Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA
Jesyon risk dezas ak rekonstriksyon
Tit pibliye: Disaster Risk Management and Reconstruction
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The Project Development Objective is to support the Recipient in improving disaster response capacity and enhancing the resiliency of critical transport infrastructure.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
- Patnè
- World Bank Group, IDA
- Sektè
- Transpò
- Etap
- Fèmen depi 30 jen 2020
- Apwobasyon
- 1 desanm 2011
- Fèmen
- 30 jen 2020
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- 5.0: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Anprentè
- Ministry of Economy and Finance
- Ajans egzekisyon
- Unite de Coordination de Projet - Ministry of Interior and Local Authorities,Unite de Coordination et Execution - Ministry of Public Works
- Antre an vigè
- 3 avril 2012
- Depatman
- Sidès, Sid, Lwès, Nòdwès, Nòdès, Nò, Grandans, Sant, Latibonit, Nip
- Dènye tranzaksyon
- 31 jiyè 2022
- Idantifyan operasyon an
- P126346
Sik lavi5 etap, 13 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 10 me 2011 |
| Apwouve | 1 desanm 2011 |
| An kou | 1 desanm 2011 |
| Ap fèmen | 30 jen 2020 |
| Fèmen | 30 jen 2020 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 10 me 2011 | Pwojè Bank Mondyal |
| Negosyasyon | 31 out 2011 | Pwojè Bank Mondyal |
| Piblikasyon | 15 septanm 2011 | Pwojè Bank Mondyal |
| Kòmansman prevwa | 24 novanm 2011 | IATI |
| Kòmansman reyèl | 1 desanm 2011 | IATI |
| Apwobasyon | 1 desanm 2011 | Pwojè Bank Mondyal |
| Premye angajman | 1 desanm 2011 | Tranzaksyon |
| Antre an vigè | 3 avril 2012 | Pwojè Bank Mondyal |
| Premye dekèsman | 31 oktòb 2012 | Tranzaksyon |
| Fen reyèl | 30 jen 2020 | IATI |
| Dat fèmti | 30 jen 2020 | IATI |
| Dènye dekèsman | 31 desanm 2020 | Tranzaksyon |
| Rapò fen atann | 29 janvye 2021 | Pwojè Bank Mondyal |
Pa dekèse: 0.0 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 30 jen 2020.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 60.0 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Operasyon ki gen rapò, milyon dola ameriken
| Operasyon | Rapò | Patnè | Etap | AngajmanMilyon dola ameriken |
|---|---|---|---|---|
| Disaster Risk Management and Reconstruction Additional Financing | Finansman adisyonèl oswa operasyon pitit | Gwoup Bank Mondyal | Fèmen | 20.0 |
Tablo 3.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 71.8 | IDA, eta kredi ak don | Pa rapòte |
| Dekèse | 66.8 | IDA, eta kredi ak don | 69.1 |
| Pa dekèse | 0.0 | IDA, eta kredi ak don | |
| Pri total | 60.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Chanjman nan operasyon an2 pwolongasyon, omwen 2 restriktirasyon, konpozan ijans prevwa
- Dat fèmti orijinal
- 31 desanm 2016
- Pwolongasyon dat fèmti
- 2
- Pwolonje soti 31 desanm 2016 rive 30 jen 2017 (dokiman 31 out 2016)
- Pwolonje soti 30 jen 2017 rive 30 jen 2020 (dokiman 31 jiyè 2017)
- Restriktirasyon
- omwen 2
- 27 jen 2019 (dokiman 27 jen 2019) dokiman restriktirasyon
- 5 jen 2020 (dokiman 5 jen 2020) dokiman restriktirasyon
- Konpozan ijans
- Konpozan repons ijans kontenjan prevwa (dokiman 5 jen 2020) dokiman restriktirasyon
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 4.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | FY2013-14Milyon dola ameriken | FY2014-15Milyon dola ameriken | FY2015-16Milyon dola ameriken | FY2016-17Milyon dola ameriken | FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | FY2019-20Milyon dola ameriken | FY2020-21Milyon dola ameriken | FY2021-22Milyon dola ameriken | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Nouvo angajman | 60.0 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | 20.0 | Pa rapòte | Pa rapòte | −4.6 | Pa rapòte | −3.6 |
| Dekèsman | Pa rapòte | 8.4 | 9.0 | 6.2 | 4.1 | 7.4 | 7.3 | 7.9 | 16.6 | −0.1 | −0.0 |
| Dekèsman kimile | Pa rapòte | 8.4 | 17.5 | 23.7 | 27.8 | 35.1 | 42.5 | 50.3 | 67.0 | 66.8 | 66.8 |
Fich ak dokiman
Tranzaksyon78 liy, 1 desanm 2011 rive 31 jiyè 2022
Tablo 5.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 1 desanm 2011 | Angajman | 60.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 8 jen 2017 | Angajman | 20.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 30 jen 2020 | Angajman | −4.4 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2020 | Angajman | −0.3 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2022 | Angajman | −0.6 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2022 | Angajman | −2.9 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2012 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2012 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2013 | Dekèsman | 2.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2013 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2013 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2013 | Dekèsman | 2.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2013 | Dekèsman | 2.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2014 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2014 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2014 | Dekèsman | 1.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2014 | Dekèsman | 4.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2014 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2014 | Dekèsman | 1.