Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / World Bank
Pwojè devlopman minisipal ak rezistans iben
Tit pibliye: Municipal Development and Urban Resilience Project
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The project Development Objective (PDO) is to (i) reduce urban flooding in the city of Cap-Haitien, (ii) improve access to quality municipal infrastructure in selected municipalities in the Cap-Haitien metropolitan area, and (iii) support the Republic of Haiti's capacity to respond to an Eligible Emergency.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
Deskripsyon
The project development of Municipal Development and Urban Resilience Project for Haiti is to (i) reduce urban flooding and enhance resilience in the city of Cap-Haïtien; and (ii) improve the capacity of six municipalities in the Cap-Haïtien metropolitan area to plan, finance and deliver basic municipal services and management. There are three components in this project. 1) The first component, Vulnerability Reduction and Climate Resilient Urban Infrastructure, aims to build resilience and reduce the effects of climate change by investing in flood mitigation infrastructure through an integrated watershed management approach that will reduce recurrent flooding in Cap-Haïtien. It has the following two subcomponents. (i)Integrated Management of the Urban Ravines; and (ii) Investments in Flood Mitigation Management along the Rivière Haut
plis
du Cap and addressing the challenges of Bassin Rhodo. 2) The second component, Municipal Investment Support, Capacity Building and Strategic Planning, aims to support the targeted municipalities to enable them to plan, finance, and manage resilient infrastructure, deliver local services in urban areas through a combination of investment support and capacity building initiatives, and ensure that local plans are developed and implemented in accordance with a coherent strategic metropolitan development framework and the risk profile of each targeted municipality. This component is divided into three sub-components as follows: (i) Urban Development Grant for Improvement of Local Infrastructure and Service Delivery; (ii) Institutional strengthening and capacity building for municipalities; and (iii) Support to Strengthen Spatial Management and Land Use Planning. 3) The third component, Contingent Emergency Response, aims to finance the implementation of emergency infrastructure reconstruction, rehabilitation and associated studies (Emergency Response Activities). 4) The fourth component, Project Management and Implementation Support, aims to finance the costs associated with strengthening and developing the institutional capacity for project management, coordination, implementation, and monitoring and evaluation, as well as costs associated with supporting the project implementing agencies.
- Patnè
- World Bank Group, World Bank
- Etap
- Fèmen depi 26 desanm 2025
- Apwobasyon
- 20 jen 2017
- Fèmen
- 26 desanm 2025
- Enstriman
- Finansman BIRD/IDA, Grants
- Diferans nan sa ki poko dekese
- 5.9: fon fidisyè yo pa nan eta IDA a, ki bay montan ki poko dekese pou lajan IDA sèlman; eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Anprentè
- Republic of Haiti
- Ajans egzekisyon
- Ministry of Interior and Local Authorities,Ministry of Public Works, Transport and Communications
- Antre an vigè
- 18 janvye 2018
- Depatman
- Nò
- Dènye tranzaksyon
- 30 jen 2026
- Idantifyan operasyon an
- P155201
Aplike pa
- World Food Programme, 0.6 milyon dola ameriken, idantifye pa montan ak dat
Sik lavi4 etap, 14 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | Dat pa rapòte |
| An kou | 7 fevriye 2014 |
| Ap fèmen | 26 desanm 2025 |
| Fèmen | 26 desanm 2025 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Kòmansman reyèl | 7 fevriye 2014 | IATI |
| Kòmansman prevwa | 7 fevriye 2014 | IATI |
| Revizyon konsèp | 13 jiyè 2015 | Pwojè Bank Mondyal |
| Piblikasyon | 17 novanm 2015 | Pwojè Bank Mondyal |
| Evalyasyon davans | 4 me 2017 | Pwojè Bank Mondyal |
| Negosyasyon | 24 me 2017 | Pwojè Bank Mondyal |
| Apwobasyon | 20 jen 2017 | Pwojè Bank Mondyal |
| Premye angajman | 20 jen 2017 | Tranzaksyon |
| Antre an vigè | 18 janvye 2018 | Pwojè Bank Mondyal |
| Premye dekèsman | 31 out 2018 | Tranzaksyon |
| Fen reyèl | 26 desanm 2025 | IATI |
| Dat fèmti | 26 desanm 2025 | IATI |
| Rapò fen atann | 29 jen 2026 | Pwojè Bank Mondyal |
| Dènye dekèsman | 30 jen 2026 | Tranzaksyon |
Pa dekèse: 1.8 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 26 desanm 2025. Dekèse nan FY2025-26: −0.0 milyon dola ameriken.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 48.4 | Enstitisyon | Pwojè Bank Mondyal |
| Strategic Climate Fund Grant | 7.0 | Fon fidisyè | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 53.1 | IDA, eta kredi ak don | Pa rapòte |
| Dekèse | 45.4 | IDA, eta kredi ak don | 53.6 |
| Pa dekèse | 1.8 | IDA, eta kredi ak don | |
