à Jacmel
Contrat d'exécution des travaux de
construction d'urgence du pont de
la rivière gauche
Contrat d'exécution des travaux de
construction d'urgence du pont de
la rivière grande à Marigot
Supervision des travaux de
construction d'urgence du pont de
la rivière grande à Marigot
Contrat de construction du Lycée
Toussaint Louverture
Supervision des travaux de
reconstruction du Lycée Toussaint
Louverture
Aménagement d'infrastructure
Sportive
Travaux de rénovation de
construction urbaine Mirebalais,
Lascahobas
Construction d'urgence d'un
viaduc su la route des rails
Recalibrage et dragage du chenal
salée Floodway sur 4km
Réhabilitation de la route
Minoterie
Localité
Contrat
Date
de
signature
Appel d'offres
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Montant
Gré à
gré
384,800.60
US
Oui
Oui
Non
Patente
Oui
Non
Non
Non
Oui
Oui
Non
Non
Restreint
Ouvert
Port-auPrince
Novembre
2012
Port-auPrince
26/11/2012
Jacmel
27/12/12
Jacmel
27/12/12
8, 682,722.00 + Avenant 1,
2, 074,238.36 US
Oui
Oui
Non
Oui
Marigot
27/12/12
8, 557,634.32 US +
Avenant 1,
2, 178,391.87 US
Oui
Oui
Non
Oui
Marigot
27/12/12
796,523.13
US
Oui
Oui
Non
Oui
Port-auPrince
… Novembre
2012
8, 029,900
US
Oui
Oui
Non
Oui
Port-auPrince
… Novembre
2012
401,495
US
Oui
Oui
Non
Oui
National
6/09/11;
12/05/11;
26/09/11 ;
7/09/15
10,150,023.US Phase II, +
7,852,851.98 US Gazonnage
+ 500,250. US Supervision +
500,145.63 US Avenant
Oui
Non
Non
Mirebalais,
Lascahobas
20 Décembre
2012
18, 981,625
US
Oui
Oui
Non
Oui
Ouest
27/12/12
Oui
Oui
Non
Quitus
Artibonite
03/01/13
Oui
Non
Non
Ouest
… Décembre
2012
13, 635,729.63
US
410, 000,000.00
Gourdes
10, 391,175.00
US
Oui
Non
Oui
Port-auPrince
20 Décembre
2012
18, 411,135
US
Non
Signé
Oui
Colladère
22 Mars 2013
9 septembe
2015(Av.)
20, 894,909.00 US +
2, 703, 776.73 US
(Avenant)
Non
Non
Oui,
Non constaté
7, 696,012.00
US
808,051.81 US + Avenant 1,
172,762.50 US
Oui
Oui
Oui
Oui
Signé
Signé
,
Non
Signé
(Av.)
Page 390 of 656
Revue de passation des marchés (Suite)
Résolution : 11 décembre 2013
No
Maitre
d'œuvre
Maitre
d'ouvrage
16
ESTRELLA
MTPTC
17
White Co. LTD
MTPTC
18
19
Igenieria
ESTRELLA
SRL
IBT, LLC
S.A.
MPCE
MSPP
20
ESTRELLA
MPCE
21
LGL
S.A.
MTPTC
22
SECOSA
MPCE
23
ETRAMEC
S.A
MSPP
24
ESTRELLA
MPCE
25
V&F
S.A
MTPTC
26
White Co. LTD
MTPTC
27
LGL
S.A
MTPTC
28
LGL
S.A
MTPTC
29
V&F
S.A
MTPTC
30
V&F
S.A
MTPTC
Description
des
travaux
Contrat d'exécution pour la
réhabilitation des travaux de
réalisation de la route de Frères
Contrat d'exécution des travaux de
construction du pont Hyppolite au
Cap-Haitien
Travaux de réhabilitation urbaine
de marchand Dessalines
Construction de l'hôpital Simbi
Continental Martissant
Travaux de réhabilitation
d'urgence des routes urbaine de StMarc
Exécution de construction
d'urgence d'un viaduc de carrefour
de l'aéroport martin Luther King
Travaux de réhabilitation route
Jacmel La Vallée (19 km)
Réhabilitation de l'hôpital Bon
Repos (Phase 1)
Réhabilitation urbaine de la ville
des Gonaïves
Travaux périodique de la route de
Canapé-Vert
Exécution et reconstruction pont
sur la rivière Roseau
Supervision des travaux de
réhabilitation de la route barrière
Battant-Milot
Supervision des travaux de
réhabilitation de la route baie
l'acul / barrière Battant-Milot
Réhabilitation et construction des
24,2 km de route reliant la baie de
l'acul a carrefour barrière Battant
Travaux de la réhabilitation de la
route Barrière Battant-Milot
Contrat
Appel d'offres
Non
objection
du CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Oui
Non
Non
Oui
Oui
Non
Non
4, 204,109.65
US
Oui
Oui
Non
Non
6, 000,404.30
US
Oui
Oui
Non
Oui
7, 531,907.30
US
Oui
Oui
Non
Non
21, 502,742.83
US
Oui
Oui
Non
Oui
Oui
Oui
Non
Oui
Oui
Oui
Non
Oui
Oui
Oui
Non
Non
Oui
Oui
Non
Non
Oui
Oui
Non
Oui
Localité
Date
de
signature
Montant
Ouest
22/10/12
84, 671,765.50
Gourdes
Nord
27/04/13
7, 098,335.65 US +
8, 767,830.64 US
Avenant
Artibonite
20/12/12
Ouest
Artibonite
… Novembre
2012
…
Decembre201
2
Gré
à
gré
Restreint
Oui
Ouvert
Approbation
CSC/CA
Ouest
27/12/12
Jacmel
… Décembre
12
Ouest
Non
Artibonite
20/10/11
Ouest
10/Octobre/20
12
GrandAnse
Non
Nord
20/12/13
6, 959,625.00
Gourdes
Oui
Oui
Non
Oui
Nord
Non
1, 671,310.00 US + Avenant
655,372.00 US
Oui
Oui
Non
Oui
Nord
27/02/11
Oui
Non
Non
Matricule
Nord
Non
Oui
Non
Non
Oui
21, 502,742.
US
37, 769,321.20
Gourdes
17, 308,638.25
US
196, 045,071.36
Gourdes
8, 469,885.83
US
24, 085,142.14 US +
Avenant
8, 636,546.16 US
117, 178,900.00
Gourdes
Page 391 of 656
Revue de la gestion des contrats
Résolution du : 11 Décembre 2013
Contrat
No
Maitre
d'œuvre
Maitre
d'ouvrage
Description
des
travaux
1
C.S.A
Central,
Inc.
MPCE
2
IBT, LLC
MPCE
3
CECOM
Consultant
MTPTC
4
White Co.
LTD.
MTPTC
5
White Co.
LTD
MTPTC
6
CECOM
Consultant
MTPTC
7
IBT, LLC
MPCE
Contrat de construction du
Lycée Toussaint Louverture
8
C.S.A.
Central
Inc.
MPCE
Supervision des travaux de
reconstruction du Lycée
Toussaint Louverture
9
J&J
Construction
MPCE
Contrat de supervision des
travaux reconstruction du
Lycée Alexandre Pétion
Contrat de construction du
Lycée Alexandre Pétion
Supervision des Travaux du
Pont sur la rivière Grande à
Jacmel
Contrat d'exécution des
travaux de construction
d'urgence du pont de la
rivière gauche
Contrat d'exécution des
travaux de construction
d'urgence du pont de la
rivière grande à Marigot
Supervision des travaux de
construction d'urgence du
pont de la rivière grande à
Marigot
Aménagement
d'infrastructure Sportive
Date
de
signature
…
Novembre
2012
26/11 2012
27/12/12
Montant
Avance
de
démarrage
Cautionnement sur
avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des travaux
Montant
décaissé
384,800.00
US
Non
Non
Non
Oui
18 mois
-
Oui
Non
Oui
Non
3 mois
1, 869,539.50
US
Oui
Non
Oui
Oui
11 + 7 mois
-
7, 696,012.00
US
808,051.81 US +
Avenant 1,
172,762.50 US
27/12/12
8, 682,722.00 +
Avenant 1,
2, 074,238.46 US
Oui
Non
Non
Oui
10 mois
1, 884,011.74
US
27/12/12
8, 557,634.36 US +
Avenant 1,
2, 178,341.87 US
Oui
Non
Non
Oui
10 mois
1, 402,102.81
US
27/12/12
796,523.13
US
Oui
Non
Oui
Oui
11 + 7 mois
-
8, 029,900
US
Oui
Non
Oui
Non
19 mois
1, 516,458.11
US
401,495
US
Non
Non
Non
Non
18 mois
-
10, 150,023.US
Phase II, +
7, 852,851.98 US
Gazonnage
+ 500,250. US
Supervision +
500,145.63 US
Avenant
Oui
Non
Oui
Oui
12 mois;
Non ;
6 mois
3, 000,000.00
US
…
Novembre
2012
…
Novembre
2012
6/09/11;
12/05/11;
26/09/11 ;
7/09/15
Page 392 of 656
Revue de la gestion des contrats (Suite)
Résolution du : 11 Décembre 2013
No
Maitre d'œuvre
Maitre
d'ouvrage
Description
des
travaux
Travaux de rénovation
urbaine et d'infra structure
socio-communautaire à
Mirebalais
Construction d'urgence d'un
viaduc su la route des rails
Recalibrage et dragage du
chenal salée floodway sur
4km
Réhabilitation de la route
Minoterie
Contrat
Montant
Avance
de
démarrage
Cautionnement
sur avance
de
démarrage
Prélèvement
2% DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
20 Décembre
2012
18, 981,625
US
Oui
Non
Non
Non
26 Mois
2, 730,051.45
US
27/12/12
13, 635,729.64
US
Oui
Non
Non
Oui
18 mois
-
03/01/13
410, 000,000.00
Gourdes
Oui
Non
Oui
Non
12 mois
4, 000,000.00
US
… Décembre
2012
10, 391,175.00
US
Oui
Non
Oui
Oui
12 mois
4, 490,677.97
US
Date
de
signature
10
Groupe des
Travaux de
Construction
MPCE
11
ESTRELLA
MTPTC
12
Représentation
S.A
MARNDR
13
HL Construction
MPCE
14
Société
Technique de
Construction
(SOTECH)
MPCE
Construction d'infrastructure
socio-communautaire à Cité
Soleil
20 Décembre
2012
18, 411,135
US
Non
Non
Non
Non
24 Mois
-
15
Hongyuan
Construction
Company
MPCE
Réhabilitation de la route
Cerca-Cavajal
22 Mars 2013
9septembre
2015(Av.)
20, 894,909.00 US
+
2, 703, 776.73 US
(Av.)
Oui
Non
Non
Non
24 Mois
-
16
ESTRELLA
MTPTC
22/10/12
84, 671,765.50
Gourdes
Oui
Non
Non
Oui
18 mois
17
White Co.
LTD.
MTPTC
27/04/13
7, 098,335.65 US +
Avenant 8,
767,830.64 US
Oui
Non
Oui
Non
17 mois
-
18
Igenieria
ESTRELLA
SRL
MPCE
Travaux de réhabilitation
urbaine de marchand
Dessalines
20/12/12
4, 204,109.65
US
Oui
Non
Non
Oui
24 mois
507,284.34
US
19
IBT, LLC
S.A.
MSPP
Construction de l'hôpital
Simbi Continental Martissant
… Novembre
2012
6, 000,404.30
US
Oui
Non
Oui
Oui
12 mois
1, 809,127.08
US
20
ESTRELLA
MPCE
Travaux de réhabilitation
d'urgence des routes urbaine
de
St-Marc
…
Décembre201
2
7, 531,907.30
US
Oui
Non
Non
Oui
24 mois
2, 619,030.10
US
Contrat d'exécution pour la
réhabilitation des travaux de
réalisation de la route de
Frères
Contrat d'exécution des
travaux de construction du
pont Hyppolite au CapHaïtien
Page 393 of 656
Revue de la gestion des contrats (Suite 2)
Résolution du : 11 Décembre 2013
No
Maitre
d'œuvre
Maitre
d'ouvrage
21
LGL
S.A.
MTPTC
22
SECOSA
MPCE
23
ETRAMEC
S.A.
MSPP
24
ESTRELLA
MPCE
25
V&F
S.A.
MTPTC
26
White Co.
LTD.
MTPTC
27
LGL
S.A.
MTPTC
28
LGL
S.A.
MTPTC
29
V&F
S.A.
MTPTC
30
V&F
S.A.
MTPTC
Description
des
travaux
Contrat
Date
de
signature
Montant
Avance
de
démarrage
Cautionnement
sur avance
De
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
Exécution de
construction d'urgence
d'un viaduc de carrefour
de l'aéroport Martin
Luther King
Travaux de réhabilitation
route Jacmel la Vallée
(19 km)
Réhabilitation de
l'hôpital Bon Repos
(Phase 1)
Réhabilitation urbaine de
la ville des Gonaïves
27/12/12
21, 502,742.83
US
Oui
Non
Non
Oui
18 +
8 mois
3, 900,695.27
US
… Décembre
12
21, 502,742.
US
Oui
Non
Oui
Oui
24 mois
3, 000,000.00
US
Non
37, 769,321.20
Gourdes
Oui
Non
Oui
Oui
6 mois
256,399.22
US
20/10/11
17, 308,638.25
US
Oui
Non
Non
Oui
24 mois
7, 619,170.75
US
Travaux périodique de la
route de Canapé-Vert
10 Octobre
2012
196, 045,071.36
Gourdes
Oui
Non
Non
Oui
6 mois
590,264.60
US
Non
8, 469,885.83
US
Oui
Non
Non
Oui
10 mois
804,288.34
US
20/12/13
6, 959,625.00
Gourdes
Oui
Non
Non
Oui
6 mois
-
Non
1, 671,310.00US
+ Avenant
655,372.00 US
Oui
Non
Non
Oui
-
-
27/02/11
24, 085,142.14 US
+ Avenant
8, 636,546.16 US
Oui
Non
Non
Oui
15 mois
721,606.79
US
Non
117, 178,900.00
Gourdes
Oui
Non
Non
Oui
6 mois
-
Exécution et
reconstruction pont sur la
rivière Roseau
Supervision des travaux
de réhabilitation de la
route barrière BattantMilot
Supervision des travaux
de réhabilitation de la
route baie l'Acul /
barrière Battant-Milot
Réhabilitation et
construction des 24,2 km
de route reliant la baie de
l'Acul a carrefour
Barrière Battant
Travaux de la
réhabilitation de la route
Barrière Battant-Milot
Page 394 of 656
1-Maitre d‟ouvrage : MPCE
Description des travaux : Travaux de rénovation Urbaine de la ville de Marchand
Dessalines (Phase I)
Localité
Marchand Dessalines
Maitre d‟œuvre Ingéniera Estrela
Montant du contrat U.S 4, 204,109.65
Date de signature du contrat
Durée des travaux
Appel d‟offres
20 décembre 2012
24 mois
Gré à gré
Approbation de la CSC/CA
signé
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
U.S 210,247.50
Retenue de bonne exécution
Prélèvement des 2%
N/A
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux N/A
Commentaires :
Ce Contrat inscrit dans la resolution du 11 decembre 2013 pris dans le cadre de notre
mission avait pour description :« Rénovation Urbaine de la ville de Marchand Dessalines
(Phase I) ».
Passé de Gré à Gré, sans l‟approbation de la CSC/CA et sans non plus le certificat de
non objection du CNMP. La durée des travaux était de 24 mois et le montant du contrat est
U.S 4, 204,109.65.
Quant à ce contrat, « Rénovation Urbaine de la ville de Marchand Dessalines (Phase I) »,
le montant total des décaissements lié à ce projet s‟élève à U.S 4, 204,955.07.
Les personnalités signataires sont :
- Laurent Salvador LAMOTHE, Ministre de la Planification et de la Coopération
Externe.
-
Ing. J. Alejandro ADAMES, Directeur de Projet en Haïti.
Page 395 of 656
Commentaires Résolution du 11 décembre 2013 :
La résolution du 11 décembre 2013 comprend cinquante-six (56) projets, de ce
nombre trentre (30) ont été retenus pour fin d‟analyse en tenant compte des critères
précédemment énoncés.
Signature :
- Des trentre (30) projets exécutés, quatre (4) ne sont pas datés et sept (7) ont des
dates incomplètes et aucun n‟est illisible.
NB : Dans le contrat « d‟Aménagement d‟infrastructure sportive », la phase I n‟est pas datée,
tandis que la phase II est datée.
Avance de démarrage :
- (28) des 30 contrats ont des avances de démarrageet deux (2) n‟en n‟ont pas.
- Des avances de démarrage ont été fournies à certains entrepreneurs tandis qu‟elles
n‟ont pas été effectuées pour d‟autre.
- Le motif de non décaissement de l‟avance est mentionné.
Cautionnement sur avance
- Aucun de ces entités ne prend pas en considération le cautionnement pour
l‟avance de démarrage.
Retenue de garantie
- Le maitre d‟ouvrage a prélevé 5% de retenue de garantie sur 25 projets, cinq (5)
n‟ont pas prélevé la retenue.
Signatures des personnes autorisées :
Contrat signé
Contrats
Maitre
Maitre
CNMP
executes
d‟œuvre
d‟ouvrage
30
0
CSC/CA
27
Retenue de 2%
- Les prélèvements de 2% de la DGI ont été prélevés sur 11 projets sur 30.
N.B : - Certains contrats comportent des avenants dont leur montant représente ⅓ du montant
du contrat.
-
Durée des projets :
Six (6) projets ont une durée d‟exécution de 18 mois.
Un (1) projet a une durée d‟exécution de trois (3) mois.
Trois (3) projets ont une durée d‟execution de dix(10) mois.
Un (1) projet a durée de 9 mois.
Quatre (4) projets ont une durée de 12 mois.
Deux (2) projets ont une durée de 26 mois.
Page 396 of 656
-
Six(6) projets ont une durée de 24 mois.
Un (1) projet a une durée de 17 mois.
Un (1) projet a une durée de 15 mois.
Quatre (4) projets + une (1) supervision ont une durée de 6 mois.
Un projet n‟a pas de durée d‟exécution.
Cas Particuliers :
Relativement à cette Résolution, deux cas particuliers ont attirés l‟attention de la
commission. Ce sont : Celui de Monsieur Charles JEAN JACQUES, Ex Ministre des Affaires
Sociales et du Travail et celui de Madame Florence DUPERVAL, Ex Ministre de la Santé
Publique et de la Population.
-
En ce qui concerne Monsieur Jean Jacques, il a declaré lors de son audition par
devant la commission que « vingt-huit millions de dollars (US 28,000,000) ont éte
transferés par le Ministre de la Planification et de la Coopération Externe sur le
compte de FAES sans passer par le MAST. Ce transfert n‟est pas conforme à l‟accord
signé entre le MAST et le FAES . Il n‟a jamais été formellement avisé de ce transfert
et n‟a jamais reçu non plus de rapports y relatif.
En vue de vérifier les déclarations du Ministre Jean Jacques, la commission s‟est
transportée au FAES et n‟a pas été reçue. Toutefois, la commission a pu recueillir certaines
informations qui lui ont permis de conclure que le programme pour lequel le montant précité
a été décaissé, n‟est supporté par aucun rapport financier ; ce qui porte à croire qu‟il s‟agit
jusqu‟à preuve du contraire d‟un détournement de fonds.
Page 397 of 656
-
En ce qui concerne Madame Florence G. DUPERVAL, Ex Ministre de la Santé
Publique et de la Population, elle a déclaré par devant la comission que pour ses
projets de réhabilitation et construction d‟hôpitaux, une enveloppe de vingt millions
de dollars (US 20,000,000) lui a été accordé par la Résolution du 21 décembre 2012.
Toutefois elle a precisé qu‟au cours de son audition qu‟elle ne dispose de pièces
justificatives que pour pour onze millions (US 11,000,000) de dollars. Elle a en
outre precisé que le Ministre de la Planification d‟alors, Monsieur Laurent Salvador
LAMOTHE avait prélevé sans son approbation le montant d‟un million cinq cent
mille dollars (US 1,500,000) aux fins de payer un contrat conclu avec le Centre de
Santé Bernard MEVS. Elle n‟a été qu‟une simple invitée au moment de la signature
dudit contrat.
Quant au fait que la première Commission lui reprochait d‟avoir signé un contrat avec
un mort, madame Duperval a répondu qu‟elle savait que la personne était décédée, mais
comme le contrat se trouvait déjà au Ministère, elle l‟a signée pensant que cela ne constituait
pas un problème. Ce qui est contraire à la loi.
Page 398 of 656
XXVII Résolution du 23 juillet 2014
Page 399 of 656
Résolution du: 23 Juillet 2014
Durée de la résolution d‟urgence du Résolution du 23 Juillet 2014 :
Pouvoir des autorités.
Gouvernement Martelly –Lamothe.
Elle represente l‟avant dernière Resolution prise par le gouvernement du premier Ministrre
Laurent Salvador LAMOTHE.
Elle était prise en vue de poursuivre les travaux d‟execution des projets déjà entamés
Composition du gouvernement Martelly-Lamothe.
Il est composé des ministres suivants
Prénom
Mr Laurent S.
Nom
LAMOTHE /16 mai 2012-7aout 2012
Fonction
Mr. Pierre Richard
CASIMIR / 7 Aout 2012- 4 avril 2014
Affaires étrangères et cultes
Mr.Duly
Mr Ronsard
BRUTUS / Du 4 avril 2014
ST CYR / du 16 mai 2012-7aout2012
Affaires socials
Mme Josepha Raymond
JOSEPH/ du7aout 2012-25 janvier 2013
Mr Charles
Agr.Thomas
JEAN-JACQUES/du 25 janv 2013
JACQUES/ du 17 mai 2012
Mr Wilson
LALEAU/ rescape du gvt conille du 16
mai2012
MEZIL/ du 16 mai 2012(rescape du
gouv.Conille
JEAN GARDY/du 16 mai 2012 - 24
janv 2013
GODEFROY/24 jan 2012-11avril
2013.
HERIVEAUX /du 3 avril 2014
DUPUY/ 16 mai 2012-23 janv2013
DARJUSTE/23 janv2013-3 avril2014
Rocourt-du 3 avril 2014
JOAZIL/16 mai 2012-3 avril 2014
Mme yanick
Ady
Mme regine
Rudy
Mr.Jean- marie
Mme Josette
Mme Monique
Mr Jean Rodolphe
Mr.Lerner
Mme .Marie Carmelle
Mr Wilson
Mme Marie Carmelle
Mr Reginald
RENAUD/du 2 avril 2014
JEAN ŔMARIE/8mai 2012-11avril2013
LALEAU/13avril2013-3 avril 2014
JEAN ŔMARIE/du 3 avril 2014
Mr Jean Vilmond
Paul(rescape du gouv.de conille)16 mai
2012-7aout2012
Pierre/du 7 aout 2012-3 avril 2014
Mr Nesmy
Mr Joseph Ronald
MANIGAT/ du 3 avril 2014
TOUSSAINT/16 mai2012-7aout
Mr Jean Vilmond
HILAIRE/du 7 aout2012-23janv 2013
Agriculture et ressources
naturelles
Commerce et de l‟industrie
Condition Féminine
Communication et culture
Culture
Défense
Economie et des finances
Education National
Environnement
Page 400 of 656
Jean Francois
Mr .Daniel
Mme Bernice
Mr.Francois
Mr.Thierry
THOMAS/du 23 janv 2013
SUPPLICE/16 mai2012-23janv2013
Phidelia/23 janv2013-11juin 2013
GUILLAUME/du4 avril 2014
Haïtiens Vivant l‟étranger
MAYARD-PAUL/du 16 mai 2012-7
aout2012
SAINT CYR/du 7aout2012-23 janv2013
BAZIL/ du 23 janvier2013-3avril 2014
Intérieur, collectivités
Territoriales et défense
Mr reginald
Mr Jean Roosevelt
DELVA /du 3 avril 2014
RENE/du 16 mai2012-23janv2013
Jeunesse et sports
Mme Magalie
RACINE/23 janv2013-3 avril2014
Mme himmler
REBU/du 3 avril 2014
Mr. Jean Renel
Mme Josépha Raymond
SANON/du 16 mai 2012
GAUTHIER/du 16mai 2012-10aout2012
LAMOTHE/du 10aout 2012
Justice et sécurité National
Planification et coopération
Externe
Mme marie Mimose
ROUSSEAU/(rescapé gvt conille) du 16
mai 2012
FELIXE/du 16 mai 2012
Mme Marie Carmelle Rose Anne
AUGUSTE/du 16mai 2012
Mr. Ralph
THEANO/du 16 mai 2012-2 avril 2014.la
position créer lors du remaniement
ministériel du 2 avril 2014
Patrick sully
JOSEPH/du 3 avril 2014. position créer
lors du remaniement ministériel du 2 avril
2014
Mr Rene
JEAN-JUMEAU.
Position Créer en juillet 2012
Travaux publics, transport et
communication
Bureau du ministre délégué
auprès du premier ministre
charge de la paysannerie
Bureau du ministre délégué
auprès du premier Ministre
Charge des Droits de l‟homme
et de la lutte contre pauvreté
extrême
Bureau du ministre délégué
auprès du premier Ministre
Charge des relations avec le
parlement(BMCRP)
Ministre délégué auprès du
premier Ministre Charge du
renforcement avec les partis
politiques
Ministre délégué auprès du
premier Ministre Charge de la
sécurité Energique
Mr.Ronsard
Mr.David
Mr Laurent
Ing. Jacques
Page 401 of 656
Liste des projets
Montant en US
1.
2.
3.
4.
Appui a la PNH
6,000,000
Achat d'engrais
Rehabilitation de la route Petite Riviere de Nippes/Petit Trou de Nippes
2,000,000
5,646,624
Projets de developpement territorial
34,000,000
5.
Augmentation de la capacite de generation electrique/Carrefour 1
5,000,000
6.
Mise en place de la Plateforme de Logiciel pour le PSUGO
Appui a la formation et capitalisation de 20000 MicroEntreprises sur l'ensemble du
Territoire
3,500,000
8.
Rehabilitation de la route jacmel_la vallee
3,500,000
9.
Rehabilitation du tronçon de route carrefour 44 /Cote de Fer
11,000,000
10.
Programme de lutte contre la pauvrete extreme et l'exclusion sociale
15,000,000
11.
Centre de traumalogie
Construction et Equipements de dortoirs et residences pour professeurs et Extension du
Campus Henry Christophe/ UEH
5,000,000
Projets Petro Caribe/ Sous Programme d'infrastructures Sportives
2,000,000
Projet de developpement Frontalier(3 Regions)
2,000,000
Cosntruction du barages des trois rivières
1,000,000
Construction d'un systeme de cabotage au niveau des presqu'iles du Sud,Nord-Ouest,
Nord, et d'un système de ferry (Mariani/P-au-P)
Construction d'une centrale Hydro-electrique dans les Nippes (Saut Baril)
Amelioration de la securité routière
Reforme de la formation professionelle
1,000,000
1,000,000
1,000,000
444,444
7.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
300,000
3,000,000
Mise en place de laboration scolaire experimentaux
Sous programme de collectes des ordures
Plan speciaux de developpement territoriale
Construction du Local du CIMO
Programme e-gouvernance
Batiment public /Logement
Projet soin de santé pour les policiers de la PNH selon accord entre le MPCE,la PNH et
l'hopital Bernameuse
1,000,000
1,000,000
8,900,000
3,800,000
1,000,000
20,000,000
Total
141,778,568
687,500
Les decaissement relatifs à ces projets sont presentés dans le tableau qui suit :
Page 402 of 656
Résolution du 23 Juillet 2014
Institution
Nature du Projet
Localité
PNH
Montant du
Projet
Montant
decaissé
No
déc.
Montant à
decaisser
7,000,000
Appui a la PNH
Appui a la PNH / Acquisition de
22 motocyclettes Honda et 5 Bus
Hyundai County
Appui a la PNH(Construction
batiment CIMO)
Appui a la PNH / Realisation des
travaux du Hangar de CIMO
6,000,000
Delmas
Champs de
Mars/ Portau-Prince
Appui a la PNH
Appui a la PNH /Acquisition de
fourniture de gaz lacrymogenes,
colorants et mousses
Sous
Total
6,000,000
Protection Contre Incendie/ achat
d'un camion de pompier
1,000,000
Total
7,000,000
MARNDR
141,156
818
1,925,573
829
108,160
857
135,200
866
220,876
895
2,530,966
208,650
3,469,034
847
2,739,616
791,350
4,260,384
2,000,000
Achat d'engrais
Achat d'engrais / Subvention et
amelioration de la productivite
Petit Goave,
Thomassin
32 & 27
Total
2,000,000
346,583
838
1,561,400
903
1,907,983
92,017
MPCE
Rehabilitation de la route Petite
Riviere de Nippes/Petit Trou de
Nippes
Rehabilitation de la route Petite
Riviere de Nippes/Petit Trou de
Nippes
Rehabilitation de la route Petite
Riviere de Nippes/Petit Trou de
Nippes
Rehabilitation de la route Petite
Riviere de Nippes/Petit Trou de
Nippes
5,646,624
Petite
Riviere de
Nippes/Petit
trou de
Nippes
Petite
Riviere de
Nippes/Petit
trou de
Nippes
Petite
Riviere de
Nippes/Petit
trou de
Nippes
2,189,488
825
1,566,283
841
817,979
842
Page 403 of 656
Rehabilitation de la route Petite
Riviere de Nippes/Petit Trou de
Nippes
Petite
Riviere de
Nippes/Petit
trou de
Nippes
Sous total
808,787
5,646,624
projets de developpement
territorial
883
5,382,536
264,088
34,000,000
sous programme de conception et
mise en œuvre de projets de
developpement territorial
4,120,280
Sous Programme de conception et
mise en oeuvre de Projets de
Developpement Territorial
819
146,864
820
Sous Programme de conception et
mise en oeuvre de Projets de
Developpement Territorial
Marchand
1,091,443
821
Sous Programme de conception et
mise en oeuvre de Projets de
Developpement Territorial(marche
public)
Pignon &
Grande
Riviere du
Nord
3,550,326
824
Sous Programme de Conception et
mise en oeuvre de Projets de
Developpement
Territorial(renovation urbaine ville
Ennery)
Ennery
290,384
833
Sous Programme de Conception et
mise en oeuvre de Projets de
Developpement Territorial
Maissade
284,557
837
Sous Programme de Conception et
mise en oeuvre de Projets de
Developpement
Territorial(Supervision
construction lycee)
Saut-d'eau
25,991
840
Sous Programme de Conception et
mise en oeuvre de Projets de
Developpement
Territorial(drainage et betonnage 2
km de rue a Savane Carree,
Ennery)
Ennery
43,716
845
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial
Jacmel,
Belle-Anse
& Acul du
Nord
152,100
846
Page 404 of 656
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement
Territorial/construction et
rehabilitation de Fontaines a Cotes
de Fer
Cotes de
Fer
Sous Programme de conception et
mise en oeuvre de Projets de
Developpement Territorial
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial
Ile de la
Tortue
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial
109,290
854
2,314,097
859
874,448
864
3,260,756
865
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial/ Plan
special de la commune de Cite
Soleil
Cite Soleil
466,666
867
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial
Grand
Bassin et
Terrier
Rouge
117,000
868
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial/ 40
lampadaires installation
Aquin
78,000
871
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial/ Lycee
Sainte Catherine
Arnaud
149,544
877
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial/l Lycee
Anse Rouge
142,199
878
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial / Lycee
National Mirebalais
Mirebalais
58,696
879
Page 405 of 656
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial / Lycee
Caracolle
Caracolle
255,007
880
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial/
Construction de 200 maisons a
Pointe a Raquettes, Plan Special
de l'Ile de la Gonave
Pointe a
Raquettes
& Iles de la
Gonave
2,500,000
888
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial /
Barrage Hydro electrique
25,498
889
Sous Programme de conception et
mise en oeuvre de Projets de
Developpement Territorial
3,000,000
890
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial/ Lycee
Bas Limbe
& Port
Magot
42,289
898
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial
Petit Goave,
Thomassin
32 & 25
46,800
900
Sous Programme de Conception et
mise en Oeuvre de Projets de
Developpement Territorial / Lycee
Petit Goave,
Thomassin
32 & 26
39,445
902
Total
34,000,000
BMPAD
10,814,605
5,000,000
Augmentation de la capacite de
generation electrique/Carrefour 1
Carrefour
5,000,000
Total
5,000,000
MENFP
300,000
Mise en place de la Plateforme de
Logiciel pour le PSUGO
Total
23,185,395
5,000,000
300,000
300,000
827
-
831
300,000
-
Page 406 of 656
MCI
3,500,000
Appui a la formation et
capitalisation de 20000
MicroEntreprises sur l'ensemble
du Territoire
3,442,623
Total
3,500,000
MTPTC
3,442,623
57,377
11,000,000
3,500,000
Rehabilitation
rehabilitation de la route jacmel_la
vallee
3,500,000
Sous
Total
3,500,000
Rehabilitation du troncon de
Carrefour 44/ Cote de Fer
819
3,500,000
-
11,000,000
Rehabilitation du troncon de
Carrefour 44/ Cote de Fer
Petit Goave,
Thomassin
32 & 28
1,431,445
905
Rehabilitattion du troncon de
Route Carrefour 44 / Cote de Fer
Cotes de
Fer
4,956,522
876
Sous
Total
11,000,000
FAES
6,387,967
4,612,033
15,000,000
Programme de lutte contre la
pauvrete extreme et l'exclusion
sociale
2,737,196
874
Programme de lutte contre la
pauvrete extreme et l'exclusion
sociale
8,085,106
896
Total
15,000,000
MSPP
10,822,303
4,177,697
5,000,000
Centre de traumalogie
Port-auPrince
Total
5,000,000
5,000,000
UEH
875
5,000,000
-
3,000,000
Construction et Equipements de
dortoirs et residences pour
professeurs et Extension du
Campus Henry Christophe/ UEH
Total
839
Limonade
2,950,820
3,000,000
2,950,820
894
49,180
Page 407 of 656
MJSAC
Projets Petro Caribe/ Sous
Programme d'infrastructures
Sportives
MEF
Projet de developpement
Frontalier(3 Regions)
2,000,000
819
1,403,402
2,000,000
-
2,000,000
1,000,000
-
1,000,000
1,000,000
-
1,000,000
1,000,000
-
1,000,000
1,000,000
-
1,000,000
444,444
-
444,444
1,000,000
-
1,000,000
1,000,000
-
1,000,000
8,900,000
-
8,900,000
Construction du Local du CIMO
3,800,000
-
3,800,000
Programme e-gouvernance
1,000,000
-
1,000,000
UCLPB
Batiment public /Logement
20,000,000
-
20,000,000
MSPP
Projet soin de santé pour les
policiers de la PNH selon accord
entre le MPCE,la PNH et l'hopital
Bernameuse
687,500
-
687,500
MTPTC
PNH
MENFP
MPCE
Cosntruction du barages des trois
rivières
Construction d'un systeme de
cabotage au niveau des
presqu'iles du Sud,Nord-Ouest,
Nord, et d'un système de ferry
(Mariani/P-au-P)
Construction d'une centrale
Hydro-electrique dans les Nippes
(Saut Baril)
Amelioration de la securité
routière
Reforme de la formation
professionnelle
Mise en place de laboration
scolaire experimentaux
Sous programme de collectes des
ordures
Plan speciaux de developpement
territoriale
National
596,598
Total
42,831,944
TOTAL
141,778,568
42,831,944
71,215,839
70,562,729
Page 408 of 656
La Résolution du 23 juillet 2014 comprend vingt- six(26) projets , de ce nombre quatre (4)
Projets ont été recus aux fins d‟analyse et sont traités dans la Résolution suivante :
Quatre (4) Projets dans la Résolution du 21 décembre 2012:
1- Construction du local CIMO
2- Travaux de réhabilitation d'urgence de la route Jacmel, La Vallée 19 km
3- Réhabilitation et construction du tronçon petite Rivière/Petit trou de Nippes
4- Construction d'un centre de traumatologie de niveau I
Page 409 of 656
Revue de passation de marché
Résolution du : 23 juillet 2014
No
Maitre
d'œuvre
Maitre
d'ouvrage
1
Ingenieria
ESTRELLA
MPCE
2
SECOSA
MPCE
3
V&F
Construction
S.A.
MTPTC
4
Bernard Mevs
Projet
MEDISHARE
MSSP
Description
des
travaux
Construction du local
CIMO
Travaux de réhabilitation
d'urgence de la route
Jacmel, La Vallée 19 km
Réhabilitation et
construction du tronçon
petite Rivière/Petit trou
de Nippes
Construction d'un centre
de traumatologie de
niveau I
Contrat
Appel d'offres
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Localité
Date
de signature
Montant
Gré
à
gré
Delmas,
Ouest
20 Novembre
2012 (C.)
…Juillet 2014
(Av.)
4, 233,950.60 US
+ Avenant:
934,481.52 US
Oui
Oui
Non
Non
La Vallée,
Jacmel
…Décembre
2012
23, 212,146.00
US
Oui
Oui
Non
Oui
Petite
Rivière/
Petit Trou de
Nippes
27 décembre
2012
30, 849,737.91
US
Oui
Oui
Non
Oui
Delmas,
Ouest
27 Février
2013
5, 000,000
US
Oui
Non
Non
Non
Restreint
Ouvert
Page 410 of 656
Revue de la gestion des contrats
Résolution du : 23 juillet 2014
Contrat
No
Maitre
d'œuvre
Maitre
d'ouvrage
Description
des
travaux
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue de
garantie
Durée des
travaux
Montant
décaissé
Date
de
signature
Montant
Avance
de
démarrage
20 Novembre
2012 (C.)
…Juillet 2014
(Av.)
