(2017-03) ANKAD Cash for Work after Matthew
Summary — A March 2017 Table Verte presentation on ANKAD cash-for-work activities after Hurricane Matthew. It anchors the intervention in the government's 4 November 2016 disaster figures and the need for temporary income during recovery.
Key Findings
- Uses cash-for-work as a recovery tool linking temporary income to local repair or clean-up work.
- Cites official 4 November 2016 figures for deaths, missing people, injuries and temporary shelters.
- Documents the livelihood-response component of the Grand Sud post-Matthew coordination agenda.
Full Description
The ANKAD deck documents the livelihood side of post-Matthew response. Its opening cites the government's official figures of 546 deaths, 128 missing people, 439 injured people and thousands of displaced people in 234 temporary shelters, then moves to cash-for-work as a recovery tool. In a territorial recovery archive, this matters because it records how public works, income support and local clean-up or repair activities were joined during the first months after the storm.
Full Document Text
Extracted text from the original document for search indexing.
ANSAMN NAP KANPE AK DIYITE (ANKAD)
CASH FOR WORK – CFW
PLAN DE LA PRESENTATION
07/28/26
2
Partie 1: ELEMENT INTRODUCTIF
Contexte
Le
rapport
officiel
du
Gouvernement du 4 Novembre
2016 fait état de:
546 décès;
128 disparus;
439 blessés ;
Des Milliers de personnes
refugiées
dans
234
Abris
provisoires
ués
q
o
v
o
pr
s
e 2
t
d
â
g
s
é
è
d
à pr
s
Les
é
US
im
t
s
s
r
e
a
l
l
sont ds de do
r
07/28/26
millia
3
Partie 1: Presentation du projet
Objectif du projet
Faciliter que les familles les plus affectées aient les moyens de répondre aux
besoins primaires urgents.
Pendant les PDMs, on mesure aussi l’utilisation des fonds (FS)
Budget: environ 15 millions
Durée: Novembre 2016- Mai
2017
07/28/26
102748 familles ont reçu une aide
de 60$ sur 18 communes
4
Phases du projet
(CHARM)
07/28/26
5
Partie II: Strategie d’implementation du
projet
,,
D
D
E
E
Les partenaires du projet
CCTT RRSS
A
A
,,
,, CC
M
M
H
H
PPAA ,, FFFF
,
,
EE rrppss
R
R
CCAA yy ccoo
:
:
m
m eerrcc
u
u
SSTT
i
i
A
A
t
t
M
M
M
M
oorr
LLee
s
s
n
n
ccoo
e
e
LL
OZZEE
KO
NK
ON
FFO
:
:
rs
rs
ie
ie
c
c
n
n
a
a
n
n
fi
fi
rs
rs
u
u
te
te
ra
ra
LLeess ooppee
rs
iers
eett LLee LLeevvie
LLeess C
CC
CC
Css iim
mpplliiqq
uuaanntt ll
eess m
maaiirriiee
lleess C
ss eett
CA
ASSEEC
Css//A
ASSEEC
Css
07/28/26
6
Structure du Comite de coordination communautaire
Equipe de gestion du Projet
(CARE) (Manager, Mobilisateurs,
Superviseurs etc.)
Maire/ DPC (autre)
Section
Communale
(CASEC/ CADEC
Section
Communale
(CASEC/ CADEC
Habitation
)
ASEC/OCB
Notable
Habitation
ASEC/OCB
Notable
Habitation
ASEC/OCB
Notable
(Localité )
Pasteur/
Professeur
Groupement de
Femme
(Localité )
Pasteur/
Professeur
Groupement de
Femme
(Localité )
Pasteur/
Professeur
Groupement de
Femme
(Localité )
(Localité)
Agent de
Sante, BAC,
Agriculteur
(Localité)
Agent
de Sante, BAC,
Agriculteur
(Localité)
Agent
de Sante, BAC,
Agriculteur
Habitation
ASEC/OCB
Notable
Pasteur/Professeur
Groupement de
Femme
(Localité )
Pasteur/
Professeur
Groupement de
Femme
(Localité )
Pasteur/
Professeur
Groupement de
Femme
(Localité)
Agent
de Sante, BAC,
Agriculteur
(Localité)
Agent
de Sante, BAC,
Agriculteur
(Localité)
Agent
de Sante, BAC,
Agriculteur
Communes d’intervention
Localités
Cash partners
GA
Chambellan
CARE
GA
Moron
CARE
SUD
Chantal
CRS
SUD
Chardonnières
Food for the Hungry
SUD
Port à Piment
ACTED
Nippes
Petit Trou de Nippes
Mercy Corps
GA
Dame Marie
ACTED
GA
Les Irois
ACTED
GA
Abricots
ACTED
SUD
Roche à Bateau
CRS
SUD
Cavaillon
Mercy Corps
SUD
Coteaux
CRS
SUD
Maniche
Mercy Corps
SUD
Ile à Vache
ACTED
SUD
Les Anglais
Food for the Hungry
GA
Roseaux
CARE
GA
Jérémie Rural
CARE
GA
Jeremie Urbain
CRS
SUD
Tiburon
Food for the Hungry
07/28/26
8
Partie 3: Realisations a date
Phase I quasi terminée: Presque tous les partenaires ont finalise la première
phase. Il reste quelques zones de rattrapage
Phase 2: Identification des sites en cours de validation, sélection des bénéficiaires en
cours, lancement de cash for work dans certaines zones
Phase 3: Non encore lancée
07/28/26
9
MERCI
07/28/26
10