Finansman adisyonèl - Pwojè konektivite transpò aeryen Ayiti ak Karayib la

Tit pibliye: Additional Financing - Haiti Caribbean Air Transport Connectivity Project

An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Objektif

The objectives of the Project (PDO) are to: (i) improve operational safety and navigation efficiency of air transport in the Recipient’s territory; and (ii) increase the climate and disaster resilience of associated infrastructure at the Recipient’s international airports.

Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.

Deskripsyon

The objective of the Project (PDO) is to: (i) improve operational safety and navigation efficiency of air transport in the Recipient’s territory; and (ii) increase the climate and disaster resilience of associated infrastructure at the Recipient’s international airports.Given the interdependence of Caribbean nations with respect to air transport sector, CATCOP will deploy a regional approach through the Series of Projects (SOP) instrument. In addition to Haiti, several other countries including St-Lucia, Dominica and Grenada have agreed to participate and all support the common objective of improving regional air transport connectivity and, as such, are seeking IDA financing for targeted country-specific critical investments and technical assistance related to improving safety and resilience. The proposed Project would include five components: (i) PAP

plis

and CAP operational safety and navigation efficiency investments; (ii) PAP and CAP airfield drainage system improvements; (iii) Technical Assistance; (iv) Contingent Emergency Response; and (v) Project Management. Total Project cost is estimated at US$96 million including proposed AF.

Patnè
World Bank Group, IDA
Sektè
Transpò
Etap
An kou depi 31 janvye 2024
Apwobasyon
5 jiyè 2023
Fèmen
31 desanm 2027
Enstriman
Finansman BIRD/IDA, IDA
Anprentè
Republic of Haiti
Ajans egzekisyon
Central Execution Unit of the Ministry of Public Works (UCE)
Antre an vigè
31 janvye 2024
Depatman
Lwès, Nò
Idantifyan operasyon an
P181119
Sik lavi2 etap, 5 dat

Istwa etap yo

EtapDepi
Apwouve5 jiyè 2023
An kou31 janvye 2024

Evènman ki gen dat

EvènmanDatSous
Evalyasyon davans26 avril 2023Pwojè Bank Mondyal
Negosyasyon27 avril 2023Pwojè Bank Mondyal
Apwobasyon5 jiyè 2023Pwojè Bank Mondyal
Antre an vigè31 janvye 2024IDA, eta kredi ak don
Dat fèmti31 desanm 2027Pwojè Bank Mondyal

Finansman

Tablo 1.Finansman, milyon dola ameriken

FinansèMontanMilyon dola amerikenWòlSous
IDA Grant12.0EnstitisyonPwojè Bank Mondyal

Tablo 2.Operasyon ki gen rapò, milyon dola ameriken

OperasyonRapòPatnèEtapAngajmanMilyon dola ameriken
Caribbean Regional Air Transport Connectivity Project - HaitiOperasyon manmanGwoup Bank MondyalAn kou96.0

Tablo 3.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSous
Angajman12.0Pwojè Bank Mondyal
DekèsePa rapòte
Pa dekèsePa rapòte
Pri total12.0Pwojè Bank Mondyal

Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Montan yo dapre sous la

Chanjman nan operasyon an1 pwolongasyon, konpozan ijans prevwa
Dat fèmti orijinal
30 jen 2026
Pwolongasyon dat fèmti
1
  • Pwolonje soti 30 jen 2026 rive 31 desanm 2027 (dokiman 31 out 2025)
Restriktirasyon
Pa rapòte
Konpozan ijans
Konpozan repons ijans kontenjan prevwa (dokiman 5 jen 2023) dokiman

Fich ak dokiman

Kote2 depatman, 2 kote nonmen, 2 kote ki gen kowòdone
DepatmanLwès, Nò
Kote sous la nonmenHugo Chavez International Airport, Toussaint L Ouverture International Airport
Kote ki gen kowòdone2
Idantifyan1 idantifyan
SistèmIdantifyanSous
Pwojè Bank mondyalP181119Fich operasyon an

Dokiman patnè a

Sous

Done jiska 18 oktòb 2026
SousLi nan dat
IDA, eta kredi ak don18 oktòb 2026
Pwojè Bank Mondyal18 oktòb 2026
Dokiman Bank Mondyal18 oktòb 2026
Site paj sa a

HaitiDocs. Finansman adisyonèl - Pwojè konektivite transpò aeryen Ayiti ak Karayib la. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP181119?lang=ht