Summary: Mitigation plan for the rehabilitation of seven springs in Bonbon and Abricots, listing the works at each locality and the measures assigned to the contractor and OREPA.
Key Findings
Full Description

DINEPA, with World Bank support, planned the rehabilitation of seven springs and water points in the communes of Bonbon and Abricots in the Grand'Anse. A table gives the commune, communal section, locality, spring name and works for each of the seven sites, beginning with sanitation works around the Figuier spring in the first section of Baptiste. Impacts covered include dust and nuisance to nearby households, with the mitigation measures assigned to the works firm and to OREPA. Residents consulted asked DINEPA to pair the water-supply works with sanitation activity in the same localities.

How to cite

National Directorate for Drinking Water and Sanitation (DINEPA); World Bank, 2020, Impact Mitigation Action Plan: Rehabilitation of Seven Springs in the Communes of Bonbon and Abricots, Grand'Anse (EPARD), https://www.dinepa.gouv.ht/wp-content/uploads/2021/03/Plan-de-mitigation-des-impacts_7-sources_GA-1.pdf