4, 233,950.60 US
+ Avenant:
934,481.52 US
Oui
Non constaté lors
de l'analyse du
contrat
Non
Non
non
1, 925,573.33
US
1
Ingenieria
ESTRELLA
MPCE
Construction du local
CIMO
2
SECOSA
MPCE
Travaux de réhabilitation
d'urgence de la route La
Vallée 19 km
Décembre
2012
23, 212,146.00 US
Oui
Non constaté lors
de l'analyse du
contrat
Non
Non
24 mois
3, 500,000.00
US
3
V&F
Construction
S.A.
MTPTC
Réhabilitation et
construction du tronçon
Petite Rivière/Petit Trou
de Nippes
27 décembre
2012
30, 849,737.91 US
ou
1, 295, 688,992.00
Gourdes
Oui
Non constaté lors
de l'analyse du
contrat
Non
Non
18 mois
5, 382,535.98
US
4
Bernard Mevs
Projet
MEDISHARE
MSPP
Construction d'un centre
de traumatologie de niveau
I
27 février
2013
5, 000,000.00
US
Oui
Non constaté lors
de l'analyse du
contrat
Non
Non
Non
5, 000,000.00
US
Page 411 of 656
XXVIII Résolution du 10 Septembre 2014
Page 412 of 656
Résolution du 10 Septembre 2014
Toutes les Résolutions prises sur l‟administration MARTELLY-LAMOTHE se justifiaient
Selon ce qu‟elles precisaient par la necessité de mettre en place des infrastructures .
Cette Résolution n‟en a pas fait exception tout en n‟operant que des desaffectations.
Gouvernement Martelly –Lamothe.
Cette Résolution a été prise toujours dans la nécessité de poursuivre les travaux
d‟infrastructure .
Les décaissements autorisés par cette Résolution était dirigé vers de projets dans leurs grande
majorité devraient être exécutés par le MTPTC en qualité de maitre d‟ouvrage.
Composition du gouvernement Martelly-Lamothe.
Il est composé des ministres suivants :
Prénom
Nom
Mr Laurent S.
LAMOTHE /16 mai 2012-7aout 2012
Mr. Pierre Richard
CASIMIR / 7 Aout 2012- 4 avril 2014
Affaires étrangères et cultes
Mr.Duly
Mr Ronsard
BRUTUS / Du 4 avril 2014
ST CYR / du 16 mai 2012-7aout2012
Affaires sociales
Mme Josepha Raymond
JOSEPH/ du7aout 2012-25 janvier 2013
Mr Charles
Agr.Thomas
JEAN-JACQUES/du 25 janv 2013
JACQUES/ du 17 mai 2012
Mr Wilson
Rudy
Mr.Jean- marie
Mme Josette
Mme Monique
LALEAU/ rescape du gvt conille du 16
mai2012
MEZIL/ du 16 mai 2012(rescape du
gouv.Conille
JEAN GARDY/du 16 mai 2012-24 janv
2013
GODEFROY/24 jan 2012-11avril
2013.
HERIVEAUX /du 3 avril 2014
DUPUY/ 16 mai 2012-23 janv2013
DARJUSTE/23 janv2013-3 avril2014
Rocourt-du 3 avril 2014
Mr Jean Rodolphe
JOAZIL/16 mai 2012-3 avril 2014
Mr.Lerner
Mme .Marie Carmelle
RENAUD/du 2 avril 2014
JEAN ŔMARIE/8mai 2012-11avril2013
LALEAU/13avril2013-3 avril 2014
JEAN ŔMARIE/du 3 avril 2014
Mme yanick
Ady
Mme regine
Mr Wilson
Mme Marie Carmelle
Mr Reginald
Mr Jean Vilmond
Paul(rescape du gouv.de conille)16 mai
2012-7aout2012
Pierre/du 7 aout 2012-3 avril 2014
Mr Nesmy
MANIGAT/ du 3 avril 2014
Fonction
Agriculture et ressources
naturelles
Commerce et de l‟industrie
Condition Féminine
Communication et culture
Culture
Défense
Economie et des finances
Education National
Page 413 of 656
Mr Joseph Ronald
TOUSSAINT/16 mai2012-7aout
Mr Jean Vilmond
HILAIRE/du 7 aout2012-23janv 2013
Jean Francois
Mr .Daniel
THOMAS/du 23 janv 2013
SUPPLICE/16 mai2012-23janv2013
Phidelia/23 janv2013-11juin 2013
GUILLAUME/du4 avril 2014
Mme Bernice
Mr.Francois
Mr.Thierry
Environnement
Haïtiens Vivant l‟étranger
MAYARD-PAUL/du 16 mai 2012-7
aout2012
SAINT CYR/du 7aout2012-23 janv2013
BAZIL/ du 23 janvier2013-3avril 2014
Intérieur, collectivités
Territoriales et défense
Mr reginald
Mr Jean Roosevelt
DELVA /du 3 avril 2014
RENE/du 16 mai2012-23janv2013
Jeunesse et sports
Mme Magalie
RACINE/23 janv2013-3 avril2014
Mme Himmler
REBU/du 3 avril 2014
Mr. Jean Renel
Mme Josépha Raymond
SANON/du 16 mai 2012
GAUTHIER/du 16mai 2012-10aout2012
LAMOTHE/du 10aout 2012
Justice et sécurité National
Planification et coopération
Externe
ROUSSEAU/(rescapé gvt conille) du 16
mai 2012
FELIXE/du 16 mai 2012
Travaux publics, transport et
communication
Bureau du ministre délégué auprès
du premier ministre charge de la
paysannerie
Bureau du ministre délégué auprès
du premier Ministre Charge des
Droits de l‟homme et de la lutte
contre pauvreté extrême
Bureau du ministre délégué auprès
du premier Ministre Charge des
relations avec le
parlement(BMCRP)
Ministre délégué auprès du premier
Ministre Charge du renforcement
avec les partis politiques
Ministre délégué auprès du premier
Ministre Charge de la sécurité
Energique
Mr.Ronsard
Mr.David
Mr Laurent
Ing. Jacques
Mme marie Mimose
Mme Marie Carmelle Rose
Anne
AUGUSTE/du 16mai 2012
Mr. Ralph
THEANO/du 16 mai 2012-2 avril 2014.la
position créer lors du remaniement
ministériel du 2 avril 2014
Patrick sully
JOSEPH/du 3 avril 2014. position créer
lors du remaniement ministériel du 2 avril
2014
JEAN-JUMEAU.
Position Créer en juillet 2012
Mr Rene
Page 414 of 656
Liste des projets
Montant
en US
7 000 000
1.
Réhabilitation de la Route de Tabarre
2.
4 197 201
Construction viaduc de Delmas
3.
2 000 000
Sous-Programme de Collecte des ordures
4.
3 500 000
Plan spéciaux de développement Territorial
5.
6 000 000
Appui a L'ULCBP
6.
3 000 000
Programme de lutte contre pauvreté et Exclusion Sociale
7.
4 000 000
Appui a la PNH
Total
29 697 201
Page 415 of 656
Résolution du 10 Septembre 2014
Institution Nature du Projet
Localité
MTPTC
Montant du Montant
Projet
decaissé
No
decaissement
Montant
à
decaisser
7 000 000
Réhabilitation de la
Route de Tabarre
Ouest
Sous total
7 000 000
7 000 000
7 000 000
892
-
Construction viaduc
de Delmas
Ouest
4 197 201
-
4 197 201
Sous-Programme de
Collecte des ordures
National
2 000 000
-
2 000 000
Plan spéciaux de
développement
Territorial
National
3 500 000
-
3 500 000
ULCBP
Appui a L'ULCBP
National
6 000 000
-
6 000 000
MAST
Programme de lutte
contre pauvreté et
Exclusion Sociale
National
3 000 000
-
3 000 000
PNH
Appui a la PNH
National
4 000 000
-
4 000 000
29 697 201
7 000 000
22 697 201
MPCE
TOTAL
Page 416 of 656
GOUVERNEMENT MARTELLY - PAUL
XXIX Résolution du 15 Avril 2015
Page 417 of 656
Résolution du 15 Avril 2015
Durée de la résolution d‟urgence du 15 Avril 2015
Pouvoirs des autorités
Gouvernement MARTELLY / PAUL
La Résolution du 15 Avril 2015 fut prise en consul des Ministres sous le gouvernement dirigé
par Evens Paul.
Installé le 19 janvier ,son Cabinet ministeriel était aussi composé :
Composition du gouvernement MARTELLY / PAUL
Il est composé des Ministres suivants :
Prénom
Duly
Victor
Jean-François
Hervé
Rotchild Jr.
Yves Rose
Dithny Joan
Lener A.I.
Wilson
Nesmy
Pieriche
Réginald
Pierre Richard
Yves Germain
Florence Duperval
Stéphanie Balmir
Jacques
Nom
BRUTUS
BENOIT
THOMAS
DAY
FRANCOIS
MORQUETTE
RATON
RENAULD
LALEAU
MANIGAT
OLIVIER
DELVA
CASIMIR
JOSEPH
GUILLAUME
VILLEDROUIN
ROUSSEAU
Jean-Fritz
JEAN-LOUIS
Fonction
Affaires Etrangères et des cultes
Affaires Sociales
Agriculture et des Ressources Naturelles
Commerce et de l‟Industrie
Communication
Condition Féminine
Culture
Défense
Economie et des Finances
Education Nationale
Haïtiens vivant à l‟Etranger
Intérieur et des Collectivités Territoriales
Justice
Planification et Coopérative Externe
Santé Publique et de la Population
Tourisme
Travaux Publics, Transports et
Communication
Ministre Délégué auprès du Premier
Ministre chargé des questions Electorales.
Trois(3) Résolution ont été en faite signées sous l‟Administration MARTELLY- PAUL . Ce
sont :
La Résolution du 15 Avril 2015
La Résolution du 22 Juillet 2015
La Résolution du 22 Juillet 2015
La Résolution du 06 Janvier 2016
Ces Résolutions ne faisaient que désaffecter certains fonds aux fin de financer d‟autres
Projets. Les Projets touchés par ces Résolutions sont présentés dans ces differents tableaux
Page 418 of 656
Résolution du 15 Avril 2015
Localité
Montant du
projet $ US
MARNDR
Nature du projet
Construction de 50 serres
dans 5 Departements
(Nord,NordOuest,Centre,GrandAnse,Sud-Est)
National
1,500,000
-
1,500,000
MARNDR
Construction de structures
d'Irrigation a Saut du Baril
(Nippes) Marion (Sud-Est) et
Trois- Riviere (Nord-Ouest) et
construction de lacs
Collinaires
National
4,500,000
-
4,500,000
MARNDR
Subvention de fertilisants et
amelioration de la
productivite des cultures et
des sols (St-Marc,Plaine des
cayes,StRaphael,Kenskoff,Ferrier)Ac
hat d'Engrais
National
1,561,400
-
1,561,400
MAST/FAES
Lutte contre la pauvrete et
l'Exclusion sociale
National
10,000,000
1,841,621
MC-BE
Soukri-Souvenance-Badio-la
ville au Camp
National
260,000
-
260,000
MCI
Mise en oeuvre d'Activites de
renforcement a la creation a
la gestion des entreprises
National
864,502
-
864,502
National
6,200,000
-
6,200,000
Institution
Montant
décaissé
No
décaissement
931
Montant à
décaisser
8,158,379
Intervention d'urgence
MEF
MEF-BMPAD
Construction de Silos de
stockage pour Securite
Alimentaire
Construction de Silos de
stockage pour Securite
Alimentaire
1,261,119
National
28,210
National
297,739
National
8,097
National
19,469
National
309,035
Construction de Silos de
stockage pour Securite
Alimentaire
Construction de Silos de
stockage pour Securite
Alimentaire
Construction de Silos de
stockage pour Securite
Alimentaire
Construction de Silos de
stockage pour Securite
Alimentaire
DGB/ASIP/8
000
No.01386 du
23 avril 2014
DGB/ASIP/8
000
No.01386 du
23 avril 2014
DGB/ASIP/8
000
No.01386 du
23 avril 2014
DGB/ASIP/8
000
No.01386 du
23 avril 2014
DGB/ASIP/8
000
No.01386 du
23 avril 2014
Page 419 of 656
Construction de Silos de
stockage pour Securite
Alimentaire
National
27,816
Construction de Silos de
stockage pour Securite
Alimentaire
National
46,020
National
58,778
Construction de Silos de
stockage pour Securite
Alimentaire
Sous total
pmt fact.#5 de
archivolt S.A
/Supervision
de la
construction
du centre de
stockage de
denrées
EXECO,S.A:
pmt facture #4
projet
construction
de silos.
Edny Cesar
.sous-traitant
de
EXECO,S.A:
pmt facture #1
projet
construction
de silos.
1,261,119
795,164
465,955
3,771,478
MEF-BMPAD
Programe de stabilisation des
prix
National
3,771,478
-
MJSP-PNH
Appui a la
PNH:Renforcement des
capacites d'intervention de la
Police Nationale (PNH)
National
8,147,778
1,011,712
908
7,136,066
MJSP-PNH
Renforcement de la
PNH/Soins de sante a la Police
Nationale dHaiti
Ouest
1,000,000
865,378
944
134,622
MPCE
Appui a la cooperation
Cubaine
National
3,070,000
-
National
787,234
787,234
910
National
500,000
913
National
158,044
915
1,514,319
DGB/ASIP/80
00 No.01908
du 5 juin 2015
3,070,000
Collecte des ordures
MPCE
-
Conception et mise en oeuvre
de projets de developpement
teritorrial.
MPCE
12,702,373
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
National
Page 420 of 656
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
Conception et mise en oeuvre
de projets de developpement
teritorrial.
National
1,328,806
DGB/ASIP/80
00 No.01909
du 5 juin 2015
National
1,298,903
934
National
523,080
935
National
110,890
936
National
107,843
940
National
290,040
949
Sous total
MPCE
MPCE
MPCE
Construction de Mediatheque
a Jean Rabel
Construction de
Mediatheques a port de Paix
Construction de
Mediatheques a Saint Louis
du Nord
12,702,373
5,831,924
6,870,449
NordOuest
361,702
-
361,702
NordOuest
425,532
-
425,532
NordOuest
702,128
-
702,128
Ouest
9,000,000
Construction d'infrastructure
socio-communautaire au
Wharf de Jeremie a cite Soleil
MPCE
Construction d'infrastructure
socio-communautaire au Wharf
de Jeremie a cite Soleil
Ouest
709,788
938
Ouest
204,230
941
Ouest
405,007
945
31,740
947
462,107
947
Construction d'infrastructure
socio-communautaire au Wharf
de Jeremie a cite Soleil
Construction d'infrastructure
socio-communautaire au Wharf
de Jeremie a cite Soleil
Construction d'infrastructure
socio-communautaire au Wharf
de Jeremie a cite Soleil
Construction d'infrastructure
socio-communautaire au Wharf
de Jeremie a cite Soleil
Ouest
Page 421 of 656
Sous total
MPCE
9,000,000
Construction du marché
public de Fontamara
Construction du marché public
de Fontamara
Construction du marché public
de Fontamara
Construction du marché public
de Fontamara
Ouest
1,812,872
7,187,128
8,222,000
Ouest
2,066,523
912
Ouest
431,445
919
Ouest
749,997
921
Sous total
8,222,000
3,247,965
Nippes
8,600,000
144,260
Artibonite
30,000
-
4,974,035
Construction Gare routiere et
Marche public a Miragoane
(incluant la supervision)
MPCE
MPCE
Construction Marche public
des Gonaives
933
8,455,740
30,000
Fonds de supervision des
travaux relatifs aux projets
d'infrastructures
MPCE
6,357,666
Fonds de supervision des
travaux relatifs aux projets
d'infrastructures
Fonds de supervision des
travaux relatifs aux projets
d'infrastructures
National
325,297
932
National
40,000
950
Sous total
MPCE
6,357,666
Reconstruction du lycee
Alexandre Petion (incluant la
supervision)
Reconstruction du lycee
Alexandre Petion (incluant la
supervision)
Reconstruction du lycee
Alexandre Petion (incluant la
supervision)
Ouest
Sous total
365,297
5,992,369
4,562,018
4,562,018
140,109
919
71,947
928
212,056
4,349,962
Reconstruction du lycee
Toussaint Louverture
(incluant la supervision)
MPCE
Ouest
Reconstruction du lycee
Toussaint Louverture (incluant
la supervision)
5,544,708
71,947
911
Page 422 of 656
Reconstruction du lycee
Toussaint Louverture (incluant
la supervision)
Reconstruction du lycee
Toussaint Louverture (incluant
la supervision)
Sous total
MPCE
MPCE
MPCE
MPCE
Rehabilitation des places
publiques
Rehabilitation place
publique"Aeroport Hugo
Chavez"
Rehabilitation place
publique"Sainte Anne"
Rehabilitation Terrain de
Football Delmas 2
613,072
919
98,161
928
5,544,708
783,180
4,761,528
National
1,680,851
-
1,680,851
Ouest
2,313,365
248,220
Ouest
180,851
-
180,851
Ouest
500,000
-
500,000
Ouest
1,680,000
-
1,680,000
National
8,200,000
2,138,473
Ouest
70,466
-
Centre
4,951,433
923
2,065,145
Rehabilitation Troncon
Fermathe-Frere via
soisson,Duplan,Girardeau et
collectrices rue
Metellus,MeyotteFrere,Thomassin 25,Fermathe
45 et Montagne Noir
MPCE
Rehabilitation,construction et
amenagement
d'infrastructures sportives
(instalation de gazon
synthetique,Hinche,Saint
Louis du Nord et Thomassin)
MPCE
946
6,061,527
Renovation des routes du
village artistique Noailles de
Croix des Bouquets
MPCE
MPCE
Renovation urbaine à
Mirbalais et Lascahobas
Renovation urbaine à Mirbalais
et Lascahobas
Renovation urbaine à Mirbalais
et Lascahobas
70,466
-
Centre
677,269
930
Centre
4,274,164
943
4,951,433
4,951,433
-
Page 423 of 656
MPCE
MPCE
MPCE
MPCE-ULCBP
MPCE-ULCBP
Rehabilitation place publique
"Geffrard"
Renovation urbaine de
Gonaives
Renovation urbaine de la ville
de Hinche
Rehabilitation place publique
"Canape vert"
Rehabilitation place
publique"Occide Jeanty"
Ouest
180,851
-
180,851
Artibonite
33,476
-
33,476
Centre
636,466
-
636,466
Ouest
319,149
-
319,149
Ouest
1,000,000
322,298
922
377,157
929
1,000,000
699,456
300,544
National
16,330,796
-
16,330,796
National
425,532
-
425,532
Sud
2,123,222
-
2,123,222
Nord
4,000,000
-
4,000,000
Sud-Est
335,111
-
335,111
Sud-Est
1,106,020
-
1,106,020
Ouest
10,709,660
Construction et rehabilitation
d Hopitaux (HUEH,St Michel
de Jacmel,Simbi Continental
de Martissant,Hopital Sans
Fil,Centre de Trauma,Hopital
de Bon Repos……)
MSPP
MSPP
MT
MTPTC
MTPTC
MTPTC
MTPTC
Rehabilitation et Construction
d'infrastructure sanitaire
Developpement des
infrastructures de l'Ile a
Vache
Amenagement du bord de
mer de la ville du Cap-Haitien
Construction du pont sur la
riviere Marigot /Peredo
Construction sur la riviere
Gauche (Rte Jacmel-la Vallee
de Jacmel)
Construction viaduc
Delmas/Nazon
Construction viaduc
Delmas/Nazon
Construction viaduc
Delmas/Nazon
Ouest
99,305
909
Ouest
2,355,499
909
Page 424 of 656
Construction viaduc
Delmas/Nazon
Construction viaduc
Delmas/Nazon
Construction viaduc
Delmas/Nazon
Construction viaduc
Delmas/Nazon
Ouest
359,566
916
Ouest
1,320,160
918
Ouest
1,780,394
927
Ouest
54,494
939
Sous total
10,709,660
5,969,417
4,740,243
Sud
2,250,000
-
2,250,000
NordOuest
2,500,000
-
2,500,000
GrandAnse
500,000
-
500,000
National
1,000,000
553,911
Ouest
6,000,000
-
National
17,000,000
5,235,705
Ouest
6,000,000
-
6,000,000
Ouest
7,000,000
-
7,000,000
MTPTC
Rehabilitation du troncon de
route Carrefour 44/Cotes de
Fer
Sud-Est
15,000,000
-
15,000,000
MTPTC
Rehabilitation route Petite
Riviere de Nippes/Petit -Trou
de Nippes
Nippes
1,242,294
817,279
925
425,015
National
7,000,000
1,063,005
920
5,936,995
Debarcadaires Faucault
MTPTC
MTPTC
Debarcadaires Saint Louis du
Nord
Pont Lahaie Dame Marie
MTPTC
MTPTC
Rehabilitation Carrefour
Dufort-Jacmel
937
446,089
Rehabilitation de la route 9
MTPTC
6,000,000
Rehabilitation de la route
Cayes-Jeremie-A033178-001Source MTPTC
MTPTC
MTPTC
MTPTC
MTPTC
Rehabilitation de la route de
Pernier
Rehabilitation de la route de
Tabarre
Rehabilitation troncon Port
de Paix,Port-Magot
926
11,764,295
Page 425 of 656
MTPTC
MTPTC
Rehabilitation troncon
RN1:Freycineau/StMarc/Bigot
(Gonaives),Construction
Bigot- Carrefour
Joffre,Biennac-Rue Clerveau
et Rn1-Marchant (4)
Renovation Urbaine de la ville
des Cayes
Artibonite
672,379
-
Sud
3,500,000
95,162
Sud-Est
50,000
-
50,000
National
9,000,000
-
9,000,000
Ouest
3,000,000
2,000,000
924
Ouest
2,861,400
914
Ouest
1,056,354
917
Ouest
2,137,146
917
672,379
942
3,404,838
Gare routiere de Jacmel
MTPTC/MPCE
Dette SECOSA
MPCE
Appui a l' UCLBP
UCLPB
UCLPB
Construction de batiment et
logement publics-UCLPB
Construction de batiment et
logement publics-UCLPB
Construction de batiment et
logement publics-UCLPB
Construction de batiment et
logement publics-UCLPB
1,000,000
12,000,000
Sous total
12,000,000
6,054,900
5,945,100
UCLPB
Implantation de sites et de
services pour un
developpement ordonne de
l'habitat(Urbanisation)
National
1,500,000
-
1,500,000
UEH
Projet de construction et
dEquipements de dortoirs et
de Residences pour
Professeurs
Nord
1,000,000
-
1,000,000
Nord
2,000,000
-
2,000,000
254,423,560
47,525,624
206,897,936
Renforcement des structures
des batiments de l'Universite
de Limonade
UEH
TOTAL
Page 426 of 656
Dans la Résolution du 15 avril 2015, dix-neuf (19) Projets ont été selectionnés aux fins
d‟analyse et sont traités initialement dans les Résolutions suivantes répartissent ainsi:
Trois (3) dans la Résolution du 11 février 2010 :
1- Rénovation urbaine et construction d‟infrastructures socio-communautaire à
Mirebalais.
2- Réhabilitation du tronçon route Fermathe/Frères
3- Réhabilitation du tronçon Freycineau/St-Marc, Bigot/Gonaives
Un (1) seul Projet dans la Résolution du 28 février 2012 :
1- Rénovation urbaine Gonaives
Un (1) seul Projet dans la Résolution du 18 juillet 2012 :
1- Réhabilitation de la Place Publique Occide Jeanty
Quatorze (14) Projets dans la Résolution du 21 décembre 2012 :
1- Marché public Fontamara
2- Construction Lycée Toussaint Louverture
3- Marché public et gare routière de Miragoane
4- Supervision routière et marché public de Miragoane
5- Infrastructure socio-communautaire Wharf Jérémie (Cité Soleil)
6- Supervision wharf Jérémie à Cité Soleil
7- Viaduc Delmas
8- Construction lycée Alexandre Pétion
9- Supervision Lycée Alexandre Pétion
10- Tronçon Petite Rivière- petit trou
11- Place Hugo Chavez
12- Rénovation place publique St-Anne
13- Réhabilitation place publique Canapé- vert
14- Pont Marigot/ Peredo
15- Freycineau / St-Marc
Page 427 of 656
Revue de passation des marchés
Résolution du : 15 Avril 2015
No
Maitre
d'œuvre
Maitre
d'ouvrage
Description
des
travaux
1
Groupe des
Travaux de
Construction
MPCE
Rénovation urbaine et
construction
d'infrastructures sociocommunautaire à
Mirebalais
2
CEEPCO Haïti
S.A
MPCE
Réhabilitation place
Occide Jeanty
3
IBT, LLC
MPCE
Marché public Fontamara
4
IBT, LLC
MPCE
Construction Lycée
Toussaint Louverture
5
La Générale
Construction et
Distribution
MPCE
Marché public et gare
routière de Miragoane
6
Groupe Trame
MPCE
7
SOTECH
MPCE
8
Groupe Trame
MPCE
9
LGL
S.A.
10
Contrat
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Appel d'offres
Localité
Date
de
signature
Montant
Gré
à
gré
Centre
20 décembre
2012
18, 981,625.00
US
Oui
Oui
Non Signé
Oui
Port-auPrince
…Novembre
2012
2, 997,774.00
US
Oui
Oui
Non Signé
Oui
Oui
Oui
Non Signé
Non
Oui
Oui
Non Signé
Oui
Port-auPrince
Port-auPrince
Non
Non
15, 647,900.00
US
8, 029,900
US
Restreint
Ouvert
Miragoane
…Novembre
2012
7, 735,135.00
US
Oui
Oui
Non Signé
Oui
Miragoane
…Novembre
2012
773,513.50
US
Oui
Oui
Non Signé
Oui
Cité Soleil
20 décembre
2012
18, 441,135.00
US
Oui
Oui
Non Signé
Oui
Supervision wharf Jérémie
à Cité Soleil
Cité Soleil
Non
2, 195,053.50
US
Oui
Oui
Non Signé
Oui
MPCE
Viaduc Delmas
Delmas
27 décembre
2012
21, 502,742.83
US
Oui
Oui
Non Signé
Oui
IBT, LLC
MPCE
Construction lycée
Alexandre Pétion
Port-auPrince
26 novembre
2012
7, 696,012.00
US
Oui
Oui
Non Signé
Non
11
CSA, Central
Inc.
MPCE
Supervision Lycée
Alexandre Pétion
Port-auPrince
…Novembre
2012
384,800.00
US
Oui
Oui
Non Signé
Oui
12
VORBE et Fils
MTPTC
Tronçon Petite Rivièrepetit trou
Nippes
27 décembre
2012
30, 849,737.91
US
Oui
Oui
Non Signé
Oui
13
La Générale
Construction et
Distribution
MTPTC
Place Hugo Chavez
Delmas
…Novembre
2012
(Phase I)
1, 795,000.00
US
Oui
Oui
Non Signé
Oui
Supervision routière et
marché public de
Miragoane
Infrastructure sociocommunautaire Wharf
Jérémie (Cité Soleil)
Page 428 of 656
Revue de passation des marchés(Suite)
Résolution du : 15 Avril 2015
No
Maitre
d'œuvre
Maitre
d'ouvrage
Description
des
travaux
Contrat
Approbatio
n CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Appel d'offres
Localité
Date
de
signature
Montant
Gré
à
gré
Restreint
Ouvert
14
GTC
MPCE
Tronçon FrèresFermathe
Ouest
Non
47, 612,854.00
US
Oui
Oui
Non Signé
Oui
15
ESTRELLA
MPCE
Rénovation urbaine
Gonaïves
Artibonite
20 décembre
2012
3, 461,727.00
US
Oui
Oui
`
Non Signé
Non
16
SOGEMAT
MPCE
Rénovation place
publique St-Anne
Ouest
Non
50, 221,000.00
Gourdes
Oui
Oui
Non Signé
Oui
17
FECINA
S.A.
MPCE /
ULCBP
Réhabilitation place
publique Canapé- vert
CanapéVert
Non
29, 562,500.00
Gourdes
Oui
Oui
Non Signé
Oui
18
CECOM
Consultant
MTPTC
Pont Marigot/ Peredo
Marigot
27 décembre
2012
19
ESTRELLA
MTPTC
Freycineau / St-Marc
Gonaives
Non
10, 736,026.19
US
51, 452,645.55
US
Oui
Oui
Oui
Non Signé
Non
Oui
Oui
Page 429 of 656
Revue de la gestion des contrats
Résolution du : 15 Avril 2015
No
1
2
Maitre
d'œuvre
Groupe des
Travaux de
Construction
CEEPCO
Haïti S.A
Maitre
d'ouvrage
Description
des
travaux
MPCE
Contrat
Cautionnement sur
avance
de
démarrage
Prélèvemen
t 2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
Non
Non
Non
Non
26 mois
4, 951,433.00
US
2, 997,774.00
US
Non
Non
Non
Non
Non
699,456.00 US
15, 647,900.00 US
Non
Non
Non
Non
Non
3, 247,965.00
US
8, 029,900 US
Non
Non
Non
Non
18 mois
783,180.00 US
Date
de
signature
Montant
Avance
de démarrage
Rénovation urbaine et construction
d‟infrastructure
sociocommunautaire à Mirebalais
20 décembre
2012
18, 981,625.00 US
MPCE
Réhabilitation place Occide Jeanty
Non
…Novembre
2012
Non pour le
contrat
(…Novembre
2012
Supervision)
3
IBT, LLC
MPCE
Marché public
Fontamara
4
IBT, LLC
MPCE
Construction Lycée Toussaint
Louverture incluant Supervision
5
La Générale
Construction
et Distribution
MPCE
Marché public Miragoane et gare
routière
…Novembre
2012
7, 735,135.00
US
Non
Non
Non
Non
24 Mois
6
Groupe Trame
MPCE
Supervision marché Miragoane et
gare routière
…Novembre
2012
773,513.50
US
Non
Non
Non
Non
25 Mois
7
SOTECH
MPCE
Infrastructure sociocommunautaire
wharf Jérémie Cité Soleil)
20 décembre
2012
18, 441,135.00 US
Non
Non
Non
Non
24 Mois
1, 812,873.00
US
8
Groupe Trame
MPCE
Supervision wharf Jérémie (Cité
Soleil)
…Novembre
2012
2, 195,053.50
US
Non
Non
Non
Non
9
LGL S.A
MPCE
Viaduc Delmas
27 décembre
2012
21, 502,742.83 US
4, 147,092.00 US
Non
Oui
23 mois
5, 969,417.00
US
10
IBT, LLC
MPCE
Construction
Lycée Alexandre Pétion
26 novembre
2012
7, 696,012.00
US
1, 924,003.00 US
Non
Non
Non
11
CSA Central
Inc.
MPCE
Supervision
Lycée Alexandre Pétion
…Novembre
2012
384,800.00
US
Non
12
VORBE et
Fils
MTPTC
Tronçon Petite Rivière / Petit
Trou
27 décembre
2012
30, 849,737.91 US
13
La Générale
Construction
et Distribution
MTPTC
Place Hugo Chavez
…Novembre
2012
1, 795,000.00
US
144,260.00 US
Non constaté
lors de l'analyse du
contrat
Non constaté
lors de l'analyse du
contrat
212,056.00 US
Non
Non
Non
18 mois
7, 712,434.48 US
Non constaté
lors de l'analyse du
contrat
Non
Non
18 mois
817,279.00 US
Non
Non
Non
Non
Non
248,220.00 US
Page 430 of 656
Revue de la gestion des contrats (Suite)
Résolution du : 15 Avril 2015
Description
des
travaux
Maitre
d'œuvre
Maitre
d'ouvrage
14
Groupe des
Travaux de
Construction
MPCE
Tronçon
Fermathe/Frères
15
ESTRELLA
MPCE
16
SOGEMAT
17
No
Contrat
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
Date
de
signature
Montant
Avance
de
démarrage
Non
47, 612,854.00 US
Non
Non
-----
-----
42 mois
---
Rénovation urbaine Gonaïves
20 décembre
2012
3, 461,727.00
US
Non
Non
-----
-----
24 mois
---
MPCE
Rénovation place publique
St-Anne
27 décembre
2012
10, 736,026.19 US
2, 139,408.58
US
Non constaté
lors de l'analyse
du contrat
-----
-----
10 mois
---
FECINA S.A.
MPCE/
ULCPB
Réhabilitation place publique
Canapé -Vert
Non
29, 562,500.00
Gourdes
7, 390,625.00
Gourdes
Non constaté
lors de l'analyse
du contrat
-----
-----
Non
---
18
CECOM
Consultant
MTPTC
Pont Marigot/ Peredo
Non
10, 736,026.19
US
Non
Non
-----
-----
12 mois
---
19
ESTRELLA
MTPTC
Freycineau / St-Marc
Non
51, 452,645.55 US
Non
Non
-----
-----
12 mois
---
Page 431 of 656
1-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de travaux de construction du marché public de
miragoane et d‟une gare Routière
Localité Miragoane
Maitre d‟œuvre La Générale Construction et Distribution S,A
Montant du contrat 7, 735,135.00 USD
Date de signature du contrat …Novembre 2012
Durée des travaux
Appel d‟offres
24 mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Le quitus (type A) a été émis le 11 janvier 2013 tandis
que la patente le 26 décembre 2012.
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre 2,018,637.00 USD
Commentaires :
Passé gré à gré avec l‟approbation de la CSC/CA et sans le certificat de non objection de la
CNMP, ce contrat est signé en Novembre 2012 dont la date est incomplète, pour un
montant de 7, 735,135.00 USD.
La durée des travaux était de 24 mois .Toutefois, nous n‟avons pas eu les procès-verbaux
de réception provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 11 janvier 2013 et la patente
le 26 décembre 2012.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués.
Ce contrat a été signé bien avant que les ressources ont été disponibles.
Page 432 of 656
Les Personnalités signataires sont :
-
Laurent Salvador LAMOTHE, Ministre du MPCE
-
Patrice MILFORT, Directeur General
-
Nonie MATHIEU, Présidente de la CSC/CA
Quant à ce contrat de travaux de construction du marché public de miragoane et d‟une gare
Routière la route Colladère Cerca-Cavajal, les montants alloués en US à ce projet sont :
Résolution du15 avril 2015
8,600,000
Résolution du 22 juillet 2015
8,455,740
Total
17,055,740
Les décaissemnts se repartissent ainsi :
Résolution du15 avril 2015
144,260
Résolution du 22 juillet 2015 1,874,377
Total
2,018,637
Ce contrat fut l‟objet de l‟evaluation d‟une equipe d‟ingenieurs evaluateurs constatant un
etat d‟avancement des travaux de 34% relaté au tableau « résumé des evaluateurs
physiques des travaux #14 page …. Le montant total decaissé est de US 2,018,637
représentant 26% des travaux.
Page 433 of 656
2-Maitre d‟ouvrage
MPCE
Description des travaux : Contrat de conception et de supervision des travaux de
construction du marché public de miragoane et d‟une gare Routière
Localité Miragoane
Maitre d‟œuvre GROUPE TRAME
Montant du contrat 773,513.50 USD
Date de signature du contrat …Novembre 2012
Durée des travaux
Appel d‟offres
25 mois
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
Le quitus (type C) a été émis le 22 février 2011 tandis
que la patente le 06 Novembre 2012.
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
N/A
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Montant total versé au maitre d‟œuvre
Commentaires :
Passé gré à gré, sans le certificat de non objection de la CNMP, ce contrat est
signé en Novembre 2012 dont la date est incomplète, pour un montant USD 773,513.50.
La durée des travaux était de 25 mois .Toutefois, nous n‟avons pas eu les procès-verbax de
réception provisoire ainsi que ceux de réception définitive.
Quant au quitus fiscal retracé dans le dossier, il a été émis le 22 février 2011 et 06
Novembre 2012.
Les 2 % à prélever pour le compte de la DGI n‟ont pas été effectués
Les Personnalités signataires pour la supervision sont :
-
Laurent Salvador LAMOTHE, Ministre du MPCE
-
Elisabeth COICOU, Président Directeur General
-
Nonie MATHIEU, Présidente de la CSC/CA
Page 434 of 656
AUDIT DES PROJETS EXECUTÉS PAR LE GOUVERNEMENT MARTELLYLAMOTHE :
GTC (Groupe travaux et Construction)
Réhabilitation Tronçon Fermathe / Frère par la firme GTC (Groupe travaux et
Construction)
La firme GTC a signé un contrat avec l‟Etat haïtien pour la construction du tronçon Fermathe
Frère pour un montant de 22 694 900.00. Ce projet est initié pour la première fois par la
résolution du 11 février 2010 du gouvernement Préval Bellerive.
Les modalités de paiements prévues dans l‟article 4 du contrat sont les suivantes :
« Le règlement des travaux se fera, après approbation du Maitre d‟Ouvrage, par
décompte provisoire mensuel »
Les décaissements effectués dans le cadre de ce contrat sont les suivants :
Liste des
décaissements:
Montant marché
Avance de
démarrage
2ème décaissement
3ème décaissement
4ème décaissement
5ème décaissement
6ème décaissement
7ème décaissement
8ème décaissement
9ème décaissement
10ème décaissement
11ème décaissement
Total
Gouv.
Date
#
ordre
Bellerive
Montant
marché
décaissé
%
Dec
8-avr.-10
1-mars-11
50
Bellerive
Conille
demissionnaire
Lamothe
6-avr.-11
148
1-avr.-12
aout 2012
20-sept.12
dec 2012
1-janv.-13
9-mai-14
1-mai-14
1-sept.-14
2 220 000,00 9,8%
6 857 960,00 30,2%
300 000,00
1,3%
968 000,00 4,3%
4 380 118,50 19,3%
336
361
750
1 319 305,77
748 708,55 3,3%
220 272,51 1,0%
1 271 101,26 5,6%
2 000 000,00 8,8%
636 343,53 2,8%
1 773 089,88 7,8%
21 375 594,23 94,2%
Modalités de paiement prévu au contrat
Selon l‟article 4 du contrat sur les modalités de paiement, il est dit :
« Le règlement des travaux se fera, après approbation du Maitre d‟Ouvrage, par
décompte provisoire mensuel »
Irrégularités :
%
Avanc
22 694 900,00
Bellerive
Bellerive
Lamothe
Lamothe
Lamothe
Lamothe
Lamothe
Lamothe
Montant
Travaux non exécutés proportionnellement aux versements effectués
Page 435 of 656
44%
La firme GTC qui a reçu USD 21 375 594,23 sur un total de USD 22 694 900,00, ce qui
représente plus de 94% du marché initial, cette firme n‟a accompli que 44% des travaux
pour lesquels elle avait été engagée, soit 8 kilomètres de route sur 18 kilomètres comme
prévus dans le contrat.
