HT Pwojè rekonstriksyon ijan pon ak diminisyon vilnerabilite
Tit pibliye: HT Emergency Bridge Reconst & Vulnerab Reduction Project
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The project's development objective is to i) restore access on selected ciritical point of the Haitian transportation system and ii) support vulnerability reduction by stregthening the Haitian National Disaster Risk Management System.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
- Patnè
- World Bank Group, IDA
- Sektè
- Transpò
- Etap
- Fèmen depi 31 me 2015
- Apwobasyon
- 18 novanm 2008
- Fèmen
- 31 me 2015
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- 0.6: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Anprentè
- MTPTC
- Ajans egzekisyon
- BMPAD,CIAT,UCE,Unite Centrale d'Execution,Unite Centrale d'Execution
- Antre an vigè
- 31 mas 2009
- Depatman
- Grandans, Sid, Lwès, Sant, Sidès, Latibonit, Nip
- Dènye tranzaksyon
- 30 septanm 2016
- Idantifyan operasyon an
- P114292
Sik lavi5 etap, 12 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 14 oktòb 2008 |
| Apwouve | 18 novanm 2008 |
| An kou | 18 novanm 2008 |
| Ap fèmen | 31 me 2015 |
| Fèmen | 31 me 2015 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 14 oktòb 2008 | Pwojè Bank Mondyal |
| Negosyasyon | 24 oktòb 2008 | Pwojè Bank Mondyal |
| Kòmansman reyèl | 18 novanm 2008 | IATI |
| Apwobasyon | 18 novanm 2008 | Pwojè Bank Mondyal |
| Premye angajman | 18 novanm 2008 | Tranzaksyon |
| Kòmansman prevwa | 18 novanm 2008 | IATI |
| Antre an vigè | 31 mas 2009 | Pwojè Bank Mondyal |
| Premye dekèsman | 30 jen 2011 | Tranzaksyon |
| Fen reyèl | 31 me 2015 | IATI |
| Dat fèmti | 31 me 2015 | IATI |
| Dènye dekèsman | 31 jiyè 2015 | Tranzaksyon |
| Rapò fen atann | 1 desanm 2015 | Pwojè Bank Mondyal |
Pa dekèse: 0.0 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 31 me 2015.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 20.0 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 19.9 | IDA, eta kredi ak don | 19.9 |
| Dekèse | 19.4 | IDA, eta kredi ak don | 19.4 |
| Pa dekèse | 0.0 | IDA, eta kredi ak don | |
| Pri total | 20.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Chanjman nan operasyon anpa rapòte
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2008-09Milyon dola ameriken | FY2010-11Milyon dola ameriken | FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | FY2013-14Milyon dola ameriken | FY2014-15Milyon dola ameriken | FY2015-16Milyon dola ameriken | |
|---|---|---|---|---|---|---|---|
| Nouvo angajman | 20.0 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | −0.1 |
| Dekèsman | Pa rapòte | 1.5 | 3.1 | 1.0 | 3.4 | 3.3 | −0.1 |
| Dekèsman kimile | Pa rapòte | 8.5 | 11.6 | 12.7 | 16.1 | 19.4 | 19.4 |
Total kimile a kòmanse ak balans ouvèti 7.0 milyon dola ameriken.
Fich ak dokiman
Tranzaksyon28 liy, 18 novanm 2008 rive 30 septanm 2016
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 18 novanm 2008 | Angajman | 20.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 30 septanm 2016 | Angajman | −0.1 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2011 | Dekèsman | 7.0 | IDA, eta kredi ak don | cumulative at first snapshot (balans ouvèti) |
| 30 jen 2011 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2011 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2011 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2012 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2012 | Dekèsman | 1.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2012 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2012 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2013 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2013 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2013 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2013 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2014 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2014 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2014 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2014 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2015 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2015 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2015 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2015 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2015 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2016 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2016 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2016 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon5 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Wi
Kote7 depatman, 23 kote nonmen, 47 kote ki gen kowòdone
| Depatman | Grandans, Sid, Lwès, Sant, Sidès, Latibonit, Nip |
| Kote sous la nonmen | Aquin, Cavaillon, Chalon, Croix des Bouquets, Croix des Missions, Ennery, Etang Saumatre, Fonfrede, Ganthier, Gonaives, Les Cayes, Mirebalais, Montrouis, Republic of Haiti, Riviere Bretelle, Riviere Gauche, Riviere Grise, Riviere de la Gosseline, Riviere des Roseaux, Riviere la Voldrogue, Saint-Louis du Sud, Tabarre, Torbeck |
| Kote ki gen kowòdone | 47 |
Endikatè rezilta37 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| (1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC | 0 | 3 | 3 | 31 mas 2015 |
