Data / Partner portfolio / World Bank Group / IDA
HT Emergency Bridge Reconst & Vulnerab Reduction Project
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
The project's development objective is to i) restore access on selected ciritical point of the Haitian transportation system and ii) support vulnerability reduction by stregthening the Haitian National Disaster Risk Management System.
As published by World Bank Projects, in its original language.
- Partner
- World Bank Group, IDA
- Sector
- Transport
- Stage
- Closed since May 31, 2015
- Approval
- November 18, 2008
- Closing
- May 31, 2015
- Instrument
- IBRD/IDA financing, IDA
- Undisbursed gap
- 0.6: the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Borrower
- MTPTC
- Implementing agency
- BMPAD,CIAT,UCE,Unite Centrale d'Execution,Unite Centrale d'Execution
- Effectiveness
- March 31, 2009
- Departments
- Grande Anse, Sud, Ouest, Centre, Sud-Est, Artibonite, Nippes
- Last transaction
- September 30, 2016
- Operation ID
- P114292
Life cycle5 stages, 12 dates
Stage history
| Stage | From |
|---|---|
| Planned | October 14, 2008 |
| Approved | November 18, 2008 |
| Under way | November 18, 2008 |
| Closing | May 31, 2015 |
| Closed | May 31, 2015 |
Dated events
| Event | Date | Source |
|---|---|---|
| Concept review | October 14, 2008 | World Bank Projects |
| Negotiation | October 24, 2008 | World Bank Projects |
| Actual start | November 18, 2008 | IATI |
| Approval | November 18, 2008 | World Bank Projects |
| First commitment | November 18, 2008 | Transactions |
| Planned start | November 18, 2008 | IATI |
| Effectiveness | March 31, 2009 | World Bank Projects |
| First disbursement | June 30, 2011 | Transactions |
| Actual end | May 31, 2015 | IATI |
| Closing date | May 31, 2015 | IATI |
| Last disbursement | July 31, 2015 | Transactions |
| Completion report due | December 1, 2015 | World Bank Projects |
Undisbursed: US$0.0 million on September 30, 2026, with closing on May 31, 2015.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDA Grant | 20.0 | Institution | World Bank Projects |
Table 2.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 19.9 | IDA Statement of Credits and Grants | 19.9 |
| Disbursed | 19.4 | IDA Statement of Credits and Grants | 19.4 |
| Undisbursed | 0.0 | IDA Statement of Credits and Grants | |
| Total cost | 20.0 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
Changes to the operationnot reported
- Original closing date
- Not reported
- Closing date extensions
- Not reported
- Restructurings
- Not reported
- Emergency component
- Not reported
New commitments and disbursements by fiscal year
Table 3.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2008-09US$ millions | FY2010-11US$ millions | FY2011-12US$ millions | FY2012-13US$ millions | FY2013-14US$ millions | FY2014-15US$ millions | FY2015-16US$ millions | |
|---|---|---|---|---|---|---|---|
| New commitments | 20.0 | Not reported | Not reported | Not reported | Not reported | Not reported | −0.1 |
| Disbursements | Not reported | 1.5 | 3.1 | 1.0 | 3.4 | 3.3 | −0.1 |
| Cumulative disbursements | Not reported | 8.5 | 11.6 | 12.7 | 16.1 | 19.4 | 19.4 |
The running total starts at the opening balance of US$7.0 million.