Excès de paiements non conforme au contrat : Six paiements de trop
Les décaissements ont été effectués pour ces travaux comme le montre le tableau ci-dessus de
2010 à 2014.
La Commission a constaté que les décaissements effectués de Septembre 2012 à Septembre
2014 ne correspondaient pas au pourcentage des travaux exécutés.
Le paiement le plus suspect qui ne ressemble pas à un décompte est celui du 9 mai 2014 pour
2 millions de d0llars. Sur quelle base ce paiement de 2,000,000 $ a été réalisé ?
Intérêts de l‟Etat non garantis
En payant les 94% du contrat alors que le degré d‟achèvement n‟est que 44%, les
ordonnateurs impliqués ont mis les intérêts de l‟Etat en danger.
Le rapport du gouvernement ne reflète pas la réalité
Selon le document préparé par le Premier Laurent Lamothe intitulé :
« La transformation D‟Haïti à travers les grand travaux de reconstruction avec le Fonds
PetroCaribe »
Budget : 25 112 854 $ US
Taux d‟exécution : 80 %
Donc, selon le Premier Ministre Laurent Lamothe, avoir réalisé 8 kilomètres de route sur 18
correspond selon ses calculs à un degré d‟achèvement de 80%.
Recommandations :
En violant le contrat d‟exécution des travaux, notamment l‟article traitant des modalités de
paiement voulant que les règlements soient effectués en fonction de l‟avancement des
travaux, les Ordonnateurs impliqués dans ces dossiers ont mis les intérêts de l‟Etat en danger
au profit des intérêts de la firme d‟exécution. De ce fait, ils ont fait des abus de fonction
condamnés par l‟article 5.5 de la loi du 12 mars 2014 portant prévention et répression de la
Corruption.
En plus, il y a violation des articles 97 et 98 de la loi du 1er février 2017 portant sur la
responsabilité des ordonnateurs d‟effectuer des contrôles qui leur incombent en matière de
crédit budgétaires ainsi que l‟article 21 de l‟Arrêté du 16 février 2005 portant règlement
général de la comptabilité publique et les articles 178 et 181 du Décret du 17 mai 2005
portant révision du statut général de la fonction publique.
Page 436 of 656
Les ordonnateurs impliqués dans ces violations sont les suivants :
Postes ministeriels
Titulaires
Periodes
Ministre de l‟Économie et des Finances
Marie Carmelle Jean
Marie
3 avril 2014-18 janv
2015
Ministre des Travaux Public, Transports,
Énergie et Communications.
Jacques Rousseau
16 mai 2012-
Ministre de la Planification et de la
coopération externe
Laurent Lamothe
10 aout 2012- 14 dec
2014
CONSORTIUM TROPIC BUILD WORLDWIDE HOLDING LLC. & JRD
CONSTRUCTION S.A.
Acquisition et installation de maisonnettes et centres communautaires préfabriqués par
le consortium TROPIC BUILD WORLDWIDE HOLDING LLC. & JRD
CONSTRUCTION S.A.
Le consortium tropic build worlwide holding llc & jrd construction S.A. a signé un
contrat pour l‟acquisition et l‟installation de maisonnettes et centres communautaires
préfabriqués. Le contrat a été signé par l‟ancien Premier Ministre Bellerive le 21 Juillet 2011
pour un montant de USD2,995,400.00.
Une avance de démarrage de 60% en toute urgence
L‟ordre de décaissement pour la première tranche a été signé le jour même par le Ministre
Bellerive pour le montant de $ USD 1,797,240.00.
Un paiement de trop :
La firme n‟exécute aucun des travaux mentionnés dans le contrats mais, Mme Josépha
Gauthier ordonne un deuxième décaissement de USD802,780.00 en faveur de cette firme le 6
juin 2012.
Liste des
décaissements:
MPCE
#
Date
ordre
21-juil.Montant marche
Bellerive
11
21-juil.Avance de démarrage Bellerive
11
J.
6-juin2eme décaissement
GAUTHIER
12
Total
Montant
marché
2 995
400,00
Montant
%
décaissement % Dec Avanc
1 797 240,00 60,0%
802 780,00 26,8%
395 380,00 2 600 020,00 86,8%
Page 437 of 656
0%
Madame Josepha Raymond Gauthier a occupé le poste de Ministre de la Planification et de la
Coopération Externe du Gouvernement Lamothe du 16 Mai 2012 au 10 Aout 2012 et le
ministre des finances à cette époque a été Marie Carmel Jean Marie.
Cette firme est associée à une firme haïtienne du nom de: JRD construction (Ayant pour
dénomination commerciale Denis & Co) dont le représentant légal est M. Jean Renel Denis
(005-014-588-3), Ingénieur au CNE et dont l‟adresse stipulée est Delmas #376, Haïti,
nouvelle société en nom collectif à Pétion-Ville, Route de Frères, Rue Saint-Louis Jeanty #
34.
M. Jean Renel Denis et Mme Jeanne Asmine Louissaint Denis (001-146-857-8) (Viceprésidente) Enregistré au Ministère du Commerce et de l‟Industrie au No F005, Folio 288
registre XI en date du 08 janvier 2015.
N.B : A voir le contrat pour conclure. Toute fois, la conclusion ne doit être différente de
GTC.
Recommandations :
En violant le contrat d‟exécution des travaux, notamment l‟article traitant des modalités de
paiement, les Ordonnateurs impliqués dans ces dossiers ont mis les intérêts de l‟Etat en
danger au profit des intérêts de la firme d‟exécution. De ce fait, ils ont fait des abus de
fonction condamnés par l‟article 5.5 de la loi du 12 mars 2014 portant prévention et
répression de la Corruption.
En plus, il y a violation des articles 97 et 98 de la loi du 1er février 2017 portant sur la
responsabilité des ordonnateurs d‟effectuer des contrôles qui leur incombent en matière de
crédit budgétaires ainsi que l‟article 21 de l‟Arrêté du 16 février 2005 portant règlement
général de la comptabilité publique et les articles 178 et 181 du Décret du 17 mai 2005
portant révision du statut général de la fonction publique.
Les ordonnateurs impliqués dans ces violations sont les suivants :
Postes ministeriels
Titulaires
Periodes
Ministre de l‟Économie et des Finances
Marie Carmelle Jean
Marie
8 mai 2012-11 avril
2013
Ministre de la Planification et de la
coopération externe
Josépha Raymond
Gauthier
16 mai 2012-10 aout
2012
N.B : A verifier si le dossier n‟a pas été initié par un ministre sectoriel. Si tel est le cas, son
nom doit ajouter à la liste.
Page 438 of 656
Constructora Hadom E.I.R.L
La compagnie dominicaine Hadom, en charge de 29 projets de construction à travers un
contrat signé, après le séisme de 2010, entre la firme et l‟Etat haïtien pour un montant de 300
millions de dollars américains, sollicite le décaissement de 52 millions de dollars américains
pour la poursuite des chantiers en cours.
22 ouvrages sont déjà achevés ou inaugurés, selon le directeur de la compagnie, José Elias
Hernandez, qui confie n‟avoir déjà reçu de l‟Etat haïtien que 130 millions de dollars
américains des 300 millions.
Construction du Ministère des Affaires Etrangères ( Firme Hadom)
Le coût de construction du Ministère des Affaires Étrangères, est estimé à 14 721 556 $
(Financement : PetroCaribe-Trésor public). La fin des travaux était prévue pour mars 2014.
La Firme HADOM qui a reçu 10 millions de dollars comme avance de démarrage sur la
construction du Ministère des Affaires Etrangères, soit 68% pourcent de la somme totale
prévue n‟a jamais lancé ces travaux.
Selon le rapport « La transformation D‟Haïti à travers les grand travaux de reconstruction
avec les Fonds PetroCaribe » publié par le Gouvernement Lamothe, le taux d‟exécution est
de 17% pour un taux de décaissement de 68%.
Irrégularités
Travaux non exécutés
La firme HADOM a encaissé les 10 millions de dollars d‟avance de démarrage, mais travaux
n‟ont même pas démarre.
N.B : A voir le contrat pour voir les modalités d‟exécution, les garanties prévues au contrat
pour conclure et les modalités en cas d‟arrêt des travaux ou d‟annulation du contrat.
A voir également les démarches initiées par le gouvernement en vue de la relance des travaux
ou le recouvrement de l‟avance de démarrage.
Recommandations
L‟Etat haïtien doit au minimum entreprendre toutes les mesures au niveau de la Justice en
vue de récupérer l‟avance de démarrage consenties, puisque les travaux ne sont pas exécutés.
En plus, le Parquet de Port-au-Prince doit mener une enquête en vue de voir s‟il n‟y a pas
complice au niveau de l‟Etat qui aide les ravisseurs a s‟emparer de cette forte somme.
Page 439 of 656
Construction du Palais législatif (Firme Hadom)
Le coût de construction du Parlement, est estimé à 33.7 millions de dollars, (Financement :
allègement de la dette FMI). Les travaux du Palais Législatif ont démarré en mars 2013 et
devraient prendre fin en janvier 2015.
Le bâtiment sera constitué de neuf (9) étages dont la construction a été confiée
À la compagnie dominicaine Constructora HADOM E.I.R.I.
La Firme HADOM a reçu 10 millions de dollars comme avance de démarrage sur la
construction du Parlement Haïtien, soit 30 pourcent de la somme totale prévue n‟a posé que
vingt pieux comme travaux pour cette dite somme.
Le rapport d‟Audit de la Commission Conille avait recommandé d‟annuler tous les contrats
signés par son prédécesseur dont les travaux n‟ont pas pu être exécutés et de les renégocier.
Irrégularités
Non éligibilité de la firme d‟exécution.
La Firme haïtienne CONSTRUCTURA HADOM S.A, adjudicataire du marché de
construction du Palais Législatif pour un montant de $ USD 33,765,66.08, a été créée le 28
juillet 2010 (Réf . Moniteur du 13 septembre 2010). Au moment de la signature du contrat par
l‟ex -Premier Ministre, Jean- Max BELLERIVE, le 8 novembre 2010, elle avait près de trois
(3) mois d‟existence. Donc, elle ne répond pas au critère des cinq (5) années d‟expérience tel
qu‟énoncé dans le DAO. Pour l‟attribution de ce marché, le Comité d‟Evaluation des Offres
était constitué de : Hervé DAY, Michel CONTENT et Lionel GRAND‟PIERRE.
Travaux non exécutés
La firme HADOM a encaissé les 10 millions de dollars d‟avance de démarrage, alors que les
travaux n‟ont fait démarrer.
N.B : A voir le contrat pour voir les modalités d‟exécution, les garanties prévues au contrat
pour conclure et les modalités en cas d‟arrêt des travaux ou d‟annulation du contrat.
A voir également les démarches initiées par le gouvernement en vue de la relance des travaux
ou le recouvrement de l‟avance de démarrage.
Recommandations :
L‟Etat haïtien doit au minimum entreprendre toutes les mesures au niveau de la Justice en
vue de récupérer l‟avance de démarrage consenties, puisque les travaux ne sont pas exécutés.
Page 440 of 656
En plus, le Parquet de Port-au-Prince doit mener une enquête en vue de voir s‟il n‟y a pas
complice au niveau de l‟Etat qui aide les ravisseurs a s‟emparer de cette forte somme.
Construction du Ministère de l‟intérieur (Firme Hadom puis OECC)
Le coût de construction du Ministère de l'Intérieur est estimé à 14 721 556 $ US
(Financement : PetroCaribe-Trésor public). Cette construction est prévue dans la résolution
du 20 mai 2011 du Gouvernement Preval Bellerive pour un montant de 15,000,000 $
entièrement décaissée.
La Firme HADOM après le versement de plus de 80% sur les montants totaux sur la
construction des ministères de L‟intérieur n‟a pu faire avancer ces travaux et a été obligée de
céder ses droits à la firme OECC pour que ces travaux puissent être terminés avec des
surcouts pour l‟Etat Haïtien.
Irrégularités :
Travaux non exécutés
La firme HADOM avait encaissé plus de 80% du contrat sans avancement réel avant l‟arrêt
des travaux et son transfert à l‟OECC.
Ministère du Commerce (Firme Hadom, puis OECC)
Le coût de construction du Ministère du Commerce est estimé à 17,5 millions de dollars
(Financement : PetroCaribe-Trésor public). Cette construction est prévue dans la résolution
du 18 juillet 2012 du Gouvernement Martelly-Lamothe pour un montant de 10,000,000 $
entièrement décaissé.
La Firme HADOM après le versement de plus de 80% sur les montants totaux sur la
construction des ministères du Commerce n‟a pu faire avancer ces travaux et a été obligée de
céder ses droits à la firme OECC pour que ces travaux puissent être terminés avec des
surcouts pour l‟Etat Haïtien.
Irrégularités
Travaux non exécutés
La firme HADOM avait encaissé plus de 80% du contrat sans avancement réel avant l‟arrêt
des travaux et son transfert à l‟OECC.
N.B :
A rechercher combien d‟argent a été versé à la firme HADOM avant l‟arrêt des travaux et
déterminer le degré d‟achèvement de ces travaux au moment de l‟arrêt.
Recommandations
Page 441 of 656
L‟Etat haïtien doit au minimum entreprendre toutes les mesures au niveau de la Justice en
vue de récupérer l‟avance de démarrage consenties, puisque les travaux ne sont pas exécutés.
En plus, le Parquet de Port-au-Prince doit mener une enquête en vue de voir s‟il n‟y a pas
complice au niveau de l‟Etat qui aide les ravisseurs à s‟emparer de cette forte somme.
Irrégularités :
Travaux non exécutés proportionnellement aux versements effectués
La firme INGENERIA ESTRELLA a reçu USD 5,332,009.23 sur un total de USD 13 635
730, ce qui représente plus de 39% du marché initial, alors que cette firme n‟a accompli
que 12% des travaux.
Construction Aéroport de Ile à Vache (Firme Estrella)
Le projet, intitulé « Destination touristique Ile-à-Vache », prévoit la tenue d'importants
chantiers dont la construction d'un aéroport international standardisé avec une piste
d'atterrissage de 2,6 kms.
Le coût de construction de l‟Aéroport d‟Ile a Vache est estimé à 19 525 143 millions de
dollars (Financement : PetroCaribe). Les travaux ont démarré le 20 aout 2013. Cette
construction est prévue dans les résolutions suivantes :
Résolutions
21-déc-12
Total
Montants Décaissement
s
4989241,96 4989241,96
4 989 241,96 4 989 241,96
Ce qui correspond a un taux de décaissement de 25% pour un degré d‟avancement de 10%
(Selon le rapport du Gouvernement Lamothe).
Irrégularités
Travaux non exécutés proportionnellement aux versements effectués
La firme ESTRELLA a encaissé 25% du contrat, alors que le degré d‟achèvement des
travaux ne dépasse pas 10%.
Recommandations
L‟Etat haïtien doit au minimum entreprendre toutes les mesures au niveau de la Justice en
vue de récupérer l‟avance de démarrage consenties, puisque les travaux ne sont pas exécutés.
Page 442 of 656
En plus, le Parquet de Port-au-Prince doit mener une enquête en vue de voir s‟il n‟y a pas de
complice au niveau de l‟Etat qui aide les ravisseurs à s‟emparer de cette somme.
Construction de l‟Aéroport des Cayes (Firme Estrella)
Le coût de construction de l‟Aéroport d‟Ile a Vache est estimé à 26 436 985 millions de
dollars (Financement : PetroCaribe). Cette construction est prévue dans les résolutions
suivantes :
Résolutions
21-déc-12
22-juil-15
Total
Montants Décaissements
7242448,64
4947368,42
12 189 817,06
7242448,64
0.00
7 242 448,64
Ce qui correspond à un taux de décaissement de 27% pour un degré d‟avancement de 10%
(Selon le rapport du Gouverment Lamothe).
Le Premier Ministre, Laurent Lamothe procèdera officiellement, ce 1er février 2013, à la
pose de la première pierre de l‟aéroport international des Cayes.
Les travaux de construction de l'aéroport international des Cayes sont exécutés par la firme
dominicaine Estrella. Il faudra attendre fin 2014 pour que la construction puisse être achevée.
Irrégularités
Travaux non exécutés proportionnellement aux versements effectués
La firme ESTRELLA a encaissé 25% du contrat, alors que le degré d‟achèvement des
travaux ne dépasse pas 10%.
Recommandations
L‟Etat haïtien doit au minimum entreprendre toutes les mesures au niveau de la Justice en
vue de récupérer l‟avance de démarrage consenties, puisque les travaux ne sont pas exécutés.
En plus, le Parquet de Port-au-Prince doit mener une enquête en vue de voir s‟il n‟y a pas de
complice au niveau de l‟Etat qui aide les ravisseurs à s‟emparer de cette somme.
Page 443 of 656
IBT Group Haïti
La firme IBT a bénéficié tout un portefeuille de 56.5 millions de dollars de projets sous
l‟administration Martelly-Lamothe :
Projets
Résolutions
Construction de la Route neuf, 9 KM;
11, 12
Construction du Lycée Toussaint Louverture ; 7, 8, 11, 12, 13
Construction du marché public de Fontamara
;
7, 11, 12 & 13
Construction du Lycée Alexandre Pétion ;
7,8, 11, 12, 13
Construction de l‟hôpital Sans Fil ;
Construction de SIMBI Continental.
Réhabilitation l'HUEH
Total
Montant
10 636 364,00
8 029 900,00
15 647 900,00
7 696 012,00
6 000 404,30
6 000 404,30
2 500 000,00
56 510 984,60
Inéligibilité de la firme IBT
Tout porte à croire que la firme IBT ne réunissent pas les conditions d‟éligibilité à pouvoir
bénéficier tous ces contrats. Les raisons sont les suivantes :
Le non respect des critères d‟ordre financier qui déterminent la capacité de cette
firme à exécuter les projets qui lui sont confiés. La firme n‟a aucun patrimoine, ni en
Floride ni en Haïti pour justifier du volume des contrats accordé. Il est à noter qu‟un
seul de ces contrats équivaut au chiffre d‟affaire annuel de la société IBT en
Floride.
Manque d‟expérience sur le marché local. La firme n‟a pas les cinq années
d‟expérience requise localement quoiqu‟il soit stipulé qu‟elle ait déjà travaillée par le
passé pour l‟Etat haïtien. En fait la Ministre signe avec IBT de Floride en novembre
2012, sans appel à la compétitivité. IBT n‟est autorisée à fonctionner en Haïti, qu‟en
mars 2013, date à laquelle elle parait au Moniteur avec l‟autorisation du Ministre
Laleau, alors Ministre du Commerce. De plus, en 2013, la firme s‟arroge le droit
unilatéral de transférer son contrat d‟IBT Floride à IBT Haïti, deux compagnies
légalement distinctes
Absence de certificat de non objection délivré par le CNMP, ce qui est contraire à
la loi sur les passations de marchés publics.
Absence de caution en bonne et due forme. La garantie est un bon à ordre qui ne
repose sur rien et qui est signé par une personne déléguée par les actionnaires de la
Page 444 of 656
société de Floride d‟autant que la version américaine de IBT est une « limited
Liability company » ce qui veut dire une « une compagnie à responsabilité limitée ».
Il s‟agit « d‟une forme juridique de société qui prémunit ses propriétaires d'une
responsabilité limitée… ». La version haïtienne de cette entreprise soit IBT Haïti,
n‟offre guère plus de garantie, n‟ayant quasiment aucun actif à son nom.
Construction du marché public de Fontamara (Firme IBT Group Haiti)
Le marché public est construit sur un terrain de plus de 15,000 m2 aura une superficie
d‟environ 7,000 m2 et inclura 300 étals de vente. Un espace de stationnement de près de
4,000 m2 d‟une capacité d‟accueil d‟environ 140 automobiles sera également doté de
stationnements pour des personnes à mobilité réduite et des stationnements. Il est prévu de
construire un quai sur la côte, près du marché, au profit des bateaux de pêche de la zone.
Un projet inachevé :
Le coût de construction du Marché public de Fontamara est estimé à 15,647,900 dollars
(Financement : PetroCaribe). Cette construction est prévue par les resolutions suivantes :
Résolutions
21-déc-12
15-avr-15
22-juil-15
06-janv-16
Total
Montants Décaissements
4 102 879,88
4 102 879,88
3 247 964,80
3 247 964,80
4 974 035,29
658 972,55
795 195,48
0,00
13 120 075,45
8 009 817,23
Ce qui correspond à un taux de décaissement de 51% pour un degré d‟avancement de 30%
(Selon le rapport du Gouvernement Lamothe au 23 février 2015).
Irrégularités
Travaux non exécutés proportionnellement aux versements effectués
La firme IBT a encaissé 51% du contrat, alors que le degré d‟achèvement des travaux ne
dépasse pas 30%.
Recommandations
L‟Etat haïtien doit au minimum entreprendre toutes les démarches en vue de faire redémarrer
le projet qui est d‟une importance capitale pour les riverains.
En plus, la Commission doit analyser en profondeur les avenants.
Page 445 of 656
L‟hôpital de Martissant (Firme IBT Group Haiti)
Le coût de construction de l‟Hôpital de Martissant est estimé à 6,000,404.30 dollars
(Financement : PetroCaribe). Cette construction est prévue par la résolution du 21 décembre
2012.
Placé sur une superficie de près de 5000m2, ce nouveau centre hospitalier comportera
environ 70 lits dont une quarantaine pour hospitalisation.
L‟Hôpital Simbie Continental pourra accueillir plus de 400 patients par jour. Cette nouvelle
structure sanitaire offrira tous les services de base, tels : pédiatrie, néonatologie, soins
intensifs, chirurgie de traumatologie, médecine interne etc.
Non encore achevé, l‟hôpital Simbi continental de Martissant, est destiné aux agents de la
Police nationale d‟Haïti, d‟après ce qu‟on peut lire dans un communiqué publié le lundi 27
mars.
Calendrier de paiement
Le contrat prévoit le calendrier de paiement suivant :
Prix contrat
Avance de démarrage
Deuxième décaissement
Troisième décaissement
Quatrième décaissement
Contrat
Pmt
Avancement
6 000 404,30
25%
35%
20%
30%
55%
10%
100%
100%
Décaissements :
Liste des décaissements:
Montant
Date
Prix contrat
6-sept.Avance de démarrage
13
Deuxième décaissement 7-juil.-14
Montant
#
ordre contrat
décaissé
6 000 404,30
577
785
1 500 101,08
4 500 303,22
6 000 404,30
%
% Dec Avanc
25%
75%
100%
Irrégularités :
Page 446 of 656
Excès de paiement par rapport à ce qui prévu au contrat
Le MPCE a payé 75% lors du deuxième paiement en date du 7 juillet 2014, alors que le
contrat prévoit seulement 35% lorsque le degré d‟achèvement atteint 20%. A cette date, le
MPCE était Laurent Lamothe, la Ministre de la Sante Publique était Florence Duperval
Guillaume et la Ministre des Finances était Marie Carmelle Jean Marie.
Le contrat prévoyait payer les 100% uniquement lorsque les travaux atteindraient les 100%.
Intérêts de l‟Etat non garantis
En payant les 100% du contrat alors que le degré d‟achèvement restait faible, les
ordonnateurs mettraient les intérêts de l‟Etat en danger.
Les ordonnateurs suscités commettent l‟abus de fonction pour avoir autoriser des paiements
excessifs au profit du fournisseur tout en mettant les intérêts de l‟Etat en danger.
Surfacturation de certains travaux ont été constatés:
La réhabilitation/Construction de la route de minoterie/Lafiteau affiche un écart positif de US
489 supérieur au coût du marché pour des travaux similaires réalisés pendant la même
période.
Surfacturation du volume de travaux supérieurs à la quantité réelle :
La réhabilitation de la route Cerca-Cavajal/Colladère a une distance de 10,5 Km, tandis que
le contrat a été signé pour une distance de 13 Km, sans oublier que ledit contrat a été
négocié pour 15 Km, ajouté à un avenant de 2 KM ; ce qui fait passer le nombre de Km payé
à 17.
Construction de la place Hugo Chavez :
Le contrat initial relatif à la construction de la place Hugo Chavez ne prévoyait pas de
travaux additionnels. En dépit de deux (2) avenants apportés audit contrat, une phase 2 a été
négociée.
L‟hôpital Simbi :
Un contrat a été négocié pour la construction de l‟hôpital Simbi à Martissant et un autre pour
la construction de l‟hôpital Sans-Fil. Les deux contrats comportant le même montant ont été
signés à la même date par le même maitre d‟œuvre, tandis qu‟il est mentionné à l‟article 1
que les travaux relatifs aux deux contrats seront exécutés à l‟hôpital Simbi.
Travaux exécutés à l‟Ile à Vache
Page 447 of 656
Des multiples inégalités sont constatées dans les ressources utilisées dans le Projet de
Développement de l‟Ile à Vache. Des valeurs sont versées, alors qu‟aucune pièce
justificative ne soit fournie.
Le Viaduc de Delmas
Les éléments constituant ce projet sont évalués à 13 millions de dollars, tandis que, le contrat
a été négocié pour US 21,502,742 dégageant un écart de 8,502,742 US.
Des avenants dépassants le seuil prévu par la loi.
Les deux avenants pris dans l‟exécution des travaux relatifs à la construction de la route
reliant la baie de l‟Acul à carrefour Barrière battant ont dépassé le seuil prévu par la loi
jusqu‟à atteindre 82% du cot initial du contrat.
Le BMPAD agissant en tant que gestionnaire du fonds et exécutant des projets
financés par le dit fonds.
Page 448 of 656
GOUVERNEMENT MARTELLY -PAUL
XXX Résolution du 22 Juillet 2015
Page 449 of 656
Résolution du 22 Juillet 2015
Durée de la résolution d‟urgence du 22 Juillet 2015
Pouvoirs des autorités
Gouvernement MARTELLY / PAUL
Le Cabinet suivant, formait le gouvernement dirigé par le premier ministre Evans Paul. Il a
été installé le 19 Janvier et comprenait 17 ministres titulaires d‟un département dont 4
femmes, un ministre délégué auprès du premier ministre et 16 secrétaires d‟état (dont 2
femmes), ainsi deux anciens ministres du gouvernement précèdent intégrèrent le cabinet et
sept ministres sortant ont été maintenus. Il est le seul premier ministre nommé par le
président élu à ne pas être dûment ratifié par les deux chambres. Le cabinet resta après le
départ de Martelly (7 Février 2016) pour liquider les affaires jusqu‟à l‟investiture d‟Enex
Jean Charles.
Composition du gouvernement MARTELLY / PAUL
Il est composé des Ministres suivants :
Prénom
Duly
Victor
Jean-François
Hervé
Rotchild Jr.
Yves Rose
Dithny Joan
Lener A.I.
Wilson
Nesmy
Pieriche
Réginald
Pierre Richard
Yves Germain
Florence Duperval
Stéphanie Balmir
Jacques
Nom
BRUTUS
BENOIT
THOMAS
DAY
FRANCOIS
MORQUETTE
RATON
RENAULD
LALEAU
MANIGAT
OLIVIER
DELVA
CASIMIR
JOSEPH
GUILLAUME
VILLEDROUIN
ROUSSEAU
Jean-Fritz
JEAN-LOUIS
Fonction
Affaires Etrangères et des cultes
Affaires Sociales
Agriculture et des Ressources Naturelles
Commerce et de l‟Industrie
Communication
Condition Féminine
Culture
Défense
Economie et des Finances
Education Nationale
Haïtiens vivant à l‟Etranger
Intérieur et des Collectivités Territoriales
Justice
Planification et Coopérative Externe
Santé Publique et de la Population
Tourisme
Travaux Publics, Transports et
Communication
Ministre Délégué auprès du Premier
Ministre chargé des questions Electorales.
Page 450 of 656
Résolution du 22 Juillet 2015
#
1.
2.
Liste des projets
Lutte contre la pauvreté et l'exclusion Sociale
Intervention d'urgence
3.
Construction de Silos de stockage pour sécurité Alimentaire
3,024,732
4.
Appui à la PNH Renforcement des Capacités d'intervention de La Police
Nationale (PNH)
6,000,000
5.
Conception et Mise en Oeuvre de Projets de Developpement territorial
15,000,000
6.
Fonds de Supervision des travaux Relatifs au projets d'Infrastructures
3,675,721
7.
Rénovation urbaine a Mirebalais et Lascahobas
4,000,000
8.
Construction d'infrastructure Socio-Communautaire au Wharf de Jérémie à Cité
Soleil
5,000,000
9.
Réhabilitation Place Publique "Sainte Anne"
180,851
10.
Réhabilitation Place Publique "Canape vert"
319,149
11.
Réhabilitation Place Publique "Geffrard"
180,851
12.
Réhabilitation Place Publique "Aeroport Hugo Chavez"
2,065,145
13.
Réhabilitation Tronçon Fermathe-FrèresVia Soisson, Duplan,Girardeau et
Collectrices Rue Météllus, Méyotte-Frères, Thomassin 25, Fermathe 45 et
Montagne Noire
1,680,000
14.
Collecte des Ordures
15.
Construction Marché Public de Fontamara
4,974,035
16.
Reconstruction du lycée Toussaint Louverture (incluant Supervision)
1,816,428
17.
Reconstructin du lycée Alexandre Pétion (incluant Supervision)
Réhabilitation , Construction et Aménagement d'infrastructures Sportives
(Installation de Gazon Synthétique, Hinche, Saint Louis du Nord et Thomassin
4,349,963
18.
Montant US
12,344,681
10,000,000
596,427
6,061,527
19.
Construction de Médiathèques A Saint Louis Du Nord
638,626
20.
Construction De Médiathèques A Jean Rabel
328,989
21.
Construction Gare routière et marché public A Miragoane( incluant la
supervision)
22.
Réhabilitation Place Publique "Occide Jeanty"
23.
Construction et Réhabilitation d'hopitaux (HUEH, St Michel de Jacmel, Simbi
Continal de Martissant, Hopital Sans fil, Centre de Trauma, hopital de Bon repos)
12,000,000
24.
Plan spécial des Cayes
2,500,000
25.
Construction Viaduc Delmas/ Nazon
4,740,243
26.
Réhabilitation de la route de Tabarre
7,000,000
27.
28.
Réhabilitation tronçon Port de Paix, Port-Margot
Réhabilitation Carrefour Dufort Jacmel
5,000,000
396,633
29.
30.
Réhabilitation de la route Cayes-Jérémie-A033178-001 Source MTPTC
Réhabilitation Route Petite rivière de Nippes / Petit Trou de Nippes
8,764,295
3,212,283
31.
Réhabilitation Tronçon Rn1 Frecyneau/ St Marc/Bigot/ (Gonaives) Construction
Bigot-Carrefour Joffre, Biennac-Rue Clerveau et Rn1 Marchand (4)
672,379
32.
Construction d'un Pont sur la rivière Marigot/ Peredo
335,111
33.
Construction d'un Pont sur la rivière Gauche( route Jacmel-La vallee de Jacmel)
8,455,740
300,544
3,126,963
Page 451 of 656
34.
Réhabilitation du tronçon Carrefour 44/ Cotes de fer
35.
Débarcadaires Saint- Louis du Nord
500,000
36.
Débarcadaires faucault
250,000
37.
Pont Lahaie Dame Marie
500,000
38.
Réabilitation de la route 9
4,636,364
39.
Réabilitation de la route de pernier
4,636,364
40.
Aménagement du bord de mer de la ville du Cap Haitien
2,000,000
41.
Travaux de réhabilitation et de réparation des rues
3,475,548
42.
Curage métallique et manuel
Projet de construction et d'équipements de Dortoirs et de Résidences pour
professeurs
3,958,263
44.
Renforcement des structures des batiments de l'université de Limonade
2,000,000
45.
Construction de batiments et logements Publics ULCBP (note #3)
5,000,000
43.
TOTAL
7,224,067
1,000,000
174,308,966
Page 452 of 656
Résolution du 22 Juillet 2015
Institution
Nature du projet
Localité
Nouvelle programmation
de la résolution du 22
juillet 2015 après
désaffectation
MAST/FAES
Lutte contre la pauvreté et
l'exclusion Sociale
National
12,344,681
MEF
Montant
decaissé
No Dec.