| Pri total | 55.4 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Chanjman nan operasyon an2 pwolongasyon, 3 restriktirasyon, konpozan ijans prevwa
- Dat fèmti orijinal
- 31 desanm 2023
- Pwolongasyon dat fèmti
- 2
- Pwolonje soti 31 desanm 2023 rive 31 mas 2025 (dokiman 31 oktòb 2023)
- Pwolonje soti 31 mas 2025 rive 26 desanm 2025 (dokiman 31 mas 2025)
- Restriktirasyon
- 3
- 29 oktòb 2020 (dokiman 29 oktòb 2020) dokiman restriktirasyon
- 25 septanm 2023, Nivo 2, direksyon an apwouve l (dokiman 25 septanm 2023) dokiman restriktirasyon
- 7 mas 2025, Nivo 2, direksyon an apwouve l (dokiman 7 mas 2025) dokiman restriktirasyon
- Konpozan ijans
- Konpozan repons ijans kontenjan prevwa (dokiman 9 desanm 2025) dokiman
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2016-17Milyon dola ameriken | FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | FY2019-20Milyon dola ameriken | FY2020-21Milyon dola ameriken | FY2021-22Milyon dola ameriken | FY2022-23Milyon dola ameriken | FY2023-24Milyon dola ameriken | FY2024-25Milyon dola ameriken | FY2025-26Milyon dola ameriken | |
|---|---|---|---|---|---|---|---|---|---|---|
| Nouvo angajman | 55.4 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | −2.3 | Pa rapòte |
| Dekèsman | Pa rapòte | 0.8 | 2.5 | 3.7 | 25.5 | 3.3 | 3.1 | 1.8 | 4.7 | −0.0 |
| Dekèsman kimile | Pa rapòte | 0.8 | 3.3 | 7.0 | 32.5 | 35.8 | 38.9 | 40.7 | 45.5 | 45.4 |
Fich ak dokiman
Tranzaksyon71 liy, 20 jen 2017 rive 30 jen 2026
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 20 jen 2017 | Angajman | 48.4 | IDA, eta kredi ak don | credit original principal at board approval |
| 20 jen 2017 | Angajman | 7.0 | Pwojè Bank Mondyal | trust funds in the Projects API financier list, not in the IDA statement, at the board approval date |
| 31 mas 2025 | Angajman | −2.3 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2018 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2018 | Dekèsman | 1.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2019 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2019 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2019 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2019 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2019 | Dekèsman | 1.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2020 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2020 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2020 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2020 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2020 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2020 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2020 | Dekèsman | 11.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2021 | Dekèsman | 2.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2021 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2021 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2021 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2021 | Dekèsman | 7.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2021 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2021 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2021 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2021 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2021 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2022 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2022 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2022 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2022 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2022 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2022 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2022 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2022 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2022 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2022 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2023 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2023 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2023 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2023 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2023 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2023 | Dekèsman | −0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2023 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2024 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2024 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2024 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2024 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2024 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2024 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2024 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2024 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2024 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2025 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2025 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2025 