Summary: A mid-cycle progress assessment marking five years since ANARSE's creation, covering the regulator's institutional presentation, capacity-building, project status updates including the Carrefour plant, and institutional development. It reproduces the 2021-2022 and 2022-2023 annual reports as annexes and is the only ANARSE document bridging the gap between the FY2023 and FY2025 annual reports.
Key Findings
- The interim balance sheet presents ANARSE's mandate under the decree of 3 February 2016 and its supervision by MTPTC.
- The first ANARSE administration prepared core operating and regulatory documents, including a procedures and regulations manual, an operations manual, and a structure document for the Regulation Directorate.
- The Carrefour III plant's 55.5 MW diesel phase is marked completed, and the GPL accessories phase is marked completed in 2022.
- The planned third phase for Carrefour III adds 60 MW through a third 30 MW turbine and a 400 MW substation, pending General Electric's technical and financial proposal.
- ANARSE reports staff training on electricity-sector licensing and tariff setting in 2018, plus a regional regulatory workshop in Barbados in 2023.