8,909,793
967
National
1,901,524
988
National
1,823,086
989
National
1,949,062
990
National
2,361,462
1009
Intervention d'urgence
Montant a
decaisser
3,434,888
10,000,000
Intervention d'urgence
Intervention d'urgence
Intervention d'urgence
Intervention d'urgence
10,000,000
MEFBMPAD
Construction de Silos de
stockage pour sécurité
Alimentaire
Construction de Silos de
stockage pour sécurité
Alimentaire
Construction de Silos de
stockage pour sécurité
Alimentaire
Construction de Silos de
stockage pour sécurité
Alimentaire
Construction de Silos de
stockage pour sécurité
Alimentaire
MJSP-PNH
National
35,267
National
811,640
National
51,300
National
2,126,526
3,024,732
-
National
3,000,000
955
National
3,000,000
956
6,000,000
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
3,024,732
6,000,000
Sous total
MPCE
1,964,866
3,024,732
Sous total
Appui à la PNH
Renforcement des
Capacités d'intervention
de La Police Nationale
(PNH)
Appui à la PNH
Renforcement des
Capacités d'intervention de
La Police Nationale (PNH)
Appui à la PNH
Renforcement des
Capacités d'intervention de
La Police Nationale (PNH)
8,035,134
6,000,000
-
15,000,000
National
2,466,837
954
Page 453 of 656
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
National
436,746
National
(1,514,319)
National
(1,328,806)
951
Retour de
fonds par le
MEF/DGB/
ASIP/8000
No. 01908
du 5 juin
2015
Retour de
fonds par le
MEF/DGB/
ASIP/8000
No. 01909
du 5 juin
2015
National
403,321
978
National
5,173,053
983
National
1,601,401
984
National
463,143
987
National
1,654,799
992
National
238,544
999
National
63,536
1000
National
1,810,806
1003
National
528,271
1008
National
1,044,936
1005
National
410,520
1007
National
538,523
1010
National
23,539
1012
National
128,464
1021
Page 454 of 656
Conception et Mise en
Oeuvre de Projets de
Developpement territorial
National
Sous total
MPCE
15,000,000
Fonds de Supervision des
travaux Relatifs au
projets d'Infrastructures
Fonds de Supervision des
travaux Relatifs au projets
d'Infrastructures
Fonds de Supervision des
travaux Relatifs au projets
d'Infrastructures
Fonds de Supervision des
travaux Relatifs au projets
d'Infrastructures
Fonds de Supervision des
travaux Relatifs au projets
d'Infrastructures
14,165,603
834,397
National
316,648
952
National
59,530
968
National
52,286
998
National
90,934
1024
3,675,721
Rénovation urbaine a
Mirebalais et Lascahobas
519,398
3,156,322
4,000,000
Rénovation urbaine a
Mirebalais et Lascahobas
Centre
546,101
975
Rénovation urbaine a
Mirebalais et Lascahobas
Centre
1,983,310
1006
Sous total
MPCE
1023
3,675,721
Sous total
MPCE
22,291
4,000,000
Construction
d'infrastructure SocioCommunautaire au
Wharf de Jérémie à Cité
Soleil
Construction
d'infrastructure SocioCommunautaire au Wharf
de Jérémie à Cité Soleil
Construction
d'infrastructure SocioCommunautaire au Wharf
de Jérémie à Cité Soleil
Construction
d'infrastructure SocioCommunautaire au Wharf
de Jérémie à Cité Soleil
Construction
d'infrastructure SocioCommunautaire au Wharf
de Jérémie à Cité Soleil
2,529,411
1,470,589
5,000,000
Ouest
865,885
966
Ouest
1,251,634
1011
Ouest
359,614
1014
Ouest
498,538
1020
Sous total
5,000,000
2,975,670
2,024,330
MPCE
Réhabilitation Place
Publique "Sainte Anne"
Ouest
180,851
-
180,851
MPCE
Réhabilitation Place
Publique "Canape vert"
Ouest
319,149
-
319,149
Page 455 of 656
MPCE
Réhabilitation Place
Publique "Geffrard"
Ouest
180,851
-
MPCE
Réhabilitation Place
Publique "Aeroport Hugo
Chavez"
Ouest
2,065,145
827,463
986
1,237,682
MPCE
Réhabilitation Tronçon
Fermathe-FrèresVia
Soisson,
Duplan,Girardeau et
Collectrices Rue Météllus,
Méyotte-Frères,
Thomassin 25, Fermathe
45 et Montagne Noire
Ouest
1,680,000
317,500
994
1,362,500
National
596,427
596,427
991
-
Ouest
4,974,035
658,973
1004
4,315,063
Ouest
1,816,428
1,176,316
995
640,112
Ouest
4,349,963
1,427,762
995
2,922,202
National
6,061,527
3,892,948
960
594,215
1001
180,851
Collecte des Ordures
MPCE
MPCE
MPCE
MPCE
MPCE
Sous total
Construction Marché
Public de Fontamara
Reconstruction du lycée
Toussaint Louverture
(incluant Supervision)
Reconstructin du lycée
Alexandre Pétion
(incluant Supervision)
Réhabilitation ,
Construction et
Aménagement
d'infrastructures
Sportives (Installation de
Gazon Synthétique,
Hinche, Saint Louis du
Nord et Thomassin
Réhabilitation ,
Construction et
Aménagement
d'infrastructures Sportives
(Installation de Gazon
Synthétique, Hinche, Saint
Louis du Nord et
Thomassin
Réhabilitation ,
Construction et
Aménagement
d'infrastructures Sportives
(Installation de Gazon
Synthétique, Hinche, Saint
Louis du Nord et
Thomassin
6,061,527
4,487,163
1,574,364
Page 456 of 656
MPCE
Construction de
Médiathèques A Port De
Paix
NordOuest
387,046
387,046
982
-
MPCE
Construction de
Médiathèques A Saint
Louis Du Nord
NordOuest
638,626
638,626
982
-
MPCE
Construction De
Médiathèques A Jean
Rabel
NordOuest
328,989
328,989
982
-
Nippes
8,455,740
Nippes
1,489,716
957
Nippes
100,572
969
Nippes
19,168
1011
Nippes
239,581
1013
Nippes
25,340
1025
MPCE
MPCEULCB
MSPP
Construction Gare
routière et marché public
A Miragoane( incluant la
supervision)
Construction Gare routière
et marché public A
Miragoane( incluant la
supervision)
Construction Gare routière
et marché public A
Miragoane( incluant la
supervision)
Construction Gare routière
et marché public A
Miragoane( incluant la
supervision)
Construction Gare routière
et marché public A
Miragoane( incluant la
supervision)
Construction Gare routière
et marché public A
Miragoane( incluant la
supervision)
Réhabilitation Place
Publique "Occide
Jeanty"
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal
de Martissant, Hopital
Sans fil, Centre de
Trauma, hopital de Bon
repos)
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
8,455,740
1,874,377
300,544
93,620
1022
National
266,936
953
National
1,881,121
958
Ouest
6,581,363
206,924
12,000,000
Page 457 of 656
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
Construction et
Réhabilitation d'hopitaux
(HUEH, St Michel de
Jacmel, Simbi Continal de
Martissant, Hopital Sans
fil, Centre de Trauma,
hopital de Bon repos)
National
219,190
965
National
218,734
985
National
116,200
993
National
524,587
1016
National
749,000
1024
Sous total
12,000,000
3,975,768
8,024,232
2,500,000
-
2,500,000
Plan spécial des Cayes
MT
MTPTC
Sud
Construction Viaduc
Delmas/ Nazon
4,740,243
Construction Viaduc
Delmas/ Nazon
Ouest
2,113,167
973
Construction Viaduc
Delmas/ Nazon
Ouest
1,602,250
977
4,740,243
3,715,416
1,024,827
MTPTC
Réhabilitation de la route
de Tabarre
Ouest
7,000,000
4,363,349
970
2,636,651
MTPTC
Réhabilitation tronçon
Port de Paix, PortMargot
National
5,000,000
529,474
1018
4,470,526
MTPTC
Réhabilitation Carrefour
Dufort Jacmel
National
396,633
396,633
971
-
National
8,764,295
MTPTC
Réhabilitation de la route
Cayes-Jérémie-A033178001 Source MTPTC
Page 458 of 656
Réhabilitation de la route
Cayes-Jérémie-A033178001 Source MTPTC
Réhabilitation de la route
Cayes-Jérémie-A033178001 Source MTPTC
Sous total
MTPTC
MTPTC
MTPTC
Réhabilitation Route
Petite rivière de Nippes /
Petit Trou de Nippes
Réhabilitation Tronçon
Rn1 Frecyneau/ St
Marc/Bigot/ (Gonaives)
Construction BigotCarrefour Joffre,
Biennac-Rue Clerveau et
Rn1 Marchand (4)
Construction d'un Pont
sur la rivière Marigot/
Peredo
Construction d'un Pont sur
la rivière Marigot/ Peredo
6,159,152
1002
8,608,322
Nippes
3,212,283
2,761,846
Artibonite
672,379
-
Sud-est
335,111
Sous total
MTPTC
964
8,764,295
Construction d'un Pont sur
la rivière Marigot/ Peredo
335,111
Construction d'un Pont
sur la rivière Gauche(
route Jacmel-La vallee de
Jacmel)
Construction d'un Pont sur
la rivière Gauche( route
Jacmel-La vallee de
Jacmel)
Construction d'un Pont sur
la rivière Gauche( route
Jacmel-La vallee de
Jacmel)
Construction d'un Pont sur
la rivière Gauche( route
Jacmel-La vallee de
Jacmel)
Construction d'un Pont sur
la rivière Gauche( route
Jacmel-La vallee de
Jacmel)
2,449,169
Sud-est
Sous total
155,973
974
450,437
672,379
14,566
963
12,551
797
27,118
307,993
3,126,963
1,210,970
962
2,674
963
12,459
997
296,727
996
3,126,963
1,522,831
1,604,132
MTPTC
Réhabilitation du tronçon
Carrefour 44/ Cotes de
fer
Sud-est
7,224,067
-
7,224,067
MTPTC
Débarcadaires SaintLouis du Nord
NordOuest
500,000
-
500,000
Page 459 of 656
Débarcadaires faucault
MTPTC
Pont Lahaie Dame Marie
MTPTC
Sud
250,000
210,714
981
39,286
Grand'Ans
e
500,000
382,793
980
117,207
Ouest
4,636,364
2,007,000
979
2,629,364
Réabilitation de la route 9
MTPTC
MTPTC
Réabilitation de la route
de pernier
Ouest
4,636,364
-
MTPTC
Aménagement du bord de
mer de la ville du Cap
Haitien
Nord
2,000,000
1,101,283
1015
898,717
MTPTC
Travaux de réhabilitation
et de réparation des rues
National
3,475,548
3,475,548
976
-
MTPTC
Curage métallique et
manuel
National
3,958,263
3,958,263
976
-
Nord
1,000,000
-
1,000,000
Nord
2,000,000
-
2,000,000
Ouest
5,000,000
UEH
UEH
ULCBP
Projet de construction et
d'équipements de
Dortoirs et de Résidences
pour professeurs
Renforcement des
structures des batiments
de l'université de
Limonade
Construction de
batiments et logements
Publics ULCBP (note #3)
Construction de batiments
et logements Publics
ULCBP (note #3)
Construction de batiments
et logements Publics
ULCBP (note #3)
Construction de batiments
et logements Publics
ULCBP (note #3)
Construction de batiments
et logements Publics
ULCBP (note #3)
Construction de batiments
et logements Publics
ULCBP (note #3)
4,636,364
1,402,869
959
1,415,904
961
1,604,229
972
4,518,353
1019
(3,941,355)
1019
Sous total
5,000,000
5,000,000
-
TOTAL
174,308,966
101,010,359
73,298,607
Page 460 of 656
Dans la Résolution du 22 juillet 2015, vingt-quatre (24) Projets ont été selectionnés aux fins
d‟analyse et sont traités initialement dans les Résolutions suivantes répartissent ainsi :
Trois (3) Projets dans la Résolution du 11 février 2010 :
1- Réhabilitation du tronçon Fermathe/Frères
2- Réhabilitation du tronçon Freycineau/St-marc ; Bigot/Gonaives
3- Supervision de la réhabilitation du tronçon Freycineau/St-marc ;
Bigot/Gonaives
Trois (3) Projets dans la Résolution du 18 juillet 2012 :
1- Réhabilitation de la Place Occide Jeanty
2- Aménagement d‟infrastructures sportives et gazonnages des 14 parcs sportifs.
3- Supervisiond‟Aménagement d‟infrastructures sportives et gazonnages des 14
parcs sportifs.
Dix-huit (18) Projets dans la Résolution du 21 décembre 2012 :
1- Contrat de construction de la place publique de l'Aéroport (phase1) et (Phase 2)
2- Contrat de travaux construction du marché public de Miragoane et d'une Gare
routière et la supervision.
3- Contrat de construction Marché public de Fontamara
4- Contrat de construction Lycee Toussaint Louverture et la Supervision
5- Travaux de rénovation urbaine et de construction d'infrastructure sociocommunautaire
6- Exécution travaux de construction d'urgence d'un viaduc de carrefour de
l'Aéroport Mathin Luther King
7- Contrat de construction du lycee Alexandre Petion et la supervision
8- Construction d'infrastructure socio-communautaire au Wharf de Jérémie (Cité
Soleil)
9- Contrat de construction et de supervision des travaux d'infrastructure sociocommunautaire dans le quartier défavorisé "Wharf Jérémie"
10- Etude et la supervision de la construction de l'hopital de Port de Paix
11- Construction de l'hopital Simbi Continental de Martissant
12- Réhabilitation construction tronçon Petite rivière-Petit trou de Nippes
13- No 1), Supervision des travaux de réhabilitation du tronçon Petite rivière-Petit
trou de Nippes
14- Avenant No 1), Supervision des travaux de réhabilitation du tronçon Petite rivièrePetit trou de Nippes
15- No2), Supervision des travaux de réhabilitation du tronçon Petite rivière-Petit
trou de Nippes
16- Construction pont sur la rivière grande Marigot/Peredo
17- Réhabilitation place Canapé-vert
18- Réhabilitation place publique St Anne
Page 461 of 656
Commentaires Résolution du 22 Juillet 2015:
La résolution du 22 Juillet 2015 Comprend soixante-dix (70) projets de ce nombre
vingt-six (26) ont été retenu pour fin d‟analyse en tenant compte des critères
précédemment énoncés.
Signature:
- Des vingt-six (26) projets exécutés, six (6) projets n‟ont pas été daté et sept 7
projets ont des dates incomplètes.
NB : Le contrat de Construction de la place publique de l‟Aéroport (Phase I et II), la
phase I n‟est pas datée tandis que la phase II est datée.
Avance de démarrage :
- Des avances de démarrage ont été fournir à certains entrepreneurs tandis que
pour d‟autres elles n‟ont pas été effectués.
- Le motif de non décaissement de l‟avance n‟est pas mentionné.
Retenue de garantie :
- Le maitre d‟ouvrage a prélevé les 5 % de retenue de garantie sur 5 projets.
Signatures de personnes autorisées
Contrat Signé
Contrats
exécutés
26
Maitre
D‟œuvre
Maitre
d‟ouvrage
CNMP
CSC/CA
1
23
Retenue de 2% :
- Les prélèvements de 2 % de DGI n‟ont pas toujours versés
- Des vingt-six (26) projets exécutés, les 2 % de la DGI ont été prélevé
seulement sur la construction de l‟Hôpital Simbi
Continental de Martissant. (Maitre d‟ouvrage MSPP).
NB : Des vingt-six (26) projets aucun montant n‟a été décaissé pour onze (11) d‟entre
eux.
Durée d‟exécution :
- Huit (8) projets n‟ont pas de durée d‟exécution
- Quatre (4) projets ont une durée d‟exécution de 12 mois
- Quatre (4) projets ont une durée d‟exécution de 18 mois
- Quatre (4) projets ont une durée d‟exécution de 6 mois
- Un (1) projet a une durée d‟exécution de 60 jours
- Un (1) projet a une durée d‟exécution de 26 mois
- Un (1) projet a une durée d‟exécution de 19 mois
- Un (1) projet a une durée d‟exécution de 42 mois
- Un (1) projet a une durée d‟exécution de 24 mois
- Un (1) projet a une durée d‟exécution de 3 mois
- Un (1) projet a une durée d‟exécution de 17 mois
- Un (1) projet a une durée d‟exécution de 10 mois
- Un (1) projet a une durée d‟exécution de 13 mois
Page 462 of 656
Revue des passations des marchés
Résolution du : 22 Juillet 2015
Contrat
No
Maitre
d'oeuvre
Maitre
d'ouvrage
1
La Général
Constrution et
Distribution
S.A
2
La Général
Constrution et
Distribution
S.A et Group
TRAME pour
la supervision
MPCE
3
IBT.LLC
MPCE
4
IBT.LLC et
CSA Central
Inc pour la
supervision
MPCE
5
GTC
MPCE
6
LGL S.A
MTPTC
7
IBT,LLC et
CSA Central
Inc pour la
supervision
MPCE
MPCE
Description des travaux
Contrat de construction de
la place publique de
l'Aéroport (phase1) et
(Phase 2)
Contrat de travaux
construction du marché
public de Miragoane et
d'une Gare routière et la
supervision.
Contrat de construction
Marché public de
Fontamara
Contrat de construction
Lycee Toussaint
Louverture et la
Supervision
Travaux de rénovation
urbaine et de construction
d'infrastructure sociocommunautaire
Exécution travaux de
construction d'urgence
d'un viaduc de carrefour
de l'Aéroport Mathin
Luther King
Contrat de construction du
lycee Alexandre Petion et
la supervision
Appel d'offres
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Localité
Date de
signature
Montant
Gré
à
gré
Delmas
Phase 1
Incomplet
(….Novembre
2012) Phase 2 7
Avril 2015
1,795,000.00 US
Phase1. et
1,257,428.07 US
Phase 2
Oui
Phase
1 et
phase2
Oui Phase 1
et phase2
Non Phase1
Oui phase2
Oui Phase1 et
phase2
Miragoane
Incomplet
(…..Novembre
2012) contrat et
la supervision.
7,735,135.00 US
(Contrat) et
773,513.50 US
(Supervision)
Oui
Contra
t et
superv
ision
Oui Contrat et
Supervision
Non Contrat
et
Supervision
Oui Contrat
et
Supervision
15,647,900.00US
Oui
Oui
Non
Oui
8,029,900.00 US
pour le contrat et
401,495.00 US
pour la supervision
Oui
Contra
t et
superv
ision
Oui Contrat et
Supervision
Non Contrat
et
Supervision
Non pour le
contrat et Oui
pour la
supervision
Fontamara
Port-auPrince
Incomplet
(..Novembre
2012)
Non mentionné
pour le contrat et
(…Novembre
2012) pour la
supervision
Restreint
Ouvert
Mirbalais
20 Decembre
2012
18,981,625.00 US
Oui
Oui
Non
Oui
Delmas
27 Decembre
2012
21,502,742.85
OSD
Oui
Oui
Non
Oui
Port-auPrince
26 Novembre
2012 pour le
contrat et
(…Novembre
2012) pour la
supervision
7,696,012.00 US
pour le contrat et
384,800.60 US
pour la supervision
Oui
Contra
t et
superv
ision
Oui Contrat et
Supervision
Non Contrat
et
Supervision
Non pour le
contrat et Oui
pour la
supervision
Page 463 of 656
Revue des passations des marchés(Suite)
Résolution du : 22 Juillet 2015
Contrat
No
Maitre
d'oeuvre
Maitre
d'ouvrage
GTC
MTPTC
9
SOTECH
MPCE
10
Groupe
TRAME
MPCE
11
ETRAMEC.S.A
MSPP
12
IBT,LLC
MSPP
8
13
14
V&F
Construction
S.A
EGIS
international
Compac S.A
MTPTC
MTPTC
15
EGIS
international
Compac S.A
MTPTC
16
EGIS
international
Compac S.A
MTPTC
Description des travaux
Travaux de réhabilitation du
troncon Fermathe Frères via
Soison Girardeau Meyotte et des
colletivités relliant la principale à
la rue Metellus à Thomassin 25 et
à Fermathe 45 à route Frère.
Construction d'infrastructure
socio-communautaire au Wharf de
Jérémie (Cité Soleil)
Contrat de construction et de
supervision des travaux
d'infrastructure sociocommunautaire dans le quartier
défavorisé "Wharf Jérémie"
Etude et la supervision de la
construction de l'hopital de Port
de Paix
Construction de l'hopital Simbi
Continental de Martissant
Réhabilitation construction
tronçon Petite rivière-Petit trou de
Nippes
No 1)Supervision des travaux de
réhabilitation du tronçon Petite
rivière-Petit trou de Nippes
Avenat No 1) Supervision des
travaux de réhabilitation du
tronçon Petite rivière-Petit trou de
Nippes
No2)Supervision des travaux de
réhabilitation du tronçon Petite
rivière-Petit trou de Nippes
Appel d'offres
Gré
A
Gré
Approbation
CSC/CA
Non
objection
du CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Localité
Date de
signature
Montant
Ouest
Non mentionné
47,612,854.00
US
Oui
Oui
Non
Oui
Port-au-Prince
20 Decembre
2012
18,411,135.00
US
Oui
Oui
Non
Oui
Port-au-Prince
(…..Nvembre
2012)
2,195,053.50
US
Oui
Oui
Non
Oui
Port de
Paix(NordOuest)
9 Septembre
2015
749,000.00
US
Non
Non
Oui
Martissant
(…Novembre
2012)
6,000,404.30
US
Oui
Oui
Non
Non
Nippes
27 Decembre
2012
30,849,937.91
US
Oui
Oui
Non
Oui
Nippes
22 Décembre
2012
2,621,350.00
US
Oui
Oui
Non
Oui
Nippes
2 Décembre
2014
782,392.50
US
Oui
Oui
Non
Oui
Nippes
5 Mai 2015
19,971,599.88
US
Oui
Oui
Non
Oui
Restreint
Oui
Ouvert
Page 464 of 656
Revue des passations des marchés(Suite)
Résolution du : 22 Juillet 2015
Contrat
No
17
18
19
Maitre d'oeuvre
CECOM
Consultant
Engeniera
Estrella
Maitre
d'ouvrage
Description des
travaux
MTPTC
Construction pont sur
la rivière grande
Marigot/Peredo
Réhabilitation du
tronçon Carrefour
Frecyneau/St Marc
Bigot Gonaives
Réhabilitation place
Occide Jeanty
Réhabilitation place
Canapé-vert
Réhabilitation place
publique St Anne
Aménagement
d'infrastructure
sportive
MTPTC
20
Groupe Travaux
de Construction
TECINA S.A
MPCE
MPCE/ULCPB
21
SOGEMAT
MPCE
22
JEANDY
Construction
MPCE
Localité
Montant
Marigot
27 Décembre
2012
10,736,026.19
US
Oui
Oui
Non
Oui
/
Non daté
51,452,645.53
US
Oui
Non
Non
Oui
Ouest
Non daté
Oui
Oui
Non
Oui
Canapé-vert
Non daté
Oui
Oui
Non
Oui
Ouest
Non daté
2,997,774.00 US
29,562,500.00
Gourdes
50,221,000.00
Gourdes
Oui
Oui
Non
Oui
National
6 Septembre
2011
10,150,023 00
US
Oui
Oui
Non
Non
12 Mai 2011
26
Septembre
2011
7,852,851.98 US
Oui
Oui
Non
Non
500,250.00 US
Oui
Oui
Non
Non
7 Aout 2015
500,145.63 US
Oui
Oui
Non
Non
10
Fevrier2016
2,406,825.00US
Non
Non
Oui
25
MTPTC
Contrat de supervision
de réhabilitation du
tronçon Frecyneau StMarc Gonaives
Document
d'éligibilité
Patente, Quitus
etc…
Gré
à
gré
24
Groupement
BEJV-Metric
Ingineering
Non
objection
du CNMP
Date de
signature
23
26
Appel d'offres
Approbation
CSC/CA
Gonaives
Oui
Restreint
Ouvert
27
Page 465 of 656
Revue de la gestion des contrats
Résolution du : 22 Juillet 2015
No
Maitre
d'œuvre
1
La Général
construction et
Distribution
S.A.
2
La Général
construction et
Distribution
S.A pour les
travaux et
Groupe
TRAME pour
la supervision
Cautionnement
sur avance
de
démarrage
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
NA phase1 et
2
Non
(Phase1
et 2)
NA
(Phase1 et 2)
Oui (phase 1
et 2)
Phase 1 et
6 mois
(Phase 2)
827,469.07 US
(Phase 1 et 2)
7, 735,135.00
US (contrat) et
7, 735,135.00
US (supervision)
NA (contrat et
supervision)
Non constaté lors
de l'analyse du
contrat (contrat et
supervision)
NA
(contrat
et supervision)
NA
(contrat et
supervision)
NA
(contrat et
supervision)
1, 874,376.88 US
Non mentionné
(contrat)
…Novembre
2012
(Supervision)
8, 029,900.00
US (contrat) et
401,495.00 US
(supervision)
Oui (contrat et
supervision)
Non constaté lors
de l'analyse du
contrat
NA (contrat et
supervision)
Non (contrat
et
supervision)
19 mois
(contrat) et 18
mois
(supervision)
1, 176,315.62 US
Travaux de rénovation
urbaine à Mirebalais
20 Décembre
2012
18, 981,625.00
US
Non
Non constaté lors
de l'analyse du
contrat
NA
NA
26 mois
2, 529,410.53 US
Exécution travaux
construction d'urgence d'un
viaduc de Carrefour de
l'Aéroport Mathin Luther
King
27 Décembre
2012
21, 502,742.85
US
Oui
Non constaté lors
de l'analyse du
contrat
NA
Oui
18 mois
3, 715,416.24 US
Contrat de construction du
lycée Alexandre Pétion et la
supervision
26 Novembre
2012 (contrat)
et
(…Novembre
2012)
supervision
7, 696,012.00
US (contrat) et
384,800.60 US
(supervision)
Oui (contrat)
Non
(supervision)
Non constaté lors
de l'analyse du
contrat
Non
Non (contrat
et
supervision)
NA (contrat) et
18 mois
(supervision)
1, 427,761.66 US
Maitre
d'ouvrage
Description
des
travaux
Contrat
Date de
signature
Montant
Avance
de démarrage
MPCE
Contrat de construction de
la place public de l'Aéroport
(phase1 et 2)
....Novembre
2012 (phase1)
et
7 Avril 2015
(phase2)
1,795,000.00 US
(phase1) et
1,257,428.07 US
(phase2)
MPCE
Contrat de travaux de
construction du marché
public de Miragoane et
d'une Gare routière et la
supervision
Non daté
(….Novembre
2012)
contrat et
supervision
4
IBT.LLC
(contrat) et
CSA Central
INC
(supervision)
MPCE
Contrat de construction du
lycée Toussaint Louverture
et la supervision
5
GTC
MPCE
6
LGL
S.A.
MTPTC
7
IBT.LLC
(contrat) et
CSA Central
INC
(supervision)
MPCE
Page 466 of 656
Revue de la gestion des contrats (Suite)
Résolution du : 22 Juillet 2015
No
Maitre
d'œuvre
8
Groupe
travaux
de
construction
9
Société
Technique de
Construction
(SOTECH)
Maitre
d'ouvrage
MTPTC
MPCE
10
Group
TRAME
MPCE
11
ETRAMEC
S.A.
MSPP
12
IBT, LLC
MSPP
13
V&F
Construction
S.A
MTPTC
14
EGIS
International
Compac
MTPTC
15
EGIS
International
Compac
MTPTC
16
EGIS
International
Compac
MTPTC
Description
des
travaux
Travaux de réhabilitation du
tronçon Fermathe / Frères, Via
Soisson, Girardeau,Meyotte et
des collectivités reliant la
principale à la rue Metellus à
Thomassin 25 et à Fermathe 45,
Meyotte à route Frères.
Construction d'infrastructure
socio-communautaire au Wharf
de Jérémie (Cité Soleil)
Contrat de construction et de
supervision des travaux
d'infrastructure sociocommunautaire dans le quartier
défavorisé (Wharf Jérémie)
Etude et la supervision de la
construction de l'hôpital (Port de
Paix)
Construction de l'hôpital Simbi
Continental de Martissant
Réhabilitation construction
tronçon Petite Rivière, Petit Trou
de Nippes
No 1) Supervision des travaux
de réhabilitation du tronçon
Petite Rivière, Petit Trou de
Nippes
Avenant 1) Supervision des
travaux de réhabilitation du
tronçon Petite rivière-Petit trou
de Nippes
No2) Supervision des travaux de
réhabilitation du tronçon Petite
Rivière/Petit Trou de Nippes
Contrat
Date de
signature
Montant
Avance
de démarrage
Non
47, 612,854.00
US
NA
20
Décembre
2012
18, 411,135.00
US
NA
(…Novemb
re 2012)
2, 195,053.50
US
NA
9
Septembre
2015
749,000.00 US
Oui
Novembre
2012
6, 000,404.30
US
Oui
27
Décembre
2012
30, 849,937.91
US
Oui
22
Décembre
2012
2, 621,150.00
US
Oui
2 Décembre
2014
782,392.50 US
Non
5 Mai 2015
19, 971,599.88
US
Oui
Cautionnement
sur avance
de
démarrage
Non contacté
lors de l'analyse
du contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
Non
Non
42 mois
317,500.00 US
Non
Non
24 mois
2, 975,670.26 US
Non
Non
Non
-----------
Non
Non
3 mois
749,000.00 US
Oui
Oui
12 mois
1.881,121.29 US
Non
Oui
18 mois
2, 761,846.02 US
Non
Non
17 mois
----------
Non
Non
6 mois
---------
Non
Non
6 mois
---------
Page 467 of 656
Revue de la gestion des contrats (Suite 2)
Résolution du : 22 Juillet 2015
No
Maitre
d'œuvre
Maitre
d'ouvrage
17
CECOM
Consultant
MTPTC
18
Engenieria
ESTRELLA
MTPTC
19
Groupe
travaux de
construction
MPCE
20
TECINA S.A.
MPCE/
ULCPB
21
SOGEMAT
MPCE
22
SECOSA
MPCE
23
24
J&J
Construction
25
26
Groupement
BEJV-Metric
Engineering
MTPTC
Description
des
travaux
Contrat
Avance
de
démarrage
Oui
2, 139,408.58
US
Date de
signature
Montant
27 Décembre
2012
10, 736,026.19
US
Non daté
51, 542,645.53
US
Non
Non daté
2, 997,774.00
US
Non
Réhabilitation place Canapé
Vert
Non daté
29, 562,500.00
Gourdes
Oui
(7, 390,625
Gourdes)
Réhabilitation place publique
St-Anne
Non daté
50, 221,000.00
Gourdes
Non
6 Septembre
2011
10, 150,023.00
US
Non
Gazonnage
12 Mai 2011
7, 852,851.98
US
Non
Supervision
26 Septembre
2011
500,250.00 US
Non
Avenant
7 Aout 2015
500,145.63 US
Non
10 Février 2016
2, 406,825.00
US
Non
Construction pont sur la
rivière Grande Marigot
Peredo
Réhabilitation du tronçon
Carrefour Freycineau/ StMarc Bigot Gonaïves
Réhabilitation place Occide
Jeanty
Aménagement
d'infrastructure sportive
(Phase 2)
Contrat de supervision de
réhabilitation du tronçon
Frecyneau (StMarc/Gonaïves
Cautionnement
sur avance
de
démarrage
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Prélèvement
2%
DGI
Retenue
de
garantie
Durée
des
travaux
Montant
décaissé
---------
--------
10 mois
27,117.64
US
Non
Non
12 mois
Non
Non
Non
Non
93,620.16
US
Non
Non
Non
----------
Non
Non
12 mois
--------------------
Non
Non
12 mois
4, 487,163.27 US
Non
Non
Non
Non
Non
6 mois
Non
Non
16 mois
Non
Non
13 mois
-------------
-
Page 468 of 656
-
XXXI Résolution du 6 Janvier 2016
Page 469 of 656
Résolution du 6 Janvier 2016
Durée de la résolution d‟urgence du 6 Janvier 2016
Pouvoirs des autorités
Gouvernement MARTELLY / PAUL
Le Cabinet suivant, formait le gouvernement dirigé par le premier ministre Evans Paul. Il a été
installé le 19 Janvier et comprenait 17 ministres titulaires d‟un département dont 4 femmes, un
ministre délégué auprès du premier ministre et 16 secrétaires d‟état (dont 2 femmes), ainsi deux
anciens ministres du gouvernement précèdent intégrèrent le cabinet et sept ministres sortant ont
été maintenus. Il est le seul premier ministre nommé par le président élu à ne pas être dûment
ratifié par les deux chambres. Le cabinet resta après le départ de Martelly (7 Février 2016) pour
liquider les affaires jusqu‟à l‟investiture d‟Enex Jean Charles.
Composition du gouvernement MARTELLY / PAUL
Il est composé des Ministres suivants :
Prénom
Duly
Victor
Jean-François
Hervé
Rotchild Jr.
Yves Rose
Dithny Joan
Lener A.I.
Wilson
Nesmy
Pieriche
Réginald
Pierre Richard
Yves Germain
Florence Duperval
Stéphanie Balmir
Jacques
Nom
BRUTUS
BENOIT
THOMAS
DAY
FRANCOIS
MORQUETTE
RATON
RENAULD
LALEAU
MANIGAT
OLIVIER
DELVA
CASIMIR
JOSEPH
GUILLAUME
VILLEDROUIN
ROUSSEAU
Jean-Fritz
JEAN-LOUIS
Fonction
Affaires Etrangères et des cultes
Affaires Sociales
Agriculture et des Ressources Naturelles
Commerce et de l‟Industrie
Communication
Condition Féminine
Culture
Défense
Economie et des Finances
Education Nationale
Haïtiens vivant à l‟Etranger
Intérieur et des Collectivités Territoriales
Justice
Planification et Coopérative Externe
Santé Publique et de la Population
Tourisme
Travaux Publics, Transports et
Communication
Ministre Délégué auprès du Premier
Ministre chargé des questions Electorales.
Page 470 of 656
Resolution du 6 Janvier 2016
Institutions
Localité
Montant du
projet
National
712,133
Montant
decaissé
No Déc.
Montant a
Décaisser
MPCE
Nature du Projet
Intervention d'urgence du
Gouvernement
MPCE
conception et mis en œuvre des
projets de developpement
territoriale
National
6,196,715
MPCE
Renovation Urbaine de la Ville
Hinche
Centre
1,538,462
1,538,462
MPCE
Renovation Place Public
Aeroport Hugo Chavez
Ouest
685,395
685,395
MPCE
Rehabillitation de la Route de
Colladere-Cerca-Cavajal 15 km
Centre
2,586,538
MPCE
Rehabillitation Troncon
Fermathe Frere Via Voisso,
Duplan, Girardeau et Collectrice
Rue Metellus Meyottes-Freres,
Thomassin25
Ouest
155,962
155,962
MPCE
Construction du Marche Public
de Fontamara
Ouest
795,195
795,195
MPCE
Construction du Marche Public
de Pignon
Nord
1,923,077
561,533
MPCE
Constrution de Batiments et
Logements-UCLBP
National
11,923,002
3,941,355
MPCE
Reconstruction du Lycee
Toussaint Louverture (Incluant
Supervision)
Ouest
2,843,391
2,843,391
MPCE
Reconstruction du Lycee
Alexandre Petion (Incluant
Supervision)
Ouest
777,347
777,347
MPCE
Finalisation de la Construction
des CASC
National
500,000
500,000
MPCE
Rehabillitation, construction et
Amenagement d'infrastructures
sportives (installation de gazon
synthetique hinche saint louis du
nord et thomassique)
National
513,806
513,806
MARNDR
Subvention de fertilisants et
amelioration de la productivites
des cultures et des sols (st marc,
plaines des cayes, straphael
kenskoff)
National
188,113
188,113
MTPTC
Rehabillitation de la Route de la
route de Frere
Ouest
384,625
384,625
712,133
1,257,495
4,939,220
1,563,745
1,022,793
1,361,544
1019
7,981,647
Page 471 of 656
MTPTC
Construction viaduc Delmas
nazon
Ouest
152,092
152,092
MTPTC
Constrution viaduc marine
hatienne
Ouest
1,923,077
1,923,077
MTPTC
Rehabillitation et entretien des
ruesdans la zone metroplitaine
port-au-prince petion ville
Ouest
1,000,000
MTPTC
Rehabillitation urbaine de la
ville des cayes
Ouest
288,462
288,462
MTPTC
Rehabillitation d e la route
canape-vert saint marie
Ouest
169,255
169,255
MTPTC
Rehabillitation de la route de
tabarre(incluant drainage vers la
riviere grise)
Ouest
247,964
247,964
MTPTC
Rehabilitation urbaine de
Jeremie
Grand
Anse
384,615
384,615
MTPTC
Rehabillitation troncon port de
paix, port marigot, port de pain,
carrefour
Grand nord
2,500,000
2,500,000
MTPTC
Travaux de construction de pont
lahaie dame marie
Grand
Anse
459,716
459,716
MTPTC
Entertien route de petion-ville
laboule 12
Ouest
74,006
74,006
MTPTC
Réhabilitation route laboule 12
kenscoff
Ouest
249,278
249,278
MTPTC
Execution laboule 12 kenscoff
Ouest
84,646
84,646
MTPTC
Réhabilitation route miragoane
petite rivière de nippes
Nippes
1,503,356
1,503,356
MTPTC
Rehabilitation des rues
d‟ouanaminte
Nord Est
52,822
52,822
MTPTC
Reconstruction rues codevi et
liberte
Nord Est
68,548
68,548
MTPTC
Rehabilitation route petite
riviere de nippes petite trou de
nippes
Nippes
1,857,255
MTPTC
Rehabilitation et entretien de la
route baie de l'acule/barierre
battant /milot (m3)et barierre.
Nord
1,923,077
1,923,077
MTPTC
Rehabilitation troncon RN1
Frecyneau saint -marc bigot
(gonaïve )
Artibonote
673,775
673,775
MTPTC
Construction d'un pont sur la
riviere marigot /peredo
Sud Est
653,545
653,545
816,259
879,961
183,741
977,294
Page 472 of 656
MTPTC
Rehabilitation de la route bigot carrefour joffre (by pass
gonaïve)
Artibonite
384,615
384,615
MTPTC
Travaux additionnels sur
frecyneau(ST
Marc)/bigot,(gonaives)
construction Raccordements
Ponts Gaugin et Mapou a RN1
Artibonite
39,199
39,199
MTPTC
Travaux additionnels sur
frecyneau(ST
Marc)/bigot,(gonaives);drainge
de Frecyneau a Pont Pirre.
Artibonite
192,308
192,308
MTPTC
Rehebilitation de la route jacmel
la vallee de jacmel
Sud Est
1,105,769
1,105,769
MTPTC
Constuction de debarcadderes a
faucault
249,175
249,175
MTPTC
Mise en oeuvre d'activites de
renforcement a la creation et a la
gestion des entreprises.
National
275,837
275,837
MTPTC
Constuction et rehabilitation
d'hpiteaux(HEUH,ST Michel de
jacmel ,smbi continal de
matissant Hopital sans Fil
centre de Trauma, Hopital de
ouanaminthe)
National
9,932,958
180,025
9,752,933
58,169,114
3,941,355
54,227,759
TOTAL
Dans la Résolution du 6 janvier 2016, ving-huit (28) Projets ont été sélectionnés aux fins
d‟analyse et sont traités initialement dans les Résolutions suivantes répartissent ainsi :
Quatre (4) Projets dans la Résolution du 11 février 2010 :
1- Réhabilitation du tronçon Freycineau/St-Marc ; Bigot/Gonaives
2- Réhabilitation de la route Miragoane/Petite Rivière de Nippes
3- Réhabilitation du tronçon carrefour Freycineau/St-marc, Bigot/Gonaives
4- Supervision du tronçon carrefour Freycineau/St-marc, Bigot/Gonaives
Six (6) Projets dans la Résolution du 24 aout 2010 :
Page 473 of 656
1- Travaux de réhabilitation des rues à Ouanaminthe
2- Travaux d‟entretien de la route Kenscoff/Laboule 12
3- Réhabilitation et entretien des 24,2 Km de la route reliant la baie de l‟Acul à carrefour
Barrière Battant
4- Supervision des 24,2 Km de la route reliant la baie de l‟Acul à carrefour Barrière
Battant
5- Réhabilitation de la route Barrière Battant à Milot
6- Supervision de la route Barrière Battant à Milot
Un (1) seul projet dans la Résolution du 12 mai 2011 :
1- Travaux d‟entretien de la route Kenscoff (tronçon Pétion-Ville/Laboule 12)
Un seul (1) projet dans la Résolution du 12 mai 2011 :
1- Projet de réhabilitation du tronçon Freycineau/St-Marc, Bigot/Gonaives
Deux (2) Projets dans la Résolution du 18 juillet 2012 :
1- Aménagement d‟infrastructures sportives
2- Supervision d‟aménagement d‟infrastructures sportives
3 Quatorze (14) projets dans la Résolution du 21 décembre 2012 :
1- Réhabilitation construction tronçon Petite Rivière/ Petit Trou de Nippes
2- Supervision #1 des travaux de réhabilitation du tronçon Petite Rivière de Nippes/Petit
Trou de Nippes
3- Supervision des travaux de réhabilitation du tronçon Petite Rivière de Nippes/Petit
Trou de Nippes (Avenant #1)
4- Supervision #2 des travaux de réhabilitation du ttronçon Petite Rivière de
Nippes,/Petit Trou de Nippes.
5- Exécution de construction travaux d'urgence d'un viaduc de Carrefour, de l'aéroport
Martin Luther King, Delmas
6- Contrat de construction du lycée Toussaint Louverture
7- Supervision des travaux de reconstruction du Lycée Toussaint Louverture
8- Construction du marché public de Fontamara
9- Contrat de construction du Lycée Alexandre Pétion
10- Contrat de supervision des travaux de reconstruction du Lycée Alexandre Pétion
11- Construction d'urgence d'un viaduc sur la Route des Rails tronçons 1
12- Contrat de construction de la place publique de l'aéroport Phase I et II
13- Contrat d'exécution des travaux de construction d'urgence du pont sur la rivière
grande à Marigot
14- Réhabilitation route Coladaire/Cerca Carvajal
Page 474 of 656
Revue de passation des marchés
Résolution du : 6 Janvier 2016
No
1
Maitre d'œuvre
J &J Construction
Maitre
d'ouvrage
MTPTC
2
V&F
Construction S.A
MTPTC
3
EGIS
International
Compac
MTPTC
4
EGIS
International
Compac
MTPTC
5
EGIS
International
Compac
MTPTC
6
V&F
Construction S.A
MTPTC
7
LGL
S.A.
MTPTC
8
IBT, LLC
MPCE
9
CSA
Central
Inc.
MPCE
Description
des
travaux
Aménagement
d'infrastructure sportive
Réhabilitation construction
tronçon Petite Rivière/ Petit
Trou de Nippes
Supervision #1 des travaux
de réhabilitation du tronçon
Petite Rivière de
Nippes/Petit Trou de Nippes
Supervision des travaux de
réhabilitation du tronçon
Petite Rivière de
Nippes/Petit Trou de Nippes
(Avenant #1)
Supervision #2 des travaux
de réhabilitation du ttronçon
Petite Rivière de
Nippes,/Petit Trou de
Nippes.