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2025 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2025 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2025 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2025 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2025 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2025 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2025 | Dekèsman | −0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2025 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2025 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2026 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2026 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2026 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2026 | Dekèsman | −0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2026 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2026 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon4 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Pa rapòte
Kote1 depatman, 9 kote nonmen, 16 kote ki gen kowòdone
| Depatman | Nò |
| Kote sous la nonmen | Acul du Nord, Bassin, Haut du Cap, Limonade, Milot, Plaine du Nord, Quartier Morin, RiviEre Haut du Cap, Rivière Haut du Cap |
| Kote ki gen kowòdone | 16 |
Endikatè rezilta55 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Availability of a flood risk management plan for the city of Cap Haitien | No | Yes | No | 14 desanm 2023 |
| Cities with improved livability, sustainability, and/or management | 0.00 | 6.00 | 6.00 | 14 desanm 2023 |
| Contingent Emergency Response Operations Manual developed and adopted | No | Yes | Yes | 6 jen 2023 |
| Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days | 0.00 | 80.00 | 50.00 | 14 desanm 2023 |
| Kilometers of urban ravines dredged and stabilized | 0.00 | 5.00 | 2.60 | 14 desanm 2023 |
| Non-structural Measures Plan developed and implemented | Not developed | Prioritized measures implemented | Implementation started | 14 desanm 2023 |
| Number COVID-19 personal protection equipment kits distributed to civil protection committees | 0.00 | 3100.00 | 3500.00 | 6 jen 2023 |
| Number of communes in which hand-washing station were installed | 0.00 | 43.00 | 43.00 | 6 jen 2023 |
| Number of municipal staff trained and provided with on the job support | 0.00 | 800.00 | 825.00 | 6 jen 2023 |
| Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year | 0.00 | 6.00 | 6.00 | 6 jen 2023 |
| Number of municipalities with fully functional City Hall/administration buildings | 0.00 | 3.00 | 2.00 | 6 jen 2023 |
| Reduction in the flooded areas of Cap Haitien | 0.00 | 48.00 | 20.00 | 14 desanm 2023 |
| Roads rehabilitated - non-rural | 000000 | 1.00 | 0.00 | 1 janvye 1900 |
| Roads rehabilitated - rural | 000000 | 0.00 | 0.00 | 1 janvye 1900 |
| Roads rehablitated | 0.00 | 6.50 | 4.10 | 14 desanm 2023 |
| Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU | 0.00 | 100.00 | 100.00 | 14 desanm 2023 |
| Number of beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 193,935.00 | 211,914.00 | 31 desanm 2023 |
| Number of beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 193935.00 | 211914.00 | 31 desanm 2023 |
| People benefiting from reduced flood risk in Cap Haitien | 0.00 | 15618.00 | 9974.00 | 31 mas 2025 |
| People benefiting from reduced flood risk in Cap Haitien | 0.00 | 10842 | 15482 | 16 desanm 2025 |
| People provided with improved urban living conditions | 0.00 | 60000.00 | 26407.00 | 31 mas 2025 |
| People provided with improved urban living conditions | 0.00 | 60,000.00 | 60000 | 16 desanm 2025 |
| People provided with improved urban living conditions - Female (RMS requirement) | 000000 | 17500.00 | 0.00 | 1 janvye 1900 |
| Women beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 96967.00 | 105957.00 | 29 desanm 2023 |
| Availability of a flood risk management plan for the city of Cap Haitien | No | Yes | No | 29 desanm 2023 |
| Availability of a flood risk management plan for the city of Cap Haitien | No | Yes | Yes | 15 desanm 2025 |
| Cities with improved livability, sustainability, and/or management | 0.00 | 6.00 | 6 | 31 mas 2025 |
| Cities with improved livability, sustainability, and/or management | 0.00 | 6.00 | 6.00 | 31 mas 2025 |
| Contingent Emergency Response Operations Manual developed and adopted | No | Yes | Yes | 29 desanm 2023 |
| Contingent Emergency Response Operations Manual developed and adopted | No | Yes | Yes | 29 desanm 2023 |
| Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days | 0.00 | 80.00 | 50.00 | 31 mas 2025 |
| Inquiries and Grievances related to the project recorded in the cash-transfer GRM system that are addressed and communicated back to the concerned stakeholder within 30 days | 0.00 | 80.00 | 100 | 31 mas 2025 |
| Kilometers of urban ravines dredged and stabilized | 0.00 | 5.00 | 2.60 | 31 mas 2025 |
| Kilometers of urban ravines dredged and stabilized | 0.00 | 3.00 | 3 | 15 desanm 2025 |
