(1979) Haiti Urban Sector Survey
Summary — This report, prepared by the World Bank, provides an overview of urban development in Haiti as of 1979. It identifies problems that World Bank urban lending can address, with emphasis on improving conditions for the urban poor.
Key Findings
- Haiti has a grave urban poverty problem with two-thirds of the urban population deriving income from informal sector activities.
- Urban service deficiencies are reflected in high residential densities and lack of access to water and waste removal in low-income areas.
- The urban poverty problem is not likely to improve rapidly due to population growth and limited absorption of labor in the formal sector.
- Sixty percent of the urban population live in the Port-au-Prince metropolitan area, which has a near monopoly on public administration, financial services, commerce, and modern manufacturing employment.
Full Description
The Haiti Urban Sector Survey, conducted in 1979, analyzes the facts and problems of urban development in Haiti to assist in formulating an urban strategy for the country. The report identifies problems that World Bank urban lending can help address, with particular emphasis on improving the lot of the urban poor. It examines demographic features, spatial difficulties in socioeconomic conditions, the spatial impact of government policies, urban employment, urban services (shelter, environmental management, water, transport), and urban management. The report also proposes alternative spatial development strategies and identifies urban project opportunities.
Full Document Text
Extracted text from the original document for search indexing.
[page 1]
DT
Ko]
N
S Report No. 2152-HA FILE
E .,*
2 Haiti COPy
5
a
? Urban Sector Survey
2
2
8 April 19, 1979
Country Programs Department
Latin America and the Caribbean
FOR OFFICIAL USE ONLY
DT
[0]
N
5]
©
5
a
œ
5
a
2
O
2
Q
2
2
=]
cu
Document of the World Bank
RS
This document has a restricted distribution and may be used by recipients
only in the performance of their official duties. Its contents may not
otherwise be disclosed without World Bank authorization.
[page 2]
This report is based on findings
of an urban sector mission
which visited Haiti in November 1977.
The mission was led by Friedrich Kahnert
and included World Bank staff members
Ulrich Thumm and Charles Goldfinger and consultants
Luther Bourne, Jean Damico and Simon Fass.
Currency equivalence: US$1.00 = Gourdes 5.00
Fiscal year: October l - September 30
[page 3]
FOR OFFICIAL USE ONLY
É HAITI
URBAN SECTOR SURVEY
TABLE OF CONTENTS
Page No.
SOCIAL INDICATORS DATA SHEET
MAP IBRD 13769
LIST OF ABBREVIATIONS ....ssssossseseseesesssssseneeneseseesessese i-ii
MAJOR CONCLUSIONS AND RECOMMENDATIONS .erosessesesersosessesssesesese 1ii-xi
Chapter IL: THE SPATIAL DIMENSION OF HAITI’s SOCIOECONOMIC SYSTEM ... l
A. Demographic Features ........sesssesscssesronsesssseseese l
B. Spatial Difficulties in Socioeconomic Conditions ........ 3
C. The Spatial Impact of Government - Past Trends in
Major Policy Areas .sscsoneosonenossenesnesescsseseese 7
D. Regional Decentralization in the Second Plan Period ..... 14
E. Summary and Conclusions .....sssessooseoosesssousencsesse 16
Chapter II: URBAN EMPLOYMENT ...ssssssonsonenonenssseneseonensenenee 19
A. Overview of Employment and Unemployment ...sssesssseosse 19
B. Manufacturing Industry ...ss.sscossssccescossonseseuessse 21
C. Handicrafts ....sesessosssoososeresecosesessceneseesseses 27
D. Construction ...ssressssesesssssosesessssssssesesessesses 29
E. The Informal Sector .....rsssssesssossosnosssosesossesses 30
F. Summary and Conclusions .....sssesssossssesssssscseocsee 33
Chapter III: URBAN SERVICES ....sosseossoseoseocssesesssesserensesee 35
A. Shelter - Port-au-Prince ....sssssossssssossssssssssuesee 35
B. Environmental Management - Port-au-Prince s.sssssossoseose 46
C. Water - Port-au-Prince ...socsosossensosorsessessosessese 56
D. Transport - Port-au-Prince ...ssessssssseseessesosssoseree 64
E. Urban Services in Three Provincial Towns eee 71
F. Summary and Conclusions ......essosessossssessosessssssee 82
Chapter IV: URBAN MANAGEMENT ..s..esosssososssessosonesssssonessesee 89
A. Some General Factors Affecting Institutional Performance 89
B. Regulatory Powers and Instruments ........oessssessseenee 92
C. General Institutional Structure and Overall Urban
Management cessooocoorssnossseosesesssesesnsssesesesuss 94
D. Urban Employment Promotion Institutions ......se.esssssee 101
E. Urban Service Delivery Institutions ....s.ssssssssssosses 106
F. Summary and Conclusions .......s.sssssesssssosseseresssee 115
This document has a restricted distribution and may be used by recipients only in the performance
of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.
[page 4]
2 -
Page No.
Chapter V: URBAN DEVELOPMENT STRATEGIES AND OPPORTUNITIES .essoesose 119
A. Alternative Spatial Development Strategies essosssoerese 119
B. Overall Economic and Financial Implications ..essvsesosee 122
C. Some Factors Conditioning World Bank Involvement ........ 130
D. Urban Project Opportunities ...ssssssssssssssssesvssseuse 133
E. Summary and Conclusions ...sesesessoessesssssossesvesees 141
TEXT TABLES
Tables Relating to Chapter I
1-1 AVERAGE NATIONAL INCOME PER CAPUT, BY REGION, HAITI 1976 .. 4
1-2 INDUSTRIAL LABOR FORCE BY DEPARTEMENTS,
HAITI 1950 AND 1971 ses sosesenossenesssesescssonessesssee 10
1-3 SPATIAL DISTRIBUTION OF PUBLIC INVESTMENT, POPULATION AND
INCOME-PERCENTAGES «essor seneseeososssseseseesessse 15
Tables Relating to Chapter II
1I-1 POPULATION AND LABOR FORCE, HAITI 1971 s...ssssssssssoscsee 20
II1-2 EMPLOYMENT BY SECTORS, HAITI 1950 and 1971 ..ss.ssseseoeses 21
Tables Relating to Chapter III |
111-1 GROSS RESIDENTIAL DENSITIES IN PORT-AU-PRINCE, 1976 «sooce 36
III-2 ESTIMATED HOUSING INVESTMENTS IN PORT-AU-PRINCE, 1976-1981 42
111-3 PUBLIC HOUSING PROJECTS MANAGED BY THE ONL .sososesosouoess 43
I1I1-4 STRUCTURE OF PORT-AU-PRINCE RESIDENTIAL WATER DISTRIBUTION
FROM THE CAMEP SYSTEM, 1976 ...cooossoesosossesossossoseses 59
III-5 ESTIMATED STRUCTURE OF DAILY TRANSPORTATION DEMAND FOR
WORK-RELATED TRIPS IN PORT-AU-PRINCE, 1975 and 1986 ......e 65
I11-6 INCREASE IN MOTORIZED VEHICLES IN PORT-AU-PRINCE, 1971-1975 67
III-7 FORECAST INCREASE IN VEHICLES IN PORT-AU-PRINCE, 1975-1986 68
III-8 STRUCTURE OF FAMILY HOUSING EXPENDITURES IN PORT-AU-PRINCE
AND OTHER TOWNS IN 1970 .....sesosssocssonessssosssssscsese 73
III-9 INVESTMENT IN THE BUILDING SUB-SECTOR, 1976 - CAP HAITIEN,
GONAIVES AND LES CAYES (US$) cossesseneosssnssssessenessese 73
111-10 FORECAST OF SHELTER CONSTRUCTION ACTIVITY IN CAP HAITIEN,
GONAIVES, AND LES CAYES, 1976-1981 ....ssssossessonsssosese 74
[page 5]
- 3 -
Page No.
Tables Relating to Chapter IV
IV-1 RECEIPTS AND EXPENDITURES OF SELECTED MUNICIPALITIES IN
1975/76 rss ssrrossoonsseesesecsssssssesssssesssssssessse 100
Tables Relating to Chapter V
V-1 SUMMARY RESULTS OF POPULATION PROJECTIONS BY SPATIAL
STRATEGY, HAITI 1986 and 2001 ........ssessesseosesscesses 121
V-2 TOTAL ANNUAL CAPITAL REQUIREMENTS BY REGION AND BY
STRATEGY eoonsesosecoseoenesssensssnonsecesessecocesssesecs 124
V-3 VOLUME AND GEOGRAPHICAL STRUCTURE OF DISCRIMINATORY
SPATIAL INVESTMENT PROGRAM COMPARED TO PLANNED PATTERN
OF INVESTMENT, HAITI 1976-1986 .........scssososecsososeosse 126
V-4 PRIORITY RANKING OF SLUM-UPGRADING IN PORT-AU-PRINCE ...+. 140
ANNEX
TECHNICAL NOTE ON THE COMPILATION OF INCOME DISTRIBUTION °
STATISTICS ..esssososnesonessnes sonne sesssosenescesesessssssee 148
TECHNICAL NOTE ON ESTIMATING THE REGIONAL INCIDENCE OF THE
FISCAL SYSTEM (tax revenues and fiscal expenditures) AND
OF PLANNED GOVERNMENT DEVELOPMENT EXPENDITURES ....esseossesesss 151
A. Tax Revenues ....se0esessosonesessoseoseusssssessesese 151
B. Fiscal Expenditures ...s.sssoreosesessscsssenosseccsecose 152
C. Planned Government Development Expenditures .....s..sore 153
Table: 1.1 POPULATION BY DEPARTEMENT AND ARRONDISSEMENT,
HAITI, 1950 and 1971 .......sesoussssesssssoeccss 155
1.2 POPULATION BY DEPARTEMENT AND ARRONDISSEMENT,
HAITI, 1950 and 1971 .....s.ssssosrosssvsossosses 156
1.3 SIZE DISTRIBUTION OF URBAN POPULATION BY
ARRONDISEMENT, HAITI, 1950, 1971, 1975 .......... 157
1.4 RESIDENT POPULATION OF DEPARTMENTAL CAPITALS,
HAITI, 1976 .....ss..ssossssesssesssesnesssesesee 158
1.5 (a) NET MIGRATION (INTERNAL AND EXTERNAL) BY
DEPARTEMENT, HAITI 1973 ......sssssssssssosessose 159
1.5 (b) CUMULATED NET MIGRATION BY DEPARTEMENT AND AREA
S OF RESIDENCE, HAITI 1971 ....ssosssesossssssoosse 160
1.6 DISTRIBUTION OF LABOR INCOME BY INCOME CLASSES
AND GEOGRAPHIC REGIONS, HAITI 1976 .....sssoseses 161
1.7 DISTRIBUTION OF NATIONAL INCOME BY CLASSES AND
GEOGRAPHIC REGIONS, HAITI 1976 .....seosseossoses 162
[page 6]
-k&4-
Page No.
Table: 1.8 MINIMUM PER-CAPITA CONSUMERS EXPENDITURE BY
TOWNS AND REGIONS, HAITI 1976 ................... 163
1.9 PEOPLE LIVING UNDER CONDITIONS OF ABSOLUTE
POVERTY, HAITI, 1976 ............................ 164
1.10 NUTRITIONAL STATUS OF CHILDREN AGED 0-6 BY
REGION, HAITI 1974/77 ......................4.... 165
‘ 1.11 REGIONAL INCIDENCE OF FISCAL SYSTEM, HAITI
1975/76 ...........,........, esse. 166
1.12 AGRICULTURAL COMMODITY PRICES, HAITI 1970 AND
1974 (MARKET PRICES AT DIFFERENT PLACES IN
US$ PER METRIC TON) ............................. 167
1.13 AGRICULTURAL COMMODITY PRICES, HAITI 1968/74
: (MARKET PRICES AT DIFFERENT PLACES, ANNUAL
AVERAGES, 1968=100) ............................. 168
1.14 IDAI LOANS BY DEPARTEMENT, 19/72/75 (PERCENTAGES). 169
1.15 TEACHERS AND SCHOOL-AGE POPULATION PER TEACHER
BY DEPARTEMENT, HAITI 1975/76 ................... 170
1.16 PUBLIC DEVELOPMENT EXPENDITURES BY SECTORS,
HAITI 1972-1981 .............,..............,.... 171
1.17 SPATIAL DISTRIBUTION OF PUBLIC DEVELOPMENT
EXPENDITURES, HAITI 1976/81 (PERCENTAGES) ....... 172
2.1 EMPLOYMENT AND SALARIES IN THE INDUSTRIAL
ENTERPRISES OF THE MODERN SECTOR IN HAITI BY
INDUSTRIAL BRANCH AND ACCORDING TO REGISTRATIONS
IN THE INSURANCE SYSTEM (OFATMA) IN
NINE URBAN CENTERS IN 19/75/76 ................... 173
2.2 EMPLOYMENT IN PORT-AU-PRINCE, 1975 .............. 174
- 2,3 EMPLOYMENT IN THE BUILDING INDUSTRY, PORT-AU-
PRINCE 1976 ........,..........e.....sesesssscess 175
3.1 COST OF CONSTRUCTION MATERIALS IN PORT-AU-PRINCE
3.2 WAGES IN HOUSING CONSTRUCTION (US$1976 per day) . 177
3.3 STRUCTURE OF HOUSING CONSTRUCTION COSTS (US$1976
per m') ss... ssesseesesese.esssssosees 178
3.4 EVOLUTION OF COSTS OF ST. MARTIN UPGRADING
PROGRAM ......................esessesssssseses 179
3.5 EVOLUTION OF COSTS OF DROUILLARD SITES AND
SERVICES PROJECT .............ssssseesessesssse.s 180
[page 7]
- 5 -
Page No.
ORGANIZATION CHART OF THE NATIONAL COUNCIL OF DEVELOPMENT
AND PLANNING sus sueoseseesesneseeseonesueeseeseses LOL
ORGANIZATION CHART OF THE DEPARTMENT OF PUBLIC WORKS,
TRANSPORTATION AND COMMUNICATIONS ...ssesueesesneenessessees O2
Table: 4.1 TAX RECEIPTS OF SELECTED MUNICIPALITIES AFTER
DEDUCTIONS — GOURDES .....sessesesessesemessesess LO
5.1 DEMOGRAPHIC PROJECTIONS BY REGIONS AND SPATIAL
STRATEGY, HAITI 1976-2001 ....................... 184
5.2 POPULATION GROWTH AND STRUCTURE BY URBAN AND
RURAL AREAS BY SPATIAL STRATEGY, HAITI
1950-2001 ..................sseesessssessesees 185
5.3 LABOR FORCE BY REGIONS, HAITI 1976, 1986 and
2001 essences. 186
5.4 INCREASES IN POPULATION AND LABOR FORCE BY
REGION, HAITI 1976-1986-2001 .................... 187
5.5 CAPITAL STOCK, HAITI 1976 ....................... 188
5.6 CAPITAL REQUIREMENTS FOR ALTERNATIVE SPATIAL
STRATEGIES, HAITI 1976-1986-2001 ................ 189
MAPS
IBRD 13652
IBRD 13680
IBRD 13663
[page 8]
Page L
TABLE 34
HAITI = SOCIAL INDICATORS DATA SHEET
HAITI REFERENCE GROUPS (ADJUSTED RARES
A
LAND AREA (THOUSAND SQ. KM} ‘ =_HOST _RECENT_ESTIMATE) __ _
TOTAL 27.8 SAME SAME NEXT HIGHER
AGRICULTURAL 14.7 MOST RECENT GEOGRAPHIC INCOME INCOME
1960 /b 1970 /b ESTIMATE /b REGION /e GROUP /à GROUP /e
GNP_PER C:PVYA (US$) 110.0 130.0 230.0 1066.7 182.9 432.3
ENERGY CONSUMPTION PER CAPITA
(KILOGRAMS OF COAL EQUIVALENT) 36.0 34.0 30.0 911.1 88.9 251.7
POPULATION AND VITAL STATISTICS
TOTAL POPULATION, MID-YEAR
CHILLIONS) 3.6 4.2 4.7 . . .
URBAN POPULATION (PERCENT OF TOTAL} 15.0 18.7 23.1 57.9 15.0 24.2
POPULATION DENSITY
PER SQ. KM. 131.0 153.0 168.0 25.6 46.8 42.7
PER S5Q+ KM. AGRICULTURAL LAND 303.0 306.0 319.0 77.6 254.1 95.0
POPULATION AGE STRUCTURE (PERCENT)
0-14 YRS. 42.0 41.5 41.3 42.0 43.6 44.9
15-64 YRS. 54.9 54.0 54.7 52.2 53.3 52.8
65 YRS. AND ABOVE 3.1 4.5 4.0 3.7 2.9 3.0
POPULATION GROWTH RATE (PERCENT)
TOTAL 1.6 1.6 1.6 /£ 2.7 2.4 2.7
URBAN 2.6 3.8 4.0 4.3 4.0 8.8
CRUDE BIRTH RATE (PER THOUSAND) 39.9 37.6 35.8 35.8 48.3 42.2
CRUDE DEATH RATE (PER THOUSAND) 21.8 17.8 16.3 91 19,7 12.4
GROSS REPRODUCTION RATE .. 3.0 2.5 2.6 2.9 3.2
FAMILY PLANNING
ACCEPTORS, ANNUAL (THOUSANDS) .. .. .. . . .
USERS PERCENT OF MARRIED WOMEN) +. mn . 15.1 14.6 14.2
FOOD AND NUTRITION
INDEX OF FOOD PRODUCTION
PER CAPITA (1970=100) 102.0 100.0 102.9 102.1 96.4 104.3
PER CAPITA SUPPLY OF
CALORIES (PERCENT OF
REQUIREMENTS ) . mn mn 103.9 92.3 99.5
FROTELNS (GRAMS PER DAY) .. a D 60.3 50.0 56.8
OF WHICH ANIMAL AND PULSE . . .. 26.7 13.9 17.5
CHILD (AGES 1-4) MORTALITY RATE 27.0 33.0 .. 8.7 . 7.5
HEALTH
LIFE EXPECTANCY AT BIRTH (YEARS) 43.2 47.7 50.0 /g 62.6 45.8 53.3
INFANT MORTALITY RATE (PER
THOUSAND) 200.0 mn 149.1 56.9 102.7 82.5
ACCESS TO SAFE WATER (PERCENT OF
POPULATION)
TOTAL mn . 12.0 60.7 26.4 31.1
URBAN .. mn 46.0 78.0 63.5 68.5
RURAL .. .. 3.0 34.9 14,2 18.2
ACCESS TO EXCRETA DISPOSAL (PERCENT
OF POPULATION)
TOTAL ES m mn 61.1 16.1 37.5
: URBAN M .. . 80.3 65.9 69.5
RURAL . D . 25.4 3.4 25.4
POPULATION PER PHYSICIAN 10600.0 11730.0 8510.0 1899.3 13432.7 9359.2
POPULATION PER NURSING PERSON 10310.0 7460.0 5550.0 1220.1 6983.3 2762.5
POPULATION PER HOSPITAL BED
TOTAL 1790.0 1370.0 1450.0 /h 422.3 1157.6 786.5
URBAN . . 290.0 7h 258.2 183.3 278.4
RURAL : . +. 5270.0 /h 2281.6 1348.8 1358.4
ADMISSIONS PER HOSPITAL BED . .. En 25.6 19.5 19.2
HQUSING
AVERAGE SIZE OF HOUSEROLD
TOTAL . 4.6 mn 5.2 5.2 .
URBAN .. 4.8 .. .. 4.8 ..
RURAL . 4.5 .. 5.3 ns
AVERAGE NUMBER OF PERSONS PER ROOM
TOTAL .. 2.1 .. 2.0 … .
URBAN mn 2.2 . 2.1 1.8 2.3
RURAL 2.1 . 2.7 mn .
ACCESS TO ELECTRICITY (PERCENT
OP DWELLINGS)
TOTAL . mn 2.9 51.2 25.9 28.3
URBAN m n .. 77.3 .
RURAL . . . 12.8 .. 10.3
—_—————— _—————_—__——_—_—_—_—_—_—_—_—_—
[page 9]
Page 2
TABLE 34
HAITI - SOCIAL INDICATORS DATA SREET
HAITI REFERENCE GROUPS (ADJUSTED AVERAGES
a
= MOST RECENT ESTIMATE) £
SAME SAME NEXT HIGHER
MOST RECENT GEOGRAPHIC INCOME INCOME
1960 /b . 1970 /b ESTIMATE /b REGION /c GROUP /d GROUP /e
EDUCATION
ADJUSTED ENROLLMENT RATIO! :
PRIMARY: TOTAL 46.0 50.0 70.0 103.5 62.9 75.8
FEMALE 42.0 43.0 .. 102.9 45.9 67.9
SECONDARY: TOTAL 4,0 6.0 8.0 37.2 14.4 17,7
FEMALE 2.0 4.0 .. 37.9 8.8 12.9
VOCATIONAL (PERCENT OF SECONDARY) 21,0 19.0 8.0 14,7 6.6 LA
PUPIL-TEACHER RATIO k
PRIMARY 43,0 45,0 LD 32.8 38.5 36,3
SECONDARY 13.0 18.0 .. 17.8 19.8 23.5
ADULT LITERACY RATE (PERCENT) 10.0 20.0 . 74.9 36.7 03.7
CONSUMPTION
PASSENGER CARS PER THOUSAND
POPULATION 2.0 3.0 3.2 26.9 3.1 7.2
RADIO RECEIVERS PER THOUSAND
POPULATION 5.0 17,0 20.0 173.5 31.1 Lo:
TV RECEIVERS PER THOUSAND
POPULATION 0.5 2.0 2.9 69.4 2.8 14.1
NEWSPAPER ("DAILY GENERAL
INTEREST") CIRCULATION PER
THOUSAND POPULATION 11.0 19.0 21.0 72.8 6.0 16.3
CINEMA ANNUAL ATTENDANCE PER CAPITA .. .. .. 4.3 1.4 1.6
EMPLOYMENT
TOTAL LABOR FORCE (THOUSANDS) 2100.0 2150.0 2357.0 . . .
FEMALE (PERCENT) 47.4 47,4 47.2 21.4 24.2 28.0
AGRICULTURE (PERCENT) 83.0 73.7 .. 37.8 60.7 54.1
INDUSTRY (PERCENT) 6.4 7.2 .. . mn .
PARTICIPATION RATE (PERCENT)
TOTAL 55.8 50.6 50.5 30.8 39.8 37.8
MALE 59.7 55.2 .55.1 47.2 53.3 50.3
FEMALE 52.1 46.4 46.2 13.2 19.6 20.9
ECONOMIC DEPENDENCY RATIO 0.8 0.8 . 1.7 1.3 1.3
INCOME DISTRIBUTION
PERCENT OP PRIVAIE INCOME
RÉCEIVED EY
HIGHEST $ PERCENT OF HOUSEHOLDS .. .. .. 28.9 20.3 19.5
HIGHEST 20 PERCENT OF HOUSEHOLDS .. .. .. 57,7 65.1 48.9
LOWEST 20 PERCENT OF HOUSEHOLDS . .. .. 3.2 5.7 5.9
LOWEST 40 PERCENT OF HOUSEHOLDS .. . .. 10,7 16.8 15.7
POVERTY TARGET GROUPS
ESTIMATED ABSOLUTE POVERTY INCOME
LEVEL (US$ PER CAPITA)
URBAN .. . 159.0 251.9 88.5 155.9
RURAL ED . 135.0 200.6 71,9 97.9
ESTIMATED RELATIVE POVERTY INCOME
LEVEL (US$ PER CAPITA)
URBAN .. .. 189.0 403.1 100.8 143.7
RURAL LE LD 34.0 258.0 42.0 87.3
ESTIMATED POPULATION BELOW POVERTY
INCOME LEVEL (PERCENT)
. URBAN .. . 55.0 24.8 46.0 22.9
RURAL .. M 78.0 65.2 48.0 36.7
+ Not available
+ Not applicable.
NOTES
La The adjusted group averages for each Andicator are population-weighted geonetric means, excluding the extreme
values of the indicator and the most populated country 1n each group. Coverage of countries among the
indicators depends on availability of data and is not uniform.
PA Unless otherwise noted, data for 1960 refer to any year between 1959 and 1961; £or_ 1970, between 1969
and 1971; and for Most Recent Estimate, between 1973 and 1977.
Le Latin America & Caribbean; /d Low Income ($280 or less per capita, 1978); /e Lower Middle
Income ($281-550 per capita, 1976); J£ 1970-76 growth rate te 1.8 percent: Haîtian Institute
of Statistics data for crude birth and death rates and for life expectancy at birth are 36.8, 14.5
and 52.2 respectively; /h 1972.
September, 1978
[page 10]
DEFINITIONS OF SOCIAL INDICATORS ‘ Page 3
Note: The adjusted group averages for each indicator are population-weighted geometric means, excluding the extreme values of che 1na1cacor ana che most
populated country in each group. Coverage of countries among the indicators depende on availability of date and is not uniform. Due to lack of data,
group averages for Capital Surplus 011 Exporters and indicators of access to water and excreta disposal, housing, income distribution and poverty are
simple population-weighted geometric means without the exclusion of extreme values.
LAND AREA (thousand sq. kn) Population per. hospical bed - totel, urban, and rural - Population (total,
Total - Total surface area comprising land area end inland waters. urban, and rural) divided by their respective number of hospital beds
Agricultural - Most recent entinate of agricultural area used temporariiy availeble in public and private general and specialized hospital and re-
or permanently for crops, pastures, market and kitchen gardena or to habilitation centers. Hospitals are establishments permanently staffed by
lie fallow. at least one physician. Esteblishments providing principally custodial
care are not included. Rural hospitals, however, include health and medi-
CNP PER CAPITA (US$) - GNP per capira estimetes at current market prices, cal center not permanently staffed by a physicien (but by a medical ag-
calculated by same conversion method as World Bank Atlas (1975-77 basis); sistant, nurse, midvife, etc.) which offer {n-patient accommodation and
1960; 1970, and 1977 data. . provide a limited range of medical facilities.
Admissions per hospital bed - Tocal number of admiesions to or d{scharges
ENERGY CONSUMPTION PER CAPITA - Annual consumption of commercial energy fron hospitale divided by the number of beds.
{coal and Îfgnite, perroleum, natural gas and hydro-, nuclear and gao-
thermal electricity) in kilograns of coal equivalent per capite. HOUSING
- Average si1o of household (persons per household) - total, urban, and rural
POPULATION AND VITAL STATISTICS A household consists of a group of individuals who share living quarters
Total population, mid-yesr (miilions) - As of July 1; 1f not availsble, and their main meals. À boarder or lodger may or may not be included in
“average of tn endper end-year estinates; 1960, 1970, and 1977 data. the household for statistical purposes. Statisticai definitions of house-
Urban population (percent of total) - Ratio of urban to total populs- hold vary.
tion; different definitions of urban areas may affect comparability Average nunber of persons per room - total, urban, and rurai - Average num-
of data among countries. ber of persons per room in ail, urban, and rural occupied conventional
Population density duellinge, respectively. Dvellinge exclude non-permanent structures and
Per sq. km, - Mid-year population per square kilometer (100 hectares) unoccupied parts.
of total area. Access to electricity (percent of duellings) - total, urban, and rural -
Per sq. km. agriculture land - Computed as above for agricultural iand Conventional dwellinge with electricity in Living quarters as percentage
only. of cotal, urban, and rural dwellings respectively.
Population age structure (percent) - Children (0-14 years), working-age
(15-66 years), and retired (65 years and over) as parcentages of mid- EDUCATION
year population. Adjusted enrollmeng ratios
Population grouth rate (percent) - total, and urban - Compound annual Primary school - total, and femnle - Total and female enrollment of all ages
grouth rates of total and urban nid-yesr populations for 1950-60, at the primary level as percentages of respectively primary school-age
1960-70, and 1970-75, populations; normally includes children aged 6-11 years but adjusted for
Crude birth rate (per chousand) - Annual live b£rths per thousand of different lengths of primary education; for countries with universal edu-
mid-year Population; ten-year arithmetic averages ending in 1960 and cation enrollment may enceed 100 percent afnce some pupils are below or
1970 and five-yeer average ending in 1975 for most recent estimate, above che official school age.
Crude death rate (per thousand) - Annual deaths per chousand of mid- Secondery school - total, and female - Computed as above; secondary educa-
vear population; ten-year arithnetic averages ending in 1960 and 1970 tion requires at least four years of approved primary instruction; pro-
and five-year average ending in 1975 for most recent est{vate, vides general vocattonal, or teacher training instructions for pupils
Gross reproduction rate - Average number of deughters a woman will besr usually of 12 to 17 years of age; correspondence courses are generally
in her normal reproductive period 1f she experiences present age- excluded.
specific fercility rates; veually five-year averages ending in 1960, Vocational enrollment (percent of secondary) - Vocational institutions in-
1970, and 1975. clude technical, industrial, or other programs which operate independently
Family planning - acceptors, annual (thousande) - Annual number of or as departments of secondary institutions.
acceptors of birth-concrol devices under auspices of national family Pupil-teacher ratio - primary, and secondary - Total students enrolieé in
plenning program. primary and secondary levels divided by nunbers of teachers {n the corre-
Family planning - users (percent of married women) - Percentage of sponding levels.
married women of child-bearing age (15-44 years) who use birth-contro] Adult literacy rate (percent) - Literate sdulta (able to read and write) as
devices to all married women in same 8ge group. a percentage of total adult population aged 15 years and over.
FOOD AND NUTRITION CONSUMPTION
Index of food production per capita (1970=100) - Index number of per Passenger cars (per chousand population) - Passenger cars comprise motor cars
capita annual production of all food commodities. seating Less chan eight persons; excludes ambulances, hearses and mflitaty
Per capite supply of calories (percent of requirements) - Computed from vehicles.
energy equivalent of net fovd supplies avaflable in country per capita Radio receivers (per chousand population) - A11 types of receivers for radio
per day. Available supplies comprise domestic production, importe leos brondcssts to general public per chougand of population; excludes uniicensed
exports, and changes in stock. Net supplies exclude animal feed, sceds, receivers in countries and Ân years uhen registration of radio sets vas {n
quantities used in food processing, and losses in distribution. Re- effect; data for recent years may not be comparable since most countries
quirements were estimated by FAO based on physiological needs for nor- abolished licensing.
mal activity and health considering environmental temperature, body IV receivere (per thousand population) - TV receivers for broadcast to generd
vetghts, age and sex distributions of population, and allowing 10 per- public per thousand population; excludes unlicenged TV receivers {n coun-
cent for waste at household level. tries and in years when registration of TV sets was in effect.
Per capita supply of protein (grams per day) - Protein content of per Neuspaper circulation (per thousand population) - Shows the average cireula-
capite net supply of food per dey. Net supply of food 16 defined as tion of “daily general Interest newspaper", defined as a periodical publi-
above. Requirements for all countries established by USDA provide for cation devoted primarily to recording general news. It 15 considered to
a minimun allowance of 60 grans of total protein per day and 20 grans be “datly" 1f it appears at lesst four times a week.
of animal and pulse protein, of which 10 grams should be animal protein. Cinema annual attendance per capita per year - Based on the number of tickets
These standards are lower then chose of 75 grems of total protein and sold during the year, including admissions to drive-in cinemas and mobile
23 grams of animal protein as an average for the uorld, proposed by units.
FAO in the Third World Food Survey.
Per capica protein supply from animal and pulse - Protein aupply of food EMPLOYMENT
derived from animals and pulses in grams per day. Total labor force (thousands) - Economically active persons, including armed
Child (ages 1-6) mortality rate (per thougand) - Annual deaths per thous- forces and unemployed but excluding housewives, students, erc. Defini-
and fn age group 1-4 years, co children in this age group. tions in various countries are not comparable.
Female (patcent) - Female labor force as percentage of total Labor force.
HEALTH Agriculture (percent) - Labor force {n farming, forestry, hunting and fishing
Life expectancy at birth (years) - Average nunber of yesre of life 48 percentage of total labor force.
remaining at birth; usually five-year averages ending in 1960, 1970, Industry (percent) - Labor force {n mining, construction, manufacturing and
end 1975. electricity, water and gas »6 percentage of total labor force.
Infant mortality rate (per chousand) - Annual deache of infante under Participation rate (percent) - total, male, and female - Total, male, and
one year of age per thousand Live birhts. Female labor force as percentages of their respective populations.
Access to safe water (percent of population) - roral, urban, and rural - These are ILO's adjusted participation rates reflecting axe-sex
Number of people (total, urban, and rural) with reasonable access to structure of the population. and long time trend.
safe water supply (includes treaced surface vaters or untreated but Economic dependency ratio - Ratio of population under 15 and 65 and over to
uncentaminared vater auch as that from protected borcholes, springs, the lebor force fn age group of 15-64 years.
and sanitary vells) 8s percentages of their respective populations.
In an urban area a public fountain or standpost located not more INCOME DISTRIBUTION
than 200 meters from a house may be considered as being within rea- ”Percentage of private income (both in cash and kind) received by richest 5
sonable access of that house. In rural areas reasonnble acceas would percent, richest 20 percent, poorest 20 percent, and poorest 40 percent.
{nply that the housewife or members of the household do not have to of households.
spend a disproportionate part of the day in fetching the family'a
water needs. POVERTY TARGET GROUPS
Access to exerers disposal (percent of population) - total, urban, and Estimated absolute poverty income level (US$ per capita) - urban and rural +
rural - Number of peopie (total, urban, and rural) served by excreta Absolute poverty income Level 15 that income level below which a minimal
disposal as percentages of their respective populations. Excreta nutritionally adequate dier plus essential non-food requirements 15 not
disposal may include the collection and disposal, with or without affordable,
treatment, of human excreta and waste-water by water-borne systems Estimated relative poverty {ncome level (US$ per capita) - urban and rural -
or the use of pit privies and similar inetallations. Relative poverty income jevel fs that income level less chan one-thiré
Population per physicien - Population divided by number of practicing per capita persona] income of the country.
Fhysicians qualified from a medical schcol at university level. Estimated population below poverty fncome level (percent) - urban and rural -
Population per nursing person - Population divided by number of Percent of population (urban and rural) who are either ‘absolute poor" or
precticing male and female graduate nurses, practical nurses, and “relative poor" whichever 18 greater.
assistant nurses.
Economic and Social Data Division
Economic Analysis and Projections Department
[page 11]
" LL
ge. w 7 EE
v - “
8 æ ATLANTIC rer. à OCEAN
CS ArTtANTIC OCEAN , * Chonne,
NES roue
L 9 Le Poynt-leon-fabe ; =
GRR 2 L PANNES
; re MSA SPEED
PAU ee RES ETES J- R Se
Fe ô ie CS a. Et as (P@T /
| Te : " Dis. TNA RES . dur ao
nr: ms CARIEOEAN SEA " Ke. Lacroso me AN D em Deere 1, eu À LS
SI ES ee er MERS NES ES PSS T"
un na nt SK F arm ee. —— CT ro ) “er ang
° $ RS VE ED
RE RE ET Le Er à ST 12
Pour top NE NES, Es Ne LR Don DRE
Do LP PRIS LE Ds on .
HAITI A —
ROADS: A ru ND PR RS LÉÉRRRS
LL RS OU LR RS L'ONU REON
—— ASPHALT, RECONSTRUCTED Gronde Sotonfxe ee M Le 7 Anées, VS SP SES CT
fem mm ASPHALT, UNDER-RECONSTRUCTION ee UE RUN ES El { if LLLSEAE, SR >
——" ASPHALT, OLD DT NE MNT RES Naf LR
—— GRAVEL AE NU me mener TUE, SSL
ER SE De ct TL LD)
PHYSIOGRAPHY DAN a RER LA PR AT ZT
FF MOUNTAIN RANGES mo DR CPAS QE \ LE
ET nav a[{ LUN Le). INA uen RPG CES
we [7 } pains S, \ DU Un NE AR CE SEAT À
€ 73 DEPARTMENT BOUNDARIES oo, MAX LA NRC HAN FC FE LTD 0
—"— INTERNATIONAL SOUNDARIES LA CARS. Nec DS PE CESR Dar, TRES LA PEN A
GONÂVE ?24 ER AE a NOIEEELERES 7
NE LENRN 7 \ ic ocean NT émet Ratobe TE
o o ” 20 30 Re: \Sa PR N— El _
bons isaene 8 Cha &o Cie Rs PSE
ÉSeUrS CArEuNES Ane/ é far #
ÉRÉEe tuer ns Een de
Es Sn . Baradère Perisvta Nlggou des gen Jravaerd
Dene-stou Re ET NUE à - get PORT-AU-PRINCE (@f LAN
FRE #0 > 1 te assnesde gs -
Sr Lure nn Rs — PES os ET ea" SAN . AE ù Pen
PE re N LÉGER TE TE Le # = & À RE 2 RUN Re. n
ee OR | es LT RE Ses ET CR RES EN A
ne > 2 SR Peu TRE RO Liu, NT |
roche -e taie ESA LS Coms LIT UE 0
ETES LT
EN LR sit $ ©
ro sas 2er CARIBBEAN $ FE A pagode LUS JL
NÉS É R nuss se HS
puis Game SR Se cat ES
WP 160 ne ra LA Lc et La
T
[page 12]
. Li
LIST OF ABBREVIATIONS
ADELA/TEC Asociacion para el Desarrollo Economico para America
Latina/Technical and Management Services Co., (S.A.)
BCA Bureau de Credit Agricole
BDL Banque du Logement
BHPI Bureau Haitien de Promotion Industrielle
BNRH Banque Nationale de la Republique d'Haiti
BPH Banque Populaire Haitienne
CAMEP Centrale Autonome Metropolitaine d'Eau Potable
CCHFP Centre Canado-Haitien de Formation Professionelle
CHISS Centre Haitien d'Investigations en Sciences Sociales
CONADEP Conseil National de Developpement et de Planification
CONATEL Compagnie Nationale de Telecommunications
COSEPA Comite Sectoriel de Politique Agricole
DATPE Division de L'Amenagement du Territoire et de la Protection
de l'Environment (CONADEP)
DCI Department of Commerce and Industry
DPPD Division de Promotion des Projets de Developpement (CONADEP)
DRIPP Developpement Regional Integre de Petit-Goave a Petit Trou
de Nippe
: DTPTC Departement des Travaux Publics, Transports et Communications
FAO Food and Agriculture Organization ‘
FCH Federation for Cooperative Housing
IDA International Development Association
IDAI Institut de Developpement Agricole et Industriel
1DB Inter-American Development Bank
IHS Institut Haitien de Statistiques
IICA Instituto Inter-Americano de Ciencias Agricolas
[page 13]
il -
ILO International Labour Office
INAREM Institut National des Ressources Minerales
INFP Institut National de Formation Professionnelle
DT Organisation of American States
OFATMA Office d’Assurances Accidents du Travail, Maladie et Maternite
OMS Organisation Mondiale de la Sante
ONA Office National d’Assurance
ONL Office National du Logement
OPs Organisation Pan-Americaine de la Saute
OTC Organization for Technical Cooperation
OXFAM Oxford Committee for Famine Relief
PADCO Planning and Development Collaborative International
PAHO Pan-American Health Organizations
PPHC Projet de Planification Physique, Habitation et Construction
SAT Service Autonome des Transports
SEN Societe d’Equipement National |
SENACA Service National de Commercialisation Agricole
SEPRN National Road Maintenance Service
SNEP Service National d'Eau Potable
SLELC Service de Location d’Equipement Lourd de Construction
SONAPI Societe Nationale des Pars Industrielle ‘
SPU Service de Planification Urbaine
SU Service d’Urbanisme
UNCDF United Nations Capital Development Fund
UNCHBP United Nations Centre for Housing, Building and Planning
UNDP United Nations Development Program
UNIDO United Nations Industrial Development Organization
USAID United States Agency for International Deveivpment
WHO World Health Organization
[page 14]
- iii -
MAJOR CONCLUSIONS AND RECOMMENDATIONS
i. This report pursues twin objectives. The first is to assist in the
formulation of an urban strategy for the country by providing an analytical
overview of the facts and problems of urban development in Haiti. The second
is to identify, within this overall framework, those problems which World Bank
Urban Lending can help to address, with particular emphasis on the improvement
of the lot of the urban poor. Facts and arguments are summarized at the end
of each chapter and only the most salient features are recalled here.
ii. Haiti already has a grave urban poverty problem. Although less
urbanized than the other Latin American countries, with less than a quarter of
the population living in urban areas, some two-thirds of Haiti's urban popula-
tion have to derive income from informal sector activities at rates that leave
up to 60% of the population of the capital and up to 80% of the population in
provincial towns unable to reach minimum levels of food and non-food consump-
tion. As an illustration, the latest nutrition survey made in 1974/75 showed
that some 834 of all children in the country suffer from different degrees of
malnutrition, urban areas being slightly worse off than rural areas. Poverty
is also reflected in urban service deficiencies. Over 40% of the Port-au-
Prince population live in areas with residential density above 800 and in some
cases more than 2,000 per ha. More than 3 out of 4 houses in the city are not
connected to the water system and organized solid and liquid waste removal
practically does not exist in low-income areas. (Section I-B and Chapter III.)
iii. The urban poverty problem is not likely to improve rapidly. With
total population growth of about 1.8% p.a. agriculture, which presently
employs some three-quarters of the total labor force in the country cannot and
should not be expected to absorb more labor: The incremental labor force will
have to find non-agricultural sources of income, predominantly in the urban
areas, where the Labor force will grow by 4% p.a. in the coming years. With
the small modern manufacturing sector, modern services, crafts and construc-
tion all expected to absorb only a fraction of the additional labor force, the
bulk of the increase will end up in informal activities. The proportion
of the labor force active in the informal sector will decline only very slowly
and the number of people depending on such activities will rise very rapidly
in absolute terms, making it likely that average earnings in informal activi-
ties will decline further relative to formal sector income earning possibi-
lities. (Chapter II.)
iv. Sixty percent of the urban population live in the Port-au-Prince
metropolitan area. The predominance of the capital is still growing, with
annual population increases of 5-6% compared to the growth of the rest of the
urban population at less than 3%. Even more strikingly, the capital has
a near monopoly on public administration, financial services, commerce and
liberal professions and is home to some 92% of modern manufacturing employ-
ment. Recent economic growth has reinforced the position of Port-au-Prince,
since it has been concentrated in assembly-type industries for export which
- are exclusively located in the capital. Immediate prospects are good for
these industries and the locational advantage of the capital is such that
its weight in the modern manufacturing sector is likely to be largely main-
tained. (Section II-B.)
[page 15]
= iv -
Ve The importance of the city is also supported by the centralized
decision-making system of the government. All decisions of substance are
taken in Port-au-Prince. For example, any expenses from the meagre municipal
budgets other than the bare minimum of obligatory current expenditure have to
be approved and vetted by the Central Government in the capital. Within
government services, even routine decisions are often made by top staff.
This leads to apathy and indifference at the lower echelons and makes it
particularly difficult to post staff to the provinces. Most government
institutions have no provincial representative and those that have, give them
very little autonomy. (Sections I-C and IV-A.)
vi. The predominance of the capital is further supported by and reflec-
ted in the expenditure patterns of the public sector and by sectoral policies.
For example in 1975/76, some 49% of the public development expenditure af-
fected the metropolitan area and although this proportion may well fall to
below 30% in the 1976/81 period, this share is still well above the capital's
share of the population. In many areas, policies are ill-defined and where
they are not, they often favor Port-au-Prince or are at best neutral. Long-
term industrial credit, for example, is practically not available outside of
the capital. 1/ Educational investments have been concentrated heavily in the
capital and general infrastructure provision is much better there, although
still far from adequate. (Sections I-C and I-D.)
vii. The government has decided to put more emphasis on rural develop-
ment, and the share of agriculture in development expenditure is planned to
more than double to 22% of the total from the first to the second Five-Year
Plan. More emphasis than in the past will also be put on the provincial
towns. The financial feasibility of such an approach depends on foreign
assistance continuing to develop at the same pace as it has done recently.
The demographic consequences of a successful implementation of this option
could be considerable. If historical trends continue, the Port-au-Prince
population would reach 2.2 million at the beginning of the next century, but
if the government's two-fold strategy is successful, it might amount to only
1.6 million. The difference between the two figures is close to the present
size of the Port-au-Prince population. Slowing down the growth of the capital
could be important. Sometime in the future, steep rises in the marginal
cost of agglomeration can be expected, in particular because the city will
start encroaching on some of the best agricultural land in the country,
and adequate water supply may require very heavy investments in additional
supply facilities, for example long distance water transport. (Sections I-D,
V-A and V-B.)
viii. In line with this decentralization strategy, provincial towns should
become centers for providing agricultural input and output processing facili-
ties to support the key agricultural development effort. The speed with which
they need to be equipped to assume this role must be tailored to the pace of
present and potential development of agriculture in their hinterland, as this
1/ The Bank's First and Second Education Projects in Haiti are first steps
= towards correcting this bias in educational investments.
[page 16]
_y-
will be the mainstay of their prosperity for years to come. They might also
be developed to become general service centers for the surrounding areas, in
particular in those sectors where Port-au-Prince is now much better
equipped than provincial towns, such as education and health. Diverting
additional resources to the provincial towns for these purposes would
probably entail very little, if any, sacrifice in national output. 1/
Port-au-Prince, however, will continue to remain for the time being the
preferred location for assembly-type industrialization because of its con-
siderable locational advantages for such activities and because making pro-
vincial centers competitive with the capital would require extremely heavy
infrastructure investments. (Section V-B.)
ix. The general decentralization objective of the government, is
however, far from implementation. Government services are just beginning
to decentralize their services to the provinces and some with very great
difficulty. The institutional and data base for effective decentralization
is in fact not yet available. One key provision that would help this effort
would be a strengthening and devolution of authority to the municipalities.
Municipal elections are planned later in 1979 and that could provide the
springboard for such devolution of authority. At the same time, those
ministries that are planning to decentralize some of their staff to the
provinces or have been instructed by law to do so should be encouraged to give
that staff greater autonomy than in the past and to group them into technical
support services for the municipalities so that a decentralized decision-
making structure backed up by technical advise can gradually develop. Sec-
toral policies should also be formulated with explicit regard to the de-
centralization objective of the government. (Sections I-D and IV-C.)
x. As was mentioned before, the present excessive centralization
of decision-making in the government in Port-au-Prince has negative effects
not only on the performance of local institutions in the provinces, but also
on general institutional performance. This is reinforced by a series of
other general factors that combine to weaken institutional effectiveness.
Among these are: the low status of the civil service due to low salaries,
little job security and a great deal of uncertainty regarding job responsi-
bilities; the overlap and uncertainty in institutional mandates; the general
lack of coordination between many institutions and the very pervasive short-
age of skilled manpower. These mutually reinforcing factors combine to put
institutional questions at the center of the major urban management problems
in the country. (Section IV-A.)
xi. Foreign assistance agencies, have tended to create separate institu-
tional structures to carry out their projects, which are often only loosely
attached to existing government services. As a result, they have increased
the competition among various services and project units for qualified staff
and the implementation of their projects has not always strengthened the
regular institutions of the government as much as is desirable. Where
institution-building has been the primary purpose of foreign assistance, it
has often been frustrated by lack of suitable counterpart staff, by unclear
1/ See beginning of Section V-A and the last part of Section V-B.
[page 17]
vi -
counterpart obligations and lack of enforcement of whatever obligations were
laid down and by the tendency not to give the Haitian staff sufficient
management responsibility. These problems have been compounded by the way
many foreign assistance agencies choose their consultants, which has made
it difficult to control the quality of foreign staff and the cohesiveness of
assistance teams. All too often, the work carried out has been mediocre,
linguistic problems have arisen and commitments to train counterparts have
not been honored. When foreign assistants leave, the institutions that were
assisted are frequently unable to continue the work. Experience with
institution-building through foreign technical assistance has, therefore,
been mixed at best and has been successful only in those cases where the
projects were tailored to fit the institutional capacity of the cooperating
institutions rather than the reverse and where foreign and domestic staff
were carefully chosen and controlled. (Section V-C.)
xii. Institutional weakness pervades all institutional levels relevant
for urban development and determines the absorptive capacity for additional
financial assistance. On the general urban management level, the previously
unclear and partly overlapping mandates of DATPE and the SU have been clari-
fied to some extent in the new organic laws of the DTPTC and the Ministry of
Planning which were enacted during 1978. À similar clarification of the role
of the municipalities in urban management would be helpful; some of the
functions now fulfilled by the DTPTC might be given to them. The munici-
palities, however, have a narrow and far from buoyant financial base and lack
the technical expertise and organizational ability to carry out any signifi-
cant urban planning functions. They may require substantial technical
assistance to do so. This has not so far been forthcoming. (Section IV-C.)
xiii. Generally speaking, the absence of a land use policy and of effective
means for its implementation is one of the major gaps in the existing frame-
work for urban development. Procedures for formulating a policy for land use
in general and public land use in particular should be: developed as a matter
of urgency. Both for the formulation of such a policy and for its effective
implementation, a considerable amount of technical work is required.
This involves establishing up-to-date cadastres, which are not now available,
managing publicly-owned land, which is presently not even inventoried and
advising on property taxation, betterment levies and land transfer taxes as
means of interventions. It also involves an overhaul of the property valua-
tion and tax collection procedures to make them more equitable and provide a
better financial base for municipal finance. Since the Administration Gen-
erale des Contributions is already active in some of the above fields, it
should be charged with this technical work, but may require general technical
assistance to carry it out. (Section IV-B.)
xiv. While the basic town planning legislation does have some important
gaps, the major problem really lies with implementation of those provisions
that already exist. While it would be helpful to modernize the town planning
legislation, the bulk of which dates back to the mid-thirties, it is not
necessary to wait for its reformulation in order to improve institutional
performance. Such improvement can be undertaken in a variety of cases
identified in this report. It should proceed gradually and, initially, should
tackle a small number of institutions. (Chapter IV.)
[page 18]
- vii-
XVe With a view to formulating an urban development project to be
supported by the Worid Bank group, several key problems require attention.
In shelter, for example, two institutions are or will be active in Haiti,
with mandates that overlap to a significant extent, i.e., and the ONL and the
BDL. The project implementation unit for the UNCDF shelter projects in
Port-au-Prince, which was initially conceived as a separate institution, will
now work under the umbrella of the ONL. It is important that this project
unit be fully absorbed into the ONL as rapidly as possible and that the
future institutional relationships between the ONL and the BDL be clearly
outlined so that they can concentrate on specific parts of the shelter prob-
lem. (Sections III-A and V-C.)
XVi. More generally, public intervention in 1ow-income shelter has
been confined in the past to emergency relocation after disasters or major
relocation requirements arising from other projects, such as the expansion
of the Port-au-Prince port facilities. No more than 18,000 people have been
given some public assistance in shelter since 1970, mostly through the provi-
sion of sites without any services in Port-au-Prince. This is less than one
year”’s population increase in the capital. The broadening of public low-
income shelter intervention has been severely hampered in the past by the
prevailing view of public officials that only houses built to certain stan-
dards, such as concrete-block walls and metal sheet roofs are valid shelter
for the poor. These standards are too high to be affordable by the low-income
population and therefore, in parallel, many public officials consider it
unrealistic to expect to recover a significant part of the cost of low-income
shelter provision from beneficiaries. Given the overall shortage of financial
resources and, in particular, current budget revenues in the country, this has
stymied any effort to provide public shelter assistance to the bulk of the
* low-income population. While the UNCDF pilot projects for slum upgrading and
sites and services provision in Port-au-Prince were initially expected to
modify these traditional ideas by demonstrating the feasibility of an approach
similar to that of the World Bank, it is unlikely that they will do so fully.
In particular, standards in these projects have been raised in successive
stages to a level where cost recovery appears difficult, even if it were
pursued as a major project objective, which it is not. It has to be noted,
however, that the attitude of public officials may now be changing, following
the endorsement of the sites and services approach to low-income shelter by
the President of the Republic. (Section III-A and V-C.)
xvii. Any Bank intervention in slum upgrading would have to adopt lower
standards than those now planned in the UNCDF slum upgrading project in
St. Martin. The cost of extending the standards of the UNCDF project to the -
rest of the Port-au-Prince slum population would exceed US$30 million at
1976 prices, not counting the high technical assistance cost of the project,
nor its needed extension to the provincial cities. It is not only required to
adopt lower standards for slum-upgrading and to limit the range of interven-
tions to some key service provisions, for example water supply and better
access roads and pathways; massive parallel improvements in the delivery of
other urban services by the relevant institutions are also essential. While
area-specific slum upgrading or sites and services projects can serve to
experiment with and develop appropriate site-specific techniques for delivery
[page 19]
: - viii -
and to demonstrate the feasibility of given approaches, they cannot by them-
selves do justice to the scale of the problem and cannot substitute for direct
efforts aimed at the institutions involved. Actions such as the UNCDF project
in St. Martin, for example, may clear the rubbish and the human waste and may
reduce the flooding in that community, but will not stop the waste entering
from other parts of the city, nor the effect upon the residents of the con-
ditions in the central market where many spend half of each day, nor will they
limit consumption by residents of food and water contaminated elsewhere in the
city. (Sections III-A and IV-E.)
xviii. Among the problems that require attention, the appalling drainage/
flooding/erosion and garbage removal situation in the capital is going to
be addressed by a forthcoming IDB project which will cost over US$45 million.
However, this project does not cover some of the worst slum areas in the city
located in Boston and Brooklyn, it does not include upgrading of the human
waste collection and disposal in the city, nor does it address the urban
sanitation problems in the provincial towns. The three towns that were
investigated in this report, i.e., Cap Haitien, Gonaives and Les Cayes
all have similar problems with human waste collection and disposal, drainage,
garbage removal and, in the case of Cap Haitien, also with erosion. It
is probable that other towns in Haiti's provinces have similar drainage
and waste removal problems. These gaps will need to be filled. (Sections
III-B and III-E.)
xix. The water problem is being addressed in 10 provincial cities by two
parallel water upgrading projects financed by the World Bank and by the UN.
In Port-au-Prince, however, water problems will remain acute, since past in-
vestments in water supply and distribution have overtaxed the administrative
and management capacity of CAMEP, the water supply authority. Any further
improvement of the water system in the city is now dependent upon a substan-
tial upgrading of the management capacity of CAMEP. A recent reform of the
management and salary structure of the institution will have to be followed
by a revision in the tariff structure and a number of other actions designed
to improve the financial position of CAMEP and to reduce the 50% loss rate
in the system. More importantly, future water availability is in doubt.
There is no hydrological survey of the metropolitan area and no long-term
water plan. IDB stands ready to finance both the survey and the development
of a master plan to the end of the century, but the request for this finance
has been very slow in coming. It should be initiated as soon as possible.
(Section III-C.)
° XX. In the meantime, the burden of the water situation in Port-au-Prince
falls very heavily on the lower income population. About three-quarters
of the population consume less than 30 litres per caput per day and, even
at these low consumption levels, a family with an income of US$40 dollars per
month would have to spend some 12% on water. The regressive aspects of water
pricing and the private water market in the city could be expected to be
alleviated if CAMEP's present plans for tariff reform and expansion of the
distribution system through much heavier emphasis on public fountains are
realized. This alone would provide a significant impact on the low-income
population. Only modest amounts of finance are needed to install public
fountains. (Section III-C.)
[page 20]
- ix -
xxi. Some institutional reforms are also required in urban employment
promotion. For example, a situation is now developing where several indus-
trial promotion efforts will be working parallel to each other and previous
experience fails to justify great optimism as to how well they will coordi-
nate their irterventions. The DCI should be encouraged to rationalize its
promotion effort and to make sure that it is consistent with industrial pro-
motion pursued by other institutions that are not under its jurisdiction,
such as the IDAI and its subsidiaries. Similarly, the recently created
National Crafts Council has such a wide mandate that institutional conflict
with other parts of the government appear likely. In addition, the craft
promotion cells in four government ministries were not abolished and, if
they continue to exist, they may preempt much of what the Council is supposed
to do and reduce it to a purely coordinating role. This should not be allowed
to happen, since a comprehensive and dynamic approach to craft development
is required. (See IV-D.)
xxii. Similarly, a comprehensive approach to construction industry devel-
opment should be undertaken. Construction industry may be one of the most
promising areas for substantial employment creation. The prosperity of
the industry will largely depend on the development of institutional housing
finance, which is practically non-existent. Whatever finance is available has
very short maturities with a maximum of eight and a half years. The creation
of the BDL is expected to improve the situation, but, if present thinking of
some of the key staff involved in setting up the Bank prevails, the BDL will
only address the finance needs of families with incomes of $200 per month or
more, which would exclude some 95% of the urban population from access to
finance from BDL. Much as the creation of the BDL would improve the situation
and should therefore be pushed vigorously, the bulk of the population would
still have no access to housing finance. Mechanisms must be developed to
reach down to much lower income levels. Also, little is known about the
problems of the construction industry and the DCI should be asked to analyze
it and to develop a support program as needed, It might also be suggested
that research into low-cost building techniques should be undertaken.
Ideally, this might be sponsored by the ONL if and when adequate technical
assistance can be provided for that purpose. In the meantime, the DTPTC could
collaborate in that effort. (Section II-D and I11-A.)
xxiii. Any Bank intervention in the urban sector in Haiti is also condi-
tioned by the fact that, while provincial towns should be given priority as
far as feasible, the service delivery needs of Port-au-Prince cannot be
neglected. As a minimum, present and future urban residents should be ex-
tended the service delivery necessary to assure minimum public health and
safety standard& and protection from the elements. In addition, the Bank's
intervention must be placed in the context of the urban-related activities
of other foreign assistance agencies. UN agencies and the IDB have so far
been the only ones active in questions of overall management for urban ser-
vice and shelter delivery. The IDB has concentrated its interventions on
Port-au-Prince, in particular on the port, the industrial estate, the water
system and now, in its forthcoming project, on the important erosion, drain-
age and solid garbage removal problems. UN agencies have supplied overall
[page 21]
x
technical assistance to some of the urban management institutions and UNCDF
has recently agreed to finance water supply to some provincial towns and :
the two pilot projects for sites and services and slum upgrading in the
capital. Other assistance agencies have only minor urban involvements,
including those that happen more or less incidentally in the conduct of
regional development projects such as DRIPP. 1/ Canada and the Federal
Republic of Germany are also known to be interested in power supply for
provincial towns and France has agreed to rehabilitate the airfield in Cap
Haitien. The Government should insist on better coordination of these urban-
related activities, which is practically left to chance at the present time.
(Chapters II and III and Section V-B.)
xXxiv. From the point of view of the Bank the following priorities can
be established. The highest priority should be given to the improvement of
the central market in Port-au-Prince. It has an overwhelming importance in
the informal sector activities not only in Port-au-Prince, but also in the
provinces. It provides the bulk of the employment for the low-income popu-
lation and is the major origin and destination of urban transport demand. It
handles the bulk of the produce entering the city and it is affected by severe
flooding, garbage accumulation, risks of human waste contamination and result-
ing health hazards. It is also important to investigate the location of the
central market since its growth is constrained in its present location and the
market may have to be decentralized to the southern and northern edges of the
city. This decentralization is presently under study. If adopted, it would
have profound impacts on low-income employment, shelter demand and overall
land use in the city. (Section V-D.)