| 10 emergency bridges purchased | 0.00 | 10.00 | 10.00 | 31 mas 2015 |
| Bridge Inventory Completed and up to date | No | Yes | Yes | 31 mas 2015 |
| Constitution of a bridge management unit in MTPTC | No | Yes | Yes | 31 mas 2015 |
| Constitution of an effective crisis management and vulnerability reduction unit in MTPTC | No | Yes | Yes | 31 mas 2015 |
| Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project. | 0.00 | 2.00 | 2.00 | 31 mas 2015 |
| Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards | 0.00 | 8.00 | 17.00 | 13 me 2015 |
| Number of bridges rebuilt with satisfactory technical standards | 0.00 | 1.00 | 1.00 | 31 mas 2015 |
| Transversal development strategies and instruments developed by CIAT, established and in place before end of project | 0.00 | 6.00 | 6.00 | 1 mas 2015 |
| Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing | 0 | 2 | 2 | 31 me 2015 |
| Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing | 0 | 2 | 2 | 31 me 2015 |
| MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operational within MPTPC | 1 | 31 me 2015 |
| MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operational within MPTPC | 1 | 31 me 2015 |
| MTPTC bridge management and asset mangement unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operational within MPTPC | 1 | 31 mas 2015 |
| Roads rehabilitated, Non-rural | 0.00 | 150.00 | 150.00 | 31 me 2015 |
| Roads rehabilitated, Non-rural | 0.00 | 150.00 | 150.00 | 31 me 2015 |
| (1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC | 0 | 3 | 3 | 31 me 2015 |
| (1)Bridge inventory completed and up to date; (2) Constitution of an effective crisis management unit in MTPTC; (3)Constitution of a bridge management unit in MTPTC | 0 | 3 | 3 | 31 me 2015 |
| 10 emergency bridges purchased | 0.00 | 10.00 | 10.00 | 31 me 2015 |
| 10 emergency bridges purchased | 0.00 | 10.00 | 10.00 | 31 me 2015 |
| Bridge Inventory Completed and up to date | No | Yes | Yes | 31 me 2015 |
| Bridge Inventory Completed and up to date | No | Yes | Yes | 31 me 2015 |
| Constitution of a bridge management unit in MTPTC | No | Yes | Yes | 31 me 2015 |
| Constitution of a bridge management unit in MTPTC | No | Yes | Yes | 31 me 2015 |
| Constitution of an effective crisis management and vulnerability reduction unit in MTPTC | No | Yes | Yes | 31 me 2015 |
| Constitution of an effective crisis management and vulnerability reduction unit in MTPTC | No | Yes | Yes | 31 me 2015 |
| Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project. | 0.00 | 2.00 | 2.00 | 31 me 2015 |
| Number of Emergency Management and Vulnerability Reduction Units (EM-VRU) created/reinforced and operational within line ministriesand within their departmental directorates before the project. | 0.00 | 2.00 | 2.00 | 31 me 2015 |
| Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards | 0.00 | 8.00 | 12.00 | 31 mas 2015 |
| Number of bridges and road sections that have been repaired or consolidated with satisfactory technical standards | 0.00 | 8.00 | 17.00 | 31 mas 2015 |
| Number of bridges rebuilt with satisfactory technical standards | 0.00 | 1.00 | 1.00 | 31 me 2015 |
| Number of bridges rebuilt with satisfactory technical standards | 0.00 | 1.00 | 1.00 | 31 me 2015 |
| Transversal development strategies and instruments developed by CIAT, established and in place before end of project | 0.00 | 6.00 | 6.00 | 31 me 2015 |
| Transversal development strategies and instruments developed by CIAT, established and in place before end of project | 0.00 | 6.00 | 6.00 | 31 me 2015 |
| Disaster Risk Management Units within key ministries are operational and sustainable, with adequate resources and staffing | 0 | 2 | 2 | 31 mas 2015 |
| MTPTC bridge management and asset management unit is operational and sustainable, with adequate resources and staffing | 0 | Bridge management & asset management unit operatio | 1 | 31 mas 2015 |
| Roads rehabilitated, Non-rural | 0.00 | 150.00 | 150.00 | 1 mas 2015 |
Nòt25 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | 30 jen 2017 |
| IEG borrowcompliance | Satisfactory | 30 jen 2017 |
| IEG borrowimplementation | Moderately Satisfactory | 30 jen 2017 |
| IEG evaltype | ES | 30 jen 2017 |
| IEG evaluation_riskdo | Substantial | 30 jen 2017 |
| IEG icrquality | Substantial | 30 jen 2017 |
| IEG mequality | Modest | 30 jen 2017 |
| IEG outcome | Moderately Satisfactory | 30 jen 2017 |
| IEG overallbankperf | Moderately Satisfactory | 30 jen 2017 |
| IEG overallborrowperf | Moderately Satisfactory | 30 jen 2017 |
| ICR bankqualityentry | Not Rated | 31 desanm 2015 |
| ICR banksupervision | Not Rated | 31 desanm 2015 |
| ICR banksupervision | Substantial | 31 desanm 2015 |
| ICR borrgovt | Substantial | 31 desanm 2015 |
| ICR borrimplegency | Moderately Satisfactory | 31 desanm 2015 |
| ICR borroverall | Moderately Satisfactory | 31 desanm 2015 |
| ICR completion_riskdo | Substantial | 31 desanm 2015 |
| ICR outratingind | Moderately Satisfactory | 31 desanm 2015 |
| ICR overallrating | Substantial | 31 desanm 2015 |
| ISR Financial Management | Moderately Satisfactory | 1 jen 2015 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | 1 jen 2015 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | 1 jen 2015 |
| ISR Procurement | Satisfactory | 1 jen 2015 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | 1 jen 2015 |