Travaux d'entretien de la
route Kenscoff tronçons
P.ville
Exécution de construction
travaux d'urgence d'un
viaduc de Carrefour, de
l'aéroport Martin Luther
King, Delmas
Contrat de construction du
lycée Toussaint Louverture
Supervision des travaux de
reconstruction du Lycée
Toussaint Louverture
Localité
Contrat
Date
de
signature
Appel d'offres
Montant
Gré
à
gré
Restreint
Ouvert
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Oui
Non
Non
Approbation
CSC/CA
National
26/09/11
10, 150,023.00 US
7, 852,851.98 US
500,250.00 US.
500,145.63 US
Nippes
27/12/12
30, 849,937.91
US
Oui
Oui
Non
Oui
Nippes
2/12/12
2, 621,350.00
US
Oui
Oui
Non
Oui
Nippes
2/12/2014
782,392.50
US
Oui
Oui
Non
Oui
Nippes
5 mai 2015
19, 971,599.00
Gourdes
Oui
Oui
Non
Oui
P.V /Laboule
12
18 avril
2011
77, 230,610.00
US
Non
Non
Oui
Delmas
(carrefour
Aéroport)
27/12/12
16, 588,378.41 US +
4, 914,364.43 =
21, 502,742.85 US
Oui
Oui
Non
Oui
Port-auPrince
Novembre
2012
8, 029,900.00
US
Oui
Oui
Non
Non
Port- auPrince
Novembre
2012
401,495.00
US
Oui
Oui
Non
Oui
Oui
Oui
Page 475 of 656
Revue de passation des marchés (Suite)
Résolution du : 6 Janvier 2016
Contrat
Maitre
d'ouvrage
No
Maitre d'œuvre
10
IBT, LLC
MPCE
11
IBT, LLC
MPCE
12
CSA
Central
Inc.
MPCE
13
Groupe des
travaux
et
construction
14
Description
des
travaux
Construction du marché
public de Fontamara
Contrat de construction
du Lycée Alexandre
Pétion
contrat de supervision
des travaux de
reconstruction du Lycée
Alexandre Pétion
Localité
Fontamara
PortauPrince
Date
de
Signature
Novembre
2012
26
novembre
2012
Appel d'offres
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus
etc…
Montant
Gré
à
gré
15, 647,900.00
US
Oui
Oui
Non
Non
7, 696,012.00 US
Oui
Oui
Non
Non
Restreint
Ouvert
PortauPrince
Novembre
2013
384,800.60
US
Oui
Oui
Non
Oui
MPCE
Travaux de
réhabilitation tronçon
Fermathe, Frère Via
Soisson, Giradeau
Ouest
novembre
2012
47, 612,854.00
US
Oui
Oui
Non
Oui
ESTRELLA
MTPTC
Construction d'urgence
d'un viaduc sur la Route
des Rails tronçons 1
Route des Rails
27
décembre
2012
13, 635,729.63
US
Oui
Oui
Non
Oui
15
La Général
construction
et
distribution
MTPTC
Contrat de construction
de la place publique de
l'aéroport Phase I et II
Delmas
(Carrefour,
Aéroport)
Phase I non
Daté, Phase
II 7 avril
2015
1, 795,000.00 US
Phase I
1, 257,428.07 US
Phase II
Oui
Oui
Phase 1
Non,
Phase 2
Oui
Oui
16
Wenling
Hongyuan
Traffic
Engineering. Co
Ltd
MTPTC
Contrat d'exécution des
travaux de construction
d'urgence du pont sur la
rivière grande à Marigot
Sud-Est
27
décembre
2012
10, 736,026.19
US
Oui
Oui
Non
Oui
Ouanaminthe
7 février
2011
63, 715,441.00
US
Non
Non
Oui
Miragoane
8/08/2012
32, 117,487.23
US
Oui
Non
Non
Oui
Ouanaminthe
13 mai 2011
2, 948,515.2
8 US
Oui
Non
Non
Oui
17
PICASO
MTPTC
18
V&F
Construction S.A
MTPTC
19
ESTRELLA
Ingenieria
MTPTC
Réhabilitation des rues
Sance Scott et
Enterrement à
Ouanaminthe
Contrat d'exécution des
travaux de réhabilitation
de la route Miragoane,
Petite Rivière de Nippes
Travaux de
réhabilitation des rues à
Ouanaminthe
Oui
Page 476 of 656
Revue de passation des marchés (Suite 2)
Résolution du : 6 Janvier 2016
Contrat
No
Maitre d'œuvre
Maitre
d'ouvrage
Description
des
travaux
Réhabilitation et
entretient des 24,2km de
route reliant la baie de
l'Acul à carrefour
Barrière Battant(RN3)
20
V&F
Construction S.A
MTPTC
21
Ingenieria
ESTRELLA
MTPTC
22
V&F
Construction S.A
MTPTC
23
Ingenieria
ESTRELLA
MTPTC
24
Groupement
BEJV-Metric
engineering
MTPTC
25
Hongyuan
Construction
MPCE
Réhabilitation du tronçon
carrefour Freycineau(StMarc), Bigot(Gonaives)
Travaux d'entretien de la
route de Kenscoff
Projet de réhabilitation
du tronçon Freycineau
(St-Marc), Bigot
(Gonaives)
Contrat de supervision de
réhabilitation du tronçon
Freycineau (St-Marc)
Gonaives
Réhabilitation route
Coladairecerca Carvajal
Appel d'offres
Approbation
CSC/CA
Non
objection
du
CNMP
Document
d'éligibilité
Patente,
Quitus etc…
Localité
Date
de
Signature
Montant
Gré
à
gré
l'Acul, carrefour
Barrière battant
27 février
2011
24, 085,142.14
US
Oui
Non
Non
Oui
Gonaives
non daté
51, 452,645.53
US
Oui
Non
Non
Oui
Kenscoff,
Laboule 12
13 mai 2011
82, 434,067.00
Gourdes
Oui
Non
Non
Oui
Gonaives
3 mai 2011
7, 257,009.95
US
Oui
Non
Non
Oui
Gonaive/St Marc
10 février
2010
2, 406, 325,00
US
Oui
Non
Non
Oui
Colladaire
22 mars
2013
20, 894,909.00+
Avenant
12, 703,776.73 US
Oui
Oui
Non
Oui
Restreint
Ouvert
Page 477 of 656
No
Maître
d'oeuvre
1
J&J
Construction
2
V&F
Construction
S.A.
3
EGIS
International
compac
4
EGIS
International
compac
5
EGIS
International
compac
6
V&F
Construction
S.A
7
LGL
S.A.
Maître
d'ouvrage
Description
des
travaux
MTPTC
Aménagement d'infrastructure
sportive
MTPTC
Réhabilitation construction du
tronçon Petite Rivière/ Petit
Trou de Nippes
MTPTC
Supervision #1 des travaux de
réhabilitation des tronçons
Petite Rivière de Nippe, Petit
Trou de Nippes
MTPTC
Supervision des travaux de
réhabilitation du tronçon Petite
rivière de Nippes/ Petit Trou de
Nippes (Avenant #1)
Revue de la gestion des contrats
Résolution du : 6 janvier 2016
Contrat
Date
de
signature
Montant
26/09/11
10,150, 023.00 US
7, 852, 851.90 US
500, 250.00 US
500, 145.63 US
27/12/12
30,849,937.91
US
2/12/12
2,621,350.00
US
2/12/2014
782,392.50
US
MTPTC
Supervision #2 des travaux de
réhabilitation du tronçon Petite
rivière de Nippes/ Petit Trou de
Nippes
5 mai 2015
19,971,599.00
US
MTPTC
Travaux d'entretien de la route
Kenscoff Troncons P.ville
18 avril
2011
77,230,610.00
US
MTPTC
Construction travaux d'urgence
d'un viaduc de carrefour de
l'aéroport Martin Luther King,
Delmas
27/12/12
16,588,378.41 US
+ 4,914,364.43 =
21,502,742.85 US
MPCE
Contrat de construction du
Lycée Toussaint Louverture
Novembre
2012
8,029,900.00
US
Novembre
2012
401,495.00
US
Non
Novembre
2012
15,647,900.00
US
Non
8
IBT, LLC
9
CSA Central
Inc.
MPCE
Supervision des travaux de
reconstruction du Lycée
Toussaint Louverture
10
IBT, LLC
MPCE
Construction du marché public de
Fontamara
Avance
de démarrage
Non
Oui
Non
Non
Non
Non
Non
Non
Cautionnement
sur avance
de
démarrage
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors de
l'analyse du contrat
Prélèvement
2%
DGI
Retenue de
garantie
Durée des
travaux
Montant Décaissé
Non
Non
12 mois
….
N/A
6 mois
………..
Non
Oui
18 mois
Non
Non
12mois
Non
Non
6 mois
Non
Non
5 mai
Non
Non
4 mois
Non
Non
5 mai
Non
Non
19 mois
Non
Non
18 mois
Non
Non
Non
………..
………..
………..
………..
………..
………..
………..
………..
………..
Page 478 of 656
Revue de la gestion des contrats (Suite)
Résolution du : 6 janvier 2016
No
Maitre d‟œuvre
11
IBT, LLC
12
CSA Central
Inc.
13
Groupe
des Travaux
de Construction
14
ESTRELLA
15
La Général
Construction et
Distribution
16
Wenling
Hongyuan Traffic
engineering Co
ltd.
17
PICASO
18
V&F
Construction S.A.
Maître
d‟ouvrage
Description
des
travaux
Contrat
Date
de
signature
Montant
Avance
de
démarrage
Non
MPCE
Contrat de construction du
Lycée Alexandre Pétion
26
novembre
2012
7,696,012.00
US
MPCE
Contrat de supervision des
travaux reconstruction du
Lycée Alexandre Pétion
Novembre
2013
384,800.60
US
MPCE
Travaux de réhabilitation
tronçon Fermathe ,Frère Via
Soisson, Giradeau, Meyotte,et
des collectivités reliant la
principale à la rue Métellus à
Thomassin 25 et à Fermathe
45, Meyotte à Rte de Frères
Novembre
2012
47,612,854.00
US
MTPTC
Construction d'urgence d'un
viaduc sur la route des rails
tronçon 1
27
décembre
2012
13,635,729.63
US
MTPTC
Contrat de construction de la
place publique de l'aéroport
Phase I et II
Phase I
non daté,
Phase II
7 avril 2015
1,795,000.00
Phase I
1,257,428.07US
Phase II
MTPTC
Contrat d'exécution des
travaux de construction
d'urgence du pont sur la rivière
grande à Marigot
27décembre
2012
10,736,026.19
US
MTPTC
Réhabilitation des rues Sance
Scott et Enterrement à
Ouanaminthe
7 février
2011
63,715,441.00
US
8/08/2012
32,117,487.23
US
MTPTC
Réhabilitation de la route
Miragoane, Petite rivière de
Nippes
Non
Non
Oui
Non
Non
Non
Non
Cautionnement
sur avance
de
démarrage
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Prélèvement
2%
DGI
Retenue de
garantie
Durée
des
travaux
Non
Non
Non
Non
Non
18 mois
Non
Non
42 mois
Non
Non
18 mois
Non
Non
60jrs
Phase 1,
6 mois
Phase 2,
Non
Non
10 mois
Non
Non
5 mois
Non
Non
36 mois
Montant
décaissé
……..
……..
………..
………..
………..
………..
………..
………..
Page 479 of 656
Revue de la gestion des contrats (Suite 2)
Résolution du : 6 janvier 2016
No
Maitre
d‟œuvre
19
ESTRELLA
Ingenieria
20
V&F
Construction
S.A.
21
Ingenieria
ESTRELLA
22
V&F
Construction
S.A
23
Ingenieria
ESTRELLA
24
Groupement
BEJV-Metric
Engineering
25
Hongyuan
Construction
Maitre
d‟ouvrage
Description
des
travaux
Contrat
Date
de
signature
Montant
MTPTC
Travaux de réhabilitation
des rues à Ouanaminthe
13 mai 2011
2,948,515.28
US
MTPTC
Réhabilitation et entretient
des 24,2km de route reliant
la baie de l'Acul à carrefour
Barrière battant(RN3)
27 février
2011
24,085,142.14
US
MTPTC
Réhabilitation du tronçon
carrefour Freycineau/St Ŕ
Marc, Bigot/Gonaives
non daté
51,452,645.53
US
MTPTC
Travaux d'entretien de la
route de Kenscoff/ Laboule
12
13 mai 2011
82,434,067.00
Gourdes
MTPTC
Projet de réhabilitation des
tronçons Freycineau/StMarc, Bigot (Gonaives)
3 mai 2011
7,257,009.95
US
MTPTC
Contrat de supervision de
réhabilitation des tronçons
Freycineau (St-Marc),
Bigot/Gonaives
10 février
2010
2,406,325.00
USC
MPCE
Réhabilitation route
Coladairecerca Carvajal
22 mars 2013
20,894,909.00 US +
Avenant 1=
2,703776.73 US
Avance
de
démarrage
Non
Non
Non
Non
Non
Non
Non
Cautionnement
sur avance
de démarrage
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Non constaté lors
de l'analyse du
contrat
Prélèvement
2%
DGI
Retenue de
garantie
Durée
des
travaux
Non
Non
6 mois
Non
Non
15mois
Non
Non
12mois
Non
Non
5mois
Non
Non
6 mois
Non
Non
13mois
Non
Non
24 mois
Montant
décaissé
Page 480 of 656
Commentaires Résolution du 6 janvier 2016:
La résolution du 6 janvier 2016 comprend 41 projets de ce nombre 29 ont été retenu pour
fin analyse en tenant compte des critères précédemment énoncés.
Le respect des règles de passation de marché :
-
Des 29 projets exécutés, trois (3) ont participé à un appel restreint.
-
26 compagnies dont les services ont été retenues de gré à gré
-
Des 29 travaux exécutés, un seul (1) a obtenu la non-objection de la CNMP que
pour l‟avenant au contrat
Approbation de la Cour Supérieure des Comptes et du Contentieux Administratif.
-
11 des 29 contrats n‟ont pas obtenu l‟approbation de la CSC/CA.
Critères d‟éligibilité
-
Quatre (4) Entreprises n‟ont pas fourni les pièces d‟éligibilité (patente, quitus,
matricule).
L‟éligibilité des firmes à fournir les services (Expérience)
-
La parité financière des firmes (Etats Financiers)
-
N/A
N/A
Accès à la commande publique.
-
N/A
Page 481 of 656
XXXII Ministère du Tourisme
Page 482 sur 656
Commentaires:
Quarante-quatre (44) projets ont été retenus aux fins analyses en tenant compte des critères
précédemment énoncés.
Signature
- Des quarante-quatre (44) projets exécutés, neuf (9) ne sont pas datés.
Avance de démarrage
- Les avances de démarrage ont été contastées pour vingt et un (21) projets parmi les
quarante-quatre (44) exécutés. On a remarqué parmi eux que certains projets ont eu comme
avance de démarrage (1er versement) un montant qui varie entre 50%, 60%, 70%, et 75% du
montant du contrat.
Cautionnenement sur avance de demarrage
- Ce cautionnement requis pour l‟avance de démarrage n‟est pas constatélors de l‟analyse des
contrats.
Retenue de garantie (5%)
- Le maitre d‟ouvrage n‟a pas prélevé les cinq pour cent (5%) de la retenue de garantie sur les
ving-cinq (25) projets parmi les quarante-quatre (44) projets exécutés.
Prélèvement de DGI 2%
- Le maitre d‟ouvrage n‟a pas prélevé les deux pour cent (2%) de la DGI sur onze (11) projets
parmi les quarante-quatre (44) exécutés dans les factures présentées par le maitre d‟œuvre.
Signatures des personnes autorisées
Contrats traités
Contrats
exécutés
Maitre
d‟oeuvre
Maitre
d‟ouvrage
CNMP
CSC/CA
44
44
44
0
36
Durée des contrats
-
Un (1) contrat a une durée de douze douze (12) mois.
Trois (3) contrats ont une durée d‟un mois.
Six (6) contrats ont une durée de deux (2) mois.
Un (1) contrat a une durée de deux (2) mois.
Quatre (4) contrats n‟ont pas mentionné la durée des travaux.
Page 483 sur 656
-
Huit (8) contrats ont une durée de six (6) mois.
Onze (11) contrats ont une durée de (3) mois.
Durée des contrats (suite)
-
Quatre (4) contrats ont une durée de 90 jours.
Un (1) contrat a une durée de 120 jours.
Un (1) contrat a une durée de 15 jours.
Un (1) contrat a une durée de huit 8 mois.
Un (1) contrat a une durée de deux mois et demie.
Un (1) contrat a une durée de 17 jours.
Un (1) contrat a une durée de 7 mois
Page 484 sur 656
1-Maitre d‟ouvrage : MT
Description des travaux : Projet Pilote de gestion/valorisation des déchets solides à l‟ile à vache
Localité
l‟ile a vache
Maitre d‟œuvre WASTEK S.A
Montant du contrat 17, 224,858.70 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
31/Oct./2014
12 mois
Gré a gré
Approbation de la CSC/CA signé
Non objection du CNMP n‟a pas signé
Documents d‟éligibilités fournis
Matricule fiscale
Avance de démarrage : N/A ; N/A ;
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution NA
Prélèvement des 2% Sera prelevé sur le montnt total de la prestation et versé a la DGI
Date de démarrage des travaux
NA
Date d‟achèvement des travaux 31 Oct 2015
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 4, 805,735.58 #ch 0011769 (1er versement)
Commentaires :
On n‟a pas trouvé les pièces Justificatives pour les prélèvements 2ème et 3ème Versement.
Le contrat est signé par :
Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
Joameson Lacour, President de WASTEK S.A
Signé et scellé par la CSCS/CA mais le nom du signataire n‟est pas mentionné.
Page 485 sur 656
2-Maitre d‟ouvrage : MT
Description des travaux : Contrat de prestation de service construction de deux
kiosques a trou milieu et Lahatte.
Localité : Ile à vache
Maitre d‟œuvre : Infinity Construction
Montant du contrat : 240,000.00 Gourdes
Date de signature du contrat : 13 avril 2015
Durée des travaux : 1 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
: Patente, Quitus, matricule fiscale
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
30%
72,000.00Gourdes
N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : 5%
Retenue de bonne exécution
Prélèvement des 2%
: N/A
:1,440.00Gourdes pour le 1e versement pas de pièces justificatives pour
les deux autres montant.
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 66,960 Gourdes, ch. # 0012897
Commentaires :
-
On a trouvé de pièces justificatives pour un seul versement soit le montant de
66,960Gourdes, chèque # 0012897
Les signataires du contrat sont :
1- Stéphanie Balmir VILLEBROUIN, Ministre du Tourisme mais non scellé
2- Cyrene Berthony, contractuel
3- Paraphe du signataire de la CSC/CA mais le nom du signataire n‟est pas
mentionné
Page 486 sur 656
3-Maitre d‟ouvrage : MT
Description des travaux :
Projet d‟appui au développement de l‟agrotourisme a l‟ile à
vache et les communes limitrophes
Localité : ile à vache
Maitre d‟œuvre : Petits Frères et Petites Sœurs de l‟Incarnation (PFI/PSI)
Montant du contrat : 4, 882,390.00Gourdes
Date de signature du contrat : 11 aout 2014
Durée des travaux : 3 mois
Appel d‟offres Gré à gré
Approbation de la CSC/CA : Oui
Non objection du CNMP : Non
Documents d‟éligibilités fournis
: Quitus
Avance de démarrage : 75% ; 3, 661,793 Gourdes ; #10164 et #10165
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : 5%
Retenue de bonne exécution
: 5%
Prélèvement des 2% : 87,883.02 Gourdes
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux
: N/A
Montant total versé au maitre d‟œuvre : 4, 306,267.90Gourdes
Ce contrat est signé par :
-
Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Frere Francklin ARMAND, Petits Freres et Petits Sœurs de l‟incarnation (PFI/PSI)
-
Thomas JACQUES, Ministre
-
Paraphé et scellé par la CSC/CA mais le nom du signataire n‟est pas mentionné.
Page 487 sur 656
4-Maitre d‟ouvrage : MT
Description des travaux : Travaux de Réhabilitation marche publique et aménagement
place publique Madame Bernard
Localité Ile a vache madame Bernard
Maitre d‟œuvre Quality Couriers International S.E.A
Montant du contrat 21, 898,374.58 Gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
9 Avril 2015
8 mois
Gré a gré
Approbation de la CSC/CA oui
Non objection du CNMP non
Documents d‟éligibilités fournis
quitus, patente, document légaux de l‟entreprise
Avance de démarrage : 30% ; 6,569, 512 Gourdes ; #001881
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
5%
Retenue de bonne exécution 5%
Prélèvement des 2%
131,390.25 Gourdes. Cheque # 0011882 sur le 1er versement
Date de démarrage des travaux
NA
Date d‟achèvement des travaux N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre : 14, 255,842.05 Gourdes. Chèques # 0011881 et
#000748
Les signataires :
1- Stéphanie Balmir VILLEBROUIN, Ministre du Tourisme
2- Gober G. Estrada NOY, représentant en Haïti de quality
3- On n‟a trouvé que deux (2) versements
Page 488 sur 656
5-Maitre d‟ouvrage : M D T
Description des travaux : Projet de développement touristique d‟ile à vache sur abaka Kay
ressort
Localité : Ile à vache (sud)
Maitre d‟œuvre : La compagnie appenhein architecture + design (CAD)
Montant du contrat : 4, 575,000.Gourdes
Date de signature du contrat : 17 septembre 2014
Durée des travaux : 5 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé et scellé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
: N/A
Avance de démarrage: 40% ; 1,830, 000 Gourdes ; N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : 91,500 Gourdes
Retenue de bonne exécution
: N/A
Prélèvement des 2% : 36,600 Gourdes
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: Novembre 2014
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 1, 701,900.00Gourdes
Commentaires :
-
Du montant de l‟avance de démarrage, on a prélevé l‟acompte de 2% de la DGI et la
retenuede 5%
-
On n‟a que le 1er versement, pas de pièces justificatives pour les deux autres versements.
Le contrat est signé par :
1- Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Chad Lawrence OPPENHEIM, contractuel
3- Paraphé et scellé par la CSC/CA mais le nom du signataire n‟est pas mentionné.
Page 489 sur 656
6-Maitre d‟ouvrage : M D T
Description des travaux : Programme d‟ingénierie socio-territoriale à l‟ile à vache
Localité : Ile à vache (sud)
Maitre d‟œuvre : SODADE
Montant du contrat : 16, 555,000.00Gourdes
Date de signature du contrat : 25 juillet 2013
Durée des travaux : 10 semaines
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé sans scellé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
: Matricule fiscale
Avance de démarrage : N/A ; N/A ; N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: 2e et 3e versement =215, 949, .18Gourdes, on n‟a pas donné le 1e
versement
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: octobre 2013
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 2e et versements =10, 581,510.00 Gourdes, on n‟a pas
donné le 1e versement.
Commentaires :
-
Pas de pièces justificatives pour le 1e versement.
Le contrat n‟est pas scellé mais signé par :
1- Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Sabine M Steilla MALEBRANCHE, contractuel
3- Mme Nonie H. Mathieu, Presidente de la CSC/CA
Page 490 sur 656
7-Maitre d‟ouvrage : MT
Description des travaux : Rehabilitation de3 places publiques
Localité Balai-Rose, Grande plaine la Hatte
Maitre d‟œuvre Administration Communal de l‟ile a vache
Montant du contrat 963,000 .00Gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
10 Mars 2015
3 mois
Gré a gré
Approbation de la CSC/CA signé et Scellé
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
N/A
Avance de démarrage : 50 % ; 481, 500 Gourdes ; #10 503
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution NA
Prélèvement des 2%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux 10Juin 2015
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 963,000.00 Gourdes
Ce contrat est signé par :
- Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme, mais non scellé.
-
Fritz Cesar, Maire principal
-
Paraphé et scellé par la CSC/CA, mais le nom du signataire n‟est pas mentionné.
NB : Le contrat est signé le 10 mars 2015 alors que le 1er versement est fait depuis le 07
octobre 2014, chèque # 0010503.
.
.
Page 491 sur 656
8-Maitre d‟ouvrage : Ministère du tourisme
Description des travaux :
Protection et repeuplement de la mangrove de l‟ile a vache
Localité
Ile à vache
Maitre d‟œuvre Fondation Verte
Montant du contrat 3,948,912.00 gourdes
Date de signature du contrat
Durée des travaux
29 Novembre 2013
6 mois
Appel d‟offres restreint
Approbation de la CSC/CA Oui
Non objection du CNMP
N/A
Documents d‟éligibilités fournis Matricule fiscale
Avance démarrage :
Cautionnement fourni pour l‟avance N/A
Retenue de garantie
N/A
Retenue de bonne exécution
N/A
Prélèvement des 2%
78,978.24 gourdes
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
15 juin 2014
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux
N/A
Date de la réception définitive des travaux
N/A
Montant total versé au maitre d‟œuvre 3, 869,933.75 gourdes
Commentaires :
Les documents fournis par le MT ne comportent pas de de retenue de garantie, de
patente et de quitus.
Signé par :
1- Mme Stephanie B. VILLEDROUIN, MT
2- Thomas JACQUES, Ministre MARNDR
3- Maniella Damiscar JEAN PIERRE, Prestataire
Page 492 sur 656
9-Maitre d‟ouvrage : M D T
Description des travaux : Procedure de la renovation urbaine de kay kok Mme Bernard et Point
Localité : Ile à vache
Maitre d‟œuvre : SODADE
Montant du contrat : 896,955.14 US ou 39, 591,600 Gourdes
Date de signature du contrat : 25/02/2014
Durée des travaux : 6 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
: patente
Avance de démarrage
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : N/A
Retenue de bonne exécution
: N/A
Prélèvement des 2% : 712,502 Gourdes, cheque #8588, #9011 ET #11423
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: 25/08/ 2014
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 34,912,622.50 Gourdes, chèque #8587, #9010 et
#11427
Commentaires :
- Du montant de l‟avance de démarrage, on a prélevé l‟acompte de 2% de la DGI, mais le
cautionnement n‟est pas constatélors de l‟analyse du contrat.
- Le contrat est signé et scellé par :
1- Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Sabine M Steillia MALEBRANCHE, contractuel
3- Mme Nonie H. MATHIEU, présidente de la CSC/CA
Page 493 sur 656
Page 494 sur 656
10-Maitre d‟ouvrage : M D T
Description des travaux : Travaux de construction de l‟INFP
Localité : Ile à vache
Maitre d‟œuvre : PANEXUS
Montant du contrat : 36,000.22 US
Date de signature du contrat : 12 fevrier 2015
Durée des travaux : 2 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé et scellé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
: quitus, patente et matricule fiscale
Avance de démarrage:
US 10,800;
30%;
11935
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : 60,102.16 Gourdes
Retenue de bonne exécution
: N/A
Prélèvement des 2% : 24,040.86Gourdes, 1er et 2eme versement
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 1, 117,900.00Gourdes
Commentaires :
Le montant du contrat est en US mais les décaissements sont effectués en gourde.
- On a prélevé l‟acompte de 2% et la retenue de 5%, mais le cautionnement n‟est pas
constatélors de l‟analyse du contrat.
- Le contrat est signé par :
1- Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Guy Jacques JEAN, PANEXUS
3- Paraphé et scellé par la CSC/CA mais le nom du signataire n‟est pas mentionné.
Page 495 sur 656
11-Maitre d‟ouvrage : MT
Description des travaux : Programme « Destination touristique »
Localité L‟ile vache
Maitre d‟œuvre MARNDR/SEPV
Montant du contrat 1, 260,000.00 $US
Date de signature du contrat
Durée des travaux
Appel d‟offres
12/03/2014
N/A
N/A
Approbation de la CSC/CA signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
N/A
Avance de démarrage: N/A; N/A; N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution NA
Prélèvement des 2%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
Mai 2014
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 738,000 Gourdes
Commentaires :
Les 2% d‟acompte de la DGI n‟ont pas été prelevés.
Le cautionnement n‟a pas été constaté.
Ce contrat est signé par :
1- Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Thomas JACQUES, Ministre de l‟agriculture
3- Scellé et paraphé par la CSC/CA
Page 496 sur 656
Maitre d‟ouvrage : M D T
Description des travaux : Etude de la biodiversité terrestre de la zone de projet à ile à vache
Localité : Ile à vache (sud)
Maitre d‟œuvre : Centre haïtien de recherche en aménagement, en développement(CHRAD)
Montant du contrat : 190,000.00$US
Date de signature du contrat : 16 avril 2014
Durée des travaux : 2 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
Avance de démarrage
: Patente, Quitus, matricule fiscale
Pourcentage %
Montant
Ordre de
décaissement
30%
57,000.00$US
N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : 5%
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: N/A
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: 16 juin 2014
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 186,200.00$
Commentaires :
Les 2% d‟acompte de la DGI n‟ont pas été prelevés.
Le cautionnement n‟a pas été constaté.
Le contrat est signé par :
-
Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Jean Lucien LIGONDE, President Directeur General
-
Fritz Robert SAINT PAUL, Av president de la CSC/CA
Page 497 sur 656
Maitre d‟ouvrage
MT
Description des travaux : Révision du système d‟adduction et distribution d‟eau potable à Kay Kok, ile
à Vache
Localité Ile a Vache ( Sud)
Maitre d‟œuvre
SODADE
Montant du contrat
3,181,560.66Gourdes
Date de signature du contrat
Durée des travaux
14/04/2014
3 mois
Appel d‟offres Gre a Gre
Approbation de la CSC/CA
Signe et Scelle
Non objection du CNMP
Non Signe
Documents d‟éligibilités fournis
Avance de démarrage
Quitus et Patente
Pourcentage %
Montant
Ordre de
décaissement
954,468.19Gourdes
30%
N/A
Cautionnement fourni pour l‟avance NON constate lors de l‟analyse du contrat
Retenue de garantie
5%
Retenue de bonne exécution
Prélèvement des 2%
N/A
85
44,541. Gourdes
Date de démarrage des travaux N/A
Date d‟achèvement des travaux
01/09/2015
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux
N/A
Date de la réception définitive des travaux
N/A
Montant total versé au maitre d‟œuvre 2,071,195.80Gourdes ; 887,655.24Gourdes (#0012537) ;
1,183,540.00Gourdes (# 0012986).
Commentaires :
On n‟a pas trouve les pieces justificatives pour le 3eme Versement, mais la modalite du paiement est :
30% ; 40% ;50%, mais on peut le determine en fonction de la modalite du paiement qu‟on n‟a donne
qui est de 30%.
Page 498 sur 656
Maitre d‟ouvrage : M D T
Description des travaux : Projet de développement touristique d‟ile à vache
Localité : cayes
Maitre d‟œuvre : Le centre haitien de recherche en amenagement en developpement
Montant du contrat : 396,000.00 US ou 18,057,600 Gourdes
Date de signature du contrat : 16/04/2014
Durée des travaux : 3 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : signé
Non objection du CNMP : non-signé
Documents d‟éligibilités fournis
: patente matricule
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
50%
9,028,800.00Gourdes
#9023
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : N/A
Retenue de bonne exécution
: N/A
Prélèvement des 2% : 366,696 Gourdes, cheque #9024, #11442
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: 16/06/ 2014
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 17, 968,104.00Gourdes
Commentaires :
- Du montant de l‟avance de démarrage, on a prélevé l‟acompte de 2% de la DGI
- Le contrat est signé par :
1- Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Jean Lucien LIGONDE, PDG
3- Paraphé et scellé par le président de la CSC/CA, Fritz Robert SAINT PAUL, Av CSC/CA
.
Page 499 sur 656
Maitre d‟ouvrage : MDT
Description des travaux : Projet d‟effectuation d‟un parc de stockage dans le cadre de l‟aménagement de
Vernet
Localité L‟ile à vache
Maitre d‟œuvre SDECO S.A
Montant du contrat 27, 045,480.00 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
03/07/2015
90 jours
Gré à Gré
Approbation de la CSC/CA
oui, signé
Non objection du CNMP
non
Documents d‟éligibilités fournis
quitus fiscal, patente, matricule fiscale
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
30%
8,113,644.00Gourdes
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution N/A
Prélèvement des 2%
162,272.88Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 7, 545,688.92 Gourdes
Commentaires :
Nous n‟avons pas retracé les pieces justificatives attestant le 2eme et le 3eme versement et les 2% pour
le compte de la DGI.
Le contrat est signé par :
Stephanie Balmir VILLEDROUIN, Minstre du Tourisme
David Philippe Francois, representant du SDECA
Paraphé et scellé par la CSC/CA mais le non du signataire n‟est pas mentionné.
Maitre d‟ouvrage : MDT
Page 500 sur 656
Description des travaux :Projet d‟appui de développement l‟agro tourisme a l‟ile a vache et les commune
limitrophes
Localité L‟ile a vache
Zone couverte par la résolution
Maitre d‟œuvre Société Agro industrielle 10 S.A
Montant du contrat 4, 500,000.00 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
11 aout 2014
3 mois
Restreint
Approbation de la CSC/CA
signé
Non objection du CNMP
non signé
Documents d‟éligibilités fournis
quitus fiscal, patente
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
75%
3,375,000.00Gourdes
10369
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution N/A
Prélèvement des 2%
67,500.00Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 3, 307,500.00 gourdes
Commentaires :
- Du document de l‟avance de démarrage, on a prélevé le 2% d‟acompte de la DGI
- Pas de pièces justificatives pour les deux derniers versements
- Ce contrat est signé par :
1- Stéphanie Balmir VILLEDROUIN
2- Lionel Coupet, Société agro industrielle
3- Thomas JACQUES, Ministre
4- Paraphé et scellé par la CSC/CA
Page 501 sur 656
Maitre d‟ouvrage : MT
Description des travaux : Projet d‟appui de développement de la pêche maritime et a l‟ile a vache et
les communes limitrophes
Localité L‟ile à vache
Maitre d‟œuvre PV ENGENEERING ET SERVICES
Montant du contrat 3, 650,000.00 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
11 aout 2014
3 mois
Restreint
Approbation de la CSC/CA
signé
Non objection du CNMP
non signé
Documents d‟éligibilités fournis
quitus fiscal, patente
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
50%
1,825,000.00Gourdes
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% N/A
Retenue de bonne exécution N/A
Prélèvement des 2%
57,220.00Gourdes, cheque #10163
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux 3 novembre 2014
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 2, 803,780.00 Gourdes, cheque #10162
Le contrat a été signé par :
-
Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Phillipe Valles, PV ENGENEERING et SERVICES
-
Thomas Jacques, Ministre
-
Signé mais non scellé et le nom du signataire n‟est pas mentionné.
Page 502 sur 656
Maitre d‟ouvrage
MT
Description des travaux : Etablissement d‟une ligne de base dans les communes de l‟ile à
Vache.
Localité
Ile à Vache (Sud)
Maitre d‟œuvre
MARNDR
Montant du contrat 11,995,245.95Gourdes
Date de signature du contrat
page non retrouvée
Durée des travaux N/A
Appel d‟offres
gré à gré
Approbation de la CSC/CA
page non retrouvée
Non objection du CNMP
N/A
Documents d‟éligibilités fournis
N/A
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
75
8,996,434.46
N/A
Cautionnement fourni pour l‟avance Non constate lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution
Prélèvement des 2%
N/A
Non mentionné
Date de démarrage des travaux N/A
Date d‟achèvement des travaux
N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux
N/A
Date de la réception définitive des travaux
N/A
Montant total versé au maitre d‟œuvre
10, 795,721.15Gourdes
Commentaires :
Pas de prelevement de l‟acompte de DGI, pas de page de signature du contrat, pas non plus de
page attestant la date de l‟aprobation de la CSC/CA, pas de document d‟eligibilité.
Le contrat a été signé par :
La page de la signature du contrat n‟est pas retrouvée, mais le maitre d‟œuvre est représenté
par Mme Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme et M. Thomas JACQUES,
Ministre de l‟agriculture.
Page 503 sur 656
Maitre d‟ouvrage : MT
Description des travaux : Installation de 50 panneaux solaires
Localité l‟ile a vache
Maitre d‟œuvre G.K Import Ŕ Export
Montant du contrat 92,500.00 US ou 4, 074, 625.00 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
28 Nov 2013
17 jours
Gré a gré
Approbation de la CSC/CA signé
Non objection du CNMP
non signé
Documents d‟éligibilités fournis
quitus fiscal, patente
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
50%
2,037,312.5
7439
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution N/A
Prélèvement des 2%
81,492,50 Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 3, 993,132.00 Gourdes
Commentaires :
Ce contrat est signé par :
-
Stephanie Balmir VILLEDROUIN, Ministre Tourisme
-
Marie Farah Wawa BLAIN, Representant G.K Import ŔExport
-
Nonie MATHIEU, Presidente CSC/CA
Page 504 sur 656
Maitre d‟ouvrage
Ministre du Tourisme
Description des travaux : Travaux de construction et amenagement du Bureau du Tourisme
Localité Kay Kok (Ile à Vache)
Maitre d‟œuvre
SODADE
Montant du contrat 3,500,000.00 Gourdes
Date de signature du contrat 09/09/2015
Durée des travaux 2 Mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Non
Non objection du CNMP Non
Documents d‟éligibilités fournis
Quitus, Patente, Matricule.
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
30 %
1,050,000.00
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat.
Retenue de garantie 5% 52,500.00 Gourdes
Retenue de bonne exécution
N/A
Prélèvement des 2% 21,000.00 Gourdes
Date de démarrage des travaux N/A
Date d‟achèvement des travaux
09-11-2015
Date de libération la retenue de garantie N/A
Date de la réception provisoire des travaux
N/A
Date de la réception définitive des travaux
N/A
Montant total versé au maitre d‟œuvre
976,500.00Gourdes, cheque #218 pour le 1er
versement
Commentaires :
-
Pas de pièces justificatives pour les autres versements, on en a seulement pour le 1er
versement.