XXVe While focusing on the market problem in Port-au-Prince, a possible
Bank supported project should be broader and address other problems, some of
which concern the entire urban sector. The following components seem to
be the most important (Section V-D):
(a) comprehensive support to the informal sector 2/; -
(b) improvement in human waste disposal in :
Port-au-Prince and in provincial towns in-
cluding the needed research and experimenta-
tion for appropriate disposal methods in
marshy areas;
(c) a sites and services component, possibly in one
or two provincial towns to demonstrate the feasi-
bility of the approach propounded by the Bank
and to start the strengthening of shelter .
delivery institution;
1/ Developpement Regional Integre de Petit-Goave a Petit Trou de Nippes,
a Canadian-financed regional development effort. ‘
2/ See Section II-D for more discussion.
[page 22]
- xi —
(d) general technical assistance to the Direction
Generale des Contributions for the technical work
required to prepare and later on implement a
land use policy and, more particularly, for the
reestablishment of a usable cadastre, and the im-
provement of property tax valuation and collection
in order to improve the financial base of the
municipalities. Also, general technical assistance
for the organizational and management improvement of
the municipalities should be considered;
(e) health and particularly nutrition improvement in
view of the serious nutritional situation in urban
areas.
XXVis In the medium term, a larger sites and services program could
be envisaged, on condition that the project component included above and the
UNCDF effort in this area establish the feasibility of such a program.
Before embarking on such a program, general upgrading of urban service de-
livery institutions as planned under the forthcoming IDB loan and suggested
for the Banks’ first urban project above concerning drainage, garbage removal
and human waste collection must be shown to be progressing successfully,
Such a program could in priority help a selected number of provincial towns
with their foreseeable problems over, say, a five-year period, while the
problems in Port-au-Prince could be addressed only in part, since the growth
of the city is such that the financial requirements for sites and services to
accommodate all of this growth would be initially too high. (Section V-D.)
xxvii. Linked to such a sites and services effort should be a component to
provide industrial and commercial sites in provincial towns as well as craft
workshops. This might be associated with credits for investment and working
capital and with the required technical assistance. An investigation into
the needs and the scope of such requirements has to be made before a compo-
nent of this type could be formulated. (Section V-D.)
xxviii. Subsequently, or preferably in parallel with a sites and services
program, a slum upgrading program could be initiated. This wuld not be too
difficult in the provincial towns, since their slum problems are relatively
circumscribed and manageable, but it would require a staged approach in Port-
au-Prince. The strategy for upgrading the slums in Port-au-Prince, where
some 320,000 people presently live, should be to upgrade in priority those
slums located upstream of the St. Martin/UNCDF project area, so that less
rubbish gets flushed down into it. Next, it would be important to address
the problems of the marshy areas in the northern part of the city, i.e.,
Boston, Brooklyn, Cite Simone, where conditions are particularly appalling.
(Chapter III and Section V-D.)
XXix. In all projects and project components, technical assistance to
the institutions involved needs to be defined and conducted with particular
care. Problems have arisen in the past with foreign technical assistance
and very careful attention will have to be paid to the cause of success
or failure in these efforts to try and avoid the more obvious pitfalls.
(Section V-D.)
[page 23]
CHAPTER IL: THE SPATIAL DIMENSION OF HAITI‘S SOCIOECONOMIC SYSTEM
A. DEMOGRAPHIC FEATURES
Overall Trends
1.01 The estimated 1976 population in Haiti of 4,668,000 has been
growing at the relatively low annual rate of 1.6% from 1950 to 1971 and at
about 1.8% since then. These low growth rates result from a comparatively
low natural growth of 2.2% p.a. and substantial emigration of 0.4% p.a.
The natural growth rate results from a gross birth rate of 36.8% and a high
mortality rate of 14.5%, which is heavily influenced by very high infant
mortality of 149.1%. 1/ Life expectancy at birth is 52.2 years.
Urban and Rural Population Growth
1.02 Population growth is very unevenly distributed across the country
because of regional differences in natural growth and substantial internal
migration. The urban population 2/ grew at an average rate of 4.1% p.a.
and the rural population at only 1.1% (see Table 1.1 in the Annex). The
urban population’s share in the total nearly doubled from 12.2% in 1950 to
an estimated 23.1% in 1976 and the total urban population is estimated at
1,079,000 for that year.
1.03 The urban population is highly concentrated in the Port-au-Prince
metropolitan area which accounted for about 60% of the total in 1976. Its
growth, by 5.9% between 1950 and 1971 and by 5.2% since then, outpaced that
of any other administrative unit in the country and accounted for more than
70% of all urban population growth. The weight of Port-au-Prince in the
urban sector is, therefore, still growing with more than half of the growth
rate, i.e. 3%, due to net immigration. The remainder of the urban population
grew at annual average rates of 2.4% (1950/71) and 2.7% (1971/76) with some
towns, such as Cap Haïîtien, Port-de-Paix, Gonaives, Hinche, etc., growing at
over 3% p.a. (see Table 1.1 in the Annex).
1.04 The urban sector in Haiti is thus extremely unbalanced (54,0000
inhabitants) and, in 1975, Port-au-Prince (653,000 inhabitants) was almost
12 times the size of Cap Haitien (54,000 inhabitants), the second largest town
in the country (see Table 1.3 in the Annex). While such dominance is not
unique, Port-au-Prince virtually monopolizes urban activities and retards the
development of provincial towns. This is especially marked with regard to
economic activities with some 90% of industrial activities concentrated in the
Port-au-Prince area, and it is supported by a strongly centralized political
and administrative system.
1/ Some estimates are as high as 200 9/00.
2/ There is no clear definition of the urban population in Haiti. What
is considered a town and therefore a part of the urban sector is rather
a matter of custom, and the smallest towns have little more than 1,000
inhabitants.
[page 24]
= 2-
1.05 Population growth in rural areas was also uneven. Whereas the
rural sector as a whole experienced net emigration and grew at little more
than 1% p.a., population in some rural areas rose at or even slightly faster
than the rate of natural increase. In some areas, net migration was so
strong that the total resident population decreased.
Migration .
1.06 The spatial pattern of population growth thus reflects intensive
international and internal migration but specific migration data are avail-
able only for 1973 (see Table 1.4 in the Annex). International migration
is estimated at 0.4% p.a. and is reported to originate mostly from the old
Department de l'Ouest, 1 essentially the Port-au-Prince area. Internal
migration follows the strong polarization of Haiti’s socioeconomic system
and net immigration into the Departement de l'Ouest with Port-au-Prince as
the main destination originates primarily in the four peripheral departments.
Enigration is particularly strong from the old Departement du Sud, probably
mainly from its northern part, the present Departement de la Grande Anse
(see Tables 1.1 and 1.4 in the Annex).
1.07 Very little is known on specific migration patterns. However, a
survey on the impact of migration on housing conditions in Port-au-Prince,
carried out in 1972, suggests that the bulk of migration is a one-stage pro-
cess from rural areas directly to Port-au-Prince without a temporary stay
in an intermediate place. 2/ There is also some interurban migration,
especially between provincial towns in the southern, northern, and western
departments and the Port-au-Prince metropolitan area (see Table 1.5 in the
Annex). Such exchange as takes place between rural areas is more of a sea-
sonal nature and is related to harvesting.
1.08 Three main factors seem to govern the migration process in Haiti:
the desire for work and higher income 2/, the desire for better education, 2/
and the security offered by the extended family. 3/ Although the existing
urban-rural and interurban average income differentials may appear to.be a
very Simple motivation for migration into the Port-au-Prince area, the under-
lying situation is quite cogplex, Overall population density is very high
with 605 inhabitants per km‘ of arable land in 1976, marginal land is already
1/ The new subdivision of the territory into nine departments was adopted
= by law on August 23, 1976.
2/ H. de Ronceray: Impact des migrations internes sur les conditions du
_ logement a Port-au-Prince, in: Les Cahiers du CHISS, September 1976.
3/ ‘ See U. Locher: Rural-Urban migration and the alleged demise of the
_ extended family: The Haitian case in comparative perspective. Centre
for Developing Area Studies, McGill University, Montreal, August 1977
(Working Paper No. 20).
[page 25]
- 3-
under cultivation, land holdings are very fragmented and disguised unemploy-
ment in agriculture is widespread. Thus, present and potential income in
rural areas is low and potential rewards from rural-urban migration are
correspondingly high. These rewards, however, may be perceived to be higher
than they actually are. Even if unskilled labor can command higher rates of
pay in urban areas than in rural areas, high open and disguised unemployment
in urban centers can considerably reduce the income that can actually be
obtained. For the lowest income strata, the rural-urban differentials may
actually disappear (see Table 1.7 in the Annex). Nonetheless, this average
income differential contributes to shaping the aspirations of the potential
migrant, as may be the chance of hitting a "one-time high income" or of better
access to some basic services.
1.09 One of the prime motives for migration appears to be education,
which is considered to be one of the population’s fundamental values.
This is not surprising in Haiti where chances for education are particularly
poor in rural areas because access to schools, where they exist, is difficult
and overall enrollment is low, curricula are of little relevance to rural
pursuits and drop-out rates are high, student-teacher ratios are high and
teaching intensity correspondingly low. Besides those migrants that seek
better educational opportunity, there are also those that have obtained some
education, especially people from provincial towns, who seek better employment
opportunities corresponding to their acquired skills by migrating to the
Port-au-Prince area. While improvement in educational opportunities in the
provinces might reduce the first type of migration, it would increase the pool
from which the second type is fed. Educationally-motivated migration might
not abate as long as Port-au-Prince remains the dominant center for employment
of the educated.
1.10 Whereas the economic and educational motivations may be considered
as primary stimulants of migration, the extended family tends to reinforce
the process by inducing chain migration. Rural-urban migration in Haiti does
not result in isolation and alienation and strong rural family ties are main-
tained. The urban members of the kinship provide a foothold for a whole
migration chain providing additional migrants with shelter and other help as
basic security when they arrive in the city. 1/ Migrant households, there-
fore, tend to expand rapidly.
1.11 Migration is basically a reaction to the spatial differential in
socioeconomic opportunites as perceived by the population. Any spatially-
oriented development strategy has to address the factors underlying the
migrational motivation such as employment and income opportunities as well
as access to education and other infrastructural facilities.
B. SPATIAL DIFFERENTIALS IN SOCIOECONOMIC CONDITIONS
1.12 In order to understand the spatial dynamics of Haiti”s socio-
economic system and especially the migration process, it would be desirable
1/ U. Locher, op. cit.
[page 26]
4
to measure the socioeconomic conditions in the different regions by means
of a whole set of socioeconomic indicators. Unfortunately, available statis-
tical information does not allow in-depth analysis on the regional level and
we have to limit the description of existing spatial differentials to a few
very general indicators.:
Rural-Urban Income Differential 1/
1.13 Haiti, with an average GDP per caput of only US$219 in 1976, 2/ is
the poorest country of the Americas and among the 30 poorest countries in the
world. Moreover, according to estimates based on a recent survey, average
income differences between the different parts of the country are of the order
of 1:7 (see Table 1-1) so that the average per caput income in rural areas
reaches only slightly more than half the national average, whereas average
: income in the relatively privileged Port-au-Prince area is about 3.5 times
the national average. The interregional distribution of "labor income",
which accounts for about 61% of national income, 3/ is less unequal than
that of total national income. The relation between per caput labor income
in rural areas, provincial towns and Port-au-Prince is 1 to 1.3 to 2.2,
: compared to 1 to 3.9 to 6.7 for total per caput income. This is due to the
heavy concentration of commercial and industrial activities in urban areas,
particularly in Port-au-Prince.
Table 1-1: AVERAGE NATIONAL INCOME PER CAPUT, BY REGION, HAITI 1976
. Urban Areas
Port-au-Prince
‘Country Metropolitan Other Rural
Total Total Area Towns Âreas
Labor Income
Gourdes . 581.9 891.0 1107.1 636.3 504.4
% (rural areas = 100) 115 177 220 126 100
Total National Income
Gourdes 951.8 2735.3 3400.0 1958.8 504.4
% (rural areas = 100) 189 542 672 367 100
Source: See Annex Tables 1.6 and 1.7.
1/ See also Technical Note on the Compilation of Income Distribution
Statistics, accompanying Tables 1.6 and 1.7 in the Annex.
2/ World Bank Atlas methodology, 1975/77 base period.
3/ The concept used here does not correspond to the normal definition of
_ labor income compared to income from entrepreneurship and property.
The survey data follows the normal concept, but was incomplete and
required additional estimates of agricultural income. Most of the
agricultural income is generated by self-employed persons and would
normally be classified as income from entrepreneurship and property
but was classified here as labor income. This seems to be more
appropriate in the Haitian context.
[page 27]
_ 5 -
1.14 Compared with income distribution data for 1970, 1/ the present
interregional differential has changed under the influence of recent economic
development and inflation. For example, the interregional distribution of
labor income between rural areas, provincial towns and Port-au-Prince stood
at 1 to 1.5 to ?.0 in 1970. The change to 1 to 1.3 to 2.2 in 1976 probably
reflects some of the distributional effects of inflation. Agricultural prices
and, thus, the bulk of incomes in rural areas kept pace with inflation (see
Annex Table 1.3) while provincial urban labor incomes lost ground. The in-
crease in the weight of Port-au-Prince is the result of two conflicting trends.
Some Port-au-Prince labor income also lagged behind inflation rates, such
as civil service salaries which increased only by 6.1% p.a., while consumer
prices rose by 13.5% p.a. However, recent economic development was mainly
fueled by industry, commerce, and construction; 2/ i.e., activities that are
highly concentrated in the Port-au-Prince area, and the concomitant rise in
labor incomes may have more than compensated for the depressing effect of
inflation. This dynamic development not only boosted labor income but con-
tributed to further increases in entrepreneurial incomes and to increasing
concentration of wealth in the Port-au-Prince 2rea.
Incidence of Relative and Absolute Poverty
1.15 Interpersonal income distribution and relative poverty are discussed
in some detail in the Bank”’s 1978 Economic Report on Haiti. The salient
features are as follows: 3/
(a) More than 60% of the population live in relative poverty,
i.e., at one-third of the average per caput income or less.
(b) Income distribution in rural areas is less unequal than in
urban areas, with about 17% of the rural population having
one-third or less of the average per caput income in rural
areas. The corresponding figure for urban areas is 69% in
provincial towns and 65% in Port-au-Prince.
(ce) The 5% of the population with the highest incomes capture .
more than 50% of national income; the average per caput
income in the highest income bracket is 176 times that in
the bottom bracket.
1.16 With an average per caput income of a litte more than US$200, it is
not surprising that--with the exception of the Port-au-Prince metropolitan
area--even more people live under conditions of absolute than relative poverty.
It is estimated that, in 1976, the cost of minimum per caput consumption,
1/ See IBRD: Current Economic Position and Prospects of Haiti, 1976.
2/ These three sectors contributed 50.1% to economic growth from 1970 to
1976, although their combined share in 1970 GDP was only 22.1%.
3/ See Annex Tables 1.6 and 1.7 for the underlying data.
[page 28]
— 6-
which would allow for the intake of a recommended minimum diet and for the
acquisition of essential non-food items, amounts to about G 1,110 (US$220)
in Port-au-Prince and a low of about G 980 (US$195) in rural areas (see
Annex Tables 1.8 and 1.9).
1.17 Within these minimum expenditures, estimates of non-food items,
which are based on the results of a 1970 survey, are assumed to be equal to
expenditures on food. This may appear very high, although expenditures on
rent and water may sometimes be very considerable. On the basis of an
alternative assumption that non-food expenditures amount to only 40% of food
expenditures throughout the country, total annual minimum expenditures amount
to about US$140 for the country as a whole, ranging from US$164 in Port-au-
Prince to US$150 in the provincial towns and US$135 in rural areas (see Annex
Table 1.9). :
1.18 The confrontation of these minimum consumption estimates with the
actual purchasing power of the population as derived from the income dis-
tribution statistics shows that the overwhelming majority of Haiti’s popula-
tion, i.e., almost 90% (75%), 1/ live under conditions of absolute poverty and
cannot afford what is considered the minimum standard of consumption of
food and non-food items. The incidence of absolute poverty varies for the
different parts of the country and ranges from about 60% (49%) in Port-au-
Prince to over 83% (74%) in provincial towns and to 94% (78%) in rural areas
(see Annex Table 1.9).
Nutrition
1.19 The recommended minimum per caput calorie intake for Haiti is of
the order of 2,000 cal/day (see Annex Table 1.8). Since the cost of such
a diet exceeds what most families can afford to spend for food, actual per
caput food consumption must be lower, resulting in malnutrition and even
starvation. À number of surveys carried out in the late sixties indicate,
on an average, a daily per caput food consumption of about 1,700 calories.
This consumption level does not only fall short of the recommended minimum
of 2,000 calories but the underlying diet is also highly unbalanced with
regard to its content of proteins and fats. Thus, many people are suffering
from multiple nutritional deficiencies resulting in "“underweight, poor mus-
cular development, short stature, and a high total serum protein with rela-
tively low serum albumin". 2/ |
4 Percentages in parentheses are based on the lower estimates of
expenditures for non-food items.
2/ U.S. Department of Health, Education and Welfare: .Syncrisis: The
Dynamics of Health, IV: Haiti (revised), 1976. Recent FAO data based
on the apparent consumption during 1972/74 indicating a daily per caput
intake of 2,028 calories, seem to overestimate the real situation. See
FAO: Monthly Bulletin of Agricultural Economics and Statistics, April
1976. A new nationwide nutrition survey, commissioned by USAID, has
. started and results will become available late in 1978.
[page 29]
-7-
1.20 Malnutrition is particularly serious among children. According to
the most recent survey (1974/75), only 13% of children were considered nor-
mally nourished (see Annex Table 1.10). About 31% showed first-degree, 38%
second-degree and 17% third-degree malnutrition. 1/ Within the generally
bad conditions, the northern half of the country tends to be worse off than
the southern half and urban areas tend to be slightly worse off than rural
areas. Compared to the: results of a 1958 survey, which classified only about
21% of children aged 0-6 years as malnourished in the first and second
degree, 2/ a marked deterioration of the nutritional situation has occurred.
The malnutrition of children causes retardation that is irreversible even
with excellent nutrition at later stages of development.
C. THE SPATIAL IMPACT OF GOVERNMENT - PAST TRENDS IN MAJOR POLICY AREAS
1.21 Public consumption and investment together accounted for some
11% of GDP in the late 19608 and 1970s. Measured in this way, the role of
government in Haiti”’s economy may not appear very important. Since then, the
Government has stepped up its public investment program with support from ‘
heavy external financing, and the public sector’s share has increased to
almost 16% of GDP in 1976. However, when trying to assess the spatial impact
of government policies, two factors have to be taken into account. Firstly,
the government”s impact on the economy is not necessarily well measured by its
share in aggregate demand since there may be highly effective regulations
that could be administered by a small number of civil servants. Secondly,
the absence of a well-defined policy or of expenditure in a particular field
may also have an impact on the economy. Thus, we have tried to make a rough
assessment of the spatial impact of both government action and inaction
in specific fields.
The Fiscal System 3/
1.22 Some 35% of Government revenues and expenditures are not accounted
for within normal budgetary procedures; both sources and purposes are uniden-
tifiable. 4/ Consequently, it is impossible to assess the total impact of the
fiscal system on the economy. The spatial incidence is here assessed with
1/ According to Gomez” classification based on weight/age relation.
Normal = 90-110% of normal weight, first degree = 75-89% of normal
weight, second degree = 60-74% of normal weight, third degree = less
than 60% of normal weight.
2/ Jeliffe survey of 1958. Results given in US-HEW, op. cit.
3/ See also Technical Note on Estimating the Regional Incidence of the
Fiscal System (tax revenues and fiscal expenditures) and of Planned
Government Development Expenditure, accompanying Annex Tables 1.11 and
1.17.
4/ The government recently announced measures to reform the fiscal system,
i.e. to establish a proper accounting system and to integrate all
government revenues (incl. the parafiscal revenues of the Regie du
Tabac) into the budget.
[page 30]
— 8-
partial data for tax revenues and current fiscal expenditures, 1/ which
in FY1975/76 represented some 60% of total current revenues and some 30%
of total expenditures respectively.
1.23 Rough estimates of the spatial incidence of taxes 2/ shows that
Port-au-Prince contributes about 47% to total tax revenues. Other urban
areas together add about 12% and rural areas the remaining 41% (see Annex
Table 1.11). The urban-rural distribution is in line with the distribution
of national income (see Annex Table 1.7) but not necessarily with the re-
gional ability to pay as reflected, for example, by per caput incomes in
the different regions. The pattern is strongly influenced by the incidence
of the coffee export tax that alone contributes about 17% to overall tax
revenues. Within the urban sector, the distribution between Port-au-Prince
and the other towns is 80:20 (as opposed to 66:34 for income) and may there-
fore more adequately reflect the respective ability to pay. The overall
picture is, of course, shaped by the specific features of the tax system which
relies heavily on indirect taxation and, therefore, tends to be regressive.
A stronger emphasis on direct taxation of incomes and on import duties for
luxury imports would result in a more equitable interpersonal and inter-
regional tax incidence.
1.24 The estimate of the spatial incidence of fiscal expenditures is
based on actual payments by financial districts. The only reasonable re-
gional breakdown that this data allows is for Port-au-Prince and the rest
of the country. On this basis, almost 83% of fiscal expenditures in FY1975/76
were effected in Port-au-Prince, only 17% in the rest of the country. These
figures reflect the extreme centralization of Haiti’s political and adminis-
trative system. The picture could be slightly different if we add recurrent
expenditures of municipalities (net of government subsidies that are included
in government fiscal expenditures) of G 3.1 million in FY1975/76. Further-
more, part of the services rendered and thus part of the salaries paid in
Port-au-Prince, as well as part of the operating expenditures incurred in
Port-au-Prince, have an impact on the rest of the country. A very rough
estimate of the actual incidence of government expenditure, as opposed to the
formal one given above, brings the figure for Port-au-Prince to a range of
50-55%. This, however, still means that the expenditure pattern is in favor
of the capital.
1.25 In order to assess the spatial incidence of the fiscal system more
fully, 3/ development expenditures, which amounted to about G 174 million in
FY1975/76, should also be taken into account. An analysis of that year’s
development budget suggests that about 49% of these development expenditures
1/ Government development expenditures, which in FY1975/76 accounted for
_ about 27% of total expenditures, are discussed separately below.
2/ The technical notes in the Annex, op. cit., for estimating procedures.
3/ identifiable expenditures only.
[page 31]
- 9 -
directly or indirectly benefited the Port-au-Prince area, whereas 51% were
channeled to the rest of the country. 1/ Considering both recurrent and
development expenditures, the actual incidence on the Port-au-Prince area
is estimated to amount to about 50%. Thus, the incidence of expenditures
corresponds rnughly to the incidence of tax revenues. The figures show,
however, that so far the fiscal system has supported the dominating role
of Port-au-Prince. The pattern of expenditures did not provide for any
spatially redistributive effects, and the tax system is not designed accord-
ing to personal or regional ability to pay.
1.26 The implementation of the 1976-1981 Development Plan is likely to
result in considerable changes. Rough estimates show that the incidence of
government expenditures on the Port-au-Prince area may well fall-below the
40% mark. Furthermore, the implementation of the new income tax law
. (effective October 1, 1977) is likely to increase the relative importance
of income tax within the whole tax system thus allowing also for a more
equitable personal and regional incidence of revenues,
Agriculture |
1.27 Until recently, the agricultural sector, which contributes about
45% to GDP and provides a livelihood for about 75% of the population, ranked
very low among the Government's priorities. During 1973/75, only about 11%
of development expenditures and about 9% of current budgetary expenditures
were spent for agriculture. Moreover, given the rudimentary size of the
extension service, with some 150-200 agents for the whole country, technical
assistance on the farm level is virtually non-existent. Partly as a conse-
quence of this neglect, agricultural production lacks dynamism and has grown
at only 1.2% p.a. between 1954/56 and 1974/76, and the spatial impact becomes
manifest in rural-urban migration of about 0.74 of the rural population per
year. °
1.28 Many agricultural experts in Haiti share the opinion that stagnation
or even decline of coffee and cotton production results from a lack of price
incentives to the producer. This may well apply also to other agricultural
commodities. Unfortunately, there is no information on farm-level prices
and the quantitative impact of the marketing and informal credit system.
The only available information refers to retail market prices. An analysis
shows that these prices, as compared to world market prices, tend to be
high 2/ (see Annex Table 1.12) and that price increases over the last years
kept pace with or even slightly outpaced general domestic price development
(see Annex Table 1.13). However, this does not mean that these favorable
price signals actually reached the producer. The agricultural marketing
system is rather intricate. In some fields, the commercial sector seems to
1/ For the spatial pattern of development expenditures planned in the
1976-1981 period, see Section D.
2/ The comparison with world market prices depends, of course, on the
— current exchange rate that may constitute an additional problem.
[page 32]
- 10 —
be very powerful, exerting considerable influence on farm prices and managing
to secure high profit margins. However, the Haitian smallholders cultivate a
good deal of marginal land, have only insufficient knowledge of agricultural
production techniques and virtually no access to improved seeds, institutional
credit and technical assistance. Therefore, they have an extremely low pro-
ductivity and unit production costs tend to be relatively high.
1.29 Government intervention in agriculture has been rather sporadic
and dispersed and agricultural development has been essentially the result
of very uneven market forces. During the past few years, Government efforts
have been considerably increased but essentially on a project-by-project
basis without any well defined sectoral policy and overall coordination.
A major attempt towards orderly Government guidance in agricultural develop-
ment has now been started with the establishment of COSEPA, (Comite Sectoriel
de Politique Agricole) 1/ in September 1977. This committee, chaired by
the Minister of Agriculture, comprises all agencies dealing with agricultural
and rural development and is designed to define sectoral policies and coor-
dinate policy actions in different fields and regions.
Industry
1.30 The manufacturing sector contributes about 13% of GDP and employs
about 6% of the Haitian labor force. As the following table shows, the
sector is highly concentrated in the western department, essentially Port-
au-Prince, where also most of the developments during the past years have
taken place. The modern industrial sector accounts only for a fraction of
employment and is almost exclusively located in the Port-au-Prince area with
only a few units, mainly in agricultural processing, established in provinctal
towns such as Cap Haitien, Gonaives and Les Cayes (see Chapter Il).
Table 1-2: INDUSTRIAL LABOR FORCE BY DEPARTEMENTS, HAITI 1950 AND 1971
1950 1971 Increase 1950-1971
Departements Number _% Number % Number a
Ouest 31162 36.5 56362 46.8 25200 72.1
Nord 18397 21.5 17086 14.2 -1311 -3.7
Artibonite 11064 13.0 14911 12.4 3847 11.0
Sud 21062 24,7 25720 21.4 4658 13.3
Nord-Ouest 3676 4.3 6238 5.2 2562 7.3
Total 85361 100.0 120317 100.0 34956 100.0
Source: ILO: Problemes de Main-d’Oeuvre et d’Emploi, Haiti, Geneva, 1976.
1/ Sector Committee for Agricultural Policy.
[page 33]
- 11 -
1.31 Between 1971 and 1977, some 20,000 jobs have been created in the
modern manufacturing sector, mostly in labor-intensive assembling activities
in the Port-au-Prince area. This development was induced by low wage rates,
the tax incentive legislation and external factors such as the proximity to
the US market and the preferential US customs treatment.
1.32 There is no evidence as to the specific role of tax incentives in
Haiti's industrial development. What is clear, however, from the existing
laws and their application is that it is relatively easy to qualify for the
privileges in the form of duty-free imports, tax exemptions (especially for
income tax) and de-facto protection by excluding potential competitors from
fiscal incentives. 1/ Also, there are no formal requirements for increasing
the contribution of these activities to the Haitian economy over time, e.g.,
through gradual increases in the number of qualified Haitian personnel and
through other increases in local value added. Thus, in the longer term
perspective, the impact of industrialization on the urban economy remains
below its potential.
1.33 Both because of its relatively developed infrastructure and the
centralization of the political and administrative structure, the Port-au- -
Prince area benefited most from the industrial development of recent years.
In order to counteract these centripetal forces in industrial location,
the new 1977 law gives additional tax incentives to firms that are established
outside Port-au-Prince and its surroundings. It is very doubtful whether
these additional incentives will have an effect on entrepreneurial behavior
since they cannot compensate for the lack of infrastructure that constitutes
a crucial problem in provincial towns, and its impact on the present value
of a given project's cash flow is small if relevant at all. 1/ Thus, probably
without the desired locational effect, the law will contribute to further
reducing tax revenues and will benefit industries, the location of which
is less sensitive to spatially differentiated tax incentives than to other
criteria, such as the availability of raw materials for agricultural process-
ing. -
Foreign Trade
1.34 Foreign trade policy virtually does not exist in Haiti as an impor-
tant element of an integrated policy of socioeconomic development. There
is no explicit policy of agricultural or industrial import substitution, nor
is there an active policy of export promotion. Specific measures rather
resemble ad hoc interventions that follow spontaneous transactions in the
private sector as, for example, the new textile agreement with the US. The
whole problem of foreign trade and domestic development is intimately linked
to the foreign exchange policy that, by maintaining the free convertibility
of the gourde at the present rate to the dollar for 50 years, has certainly
favored commercial transactions rather than the development of domestic pro-
duction. During the 1960s and 1970s, a differential of about 20% has developed
between domestic and international prices for traded goods. At the same time,
1/ See Chapter II, Section B.
[page 34]
- 12 -
import duties have not been increased and imports have gained a competitive
edge over domestic products. The absence of an import-substitution policy
in general and of regulations to increase the local content of manufactured
products in particular have negative effects on agricultural and thus on
the whole rural economy. Cotton is a prominent example where national
production has gradually been sacrificed and where the local textile industry
has access to imports without any obligation to organize and improve
local cotton production.
1.35 So far, foreign trade has been mainly the object of fiscal consid-
erations. In FY1975/76, foreign trade generated G 196 million in fiscal
revenues, Î.e. G 105 million (53.6%) in import duties and G 91 million
(46.4%) in export taxes, of which about G 53 million came from coffee ex-
ports. The relative tax burden is 10% on merchandise exports and only 9% on
merchandise imports. Because of the high share of coffee export taxes, the
taxation of total foreign trade tends to discriminate against rural areas.
The incidence of total customs revenues on rural areas is estimated at 574
in 1976, whereas the share of rural areas in national income is only about 42%
(see Annex Tables 1.7 and 1.11). Urban areas, especially Port-au-Prince, where
the bulk of merchandise imports goes, are privileged by the present system.
Credit
1.36 Credit to the private sector is available from the commercial
banks established in Haiti and from the Government-controlled Institut de
Developpement Agricole et Industriel (IDAI). Another public institution, the
Bureau de Credit Agricole (BCA) is catering to agriculture. (Commercial banks
are primarily involved in short-term commercial credit, mostly foreign-trade
related, which can be revolved to maximum maturities of two to three years
for certain customers. -IDAI is the only source of medium- and long-term
credit. 1/ Total credit to the private sector stood at G 633 million as of
March 31, 1977, of which about G 177 million came from the monetary authori-
ties, G 425 million from commercial banks and only G 31 million from IDAI;
hence the limited impact of this development bank. 2/
1.37 Activities of commercial banks are mostly concentrated in the
Port-au-Prince area. IDAI, with its rudimentary system of branch offices,
is active in two major areas, i.e., the Departement de l’Ouest, mainly Port-
au-Prince, and the Departement de l’Artibonite (see Annex Table 1.14). The
bulk of IDAI’s portfolio consists of long-term loans for the industrial
sector, mainly in the Port-au-Prince area, with maxium maturities of 10
years. Agriculture, which in recent years hardly accounted for 10% of the
credit volume, or less than 0.5% of total private sector credit, is mainly
provided with short-term funds. Thus, development financing is biased towards
the industrial sector and urban areas. Loan conditions do not reflect
any sectoral or regional priorities and the interest rate, at present 12%
p-a., is applicable irrespective of the maturity, the sector or the location
of the activity. Thus, IDAI credit is also an element in the centripetal
socioeconomic forces.
1/ BCA’s long-term credit is insignificant.
2/ See IMF: Haiti - Recent Economic Developments, July 1977.
[page 35]
_ 13 -
Education ‘ :
1.38 Education has long been a neglected area. In 1976, only 1% of GDP
or 13% of government current budgetary expenditures were devoted to public
education which, when compared with other countries, is extremely low. 1/
The education system has mainly catered to a small urban elite and the vast
majority of children and adults, especially in rural areas, has been excluded.
Annex Table 1.15 clearly shows the urban bias of the system. The most neg-
lected area seems to be the rural section of the old Departement du Sud.
Enrollment in primary education ‘amounts to 41% of school-age population in
rural areas and to 176% 2/ in urban areas. The urban-rural differential is,
however, worse in terms of completion. Only 2% of children in rural areas
complete primary education versus 27% in urban areas. The Bank's First and
Second Education projects in Haiti are first steps towards correcting this
* bias in educational investments.
1.39 Curricula and syllabi in primary education, which are designed to
prepare for a certificate at the end of the 6th grade, appear mostly irrele-
vant to the country's socioeconomic development and inappropriate to the
learning capacity of children. These general features combined with the
extremely high drop-out rates make the education expenditure in rural areas
almost a complete loss. Most rural children receive largely irrelevant
education for an extremely short time in a language (French, the official
language) which they do not understand. Thus, education has so far not
been a positive factor in rural development and, as discussed in Section A
above, the lack of adequate facilities in rural areas contributes to fueling
the rural-urban migration process.
Administrative Structure
1.40 It is clear from the preceding discussions that Government policies
and services cater mostly to urban sector activities at the expense of rural
areas. Moreover, the administrative system is highly centralized without
leaving any significant administrative and financial autonomy to the depart-
mental or municipal level (see Chapter IV), and it exerts strong centripetal
forces within the urban sector. This centralized structure not only contri-
butes to draining talent and resources from provincial towns but also to
shaping the spatial pattern of urban economic activities. All relevant
Government decisions related to private sector investment are taken on the
central level and a private investor must have very specific reasons to
locate outside Port-au-Prince where infrastructural facilities also tend to
be worse. In order to be successful, any attempt at decentralization of
economic activities will have to rely more on local initiatives and, therefore,
will have to be accompanied by some devolution of political and administra-
tive power.
1/ Public education expenditures are typically near 4% of GDP and 21%
: of current budget expenditures, like for example in Senegal, Mauritania,
El Salvador and Honduras.
2/ Percentage exceeding 100% due to enrollment of overaged children and
_ children from rural areas.
[page 36]
- 14 -
D. REGIONAL DECENTRALIZATION IN THE SECOND PLAN PERIOD
1.41 The second Five-Year Development Plan covering 1976-1981 defines
four major priority areas, i.e, agriculture, decentralization of industrial
infrastructure, education and strengthening of the institutional structure.
The pursuit of the first two priorities, in particular, could have a consider-
able impact on the spatial structure of the country by counteracting the
previously noted neglect of the rural sector and the stagnation in provinciai
towns.
Spatial Development Strategy
1.42 The Plan broadly defines a spatial development strategy 1/ which
relies on the decentralization of non-agricultural activities and rural
development. The decentralization process is shaped along the growth-pole
and related theories and assigns specific functions to communities on
different hierarchical levels. Conceptually, this is the usual approach to
a rational distribution of economic activities and infrastructural facili-
ties over a given territory. However, the approach outlined in the Plan
requires more concrete and clearer definitions of goals, objectives and
regional priorities and of specific policy measures. This presupposes more
complete information and a better understanding than is now available of the
regional development problems in general and of urban and rural poverty in
particular. The identification of specific problems as to their intensity
and spatial incidence could then be used to define operational objectives
and establish priorities for their pursuit in different sectors and regions
over time.
1.43 Given the early stage of physical planning or any explicit spatial
development efforts in Haiti and this lack of specific information, the
spatial development strategy outlined in the Plan falls short of compre-
hensive regional development programs or an explicit regionalization of sec-
toral investment programs. Decentralization is pursued only to the extent
that more emphasis is given to agricultural and rural development and to
non-agricultural development outside Port-au-Prince, in particular for
infrastructure.
1.44 The 1976-1981 Plan includes a public investment program 2/ of
about US$615 million at 1976 prices. This very ambitious program would
represent a dramatic jump in public and total investment, relying heavily
1/ See CONADEP (Conseil National de Developpement et de Planification)
Plan Quinquennal 1976-1981, October 1976 (Vol. I, Chapter 3). There
is also a more detailed background paper by CONADEP: Regionalisation
et Strategie de Developpement Regional, June 1976.
2/ See also Technical Note on Estimating the Regional Incidence of the
Fiscal System, etc., op. cit.
[page 37]
15 -
on external financing. Although actual implementation has fallen short of
the Plan targets, the new development thrust is noticeable and public invest-
ment already increased from FY1974/75 to FY1975/76 by about 35% in real terms.
1.45 The sectoral priorities mentioned above are clearly reflected in
the 1976-1981 public investment program, particularÿ in the fields of agri-
culture, education, health and water supply. This is evident from Annex
Table 1.16 which compares the pattern of development expenditures during
1972 to 1975 with that of the 1977/78 development budget and with the program
for the first years of the 1976-1981 period, as approved by the Government
and financially supported by external agencies.
1.46 Marked changes have also taken place with regard to the regional
orientation of government development expenditures. Whereas a rough estimate
of expenditure in FY1975/76 points to an incidence on the Port-au-Prince area
of about 49%, an analysis of the 1976-1981 program on the basis of projects
approved as of December 1977 or to be approved within the next few months
shows that the share of Port-au-Prince may decrease to about 28% (see Annex
Table 1.17). The incidence of development expenditures on provincial towns
is estimated at about 18% and that on rural areas at about 54%. Table 1-3
shows that with this pattern, government development expenditures, if compared
to the distribution of population, will still be concentratred in the Port-au-
Prince area and in the provincial towns. However, when the incidence of
development expenditures is compared to the spatial distribution of national
income, it becomes clear that significant decentralization will take place.
The pursuit of the present public investment program is thus likely to lead
to a gradual change of the spatial structure of Haiti”s socioeconomic system,
a process which may be reinforced by a gradual reorientation also of private
investment. The change will be slow since current investment represents only
a fraction of the capital stock with its given spatial distribution.
Table I-3: SPATIAL DISTRIBUTION OF PUBLIC INVESTMENT,
POPULATION AND NATIONAL INCOME-PERCENTAGES
Spatial Incidence Spatial Distribution of
of 1976-1981 Population National Income
Investment Program 1976 1976
Urban areas 46.1 23.1 58.5
Metropol. Port-au-Prince 28.2 14.0 39.3
Other Towns 17.9 9,1 19.2
Rural areas 53.9 76.9 41,5
Total 100.0 100.0 100.0
Source: See Annex Tables 1.7 and 1.17; population from IHS.
1.47 In the spatial incidence of planned development expenditures,
the Northern Department ranks second in importance after the Port-au-Prince
metropolitan area (see Annex Table 1.17). Including part of the expenditures
[page 38]
, - 16 -
that are not spatially specified, the North's share corresponds to about
its share in population. Within the department, a certain concentration
of the investment efforts in the urban areas is in line with government 's
growth-pole strategy intending to upgrade Cap Hatien as the second most :
important town of the country. A similar concentration applies to the
Artibonite Department, where the urban centers are Gonaives and St. Marc.
The development program in rural areas is strongly biased in favor of the
northern and northwestern departments.
1.48 The development program as a whole also tends to favor the
northern part of the country over the southern part. The northern depart-
ments 1/ have 48% of the population living in the country outside of Port-
au-Prince but will benefit from 60% of total development expenditures outside
the metropolitan area. The corresponding figures for the southern part are
40% of expenditures for 52% of the population. This particular spatial
distribution of development efforts may be justifiable on grounds of relative
development potential, and will contribute to gradually changing the country's
spatial development. However, the southern peninsula is the main origin of
rural-urban migration and the impact of regional development expenditures may
not significantly alter the trends'in internal migration.
E. SUMMARY AND CONCLUSIONS . .
1.49 In the 1970s, Haiti's population has grown at around 1.8% per annum
as a result of relatively low natural growth rates of 2.2% per annum and sub-
stantial emigration averaging 0.4% per annum. With rural population growth
at just over 1%, the urban population has increased by more than 4% and
now accounts for about 23% of the total. 60% of the urban population is
located in Port-au-Prince and the metropolitan area is growing between 5%
and 6% so that its weight in the urban sector continues to increase.
1.50 Rural-urban migration is mainly fueled by better work and income
opportunities and by better educational facilities in urban centers and
in particular in Port-au-Prince. It is also facilitated by the continued
importance of the extended family in Haiti. Any effort to decentralize :
economic developments away from Port-au-Prince will have to address these
differentials in economic and educational opportunity as well as access to
other public services, if the policy is to have an impact on rural-urban
migration.
1.51 Haiti is the poorest country in the Americas and among the 30
poorest in the world with a GDP per caput of little more than $200 in 1976.
Overall, the rural areas average only half that per caput income level with
Port-au-Prince averaging 3.5 times the average for the country. The con-
centration of higher income in Port-au-Prince is due to the near-monopoly
1/ Nord, Nord-Est, Nord-Ouest, Artibonite, Centre.
[page 39]
- 17 -
of the capital in industry, commerce and construction activities. For ex-
ample, over 90% of industrial employment is located in the metropolitan area.
If anything, the weight of Port-au-Prince has increased in recent years.
1.52 Intirpersonal income distribution is also very unequal. More than
60% of the population live on US$60 per annum or less, i1.e., at a level of 32%
or less of the average per caput income in the country (1976 data-straight
conversion into US$). The top 54 of the population attract more than half of
national income. Income distribution in rural areas is somewhat less unequal,
with only 17% living at or below about one-third of average income in rural
areas. The same figure for relative poverty is 69% in provincial towns and
65% in Port-au-Prince. «
1.53 With such low per caput income levels, ît is not surprising that
more people live in absolute poverty than in relative poverty. Depending
on the amount judged essential for minimum expenditure for non-food items,
some 75% to 90% of Haiti’s population live under absolute poverty. This
means that up to 60% of the population in Port-au-Prince, 83% in provincial
towns and 94% in rural areas cannot afford what is considered minimum stand-
ards of food and non-food consumption. This is supported by the latest
nutrition survey carried out in 1974/75, which showed that only about 134
of children are normally nourished, the rest suffering from varying degrees
of malnutrition. This survey shows a significant deterioration from the
previous survey carried out in 1958.
1.54 Public consumption and investment averaged some 11% of GDP in the
late 1960’s and early 1970’s and rose to 16% in 1976. Some 35% of govern-
ment revenues and expenditures are unidentifiable within normal budgetary .
procedures and it is not possible to assess the total impact of the fiscal
system on the economy. From partial evidence, however, it can be stated that
government expenditure patterns follow the tax incidence to some extent but
have no regional redistribution effects and have heavily favored Port-au-
Prince in the past. The tax system does not take into account regional
ability to pay as shown by regional income distribution, and revenues are
heavily dependent on regressive indirect taxes. The Second Five-Year Develop-
ment Plan (1976-1981) will reduce the expenditure concentration in Port-au-
Prince to below 40%, which, however, is still above the share of the metro-
politan area in total population. Recent measures will also slightly increase
the reliance of public revenues on income taxes.
1.55 In the past, the regional incidence of major policy areas has been
at best minor but mostly negative in terms of decentralized development.
Agriculture, which provides a living for about 75% of the population and
contributes some 40% of GDP, has attracted only 11% of development expenditure
and 9% of current budget expenditure in the past. In line with the govern-
ment”’s decentralization objective, the share of agriculture is to rise to
about 22% of development expenditure in the current plan. Incentives to
locate outside of the dominant Port-au-Prince area have recently also been
established for industry, which remains, however, a fairly minor sector
contributing only some 13% to GDP and employing about 6% of the labor force.
Their actual impact on shifting industrial investments to the provinces
remains doubtful and is likely to be minor.
[page 40]
- 18 -
1.56 In other policy areas, there is either an absence of a coherent
policy, as in foreign trade, or a heavy concentration on the Port-au-Prince
area. The latter is particularly obvious in the provision of industrial
credit, the provision of educational facilities and in the centralization
of the administrative structure. Decentralization of the administrative
structure to the provinces is just beginning.
1.57 In addition to putting heavier emphasis on agricultural development,
the current Five-Year Plan also includes decentralization of industrial
infrastructure away from Port-au-Prince. However, the Plan falls short of
a comprehensive regional growth pole strategy and the basic data base for
such a policy remains inadequate. While implementation of Plan objectives
falls short of the targets, dramatic increases in investments are taking
place with heavy foreign assistance and, over the period 1976 to 1981, only
28% of development expenditure is to be made in the Port-au-Prince area,
a substantial fall from 49% in 1975/76.
1.58 The northern part of the country is the main beneficiary of this
shift away from Port-au-Prince to the regions and it is the area which is
judged to have the best immediate development potential. If realized, this
shift in the spatial distribution of development expenditure will gradually
move the country towards more decentralized development, but it may not
significantly alter the trends of internal rural-urban migration. The main
origin of such migration is in effect the south, whose allocation of devel-
opment expenditure will remain below its share in total population.
[page 41]
_ 19 _
CHAPTER 11: URBAN EMPLOYMENT
Introduction
2.01 Starting with an overview of the employment problem in the country,
this chapter will examine the role of industry, handicrafts, construction and
the informal sector in providing non-agricultural income earning opportunities
for the urban labor force. Less than a quarter of the labor force now resides
in urban areas but all of the nation's Labor force growth will be concentrated
in the urban sector.
2.02 Only a fraction of this increase can be absorbed by manufacturing,
handicrafts and construction. The bulk will have to make a living in the
informal sector, which now accounts for around two-thirds of urban employment.
Throughout the Chapter, the statistical base for analysis is extremely weak.
This is most serious for informal activities, which cut across the traditional
national accounts statistics on manufacturing and crafts, construction,
trade and commerce and other services. Furthermore, linkages between informal
and modern activities such as industrial manufacturing, remain ill-defined
and public policy has not yet focussed on support to the informal sector. And
yet, its importance is such that there is little hope to relieve the grave
urban poverty picture unless output in this sector becomes a dynamic force in
the economy.
A. OVERVIEW OF EMPLOYMENT AND UNEMPLOYMENT
2.03 The concepts of employment and unemployment do not apply easily
to Haiti, The country is so poor that very few people can really afford to
be unemployed and many activities, especially those performed by children,
hardly qualify for the traditional definition of employment. Thus, labor
force and employment data is difficult to interpret.
2.04 According to the 1971 census, total population amounted to 4.33
million. Population of working age (defined as those aged 10 and over)
amounted to 3.13 million of which 2.27 million were considered economically
active, with 1.95 million or 85.8% employed and 323,000 or 14.2% openly
unemployed (see Table II-1). In addition to open unemployment, underemploy-
ment is heavy, particularly in agriculture and in the informal sector. Rough
estimates of disguised unemployment in the agricultural sector range as high
as 40-55%. 1/ No similar estimate exists for the informal sector. :
1/ See ILO: Problemes de Main-d'Ouevre et d'Emploi - Haiti, op. cit.
[page 42]
— 20 —
Table II-1: POPULATION AND LABOR FORCE, HAITI 1971
‘000 Persons Percentages
Total population ‘ 4,330.0 100.0
Population aged 10 and over 3,131.7 72.3
Labor force
(economically act. pop.) 2,271.8 52,5 100.0
Employed 1,948.8 85.8
Family aides 655.2 28.8
Others 1,293.6 57.0
Unemployed 323.0 14.2
Source: IHS, ILO; based on census information.
2.05 Although employment in agriculture shrank slightly from 1950
to 1971, this sector still offers the bulk, i1.e., 73.5%, of all jobs (see
Table II-2). During the same period, employment in non-agricultural activi-
ties more than doubled from 245,000 to 515,000 in 1971. Most of this addi-
tional employment accrued in the informal sector and only a small proportion
in modern sector activities. Despite further increases in the manufacturing
employment in Port-au-Prince in the 1970s, by 1975, the informal sector
accounted for about 60% of employment in Port-au-Prince.
2.06 Total Labor force is estimated to increase at an annual rate of
0.8% during the next ten years. 1/ Because of migration and changes in the
age structure, the labor force is expected to shrink slightly in rural areas,
but will increase strongly in urban areas, i.e., by about 4% p.a. (see Annex
Table 5:3). This expected rise will aggravate the precarious situation in
urban labor markets and adds further urgency to the creation of employment
opportunities in the non-agricultural sectors.
L Overall growth of the labor force is lower than population growth for
three main reasons: (a) participation rates in urban areas are tradi-
tionally lower than ‘in rural areas and population growth will be con-
centrated in the urban areas; (b) better educational opportunity will
reduce labor force participation of the young; (ec) a disproportionate
share of emigrants are of working age.
[page 43]
- 21-
Table II-2: EMPLOYMENT BY SECTORS, HAITI 1950 and 1971
- Persons _employed
‘ Sector 1950 1971
7000 % 7Ü00 %
Agriculture 1,453.9 85.6 1,433.2 73,5
Mining, quarrying 0.5 0.0 1.0 0.0 °
Manufacturing industries 85.4 5.0 120.3 6.2
Construction 10.3 0.6 17.9 0,9
Electricity, water 1,0 0,1 1.4 0.1
Transport, communication 6.5 0.4 11.9 0.6
Commerce 194.8 10.0
Banking, insurance 61.6 3.6 2.4 0.1
Services (including Government) 80.4 0.7 160.9 8.3
Statistical discrepancy - _ 5.0 0.3
Total 1,699.6 100.0 1,948.8 100.0
. Source: Problemes de Main-d'’Oeuvre et d'Emploi, Haiti, op. cit.
B. MANUFACTURING INDUSTRY
Past Trends
2.07 Industrial development is not one of the major priorities in
the development plan and the sector is still of relatively minor overall
importance in the country, although of increasing consequence in the capital.
After stagnating for a decade and a half, industrial production picked up
at the beginning of the 1970s, fueled by the installation of export assembly
industries, mostly in the Port-au-Prince area. By 1976/77, manufacturing
accounted for some 13% of GDP. This figure is understated because national
accounts coverage is based on the industrial structure of the mid-1950’s
with inadequate adjustment for changes since then, so that some of the
new activities, such as the steel plant and some export processing activities
go unrecorded. Industry’s contribution to GDP remains well below that in
other Latin American countries. The gap is striking in terms of industrial
product per caput, which in 1976 (at 1976 price levels and foreign exchange
rates) amounted to about US$13 per head in Haiti compared to US$20 in Bolivia,
the next highest in Latin America and nearly US$72 in the neighboring Dominican
Republic.
[page 44]
= 22 -
2.08 In the absence of an industrial census, 1/ the only consistent
nationwide data are those collected by the National Insurance Office (Office
d’Assurance -— Acidents du Travail, Maladie et Maternite-OFATMA), given in
Annex Table 2.1 for 1975/76. The table shows 1,000 industrial enterprises
for the nation, although only about 480 can be said to be "industrial" while
the remainder are more in the nature of craft-type workshops. Total employ-
ment at close to 18,000 people and the wage bill at about G 59 million
(US$11.8 million) are likely to be understated by 20 to 30%, due to seasonal
labor fluctuations, prolonged employment of temporary and part-time workers
and widespread.use of out-workers, all of which are not covered by insurance
legislation. There may also be some deliberate under-reporting. Even with
a 30% adjustment for this under-recording, OFATMA data are still below those
from other sources. A 1975 estimate, made in the framework of the PPHC 2/,
puts employment in the modern manufacturing sector in the Port-au-Prince area
alone at some 28,000 people (see Annex Table 2.2). This is still only about
10% of the metropolitan area labor force.
2.09 Consumer goods industries catering to the local market, building
materials production and export processing industries, also mostly consumer
goods, dominate the sector. It is the latter that have accounted for most
of the recent industrial growth. Since 1971, they have created an estimated
18,000 jobs compared to only about 2,000 new jobs created in industries
working for the local market. They export all of their production, almost
exclusively to North America, and most of their raw materials come from there.
Duty-free import status into the United States depends on purchasing US
material inputs. Linkages to the local economy are thus kept fairly low,
although these industries have stimulated some ancillary developments, mostly
in transport and catering.
Spatial Pattern
2.10 Annex Table 2.1 illustrates the overwhelming weight of Port-au-
Prince in manufacturing. The metropolitan area accounts for 67% of all
enterprises, more than 92% of ali recorded employment and about 94% of the
recorded wage bill. The second largest town, Cap Haïitien, has 10% of the
enterprises but only 3% of the employment and between 2 and 34 of the wage
bill. This preponderance of Port-au-Prince is not likely to diminish rapidly.
1/ A UNIDO Industrial Survey Mission started work at the end October 1978
and is expected to be in the field for up to three months. According to
the terms of reference, the mission will establish an inventory of
existing industrial activities as well as of the human and natural
resources and the whole system of industrial infrastructure. Further-
more, it should assess the medium-term prospects for industrial develop-
ment, identify new industries and produce recommendations for medium-term
developments. USAID is also engaged in a Small Business Survey.
2/ Planification Physique, Habitation et Construction, joint project of
the government of Haiti and the UN, No. HAI/SD 0970.
[page 45]
- 23 -
Export processing industries will continue for the time being to prefer
Port-au-Prince as a location. All sea-borne international trade has to go
through Port-au-Prince and the capital also has the only airport capable of
handling large cargo planes. Even after the rehabilitation of the Cap Haitien
airport, with French bilateral assistance, that airport will still not be able
to handle anything larger than a DC-6. Provincial locations thus mean higher
transport costs for inputs and outputs in addition to the increased costs of
keeping în touch with the centralized government machinery in Port-au-Prince.
2.11 Also, industrial infrastructure is generally more deficient and
sometimes more costly in the provincial towns than in Port-au-Prince. This
applies to transport infrastructure, water, power, 1/ and telecommunications.
Remedial actions are getting under way on many of these problems 2/ but will
take many years to complete. In the meantime, the only industrial zone
operation in the country is in Port-au-Prince and is beirg expanded with
IDB finance, while plans for the development of an industrial estate in
Cap Haitien are in abeyance.
Industrial Policy
2.12 Industrial policy is not developed and is presently limited to
the enunciation of three lines along which development should be pursued
in the coming years, i.e.:
(a) an increase in exports,
(b) a progressive replacement of export assembly industries by
activities based on national resources; and
(c) decentralization of industrial development towards the
provinces.
With the exception of the building materials subsector, most of the more
obvious import substitution possibilities are already realized or are blocked
by vested commercial interests and the Government”s trade and foreign exchange
‘policies (see Chapter I).
2.13 The major specific policy measures in force are the industrial
incentive law and the minimum wage regulations. The industrial incentive
law was passed in 1960 and subsequently amended in 1963, 1969 and 1977.
1/ The application of a national electricity tariff in 1977 has removed
the previous discrimination of electricity rates in favor of Port-au-
Prince, which was a deterrent to decentralization. The problem of
inadequate and unreliable power supplies remains.
2/ Further major road investments, including the upgrading of the secondary
road system are under preparation and the World Bank will support im-
provements of the coastal shipping system. The Bank and the UN will
upgrade water supply and distribution in 10 provincial towns and some
bilateral donors are planning to improve provincial power supply.
[page 46]
- 24 —
The key provisions refer to new industries for export or new products for
the domestic market. They are:
(a) duty-free imports of machinery and equipment;
(b) duty-free imports of raw materials and components for
re-export;
(c) five-year total income tax exemption, progressively reduced
over a further five-year period, for factories in the Port-
au-Prince metropolitan area; .
(d) fifteen-year total income tax exemption plus the same five-
year tapering-off period for factories outside of the Port-
au-Prince area; and ‘
(e) some protection from competition for new products for the
domestic market and some differentiation between priority
industries in the Development Plan and others.
2.14 The legislation does not ask entrepreneurs to increase local value
added over time through such actions as enlarging the use of local raw mate-
rials, widening the scope of the transformation process carried out in Haiti
with imported raw materials or components and encouraging the employment of
Haïtians in responsible positions. Some scope for increasing local value
added should exist and, if exploited, would increase the impact of industrial
development on the local economy beyond the present very low level. The im-
pact of the legislation on industrial decentralization must also be considered
minor. Entrepreneurs in Haiti are accustomed to pay-back periods of three to
five years and, for a 25-year investment and rates of return (or discount) of
33%, the added incentive for provincial locations only produces a 7% higher
present value of the income stream after taxes.
2.15 Minimum wages were raised in September 1977 from US$1.30 to between
US$1.60 and US$2.00 per 8-hour day. 1/ Industry-specific rates are assigned
at levels within this range. The minimum wages apply to unskilled workers.
Skilled workers, at least in the larger enterprises, earn wages up to a third
above the minimum, while trainees earn less. The legislation does not give
any wage preference for enterprises locating outside of Port-au-Prince, al-
though this could be justified by differences in the cost of living. The
best that can be said for this legislation is that its enforcement is far
from general and, where it is enforced, it increases to some extent the local
impact of export assembly operations.
2.16 Finally, some further efforts are getting under way in industrial
promotion. In mid-1977, an Industrial Promotion Office 2/ was created with
assistance from the Federal Republic of Germany (see Chapter IV for details).
1/ Decree of September 15, 1977.
2/ Bureau Haitien de Promotion Industrielle - BHPT.
[page 47]
— 25 -
The Office has already started with concrete projects for rehabilitation of
existing enterprises and the creation of new ones and is providing a link
to potential German investors. It has set itself a target of creating some
2,800 to 3,500 jobs in manufacturing over the next five years, in addition to
job creation in civil works and in crafts. A parallel promotional effort is
expected to be mounted with UNIDO assistance in the Ministry of Industry and
Commerce and UNIDO will also organize the training of industrial promotion
officers in New York with the objective of placing such officers later into
Haitian embassies abroad.
Prospects
2.17 Given the limited agricultural potential of the country, industry
retains considerable long-term importance. However, given its small size,
manufacturing cannot be expected to provide a major part of the needed non-
agricultural employment creation in the near future. Many of the existing
export processing enterprises are subsidiaries of US companies and many others
depend on contracts to supply a given US Company. Thus, their prospects
largely depend on the political relationship with the U.S., on the development
of the North American economy or on the fate of a given U.S. customer.
European companies are just beginning to show an interest in investments in
Haiti, and this might lead to a desirable diversification of markets and
should be encouraged. Overall, prospects for such industries will remain
relatively favorable as long as the conditions that attract them remain in
place. These are an abundant supply of cheap, unskilled but dexterous and
relatively unmilitant labor, the absence of foreign exchange controls, little
government interference, proximity to the US market and favorable incentives.
Many of these enterprises have plans for expansion in the next two years and
the further extensions of the industrial zone in Port-au-Prince are largely
based on specific demand for the new facilities.
2.18 There are also good prospects for the further development of build-
ing material industries. Building activity has been growing at some 6% per
annum recently. Building and other construction demand should continue to
be strong and might accelerate if adequate mechanisms for housing finance
are put in place (see Chapter III). Considerable potential for clay-based
products such as bricks, tiles and sanitary equipment can still be exploited.
However, the prospects for industries based on other national resources re-
main clouded. Known mineral resources other than building materials are few.
Exploitation of bauxite ores has fallen in recent years and a small copper
mine has ceased operations. Other known significant deposits are limited to
a recently discovered copper ore body of commercial size near Douvray and the
well known brown coal deposits. Exploitation of both is under study. If the
copper mine, which is suitable for open-cast exploitation, proves a viable
proposition, it might provide some 1,000 to 2,000 jobs but not before the
mid-1980s. Use of the brown coal deposits, which depends on the construction
of an all-weather road, could help in alleviating the heavy dependence of the
power sector on imported oil. Mineral exploration through INAREM (Institut
National de Ressources Minerales) the Minerals Resources Institute, continues.
