HaitiDocs

Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA

Pwojè rejyonal koneksyon transpò ayeryen nan Karayib la - Ayiti

Tit pibliye: Caribbean Regional Air Transport Connectivity Project - Haiti

An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Objektif

The objectives of the Project (PDO) are to: (i) improve operational safety and navigation efficiency of air transport in the Recipient’s territory; and (ii) increase the climate and disaster resilience of associated infrastructure at the Recipient’s international airports.

Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.

Deskripsyon

The objectives of the Caribbean Regional Air Transport Connectivity Project for Haiti are to: (i) improve operational safety and navigation efficiency of air transport in the Recipient’s territory; and (ii) increase the climate and disaster resilience of associated infrastructure at the Recipient’s international airports. The Project has four components. 1. PAP (IATA 3-letter code for Port-au-Prince Toussaint Louverture Airport) and CAP (IATA three-letter code for Cap-Haïtien Airport) operational safety and navigation efficiency investments component will finance infrastructure and equipment at Haiti’s two international airports—PAP and CAP. It will finance, inter alia: (i) Civil works; (ii) Purchase and installation of equipment; (iii) Consulting and non-consulting services. 2. PAP and CAP airfield drainage system improvements component will reduce the risk of airfield

plis

flooding associated with the annual rainy season, hurricanes, and climate change at PAP and CAP by increasing the drainage capacity at both airfields and thus improving their climate/disaster resilience. This component would finance inter alia: (i) Civil works; (ii) Consulting and non-consulting services. 3. Institutional strengthening and project management component will: (i) strengthen the institutional capacity of the Ministry of Public Works, Transportation, and Communication (MTPTC), National Airport Authority (AAN), and National Office of Civil Aviation (OFNAC) to manage, operate, and oversee airport operations and their development through a combination of TA activities and training; (ii) provide technical assistance (TA) to assess the capabilities, needs, and opportunities for the use of Unmanned Aircraft Systems (UAS) in Haiti; ; and (iii) finance project implementation support. 4. Contingent Emergency Response component is included for rapid response in the event of an eligible emergency, subject to the request of the Government of Haiti (GoH).

Patnè
World Bank Group, IDA
Sektè
Transpò
Etap
An kou depi 28 me 2020
Apwobasyon
28 me 2020
Fèmen
31 desanm 2027
Enstriman
Finansman BIRD/IDA, IDA
Diferans nan sa ki poko dekese
0.4: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
Anprentè
Republic of Haiti
Ajans egzekisyon
Central Execution Unit of the Ministry of Public Works (UCE)
Antre an vigè
27 out 2020
Dènye tranzaksyon
30 septanm 2026
Idantifyan operasyon an
P170907
Sik lavi3 etap, 13 dat

Istwa etap yo

EtapDepi
Planifye30 me 2019
Apwouve28 me 2020
An kou28 me 2020

Evènman ki gen dat

EvènmanDatSous
Revizyon konsèp30 me 2019Pwojè Bank Mondyal
Piblikasyon6 jen 2019Pwojè Bank Mondyal
Kòmansman prevwa15 janvye 2020IATI
Evalyasyon davans11 fevriye 2020Pwojè Bank Mondyal
Negosyasyon14 mas 2020Pwojè Bank Mondyal
Kòmansman reyèl28 me 2020IATI
Apwobasyon28 me 2020Pwojè Bank Mondyal
Premye angajman28 me 2020Tranzaksyon
Antre an vigè27 out 2020Pwojè Bank Mondyal
Premye dekèsman28 fevriye 2021Tranzaksyon
Dènye dekèsman30 septanm 2026Tranzaksyon
Dat fèmti31 desanm 2027IATI
Rapò fen atann30 jen 2028Pwojè Bank Mondyal

Pa dekèse: 71.1 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 31 desanm 2027. Dekèse nan FY2025-26: 11.2 milyon dola ameriken.

