Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA
Jesyon risk dezas ak rekonstriksyon, finansman adisyonèl
Tit pibliye: Disaster Risk Management and Reconstruction Additional Financing
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The Project Development Objective is to support the Recipient in improving disaster response capacity and enhancing the resiliency of critical transport infrastructure.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
- Patnè
- World Bank Group, IDA
- Sektè
- Transpò
- Etap
- Fèmen depi 30 jen 2020
- Apwobasyon
- 8 jen 2017
- Fèmen
- 30 jen 2020
- Enstriman
- Finansman BIRD/IDA, IDA
- Antre an vigè
- 6 novanm 2017
- Depatman
- Sidès, Sid, Lwès, Nò, Grandans, Sant, Latibonit, Nip
- Idantifyan operasyon an
- P163199
Sik lavi4 etap, 6 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Apwouve | 8 jen 2017 |
| An kou | 6 novanm 2017 |
| Ap fèmen | 30 jen 2020 |
| Fèmen | 30 jen 2020 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Evalyasyon davans | 24 avril 2017 | Pwojè Bank Mondyal |
| Negosyasyon | 1 me 2017 | Pwojè Bank Mondyal |
| Apwobasyon | 8 jen 2017 | Pwojè Bank Mondyal |
| Antre an vigè | 6 novanm 2017 | IDA, eta kredi ak don |
| Dat fèmti | 30 jen 2020 | Pwojè Bank Mondyal |
| Rapò fen atann | 29 janvye 2021 | Pwojè Bank Mondyal |
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant from CRW | 20.0 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Operasyon ki gen rapò, milyon dola ameriken
| Operasyon | Rapò | Patnè | Etap | AngajmanMilyon dola ameriken |
|---|---|---|---|---|
| Disaster Risk Management and Reconstruction | Operasyon manman | Gwoup Bank Mondyal | Fèmen | 71.8 |
Tablo 3.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | |
|---|---|---|
| Angajman | 20.0 | Pwojè Bank Mondyal |
| Dekèse | Pa rapòte | |
| Pa dekèse | Pa rapòte | |
| Pri total | 20.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Montan yo dapre sous la
Chanjman nan operasyon an0 pwolongasyon
- Dat fèmti orijinal
- 30 jen 2020
- Pwolongasyon dat fèmti
- 0
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Fich ak dokiman
Kote8 depatman, 9 kote nonmen, 9 kote ki gen kowòdone
| Depatman | Sidès, Sid, Lwès, Nò, Grandans, Sant, Latibonit, Nip |
| Kote sous la nonmen | Centre, Departement de Nippes, Departement de l'Artibonite, Grandans, Nord, Port-au-Prince, Riviere des Cotes de Fer, Sud, Sud-Est |
| Kote ki gen kowòdone | 9 |
Endikatè rezilta24 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| A draft road map with a score card for a disaster risk management system is developed | No | Yes | No | 5 out 2016 |
| A first pilot detailed hydrological risk modelling is developed using the Digital Elevation Model | No | Yes | No | 15 mas 2017 |
| A national radio communication system has been initiated and at least four pilot departments have been connected to the national level | 0.00 | 4.00 | 4.00 | 5 out 2016 |
| Actions are taken in a timely manner in response to feedback received during consultation sessions with beneficiaries/project affected people(Feedback, Responses and Action are monitored and reported) | No | Yes | No | 21 me 2017 |
| Female Beneficiaries | 0.00 | 30.00 | 0.00 | 15 mas 2017 |
| Number of CCPC Staff trained and level 2-certified (Office Management and Emergency Operation Center Management), disaggregated bysex | 0.00 | 3500.00 | 1400.00 | 5 out 2016 |
| Number of beneficiaries from a training in disaster risk management, disaggregated by sex | 0.00 | 400.00 | 330.00 | 5 out 2016 |
| Number of bridges and road sections damaged by hurricane Matthew that have been repaired or consolidatedwith satisfactory technical standards | 0.00 | 15.00 | 0.00 | 15 mas 2017 |
| Number of bridges built or rehabilitated with satisfactory technical standards | 0.00 | 6.00 | 3.00 | 5 out 2016 |
| Number of bridges damaged by hurricane Matthew that have been rebuiltwith satisfactory technical standards | 0.00 | 3.00 | 0.00 | 15 mas 2017 |
| Number of departments with investment plan to improve all weather rural accessibility based on the Rural Index Access methodology | 0.00 | 3.00 | 0.00 | 5 out 2016 |
| Number of level 2-certified operational Municipal Civil Protection Committees (CCPCs) | 0.00 | 140.00 | 140.00 | 5 out 2016 |
| Number of man/days of LIW generated by project activities | 0.00 | 300000.00 | 0.00 | 15 mas 2017 |
| Number of ministry officials benefitting from a training program in risk management, disaggregated by sex | 0.00 | 75.00 | 0.00 | 5 out 2016 |
| Number of risk maps are produced, disseminated and available in an open-data online platform | 0.00 | 35.00 | 0.00 | 25 me 2017 |
| Number of spot interventions to protect the local access executed with satisfactory technical standards | 0.00 | 20.00 | 20.00 | 5 out 2016 |
| Percentage of the national territory covered by a high resolution Digital Elevation Model and high resolution aero-photography | 0.00 | 100.00 | 90.00 | 5 out 2016 |
| Pilot evacuation shelters have been rehabilitated or reconstructed with multi-hazard resilient measures | 0.00 | 25.00 | 5.00 | 15 mas 2017 |
| Pilot evacuation shelters tool to evaluate and prioritize shelters needs is developed and used in the affected area by Matthew | No | Yes | No | 15 mas 2017 |
| Roads rehabilitated, Non-rural | 0.00 | 100.00 | 72.00 | 5 out 2016 |
| Line ministries developing an action plan for vulnerability reduction | 0.00 | 2.00 | 0.00 | 5 out 2016 |
| Number of beneficiaries from an improved and resilient investments on the road network | 0.00 | 70000.00 | 60000.00 | 5 out 2016 |
| Percentate of Female Beneficiaries from an improved and resilient investments on the primary and secondary road network | 0.00 | 50.00 | 50.00 | 5 out 2016 |
| Share of population living in a municipality with a CCPC (Comite Communal de Protection Civile - Municipal Civil Protection Staff) of category 2 or higher | 45.00 | 75.00 | 45.00 | 5 out 2016 |
Idantifyan1 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Pwojè Bank mondyal | P163199 | Fich operasyon an |
Dokiman patnè a
- Haiti - Disaster Risk Management and Reconstruction Project : additional financing and restructuring, 25 me 2017, documents.worldbank.org
- Appraisal Project Information Document-Integrated Safeguards Data Sheet - Disaster Risk Management and Reconstruction Additional Financing - P163199, 20 avril 2017, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : additional financing - environmental assessment : Cadre de gestion environnementale et sociale, 1 mas 2017, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : additional financing - resettlement plan : Cadre de procedures de reinstallation, 1 mas 2017, documents.worldbank.org
Sous
- IDA, eta kredi ak don: World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Jesyon risk dezas ak rekonstriksyon, finansman adisyonèl. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP163199?lang=ht