-
Le contrat est signé par :
1- Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Sabine m. Steillia MALEBRANCHE, SODADE
3- Non signé par la CSC/CA
Page 505 sur 656
Maitre d‟ouvrage : MT
Description des travaux : campagne de promotion, communication et sensibilisation pour la
destination de jacmel
Localité Jacmel
Maitre d‟œuvre DAGMAR
Montant du contrat 3,421,480.00 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
30 mai 2014
6 mois
N/A
Approbation de la CSC/CA
OUI
Non objection du CNMP
NON
Documents d‟éligibilités fournis
quitus fiscal, patente
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
75%
1,909,185.84Gourdes
NA
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : 171,074 Gourdes
Retenue de bonne exécution N/A
Prélèvement des 2%
68,429.60Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 3, 181,976.50 Gourdes
Commentaires :
On n‟a pas retracé les pièces justificatives pour le 1er versement
Le contrat est signé par :
- Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
- Cassandre Christine Coupet Jacques, D.A.G.M.A.R
- Signé et scellé par la CSC/CA mais le nom du signataire n‟est pas mentionné.
Page 506 sur 656
aitre d‟ouvrage :
Ministère Tourisme
Travaux de conception et construction d‟un Quai
Description des travaux
Localité
Ile à-Vache / Kay Kok
Maitre d‟œuvre
TRUXTON S.A
Montant du contrat
9,126,569.74 Gourdes
Date de signature du contrat
Non daté
Durée des travaux
6 mois
Appel d‟offres
Gré à gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
Non signé
Documents d‟éligibilités fournis
Patente,Quitus
Avance de démarrage
Pourcentage %
50%
Montant
4,563,284.87
Gourdes
Ordre de
décaissement
N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
365,062.79 Gourdes
Retenue de bonne exécution
N/A
Prélèvement des 2%
146,025.12 Gourdes
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
NA
Date de libération la retenue de garantie
NA
Date de la réception provisoire des travaux
NA
Date de la réception définitive des travaux
NA
Montant total versé au maitre d‟œuvre
6,790,167.89 Gourdes
Commentaires :
-
pas de pièces justificatives pour le troisième versement, soit le montant 1,825,313.94
Gourdes
Du montant de l‟avance de demarrage, on a preleve l‟acompte de 2% de la DGI et la
retenue de 5%
Le contrat est scellé et paraphé par la CSC/CA mais le nom du signataire n‟est pas
mentionné
Ce contrat est signé par :
1- Stephanie Balmir VILLEROUIN, Ministre Du Tourisme. Signé mais non scellé
2- Jean Didier GARDERE
Page 507 sur 656
Maitre d‟ouvrage :
Ministère Tourisme
Description des travaux
Localité
Acquisition et livraison 10 attelages de boeuf
Ile à-Vache
Maitre d‟œuvre
GRADES
Montant du contrat
2,099,250.00 Gourdes
Date de signature du contrat
La dernière page du contrat n‟est pas retracée
Durée des travaux
3 mois
Appel d‟offres
Restreint
Approbation de la CSC/CA
N/A
Non objection du CNMP
Documents d‟éligibilités fournis
N/A
N/A
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
85%
1,784,362.50
10167
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
NA
Retenue de bonne exécution
NA
Prélèvement des 2%
41,985.00 Gourdes, cheque #10168 et #11750
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
NA
Date de libération la retenue de garantie
NA
Date de la réception provisoire des travaux
Date de la réception définitive des travaux
Montant total versé au maitre d‟œuvre
NA
NA
2, 057,265.00 Gourdes
Page 508 sur 656
Maitre d‟ouvrage : M T
Description des travaux : Travaux d‟amenagement d‟un terre-plein adjacent au port de Madame
Bernard
Localité : Ile à vache
Maitre d‟œuvre : TRUXTON S.A
Montant du contrat : 9, 910,805.25 Gourdes
Date de signature du contrat : N/A
Durée des travaux : 6 mois
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : OUI
Non objection du CNMP : NON
Documents d‟éligibilités fournis
: N/A
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
50%
4,955,402.60Gourdes
N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : N/A
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: 198,216.10Gourdes, cheque #9862, #10798 et #11438
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 9, 712,589.12Gourdes, cheque #9860,#10798 et #11437
Page 509 sur 656
Maitre d‟ouvrage : MT
Description des travaux :Projet d‟xecution d‟un lot au centre historique de Jacmel
Localité Jacmel
Maitre d‟œuvre SOGEGA
Montant du contrat 6,795,138.00 gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
N/A
4 mois
Gre a Gre
Approbation de la CSC/CA
oui
Non objection du CNMP
non
Documents d‟éligibilités fournis
Avance de démarrage
quitus fiscal, patente, CIF
Pourcentage Montant
50%
Ordre de
4,077,082.80Gourdes décaissement
0009729
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : 339,756.90 Gourdes
Retenue de bonne exécution N/A
Prélèvement des 2%
135,902.77Gourdes, 2eme versement cheque #11041,
3eme versement#11814, le chèque du 1er versement du montant 81,541.66 n‟est
pas retrouvé.
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux N/A
Date de libération la retenue de garantie
22/05/15
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre 6, 659,235.23 Gourdes, cheque #9729,
#11040, #11813 et #12154.
Commentaires :
Le contrat est signé par :
-
Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Jephté JEAN PIERRE, SOSEGA
Paraphé et signé par la CSC/CA mais le nom du signataire n‟est pas mentionné
Page 510 sur 656
Maitre d‟ouvrage :
MT
Description des travaux
Déstination Jacmel
Localité
Jacmel
Maitre d‟œuvre
Joaneson LACOUR (préstataire)
Montant du contrat
1, 941,423.75 Gourdes
Date de signature du contrat
10 Février 2014
Durée des travaux
6 mois
Appel d‟offres
Gré à Gré
Approbation de la CSC/CA
Oui
Non objection du CNMP
Non
Documents d‟éligibilités fournis
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
60 %
1,164,854.25
ch.#0008936 cheque
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie
Non
Retenue de bonne exécution
Prélèvement des 2%
Non
23,297.085 Gourdes; 11,648.54 Gourdes
Date de démarrage des travaux
N/A
Date d‟achèvement des travaux
N/A
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux
Date de la réception définitive des travaux
Montant total versé au maitre d‟œuvre
N/A
N/A
1, 712,335.745 Gourdes
Commentaires :
-
Pour le 1er versement qui représente 60% du montant soit 1, 164,854.25 Gourdes on a émis
deux (2) chèques de # 0008936 et # 0008906 pour le même montant soit 1, 141,557.17
Gourdes
-
Les signataires du contrat sont :
1- Stéphanie Balmir VILLEBROUIN, Ministre du Tourisme
2- Joaneson LACOUR, Contractant
3- Paraphé par la CSC/CA mais son nom n‟est pas mentionné
Maitre d‟ouvrage
Ministère du Tourisme
Page 511 sur 656
Description des travaux : Projet de Formation Professionnelle aux Bénéfices de 200 Jeunes à
l‟Ile à Vache
Localité Ile à Vache
Maitre d‟œuvre
INFP
Montant du contrat 6,467,041.30 Gourdes
Date de signature du contrat 19 Septembre 2014
Durée des travaux
7 Mois
Appel d‟offres N/A
Approbation de la CSC/CA
N/A
Non objection du CNMP
N/A
Documents d‟éligibilités fournis
# Matricule fiscal 003-817-980-3
Avance de démarrage
Pourcentage %
Montant
Ordre de
décaissement
N/A
N/A
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du Contrat
Retenue de garantie
N/A
Retenue de bonne exécution
N/A
Prélèvement des 2% N/A
Date de démarrage des travaux
1er Octobre 2014
Date d‟achèvement des travaux
30 Avril 2015
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux
N/A
Date de la réception définitive des travaux
N/A
Montant total versé au maitre d‟œuvre
4,504,985.99 Gourdes pour le 1er versement
Commentaires :
Pas de pièces justificatives pour les autres versements.
On a seulement le 1er versement.
Le contrat est signé par :
-
Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Mervil Guillemette, Directeur général INFP
Page 512 sur 656
Maitre d‟ouvrage : MT
Description des travaux : Réalisation d‟un projet d‟un parc d‟attraction en plein air
Localité Jacmel
Maitre d‟œuvre
GRENN GYM
Montant du contrat US 34,800.00
Date de signature du contrat
Durée des travaux
Appel d‟offres
28 mars 2014
3 mois
Gré à Gré
Approbation de la CSC/CA
Signé et scellé
Non objection du CNMP
N/A
Documents d‟éligibilités fournis
Avance de démarrage : 70% ;
N/A
US 24,360.00/ Gourdes 1,088,599.68 ;
#9953
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
5%
Retenue de bonne exécution N/A
Prélèvement des 2%
31,821.12Gourdes, chèques #9954 et #10796
Date de démarrage des travaux
14 aout 2014
Date d‟achèvement des travaux 14 novembre 2014
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux 14 aout 2014
Date de la réception définitive des travaux 27 octobre 2014
Montant total versé au maitre d‟œuvre 1, 559,234.88 Gourdes
Commentaires :
Ce contrat est signé par :
-
Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Boris BREZAULT, PDG, GRENN GYM
-
Paraphé et signé par la CSC/CA, mais le nom du signataire n‟est pas mentionné.
Page 513 sur 656
Maitre d‟ouvrage : MT
Description des travaux : Concevoir et Produire le mobilier urbaine adéquat
Localité : Jacmel
Maitre d‟œuvre : Société de Génie Conseil S.A
Montant du contrat : 6,800,000 Gourdes
Date de signature du contrat : N/A
Durée des travaux : 6 mois
Appel d‟offres : Gré à Gré
Approbation de la CSC/CA : OUI
Non objection du CNMP : Non-signé
Documents d‟éligibilités fournis
: Quitus, Patente, Matricule Fiscale
Avance de démarrage : N/A ; N/A ; N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie 5% : 250,000 Gourdes
Retenue de bonne exécution
: N/A
Prélèvement des 2% : 102,000 Gourdes
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 4, 743,000.00 Gourdes
Commentaires:
Le contrat est signé par :
-
Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Bernard Chancy, représentant de la société de génie
-
Paraphé et scellé par la CSC/CA, mais le nom du signataire n‟est pas mentionné.
Page 514 sur 656
Maitre d‟ouvrage
: MT
Description des travaux : Construction de 20 parasols à Raymond des bains et
l‟aménagement du parking
Localité :
Jacmel
Maitre d‟œuvre : SOCECOS
Montant du contrat : 567,073.10 Gourdes
Date de signature du contrat : 8 mai 2014
Durée des travaux : 15 jours
Appel d‟offres
: Gré à Gré
Approbation de la CSC/CA : Signé
Non objection du CNMP
: Non
Documents d‟éligibilités fournis
: Quitus, patente, matricule fiscal
Avance de démarrage : 70% ; Gourdes 396,915.17 ;
N/A
Cautionnement fourni pour l‟avance : Non constaté lors l‟analyse du contrat
Retenue de garantie : 28, 354,10 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: 11,341.10 Gourdes
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux
: N/A
Montant total versé au maitre d‟œuvre : 567,073.10 Gourdes
Commentaires :
Le contrat est signé par :
-
Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Charles Ricardo, representant du SOCECOS
-
Paraphé et signé par la CSC/CA, mais le nom du signataire n‟est pas mentionné.
Page 515 sur 656
Maitre d‟ouvrage
: MT
Description des travaux : Travaux d‟aménagement sur le boulevard de la plage Congo Jacmel
Localité : Boulevard de la plage Congo (jacmel)
Maitre d‟œuvre : STL Construction
Montant du contrat : 5, 085,029.68 Gourdes
Date de signature du contrat : Non daté
Durée des travaux : 90 jours
Appel d‟offres
: Restreint
Approbation de la CSC/CA : Signé et scellé
Non objection du CNMP
: Non
Documents d‟éligibilités fournis
: Quitus, patente, matricule fiscal de la firme, NIF et CIN
du contractant
Avance de démarrage : 60% ; 3,051,017.81 ;
Chèque #0009107
Cautionnement fourni pour l‟avance : Non constaté lors l‟analyse du contrat
Retenue de garantie : 5%
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: N/A
Date de démarrage des travaux
: N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux
: N/A
Montant total versé au maitre d‟œuvre : 4, 729,077.60 Gourdes
Page 516 sur 656
Commentaires :
Le contrat a été signé par :
-
Stephanie Balmir VILLEBROUIN, Ministre du Tourisme
-
Louis Socrate, STL construction
-
Paraphé et signé par la CSC/CA, mais aucun signataire n‟a été identifié.
La CNMP n‟a pas signé dans le contrat.
Les prélèvements des 2% pour le compte de la DGI n‟ont pas été prelevés.
Le cautionnement n‟a pas été constaté, la retenue de bonne execution non plus.
Maitre d‟ouvrage
MT
Description des travaux : Travaux de Réhabilitation de ravalement de façade de trois
maisons à la rue du commerce.
Localité
Jacmel
Maitre d‟œuvre
BEREC
Montant du contrat
2,036,649.00 Gourdes
Date de signature du contrat
Durée des travaux
Appel d‟offres
Non daté
90 Jours
Restreint
Approbation de la CSC/CA
Non objection du CNMP
oui
Non Signé
Documents d‟éligibilités fournis
Patente
Avance de démarrage : 50% ; Gourdes 1,018,324.50 ;
#9741
Cautionnement fourni pour l‟avance : Non Constaté lors de l‟analyse du contrat
Retenue de garantie
101,832.45 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
N/A
8,146.60 Gourdes chèque #0011364
Date de démarrage des travaux
Date d‟achèvement des travaux
N/A
N/A
Date de libération la retenue de garantie N/A
Date de la réception provisoire des travaux
N/A
Date de la réception définitive des travaux
N/A
Montant total versé au maitre d‟œuvre 1, 894,083.00 Gourdes
Page 517 sur 656
Ce contrat est signé par :
-
Stéphanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Barthaly Shilgens CHARLES, BEREC
-
Paraphé et scelle par la CSC/CA, mais le nom de la signataire n‟est pas mentionné
-
La CNMP n‟a pas signée le contrat.
Page 518 sur 656
Maitre d‟ouvrage : M T
Description des travaux : Travaux de construction et de réparation du centre
d‟interprétation du carnaval
Localité : Jérémie
Maitre d‟œuvre : SONAC
Montant du contrat : 6, 592,303.26 Gourdes et 1, 970,394.34 Gourdes Av.
Date de signature du contrat : N/A
Durée des travaux : 10 semaines
Appel d‟offres : Gré à gré
Approbation de la CSC/CA : oui
Non objection du CNMP : non
Documents d‟éligibilités fournis
Avance de démarrage : 60% ;
: Patente
N/A ; N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : 329,615.16 Gourdes
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: 131,846.03 Gourdes
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: N/A
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : 6, 460,457.20 Gourdes
Commentaires :
-
Le contrat n‟est pas daté, il est signé par :
1- Eric PEAN, contractant
2- Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
3- Signé et scellé par la CSC/CA mais le nom du signataire n‟est pas mentionné
Page 519 sur 656
Maitre d‟ouvrage : MT
Description des travaux : Programme « Destination Touristique »
Localité L‟Ile à Vache
Maitre d‟œuvre MARNDR/SEPV
Montant du contrat US 1, 260,000.00
Date de signature du contrat
Durée des travaux
Appel d‟offres
12/03/2014
N/A
N/A
Approbation de la CSC/CA Signé
Non objection du CNMP Non signé
Documents d‟éligibilités fournis
N/A
Avance de démarrage :
N/A ;
N/A ;
N/A
Cautionnement fourni pour l‟avance Non constaté lors de l‟analyse du contrat
Retenue de garantie
N/A
Retenue de bonne exécution NA
Prélèvement des 2%
NA
Date de démarrage des travaux
NA
Date d‟achèvement des travaux
Mai 2014
Date de libération la retenue de garantie
N/A
Date de la réception provisoire des travaux N/A
Date de la réception définitive des travaux N/A
Montant total versé au maitre d‟œuvre
738,000 Gourdes
Commentaires :
Ce contrat est signé par :
1- Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
2- Thomas JACQUES, Ministre de l‟Agriculture
3- Scellé et paraphé par la CSC/CA
C‟est un contrat de service inter-institutionnel, il fut signé le 13 mars 2014, approuvé par la
CSC/CA et le certificat de non-objection de la CNMP n‟a pas été sollicité. Le montant à
prélever pour le compte de la DGI n‟a pas été effectué. Le montant versé représente 58% du
contrat, le cautionnement n‟a pas été constaté. Aucun document attestant que ce service a été
effectivement fourni n‟a été retrouvé.
Page 520 sur 656
Maitre d‟ouvrage : M D T
Description : Étude de la biodiversité terrestre de la zone de Projet Ile à Vache
Localité : Ile à vache (sud)
Maitre d‟œuvre : Centre haïtien de recherche en aménagement, en développement(CHRAD)
Montant du contrat : US 190,000.00
Date de signature du contrat : 16 avril 2014
Durée des travaux : 2 mois
Appel d‟offres : Gré à Gré
Approbation de la CSC/CA : Signé
Non objection du CNMP : Non-signé
Documents d‟éligibilités fournis
Avance de démarrage :
: Patente, Quitus, matricule fiscale
30% ;
US 57,000.00 ;
N/A
Cautionnement fourni pour l‟avance : Non constaté lors de l‟analyse du contrat
Retenue de garantie : 5%
Retenue de bonne exécution
Prélèvement des 2%
: N/A
: N/A
Date de démarrage des travaux : N/A
Date d‟achèvement des travaux
: 16 juin 2014
Date de libération la retenue de garantie : N/A
Date de la réception provisoire des travaux
: N/A
Date de la réception définitive des travaux : N/A
Montant total versé au maitre d‟œuvre : $ 186,200.00
Commentaires :
Les 2% d‟acompte de la DGI n‟ont pas été prelevés. Aucun document attestant que ce service a
été effectivement fourni n‟a été retrouvé.
C‟est un contrat de service, il fut signé par :
-
Stephanie Balmir VILLEDROUIN, Ministre du Tourisme
-
Jean Lucien LIGONDE, President Directeur General
-
Fritz Robert SAINT PAUL, Av president de la CSC/CA
Page 521 sur 656
Le certificat de non-objection de la CNMP n‟est pas retrouvé au dossier. Les documents
devant nous permettre de nous assurer que le service a été fourni, et qu‟ils n‟ont pas été
acheminés. Le montant décaissé représente 98% du coût du contrat. Le montant de 2% à
prélever pour le compte de la DGI n‟a pas été effectué.
Conclusion :
Analyse des dossiers (Contrats de décaissements, exécutions de projets) réalisés sous la gestion de
Madame Balmir Ministre du Tourisme révéle que la majorité des contrats et projets exécutés l‟ont été sans
pièces justificatives permettant de retracer les opérations comptables de son administration. Par Exemple,
pour le contrat Wasteck SA, pour un montant de 17,224,858.70, les 2e et 3e versement n‟ont aucune
pièces les justifiant , il en est de même pour la firme Infinity Construction qui n‟a pas de pièces
justificatives que pour un seul versement, dans certains contrats la Commission a noté des anomalies telles
le nom de signature non mentionne, aucune retenue de garantie pour certaines des firmes sans patente, ni
quitus fiscal et qui ont été ainsi sélectionnées. Il y a un ensemble de contrats qui n‟ont pas obéi aux règles
de passation de marché, qui n‟ont pas obtenu le certificat de non objection de la CNMP. Des modalités de
paiement ne sont pas respectées par rapport au pourcentage prévu dans les contrats et déterminées par les
lois en vigueur.
Aussi la Commission estime que la Madame Stephanie Balmir Villedrouin doit être mise en accusation par
les instances compétentes.
XXXIII. Cas particuliers :
- Cour Superieure des Comptes et du Contentieux Administratif
La commission n‟a pas pu établir la responsabilité de la Cour Supérieure des Comptes et du
Contentieux Administratif CSC/CA par rapport aux opérations relatives aux différentes résolutions. La
grande majorité des contrats passés pendant cette période avait presque totalement fait abstraction de la
CSC/CA. Les seuls contrats portant l‟homologation de la cour ont eu d‟ailleurs des anomalies dans leur
suivi et exécutions.
-
OFATMA
Un de ces cas qui a également retenu l‟attention de la Commission est celui relatif à l‟OFATMA ou des
ressources du fonds PETRO CARIBE étaient initialement allouées a l‟investissement sont plutôt utilisées
comme des dépenses de fonctionnement alors que cette Institution disposait d‟un budget
de
fonctionnement. À partir de l‟audition de Monsieur Max Rudolph ST-ALBIN, Directeur Général de
l‟OFATMA pendant la période couvrant cette anomalie, ce dernier n‟a pu éclairer la Commission sur le
Page 522 sur 656
mode opératoire qui lui a permis de procéder de cette manière vu que les prévisions au niveau des
Résolutions ont été visiblement détournées pour des dépenses qui étaient déjà prévues au budget de
l‟OFATMA au regard de la loi sur la comptabilité publique. Le fait que ses dépenses n‟aient pas été
postées régulièrement dans les livres comptables de l‟OFATMA, la Commission s‟est légitimement
interrogée sur l‟utilisation détournée du montant provenant du fonds PETRO CARIBE et que l‟Ex
Directeur General de l‟OFATMA n‟ait pu fournir les éléments probants quant a la destination finale des
dépenses qui non seulement est un double emploi et équivaut au fait de dissiper des deniers publics ce qui
est prévu et puni par la l‟article340 du Code Pénal haïtien.
Page 523 sur 656
XXXIII Conclusion
Conclusion
Au terme de l‟approfondissement de l‟enquête menée autour de l‟utilisation du fonds PETRO
CARIBE, la Commission Sénatoriale Spéciale d‟Enquête (CSSE), sur la base des documents inventoriés et
analysés , sur les données fournies et examinées par la firme d‟audit qu‟elle avait engagée aux fins de cette
enquête, a abouti à la conclusion que la gestion du fonds PETRO CARIBE a été marquée par de graves
anomalies, des irrégularités, des actes de malversations et de prévarication qui font penser que ceux qui ont
eu la responsabilité d‟exécuter les programmes et projets liés aux Résolutions concernant le Fonds PETRO
CARIBE n‟ont pas respecté les normes et les dispositions légales dans l‟attribution des marchés et n‟ont
pas eu non plus le souci de protéger les intérêts de l‟Etat haïtien. Les faits, tels que révélés dans l‟ensemble
des opérations, prouvent que la majorité de ceux et celles qui avaient l‟autorité pour ordonnancer et rendre
opérationnel les décaissements découlant des différentes résolutions ont agi avec un laxisme tel que la
CSSE est parvenue à déduire que dans presque tous les cas répertoriés la négligence, les incohérences et
autres anomalies étaient à répétition. En pareil cas, il ne pouvait plus s‟agir de simples erreurs matérielles
mais plutôt d‟actes susceptibles d‟induire en erreur et de faciliter l‟opérationnalisation de pratiques
illicites, de collusion et de trafic d‟influence. L‟examen des contrats a démontré que plus de la moitié
d‟entre eux ont été signés en dehors des procédures de passation de marchés publics (absence de
transparence, de bonne gouvernance, etc.) et dans l‟irrespect des normes de distribution de contrats (équité,
égalité de traitement, libre concurrence, libre accès à la commande publique etc.). Les lois d‟urgence qui
ont été adoptées par les gouvernements qui se sont succédés de 2008 à 2016 ont permis aux Ordonnateurs
publics et aux Comptables des deniers de l‟État d‟exercer leur pouvoir avec un excès qui frise parfois
l‟indécence. Sous couvert de ces lois, des actes tant à la fois irrationnels qu‟illégaux ont été accomplis en
violation des règlements et des lois sur la comptabilité et les finances publiques.
Toutes les investigations menées auprès des Organismes concernés ont démontré des faiblesses
d‟une telle ampleur qu‟il a fallu considérer tous les cas de façon spécifique et les placer dans un contexte
plus général aux fins d‟établir les responsabilités individuelles et collectives; car il est apparu au fil de
l‟enquête que PETRO CARIBE a été l‟objet d‟une escroquerie à grande échelle. L‟exemple le plus
probant est que la situation actuelle du Fonds PETRO CARIBE et les décaissements effectués à travers les
Treize (13) Résolutions qui le concernent pour la période allant de septembre 2008 à septembre 2016 est
tellement entachée d‟actes irréguliers voir frauduleux qu‟il à été nécessaire de procéder à une analyse des
états financiers du BMPAD, principal et premier acteur dans la gestion du fonds PERO CARIBE . Le
constat est qu‟il est difficile de se prononcer sur l‟exactitude et la fiabilité du solde du fonds, sur les
décaissements et la gestion des contrats. Dès lors, la gestion du Fonds PETRO CARIBE, selon ce qui a été
soumis par le BMPAD, ne reflète nullement la situation financière de ce fonds.
En fait, l‟enquête a clairement démontré avec force détails que :
Les règles de passation de marché n‟ont pas été respectées. Bref, la loi sur la passation des marchés
publics a été systématiquement violée ;
Beaucoup de firmes choisies n‟étaient pas éligibles au moment de la signature de leurs contrats ;
Page 524 sur 656
Les critères d‟ordre technique, juridique et financier n‟ont pas été respectés dans tous les cas ;
Les intérêts de l‟Etat dans la majorité des cas n‟ont pas été protégés ;
L‟efficacité et l‟opportunité des dépenses publiques sont sujettes à de sérieux doutes ;
L‟application des normes relatives à la loi des finances a toujours été écartée;
Le Certificat de non objection de la CNMP dans la majorité des contrats conclus avec des firmes
n‟est pas obtenu;
L‟approbation de la CSC/CA est parfois mentionnée dans certains contrats alors que dans d‟autres
elle n‟existe pas ;
Certains contrats ne comportent pas de date de signature,
Un contrat a même été signé avec une personne décédée ;
Souvent es documents d‟éligibilité ne sont pas conformes;
Les délais d‟exécution des travaux ne sont pas toujours respectés. Parfois, ils sont incomplets ;
Les pénalités de retard ne sont pas prélevées;
Les prélèvements de 2% pour le compte de la DGI ne sont pas indiqués ou sont parfois effectués
sans aucun document attestant leurs paiements ou leur restitution effective à la DGI;
Des écarts positifs matériels sont constatés au niveau du coût d‟un (1) KM de route entre deux (2)
entrepreneurs évoluant dans le même secteur d‟activité, pour la même période et dont les
spécificités des travaux sont similaires..
Certains projets sont exécutés avec mention phase 2 dans un deuxième contrat tandis que le
contrat initial n‟avait nullement prévu des travaux additionnels.
Certains contrats comportent des avenants dépassant le seuil de 30% prévu par la loi ;
Certains contrats font mention de réhabilitation de route sans préciser le nombre de kilomètre à
réhabiliter ;
Le nombre de kilomètre de certaines routes est inférieur à celui défini dans le contrat ;
L‟évidence de surfacturation est constatée dans de nombreux projets ;
Une utilisation abusive des avenants aux contrats initiaux permettant de décaisser des fonds
additionnels pour couvrir les fraudes lors des passations de marchés ;
De plus, une grande partie des projets financés par PETRO CARIBE ont été considérés comme
surfacturés. Cette mauvaise pratique a été installée dans le but de favoriser les versements de prébendes, de
commissions et d‟autres avantages inavouables. Elle constitue un indicateur puissant de la corruption qui a
entaché l‟utilisation du fonds PETRO CARIBE. Ne disposant ni de pouvoir légal, ni de dispositions
statutaires pour accéder aux comptes des personnalités responsables de ces forfaits tant au niveau des
banques locales qu‟ internationales, la Commission souhaite ardemment que la Justice se saisisse de cet
aspect du dossier en mobilisant tous les moyens qui sont mis à sa disposition y compris l‟entraide
judiciaire des partenaires internationaux en vue de mieux appréhender les tenants et aboutissants de ce
dossier et de fixer la responsabilité de ceux et celles qui se sont rendus coupables des infractions perpetrées
à partir de l‟exécution des projets liés au Fonds PETRO CARIBE.
La commission croit qu‟il est aussi opportun de recommander à l‟Assemblée des Sénateurs de se
pencher sur une Résolution qui a été prise par le Gouvernement provisoire de PRIVERT/JEAN-CHARLES,
dans le cadre du fonds PETRO CARIBE.
En ce qui a trait aux acomptes non prélevés au profit de la DGI, lesquels accusent un montant de plus de
deux milliards de Gourdes, ce qui constitue un manque à gagner énorme pour le fisc, la Commission
Page 525 sur 656
recommande que l‟Etat haitien à travers la DGI réclame immédiatement le dit montant, sans préjudices des
poursuites pénales contre les personnes responsables, conformément à la loi.
Fort des considérations qui précèdent la CSSE croit pouvoir déclarer que le Fonds PETRO
CARIBE a été l‟objet de détournement, de concussion, de malversation et prévarication de la part de
ceux et celles qui sont indexé dans le présent rapport. Les cas spécifiques qui ont retenu l‟attention des
Commissaires et pour lesquels la Commission attire particulièrement l‟attention tournent autour des sujets
suivants :
1- Les prélèvements obligatoires de l‟acompte de 2% au profit de la DGI, dans Presque tous les cas, n‟ont
pas été effectués
2- Toutes les firmes Dominicaines et certaines firmes haïtiennes n‟étaient pas éligibles au moment de la
signature des contrats.
3- La route du Cerca Cavajal : Le nombre de Km de la route est inférieur à celui défini dans le contrat.
Elle mesure en réalité 10.5 Km alors que le ministère de la Planification et de la Coopération Externe
a payé pour 17 Km.
4- La place Hugo Chavez : Le contrat a subi deux avenants totalisant 30% du projet. Un deuxième contrat
appelé phase II a été signé avec la même firme
par Yves Germain JOSEPH, ministre de la
Planification d‟alors, sans qu‟il ait été prévu des travaux additionnels dans le contrat initial.
5- Les travaux de réhabilitation/ construction de la route minoterie-Lafiteau (7Km) qui s‟élèvent à US 10,
391,175, réalisés par HL Construction ont été surfacturés. Le coût du Km est donc US 1,484, tandis
que le coût d‟un Km d‟une autre firme évoluant dans le même secteur d‟activité pour la même période
et dont les spécificités des travaux sont similaires est estimé à US 995 ; d‟oû un écart de 489 dollars
américains par km.
6- Les avenants portés aux contrats relatifs à la construction de la route reliant la baie de l‟acul à carrefour
barrière Battant ont dépassé le seuil prévu par la loi. Ils sont arrivés jusqu‟à 82% du cout initial du
projet. Ils sont signés par Jacques ROUSSEAU, Ministre des TPTC.
7- Le marché de Fontamara : Le montant décaissé pour la construction de ce marché est largement
supérieure à l‟état d‟avancement des travaux.
8- La firme J&J Construction qui a signé des contrats avec des maitres d‟ouvrages a été dissoute avant
même la signature desdits contrats.
9- La signature d‟un contrat entre le MSPP et une personne décédée.
10- Intervention directe de certains Ministres des finances au Fond du BMPAD dont Wilson LALEAU,
pour effectuer des décaissements sans aucune résolution en conseil des ministres.
11- Des Directeurs Généraux du BMPAD : Eustache St-Lot et Michael LECORP ont procédés à des
décaissements provenant du fond PETRO CARIBE sans aucune résolution préalable.
Page 526 sur 656
12- Des ministères, tels ceux du Tourisme, de la Santé Publique de la Population n‟ont pu produire des
pièces justificatives relatives aux décaissements des sommes assez importantes sous la gestion de
Madame Stephanie B. VILLEDROUIN et de Madame Florence G. DUPERVAL.
Au regard de toutes les considérations spécifiques et aux conclusions transitoires qui constituent le
fonds et la forme de ce dossier, la Commission Sénatoriale Spéciale d‟Enquête chargée
d‟approfondir l‟enquête menée par la Commission Éthique et Anti-Corruption du Grand Corps
s‟estime en mesure de faire les recommandations suivantes :
Transmettre le dossier présenté par la Commission Sénatoriale Spéciale d‟Enquête (CSSE) et celui
de la Première Commission d‟Éthique et Anticorruption à la Justice en vue de mettre l‟action
publique en mouvement contre les personnes à l‟encontre desquelles elle a relevé des preuves
pouvant les amener à répondre de la justice en fonction d‟un ensemble d‟infractions prévues et
punies par le code pénal haïtien et la loi du 12 mars 2014 portant prévention et répression de la
corruption
Dans cette optique, la commission recommande que l‟action publique soit mise en
contre :
mouvement
1- L‟ancien Ministre des TPTC : Jacques GABRIEL pour forfaiture, concussion et détournement ou
dissipation de deniers publics, faits prévus et punis par les articles 127 et 128, 135 et 340 du Code
Pénal et en conformité aux articles 5.5, 5.8, 5.9, 5.10, 5.12 de la loi du 12 mars 2014 portant
prévention et répression de la Corruption ;
2- Les anciens Directeurs Généraux du BMPAD : Michael LECORPS et Eustache ST-LOT pour
forfaiture, concussion et détournement ou dissipation de deniers publics, faits prévus et punis par les
articles 127 et 128, 135 et 340 du Code Pénal et en conformité aux articles 5.5, 5.8, 5.9, 5.10, 5.12 de
la loi du 12 mars 2014 portant prévention et répression de la Corruption ;
3- L‟ancien Premier Ministre et Ministre de la Planification et de la Coopération Externe Jean Max
BELLERIVE, pour forfaiture, concussion, détournement de deniers publics, faits prévus et punis par
les articles 127, 128, 135 et 340 du Code Pénal, et en conformité aux articles 5.5,5.8,5.9,5.10,5.12 de la
loi du 12 mars 2014 portant prévention et répression de la corruption ;
Contre les membres du comité d‟appel d‟offre qui sont :
4- Hervé DAY, Michel CONTENT et Lionel GRAND PIERRE, pour forfaiture, délits de
fonctionnaires, corruption et concussion, faits prévus et punis par les articles 127, 128, 136, 137 et 135
du Code Pénal ainsi que les dispositions des articles 5.5, 5.8, 5.9, 5.10, 5.12 de la loi du 12 mars 2014
portant prévention et répression de la corruption ;
5- Hebert DOCTEUR, ex Ministre de l‟Agriculture pour usurpation de titre selon les articles 217 et 218
du Code Pénal haïtien.
Page 527 sur 656
6- Laurent Salvador LAMOTHE, ex Premier ministre et Ministre de la Planification et de la Coopération
Externe, pour forfaiture, concussion, détournement de deniers publics et soustraction de deniers
publics, faits prévus et punis par les articles 127, 128, 135, 340 et 130 du Code Pénal, et en conformité
aux articles 5.5, 5.8, 5.9, 5.10, 5.12 de la loi du 12 mars 2014 portant prévention et répression de la
corruption ;
7- Josefa GAUTHIER, pour forfaiture, concussion, détournement de deniers publics, faits prévus et
punis par les articles 127, 128, 135 et 340 du Code Pénal, et en conformité aux articles 5.5, 5.8, 5.9,
5.10, 5.12 de la loi du 12 mars 2014 portant prévention et répression de la corruption ;
8- Jacques ROUSSEAU, pour forfaiture, concussion, détournement ou dissipation de deniers publics,
faits prévus et punis par les articles 127, 128, 135 et 340 du Code Pénal, et en conformité aux articles
5.5, 5.8, 5.9, 5.10, 5.12 de la loi du 12 mars 2014 portant prévention et répression de la corruption ;
9- Marie Carmelle JEAN MARIE, ex Ministre des Finances pour détournement ou dissipation de deniers
publics conformément à l‟article 340 du code pénal et en conformité aux dispositions des articles 5.5,
5.8, 5.9, 5.10, 5.12 de la loi du 12 mars 2014 portant prévention et répression de la corruption.
10- Wilson LALEAU, ex Ministre des Finances, pour détournement ou dissipation de deniers publics
conformément à l‟article 340 du code pénal et en conformité aux dispositions des articles 5.5, 5.8, 5.9,
5.10, 5.12 de la loi du 12 mars 2014 portant prévention et répression de la corruption ;
11- Florence Guillaume DUPERVAL, ex-Ministre de la Santé publique pour forfaiture, concussion,
détournement de deniers publics, soustraction de deniers publics, faits prévus et punis par les articles
127, 128, 135 , 340 et 130 du Code Pénal, et en conformité aux articles 5.5, 5.8, 5.9, 5.10, 5.12 de la
loi du 12 mars 2014 portant prévention et répression de la corruption ;
12- Stéphanie Balmir VILLEDROUIN, ex Ministre du Tourisme publique pour forfaiture, concussion,
détournement de fonds publics, soustraction de deniers publics, faits prévus et punis par les articles
127, 128, 135, 340 et 130 du Code Pénal, et en conformité aux articles 5.5, 5.8, 5.9, 5.10, 5.12 de la loi
du 12 mars 2014 portant prévention et répression de la corruption ;
13- Yves Germain JOSEPH, ex Ministre de la Planification pour forfaiture, concussion, détournement ou
dissipation de deniers publics, soustraction de deniers publics, faits prévus et punis par les articles
127, 128,135, 340et130 du code pénal et en conformité aux dispositions des articles 5.5, 5.8, 5.9, 5.10,
5.12 de la loi du 12 mars 2014 portant prévention et répression de la corruption.
14- Max Rudolph SAINT-ALBIN, pour détournement ou dissipation de deniers publics conformément à
l‟article 340 du code pénal et en conformité aux dispositions des articles 5.5, 5.8, 5.9, 5.10, 5.12 de la
loi du 12 mars 2014 portant prévention et répression de la corruption.
Page 528 sur 656
La Commission recommande aussi de mettre l‟action publique en mouvement contre les responsables
des firmes suivantes :
J & J Construction & Co.
ROFI S.A
IBT S.A
HADOM Constructora S.A
Pour escroquerie conformément aux dispositions de l‟article 337 du code pénal, sans préjudices aux
responsabilités civiles.
En ce qui concerne les firmes ci-dessous mentionnées :
ENSTRAP
MAXITECH S.A.