Finansman

Tablo 1.Finansman, milyon dola ameriken

FinansèMontanMilyon dola amerikenWòlSous
IDA Grant84.0EnstitisyonPwojè Bank Mondyal

Tablo 2.Operasyon ki gen rapò, milyon dola ameriken

OperasyonRapòPatnèEtapAngajmanMilyon dola ameriken
Additional Financing - Haiti Caribbean Air Transport Connectivity ProjectFinansman adisyonèl oswa operasyon pititGwoup Bank MondyalAn kou12.0

Tablo 3.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSousIATIMilyon dola ameriken
Angajman96.0IDA, eta kredi ak don96.0
Dekèse24.4IDA, eta kredi ak don16.9
Pa dekèse71.1IDA, eta kredi ak don
Pri total84.0Pwojè Bank Mondyal

Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la

Chanjman nan operasyon an1 pwolongasyon, 1 restriktirasyon, konpozan ijans prevwa
Dat fèmti orijinal
30 jen 2026
Pwolongasyon dat fèmti
1
  • Pwolonje soti 30 jen 2026 rive 31 desanm 2027 (dokiman 31 out 2025)
Restriktirasyon
1
Konpozan ijans
Konpozan repons ijans kontenjan prevwa (dokiman 27 jen 2025) dokiman restriktirasyon

Nouvo angajman ak dekèsman pa ane fiskal

Dekèsman, milyon dola ameriken
FY2019-20, pa rapòtep.r.19-20FY2020-21, 3.0 milyon dola ameriken320-21FY2021-22, 0.5 milyon dola ameriken0.521-22FY2022-23, 1.2 milyon dola ameriken122-23FY2023-24, 4.3 milyon dola ameriken423-24FY2024-25, 4.2 milyon dola ameriken424-25FY2025-26, 11.2 milyon dola ameriken1125-26FY2019-20, pa rapòtep.r.19-20FY2020-21, 3.0 milyon dola ameriken320-21FY2021-22, 0.5 milyon dola ameriken0.521-22FY2022-23, 1.2 milyon dola ameriken122-23FY2023-24, 4.3 milyon dola ameriken423-24FY2024-25, 4.2 milyon dola ameriken424-25FY2025-26, 11.2 milyon dola ameriken1125-26

Tablo 4.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken

FY2019-20Milyon dola amerikenFY2020-21Milyon dola amerikenFY2021-22Milyon dola amerikenFY2022-23Milyon dola amerikenFY2023-24Milyon dola amerikenFY2024-25Milyon dola amerikenFY2025-26Milyon dola ameriken
Nouvo angajman84.0Pa rapòtePa rapòte12.0Pa rapòtePa rapòtePa rapòte
DekèsmanPa rapòte3.00.51.24.34.211.2
Dekèsman kimilePa rapòte3.03.54.79.013.224.4