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2015 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2015 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2015 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2015 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2015 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2015 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2015 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2015 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2015 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2016 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2016 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2016 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2016 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2016 | Dekèsman | 2.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2017 | Dekèsman | 1.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2017 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2017 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2017 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2017 | Dekèsman | 2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2018 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2018 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2018 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2018 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2018 | Dekèsman | 2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2018 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2018 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2018 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2018 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2018 | Dekèsman | 1.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2018 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2018 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2019 | Dekèsman | 1.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2019 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2019 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2019 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2019 | Dekèsman | 1.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2019 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2020 | Dekèsman | 1.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2020 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2020 | Dekèsman | 1.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2020 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2020 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2020 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2020 | Dekèsman | 2.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2020 | Dekèsman | 3.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2020 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2020 | Dekèsman | 2.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2020 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2020 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2020 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2020 | Dekèsman | −0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2020 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2021 | Dekèsman | −0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2021 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2021 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2021 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2021 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2021 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2022 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon5 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Wi
Kote10 depatman, 10 kote nonmen, 20 kote ki gen kowòdone
| Depatman | Sidès, Sid, Lwès, Nòdwès, Nòdès, Nò, Grandans, Sant, Latibonit, Nip |
| Kote sous la nonmen | Departement de Nippes, Departement de l'Artibonite, Departement de l'Ouest, Departement de la Grand'Anse, Departement du Centre, Departement du Nord, Departement du Nord-Est, Departement du Nord-Ouest, Departement du Sud, Departement du Sud-Est |
| Kote ki gen kowòdone | 20 |
Endikatè rezilta26 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| A draft road map with a score card for a disaster risk management system is developed | No | Yes | Yes | 25 jen 2020 |
| A first pilot detailed hydrological risk modelling is developed using the Digital Elevation Model | No | Yes | Yes | 25 jen 2020 |
| A national radio communication system has been initiated and at least four pilot departments have been connected to the national level | 0.00 | 4.00 | 4.00 | 26 jen 2020 |
| Actions are taken in a timely manner in response to feedback received during consultation sessions with beneficiaries/project affected people(Feedback, Responses and Action are monitored and reported) | No | Yes | Yes | 30 jen 2020 |
| Dissaggregation by sex in percent | 0.00 | 0.00 | 14.00 | 26 jen 2020 |
| Female Beneficiaries | 0.00 | 0.00 | 40.00 | 30 me 2018 |
| Number of CCPC Staff trained and level 2-certified (Office Management and Emergency Operation Center Management), disaggregated bysex | 0.00 | 2800.00 | 3313.00 | 26 jen 2020 |
| Number of beneficiaries from a training in disaster risk management, disaggregated by sex | 0.00 | 799.00 | 1520.00 | 26 jen 2020 |
| Number of bridges and road sections damaged by hurricane Matthew that have been repaired or consolidatedwith satisfactory technical standards | 0.00 | 15.00 | 27.00 | 30 jen 2020 |
| Number of bridges built or rehabilitated with satisfactory technical standards | 0.00 | 6.00 | 6.00 | 30 jen 2020 |