| ISR Project Management | Moderately Satisfactory | 1 jen 2015 |
Lajan ki pase bay lòt34 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Angajman | 30 septanm 2016 | −0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 out 2016 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 jen 2016 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 mas 2016 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 oktòb 2015 | −0.0 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 jiyè 2015 | 0.3 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 mas 2015 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 28 fevriye 2015 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 janvye 2015 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 desanm 2014 | 1.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 novanm 2014 | 0.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 septanm 2014 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 jen 2014 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 avril 2014 | 1.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 28 fevriye 2014 | 0.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 desanm 2013 | 1.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 out 2013 | 0.7 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 jen 2013 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 28 fevriye 2013 | 0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 septanm 2012 | 0.6 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 out 2012 | 0.3 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 avril 2012 | 1.9 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 mas 2012 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 septanm 2011 | 0.6 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 out 2011 | 0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 jen 2011 | 0.8 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 mas 2011 | 0.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 desanm 2010 | 1.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 jiyè 2010 | 2.2 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 jen 2010 | 0.1 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 avril 2010 | 1.4 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 30 jen 2009 | 0.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Dekèsman | 31 me 2009 | 1.5 |
| BMPAD; CIAT; UCE; Unite Centrale d'Execution | Angajman | 30 novanm 2008 | 20.0 |
Idantifyan4 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P114292 | IATI |
| Kredi oswa don IDA | IDAH4320 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-H4320 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P114292 | Fich operasyon an |
Kote sous yo pa dakò1 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a25 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, 30 jen 2017, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, 30 novanm 2015, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 14, 1 jen 2015, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 13, 12 mas 2015, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 12, 1 septanm 2014, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 11, 24 fevriye 2014, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 10, 1 desanm 2013, documents.worldbank.org
- Official Documents - Amendment to Financing Agreement, Grant H432, 6 jen 2013, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 2 of 2) : Data sheet, 30 me 2013, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 1 of 2) : Main report, 30 me 2013, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 09, 24 fevriye 2013, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst & Vulnerab Reduction Project : P114292 - Implementation Status Results Report : Sequence 08, 27 jen 2012, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst : P114292 - Implementation Status Results Report : Sequence 07, 2 novanm 2011, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 1 of 2) : Main report, 21 mas 2011, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project : restructuring (Vol. 2 of 2) : Data sheet, 16 mas 2011, documents.worldbank.org
- Haiti - HT Emergency Bridge Reconst : P114292 - Implementation Status Results Report : Sequence 06, 22 fevriye 2011, documents.worldbank.org
- Financing Agreement for Grant H432-HT Conformed, 12 fevriye 2009, documents.worldbank.org
- Announcement of Twenty Million US Dollars Grant to Haiti for Hurricane Recovery on November 18, 2008, 18 novanm 2008, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, 3 novanm 2008, documents.worldbank.org
- Cadre de gestion environnementale et sociale, 1 novanm 2008, documents.worldbank.org
- Haïti - Projet d’urgence de reconstruction des ouvrages d’art et de réduction de la vulnérabilité : Cadre conceptuel et opérationnel pour les expropriations, 1 novanm 2008, documents.worldbank.org
- Haiti - Bridge Reconstruction and Disaster Mitigation Project, 23 oktòb 2008, documents.worldbank.org
- Haiti - Emergency Bridge Reconstruction and Vulnerability Reduction Project, 17 oktòb 2008, documents.worldbank.org
- Cadre de gestion environnementale et sociale, 14 oktòb 2008, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |