Data / Partner portfolio / World Bank Group / World Bank
HT Center and Artibonite Regional Development
US$ millions unless stated. Haitian fiscal year, October to September. FY2026-27 began October 1, 2026.
Objective
The objectives of the Project are to: (a) support the development of the Centre Artibonite Loop region, primarily by enhancing all-weather connectivity and logistics for producers, and the region’s resilience to climate change; and (b) support the Recipient’s capacity to respond promptly and effectively to an Eligible Emergency, as needed.
As published by World Bank Projects, in its original language.
Description
The development objectives of the Center and Artibonite Regional Development Project for Haiti are to: (a) support the development of the Centre Artibonite Loop (CAL) region, primarily by enhancing all-weather connectivity and logistics for producers, and the region's resilience to climate change; and (b) support the recipient's capacity to respond promptly and effectively to an eligible emergency, as needed. The project comprises of five components. The first component, enhancing logistics, transport connectivity, and climate resilience aims to link the CAL region to economic growth poles outside the region, and to improve the internal connectivity of the CAL, by increasing all-weather access to agricultural production areas, markets and services, and by increasing the rural access index and the macro-resilience of the
more
road network to natural events and effects of climate change. It has following four sub-components: (i) improving the structuring road network; (ii) improving the rural road network; (iii) strengthening road maintenance capacity and mechanisms at the local level; and (iv) supporting the application of best practices addressing the issue of climate resilience. The second component will improve the infrastructure and management capacity of key selected urban markets (2 to 4) and rural markets (4 to 8) to link agricultural producers with the roads provided under first component. It comprises of following two sub-components: (i) urban markets and associated facilities; and (ii) rural markets. The third component, supporting the development of regional knowledge, planning capacity, and local participation aims to support the Government of Haiti (GoH), municipalities, and local stakeholders to effectively plan and make consensual decisions. It has following two sub-components: (i) improving regional knowledge; and (ii) supporting the development of regional planning capacity and local participation. The fourth component, contingent emergency response include triggers and conditions for the use of funds, included in most investment projects in Haiti in keeping with the recommendations of the 2011 World Development Report (WDR) on conflict, security and development, and with the operational experience acquired in Haiti since the 2010 earthquake. The fifth component, project implementation, monitoring and evaluation will finance the activities of the implementing agency for the project: the unite technique d'execution (UTE), an existing project implementation unit (PIU) under the responsibility of Ministry of Economy and Finance (MEF).
- Partner
- World Bank Group, World Bank
- Sector
- Transport
- Stage
- Closed since August 31, 2020
- Approval
- May 19, 2014
- Closing
- August 31, 2020
- Instrument
- IBRD/IDA financing, Grants
- Undisbursed gap
- 9.8: trust funds are not in the IDA statement, which gives undisbursed amounts for IDA money only; the IDA statement values undisbursed credits in special drawing rights at the current exchange rate
- Borrower
- Ministry of Economy and Finance
- Implementing agency
- Unite Centale d'Execution (UCE),Unite Technique d'Execution (UTE)
- Effectiveness
- October 6, 2014
- Departments
- Ouest, Nord, Centre, Artibonite
- Last transaction
- June 30, 2021
- Operation ID
- P133352
Life cycle4 stages, 12 dates
Stage history
| Stage | From |
|---|---|
| Approved | May 19, 2014 |
| Under way | May 19, 2014 |
| Closing | August 31, 2020 |
| Closed | August 31, 2020 |
Dated events
| Event | Date | Source |
|---|---|---|
| Planned start | December 26, 2013 | IATI |
| Appraisal | January 13, 2014 | World Bank Projects |
| Negotiation | April 2, 2014 | World Bank Projects |
| Actual start | May 19, 2014 | IATI |
| Approval | May 19, 2014 | World Bank Projects |
| First commitment | May 19, 2014 | Transactions |
| Effectiveness | October 6, 2014 | World Bank Projects |
| First disbursement | October 31, 2014 | Transactions |
| Actual end | August 31, 2020 | IATI |
| Closing date | August 31, 2020 | IATI |
| Last disbursement | December 31, 2020 | Transactions |
| Completion report due | February 27, 2021 | World Bank Projects |
Undisbursed: US$0.0 million on September 30, 2026, with closing on August 31, 2020.
Financing
Table 1.Financing, US$ millions
| Financier | AmountUS$ millions | Role | Source |
|---|---|---|---|
| IDA Grant | 50.0 | Institution | World Bank Projects |
| Strategic Climate Fund Grant | 8.0 | Trust fund | World Bank Projects |
Table 2.Position at the data date by source (stocks), US$ millions
| This pageUS$ millions | Source | IATIUS$ millions | |
|---|---|---|---|
| Commitment | 25.3 | IDA Statement of Credits and Grants | 20.8 |
| Disbursed | 15.5 | IDA Statement of Credits and Grants | 15.5 |
| Undisbursed | 0.0 | IDA Statement of Credits and Grants | |
| Total cost | 58.0 | World Bank Projects |
World Bank amounts. Approved: Net commitment, the amount approved less cancellations, in US$ at the data date. Disbursed to date: The disbursements of the IDA statement and the Projects API to date, in US$. Undisbursed: The undisbursed balance the IDA statement publishes, in US$ at the data date. IATI column: the commitments and disbursements the partner reports to IATI, converted to US$. Amounts by source
Changes to the operation1 extension, at least 2 restructurings
- Original closing date
- February 28, 2020
- Closing date extensions
- 1
- Extended from February 28, 2020 to August 31, 2020 (document of March 31, 2020)
- Restructurings
- at least 2
- June 27, 2018 (document of June 27, 2018) restructuring paper
- February 25, 2020 (document of February 25, 2020) restructuring paper
- Emergency component
- Not reported
New commitments and disbursements by fiscal year
Table 3.New commitments and disbursements by fiscal year (flows), US$ millions
| FY2013-14US$ millions | FY2014-15US$ millions | FY2016-17US$ millions | FY2017-18US$ millions | FY2018-19US$ millions | FY2019-20US$ millions | FY2020-21US$ millions | |
|---|---|---|---|---|---|---|---|
| New commitments | 58.0 | Not reported | Not reported | Not reported | Not reported | −26.2 | −6.5 |
| Disbursements | Not reported | 2.5 | 2.0 | 2.0 | 13.8 | −3.0 | −1.9 |
| Cumulative disbursements | Not reported | 2.5 | 4.5 | 6.5 | 20.3 | 17.3 | 15.5 |
Records and documents
Transactions19 records, May 19, 2014 to June 30, 2021
Table 4.Transactions, US$ millions
| Date | Measure | AmountUS$ millions | Source | Method |
|---|---|---|---|---|
| May 19, 2014 | Commitment | 50.0 | IDA Statement of Credits and Grants | credit original principal at board approval |
| May 19, 2014 | Commitment | 8.0 | World Bank Projects | trust funds in the Projects API financier list, not in the IDA statement, at the board approval date |
| March 31, 2020 | Commitment | −26.2 | IDA Statement of Credits and Grants | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| June 30, 2021 | Commitment | −6.5 | IDA Statement of Credits and Grants | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2014 | Disbursements | 0.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| January 31, 2015 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2015 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2016 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| May 31, 2017 | Disbursements | 1.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2018 | Disbursements | 2.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| October 31, 2018 | Disbursements | 3.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| November 30, 2018 | Disbursements | 8.5 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| July 31, 2019 | Disbursements | 2.3 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2020 | Disbursements | 0.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| August 31, 2020 | Disbursements | −3.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| December 31, 2020 | Disbursements | 0.8 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| February 28, 2021 | Disbursements | −1.9 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| March 31, 2021 | Disbursements | −0.7 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| April 30, 2021 | Disbursements | −0.0 | IDA Statement of Credits and Grants | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Terms4 of 6 reported
- Finance type
- 110 Standard grant
- Flow type
- Not reported
- Aid type
- C01 Project-type interventions
- Tied status
- 5 Untied
- Collaboration type
- 2 Multilateral inflows
- Humanitarian
- Not reported
Locations4 departments, 4 places named, 8 places with coordinates
| Departments | Ouest, Nord, Centre, Artibonite |
| Places named by the source | Centre, Departement de l'Artibonite, Departement de l'Ouest, Nord |
| Places with coordinates | 8 |
Results indicators13 indicators
| Indicator | Baseline | Target | Latest value | Date of latest value |
|---|---|---|---|---|
| Number of Road Maintenance Centers build or rehabilitated | 0.00 | 1.00 | 0.00 | August 31, 2020 |
| Number of events/activities dedicated for knowledge dissemination and consultation | 0.00 | 0.00 | 12.00 | August 31, 2020 |
| Number of people trained within selected communities on basic Rural Road Maintenance (disaggregated by gender) | 0.00 | 300.00 | 284.00 | February 28, 2020 |
| Roads rehabilitated, Non-rural | 0.00 | 60.00 | 55.87 | August 31, 2020 |
| Roads rehabilitated, Rural | 0.00 | 40.00 | 30.00 | August 31, 2020 |
| Spot interventions to enhance all-weather and resilient connectivity | 0.00 | 44.00 | 64.00 | August 31, 2020 |
| Urban plans developed and consulted with Local officials and local stakeholders | 0.00 | 3.00 | 2.00 | August 31, 2020 |
| disaggregated by gender, in % of women | 0.00 | 0.00 | Not reported | Not reported |
| Number of producers and users serviced by an all-weather-road accessing urban and rural markets. | 0.00 | 0.00 | 123500.00 | August 31, 2020 |
| Share of rural population with access to an all-season road | 39.00 | 45.00 | 44.00 | August 28, 2020 |
| Share of the population in the Project area satisfied with the quality and impact of infrastructure financed by the Project | 0.00 | 0.00 | 97.50 | June 30, 2020 |
| Female beneficiaries | 0.00 | 0.00 | 0.00 | July 18, 2018 |
| Number of rural people with access to an all-season road | 374400.00 | 0.00 | 0.00 | July 18, 2018 |
Ratings17 ratings
| Rating | Value | Date |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | June 21, 2021 |
| IEG borrowcompliance | Not Rated | June 21, 2021 |
| IEG evaltype | ES | June 21, 2021 |
| IEG icrquality | Substantial | June 21, 2021 |
| IEG mequality | Modest | June 21, 2021 |
| IEG outcome | Moderately Unsatisfactory | June 21, 2021 |
| IEG overallbankperf | Moderately Satisfactory | June 21, 2021 |
| ICR bankqualityentry | Not Rated | February 27, 2021 |
| ICR banksupervision | Not Rated | February 27, 2021 |
| ICR outratingind | Moderately Unsatisfactory | February 27, 2021 |
| ICR overallrating | Moderately Satisfactory | February 27, 2021 |
| ISR Financial Management | Moderately Satisfactory | August 31, 2020 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | August 31, 2020 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | August 31, 2020 |
| ISR Procurement | Moderately Satisfactory | August 31, 2020 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | August 31, 2020 |
| ISR Project Management | Moderately Satisfactory | August 31, 2020 |
Contract awards10 awards
| Supplier | Date | Method | Amount |
|---|---|---|---|
| Civil Design & Construction | June 8, 2020 | DIR | 894,400 HTG |
| Global Communities | November 6, 2019 | FBS | 3,795,000 USD |
| SETEC International | October 31, 2019 | QCBS | 112,348,069.39 HTG |
| SETEC International | October 31, 2019 | QCBS | 41,016.36 USD |
| BETA Ingnieurs-Conseils | October 31, 2019 | QCBS | Not reported |
| Name not shown | April 25, 2019 | CDS | 4,143,422.11 Haitian Gourdes |
| Name not shown | January 15, 2019 | CDS | 7,648,647 Haitian Gourdes |
| Name not shown | November 16, 2018 | RFQ | 16,281,998 HTG |
| Name not shown | November 16, 2018 | RFQ | 14,425,950 HTG |
| Name not shown | November 16, 2018 | RFQ | 15,600,000 HTG |
Funds passed on18 transactions
| Receiver | Transaction | Date | US$ millions |
|---|---|---|---|
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Commitment | June 30, 2021 | −6.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | April 30, 2021 | −0.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | March 31, 2021 | −0.7 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | February 28, 2021 | −1.9 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | December 31, 2020 | 0.8 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | August 31, 2020 | −3.9 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Commitment | March 31, 2020 | −23.2 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | March 31, 2020 | 0.9 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | July 31, 2019 | 2.3 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | November 30, 2018 | 8.5 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | October 31, 2018 | 3.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | July 31, 2018 | 2.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | May 31, 2017 | 1.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | October 31, 2016 | 1.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | July 31, 2015 | 1.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | January 31, 2015 | 1.0 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Disbursement | October 31, 2014 | 0.5 |
| Unite Centale d'Execution (UCE); Unite Technique d'Execution (UTE) | Commitment | May 31, 2014 | 50.0 |
Identifiers4 identifiers
| System | Identifier | Source |
|---|---|---|
| IATI identifier | 44000-P133352 | IATI |