| Non-structural Measures Plan developed and implemented | Not developed | Prioritized measures implemented | Prioritized measures implemented | 31 mas 2024 |
| Non-structural Measures Plan developed and implemented | Not developed | Prioritized measures implemented | Implementation started | 31 mas 2024 |
| Number COVID-19 personal protection equipment kits distributed to civil protection committees | 0.00 | 3100.00 | 3500.00 | 29 desanm 2023 |
| Number COVID-19 personal protection equipment kits distributed to civil protection committees | 0.00 | 3,100.00 | 3,500.00 | 29 desanm 2023 |
| Number of communes in which hand-washing station were installed | 0.00 | 43.00 | 43.00 | 29 desanm 2023 |
| Number of communes in which hand-washing station were installed | 0.00 | 43.00 | 53 | 29 desanm 2023 |
| Number of municipal staff trained and provided with on the job support | 0.00 | 800.00 | 825.00 | 29 desanm 2023 |
| Number of municipal staff trained and provided with on the job support | 0.00 | 800.00 | 825.00 | 29 desanm 2023 |
| Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year | 0.00 | 6.00 | 6.00 | 31 mas 2025 |
| Number of municipalities submitting financial reports to MICT no later than one month after the start of the Fiscal Year | 0.00 | 6.00 | 6.00 | 15 desanm 2025 |
| Number of municipalities with fully functional City Hall/administration buildings | 0.00 | 3.00 | 2.00 | 31 mas 2025 |
| Number of municipalities with fully functional City Hall/administration buildings | 0.00 | 3.00 | 2.00 | 15 desanm 2025 |
| Reduction in the flooded areas of Cap Haitien | 0.00 | 48.00 | 20.00 | 31 mas 2025 |
| Reduction in the flooded areas of Cap Haitien | 0.00 | 28.00 | 28 | 15 desanm 2025 |
| Roads rehablitated | 0.00 | 6.50 | 4.10 | 31 mas 2025 |
| Roads rehablitated | 0.00 | 6.50 | 8.1 | 15 desanm 2025 |
| Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU | 0.00 | 100.00 | 100.00 | 31 mas 2025 |
| Share of sub-projects captured by M&E framework and reflected in annual reporting from the PIU | 0.00 | 100.00 | 100.00 | 15 desanm 2025 |
| Number of beneficiaries receiving COVID-19 emergency cash transfers | 0.00 | 193935.00 | 211914.00 | 14 desanm 2022 |
| People benefiting from reduced flood risk in Cap Haitien | 0.00 | 15618.00 | 9974.00 | 14 desanm 2023 |
| People provided with improved urban living conditions | 0.00 | 60000.00 | 26407.00 | 14 desanm 2023 |
Nòt8 nòt
| Nòt | Valè | Dat |
|---|---|---|
| ICR outratingind | Substantial | 29 jen 2026 |
| ICR overallrating | Moderately Satisfactory | 29 jen 2026 |
| ISR Financial Management | Moderately Unsatisfactory | 8 desanm 2025 |
| ISR Monitoring and Evaluation | Satisfactory | 8 desanm 2025 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | 8 desanm 2025 |
| ISR Procurement | Moderately Satisfactory | 8 desanm 2025 |
| ISR Progress towards achievement of PDO | Satisfactory | 8 desanm 2025 |
| ISR Project Management | Moderately Satisfactory | 8 desanm 2025 |
Kontra yo bay30 kontra
| Founisè | Dat | Metòd | Montan |
|---|---|---|---|
| Université d'État d'Haïti (UEH) | 30 oktòb 2025 | CDS | 49,500 USD |
| Campus Henry Christophe de l'Université d'Etat d'Haïti (CHCL/UEH) | 19 out 2024 | DIR | 538,780 USD |
| Haiti Print & Sign | 29 jiyè 2024 | RFQ | 12,072.5 USD |
| Pan American Devel. Foundation-PADF | 15 janvye 2024 | CDS | 4,021,227.1 USD |
| Newhomedepot | 12 janvye 2024 | RFQ | 134,881 USD |
| Non an pa afiche | 3 out 2023 | INDV | 87,500 USD |
| SD Construction | 15 fevriye 2023 | DIR | 2,592,344.73 USD |
| RTOS, Business Coaching Technology and More | 5 desanm 2022 | RFQ | 61,127.73 USD |
| V3 Companies of Illinois Ltd. | 11 novanm 2022 | QCBS | 10,536,595 HTG |
| V3 Companies of Illinois Ltd. | 11 novanm 2022 | QCBS | 376,354 USD |
| Royale Construction S.A | 30 out 2022 | RFB | 1,057,552.39 USD |
| Non an pa afiche | 30 out 2022 | RFB | 505,740.61 USD |
| Centre Agronimique Tropical pour la Recherche et l'Ducation (CATIE) | 24 fevriye 2022 | CQS | 800,000 USD |
| Ingenieria de Obras Zaragoza S. L. (Ingeobras) | 24 fevriye 2022 | CQS | Pa rapòte |
| United Nations Office Project Services (UNOPS) | 5 janvye 2021 | DIR | 14,528,863 USD |
| BG Ingnieurs Conseils | 5 janvye 2021 | DIR | 176,130 CHF |
| United Nations World Food Programme (WFP) | 20 oktòb 2020 | UN | 18,858,000 USD |
| Bureau d'Ingnierie et d'Expertise Nationale (BIEN) | 30 septanm 2020 | DIR | 32,000 USD |
| BG Ingénieurs Conseils | 10 septanm 2020 | QCBS | 427,440 CHF |
| Technique Industrie Agriculture S.A. (Tecina) | 2 desanm 2019 | RFB | 681,966.71 USD |
| SD Construction | 2 desanm 2019 | RFB | 480,709.24 USD |
| Technique Industrie Agriculture S.A. (Tecina) | 2 desanm 2019 | RFB | 441,367.14 USD |
| Groupe TRAME S. A. | 2 desanm 2019 | RFB | 657,895.55 USD |
| Groupe TRAME S. A. | 2 desanm 2019 | RFB | 634,355.9 USD |
| MVF Plus Construction | 2 desanm 2019 | RFB | 447,058.88 USD |
| Firme de Construction et de Service Agricole (Ficosa) | 2 desanm 2019 | RFB | 589,402.25 USD |
| Pan American Development Foundation (PADF) | 23 septanm 2019 | QBS | 546,516,000.54 HTG |
| Elmecen S.A. | 20 septanm 2019 | RFB | 350,700 USD |
| Institut de Formation et de Services, S,A. | 19 septanm 2019 | QBS | 2,033,705.46 USD |
| BRLI | 8 mas 2019 | CDS | 463,440.25 EUR |
Lajan ki pase bay lòt157 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 jen 2026 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 me 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 avril 2026 | −0.2 |
| HAITI | Dekèsman | 31 mas 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 mas 2026 | −0.0 |
| HAITI | Dekèsman | 28 fevriye 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 28 fevriye 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 janvye 2026 | <0.1 |
| HAITI | Dekèsman | 31 janvye 2026 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 desanm 2025 | <0.1 |
| HAITI | Dekèsman | 31 desanm 2025 | <0.1 |
| HAITI | Depans | 30 novanm 2025 | <0.1 |
| HAITI | Dekèsman | 30 novanm 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 novanm 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 oktòb 2025 | −0.1 |
| HAITI | Dekèsman | 30 septanm 2025 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 septanm 2025 | 0.2 |
| HAITI | Dekèsman | 31 out 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2025 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 jiyè 2025 | 0.2 |
| HAITI | Dekèsman | 31 jiyè 2025 | <0.1 |
| HAITI | Dekèsman | 30 jen 2025 | 0.7 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 jen 2025 | 0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 me 2025 | 0.2 |
| HAITI | Dekèsman | 31 me 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 avril 2025 | 0.6 |
| HAITI | Dekèsman | 30 avril 2025 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 mas 2025 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Angajman | 31 mas 2025 | −2.2 |
| HAITI | Dekèsman | 31 mas 2025 | <0.1 |
| HAITI | Dekèsman | 28 fevriye 2025 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 28 fevriye 2025 | 0.4 |
| HAITI | Dekèsman | 31 janvye 2025 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 janvye 2025 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 desanm 2024 | <0.1 |
| HAITI | Dekèsman | 31 desanm 2024 | <0.1 |
| HAITI | Dekèsman | 30 novanm 2024 | 0.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 novanm 2024 | 0.7 |
| HAITI | Dekèsman | 31 oktòb 2024 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 oktòb 2024 | 0.9 |
| HAITI | Dekèsman | 31 out 2024 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2024 | 0.4 |
| HAITI | Dekèsman | 30 jen 2024 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 jen 2024 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 me 2024 | 0.6 |
| HAITI | Dekèsman | 31 me 2024 | <0.1 |
| HAITI | Depans | 31 me 2024 | <0.1 |
| HAITI | Depans | 30 avril 2024 | <0.1 |
| HAITI | Dekèsman | 30 avril 2024 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 avril 2024 | 0.1 |
| HAITI | Dekèsman | 31 mas 2024 | 0.1 |
| HAITI | Depans | 29 fevriye 2024 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 29 fevriye 2024 | 0.1 |
| HAITI | Dekèsman | 29 fevriye 2024 | <0.1 |
| HAITI | Dekèsman | 31 janvye 2024 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 janvye 2024 | 0.1 |
| HAITI | Depans | 31 janvye 2024 | <0.1 |
| HAITI | Depans | 31 desanm 2023 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 desanm 2023 | 0.6 |
| HAITI | Dekèsman | 31 desanm 2023 | −0.2 |
| HAITI | Dekèsman | 30 novanm 2023 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 novanm 2023 | −0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 oktòb 2023 | 0.2 |
| HAITI | Dekèsman | 31 oktòb 2023 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2023 | 0.3 |
| HAITI | Dekèsman | 31 out 2023 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 jiyè 2023 | 0.6 |
| HAITI | Dekèsman | 31 jiyè 2023 | 0.1 |
| HAITI | Depans | 30 jen 2023 | −0.0 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 me 2023 | 0.3 |
| HAITI | Dekèsman | 31 me 2023 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 avril 2023 | 0.6 |
| HAITI | Dekèsman | 30 avril 2023 | 0.2 |
| HAITI | Depans | 31 mas 2023 | <0.1 |
| HAITI | Depans | 28 fevriye 2023 | <0.1 |
| HAITI | Depans | 28 fevriye 2023 | −0.0 |
| HAITI | Depans | 31 janvye 2023 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 desanm 2022 | 0.5 |
| HAITI | Depans | 31 desanm 2022 | −0.0 |
| HAITI | Dekèsman | 31 desanm 2022 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 novanm 2022 | 0.6 |
| HAITI | Depans | 30 novanm 2022 | −0.0 |
| HAITI | Dekèsman | 30 novanm 2022 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 oktòb 2022 | 0.3 |
| HAITI | Depans | 31 oktòb 2022 | −0.0 |
| HAITI | Dekèsman | 31 oktòb 2022 | 0.1 |
| HAITI | Depans | 30 septanm 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2022 | 0.4 |