| Number of bridges damaged by hurricane Matthew that have been rebuiltwith satisfactory technical standards | 0.00 | 1.00 | 1.00 | 30 jen 2020 |
| Number of departments with investment plan to improve all weather rural accessibility based on the Rural Index Access methodology | 0.00 | 5.00 | 5.00 | 30 jen 2020 |
| Number of level 2-certified operational Municipal Civil Protection Committees (CCPCs) | 0.00 | 140.00 | 119.00 | 25 jen 2020 |
| Number of man/days of LIW generated by project activities | 0.00 | 350000.00 | 370000.00 | 30 jen 2020 |
| Number of ministry officials benefitting from a training program in risk management, disaggregated by sex | 0.00 | 70.00 | 127.00 | 26 jen 2020 |
| Number of risk maps are produced, disseminated and available in an open-data online platform | 0.00 | 35.00 | 0.00 | 25 jen 2020 |
| Number of spot interventions to protect the local access executed with satisfactory technical standards | 0.00 | 40.00 | 112.00 | 30 jen 2020 |
| Percentage of the national territory covered by a high resolution Digital Elevation Model and high resolution aero-photography | 0.00 | 100.00 | 100.00 | 26 jen 2020 |
| Pilot evacuation shelters have been rehabilitated or reconstructed with multi-hazard resilient measures | 0.00 | 12.00 | 5.00 | 26 jen 2020 |
| Pilot evacuation shelters tool to evaluate and prioritize shelters needs is developed and used in the affected area by Matthew | No | Yes | Yes | 25 jen 2020 |
| Roads rehabilitated, Non-rural | 0.00 | 100.00 | 120.00 | 30 jen 2020 |
| Line ministries developing an action plan for vulnerability reduction | 0.00 | 2.00 | 2.00 | 24 jen 2020 |
| Number of beneficiaries from an improved and resilient investments on the road network | 0.00 | 150000.00 | 150000.00 | 30 jen 2020 |
| Percentate of Female Beneficiaries from an improved and resilient investments on the primary and secondary road network | 0.00 | 0.00 | 50.00 | 21 jen 2018 |
| Share of population living in a municipality with a CCPC (Comite Communal de Protection Civile - Municipal Civil Protection Staff) of category 2 or higher | 45.00 | 75.00 | 77.30 | 27 jen 2020 |
| Number of CCPC Staff trained and level 2-certified (Office Management and Emergency Operation Center Management), disaggregated by sex | 0.00 | 2800.00 | 3313.00 | 27 jen 2019 |
Nòt17 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | 29 jen 2021 |
| IEG borrowcompliance | Not Rated | 29 jen 2021 |
| IEG evaltype | ES | 29 jen 2021 |
| IEG icrquality | Substantial | 29 jen 2021 |
| IEG mequality | Modest | 29 jen 2021 |
| IEG outcome | Moderately Satisfactory | 29 jen 2021 |
| IEG overallbankperf | Moderately Satisfactory | 29 jen 2021 |
| ICR bankqualityentry | Not Rated | 29 janvye 2021 |
| ICR banksupervision | Not Rated | 29 janvye 2021 |
| ICR outratingind | Moderately Satisfactory | 29 janvye 2021 |
| ICR overallrating | Moderately Satisfactory | 29 janvye 2021 |
| ISR Financial Management | Moderately Unsatisfactory | 30 jen 2020 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | 30 jen 2020 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | 30 jen 2020 |
| ISR Procurement | Moderately Satisfactory | 30 jen 2020 |
| ISR Progress towards achievement of PDO | Satisfactory | 30 jen 2020 |
| ISR Project Management | Moderately Satisfactory | 30 jen 2020 |
Kontra yo bay37 kontra
| Founisè | Dat | Metòd | Montan |
|---|---|---|---|
| Interloc | 27 desanm 2019 | RFQ | 233,492.6 USD |
| FB GROUP | 27 desanm 2019 | RFQ | 279,160 USD |
| MT Construction | 27 desanm 2019 | RFQ | 481,451.75 USD |
| FB GROUP | 27 desanm 2019 | RFQ | 214,330 USD |
| ETUDE, Plan, Construction, EPCOS | 27 desanm 2019 | RFQ | 153,247.83 USD |
| SAGESS | 27 desanm 2019 | RFQ | 184,041.8 USD |
| BECOS Plus | 27 desanm 2019 | RFQ | 167,944 USD |
| Interloc | 27 desanm 2019 | RFQ | 473,339 USD |
| Firme de Construction et de Service Agricole (Ficosa) | 20 desanm 2019 | RFQ | 341,191.32 USD |
| Interloc | 20 desanm 2019 | RFQ | 287,422.72 USD |
| LICC Construction | 2 desanm 2019 | RFQ | 212,422.86 USD |
| Bureau d'ETUDE et de Construction (BECO) | 2 desanm 2019 | RFQ | 270,875 USD |
| Bureau D Etudes et D Exécution D Haiti, BEEH | 2 desanm 2019 | RFQ | 314,520 USD |
| ENCAUSA | 2 desanm 2019 | RFQ | 579,725 USD |
| FB GROUP | 2 desanm 2019 | RFQ | 173,460 USD |
| Embellissement Plan Construction (EPC) | 2 desanm 2019 | RFQ | 203,845 USD |
| BECAM | 2 desanm 2019 | RFQ | 282,700 USD |
| M & L Construction | 22 novanm 2019 | RFQ | 195,187.4 USD |
| Ceforex Construction | 22 novanm 2019 | RFQ | 198,886.12 USD |
| Embellissement Plan Construction (EPC) | 22 novanm 2019 | RFQ | 243,581.9 USD |
| Bureau d'ETUDE et de Construction (BECO) | 22 novanm 2019 | RFQ | 278,737.5 USD |
| Bureau D Etudes et D Exécution D Haiti, BEEH | 22 novanm 2019 | RFQ | 201,750 USD |
| Alliance Technique et de Services d'Haiti (Altesha S. A.) | 22 novanm 2019 | RFQ | 92,975.71 USD |
| BECAM | 22 novanm 2019 | RFQ | 126,461.1 USD |
| Bureau d’Études et Exécution des Projets de Construction (MC Beepco) | 22 novanm 2019 | RFQ | 210,954.2 USD |
| Gecotech | 22 novanm 2019 | RFQ | 166,570 USD |
| Bureau d'ETUDE et de Construction (BECO) | 22 novanm 2019 | RFQ | 202,945 USD |
| Acc Group | 22 novanm 2019 | RFQ | 190,145 USD |
| Encotrans | 22 novanm 2019 | RFQ | 164,340.42 USD |
| Non an pa afiche | 1 novanm 2019 | INDV | 38,500 USD |
| Non an pa afiche | 1 novanm 2019 | INDV | 38,500 USD |
| Matiere SAS | 31 oktòb 2019 | RFB | 8,341,569.74 USD |
| Non an pa afiche | 1 septanm 2014 | QBS | Pa rapòte |
| Non an pa afiche | 1 septanm 2014 | QBS | Pa rapòte |