Records and documents
Transactions28 records, November 18, 2008 to September 30, 2016
Table 4.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| November 18, 2008 | Commitment | 20.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| September 30, 2016 | Commitment | −0.1 | IDA Statement of Credits and Grants | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2011 | Disbursements | 7.0 | IDA Statement of Credits and Grants | cumulative at first snapshot (opening balance) |
| June 30, 2011 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2011 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2011 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2012 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2012 | Disbursements | 1.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2012 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2012 | Disbursements | 0.6 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2013 | Disbursements | 0.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2013 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2013 | Disbursements | 0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2013 | Disbursements | 1.1 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2014 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2014 | Disbursements | 1.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2014 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| September 30, 2014 | Disbursements | 0.2 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2014 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2014 | Disbursements | 1.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2015 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2015 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2015 | Disbursements | 0.4 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2015 | Disbursements | 0.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2015 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2016 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2016 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2016 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms5 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Yes
Locations7 departments, 23 places named, 47 places with coordinates
| Departments | Grande Anse, Sud, Ouest, Centre, Sud-Est, Artibonite, Nippes |
| Places named by the source | Aquin, Cavaillon, Chalon, Croix des Bouquets, Croix des Missions, Ennery, Etang Saumatre, Fonfrede, Ganthier, Gonaives, Les Cayes, Mirebalais, Montrouis, Republic of Haiti, Riviere Bretelle, Riviere Gauche, Riviere Grise, Riviere de la Gosseline, Riviere des Roseaux, Riviere la Voldrogue, Saint-Louis du Sud, Tabarre, Torbeck |
| Places with coordinates | 47 |
Results indicators37 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| (1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC | 0 | 3 | 3 | March 31, 2015 |
| 10 emergency bridges purchased | 0.00 | 10.00 | 10.00 | March 31, 2015 |
| Bridge Inventory Completed and up to date | No | Yes | Yes | March 31, 2015 |
| Constitution of a bridge management unit in MTPTC | No | Yes | Yes | March 31, 2015 |
| Constitution of an effective crisis management and vulnerability reduction unit in MTPTC | No | Yes | Yes | March 31, 2015 |
| Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project. | 0.00 | 2.00 | 2.00 | March 31, 2015 |
| Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards | 0.00 | 8.00 | 17.00 | May 13, 2015 |
| Number of bridges rebuilt with satisfactory technical standards | 0.00 | 1.00 | 1.00 | March 31, 2015 |
| Transversal development strategies and instruments developed by CIAT, established and in place before end of project | 0.00 | 6.00 | 6.00 | March 1, 2015 |
| Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing | 0 | 2 | 2 | May 31, 2015 |
| Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing | 0 | 2 | 2 | May 31, 2015 |
| MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operational within MPTPC | 1 | May 31, 2015 |
| MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operational within MPTPC | 1 | May 31, 2015 |
| MTPTC bridge management and asset mangement unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operational within MPTPC | 1 | March 31, 2015 |
| Roads rehabilitated, Non-rural | 0.00 | 150.00 | 150.00 | May 31, 2015 |
| Roads rehabilitated, Non-rural | 0.00 | 150.00 | 150.00 | May 31, 2015 |
| (1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC | 0 | 3 | 3 | May 31, 2015 |
| (1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC | 0 | 3 | 3 | May 31, 2015 |
| 10 emergency bridges purchased | 0.00 | 10.00 | 10.00 | May 31, 2015 |
| 10 emergency bridges purchased | 0.00 | 10.00 | 10.00 | May 31, 2015 |
| Bridge Inventory Completed and up to date | No | Yes | Yes | May 31, 2015 |
| Bridge Inventory Completed and up to date | No | Yes | Yes | May 31, 2015 |
| Constitution of a bridge management unit in MTPTC | No | Yes | Yes | May 31, 2015 |
| Constitution of a bridge management unit in MTPTC | No | Yes | Yes | May 31, 2015 |
| Constitution of an effective crisis management and vulnerability reduction unit in MTPTC | No | Yes | Yes | May 31, 2015 |
| Constitution of an effective crisis management and vulnerability reduction unit in MTPTC | No | Yes | Yes | May 31, 2015 |
| Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project. | 0.00 | 2.00 | 2.00 | May 31, 2015 |
| Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project. | 0.00 | 2.00 | 2.00 | May 31, 2015 |
| Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards | 0.00 | 8.00 | 12.00 | March 31, 2015 |
| Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards | 0.00 | 8.00 | 17.00 | March 31, 2015 |
| Number of bridges rebuilt with satisfactory technical standards | 0.00 | 1.00 | 1.00 | May 31, 2015 |
| Number of bridges rebuilt with satisfactory technical standards | 0.00 | 1.00 | 1.00 | May 31, 2015 |
| Transversal development strategies and instruments developed by CIAT, established and in place before end of project | 0.00 | 6.00 | 6.00 | May 31, 2015 |
| Transversal development strategies and instruments developed by CIAT, established and in place before end of project | 0.00 | 6.00 | 6.00 | May 31, 2015 |
| Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing | 0 | 2 | 2 | March 31, 2015 |
| MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operatio | 1 | March 31, 2015 |
| Roads rehabilitated, Non-rural | 0.00 | 150.00 | 150.00 | March 1, 2015 |
Ratings25 ratings
| Rating | Value | Date |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | June 30, 2017 |
| IEG borrowcompliance | Satisfactory | June 30, 2017 |
| IEG borrowimplementation | Moderately Satisfactory | June 30, 2017 |
| IEG evaltype | ES | June 30, 2017 |
| IEG evaluation_riskdo | Substantial | June 30, 2017 |