[page 48]
- 26 -
2.19 Further development of agro-based industries, whether directed
at the narrow local market or at exports, is conditional on a successful
agricultural development effort. The regional agricultural projects now
underway could strengthen both the supply of raw materials and the basis for
an expansion in the industry supplying simple agricultural implements. At
present, however, production of some major agricultural products such as
coffee, sugar cane and cotton is stagnating or falling in quantity and quality.
The artisanal fishing industry does not satisfy even the low level of domestic
demand, and no fish processing is done. 1/ Wood resources are declining and
will not pick up until reforestation pays off. The only immediate hope for
agricultural processing development exists in fruit juice processing in
relation with the essential oils industry and in vegetable canning. Citrus
fruits are presentlÿy processed only for essential oîls and the juice is
discarded. Some juice processing and vegetable canning plants are now in
various stages of preparation and start-up. There is scope for further
extending the development of integrated projects which combine the production
of raw materials and their processing to break through the reluctance of
farmers to grow the produce without an assured outlet and the reluctance of
industrialists to invest in a plant without assured raw materials supply. The
experience in agriculture and industry of the IDAI (Institut de Developpement
Agricole et Industriel), could be put to use in this area, on condition that
the institution is reorganized and strengthened.
2.20 There is also need for modernization and quality control. The
equipment in small sugar processing plants, the essential oil industry,
clairin production (the local alcohol) and cotton spinning and weaving is
largely obsolete. Quality control is a problem for export development in the
essential oil industry but also in other manufacturing activities. Sugar cane
processors will be supported through IDAI with IDB finance and USAID is in-
terested in supporting agro-industries that use raw materials produced by
small farmers through the possible creation of a private DFC for which a feasi-
bility study was recently completed by ADELA/TEC. The recent IDB loan to IDAI
also includes support to a quality control laboratory.
2.21 No discussion, however brief, of industrial development in Haiti
is complete without emphasizing the major constraint of skilled manpower
shortages. Shortages exist at all skill levels. Some return migration of
expatriate Haitians provides only a very partial counterweight against con-
tinued emigration of skilled professionals. Shortages are particularly acute
in high level technical staff, which now commands a salary premium of some 60
to 70% over management professionals. But skilled workers are also in short
supply. A multitude of technical and vocational training schools operate in
the country (see Chapter IV), but they do so in a largely uncoordinated manner,
with insufficient training materials and equipment and, above all, mostly
without reference to the needs of industry. As a result, only about 54 of
"skilled” workers are estimated to have acceptable proficiency levels, and
many industrialists are obliged to conduct their own in-house training.
The recently created National Training Institute (Institut National de la
Formation Professionnelle — INFP) has not yet assumed its coordinating
1/ IDB is planning to initiate a major survey of fishing potential for
_ the country.
[page 49]
- 27 -
functions. However, it has started a major survey of employment and skill
structures and requirements with ILO assistance and the involvement of IHS, 1/
‘ and this should provide the basis for the rationalization of the training
efforts and the formulation of a comprehensive training policy.
2.22 Estimating the likely volume of employment creation in modern in-
dustry in the coming years faces the difficulties that export processing
industries depend more on what happens in the U.S. economy than on any other
factor, that agro-based industries depend on the development of agriculture,
which is notoriously difficult to forecast, that there is little or no know-
ledge of the expansion plans of the existing industrial establishments and
that, for a number of projects under discussion, expected employment data are
not yet available. Any estimate is, therefore, little more than guesswork.
On that rough basis, modern industry may create some 12,000 additional jobs
between 1977 and 1981, or some 3,000 per annum. This amounts to some 12-13%
of the expected increase in the urban labor force over the same period.
C. HANDICRAFTS
2.23 If statistics on modern manufacturing industries are deficient,
those on the Haitian craft sector are practically non-existent. The sector
is an integral part of the economy and is of considerable importance in the
rural as well as urban areas but has remained at the margin of statistical
work and studies. This may be partly explained by the past dispersal of
official responsibilities for the craft sector among four different min-
istries. 2/ The recently created National Crafts Council (Conseil National
d'Artisanat) and the attached National Crafts Office 3/ (office National
d'Artisanat) have not yet become fully operational and their impact will
depend on the financial and staff resources that will be put at their disposal
(see Chapter IV).
2.24 There is no agreed definition of the handicraft sector in Haiti.
The decree creating the National Crafts Office defines handicrafts as products
basically produced by individual manual work. Articles of this type produced
in Haïti include braided vegetable fiber (hats, baskets, mats, rugs, etc.),
ceramics, hand-embroidered textiles and wool and cotton weaving and crocheting,
wood working for kitchen utensils, statuettes and some furniture, metal working
to produce household goods, small implements and some furniture, stone cutting
and shell and bone work. A survey made in 1975 in Port-au-Prince showed that
some 2,000 people were employed in craft production in the metropolitan area
1/ Project HAI/74/014: Planification des Ressources Humaines et de l'Emploi.
2/ The Ministries of Commerce and Industry, Social Affairs, Education and
_ of Agriculture, Natural Resources and Rural Development.
3/ Decree of September 12, 1977. The office was formally set up in August
: 1978 and a request for budgetary funds has been submitted to the Ministry
of Finance.
[page 50]
- 28 -
(see Annex Table 2.2). This figure, however, does not include large scale
crafts production. For example, an ILO report 1/ estimates that over 2,500
women produce crocheted and embroidered garments for exports to the US and
some 700 people are involved in the production of teddy bears. Woodcarving,
mostly done in Port-au-Prince workshops, also employs a sizable number of
- people, and it Îs not clear how far these have been accounted for in the 1975
survey. Also, sizable numbers of people are involved in selling crafts prod-
ucts. About 1,000 licensed sellers are active in Port-au-Prince alone and
large numbers of sellers are not licensed.
2.25 While comprehensive statistics are lacking, crafts production is
clearly of considerable importance. Direct sales abroad and sales to foreign
tourists are estimated to have totalled about US$10 million per annum in 1975
and 1976. 2/ Substantial production also takes place for local consumption
and most of the raw materials are of local origin. Over 80% of sales go to
the United States but they represent only 2 to 3% of such United States im-
ports. The other main clients are the surrounding Caribbean islands, where
Haitian products known for their quality, variety and sometimes distinctive
style, supply much of the "typical" souvenirs sold there. Smaller quantities
are also beginning to go to Europe and Canada.
2.26 Further market potential for expanding Haitian craft exports should
cleariy exist. Despite competing products from other developing countries,
Haiti”s market share in North America could no doubt still be expanded and
its products are just beginning to become known in Europe. Expansion of craft
production, however, will have to overcome certain obstacles. Crafts training
is in the same confused and unsatisfactory state as that for industrial skills.
Raw material supplies are unreliable in quantity and quality. Some are sub-
ject to international price fluctuations such as sisal, which creates problems
for small workshops that do not have the finance to keep stocks. Others, such
as hardwood, are in short and declining supply and can be imported only with
difficulty. Lack of finance also prevents the keeping of stocks of finished.
products by the crafts producers, who often have to request advance payments
before they can undertake to fill an order. This creates problems with large
export orders, although some of the 35 to 40 craft export houses in Port-au-
Prince accumulate stocks and prefinance craftsmen.
2.27 While crafts training, the organization of raw materials and credit
availability to crafts producers will require attention, the major field in
which government might usefully intervene is the organization of steady flows .
of information about Haitian products to clients abroad and the reverse flow
of information about design and fashion trends abroad to Haitian producers.
The primary importance of the marketing question has led to a proliferation
of private commercial and non-profit institutions active in promoting Haitian
crafts but this is almost universally based on haphazard or fortuitous circum-
stances and not on a conscious overall marketing effort. A telling example
1/ Haiti: Problemes de Main-d’Oeuvre et d’Emploi, op. cit., p. 16.
2/ Estimates by the Bank’s Tourism Sector Mission to Haiti in November
1977.
[page 51]
— 29 -
is the sisal rug factory created in 1976, which now provides direct employment
equivalent to 150 full-time jobs, 1/ but started with a purely touristic
visitor who happened to have the right interests, connections and skills and
a good deal of luck.
2.28 The Industrial Promotion Office has initiated some relevant activity
by sponsoring Haitian participation in a German trade fair late in 1977. The
office also hopes to organize a permanent exhibition of foreign equipment and
products in Haiti to acquaint the Haitian entrepreneurs with the competition
and with new tools, design trends, etc. Thirdly, the office hopes to be able
to provide financing for valid handicraft projects but, so far, has no credit
funds at its disposal. Overall, this office hopes to create some 2,500 jobs
in the craft sector over the next five years. All these activites are part
of the mandate of the National Crafts Office, which should be given adequate
resources to deal with its tasks.
D. CONSTRUCTION
2.29 Statistical information on construction activity is no better than
for the other sectors discussed, In 1977, construction accounted for an esti-
mated 5.1% of GDP excluding the materials subsector which was largely covered
by the discussion of manufacturing. The building subsector is estimated to
have grown by some 6% per annum in the 1970s with some acceleration of growth
in the more recent years. Value added is concentrated in housing (70%) and
industrial and commercial structures (25%), with public works (excluding
major road investments) accounting for the remaining 54.
2.30 Estimates of employment in the industry differ widely. Annex
Table 2.2, based on work done for the PPHC project, gives construction employ-
ment for Port-au-Prince at 5,700 in the modern sector in 1975. Another
estimate, also from PPHC data and based on total building investment in
Port-au-Prince of US$42.5 million in 1976, puts employment in the building
sector of the capital at 36,000. Much of this, however, is less than .
full-time employment and on a full-time equivalent basis of 300 work days per
year, employment in building in the city would be between 22,000 and 23,000.
(See Annex Table 2.3). At the same time, the Institut Haitien de Statistiques
. (IHS) estimates employment in construction in 1976 at 18,000 in the urban
area. Very roughly, employment in the building industry in Port-au-Prince
may, therefore, be around 20,000 in full-time equivalent terms with perhaps
some 35,000 people involved in all, many on a part-time basis. Country-wide,
these figures would be about 10 to 20% higher. They also do not include
employment in the production, transport, and marketing of building materials,
which may account for another 6,000 to 7,000 persons.
1/ At less than US$100 of investment per job.
[page 52]
= 30 -
2.31 From a 1971/1972 input-output table for the Haitian construction
sector (including public works) it can be estimated that local raw materials
account for some :25% of the gross value of construction and imported materials
for another 12.8%, with the share of transport at 5.5% and services (including
banking, engineering, etc.) at 12.6%. Of the 44% of value added in the
sector, some two-thirds are estimated to accrue to labor. As mentioned
before, some further scope exists for substituting local manufacture for some
of the imports, particularly in ceramic-based sanitary equipment.
2.32 The future of building activity is relatively bright, on condition
that the repatriation of Haitian capital continues and, more importantly, that
adequate systems of long-term housing finance are established (see Chapter
111). There is a severe shortage of housing, especially in the low and middle
income categories, in all urban centers but effective demand is severely
constrained by lack of suitable financing mechanisms. ‘If these are estab-
lished, employment in building could more than double by 1986.
2.33 Little is known about the problems of the building industry.
No government institution has a clear responsibility to investigate its
problems and provide what assistance may be required. The Ministry of Public
Works provides some support to public works contractors, mostly through a
° small equipment leasing operation, but has not developed a coherent data base
on the sector. This situation is likely to improve.with respect to the public
works part of the construction industry, following the recent creation of a
heavy equipment leasing service (SLELC - Service de Loëéation d'Equipment Lourd
de Construction) by the DTPTC. An attempt at surveying the construction
industry by the Ministry of Industry änd Commerce failed for lack of response
from the enterprises. It is generally known that skill and vocational train-
ing problems are similar to those in manufacturing and crafts and, in some
provincial towns, both skilled workers and supervisors have to be brought in
from Port-au-Prince for any building other than traditional wattle-filled,
wood-framed houses with straw roofs. Much waste and loss of time occurs
because even skilled workers are not sufficiently familiar with modern con-
struction materials and foremen and supervisors are not well trained in site
management. A deliberate effort should be undertaken to investigate the
building industry and develop a proper understanding of its functions, im-
portance and problems. There is also a need for research into low-cost
building technology. . -
. E. THE INFORMAL SECTOR
2.34 The. bulk of the urban labor force is employed in the informal
sector and some 60% of .the gainfully employed in Port-au-Prince belong to it.
This proportion is-probably even higher in the regional towns, except for
the significant number of their residents occupied in agriculture. In 1975,
it was estimated that the informal sector in Port-au-Prince comprised some
194,000 people (see Annex Table 2.2). A small number of :craftsmen are classi-
fied as falling in this sector by the PPHC project, but the vast bulk of the
sector's activities is concentrated in domestic services (78,000), small
[page 53]
- 31 -
trading activities (40,000) and other activities (74,000). The latter cate-
gory is labelled “other services" by the PPHC project but this is probably a
misnomer. It is in effect likely that this figure includes many casual
‘ laborers, like those that might work in construction activities and, on the
basis of an in-depth study of the St. Martin slum neighborhood 1/, a consid-
erable amount of income in the informal sector:is generated by manufacturing
activities.
2.35 Such projections as exist of the size of this sector indicate
that it will practically not decline in relative importance for years to come.
The IHS has projected that, from 61.4Z of urban "employment" in 1976, the
sector will move to 60.2% of urban "employment" in 1986. 2/ Over the same
period, the number of people engaged in informal activities is projected
to rise from 196,000 to 322,000 in Port-au-Prince and average value added
per job in informal activities to deteriorate.
2.36 Given the numerical importance of the informal sector and its pre-
dominant role in providing income to the poor, it is unfortunate that more
is not known about its workings and problems. The only insights we have now
come from the above cited study on Families in Port-au-Prince, etc., and
some of them can be summarized as follows: 3/
(a) A significant proportion of the incomes of those that simply
sell their labor come from "modern" activities in circum-
vention of the minimum wage legislation. Strict enforcement
of wage laws might restrict earnings opportunities for this
group, at least in the short run. It might also lead to
substitution of capital for labor which, even if only marginal,
would be counter-productive in the Haitian context.
(b) Trade activities offer many income opportunities at earnings
levels that, in the neighborhood investigated, average US$0.60
per day with little variation between traders. Despite sea-
sonal fluctuations and heavy competition, profit opportunities
exist due to the limited availability of working capital which
restricts entry to some extent. If working finance were made
more generally available and demand did not increase pari .
passu, the net effect of new entrants into trade might be to
drive individual earnings down.
(c) Those that engage in manufacturing activities are at the same
time traders in buying inputs and selling their output. For the
trade part of their activity, similar considerations on capital
1/ Families in Port-au-Prince: A Study of the Economics of Survival by
Simon Fass, mimeographed, Washington, D.C., September 30, 1977, prepared
for and cited by courtesy of USAID, Office of Urban Development.
2/ The percentages of total employment are lower in the IHS projection than
in Annex Table 2.2 based on PPHC data because the latter table covers
only part of total employment in Port-au-Prince. In absolute terms,
PPHC and IHS figures for the informal sector are virtually identical.
3/ See Families in Port-au-Prince, etc, op.ct. chapter on Conclusions and
Recommendations, page 149 ff.
[page 54]
- 32 -
availability apply as mentioned above. However, the
problems identified and, consequently, the type of
assistance that might be fruitful to small manufacturers,
cover the whole range of business promotion services, from
better information about markets and products to better
equipment, more investment and working capital, better
techniques and management, cooperative purchasing and
warehousing services, etc.
(d) Interactions between producers and market are characterized
by heavy transaction costs, i.e., workers invest much time
in order to exploit the imperfections in the market or avoid
being exploited by them.
(e) Opportunities for government procurement of labor services
and products from the informal sector exist and should be
more fully exploited to help alleviate the demand constraint
which dominates most of the activities of the informal sector. 1/
(£) The income of most traders and manufacturers in the informal
sector is highly sensitive to the organization of space. The
impacts on earnings from informal activities of urban projects
in transportation, market facilities, harbors, housing, etc.
must be clearly understood and integrated into the analysis
of urban programs.
(g) Certain types of public infrastructure or their absence may
have significant effects upon income production processes.
Informal activities are usually highly integrated with shelter
and make slum areas significant warehousing centers and
industrial workshop areas. Disasters such as fire, flooding
or epidemics affect the ability of households to -accumulate
productive resources. Improvements in disaster prevention
will markedly strengthen income earning capabilities and
can be justified on economic grounds.
(h) Financial assistance needs to be applied selectively. While
only a small proportion of families would benefit from cheaper
credit (interest rates are now as high as 60% per month), it
is for them a precondition for productivity change, innovation
and experimentation.
2.37 The major conclusion that emerges from this study is that the
informal sector, in all its diversity, is a sensitive tissue of relation-
ships producing a livelihood of a sort for a large number of people which can
and should be helped. Assistance must, however, be carefully tailored to the
circumstances of the people it is supposed to benefit. Unconsidered inter-
ference could be disastrous. The study needs to be repeated in other neigh-
borhoods of the city and translated into actual policy proposals and action.
1/ Although this is not explicitly addressed in the study, the Haitian ex-
— perience with labor-intensive methods, both in the building sector and
in some government infrastructure works such as the feeder roads program,
should provide a good basis for using labor-intensive methods in slum-
upgrading and sites and services schemes.
[page 55]
- 33 -
F. SUMMARY AND CONCLUSIONS
2.38 Conceptual difficulties and almost universal lack of reliable and
comprehensive statistics inhibit a clear analysis of employment problems in
Haiti. However, unemployment, underemployment, and very low productivity
jobs are clearly a major problem that affects more than half the labor force.
Labor force participation rates are high at more than 50% and nearly 75% of
the labor force are active in agriculture, the major employer.
2.39 While the labor force in rural areas will stagnate or continue to
decline slightly, that in urban areas will grow by some 4% per annum in the
next ten years. This will exacerbate the employment problem in urban areas.
Modern manufacturing, which now accounts for less than 10% of total urban
employment and about 13% of GDP, may absorb only 12 to 13% of this increase.
While construction and crafts are also likely to absorb parts of the increase,
the bulk of the additional labor force will have to earn a living in the
. informal sector. As a result, average earnings in informal activities are
likely to decline relative to other earnings opportunities in urban areas.
- 2.40 Industrial development is not one of the top priorities of the
development plan and industrial policy is insdequately developed. Three
objectives are, however, emerging, 1.e., increases in exports, particularly
of labor intensive manufactures, the replacement of export assembly indus-
tries by those based on national resources and decentralization to the pro-
vinces. All three of these objectives face severe implementation problems.
2.41 In the 1970s, industrial production, employment and exports were led
by export assembly industries, mostly consumer goods manufacturing. Export
prospects continue to appear brightest in such industries, as long as the
favorable conditions that attract them are maintained. However, their links
to the national economy remain very limited, and it should become an objective
of public policy to realize the potential for increasing the local value added
of the assembly operations. Replacing them in the country’s export perform-
ance by resource based industries is, however, severely constrained. Unex-
ploited mineral resources are mostly in building materials and brown coal,
which are unsuitable for vigorous export growth. The recently discovered
copper ore body, if commercially viable, could not contribute to exports until
the mid-1980s. Agro-based industry potential depends on the success of the
agricultural development effort which will take time to achieve. Until then,
potential for agro-based manufacturing exports is limited to fruit and vege-
table canning and exports made possible through the modernization and quality
control of essential oîls production. These should be vigorously pursued.
2.42 Fairly good export prospects also exist in crafts. The market
share of Haïtian products in the US, which 1s the major client, is no more
than 2 to 3%, and Haitian products are just beginning to enter the European
market. To exploit the potential, the government will have to pursue a cohe-
rent and dynamic policy of crafts development, especially in marketing and
product development but also in raw material supply, finance and crafts
[page 56]
- 34 -
training. The recently created National Crafts Office has the mandate to do
so and should be made operational, with adequate resources and as a matter of
priority.
2.43 A number of conditions prevent industrial decentralization away
from Port-au-Prince, which now accounts for over 90% of employment and wage
payments, from becoming a reality. Industrial infrastructure in the provin-
cial towns such as water, power, transport, and telecommunications is in
short supply or more costly. 1/ Institutional finance for industrial invest-
ments is practically only available in Port-au-Prince. Recent measures to
encourage decentralization through fiscal incentives provide only minor
stimuli to locate outside the capital. The minimum wage legislation does
not include any incentive to locate plants in the regions and the National
Electricity Tariff, now implemented, simply removes the past preference in
favor of Port-au-Prince but provides no compensation for the higher transport
and administrative costs of operating in the provinces. Projects are underway
or planned on many infrastructure improvements but will not match the Port-
au-Prince facilities, which are themselves not without shortcomings, for
years to come.
2.44 The building industry has good prospects providing that return
flows of Haitian capital continue and, above all, that adequate housing
finance mechanisms are developed. But knowledge of the prospects, importance
and problems of the building industry is practically non-existent. The DCI
should be asked to develop such knowledge and act upon it to develop the role
of the construction industry in the economy.
2.45 Similarly, knowledge of the workings of the important informal
sector needs to be developed beyond the partial understanding now available.
The sector provides a living of a kind to some three-fifths of the urban
population and will not appreciably decline in relative importance while
continuing to grow rapidly in absolute terms. Its numerical importance for
the urban poor makes it urgent to devise assistance to these activities and
to carefully develop modes of intervention that will not endanger its func-
tioning. Tentative ideas for such assistance are available but must be
developed into concrete policy proposals and supported by further analysis
of the situation in the sector. :
2.46 Throughout the urban employment spectrum, sustained efforts must be
made to improve technical and vocational training. Most training is now done
without reference to a comprehensive human resources development strategy,
with inadequate quality and quantity of teachers and didactic materials and
almost always without reference to the needs of entrepreneurs. No coordina-
tion exists between the multitude of organizations active in the field.
Initial efforts to address these problems through the INFP need to be pursued
vigorously and on a sustained basis. At the same time, consideration should
be given to the creation of an extension service to assist small enterprises
with technical and managerial problems. No such service exists at the moment,
although the BHPI provides some help on a selective basis.
1/ Among these, it is reported that insufficient and unreliable power supply
_ is considered the most serious constraint by potential investors.
[page 57]
_ 35 _
CHAPTER III. URBAN SERVICES
À. SHELTER — PORT-AU-PRINCE 1, /
3.01 Housing conditions in Port-au-Prince are poor. About 134 of all
dwelling units are made of scrap materials, 19% of wattle and straw and
another 32% of wod. More than three-quarters of the homes in the city
are not connected to the water supply system. Residential densities are very
high. In 1976, an estimated 132,000 dwelling units in the city housed 640,000
people. The number of independent structures, however, is very much smaller,
because many buildings have anywhere between two and eight rooms, each occu-
pied by separate Llow- and middle-income households, and many rooms are shared
by gore than one family. Sixty-one percent of dwelling units offer less than
3 m per resident and 43.7% of the urban population occupy about 12% of
. residential land at gross densities in excess of 800 persons per ha.
3.02 Table III-1 gives estimates of gross residential densities in the
city. The higher of these densities, unusual for one-storey residential
areas, reflect high demand from low-income families for residential space
in proximity to work-places in the downtown area. Though there has been
considerable growth of low-income residential areas on the periphery of the
city, the built-up areas continue to grow denser. For example, extrapola-
tion of 1971 census data in combination with an analysis of aerial photo-
graphs made in 1973 indicated that the population density of the St. Martin
neighborhood was then about 1,500/ha 2/. A complete survey indicated that, by
1978, density had increased to over 1,600 persons/ha. 3/
1/ See maps on Port-au-Prince City Orientation and Residential Population
Density.
2/ Project "Planification Physique, Habitations et Construction": Plan de
Developpement de Port-au-Prince et de sa Region Metropolitaine. Phase
III, Vol. V: Habitat, UN Project HAI/SD 09 70. Port-au-Prince, February
1976.
3/ Information Supplied by DATPE, Ministry of Planning.
[page 58]
- 36 -
Table III-1: GROSS RESIDENTIAL DENSITIES IN PORT-AU-PRINCE, 1976
Density Class Population % of m per
(persons/hectare) (’000) Population resident (gross)
— 199 89.7 14.1 > 50.0
200 - 399 111.5 17.4 50.0 - 25.0
400 - 599 86.5 13.5 25.0 - 16.7
600 —- 799 72.0 11.3 16.7 - 12.5
800 —- 999 77.0 12.0 12.5 - 10.0
1,000 - 1,199 90.0 14.1 10.0 - 8.3
1,200 - 1,399 80.0 : 12.5 8.3 - 7.1
1,400+ 32.0 5.1 < 7.1
Source: World Bank estimates based on "Plan de Developpement de Port-au-
Prince, etc." Vol. V: Habitat, op. cit., and on "Families in
Port-au-Prince, etc.," op. cit.
3.03 With high gross densities and the prevalence of one-storey struc-
tures, the average size of dwelling units tends to be small. PPHC 1/
estimated that the average size of 43% of the urban housing stock is about
10 m , and another 16% is about 15 m”. Dwellings averaging 40 m° constitute
25% of thg stock, reserved for higher income groups, and only 13% are larger
than 60 m°. These figures indicate that most families, given the price
structure for land, construction and rent, the lack of adequate credit
mechanism, the existence of other expenditure priorities such as food and
water, and the out-of-pocket and time costs of commuting cannot spend more
than required to obtain a bare minimum quality and quantity of housing.
Land
3.04 Due to the non-existence of either a cadastre or published informa-
tion on land transactions, it is impossible to obtain comprehensive and
accurate data on the characteristics of the market for land. From partial
information based on private records of real estate brokers, PADCO estimates 2/
that, in 1973 and 1974, about 2,000 larger land transactions took place for a
total of US$10 million. About 10% of the transactions were of the order of
US$20,000, 40% of the order of US$5,000 and 50% of the order of US$2,000 each.
Roughly 40% of the land was sold for residential use, 40% for industrial use,
and 20% for commercial use. Demand was concentrated in areas occupied by
large industrial and commercial concerns and by high-income homes.
3.05 Lot and parcel sizes vary throughout the city. In the residential
areas of Carrefour, Turgeau, and Bois Verna they are of the order of 120 to
1/ Plan de Developpement de Port-au-Prince etc., Phase III, Volume V,
_ Habitat, op. cit.
2/ Ibid.: includes only transactions processed by or large enough to be
= known by brokers and notaries. See also map on water consumption
and land prices in Port-au-Prince.
[page 59]
150 m2 because of heavy demand by low- and middle-income groups for residential
space in proximity to work places and urban services. In newer and less dense
areas, such as Delmas and Diquini, subdivisions are of the order of 400 to
550 m2. On the periphery of the city, where the highest-income groups live,
such as Petionville and Laboule, lots are about 1,000 m .
3.06 Land values in the city average out at US$8 per mn? with dowmtown
values averaging from US$50 to US$150, older built-up residential areas from
US$10 to US$20, newly developing areas from US$5 to US$10, and peripheral
areas from US$1 to US$S5. As expected, variations reflect desirabilities
associated with the proximity to major thoroughfares or the coastline,
with panoramic views, etc. .
3.07 It is clear that the land prices are high relative to the income
levels of the Llow-income population and the savings levels which suçh incomes
permit. A US$300 land investment, which would gither secure a 15 m lot in
the built-up areas of the city or a 60 to 120 m° lot on the periphery, is
beyond the reach of most low-income families since financing mechanisms with
reasonable maturities are not available (see below), and legal and fiscal
transactions costs may run as high as US$30-US$40 for such a purchase.
3.08 Supply of land to low-income purchasers is also constrained. Land
is held by a relatively limited number of urban property-owners with rela-
tively large holdings, many of which held for speculative purposes. Sale
or leasing of small lots for low-income residential use might tend to deflate
the attractiveness of the remaining property. Furthermore, if the owner
wishes to develop the property himself for other purposes at a later date,
he would have to incur considerable administrative and financial costs for
displacing large numbers of people. Consequently, the number of property-
owners who are willing to sell or lease to low-income customers tends to
be limited.
Construction Costs
3.09 Construction costs for housing vary from a low of US$7/m° ,£or
structures built of wood and scrap materials, to a high of US$140/m for
structures built of concrete with reinforced concrete roofs. Costs also
depend on the scale of construction (i.e., material costs are higher when
bought in small amounts), the infrastructure services included, the type
of labor and the building methods used. The cost of materials used in
house-building has increased rapidly as a result of increased demand,
decreased supply (local wood) and increases in the cost of energy used
in production of cement and steel. Table 3.1 in the Annex indicates
materials prices in 1976, the increase in some of them since 1970 and
price differentials associated with different scales of purchase.
3.10 Where construction is carried out with hired help, the cost
of labor varies with the type of building and with the contractual
[page 60]
‘ - 38 -
arrangements between builder and worker. Generally speaking, for most low-
and middle-income housing, unskilled labor will earn less than the minimum
wage and the wage bill will be between 20% and 25% of total construction
costs. Somewhat higher wage rates and labor cost proportions apply in high-
income buildings. 1/ Though the unit gosts appear, to be regsonable for a
low-income family, ranginge from US$7/m to USS50/m°, a 15 m house will still
require an investment of between US$105 and US$750, in addition to the price
of land.
Housing Finance 2/
3.11 Given the level of land prices and construction costs, one key
element necessary to make the market for land and dwellings accessible to
low-— and middle-income groups is appropriate finance. Prior to 1963, mortgage
loans for land purchases were quite commonly issued by private individuals
active in the market. In 1963, a law on reassessment of land was promulgated
that aimed at reducing the insolvency of debtors by requiring that creditors
pay their debtors whatever increase in the value of the land had occurred
since the loan was issued, prior to forcing its sale for a loan in default.
Creditors now assumed the resale risk and could no longer count on prior
debtor land improvements to cover interest in default and resale transaction
costs so that this form of mortgage loan has all but disappeared. 3/
3.12 In Port-au-Prince, short-term private loans are available at a
secured interest rate of about 25% per month and an unsecured rate of about
60% per month. 4/ These rates are generally too high-for the purchase of
land or for the construction of a house. They are, however, used frequently
for the leasing of land and six-month dwelling unit leases. The savings in
both cases are more than enough to cover the interest payments if repayment
is made within six weeks to four months, depending on the interest rate (see
para. 3.21.)
3.13 Beyond these types of credit, mortgage finance is limited to that
available from large-scale commercial and public institutions. Since the
passage of a law in August 1975 limiting the rights of foreigners to own
property, all foreign banks and individuals have ceased to make mortgage
loans and mortgage finance is now the exclusive domain of purely Haitian
institutions.
3.14 Two major institutions, the Central Bank (Banque Nationale de
la Republique Haïtienne - BNRH) and the National Insurance Office (Office
National d’Assurance - ONA) presently provide mortgages. A third one,
1/ See Annex tables 3.2 and 3.3 for some details on wage levels and con-
struction costs.
2/ Pari passu, this discussion also applies to provincial towns.
3/ Projets et Planification en Haiti. Volume IV: Logement, CONADEP/
Louis Berger Inc., Port-au-Prince, February 1977.
4/ Families in Port-au-Prince, etc., op. cit.
[page 61]
- 39 -
the Housing Bank (Banque de Logement - BDL), may become operational in the
future (see Chapter IV). The BNRH is the more important of two main in-
stitutions active today. In 1975/76 and 1976/77, it granted mortgage loans
for residential and non-residential purposes for a total of US$4 million each
year, up 170% over the level of US$1.5 million in 1972. In 1976/77, 1,157
mortgage loans were granted, up from 900 in the previous year but average loan
size fell to US$3,500. Mortgage loans are issued to personally known custom-
ers, carry an interest rate of 12% with a maturity of only five years, and are
limited to 50% of the intended total investment.
3.15 ONA, the other main institution active in mortgages, initiated
a program of residential mortgage loans after enabling legislation was
passed in November 1974. Access to the loans is limited to those of the
58,000 individual contributors to ONA who had a perfect payment record
for five consecutive years. Initially, loans were limited to US$5,000 at
12% over five years. The fund for this purpose was then US$200,000 and
20 loans a year were made. By September 1977, funds had increased
to US$250,000, the number of loans to 33 a year and loan conditions were
changed to a maximum of US$10,000 at 8% for 8-1/2 years. Funds for fiscal
1977/78 were increased to US$500,000 and the number of loans was expected
to rise to 60 per year. 1/
3.16 When the BDL becomes operational, 2/ changes in the mortage activi-
ties of the BNRH and the ONA may occur. While BNRH mortgage lending may
continué at present levels, it may well shift to lending exclusively for
non-residentiai purposes. The ONA mortgage fund might be significantly
reduced or may even disappear. In fact, the Law of August 1974, recreating
the BDL, authorizes ONA to place a portion of its funds with the BDL with
the amount and terms to be negotiated by the two agencies.
3.17 It is clear from the above description and, in particular, from the
unusually short maturities now in force for institutional mortgage finance,
that the vast majority of the Port-au-Prince population does not have access
to housing finance. Whether this situation will change significantly when the
BDL becomes operational is far from certain. The initial OAS proposal for
setting-up the BDL included a suggestion for lending to low-income families
with monthly incomes of US$40-US$60. This would exclude about a third of the
present urban population in Port-au-Prince and a higher proportion in the
provincial towns. However, the weight of opinion among people who will decide
such operational issues, while not being unanimous, appears to be that direct
BDL finance and housing development should focus on borrowers earning at least
$200 per month, thereby excluding more than 95% of the urban population.
1/ Some private banks, like the Banque Populaire Haitienne, the Banque
_ de l'Union Haitienne, etc., are also active in mortgage lending, but
at a very small scale. Information on their activities was not obtained.
2/ The difficulties that have delayed the start of the BDL's operations
= are detailed in Chapter IV.
[page 62]
- 40 -
Renting
3.18 With the costs of land and construction coupled with inadequate
or non-existent mortgage finance, it is not surprising that about three-
quarters of Port-au-Prince families are renters. Squatting is a very short-
lived and rare phenomenon in the city. On public lands, which the State has
not leased officially or has reserved as road easements or for environmental
reasons, such as ravine and river banks, rents are collected by individuals
charged with managing the land or with ensuring that it is not invaded
by permanent structures.
3.19 Four basic types of rental arrangements are practiced. First is
the weekly rental of a dwelling unit usually made by the lowest income
families, about 8% of renters 1/ who cannot commit the larger cash amounts
required for longer periods. The homes are usually small and in very bad
condition, but still require larger proportional expenditures of income
and larger per unit rents than other arrangements. 2/
3.20 The largest groups of renters, about 40%, rent on a conventional
month-to-month basis. Households in this category tend to have incomes in the
mid-range of the poor majority or above. The poorer part of this group again
cannot or does not wish to commit larger cash amounts beyond a one-month
period. The homes pend to be of better quality than the weekly rental units
and the costs per m are far less. High-income families that live in rented
housing choose this basis because they save nothing by longer-term leases.
3.21 Low-income renters, however, get a 50% reduction in the rental
charge, if they prepay rents for 6 to 12 months and 33% of the rental popula-
tion do so. Families renting in this manner usually have the same income
levels as low-income monthly renters but, systematically, dispose of larger
amounts of working capital and perceive a lower opportunity cost for com-
mitting cash for 6 to 12 months. Quality and size of the dwellings will be
the same as those rented on a monthly basis. Rental options thus permit
families of equivalent size and income to obtain equivalent shelter at
completely different rates. The choice depends less on income per se and more
on the perceived value of cash over time.
3.22 Finally, about 18% of renters lease land on long-term and build
their own units. Families in this category tend to be in the upper strata
of the low-income and in the middle-income ranges. The lack of security
on the land obliges these families to build relatively primitive shelters
which can be taken down and transported to another location at the expiration
of the lease, so that the outward appearance of houses in Port-au-Prince is
1/ The percentages of renters practicing the different types of arrangements
: are indicative only, since they are based on a small sample.
2/ Families in Port-au-Prince, etc., op. cit.
[page 63]
- 41 -
not an accurate indicator of the economic status of their inhabitants. It
should be noted also that many renters sublet. There are no legal or cul-
tural norms which control subletting practices.
3.23 In edition to this housed population, there may be some 30,000
people who sleep in the streets. 1/ Some of these are members of households
which have homes which are too small to contain all members at one time, 80
they have to sleep outside in shifts. Others are market women who commute
from rural areas each week and sleep near their goods in the markets. A
third group may be families who temporarily cannot afford a weekly rental
and who cannot move in with family or friends. Finally, there are single
men without household attachments who have very low earnings, do not accumu-
late possessions, and find little usefulness in housing. The actual number
of people who "need" housing but cannot afford it over extended periods is
far less than the 30,000 figure would suggest.
Housing Demand Projection
3.24 The data base for estimating housing demand in Port-au-Prince is
weak. À rough approximation of the price-income elasticity of demand has
been made recently by Louis Berger International, Inc., consultants to CONADEP
for the preparation of the 1976/81 National Development Plan. 2/ It was based
on sociceconomic data gathered by the Institut Haitien de Statistiques in
1970. 3/ The firm arrived at an aggregate income elasticity for housing of
about 0.73 across the Port-au-Prince population. Combining this figure with
the estimated rate of household formation in Port-au-Prince of 5.3% p.a. and
household real income increases of 1% p.a. 4/ results in a rate of growth of
investment in housing of 6% p.a. through 1981. Applying this rate to the
estimated level of housing investment in 1976 of US$28.7 million results in
a total investment of US$171 million over the period 1976/81. The estimated
distribution of this investment by type of housing is given in Table III-2
below. This very crude estimate does not account for the possible effects
of increased financing of low- and middle-income housing, which might move
effective demand for housing to a higher level. The impact of better housing
finance, however, is unlikely to be significant before 1981.
1/ Families in Port-au-Prince, etc., op. cit.
2/ Projets et Planification en Haiti, Vol IV: Logement, op. cit.
3/ Enquete Socio-Economique (April 1970), Premiers Resultats, IHS, May 1975.
4/ This may be too conservative.
[page 64]
- 42 —
Table III-2: ESTIMATED HOUSING INVESTMENTS IN PORT-AU-PRINCE
1976-1981 - US$ 1976
Average Cost Number of Total Capital Percentage of
Per Unit (US$) Units Investment. (USS) Investment
400 27,000 11,000,000 6.5%
6,000 6,000 30,000,000 17.5%
20,000 5,000 100,000,000 58.54
Repairs - = 30,000 ,000 17.5%
TOTAL 38,000 171,000,000 100.0%
Source: World Bank estimated based on: Projets et Planification en Haïti,
Vol. IV: Logement, op. cit.
Shelter Policy and Activities
3.25 There is currently no single institution or group of coordinated
institutions which have developed anything resembling a coherent national
or urban housing strategy or policy. The housing section of the five-year
plan is more a collection of projects than a statement of policy. There
are, however, four public agencies and some private organizations that
have activities relevant to the housing sector, not counting the financial
institutions already mentioned. The relationships among these institutions
are discussed in detail in Chapter IV. This section will describe the acti-
vities of the National Housing Office (Office National de Logement - ONL) and
the evolution of the UNCDF-financed pilot projects for slum-upgrading and
sites-and-services.
3.26 The ONL was created in 1966, is under the supervision of the
Ministry of Social Affairs and, within its very wide mandate, administers
all public housing projects executed thus far. These are listed in Table
I11-3. All these projects wre constructed under the auspices of the Depart-
ment of Public Works and then placed under the management responsibility of
the ONL. Some of the projects in the list, in particular Cite 1 and Cite 2
and the project in Gonaives, consist of middle-income housing. In Port-au-
Prince, only some 1,370 dwelling units presently managed by ONL can be
considered low-income housing. This represents the bulk of past public
activity in low-income housing and is obviously marginal at best.
[page 65]
-43-
Table III-3: PUBLIC HOUSING PROJECTS MANAGED BY THE ONL
Original
Number Construction Monthly
Project Name/Location a/ . of Units Cost (US$) Receipts (US$)
Port-au-Prince
Cite No. 1 115 b/ 130,000 1,040
Cite No. 2 229 b/ 435,000 &,600
Simone 0. Duvalier 1,197 _ 0
Jean Claude Duvalier 128 230,000 0
Croix Rouge 48 - 0
Gonaives 19 = 120
Cayes ° 14 - 11
Jeremie 185 31,000 0
Cap. Haitien 32 - 25
Port de Paix 20 — 16
Total 1,987 _ 5,800
a/ Dates of construction are known only for Cite No. 1 (1955/58),
Cite Jean Claude Duvalier (1975), Croix Rouge (1971) and Jeremie
(1966).
b/ Includes only homes not yet transferred to buyers. Homes in
these two projects are being sold to residents over a 20-year
period.
Source: Projets et Planification en Haiti, Vol. IV: Logement, op. cit.
3.27 Most of the low-income units provided to date are well over 20 years
old. Since 1971, the 128 dwelling units in the Cite Jean-Claude Duvalier,
built in response to the 1975 downtown fire that displaced 5,000 people, were
the only sizeable low-income (although relatively high-cost) housing project.
A previous fire in 1972, that displaced 6,000 people living near the central
market, led to the joint government/church effort that provided unserviced
sites on public marshland at Brooklyn, on the northern periphery of the city.
Another relocation program on unserviced lots, involving the removal of 1,000 .
families in the path of the port expansion, is currently underway in an area
called Boston, located next to Brooklyn. One can, therefore, state that
since 1971, public action has or will provide housing and ‘'sites without
services" to up to 18,000 people, none of which represents an addition to
the low-income housing stock but simply relocation. This is well below the
Port-au-Prince population increase in a single year.
3.28 Over the years, several of the many private voluntary organiza-
tions that operate in Port-au-Prince have also attempted small-size efforts
[page 66]
.— 44 -
in the housing field. These have mostly been unsatisfactory because a
combination of high design standards and low incomes of the target groups has
resulted in low repayment schedules and the depletion of investment funds.
3.29 The St. Martin slum-upgrading 1/ and Drouillard sites-and-services 2/
projects financed by UNCDF are the only sizeable public shelter projects
nearing the implementation phase. Staffing of the project unit has started
in March 1979 and is to be essentially finished by mid-year. The St. Martin
project affects a population in excess of 20,000 and the Drouillard project
will provide serviced sites or, possibly, more complete shelter to 1,000
low-income families. Both were prepared by DATPE/CONADEP/UN staff on the
basis of previous work by PPHC. The Foundation for Cooperative Housing (FCH)
has evaluated these proposals, and assisted in preparing the project docu-
ments. 3/
3.30 A detailed analysis of the two projects and their evolution reveals
a number of problems. First among these is the cost increases since early
1976. 4/ The St. Martin project, initially costed by PPHC at US$401,000 is
now expected to require US$3,210 million 5/ and the cost of the Drouillard
project has risen from US$682,000 to US$1.53 million. A large part of these
increases can be traced to decisions to upgrade the services provided. In St.
Martin, the decision to upgrade the planned paved pathways to wider roads
suitable for vehicle access has led to an increase in displaced families from
220 to about 740, which means the relocation of some 15% of the St. Martin
population.
3.31 In parallel, it was also decided to impose building standards for
about 600 housing units for the displaced families in St. Martin itself,
rather than simply provide the bare or semi-prepared lots initially foreseen.
Financing of these units for costs other than labor is now included in the
project. For the Drouillard project site, cost figures for one of the possible
variants now include the construction of 1,000 houses at US$750 each plus 10%
contingencies, but design work is less advanced than in St. Martin and the
degree of home completion to be provided by project management is not yet
decided. :
1/ Avant-Projet pour la Rehabilitation du Quartier St. Martin, CONADEP/
UNDP--Projet HAI/77/007, Port-au-Prince, October 1977.
2/ Esquisse de Projet Pour Parcelles Assainis/Drouillard, CONADEP/UNDP
Projet HA1I/77/007, Port-au-Prince, October 1977.
3/ Assessment Report of the UNCDF on Proposed Sites and Services and
Slum Rehabilitation Programs in Port-au-Prince, FCH International Inc.,
March 1977.
4/ See Annex Tables 3.4 and 3.5 for details.
5/ Including the cost of technical assistance and management of both
projects.
[page 67]
- 45 -
3.32 Another source of rising costs is the complex management structure
for the projects (see Chapter IV). Costs for project management now stand
at US$1,312 million or 28% of total project costs. Significant savings
could have been made if the Administration Generale des Contributions,
the Ministry uf Social Affairs and the competent services of the DTPTC had
been involved with their regular functions. It is also doubtful that as many
as seven foreign experts should be involved. If the project is too sophis-
ticated for local capabilities, which is not certain, it might have been more
appropriate to maintain lower design standards.
3.33 Another problem is the absence of a cost-recovery schedule for the
expected outlays. This is important because at the St. Martin cost of US$104
per caput, excluding the large technical assistance element, the price of
upgrading the high-density slum areas occupied by another 306,000 residents of
the city would amount to nearly US$32 million at 1977 dollars. A significant
part of the cost of upgrading schemes, such as for road building, should be
borne, as usual for this type of investment, by the general budget. Other
types of improvements should, however, be financed by the beneficiaries. The
St. Martin project team is expected to define a cost recovery schedule from
beneficiaries. Only when this becomes available will it be possible to assess
the budgetary consequences of extending the St. Martin approach to the rest of
the slums in the capital and whether and over what time span it will be pos-
sible to upgrade the Port-au-Prince slums in this manner. As for Drouillard,
the site was partly chosen because of its proximity to employment opportunities
in the coastal shipping port, the industrial estate and northern truck terminal,
the latter possibly associated with a decentralized market. It is, therefore,
hoped that the Drouillard scheme will attract a clientele that is able to pay
for homes costing up to US$825 each on plots costing about US$95, despite its
peripheral location and the discouraging drainage problems on the site. Before
a final decision is taken on the design standards for this project, it might
be advisable to inquire into the characteristics of the population planning to
relocate to Drouillard and their ability to pay.
3.34 The projects are also affected by a number of design questions
relating both to physical design and to management, such as relying primarily
on cooperative approaches for house building and management of the revolving
fund, in St. Martin. Cooperative approaches are not in the tradition of the
urban population and doubts are permitted whether and how quickly they can be
made to function adequately. Also, a precondition for start-up of the St.
Martin project is the reconstruction of the Rockefeller drainage canal through
the middle of the neighborhood. This is part of the IDB drainage project
discussed below. 1/ The Rockefeller canal would be given priority in actual
construction work, which is scheduled to start late in 1979 or early 1980.
This is rather late in relation to the time schedule of the UNCDF project. If
the government decides to rehabilitate the canal before implementation of the
IDB project, IDB is sympathetic to reimbursement of the cost, provided
1DB's design and labor-intensive construction methods are followed. However,
1/ See Section B below for details.
[page 68]
the Service de Genie Municipal, 1/ which was the relevant executing agency,
was not aware of the immediate need to begin construction.
3.35 A number of other shelter proposals have been made since 1972.
Apart from the Port-au-Prince shelter programs develped by PPHC, which
served as a starting point for the UNCDF projects, none of them have so
far progressed towards implementation. This is also true for the five
projects that make up the shelter component of the five-year plan and for the
middle income housing project of the ONL that is not included in the plan.
B. ENVIRONMENTAL MANAGEMENT - PORT-AU-PRINCE
3.36 The issues of stormwater drainage, erosion, solid and liquid waste
collection and disposal in Port-au-Prince are closely interrelated elements
of the single problem of urban environmental management and are therefore
discussed as a group under that heading.
Stormwater Collection and Disposal
3.37 Most of the stormwater drainage system in Port-au-Prince was
built between 1910 and 1920. In 1949, the drainage channels were extended
through the landfill along the downtown shoreline, which became the site
of the International Exposition. These man-made elements are complemented
to the south and east by a series of natural drainage ravines which run
down the slopes of Morne l'Hopital, a hill rising steeply behind the city
to an altitude of 1,000 m. ‘
3.38 Stormwater flows down the steep ravines into open drainage channels
and then through stormsewers to the sea. Eroded material carried by the
runoff is supposed to deposit in a number of settlement basins scattered
throughout the flatter portions of the system. However, the large quantities
of eroded material, variously estimated at between 100,000 and 200,000 tons
a year, quickly fill the settlement basins and many become full after a single
storm. Boulders, stones, gravel and sand therefore pass over the barriers
into the lower reaches of the system. As runoff speeds decrease, the material
progressively settles into the open channels and sewers, especially in the
very flat downtown areas near the landfill zone. As a result, the drainage
system is heavily obstructed for most of the year and general estimates
suggest that flow capacity is reduced by 75% in the downtown area and by
50% in areas peripheral to the centre. 2/ This results in flooding of various
parts of the city during each storm and more extensive flooding after each
subsequent rainfall as flow capacity is further reduced. 3/
1/ The law of July 19, 1978 has modified the organization of the DTPTC
_ and the construction would now be under the responsibility of the
Service de Construction et de Supervision.
2/ Etude et Avant - Projet des Reseaux d'Egouts et d'Evacuation des Eaux
T Pluviales. Engineering Science Inc., and McLaren International Ltd.,
Port-au-Prince, 1972.
3/ See Port-au-Prince City Orientation map for areas subjects to flooding.
[page 69]
- 47 - ‘
Erosion
3.39 The degradation of the drainage system through erosion materials
is a relatively recent occurrence. Among the contributing factors should
be mentioned:
(a) the destruction of the ground cover on the slopes of the
Morne l'Hopital through deforestation, goat grazing and
corn cultivation; ‘
(b) uncontrolled urbanization and road-building projects on
the lower slopes of the mountain which are being carried
out without appropriate drainage facilities;
(c) suspension of work on the "Canape Vert" road from the city
to Petionville. The unstabilized roadbed that was cut for
6 km alongside a major drainage ravine is a major source of
material washed into the drainage system; 1/
(d) construction of another badly drained road with similar,
though less disastrous, impact from Boutilliers, at the
top of the mountain, to the Sanatorium near the center
of the city; and
Ce) the major sand quarry on the south face of Morne l'Hopital
which exposes several thousand square meters of loose sand
to the rain. Erosion material from this area does not
yet affect the central part of the city but it drains
around the mountain to affect the western urban periphery
at the mouth of the Riviere Froide in the Carrefour area.
Flood Damage and Costs
3.40 The design of the drainage system is adequate to carry rainwater
from severe storms most of the time but not for transport of as much solid
material as it is forced to carry today. 2/ Thus, flooding is regular during
the rainy season and gets progressively worse as water absorption capacity of
the soil and the carrying capacity of the drainage system both decrease.
3.41 On the flatter slopes of the downtown area the drainage system
simply fails to function during storms. Water and mud flow through the ‘
1/ While the completion of the road would reduce or stop the erosion
material coming from the road itself, it would also make adjacent land
more valuable and lead to more residential development and increased
runoff. The alternative is to restore the site of the road to its
original condition.
2/ In addition to erosion materials, the system is widely used for disposal
of solid waste, which is dumped into the system directly or washed
into it from hillsides, streets and empty lots (see below).
[page 70]
- 48 —
streets and stagnate in the shoreline landfill area, allowing the sediment
to settle. The health hazards associated with continual flooding in the
downtown area are compounded by the presence of solid and human waste in the
stormwaters and its infiltration into the drinking water distribution system
which is under irregular internal pressure with pipes lying exposed on the
surface of many streets.
3.42 Eroded materials and other solid waste flushed down the Bois de
Chene ravine settles in part at the mouth of this ravine, located at the
souther end of the downtown area. This area is used as a landfill and the
debris cleared from the drainage system and from the streets after flooding
is deposited there. Between the closing of the garbage dump near the central
market in mid-1976 and the opening of the new dump north of the city late in
1977, the city”’s garbage was also deposited there. Part of the material,
however, is pushed out to sea and causes silting of the harbour which re-
quires periodic dredging.
3.43 À conservative estimate places the value of private property
losses in the city at around US$500,000 per year, 1/ but the degeneration
of the draïînage system also leads to important increases in public expendi-
tures necessary to cope with the problem. A recent estimate 2/ places the
maintenance cost of the drainage system alone at about US$100,000/year,
excluding crisis allocations for additional day workers and equipment and
dredging of the harbour area each season. Additional costs arise from the
repair of damaged or destroyed roads and bridges, which can be estimated to |
have cost, since 1974, some US$600,000 3/ or about US$200,000 p.a. Finally,
the Service de Genie Municipal of the Department of Public Works, which is
in charge of construction and maintenance of roads, bridges and the drainage
system has requested the acquisition of about US$500,000 worth of equipment
for these operations.
3.44 Pending a thorough rehabilitation of the system, some of this
expenditure could be avoided through better management of available resources.
Instead of using extraordinary allocations after disaster strikes, much of the
damage could be avoided by deploying additional workers to fully clear the
drainage system during the dry period prior to rains. The higher regular
clearance costs for the Department of TPTC might be more than compensated
for by reduced capital repair and maintenance cost of other agencies involved
in things such as street cleaning. In any case, dry period clearance of
settlement basins, channels and sewers is inadequate; workers and equipment
are used then for road and bridge repair and construction.
1/ Etude et Avant-Projet des Reseaux d’Egouts, etc., op. cit.
2/ PPHC, Plan de Developpement de Port-au-Prince et de sa Region Metropoli-
taine. Phase III,Volume III: Infrastructure, UN Projet No. HAI/74//R40,
CONADEP/TPTC/PADCO, Port-au-Prince, February 1976.
3/ Reconstruction of bridges destroyed on Route Delmas, Route de L’Aeroport,
Ruelle Nazon (in progress), Ave. Charles Summer (in progress), repair of
a fallen portion of Ave. Panamericaine, reconstruction of drainage works
at Bois Patate plus a number of smaller repair works underway at the time
of the World Bank mission visit. See Port-au-Prince City Orientation map
for location of destroyed bridges.
[page 71]
- 49 - .
3.45 There has also been some misconceived expenditure. In 1975, the
Service de Genie Municipal bought two sewer-cleaning trucks for US$60,000
which are useless for cleaning the gravel, boulders, and compressed solid
waste that obstruct the system. Another example is the reconstruction
of the drain?ge works at Bois Patate which were destroyed in October 1974
because the arainage channels under the street had become blocked. To attack
the cause rather than the symptom of the problem, it would have been necessary
to r-ntrul upstream erosion and to have an effective clearing program. Some
check dams and settlement basins were built upstream but, in the absence of
regular clearing, the drainage channel again became obstructed. During a
storm in November 1977, the upstream check dams and a bridge were damaged.
The pattern of 1974 is repeating itself and costly investments are literally
going down the drain. Other current reconstruction programs such as that of
the bridge on Ruelle Nazon have similarly short life expectancies if the root
cause of the problem is not addressed.
Solid Waste Collection and Disposal
3.46 Port-au-Prince currently produces an estimated 125,000 tons of
solid waste per year, or about 340 tons per day. Eighty percent is produced
by private households, 10% in urban agricultural produce markets and 10%
by large-scale commercial and industrial enterprises. The figure is net
of reusable materials, since marketable solid waste such as papers, card-
board, tin cans, boxes, bottles, crates, scrap metal, etc. is generally
recycled through the numerous scavengers and scrap merchants to the small-
scale manufacturing, commercial and construction sectors. Except for that
part of waste that is fed to goats and pigs, this is the amount public
agencies should collect and dispose of.
3.47 Two public agencies are responsible for solid waste collection
and removal, i.e., the Service de Voirie et Transports and the Service
de Controle, both of the Municipality and one, the Service de Genie Municipal
of the DTPTC, is involved in practice through its drainage clearing activities
(see Chapter IV). Actual collection of waste by these agencies is inadequate.
The most recent estimate 1/ is that only about 35% of solid waste produced in
the city, i.e., 45,000 tons p.a. is actually collected on a regular basis.
About 85 tons a day are collected by the trucks of the Voirie, 15 tons by
COVELSA, a private company under contract with the municipality and 25 tons by
the Service de Genie Municipal from the drainage system. The remaining 80,000
tons accumulate in the streets, ravines and other unofficial dumps where waste
is sometimes burned, sometimes used as a feeding ground for domestic animals
and always used by rats. During the two rainy seasons most of the previously
. uncollected waste is deposited on downtown streets, in drainage canals and
sewers or swept out to sea. The three public agencies combine their efforts
then and most urban solid waste is finally removed.
3.48 The accumulation problem is critical in the central produce market
of Croix des Bossales, located in a flat area between the downtown commercial
1/ PPHC, Plan de Developpement de Port-au-Prince, etc., Phase III, Vol. III:
Infrastructure, op. cit.
[page 72]
- 50 -
district and the maritime port. It is poorly drained and every major rainfall
sweeps tons of mud into the area, which is added to the agricultural waste
produced by up to 50,000 small-scale traders and manufacturers and 200,000
daily customers. The Service de Controle used to assign only 11 workers and
wheelbarrows to this zone. Mud and debris pile up quickly under the market
and, for most of the year, are up to 1 m deep with market transactions taking
place on top of the pile. À large-scale clean-up effort, undertaken in late
summer 1977, was abandoned with the first rains in October and market con-
ditions quickly reverted to their previous state. However, regular cleaning
efforts were intensified during 1978 and the situation is now markedly better
although not yet fully satisfactory.
3.49 Other critical areas of accumulation in the dry season are the
ravines and streets of low-income high-density residential areas such as
St. Martin, Portail St. Joseph, La Saline, Bel-Air, Fort National, Bolosse,
Martissant, Sans Fil and Brooklyn where some 320,000 people live, or half
the urban population. Due to the lack of access routes for trucks and
wheelbarrows, the very limited number of laborers allocated to these zones
and the lack of official concern about waste accumulation in them, it is
not until the rain flushes the debris away that the neighborhoods become
partially cleared of decomposing waste.
3.50 Until 1976, the collected waste was dumped on the downtown water-
front about 100 m from the maritime port and the central produce market.
With the expansion of the port and related facilities, the dump was moved
to the area in use for depositing eroded material cleared from the storm
drainage system, 2 km further south on the waterfront. The waste was burned
there until November 1977, when a new dump was opened at the northern ex-
tremity of the city, away from inhabited areas. This dump will remain in
use until a waste processing plant becomes operational near the airport,
reportedly in September 1978. 1/ The new dump is further away and the
average number of daily round trips by the trucks of the municipality has
been reduced by 30%, This loss in productivity may be temporary if the
treatment plant, which is closer to the city, operates reliably. However,
the southern end of the waterfront continues to be used by the Service de
Genie Municipal, and the solid waste picked up through their drainage clearing
activity is still burned at that location.
3.51 Several factors contribute to the inadequate level of regular waste
collection, one of which may be insufficiency of workers and equipment (see
Chapter IV for details). More importantly, management of existing resources
leaves much to be desired. For example, on any given day, two to three of the
twelve trucks in the fleet of the Voirie are inoperative due to mechanical
1/ According to the draft contract between the Government and SOFRANIE,
the supplier of the plant, dated November 21, 1975, investment cost
of the plant is around FF16 million. The final agreement with the
actual purchase price could not be found. It is not sure that any
economic or financial analysis for the new plant was ever made. Also,
there is some doubt whether the technology used in the plant is sturdy
and reliable enough to ensure fairly regular operations.
[page 73]
- 51 -
problems. Eight more dump trucks were recently purchased to increase the
fleet, but they come from six different manufacturers which will not help
the maintenance problem. 1/ On all six compressor trucks in the fleet,
the compressor mechanism and the lift mechanism for loading trash with
the 70 metal containers deposited throughout the city were not functioning
at the time of the Bank mission. These trucks, because of their height,
cannot be loaded by hand and thus carry only what can be piled into the
rear loading bin or about 10% to 20% of their capacity.
3.52 Partial loading is also prevalent with the dump trucks. Two of
the four mechanical loaders were also out of commission so that most trucks
are loaded by hand, which is a slow process. In addition, the Voirie controls
only the number of trips to the dump and not the amount of waste carried.