GPL SOLAR LLC
ESOLAR HAITI
SUNTECH SOLAR HAITI S.A.
ENERSA
BUROCAD
COMPHENER
GREEN SOLAR SPECIALIST, selon les informations recueillies par la Commission lors de son
investigation sur le terrain, elles ont bénéficié des contrats passés de Gré à Gré pour des montants
exorbitants à partir d‟une enveloppe de treize millions de dollars américains segmentés en parts. Ce
qui a permis aux ordonnateurs de violés les règlements de passation de marchés publics et de
pouvoir ainsi octroyer des contras à des compagnies choisies sur la base du clientélisme et du
népotisme. Il faut signaler que ces opérations ont été effectuées en dehors de la période d‟urgence.
Aussi, la Commission recommande-t-elle aux autorités judiciaires d‟approfondir l‟enquête en vue
d‟établir la responsabilité des dirigeants de ces firmes.
Page 529 sur 656
XXXIV RAPPORT FINAL DE L‟EVALUATION TECHNIQUE DES PROJETS
L‟évaluation technique des Projets exécutés ou en cours d‟exécution financés par des fonds Pétro-Caribe
est un audit physique des projets ciblés et considérés comme des échantillons des différents secteurs
d‟activités. Tels que :
1) Les infrastructures routières
2) Les ouvrages d‟art
3) Les marchés publics
4) Les hôpitaux
5) Les centres sportifs repartis à travers les dix départements du pays.
Les principaux critères retenus pour cette évaluation sont :
1) le respect des normes technique requises en matière de construction civile.
2) La description physique des ouvrages
3) L‟état d‟avancement des travaux réalisés
Ce qui permet aux évaluateurs d‟apporter un pourcentage d‟avancement à chaque étape spécifique d‟un
ouvrage quelconque ainsi que l‟état d‟avancement global sur l‟ensemble des travaux réalisés sur le chantier
ce qu‟on peut aussi considérer comme pourcentage d‟appréciation pour les travaux remis aux maitres
d‟ouvrages.
L‟évaluation des projets dits finis n‟arrive pas à se faire en toute intégralité surtout en certaines partie non
vues au cours de l‟exécution. Donc on les apprécie suivant les faits constatés, les matériaux utilisés et le
mécanisme d‟exécution qui peuvent être idéal, qui peuvent être aussi considérés comme gaspillage.
CONSTATS GENERAUX
1) Dans certaines structures, on utilise des aciers d‟une dimension excessive dans certaines phases par
exemple dans le chainage inférieur qu‟on estime comme un facteur du gaspillage. <<Moins d’armature,
moins de ciment égal à moins de sécurité cependant, plus d’armature, plus de ciment ne veut pas dire
pour autant plus de sécurité>>
2) Dans le domaine d‟infrastructure routière on constate qu‟il y a plusieurs tronçons de route sur lesquels
on trouve d‟un côté un projet de réhabilitation et d‟un autre coté un projet de construction et ceci dit
dans un délai très rapproché. Dans ce cas, on devrait tout simplement procéder au processus de la
construction. Exemple : <<Tronçon de route Miragoane-Petite-Rivière et celui de Petite-Rivière-PetitTrou de Nippes >>
Page 530 sur 656
3) Une remarque si importante sur le tronçon de route Carrefour Kans (Cayes)-Camp-Perrin et la route
Cayes-Jérémie.
Soient : a) (AB), la distance Cayes-Camp-Perrin ; b) BC la distance Camp-Perrin-Jérémie, donc la
distance Cayes-Jérémie est :[ AC ]= [AB]+[BC]
Or si [AB] distance Cayes-Camp-Perrin qui représente 1/5 de AC (distance Cayes-Jérémie) est déjà
budgétisé pour construire. Donc il resterait seulement à budgétiser pour le tronçon [BC] qui est CampPerrin-Jérémie.
4) Des effondrements se font sur certaines parties de plusieurs tronçons de route construits en remblais qui
ne sont pas protégé par des murs de soutènement nécessaires. Cependant, il y avait des talus en terre
naturelle qui ne répondaient pas aux attentes pour lesquelles ils étaient faits. Exemple : La rentrée de la
ville de Petite-Rivière de Nippes.
5) Le terrassement de certains tronçons de route qui se fait en déblais nécessite sans doute une plus longue
durée de l‟exécution et un coût plus élevé pour une bonne réalisation. Tout ça peut conduire à la
sollicitation des avenants. Exemple : (Fanm Pa Dra) sur la route de Jérémie et Morne Calebassier sur
la route de Miragoȃne-Petite-Rivière de Nippes
6) Plusieurs constructions de bâtiments publics inachevés, fermés depuis environ 16 à 22 mois. Dans
certaines sont en toiture coffrée et ferraillée mais endommagés après le passage du cyclone Mathieu. En
outre, la fermeture si longtemps de ces chantiers par exemple : Lycée Pétion, Lycée Toussaint et le
Marché Public de Fontamara entrainera des déficits énormes à savoir :
a) la reconstruction de la charpente
b) L’oxydation des aciers exposés à l’air libre surtout aux endroits à fissuration préjudiciable
c) La remise en place du ferraillage
En conséquence, l‟oxydation profonde des aciers peut provoquer d‟autre achat en matière d‟armature au cas
contraire, les aciers endommagé ou oxydés pourraient affaiblir la résistance structurale des bâtiments et
réduire considérablement son espérance de vie.
7) On constate que la couche de béton hydraulique du tronçon de route reliant Coladère et Cerca-Cavajal
et la couche de bitume du tronçon de route Frécyneau-Gonaïves sont trop minces pour répondre aux
trafics et aux dégradations dues à des eaux de ruissellement. Pour ne citer que ça, on constate que la
majorité des tronçons de route évalués engendrent ce même problème tant qu‟au niveau de couches de
bitumes trop minces et souvent un problème de bombement qui laisse séjourner sur la route surtout les
eaux pluviale qui est le plus grand ennemi du béton. Donc, tout ceci affectera sans doute la durabilité
de la route.
8) Les avenants ont pour objet : la modification du montant et la durée des projets. L‟audit physique exige
une analyse sur chaque projet modifié afin de juger les motifs présentés par le maître d‟œuvre et
l‟acceptation du maître d‟ouvrage.
Avant d‟accepter les avenants, le maître d‟ouvrage devrait analyser la nécessité des motifs présentés par
le maitre d‟œuvre. Tout comme, le maitre d‟ouvrage demande parfois des avenants
Dans ce cas, lorsqu‟il s‟agit d‟une demande du maitre d‟ouvrage, dépendamment de la taille de
l‟avenant, il serait mieux de faire un nouveau contrat.
Page 531 sur 656
La majorité des projets évalués, les contrat se font à un prix ferme et non révisable ce qui permet aux
évaluateurs de dire que dans le coût estimatif du projet est inclus un montant destiné aux imprévus
calculé à un pourcentage Avant du coût total du projet.
Un projet bien étudié ne devrait pas avoir d‟avenants à moins qu‟ils soient additionnels et n‟ayant pas la
taille pour constituer un nouveau contrat sauf en cas de forces majeures et les terrassements dans la
construction routière dans des zones rocailleuses qui exige souvent des déviations à ce moment Ŕlà, la
modification est incontournable.
A noter que, l‟évaluation de chaque projet se réalise de manière séparée avec chacun ayant sa fiche
technique et ses propres observations.
LISTE DES PROJETS EVALUES PAR DEPARTEMENT
OUEST
IIIIIIIVVVIVIIVIIIIXX-
Construction du viaduc de Delmas
Construction du viaduc de Carrefour
Marché poisson de Fontamara
Hôpital Simbi de martissant
Construction de la place Hugo Chavez
Construction d‟infrastructures socio-économique au wharf Jérémie à Cité Soleil
Construction du lycée Toussaint Louverture
Construction du lycée Alexandre Pétion
Dragage des exutoires de la baie de Port-au-Prince
Dragage de la rivière Rouyonne de Léogane
NIPPES
XIXIIXIIIXIV-
Construction de la gare routière de Miragoane
Réhabilitation de la place Carrefour Desruisseaux
Réhabilitation et construction de la route Miragoane-Petite-Rivière de Nippes
Réhabilitation et construction de la route Petite-Rivière de Nippes-Petit-Trou de Nippes
Sud
XVXVIXVII-
Construction Aéroport international de l‟Ile-à-Vache
Construction de l‟Aéroport international des cayes
Construction de la route Kans-Camp-Perrin
Grand-Anse
XVIIIXIXXXXXIXXII-
Réhabilitation et Construction de la route Cayes-Jérémie
Construction du pont Roseau
Construction du pont Voldrogue
Construction du wharf de Jérémie
Rénovation urbaine de la Ville de Jérémie
Sud-est
XXIII-
Réhabilitation et construction de la route de la Vallée de Jacmel
Page 532 sur 656
XXIVXXV-
Construction du pont sur la rivière Gauche
Construction du pont sur la rivière de Marigot-Péredo
Artibonite
XXVI-
Réhabilitation du tronçon de route Frécyneau-Gonaïves
Nord
XXVIIXXVIIIXXIXXXXXXXIXXXII-
Réhabilitation des rues du Cap-Haitien
Rénovation urbaine de la ville de la Grande Rivière du Nord
Réhabilitation de la route Ennery-Cap-Haitien
Construction du pont hyppolyte
Rénovation urbaine de la ville de la Grande Rivière du Nord
Réhabilitation de la route Baie d‟Acul/Milot
Nord-Ouest
XXXIIIXXXIV-
Rénovation urbaine de la ville de Port-de-Paix
Construction de la route Carrefour Joff /Port-de-Paix
Centre
XXXVXXXVIXXXVIIXXXVIII-
Rénovation urbaine de la ville de Mirbalais
Rénovation urbaine de la ville de Hinche
Rénovation urbaine de la ville de Lascahobas
Construction de la route Colladère Cerca-Cavajal
Au niveau national
Réhabilitation/construction et aménagement d‟infrastructures sportives au niveau national
(14 centres sportifs)
Page 533 sur 656
No
Projets
1 Const. Marché Fontamara
Hopital Simbi de
2 Martissant
Const. du Viaduc Marine
3 Haitienne
Const. Lycée Toussaint
4 Louverture
Const. Lycée Alexandre
5 Pétion
Cnst inf socio-c. wharf de
6 Jérémie
Const. de la place Hugo
7 Chavez
Const. du Viaduc de
8 Delmas
Drag. Des exutoires de la
9 baie de PauP *
Drainage de la rivière
10 Rouyonne *
Const. route Kans-Camp11 Perrin *
Construction de
12 l'Aéroport des Cayes *
Const. Aéroport Ile-a13 Vache
Gare routière de
14 Miragoane
Const. Place Carrefour
15 Desruisseux
Cons. Route
16 Miragoane/Pte-
Coût.initial
Coût.Estim.
en U.S
Avenants
En U.S
Décaiss en
U.S
% d'av.
Montant
eff. En U.S
Sold. Eff.
En U.S
Soldes
Réels en
U.S
15,647,900
-
15,647,900
8,009,817
56.5
8,841,064
6,806,837
(831,246)
6,000,404
-
6,000,404
5,190,349
69.5
4,170,281
1,830,123
1,020,068
13,635,730
-
13,635,730
3,408,932
36.87
5,027,494
8,608,236
(1,618,562)
8,029,900
-
8,029,900
3,581,904
70.63
5,671,518
2,358,382
(2,089,614)
7,696,012
-
7,696,012
3,610,901
76
5,848,969
1,847,043
(2,238,068)
18,411,135
5,517,257
23,928,392
14,279,220
94
22,492,689
1,435,704
(8,213,469)
3,052,428
-
3,052,428
1,916,818
93
2,838,758
213,670
(921,940)
16,588,378
4,914,364
21,502,743
21,585,528
97.85
21,040,434
462,309
545,095
11/12/13-22/07/15
15/04/15-22/07/1521/12/12
21/12/12-11/12/1322/0715-06/01/16
17,500,000
-
17,500,000
17,330,124
25
4,375,000
13,125,000
12,955,124
21/12/12 - 11/12/12
4,000,000
-
4,000,000
4,000,000
35
1,400,000
2,600,000
2,600,000
21/12/12
7,500,000
-
7,500,000
7,500,000
55.66
4,174,500
3,325,500
3,325,500
12/5/2011
8,000,000
-
8,000,000
7,242,449
81.27
6,501,600
1,498,400
740,849
21/12/12
19,525,143
-
19,525,143
4,989,242
7.5
1,464,386
18,060,757
3,524,856
21/12/12
7,735,135
-
7,735,135
2,018,637
34
2,629,946
5,105,189
(611,309)
15/04/15-22/07/15
2,500,000
-
2,500,000
1,928,501
78.2
1,955,000
545,000
(26,499)
18/07/12 -21/12/12
27,831,472
4,286,015
32,117,487
21,831,472
80
25,693,990
6,423,497
(3,862,518)
11/2/2010
Résolutions
21/12/12-15/04/1506/01/16
21/12/12-11/12/1322/07/15
21/12/12
11/12/13-15/04/1522/07/15-21/12/12
15/04/15-21/12/1211/12/13
Page dxxxiv sur 656
17
18
19
20
21
22
23
24
25
26
27
Riv.Nippes
Const. Route Pte-Riv/PtTrou Nippes
Const. de la Route La
Vallée
Const. Route Carrefour
44/Cotes de Fer*
Const. Pont sur la Rivière
Gauche
Const. pont sur la Rivière
Pérédo
Rénov. urbaine de la ville
de Jacmel *
Const. route CayesJérémie *
Const. du pont sur la
Rivière Roseau
Const. pont sur la rivière
Voldrogue *
Construction du wharf de
Jérémie *
Rén. urbaine de la ville
de Jérémie *
Réh. De la route
Frécyneau/Gonaives
28
30,849,738
-
30,849,738
18,841,622
15
4,627,461
26,222,277
14,214,161
23,212,146
-
23,212,146
15,483,704
42.8
9,934,798
13,277,348
5,548,906
55,724,067
-
55,724,067
28,887,967
55.82
31,105,174
24,618,893
(2,217,207)
8,682,762
2,074,238
10,757,000
8,406,842
98.87
10,635,446
121,554
(2,228,604)
8,557,634
2,178,392
10,736,026
5,929,220
90.11
9,674,233
1,061,793
(3,745,013)
21/12/12-23/07/1422/07/15 - 15/04/15
21/12/12-11/12/1323/07/14
21/12/12 - 28/02/12 23/07/14
11/12/13-21/12/1222/07/15
21/12/12-11/12/1322/07/15
28,000,000
-
28,000,000
21,740,083
35
9,800,000
18,200,000
11,940,083
21/12/12 - 28/02/12
5,500,000
-
5,500,000
3,327,500
35
1,925,000
3,575,000
1,402,500
21/12/12 - 12/05/11
8,469,886
-
8,469,886
5,118,950
98.62
8,353,001
116,884
(3,234,051)
21/12/12-11/12/13
7,429,818
-
7,429,818
4,809,882
92.62
6,881,497
548,321
(2,071,616)
18,500,000
-
18,500,000
11,303,550
55.71
10,306,350
8,193,650
997,200
21/12/12 - 11/12/13
15/04/15 - 11/12/13 21/12/12
5,000,000
-
5,000,000
3,583,861
20
1,000,000
4,000,000
2,583,861
11/12/2013
58,709,656
-
58,709,656
73,190,699
68.66
40,310,050
18,399,606
32,880,649
11/02/10 -24-08-10
28/02/12
9,818,245
2,029,262 11,847,507
5,967,097
24
2,843,402
9,004,105
3,123,695
21/12/12 - 11/12/13
7,098,335
1,669,494 8,767,831
5,455,088
82.25
7,211,541
1,556,290
(1,756,453)
24/08/10 - 11/12/13
2,500,000
-
2,500,000
2,500,000
35
875,000
1,625,000
1,625,000
11/12/2013
750,000
-
750,000
742,958
30
10
225,000
525,000
517,958
11/12/2013
24/08/10 - 28/02/12 -
`Réh.de la route
Ennery/Cap-Haitien
29
30
31
32
33
Construction du pont
Hyppolite
Réh. Des rues ville CapHaitien *
Réh. Urbaine ville
Grande Riv. Nord *
Réh. Route Baie
Page dxxxv sur 656
d'Acul/Milot
Rén. Urbaine ville Port34 de-Paix *
const. route carrefour
35 Joff/Port-de-paix
Const. 15 ponts route
36 Joff/Port-de-Paix *
Rén. urbaine ville
37 Mirebalais
Rén. urbaine ville de
38 Hinche *
Rén. Urbaine ville
39 Lascahobas
26,984,885
8,636,546 35,621,431
19,555,106
5,000,000
-
2,830,254
5,000,000
Contrat non fourni
22,965,438
35
3,562,143
32,059,288
15,992,963
11/12/13
1,750,000
3,250,000
1,080,254
11/12/2013
7
22,965,438
20,483,190
67.5
15,501,671
7,463,767
4,981,519
18,981,625
-
18,981,625
18,490,347
35
6,643,569
12,338,056
11,846,778
11/02/10 - 28/02/12
11/02/10 - 22/07/15 21/12/12 - 11/12/13 15/04/15
21,174,928
-
21,174,928
16,535,271
40
8,469,971
12,704,957
8,065,300
12/5/2011
45
-
-
-
Const. route
40 Coladère/Cerca-Cavajal
20,894,909
2,703,777 23,598,686
9,044,977
85.6
20,200,475
3,398,211
(11,155,498
)
Projet Gazonnage 14
41 Centres Sportifs
34,961,527
500,146
25,617,683
49.99
17,727,290
17,734,382
7,890,393
35,461,673
Solde Réels
REMARQUE:
Lorsque le Solde Réel est (-) cela signifie que le maitre d'ouvrage a un solde pour le maitre d'oeuvre.
Lorsque le Solde Réel est (+) cela signifie que le maitre d'oeuvre a un solde pour le maitre d'ouvrage.
Lorsque le solde réel est nul cela signifie qu'il y a l'équilibre.
Les photos 37 et 39 sont regroupées en un seul contrat.
21/12/12-06/01/16
12/05/11 -28/02/1218/07/12 - 22/07/15 15/04/15 - 11/12/1323/07/14
94,690,653
Page dxxxvi sur 656
I1)
2)
3)
4)
5)
6)
Construction Marché de poisson de Fontamara
Sommaire
Localisation
Description
Matériaux utilisés
Niveau d‟avancement
Observations et Conséquences
Photos
1) Localisation
Ouest
Carrefour
Fontamara 31
Très préjudiciable
Département
Commune
Adresse
Fissuration
2) Description
Type de projet
Utilisation
Fin utile
Nombre de niveaux
Nombre de places
Position géographique
Nord
Sud
Est
Ouest
Golf de la Gonâve
Route nationale #2
Parcelle limitrophe
Place Fontamara
Construction bâtiment publique
Marché
Valorisation du secteur de la pêche
R+ 1
Thème de référence !!!
1) Matériaux utilisés
RDC
Dalle
Parquet : Sable, ciment, gravier, sable, aciers (3/4‟‟, 5/8‟‟, ½‟‟, Plancher : Blocs de faume, béton
3/8‟‟)
armé
Élévation : Blocs : 20, 15, 10, mortier
Toiture : Blocs de faume, béton
armé
Colonne : béton armé
2) Niveau d‟avancement
Activités
Préparation du site
Installation de chantier
Fondation
Parquet
Elévation
Dalle de plancher
Toiture
Installations hydro-sanitaires et frigorifiques
Installations électriques
Travaux de finition
Aménagement de la cour
Clôture
Pourcentage (%) d‟avancement
100
100
100
60
50
75
30
35
5
0
10
0
Page 537 sur 656
Moyenne d‟avancement globale
56.5
3) Observations et conséquences
a) Le chantier étant au bord de la mer donc cela sous-entend qu‟il est exposé à un risque très élevé quant à
l‟oxydation des métaux. Les pièces telles que : le parquet, les dalles et certaines colonne ferraillés non-coulé en
béton peuvent non seulement exposer les métaux à l‟oxydation mais aussi réduire à la résistance du bâtiment et
à sa durée de vie.
b) Le passage du cyclone Mathieu a beau endommagé le coffrage qui a été mis en place pour le coulage de la dalle
de toiture, bien que celui allait devoir se refaire suite à la longue durée de stoppage des travaux.
c) Des parois en béton armé sont construites pour permettre au bâtiment de mieux résister aux secousses
sismiques et l‟utilisation des blocs en faume est idéale pour alléger le poids du bâtiment.
d) En tout dernier lieu, on constate que le chantier est sécurisé mais non opérationnel.
4) photos
Façade principale du marché de Fontamara
Page 538 sur 656
Façade nord du marché de Fontamara
Etat de la toiture du marché de Fontamara
Page 539 sur 656
Ferraillage du parquet
Les comptoirs du marché de Fontamara
II-
Hôpital Simbi de Martissant
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Département
Commune
Adresse
Ouest
Carrefour
Martissant 25, Rte Nle
#2
Position géographique
Nord
Sud
Est
Rte Nle # 2
Parcelle limitrophe
Parcelle limitrophe
Page 540 sur 656
Fissuration
Préjudiciable
Ouest
Parcelle limitrophe
2) Description
Type de projet
Utilisation
Nombre de niveaux
Construction bâtiment publique
Services sanitaires
1
3) Structure de l‟ouvrage : Béton armé, blocs, brique ect….
4) Niveau d‟avancement
Activités
Préparation du site
Instillation de chantier
Structure générale du bâtiment
Installations sanitaires
Installations électriques
Ouvertures
Revêtement
Aménagement de la cour
Clôture
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement
100
100
100
75
80
80
70
30
60
69.5
5) Observation:
Le chantier de l‟Hôpital Simbi Continental est en cours, les activités comme ; L‟installation sanitaires, les finitions, la
clôture sont quelques parmi les travaux qui restent à réaliser pour arriver à son achèvement.
6) Les Photos
Page 541 sur 656
Hôpital Simbi Continental de Martissant
Hôpital Simbi Continental
III-
Construction Viaduc Marine Haïtienne
Sommaire
1) Localisation
2) Description
Page 542 sur 656
3)
4)
5)
6)
Structure de l‟ouvrage
Niveau d‟avancement
Observations
Photos
1) Localisation
Département
Commune
Adresse
Fissuration du milieu
2) Description
Type de projet
Utilisation
Fin utile
Ouest
Carrefour
Bizoton 51 à côté de la Marine Haïtienne
Très préjudiciable
Ouvrage d‟art
Circulation routière
Empêcher l‟embouteillage de la circulation
3) Structure de l‟ouvrage : Béton armé
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Installation de l‟infrastructure
Installation du tablier
Superstructure
Éléments décoratifs
Passages collatéraux
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement des travaux
100
100
95
0
0
0
0
36.87
5) Observations
La construction des ouvrages d‟art nécessite du temps, mais la construction du Viaduc du Carrefour met trop de
temps pour arriver à terme car elle constitue un obstacle pour la circulation de la zone.
6) Photos
Page 543 sur 656
Structure de base du Viaduc de la Marine Haïtienne
Le chantier de construction du viaduc de la Marine Haïtienne en cours
Page 544 sur 656
IV- Construction du Lycée Toussaint Louverture
Sommaire
1) Localisation
2) Description
2) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Département
Commune
Adresse
Fissuration
Ouest
Port-au-prince
Angle R. St-Honoré & R. du
Centre
Peu préjudiciable
2) Description
Type de projet
Utilisation
Nombre de niveaux
Nombre de salles de classe
Nombre de laboratoires
Salle de sports cérébraux
Nombre de bureaux
Infirmerie
Salle des professeurs
Salle amical des anciens
Position
géographique
Nord
Sud
Est
R. du Centre
R. St-Honoré
Rue Jn-Paul l II
Ouest
Place Sainte-Anne
Construction bâtiment publique
Ecole
R+1
24
2
1
6
1
1
1
3) Structure de l‟ouvrage : béton armé, blocs, adoquin, métal
4) Niveau d‟avancement
Activités
Préparation de sites
Installation de chantier
Structure générale des bâtiments
Installations sanitaires
Installations électriques
Ouvertures
Revêtement
Terrain de foot
Terrain basket
Parking
Dortoir
Aménagement de la cour
Construction du puits artésien
Construction du réservoir
Clôture
Pourcentage
d‟avancement
(%)
du
niveau
100
100
76.55
70
72
80
70
98
95
10
50
60
98
0
80
Page 545 sur 656
Moyenne d‟avancement globale
70.63
5) Observation
a) L‟exécution de l‟ouvrage se fait en deux (2) phases.
La première phase est constituée de deux (2) bâtiments totalisant 24 salles de classe et les bureaux administratifs, une
infirmerie, une salle d‟Amical des anciens, salle des professeurs, un terrain de foot, une bibliothèque, un laboratoire
informatique de 48 PC opérationnels, 2 blocs sanitaires totalement meublés.
La deuxième phase est constituée : d‟une cafétéria, d‟une salle de sports cérébraux, un terrain de basketball, un parking,
d‟un réservoir de 1500 gallons, d‟un auditorium, d‟un dortoir, d‟un laboratoire de sciences, d‟un appartement pour
gardien et la construction de la clôture qui ne sont pas encore achevés.
b) La fermeture du chantier depuis environ un mois laisse par terre certains matériaux tels que : (aciers, planches
de coffrage, étaies métalliques et autres) exige à la firme d‟exécution de laisser sur place un ingénieur résident
et des agents de sécurité.
6) Photos
Façade nord du lycée Toussaint Louverture
Page 546 sur 656
Façade principale du lycée Toussaint Louverture
Page 547 sur 656
Façade principale du lycée Toussaint Louverture
Partie inachevée du lycée Toussaint Louverture
Page 548 sur 656
V-
Construction du Lycée Alexandre Pétion
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Département
Commune
Adresse
Fissuration (risque)
Ouest
Port-au-prince
R. Pétion, à côté de la Cathédrale
Peu préjudiciable
2) Description
Type de projet
Utilisation
Nombre de niveaux
Nombre de salles de classe
Nombre de laboratoires
Salle de sports cérébraux
Nombre de bureaux
Infirmerie
Salle des professeurs
Construction bâtiment publique
Ecole
3
24
3
0
6
0
1
3) Structure de l‟ouvrage : béton armé, blocs, adoquin, métal
4) Niveau d‟avancement
Activités
Préparation de sites
Installation de chantier
Structure générale des bâtiments
Installations sanitaires
Installations électriques
Ouvertures
Revêtement
Terrain de foot
Terrain basket
Parking
Dortoir
Aménagement de la cour
Construction du puits artésien
Clôture
Moyenne d‟avancement globale
Pourcentage (%) du niveau d‟avancement
100
100
65
70
72
80
70
0
98
90
?
75
98
70
76
Page 549 sur 656
5) Observations
La construction du lycée se fait en deux phases :
Une première achevée qui est constituée de la partie secondaire de 24 salles de classe et les bureaux administratifs, de la
cafétéria, de deux laboratoires de langue, d‟une bibliothèque, d‟un auditorium, d‟une salle de professeur, d‟un bloc
sanitaire, d‟un laboratoire de sciences non opérationnel et d‟un terrain de basketball.
Une deuxième phase inachevée constituée de la partie primaire et du terrain de foot et autres.
A noter que, la dalle du rez-de-chaussée de la partie primaire est coffrée et ferraillée depuis environ 18 mois où le
chantier est fermé avec surveillance des agents de sécurité.
6) Photos
Façade achevée du lycée A. Pétion
Partie inachevée du lycée
Page 550 sur 656
VI- Construction d‟infrastructures sociocommunautaires au Wharf de Jérémie à Cité Soleil
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Wharf Jérémie à Cité soleil (département de l‟Ouest)
2) Description
Type de projet
Utilisation
Fin utile
Nombre de niveaux des bâtiments
Bâtiment publique
Ecole, marché
Service socio-économique
1-2
3) Structure de l‟ouvrage : Béton armé, blocs, brique chaussée semi-rigide ect….
4) Niveau d‟avancement
Activités
Préparation du site
Instillation de chantier
Structure générale du bâtiment
Installations sanitaires
Installations électriques
Ouvertures
Revêtement
Aménagement de la cour
Clôture
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement
100
100
100
90
90
98
98
85
85
94
5) Observation
Apparemment le projet est achevé, mais il n‟est pas remis pour son utilisation
Page 551 sur 656
6) Photos
Wharf de Jérémie à Cité Soleil
Page 552 sur 656
Marché de Cité Soleil
Intérieur du marché de Cité soleil
Page 553 sur 656
VII- Construction de la place Hugo Chavez
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : La place Hugo Chavez se trouve près de l‟aéroport de Toussaint Louverture entre la route de
l‟Aéroport et la route de Gérald Bataille
2) Description
Type de projet
Utilisation
Terrain de foot
Kiosque
Jet d‟eau
Parc de jeux d‟enfants
Blocs sanitaires
Eclairage
Place publique
Service socio-culturel
1
1
1
1
1
Existent
3) Structure de l‟ouvrage : Béton armé, blocs, brique métal ect….
4) Niveau d‟avancement
Activités
Préparation du site
Instillation de chantier
Structure générale du bâtiment
Installations sanitaires
Eclairage
Terrain de foot
Terrain de basket
Revêtement
Aménagement de la cour
Clôture
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement
100
100
98
98
90
60
90
98
98
98
93
5) Observations
La place est accédée avec un terrain de football non gazonné.
A noter qu‟un manque d‟entretien régulier entraine le disfonctionnement du jet d‟eau, le vieillissement des
lampadaires, la pousse des herbes sauvages au niveau de l‟espace vert et la détérioration au niveau de certaines
structures de l‟espace.
Page 554 sur 656
6) Photos
Kiosque de la Place Hugo Chavez
Terrain de basketball de la place Hugo Chavez
Page 555 sur 656
Espace vert Place Hugo Chavez
Page 556 sur 656
Terrain de foot de la place non gazonné
Le gradin du terrain d‟un jeu
Page 557 sur 656
VIII-
Construction du Viaduc de Delmas
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Département
Commune
Adresse
Fissuration du milieu
Ouest
Delmas
Axe Rte de Delmas et Carrefour Aéroport
Peu préjudiciable
2) Description
Type de projet
Utilisation
Fin utile
Ouvrage d‟art
Circulation routière
Empêcher l‟embouteillage de la circulation
3) Structure de l‟ouvrage : Béton armé et métal
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Installation de l‟infrastructure
Installation du tablier
Superstructure
Éléments décoratifs
Passages collatéraux
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement des travaux
100
100
100
100
95
90
100
97.85
5) Observations
Des affaissements sont constatés au niveau des chaussées des voies collatérales qui pourraient être dûs par l‟une ou
plusieurs causes suivantes :
1) La qualité des matériaux constitutifs des couches (de fondation, de base, de roulement)
2) Erreurs opérationnelles lors des travaux de compactage
3) Des secousses sismiques
Page 558 sur 656
6) Photos
Viaduc de Delmas
Viaduc de Delmas
Page 559 sur 656
IX- Dragage des exutoires de la baie de Port-au-Prince
Sommaire
1) Localisation
2) Description
3) Niveau d‟avancement
4) Observations
5) Photos
1) Localisation : Commune de Port-au-Prince
2) Description
Normalement les exutoires devraient être utilisées pour collecter les eaux usées et les drainent vers d‟autres endroits,
mais notre réalité ils se servent de poubelles
3) Observations
On ne peut pas évaluer le niveau d‟avancement de ces travaux car même si on les a dragués, ils restent encore au même
état qu‟avant toutefois qu‟ils reçoivent des déchets solides.
4) Suggestions
La situation reste inchangée vue à des mauvaises utilisations des canaux à eaux usées.
Dans ce cas, il faudrait une autre stratégie pour empêcher le rejet des débris solides à travers les canaux. Il faudrait aussi
penser à résoudre le problème en amont vue à des constructions anarchiques et le déboisement dans les hauteurs qui
peuvent causer l‟obstruction des exutoires à l‟arrivée des alluvions et autres déchets divers au moment des pluies.
5) Photos
Etat d‟un exutoire à ciel ouvert de Port-au-Prince
Page 560 sur 656
Exutoire de la baie de Port-au-Prince
Page 561 sur 656
X-
Drainage de la rivière Rouyonne
En général, les travaux de dragage ne devraient pas être considérés comme un projet viable car l‟alluvionnement des
rivières ne peut être traité qu‟en amont afin de diminuer le volume des alluvions au moment des crus.
Dans le cas de la rivière Rouyonne, les travaux de dragage sont en cours par une institution étatique (CNE)
On conclure que les travaux de dragage des rivières devraient être un entretien du ministère en charge quand c‟est
nécessaire.
1) Photos
Dragage de la rivière en cours de réalisation
Page 562 sur 656
Le CNE aux travaux de dragage de la rivière
Page 563 sur 656
XI-
Construction de la route Kans-Camp-Perrin
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Département du Sud (Commune Cayes et Camp-Perrin)
2) Description
Entités
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
inachevées
Acceptable, inachevé
Aucune
Aucune
standard
Flexible (bitumineuse)
inachevé
Peu Construits
passable
Aucun
Mauvais
Bonne
3) Structure de l‟ouvrage : La route est constituée de différents types de structures suivant le type
d‟ouvrage en question.
a) Drainage : béton hydraulique, maçonnerie de roche, buse de drain
b) Ouvrage d‟art: Béton armé
c) Chaussée : béton bitumineux
4) Niveau d‟avancement
Activités
Terrassement et déblais
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Pourcentage (%) d‟avancement
100
85
60
0
0
98
75
90
80
0
0
Page 564 sur 656
Visibilité dans les courbes
Pourcentage global
80
55.66
5) Observations
Le tronçon de route Kans-Camp-Perrin, partant près de l‟Aéroport Antoine Simon (Cayes) est en phase de
construction tout en respectant certaines normes requises de la technique routière. Le chantier est à un
niveau d‟avancement moyen comme indique le tableau de pourcentage.
6) Photos
Bétonnage de la route Kans Camp-Perrin en cours
Page 565 sur 656
Bétonnage de la route Kans Camp-Perrin en cours2
Terrassement de la partie restante
Page 566 sur 656
XII-
Construction de l‟Aéroport des Cayes
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Kans, Commune des Cayes (Département du Sud)
2) Description
Entités
Réception
Piste d‟atterrissage
Porte d‟embarquement &
débarquement
Tour de contrôle
Restaurant
Bloc sanitaire
Drainage
Eclairage
Aménagement de la cour
Parking
Clôture
Sécurité
Appréciations
achevée
Achevée
Acceptable
Existant
Construit
Construit
Acceptable
Suffisant
Acceptable
Peu acceptable
Acceptable
Acceptable
3) Structure de l‟ouvrage : Béton armé, béton hydraulique, maçonnerie de roche, grille métallique, tôles
ect…
4) Niveau d‟avancement
Activités
Réception
Piste d‟atterrissage
Porte
d‟embarquement
débarquement
Tour de contrôle
Restaurant
Bloc sanitaire
Drainage
Eclairage
Aménagement de la cour
Parking
Clôture
Sécurité
Moyenne d‟avancement global
&
Pourcentage (%) d‟avancement
95
96
65
Pas d‟infos
80
60
80
85
90
60
98
85
81.27
Page 567 sur 656
5) Observations et suggestions
a) L‟ouvrage est remis au maître d‟ouvrage et opérationnel. Cependant, nous constatons qu‟on devrait
augmenter le nombre de toilettes pouvant desservir à la fois plusieurs personnes, malheureusement
elles sont au nombre de deux (2) dont l‟une destinée aux femmes et l‟autre aux hommes.
b) La porte d‟embarquement et de débarquement ne répond pas à tous les critères nécessaires afin de
faciliter les handicapés et généralement les passagers aux intempéries.
6) Photos
Aéroport Antoine Simon des Cayes
Page 568 sur 656
Piste d‟atterrissage
Administration de l‟aéroport
Page 569 sur 656
XIII- Construction de l‟Aéroport de l‟Ile –à- Vache
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Ile-A-Vache, commune des Cayes, Département du Sud.
2) Description
Entités
Réception
Piste d‟atterrissage
Tour de contrôle
Restaurant
Bloc sanitaire
Drainage
Eclairage
Aménagement de la cour
Parking
Clôture
Sécurité
Appréciations
Non construite
Inachevée
?
Non construit
Non Construit
Partiel
?
?
?
Non construit
?
3) Structure de l‟ouvrage : Seulement le terrassement de la piste d‟atterrissage est aménagé au niveau de
la couche de base et du compactage.
4) Niveau d‟avancement
Activités
Réception
Piste d‟atterrissage
Porte
d‟embarquement
débarquement
Tour de contrôle
Restaurant
Bloc sanitaire
Drainage
Eclairage
Aménagement de la cour
Parking
Clôture
Sécurité
Moyenne d‟avancement global
&
Pourcentage (%) d‟avancement
0
60
?
?
0
0
30
0
0
0
0
0
7.5
Page 570 sur 656
5) Observations
a) La réalisation de l‟ouvrage est à un bas niveau d‟avancement sans tenir compte des difficultés et
contraintes pour l‟arrivée des matériels et matériaux sur le site qu‟on ne peut pas trouver dans la
commune en question.
b) A noter que le maitre d‟œuvre a construit des pavillons avec des structures en bois, tôles utilisés
pour son administration et un pavillon en béton armé, en toiture métallique qui pourraient
finalement utiliser pour les services dudit aéroport.
c) Le chantier est fermé depuis environ 18 mois, mais on observe des matériaux restant sur le site tels
que : sable, gravier.