| IEG icrquality | Substantial | June 30, 2017 |
| IEG mequality | Modest | June 30, 2017 |
| IEG outcome | Moderately Satisfactory | June 30, 2017 |
| IEG overallbankperf | Moderately Satisfactory | June 30, 2017 |
| IEG overallborrowperf | Moderately Satisfactory | June 30, 2017 |
| ICR bankqualityentry | Not Rated | December 31, 2015 |
| ICR banksupervision | Not Rated | December 31, 2015 |
| ICR banksupervision | Substantial | December 31, 2015 |
| ICR borrgovt | Substantial | December 31, 2015 |
| ICR borrimplegency | Moderately Satisfactory | December 31, 2015 |
| ICR borroverall | Moderately Satisfactory | December 31, 2015 |
| ICR completion_riskdo | Substantial | December 31, 2015 |
| ICR outratingind | Moderately Satisfactory | December 31, 2015 |
| ICR overallrating | Substantial | December 31, 2015 |
| ISR Financial Management | Moderately Satisfactory | June 1, 2015 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | June 1, 2015 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | June 1, 2015 |
| ISR Procurement | Satisfactory | June 1, 2015 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | June 1, 2015 |
| ISR Project Management | Moderately Satisfactory | June 1, 2015 |
Funds passed on34 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Commitment | September 30, 2016 | −0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | August 31, 2016 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | June 30, 2016 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | March 31, 2016 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | October 31, 2015 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | July 31, 2015 | 0.3 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | March 31, 2015 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | February 28, 2015 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | January 31, 2015 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | December 31, 2014 | 1.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | November 30, 2014 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | September 30, 2014 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | June 30, 2014 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | April 30, 2014 | 1.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | February 28, 2014 | 0.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | December 31, 2013 | 1.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | August 31, 2013 | 0.7 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | June 30, 2013 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | February 28, 2013 | 0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | September 30, 2012 | 0.6 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | August 31, 2012 | 0.3 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | April 30, 2012 | 1.9 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | March 31, 2012 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | September 30, 2011 | 0.6 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | August 31, 2011 | 0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | June 30, 2011 | 0.8 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | March 31, 2011 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | December 31, 2010 | 1.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | July 31, 2010 | 2.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | June 30, 2010 | 0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | April 30, 2010 | 1.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | June 30, 2009 | 0.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Disbursement | May 31, 2009 | 1.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Commitment | November 30, 2008 | 20.0 |
Identifiers4 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | 44000-P114292 | IATI |
| IDA credit or grant | IDAH4320 | IDA Statement of Credits and Grants |
| World Bank loan | IDA-H4320 | World Bank Projects |
| World Bank project | P114292 | Operation record |
Where sources differ1 field
| Field | Source | Value | Used |
|---|---|---|---|
| Status | World Bank Projects | Closed | ✓ |
| Status | IATI | Active |
Partner documents25 documents
- Record on projects.worldbank.org, projects.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, June 30, 2017, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, November 30, 2015, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 14, June 1, 2015, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 13, March 12, 2015, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 12, September 1, 2014, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 11, February 24, 2014, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 10, December 1, 2013, documents.worldbank.org
- Official Documents - Amendment to Financing Agreement, Grant H432, June 6, 2013, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 2 of 2) : Data sheet, May 30, 2013, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 1 of 2) : Main report, May 30, 2013, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 09, February 24, 2013, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 08, June 27, 2012, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst : P114292 - Implementation Status Results Report : Sequence 07, November 2, 2011, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 1 of 2) : Main report, March 21, 2011, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 2 of 2) : Data sheet, March 16, 2011, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst : P114292 - Implementation Status Results Report : Sequence 06, February 22, 2011, documents.worldbank.org
- Financing Agreement for Grant H432-HT Conformed, February 12, 2009, documents.worldbank.org
- Announcement of Twenty Million US Dollars Grant to Haiti for Hurricane Recovery on November 18, 2008, November 18, 2008, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, November 3, 2008, documents.worldbank.org
- Cadre de gestion environnementale et sociale, November 1, 2008, documents.worldbank.org
- Haïti - Projet d’urgence de reconstruction des ouvrages d’art et de réduction de la vulnérabilité : Cadre conceptuel et opérationnel pour les expropriations, November 1, 2008, documents.worldbank.org
- Haiti - Bridge Reconstruction and Disaster Mitigation Project, October 23, 2008, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, October 17, 2008, documents.worldbank.org
- Cadre de gestion environnementale et sociale, October 14, 2008, documents.worldbank.org
Procurement notices (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sources
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |
Cite this page
HaitiDocs. HT Emergency Bridge Reconst & Vulnerab Reduction Project. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP114292