| IDA credit or grant | IDAH9500 | IDA Statement of Credits and Grants |
| World Bank loan | IDA-H9500 | World Bank Projects |
| World Bank project | P133352 | Operation record |
Where sources differ2 fields
| Field | Source | Value | Used |
|---|---|---|---|
| Commitment | IDA Statement of Credits and Grants | US$25.3 million | ✓ |
| Commitment | IATI | US$20.8 million | |
| Commitment | World Bank Projects | US$58.0 million | |
| Status | World Bank Projects | Closed | ✓ |
| Status | IATI | Active |
Partner documents64 documents
- Record on projects.worldbank.org, projects.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P133352 - HT Center and Artibonite Regional Development - Audited Financial Statement, July 9, 2021, documents.worldbank.org
- Haiti - HT - Ctr Artibonite Reg Dev., June 21, 2021, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project, February 28, 2021, documents.worldbank.org
- Disclosable Version of the ISR - HT Center and Artibonite Regional Development - P133352 - Sequence No : 12, September 1, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, August 17, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, August 6, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, June 9, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, May 20, 2020, documents.worldbank.org
- P133352 - Haiti Center and Artibonite Reg. Dev. Proj. - Audit Statements as of Sept. 2019, April 19, 2020, documents.worldbank.org
- Official Documents- Amendment to the Agreement Providing for the Amendment and Restatement of the Financing Agreement for Grant H950-HT, February 27, 2020, documents.worldbank.org
- Disclosable Restructuring Paper - HT Center and Artibonite Regional Development - P133352, February 25, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, February 21, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, February 21, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, February 4, 2020, documents.worldbank.org
- Disclosable Version of the ISR - HT Center and Artibonite Regional Development - P133352 - Sequence No : 11, January 14, 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, November 11, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, September 4, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, July 24, 2019, documents.worldbank.org
- Disclosable Version of the ISR - HT Center and Artibonite Regional Development - P133352 - Sequence No : 10, July 5, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, June 7, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, May 14, 2019, documents.worldbank.org
- P133352 - Haiti Center and Artibonite Reg. Dev. Proj. - Audit Statements as of Sept. 2018, April 21, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, April 4, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, March 20, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, February 19, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, February 7, 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P133352- HT Center and Artibonite Regional Development - Procurement Plan, January 31, 2019, documents.worldbank.org
- Disclosable Version of the ISR - HT Center and Artibonite Regional Development - P133352 - Sequence No : 09, January 10, 2019, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Environmental Assessment (Vol. 3 of 3) : Plan de Gestion Environnementale et Sociale pour le Traitement des Points Critiques sur le Tronçon Titanyen-Saut d’Eau, January 1, 2019, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Resettlement Plan (Vol. 3 of 3) : Plan Succinct de Réinstallation, October 1, 2018, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Resettlement Plan (Vol. 2 of 3) : Déviation pour Construction des Dalots au Pk 1+083 et au Pk 8+959, August 1, 2018, documents.worldbank.org
- Disclosable Version of the ISR - HT Center and Artibonite Regional Development - P133352 - Sequence No : 08, August 1, 2018, documents.worldbank.org
- Official Documents- Amended and Restated Financing Agreement for Grant H950-HT, July 6, 2018, documents.worldbank.org
- Official Documents- Fiirst Restatement of the Disbursement Letter for Grant H950-HT, June 29, 2018, documents.worldbank.org
- Disclosable Restructuring Paper - HT Center and Artibonite Regional Development - P133352, June 27, 2018, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Resettlement Plan (Vol. 1 of 3) : Plan Succinct de Réinstallation : Traitement des Points Critiques sur le Tronçon RoutierHinche–Maïssade, June 1, 2018, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Mid-term Review Mission - 21 February to 2 March and 2 to 11 April, 2018, April 11, 2018, documents.worldbank.org
- Disclosable Version of the ISR - HT Center and Artibonite Regional Development - P133352 - Sequence No : 07, January 2, 2018, documents.worldbank.org