Fich ak dokiman

Tranzaksyon39 liy, 28 me 2020 rive 30 septanm 2026

Tablo 5.Tranzaksyon, milyon dola ameriken

DatMeziMontanMilyon dola amerikenSousMetòd
28 me 2020Angajman84.0IDA, eta kredi ak doncredit original principal at board approval
5 jiyè 2023Angajman12.0IDA, eta kredi ak doncredit original principal at board approval
28 fevriye 2021Dekèsman3.0IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 jiyè 2021Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 janvye 2022Dekèsman0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 mas 2022Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 me 2022Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 oktòb 2022Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 novanm 2022Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 desanm 2022Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 mas 2023Dekèsman0.2IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 me 2023Dekèsman0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 out 2023Dekèsman0.3IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 novanm 2023Dekèsman1.8IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 janvye 2024Dekèsman0.2IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
29 fevriye 2024Dekèsman0.3IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 avril 2024Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 me 2024Dekèsman0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 jen 2024Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 jiyè 2024Dekèsman0.9IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 out 2024Dekèsman0.2IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 septanm 2024Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 oktòb 2024Dekèsman0.3IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 novanm 2024Dekèsman0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 desanm 2024Dekèsman0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 janvye 2025Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 avril 2025Dekèsman0.3IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 me 2025Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 jen 2025Dekèsman0.8IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 jiyè 2025Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 septanm 2025Dekèsman1.8IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 oktòb 2025Dekèsman0.4IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 desanm 2025Dekèsman0.5IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
28 fevriye 2026Dekèsman1.5IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 mas 2026Dekèsman<0.1IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 me 2026Dekèsman1.0IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 jen 2026Dekèsman0.2IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
31 jiyè 2026Dekèsman0.9IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
30 septanm 2026Dekèsman6.7IDA, eta kredi ak dondifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
Kondisyon4 sou 6 rapòte
Kalite finansman
110 Don estanda
Kalite koule
Pa rapòte
Kalite èd
C01 Entèvansyon kalite pwojè
Èd mare oswa pa mare
5 Pa mare
Kalite kolaborasyon
2 Apò miltilateral k ap antre
Imanitè
Pa rapòte
Kote1 kote nonmen, 2 kote ki gen kowòdone
DepatmanPa rapòte
Kote sous la nonmenRepublic of Haiti
Kote ki gen kowòdone2
Endikatè rezilta27 endikatè
EndikatèValè referansSibDènye valèDat dènye valè
ADS-B for CAP and PAP installed and operationalNoYesNo13 fevriye 2024
Additional aircraft parking apron built at PAP0.0026100.000.0013 fevriye 2024
Airfield Ground Lighting (AGL) for the CAP runway is installed and operationalNoYesNo13 fevriye 2024
Aviation sector strategy preparedNoYesNo13 fevriye 2024
Constructed CAP Air Traffic Control Tower (ATCT) in compliance with ICAO SARPsNoYesNo13 fevriye 2024
Grievances adequately responded to and/or resolved within the stipulated service standards0.00100.000.0013 fevriye 2024
Length of CAP runway rehabilitated0.002450.000.0013 fevriye 2024
Length of PAP drainage system3850.002450.003850.0013 fevriye 2024
Length of PAP taxiway system built0.001460.000.0013 fevriye 2024
New culverts built at CAP0.004.000.0013 fevriye 2024
OFNAC safety inspectors trained by a certified agency0.0050.000.0013 fevriye 2024
PAP RESAs implemented and consistent with ICAO SARPsNoYesNo13 fevriye 2024
People with Enhanced Access to Transportation Services0.001900000.000.0013 fevriye 2024
Regional training programs attended by AAN and OFNAC0.005.001.0013 fevriye 2024
Rescue Coordination Center staff trained by a certified agency0.0050.000.0013 fevriye 2024
Semi-annual meetings held with stakeholders to discuss their suggestions and related actions taken by the Project0.0012.003.0013 fevriye 2024
Share of infrastructure activities identified as climate resilient0.00100.000.0013 fevriye 2024
Share of women hired in medium-skill jobs by UCE-MTPC, OFNAC and AAN0.0015.000.0013 fevriye 2024
Share of women included in the medium-skills training0.0030.0033.0013 fevriye 2024
Wildlife management plan prepared and implemented for PAP and CAP airportsNoYesNo13 fevriye 2024
Average Runway Occupancy Time (ROT) of airplanes at PAP7.505.007.5013 fevriye 2024
Average number of days per year the discharge exceeds the capacity of the airport drainage system at PAP and CAP20.000.0020.0013 fevriye 2024
PAP and CAP runways in compliance with ICAO SARPsNoYesNo13 fevriye 2024
Targeted upgrade of air navigation systems achieved at CAP and PAPNon-precision navigation system: No VSAT or ADS-BElectronic navigation system in place (ADS-B impleNon-precision navigation system: No VSAT or ADS-B13 fevriye 2024