| HAITI | Depans | 31 out 2022 | <0.1 |
| HAITI | Dekèsman | 31 out 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 jiyè 2022 | 0.2 |
| HAITI | Dekèsman | 31 jiyè 2022 | <0.1 |
| HAITI | Depans | 30 jen 2022 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 jen 2022 | 0.8 |
| HAITI | Dekèsman | 30 jen 2022 | 0.2 |
| HAITI | Depans | 31 me 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 avril 2022 | 0.3 |
| HAITI | Depans | 30 avril 2022 | <0.1 |
| HAITI | Dekèsman | 30 avril 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 mas 2022 | 0.2 |
| HAITI | Depans | 31 mas 2022 | <0.1 |
| HAITI | Dekèsman | 31 mas 2022 | <0.1 |
| HAITI | Depans | 28 fevriye 2022 | <0.1 |
| HAITI | Dekèsman | 28 fevriye 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 28 fevriye 2022 | 0.1 |
| HAITI | Depans | 31 janvye 2022 | 0.1 |
| HAITI | Dekèsman | 31 janvye 2022 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 janvye 2022 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 desanm 2021 | 0.2 |
| HAITI | Depans | 31 desanm 2021 | <0.1 |
| HAITI | Dekèsman | 31 desanm 2021 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 novanm 2021 | 0.7 |
| HAITI | Depans | 30 novanm 2021 | <0.1 |
| HAITI | Depans | 31 oktòb 2021 | 0.1 |
| HAITI | Depans | 30 septanm 2021 | <0.1 |
| HAITI | Dekèsman | 30 septanm 2021 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 septanm 2021 | 0.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2021 | 0.7 |
| HAITI | Dekèsman | 31 out 2021 | 0.2 |
| HAITI | Depans | 31 out 2021 | <0.1 |
| HAITI | Dekèsman | 31 jiyè 2021 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 jiyè 2021 | 0.3 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 jen 2021 | 7.8 |
| HAITI | Dekèsman | 30 jen 2021 | 0.2 |
| HAITI | Depans | 31 me 2021 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 me 2021 | 0.5 |
| HAITI | Dekèsman | 31 me 2021 | 0.1 |
| HAITI | Depans | 30 avril 2021 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 mas 2021 | 0.8 |
| HAITI | Depans | 31 mas 2021 | <0.1 |
| HAITI | Dekèsman | 31 mas 2021 | 0.2 |
| HAITI | Depans | 28 fevriye 2021 | <0.1 |
| HAITI | Dekèsman | 28 fevriye 2021 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 28 fevriye 2021 | 0.1 |
| HAITI | Depans | 31 janvye 2021 | <0.1 |
| HAITI | Dekèsman | 31 janvye 2021 | 0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 janvye 2021 | 2.7 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 desanm 2020 | 11.9 |
| HAITI | Dekèsman | 31 desanm 2020 | 0.2 |
| HAITI | Depans | 30 novanm 2020 | <0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 oktòb 2020 | 0.1 |
| HAITI | Dekèsman | 31 oktòb 2020 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 septanm 2020 | 0.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2020 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 jiyè 2020 | 0.9 |
| HAITI | Dekèsman | 30 jen 2020 | 0.4 |
| HAITI | Depans | 30 jen 2020 | 0.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 jen 2020 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 mas 2020 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 oktòb 2019 | 1.6 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 septanm 2019 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2019 | 0.4 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 jiyè 2019 | 0.1 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 me 2019 | 0.5 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 30 novanm 2018 | 1.2 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Dekèsman | 31 out 2018 | 0.8 |
| Ministry of Interior and Local Authorities; Ministry of Public Works, Transport and Communications | Angajman | 30 jen 2017 | 48.4 |
Idantifyan5 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | XI-IATI-WBTF-P155201 | IATI |
| Kredi oswa don IDA | IDAD2200 | IDA, eta kredi ak don |
| Liy pwogram envestisman piblik | 11141-1-25-31-10 | Pwogram envestisman piblik |
| Prè Bank mondyal | IDA-D2200 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P155201 | Fich operasyon an |
Kote sous yo pa dakò3 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Dat fèmti | Pwojè Bank Mondyal | 26 desanm 2025 | ✓ |
| Dat fèmti | IATI | 26 jen 2026 | |
| Angajman | IDA, eta kredi ak don | 53.1 milyon dola ameriken | ✓ |
| Angajman | Pwojè Bank Mondyal | 55.4 milyon dola ameriken | |
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a119 dokiman
- Project Appraisal Document, documents.worldbank.org
- Financing Agreement, documents.worldbank.org
- Agreement, documents.worldbank.org
- Agreement, documents.worldbank.org
- Project Information Document, documents.worldbank.org
- Agreement, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Completion and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project , 26 jen 2026, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 18, 9 desanm 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 22 oktòb 2025, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 17, 24 jen 2025, documents.worldbank.org