- Haiti - HT Center and Artibonite Regional Development : P133352 - Implementation Status Results Report : Sequence 06, June 30, 2017, documents.worldbank.org
- Haiti - HT Center and Artibonite Regional Development : P133352 - Implementation Status Results Report : Sequence 05, January 3, 2017, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Environmental Assessment (Vol. 1 of 3) : Plan de gestion environnementale et sociale pour la construction des points critiques sur les deux tronçons Saint-Michel de l’Attalaye et Saint-Raphaël et Hinche-Maïssade, December 1, 2016, documents.worldbank.org
- Haiti - HT Center and Artibonite Regional Development : P133352 - Implementation Status Results Report : Sequence 04, May 31, 2016, documents.worldbank.org
- Haiti - HT Center and Artibonite Regional Development : P133352 - Implementation Status Results Report : Sequence 03, November 24, 2015, documents.worldbank.org
- Haiti - HT Center and Artibonite Regional Development : P133352 - Implementation Status Results Report : Sequence 02, May 12, 2015, documents.worldbank.org
- Haiti - HT Center and Artibonite Regional Development : P133352 - Implementation Status Results Report : Sequence 01, October 11, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Environmental Assessment (Vol. 2 of 3) : Plan de Gestion Environnementale et Sociale (PGES), October 7, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : environmental assessment : Cadre de gestion environnementale et sociale, October 1, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : resettlement plan : Cadre de la politique de réinstallation (CPR), September 1, 2014, documents.worldbank.org
- Official Documents- Financing Agreement for Grant H950-HT (Closing Package), July 9, 2014, documents.worldbank.org
- Official Documents- Supplemental Letter Ref. Financial Data for Grant H950-HT (Closing Package), July 9, 2014, documents.worldbank.org
- Official Documents- Disbursement Letter for Grant H950-HT (Closing Package), July 9, 2014, documents.worldbank.org
- Official Documents- Recommendation of Statutory Committee for Grant H950-HT and TF017021 (Closing Package), April 28, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project, April 15, 2014, documents.worldbank.org
- Official Documents- Amendment to the Disbursement Letter for Advance Q904-HT, March 24, 2014, documents.worldbank.org
- Project Information Document (Concept Stage) - HT Center and Artibonite Regional Development - P133352, February 6, 2014, documents.worldbank.org
- Official Documents- Agreement for Advance Q904-HT, February 4, 2014, documents.worldbank.org
- Official Documents- Disbursement Letter for Advance Q904-HT, February 4, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Integrated Safeguards Data Sheet (Appraisal Stage) - HT Center and Artibonite Regional Development - P133352, January 24, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Haiti - Projet de developpement regional de la boucle Centre Artibonite, January 24, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Project Information Document (Appraisal Stage) - HT Center and Artibonite Regional Development - P133352, January 16, 2014, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project, December 12, 2013, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Integrated Safeguards Data Sheet (Concept Stage) - HT Center and Artibonite Regional Development - P133352, November 30, 2013, documents.worldbank.org
- Haiti - Center and Artibonite Regional Development Project : Projet de developpement regional de la boucle Centre Artibonite, November 14, 2013, documents.worldbank.org
Procurement notices (2)
- Procurement Notices, projects.worldbank.org
- Contract Awards, projects.worldbank.org
Sources
- IATI record (d-portal): terms of use set by the publisher
- IATI: terms of use set by the publisher
- IDA statement of credits and grants (dataset): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Transactions: terms of use set by the publisher
- Operation record: terms of use set by the publisher
- World Bank procurement notices: terms of use set by the publisher
- World Bank project page: terms of use set by the publisher
- World Bank documents: terms of use set by the publisher
Data as of October 18, 2026
| Source | Read on |
|---|---|
| IATI | October 18, 2026 |
| IATI | October 18, 2026 |
| IDA Statement of Credits and Grants | October 18, 2026 |
| World Bank procurement notices | October 18, 2026 |
| World Bank Projects | October 18, 2026 |
| World Bank documents | October 18, 2026 |
Cite this page
HaitiDocs. HT Center and Artibonite Regional Development. Partner portfolio, data as of October 18, 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP133352