Direct users that benefit from improved access to sustainable transport infrastructure and services0190,00000Pa rapòte
Average number of days per year the discharge exceeds the capacity of the airport drainage system at CAP10.000.0010.0013 fevriye 2024
Average number of days per year the discharge exceeds the capacity of the airport drainage system at PAP10.000.0010.0013 fevriye 2024
Nòt6 nòt
NòtValèDat
ISR Financial ManagementModerately Satisfactory19 jen 2026
ISR Monitoring and EvaluationSatisfactory19 jen 2026
ISR Overall Implementation Progress (IP)Moderately Satisfactory19 jen 2026
ISR ProcurementModerately Satisfactory19 jen 2026
ISR Progress towards achievement of PDOModerately Satisfactory19 jen 2026
ISR Project ManagementModerately Satisfactory19 jen 2026
Kontra yo bay21 kontra
FounisèDatMetòdMontan
V&F Construction17 jiyè 2026RFB31,546,341.58 USD
REMIX S. A.17 jiyè 2026RFBPa rapòte
V&F Construction17 jiyè 2026RFBPa rapòte
VINCI Construction Grands Projets7 me 2026CDS1,700,000 USD
Artelia Passion and Solutions8 me 2025CQS529,117.11 USD
Societe de GENIE Conseil S. A.8 me 2025CQSPa rapòte
Artelia Passion and Solutions7 avril 2025CDS480,608.8 USD
SETEC International29 janvye 2025QCBS829,801.5 USD
BETA Ingénieurs-Conseils29 janvye 2025QCBSPa rapòte
SETEC International13 janvye 2025QCBS939,677.2 USD
BETA Ingénieurs-Conseils13 janvye 2025QCBSPa rapòte
Coamco Haïti S. A.24 jen 2024RFB4,725,442.26 USD
Non an pa afiche27 jiyè 2023INDV6,642 USD
Non an pa afiche1 jen 2023INDV20,000 USD
Instituto Dominicano de Aviacin Civil (IDAC)28 avril 2023DIR1,387,337.87 USD
Firme Turnier13 desanm 2022LCS4,161,000 HTG
Unite Caribbean SAS22 novanm 2022CQS96,275 USD
CECOM Consultants S. A.8 novanm 2022QCBS1,177,697 USD
CECOM Consultants S. A.8 novanm 2022QCBS11,914,000 HTG
Techniplan SRL8 novanm 2022QCBSPa rapòte
France Aviation Civile Services (FRACS)8 oktòb 2021CDS2,030,600 EUR
Lajan ki pase bay lòt37 mouvman
BenefisyèMouvmanDatMilyon dola ameriken
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 jen 20260.2
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 me 20261.0
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 mas 2026<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman28 fevriye 20261.5
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 desanm 20250.5
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 oktòb 20250.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 septanm 20251.8
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 jiyè 20250.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 jen 20250.8
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 me 20250.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 avril 20250.3
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 janvye 2025<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 desanm 20240.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 novanm 20240.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 oktòb 20240.3
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 septanm 20240.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 out 20240.2
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 jiyè 20240.9
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 jen 20240.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 me 20240.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 avril 2024<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman29 fevriye 20240.3
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 janvye 20240.2
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 novanm 20231.8
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 out 20230.3
Central Execution Unit of the Ministry of Public Works (UCE)Angajman31 jiyè 202312.0
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 me 20230.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 mas 20230.2
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 desanm 2022<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman30 novanm 20220.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 oktòb 2022<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 me 2022<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 mas 20220.4
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 janvye 20220.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman31 jiyè 2021<0.1
Central Execution Unit of the Ministry of Public Works (UCE)Dekèsman28 fevriye 20213.0
Central Execution Unit of the Ministry of Public Works (UCE)Angajman31 me 202084.0
Idantifyan7 idantifyan
SistèmIdantifyanSous
Idantifyan IATI44000-P170907IATI
Kredi oswa don IDAIDAD6290IDA, eta kredi ak don
Kredi oswa don IDAIDAE2030IDA, eta kredi ak don
Liy pwogram envestisman piblik11141-1-25-31-86Pwogram envestisman piblik
Prè Bank mondyalIDA-D6290Pwojè Bank Mondyal
Prè Bank mondyalIDA-E2030Pwojè Bank Mondyal
Pwojè Bank mondyalP170907Fich operasyon an
Kote sous yo pa dakò1 chan
ChanSousValèItilize
AngajmanIDA, eta kredi ak don96.0 milyon dola ameriken✓
AngajmanPwojè Bank Mondyal84.0 milyon dola ameriken
Dokiman patnè a62 dokiman
Avi apèl dòf (2)

Sous

Done jiska 18 oktòb 2026
SousLi nan dat
IATI18 oktòb 2026
IATI18 oktòb 2026
IDA, eta kredi ak don18 oktòb 2026
Pwogram envestisman piblik18 oktòb 2026
Avi pasasyon mache Bank mondyal18 oktòb 2026
Pwojè Bank Mondyal18 oktòb 2026
Dokiman Bank Mondyal18 oktòb 2026
Site paj sa a

HaitiDocs. Pwojè rejyonal koneksyon transpò ayeryen nan Karayib la - Ayiti. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP170907?lang=ht