- Haïti - Projet de Développement Municipal et de Résilience Urbaine (MDUR) : Dix-Septième Mission d’Appui à la Mise en Œuvre - du 19 au 22 Mai 2025 , 22 me 2025, documents.worldbank.org
- Official Documents- Corrigendum revising the withdrawal table to the Financing Agreement for D2200-HT.pdf, 27 mas 2025, documents.worldbank.org
- Official Documents- Third Amendment to the Financing Agreement and Third Amendment to the Grant Agreement for Grant D2200-HT and Grant TF0A4926-HT.pdf, 12 mas 2025, documents.worldbank.org
- Disclosable Restructuring Paper - Municipal Development and Urban Resilience Project - P155201, 7 mas 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 21 fevriye 2025, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 16, 24 desanm 2024, documents.worldbank.org
- Haïti - Projet de Développement Urbain au Cap-Haïtien (CHUD) : Seizième Mission d'Appui à la Mise en Œuvre - du 15 au 22 Novembre 2024 , 22 novanm 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 9 jiyè 2024, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 15, 28 jen 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 9 jen 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, 16 avril 2024, documents.worldbank.org
- Haïti - Projet de Développement Municipal et de Résilience Urbaine (MDUR) : Quinzième Mission d'Appui à la Mise en Œuvre - du 8 au 12 Avril, 2024 , 12 avril 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 27 fevriye 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 8 janvye 2024, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 14, 30 desanm 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Revised Environmental, Social, Industrial Safety and Occupational Health Management Plan , 18 desanm 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 30 novanm 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 1 of 2) : Resettlement Plan Summary for Treatment of Terrier Ravine , 1 oktòb 2023, documents.worldbank.org
- Disclosable Restructuring Paper - Municipal Development and Urban Resilience Project - P155201, 25 septanm 2023, documents.worldbank.org
- Restructuring Integrated Safeguards Data Sheet - Municipal Development and Urban Resilience Project - P155201, 5 septanm 2023, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 13, 20 jen 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 8 jen 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 25 avril 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental and Social Management Plan for Sub-project Reprofiling Works of the Pont Du Pont Area Zanguy Canal in the Town of the Limonade Commune , 1 avril 2023, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Brief Resettlement Plan for Construction of the Buildings of the Morin, Milot and Plaine du Nord Town Halls , 1 avril 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, 31 mas 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 16 janvye 2023, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 12, 20 desanm 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental and Social Management Plan for Treatment of Ravine Zetrier (Carrefour 0-L at Bassin Rhodo), 1 desanm 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 1 of 2) : Brief Resettlement Plan for the Treatment of the Zetrier Ravine (Section Carrefour Rue 0-L at Bassin Rhodo), 1 desanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 1 novanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 18 oktòb 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, 15 septanm 2022, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 11, 27 jen 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 6 jen 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Brief Resettlement Plan, 31 me 2022, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Environmental and Social Management Plan for Construction of Three Town Halls in Quartier Morin, Milot and Plaine du Nord, 31 me 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 4 me 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 24 avril 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 16 mas 2022, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 10, 20 desanm 2021, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 09, 14 jen 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P155201 - Municipal Development and Urban Resilience Project - Audited Financial Statement, 31 mas 2021, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 2 of 2) : Plan d’Action de Reinstallation Bassin Rhodo, 1 janvye 2021, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Etude d’Impact Environnemental et Social, 1 janvye 2021, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Resettlement Plan (Vol. 1 of 2) : Plan d’Action de Reinstallation : Traitement des Ravines Belle Hotesse et Zetriye, 1 janvye 2021, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 08, 18 desanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 30 novanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 24 novanm 2020, documents.worldbank.org
- Official Documents- Amendment and Restatement of Financing Agreement and Grant Agreement for Grant D2200-HT and SCF-PPCR Grant TF0A4926, 5 novanm 2020, documents.worldbank.org
- Official Documents- Amendment and Restatement of the Financing Agreement for Grant D2200-HT, 5 novanm 2020, documents.worldbank.org
- Disclosable Restructuring Paper - Municipal Development and Urban Resilience Project - P155201, 29 oktòb 2020, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 07, 22 oktòb 2020, documents.worldbank.org
- Restructuring Integrated Safeguards Data Sheet - Municipal Development and Urban Resilience Project - P155201, 7 oktòb 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 28 septanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 9 septanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 2 septanm 2020, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment (Vol. 2 of 2) : Cadre de Gestion Environnementale et Sociale pour les Activités d’Urgence en Réponse Liée à la COVID-19, 4 out 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 31 jiyè 2020, documents.worldbank.org
- Haiti P155201 - MDUR Audit Statements as of Sept. 2019, 24 me 2020, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 06, 14 avril 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 17 desanm 2019, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 05, 27 septanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 19 out 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 19 jen 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 1 me 2019, documents.worldbank.org
- Haiti P155201 - MDUR Audit Statements as of Sept. 2018, 21 avril 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 9 avril 2019, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 04, 28 mas 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 19 mas 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 31 janvye 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 31 janvye 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P155201- Municipal Development and Urban Resilience Project - Procurement Plan, 31 janvye 2019, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment : Plan de Gestion Environnementale et Sociale, 1 desanm 2018, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 03, 3 septanm 2018, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 02, 15 me 2018, documents.worldbank.org
- Disclosable Version of the ISR - Municipal Development and Urban Resilience Project - P155201 - Sequence No : 01, 12 oktòb 2017, documents.worldbank.org
- Official Documents- Supplemental Letter Ref. Financial and Economic Data for Grant D2200-HT (Closing Package), 29 jen 2017, documents.worldbank.org
- Minutes of Meeting of the Executive Directors of the Bank and IDA and the Boards of Directors of IFC and MIGA held on June 20, 2017 and record approvals June 16 thru 20, 20 jen 2017, documents.worldbank.org
- Official Documents- Financing Agreement for Grant D2200-HT (Closing Package), 9 jen 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project, 7 jen 2017, documents.worldbank.org
- Appraisal Project Information Document-Integrated Safeguards Data Sheet - Municipal Development and Urban Resilience Project - P155201, 22 me 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : Environmental Assessment (Vol. 1 of 2) : Cadre de gestion environnementale et sociale, 1 mas 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : resettlement plan : Cadre de politique de reinstallation, 1 mas 2017, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : environmental assessment : Composante 2 : investissements en matière de réduction de la vulnérabilité et pour des infrastructures urbaines résilientes au climat pour Ville de Cap-Haïtien, 19 out 2016, documents.worldbank.org
- Haiti - Municipal Development and Urban Resilience Project : resettlement plan : Termes de reference recrutement d’un consultant chargé du plan de réinstallation - Composante 2 : Investissements en matière de réduction de la vulnérabilité, 19 out 2016, documents.worldbank.org
- Integrated Safeguards Data Sheet (Concept Stage) - Municipal Development and Urban Resilience Project - P155201, 19 novanm 2015, documents.worldbank.org
- Project Information Document (Concept Stage) - Municipal Development and Urban Resilience Project - P155201, 10 novanm 2015, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Pwogram envestisman piblik: kondisyon itilizasyon piblikatè a fikse
- Avi pasasyon mache Bank mondyal: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Pwogram envestisman piblik | 18 oktòb 2026 |
| Avi pasasyon mache Bank mondyal | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |
Site paj sa a