6) Photos
Piste d‟atterrissage de l‟aéroport de l‟Ile-A-Vache
Cour de l‟aéroport de l‟Ile-A-Vache
Page 571 sur 656
Dortoirs provisoires de l‟Aéroport de l‟Ile-A-Vache
Matériaux restants sur le site
Page 572 sur 656
XIV-
Gare routière de Miragoȃne
Sommaire
1)
2)
3)
4)
5)
6)
Localisation
Description
Matériaux utilisés
Niveau d‟avancement
Observations et Conséquences
Photos
1) Localisation : Route Nationale # 2, Station Miragoȃne Port-au-Prince
2) Description
Type de projet
Construction publique
Utilisation
Marché, Gare routière et autres
Nombre de places
inconnu
Clôture
inachevé
Voie d‟accès
inachevé
Drainage du site
Inachevé
Éclairage
Non construit
Terre-plein central
inachevé
Bloc sanitaire
Non construit
Construction des pavillons du Marché
inachevé
3) Matériaux utilisés : Roche, sable, ciment, gravier, eau, métal, barre d‟acier ect..
Activités réalisées
Clôture
Voie d‟accès
Terre-plein central
Construction du Marché
Garage
4) Niveau d‟avancement
Activités
Préparation du site
Installation de chantier
Fondation
Parquets des bâtiments à construire
Elévation
Dalle
Toiture
Voies d‟accès
Installations hydro-sanitaire et frigorifiques
Installations électriques
Travaux de finition
Aménagement de la cour
Structure
Béton armé, maçonnerie de roches, métaux
Couches de base (Tout venant d‟une rivière)
Béton hydraulique
Béton armé, fondation
Couche de fondation et couche de base (Tout
venant)
Pourcentage (%) d‟avancement
100
100
30
10
0
?
0
50
0
0
5
25
Page 573 sur 656
Clôture
Mur de soutènement
Drainage
Moyenne d‟avancement globale
65
10
85
34
5) Observations et conséquences
a) Le site est complètement préparé au niveau de la fondation, du déblais/remblais et le compactage
total, prêt à recevoir les infrastructures conçues pour le projet.
b) Les travaux tels que : drainage, voie d‟accès à l‟intérieur du site, clôture sont à un niveau
d‟avancement considérable.
c) On constate début de la construction de deux (2) structure apparemment identiques dont l‟une est
dans la phase de fondation et béton de propreté à travers les lignes de fondation alluvionnées suite
aux arrêt du chantier et l‟autre atteint le niveau du parquet ferraillé, couvert de tapis afin de protéger
les aciers contre la rouille.
d) La clôture atteint un niveau très avancé. Cependant, le mur de soutènement inachevé qui devrait
protéger une partie de la clôture qui se trouve au côté la route nationale #2 peut entrainer une grave
conséquence (l‟éboulement etc..).
e) Le Chantier est fermé depuis environ neuf (9) mois.
6) Photos
Etat de la voie d‟accès de la gare de Miragoâne
Page 574 sur 656
Parquet ferraillé et couvert pour éviter la rouille
Drainage de la gare de Miragoȃne
Page 575 sur 656
Mur de soutènement inachevé
Etat d‟aménagement de la cour
Page 576 sur 656
XV-
Construction de la place de Carrefour Desruisseaux
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : La place se trouve au Carrefour Desruisseaux à l‟entrée de la ville de Miragoâne sur la route
Nationale #2
2) Description
Type de projet
Utilisation
Terrain de basketball
Jet d‟eau
Parc de jeux d‟enfants
Blocs sanitaires
Eclairage
Parc d‟attraction
Réservoir d‟eau
Place publique
Service sportif et culturel
1
2
1
?
Existent
1
1
3) Structure de l‟ouvrage : Béton armé, blocs, métal, Adoquin ect….
4) Niveau d‟avancement
Activités
Préparation du site
Instillation de chantier
Structure générale
Installations sanitaires
Eclairage
Terrain de basket
Revêtement
Aménagement de la cour
Clôture
Parc d‟attraction
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement
100
100
98
0
90
60
98
98
98
40
78.2
5) Observations
a) La construction de la place est achevée depuis environ 40 mois avec, un éclairage suffisant pour
l‟espace par des lampadaires qui ne sont pas de bonne qualité et des luminaires électriques
dysfonctionnels par manque d‟énergie et d‟entretien.
b) Le terrain de basket est loin d‟être régulier car l‟espace de jeu est trop petit et il n‟y a pas d‟espace
pour les spectateurs.
Page 577 sur 656
6) Photos
Partie ouest de la place de Carrefour Desruisseaux
Partie centrale de la place de carrefour Desruisseaux
Page 578 sur 656
Partie Est de la place de carrefour Desruisseaux
Mini parc d‟attraction de la place de carrefour Desruisseaux
Page 579 sur 656
XVI- Construction de la route Miragoȃne/Petite-Rivière de Nippes
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Ce tronçon se débute au Carrefour Calebassier de la route nationale #2 pour finir à l‟entrée de la ville de
Petite-Rivière de Nippes.
2) Description
Entités
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
acceptable
Très bien
bien
standard
Flexible (bitumineuse)
Acceptable
Construits
passable
Très bien
Mauvais
Moyenne
3) Structure de l‟ouvrage : La route est constituée de différents types de structures suivant le type
d‟ouvrage en question.
a) Drainage : béton hydraulique, maçonnerie de roche, buse de drain
b) Ouvrage d‟art: Béton armé
c) Chaussée : béton bitumineux
4) Niveau d‟avancement
Activités
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Drainage
Ouvrages d‟arts
Accotement
Pourcentage (%)
d‟avancement
100
98
95
98
90
80
70
Page 580 sur 656
Parapet
Eclairage des rues
Visibilité dans les courbes
Moyenne d‟avancement globale
98
0
75
80
5) Observations
a) Ce tronçon de route est construit où dans une certaines parties les travaux de terrassement a exigé un
travail hautement mécanisé pouvant aussi exiger un coût élevé.
b) Dans certaines zones, la route est traversée par plusieurs mangroves et elle se comporte très bien, ce qui
expliques que les travaux à travers les couches de fondation et de base dans ces zones ont été bien exécutés.
D‟un autre côté on observe plusieurs effondrements et endommagements de la chaussée dus à l‟absence des
murs de soutènement remplacés par des talus naturels ne pouvant pas résister aux cas de forces majeures ou
de catastrophes naturelles et à l‟absence des dalots nécessaires non réalisés.
6) Photos
A environ 8 km du début de la route Miragoȃne-Petite-Rivière de Nippes
Page 581 sur 656
Existence de la signalisation
Existence de la signalisation2
Page 582 sur 656
Effondrement de la route dû au non traitement de la base
Détérioration de la chaussée dû au problème de drainage
Page 583 sur 656
XVII- Construction de la route Petite-Rivière de Nippes/Petit-Trou de Nippes
Ce tronçon de route qui devrait commencer de Petite-Rivière vers Petit-Trou de Nippes atteint
plusieurs phases différentes
inachevées et simultanément telle que : Le terrassement,
l‟aménagement de certaines couches de base et réalisation de certains ouvrages d‟arts.
En gros, on peut dire que les travaux réalisés dans ce tronçon représentent environ 15% des
contenus du projet.
Et encore pire on voudrait inverser l‟ordre des travaux en préférant de commencer de Petit-Trou à
Petite-Rivière qui exigera de toute façon une plus longue durée et un coût plus élevé.
1) Photos
Dalot en construction non achevé du tronçon Petite-Rivière/Petit-Trou
Page 584 sur 656
Travaux de terrassement du tronçon Petite-Rivière/Petit-Trou de Nippes
Effondrement des couches de base du tronçon Petite-Rivière/Petit-Trou de Nippes
Page 585 sur 656
Préparation de la base à la plaine Baconoire
Page 586 sur 656
XVIII- Construction de la route de La Vallée
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Ce tronçon se débute après la rivière Gauche, limite de la commune de Jacmel et celle de La Vallée de
Jacmel pour se terminer à l‟entrée du centre-ville de la commune de La Vallée de Jacmel.
2) Description
Entités
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
Insuffisante
Aucune
Aucune
standard
Bitumineux & Hydraulique
Acceptable
Construits
passable
Aucun
Aucun
Bien
3) Structure de l‟ouvrage : La route est constituée de différents types de structures suivant le type
d‟ouvrage en question.
1) Drainage : béton hydraulique, maçonnerie de roche, buse de drain
2) Ouvrage d‟art: Béton armé
3) Chaussée : béton bitumineux, béton hydraulique
4) Niveau d‟avancement
Activités
Couche de roulement
Nombre de voies
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Drainage
Ouvrages d‟arts
Pourcentage (%) d‟avancement
65
2
0
0
98
90
95
Page 587 sur 656
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Pourcentage global
90
0
0
95
42.8
5) Observations
a) La couche de béton bitumineux se révèle trop mince pour une route qui ne se construit pas sur un
sol plat, les ruissellements des eaux pluviales peuvent aisément l‟endommager ce qu‟on a constaté
bien avant l‟achèvement total des travaux.
b) Une partie de la route est construite en béton hydraulique et l‟autre partie est construite en béton
bitumineux.
c) La route est inachevée et le chantier est fermé.
Photos
Connexion de la chaussée en béton hydraulique et celle en béton bitumineux
Page 588 sur 656
Une section des tronçons non bétonnées
Béton hydraulique inachevé
Page 589 sur 656
XIX- Construction de la route Carrefour 44 / Côtes de Fer
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Ce tronçon se débute au Carrefour 44, route Nationale # 2 pour se terminer à la commune de Cotes Ŕ de Ŕ
Fer.
2) Description
Entités
Couche de roulement
Nombre de voies
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
Insuffisante
4-2
Aucune
Partielle
standard
Bitumineux
Acceptable
Construits
passable
Aucun
Aucun
Bien
3) Structure de l‟ouvrage : La route est constituée de différents types de structures suivant le type
d‟ouvrage en question.
a) Drainage : béton hydraulique, maçonnerie de roche, buse de drain
b) Ouvrage d‟art: Béton armé
c) Chaussée : béton bitumineux, béton hydraulique
4) Niveau d‟avancement
Activités
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Drainage
Ouvrages d‟arts
Accotement
Pourcentage
d‟avancement
40
15
30
98
90
95
90
(%)
Page 590 sur 656
Parapet
Eclairage des rues
Visibilité dans les courbes
Pourcentage global
0
0
95
55.8
5) Observations
a) On constate que les couches de béton de la surface de roulement se dégradent prématurément du à la
qualité des matériaux utilisés, le drainage de la chaussée, et la lenteur au cours de l‟exécution.
b) La dégradation des couches de base va nécessiter une réhabilitation avant la mise en place des
couches de béton.
c) 22 km environ sont déjà asphaltés en reste environ la même quantité à réaliser pour terminer avec
l‟exécution totale.
d) Le chantier est fermé
6) Photos
Route Carrefour 44/Cotes-de-Fer
Page 591 sur 656
Route Carrefour 44/Cotes-de-Fer en dégradation
Page 592 sur 656
XX-
Construction du pont sur la Rivière Gauche
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Commune de Jacmel, Département du Sud-est
2) Description
Type de projet
Infrastructure
Superstructure
Appareil d‟appui
Tablier
Drainage
Protection berge
Signalisations
Eclairage
Ouvrage d‟art
bien
Bien
Bien
Bien
bien
Bien
Bien
Aucun
3) Structure de l‟ouvrage : Béton armé et métal, élastomère.
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Installation de l‟infrastructure
Installation du tablier
Superstructure
Appareil d‟appui
Signalisation
Protection berge
Moyenne d‟avancement globale
Pourcentage
travaux
(%)
d‟avancement
des
100
100
100
100
95
100
98
98
98.87
5) Observations
C‟est un pont qui a été bien construit respectant les normes de construction d‟ouvrages d‟arts, mais les
autorités doivent surveiller à ses bons entretiens surtout à alluvionnement de la berge.
Page 593 sur 656
6) Photos
Entrée du pont de la rivière gauche
Profil du pont de la rivière gauche
Page 594 sur 656
XXI-
Construction du pont sur la Rivière de Péredo
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Commune de Péredo, Département du Sud-est
2) Description
Type de projet
Ouvrage d‟art
Infrastructure
Superstructure
Appareil d‟appui
Tablier
Route d‟accès
Drainage
Protection berge
Signalisations
Eclairage
bien
Bien
Bien
Bien
En construction
bien
Bien
Bien
Aucun
3) Structure de l‟ouvrage : Béton armé et métal.
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Route d‟accès
Installation de l‟infrastructure
Installation du tablier
Superstructure
Appareil d‟appui
Signalisation
Protection berge
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement des
travaux
100
100
20
100
100
95
100
98
98
90.11
5) Observations
Le pont sur la rivière de Péredo est construit mais sa voie d‟accès est en phase de construction, donc la
construction est inachevée tout en constatant que le chantier est en cours.
Page 595 sur 656
6) Photos
Le pont de Marigot (Péredo)
Le pont de Marigot (Péredo)
Page 596 sur 656
Le pont Péredo de profil
Les travaux de construction de la voie d‟accès
Page 597 sur 656
XXII- Rénovation urbaine de la ville de Jacmel
Pour la rénovation urbaine de la ville de Jacmel on constate des travaux un peu intéressants qui ont été
réalisés parmi lesquels on peut citer :
a) Le ravalement de façades de certaines anciennes maisons de la zone touristique de Jacmel
b) La construction de plage de La cour New York
c) La rénovation de certaines rues de la ville
On n‟arrive pas à distinguer tous les travaux qui sont effectués par le fond de l‟Etat dans cette ville car il
semblerait qu‟il y a d‟autres institutions non gouvernementales comme Coopération Espagnole qui ont
intervenu au Centre Historique de la ville de Jacmel et qui ont financé certains projets de réhabilitation.
1) Photos
La rue du Commerce transformée en rue piétonne
Page 598 sur 656
XXIII- Construction de la route Cayes-Jérémie
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Département du Sud et de la Grand-Anse
2) Description
Entités
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
inachevées
inachevé
Aucune
Aucune
Acceptable
Flexible (bitumineuse) inachevé
inachevé
Incomplet
Peu acceptable
Aucun
Aucun
Peu acceptable
3) Niveau d‟avancement
Activités
Terrassement et déblais
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Pourcentage global
Pourcentage (%) d‟avancement
75
65
25
5
5
65
80
15
0
10
40
35
4) Observations
L‟évaluation de la route Cayes-Jérémie devrait être considérée en deux (2) projets de deux (2) tronçons.
Soit, tronçon Cayes-Camp-Perrin et Camp-Perrin-Jérémie.
Page 599 sur 656
NB : Le tronçon Cayes-Camp-Perrin représente environ 1/5 de la route Cayes-Jérémie.
5) Photos
Travaux de drainage inachevé, Duchity
Effondrement de la base de la route Cayes-Jérémie
Page 600 sur 656
Travaux de drainage inachevé
Le terrassement (Fanm Pa Dra)
Page 601 sur 656
XXIV- Construction du pont sur la Rivière Roseau
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Commune Roseau du Département de la Grand-Anse
2) Description
Type de projet
Infrastructure
Superstructure
Dalle de transition
Appareil d‟appui
Tablier
Drainage
Protection berge
Signalisations
Eclairage
Ouvrage d‟art
bien
Bien
Bien
Bien
Bien
Assez bien
Bien
Bien
Aucun
3) Structure de l‟ouvrage : Béton armé et métal,
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Installation de l‟infrastructure
Installation du tablier
Superstructure
Appareil d‟appui
Signalisation
Protection berge
Moyenne d‟avancement globale
Pourcentage
travaux
(%)
d‟avancement
des
100
100
100
100
95
98
98
98
98.62
5) Observations
L‟ouvrage est bien exécuté sauf qu‟il mérite un peu d‟éclairage même s‟il s‟agit de lampadaires.
Page 602 sur 656
6) Photos
Entrée du pont Roseau
Pont Roseau de profil
Page 603 sur 656
XXV- Construction du pont sur la Rivière Voldrogue
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Commune Jérémie du Département de la Grand-Anse
2) Description
Type de projet
Infrastructure
Superstructure
Appareil d‟appui
Tablier
Drainage
Protection berge
Dalle de transition
Signalisations
Eclairage
Ouvrage d‟art
bien
Bien
Bien
Bien
Assez bien
Bien
Bien
Bien
Aucun
3) Structure de l‟ouvrage : Béton armé et métal, élastomère.
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Installation de l‟infrastructure
Installation du tablier
Superstructure
Appareil d‟appui
Signalisation
Protection berge
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement des
travaux
100
100
100
100
95
98
98
50
92.62
5) Observations
a) L‟ouvrage est bien exécuté sauf qu‟il mérite un peu d‟éclairage
b) La berge proche du pont n‟est pas protégée suffisamment pour éviter la dégradation des piles quant aux culées
elles sont protégée par un mur de soutènement construit en maçonnerie de roches.
Page 604 sur 656
6) Photos
Infrastructure du pont Voldrogue
Entrée du pont Voldrogue
Page 605 sur 656
Pont Voldrogue de profil
Page 606 sur 656
XXVI- Construction du wharf de Jérémie
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Commune de Jérémie Département de la Grand-Anse.
2) Description
Type de projet
Rénovation du bureau de douane
Infrastructure
Superstructure
Tablier
Drainage
Protection berge
Eclairage
Ouvrage d‟art
En cours
bien
Aucun
Endommagé
Assez bien
Bien
Aucun
3) Structure de l‟ouvrage : Béton armé, Métal ect...
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Rénovation du bureau de douane
Installation de l‟infrastructure
Installation du tablier
Superstructure
Signalisation
Protection berge
Moyenne d‟avancement globale
Pourcentage (%) d‟avancement des travaux
100
100
30
0
75
0
0
85
55.71
5) Observations
a) On remarque que les travaux de la construction du wharf a été belle et bien commencée et arrivée à
un niveau très avancé de sa réalisation. Mais, le passage du Cyclone Matthew l‟a beaucoup
endommagé. Parmi les parties qui ont été les plus frappées par cette catastrophe on peut identifier :
Le tablier, le bureau de la douane etc...
b) Le tablier est inaccessible car il y a une rupture entre la voie d‟accès à celui-ci.
c) On constate que le chantier de la construction de la douane est en cours.
Page 607 sur 656
6) Photos
Construction du bureau de douane de Jérémie
Détérioration du nouveau wharf de Jérémie
Page 608 sur 656
Le wharf de Jérémie
Détérioration du tablier du wharf
Page 609 sur 656
XXVII- Rénovation urbaine de la ville de Jérémie
Pour la rénovation urbaine de la ville de Jérémie, on ne constate que quelques rues bétonnée et inachevées. Impossible
d‟identifier ces rues, car elles ne sont pas indiquées et les informations recueillies sur place sont contradictoires
Vue de la ville de Jérémie
Vue d‟une rue bétonnée inachevée
Page 610 sur 656
La ville de Jérémie depuis la mer
Page 611 sur 656
XXVIII-
Réhabilitation de la route Frécyneau/Gonaïves
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation
Ce tronçon de route se trouve dans la commune de Saint-Marc pour s‟achever à la ville de Gonaïves
2) Description
Entités
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
Acceptable
Aucune
Acceptable
standard
Bitumineux
Acceptable
Construits
passable
Aucun
Aucun
Bien
3) Structure de l‟ouvrage : La route est constituée de différents types de structures suivant le type
d‟ouvrage en question.
1) Drainage : béton hydraulique, maçonnerie de roche, buse de drain
2) Ouvrage d‟art: Béton armé
3) Chaussée : béton bitumineux
4) Niveau d‟avancement
Activités
Couche de roulement
Signalisation verticale
Signalisation horizontale
Drainage
Ouvrages d‟arts
Accotement
Parapet
Visibilité dans les courbes
Pourcentage global
Pourcentage (%) d‟avancement
85
75
70
80
90
80
60
78
68.66
Page 612 sur 656
5) Observations
a) La réhabilitation du tronçon de route Frécyneau/Gonaïves est pratiquement achevée comme indique
le tableau précédent
b) On constate des petits tassements qui pourraient être dus par la mise en place des matériaux de
mauvaise qualité au niveau des couches de base.
c) La couche de roulement est quelque part acceptable sur toute la ligne.
6) Photos
Réhabilitation de la route Frécyneau Saint-Marc
Réhabilitation du tronçon de route Saint-Marc/Gonaïves
Page 613 sur 656
XXIX- Réhabilitation de la route Ennery/Cap-Haitien
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Département de l‟Artibonite et du Nord
2) Description
Entités
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Accotement
Parapet
Eclairage des rues
Visibilité dans les courbes
Appréciations
inachevées
inachevé
Aucune
Aucune
Acceptable
Terre battue et bitumineux
inachevé
Incomplet
Peu acceptable
Aucun
Aucun
Peu acceptable
3) Niveau d‟avancement
Activités
Terrassement et déblais
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Drainage
Ouvrages d‟arts
Accotement
Parapet
Visibilité dans les courbes
Pourcentage global
Pourcentage (%) d‟avancement
30
25
20
5
5
40
60
15
0
40
24
4) Observations
Page 614 sur 656
a) La route est en chantier avec des différentes activités qui se réalisent simultanément à savoir : Cubature,
le drainage et les œuvres d‟art.
5) Photos
Travaux de terrassement du tronçon Ennery-Cap-Haitien, Puilboreau versant sud
Page 615 sur 656
Travaux de terrassement du tronçon Ennery-Cap-Haitien, Pulboreau versant Nord.
Travaux de réhabilitation de la route Ennery-Cap-Haitien.
Page 616 sur 656
XXX- Construction du pont Hyppolite
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Commune du Cap-Haitien, département du Nord.
2) Description
Type de projet
Infrastructure
Superstructure
Appareil d‟appui
Tablier
Drainage
Protection berge
Dalle de transition
Signalisations
Eclairage
Ouvrage d‟art
bien
Bien
Bien
Bien
Assez bien
Bien
inachevée
Passable
Aucun
3) Structure de l‟ouvrage : Béton armé et métal, élastomère.
4) Niveau d‟avancement
Activités
Préparation du site
Installation du chantier
Installation de l‟infrastructure
Installation du tablier
Superstructure
Appareil d‟appui
Signalisation
Protection berge
Moyenne d‟avancement globale
Pourcentage
travaux
(%)
d‟avancement
des
100
100
100
100
80
98
35
45
82.25
5) Observations :
a) Dégradation prématurée des parapets
b) Utilisation de l‟ouvrage avant la construction de la dalle de transition cause une dégradation au
niveau du tablier qui peut même occasionner l‟oxydation des aciers.
Page 617 sur 656
6) Photos
Pont Hyppolite du Cap-Haitien
L‟inachèvement du pont Hyppolite du Cap-Haitien.
Page 618 sur 656
XXXI- Réhabilitation des rues de la ville du Cap-Haitien
En ce qui concerne la réhabilitation des rues de la ville du Cap-Haitien non spécifiées dans le projet, on
peut constater que les rues réhabilitées ne représentent qu‟environ 35% de la totalité des travaux qui
devraient être réalisés à travers la ville.
Parmi les rues réhabilitées, on peut citer : Rue 2 A-B, rue 19, rue 18, rue 16, rue 17, rue 15.
Etat de réhabilitation des rues du Cap-Haitien
Page 619 sur 656
Etat de réhabilitation des rues du Cap-Haitien
Rue en mauvais état de la ville du Cap
Une rue réhabilitée de la ville du Cap
Page 620 sur 656
XXXII- Réhabilitation urbaine de la ville de la Grande Rivière du Nord
Jusqu‟à présent, la réhabilitation de la ville de la Grande Rivière du Nord ne consiste que des petits
aménagements de rues, mais aucune autres réalisations au niveau des infrastructures représentant des
patrimoines de la ville.
Remarque importante : Dans un projet de réhabilitation de la ville de la Grande Rivière du Nord, on devrait
procéder à une stratégie de protection de la ville contre les crues. A titre d‟exemple, l‟effondrement d‟une
bonne partie de la route à l‟entrée de la ville causé par la non protection de la berge.
Le niveau d‟avancement des travaux de rénovation urbaine de la ville de la Grande Rivière du Nord est
estimé à 30%.
Ville de la Grande Rivière du Nord
Page 621 sur 656
Effondrement de la route de l‟entrée de la ville de la grande Rivière du Nord
Page 622 sur 656
XXXIII- Réhabilitation de la route Baie d‟Acul/Milot.
-
Jusqu‟à présent la route Baie d‟Acul/Milot reste un passage non accessible aux véhicules.
-
La réhabilitation de ce tronçon de ne peut-être en phase d‟étude estimée à 10% de son avancement.
XXXIV- Rénovation urbaine de la ville de Port-de-paix
Pour la rénovation urbaine de la ville de Port-de-Paix, on constate qu‟il y a eu l‟aménagement de quelques
rues, des ouvertures pour la création de trottoirs. Mais insuffisant par rapport aux travaux nécessaires pour
la rénovation de la ville.
Vue l‟ancienneté de la ville il y a des bâtiments qui devraient être restaurés par l‟Etat afin de les garder
comme des patrimoines historiques.
Voici quelques rues aménagées : Boisrond Tonnerre, Rue Dessalines, Rue Béreca ect.
A noter qu‟il y a des travaux d‟aménagement inachevés. Donc le niveau d‟avancement du projet est estimé
à environ 35%.
1) Photos
Rue réhabilitée de la ville de Port-de-Paix
Page 623 sur 656
Rue réhabilitée de la ville de Port-de-Paix
Page 624 sur 656
XXXV- Construction de la route Carrefour Joff/Port-de-Paix
On ne constate pas de grands avancements pour la construction de la route Carrefour Joff-Port-de-Paix. Il
n‟y a que des travaux de base en cours au niveau du tronçon reliant carrefour Joff à Gros-Morne. Ces
travaux ne représentent qu‟environ 7% de l‟intégralité du chantier.
1) Photos
Cubature du tronçon Carrefour Joff/Port-de-paix
Page 625 sur 656
Travaux sur la route de Port-de-Paix
XXXVI- Projet de construction de 15 ponts sur la route Carrefour Joff /Port-de-Paix
Pendant notre visite sur la route, nous observons environ 18 ponts construits, dont incluant les 15 ponts
ciblés dans notre cas d‟évaluation technique qui sont les suivants :
Nous constatons que les 15 ponts sont presque similaires en terme de structure (béton armé) et en dimension soit
environ 23 m de long.
On constate un manque au niveau de la protection de certaines berges qui pourra produit le phénomène
d‟affouillement local ce qui pourra même entrainer l‟effondrement ou la disparition totale du pont au moment de
crues.
Les garde-corps de certains ponts sont en béton précontraints qui commence déjà à se dégrader ce qui nous
permet de dire que la réalisation de cette partie de l‟ouvrage ne respecte pas toutes les normes techniques qui
mettra en question la précarité de sa durée de vie. Donc, notre constat technique à partir paramètres vérifiés
suivant les normes de construction d‟ouvrage d‟art en vigueur nous permet d‟octroyer une appréciation estimée à
environ 68% sur l‟ensemble des travaux réalisés.
Entités
Infrastructure
Tablier
Superstructure
Protection berge
Appréciation globale
Niveau d‟appréciation
80%
60%
80%
50%
67.5%
Page 626 sur 656
Photos de quelques ponts construits :
Une photo des 15 ponts
Page 627 sur 656
Une photo des 15 ponts
XXXVII- Rénovation urbaine de la ville de Mirebalais.
La ville de Mirebalais apparait à environ 35% rénovée, car presque la majorité des rues sont entretenues
sauf qu‟il y a un manque de mise en valeur de certaines constructions qui représenteraient l‟identité de la
ville.
1) Photos
Centre-Ville de Mirbalais
Page 628 sur 656
Une rue rénovée de la ville de Mirbalais
XXXVIII- Rénovation urbaine de la ville de Hinche
On constate que plusieurs rues sont aménagées en chaussée semi-rigide et quelques autres en chaussées
flexibles et rigides qui auraient représentées à environ 30% des travaux nécessaires pour une bonne
rénovation de la ville.
Le niveau d‟avancement de la rénovation de la ville de Hinche est estimé à 40%.
Entrée de la ville de Hinche
Page 629 sur 656
Rue en mauvais état de ville de Hinche
Zone adoquinée du centre-ville de Hinche
Page 630 sur 656
XXXIX- Rénovation urbaine de la ville de Lascahobas.
Pour la rénovation urbaine de la ville de Lascahobas on a constaté qu‟il y a eu des rue qui sont construites
ou réhabilitées soit en béton hydraulique ou en adoquin. Il faut signaler qu‟aucune rénovation au niveau des
bâtiments qui puissent être considérées comme patrimoines au niveau de la ville.
Nous estimons que les travaux de réhabilitation de cette ville est à un niveau de 45% de ce qu‟on devrait
réaliser.
Entrée de la ville de Lascahobas
Rue adoquinée de la ville de Lascahobas
Page 631 sur 656
XL- Construction de la route Coladère/Cerca-Cavajal.
Sommaire
1) Localisation
2) Description
3) Structure de l‟ouvrage
4) Niveau d‟avancement
5) Observations
6) Photos
1) Localisation : Département du Sud et de la Grand-Anse
2) Description
Entités
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Largeur de la chaussée
Type de chaussée
Drainage
Ouvrages d‟arts
Parapet
Visibilité dans les courbes
Appréciations
achevée
achevée
oui
oui
Acceptable
Rigide
achevé
Construits
oui
acceptable
3) Niveau d‟avancement
Activités
Terrassement et déblais
Couches de bases
Couche de roulement
Signalisation verticale
Signalisation horizontale
Drainage
Ouvrages d‟arts
Parapet
Pourcentage global
Pourcentage (%) d‟avancement
100
100
100
70
80
80
80
75
85.6
Page 632 sur 656
4) Photos
Début de la route Coladère Cerca-Cajavajal
Route de Cerca-Cavajal en béton hydraulique
Page 633 sur 656
XLI- Projet de gazonnage de 14 parcs sportifs repartis à travers les 10 départements du pays.
L‟évaluation des 14 centres sportifs repartis au niveau du territoire national se fait suivants les aspects
techniques en donnant des observations pour chaque centre sportif de manière particulière en accordant un
pourcentage d‟avancement à chaque étape spécifique des travaux dressé dans un tableau.
Dont, les 14 centres sportifs sont les suivants :
1) Parc sportif de Gressier
2) Parc sportif de Saint-Louis du Sud
3) Parc sportif de Jérémie
4) Parc sportif de Cayes-Jacmel
5) Miragoane
6) Verettes
7) Marchand Dessalines
8) Résigné de Milot
9) Grande Rivière du Nord
10) Nelson de de Saint-Louis du Nord
11) Thomonde
12) Hinche
13) Pignon
14) Mont-Organisé
Observations :
1) Gressier :
Les majeures parties des travaux d‟infrastructure et du drainage sont déjà réalisées. La préparation
de base du champ de jeu est à un niveau très avancé. Le gazon synthétique est sur place, on n‟attend
que la finition de la préparation de la couche de base et mise en place du gazon.
Couche de base du champ de jeu du parc de Gressier
Page 634 sur 656
Gazon synthétique sur le site du parc de Gressier
2) Saint-Louis du Sud :
Les travaux d‟infrastructure et du drainage sont pratiquement terminés mais aucune préparation sur
le champ de jeu afin de mettre en place le gazon synthétique.
Page 635 sur 656
Parc sportif de Saint-Louis du Sud
Parc sportif Saint-Louis du sud
3) Jérémie:
Les travaux d‟infrastructures ont été construits mais endommagées au passage du cyclone Mathieu.
On n‟a remarqué aucune préparation pour le gazonnage synthétique du champ de jeu.
Le champ de jeu du parc sportif de Jérémie
Page 636 sur 656
Parc sportif de Jérémie
4) Miragoȃne:
Sur le parc sportif de Miragoane on n‟a remarqué aucune construction d‟infrastructure, aucun
drainage, aucune préparation pour le gazonnage.
Page 637 sur 656
Parc sportif de Miragoȃne
„
5) Cayes-Jacmel :
Ce centre est pratiquement achevé et opérationnel.
Page 638 sur 656
Pelouse du parc sportif de Cayes-Jacmel
Page 639 sur 656
Pelouse du parc sportif de Cayes-Jacmel
Pelouse du Parc sportif de Cayes-Jacmel
Page 640 sur 656
Installation des infrastructures du Centre sportif de Cayes-Jacmel
6) Parc sportif de Verrettes:
Les travaux d‟infrastructure et du drainage sont pratiquement terminés mais aucune préparation sur
le champ de jeu afin de mettre en place le gazon synthétique.
Page 641 sur 656
Pelouse du parc sportif de Verettes
Parc sportif de verettes
Page 642 sur 656
7) Parc sportif Marchand Dessalines
Aux différentes étapes du projet aucun travail sérieux n‟est réalisé excepté qu‟une partie de la
clôture et de l‟infrastructure sont entamées.
Parc sportif de Marchand Dessalines
Partie de l‟infrastructure construite du parc de Marchand
Page 643 sur 656
8) Parc sportif de Milot:
Les travaux d‟infrastructure du parc sportif de Milot sont achevés. Déjà mis en service avec un
gazon naturel sur le champ de jeu. D‟où aucune préparation pour la mise en place du gazon
synthétique.
Parc sportif de Milot (pas de pelouse synthétique)
Page 644 sur 656
Infrastructure du parc sportif de Milot
9) Parc sportif de la Grande Rivière du Nord.
Les constats faits pour le Centre sportif de Milot sont les mêmes pour le Centre sportif de la Grande
Rivière du Nord.
Parc sportif de Grande Rivière du Nord (pas de pelouse synthétique)
Page 645 sur 656
10) Parc sportif Nelson de Saint-Louis du Nord
Ce centre sportif est achevé et opérationnel. Sauf que, l‟éclairage est insuffisant.
Page 646 sur 656
Clôture du parc sportif de St-Louis du Nord
Pelouse du Parc sportif de St-Louis du Nord
Page 647 sur 656
L‟infrastructure du Parc sportif de St-Louis du Nord
11) Parc sportif de Thomonde
Les travaux de l‟infrastructure et de la clôture sont effectués. Mais, aucune préparation pour la mise
en place du gazon synthétique.
Page 648 sur 656
Cour du Parc sportif de Thomonde
Terrain de basket à l‟intérieur du parc
Page 649 sur 656
12) Parc sportif de Hinche
Ce centre sportif a une clôture déjà existée non réhabiltée. Nous avons aussi constaté que le champ
de jeu est protégé d‟un grillage métallique. Mais, aucune préparation pour la mise en place du gazon
synthétique.
Entrée du parc sportif de Hinche
Pelouse naturelle du parc sportif de Hinche
Page 650 sur 656
13) Parc sportif de Pignon
Le Parc sportif de pignon serait le plus grands parcs construits des 14 parcs du projet, mais il n‟y
n‟y a que le début de la construction des infrastructures. On ne constate pas le gazonnage ni aucune
préparation pour sa mise en place.
Infrastructure du centre sportif de Pignon
Page 651 sur 656
Pelouse du Centre sportif de Pignon
14) Parc sportif de Mont-Organisé
Ce centre sportif est clôturé et les travaux d‟infrastructure sont déjà commencés.
Page 652 sur 656
Surface de jeu
Pelouse du centre sportif de Mont-Organisé
Page 653 sur 656
Tableau résumé des centres sportifs
Parcs
sportif
Localisation
Infrastructure
s & drainage
Clôture
Blocs
sanitaires
Champ de jeu
Couche
de
Gazonnage
base
Éclairage
Gressier
Gressier
(Ouest)
90 %
98%
60
90%
50%
95%
SaintLouis-duSud
St-Louis
(Sud)
90%
98%
60
0%
0%
80%
90%
98%
60
0%
0%
0%
10
98%
60
0%
0%
0%
100%
98%
60
100%
100%
90%
50%
98%
80%
0
0
80
20
15
0
0
0
0
Nord
80
98
80
0
0
80
Nord
St-Louis
du Nord
Centre
80
98
80
0
0
80
98
99
85
100
100
80
80
95
80
0
0
80
Centre
Centre
20
30
45
80
20
70
0
0
0
0
0
0
Nord-est
30
80
65
0
0
0
Jérémie
Miragoane
CayesJacmel
Verettes
Marchand
Grande
Rivière du
Nord
Milot
Nelson
Thomonde
Hinche
Pignon
MontOrganisé
Jérémie
(G.-Anse)
Desruisseaux
(Nippes)
CayesJacmel (SudEst)
VeretteS(Arti
bonite)
Artiibonite
Page 654 sur 656
Niveau d‟avancement
Parcs sportifs
Gressier
Saint-Louis du Sud
Jérémie
Miragoane
Cayes-Jacmel
Verettes
Marchand
Grande Riv. Du Nord
Milot
Nelson
Thomonde
Hinche
Pignon
Mont-Organisé
Moyenne d‟avancement globale
Localisation
Gressier(Ouest)
St-Louis (Sud)
Jérémie (G.-Anse)
Desruisseaux (Nippes)
CayesJacmel (Sud-est)
Verettes (Artibonite)
Artiibonite
Nord
Nord
St-Louis du Nord
Centre
Centre
Centre
Nord-est
Pourcentage d‟avancement
85.5%
56%
41.33%
28%
91.33%
51.33
5.83%
56.33
56.33
93.66%
55.83%
14.16%
35%
29.16
43.16
Page 655 sur 656
L‟an deux mille dix sept et le onze (11) Octobre, nous, Sénateurs de la République, membres de la
Commission Sénatoriale Spéciale d‟Enquête, certifions et attestons que le présent rapport intitulé :
« Rapport de la Commission Sénatoriale Spéciale d‟Enquête sur le fonds PETRO CARIBE couvrant les
Périodes Annuelles allant de Septembre 2008 à Septembre 2016 », est conforme, authentique et correspond
aux travaux réalisés dans le cadre de l‟approfondissement de l‟enquête sur l‟utilisation du fonds PETRO
CARIBE, en vertu du mandat qui nous a été confié par l‟Assemblée des Sénateurs.
De quoi, ce rapport d‟enquête est dûment signé et remis au Bureau du Sénat de la République aux fins
utiles que de droit.
Fait de bonne foi à Port-au-Prince, les jour, mois et an que dessus.
Sénateur Evallière BEAUPLAN, DDS,
Président
Sénateur Nenel CASSY,
Rapporteur
Sénateur Antonio CHERAMY,
Membre
Sénateur Richard Lenine Hervé FOURCAND,
Membre
Sénateur Onondieu LOUIS,
Membre
Page 656 sur 656