Drivers are thus tempted to make the required number of trips with partial
loads and to render "private" transport services thereafter, either collecting
garbage from large commercial establishments and hotels or transporting sand
and gravel from quarries to construction sites.
Liquid Waste Disposal
3.53 The major problem in this area is human waste disposal. Human
waste production in the city is currently estimated at about 600 tons per
day and is expected to rise to over 1,000 tons by 1986. Substantial amounts
enter the stormwaters and some accumulate in the central market area. Most of
it eventually ends up in the sea.
3.54 À census undertaken by the Metropolitan Water Authority (Centrale
Autonome Metropolitaine d'Eau Potable-CAMEP) in 1966 and 1967 indicated
that the city had 34,000 latrines, 13,000 hygienic toilets and 50 septic
tanks. A PPHC survey of 1976 estimated that the number of pit latrines
had risen to about 58,000, an average of 11 persons for each facility, 2/
with considerable variation around the average figure. A significant pro-
portion of the low-income population was shown to have practically no fa-
cilities whatsoever. Most of these, about 60,000 persons, reside along the
coastline to the north of the maritime port in the communities La Saline, Cite
Croix Rouge, Cite Simone, Cite Jean-Claude, Brooklyn and Boston.
3.55 These marshland areas are impractical for low-cost pit latrines
because of the high water table and the constant flooding during the rains.
Reinforced pit latrines, lined to a depth of one to two meters with concrete
blocks, seem to have proved successful, but the high cost of construction has
kept the number low. The government and a private voluntary organization have
experimented with different kinds of communal waste disposal facilities above
ground level. These were poorly maintained and became inoperative a few
1/ The Director of the Voirie had no say in the selection of the equipment.
2/ Plan de Developpement de Port-au-Prince, etc., Phase III, Vol. III:
Infrastructure, op. cit.
[page 74]
- 52 -
months after construction. Most of the population now uses the empty fields
and drainage canals that surround the area.
3.56 Latrines and pits built across the rest of the city by property-
owners and on leased land tend to be well-maintained and relatively clean,
even when up to 30 people share one facility. However, in areas with den-
sities of 1,000 or more, it is not possible to pursue the usual habit of
covering a pit which has become full and digging another nearby. The high
price of latrine cleaning charged by the Division d'Hygiene Publique, US$25 to
US$30, precludes purchase of this service by the majority of the population
and cleaning sometimes takes place during the rainy seasons when ground water
pressure forces sludge out of pits and into the city streets. 1/
3.57 This ‘'disposal" system creates serious health hazards. Human
waste infiltrates the exposed potable water pipes that run along the streets
and contaminates the distribution system. Homes and pits built above water-
supply sources also contaminate the system, such as the Plaisance-Cerisier
Source in Petionville which supplies 7% of urban water. The non-aedificandi
areas established around each source have not been respected and large homes
are built in them without controls on the type of waste disposal facilities
required to minimize pollution. Finally, to the extent that human waste
enters the flood waters (see above), it creates contamination risks in the’
central fruit and vegetable market during the rainy season.
3.58 Contamination of the water system is increased by domestic waste
vater other than human waste. High- and low-income families dump this water
into the streets or drainage ravines and canals and this is the primary
source of contamination during the dry seasons, mostly in high-income areas.
The problem is less acute in low-income areas, since the quantity of such
wastewater is very low because of the inadequacy of the water supply system
and such quantities as are dumped are absorbed relatively quickly into
the ground. The major exception is the coastal marsh area identified pre-
viously, where drainage is poor and contaminated water stagnates on the
ground, outside as well as inside many homes. As noted, some 60,000 people
live under these conditions.
3.59 Only a relatively small number of manufacturing establishments
are heavy wastewater producers. The most important are sugar refining
and the manufacture of soap and detergents, vegetable oils, textiles,
leather and cigarettes. PADCO estimated current wastewater production
at 2,000 m? per day, of which HASCO the sugar refinery, contributes 60%.
Except for the cigarette factory and one or two smaller enterprises, which
have individual treatment facilities, industrial wastewater is dumped
directly into drainage ravines and flows to the sea. The proximity of
most of these industries to drainage canals and to the coast minimizes
the. pollution effect upon the city itself but increases the pollution prob-
lem in the bay.
1/ PPHC, op.cit., Phase II, Vol IV, page 31.
[page 75]
- 53 -
Environmental Management - Improvement Proposals :
3.60 Several studies addressing the problems described in this section
were made in the last few years. Drainage and sewage problems were addressed
in an IDB-sponsored study in 1972 1/ which identified solving the erosion
problem as a precondition for all downstream drainage works and underlined
the importance of adequate system maintenance and clearance operations.
This was followed in 1974 and 1975 by work on a detailed master plan for
the city's drainage system and on project documents for an IDB drainage
improvement loan which, however, did not address the erosion issue. In the
absence of an overall program on the mountain, much of the work undertaken
by the government on the basis of the plan has already been damaged or
rendered ineffective. Solid waste disposal problems were first analyzed and
recommendations for improvements made by PAHO in 1971 2/ but were not imple-
mented. À second analysis was made by the PPHC project in 1976, 3/ which
recommended a series of actions to be undertaken over a l0-year period. The
cost of the program implied only a small increase over present rates of
expenditure, while most of the proposed improvements were in management and
more efficient use of existing resources (see Chapter IV).
3.61 The PPHC project also made a further analysis of the erosion and
drainage problems. 4/ It noted that most of the studies required for an
erosion control program have been carried out and that the legal basis to
implement the program exists. The basic problem is managerial, i.e., re-
commendations are not followed and laws are not enforced. Fundamentally, the
Immediate Action Report argues that a natural regeneration period for the
Morne l'Hopital will significantly reduce runoff. This would require a series
of actions on the mountain such as elimination of inappropriate grazing and
crop-raising practices, drainage and erosion control along major paved and
unpaved roads, a detailed zoning plan, control of subdivision and land-leasing
practices, special building standards, elimination of the sand quarry, refor-
estation and revegetation on critically eroded surfaces, etc. For the lower
segments of the drainage system, the PPHC work completed the IDB master plan
1/ Etude et Avant-Projets des Reseaux d'Egouts etc., op. cit.
2/ La Voirie Urbaine a Port-au-Prince, Republique de Haiti. J.F. Haddad,
PAHO, Reference HAI-300, Port-au-Prince, 1971.
3/ Phase III, Vol. III: Infrastructure, op. cit.
4/ See for erosion issues: Projets d'Actions Immediates, No. l: Developpe-
ment Physique du Morne l'Hopital. Plan de Developpement de Port-au-
Prince et de sa Region Metropolitaine, UN Project No. HAI/74R 40, CONADEP/
DTPTC/PADCO, Port-au-Prince, February 1976. See for the drainage system
analysis: Plan de Developpement de Port-au-Prince etc., Phase III,
Vol. III, op. cit. ‘
[page 76]
54 —
by including a full clearing of the existing system, dredging of the harbor
and extension of the master plan to areas of the city not covered by it but
likely to undergo rapid urbanization, 1.e., Carrefour and the northern coastal
marshland area.
3.62 Partlyÿ on the basis of these studies, the IDB has approved a
major drainage improvement project in December 1978 1/ for a total cost of
about US$45.8 million, including land purchases. The DTPTC will implement
the project over a period of five years starting in mid-1979 through a project
implementation unit that has already been created. The four major project
components are briefly described in he following paragraphs,
3,63 The erosion control component of the project picks up most of
the recommendations made by the PPHC study at a direct cost of US$4.35 mil-
lion, excluding engineering and administration, contingencies, cost escala-
tion, land acquisition, and financing charges. It includes reforestation,
terracing and the construction of retaining walls on the mountain, the
stabilization of some 28 km of urban roads in the lower reaches of the
mountain, and drainage improvements on the Boutilliers/Sanatorium road and
on the Avenue Panamericaine. It also includes construction of new settlement
basins and check dams including access roads for maintenance.
3.64 The garbage collection and disposal component is expected to cost
some US$3.55 million 2/ and will rely on a mixed system of house-to-house
pick-up and collective pick-up points with large metal containers serviced
by collection crews. The component includes the provision of equipment
; maintenance facilities and the paving of the collective container depots
and some market areas. It does not depend on the operation of the garbage
processing plant; an area 20 km north of the city has been chosen for a
sanitary landfill. The component includes the creation of a unified solid
waste collection agency for the metropolitan area that would absorb the waste
collection agencies of the municipalities of Port-au-Prince and Petionville
and the street cleaning services of the Urban Engineering Office of the
DTPTC.
3.65 Rehabilitation of the existing drainage system will be done at a
direct cost of some US$7.1 million. 2/ It will involve complete clearing of
the existing system and the repair of the existing channels and pipes, the
removal of bottlenecks to increase flow capacity, such as exist under bridges
and in culverts, and for a number of pedestrian crossings. The component also
includes dredging the bay at the mouths of the draïnage channels, involving
the removal of an estimated 110,000 m of material.
3.66 The fourth and final component is an expansion of the system,
involving work on eight additional drainage channels at a direct cost of
1/ Port-au-Prince Storm Drainage Project, HA-0019, IDB document PR-905,
approved on Dec. 7, 1978.
2/ Cost estimate on the same basis as defined for the erosion control
component.
[page 77]
- 55 —
US$7.235 million. 1/ Three of these channels will extend the system to the
east in the direction of Carrefour and will affect the areas of Savane Sale
and Martissant. An extension to Carrefour itself is not presently foreseen.
Similarly, the northern marshland areas such as Brooklyn and Boston are not
included for lack of a technical solution to their drainage problem. Funds to
study the problems and experiment with solutions have, however, been included.
If the work is successfully concluded, it could also provide the basis for
badly needed drainage works in some provincial towns with the same problem
(see below).
3.67 The project has two other noteworthy features. As presently
defined, construction will be very labor-intensive, with wage payments
expected to amount to some 574 of the direct cost for some 17,000 man-years of
employment over the five-year implementation period. Secondly, the project
includes a special fund of the Central Bank for maintenance of the works for a
period of five years after completion with project financing of a declining
share of expenditures foreseen. Some 10 years should, therefore, be available
for strengthening the institutions involved in drainage and garbage removal.
Altogether, if properly implemented, the project should solve the major part
of the city’s environmental sanitation problems. . ‘
3.68 The project does not, however, deal with human waste disposal.
Costs and technical problems make it unlikely that a waterborne sewerage
system in the city is an appropriate solution in the near future despite the
critical public health problems posed by the present situation. From a
preliminary assessment of the costs of sanitary sewer facilities made in 1972
for IDB and CONADEP, 2/ it can be estimated that the present-day cost of a
primary and secondary system for the city would amount to some US$80-90
million.
3.69 Several other factors compromise the construction of a conventional
sewerage system. There is, and will continue to be for the foreseeable
future, insufficent water consumption to clear a sewer system adequately. Only
about 30,000 private water connections are scattered about the city today and,
by 1986, there are unlikely to be more than 60,000 connections, with no more
than 40,000 homes likely to be equipped with conventional toilet facilities.3/
It is also unlikely that hudrological resources will permit 24=hour water
services. Also, in the absence of an enforced urban development plan, it is
presently also close to impossible to estimate future wastewater flows and
pressures and to determine the layout and capacity of a sewer system. Under
these conditions, the best that can be done now is to reserve the necessary
space for possible future construction of a sewerage system in newly develop-
ing urban areas. . ‘
1/ Cost estimate on the same basis as defined for the erosion control
component. ‘
2/ Etude de Avant - Project des Reseaux d’Egouts, etc., op. cit.
3/ PPHC, op. cit., Phase II, Vol, IV, Section 15.1 and World Bank mission
estimates. k
[page 78]
56 -
3.70 ‘The’ alternative to :a modern sewerage system is to improve the
effectiveniess of the current disposal methods, In line with proposals
made by PPHC in 1976, 1/ this might involve:
° TE
(a) ‘the creation: of a ‘public service for biannual cleaning
of bit’.latrines ‘and .cesspools in the city, which could
‘ probably bé organized to be financially self-sustaining;
(b) grant assistance in the form of concrete blocks for con-
structing latrines to the low-income population living
under the difficult conditions of the northern marshland
areas of the city; 2/:'and
(c) a coniprehensivé: study to determine the absorptive capacity
of the:soils ünderlying the city, establish standards of
‘ density.for latrines;, «construction standards for cesspools
and septic tanks in potable watersheds, construction standards
for domestic wastewater disposal, evaluate the need and
feasibility. of-industrial wastewater, sewerage and treatment
facilities, and identify the ‘scale and importance of coast-
line water pollution caused by current practices.
The estimated study: and'investment costs of these activities amounted to
“US$950,000. with :än «annual ‘opérating expense of about US$80,000. The present
operating budget ‘for ilatrine clearance is US$15,000. °
C.:', WATER - PORT-AU-PRINCE
Hydrological: Resources
3.71 «Water réBources in the Port-au-Prince region have never been
fully assessed.. Suchreports.as exist indicate that resources. in the Cul-
de-Sac plain, to thè’north 6f thé city, could provide 3 to 5 m /sec. con-
tinuously: 3/-'Another 4.3 m /sec. could'be obtained by building a dam .
on the Riviere Grisg' to’the east of the city, for an estimated total avail-
ability of 7 to 9'm /set. ‘This'éstimate excludes resources which might
be availablè in thé mountains to the‘‘south, especially in the Riviere Froide,
and to the wêst betwèen Carfefour and the Riviere Momance. The absence of a
full inventory'is serious in view of general estimates of possible future
1/ Op. cit.
2/ This would bring down the user cost of pit latrine construction to
7 that'in other‘pärts of thé‘city.
3/ Plan de Developpement de Port-au-Prince et de sa Region Metropolitaine,
— Phase III; Vol:°III, Infrastructure, op. cit.
[page 79]
- 57 -
demands for water. Irrigation of the Cul-de-Sac plain could require some
13 to 18 m9/sec. Potable water requirements for the regional population,
now about 0.92 m/sec., might be about 2.7 mI/sec. by 1986 and 5.2 m/sec.
by the year 2000. Making allowances for water recycling, the minimum
future requirements might be about 15 m°/sec. or about twice the currently
estimated resources.
3.72 Available resources have declined during the last decades because
deforestation and erosion have reduced the water absorption capacity of major
watersheds. Two sources on the Morne l'Hopital provided 338 1/sec in 1939,
171 l/sec. by 1957 and are now estimated to provide only about 70 1/sec. 1/
Rainfall patterns did not change significantly during the period. Faced with
declining source flows on the Morne, CAMEP began pumping an additional 160
l/sec out of wells in the Cul-de-Sac plain in 1976. The water is on the
margin of potability because of salt water infiltration and while this may be
due to excessive pumping in a period between serious droughts, it may also
reflect an overestimate of resources available in the plain. In any case, a
resource inventory is required, unnecessary losses in the potable water system
of the city must be reduced, and watershed protection and soil conservation
must be -undertaken.
Water Quality
3.73 At present, an average of about 900 1/sec or about 120 1/c/d enter
the city's water distribution. Two hundred twenty litres/sec. are drawn from
increasingly saline wells in the plain, 40 l1/sec from two sources in the
western part of the city and the rest from sources on Morne l'Hopital. Most
of the water is very alkaline and contains a high percentage of carbonic acid.
As a result calcium deposits accumulate in water mains, flow capacities are
reduced and maintenance and replacement costs are high. In some areas, the
service life of main pipes is only eight years. Water softening at the source
has been used from time to time but never over an extended period.
3.74 As previously mentioned, there is also serious contamination from
waste water. Seven percent of urban water comes from a source that is
contaminated by pits and cesspools in residential areas above it. Efforts to
assure potability at the sources, like the chlorination facilities that were
installed, are negated by the combined effects of leaks in pipes especially
those lying on street surfaces, intermittant pressure, the use of streets for
domestic wastewater disposal and frequent flooding by overflows from the storm
drainage system containing solid and human waste material. This contamination
problem is most acute in the central portions of the city.
1/ Ibid.
[page 80]
_- 58 -
System Losses
3.75 About 50% of water input is lost in the system. 1/ Most of the
loss is due to breaks and leaks in pipes but much of it also occurs because
connections to reservoirs in homes and establishments are not equipped
with automatic shut-off valves, or sometimes any valves at all. When such
reservoirs, including swimming pools, are full they overflow into the streets.
Since there are no metering devices, no enforced penalties for not having
valves and the water tariff is on a flat rate basis, there is no incentive to
subscribers to invest in appropriate valves. It is estimated that control
mechanisms at private connections would reduce losses to a more reasonable 30%
to 35%.
3.76 Individual reservoirs are installed because distribution and pres-
sure of water flows are irregular. The irregularities arise from heavy demand
fluctuations, irregular rainfall, limited public storage capacity and high
distribution losses. Even if losses at private connections were eliminated,
the system would still provide less than 24-hour service. Initial hopes
that pumping from wells in the Cul-de-Sac plain might lead to a more regular
service level are unlikely to materialize because of the questionable quality
of the water and the high costs of pumping.
Distribution Methods
3.77 The primary distribution system works with gravity or pumps and
covers most of the urban area. The secondary system consists of about
30,000 legal and clandestine private connections, about 40 public fountains
and less than 100 fire hydrants or less than one per 20 ha of urbanized
area.
3.78 All types of final outlets are used beyond their initial intent.
Tanker trucks draw water from the hydrants and transport it to homes and
industrial and commercial establishments without connections or without
regular service. Much of this water is transported to peripheral areas
not yet served by pipes. Many connected families give water to their
low-income unconnected neighbors and many others, especially in high-
density and low-income areas, sell water by the bucket. The buyers are
families purchasing for their own use plus some 14,000 female water
sellers who distribute the commodity to poorer families. 2/ The same
happens at public fountains. Breaks and leaks in pipes are also an important
source of water. The importance of these various distribution methods in 1976
is listed in Table III-4. The table clearly shows that 23% of the population
obtain 75% of urban water and that 47% obtain 11% of water. Seventy five
1/ Rapport de Diagnostic (Phase I) pour la CAMEP, OPS/OMS, Port-au-
— Prince, June 15, 1977.
2/ Families in Port-au-Prince etc., op. cit.
[page 81]
T11-4 N
Table 7777? STRUCTURE OF.PORT-AU-PRINCE RESIDENTIAL WATER DISTRIBUTION, &/
FROM THE CAMEP SYSTEM, 1976
Daily per Total Daily
Caput Consumption
Number of 4 of Congumption (million 4 of
Supply Source Consumers Consumers {iitres) litres) Consumption
Private Connections (legal 150,000 234 156 23.4 75%
and illegal)
Public Fountains (Free) 55,000 9% 15 0.8 34
From another's private 95,000 15% 32 3.0 10%
connection (Free)
0
From leaks and breaks 40,090 62 18 0.7 (22 NA
Purchase from interme- 300,000 47% 11
diaries 3-3 11%
.Total (Average) ‘ 640,000 100% 49 31.2 100%
Source: Plan de Développement de Port-au-Prince etc., Phase III, Vol. 111:
Infrastructure, op.cit.
1/ Truck deliveries drawn from the CAMEP system are not included. In 1976, they were estimated to
represent less than 2% of total consumption; more recent estimates are not available. The table
also excludes CAMPE supplies to non-residential customers, about 5% of total supply.
[page 82]
- 60 -
percent of the population consume less than 30 1/caput/day. 1/ The table does
not include several large-scale industrial and commercial water users like the
sugar refinery, ice plants, beverage producers, etc., which have their own
wells on the periphery of the city and either pipe or truck it to their
plants.
Water Prices
3.79 Water users legally connected to the piped system pay a fixed rate
related to the assessed value of the house ,or to the size of the industrial
or commercial establishment in question. There are no water meters to link
tariffs to consumption. Depending on the assessments gade and the estimated
consumptiqn volume, rates vary from a low of US$0.03/m to a high of
US$O.11/m . The price for water from other methods of distribution depends
entirely on supply and demand conditions which vary from season to season,
from day to day and from neighborhood to neighborhood. Fer example, charges
for truck delivery vary between US$3.00 and US$6.00 per m depending on
availability and distance. For lowest incomg families, the rates range from a
minimum of US$1.10/m to ajhigh of US$5.60/m during the dry season, with an
.. average of about US$2.30/m . During drought,periods such as 1975 and 1977,
prices can be as high as US$10/m to US$20/m for several months at a time.
These high price levels explain the very low per caput consumption rates
indicated in the previous table.
3.80 Artificial scarcities exacerbate an already bad situation. Truckers
have been known to break pipes to create demand for transported water over the
extended periods required to locate the breaks and repair them. The valve
operators of CAMEP can be ‘'persuaded" to open a flow to one part of the area
under their jurisdiction and close it to another thus creating a scarcity
and increasing the asking prices of water sellers. Connection and repair
crews can be used to secure a clandestine connection or to cut off another
family's legal or illegal connection. Even public fountains do not escape
deliberate destruction and, in situations of acute scarcity, access to them
may be subject to a fee levied by private individuals.
3.81 As a result of this situation, the private market for water in the
city, excluding the trucking operations, can be estimated at US$2.8 million a
year. 2/ An estimated US$930,000 accrues to the 14,000 small-scale watér
sellers, who obtain an average income of US$0.20 a day for their services.
The remaining US$1.87 million is presumed to accrue to some 2,000 individuals,
who obtain à gross annual revenue of US$500 to US$2,000 each. The proportion
of this revenue used to pay CAMEP workers is unknown, though the amount which
they might collectively have to pay for legal connections would be less than
US$100,000. CAMEP's revenues from water sales amounted to little more than
US$650,000 in 1976. 3/
1/7 See map on Water Consumption and Land Prices in Port-Au-Prince for
geographical distribution of different water consumption levels in the
city.
2/ Plan de Developpement de Port-au-Prince, Phase III, Vol. IIl: Infra-
structure, op. cit.
3/ Raport de Diagnostic (Phase 1) pour la CAMEP, op. cit.
[page 83]
- 61 -
3.82 These operations of the water market have serious economic and
physical effects on the low-income population. Despite the low water con-
sumption levels of unconnected families shown in Table III-4, significant
proportions of disposable income have to be spent on water. At income
levels of US£:5/month per family, 20% to 25% of income have to be spent
on water and, at levels of US$40/month, the proportion remains as high
as 8% to 12%. These figures help to explain why relatively little can
be spent on housing and why savings for housing investments are difficult
to generate. They also explain why water from broken pipes, water flowing
in the drainage system and street-runoff are widely used for certain
purposes. This leads to increased health risks and the associated costs
of curative health services. 1/
Improvement Proposals
3.83 In 1976, the PPHC project made the first comprehensive analysis of
water needs of the urban population. 2/ For a target consumption of 30
1/d/c for the low-income population and 175 1/d/e for the high-income popula-
tion, estimated source flows would have to increase to 1,850 1/second by
1986, i.e., double from present levels, and system losses would have to
be reduced to 35%. It was recommended to survey available water resources
prior to any major extensions of the distribution system, and it was felt that
at least 320 public fountains would have to be built to provide 30 1/d/c
to the low-income population. With a design density of one fountain for
three ha of residential land, this would not significantly affect the employ-
ment and incomes of small-scale water sellers in the city, while reducing the
cost of water to the low-income consumers by 60% to 70%.
3.84 Present chances that these fountains will be built are small. CAMEP
has included only 50 fountains in its development plan and only 10 fountains
were added, mostly in peripheral areas, to the previous total of 30 during the
US$7.4 million systems extension recently completed with an IDB loan. Construc-
tion of 320 fountains to serve over 75% of the population would have absorbed
only 5% of the capital expenditures of the IDB loan. As it is, only US$8,000
were spent on fountains, and the bulk of the expenditures only served to
provide more water to those already enjoying a disproportionate share of
consumption. In addition, PAHO representatives in Haiti appear unenthusiastic
about large-scale building of public fountains. The risks of contamination
are said to be too high, even though it is agreed in principle that the high
family expenditures for water and the resulting use of street runoff lead to
equally serious hazards and that piped water in central areas is sufficiently
polluted for additional contamination at fountains to be marginal. Whatever
the rationale, the approaches and actions of PAHO and IDB have been instru-
mental in maintaining the current structure of consumption.
1/ Water scarcity occasionally also increases the cost of concrete block
manufacture by as much as 10%.
2/ Plan de Developpement de Port-au-Prince, etc., Phase III, Vol. III,
_ Infrastructure, op. cit.
[page 84]
_- 62 -
3.85 In 1977, engineering studies were completed by an IDB consultant
for further extension of the system in the areas of Petionville, Delmas and
Carrefour for the period up to 1992. The project envisaged pumping of
water from the Cul-de-Sac plain to reservoirs above these areas 1/ and
flow-back by gravity. The estimated capital cost of the project is about
US$27.5 million by 1992, US$19 million arising between now and 1982. This
program is again aiîmed essentially at the highest income groups of the
city. It does call for construction of 10 more fountains but in areas
which are not heavily populated by low-income families. Its implementation
might nearly double the 1977/78 budget of CAMEP by 1982, if depreciation
and debt service are accounted for. Given the current fiscal and managerial
condition of CAMEP and given also the salinity problems with water from
the plain and the fact that sources up in the mountains might exist and
would obviate the need for the pumping stations, the initial design of
this project can be questioned.
3.86 Partly in the light of these facts, IDB has decided to postpone
further loan activities for the planned extension of the system to allow
time for completion of certain actions. These include:
(a) reform of the management and salary structure, which
has been implemented recently;
(b) a new tariff structure, which is approved in principle
but had not yet been implemented at the end of 1978; and
(c) the installation of water meters, centralized valve con-
trol, a hydrological study for the region 2/ and subse-
quent preparation of a long-term master plan for water re-
sources development and distribution up to the year 2000.
3.87 In line with this decision, the PAHO consultant financed by the
IDB to assist in the financial, technical and managerial upgrading of the
water authority has requested a special allocation of US$275,000 from the
President of the Republic to enable him to do the following:
(a) a complete survey of existing water users, including
private connections, truck transporters and users of
wlls;
(b) updating of the cadastre, at least for those properties
with connections;
1/ Etude d’un Systeme d’Eau Potable pour Petionville, Noveau Port-au-
Prince, Carrefour, Rapport No. III, Premiere Etape, Plan de Developpement
et Faisabilite, EBA Engineering Consultants Ltd., Edmonton, Alberta,
March 31, 1977.
2/ IDB expected to receive at the beginning of 1978 a request from CAMEP for
the financing of a hydrological survey which IDB considers essential
before it finances a further extension of the system. By July 1978, this
request had not been received. IDB is ready to finance the survey and
the master plan if asked to do so.
[page 85]
— 63 -
(c) updating of plans and drawings of the existing system
(CAMEP does not have up-to-date plans for the system
it operates);
(d) purchase, installation and testing of 400 to 600 water
meters;
(e) a feasibility study for centralized control of distribu-
tion valves to eliminate the independent practices of
valve operators; and
(£) training of personnel and purchase of basic equipment for
control of leaks and other system losses.
3.88 With expected Presidential approval, these steps could be imple-
mented immediately. Wider-ranging actions are also envisaged dealing with
management and personnel upgrading, and overhaul of the tariff structure to
put CAMEP in a financially self-sustaining position. 1/ In this regard, the
PAHO consultant has estimated that an average charge of US$7 per month for all
present connections would provide a revenue of US$2.5 million. 2/ The PAHO
consultant has also set himself a goal of 500 public fountains to be built
over the next 10 years. While the capital cost for these facilities could
probably be borne by CAMEP’s own budget, if the planned tariff changes are
implemented, it is likely that it would take several years before CAMEP could
be upgraded to manage such a large number of fountains. Construction probably
would and should, therefore, not be started until then.
3.89 Other, more difficult, actions are envisaged with respect to third
party sales. These include the identification of well-owners, who would be
metered and charged 25% of water use rates, 3/ the identification of truckers
who would be licensed and inspected on a three-month cycle, would be required
to purchase at designated points at regular metered rates and would be subject
to sales price control and, finally, the issuance of temporary permits for
third party sales by private connected families in low-income areas. It is
also intended to establish a redistributive tariff structure which would use
cross-subsidization to lower connection and use costs in low-income areas and
might lead to a larger aumber of private sellers and lower prices for low-
income families without connections.
1/ See Chapter IV for a discussion of CAMEP.
2/ Present rates for residential construction are US$5 per month for
T homes of an assessed value exceeding US$5,000 and US$3 per month for
houses valued more than at US$1,000 to US$5,000.
3/ In principle, all water is public property.
[page 86]
64 —
D. TRANSPORT — PORT-AU-PRINCE
Road Network 1/
3.90 Port-au-Prince is equipped with 60 km of major arteries which are
all paved but in many cases do not have shoulders or sidewalks, and pedes-
trians and vehicles share the same rights of way. There are also 335 km of
secondary streets of which about 120,km are paved, as well as privately-built
access roads and driveways, usually unpaved, the total length of which is
unknown. 2/ The two major problems with this network are inefficient use of
the facilities and inadequate access to high-density/low-income neighborhoods.
3.91 Although some major and minor arteries are underdesigned for the
volume of pedestrian and vehicle traffic that they now carry, major traffic
delays during peak hours are caused more by inefficient use of existing facil-
ities. The random stopping habits of public transport vehicles, the absence
of shoulders and sidewalks, bad intersection designs, bad placement of traffic
lights and road signs, the absence of road surface markings, etc., all con-
tribute to delays. Much improvement in traffic flow could be obtained by
more effective use of the existing network.
3.92 While many areas are reasonably well served by roads, narrow and
unpaved pathways severely restrict vehicle access to the high-density neigh-
borhoods where the low-income residents are concentrated. This seriously
inhibits the delivery of goods. and public services like fire protection,
latrine cleaning, solid waste removal, stormwater drainage cleaning,
delivery of construction materials, etc.
Transport Modes
3.93 Table III-5 shows the modes used for work-related passenger traffic
in the city in 1975 and a projection for 1986. In 1975, almost 90% of work-
related trips were done on foot, partly because of the low-income of much of
the population relative to the cost of motorized transport. By 1986, walking
will remain the dominant transport mode, but it is estimated that travel dis-
tances for low-income .families will rise by 43%. This estimate assumes that
the downtown market area will remain the dominant employment center for the
city and that low-income housing programs will tend to be located on the
periphery of the city to the north and west. The estimate, especially of
the travel distances, will not hold if the market is decentralized, which now
appears probable.
1/ See Port-au-Prince City Orientation map for major roads, and proposed
alignments of possible future roads.
2/ Plan de Developpement de Port-au-Prince et de sa Region Metropolitaine,
op. cit. Volume IV, Transports, February 1976.
[page 87]
. Table III-5: ESTIMATED STRUCTURE OF DAILY TRANSPORTATION DEMAND FOR WORK-RELATED TRIPS IN PORT-AU-PRINCE
‘ 1975 and 1986
1975 1986
Average Total Average Total
Number One-Way Daily Number One-Way Daily
of Trips Distance Person of Tripe Distance Person
Per Trip kms Per Trip kms
On-root 570,000 | 897 | 2.3 km 1,311,000 81% | 929,000 87% | 3.3 km 3,065,700 837
Public Transport | 54,000 8% | 4.0 km 216,000 133 | 118,000 117 | 4.1 km 483,800 137
- 3
Otner Venicles 16,000 32 | 6.0 km 96,000 6x 23,000 2% | 6.1 km 140,300 43
« u
° '
Source: Plan de Développement de Port-au-Prince etc., op. cit., Vol. IV: Transports.
[page 88]
— 66 —
3.94 Motorized passenger traffic only accounted for 11% of the number
of trips and 19% of the passenger kilometers with only slight increases in the
percentages expected by 1986. Unfortunately, there is no equivalent analysis
for goods traffic within the city. What is known is that, in 1975, a total
of about 560,000 tons of goods moved through the city, of which about 270,000
inside Port-au-Prince, 165,000 tons to and 125,000 tons from other destinations
in Haiti. 1/ Much of this was transit traffic to and from the port.
3.95 The composition and development of the stock of motorized vehicles
in the city is shown in Table III-6. Most vehicles can be and are used for
the transport of both passengers and goods. The figures are also affected
by year to year changes in vehicle classification and place of registration.
Buses may become classified as trucks, and minibuses, including small station
wagons, may be classified as jeeps or cars and vice versa. Procedures now
appear to have stabilized and the 1975 figures appear reasonably accurate.
3.96 Although complete statistics are not available for years after 1975,
it appears that the upsurge in car registrations since 1974 has continued at
a rate of about .25% per annum. This alone would put the 1977 vehicle fleet
in the city at about 28,000, of which 19,000 would be cars. Recent high rates
of growth of the urban economy, repatriation of Haitian savings and citizens
from abroad, rapid increases in the number of foreign personnel and the de
facto public policy of not restraining vehicle imports, have all contributed
to this increase in vehicle investments. The import tax on vehicles for pri-
vate use is relatively high, especially for larger cars with high fuel con-
sumption rates, but it is estimated that 60% to 80% of all private vehicles
are imported free of taxes. Both expatriate personnel and public agencies
do not pay import taxes on cars, but there is also some political difficulty
in restraining consumption habits of the rich.
3.97 An estimate of the increase in the number of vehicles in the Port-
au-Prince region for the period 1976-1986 is given in Table III-7. Accord-
ing to the estimate, the vehicle stock in Port-au-Prince in 1986 would be
about double that shown for 1975. This conservative-looking estimate assumes,
inter alia, that import taxes will remain the same as today but will be en-
forced, that fuel costs will remain stable, that efforts will be made to
maximize existing road capacity and that the repatriation of Haitians and
their foreign savings will slow down. As for traffic volumes, these are
estimated to rise by about 4.5% per annum. Present vehicle flows on the
main arteries range between 10,000 and 25,000 per day, most of which are
public transport. vehicles travelling fixed routes many times.
1/ Louis Berger International, Inc.; National Transport Study, Final Report,
Volume III: Sector Analysis by Modes, Port-au-Prince, Aug. 1977, Table
7-7.
[page 89]
Table III-6+ INCREASE IN MOTORIZED VEHICLES IN PORT AU PRINCE, 1971-1975
Year
— Average Annual
Type 1971 1972 1973 1974 1975 Rate of Increas!
1971-1975
Trucks 463 532 781 439 1,332 30%°
Buses 140 23 88 79 135 ——
Minibuses 480 1,150 1,070 2,070 2,290 48%
Jeeps 793 911 1,053 994 1,338 142 i
Cars 8,600 8,350 9,060 9,703 12,310 9% 3
:
Total (Port au Prince) 10,476 10,966 12,052 13,285 17,405 13.52%
Total (Haiti) 14,919 16,160 18,030 20,396 23,350 11.9%
Source: Plan de Développement de Port-au-Prince etc.,.op.cit., Vol. IV, Transports.
[page 90]
= 68 -
Table ILI-7: FORECAST INCREASE IN VEHICLES IN PORT-AU-PRINCE
1975-1986
Year Annual Average
Type 1975 1986 Rate of Increase
Commercial-Goods 935 1,500 &.6%
Commercial-Passengers 3,270 6,700 6.7%
Private 12,000 23,800 6.4%
Others 1,200 2,000 5.0%
Total (Average) 17,405 34,000 6.3%
Source: Plan de Developpement de Port-au-Prince et de sa Region
Metropolitaine, op. cit. Rapport Sommaire Final, Vol. I
and II, August 1976.
3.98 There are also some non-motorized modes of goods transport in the
city. About 1,000 man-powered and locally manufactured wagons in the city
are used for the transport of agricultural produce between the central and
peripheral markets and warehouses and for the transport of construction mate-
rials. Animal-powered wagons are rare inside the city and are reserved for
delivery of sugar cane from rural areas to the refinery on the north side
of the town. Some of the rural produce arriving in the city is brought in
by small horses and donkeys or by the 50,000 sales women and their hired
male porters. The latter also engage in vehicle loading and unloading and
independent intra- and inter-market transport and might number from 30,000
to 50,000, depending on the intensity of daily or seasonal market activity. 1/
Public Transport
3.99 Some 1,500 buses and minibuses plying about 60 km of streets on
seven well-defined routes provide the basic public transport service in the
city. In 1975, nearly half of these (47%) were diesel station-wagons, having
a seat capacity of nine passengers each. One-third were diesel minibuses
with seat capacities of 12 to 18, and another 15% minibuses with an average
capacity of 22 seats. Buses comprise 5% of the fleet with seating capacities
of 30 to 50. The vehicle fleet has recently grown at an average of 15% to
20% a year. 2/ No information is available on the socioeconomic profile of
the users nor on the capacity utilization of these vehicles.
1/ Same source as Table III-7.
2/ Ibid.
[page 91]
69 -
3.100 Although the vehicles ply fixed routes, there are no predetermined
stops. Stops to pick up customers may be as close together as 25 to 50 m in
the downtown area. Driver resistance has thwarted efforts to regulate random
stopping practices because almost all drivers rent the vehicles, and their
incomes are a function of the number of passengers they can pick up. Fixed-
route transport is complemented by about 1,200 taxis that provide service
mostly in areas not well served by the fixed-route vehicles.
3.101 Rates for fixed-route public transport vehicles vary between US$0.09
and $0.14 per ride during the day and between US$0.18 and US$0.28 at night.
Rates vary from route to route and are regulated by the Government. Taxi
fares are US$0.18 during the day and US$0.36 at night. These rates are high,
relative to incomes in the city, 1/ and it is estimated that no more than 8%
of daily urban work trips and 13% of daily passenger miles are made by these
modes.
The Central Area
3.102 The Central area is the origin or destination of most work and
shopping trips in the city. About 54% of all urban employment is located
there and the residential population is close to 300,000. The major con-
centration of traders, manufacturers and customers is in the central market
area, which is part of the downtown commercial district. About 250,000
people produce, buy and sell there each day on a surface of about 6.5 ha. 2/
3.103 Until about 1974, the market expanded until it covered parts of
the city”’s garbage dump and spilled into main thoroughfares. Since then,
it has been constrained both by police action and by the port expansion and
port-related activities which have led to walling-off the northern and south-
ern side of the market. The truck and bus terminal has closed and this has
forced the vehicles into the market”s open spaces. This has led to proposals
to build truck terminals on the periphery of the city and to close the central
zone to them. This implies the decentralization of the market.
3.104 The location of market activities is the central urban transport
question for the low-income majority. The conventional separation between
work-place and residence has only limited applicability in Port-au-Prince. 3/
Most low-income families are self-employed in trade and manufacturing at very
small scales of operation and they mostly use their homes for goods storage
1/ One trip daily at the lowest fare of US$0.09 would absorb 14% of the
income of the person at the relative poverty cut-off level of US$234
p-a. in Port-au-Prince. Sixty-five percent of the population live at or
below this level. (See Chapter I.)
2/ Plan de Developpement de Port-au-Prince, etc., op. cit., Projet d’Action
Immediate No. 2/3: Renovation du Centre de la Capitale, undated.
3/ Families in Port-au-Prince, etc., op. cit.
[page 92]
— 70 -
and transformation. Trips are made to purchase inputs and to sell outputs,
almost all to and from the central market and the immediately surrounding
downtown area. Time and money costs of travel to and from the market area
thus have an important effect on household incomes. In a pedestrian society,
travel costs are measured mostly in time lost for purchasing, transforming
and selling activities. Such costs may appear small in absolute terms, but
they are large in relative terms for the majority of families earning less
than US$40 a month. To minimize these costs, it is essential that places
of purchase and sale, the place of manufacturing activity and the residence
are as close together as possible.
3.105 Any efforts to decentralize the market to peripheral locations
will then have significant effects on this intimate spatial relationship
which underlies the intensive demand for residential space around the center
and the high densities that were discussed in the shelter section of this
report. Important effects will be felt on current household incomes and
on the spatial pattern of land and housing demand. By the same token, the
location of market activities will affect both the siting and pricing of
low-income shelter projects. À family willing to pay US$5 a month for a
location close to the market may not be willing to pay the same at the peri-
phery, where the higher travel costs to and from the market would reduce
income. Efforts in low-income housing must therefore be integrated with
parallel efforts of market reorganization, or they must account in their
price structure for increased transport costs.
Improvement Proposals
3.106 In the framework of the development plan for the Port-au-Prince
metropolitan area, PPHC studied urban transport questions and made a number
of improvement proposals. In addition to some roadbuilding elements that
were already included in the slum-upgrading and erosion control programs
developed by PPHC, these proposals included investments in the primary and
secondary road network in excess of US$10 million and improvements in inter-
sections and traffic management, costing some US$535,000 in investments and
some US$3.8 million in operating and maintenance costs until 1986. PPHC
also recommended a major traffic study, including an analysis of urban pro-
duce marketing, for a cost of close to US$0.5 million.
3.107 Since then, a number of actions have been undertaken. An align-
ment for a new road to the north of and parallel to Delmas has been selected
and financing may be obtained from the Republic of Germany for the cost of
about US$2.5 million 1/. Reconstruction of the existing Delmas road is being
prepared by SAT 2/ and US$2 million have been set aside by the government
for the investment. The DTPTC is studying the construction of truck and bus
parking facilities in the central market, reorganization of marketing space
1/ See Port-au-Prince City Orientation map for approximate alignments
for proposed Delmas II and coral reef roads.
2/ Service Autonome des Transports, a transport service, attached to the
DTPTC; see Chapter IV.
[page 93]
- 71 -
and reconstruction of Blvd. La Saline to link the Delmas and the northern
highvays to the port and to Harry Truman Blvd., which in turn links the port
to the Carrefour road in the south. This latter project, which will be
financed by the IDB with residual funds from other projects, would quadruple
north/south traffic capacity through the downtown area. 1/
3.108 Another proposed study concerns a north/south connector either along
the base of the Morne l’Hopital or along a stretch of coral reef off the coast
to Carrefour. Since most commercial traffic în and out of the city is des-
tined for or originates from downtown, the logic of a separate north/south
connector is in doubt. Also, commercial vehicles going through the city have
already adapted to delay patterns and tend to pass through Port-au-Prince in
off-peak hours. In any case, the social benefits of the connector are not
evident. No finance has yet been found for this study.
3.109 Finally, some design work is underway in the Service d'Urbanisme
on intersection improvement and the Service de Circulation has put forward
a proposal for institutional upgrading of traffic management capabilities.
Information on this proposal could not be obtained.
E. URBAN SERVICES IN THREE PROVINCIAL TOWNS
3.110 The discussion of urban services in Cap Haitien, Gonaives and Cayes
is relatively short. These are the three largest provincial centers after
Port-au-Prince but, in 1975, together accounted for less than 11% of total
urban population (see Annex Tables’ 1.3 and 1.4). The brevity of the dis-
cussion also reflects the extreme paucity of information concerning them.
This lack of information upon which urban program proposals could be based
may in itself be the major problem of the towns.
Sheiter
3.111 Such published information as exists about housing in urban areas
outside Port-au-Prince combines figures for towns with a current population
of about 400,000 persons. It is biased by the inclusion of centers that
are basically large agricultural villages, as shown by the statistic that
35% of the urban population outside the capital are directly engaged in
agriculture. 2/ -
1/ In this context, the Service has serious reservation about the proposed
construction of a new coastal shipping port (to be financed by IBRD) in
the area of La Saline.
2/ Enquete Socio-Economique, IHS, op. cit.
[page 94]
-72-
3.112 The agricultural vocation of a significant portion of.the popula-
tion, even in important centers like Cap Haitien, Gonaives and Cayes, under-
lines the difficulty in deciding where "rural" ends and "urban" begins. This
affects the interpretation of certain observations. For example, houses
made of wattle or wood in Port-au-Prince can be labeled as "slums" or as
“inappropriate" methods of urban construction, but it is more difficult to
do so for the smaller cities. Housing characteristics of the city popula-
tion engaged in agriculture should not be expected to differ fundamentally
from housing in nearby rural areas, What appears to be a "problem" in Port-
au-Prince is not quite the same ‘'problem" in other towns, similarities of
appearance notwithstanding. Low-income shelter programs in the smaller towns
will necessarily include an important mmher nf farmare
3.113 Shelter conditions in the. provincial towns are better than in Port-
au-Prince. The IHS reports that, in 1976, 28% of families in small cities
lived in one-room dwelling units and 33% lived in two-room units. In Port-
au-Prince, the respective figures were 58% .and 17%. Unlike the capital,
where most of these units were rooms, in larger structures containing sev-
eral families at a time, most units in the towns are independent structures.
Within the size constraints of traditional building methods and given the
lower residential densities observed in provincial tons, family housing
space tends to be larger than in the capital.
3.114 At the same time, a larger proportion of families in provincial
towns are property owners (47%), and a smaller proportion (17%) engage in
long-term leases of land or dwelling units. It appears that most long-term
lease families rent bare plots and build their own houses. This is supported
by data on low-income household expenditures for construction and repairs in
provincial towns (Table III-8).
3.115 Housing construction costs are, in general, lower in the smaller
towns than in Port-au-Prince. Scrap is not usually available and low-income
families tend to build with wattle and mud with straw roofs. With higher
incomes, they invest in corrugated metal roofs and supporting structures.
The methods of construction and Labor use are the same as in the capital.
Lower housing costs arise from slightly lower labor costs; and self-heip
construction, even in ruràl areas, is not common. For houses made of con-
crete blocks, unit construction costs are about the same as in Port-au-Prince.
Lower costs of sand, rocks, labor, etc. compensate for higher cost of cement,
wood and metal sheets. Higher housing investments in the provincial towns
(see Table III-8) reflect higher maintenance costs associated with tradi-
tional construction methods, larger dwelling unit sizes, and a higher pro-
portion of property owners. Renters pay a lower proportion of their incomes
for housing and usually obtain larger housing space.
[page 95]
-73-
Table III-8: STRUCTURE OF FAMILY HOUSING EXPENDITURES
IN PORT-AU-PRINCE AND OTHER TOWNS IN 1970
Annual Annual Construction and Rental Expenditure
Income Class Repair Expenditures as % of Total Expenditure
US$ Port-au-Prince Other Towns Port-au-Prince Other Towns
O0 - 100 0 . 0.20 30.1 13.6
100 —- 140 6.40 0.40 22.3 12.1
140 — 200 0 0.50 18.1 11.3
200 —- 250 0 0.40 16.5 10.7
250 —- 300 1.40 0,55 14.4 9.7
300 - 350 0.85 1,40 ‘11.3 9,1
350 —- 400 1.50 1.90 9.8 8.1
400 - 450 1.60 1.20 11.1 9.5
450 - 500 1.60 2.15 14,5 9.1
500 —- 600 5.80 15.70 11.8 9,9
600 —- 700 3.70 11.40 12.3 8.9
700 - 1,000 4.10 2.15 10.7 7,7
1,000 - 1,700 17.40 4,35 10.3 9.9
1,700 and above 22.50 16.70 12.4 12.2
Source: Enquete Socio-Economique, op. cit.
3.116 À 1976 estimate puts housing investment in Cap Haitien, Gonaives
and Cayes at a total of US$1.7 million, or US$15.00 per caput. This per
caput level is about 25% of that estimated for Port-au-Prince. The structure
of investment is indicated in Table III-9,
Table III-9: INVESTMENT IN THE BUILDING SUBSECTOR, 1976
CAP HAITIEN, GONAIVES AND LES CAYES
(us$)
Average Number Total Percent
Cost of Unit of Units Investment of Investment
500 1,200 600,000 35.3%
2,000 200 400,000 23.54
6,000 50 300,000 17.74%
Repairs = 400,000 23.54
TOTAL 1,450 $1,700,000 100.0%
Source: Projets et Planification en Haïti, Vol. IV:
Logement, op. cit.
[page 96]
— 74
3.117 On this basis, with an estimated rate of household formation of
3.2% p.a., a calculated income elasticity of housing demand of 0.96% and
an estimate.of per caput real income increase of 1.1% p.a., the rate of
increase in housing construction was estimated atabout 4.3% p.a. until
1981. Table III-10 shows the estimated investment composition. Possible
future increases in long-term finance availability as a result of creating
the BDL are not taken into account in the estimate.
Table III-10: FORECAST OF SHELTER CONSTRUCTION ACTIVITY
IN CAP HAITIEN, GONAIVES AND LES CAYES, 1976-1981
(US$)
‘ Average Cost Number of Total Percentage of
Town Per Unit Units Investment Investment
Cap Haitien 500 3,240 1,620,000 16.54%
2,000 540 1,080,000 11,0%
6,000 135 810,000 8.2%
Repairs = 1,081,000 11.0%
Subtotal 3,915 &,591,000 46.8%
Gonaives : 500 2,100 1,050,000 10.7%
2,000 350 700,000 7.3%
6,000 90 540,000 5.5%
Repairs = 690,000 7.0%
Subtotal 2,540 2,980 ,000 30.5%
Cayes 500 1,560 780,000 8.0%
2,000 260 ‘520,000 - 5.34.
6,000 65 390,000 4,0%
Repairs = 530,000 5.47%
Subtotal 1,885 2,220,000 22.7%
TOTAL 8,340 9,790,000 100.0%
Source: Projets et Planification en Haiti, Vol. IV: Logement, op. cit.
3.118 Public officials met in Cap Haitien agree that housing is a major
issue. They indicate that about 40% of the population, or 4,300 families,
live in siums and that others are forced to pay high rents for small spaces
in existing high-grade structures. Four to five permits for the construc-
tion of latter-type homes were said to be granted per month, i.e., about
half the rate of household formation of the higher income families.
[page 97]
75 —
3.119 As in Port-au-Prince, the low-income housing problem is perceived
to be the existence of slums and the opinion is widespread that "decent"
housing built for this group must be subsidized by the state. For higher
income groups the maïin problem is one of finance. Current credit conditions
prevent families from building homes, though the relatively lower cost of
land in the city is still within the reach of middle-income residents. The
BNRH is the only major financial institution active in the area.
3.120 Public efforts in the housing field have been limited to the con-
struction of 32 units over 30 years ago, which are rented out on a monthly
basis. The revenues, totalling US$25 à month, are collected by the Admin-
istration Generale des Contributions and on behalf of the Office National de
Logement in Port-au-Prince.
3.121 One of the problems associated with housing is the difficult terrain
of Cap Haitien. On the west side of town, a steep h111 rises to 700 meters,
and river and marsh border the east. The space in between that is suitable
for construction is less than one km in width, most of it already occupied
by the older portions of the town. New low-income housing is now edging up
the mountainside on land under long-term lease or being strung out for several
kilometers along the main highway leading south. Suitable residential land
east of the river is available, but has not yet been developed. Whether
this results mostly from lack of urban services, difficulty in acquisition
or public policy (the area lies between the airport and the town) could not
be determined.
3.122 The Service d'Urbanisme 1/ has recently assigned one staff member
to Cap Haitien on a part-time basis. He spends four or five days a month
in the locality and, in cooperation with the resident engineer of the DTPIC,
is working to prepare guidelines for a form of urban development, best adapted
to the site conditions. This is the Service”s first attempt at extending the
range of its activities beyond the confines of the capital.
3.123 In this context, it ought to be mentioned that the bridge linking
the city center with areas to the east collapsed in August 1977. An IBRD
transport mission recommended reconstruction of the bridge at a point further
south. In the interim, USAID fs providing a temporary bridge at the old site.
If it is decided that the east side of the river is to be urbanized, future
urban development will partly depend on when the new bridge 18 built and
just how long the temporary bridge will remain in place. The decision on
the site of the new bridge was based on engineering and regional transport
considerations but did not take account of urban land use patterns.
3.124 In 1976, the Division de Promotion de Projets de Developpement
of CONADEP, with the assistance of Louis Berger Int”’l1, Inc. prepared the
only public housing proposal for the city for the period up to 1981. It
consists of the construction of 100 houses under the auspices of ONL to be
1/ Since the reorganization of the DTPTC in mid-1978, the Service is now
called Service de Planification Urbaine (see Chapter IV for details).
[page 98]
- 76 -
sold to families with incomes of about US$100 a month at a monthly payment
rate of US$18.50. The investment was estimated at US$275,000 and the 25-year
management and operations cost at US$200,000. ‘The project was based on full
cost recovery and, on paper, suggested an internal rate of return of 14.24%.
3.125 In Gonaives, public officials shared the view that housing was a
major problem and that "slums" had to be eliminated. However, they insisted
that some cost recovery had to be obtained and that houses built for low-
income families should be kept simple. Their estimates of current housing
needs were: 4,000 very inexpensive units which could be sold or rented
at a rate between US$2.00 and US$5.00 a month, 100 moderate income units at
US$10 to US$20 a month, 50 high income units at US$40 to US$50 a month and
20 villas for future industrialists and the like. Together, these proposals
inplicitly suggest replacement of 60% of the town”s current housing stock.
3.126 . Visits to the so-called "slum"” areas of the town, located mostly
on a fla. area in the southern part of town, revealed an organization of
housing which appeared no different than what one might expect in the early
ÿears of a sites-and-services program. There were wide streets with clearly
demarcated easement lines and clear lot subdivision within residential blocks.
Houses were a mixture. of completely traditional construction with wattle walls
and straw roofs, partiy upgraded versions composed of wattle walls and sheet-
metal roofs and final upgraded units with block walls and metal roofs. Con-
trol of urban development is well-organized by a local inspector of the:
DTPTC. No other provincial town has such an inspector. Gonaives also has
the only representative of ONL outside Port-au-Prince. He is responsible
for the management of 20 large homes built several years ago which are being
sold to their high-income occupants. Revenues average a total of US$120 a
month. .
3.127 In 1974, the city received a special allocation of US$40,000 from
the Ministry of the Interior for the construction of homes in slum areas.
Ten apartments were built at a cost of about US$120/m and given to “respon-
sible" families free of charge. All the units have since been subdivided
and rented out by the original beneficiaries and they now house between 20
and 40 families. This subdivision activity was not known by the public offi-
cials until they visited the site with mission members. In 1976, CONADEP
and Louis Berger Inc. prepared a housing project proposal for Gonaives with
features identical to those for Cap Haitien.
3.128 In Cayes, the situation is much the same as in Gonaives. There
is an expressed feeling that housing is a major problem, that slums should
be eliminated, that subsidies are necessary, etc. Public officials noted
that among poorest groups, who pay between US$0.60 and US$0.90 a month, there
is still a housing shortage and that some family members must sleep in shifts.
Hovever, unlike the other towns, Cayes has a limited ongoing housing devel-
opment programe
3.129 Several years ago, the North American Oblate fathers organized
a savings and loan association in the town. It offered no interest on sav-
ings and charged no interest on loans. The object was to provide 'a savings
mechanism for salaried workers and families whose deposits and withdrawals
were too small to be handled by the commercial bank. The management costs
[page 99]
- 17 - .
were subsidized by the church. Later, with a capital fund obtained from
OXFAM, the association began to build middle-income homes to be sold on
credit with 10-year maturities to members with acceptable savings and loan
repayment records. At first, the houses were built in the cost range of
US$600 to US$800. By 1976, inflation had forced increases to US$1,200 and,
in 1977, the same house cost about US$1,600. Since there is no interest
charge (a question of morality for the Oblates), and since costs have been
increasing, the rate of construction largely depends on OXFAM allocations.
Currently, about 20 units a year are built and a little more than 200 have
been completed. Monthly payments range from US$8.00 for earlier sales to
US$16.00 for current sales. Purchasers typically earn US$60 to US$150 a
month.
3.130 Public housing is limited to 14 rental units built several decades
ago. The Administration Generale des Contributions coïlects US$11.00 a month
from them on behalf of the ONL. In 1976, CONADEP and Louis Berger Int”’1 Inc.
proposed construction of 100 units identical to those proposed for Gonaives
and Cap Haitien.
Environmental Management
3.131 As noted above, the topographic condition around Cap Haitien has
led to urban development up the mountainside on the western side of the city.
This small-scale version of what has happened in Port-au-Prince has increased
erosion and obstruction of the storm-sewer system. Water and eroded material
flowing down the steep streets now cause damage to them and to homes in their
path. Deforestation for agricultural uses and urbanization have carved out
a principal ravine on the north side of the city called "Bas de Ravine."
Small houses on its banks are occasionally washed away. Though degenera-
tion has started, the problem would remain manageable if land use enforce-
ment were undertaken on the hill. Rapid action can prevent the need to
rebuild the drainage system in the future. In the light of the limited
DTPTC budget for the whole region, i.e. one engineer, nine salaried work-
ers (US$1,700/month), and a payroll of US$2,500/month for day workers, special
preventive action is called for. Hopefully, the Service de Planification
Urbaine will address this problem.
3.132 Solid waste collection is carried out through joint efforts of
the municipality and the Department of Public Health, complemented by drain-
age clearing by the DTPTC. Although four trucks used to be available several
years ago, the city now has only one plus 12 wheelbarrows. First appearances
suggested that an adequate job was being done with the single truck, although
the mayor stated that he needed at least three more to do the job well. Prob-
lems of collection exist in the low-income areas in the marshes and hills,
but these are inaccessible to trucks in any case. Proper collection in
these areas would require other labor-intensive methods. There is no dump
in the city. Waste is thrown into various ravines with the hope that it
will wash into the sea.
3.133 Liquid waste is disposed of in much the same way as in the capital;
domestic water is disposed in the streets and in stormsewers or on the ground
and human waste in cesspools and pits. Five hundred homes are equipped with
[page 100]
- 78 -
toilets, of which 50 have septic tanks or cesspools. 1/ The rest of the
population uses latrines and pits. In general, the water table is at least
10 meters below the surface and hence poses few problems regarding pit con-
struction. The exception is the marsh area to the east of the city”’s entry
gate where the water table is closer to the surface. The whole of the city is
underlain with polluted groundwater, but many homes and establishments still
draw significant quantities from wells. The Services Hydrauliques de la
Republique de Haiti have analyzed well-water samples on several occasions.
Some of them were found improper for human consumption. The Services
Hydrauliques have recommended to the owners not to use the wells but have
no power to close them.
3.134 The topographic conditions in Gonaives are quite different from
those in Cap Haitien. The city is spread out on a flat plain just a few
feet above sea level. During the dry season, the area is semi-arid and the
water table drops well below the surface. During the rainy season, the table
rises almost to the surface, and the city is flooded for several days at a
time.
3.135 The central portion of the city is equipped with a closed storm-
water drainage system built several years ago. However, it has become com-
pletely obstructed with silt and solid waste and stormwaters run along the
surface. When they subside, they remain stagnant in the closed system beneath
streets. According to public health officials, this trapped body of water is
a major breeding ground for mosquitoes which plague the city and lead to occa-
sional malaria problems. City officials noted that the city used to have an
open channel drainage system which offered better run-off characteristics
and could be cleared regularly to minimize the amount of stagnant water.
Their request to Port-au-Prince several months ago, asking for construction
of an open channel system, had not received a response.
3.136 At present the DTPTC budget for the Gonaives region is US$1,600 a
month for salaries of one engineer and 13 employees plus US$1,740 a month for
daily worker payrolls. This labor force is adequate to engage in a major
drainage clearing operation for a short time, but does not have any of the
hand tools and machines necessary to do the job. 2/
3.137 Solid waste collection and disposal is carried out by the Depart-
ment of Public Health with the use of 30 wheelbarrows. Such waste as is not
washed or thrown into the drainage system is collected and dumped in water-
ways and fields at several locations around the city. A new truck is ex-
pected shortly and this will permit a higher rate of collection and the
ability to transport waste to a location farther away from town.
1/ Enquete Socio-Economique, op. cite
2/ The two sewer clearing trucks of the Service de Genie Municipal in
Port-au-Prince, unusable in the capital, might be helpful in Gonaives.
The obstructions in the Gonaives system may not contain as much heavy
eroded material and the trucks might prove useful, if not for complete
clearing, then for regular preventive maintenance after a major hand-
clearing operation.
[page 101]
- 79 -
3.138 Domestic wastewater is either dumped into the stormsewer system
or directly onto the ground. As to human waste disposal, about 220 homes
are equipped with toilet facilities, 1/ the rest use latrines and pits.
Because of flooding and the seasonal rise of the water table, most latrines
become unusable for several months at a time. In those circumstances, shal-
low holes are dug, used, refilled and then another hole is dug. Residents
of lower-income areas do not bother with holes and use the surrounding mud
flats. During rainy periods, these practices contaminate the floodwaters
and constitute a contamination risk for the potable water distribution system
which is under irregular pressure. Human waste disposal facilities suited
to these conditions and adapted to the socioeconomic characteristics of the
population need to be déveloped.
3.139 Les Cayes also lies in a flat area only a little above sea level.
Seasonal rain patterns are not as variable as those in Gonaives and the vater
table is always close to the surface. This has compromised most public and
private attempts at finding solutions to stormwater and human waste disposal.
With respect to stormwater, the city is equipped with an unlined, open drain-
age channel system which has to be cleared every two months. Between clear-
ings, the stagnant waters exacerbate a local mosquito and malaria problem
caused by rice fields inside and around the city. Although a major landfill
program and a sloped and lined drainage channel system would help remove
Waters from the city, the insect problem would persist because of the semi-
stagnant water bodies in the surrouding rice fields. The regional budget
of the DTPTC with US$1,540/month for 12 salaried employees and US$2,460/month
for day laborers is inadequate to undertake a major city drainage construc-
tion program on its own. Either a simpler solution must be found, or else
significant additional allocations must be obtained. Response from the
capital has been slow; the departmental engineer is still waiting for two
trucks requested three years ago.
‘3.140 Concerning human waste disposal, the high water table has limited
the number of deep pits in use, and more reliance is placed on shallow holes
that are replaced when full. For several years, PAHO had manufactured high
strength reinforced concrete latrine covers in Cayes, which were marketed
throughout the rural countryside. The idea was to provide families with
portable covers which could be moved from pit to pit as necessary. Infor-
mation on the extent of sales and the current status of the factory was not
obtained. Like Gonaîives, Cayes requires a marketable design for human waste
disposal adapted to its particular environmental conditions.
3.141 The municipality and the Department of Public Health are respon-
sible for solid waste removal in the city. Two trucks and a number of
wheelbarrows are available for this service. Public officials suggested
that two more trucks were necessary, but more efficient use of existing
personnel and equipment could provide the same effect. At most, the city
produces about 30 m /day, 1.e., an amount which one dump truck can carry
1/ Enquete Socio-Economique, op. cit.
[page 102]
- 80 -
for disposal with six to eight round trips. In all three cities, as in Port-
au-Prince, officials tend to rely on acquisition of more heavy equipment as
a means to solve the garbage collection problem rather than better use of
what they already have.
Water 1/
3.142 In Cap Haitien, the water supply system functions 12 hours a day
” and serves about 23% of the population. Distribution is by zonal rotation
with a frequency of three or four days. Because of the inadequate service
provided, the number of active house connections has decreased in the past
five years from 1,800 to about 1,000. There are eight public standpipes
serving an estimated 4,000 people. Water from wells and springs 10 km away
is pumped to the city. There are three storage reservoirs with a total
capacity of 4,200 m . The largest of these, a steel tank with a capacity
of over 3,100 m is out of service but can be repaired. The other two, built
in 1896, are still in use. The distribution system, with 27 km of pipes, was
built in 1922 and extended in 1952 and is in very poor condition.
3.143 In Gonaives, the system provides limited service eight hours a day
to about 17% of the population through 490 house connections and six public
standpipes. Water from one well is pumped directly into the distribution
system since there is no storage reservoir. The distribution system has 33
km of pipes in good condition.
3.144 In Cayes, the system provides service three hours a day to 72% of
the population, 17% served by about 700 house connections and anotner 55%
from public standpipes. Water frgn one well dug in 1927 is pumped into a
single storage reservoir of 380 m capacity. It is in bad condition but can
be repaired. Water flows from there into a 17 km distribution system built
in 1927 and 1966. 2/
3.145 Though water consumption rates tend to be low in all three cities,
only Cap Haitien has developed a major third-party sales situation resembling
that of Port-au-Prince. In Gonaiïves and Cayes, water is distributed freely
to many of those without connections. In addition, there are many private
wells in the two areas which provide water to a significant portion of the
respective populations. Administration and management of water systems in
all three towns is the responsibility of a newly created Service National
d’Eau Potable (SNEP) which has 111 employees. The Service is weak in all
dimensions of planning, execution and management.
1/ This section relies heavily on: Provincial Towns Water Supply Project,
Staff Appraisal Report, No. 1694b-HA, IBRD, Nov. 30, 1977.
2/ Rapport sur l’Approvisionnement et/ou l’Amelioration des Services d’Eau
_ Potable dans 10 Villes Moyennes d’Haiti, Tome I a IV; Services Hydrau-
liques/OPS/OMS/PNUD, Port-au-Prince, August 1977.
[page 103]
81 -
3.146 In late 1975, UNDP granted US$155,000 to the Government to finance
the feasibility studies for water supply systems in 10 towns, including Cap
Haitien, Gonaives and Cayes. This grant was increased to US$227,000 in FY1977.
The activities financed by the UNDP grant (with PAHO as the executing agency)
covered the preparation of feasibility studies for the 10 towns, an analysis
of SNEP”’s financial and administrative situation and a study of the socio-
economic conditions of the population in these towns. Three towns, includ-
ing Cayes, have been selected by the Government for financing under a UNCDF
grant; IBRD financing will cover the remaining seven towns, including Cap
Haitien and Gonaives.
3.147 The IBRD/IDA project involves improvements and extensions of the
water supply systems of Cap Haitien and Gonaives. It is intended to elimi-
nate deficiencies in the existing systems and to extend service to a large
segment of the population that does not have adequate and safe water supply.
The project will also contribute to improving the institutional and opera-
tional capabilities of SNEP, to develop long-range policies for the sector,
and to assess the needs and define priorities for future programs. At the
end of the construction period by 1982, the project will (a) provide potable
water to about 90,000 people by rehabilitating and extending the distribu-
tion system; the systems will have adequate production capacity to serve
125,000 people by 1993; (b) control water wastage by the use of flow-lim-
iting devices (restricted orifice) in ali house connections and public stand-
pipes; (c) improve the efficiency of SNEP’s management and operations; and
(d) develop a long-range plan to improve the service levels in both the
urban (except for the metropolitan area of Port-au-Prince) and rural areas.
The total project cost for the seven towns is estimated to be of the order
of US$8 million, of which US$2.2 million is the anticipated capital cost of the
system in Cap Haitien and Gonaives.
3.148 The physical components of the project are designed to substan-
tially improve the reliability of existing systems, and would have adequate
capacity to service about 90% of the population in these towns (50% from
house connections and 40% from public standpipes) until about 1993, and
permit phased expansion in capacity as demand increases. The 10% of the
population not served is located in sparsely populated areas, where it would
be very costly to provide service. The project would satisfy the basic water
requirements of most of the population and reduce considerably the incidence
of disease from unsafe water.
3.149 Parallel to this IBRD project, UNCDF has given a grant of US$1.34
million with IBRD as main executing agency, for the construction and improve-
ment of water supply systems in Saint Marc, Les Cayes and Leogane. Close
coordination between UNCDF and IDA will assure that the same design and
construction standards will be applied to the two projects and that both
organizations will act in parallel to improve SNEP’s administration and
finances, The UNCDF project will provide safe water to a population of
about 54,400 by 1982 and will have adequate capacity to meet demand up to
1993 in these three project towns. The estimated capital investment is
expected to be of the order of US$630,000 in Cayes. Presupposing that all
[page 104]
- 82 -
goes according to plan, all three towns will have better water service in
the future than today, and much better water service than that available
or planned in Port-au-Prince. However, 1f 24-hour pressure cannot be main-
tained, or if disinfection becomes irregular, then the new system will con-
tinue to become contaminated if efforts at improving drainage and human
waste disposal methods are not undertaken.
Transport
3.150 Intra-urban transportation in Cap Haîtien, Gonaives and Cayes
is, for all intents and purposes, a non-issue. For years, the important
problem was transport between the towns and Port-au-Prince, and this is now
solved for the first two towns and a solution is well underway for the third.
Intra-regional transport remains an issue, but this is being addressed by
several multilateral and bilateral assistance agencies which work with the
Government.
3.151 One issue which remains is street paving in the towns. Programs
in this area are slowly being carried out, especially in Gonaives. Justi-
fication for paving cannot be made on transport grounds alone but rather
on grounds related to improving surface drainage characteristics in the
towns. Another issue, which may take on more importance ir the near future,
1s the small space accorded to the truck and bus terminal. on the outskirts
of Cap Haitien and its distance from the central produce market of the town.
At present, these questions are minor but, as the town grows larger, there
will be a need for more marketing space, which is not possible at the pres-
ent market location, and more truck and bus parking and loading/unloading
space, which is also not available at the current location of the terminal.
The efforts of the Service de Planification Urbaine to begin urban management
are opportune, and this service may address the issue.
F. SUMMARY AND CONCLUSIONS
3.152 Housing conditions in Port-au-Prince are poor:
(a) 64% of the housing stock are built of scrap, wattle,
straw and wood, much of it considered slums by gov-
ernment officials;
(b) 43.7% of the population live in densities of 800
people per hectare rising to as high as 2,000 in
some places;
(c) more than 80% of the housing stock in Port-au-Prince
are not connected to the water supply system;
(d) 61% of dwelling units offer less than 3 m? per resident; °
and
(e) new construction is inadequate and high-density areas
continue to grow denser.
[page 105]
- 83 -
3.153 Shelter conditions in the provincial towns are better than in the
capital. Compared to Port-au-Prince, dwelling units tend to be larger, sub-
division of existing units less frequent, and a larger proportion of families
are owners. Rents typically take a smaller proportion of income. With a
sizeable proportion of the labor force in provincial towns engaged in agri-
culture, traditional construction methods are less "“inappropriate" than in
the capital. Construction activity here also remains inadequate and shortage
of housing is felt at all income levels.
3.154 Both supply and demand factors constrain the quantity of land, espe-
cially for low-income residential purposes. In Port-au-Prince, large private
land owners are reluctant to release land for this purpose for fear of jeo-
pardizing the value of adjacent properties for future, more profitable, use
of the land. Demand for land is constrainted by land prices and transaction
costs, in relation to incomes, the cost of construction and, above all, by
the absence of adequate housing finance. Maturities for housing loans are
typically five years and only for some of them eight and one-half years. Only
a very tiny fraction of the population has access to these loans and the crea-
tion of the BDL may not change the situation for the vast bulk of the popula-
tion. If present thinking on the BDL’s operations prevails, more than 95%
of the urban population may still not have access to institutional housing
finance. It is not surprising that, at the moment, three out of four families
in Port-au-Prince and three out of five in provincial towns live in rented
accommodation.
3.155 There is no national shelter policy. Government attitudes to low
income shelter provision, in particular, can be characterized as follows:
(a) the housing problem 1s the existence of slums, i.e.,
of structures not made of concrete blocks, and gov-
ernment action should aïm at providing concrete-
block homes for low-income families. The concept
that houses made of scrap may be valid shelter for
the economy of low-income families is not generally
accepted; and
(b) low-income families cannot afford to pay for housing
and cost-recovery, direct or cross-subsidized, is
impossible. As a result, government shows little
interest in increasing the supply of residential
land for low-income families for fear of creating
new slum areas and insists that heavy state sub-
sidization is required for low-income housing.
3.156 In the past, these views have resulted in severely limiting public
action to provide low-income housing. The public sector has intervened in
sheiter only for emergency relocation of no more than 18,000 persons since the
beginning of the 1970°s, all of them in Port-au-Prince. In principle, the St.
Martin and Drouillard projects are a first step away from these traditional
ideas, but efforts are still being made to translate the original intent of
[page 106]
- 84 —
the projects into the more habitual forms of public housing delivery and
standards for the projects have been rising. The attitude of public officials
has thus been a major obstacle in the path of an extensive program in 1ow-
income shelter provision. This may now be changing following an endorsement
of the sites-and-services approach to low-income shelter by the President of
the Republic.
3.157 The budgetary constraints in the country and the pervasive shortage
of skilled manpower make it imperative that, both for low-income shelter and
for urban service provision, minimal standards should be adopted initially.
Projects need to be kept as simple as possible and to increase in sophis-
tication only in line with institutional improvement. This applies both
to physical standards of service provision and to sophisticated management
methods, such as revolving funds.
Environmental Sanitation
3.158 The erosion problem on the Morne 1’Hopital dominates environmental
Sanitation in Port-au-Prince. Deforestation, goat grazing and other inappro-
priate agricultural practices on the mountain, as well as uncontrolled urbani-
zation on the lower slopes all contribute to flushing an estimated 100,000
to 200,000 tons of eroded material annually into the stormwater drainage
system of the city. Significant amounts of solid waste also enter the system
due to the inefficiency of the garbage removal services and, while the drain-
age system would be adequate most of the time, it is unable to carry this
much solid material. ÀAs a result, flow capacities of the system get pro-
gressively reduced during the rainy season by as much as 75% in the down-
town area and this causes regular flooding in the city. Estimated flood
damage reaches US$700,000 per annum, not including the costs of the inade-
quate regular clearing activities and crisis clearing after heavy storms.
3.159 Action on the erosion problem has been hampered by past lack of
official concern with erosion and waste management, partly due to the poli-
tics of private land ownership. The current insufficiency of public mate-
rial resources is aggravated by managerial and administrative inadequacy and
by lack of coordination among the compartmentalized and conflicting respon-
sibilities of the institutions involved. A substantial attack of the ero-
Sion problem on the mountain is now included in the IDB drainage system
improvement project recently approved.
3.160 In the meantime, the current situation affects all residents in
Port-au-Prince but weighs most heavily on the low-income portion of the
urban population. It is primarily low-income housing built on steep streets
or adjacent ravines and large drainage channels that is damaged or destroyed
through flooding. In addition, flooding in such areas as La Saline, Brooklyn
and St. Martin causes severe health hazards, which are compounded by flooding
in the central market area where the bulk of agricultural produce for the
city is handled. Health hazards fn these areas are increased by the presence
of human waste in the flood waters and by the risk of contamination of the
water supply system (see below). Beyond the clear relationship between
inadequate waste removal and drainage system obstructions, decomposing waste
is the feeding ground for pigs, goats and rats and breeds a variety of disease
vectors thriving in close proximity to human habitations.
[page 107]
- 85 —
3.161 Among the three provincial towns analyzed, Cap Haitien is building
up an erosion cum drainage problem very similar to that in Port-au-Prince in
terms of causes, effects and possible remedies. Rapid action is required to
avoid the need to reconstruct the system completely. There are no similar
erosion problems in Gonaives and Les Cayes, both of which are built on flat
areas very little above sea level. However, both towns have a drainage prob-
lem with inadequate clearing operations and stagnant water bodies that create
mosquito and malaria hazards. Technical research and experimentation are
required to develop suitable drainage methods.
3.162 Solid waste removal in Port-au-Prince and in the provincial towns
suffers from insufficient resources but mostly from inefficient management.
Everywhere, solid waste disposal in the drainage system aggravates flood
control problems and increases health hazards. In Port-au-Prince, a com-
posting plant may become operational and IDB has included a solid waste
collection component in its drainage rehabilitation project. Not enough is
known about these measures to assess whether they will be adequate. Manage-
ment assistance to provincial towns will also be required but is not part of
any known project today.
3.163 Liquid waste disposal in Port-au-Prince is mostly through latrines.
The cleaning service run by the Ministry of Health is expensive and the
cleaning trucks do not have easy access to most low-income high-density
areas because of the lack of access roads. Latrines are therefore sometimes
cleaned only by being flushed out during the rainy seasons and the human
vaste mingles with the flood waters and parts of it get deposited in the
streets and in the central market area. Some parts of the city are built
on marsh land areas, and some 60,000 people live under conditions where they
have no latrines and stagnant water in and around the homes most of the time.
Irregular water pressure and leaks in the water pipes, often lying uncovered
in the streets, lead to contamination of the system. Domestic water other
than human waste, mostly from high income areas, is also a source of conta-
mination of the water system during the dry periods.
3.164 There is no sewerage system in Port-au-Prince and it is not likely
that this will be an economic proposition in the near future. However,
improvements to the present collection and disposal methods could be effected
and a regular latrine clearing program could be made financially self-suffi-
cient. Construction standards could also be developed for housing built
around the water sources, which now contaminates part of the water supply
of the city, and a study on the absorptive capacity of the soils underlying
the city could help in devising a proper disposal system.
3.165 In the provincial towns, human waste and other domestic waste-water
are disposed of in much the same way as in Port-au-Prince. To varying degrees,
all three provincial cities have problems with high water tables in all or
part of their residential areas, which makes latrines and deep pits generally
or seasonally unusable. Like in parts of Port-au-Prince, human waste enters
floodwaters and risks contaminating the potable water systems. Technological
research and experimentation is required to develop suitable methods of human
vaste disposal.
[page 108]
- 86 -
Water
3,166 In Port-au-Prince the erosion problem also affects water supply.
There is no overall hydrological survey of the area, and presently known
resources cover only about half of the needs anticipated for the year 2000.
As the runoff from the mountain increases, absorption in the soil diminishes
and the sources from the mountain have produced sharply declining quantities
of water over the last decades. Pumping of water from the adjacent Cul-de-
Sac plain has now reached a level where saline infiltrations are taking
place which may indicate overpumping. Total water resource availability thus
remains an important issue. If it is discovered that there is indeed a
serious water resource problem, the burden of long distance water transport or
large storage capacity may significantly increase the costs associated with
further urban growth and may affect low-income families most severely.
However, serious efforts at loss minimization and at restoration of the Morne
1’Hopital could both, if undertaken, lead to relatively large increases in the
amount of water available. This might be sufficient, at increased levels of
low-income group consumption, at least through 1983.
3.167 The available water is generally very alkaline, is not regulariy
softened at the source, and the resulting deposits clog the system so that the
life of water mains may be as low as eight years in certain parts of the city.
System losses are as high as 50% and there is no metering of water consumption.
Many of the connections are illegal and rates for legal connection are based
on property values and some assessment of consumption levels. There are no
penalties for waste of water. Leaks in pipes take a long time to repair
and CAMEP has had sizable deficits in its operations.
3.168 Distribution methods of water rely heavily on private water sellers,
which often draw the water from the CAMEP system. These private sellers
include large-scale trucking operations and some 14,000 small water séllers
marketing water by the bucket. Some 23% of the population obtain three-
quarters of the water and some 47% obtain 11% of the water. About three-
quarters of the population consume less than 30 1 per caput per day.
Prices for legal water congections come to a maximum of US$O.11/m , truck 3
delivery costs US$2 to 3/m and bucket consumers pay ançaverage of US$2.30/m .
The latter figure, however, may rise as high as US$20/m in periods of drought
such as 1975 or 1977. In addition to natural scarcities, the system is also
prone to artificial scarcities by the independent methods of operation of the
valve operators or by deliberate sabotage. Water costs are extremely high
for the low-income population and amount to some 8% to 12% of family income
at levels of US$40 dollars per month and can be considerably higher for the
lowest-income population.
3.169 Expansions in the water system recently financed by IDB have not
included sizable numbers of public standpipes. There is currently only
one public fountain per 12,500 low-income persons and it is estimated
that some 300 to 500 fountains need to be built for average consumption of
of 30 1/c/4 by the low-income population; only 10 fountains were built in
[page 109]
- 87 -
Phase II of the IDB water project. Some action is now underway on the
institutional upgrading of CAMEP, the installation of meters and central
valve control. IDB also stands ready to finance a hydrological study and
a water master plan for the year 2000 if requested to do so. Other actions
planned by CAMEP include a new water tariff, the control of the trucking
operations and payments by well owners, since all water sources are considered
national property. If these efforts are successful, many of the current
regressive aspects of water distribution, consumption, and expenditure may be
alleviated four or five years from now. CAMEP’s institutional upgrading and
efforts should, therefore, be followed closely.
3.170 In the three provincial cities, public water service covers only
part of the population, is intermittent and unreliable and often contaminated.
À private water market has developed only in one of them, Cap Haitien. In
Gonaives and Les Cayes, water is generally given free of charge to those
without connections. All three of the towns are among the 10 provincial
centers where water supply and distribution networks will be upgraded through
recently approved UN and World Bank projects. When completed, these projects
will ensure adequate and safe water supply until the early 1990°s. In paral-
lel, the recently created SNEP, which is in charge of water supply and dis-
tribution outside the metropolitan area, is expected to be strengthened to the
point where it can fulfill its mandate. To attain safe water supplies it
will, however, be necessary to solve the drainage and human waste disposal
problems affecting the provincial towns.
Transport
3.171 The transport situation in Port-au-Prince is characterized by
inefficient use of the existing facilities. In addition, many high-density,
1low-income neighborhoods have no or inadequate access for road transport.
This aggravates conditions of emergency intervention, supply of construction
materials, latrine clearing, etc. One thousand five hundred buses and mini-
buses provide public transport in the city. They are privately owned and
charge government-regulated rates that are not affordable by the bulk of the
population. For example only one trip per day amounts to 14% of the income
of a family living at the cutoff level for relative poverty, i.e., about one-
third of average income in the urban area. Some two-thirds of the population
are in this situation. It is therefore not surprising that most of personal
transport is pedestrian. Close to 90% of all work trips and over 80% of the
distances covered by work-related trips are done on foot. No substantial
change is anticipated by 1986. Most work-related trips are to and from the .
central area, where 54% of employment opportunities in Port-au-Prince are
located and where some 300,000 people reside. The location of the central
market is the main urban transport question for the low-income population.
[page 110]
- 88 -
3.172 The absence of an explicit urban transport policy, of urban trans-
port management capability and of overall urban planning constitutes a serious
problem. It makes it impossible to forecast the future shape and structure
of the city and precludes accurate planning of urban service requirements
and road facilities, thereby creating high risks of wastage in public re-
sources. However, the weakness of local institutions makes it inappropriate
to suggest that the Government immediately set forth a transport policy
and create a corresponding central institution. It is preferable to extend
and clarify the mandates of existing institutions, assist in their slow
upgrading and facilitate their cooperation to encourage the development of
overall transport management capacity.
3.173 There are no intra-urban transport questions in the provincial
cities. Paving of city streets could not be justified by transport questions
alone but might be needed to improve the drainage situation. In the longer
run, Cap Haitien may develop a problem with the location of the central market
and bus and truck parking and loading areas. These are presently relatively
far from each other and cannot be expanded at their locations. With growth
of the town, more space will be required for both. This issue will have to
receive attention, preferably through the recent effort of the Service de
Planification Urbaine to develop an urban planning mechanism for Cap Haitien.
[page 111]
= 89
CHAPTER IV: URBAN MANAGEMENT
A+ SOME GENERAL FACTORS AFFECTING INSTITUTIONAL PERFORMANCE
Unsatisfactory Civil Service Status
4.01 One overall problem that should be mentioned at the outset is the
general status of the civil service. While it would be inappropriate to
develop this in detail in the framework of this report, it does have a per-
vasive influence on institutional performance. At the present time, the
low level of remuneration is compounded by the absence of unified procedures
for selection, promotion and remuneration of staff. There is no classifica-
tion and grading of posts, nor are job descriptions generally available, and
there is little security of tenure.
4.02 As a result, it is difficult to attract and retain personnel of the
highest calibre in the public service, emigration of qualified staff is quite
. sizeable, it is common practice for public officers to engage in other forms
of employment or professional activity parallel to their official jobs, and
it is not unknown for an officer to be appointed to and paid for more than
one official post. It is also possible to find persons with similar qualifi-
cations and experience, performing comparable duties and receiving substan-
tially different levels of remuneration. The Presidential Commission on
Administrative Reform that was established some years ago to consider these
matters has yet to produce any publicly available results.
Excessive Centralization
4.03 Decision-making is almost exclusively concentrated in Central Gov-
ernment in Port-au-Prince. Only a few government departments have offices
in provincial towns 1/ and those that have delegate practically no decision-
making authority to them. Their budgetary allocations are normally limited
to allocations for wages and salaries and the bare minimum of other current
expenses. All decisions on equipment or other investment expenditures have
to be referred to Port-au-Prince. . This is true also of the municipalities
which have no power to incur investment expenditures, even within the amounts
available in their meagre budgets. Express approval has to be obtained from
the central government in Port-au-Prince.
4.04 Within government departments, many matters that could be considered
of a routine character also have to be decided at the highest level. This
creates bottlenecks and considerable delays throughout the machinery. As a
result, subordinate staff and, particularly, provincial officials, are apa-
thetic and, in many cases, do not even forward their proposals to the central
1/ Under a recent agreement with USAID, four ministries, including the DTPTC,
will get special budget allocation of US$25 million per annum over an
initial period of five years to step up their activities in the provinces.
[page 112]
- 90 -
authorities. This situation also contributes to the reluctance of public
officials to be posted in the provincial centers and creates a disincentive for
industries to locate outside of Port-au-Prince and its immediate surroundings.
Uncertainty of Mandates
4.05 Throughout the following sections, it will become clear that basic
mandates for many urban activities lack precision. They are open to varying
interpretations and leave excessive room for particularly dynamic or powerful
individuals to move their institutions into activities that are not or should
not be part of their functions. Given the general shortage of resources,
this is often done at the expense of their legitimate mandates. DATPE, for
example, has paid much less attention to its national and regional spatial
planning functions than to Port-au-Prince in general and the development
of the very specific UNCDF projects in particular. CAMEP has been. making
population projections, etc., when it might more usefully have developed
up-to-date plans of the system it operates. The lack of precision in man-
dates also makes it relatively easy not to implement legal provisions, so
that implementation is much less satisfactory than the basic legal frame-
work itself.
4.06 The problem is compounded by clear duplication in mandates, such
as can be noted for the ONL and the BDL, for industrial and craft promotion
offices and for some of the other urban service delivery agencies. It is
further aggravated by the absence of medium or long-term guidance in most
policy areas on objectives, strategies and instruments. Pervasive uncer-
tainty as to the direction and scope of institutional development is the
result.
4.07 With few exceptions, institutions in the country do not coordinate
their interventions. This is partly due to the absence of clear guidelines
to this effect and partly the result of uncertainties surrounding the man-
dates of the various institutions. Since there is no functioning overall
planning agency for the Port-au-Prince area or for any other urban center
in Haiti, coordination among the relevant agencies is left to the goodwill
of the personalities involved and to their perception of their own institu-
tional or private interests. Problems in this area abound and many can be
identified. They range from the overall regional and urban planning level
(for example, between DATPE and the Service d’Urbanisme) 1/ through the
delivery of employment promotion and urban services (like in housing or
environmental management) to the implementation of rural development projects
without adequate consideration of their urban impact. The tradition of
institutional cooperation in the interests of efficiency and substantive
problem-solving has simply not developed.
1/ The mandates of the Service d'Urbanisme and of DATPE have been modified
during 1978 (see below).
[page 113]
- 91-
Manpower Shortages
4.08 AS was pointed out in Chapter I, the basic educational system of
the country provides access only for a fraction of the population. The low
output of the basic system in turn reduces the scope for further technical,
professional and administrative training. Together with the emigration,
at least in the past, of the educated, this produces a dearth of qualified
mto staff them. The staff strength of the Port-au-Prince Municipality, for
example, appears quite high but the staff is inappropriately concentrated in
general administrative capacities and lacks the needed technical and profes-
sional qualifications. Similar problems affect many government departments
and institutions. ‘
4.09 Haiti depends largely on external sources for the training of much
of its specialized personnel. In those cases where there is no dearth of
scholarships and other assistance, it remains difficult to find persons
of the right caliber to take advantage of them. Some services, like the
Service d’Urbanisme, find that even though they have eligible candidates,
their staffing situation is such that they cannot afford to release more than
one or two a year. The University of Haiti trains architects and engineers
and the country seems to be reasonably well supplied with these. However,
there is at present no training of urban and regional planners, who are
consequently all trained abroad. There are perhaps no more than half a
dozen trained planners in the country, and there is also a shortage of well
trained economists.
4.10 In the area of administrative training, some 30 persons have
recently completed a 9-month course of training in Organization and Methods
and are now dispersed throughout the various ministries and para-statal
bodies. Another 30 were due to start training in January 1978. Last year,
four persons graduated from the course in Social Administration in the Faculty
of Human Sciences, and twenty-two are currently enrolled in this course.
Only one student completed attendance of the management course at the National
Institute for Public Administration last year, in a course which started
with eleven students. Two of these went off on foreign scholarships and
the others dropped out. Thus, prospects for the availability of personnel
with appropriate urban management skills are not brilliant for the near
future. |
4.11 These various negative factors are mutually reinforcing. Low
remuneration aggravates the shortage of qualified staff in public administra-
tion which in turn contributes to justifying centralized decision-making.
The latter is partly responsible for the reluctance of staff to serve in the
provinces, which makes it difficult to enlarge the power of local bodies and
so on. By the same token, 1f this vicious circle could be broken, for example
through improved material conditions in the civil service or through devolu-
tion of power to local bodies, a self-reinforcing process of improvement
might result.
[page 114]
— 92 —
B. REGULATORY POWERS AND INSTRUMENTS
Basic Legislation
4.12 The basic legislation for the control of urban development is an
Executive Order (decret-loi) of 1937 establishing special rules relating to
housing and land use in towns and elsewhere in the country and arranging for
their coordination in a manner conducive to the necessities of hygiene and
modern town planning as well as regional and national needs. ]1/ In its
seven chapters, it lays down a large array of rules pertaining to town
planning and the supply of urban services.
4.13. ‘ Like most of such legislation in that period, the 1937 law is
heavily oriented towards architectural and public health aspects. While it
sets the requirement to seek permission for any construction, the procedures
for obtaining the permit focus on details of the design and structural charac-
teristics of the proposed building. The law does not provide for examining
whether a building or a sub-division should be allowed in the proposed loca-
tion in the first place, nor does it make adequate arrangements for measuring
the impact of a sub-division for example, on traffic flows, the provision of
public utilities and communal facilities, etc. Though there is some require-
ment for applicants to make provisions for water supply, waste and sewage
disposal and roads, there is no obligation to ensure provision of basic
infrastructure prior to the occupation of lots.
4.14 The legislation has other shortcomings. It does not deal with
changes in land use, and, for example, it is not prohibited to change a dwell-
ing unit into a dance hall or factory. It establishes no control over the
leasing of land and no requirements for provision of minimum services on such
land. 2/ Finally, there is no mechanism to control developments sponsored by
government departments and para-statal bodies. For example, the mayor of
Port-au-Prince and the town planning office have no power to regulate the
development of industrial estates in the metropolitan area or to control the
siting of facilities such as schools, clinics, community centers, or the timing
of infrastructural developments.
4.15 Expropriation for public purposes is regulated by a law passed on
February 6, 1948. 3/ To obtain a “declaration of public interest", the agency
involved makes a request .to the general tax administration which technically
1/ Decret-Loi Etablissant des Regles Speciales Relatives a l’Habitation et
a 1’Amenagement des Villes et des Campagnes, Le Moniteur, 92nd year,
No. 63 of August 5, 1937.
2/ This affects a large part of low-income shelter, in particular because
the building permit procedures do not, in practice, reach down to this
level.
3/ The text was not obtained by the Bank mission. Also, there remains some
uncertainty about the dates of the basic laws governing expropriation.
[page 115]
= 93 - .
identifies the land. Subsequently, the Ministry of Finance prepares the order
which, after signature by the President, is published in "Le Moniteur", the
official gazette. This law is considerably strengthened by subsidiary legis-
lation, which establishes procedures to delineate clearly the area required
for public purposes and to ensure speedy possession by the state.
4.16 Once a declaration of public interest has been made, the procedures
for compensation and taking possession are strong and expeditious. However,
major delays may occur between the time a request for public interest is
initiated and the signature of the necessary decree. In the case of the
UNCDF-financed projects in St. Martin and Drouillard, six to eight months
elapsed from inception of the procedure to the submission of the legal texts
to the Presidency for signature and another four months until the decree was
signed and published in the official gazette . Delays may also occur during
the functioning of the Special Compensation Commission, which has to meet and
report on each individual property. Where the area to be expropriated belongs
to a large number of owners and where structures or land improvements have to
be evaluated, it may take considerable time for the Commission to finish its
work. The projects at St. Martin and Drouillard should provide a good test of
the working of the machinery.
Other Instruments
4.17 Haiti does not have at least three usually necessary or helpful
instruments for urban management. Firstly, for all practical purposes,
Port-au-Prince has no cadastre. While cadastres exist in the provincial
towns, they are mostly well out-of-date, in part because it is costly to
change entries. Determining the present ownership of a piece of property is
therefore a lengthy procedure and can be expensive. Secondly, there is no
comprehensive inventory of public real estate, which is held by a variety of
government departments and institutions, although the Ministries of Finance
and the Interior share the legal responsibility for its administration and
supervision. 1/ Whether the government owns a given piece of property is,
therefore, determined on a case by case basis as the need arises. Finally,
neither Port-au-Prince nor the provincial towns have zoning plans. While the
urbanization law of 1937 provided the basis and some general prescriptions for
their development, no time schedule was fixed for this work, and its initia-
tion was left to the discretion of the Ministry of the Interior. It appears
that the law has remained a dead letter and that no such plans have ever been
prepared.
4.18 The gaps in the basic legislation as well as the absence of these
important instruments aggravated by piecemeal land valuation methods seriously
impede efficient urban management by making it impossible to establish present
land use patterns and to formulate and implement a land use policy in urban
areas. Whether such a policy were to be carried out through direct public
intervention in the land market or by land taxation providing incentives or
1/ See Law of the 26th of July 1927, Le Moniteur, of August 8th and Lith,
1927, Nos. 63 and 64.
[page 116]
- 94 -
disincentives, the institutional and data base 1{s not in place. Furthermore,
even the considerable existing powers are far from being fully used, as is
discussed below. Thus, while it is important to modernize the town planning
legislation, it is equally or more important to improve implementation of
existing regulations.
C+ GENERAL INSTITUTIONAL STRUCTURE AND OVERALL URBAN MANAGEMENT
4.19 Three main institutions have some overall urban management respon-
sibilities. These are the Ministry of Planning, the Ministry of Public Works,
Transport and Communications (Departement des Travaux Publics, Transport et
Communications-DTPTC) and the municipalities. The Ministry of Planning was
created in November 1978 1/ to replace the National Development Planning
Council (Conseil National de Developpement et de Planification — CONADEP)
and the DTPTC has also been reorganized recently, i.e., in August 1978 2/,
when the previous Service d’Urbanisme (SU) was replaced by the Service de
Planification Urbaine (SPU) and some of its responsibilities were transferred
to other services of the DTPTC. Two of the main actions in urban management
have, therefore, seen their mandates amended in the recent past. The follow-
ing discussion will place those changes into a brief historical perspective.
CONADEP and the Ministry of Planning
4.20 The legal basis for planning at the national and regional level
is laid down in various decrees and laws, starting July 1, 1963. 3/ The last
enactment which concerned CONADEP, was dated October 14, 1976, and set out
the structure and functioning of the Council. 4/ The Council (see Annex
for organization chart and composition was to establish overall development
policies and priorities and had a fairly wide-ranging mandate for planning
and coordination of the government”’s local and economic development budget.
It directly administered only about one-third of the development funds of
national origin and just over 10% of the total development funds and did not
have a direct implementation role, but, in principle, all development projects
had to be vetted by the Council. The Ministry of Planning as successor to
CONADEP no longer has any direct financial responsibility 5/ although it still
participates and assists in financial programming and the establishment of
the development budget. Its mandate is presented in more general terms than
was that of CONADEP and is too recent to present a clear assessment of the
other changes that have taken place in the planning machinery through this
reorganization.
1/ Le Moniteur of November 16, 1978.
2/ Le Moniteur of August 10, 1978.
3/ Le Moniteur of July 11, 1963, No. 61.
4/ Loi organique du CONADEP, decree of October 14, 1976.
5/ As a consequence, the CONADEP Division II on the Development Budget
and Financing is not part of the Ministry of Planning.
[page 117]
- 95 -
4.21 Among the six specialized divisions of the central planning office
in Port-au-Prince that was the technical arm of CONADEP, the Division for
Regional Planning and Environmental Protection (Division de 1”Amenagement du
Territoire et de la Protection de l’Environment - DATPE) was the one most
immediately relevant for urban management. Its functions, as set out in the
decree of December 31, 1973, 1/ were:
(a) to coilect, evaluate and update basic information on all
aspects of land use, land resources and land development;
(b) to formulate strategies and priorities for development and
determine principal geographic growth poles;
(c) to elaborate structure plans, classification of towns and
boroughs according to their function and role;
(d) to plan and study long-term physical development and to
collaborate at national and regional level in the implemen-
tation of projects identified in this framework; and
(e) to assist and cooperate directly and continuously in the
elaboration of regional plans, urban development plans and
physical area-planning projects.
4.22 In the same way as the overall mandate of the Ministry of Planning
compared to that of CONADEP, the new mandate of DATPE appears less precise
than its predecessor. DATPE is expected to define the regions in the country,
undertake studies and formulate strategies concerning regional decentraliza-
tion and development and the spatial distribution of population and (socio-
economic?) activities. DATPE is called upon to make recommendations con-
cerning environmental protection and, concerning urban development more
specifically, is to keep abreast of work on urbanization within the country.
The latter formulation seems to indicate that the urban planning function is
to be carried out primarily in the DTPTC (see below). While this appears to
be a useful clarification, only time can tell how the new DATPE mandate will
be interpreted in practice.
4.23 Through its analytic and strategic role in regional development and
decentralization, DATPE will remain an important force in urban development
in Haiti. It is, therefore, worthwhile to recall its past activities in this
field including the Director; the Division had a total staff of 20 people in
1977, 11 of which were professionals, and was organized into four sections
on regional planning, urban planning, studies and graphics. All staff were
concentrated in Port-au-Prince. Regional offices of CONADEP were foreseen by
the basic legislation but were not actually established. 2/ At the beginning,
1/ Le Moniteur, February 21, 1974.
2/ The law establishing the Ministry of Planning (op. cit.) creates a
Directorate of Regional Services (Direction des Services Exterieurs),
and specifies that regional offices are to be created according to
needs (Article 14).
[page 118]
- 96 -
activities of the division were centered on the preparation of a development
plan for Port-au-Prince and its.metropolitan region 1/, a study which had
started before DATPE was put in place. The UNCHBP-assisted 2/ project was
carried out for the Haitian government by DATPE and the Service d'Urbanisme of
the DTPTC, with important assistance from foreign consultants. Since July 1,
1977, it is being followed by another UN technical assistance project to
reinforce the urban planning section of DATPE with particular regard to
immediate action projects, the development of functional zoning and related
infrastructure needs and the coordination of financial aspects of the develop-
ment of the metropolitan region and other regional centers. 3/
4,24 The plan for the development of Port-au-Prince and its metropolitan
region has not, so far, been given overall consideration by the government.
Copies have not been widely distributed and there is no established procédure
for the approval of such a document. Some features of the numerous proposals
made in the plan, in particular the creation of what amounts to the nucleus
of a metropolitan development authority for the capital, appear to have been
implicitly rejected by the government. The status of the plan as a whole
remains uncertain.
4.25 DATPE has, however, developed three projects in greater detail,
partly on the basis of the plan. These are the St. Martin slum rehabilitation
and Drouillard sites-and-services projects financed by UNCDF (see Chapter III,
Section A) and a project for the development of the Delmas area, which may
attract foreign assistance from the German Federal Repubiic for part of the
roadbuilding investment foreseen. Such detailed plan preparation, especially
in the area of housing, was and is not part of the legal mandate of DATPE.
4.26 In addition to these activities in the metropolitan area, DATPE has
also done some work on intra-urban planning and on defining planning regions
for the country. In November 1977, the staff of the Division for the first
time visited a regional center, 1.e. Hinche in the central plateau region,
which has been chosen for the first regional planning effort. The actual
work will be carried out with foreign financing and technical assistance.
4.27 While DATPE had the authority to formulate strategy, elaborate
schemes, prepare long term plans at the national level, etc., the legislation
did not specify procedures for linking this division with the sectoral depart-
ments and the economic and financial divisions of the planning machinery. The
1/ Plan de Developpement de Port-au-Prince et de sa Region Metropolitaine,
op. cit. Phase III of the plan consists of 14 volumes, of which six
deal with sectors, six with immediate action projects and two are
summaries.
2/ United Nations Center for Housing, Building and Planning.
3/ Based on the UN project document No. HAI/77/007/A/01/01. In the light
of new mandates for DATPE and the Town-Planning Service of the DTPTC,
it is not clear that this project helps the right service.
[page 119]
- 97 -
powers of DATPE were therefore relatively limited and it could find itself
producing plans and studies that had little or no relevance for or influence
on the investments which actually took place. DATPE was and remains subject
to the general factors that weaken institutional performance in Haïti and much
of its work has gone forward because of substantial foreign assistance and
could not be carried on without such expatriate involvement.
DTPTC
Service d’Urbanisme and Service de Planification Urbaine (Town-Planning Service)
4.28 Under the 1971 organic law of the Department of Public Works,
Transport and Communications, provision was made for the establishment of a
Town Planning Service as one of the specialized services of the department. 1/
The Service belonged to the Directorate of Studies, the other directorates
being concerned with Administration, Control and Supervision, Physical Plan-
ning and Departmental and Communal Services (see Organization Chart in the
Annex). While many other parts of the DTPTC and institutions under its
supervision had functions related to urban services, etc., the Service
d’Urbanigme had the main responsibilities in overall town planning matters.
4.29 In the overall framework of the 1937 Town-Planning Law, the Service
was charged with:
(a) the preparation of plans for the development and improvement
of urban and rural centers;
(b) the study of the construction and maintenance of public
buildings; and
(c) the control of construction, repair and extension of all
private properties, both residential and commercial.
This involved giving technical advice to the municipalities on the approval
of construction permits, the control of unauthorized constructions, the
approval of road layouts, private subdivisions and plans for reconstruction
following a natural disaster. The service has undertaken the physical plan-
ning and construction of low-income housing on behalf of the ONL, the most
recent example being the extension of the Cite Jean Claude Duvalier in
Port-au-Prince in 1975.
4.30 At the time of the Bank”’s Sector Mission in November 1977, the
Service had a staff of some 20 architects and engineers and approximately 30
lower level personnel with an annual budget of some US$90,000. Nineteen of
the staff, of which some 13 are inspectors, were charged with the control of
private construction in the Port-au-Prince metropolitan area. All the staff
of the Service and the overwhelming bulk of its other activities wre located
1/ Article 9(9) - Specialized Services: Loi Organique du Departement des
Travaux Publics, des Transports et Communications, Le Moniteur, No. 48,
June 17, 1971.
[page 120]
- 98 -—
in Port-au-Prince. Apart from some work underway on recasting the town
planning legislation, eight other sizeable projects were underway in the
city, involving work on parks and public places, markets, road intersections,
sidewalks and the like. The only activity of the Service outside the city
was in Cap Haitien, where one officer spent a few days each month to develop
town planning capability.
4.31 The venture into Cap Haitien was the first effort of the Service
directed at overall town planning. The Service has cooperated with DATPE in
the work on the development plan for the Port-au-Prince metropolitan region
and has provided some technical expertise for the specific projects in St.
Martin and Drouillard developed by DATPE. In general, however, the Service
has kept a low profile in urban planning questions, partly because DATPE had
tended to preempt some of the work. Together with DATPE, it has benefitted
from foreign assistance under the UNCHBP project between 1972 and 1976 but has
worked without expatriate assistance afterwards.
8.32 The Service had certain limitations in its role of controlling
private construction activity. The absence of a zoning plan and of an appro-
priate building code obliges the 13 inspectors of the Service to base their
judgments on the very general prescriptions of the 1937 town planning law.
Not only is this open to widely different interpretations, but the inspectors
are not highly qualified and their analysis often remains cursory. In cases
where violations were found and injunctions issued, 1/ enforcement powers
were and are extremely limited. Only in a few cases is a building or part
of it torn down, and the legal basis for this remains doubtful. Often, it
is also physically difficult to meet the builders, who may be conveniently
absent during the working hours of the Government. As a result, the Service
was unable to control urbanization and to ensure the urban infrastructure
and service delivery standards laid down in the basic legislation. This
aggravates erosion and drainage problems and hampers improvements in solid
and liquid waste collection and disposal. (See Chapter III, Section B and
Section D of this chapter).
4.33 With the reorganization of the DTPTC in August 1978 2/, the Service
d’Urbanisme was replaced by the Service de Planification Urbaine (SPU). The
title of the new sevice contains the word "Planning" and highlights the change
in the mandate of the Town Planning Service. The SPU is in charge of all
matters concerning the physical and economic planning of urban and rural
centers. In close collaboration with DATPE, SPU is responsible for the
formulation of objectives and strategies for their development. SPU will
also prepare and program projects, control progress in their implementation 3/
1/ Between September 1, 1975 and October 30, 1976, 3,872 injunctions were
issued. For the same period, the Service gave its advice on 376 con-
struction permits.
2/ Le Moniteur, August 10, 1978.
3/ Similar responsibilities in following and controlling projects are given
to the Direction de Controle et d’Evaluation of the Ministry of Planning
(Article 12 of the mandate). This introduces a new overlap in mandates.
[page 121]
- 99 -
as well as revise their budgets, and it is in charge of establishing norms
for land use, urban infrastructure (including garbage collection, sewerage and
drainage) and for commercial, industrial and residential building.
4.34 The SPU, is however, relieved of all executing functions previously
assumed by the SU (see para 4.29 (b) and (c) above) which are transferred to
the Service de Genie Urbain 1/ (Urban Engineering Service). Detailed control
of urban development will be the responsibility of this service, while the
SPU can devote all its energies to the functions of planning and norm-setting.
Only time can tell how this reorganization will work in practice and, in par-
ticular, whether the Urban Engineering Service will be given the means to do
better than the old SU in the control of urban development (see above).
Programming Unit
4.35 The new organic law of the DTPTC also specifies the mandate of a
programming unit (Unit de Programmation - UP) which is to ensure the coherence
of the objectives of the different services of the Department and of the
various autonomous bodies under the Department”’s supervision. In the frame-
work set by the planning machinery, the UP prepares five-year and annual plans
in the areas of public works and urbanization, transport, energy, drinking
water and communications. While the division of labor between the SPU and
the UC with respect to urban planning will need further elaboration, the
coordination of the wide-ranging activities of the DTPTC and its subsidiary
bodies through the UP is of great potential importance for the efficiency of
urban management.
The Municipalities
4.36 According to the Constitution, 2/ the communes are autonomous,
subject to limitations established by law. Between 1964 and 1970, five towns
in the country received complete financial and administrative authority by
decree. By 1971, however, all these decrees were repealed and communal com-
missions were set up consisting of a mayor and two assistants. 3/ The Bank
mission was unable to secure good information on the structure, functioning
and responsibilities of these bodies. Generally, it appears that they have
little or no technical staff at their disposal and that their activities,
apart from their political functions, are largely confined to certain partial
maintenance functions with little or no planning, managing or coordinating
authority.
4.37 Some information is available on the Port-au-Prince municipality.
The office of the major has 250 staff on monthly payroll, 4/ divided into
some 10 divisions, of which five have some substantive functions, the others
1/ Formerly called Service de Genie Municipal.
2/ Constitution of the Republic, 1964, amended in 1971.
3/ Law of July 12, 1971.
4&/ Plus some 570 regular daily paid workers and the possibility to hire
200-500 more to deal with floods.
[page 122]
— 100 -
providing support and general statistical and accounting services. The sub-
stantive functions cover collection and disposal of garbage, general inspec-
tion services, administration and maintenance of municipal schools, asyluns,
dispensaries and cemeteries, issue of building permits, 1/ and identification
of concrete block buildings for tax purposes. Most of the staff have admin-
istrative rather than technical skills which severely restricts the efficiency
of the municipality’s interventions. Generally speaking, the role of the
municipality is confined to selective urban service delivery with no influence
on the city’s growth and development. The situation is certainly no better in
the provincial towns.
4.38 Not only the responsibilities of the municipalities are restricted,
their financial position is also precarious. Table IV-1 shows the revenues
and expenditures of selected municipalities in 1975/76. The Port-au-Prince
figures are not fully comparable because both total receipts and total ex-
penditures are budget figures and not actuals, as for the other municipalities.
The buoyancy of municipal revenues cannot be fully assessed for any length of
time but Annex Table 4.1 shows that the tax part of the revenues 15 growing
very slowly, even without the depressing effect of the abolishment of the
market transaction tax (seé below). In real terms, revenues from local taxes
are falling. Municipal tax collection suffers from shortcomings and substan-
tial deductions from the amounts collected. Rental value is assessed by low-
paid officials and the Mayor of Port-au-Prince estimated that about 5,000
high income residences in the city escape valuation altogether and pay no
local tax. Of the amount collected, deductions are made for the collection
service and, in much larger amounts, for transfers to other Government ac-
counts. Together, these can amount to as much as 50% of the amounts collected.
Better valuation and collection procedures and the elimination of deductions
other than for the collection service would provide a very substantial boost
to municipal budgets.
| Table IV-1: RECEIPTS AND EXPENDITURES OF SELECTED MUNICIPALITIES IN 1975/76
Receipts Expenditures
Total Of which: Total Per head of
Municipality 1000 US$ local taxes 1000 US$ 1975 population
1000 US$ US$
Port-au-Prince 1,283 731 1,283 2.06
Cap Haitien 69 44 68 1.28
Les Cayes 51 21 45 1.82
Jacmel 31 13 31 2.50
Gonaives 48 17 45 1.32
Source: Ministry of Finance and Port-au-Prince municipality.
1/ After review and advice by the DTPTC.
[page 123]
- 101 -
4.39 After deductions, about 55% of municipal revenues comes from taxes
earmarked for the municipalities and collected on their behalf by the Ministry
of Finance. These are a tax on the rental value of built-up properties and
a license tax on commercial, industrial and professional enterprises. Until
1974, there was also a tax on market transactions, but this was abolished by
the Government. The remainder of municipal revenue consists essentially of
government grants from the Departments of the Interior, Public Health and
Public Works, including compensation for the abolished tax on market tran-
sactions. Municipal fees account for the rest.
&.40 At present budget levels, the bulk of the expenditure goes to
wages and salaries and related costs. In the 1976/77 budget of Port-au-Prince,
for example, only just over 10% is available for the purchase of equipment and
materials or a little more than 20 US cents per inhabitant. 1/ The situation
is likely to be no better in the provincial towns, although detailed data is
not available. Even for the small amounts available for other than obligatory
current expenditures, the provincial town administrations have to get spending
authority on a case-by-case basis from the central government.
4.41 Given their poor financial status, the lack of technical expertise
and the severe limits on local decision-making and spending authority, it is
not surprising that the municipalities are in a state of near-paralysis.
This is most noticeable in overall town planning activities but also affects
the discharge of municipal responsibilities in urban maintenance and service
delivery. Whether the municipal elections planned in the next 18 months will
provide the springboard from.which the municipalities might be revitalized
remains to be seen.
D. URBAN EMPLOYMENT PROMOTION INSTITUTIONS
Manufacturing
4.42 The development of the manufacturing sector is, in principle, the
domain of the Ministry of Commerce and Industry (DCI). In practice, the Min-
istry does little more than prepare the licensing of new industrial enter- |
prises and participate in the commission that recommends the granting of
fiscal incentives to eligible candidates. The implementation of the wage
legislation is the responsibility of the Ministry of Social Affairs. The
DCI’s responsibilities do not cover the construction industry and it does
not intervene in questions of vocational and professional training, except
perhaps if asked to do so by entrepreneurs. DCI has no regional offices.
1/ This compares with, for example, the budget of the municipality of
Jakarta which, in 1976/77, amounted to a total of US$34 per person
with payroll and maintenance expenditure accounting for less than 27%.
Nearly US$25 per person were available in Jakarta for materials,
equipment and other development expenditures, 1.e., about 150 times
the Port-au-Prince level.
[page 124]
- 102 -
Even in its limited activities, the DCI keeps no systematic records and
there is no monitoring activity of investment, employment, etc., once an
enterprise has been licensed. The chronic shortage of qualified adminis-
trative and technical staff is partly responsible for the inability of the
Ministry to develop an overall industrial policy, and its programming unit,
set up for just this purpose, has worked only sporadically in the past, such
as for the preparation of the five-year plan. The manufacturing section of
the plan, however, is little more than a list of projects on the books of
the IDAI and its subsidiaries plus some suggestions for private sector
projects.
4.43 Since June 1977, a small industrial promotion office (BHPI) is
functioning under the aegis of the Ministry and with financial and technical
assistance of the Federal Republic of Germany. Its functions are to identify
promising projects either for new investment or for rehabilitation and ex-
pansion, to establish links with foreign investors and know how and to provide
technical assistance. Eventually, the office should prepare feasibility
studies. The BHPI has presently six professional staff, including the Director
and the Co-Director, some supporting staff and a small consultants budget for
technical assistance and traîning. All staff work in Port-au-Prince, but BHPI
hopes to open a branch office in Cap Haïtien. The BHPI has got off to an
energetic start and has already identified some concrete projects, for which
interested foreign participants, mostly from Germany, have been found. Dis-
cussions are under way with the German Government about giving the Office
a financing capability which would complement the promotion services it can
offer. À very similar industrial promotion effort is to be mounted as from
1979 with UNIDO assistance in the DCI and an UNCTAD expert has been placed
in the Ministry to develop commercial policies with particular regard to
encouraging labor intensive export industries. It is not clear why these
efforts could not be combined in one operation. Beginning in July 1978,
UNIDO also intends to train industrial promotion officers of small and poor
countries, among which Haiti, for eventual attachment to embassies abroad.
4.44 Industrial promotion is also in the mandates of other institutions,
that do not fall under the supervisory responsibility of the DCI. For example,
Division V of CONADEP, the Development Project Promotion Division (Division
de Promotion des Projets de Developpement-DPPD) is supposed to generate
project ideas, develop them through the feasibility study stage and find
suitable investors. Here again, staff shortages are one of the reasons why
the Division has so far only developed a roster of past, present and future
projects and has not developed new projects or carried out feasibility studies.
IDB is now planning to provide assistance to CONADEP in project identification
and evaluation. INAREM, an autonomous organization which is not under DCI,
has responsibilities in the development of projects based on mineral resources.
4.45 Similarly, the IDAI with its subsidiaries was also set up to promote
industrial projects. IDAI is the only existing institutional source of medium-
and long-term industrial finance in the country. It is not under the direct
supervision of the DCI, although DCI is represented on its Board of Directors.
BNRH supervises its assets. IDAI, which had a total staff of 394 at the end
[page 125]
- 103 -
of 1976, is financed from a share of customs receipts (over 86% of current
income in 1975/76), its own financial income (less than 14% of current income
in 1975/76) and external Lloans from the IDB. Its lending activities have been
affected by long delays in loan approval and by inadequate project appraisal
and financial management. 1/ The organization has been in persistent financial
difficulties and, at the end of 1976, payments in arrears amounted to 48.6%
of its total portfolio, with agricultural loans in arrears by 73.8%, direct
industrial loans by 45.3% and loans to its subsidiary, Societe d’Equipement
National (SEN) in arrears by 37%. As part of a recently approved IDB loan,
IDAI will receive technical assistance and has undertaken to reduce its
delinquent accounts to 10% of the total portfolio by the end of the fourth
year of the proposed lending program. 2/ IDAI has four regional branch
offices but they have not so far handled any industrial lending.
4,46 Most of IDAI’s industrial lending takes place through its sub-
gsidiary, the SEN. This company can make direct investments but is obliged
to sell its participation in any profitable enterprises to the public. SEN
was to identify new projects, appraise them and find interested investors
but has not done so for some years. Many of its ventures operate at a loss
or have ceased to function. Another subsidiary of IDAI, the Societe Nationale
des Parcs Industriels (SONAPI) builds and manages industrial zones in the
country. The only industrial zone now operational is in Port-au-Prince.
It offers either serviced land on lease to potential investors or standard
buildings gt constructs itself for rent. Presently, six standard buildings
of 2,400 m each have been constructed and fully rented by SONAPI and the
construction of four new buildings has just been decided to meet part of
pending demand for space. Two buildings have also been built by outside
investors leasing only serviced plots. By the time the four new buildings
are finished, SONAPI will thus have realized about 36% of the first phase
objectives fixed for the estate. Faster development has been hampered by
construction delays and by the high cost of rental space on the estate,
which at US$1.05 per sq.ft. for the new buildings is w1l above the US$0.60
to US$0.70 per sq.ft. on adjacent privately developed sites. Plans for the
industrial zone in Cap Haiïtien have been postponed for lack of finance and
qualified staff. However, at the end of 1978, the government has requested
assistance from IDB to conduct a feasibility study for an industrial estate
in Cap Haiïitien.
1/ An industrial loan application from Les Cayes took one and a half years
to process until disbursement, and the collateral required was three
times the requested loan amount.
2/ IDB: Haiti, Industrial and Agricultural Development Program, HA-0020,
loan proposal, undated; circulated to Board of Executive Directors on
August 23, 1977,
[page 126]
— 104 -
Handicrafts
4.47 The institutional arrangements for the promotion of handicrafts are
even more complicated. Until autumn 1977, four ministries had services in-
volved in craft development, i.e., the Ministries of Commerce and Industry,
Social Affairs, Agriculture, Natural Resources and Rural Development, and
the Ministry of Education. In September 1977, 1/ the National Crafts Office
was created and in August 1978, it was formally inaugurated. It has a very
wide mandate for supporting crafts development ranging from technical, finan-
cial, marketing assistance and training to stimulating, through community
action, shelter improvement, potable water supply, schools, dispensaries,
etc. 2/ The office is organized in four sections concerning inspection, craft
development, credit and rural handicrafts. It will also take over the running
of some publicly sponsored craft workshop and is expected to have at its
disposal about a dozen qualified staff. À request for a budget is pending
with the Ministry of Finance. It is not envisaged that present staff working
on crafts in the Ministries will be transferred to the Office. Unless these
crafts sections cease to function, the Office will either have to limit itself
to a coordinating role (which is in contradiction with large parts of its
mandate) or it will simply increase institutional confusion.
4.48 In budgetary terms, the Crafts Office is part of the Ministry of
Social Affairs but is governed in its daily operations by a National Crafts
Council. That council has already met a couple of times and consists of five
representatives of the four Ministries mentioned above and the Ministry of
Planning, two representatives of the private commercial sector and two
representatives of the crafts producers. The non-governmental representa-
tives from the council have not yet been officially nominated and their
role is not specifically spelled out.
4.49 In addition to these official institutions, a large, unspecified,
nunber of private organizations are active in crafts development. These
range from purely commercial organizations to the numerous NG0”’s active in
Haiti. Many of them have training activities attached to their production
efforts. The non-profit but economically self-sufficient Comite Artisanal
Haitien, for example, sells the output of 19 production-cum-training centers
in the country. Others focus on developing markets for Haitian crafts, like
the Association pour le Developpement de 1’Artisanat, which was created by
businessmen and the Rotary Club with government support. Overall, however,
the development of overseas markets is left more to chance and special con-
nections then based on a comprehensive policy or institutional responsibility.
Vocational Training
4.50 In Chapter II of this report, shortages of skilled manpower were
emphasized as a serious obstacle to industrial and crafts development.
Technical and vocational training is thus of considerable importance. Three
1/ Decree of September 12, 1977.
2/ The latter parts of the mandate raise possibilities of conflict with
other government departments.
[page 127]
— 105 -
Ministries have sizable involvement in these activities. In addition to all
institutions of higher education, the responsibility of the Ministry of
Education includes craft and apprentice centers, the Ministry of Agriculture
has rural craft training centers, and the Ministry of Social Affairs runs
craft and industrial worker training, mostly in Port-au-Prince. The Ministry
of Commerce and Industry is only marginally involved with a small handloom
training center in îts headquarters in Port-au-Prince. 1/ In addition, there
is a large nunber of technical and vocational training schools which are
presently independent of these Ministries. Some are semi-public, like the
vocational training center financed by Canada, the CCHFP, 2/ others are run
by private organizations, often church-based. There may be some 70 technical
and vocational training schools in urban areas, of which 16 are public and
about 55 are located in Port-au-Prince. Unknown members of rural centers
would have to be added for a complete picture, 3/
4,51 The type and quality of training offered differ widely between
these institutions. Most suffer from lack of qualified teaching staff and
a severe shortage of training equipment and materials. Curricula are not
standardized and not related to an overall manpower development policy nor,
in most cases, to the specific requirements of industry. The only exception
that could be found is the CCHFP, where industrialists have a say as to the
trades being taught and participate financially in training costs. This
Center trains car and diesel mechanics, electricians, electronic technicians,
refrigeration specialists and may add store management courses. It was
created in 1974 and offers three to four years courses to a total student
body of 180 to 200. Even this center, however, operates in relative isola-
tion from other vocational training efforts.
4,52 Some of these issues are now being addressed through the National
Vocational Training Institute (INFP-Institut National de Formation Profes-
sionelle). This Institute, created under the auspices of the Ministry of
Education with foreign assistance from the ILO and France, is set up to
evaluate skilled manpower requirements in industry, develop programs and
teaching materials, train teachers for public training schools and generally
reorganize and support the vocational training effort, including that carried
out by industrial enterprises themselves and by the rural crafts centers.
The INFP is now laying the basis for fulfilling this mandate. In September
1977, it started an inquiry into the present skill levels and skill structure
: of industrial employment, the size and composition of employment and the ex-
pected skill requirements in the future. The inquiry, which is carried out
in close cooperation with CONADEP and the IHS, is expected to provide the
basis for an industrial manpower development policy which is then expected
to lead to proper curriculum development for the identified priority training
needs, In the meantime, with the pilot training school directly attached to
it, the INFP is planning to reorganize rural crafts training and may shortly
create nine rural crafts training centers with help from ILO. Its coordinating
function, howevèr, will take considerable time to be developed and accepted.
1/ This Centre has been transferred to the Office National d’Artisanat.
2/ Centre Canado-Haitien de Formation Professionelle,
3/ USAID has recently started a survey of vocational training institutions
— with a view to supporting a program to teach sub-professional engineering
[page 128]
- 106 -
E. URBAN SERVICE DELIVERY INSTITUTIONS
Shelter
4.53 The two main institutions that are or may shortly be active in
public shelter provision are the ONL, and the BDL. In addition, Divisions
III (DATPE) and V (DPPD) of CONADEP and the Service d’Urbanisme of the DTPTC
have been or are involved in certain aspects of public shelter provision.
4.54 The ONL was created in 1966 as a semi-autonomous agency attached
to the Ministry of Social Affairs. Its legal mandate includes the following
main functions: 1/
(a) maintain and manage all housing projects built by Government;
(b) carry out socioeconomic studies and research necessary to
establish housing needs and priorities for the country;
(c) construct and promote construction of low-cost housing for
families with modest incomes;
(d) develop and establish norms and criteria to be used in the |
pursuit of these objectives;
(e) establish precise criteria for the allocation of housing
types and the methods of accession to private property; and
(£) obtain guaranteed loans for housing development with prior
authorization from the Minister of Finance.
4.55 On paper, the responsibilities of the ONL fnclude most of the
elements required to execute a low-income housing policy, although the
development of housing policy as such, low-income or otherwise, is not part
of its mandate. In practice, however, ONL’s activities have been confined
to the maintenance and management of housing projects planned, built and
financed by other state agencies (see Chapter III), and its staff has not
been directly involved in planning, programming, finance or construction
of shelter. Consequently, ONL has acquired very little experience in housing
development over the 11 years of its existence.
4.56 The Office has 39 employees, all but one located in Port-au-Prince.
Only three of its staff are engineers. The office works with a current budget
of US$120,000, half of which is for payroll expenses. The budget is financed
from the declining mortgage payments collected for the ONL by the Administra-
tion Generale des Contributions and from Government subsidies which vary from
year to year. Recently, the Government has institutionalized the subsidy, which
now comes from a US$0.10 charge on land transactions and a share of 1.2% of
1/ Decret creant 1’0ffice National de Logement, Le Moniteur, No. 19,
March 7, 1966.
[page 129]
— 107 -
the national rental tax and provides about US$60,000 per annum. To compensate
for declining mortgage payments, the ONL has now started to collect voluntary
contributions for maintenance purposes from families residing in its housing
projects În Port-au-Prince. The small investment budget of the ONL
(US$114,000 in 1976/77) is drawn from special allocations of other public
agencies.
4.57 Recognizing its own deficiencies, the ONL has requested technical
assistance and a financing base which would permit it to upgrade its manag-
erial and technical capacity and to establish clear and coordinated relations
with the DTPTC, CONADEP, the BDL, etc. Little, if anything, has yet been
done for the ONL although considerable assistance in the housing field has
been obtained by the other three agencies. Unless the ONL receives such
assistance, it will remain unable to expand its activities beyond their
present range.
4.58 Recent developments make it possible that the ONL will benefit from
substantial technical assistance through the low-income shelter projects
financed by UNCDF. In fact, it has now been decided that the project team
in charge of implementation will be placed into the ONL. Initially, plans
ve.e d.awn up for a separate institution and the management structure of the
projects still reflects that concept. It is complex and has three levels. 1/
At the top is a Management Council consisting of representatives of the Minis-
tries of Public Works, Social Affairs and Finance, the BNRH, the Plan, the
Mayor”’s Office and undesignated members of the private sector and community
representatives. Below this is an Executive Committee consisting of represen-
tatives of the Ministries of Public Works and Social Affairs, the Plan, ONL,
the Mayor”’s Office, UNDP, private voluntary organizations and the project
manager and his counterpart. Finally, there is a Technical Service Unit
divided into three divisions: Cooperative and Community Development, Tech-
nical Services, Finance and Administration. It would consist of 30 Haitian
staff, five UNDP experts and two associate UN experts or expatriate volunteers.
Following the decision to place the implementation unit into the ONL, this
management structure will be reviewed and, hopefully, streamlined. Also, the
full integration of the project unit into the ONL as soon as possible would
be most desirable to ensure a lasting impact of the large technical assistance
element on the capabilities of the ONL.
4,59 Institutional uncertainty in shelter provision is being increased
by the creation of the BDL. A first attempt at creating the BDL was made in
1972 2/ but was not carried out, partly because of opposition from parts of
the Government, apparently including the Ministry of Social Affairs and ONL.
The first attempt was superseded by a second law in 1974. 3/ According
to this law, the BDL is created to promote private property access for middle-
income classes in the population and to improve the housing conditions of
low-income families.
1/ Draft copy of UNDP project report, November 1977.
2/ Le Moniteur, 127th year, No. 77-A, November 1972.
3/ Le Moniteur, 129th year, No. 66, August 1974.
[page 130]
- 108 -
4.60 Some of BDL’s functions are clearly different from those of the
ONL, such as the creation of savings and loan mechanisms, preparation of
loan guarantees and the supervision of private home savings and loan associa-
tions. Other functions, however, clearly overlap with the mandate of ONL,
such as:
(a) construct housing for rent or sale to low-income families;
(b) determine physical design and financial standards for low
income housing;
(c) maintain and manage all housing built by the BDL; and
(d) establish allocation policies and determine methods of
: property acquisition and transfer, etc.
4.61 Most of the low income housing activities of the BDL are to be
carried out by its Departement d’Interet Social. The law stipulates that,
onte the funds at the disposal of this department reach US$200,000, the
department will take over the accounts and housing under the current juris-
diction of the ONL. Since the finance for this department will come from 10%
of the BDL’s profits, this may take 10 to 15 years. Government officials
appear divided on the merit of this stipulation and some feel that this
department of the BDL is redundant, that the funds earmarked for it should
be made available to ONL at low interest rates, that the ONL should remain
an independent institution and that it should be given exclusive responsi-
bility for building and administering housing for families with incomes
below US$200 per month. Whatever the solution finally adopted, it seems
important that the problems of overlapping responsibilties and the institu-
tional relationships between the BDL and the ONL be resolved as early as
possible.
4.62 The management of the BDL is in place. The Board of Directors
w1i1l1 consist of the Minister of Finance, the Minister of Social Affairs
and the five members of the Board of Directors of the Banque Populaire
Haitienne (BPH). The BPH, a small institution salvaged by the BNRH from
a bankrupt predecessor, the Banco Colombo, will manage the BDL. The
Director of the BDL and five senior staff are already employees of the BPH.
The senior staff have been on a six-week training course in the Dominican
Republic and have received technical assistance in Haiti from the OAS, which
was generally involved in the setting up of the BDL.
4.63 The start-up of the BDL’s operations has, however, been delayed by
difficulties in finding the starting capital. Of the authorized capital of
US$5 million, the BNRH was supposed to supply US$i million. The remainder
was to come from 10% of the net profits of certain unspecified autonomous
public agencies, loans for private and other public sources, including the
ONA, issue of negotiable bonds, etc. Tlie contribution from the BNRH is,
so far, limited to the transfer of a 10 ha property in Diquini valued at
US$400,000, the hoped-for ONA contribution of US$1 million has not material-
ized, and the promised finance from private commercial banks has been held
up by the question of guarantees for its servicing and repayment.
[page 131]
- 109 -
4.64 Partly due to the past inability of ONL to fulfill its mandate,
other institutions have also been active in housing. In the preparation of
the five-year plan, DPPD of CONADEP noted that the ONL program in housing was
weak and prepared a five-year housing development program to avoid the
embarrassment of having a plan without a shelter component. Despite some low
level technical cooperation between DPPD and ONL, this was basically an
independent technical operation. The national plan now indicates a US$23.4
million investment in housing and designates the ONL as the executing agency,
but the ONL had little or nothing to do with its preparation, does not have
the means to carry out this level of activity and has its own preferred
project worth US$13 million (prepared by a private developper) which does not
appear in the plan. The projects identified by DPPD are not carefully
thought out, and the work was done completely by foreign consultants.
4.65 AS was mentioned before, DATPE has also been active in housing
project preparation, although this was not part of its legal mandate.
Foreign experts contributed significantly to this work and the capacity of
DATPE to carry out further project preparation work of this type without
external assistance is in doubt. Finally, the Service d’Urbanisme of the
DTPTC has been active in shelter questions on the technical level. The
Service has undertaken technical studies, contracting and supervision for the
ONL, including community facilities, roads, drainage works, etc. It has also
provided technical analysis services to DATPE in the preparation of the UNCDF
projects. While being weak in financial and economic evaluation, the Service
has long experience in the architectural and engineering facets of project
preparation and in contracting and supervision. Some of the staff have
been informally trained (through the UNCHBP program) in low-income housing
and the site and services approach. Most important, the Service was the
first public agency to support the approach and to argue seriously in favor
of a full cost-recovery agenda in any low-income shelter program. Under the
impulsion of the Director, the Service had begun tentative studies of simple
sites and services projects in 1977. 1/
Environmental Management
4.66 The interrelated issues of erosion, drainage, solid and liquid
vaste removal directly and indirectly affect the responsibilities of a
number of public agencies. With respect to erosion above Port-au-Prince,
but also in other parts of the country, the Service de la Conservation des
Sols in the Division of National Resources of the Department of Agriculture
is supposed to prevent deforestation and to control land use to minimize
erosion in rural areas. The Morne l’Hopital, for example, is defined as
a rural area and'the Service works on the basis of a comprehensive set of
regulations for controlling land use on the mountain. Despite the existence
and evolution of the legal basis for intervention over 50 years, 2/ it 1s
evident that the Service with its seven agents responsible for the six
1/ See Chapter V for more detail.
2/ Since 1926, some 15 generally relevant laws and six laws dealing
specifically with the Morne 1’Hopital have been enacted.
[page 132]
- 110 -
watershed zones on the mountain has failed in its mission, for reasons
related to technical and administrative, competence, lack of cooperation
from property owners and tenant farmers, lack of effective enforcement powers,
insufficient personnel and resources, and the absence of real central gov-
ernment concern about the problem.
4.67 Occasionally, the Service has undertaken works to reduce erosion
runoff from the upper reaches of the mountain. The works such as check-dams
in ravines and natural terracing with ‘vetiver" were started in 1948 and
repeated several times thereafter. The construction of additional dams
with food for work labor in 1975 quickly aborted when large-scaie property
owners resident in the city objected to public incursion on their lands.
The capital projects undertaken to date have had little, if any, effect on
erosion and runoff into the city”’s drainage system.
4.68 The Service de Genie Municipal 1/ of the DTPTC also has a vaguely-
termed mandate to "control" hydrographic basins which may affect runoff in
the city. More importantly, it is the main agency responsible for construc-
tion and maintenance of the drainage system, streets and bridges. At present,
the Service has a regular staff of five supervisory engineers and 30 other
technicians and foremen receiving a combined annual salary of US$59,000.
It also spends about US$200,000/year for purchase of labor service from 300
to 500 day workers, of which 100 to 120 may be involved in the maintenance
of the drainage system during dry periods, and the full 500 during the rainy
seasonse
4.69 The service is involuntarily involved in solid and human waste
removal. Through inadequate collection of solid waste and inadequate human
waste disposal facilities, significant amounts of waste end up in the drainage
system and contribute to the obstruction of the storm sewers and canals. Part
of this waste is removed through the clearing operations of the service.
However, since dry season clearing is quite inadequate, much of it gets
flushed out of the system during the rainy periods, especially in the low-
lying areas of the city. Mud and debris flushed out of the drainage system
are no longer the responsibility of the Service de Genie Municipal and the
Service de Voirie and the Service de Controle of the municipality have to
collect and dispose of it. Waste that becomes the responsibility of the
Service de Genie Municipal upstream by default of the Voirie and Controle
is part of what is passed back to the latter for collection and disposal
downstream.
&.70 The Service de Voirie et Transports of the Port-au-Prince Munic-
ipality is responsible for removal of domestic waste, the cleaning of streets,
and the transport of waste collected by other agencies. Similar services in
Petionville are carried out separately by the municipality of that city. The
Service de Controle, also of the city administration, is responsible for
1/ In the reorganization of the DTPTIC, this service has been renamed
Service de Genie Urbain.
[page 133]
- 111 -
cleaning public places such as parks and monuments, the area of the bicen-
tennial exposition on the waterfront, the urban produce markets, the airport
road, the cemeteries and the municipal asylum. The service is supposed to
concentrate waste produced in these areas at designated points, where trucks
of the Voirie can collect it for disposal.
4.71 Between them, the two municipal collection agencies have a total
salaried staff of 98 costing some US$114,000 and annual payroll allocations
of about US$300,000 for the payment of 30 additional supervisors and some
540 day laborers. The Service de Voirie also has an annual budget alloca-
tion for vehicle operation and maintenance of US$64,000 and can draw on
another municipal account for the purchase of equipment and materials.
Much of the equipment of the service is inappropriate or out of order which
severely affects the efficiency of the operations. The Service has recently
contracted with a private company for the removal of some of the solid waste
at unit costs below its own. When extraordinary storms hit the city, as was
the case in October 1974, the pool of personnel and equipment can be expanded
by Presidential Decree authorizing the requisition of equipment and personnel
from other Government agencies and the private sector.
4.72 The Public Hygiene Division of the Department of Public Health is
also involved in solid and human waste problems. Until 1973, this agency was
responsible for solid waste removal in all towns. Since then, this responsi-
bility was transferred to the municipal agencies in Port-au-Prince and
Petionville but the Division remains responsible for solid waste collection
and disposal in the provincial towns. In Port-au-Prince, the Division has
107 inspectors who are responsible for educating the population in methods
of waste disposal (human and solid), to check on human waste disposal facili-
ties and to create neighborhood sanitation committees which, inter alia,
attempt to improve waste disposal habits by identifying appropriate local
dumping areas and disposal techniques such as burning. The Division operates
independently and communication does not appear to exist between the Hygiene
Division and the other agencies in the city. 1/ Other than the 1937 urbaniza-
tion law mentioned above, the inspectors have no fixed criteria and judgment
on the adequacy of facilities 18 left to them. There is no provision for
enforcement of their recommendations 2/ and compliance is left to the dis-
cretion of property owners. The Division also has a human waste removal
service in Port-au-Prince with two tanker trucks and a crew of 20 laborers
that remove sludge for a fee of US$25-30 upon demand of property owners.
Vater
4.73 For the Port-au-Prince region, the Centrale Autonome Metropolitaine
d'Eau Potable (CAMEP), created in 1964, has the responsibility to ensure
water supply, manage the distribution facilities and plan and develop ex-
tensions and improvements to the system. It is not, however, responsible
1/ The Service de Voirie appears to be unaware of the standards of public
waste collection laid down in the town planning law.
2/ Loi Reorganisant le Departement de la Sante Publique et de la
Population, Moniteur No. 68, August 26, 1971.
[page 134]
- 112 -
for protecting watersheds which supply sources and wells. This is the re-
sponsibility of the Department of Agriculture with respect to rural zones
and the Department of Public Works with respect to built-up areas. In the
provincial towns, similar responsibilities are given to the recently created
Service National d'Eau Potable (SNEP), l/ created in August 1977 to replace
the Service Hydrauliques that existed since 1892 and the Cooperative
d’Alimentation en Eau Potable de l’Arriere Pays (Provincial Drinking Water
Cooperative) which was part of the Services Hydrauliques since February 1968.
4.74 CAMEP, which employs 313 persons, including about 100 valve
operators, has had an operating deficit in eight out of the last eleven
years of operation. If depreciation were included, a deficit would have
been shown in ali years. In 1976, its operational expenditure was US$764,000,
94% of which coming from home subscribers. As in previous years, the US$70,000
loss will be covered by a government subsidy. For the 1977-78 budget year,
expenditure, including depreciation and debt service for a US$7.4 million IDB
loan, is estimated to increase to US$2.47 million with estimated revenues
amounting to US$700,000 and the book loss rising to US$1.77 million. 2/
4.75 CAMEP is not legally required to be financially self-sufficient,
but loss minimization has been considered desirable and efforts are made
occasionally to increase revenues. In 1970, for example, on the basis of
a survey of all legal and illegal connections, all of the latter were required
to start paying fees and revenues increased from US$250,000 to US$475,000
within the year. No similar actions have followed. This financial situation
has prevented CAMEP from carrying out effective maintenance and repair work.
4.76 However, the major problem of CAMEP appears to be extreme management
inadequacy. VWeak personnel management capability has thwarted such attempts
as have been made to install water meters, identify clandestine connections,
oblige valve operators to provide regular service, identify and repair leaks
and breaks rapidly, collect water charges consistently, etc. Lack of equip-
ment and parts has hampered repair and maintenance. In the absence of a
competent planning and coordination capacity, major development areas have
not been provided with trunklines, main pipes are laid just to serve small
groups of houses on the periphery of the city, etc. ÆCAMEP makes its own
population projections, estimates of consumption, maps of urban development,
etc. These are not consistent with similar work done by CONADEP, the
Service d’Urbanisme, Electricite d’Haiti, etc. While the city moves in one
direction, CAMEP has had a tendency to plan for its movement in another.
4.77 Between 1971 and 1976, CAMEP became vested with a US$10.1 million
capital system financed by the IDB. Given the scale of the system before
the IDB intervention, this proved too large and complicated to handle with-
out parallel assistance to develop qualified manpower and management and
1/ While the service is weak in all dimensions of planning, execution
and management, it will benefit from the upgrading of water supply
and distribution systems in 10 provincial towns under upcoming Bank
and UN projects. It is, therefore, not discussed in detail here.
2/ Rapport de Diagnostic, op. cit.
[page 135]
- 113 -
explains a large part of the institutional weakness that permeates all of
CAMEP”’s functions. Technical assistance during this period was limited to
consultant services retained by IDB for project preparation and construction
supervision and one PAHO engineer to assist in overall planning questions at
the upper management level. Assistance to develop manpower and management
capability has now become central to improvement in the delivery system for
potable water in Port-au-Prince.
Urban Transport
4.78 The management of the urban transport system is spread about a
large number of agencies, some of which work closely together while others
operate totally on their own. While it is possible to deduce an urban trans-
port policy of a sort from an analysis of the activities of these institutions,
there. is no explicit overall policy and no explicit program assigned to one
or more institutions. Transportation planning and management in the usual
sense, either physical or economic, does not exist in Port-au-Prince. As is
evident from Chapter IIL, Port-au-Prince is the only place that presently
has any urban transport problems.
4.79 DATPE, although it had no legal mandate to do so, was active in
road system planning in the city. It prepared area plans including road
alignments and identification of intersections in need of improvement.
Some efforts of DATPE were coordinated with the Service d’Urbanisme of the
DTPTC which prepared the localized area plans for road and intersection
improvements, authorized private road construction and initiated the legal
processes for acquiring or reserving land for public road purposes. The
Service has coordinated its efforts with the Service de Genie Municipal of
the same Department which was responsible for construction documents, cost
estimation and actual road construction and its supervision.
4.80 The Service d’Urbanisme has also coordinated with the Service
Autonome des Transports (SAT) of the DTPTIC regarding the alignments and design
requirements for major thoroughfares in the city. SAT was created as a spin-
off from the 1975 UNDP/IBRD technical assistance project for preparation for
the national transport plan (except in Port-au-Prince) and is responsible for
national transport planning. Except for those parts of the national system
‘which are located in the city (e.g., ports, airport, the Northern, Southern
and Kenscoff roads), SAT does not have a mandate to plan urban transport
facilities. However, since it is the only institution whose staff has had
some traîning in such components of transport planning as traffic counting
and forecasting, capacity design, economic and financial feasibility analysis,
etc., it provides advisory and evaluative services at the request of the
Service d'Urbanisme. Coordination between DATPE and SAT does not appear to
exist in any meaningful way.
4.81 Both the Service d’Urbanisme and SAT have coordinated closely with
the Service de la Circulation, the traffic police under the Haitian Armed
Forces. This Service is responsible for vehicle inspection, traffic manage-
ment and, together with the Administration Generale des Contributions, the
licensing of vehicles and drivers and the control of routes and tariffs of
[page 136]
- 114 -
privately operated public transport vehicles in the city. It maintains
statistics on the size and composition of the vehicle fleet, carries out
occasional traffic counts, maintains records on accidents, etc.
4.82 The Service National de Commercialisation Agricole (SENACA) of
the Department of Agriculture, created in 1976, is responsible for monitor-
ing, evaluating and intervening in the national agricultural product mar-
keting system, including intra-urban goods transport. Some studies in
the latter area have been done by IICA, which assisted in the creation
of SENACA. The staff has some experience in carrying out commodity flow
surveys and tracing price effects of transportation costs changes. Because
this organization is so new, coordination with SAT has not yet been built up.
4.83 ” Specialized responsibilities also lie with the Administration
de 1’Aeroport International de Port-au-Prince, which operates the airport
with a sub-contract to Pan American World Airways, with the Administration
Portuaire de Port-au-Prince, which manages the wharfs in the city and the
Signalisations Routieres d’Haiti, a semi-autonomous agency attached to the
DTPTC. This recently created agency fabricates and installs highway signs
and street-name panels which, until 1976/77, were practically non-existent.
In a broader sense, the General Tax Administration, the Motor Vehicle
Insurance Office, the Customs Administration, the Department of Commerce and
Industry and the Presidency all play indirect roles in the de facto national
transport policy. Their actions concerning fuel taxes, licensing fees,
transaction charges, insurance charges and import taxes all have effects on
the growth and composition of the national and urban vehicle fleet.
[page 137]
- 115 -
F. SUMMARY AND CONCLUSIONS
4.84 Basic town planning legislation in the country is in the public
health/architectural cast that was typical in the 19308 when it was estab-
lished. While it was fairly comprehensive then, it suffers from a number
of important shortcomings and lacunae, and some of its provisions such as
the preparation of zoning regulations and basic layout plans have remained
a dead letter. The absence of such basic instruments of urban management
as zoning regulations, usable cadastres or an inventory of public real estate
make public policies impossible or inefficient.
4.85 À recast of the town planning legislation, now in its beginnings
in the DTPTC, should put the legislation in a new mold that better meets
the needs of modern urban planning and management. It could provide the
vehicle for:
(a) giving clearer and more precise mandates to DATPE, the
Service d'Urbanisme 1/ and the municipalities as well as
other relevant institutions;
(b) vwidening the basis of land use control through policy
guidelines for spatial development and a duly approved
land use plan; and
(c) establishing better coordination among the various insti-
tutions and better enforcement powers throughout the system.
4.86 The absence of a land use policy and of effective means for imple-
menting ît is one of the major gaps in the existing framework for urban
management. Procedures for formulating such a policy should be urgently
developed. Both the formulation of land use policy and its implementation
require a considerable amount of technical work and it is important that one
institution should be clearly responsible for it. This institution should
have the responsibility for establishing and updating urban cadastres and
an inventory of publicly-owned lands, for the management of public lands
(acquisition, holding and disposal) and for advising the government on land
taxation measures such as betterment levies and land transfer taxes. This
will also entail a complete overhaul of the property valuation system with a
view to making it more equitable, providing a better revenue base and harness-
ing it to serve the objectives of sound land use planning through the judicious
use of incentives and disincentives, The role of the Administration Generale
des Contributions in many of these fields makes this Service the first choice
for these activities. :
4.87 One specific aspect of land use needs to be addressed urgently,
1.e., land use on the Morne l’Hopital above Port-au-Prince. Like many other
urban improvements, this is not contingent on more or better legislation,
1/ Some progress in clarifying the respective roles of DATPE and the SPU,
the successor of the Service d'Urbanisme, has been made in the reorgani-
zation of the DTPTC and the creation of the Ministry of Planning.
[page 138]
- 116 -
but is more an implementation problem. A coordination mechanism between
the various institutions concerned with land use on the mountain. should
be established to implement an integrated program. Adequate legal powers
exist and the technical solutions to the problems on the mountain are known.
Addressing these effectively will be of overriding importance for any lasting
improvement in the city’s severe drainage and flooding problems. It will
also be a test of the government’s willingness and ability to solve a thorny
problem with wide ramifications. The problem is. now being tackled by the
project implementation unit created in the DTPTC for the IDB drainage project
in Port-au-Prince (see Chapter III, Section B).
4,88 Implementation problems dominate all of urban management and
service delivery in Haiti. The general factors that depress institutional
performance are:
(a) the low status of the civil service. Non-competitive salaries,
unclear or non-existent job descriptions and rules for recruit-
ment, promotion, etc., as well as the widespread practice of
civil servants to have outside interests make it difficult
to attract and retain staff and inhibit the proper discharge
of their public duties;
(b) the excessive centralization of decision-making to Port-au-
Prince and, within the various ministries, in the top echelons
of the government, which creates very long delays even for
routine decisions and fosters apathy at the working level,
especially in the provinces. It also makes it difficult to
find people willing to be posted in provincial towns;
(c) the almost ubiquitous plurality of institutions active on
the same problems with gaps, overlaps and uncertainties in
their mandates, that make it easy to neglect important tasks
or to address others that are not or should not be part of
their activities;
(d) the lack of coordination among institutions which is seldom
prescribed, leaves too much room for the inclinations or
disinclinations of individuals and leads to much parallel
efforts, inefficiency and inappropriate actions; and
(e) the pervasive shortage of skilled manpower at all levels
which leaves many institutions understaffed or inappropriately
staffed to carry out their appointed tasks.
4,89 Added to general budget constraints, these factors make it advis-
able to exercise extreme caution in.the creation of new institutions. By
competing with existing institutions for the limited pool of qualified staff
and financial resources, these might simply weaken the existing ones further
without improving overall performance. It is more promising to promote insti-
tutional efficiency by clarifying mandates, encouraging inter-agency coordina-
ation and selective upgrading of the most seriously deficient services.
[page 139]
- 117 -
4.90 There are many opportunities for this type of intervention and some
promising places to start from, beginning with overall urban planning. The
mandates and activities of DATPE, the relevant services of the DTPIC and the
municipalities need to be clarified vis-a-vis each other. Progress in this
direction has been made in the recent reorganization of the DTPTC and the
creation of the Ministry of Planning to succeed CONADEP. The role of DATPE
in urban questions, previously much less circumscribed, is now limited to
establishing the planning regions of the country and to studying and formula-
ting strategies for regional decentralization and development and the spatial
distribution of population and activities. The Service d’Urbanisme of the
DTPTC was succeeded by the SPU which is now the main institution concerned
with physical and economic planning of urban centers, the urban project
process and the establishment of norms for urban investments. Detailed
executing and control functions of the SU were transferred to other services
of the DTPTC. A programming unit was also established in the DTPTC to
ensure, inter alia, coordination among the various services of the Department
and its subsidiary bodies in the provision of urban infrastructure. Such
coordination was previously lacking and its establishment is of great poten-
tial significance for efficient urban management. It is hoped that the
practical application of these reforms will lead to a more rational conduct
of urban planning and management.
4.91 Some of the functions now fulfilled by the DTPTC could conceivably
also be assigned to the municipalities such as the control and inspection of
construction. The municipalities” present role in town planning and infra-
structure provision is minimal. An improvement in their position is contingent
upon a substantial improvement in their financial base, a gradual devolution
of decision-making powers to them and an improvement in their staff qualifica-
tions. Municipal reform might pay handsome dividends in terms of more local
initiatives, more efficient implementation of development efforts and better
balance in regional development. Between DATPE, the SPU and other relevant
services of the DTPTC and strengthened municipalities, a consistent urban
planning mechanism could thus gradually emerge.
4.92 Whatever the role assigned to the municipalities in the future,
they need assistance in carrying out the tasks which they are currently
assigned. At the present time, they are largely incapable of even diag-
nosing their problems although there is awareness that all is not well.
Considerable scope exists for technical assistance in reorganizing the
offices, in training and upgrading of staff, and in the establishment of
proper operational and management systems. Parallel to this, the repres-
entatives of the various ministries who are already in place in the provinces
or will be posted there should be given wider responsibilities 1/ and should
provide, for a start, coordinated technical support to the political repres-
entatives. The long term aim should be their integration into regional
structures, working closely with their colleagues at the national level, but
owing first allegiance to the region.
1/ At least for the DTPTC, this now appears to be accepted policy.
[page 140]
- 118 -
4.93 Other, more specific institutional improvements have been identified
as necessary or highly desirable:
a) the need to clarify the respective mandates and institutional
relationships between the ONL, and the BDL and the need to fully
integrate the UNCDF project implementation unit into the ONL;
b) the need to provide some relief to the city”’s drainage and
public health problems by upgrading the solid waste collec-
tion agencies of the municipalities, which is now part of
the IDB drainage project;
c) the need to provide management assistance to the Service de
Genie Urbain of the DTPIC for better use of its available
resources;
d) the necessity for substantial institutional upgrading of
CAMEP prior or parallel to any further extension of the
Port-au-Prince water system; |
e) the desirability of involving SAT in urban transport
analysis by a suitable extension of its mandate;
£) the desirability of rationalizing the various industrial
promotion efforts, including those in the vital area of
professional and vocational training;
8) the desirability of institutional streamlining in the
area of crafts promotion; and
h) the desirability of making the DCI responsible for
developing a data base on the construction industry and
providing the support that may be needed.
[page 141]
- 119 -
CHAPTER V: URBAN DEVELOPMENT STRATEGIES AND OPPORTUNITIES
A. ALTERNATIVE SPATIAL DEVELOPMENT STRATEGIES
5.01 The preceding chapters of this report have identified major im-
balances in the spatial structure of Haiti between different departments,
between rural and urban areas and between the metropolitan area and provin-
cial towns. These imbalances, which have developed over a long time, play
a strong role in the spatial dynamics of the country by influencing the
behavior of the whole population and the different economic factors. An
urban sector strategy has to take them into account and must be designed
with a view to the whole system of spatial interdependence in order not to
perpetuate or worsen present problems.
5.02 Concern with spatial balance in development is based on two major
working assumptions. The first is that overall living standards will rise
more rapidly and on a more sustained basis 1f resources are allocated in a
balanced way to both the rural and urban sectors, rather than with a heavy
bias in favor of one or the other. The second is that, 1f urbanization
proceeds "too rapidly", the social costs of agglomeration will tend to exceed
the undisputed benefits of the process, thus making it an advantage to divert
some of the relatively rapid growth of Haiti’s capital to the provincial
towns.
5.03 While there is some evidence in favor of both assumptions, they
cannot be verified quantitatively beyond dispute, There is little doubt
that Haiti”’s decision to put more resources into agricultural development
than in the past 1s right. This would produce some significant spill-over
effects on the urban areas, especially the provincial towns, since much of
their activity depends on the prosperity of agriculture. Also, greater
emphasis than in the past on the development of provincial towns versus
Port-au-Prince may not lead to any significant loss in national output since
the marginal productivity of a new migrant in the Port-au-Prince informal
sector is not likely to be much higher than in the provincial towns. Even
if îÎt were, this might be more than compensated for by the likely escalation
of the marginal cost of infrastructure and service provision and by other
social costs of agglomeration in Port-au-Prince.
5.04 Other, nonquantifiable, costs and benefits associated with urban-
ization should also be considered. These are generally described in such
terms as psychic rewards or stress, pollution, alienation, stimulation,
quality of life, etc. Their meaning is real, both in urban and rural areas,
but defies quantification. When the chips are down, a spatial strategy can-
not be decided on economic and quantifiable grounds alone and is a political
decision. This section attempts to illustrate some of the demographic,
financial and economic consequences of the political choice of an urban
strategy in Haiti.
[page 142]
— 120 -
General Alternatives
5.05 Among Haiti”s options for future spatial development, four have
been chosen for analysis, i.e., those that:
(a) allow present spatial dynamics to continue (development
under status quo conditions);
(b) attempt to conserve the present spatial structure by
eliminating internal migration by 1996 (forced rural
development);
(c) attempt to reduce rural-urban migration without influencing
its direction (realistic rural development}; and
(d) attempt to reduce rural-urban migration and to reorient it
towards more balanced urban growth (realistic rural develop-
ment with balanced urban development),
The second of these four options is not a practical alternative and is in-
cluded simply for illustration and comparison. All four options have been
translated into different hypotheses on future rural-urban and interurban
migration between the different administrative units of the country. Assump-
tions on the'natural growth of the population 1/ in different regions as well
as on international migration 2/ are the same for all options.
5.06 Rural-urban migration will and should continue in the future. It
will, because the capacity of the agricultural sector in Haiti to absorb more
labor is already strained and the scope for the creation of non-agricultural
employment in rural areas is limited. It should, because rural-urban migra-
tion cannot be regarded as an evil but as one factor contributing to socio-
economic progress, including progress in agriculture. Thus, the main problem
is not rural-urban migration as such but rather its pace and direction.
Demographic Implications
5.07 The results of the demographic projections under alternative
hypotheses on internal migration are shown in Annex Tables 5.1 and 5.2
and summarized below.
1/ It is assumed that overall natural population growth will gradually
decline from its present rate of 2.24 p.a. to about 1.5% p.a. in the
year 2001.
2/ It is assumed that migration from Haiti will remain constant at 20,000
persons p.a. throughout the projection period, a level slightly higher
than that reported for 1973.
[page 143]
- 121 -
Table V-1: SUMMARY RESULTS OF POPULATION PROJECTIONS BY. SPATIAL STRATEGY
HAITI 1986 AND 2001
(1000’s of inhabitants)
1986 2001
Region I Il III IV. I Il III iv
Total /1 5,461.2 5,464.4 5,462.6 5,462.6 6,629.2 6,733.9 6,688.4 6,689.5
Urban areas 1,677.5 1,616.2 1,640.0 1,640.0 2,905.5 2,082.9 2,356.1 2,357.2
Port-au-Prince 1,121.4 1,062.5 1,084.9 1,081.9 2,161.3 1,372.5 1,628.3 1,579.4
Other Towns 556.1 553.7 555.1 558.1 744,2 710.4 727.8 777.8
Rural Areas 3,783.7 3,848.2 3,822.6 3,822.6 3,723.7 4,651.0 4,332.3 4,332.3
J1 Totals equal the sum of regional projectiôns. Differences due to regional variations
in natural growth rates.
Source: See Annex Table 5.1.
5.08 Under status-quo conditions (Alternative I), rural-urban migration
would continue to fuel rapid urban growth, especially in the metropolitan
area, where the population would pass 2 million before the year 2000 and
reach about 2.2 million in 2001. The share of the urban population in the
total would nearly double to close to 44%. Directly and through its effects
on age structure and natural growth, this migration process wuld lead to
absolute decreases in the total rural population of about 0.1% p.a. during
the 1990°s. The fall would occur in the North-West and, most heavily, in the
South, where population would fall by 388,000 or 44% between 1976 and 2001.
5.09 It s notable that, under the unrealistic Alternative II of totally
eliminating rural-urban migration by 1996, the Port-au-Prince population
would still double by that year and come close to 1.4 million at the end of
the century. Of equal importance, the strong but realistic rural development
effort implied in Alternative III could reduce the metropolitan population at
the turn of the century by about 530,000 compared to the unfettered continua-
tion of present trends as in Alternative I. Successful implementation of
Alternative IV, by redirecting some of the migration to provincial towns,
would reduce the Port-au-Prince population by another 50,000 in 2001. By
that year, the difference in the population size of Port-au-Prince, 1f it
grows at historical rates (2.2 million) or if a strong rural development
effort plus promotion of provincial towns is undertaken (1.6 million), would
be close to 600,000 people, a difference which approaches the present size
of the capital. This illustrates the importance of efforts to develop rural
areas.
Needs for Employment Creation
5.10 Since the search for work and higher incomes is a key feature of
the motivations underlying the migration process, a reduction and reorien-
tation of migration flows must rely heavily on absorbing the labor force in
[page 144]
— 122 -
productive employment at places where people live or should migrate to.
Projections of the labor force presented in Annex Tables 5.3 and 5.4 show
the number of jobs needed in the different regions of the country. On the
assumption, developed in an ongoing ILO project on vocational training,
that participation rates will decline gradually, particularly because child
labor will diminish with extended and better education, the total labor force
ia Haiti will increase by some 22,000 p.a. from 1976 to 1986 and by about
37,000 p.a. from 1986 to 2001. . Marked differences in regional labor force
increases between the strategic spatial alternatives can only be expected in
the longer run, since the spatial orientation of a development strategy will
take considerable time to become effective. Between 1986 and 2001, depending
on the alternative chosen, the number of jobs needed in the Port-au-Prince
area varies between 11,000 and 29,000 p.a., that in provincial towns between
5,000 and 7,000 p.a. and that in rural areas between 0 and 22,000 p.a. (see
Annex Table 5.4), .
5.11 The agricultural sector employs more than 70% of the Haitian labor
force, but is characterized by a very low land-labor ratio of less than 1 ha
per economically active person, by a high percentage of marginal land under
cultivation (about 45%) and by substantial disguised unemployment. 1/ It is,
therefore, highly unlikely and perhaps undesirable; for agriculture to absorb
much more labor. Modern activities in manufacturing, construction, commerce,
banking, etc., account for only a fraction of total jobs, 1.e., about 25% in
the Port-au-Prince area in 1975, and much less in the rest of the country.
Job creation in these activities has been relatively modest during the past
few years, e.g., less than 4,000 p.a. in manufacturing. Thus, new entrants
in the labor force will have to make a living mainly in the so-called in-
formal sector, i.e., handicrafts, services, micro-commerce, etc. This
applies to urban as well as rural areas, where any additional labor force
will have to be absorbed in non-agricultural pursuits. Maximum development
in the ‘basic sectors of agriculture, industry and construction is needed to
fuel the demand for goods and services produced by the informal sector.
B. OVERALL ECONOMIC AND FINANCIAL IMPLICATIONS
5.12 As pointed out at the beginning of this Chapter, it is not possible
to assess fully the costs and benefits of alternative strategic approaches to
spatial development. Ultimately, the benefits of a spatial strategy based on
strong rural development and reduced urban migration depend on a comparison
between the net result of lower social costs and benefits of agglomeration,
especially in Port-au-Prince, and the strategy’s impact on overall social
product. None of these can be adequately measured. This analysis is, there-
fore, limited to comparing estimated investment costs between the different
approaches needed to accommodate the existing and incremental population and
labor force by region.
1/ See A. Giles: Quantification des Principales Variables du Developpement
Agraire D’Haiti, IICA, Port-au-Prince, 1973.
[page 145]
- 123 -
Estimate of Capital Stock
5.13 The investment cost comparison between the different spatial
strategies starts with an estimate of the economy’s capital stock and
projections of the population and labor force. The 1976 capital stock is
estimated at about US$3,250 million, of which US$1,400 million in infra-
structure and US$1,850 million in directly productive activities (see Annex
Table 5.5). 1/ About US$1,860 million of the stock were estimated to be
in urban areas (US$1,250 million in Port-au-Prince, US$610 million in other
towns) and US$1,390 million in rural areas. On a per caput basis, infra-
structural equipment is estimated at about US$300, varying between US$164 in
rural areas, US$617 in provincial towns, and US$825 in the Port-au-Prince
area. The capital stock for directly productive activities 1s estimated at
about US$720 per head of the economically active population, 2/ varying
between US$373 in rural areas, US$1,745 in provincial towns, and US$2,093 in
Port-au-Prince.
Cost of Alternative Spatial Strategies
5.14 These 1976 per caput figures of capital stock were adijusted in two
ways for estimating the investments required in different regions for each
of the four alternative strategies. Firstly, it was assumed that per caput
total investment for infrastructure and for productive purposes should rise
by 4% per annum in real terms to make up for the general inadequacy of in-
frastructure and to allow both for the gradual absorption of open and dis-
guised unemployment and some rise in the average capital-intensity of job
creation. Secondly, in recognition of the presently vastly inferior infra-
structure and productive capital stock in the provinces compared to Port-
au-Prince, it was postulated that, for 1976/86, the observed differences
between Port-au-Prince and the provincial towns and between the latter and
rural areas should be halved. A further reduction in these differences was
targetted for the average over the years 1986/2001. 3/ This is done to
allow the rural areas and the provincial towns to catch up to some extent
and in recognition of the fact that historical per caput stock amounts are
{inadequate for the building of new facilities. Table V.2 below summarizes
the results of these calculations.
1/ Total derived from national accounts data since 1950, national capital-
output ratio of 3.0 in real terms and an adjustment for inflation to
1976. Estimate of the components based on an analysis of the structure
of investment. Capital stock allocated by region in line with the geo-
graphic distribution of national income, as shown in Annex Table 1.7,
2/ Given the difficulties of applying the concepts of employment and unem-
ployment in the Haitian context (see Chapter II, Section 1}, these
figures are not costs per job but capital stock per member of the labor
force. The high percentage of informal activities and of open and dis-
guised unemployment in Haiti suggests that historical costs per job have
been significantly higher,
3/ See Annex Table 5.6 and explanatory notes for further details.
[page 146]
- 124 -
Table V-2: TOTAL ANNUAL CAPITAL REQUIREMENTS BY REGION AND BY STRATEGY,
1976 - 1986 - 2001
(1976 Prices)
1976 — 1986 1986 - 2001
I II III IV I Il III IV
Total - US$ Mil. 207.5 207.0 211.2 210.9 336.3 308.5 322.2 320.9
Percent 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Urban areas 78.1 78,7 75.7 75.7 87.7 57.1 70.0 69.9
Port-au-Prince 61.0 56.5 57.7 57.4 74,2 41.1 53.8 51.1
Other towns 17.1 18.2 18.0 18.3 13.5 16.0 16.2 18.8
Rural areas 21.9 25.3 24.3 24.3 12.3 42.9 30.0 30.1
Source: Annex Table 5.6.
5.15 Among the different strategies, differences between annual capital
requirements and their geographical composition appear in the 1986/2001 period
when, as assumed in the demographic projections, the impact of the different
strategies will really be felt on migration and thus growth of population and
labor force in the different regions. By the same token, differences between
the four options are minor for the period up to 1986. The status-quo Strategy
I remains relatively cheap during this period because it is based on actual
per capita capital stock figures rather than on higher target figures for
provincial towns and rural areas as 18 the case for all other strategies.
5.16 Strategy II, eliminating rural-urban migration, would be the least
expensive alternative but is highly theoretical. Even 1f it were politically
feasible, it would require the creation of some 22,000 jobs p.a. in rural
areas during 1986/2001 which, in view of the overcrowded agricultural sector,
would have to take place exclusively in non-agricultural activities. This
is a highly unlikely prospect.
5.17 Alternative Strategies III and IV require less employment creation
in rural areas and are thus more realistic. Strategy IV (realistic rural
development cum balanced urban development) is slightly less expensive than
Strategy III. It implies non-agricultural employment creation in rural areas
at a rate of 12,700 p.a. during 1986/2001, which could be attainable through
specific programs such as labor-intensive public works and environmental
conservation measures. It also implies job creation in provincial towns
at an average rate of about 6,900 per annum over the same period which could
be feasible if the provincial tons wre given the intermediate role suggested
for them below. This approach is not only relatively cheap but achieves a
more balanced spatial structure. .in the long run and corresponds to the Gov-
ernment”’s strategy as outlined in the second Five-Year Development Plan: it
qualifies as the most reasonable framework for a spatially oriented develop-
ment strategy and thus also for an urban sector strategy.
[page 147]
- 125 -
Orientation of the Investment Program
5.18 These cost estimates which are based on the previously discussed
migration hypotheses are far from providing the general framework of an
overall investment program. The estimates use target investment figures for
provincial tons and rural areas rather than present capital stock figures
per caput. Their use would reduce the gaps in capital equipment between
Port-au-Prince, the provincial towns and rural areas and result in geographi-
cal shifts in capital investments. However, this shift would probably not
be sufficient to change the spatial structure by itself. As Annex Table 5.6
shows, much of the investment will be absorbed by replacement needs which will
most likely be carried out in the present locations of these assets. To”
achieve a spatial reorientation, an investment program has to overcome this
heavy "historical burden" of the established system of spatial dynamics as
demonstrated, inter alia, by patterns of migration and industrial location.
As experience elsewhere shows, it is not enough to make changes in the spa-
tial allocation of public investment in favor of regions so far neglected,
especially since public investment is only part of the total. It has to
be accompanied by a certain discrimination against traditional centers of
gravity thus setting clear bench marks for the reorientation of investors and
population.
5.19 If such a policy of discrimination against the future relative
growth of Port-au-Prince were to be pursued, one possible step wuld be to
reduce the investment deemed necessary to accommodate the additional popu-
lation and employ the additional labor force. While maintaining and improving
the existing capital stock, the reduction of new investment in infrastructure
and directly productive activities might conceivably help to discourage new
migrants. About 57% of the expected population increase in the Port-au-Prince
area during the period 1976/1986 is directly and indirectly due to migration
and an equivalent cut of about 60% in new investment, as calculated in Annex
Table 5.6 for Alternative IV, illustrates the theoretical impact of such a
policy on the investment program. Since overall investment of about US$211
million p.a. at 1976 prices is feasible during the period up to 1986, if
foreign assistance continues to develop at the present pace, funds released
by reducing investment in the metropolitan area could be allocated to provin-
cial towns and rural areas. Volume and geographical structure of such a
hypothetical program compared to the actual structure of planned investment
in Haiti are shown in the following Table V.3.
[page 148]
— 126 -
Table V-3: VOLUME AND GEOGRAPHICAL STRUCTURE OF DISCRIMINATORY,
SPATIAL INVESTMENT PROGRAM COMPARED TO PLANNED PATTERN OF INVESTMENT,
HAITI 1976-1986
Investment Program Discriminating Actual Investment
Against Port-au-Prince, 1976/1986 Program, 1976/1981 /1
Total Amount p.a. in Percentage
Millions of 1976 G Structure Percentage Structure
Urban areas 658.3 62.4 63.3
Port-au-Prince 361.3 34.2 49,9
Other Towns 297.0 28.2 13.4
Rural areas 396.3 37.6 36.7
TOTAL 1054.6 100.0 100.0
/1 Based on 1976 volume of investment; regional breakdown of public invest-
ment according to estimates in Table 1.17; directly productive private
investment according to present geographical distribution of national
income from Table 1.7.
Source: Tables 1.7, 1.17 and 5.6; totals based on Alternative IV.
5.20 Rural areas get almost the same relative importance in the "pro-
posed"" and the actual investment programs but allocations diffèr consider-
ably within the urban sector. In order to achieve the changes in the spatial
structure envisaged in the second Five-Year Plan and reflected by Alternative
IV, the Government might have to go some way towards a "discriminatory"
policy and emphasize rural development and urban development outside the
Port-au-Prince area even more than it does now. Any urban sector develop-
ment strategy should be designed with this background. Investments in the
Port-au-Prince area should do little more than is necessary to accommodate
the natural increase in population and labor force. In provincial towns
and rural areas, a maximum program should be designed to encourage the desired
improvement of the interurban structure and a slowdown in rural-urban migra-
tion.
Financial Considerations
5.21 Average annual investment requirements estimated for the period
1976/1986 amount to about US$211 million in 1976 prices. This investment
volume is feasible if GDP grows at 4-5% p.a. in real terms and if resource
inflows from foreign aid, private direct investment and transfer payments
continue at a level of 40%-45% of total investment.
[page 149]
- 127 -
5.22 An estimated one-third of total investment will be made directly
by the public sector in infrastructure. The public sector will also be
involved in the 20%-25% of total investment to be spent for housing and,
through the industrial estate operations, equity participations and lending
activities of the IDAI group and the leasing activities of the DTPTC, in
directly productive investment. Assuming public sector involvement in the
latter two areas is equivalent to about 15% of the total, some 50% of total
investment or about US$105 million in 1976 prices will be accounted for
by public investment activities. Given the low level of domestic savings
in general and of public sector savings in particular, a high percentage of
this investment will have to be financed by external loans and grants. If
foreign aid inflows continue at their present pace, this should be feasible.
Difficulties might, however, arise with the financing of operating and main-
tenance costs of the investments realized.
5.23 Total resource mobilization, with an overall fiscal burden on the
order of 12%-13% of GDP, 1/ is about in line with that in other countries as
poor as Haiti. However, over the years, Haiti has developed a very intricate
fiscal system characterized by high proportions of earmarked revenues and a
large number of special accounts, which are not subject to normal budgetary
procedures. Revenues actually available for the operating budget are thus
very limited; in FY 1975/76, they reached only about 43% of Government cur-
rent revenues. Moreover, the tax system relies strongly on volume-specific
taxes with relatively 1ow elasticity, 2/ and revenues to finance recurrent
budgetary expenditures are sluggish. It is estimated that, with present tax
legislation and present earmarking procedures, budgetary revenues will grow
at annual rates of only 8%-9% in nominal terms over the next five years.
Thus, there is little scope for massive additional recurrent expenditures.
The strained fiscal situation has to be kept in mind when discussing invest-
ment programs with public sector involvement.
Shaping the Urban Sector
5.24 The Government has opted for a policy of encouraging the develop-
ment of provincial centers more than in the past, and the preceding discus-
sion has established the financial feasibility of this option. Given our
present inability to assess the costs and benefits of possible alternatives
with an adequate degree of completeness and precision, the government’s option
must be the basis for any proposed Urban Strategy. The real difficulty lies
in trying to flesh out this overall policy option for practical guidance of
urban development.
5.25 In Haïti, the prime requirement is to strengthen institutions and
decision-making procedures and to make them more responsive to urban develop-
ment needs and potentials. In this sense, regardless of its content, any
urban strategy is better than the still vague present policy since it would
1/ Including estimated revenues of Regie du Tabac.
2/ The elasticity of revenues with regard to GDP is estimated at about 0.8.
[page 150]
— 128 -
provide a framework against which to define institutional ambitions, respon-
sibilities and procedures and to assess institutional performance. Beyond
that, the nature and shape of these strategic guidelines retain their full
importance.
5.26 An urban strategy in Haiti has to recognize that maximum develop-
ment of agriculture is a valid top priority for the country. Urban develop-
ment should support this priority. It can do so in two main ways. Firstly,
the urban sector has to supply material and service inputs to agriculture
and to process agricultural output. Secondly, it must support increases
in agricultural incomes by providing non-agricultural employment opportuni-
ties in the most efficient manner possible. These two support roles provide
the general basis for defining the economic roles of Port-au-Prince and of
the provincial towns, respectively.
5.27 There is little doubt that the first of these two support functions
should be carried out through the provincial towns. There would be little or
no advantage in locating in Port-au-Prince production of the type of input
into agriculture that can be economically produced in the country, such as
simple agricultural machinery or non-motorized transport vehicles. Even
though the main provincial towns are a maximum of five to six hours away
from Port-au-Prince by road, economies of scale are not likely to be large
enough to provide a strong case for centralized production in Port-au-Prince.
Similar considerations apply to agricultural processing activities. Provin-
cial towns, therefore, should be adequately equipped to become agricultural
service, marketing and processing centers. This would already require sub-
stantial upgrading of their infrastructure facilities.
5.28 The case is much less clear-cut for efficient creation of non-
agricultural employment beyond that implied in the preceding function.
Existing opportunities for creating employment in manufacturing activities
based on natural resources other than agriculture are limited. Craft develop
ment should be encouraged both in Port-au-Prince and in the provincial towns,
as should the development of the construction industry. That leaves modern
manufacturing, essentially in assembly-type industries. There is no doubt
Port-au-Prince presently provides considerable locational advantages for
this type of activity. To make provincial locations competitive with the
metropolitan region would require such heavy investment in physical and
institutional infrastructure that equally considerable payoffs wuld be
needed to justify them.
5.29 Such payoffs cannot be easily identified. The major area where
they might be expected is in reducing the costs of agglomeration in the metro-
politan area. These can be expected to increase significantly as Port-au-
Prince grows, for example, because the city may soon start encroaching on
some of the best agricultural land in the country and because at some time
in the future, major new investments in water supply may be needed. Slowing
the growth of the capital would postpone the time when these costs have to
be faced. Unfortunately, the dominance of the, metropolitan area is such and
the number of jobs involved so small that very little relief for Port-au-
Prince can be expected even from extraordinarily successful efforts to move
[page 151]
- 129 -
footloose industries to locations in the provinces. Even if all of the ex-
pected increase in assembly-type industry employment of some 3,000 p.a. took
place in the provincial towns, which would provide jobs to about three out
of five new entrants to their labor force (on the basis of historical trends),
this would still amount to less than 15% of the incremental labor force
expected in Port-au-Prince, In addition, present employment in all modern
manufacturing in the provinces is so Low that it would take a very long time
to reach a level of employment creation of 3,000 p.a. In 1975/76, seven
major provincial centers provided no more than a total of 1,700-1,800 jobs
in modern manufacturing industries. 1/ It would take many years, even dis-
regarding the time required to provide the needed infrastructure, before
manufacturing employment creation in provincial centers could make any sig-
nificant dent in the growth of Port-au-Prince,
5.30. In addition to its role in overall development strategy as exem-
plified by the agricultural support and employment creation functions, urban
strategy has to come to grips with the need for urban service delivery. As
a bare essential, minimum service delivery is mandatory on grounds of public
health and safety and protection from the elements. As w have seen, the
low-income population in Port-au-Prince is at least as badly off and in some
cases worse off in these respects than the population in the three provincial
towns that were analyzed. This applies to water, garbage and human waste
disposal, shelter, fire and flood protection, nutrition and public transport.
It is, therefore, not possible to neglect this category of problems in Port-
au-Prince in favor of the provincial towns.
5.31 The following features of an urban strategy emerge from this dis-
cussion:
(a) Provincial towns, selected for the agricultural
potential of their hinterland, should be equipped
speedily and adequately to fulfill their functions
as agricultural service and processing centers;
activities of this type in Port-au-Prince should
be limited to its own agricultural hinterland;
(b) Port-au-Prince and its surroundings should, for
the time being, continue to be promoted as the
main location for assembly type industrialization.
Until such time as substantial benefits can be
anticipated from trying to redirect such indus-
tries to provincial locations, activities in
provincial towns should be limited to preparing
the ground for such a move by building up the
institutional capacity of the towns;
1/ See Table 2.1 in Annex.
[page 152]
- 130 -
(c) While employment creation {n urban areas should
receive top priority, it should go hand in hand
with minimum urban service delivery. Such ser-
vice delivery should be pursued simultaneously
in the provincial towns and in Port-au-Prince.
Preference should be given to the provincial
towns only insofar as the less severe and less
widespread nature of their problems makes it
possible to adopt a shorter time horizon for
complete or near-complete coverage of their
population than is possible for Port-au-Prince; and
(d) Preference should also be given to the provin-
cial towns in those areas where Port-au-Prince
is manifestly much better equipped, such as
in educational opportunities and in health
delivery. This wuld enhance their role in
servicing the.surrounding rural areas, espe-
cially if accompanied by greater political and
financial autonomy of the local administration
and by decentralized institutional development
more generally.
5.32 With these considerations.in mind, the project and progran ideas
that are suggested below for possible involvement by the World Bank in
Haiti”’s urban sector have been defined and ranked by order of priority.
C. SOME FACTORS CONDITIONING WORLD BANK INVOLVEMENT
5.33 From the discussion in the preceding chapters, it is evident that
Haiti needs urban sector assistance in general institutional strengthening,
employment creation, housing and land finance, environmental management,
water supply and certain transport/land use aspects concerning marketing and
related activities. Although health delivery was not specifically analyzed
in this report, it is also generally clear that urban health and nutrition
assistance is required. In principle, the prospects for integrated urban
development efforts appear good. Policy statements at the national level
reflect a desire to develop human resources, to redistribute social wealth
and to stimulate upward social mobility. There is also a stated bias in favor
of developing provincial towns, although public program proposals and actions
have continued to focus on Port-au-Prince. Therefore, theoretical opportuni-
ties exist for assistance to all places analyzed in this report.
5.34 In practice, however, a number of issues are likely to affect
project acceptability as far as the Government is concerned. One important
issue is the opinion of public officials that slum-upgrading efforts or
sites and services provision and the temporary."’slums"” which are part of
such schemes are not the answer to housing problems, and that subsidized
concrete homes are the only option available. Even recently, this seemed to
[page 153]
- 131 - .
be a fairly widespread view and the two UNCDF projects provide ample evidence
of efforts to transform simple slum-upgrading and sites and services projects
into relatively high-cost housing tract developments.
5.35 In a sense, some of the past public shelter activities, though
very small, have used a simple sites and services or sites without services
approach. Until now, the prevailing public view has confined this approach
exclusively to emergency relocations. In tandem with what is considered
adequate shelter it is also an article of faith that low-income families
cannot afford to pay for housing and that cost-recovery, direct or cross-
subsidized, is impossible. This is certainly true in the case of high-quali-
ty shelter. For the vast majority of low- and middle-income urban families,
the ability to pay ranges from US$2 to US$12 a month. 1/ Current market
prices for land, construction materials and labor thus require the adoption
of low design standards, even with very attractive long-term interest rates
for borrowing. Any large-scale public intervention in low-cost shelter can
only go ahead with the determined support for this approach at the highest
official levels. A change of view in the desired direction was initiated by
the position taken by the President of the Republic in favor of sites and
services schemes,
5.36 À pointer that this change of opinion would be possible was the
work done by the Service d’Urbanisme on low- and middle-income shelter in
1977. 2/ Though at an early stage and not yet an official proposal, it
represented the only coherent and logical low-income strategy yet produced by
any Haitian public institution. Arguing for a strategy of "controlling" the
growth of urban slums rather than eliminating them, the proposal, which is
based on work done by the PPHC, outlines four levels of intervention with
increasing design standards. The costs and revenue estimates made in the
proposal are preliminary and crude and are intended only to demonstrate the
relative effectiveness of each form of intervention and thereby promote
acceptance of an approach that could readily be designed, implemented and
managed without recourse to large outside technical, financial, or managerial
assistance.
5.37 Another important issue could be interagency competition for housing
projects. In the past, DATPE, the DPPD, the ONL and the Service d'Urbanisme
have all made their own proposals and the BDL is bound to do s0 when it
starts operating. In terms of Government acceptance of proposals for
outside assistance, it is important to note that the Ministry of Planning is
the legal coordination agency for such assistance. Under the predecessor of
the Ministry, CONADEP, this key position between external assistance and
sectoral agencies has led to DATPE taking the direct lead in a number of
projects which should have been under sectoral agencies like the ONL, the
Service d'Urbanisme, etc. :
1/ See Chapters I and III.
2/ Propositions Pour 1’Amelioration du Logement Social a Port-au-Prince
e5,1es Autres Villes d’Haiti, Service d'Urbanisme, DTPTC, September 1,
[page 154]
— 132 -
Only experience can show whether the reformulation of mandates of many of the
services active in urban questions will alleviate these problems, what degree
of influence the Ministry of Planning will have on housing projects and how
it interprets Îts coordinating role.
5.38 Other issues are likely to affect project preparation and implemen-
tation, such as the technical, managerial and financial inadequacies and
constraints of sectoral agencies, weak or non-existent interagency coordi-
nation, quasi-total absence of enforcement powers, etc. (see Chapter IV).
Past efforts at institutional upgrading with outside assistance have often
been unsuccessful. In many projects with training components, the counter-
part personnel did not have the agreed qualifications, or have demonstrated
work habits, such as absenteeism, which the Govérnment has not controlled,
etc. As a result, foreigners often had to substitute for locals in the
preparation and implementation of projects. These problems have often been
compounded by the way many foreign assistance agencies choose their con-
sultants which has made it difficult to control the quality of foreign staff
and the cohesiveness of assistance teams. All too often, their work has been
mediocre, linquistic problems have arisen and commitments to train counter-
parts have not been honored. It is, therefore, not surprising that many
assisted agencies wre subsequently unable to carry on even a segment of the
technical work that had previously been done. Such an outcome is exemplified
by UNCHBP assistance to CONADEP and the Service d’Urbanisme, UNDP assistance
to DATPE, past PAHO and IDB assistance to CAMEP and IDB assistance to the
Service de Genie Municipal. IICA has obtained better results in its assist-
ance to the Department of Agriculture because it selected counterparts from
a list of candidates put forward by the Department, it designed programs
around counterpart capabilities, and it signed an agreement with the Depart-
ment whereby absenteeism or other forms of irresponsibility would result in
counterpart dismissal. The Bank must take careful note of the causes of
failure or success. Technical assistance components of project proposals
cannot, in the case of Haiti, be treated lightly as a simple condition for
project implementation. In the short run, the implementation of appropriate
technical assistance will itself constitute a major effort.
5.39 it follows from this discussion that:
(a) projects must be carefully designed and, initially,
must be kept very simple in their components and
adapted to existing levels of institutional com-
petence. When and if the performance of agencies
improves, projects can gradually be made more com-
plex and larger;
(b) the number of agencies involved must be kept to a
minimum in order to facilitate and test coordina-
tion capabilities. This implies a small number of
services or activities in initial years, in line
with point (a) above;
[page 155]
- 133 -
(c) the specific agencies to be involved must be care-
fully selected, and they must be willing to sign
precise agreements concerning personnel evaluation,
selection and management; and
(d) in line with and in support of points (a) and (c)
above, Haitian personnel should take management
responsibility as early as possible.
D. URBAN PROJECT OPPORTUNITIES
5.40 A number of project or project component ideas arise from this
report. They are preliminary, because important urban projects of other
assistance agencies are being implemented right now, 1/ some basic surveys
are underway 2/ and the experience with the UNCDF shelter projects will
have an important bearing on the type and nature of possible World Bank
intervention.
Central Market Improvement in Port-au-Prince
5.41 The central market of Croix des Bossales Îs a fundamental issue of
top priority from the point of view of income production, including costs of
transport and costs of remedial health care, and for the spatial pattern of
demand for land and housing (see Chapter III). It has to be dealt with in
terms of all the roles it plays in the city and in relation to the effects
that other programs might have on it. For example, urban-wide erosion con-
trol and drainage improvement will reduce the degree of flooding in the
area. More specifically, slum-upgrading projects in the areas of Bel Air,
Sans Fil and Fort National/Poste Marchand may reduce the amount of silt and
human waste that runs directly into the market. However, these programs have
relatively long-term time schedules, and it is necessary to seek improvements
under current environmental conditions,
5.42 Conditions in the market would be improved somewhat if solid waste
collection by the municipality is upgraded, as planned in the above-mentioned
IDB project. However, an effort specifically aimed at the central market
- may be needed. Major improvement efforts require a prior decision as to
whether the market will be permitted to grow at its present location or be
moved to other locations. Such a decision must be based on careful analysis
of all its implications and must take account of the conflicting effects of
current public actions in and around the market.
1/ In particular the IDB drainage project in the capital.
2/ Such as the INFP/IHS survey of manpower requirements in industry,
the USAID-sponsored nutrition survey and the UNIDO industrial survey.
[page 156]
- 134 -
5.43 The more important of these actions are the expansion of port
facilities and private port-related activities, construction of a new coastal
shipping wharf at La Saline, reconstruction of La Saline Boulevard and the
reorganization of marketing space and construction of a truck terminal.
While some of these actions stimulate the market”s activities, others con-
strain its expansion. To decide whether the market should or should not
be decentralized and if so, when and where, a study is needed to identify
: and assess the effects of alternative market locations. Such a study re-
quires a great deal of technical assistance and integrated efforts of a
long list of agencies. The major ones are as follows:
(a) analysis of effects on the intra-urban produce mar-
keting system:
(1) Service National de Commercialisation Agricole
(SENACA) of the Department of Agriculture;
(ii) Instituto Interamericano de Ciencias Agricolas
(IICA) for technical support to SENACA;
(b) analysis of joint effects on transport and on the
spatial pattern of housing demand:
(4) DTPTC and DATPE for analysis of land use and
demand effects and related urban service re-
quirements;
(ii) Administration Generale des Contributions for
analysis of land price effects and selection
of alternative sites;
(iii) Service de Circulation for analysis of traffic
management effects;
(iv) SAT for analysis of traffic effects and road/
sidewalk requirements; and
(v) the municipality for analysis of requirements
for market management and of possibilities
for revenue generation at the market.
5.44 Since most of the identified agencies cannot carry out the neces-
sary technical analyses alone, assistance is required. Since one objective
of the study would be to identify a concrete project for market reconstruction
and improvement, both the DTPTC and the municipality should have leading roles
in this effort. The DTPTC should later become the project executing agency
and the municipality should manage the completed facilities.
5.45 In line with the preponderant if not overwhelming role of the
central market in the informal sector, both of Port-au-Prince and of the
[page 157]
- 135 -
provinces, informal sector assistance should be an integral part of prep-
aration and execution of a market improvement project. Lack of adequate
institutional support to employment generation activities has been iden-
tified over the whole range of industry, crafts and informal sector activ-
ities, but is most noticeably absent for the bulk of small-scale activities
that take place in the latter sector. A precondition for any sizeable sup-
port program for the informal sector is a much better understanding of its
functioning and its support needs. A policy-oriented investigation of this
type is, therefore, the initial requirement. Such a study would find its
most logical place in the preparation of a market improvement project for
Port-au-Prince but could also be attached to any other urban project that
may be retained for priority attention.
5.46 There is no obvious institutional home for this effort. The
IDAI group is already stretched thin and has not been successful with small-
scale loans or technical and marketing assistance. The National Crafts
Office is not yet really operational and its mandate only covers part of the
informal sector. The BHPI does not have the capacity to take on a study or
to implement such a program. It is important that the agency that will
eventually implement any support activities should be involved in the initial
investigation. Possibly, the Department of Commerce and Industry could be
asked to take the lead in this field, drawing on the staff resources that
should be relieved of their previous duties în the four ministries previously
responsible for crafts promotion by the creation of the National Crafts
Office. Support might also be sought from SENECA/IICA based on their work of
a similar nature in rural areas and from ILO/IHS. It is also strongly
recommended that non-governmental agencies should be involved from the
beginning to make use of their grassroots knowledge of informal activities
and to prepare them for a possible role in assistance delivery later.
Finally, an attempt should be made to harness the expertise and cooperation
of at least some of the moneylenders active in urban areas.
Urban Services
5.47 Another important component that might be attached to a market
improvement project concerns urban sanitation improvement. This component
should have three elements: 17
(a) creation of a comprehensive human waste collection
and disposal service in Port-au-Prince; 2/
1/ These proposals are based on the assumption that the forthcoming IDB
project will achieve a comprehensive improvement in solid waste col-
lection in the capital, including institutional reforms and strength-
ening.
2/ Rough calculations suggest that a human waste collection service in
Port-au-Prince could be set up for some US$750,000 to US$800,000 and
could be managed on a financially self-sustaining basis.
[page 158]
- 136 -
(b) development, testing and introduction of human waste .
disposal methods appropriate for difficult conditions
such as those in the marshy areas in the northern
part of the capital and in all three provincial
towns analyzed; and
(ce) improvement of garbage collection and disposal in
provincial towns. 1/
5.48 Neither the upgrading of the human waste disposal systems in all
the urban centers, nor improvement of solid waste collection and disposal in
the provincial towns are covered by ongoing or planned projects. While only
minor management and equipment efforts seem necessary in garbage removal in
the provincial cities, a comprehensive effort at better human waste disposal
needs to be undertaken in all the urban areas analyzed. Without such an
improvement in Port-au-Prince, for example, the public health benefits
of the erosion control/drainage/garbage removal elements of the IDB project
will not be fully realized. A massive improvement in human waste disposal
1s also an obvious condition for improvement in the central market and for
the effectiveness of the services components of future sites and services
and slum upgrading schemes both in the capital and in the provincial towns.
5.49 For both garbage collection in the provinces and human waste
disposal problems, the Division d’Hygiene Publique of the Department of Public
Health is the responsible agency... PAHO should be associated with this project
component. If, as is desirable, the feasibility of converting human waste and
garbage into fertilizer. is being investigated, 2/ IICA should participate in
assessing marketing potential for the fertilizer.
5.50 Some efforts in drainage improvement could also be attached to the
first urban project of the Bank in Haiti. Gonaives, Cayes, parts of Cap
Haitien and the Brooklyn-Boston-Cite Simone-Drouillard area of Port-au-Prince
all suffer from similar poor drainage conditions. 3/ In order to facilitate
shelter improvement projects in these areas, technical assistance to the
Department of Public Works is required to determine methods of dealing with
the problems and to assist in the preparation and design of improvement
projects. Assistance should also include advice concerning erosion and
drainage system degeneration in Cap Haiïitien. Some of these problems, in
particular those in the Brooklyn-Boston area of Port-au-Prince, will be
studied under the forthcoming IDB project, but the subsequent investments are
not included in that effort. No cost estimate is available for the needed
investments in Port-au-Prince and in the provincial towns.
1/ Other provincial towns may have the same problem and should be included
in the component. ‘
2/ In the framework of DRIPP (Developpement Regional Integre de Petit-
= Goave a Petit Trou de-Nippe), a Canadian-financed regional development
effort, experiments are underway with intermédiate technology in
the collection and treatment of garbage.
3/ Other towns that may have similar problems would be included.
[page 159]
— 137 -
5.51 Consideration should also be given to attaching a sites and
services project component to the Bank’s first urban project in Haiti. Its
purposes wuld be to:
(a) test the willingness of Government to engage in
a sites and services scheme consistent with Bank
policy; .
(b) test and evaluate the competence, commitment and
coordination capabilities of the primary executing
agencies; and :
. (c) demonstrate the feasibility of cost recovery and the
possibilities of improving institutional capabilities.
5.52 Latest developments make it possible that such a sites and services
component in a Bank-financed project could benefit for at least some of
the open questions from the experience of the UNCDF financed projects in
St. Martin and Drouillard. While the raising of the design standards in these
projects makes it unlikely that cost-recovery will be possible at desirable
levels, the large technical assistance in the projects will at least benefit
and upgrade the ONL on condition that the implementation of the UNCDF projects
is fully integrated into the ONL which now seems to be planned. In any case,
the site for this component in a Bank project should be chosen to be within
the present operational range of the main service delivery agencies, such as
water and garbage removal.
5.53 Whether the project site is in the provinces or in Port-au-Prince,
three primary executing agencies would be involved:
(a) the Administration Generale des Contributions for
site acquisition and later collection of payments
on behalf of the ONL; :
(b) the ONL for definition and administration of allocation
and accession policy, development of pricing policy and
for eventual overall management responsibility; 1/ and
(c) the DTPTC for site evaluation, technical design studies,
cost estimates, contract and construction supervision,
enforcement of town planning laws, coordination with :
service delivery agencies and short-run overall manage-
ment responsibility.
1/ Now and later in this report, the ONL is named as the institution to
administer public, low-cost shelter programs. This should not prejudice
the decision by the government on the respective mandates of ONL and BDL,
a decision which is urgent (see Chapter IV).
[page 160]
- 138 -
5.54 High priority also attaches to general technical assistance to
the Administration Generale des Contributions in the very important area of
property valuation and taxation. As was discussed in Chapter IV, reform in
these methods is urgently required and may be a precondition for cost re-
covery and for strengthening of the municipalities. Given the likely lead
times required to implement reform in property valuation and taxation, it is
important to initiate work in this area at the earliest possible moment.
Technical assistance may also be needed for other technical work that is
required to prepare the formulation and later implementation of a land use
policy, such as the reestablishment of usable cadastres. Later on, the
municipalities should also become the recipients of a general technical
assistance effort, particularly in management and administration. Finally,
consideration might be given to the formulation of a health and nutrition
component. Fresh data on urban nutrition problems should become available
from the USAID sponsored nutrition survey and might provide the basis for
intervention. The need and scope for other health interventions such as
community health centers would need to be investigated separately in project
preparation work.
Large-Scale Sites and Services. Program
5.55 If the sites and services element of a first Bank project and
the UNCDFP pilot projects appear to function well, including coordination
with other agencies in waste collection, latrine cleaning and potable water
services, and if parallel projects are successful in improving service de-
livery by other agencies, îit becomes reasonable to think in terms of a
larger-scale program approach. Sites and services provision should probably
receive some priority over slum upgrading or at least be carried out in
parallel in order to minimize the growth of new slum areas and the cost of
subsequent upgrading. The first stage of the program could cover the major
part of the anticipated low-income shelter needs in the provincial towms
selected by the government for priority attention but could not hope to deal
with all the requirements of Port-au-Prince.
5.56 It is premature to suggest what size and what service standards
or service composition this larger program should have. Purely as an
illustration of what might be possible, some work done in 1976 in Port-au-
Prince suggested that in an area of 60 ha, for example, some 10,000 plots
could be serviced, about half of which with no constructions, the other
half with varying degrees of house completion. A project of this size
would provide shelter support to some 50,000 people or the equivalent of
about 18 months of population growth in the capital at present rates. 1/
With a design density of 830 persons per ha, cost recovery could be possible
at monthly payments of US$4.60 to US$10.50. This implies an income range
of beneficiaries from US$25 to US$50 per month. Even the higher of these
figures is well below the lower of the absolute poverty levels defined for
1/ If such a program were spread over the provincial towns, it would
accommodate four years of population increase at present rates.
[page 161]
- 139 -
Port-au-Prince in Chapter I. However, at the lower end, the calculations
do not include credits for house completion and the resulting repayment
burden.
5.57 The primary executing agencies would remain the same as in the
sites and services project element described above. However, if the
management capabilities of the ONL improve sufficiently, it should become
the lead agency.
Industrial Sites and Workshop Areas
5.58 In those provincial towns where residential sites and service
projects are located and whose hinterland is being developed with promis-
ing rural development projects, industrial and commercial sites and craft
workshop areas could be developed. At present, only Port-au-Prince has
part of such a program on its industrial estate. The need for such facil-
ities would have to be investigated fully by the IDAI, the Industrial Promo-
tion Office and the National Crafts Office. The need for parallel provision
of investment and working capital finance should be included in the investi-
gation. IDAI and its subsidiaries might be made responsible for the sale .
or lease of developed sites and the Industry and Craft Promotion Offices
for the required technical assistance. If a development finance company
is set up following the USAID-sponsored feasibility study, and 1f it becomes
operational in good time, that institution might also be involved.
Sluu Upgrading
5.59 À low-keyed approach must be suggested in slum upgrading, not only
because of the previously discussed need to keep projects within the manage-
ment capabilities of existing institutions but also because of the financial
implications of more ambitious approaches for the Government budget and the
chances of cost recovery. In Port-au-Prince alone, the replication of the
standards now adopted for the St. Martin/UNCDF project, over the remaining
306,000 slum dwellers, would cost some US$32 million plus another US$30
to US$50 million for land expropriation. At the lowest level of interven-
tion, important improvements in welfare could be obtained just by better
water supply.
5.60 A Simple approach might be to provide water, construct pathways
and associated community drainage works and provide latrine construction
assistance. Parallel works in drainage system improvement, road pavings, .
garbage removal and latrine cleaning should be covered in the investment
programs of the responsible agencies. Drainage system improvement and gar-
bage removal are part of the IDB project in Port-au-Prince but the drainage
improvement program of this project does not include the new northern slums
Such as Brooklyn and Boston except for technical design and experimentation
of drainage methods. Their upgrading would, therefore, require a drainage
investment component. This would also be the case for some of the slum areas °
in provincial towns. Improvements in human waste disposal and collection
were proposed in the Bank”s first urban project throughout Port-au-Prince and
[page 162]
- 140 -
the provincial towns. Road paving should be decided on a case-by-case basis.
This approach could be complemented by credit :or house improvements and land
acquisition under the same conditions as for sites and services activities.
5.61 Slum problems in provincial towns are sufficiently manageable
80 as not to require a staged approach; they could be dealt with in their
entirety, 1f the Bank decides to support an upgrading program. This is
not so in Port-au-Prince. A slum upgrading strategy for Port-au-Prince
has to take into account a number of factors and recent developments. The
area of La Saline has been depopulated by port-related activities, and half
of the population has been transferred to the Brooklyn area. The Brooklyn-
Boston-Cite-Simone area has now grown to almost 60,000 inhabitants living
under particularly bad conditions. Portail St. Joseph is an integral part
of the central market zone, and its general improvement could be attached
to a market upgrading project. Finally, the St. Martin project is about to
start, including the reconstruction of its drainage facilities, and it would
be logical to upgrade the areas upstream, where erosion and solid waste
originate and flow to St. Martin. Upgrading might in priority proceed as
shown in Table V-4 below.
Table V-4: PRIORITY RANKING OF SLUM-UPGRADING IN PORT-AU-PRINCE
Estimated Estimated Estimated Total
Community Inhabitants Investment Investment (US$)
(Per Caput (US$))
St. Martin (UNCDF) 20,000 1160 3,210,000
Sans Fil 42,000 20 840,000
Fort National/
Poste Marchand 38,000 20 760,000
Bel Air 26,000 16 416,000
Brooklyn/Boston 60,000 20 1,200,000
Martissant 14,000 20 280,000
Bolosse 65,000 20 1, 300,000
TOTAL (excl.
St. Martin) 245,000 <20 $4,800,000
Source: Mission estimate based on PPHC data. Includes only the approach
outlined at the beginning of para 5.60. St. Martin costs include
technical assistance expenditures for the Drouillard site-and-
services project.
[page 163]
- l4l -
5.62 The executing agencies for these projects should be:
(a) the relevant services of the DTPIC for project prepara-
tion, technical and engineering studies, supervision of
construction, enforcement of town planning laws, road
and drainage works and subsequent maintenance; and
(b) the Administration Generale des Contributions for
establishment of cost-<recovery methods, tariff rates,
collection and disbursement to agencies delivering
urban services.
The agencies must coordinate with CAMEP for water supply, the Division
d’Hygiene Publique for latrine cleaning and construction assistance and
the relevant agency for garbage collection. The ONL may enter with credit.
For this kind of limited project, there will be little need for outside
technical assistance if assistance is already rendered for sites and services
projects. 1/ Some short-term engineering assistance might be needed for
evaluation of drainage methods on steep urbanized hillsides.
E. SUMMARY AND CONCLUSIONS
5.63 Among the various alternatives for a spatial strategy in Haiti,
four were chosen for analysis. One is the continuation of the present spa-
tial dynamics and another was chosen for comparative purposes only and, highly
theoretically, assumes that rural-urban migration could be totally stopped by
1996. The two others attempt a reduction of rural-urban migration and, in one
of them, a stronger orientation of such migration to provincial towns. It is
this latter alternative, called Alternative IV, that corresponds most closely
to the Government”s stated objectives.
5.64 It is noteworthy that, even under the unrealistic alternative
of totally arresting rural-urban migration as from 1996, the Port-au-Prince
population would still double by the mid-90’s. Equally important, however,
with strong rural development efforts, 1f successful in reducing rural-urban
migration, the population of the capital at the beginning of the next century
would be some 500,000 to 600,000 below the population of 2.2 million that
would result from the continuation of present trends. This shows the possible
payoff from a conscious spatial development effort.
5.65 Assuming that labor force participation rates will gradually decline,
some 22,000 jobs p.a. will have to be found between 1976 and 1986 and some
37,000 p.a. on average after that. This takes no account of present open
and disguised unemployment. All of this labor force must be accommodated
in non-agricultural activities. Labor absorption in agriculture is already
1/ However, it may be necessary for the Government to put one organization
clearly in charge of the overall conduct of the slum-upgrading program.
[page 164]
— 142 -
stretched to the limit, and it is neither likely nor desirable that more
labor should be employed in this sector, if per caput incomes in agricul-
ture are to rise significantly. Modern activities, however, are too small
in both absolute and relative terms to offer the prospect of creating more
than just a fraction of the needed employment. Most of the additional labor
force will have to earn a living in the rural and urban informal sector,
which thus becomes the key sector for helping the poor.
5.66 Only the costs of the various spatial alternatives can be defined
and that only in part. Based on an estimate of capital stock in the country
and on the population projections inherent in the four alternatives for spa-
tial development, investment costs were estimated for the various options
and allocated to rural areas, provincial towns and Port-au-Prince. Overall,
they show only small differences in total costs between now and 1986 but
somewhat larger ones after that date. The projections postulate a signifi-
cant reduction in the historical differences in investment per caput and per
member of the labor force between the capital and the provincial towns and
between the latter and the rural areas. Moderate growth of the capital stock
per caput is also assumed in order to allow for improvements in infrastruc-
ture and somewhat higher capital intensities in productive employment crea-
tion.
5.67 A strategy of strong rural development and balanced urban growth
with emphasis on the provincial towns (Alternative IV) is both realistic
and in line with the government’s priorities as expressed in the Five-Year
Plan. It is also financially feasible. The implied annual average invest-
ment level of US$164 million between now and 1986 can be achieved, if GDP
grows at 4.5% in real terms and if foreign resource inflows continue to
develop at their present pace.
5.68 Public investment is expected to account for about half of the
total. Such a level was actually reached in FY1976 and can be sustained
1f foreign assistance continues: to. account for some 40%-45% of public invest-
ment. However, some redirection of the composition of public investments may
be required to emphasize further the provision of infrastructure for produc-
tive activities and, possibly, to introduce some selectivity against the
Port-au-Prince metropolitan area. While the investment volume is sustainable,
problems may arise in financing current public expenditures. Until recently
much of Haiti”’s current revenue was earmarked and remained outside the budget.
Current budget resources grew only slowly, and there was little scope for
massive increases in recurrent expenditures. It is too early to tell how
this situation will develop after the fiscal reforms announced by the Govern-
ment in 1978. Thus, the impact of public investments on subsequent current
expenditure has to be carefully evaluated in any future projects.
5.69 The government”’s decision to emphasize rural development is right
and determines an important part of urban strategy since the urban sector
should support the development of the rural sector, both by providing needed
agricultural inputs and processing facilities for agricultural output and by
creating non-agricultural employment opportunities. Given the government’s
[page 165]
- 143 -
decision to encourage the development of provincial towns more than in the
past, provincial towns should be equipped to provide the bulk of the inputs
and processing facilities needed. The construction and craft activities of
provincial toins should also be encouraged to develop (as they should in
Port-au-Prince). This would already involve substantial improvement in in-
frastructure in provincial towns. It is likely that directing more resources
to them for this purpose would involve very little, 1f any, loss in output.
5.70 For the important but numerically small assembly-type industries,
Port-au-Prince should, for the time being, continue to be promoted as the main
location. It has a locational advantage for these industries that could only
be rivalled by provincial towns with comparatively heavy additional invest-
ments, which it would take equally important pay-offs to justify. Such pay-
offs cannot be expected for a long time to come despite the fact that the
growth of the capital will cause rapidly escalating costs at some time in
the future, e.g., when the city starts encroaching on the prime agricultural
land that surrounds it or if and when heavy investments in water supply become
necessary. Because of the relatively small number of jobs involved, even out-
standingly successful efforts to move footloose assembly industries to the :
provinces will take many years to slow down the growth of the capital.
5.71 Urban strategy also has to come to grips with urban service deliv-
ery. The minimum necessary for public health and safety and for protection
from the elements should be extended to all urban residents, regardless of
where they live. Priority for provincial towns should, therefore, be limited
to trying to resolve their problems faster than the much more extensive prob-
lems of Port-au-Prince. Only in services where Port-au-Prince is much better
equipped than provincial towns, e.g., în education and health delivery, should
the latter receive further preferential attention.
5.72 Within this overall framework, prospects for urban development proj-
ects and programs are reasonably good in theory and project opportunities
exist in all the urban areas analyzed in this report. In practice, Bank-
assisted projects will face a series of problems, such as:
(a) the prevailing view of many government officials that
anything short of houses made of concrete blocks
and solid roofing is inadequate even for low-fncome
shelter provision. However this attitude may now be
changing.
(b) the parallel view that cost recovery 1s unrealistic
and heavy state subsidies are required, a view in con-
tradiction with the previously identified budgetary
constraints of the country. Here again, a softening
of this position may be underway.
(c) interagency competition for project control in Llow-
income shelter, which may frustrate the efficient
attainment of institution-building objectives of Bank
projects; and
[page 166]
- 144 -
(4) the general weakness of urban planning and service
: delivery institutions.
5.73 Project 1aeas 1or woria panx involvement in Haiti’s urban sector
have been defined and ranked with the above considerations in mind. : Top
priority should be given to the possible decentralization and improvement of
the central market in Port-au-Prince. The central market is of overriding
importance for income generation of the poor, both in the capital and in the
provinces, and for the location of any large scale low-income shelter projects
in the city. In its present unsanitary condition, the market is a health
hazard of the first order and requires urgent attention. Improvements in
garbage collection and slum upgrading schemes could help to some extent but
will take years to be effective. Improvements must be sought under present
environmental conditions. Prior to any large investments, including those
in low-income shelter, it has to be decided whether the market will remain at
its present location or be decentralized. Its all-pervasive role in income
generation, transport questions, land use and demand for shelter, etc.,
requires a careful and comprehensive analysis of the implications of maintain-
ing or changing the market location. Among the large number of institutions
that should participate in such an analysis, the DTPTC and the municipality
should take the leading role because they would. be in charge of the actual
work and later administration of the facilities,.
5.74 À market improvement project might also provide the best place
‘for conducting the needed inquiry into the functioning and the support needs:
of the important and difficult informal sector. If it were decided to =44r4&e.
another urban problem in priority over the market, such a study could and
should also be attached to that project. It is, in effect, the informal
sector that will have to absorb the bulk of the increases in the labor force
in the urban areas in the future. Policy-oriented research is required to
define the support system that is needed:
5.75 There is no obvious institutional home for such a study. Many
of the institutions presently active in the delivery of finance or tech-
nical assistance to productive activities appear too small or too weak to
undertake this effort. Further discussions will be required as to where
this study should be carried out, but, as a first suggestion, it might be
considered to place the responsibility with the Ministry of Commerce and
- Industry. The Ministry could draw on the staff resources that have be-
come available when the activities of different ministries in crafts pro-
motion, which are part of informal sector activities, were transferred to
the National Crafts Council. A task force approach might be used, and it
should be strongly urged that the task force incorporate representatives
from non-governmental organizations active in Haiti and, if possible, of
the moneylending networks in urban areas. It is these institutions and
individuals that have the required grassroots knowledge and that might be
used in any subsequent support delivery system.
[page 167]
- 145 -
5.76 Another important component of a Bank project in Haiti could be
concerned with urban sanitation improvements both in Port-au-Prince and in
the provincial towns. Human waste disposal improvement is not part of on-
going or planned projects in any urban area in Haiti. Improvements are
required in all the urban areas analyzed and need to be complemented in the
provincial towns by improvements in garbage removal and drainage. Appro-
priate technical solutions to some of the drainage and human waste disposal
problems are not available and require research, design and experimentation.
The Ministries of Public Health and Public Works are the appropriate institu-
tions for these efforts.
5.77 Befoie vue vaur Can engage in large-scale shelter projects in
the country, the opinions on shelter standards and cost recovery that persist
in certain official circles will have to be further modified. The UNCDF-
financed pilot projects wre originally expected to serve as testing ground
in this respect. During their elaboration, certain doubts surfaced in
this regard, especially concerning the increase in construction standards,
badly defined cost recovery and the plan to implement the projects outside
the existing institutional framework, in particular the ONL. Very recently,
these doubts have been partly dispelled except for a reasonable degree of
cost recovery which remains an open question.
5.78 The Bank could, therefore, build on these projects by attaching a
sites and services component to its first urban project. Initially, such an
effort has to be kept simple and must be carefully designed to adapt to
existing levels of institutional competence. Also, a small number of care-
fully chosen institutions should be involved to minimize coordination pro- .
blems and to strengthen the right institutions. Specific attention must be
paid to personnel evaluation, selection and management, to avoid the pitfalls
of past, often unsuccessful, institution-building efforts with foreign
technical assistance.
5.79 Whether this component is located in the capital or in the provinces,
it could be conducted with three main executing agencies, 1.e., the DTPTC,
the Administration Generale des Contributions and the ONL or, if the govern-
ment so desires, the BDL. Coordination with other agencies, e.g., for water
and garbage collection would be necessary, but many other services such as
electricity, would be excluded to keep outside coordination requirements low.
The DTPTC is well placed to assume the coordinating role and its former
Service d’Urbanisme was the first agency to propose a low- and middle-income
shelter approach similar to that of the World Bank. .
5.80 Another possible component of a first urban project of the Bank
might consist of general, as opposed to project-specific, technical assistance
to the tax administration to rehabilitate land valuation methods, reform
land and property taxation procedures, reestablish usable cadastres and
generally carry out the technical work required for the formulation of a land
use policy and its later implementation. Some of these activities are the
basis for any substantial improvement in municipal performance and for systems
[page 168]
— 146 -
of cost recovery. Assistance to the municipalities is another area where
general technical assistance schemes are required, if a consistent urban
planning mechanism is to emerge gradually. Payoffs from both these areas
could be substantial. Finally, a héalth and nutrition component could be
defined. .
5.81 À larger site and service program depends on the successful conduct
of the small component described above and of the UNCDF project. Projects
which are part of the program could be made gradually more complex if the
performance of the executing agencies improves and if parallel projects to
upgrade other service delivery institutions pay off. À first phase of such
a program might deal with the anticipated population growth of provincial
towns but could not hope to solve the problems of the capital. The executing
‘agencies for a sites and service program should be the same as those chosen
for the project component in the first urban project. If the performance of
the ONL improves, this agency could gradually become the lead institution.
5.82 In those provincial towns where sites and service efforts are
undertaken and whose hinterland is the subject of promising rural develop-
ment efforts, the provision of serviced industrial and commercial sites and
of craft workshop areas could be envisaged. This might go hand in hand with
the provision of credit and technical assistance which would require the in-
volvement of other agencies such as the IDAI group, the industrial and craft
promotion offices and, 1f created in time, a development finance company.
5.83 Similar to the proposals on sites and services schemes, slum upgrad-
ing projects must start simply and, in any case, below the standards of the
UNCDF-St. Martin Project. Slum problems in provincial towns are circumscribed
enough not to require the strategic planning that is needed to deal with the
problems of the capital. In Port-au-Prince, slum upgrading should start with
the areas above the St. Martin neighborhood where much of the material that
flows into that neighborhood is generated, so that the imminent reconstruc-
tion of the drainage facilities will benefit from the effort. Other priority
areas are the new slums in the northern marshland area of the city, where some
60,000 people live under particularly appalling conditions.
5.84 Initially, the range of services to be provided in slum upgrading
should be limited and might be confined to water supply, pathway and asso-
ciated drainage works and latrine construction assistance. The range of proj-
ect activities also depends on other urban projects. For example, drainage
and solid waste collection will be upgraded through IDB assistance, though
drainage problems in the marshes of Port-au-Prince and in provincial towns
will not be fully covered. Drainage components wuld, therefore, be necessary
in these locations in any Bank project. °
5.85 Consequently, other projects in urban areas, in particular those
financed by the IDB and by UNCDF, will have an impact on the exact shape and
nature of the Bank”’s intervention and their evolution should be very carefully
followed. Finally, for all of these preliminary project ideas, technical
[page 169]
- 147 -
assistance to the institutions involved needs to be defined and conducted
with particular care. Many problems with foreign technical assistance have
arisen in the past. Careful attention will have to be paid to the causes of
success or failure in these efforts to try and avoid the more obvious pit-
falls.
[page 170]
- 148 -
ANNEX
TECHNICAL NOTE ON THE COMPILATION OF INCOME DISTRIBUTION STATISTICS
(See Annex Tables 1.6 and 1.7)
1. The estimate of income distribution as shown in tables 1.6 and
1.7 has followed a three-step procedure:
(1) estimate of incomes as specified by a survey (enquete
a buts multiples) carried out by the Haitian Institute
of Statistics (IHS) in 1976;
(ii) supplementary estimates of non-specified incomes, mainly
agricultural income in rural areas; and
(iii) supplementary estimates with regard to the rest of
the national income, i.e. income from entrepreneurship
and property.
2, The IHS survey covered 10,000 households all over the country and
was designed to permit conclusions on a "regional" level, i.e. Port-au-
Prince metropolitan area, other towns, and rural areas. The income-related
data refer to employed persons in different income brackets where incomes
are given on a daily, weekly, half-monthly and monthly basis. The large
wajority of the population (70%), especially in rural areas, is shown without
specification of corresponding incomes thus requiring supplementary estimates.
3, Incomes for persons specified by the IHS survey were calculated
assuming that every person falling into a certain income bracket makes an
income that is equal to the mean of that bracket. With regard to the highest
income bracket we assume an average of G 30,000 a year which is in line with
information obtained from the tax administration. Since our estimate refers
to annual income and the survey data relate to incomes for shorter periods,
an assumption had to be made with regard to the actual annual working time.
Whereas for urban areas we assume 250 days of productive work (and thus
income) per year, we adopted an average of 175 days per year for the mostly
agriculturally oriented rural areas. These average figures were applied
to incomes given on a daily and weekly basis (calculating with 5 working
days per week). Half-monthly and monthly incomes were multiplied by 24 and
12 respectively. Although most of the poor people may actually work every
day it is unlikely that they always obtain an income. Thus, the above
average figures may be justified..
4. The shares of employed persons with unspecified income are: 16.54
in the Port-au-Prince area, 49.1% in other towns and 77.5% in rural areas. We
assumed that these people either do not know their income (which is likely
to apply to people in the lowest income brackets) or do not want to reveal
it (which is likely to apply to people in the highest income bracket). Both
in the Port-au-Prince area and in other towns we distributed people with
[page 171]
- 149 —
ANNEX
unspecified incomes in proportion to the number of people in the lowest
and highest income brackets. For rural areas with the extremely high per-
centage of persons with unspecified income - a fact which is probably due to
the prevalence of subsistence agriculture - we followed a somewhat more
complicated approach by estimating agricultural labor income 1/ which sub-
sequently was attributed to the different income classes on the basis of
the average incomes calculated for persons specified by the survey.
5, Total labor income (as estimated according to the above methods)
accounts for about G 2,720 million or about 61% of national income in 1976.
The remaining G 1,729 million or 39% are considered income from entrepre-
neurship and property and attributed to people in urban areas falling into the
highest income bracket. The assumption regarding the urban residence of these
people may be justified by the fact that rural areas in Haiti are little
attractive and that the urban sector comprises even communities with a popu-
lation of little more than 1,000 inhabitants, Income from entrepreneurship
and property was distributed between the Port-au-Prince metropolitan area
and the other towns in proportion to total labor income calculated for these
areas.
6. The 39% share of non-labor income in national income seems to be
high when compared to the distribution in industrial countries where the
share normally ranges between 20 and 30%. However, when compared to other
developing countries, the Haitian distribution falls into the normal range
of 35 to 55%. This distribution between labor and non-labor income reflects
both the relative scarcity of the factors of production and the power struc-
ture within the social system.
7. We estimate that about 30% of the non-labor income comes from
land property thus leaving 70% or G 1,210 million for remunerating entre-
preneurs and the capital stock bound in directly productive activities.
Total capital stock in 1976 is estimated at G 16,175 million of which about
G 9,220 million are considered directly productive, i.e., not bound in infra-
structure and housing (see Table V-5). Thus, the overall return on capital is
in the order of 13%--a rate that does appear reasonable and plausible,
1/ In Haïti most people active in agriculture are to be considered self-
employed or family aides. Thus, in principle, they are remunerated
from operating surpluses. However, not all the agricultural income
is attributable to persons considered economically active in the sector.
Part of the income (30%) is rental and capital income incurred by
(absentee) landlords and financial intermediaries. We, therefore,
applied the concept of labor income which seems to be most in line with
the other incomes specifically measured by the IHS survey. The agricul-
tural sector’s gross value added in 1976 is estimated at G 905 million in
1955 prices and at G 2,267 million in 1976 prices. Net value added at
factor cost is estimated to amount to 90% of gross value added.
[page 172]
- 150 -
ANNEX
8. Gross national savings in 1976 amounted to about 10.9% of GNP which
is relatively low when compared to the relatively high share of non-labor
income in national income. It is, therefore, to be inferred that substantial
amounts of non-labor income are transferred to other countries. It is esti-
mated that the outflow of private unrequited transfers and short-term capital
amounted to about G 200 million in 1976. The private sector's gross savings
in 1976 are estimated at about G 465 million, of which about G 330 million may
have come from non-labor incomes. Income tax revenues accounted for another
G 60 million, of which about G 56 million may be attributed to non-labor
incomes. Savings and income taxes accounted for about 22 percent of non-labor
income, transfers for different purposes for another 12 percent. The income
share left for consumption was 66-78 percent - a share that again appears
reasonable.
9. With the background of the above deliberations the estimate of
non-labor income seems to be plausible. Thus, the picture presented in
table 1.7 is most likely to reflect the actual situation of income distribu-
tion in Haiti. It should be taken as starting point for further considera-
tions, particularly with regard to taxation of high incomes, which, however,
go beyond the scope of this report.
[page 173]
- 151 -
ANNEX
TECHNICAL NOTE ON ESTIMATING THE REGIONAL INCIDENCE OF THE FISCAL SYSTEM
(tax revenues and fiscal expenditures)
AND OF PLANNED GOVERNMENT DEVELOPMENT EXPENDITURES
(see Tables 1.11 and 1.17)
A. TAX REVENUES (see Table 1.11)
1. Tax revenues accounted for about 60% of total current goverment
revenues in FY1975/76. The balances are non-tax revenues and, above all,
revenues from unindentifiable sources. Tax revenues comprise internal
revenues (consisting of excise, income, property and other taxes) and customs
receipts (consisting of import duties and export taxes). Two different
approaches were followed for estimating the regional incidence of the two
categories of revenues. .
2. The estimate of the regional incidence of internal revenues in
FY1975/76 starts from the receipts by financial districts as reported by the
Administration Generale des Contributions. Since the Port-au-Prince district
comprises the Central Region and excise taxes are levied on production
(and thus in the district where the factory is located rather than at the
place of consumption), the receipts by district are far from reflecting the
actual regional incidence of the tax system, and the appropriate adjustments
had to be made. Furthermore, the delimitation of the financial districts is
different from that of other administrative or statistical units. Thus, the
regional breakdown had to be limited to the Port-au-Prince area, provincial
towns and rural areas.
3. The adjustment for taxes incurred by the Central Region but collec-
ted in the Port-au-Prince district is based on the Central Region's share in
the population of the areas outside Port-au-Prince, which is about 8.74.
Total internal tax revenues outside the Port-au-Prince area being G 9.5 mil-
lion in FY1975/76, the adjustment amounts to G 0.8 million. This assumption
presupposes that the per-capita tax burden in the Central Region is the
same as in the rest of the country (outside the Port-au-Prince area).
&. In order to correct for the discrepancy between the formal and
actual incidence of excise taxes (at the place of production and consumption
respectively) we assumed a direct relationship between labor income and con-
sumption. The estimate was based on the geographical distribution of Labor
income rather than that of total national income in order to reflect better
the regressve character of excise taxes. Thus, excise taxes, which amounted
to G 24.9 million in FY1975/76 were singled out and distributed according to
the share in labor income of the Port-au-Prince area and the rest of the
country (20.6:79:4, see Table 1.6). Given the nature of the excise taxes
and the concentration of industrial production in the Port-au-Prince area,
we assumed that all the excise taxes are collected in the Port-au-Prince
district. However, according to the above distribution, only G 5.1 million
[page 174]
- 152 -
ANNEX
are actually shouldered by the population living in the Port-au-Prince area.
Thus, the amount of G 19.8 million in excise taxes had to be subtracted from
tax receipts in the Port-au-Prince district and be added to those of the rest
of the country. Consequently, the Port-au-Prince area bears about G 96 mil-
lion or 76% of internal revenues, whereas the rest of the country bears about
G 30 million or 24%. This part of the tax burden was distributed between
provincial towns and rural areas according to their respective shares in
national income (31.6:78.4, see table 1.7) thus reflecting specifically
the taxation of high incomes in provincial towns.
5° As far as customs receipts are concerned we separated the coffee
export taxes from other receipts. The coffee export taxes are ultimately
borne by the coffee producers and thus by rural areas. Other receipts
comprise mainly import duties (about 74%) and the bauxite export taxes (about
25%). These latter represent a special case within the whole tax system.
They are generated by an enclave activity, which, in the absence of these
taxes, would not yield larger noû-tax benefits to the country (e.g. in the
form of higher salaries or a higher contribution to national savings). So
it could be argued that these taxes are not really borne by the Haitian
economy. Nevertheless, we included them in other customs receipts and treated
them as quasi-income tax. Other custom receipts ‘were attributed to the dif-
ferent regions in proportion to their respective shares in national income
assuming that imports (which are the main source of these receipts) are a
function of total income in the different regions.
6. Taking the incidence of internal revenues and customs receipts
together we obtain the regional incidence of the whole tax system. Thus,
we estimate that the Port-au-Prince area bears about 47% of the total tax
burden, the provincial towns about 12% and rural areas about 41%.
B. FISCAL EXPENDITURES (see table 1.11)
7. Whereas the above figures are likely to reflect the actual incidence
of the tax system, available data for expenditures only allow an assessment. of
the formal regional incidence. However, starting from the formal incidence
and taking the sectoral breakdown of expenditures into account one can develop
a rough idea of the actual regional incidence of expenditures.
8. Fiscal expenditures comprise only recurrent budgetary expenditures
other than expenditures from earmarked funds. They exclude all the expendi-
tures from extrabudgetary accounts as well as development expenditures. In
FY1975/76 they represented less than one-third of government expenditures.
9. The estimate of the regional incidence is based on ‘actual cash
disbursements in the different financial districts as reported by the
Direction du Tresor. Since the geographical coverage of these districts
differs from that of all other administrative or statistical units we
restricted the regional breakdown of our analysis to the Port-au-Prince
area and the rest of the country. (A further breakdown into provincial
towns and rural areas according to the methods applied for tax revenues
[page 175]
- 153 -
ANNEX
would not hold in the case of expenditures since these are not related to
income). Fiscal expenditures are divided into three categories: salaries,
operating expenditures and subsidies. Whereas salaries and operating expendi-
tures are disbursed and reported where they actually occur (with the exception
of some centralized purchases) subsidies are exclusively disbursed through the
central financial administration. In the case of salaries and operating ex-
penditures, adjustments had to be made for the Central Region which is covered
by the Port-au-Prince district. The adjustment was made according to the
Central Region's share in the population of the rest of the country outside
the Port-au-Prince area. The regional breakdown of subsidies is based on
an analysis of budgeted items for FY1975/76.
10. Following the approach described above we obtain an estimate of the
formal regional incidence: about 83% of fiscal expenditures occur in the
Port-au-Prince area, about 17% in the rest of the country. The actual regional
incidence, however, is different from this picture. A slight change occurs
if recurrent expenditures of municipalities (net of government subsidies that
are included in government fiscal expenditures) of G 3.1 million in FY1975/76
are also taken into account. Furthermore, even considering the low effective-
ness of the Haitian civil service, part of the services rendered and thus
part of the salaries paid in Port-au-Prince as well as part of the operating
expenditures ,incurred in Port-au-Prince actually benefit the rest of the
country. A rough sectoral analysis of budgeted expenditures in FY1975/76
suggests that about 42% of salaries and operating expenditures incurred in
the Port-au-Prince area have to be attributed to the rest of the country.
Taking this estimate and the municipal expenditures into account, the actual
incidence of expenditures on the Port-au-Prince area is likely to be in a
range of 502-554.
C. PLANNED GOVERNMENT DEVELOPMENT EXPENDITURES (see table 1.17)
11. The basis for future government development expenditures is the
second Five-Year Plan for the period 1976/1981. However, the different
sectoral programs in the Plan vary in concreteness: whereas in some sectors
most of the envisaged projects have been identified and prepared and have the
financial support of external aid agencies, projects in other sectors have
rather the character of project ideas, some of which will probably not get any
external support and therefore entirely depend on the availability of local
finance. Thus, the Plan would not have been the appropriate basis for our
analysis. Therefore, we limited our analysis of the spatial incidence of
future government development expenditures to the projects that have already
been approved by the Government, have the support of external agencies, 1/
and are, therefore, likely to be actually implemented within the near future.
1/ See CONADEP: Projets d'investissement et d'assistance technique avec
financement externe par secteur, agence, organisme d'execution
selon l'etat d'avancement, la duree et le type (dons, prets), Version
preliminaire, October 1977.
[page 176]
- 154 -
ANNEX
12. Our analysis covers all projects approved as of the end of 1977
as well as some projects that will be approved within the next few months.
With a total volume of about US$480 million these projects represent
the bulk of development expenditures envisaged for the plan period from
1976 to 1981. 1/ Thus, the estimate of the regional incidence is likely
to be fairlÿ representative for the whole program.
13. The analysis was carried through on a project-by-project basis
focusing on the localization of the projects. For most of the projects
the available information allowed to identify the localization at the depart-
mental level and with regard to urban and rural areas. In some cases the
localization could only be specified with regard to urban and rural areas.
Finally, for highway projects linking several departments, the assessment of
the spatial incidence was made roughly in proportion to the population of the
affected areas (although it is likely that the benefits are rather shared
in proportion to income). Thus, it is possible to identify the spatial
impact of the whole program of government development expenditures in broad
terms, i.e. with regard to the Port-au-Prince metropolitan area, other
towns and rural areas. For about 68% of the expenditures, it is even possible
to estimate the impact at the departmental level and with regard to urban
and rural areas,
1/ Total development expenditures planned for 1976/1981 amount to about
USS$600 million (at 1976 prices). The figure of US$480 million for
projects already approved is not entirely comparable since project
cost estimates normally allow for expected price increases. How-
ever, the impact of anticipated price increases cannot be quantified
on the basis of the available information.
[page 177]
1
Table 1.1: POPUEATION BY DEPARTEMENT “1 xD arnoxnISSEMENT, 1950 AND 1971
a —_——————————————————————————————————
àdministrative Total Population Urban Population Rural Population
Unit Thousands Av. Annual Thousänds Av. Annual __Thousands __ Av. Annual
1959 1971 growth _(%) 1950 1971 growth (4) 1950 1971 growth (4)
Département de l'Ouest 624.8 1151,8 3.0 162,7 523.2 5.7 462.0 628.6 15
Port-au-Prince 413.8 877.3 3.6 151.9 506.5 5.9 261.9 370.8 1.7
Léogane 211.0 278.5 1,3 10.8 16,7 2.1 200.1 257.8 1.7
Cépartement du Nord 431.4 583.1 Lé 60.8 101.6 2.5 370.6 481.8 L3
Cap Haitien 318.2 199.8 2,5 29.4 54,7 3.0 88.8 145.1 2.4
Grande Rivière du Nord 1c6,5 100,4 0,3 9.3 16.1 2.6 97.1 84.3 0,7
Trou du Koré 52.3 69.3 1,4 1.9 14.8 0,9 40.4 54.9 1.5
Lorgne 57.6 80.3 1.6 3.3 5.7 2.6 54.3 74.5 1,5
P1. isance 57.2 96.8 2.5 3.0 4.0 14 54.3 92.8 2.6
Libé 39.6 36.5 0.6 3.9 6.5 2.5 35,7 30.0 0.8
Département du Nord-Est 107.7 116.8 CAS 16.1 16.4 0.7 93.4 190.3 9.3
Fort Liberté 64.4 68.9 0.3 12.2 12.9 0.3 52.2 56.0 0.3
Valiières 43.3 47.9 0,5 1.9 3.5 3.0 41.4 43.3 0.3
départenent du Nord-Quest 168,3 216.5 1.2 13.5 26.1 322 154.8 190.4 1.0
Port-ce-Pain 115,8 136.4 6,8 16,8 21.7 3.4 105,0 114,7 0.4
Môle St. Nicolas 52.5 89.1 2.1 2.7 4.4 2.3 49.8 75.7 2.0
Département de l'Artibonite 466.9 622.2 L4 81.3 16.3 3.0 425.8 546.1 1.2
Gensives 165,7 186.7 0.6 17.9 36.7 3.5 147,9 150,1 0.1 t
Dessaiines 129.1 174,6 1,5 8.9 13.3 1.9 120.2 161,3 1.4
3t. Harc 96.6 147,6 2,1 11.6 20.5 2.8 85.3 127.1 1.9 4
Hsimelade 75.5 113,3 2,0 3.1 5.8 3.0 72.8 107.6 1.9 U
Département du Centre 256.0 300,1 0.8 25.2 26.6 2.7 240.9 273.5 0.6 !
Hinche 100,3 133,5 1.4 7.6 14.2 3.0 92.7 119,3 1,2
Mirebalais 114,1 126.5 0,5 4,2 7.1 2.5 110.0 119.4 0.4
Lascahobas 41.6 40.1 0.2 3.8 5.3 2.2 38.2 34.8 0.4
Départenent du Sud-Est 302.6 351,3 9.7 14.7 19.6 L3 287.9 331.8 07
Belle ânse 56.9 52.2 -0.4 2.2 3.0 1.6 58,7 49.2 0.5
Jacmel 245,7 299,1 1,0 12.5 16.4 13 233.2 282.6 9.9
Département du Sud 375.3 519,7 16 29.2 42.2 LS 346.1 817.5 LS
Cayes 195,2 272.7 1.6 15.8 27.2 2.6 179.4 245.4 15
Côteaux 56.2 86.4 2.1 7.7 9.7 1.1 48.5 76.7 2.2
Aquin 123.9 160.6 1:3 5.7 5.3 0.4 118.2 155.4 1.3
Département du Grande Anse 364,3 453.1 1.0 27,2 Œ.8 27 335.9 405.2 0.9
Jerenie 175.4 240.9 -1.6 15.7 25.1 2.3 159.6 215.7 1.5
Tiburon 47.1 61.9 1.3 5.5 13.0 4.2 41,5 48,9 0.8
Anse à Veau (Nippes) 141,8 150.3 0,3 6,0 9.7 2.3 135,8 140.6 0.2
ITAL 3097.2 4318.6 1.6 378.8 829,7 8.1 2718.4 3434.9 LL É
4/ 9 departements.
Source: THS - Guide Economiaue de la République d'Haiti, 1977
May l, 1978
[page 178]
1/
Table 1.2 : POPULATION BY DEPARTEMENT AND ARRONDISSEMENT, HAITI 1950 AND 1971
————————————— 00
Administrative Total Population Urban Population Rural Population
Unit in 1000. Av.annual _1n_______1000 . Av. Annual in 1000 Av. annu
1950 1971 7 growth 1950 1971 growth É 1950 1971 growth
Département Ouest 1083.1 1669.7 2.1 185.0 355.0 5.4 898.1 1114.6 1.0
Port-au-Prince 413.8 877.3 3.6 151.9 506.5 5.9 261.9 370.8 1.7
Lévogane 211,0 274.5 1.3 10.8 16.7 5 2.1 200.1 257,8 1.2
Jacmel 245.7 299.1 1,0: 12.5 16.4 1.3 233,2 282.6 a.9
Belle-Anse 56,9 52.2 -0.4 2.2 3.0 1.6 54.7 49,2 0.5
Mirebaiais 114.1 126.5 0.5 4.2 7.1 2.5 110.0 119.4 0.4
Loscahobas &1.6 40.1 -0.2 3.4 5.3 2.2 38.2 34,8 0.4
Département Nord 539.1 699.9 1.3 14.9 117.8 2.2 464.2 581.9 211
TTap Raîtien 118.2 199.8 2.5 29.4 54.7 3.0 88.8 145.1 2.4
Troû du Nord 52.3 69.3 1.4 11,9 14.4 9.9 40.4 54.9 1.5
Grande Rivière du Nord 106,5 100.4 -0.3 9,3 16.1 2.6 97.1 84.3 -0.7
Fort-Liberté 64.4 68.9 0.3 12.2 12.9 0.3 52.2 56.0 0.3
Plaisance 57.2 96.8 2.5 3.0 4.0 1.4 584,3 92.8 2.6
Limbé 39,6 36.5 -0,4 3.9 6.5 2.5 35,7 30.0 0.8
Borgne 57.6 80.3 1,6 3,3 5.7 2.6 54.3 784.5 15
Vallières 43,3 47.9 0.5 1.9 3.5 3.0 41.4 44.3 0.3
Département Artibonite 567,2 255,7 Lé 48.9 90.5 3.0 518,5 665.4 12
Gonaives 165.7 186.7 0.6 17.9 36.7 3,5 147.9 150.1 0.1
St,Marc 96.6 147.6 2.1 11.4 20.5 2.8 85.3 127,1 1.9
Marmelade 75.5 113,3 2,0 3.1 5.8 3.0 72.4 107.6 1.9
Hinche 100.3 133,5 1.4 7.6 14.2 3,0 92.7 119.3 1,2
Dessalines 129.1 174.6 1.5 8.9 13,3 1.9 120,2 161.3 1.4
Département Sud 739,5 972.8 L3 56.4 90.0 2.3 683.0 882.7 12.
Cayes 195.2 272,7 1.6 15.8 ‘27.2 2.6 179.4 245.4 1.5
Aquin 123.9 160,6 1,3 5.7 5.3 -0.4 118.2 155.4 1.3
Côteaux 56.2 86.4 2.1 7.7 9.7 1.1 48.5 76,7 2.2
Grand'Anse 175.4 240.9 1.6 -15,7 25.1 2.3 159.6 215.7 1.5
Tiburon 47.1 61.9 1.3 5,5 13.0 4.2 41.5 48.9 0.8
Anse à Veau 141.8 150.3 0,3 6,0 9.7 2.3 135.8 140.6 0.2
Département Nord-Quest 168.3 216.5 1.2 13.5 26.1 3-2 154.8 190.4 1.0
Port-dc-Paix 115.8 136.4 0.8 10,8 71.7 3.4 105,0 114,7 0.4
Môle St, Nicolas 52.5 60.1 2.1 "2,7 4.4 2.3 49.8 75.7 2.0
TOTAL 3097.2 4314.6 L6- 378.8 879,7 C1 2718.4 3434.9. Li
1/ 5 Départements
Source: IHS - Guide Economique de la République d'Haiti, 1977,
May 1, 1978
[page 179]
- 157 - ANNEX
Table 1.3 : SIZE DISTRIBUTION OF URBAN POPULATION BY ARRONDISSEMENT, HAITI 1950, 1971,1975
1950 1971 1975
% of Total Rank % of Total Rank % of Total Rank
Arrondissements Urban Urban Urban
Population Population Population
Port-au-Prince 40.1 1 57.6 1 60.4 1
Cap Haitien 7.8 2 6.2 2 5.1 2
Gonaives 4.7 3 4.2 3 3.3 3
Cayes 4,2 4 3.1 & 2.4 &
Jérémie 4.1 5 2.8 5 1.9 6
” Jacmel 3.3 6 1.9 9 1.2
Fort-Liberté 3.2 7 1.5 15 N.A
Trou du Nord 3.1 8 1.6 11 N.A.
St Marc 3.0 9 2.3 7 1.9 5
Léogane 2.9 10 1.9 8 N.A.
Port-de-Paix 2.8 11 2.5 6 1.6 7
Grande Rivière du Nord 2,5 12 1.8 10 N.A.
Dessalines 2.4 13 1.5 13 N.A.
Côteaux 2,0 14 1.1 17 N.A.
Hinche 2.0 15 1.6 12 N.A.
Anse à Veau 1.6 16 1.1 16 N.A.
Aguin 1.5 17 0.6 23 N.A.
Tiburon 1.5 18 1.5 14 N.A,
Mirebalais 1.1 19 0.8 18 N.A,
Limbé 1.0 20 0.7 19 N.A.
Lascahobas 0.9 21 0.6 22 N.A,
Borgne 0.9 22 0.7 21 N.A,
Marmelade 0.8 23 0,7 20 N.A,
Plaisance 0.8 24 0.5 25 N.A.
Môole St Nicolas 0.7 25 0.5 24 N.A.
Belle Anse 0.6 26 0.3 27 N.A.
Vallieres 0,5 27 0.4 26 N.A,
TOTAL % 100.0 100.0 100.0
abs. figure 378806 879708 1033570
Source: IHS - Guide Economique de la Republique d'Haiti, 1977
May 1, 1978
[page 180]
- 158 - ANNEX
Table 1.4: RESIDENT POPULATION OF DEPARTMENTAL
CAPITALS, HAITI 1976
Departement Capital Population
Ouest Port-au-Prince 652,900
-(Metropolitan area)
Nord Cap Haitien 53,797
Nord-Est Fort-Liberte 3,509
Artibonite Gonaives 35,096
Centre Hinche 9,487
Sud-Est Jacnel 12,165
Sud Cayes 25,711
Grand Anse Jeremie 19,697
Nord-Ouest Port-de-Paix 16,735
Source: Institut Haitien de Statistiques.
July 20, 1978
[page 181]
- 159 - ANNEX
Table 1.5(a): NET MIGRATION (INTERNAL & EXTERNAL)
BY DEPARTEMENT - HAITI 1973
Net Migration
Département Internal International Total %o Population
of popu- mid 1973
© tation (1000)
Ouest +23873 -1541h +859 +},9 1730.0
Nord -2946 -1236 -h182 -5.8 718.6
Artibonite -3820 -882 -L702 -6.1 773.7
Sud -1:649 -852 -15501 -15.6 990.7
Nord-Ouest -2L58 -173 -2631 -11.7 22k.7
Total 0 -18557 -18557 -h,2 uL37.7
Source: Institut Haitien de Statistiques,
May 1, 1978
[page 182]
- 160 - ANNEX.
1 .
Table 1.5(b): CUMULATED NET MIGRATION 1/ BY DEPARTEMENT AND AREA OF RESIDENCE
HAITI 1971 |
Number of % of Resident
Persons Population
Migrants Département Ouest +138h41 +1.2
Urban areas -906 -1.5
Rural areas +1h747 #1.3
Migrants Aire Métropolitaine +102771 +20.8
Migrants Département Nord -27426 -3.9
Urban areas -5905 -5.0
Rural areas -21521 -3.7
Migrants Département Artibonite +627 +0.6
Urban areas | +9446 +10.5
Rural areas -4819 -0.7
Migrants Département Sud -88392 -9.1
Urban areas -14795 _. -16.k
Rural arees 73597 -8.3
Migrants Département Nord-Ouest -5421 -2.5
Urban areas +1716 +6.h
Rural areas -7137 -3.7
1/ Cumulated net migration = resident population - population born in the
area.
Source: Institut Haitien de Statistiques.
May 1, 1978
[page 183]
Table 1.6 DISTRIBUTION OF LABOR INCOME BY INCOME CLASSES AND GEOGRAPHIC REGIONS, HAITI 1976
Country Total Urban Aress Metropolitan Arena (Port-au-Prince)
Incone class Average Enployed Persons Lsbor Income Aversge Employed Persons Labor Income Average Emploved Persons Labor Income
(annusl income in G) Ancose or ncose for TT incone for
ces in 1099 7% in 1000 6 7% class in 1000 ___Z7 __in 1000 C_ 7% class {a 1000 Zn 1000 © 7
<1299 684.5 1287.8 68.4 881555.4 32.4 660.1 134.7 45.9 88914.5 10.7 630.3 38.0 26.2 23951.4 4.3
125) - 2590 1826.7 389.9 20.7 711459.3 26.2 1739.7 36.1 12.3 62802.4 7,5 1755.8 16.7 11.5 29321.9 5.2
258: - Sûc0 3533.6 157.4 8.8 556350.1 20.4 3676.0 96.4 32.8 354171.7 42.4 3684.6 69.6 47.9 256448.2 45.7
5091 - 7509 7039.8 22.7 1.2 159603.2 5.9 7500.0 7.0 2.4 52500.0 6.3 7500.0 5.4 3.7 40560.0 7.2
7561 -10099 9260.1 9.9 0.5 89694.5 3.3 9050.1 9.9 3.4 89694.5 10.8 91i08.2 8.0 5.5 72865.6 13.0
10001 -12500 L 10500.0 6.1 0.3 6:050.0 2.4 10500.0 3.5 1.2 36750.0 . 4.4 10500.0 3.0 2.1 31500.C 5.6
12561 -15000 15000.0 2.7 0.1 40500.0 1.5 15600.0 1:8 0.6 27000.0 3.2 15000.0 ‘1.7 1.2 25500.0 4.6.
715u60 30cc0.0 7.2 0.4 216000.0 7-9 30000.0 4.1 1.4 123000.0 14.7 30000.0 2,7 1.9 81G00.0 -14.6
TOTAL 1663.7 1883.7 100.0 2719412.5 100.0 2644.87 293,5 100.0 834833.1 100.0 3866.9 145.1 100.0 361087.L 100.0
—_—__—_—__———__—_——————_————
Average Incème fn 122 240 326
zeral sm ase120
Average ncose per head 581.9 891.0 1107,1
ni torsl 2anuletton
!
Averège per-copita 4n- 115 177 220 :
eoze jm rural axeses100 - 5
A
Other Towns Rural Areas 1
a ———_—_—_——__————_—_— ———…———.—— ————"—— ——————————
<1259 671.8 96.7 65.1 ‘66963.1. 23.7. . 687.6 1153.1 72.5 792660.9 42,1
1220 - 2:90 1725.8 19.4 13.1 73480.5 12.2 1833.1 * 353:8 22:5, 648656.9 34.4
259: - 5029 3626.4 26.8 18.1 97723.5 35.7 3316.6 61.0 3.8 202178.4 10.7
5901 - 7500 7500.0 1.6 1.1 12000.0 4.4 6834.6 15.7 1.0 107303.2 5.7
7521 -19909 ea57.3 1.9 1.3 16928.9 6.1 - 0 0 0 0
1c:51 -12500 1C500.0 0.5 0.3 5250,0 1.9 10500.0 2.6 0,2 27300.0 1.5
12501 -15000 15000.0 01 0.1 1500.0 0.6 15000.0 0.9 0.1 13500.0 0.7
>15000 30900.0 1.4 0,9 42000 .0 15.4 30200.0 3.1 0.2 93000.0 4.9
TOTAL 1844.6 168.4 100.0 273746.0 100.0 1185.2 1590.2 100.0 1884579.6 100.0
a ———————_—_—_—_—_————_————————
Average incone in 156 100
rurel_aress2109
A ————_—_—_—_—_——_—_——_————————— ""——— "——_—_—_—_—_—_————
Average incème per head 636.3 506.6
ci total population
Average per-capita in- 126 100
core in rural areas=100
Source: IHS - Enquête a buts multiples, 1976; Mission estimates
May 1, 1578
[page 184]
Table 1,7 DISTRIBUTION OF NATIONAL INCOME BY INCOME CLASSES AND GEOGRAPHIC REGIONS, HAITI 1976
Country Total Urban Arcas Metropolitan Ares (Port-au-Prince)
a ————— —_"——————————————————— ————————————“û ——_——————— ——_—û—
Incose class Average Enploed Persons Total Income Average Enploved Persons Total __Incom Average Employed Persons Totsl Income
(srnca!t incose {n6) incoce for income for income for
class in 1090 LA in :000_G LA ciass in 1000 7. in 1000 6 _% class in 1000 LA in :000 G z
<1290 684.5 1287.8 68.4 881555.4 15.8 660.1 134.7 45.9 83914,5 2.5 630.3 38.0 26.2 23951.4 1.6
1290 - 2500 1824.7 369.9 20.7 711459.3 16.0 1739.7 36.1 12,3 62802.4 2.4 1755.8 16.7 11.5 29321.9 2.7
2501 - 5200 3536.6 157.4 8.4 556350.1 12.5 3674.0 96.4 32.8 354171.7 13.8 3684.6 69.6 47.9 256448.2 16.9
Suit - 7500 7039.8 22.7 1.2 159503.2 3.6 7500.0 7.6 2.4 52500.0 2.1 7500.0 5.4 3.7 40500.0. 2.6
7591 -10509 9060.1 9.9 0.5 89694.5 2.0 9060.1 9.9 3.4 69694.5 . 3.5 9108.2 8.0 5.5 72865.6 «2
10991 -12505 10506 .0 6.1 0.3 64950 .0 1.5 10500,0 3.5 1.2 36750.0 1.4 10500.0 3.0 2.1 31500.0 1.8
12501 -!5533 15000.0 2.7 0.1 40500 .0 0.9 15000.0 1.8 0.6 27000.0 1.1 15000.0 © 1.7 1.2 25500.0 1.5
215006 270697.2 7.2 0.4 1946306.0 43.7 451634.2 4&.i 1.4 1851700.0 72.2 460342.0 2.7 1.9 1242923.3 72.1
TOTAL 2351.64 1883.7 100.0 4448112.5 100.0 8734.4 293.5 100.0 2563533.1 100.0 11874.6 145.1 100.0 1723010,4 100.0
:
Average inecme in 199 - 73: 1002
zeral areas=]100 L =
Aïersge income per heaé
c£ total population 951.8 = 2735.9 3400.0
Average per-capits 1n- 189 - 542 674 . 0
ccse in rural areas=100 . L Ce
: a
©
Other Towns ‘ : ., Rural Areas !
>1209 671.8 96.7 65.1 64963.1 7.8 687.4 153.1 72.5 (792640,9 42.1
1250, - 2500 1725.8 19.4 13.1 33480.5 4.0 1833.1 353.8 22.2 648656.9 34.6
2501 - 5009 3666.64 26.8 18.1 97723.5 11.6 3314.84 61.0 3.8 202178.6 10.7
2391 - 7529 7590.0 1.6 1.1 12000.0 1.4 6834.6 15.7 1.0 107303.2 5.7
75è1 -:0090 8857.3 1.9 1.3 16828.9 2.0 . 0 0 ° 0 0
1COÿl -12500 10590.0 0.5 0.3 5250.0 0.6 10500.0 2.6 0,2 27300.0 1.5
1250! -:5250 15000 .0 0.1 0.1 1500.0 0.2 15000.0 7 0.9 - o.1 13500.0 0.7
>15060 434640.5 1.6 0.9 608776.7 72.4 30000.0 3.1 0.2 93000.0 4.9°
TOTAL 5663.9 148.4 100.0 840522.7 100.0 1185.2 1590.2 100.0 1884579.4 100.0
————_—————————————————————…—— ——————————————————.——————………—…————…——…—…" _ —————————
Average fncone in 478 100 :
rurei arcasr10) u “
âveraye incone per head =
of total population 1953.8 306.4 L 2
Average per-capita in- 387 100 ,
conc in rural _areas=100
Source: 148 - Enquête a buts multiples, 1976; Mission estimatas. °
May 1, 1978
[page 185]
ble LS - MINLEN PENCAPITA CONFIERS EXFENDITURE ST JOUR AND RECIEMS, HAITI 1976
————— ©
Datiy Loti di Cost st Fort-au-Prines Cost at Cap haitien Cost at Conaives Cast at Les Cuyes Je st Jérésie est In rurei arene
Conrmptios Îtens Conswaption TE piles Costper rost fer cree drcer Gcpe Micrfe deemr ŒNC qu DRE ter pe ES CES CT UE LOT CE SET
Rte ge yie queise QU deplne ur iee G/eD ee dyne yres fre {en M #iee veriee CPU) de Une poutre EMe) fente e eee (né
Be mu Léo 583. Las 363. CRE: 388 s,3 Lars HA ge.
éreurY 220 HE Las [SH] Hat 1.36 Ds on. 518 Des] it 0. EXT] al 12 LR La 0.1 - em 4
Bresd CE 2.50 0.150 34.8 2:30 2.159 34.8 1:50 9.139 Pa 250 0.130 ea] 2:30, a:1s0 Ses 3:50 au ss
TENTE u 59 on go 115 9.10 905% 10 oh os 15, O4 9.041 use ou 0.0» M7 oo 6.03 10
Sur rl & 20 aœs 17.7 20 os nr 22 os 377 12 9.068 ut 3.20 9.04 INT 22 x nel
foisers CET or] 0.18 1124 Ex 01 110.0 26 0:23 4066 26 0.129 105.6 25 CET CN NT ain #5,
Lecctebtes(Csbbege) «0 “ rer 0.045 16.6 1:10 Do 141 1.0? 9.043 15.6 1.05 9.081 154 4.01 cout AS os res 2e
rlsncies me % +0 D06 215 Lt CEE 101 En 16 0.67 0:03 ur oc. 90% 13 on 8.05 12.6
Queer LEuLE Casegeh & # can 9.02 1 2.3 9.016 37 0.39 9.016 ST 0.5 got 4 0.29 oo A2 0% 01: az
tee pen) “ 16 FAN 0283 16 19 0:28 107.9 eu a.z14 FX] ras 0.23 #4 su ET 6 6: 0295 or
Où rs fe % 30 sw 0:27 414 or QT #22 4.0 0.237 #24 ue 9.237 ue ser on “is uw rois rx
Cotton 9 ‘ 735 9.065 22.4 12 0063 234 “nt 9.057 20.8 Ces 0.00 aus EXO 8.069 2 5 0:05 HE
puit 1e 181.5 ns RER ITU ss H
ggsst
“tu CTAI pli FUN 222 De. ga S
a! averese per-ciput consveption sec où commet ioe partarn ef à typienl fantly of five parsons (constetos 68 À 04016 male, À odule fonte, À Chilé fe school age, 2 Ehlléren of 3 yaurs.
Dfiuc cices 67 male; ÉTE cop +
LES EM ancre potatos 272 sanlocs 161 yene
Zi intereoc Gypes 9€ pren
Spereher it
Laverase prices AprileSeptender 1916 où fort-as-Priace mucbste; partiolir eotimeceé
Lt pureie prices Avcil-Augost 1976 08 Cap Hoitien sarkat: partially s6t1msced
D? Aerste prices Aprll-Septesber 1976 où Constves market partis)ly estimated
Feet patte et
LES atesse prices Jatr-Sepcenber 1926 on Len Cayes aaruet; parctally estimated
Srancete prices April-august 1926 00 Jéténie merkst; partlally entionteé
y vreianses aversne prices for provinctel tons lens 204 markstiog cost (oncepe los brasd, oegar, mat, 061)
ZE! tusissteé où te beces 0€ Iu$ - Eaquéte socfo-écononfque, 1470, adlusted £or Inllorion
Sr ansptices su-tooë 1te0s = AO of focs Liens
Saurcuus Diec calculated by Dr. Donas, Murritiooal Expert, PAUD, Port-au-Prince; Prices £res Ne. 0f Commerce and LICA Pubilestions; Mioaien estimtes,
agest 29, 1978 L
[page 186]
Table 1,91 PEOPLE LIVING UNDER CONDITIONS OF ABSOLUTE POVERTY, HAITI 1976
: Minimum Consumer Expenditure Percentage of Total Population with
Region per year in G Per-Caput Income Lower than Minimum
| ° Expenditures a/
‘ Per-Caput I b/ Per-Caput II </ 1 / 11
Country Total 1000.5 702.6 89.7 73.8
Urban Areas 1082.1 794.0 70.7 55.2
Metropolitan Area 1113.0 819.7 60.h 39.2
Other ‘Towns 1045.74 154.7 82.9 Th.1 .
Rural Areas 980.0 675.1 9h. 78.h &
!
ee —
a/ Adjustments made for group-specific participation rate_
B/ See footnote 13 table 1.8:
£</ See footnote 1h table 1.8
d4/ Veighted average of k provincial towns
Source: Tables 1.7, 1.8; Mission estimates
May 2, 1978 lg
[page 187]
Table 1,10: NUTRITIONÆ STATUS OF CHILDREN AGED 0-6 BY REGION, HAITI 1976
Region Number of —————— 2 gnce nage into
Southern Urban 1098 15.2 21.3 39.7 20.9 1.2 1.7
| Southern Rural 1812 17.7 35.1 32.2 13.8 0.9 0.3
Northern Urban 1325 9.6 30.2 42.1 16.8 0 1.3
Northern Rural 1354 8.1 33.4 38.6 16.9 0.9 2.1
TOTAL 5589 13.0 30.8 37.6 16.7 0.7 1.2
Urban 2423 12.1 26.2 41,0 18.7 0.5 15 :
| Rural 3166 13,6 34.4 34.9 15.1 0.9 1.1 &
7 al First, eccondithird degree mainouriohed CacCOPdiOg 60 GBaee 8e)
M= Marasnus .
K= Kwashiorkor
Source: Enquête de Dr. Serge Toreau Dec.74-Janvier 1975 (OMS/PAHO); Data adiusted by Mission
May 1, 1978
[page 188]
Table L.11: REGIONAL INCIDENCE OF FISCAL SYSTEM, HAITI 1975/76
a) Tex revenues (millions of G)
——_—_—_——_——_————p—
Internal Adjust;, Internal Coffee ex- Other Customs Total current tax
Regional Units revenues ments à revenues 2/ port tax customs 3/ receipts revenues
@) (2) édjusted — (4) receipte (6)=(4)+(5) (7)=(3)+(6) Percentage
(G3)=(1)+(2) (5) distribution
Port-au-Prince 116.4 -20.6 95.8 56.0 56.0 151,8 #7.2
Rest of the country 9.5 +20.6 30.1 86.6 140.0 170.1 52.8
Provincial towns . 9.7 28.1 28.1 37.8 11.7
Rural areas . 20.4 53.4 58.5 111.9 132.3 41.1
TOTAL 125.9 0 125.9 53.4 142.6 196.0 321.9 100.0
b) Fiscal expenditures (millions of 6)
(on cash basis)
M t
Salaries Adjust- Salaries Opersting Adjust- Operating - Subsidies & &
. (1) ments for adjusted expenditures ments for expenditures (7) * Expenditure(
Centrel (3)=(1)+(2) (8) Central adjusted Percentage !
Region(2} Region(5} (6)=(4)+(5) (8)2(3)+(6}+(7) __disgribution
Port-au-Prince 106.2 -2.1 102.1 38.6 -0.2 38.4 17.6 158:1 62.7
Rest of the country 24,5 +2.1 26.6 1.9 #0.2 2.1 4.4 33.1 17.3
TOTAL 128.7 0 128.7 40.5 0 40.5 22.0 191.1 100.0
1/ Adjustments for Central Region (40,8) and assumed incidence of excise taxes (19.8) according to regional distribution of labour incomes, [CE mabie 1.6) ‘
Z/ Breakdown of rest of the country according to regional distribution of nationsl income (cf Table 1.7 }
3/ Regional incidence according to regional distribution of nat£onal income (c£ Table 1.7 )
& Regional incidence based on budget for FY 1975/76
Source: Ministry of Finance; Administration Générale des Contributions IMP; Mission estinates, L
Mey 1, 1978
[page 189]
_ 167 - ANNEX
Table 1.12:AGRICUILTURAL COMMODITY PRICES, HAITI 1970 AND 1974
(MARKET PRICES AT DIFFERENT PLACES IN US$ PER METRIC TON)
. .
Rice Weights— 1970 1974
Port-au-Prince 506 299.8 564 .h
Croix des Bouquets 371 317.5 537.9
St. Marc 148 286.6 56.7
Cap Haitien 118 por.2 582.0
Jacmel 246 05.6 568.8
Les Cayes 195 343.9 533.5
Jérémie 175 374.8 163.0
Gonaives 166 269.0 449,7
Total (weighted) 2/ 1925 330.6 537.3
World marked price— 144.0 542.0
Millet
Port-au-Prince 506 114.6 189.6
Croix des Bouquets 371 105.8 145.5
St. Marc 148 83.8 119.0
Jérémie : 175 97.0 119.0
Total (weighted) 1200 105.5 157.0
Worlä market price2/ 51.8 121.0
Grain Corn
Port-au-Prince 506 75.0 189.6
Croix des Bouquets 371 88.2 154.3
St. Marc 148 88.2 145.5
Cap Haitien 118 83.8 145.5
Jacmel 246 119.0 189.6
Les Cayes 195 83.8 167.5
Jérémie 175 92.6 145,5
Gonaives 166 75.0 11.1
Total (weighted) 2/ 1925 87.2 166.3
World market price= 58.h 132.0
1/ 1971 Population in area of influence (thousands)
2/ From Worlä Bank commodity price forecasts, October 21, 1977.
Source: ITCA: Agricultural product prices in Haitian market places,
March 1975; Mission estimates.
May 1, 1978
[page 190]
Table 1.13 AGRICULTURAL COMMODITY PRICES, HAITI 1968-1974
7 (MARKET PRICES AT DIFFERENT PLACES, ANNUAL AVERAGES, 1968=100)
Weightsl/ 1968 1969 1970 1971 1972 1973 197k
Rice 92 100 100.9 107.9 126.2 128.6 177.6 177.9
Millet 37 100 90.3 9k.9 97.0 B9.6 16k.6 136.9
Grain Corn 92 100 87.5 103.6 110.5 118.5 219.1 192.5
Red Beans 57 100 97.7 96.1 106.5 119.4, 155.3 171.9
Bananes 51 100 108.9 111.2 114.0 130.9 173.2 181.
Sweet Potatoes 13 ‘100 92.5 93.1 107.h 101:7 ‘116.5 ‘127.
Yuca mn 100 8k.9 89.4 101.5 105.4 116.2 120.5
Coffee 100 100 96.7 1h7.2 99.5 128.3 190.9 197.2
Total (weighted) LL6 100 96.4 113.0 109.9 121.3 182.k 179.5
Total without coffee 100 96.3 103.1 112.9 119.2 179.9 17h.
GDP deflator 100 102.5 105.8 108.7 112.0 1h0.6 158.u
Consumer prices !
(Port-au-Prince) a
Food 100 105.6 105.9 110.8 151.3 151.3 171.9 n
Non- food
{clothing and housing) 100 105.9 106.0 117.8 113.0 121.8 14k.0
1/ 1971 Agricultural production at 1955 prices (6 million)/ represents about 50% of agricultural
production.
Source: IICA: Agriculturel product prices in Haïtian market places, March 1975; Mission estimates.
May 1, 1971 E
ES
[page 191]
- 169 - ANNEX
Table 1.1h:IDAI LOANS BY DEPARTEMENT, 1972-1975
(PERCENTAGES)
Département 1971/72 1972/73 1973/7k 1974/75
Nord 2.3 1.9 2.1 1.6
Nord-Ouest 0.2 0.2 0.1 0.1
Artibonite 34. L2.6 19,3 k2.0
of which: Plateau Central L.9 5.1 5.2 6.6
Ouest 45,2 37.1 33.1 45,7
Sud 17.9 18.2 15.4 10.6
of which: Grande Anse 1.3 1.2 1.1 0.6
Total % 100.0 100.0 100.0 100.0
1000$ 12126.3 12875.7 14212.2 21027.5
Source: IDAI
Mey 1, 1978
[page 192]
Table 1.15? TEACHERS AND SCHROL-AGE PPULATIONL/ PER TEACHER EY DEPARTEMENT, HAITI 1975-76
SECONDARY EDUCATION
PRIMARY EDUCATION (URBAN ARFAS)
Total Urban Areas Rural Âreas
Number of Population Number of Population Number of Population Number of) / Population
Départements teachers aged 5-14 teachers aged 5-14: teachers aged 5-14 teachers — aged 10-19
per _ teacher per teacher per teacher per teacher
Nord 1991 104.4 1607 23.9 384 441.4 604 "61.4
Nord-Ouest 636 100.8 527 17.5 109 504.3 103 88.5
Artibonite 1450 153.6 ‘1118 27.7 332 578.0 278 102.6
Ouest 6376 78.6 5801 32.7 575 540.9 2023 101.1
Sud 2050 134.7 | 1690 17.6 360 684.8. 272 85.0
Total 12503 101.7 10743 27.8 1760 553.4 3280 93.9 '
à
Û
1/ Population aged 5-14 years (primary education) and 10-19 years (secondary education),
2/ Number of teachers refers to FY1976-77.
Source: Ministry of Education: Mission estimates.
May 1, 1978
Ë
[page 193]
Table 1.16 : PUBLIC DEVELOPMENT EXPENDITURES BY SECTORS, HAITI 1972-1981
(Percentages)
Actual Pattern Development Plan 1976-1981 1/
Sector FY 1972/7173 - FY 197k/75 budget (approved projects —)
| Average FY_1977/78 —
Fover 7.h 9.7 8.6 ‘
Cressport 3b4.1 29.5 34.5
Corrunications 13.3 5.1 0.2
Écriculture 11.1 22.0 23.8
Inéustry 2/ 2.9 5.3 2.3
Tourisn 0.7 0.8 0.1
rater Supply 1.6 2.9 h.6
Féication 6.8 6.9 9.8
Éeeltà . 8.5 6.h 10.3 0
Cerrunity Development 7.1 4.0 3.5 Le
Housing 0.l 3.7 1.8 #
Otrer Aëministrations 3/ _ 3.7 0.5 }
Preinvestment 6.1 .h/ .b/
Total % 100.0 100.0 100.0
US$ million 36.6 179.3 479.6
1/ Frojects apnroved by the end of 1977 or to be approved within next few months.
2/ Inci. minins
3/ Tnel. social affairs
L/ Incl. in all other categories
ë
Source: CONADEÏ £
FA
May 1, 1978
[page 194]
- 172 - ANNEX
Table 1.17: SPATIAL DISTRIBUTION OF PUBLIC DEVELOPMENT EXPENDITURESL/
HAITI 1976-1981 (PERCENTAGES)
Total Non-agri-
Region/Subregion cultural …_—Fopuation ____
‘ | A in 1971 in 1976
| Urban Areas L6.1 59.3 20. 23.1
Metropolitan Port-au-Prince 28.2 37.0 11.7 14.0
Other towms 17.9 22.3 8.7 9.1
. 76.9
Rural Areas 53.9 k0.7 79.6. 100.0
Total Li 100.0 100.0 100.0
1000 US$ L79609 365742
Metropolitan Port-au-Prince 28.2 37.0 11.7
Nord 11.h 10.5 13.6
Urban 3.5 k.6 2.4
Rurel 7.9 5.9 11.2
Nord-Est 0.h 0.b "2.7
Urban ” 0.2 0.2 . 0.h
Rurel 0.2 0.2 2.3
Nord-Ouest 3.5 0.6 5.0
Urban 0.h 0.5 0.6
Rural 3.1 0.1 h.h
Artibonite 6.7 5.6 1h.l
Urban 3.1 4.1 1.8
Rural 3.6 1.5 12.6
Centre 2.1 0.2 6.9
Urban 0.2 0.2 0.6
Rural 1.9 ] 6.3
Ouest 6.1 5.1 15.0
Urban 0.6 0.3 0.h
Rural 5.5 : 4,8 14.6
SudEst o.l 0.k 8.1
Urban 0.3 0.k 0.k
Rural 0.1 0 7.7
Sud 6.1 5.7 12.1
Urban 0.9 1.1 1.0
Rural 5.2 4.6 11.1
Grande Anse 3.2 1.6 10.5
Urban 1.2 1.1 1.1
Rural 2.0 0.5 9.4
Location not specified . 31.9 32.9
Urban 75 9.8
Rural .2h,.h 23.1
Total. :100.0 100.0 . 100.0
1/ Only approved projects and projects to be approved within the next few months
Source: CONADEFT; Mission estimates.
May L, 1978
[page 195]
. Table 2.1: PWLOMENS AND SALAXIES 11 TUE TEUSTAUL DTCAPAISTS OP TUE MÂELS FLCTCS ï BAITI 57 DOCSTRIAL BMAMQU
AO ACCONDISG TO BEGISTRATICRS GA TUE LXSCRARCE SYSTEM (ODA) LS BikE UABAS CEXTERS LE 1975/78
————— ————_—— ————————————"————]]—— ———— —————————— ——_————————— .———]————————""—
lodsstrtel Branch Port-au-Prisce Jeremie dort de Paix Les Cayss $aiat bare Coraires Petit Coavs Jecsel Ce? Maitien TOTAL Percearages
GE RE UE RE RE NE ER NE DO PRE RER AE ARS VERS DU PRE DE NE ARRRON DERREEN RE ANR NS RE ARE RENE RE RE ER RE VS
Tocd 2 47 3.686 13.746.511 f di 5.550 6 13, 37.768 23 589270 62 175 220.149 1 15 163.150 7 30.615 5 2] 56.068 29 316 LICE 278 4.478 19.263.964 27.8 25.48 29 59
âtecholle aod an-aicchoiie beverages a L' #16 3.063.344 15 42 108,155 3 5 n.46s #2 2101.93 1 24 59.470 7 3 13.50 17 % 4.20 —- = 55 216 428.719 240 1.206 4.056.415 160 6.80 6.9
Tobacce a 1 205 2.056.835 - - D ee - - - - - __— _ = - CE) ee - © 1 04 7.058.8H 01 136 34
Zncties an1 etre 218 DS 2860 = = . ee ne 2 + 2 D 80 160 - - 2 1 D OR 2 LE UE Jo 923 6.8
Shoes + Loing + Keutacturtog HO 10 M6 mu > - = ee A 1 sem + - 3 2 ww > + + - - + - - . A MU GINS AS? 122% 106
boot and Core 25 4 15 délés, - - - - - - . . CR - - L - ° _— _— _ : L Lo LP LE COR )] 0.6
Feraiture + Cabinet roktog 2% 0 2? son - = _- . à 5 nus à à sem + - ee mm 9 2 OSU6S 4A 287 6627 42 LA 115
reseleg 254 Pbtontes 2609 GO BE ee + ee + + ee ee ee où ee OA O2 SE 10 M MAI Lo 0 4
Leathers - Pure and Plastie 2 16 26 sn - + ee ee ee. ee se AO 2530 A7 1308 2.982.08 LT 27 67
Getents MO 42 LAW = + + + + - 1 MIN à = 301$ AUATS O1 15 AM 1 6 1020 1 à 5070 33 4655 16H.M6 33 à10 3.16 !
Mooursllle alneral products 5 2 716 4,74 = — + L 2 5.070 1 1 5.079 - - - CC _ CRE _ _— - - - LI T80 4.761.531 20 440 9.08 Lu
Netalite vores 35 2 409 1.672.790 ie . en . ee - - - __— _ _— - CC 4 Li 10.208 pi) 413 3-682.995 2 2» 247 à
fartactes! ergioeerios % 1 5 Gen - Le _ - - = _. - = = a . 19 15 6w.20 10 ut 1.07 1
Mechanical ver esc7a MO dé 4 &nEmG + + + + - + - - - en a a ne 16 A0 478.700 LE 0 7.5
Trastaurt equicent Ed a ui dam 3 Sos - > - 2 SO 1 2 500 - - - - - - St 423 1.136.170 52 238 34
Sarteus mavufecrores 359 62 239 uns» > =" = + ee = PRES ae 2 + + = - met 1 10 6620: 95 2mp 698,707 | > Jim 1.02
Mannlsctutirz Industries TFOTALS 671 14.350 33.706.580 27 69 174,580 19 10 43.313 63 14) 605.106 78 102 250.579 1)- 69 3.655 18 11 493.062 6 15 66.228 106 362 1.507.395 1,000 17.712 59.233.381 100.0 109.60 110.03
TT
Percentges 3 OC6TL 9283 93981 27 039 0.198 1 0.11 O.C86 6.3 1.37 10% 7e 2,15 O,495 3,3 0,50 0,5) 2,6 0,63 0,41 0,6 0,24 0,122 10,46 3,18 32,%1 100 1% 2100
a ————————————————— —— —— "a ————————"—————————————
Sourcus GFADU for pariod 2575/76, , Table prepored by JN. Danico
SET. onu
le vaber of eacerprises
Fe nou of esglopues
3. Salaries {ie gouttes)
É
[page 196]
- 174 -
ANNEX
Table 2.2: EMPLOYMENT IN PORT-AU-PRINCE, 1975
Thousands
Sector of persons ___%__
Modern Sector 83.0 30.0
L Manufacturing industries 28.0 10.1
Construction 5.7 2.1
Transport 2.5 0.9
Commerce 16.4 5.9
Banking 2.7 1.0
Services 27.7 10.0
of which Tourism 3.1 1.1
Liberal professions 6.5 2.4
Public administration 4.9 1.8
Social services, education 6.5 2.3
Other 6.7 2.4
Informal Sector 194.0 70.0
Micro commerce 40.0 Lä. 4
Hand craft 2.0 0.7
Domestic services 78.0 28.2
Other services 74.0 26.7
Total 277.0 100.0
Source: Projet de Planification Physique. op. cit.
N.B.: Coverage in this Table is incomplete. .
May 1, 1978
[page 197]
- 173 -—
ANNEX
Table 2.3: EMPLOYMENT IN THE BUILDI?G INDUSTRY, PORT-AU-PRINCE 1976
Average Average Estimated
% to Daily Workday Annual
Item Investment labour Wage Rate Frequency Employment
Housing, low income 1.8 25 $1.00 150 3,000
Housing, middie income 5.7 30 $1.50 150 7,600
Housing, high income 21.2 33 $2.00 200 17,700
Industry and Commerce 11.7 20 $2.00 200 5,800
Public Works 2.1 33 $1.50 300 1,600
Total 42.5 Ds —— —— 35,700
Source: World Bank estimate based on PADCO data.
May 1, 1978
[page 198]
- 176 -:
ANNEX
. Table 3.1: COST OF CONSTRUCTION MATERIALS IN PORT-AU-PRINCE (US$1976)
Price Increase
Item Unit Price ($) 1970-1976
Small Tree Trunks (5cm. dia) dozen 2.00-7.00 —
Quarry Stone 1° 2.50 50%
Rocks n° 5.00 50%
Kattle mn? 6.00 _—
Blocks, 10cm.-vibrated each 0.12 _—
| -nonvibrated each 0.12 _—
Blocks, 15cm.-vibrated each sus! 55%
-nonvibrated each 0.13
Blocks, 20cm.-vibrated each nu 45%
-nonvibrated each 0.16
Wood Planks, scrap m? 3.00-5.00 ——
Wood Planks, locak-wholesale mn? 2.50 105%
-retail mn? eo)
Wood Planks, imported-wholesale n? 3.50 65%
-retail n? 00!
Sheet Metal, scrap each=n? 0.90 _—_
Corrugated Sheets, inferior each=n? | 30%
Corrugated Sheets, inferior hundred 140.00
Corrugated Sheets, superior each=m? s 00! 207
Corrugated Sheets, superior hundred 175.00
Asphalt Panels each=m? 8.90 30%
Sand-delivered by wheelbarrow mn 8.50 65%
-delivered by truck n° 00)
Cement . sack 2.40 60%
Reinforcing Steel pound 000 130%
Reinforcing Steel 1,000 1bs. 190.00
Source: Projets et Planification en Haiti , Vol. IV: Logement, CONADEP/
Louis Berger International, Port-au-Prince, February 1977
May 1, 1978
[page 199]
- 177 - ANNEX
Table 3.2: WAGES IN HOUSING CONSTRUCTION (US$1976 per day)
Unskilled Semi-Skilled Skilled
Method of Payment Labourer. Labourer Worker
Lump-sum contract, low income 0.60 1.40-1.80 ——
Payment per n°, middle income 0.70-0.80 2,.00-2.20 _
Lump-sum contract, middle income 0.70-0.80 2.00-2.20 _—
Payment per n?, high income 1.00-1.20 2.00-3.00 3.00-4.00
Source: PPHC; Phase III, Vol. V, op. cit.
May 1, 1978
[page 200]
— 178 - ANNEX
Table 3.3: STRUCTURE OF HOUSING CONSTRUCTION COSTS (US$1976 per m2)
Walls Ratio of
and Materials Labour Total Materials
Builder Structure Roof ($/m2) ($/m2) ($/m2) to Labour
Low Income Scrap Scrap or Straw 5- 10 2- 3 7- 13 2.5
Wattle Straw 15- 20 ‘5-7 20- 27 3.0
Wood Sheet Metal 20- 30 5- 8 25- 38 4.0
Blocks Sheet Metal 25- 35 10-13 35- 48 2.5
Middle Income Blocks Sheet Metal 50- 80 25-40 75-120 2.0
High Income Blocks Concrete 90-140 #5-70 135-210 2.0
Source: PPHC, Phase III, Vol. V, op. cit.
May 1, 1978 |
[page 201]
Table 3.4: EVOLUTION OF COSTS OP ST. MARTIN UPGRADING PROGRAM
CONSULTANT'S ESTIMATE ‘OF
PPHC patre/u.n. FCH, MARCH 3977 CURRENT PROGRAM (US$)
Early Late Cost DATPE/UN
1976 1976 Cost Finance Recovery Oct. 1977
Ites {us$) {usS) {us$) Source (us s) {us$) vxCDP UKDP Gov'T TOTAL
Land 42,000 _—— 328,000 covT. _—- = -— _— 210,000 210,000
Infrastructure (incl. 294,000 327,529 327,579 UNCDF 75,152 620,500 546,000 74,500 620,500
community facilities)
Housing 42,000 81,000 81,009 UNCDF 81,000 346,000 346,000 346,000
Revolving and Morcgage _—— = 215,000 URCDF 275,000 _—— 460,000 460,000
funès
: t
Conœunali Labor = = 74,250 Beneficiaries --- 14 1/ H
el
Conringencies and -—- 40,852 63,302 UNCDF 15,615 ——— 262,000 262,000 wo
Ixflation n
2/
Organization and 23,000 28,593 166,000 GOVT/UNCDP 168,000 = 40,000 _866,800 424,900 1,311,7007
Development
Total: 401,000 477,964 1,316,971 614,767 966,500 1,306,000 846,800 1,055,600 3,209,700
1! Housinc costs are for materlals and sunervislon only. An adittional labor enœponent nf abour Us$1n46,009 would have to be added to total costs for this 1ren,
27 For both niloc proiects. “
3/ Organtzation and Development expenditures cover both St, Martin and Droutllard, It is not clear whether the US$75,000 shown for this {tem in the penultimate
column vf Table 3,5 15 included here or not.
Scurcei Avant Projet pour La Rahabilitation du Quarrier St. Marcia, op. cit., Acsassmant Riport ta the UXCDF, op. cit, UNCDF Project Description Document;
Sc. Narcin $lum Clearance and Rekabilitation, (HA1/26/C31).
July 20, 1978 É
[page 202]
Table 3.5: ÉVOLUTION OF COSTS OF DROUILLARD SITES AND SERVICES PROJECT
DATPE/U.N. FCH, MARCH 1977 Planned
Late Cost DATPE/UN UNCDF
1976 Cost Finance Recovery Oct. 1977 Contribution
Iten (US$) (US$) Source (us$) (us$) (us$)
Länd 93,000 93,000 ‘GOv'T _—— 93,00(
Site Preparation 62,000 62,000 UNCDF 68,20t
87,200 520,000
Infrastructure 265,100 265,100 UNCDF 291,70
Housing 176,708 61,440 UNCDF 61,400 825,50
Revolving Fund —— 550,000. UNCDF 550,000 _— 560,000
Communal. Labour _— 278,175 Beneficiaries _—— _—_—
Contingencies 50,380 103,105 UNCDF 14,700 -—- 324,000 Lu
œ
Organization and 35,267 42,000 GOV'T + UNCDF 42,000 75,000 n
Development
Total 682,450 1,454,800 _—— 755,384 1,353,400 1,404,000
Government Contribution ‘125,000
Total 1,529,000
Sources: Esquisse de Projet Pour Parcelles Assainis/Droufllard, op. cit.
Assessment Report to the UNCDF, op. cit.
UNCDF Project Description Document: Sites and Services (HAI/76/C32)
May 1, 1978
[page 203]
- 181 - ANNEX
ORGANIZATION CHART
NATIONAL COUNCIL OF DEVELOPMENT AND PLANNING
(CONAGEP)
DECRÉE OF léth OCTOBER, 1976
PRESIDENT FOR LIFE
OF THE
REPUBLIC
NATIONAL COUNCIL
OF DEVELOPMENT AND PLANNING
(CONADEP)
k EXECUTIVE SECRETARY
SECRETARY OF STATE OF FINANCE AND ECONOMIC AFFAIRS
SECRETARY OF STATE OF COMMERCE AND INDUSTRY
SECRETARY OF STATE OF PUBLIC WORKS, TRANSPORTATION AND COMMUNICATION
SECRETARY OF STATE OF AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT
‘ SECRETARY OF STATE OF PUBLIC HEALTH AND POPULATION
SECRETARY OF STATE OF NATIONAL EDUCATION
PRESIDENT OF NATIONAL BANK OF REP, OF HAITI
CENTRAL PLANNING OFFICE (CPO -
_ Advisers
EXECUTIVE SECRETARY |
Administrative Service
Division I Division II Division III Division IV Division V Division VI
FU 7 7 x 7 g
PES, B,.D.F. A,.T.P,E. C.E. P.D.P, S.D.
BUREAU OF REGIONAL PLANNING (BRP)
1/ Economic and Social Programming. &4/ External Cooperation.
2/ Development and Finance Budget. 5/ Promotion of Development
3/ Regional Planning and Protection Projects.
of the Environment. 6/ Statistics and Documentation.
November 1977
[page 204]
ORGANIZATION CHART OF THE DEPARTMENT OF PUBLIC WORKS, TRANSPORTATION AND. COMMUNICATIONS
. Electricite D'Haiti |
SECRETARY OF STATE a
SXEP i
UNDER SECRETARY OF STATE | - ——_—_——
CAMEP s
CHEF ENGINEER CONATEL
Executive Engineer | Director :
! .Hechnical Council o L : ue
Autonorbus —+ FEEDER ROAD
Transportation Service | | Coordination Unie ee —— |
| 0
en ——— —, ee me me me =
TL CT $
: LS)
i Department of Land Department of Departmental
tment Control and Supervision Administrative Department pal P n
Studies Depar | | Servir 8 Preparation | and Communal Services
t
ie ES 2] us mn e. _—
Œ Planning Service 7 / North
Li an: ‘Ans jé L ort South East
: pection and Control General Administration Bridge and Highwa:
Îlj control of Private Énvice meral vins nan Enver | Department Departnent
| Constructions |
. a —— | ss ES North East South
\ Department Department |
D ————————— ——— ————————
{ | studies and Design Control sers of Control and Supervision civil Engineering |
| Service Power Stations Department Municipal Service | North Kest Grande Anse
EL | hi Departoent Department |
ES
! TT TT Artibonite St. Marc
; | Project Implementatioi
L:4 and Land Acquisition Laboratory Service & s Geodesy, Carrogrsphy and Department District |
Service 1 erage Service | Topography Service
0 -
FT Te es Central Petit-Goavel
Departoent À District |
! vest
1 Department
a PET à
j&
El
March 1979 LE
[page 205]
Table 4.1: TAX RECEIPTS OF SELECTED MUNICIPALITIES AFTER DEDUCTIONS - GOURDES
Municipality FY: 72/73 FY:_ 73/74 FY: 74/75 FY:__75/76 FY:_76/77
Port au Prince 2,869,890 3,002,086 2,618,527 3,652,764 3,706,207
Cap-Haitier 312,952 303,944 197,299 220,893 227,372
Cayes 129,496 134,243 88,916 103,853 105,839
Jacwel. 86,120 116,684 59,312 63,998 73,976
Gonaives 104,516 117,487 79,549 83,488 89,213 l
&
ww
Û
Source: Ministry of Finance
July 21, 1978
É
Z
5
Ce
[page 206]
Table 5.1: DENOGRAPHIC PROJECTIONS BY REGIONS AND SPATIAL STRATEGY, HAITI 1976-2001
7 (Thousands of inhabitants)
1986 1991 1996 2001
Departement de l'Ouest 1240.2 1305,1 1366.3 1378.0 1372.6 1372.9 141.9 1A7L.Q 1448.3 1469.6 1452.3 1572.3 1526.8 1529.6 176.4 1670.7 1604.1 1609.35
ürban 65.8 718 78.6 78.6 18.6 78.9 85.3 85.3 85.3 86.6 91.4 91.4 91.4 96.2 96.5 96.5 96.5 l0:.7
Furai 11744 1233.3 1285,7 1299.46 1294.0 1294.0 1329.6 1385.7 1363.0 1363.0 1360.9 1480.9 1435.4 435.4 1379.9 1576.2 1507.6 1507.6
etropolitain Area 647,5 851.7 11214 1062.5 1084.9 1081.9 1439.6 1201.8 1295.0 1282.9 1790.5 1292.8 174.4 1447,1 2161.3 1372.5 1628.3 1579.4
Dépurtenent du Nord 758.3 618.3 879.4 886.6 883.7 884.3 938.9 969.9 957.5 960.0 995.2 1062.4 1037.) 1042.6 1069.0 1158.8 1121.3 ‘1121.3
fear 1318 148.2 166.4 166.4 166.4 ‘167.0 186.4 184,4 184,4 186.9 201.1 201.1 201.1 206.6 217.0 217.0 217.0 225.0
quai 626.5 670.1 712,8 720.2 717.3 717.3 754.5 785.5 * 773.1 773.1 794.1 861.3 836.0 636.0 832.0 941.8 906.3 504.3
Département du Nord-Ouest 229.3 240.1 247,2 252.1 249.8 250.0 250.3 270.1 261.7 262.6 248.7 291.5 275.3 277.4. 203.8 316.0 290.3 294.1
Vrban 31.5 37.5 44,4 43.9 44.2 &h.& 51.8 49.6 50.8 51.7 58.9 54.4 56.9 59.0 66.0 58.9 62.6 66.8
fucal 197.8 202.6 "202,4 208,2 205.6 205.6 ‘198,5 220.5 210.9 210,9 189.8 237.1 218,4 213,4 127.8 255.1 227.7 227.7
Département de l'Artibonite 823.6 880.4 933.0 941.8 938,8 939.6 981.1 1017.4 1004. 1007.6 1022.7 LI01.4 1074.4 1082,3 1059.2 1188.1 1144.3 31618 1
Urban, 106.5 126.1 148.0 146.1 147.2 148.0 170.9 162.9 167.6 170.9 193.5 176.8 195.9 193,8 216.0 189,3 203.0 216.5 M
Rurei NL 796.3 765.0 795.7 791.6 791.6 810.2 854.5 836.7 836.7 629.2 920.6 898.5 888.5 da3.2 998.8 ‘945.3 945.3 œ
+
Zepartenent éu Sud 977,0 960,6 916.1 943.4 932.8 933.9 846.5 958.9 913.6 ,. 917.9 753.1 993.6 902.6 912.1 639.5 1029.68. 896.1 913,6 '
Urben 97.8 107.6 118.7 118.7 118.7 119.8 . 129.8 129.8 129,8 134.1 139.9 139.9 139.9 149.4 148.7 198.7 148.7. 160.2
Rural 879.2 853.0 797.4 824.7 Blu.l 8l4.1 716.7 829,1 783.8 783.8 613.2 853.7 762.7 762.7 490.8 881.1 747.4 747.4
Totsi 675.9 5056,2 561,2 5464.4 S462.6 5462.6 5871.3 5889.1 5880.6 880.4 6262.5 6310.0 6290.6 6291.1 6629.2 6739.9 6658. 6689.5
üréan 1080.9 1342.9 1677.5 1616.2 1660.0 1640.0 2061.8 1813.8 1912.9 1912.9 2475.3 1956.4 2149.6 Z2150.1 ,2905.5 2082.9 2356.1 2357.2
Rural 3595.0 3713,3 3783.7 3648.2 3822.6 3822.6 3809.5 4075.37 3967.5 3967.5 3787.2 4357.6 4l4l.O 161.0 723.7 4651.0 43323 4392.3
1/ Projecteë frow 1971 census data
Z/ Stratezy 1 = development under status guo conditions
37 Strategy 11 = forceë rural development
1 Strategy 111 = reslistic rural development
3/ Strategy IV » realistie rurel development cum balanced urban deÿelopme
Source: Mission estimatue based où IHS data.
Her 1, 1973
É
[page 207]
Table 5.2: POPULATION GROWTH AND STRUCTURE BY URBAN AND RURAL AREAS BY SPATIAL STRATEGY, HAITI 1950-2001
a) Structure (percentages)
1950 1971 1976 1986 2001
Regions I II III IV I Il III IV
ER —— —————_—_—_—_——_—_—_— —…"]"-—]… —_——”… -— —_—_ …— —… —]—+ Ed
Total 100.0 100.0 100.0 100,0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Urban Areas 12.2 20.4 23.1 30.7 29.6 30.0 30.0 43.8 30.9 35.2 35.2
Port-au-Prince 4,9 11.7 13.8 20.5 19.4 19.9 19.8 32.6 20.4 24.3 23.6
Other towns 7,3 8.7 9.3 10.2 10.2 10.1 10.2 11.2 10.5 10.9 11.6
Rural Areas 87.8 79.6 76.9 69,3 70.4 70.0 70.0 56.2 69.1 64,8 64.8
| &
un
Û
b) Average annual growth rates (percentages)
1950-1971 1971-1976 1976-1986 1986-2001
I IE TITI IV I II III IV
Total 1.6 1.5 1.6 1.6 1.6 1.6 1.3 14 14 1.4
Urban areas &,1 4.2 4,5 &,1 4.3 4.3 3.7 1.7 2.4 2.4
Port-au-Prince 5.9 5.6 5.6 5.1 5.3 5.3 4.5 1.7 2.7 2.5
Other towns 2.4 2.3 2.5 2.5 2.5 2.5 2.0 1.7 1.8 2.2
Rural Areas 1.1 0.8 0.5 0,7 0.6 0.6 -0.1 1.3 0.8 0.8 É
Ë
Source: Tables 1.1 and 5.1
May 1, 1978
[page 208]
Table 5.3: LABOR FORCEL/ BY REGIONS, HAITI 1976, 1986 AND 2001
(Thousands of economically active persons) k
1986 : 2001
1976 I II III Iv I Il III IV
TT —————
Total 2568.1 2717.9 2790.5 2789.2 2789.0 3197.3 3357.3 3338.0 3337.6
Urban areas 515.2 769.7 747.9 761.4 761.2 1282.2 984.5 1220.0 1119.6
Port-au-Prince 312.7 518.9 L98.h 511.2 509.5 951.6 662.8 789.7 764.8
Other tons 202,5 250.8 249,5 250.2 251.7 330.6 321,7 330.3 354.8
Rural areas 2052.9 19h8.2 202.6 2027.88 2027.8 1915.1 2372.8 2218.0 2218.0
1/ Labor force participation rates estimated by ILO: 1975: 50.50%
1980: 49.95% ù
1985: 49.03% u
1990: 48.16% >
2000: 48.68% Û
Source: ILO (Projection of participation rates); Mission estimatés
July 21, 197€
É
Z
oi
*
[page 209]
Table 5.4: INCREASES IN POPULATION AND LABOUR FORCE BY REGION, HAITI 1976-1986-2001
(Thousands of persons)
1976 - 1986 1986 - 2001 |
TOTAL INCREASE AVERAGE ANNUAL increase” TOTAL INCREASE . AVERAGE ANNUAL INCRFASE
: T Il TIZ IV I It III | IV I Il IIJ IV I pat III iv
2 ———]_—_—_—_—_—_——"— ——""—"——————…———""——————"————…———————————— € Z_—_————_———_—]— …———_…———.——
Population .
Total 785.3 788.5 786,7 786,7 78.5 78.9 78.7 78.7 1164.8 1269.5 1225.8 1226.9 77.7 84.8 81.7 81.8
Urban aress 596.6 535.3 559,1 559.1 59.7 53.5 55.9 55.9 1228.0 466.7 716.1 717.2 81.9 31.1 47.7 47,8
Port-au-Prince 473.9 415.0 437.4 434.4 © 47,4 841,5 43.7 43.4 1040.0 310.0 543,4 497.5 69.3 20.7 36.2 33.2
Other touns 122.7 120.3 121,7 124,7 12.3 12.0 12.2 12.5 188.0 156.7 172.7 219.7 12,5 10.4 11.5 14,6
Rural areas 188.7 253.2 227.6 227.6 18.9 25.3 22.8 22.8 -60,0 802,8 509.7 509.7 -4.0 53.5 34.0 34,0 1
Total 149,8 224.4 221,1 220.9 15.0 22.2 22.1 22,1 479,4 566.8 548,8 548.6 32.0 37,8 36.6 36.6 i
: Urban areas 254.5 232.7 246.2 246.0 25.5 23.3 24.6 24.6 512.5 236.6 358.6 358,4 34,2 15.8 23.9 23.9
Port-au-Prince 206.2 185.7 198.5 196.8 20,6 18.6 19.9 19.7 432.7 164.4 278,5 255.3 28.8 11,0 18.6 17.0
Other touns 48.3 47.0 47,7 49.2 4.8 4.7 4.8 4.9 79.8 72.2 80.1 103,1 5.3 4.8 5.3 6.9
Rural areas -104,7 -10,3 -25.1 -25,1 -10,5 -1,0 -2,5 -2.5 -33,1 330.2 190.2 190,2 -2,2 22.0 12.7 12.7
1/ Figures may not add to total due to rounding
Source: Tables 5.1 and 5,3
May 1, 1978 Ë
[page 210]
Table 5.5: CAPITAL STOCK, HAITI 1976
Capital stock 1976 Capital stock per caput (f)
(millions of G)
. Infrastruc- Directly Infrastructure Dir. prod. Cap.
Region Total ture incl. productive per head of per head of
housing capital population ec.act. pop.
Toti_ 16,175.0 6,955.0 9,220.0 1,489.9 3,590.2
Urban area 9,321.9 4,008 .3 5.313.6 3,714.5 10,462.8
Port-au-Prince 6,265.5 2,694.1 3,571.4 4,126.4 11,586.6
Other tons 3,056.4 . 1,314.0 1,742.84 3,083,1 8,728.6
Rural area 6,853.1 2,946.7 3,906.4 821.0 1,865.3
Source: Mission estimates '
August 7, 1978 8
©
1
É
C3
|
[page 211]
Table 5,6: CAPITAL REQUIREMENTS FOR ALTERNATIVE SPATIAL STRATEGIES, HAITI 1976-1986-2001
1976 = 1986 1986 _2001
Capital requirements per head in 4 Average annual investment © Capitai requirements per heaë in g Aversge annual investmenc
éeglons Actua) 1976 values Turget values for,, (millions of 1976 &) Values for ghser- Target values for, y {millions of 1976 4)
ne £or slrernative I alternatives II-IV # native 1 3/° alternatives 11-1V * .
777 T'Infrascructure Dir. prod, Thfrastructure Dir.prod, Tafr ue
per head of Cap.per head per head of Cap.per head 1 OT IVe on Cppee ie pq que Dé 1 Et ur iw
population of ec.sct.pop. population of ec. act.pop. pernlation sf ve-ect.irg. rorulation of ee: net. pepe
A. New investment for absorption of additional popclation/labor forci
Port-au-Prince 4325 11590 4125 13590 434.3 386.8 410.9 407.3 6105 17255 6105 17155 917.1 315.1 540.1 493.3
Cthec urrns 358% 8730 3605 10160 79.8 91.0 92.7 94.8 4565 9080 5720 15860 105.2 126.0 139,2 379.1
Rnsl areas a22 1865 1550 5300 15.5 49.3 44.5 46.5 1215 2760 5875 10850 0.0 446.0 269.5 269.5
Toisl . . . . 529.6 527.1 548.1 546.6 . . . 7 1022.35 887.1 948.8 242.6
5/
B. Replacement of capital stock —
Furt-au-Prinee 82.5 463.6 - - 198.4 198.4 198.4 198.2 62.5 63.6 - - 30 jer 965 32.
her covns 61.7 349.2 - - 975 97.5 97.5 97.5 61,7 349.2 = - 207.4 D33 20 2
Rural areas 16.4 74.6 - - 212.1 212.1 212.1 212,1 16.4 74.6 - - ‘ 15.5 : 214.0
fotal . . s08.0 504.0 508.0 508.0 . . 659.4 655.5 66.5 6er |
HF
C. Total investment (C = A + B) ge
Urban areas 810.0 773.7 799.5 798.0 1474.3 881.1 OA127. 21.2 9
Port-au-Prince 632.7 SÉ5.2 609.3 605.7 TT.T 633.8 866.6 819.6 -
Other tosno 177.3 188.5 190.2 192.3 227.1 247.3 260.8 301.6
Aurst areas 227.6 261.4 256.6 256.6 207.8 661.5 483.5 463.5
Toral | 1037.6 1035.1 1056.1 105.6 1681.7 1542.6 16109 :60..7
ER EE ee es “mecame mn et mess
1/ be Investsenc = annual increases {n population and labour force (see table 5.4) multiplied by corresponding capital requirements per head.
21 Terget values 1976: Per-capita capital stock fn 1976 (see table 5.5); differences between Port-au-Prince and other touns 45 well as between other touns and rural areas reduced by 50%.
3/ Veiues for alternative 1 {n 1986 = 1976 values + 4% annual growth for 1976 - 1986.
47 Targec values 1966: 1976 target figures + 4% annual growth; regional differences again reduced by 507 as compared to 1976 target figures.
5! Peplacement: 2.0% p.a. for infrastructure; 4% p.a. for directly productive capital.
Kcplacement = per-capite replacement of 1976 capital stock multiplied by total population and labour force (see tables 5.1 and 5.3)
Scurce: Mission estimates.
August 29, 1978 3
#.B.: Population déta for 1976 differ from those used {n Chapter I and related Annex Tables for incone distribution calculations, Data usod here ie derived £rom the 1971 cenous se
which sives higher population figures for Port-au-Prince than those of the "Enquête a but mulciple", op. cit., used ia Income distribution statistics,
[page 212]
1BRD 13663
JUEY 1978
W ne ATLANTIC OCEAN De raie ae de Re Î D» res |
= Ke pb] Te Gr accapance of such boundanes | — © |
. s DS AURELE 2 S L
JAWAICA En Le TS pen 51 (73 | A
SD pre LR so /
Caribbean Sea où en, À
HAITI Qu l
PORT-AU-PRINCE H TER 3 .
WATER CONSUMPTION, 1976/LAND PRICES, 1975 > ri à > he
& LOCA CL DE NON — <<
CL. e PORT. suc? RINCE ) © RIT & no) "
\ 2 . DÉLE, ie
a ‘ Se é » _ DT 8520 {
5 14046) } Z CZ ; CZ Z 2 UN
4 5-10 \ oo À ; | fs A 4 a' 0 __j à 4
Î_ NC Ü #20 RS, ) À S
TK | WATER CONSUMPTION, 1976 NX Sd
Y | F2] Average Consumption in Liters Per Copita Per Doy : N Z —
Lan pee of Population Consuming 8 Liters or Less PSP
ET Areas where 50% or More of the Population Consume 8 Liters or Less À
ñ LAND PRICES, 1975 N 6-10 f
o 290 490 6Go 200 1000 | Land Prices Up to 10 Dollars Per m2 N 10647 Î
METERS EX Land Prices Worth More than 10 Dollars Per m2 ———, )
ès =
[page 213]
— IBRD 13680
& s Pen Dhs IR
a 4 ? a PEER COASTAL SHIPPING & ; RANÇOIS QUVALIER INTERNATIONAL ARPORT
S > ée HAITI PORT
… ROHAN PORT - AU - PRINCE « ®
auacs mir “A RESIDENTIAL POPULATION DENSITY, 1975 Me» .
TS x
Corbban See S \ ü
—:— Intgroghonel Boundory H
RRERREETE ÿ INDUSTRIAL «
Go et mp. ee par ee INHABITANTS PER HECTARE PROPOSED NE & é
ECM Selected Areas COASTAL SHIPPING » , Q
re ED 0-19 ESS , S_2 ax
200 - 399 me n 9, +2 Q/
PO p Fr 3 400 - 599 mie, 2, F3 LS Se (1 »
= 600 - 799 —— RSS 9 À Po Dr 40
Te ESS 400 1200 ’ BEN LE
-, 40: thon 1,200 Le ER. à
—— Main Access Road: ya <
la NAS, £ SE
SAS à s K- SFR +
PSE Tr RC RES ee RE SRE
AR GER AL 2 Se ep à ie
7 A @ LP ET,
PS. Y'A $
: G 7 e%
l AT LE
| Q 300 600 agro 204 Ie ==
METERS BOUTILLIERS y
; MORNE L'HÔPITAL ROAD
KENSCOF
7204 To Kenscof