| Non an pa afiche | 1 septanm 2014 | QBS | Pa rapòte |
| Non an pa afiche | 1 septanm 2014 | QBS | Pa rapòte |
| Non an pa afiche | 4 fevriye 2014 | ICB | Pa rapòte |
Lajan ki pase bay lòt84 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Angajman | 31 jiyè 2022 | −0.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Angajman | 31 jiyè 2022 | −2.5 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 jen 2022 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2021 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2021 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2021 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2021 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2021 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2021 | −0.1 |
| HAITI | Depans | 31 desanm 2020 | <0.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2020 | −0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2020 | 0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 oktòb 2020 | <0.1 |
| HAITI | Depans | 31 oktòb 2020 | −0.0 |
| HAITI | Depans | 30 septanm 2020 | −0.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 septanm 2020 | 0.1 |
| HAITI | Depans | 31 out 2020 | <0.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2020 | 2.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2020 | 1.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2020 | 0.6 |
| HAITI | Dekèsman | 30 jen 2020 | 0.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Angajman | 30 jen 2020 | −3.7 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 jen 2020 | 3.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Angajman | 30 jen 2020 | −0.3 |
| HAITI | Depans | 30 jen 2020 | 2.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 me 2020 | 2.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 me 2020 | 0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2020 | 1.7 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2020 | 0.5 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2020 | 1.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 29 fevriye 2020 | 1.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 janvye 2020 | 1.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 septanm 2019 | 0.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2019 | 1.8 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 me 2019 | 0.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2019 | 0.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2019 | 1.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2019 | 0.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2018 | 0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 novanm 2018 | 0.9 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 oktòb 2018 | 1.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 oktòb 2018 | 1.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 septanm 2018 | 0.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2018 | 0.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2018 | 2.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2018 | 1.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 jen 2018 | 0.5 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 me 2018 | 0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2018 | 0.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 28 fevriye 2018 | 0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2017 | 2.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2017 | 1.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2017 | 0.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Angajman | 30 jen 2017 | 20.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2017 | 0.9 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 28 fevriye 2017 | 1.9 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2016 | 2.9 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2016 | 0.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2016 | 1.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 29 fevriye 2016 | 1.7 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 janvye 2016 | 0.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2015 | 0.5 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 novanm 2015 | 0.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 septanm 2015 | 0.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2015 | 0.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2015 | 1.7 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 jen 2015 | 0.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 me 2015 | 0.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2015 | 0.9 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 28 fevriye 2015 | 0.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2014 | 1.3 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 oktòb 2014 | 0.4 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 septanm 2014 | 4.1 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 avril 2014 | 1.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2014 | 0.8 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 28 fevriye 2014 | 0.7 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 desanm 2013 | 2.2 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 septanm 2013 | 2.5 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 out 2013 | 0.8 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 jiyè 2013 | 0.5 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 mas 2013 | 2.9 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 30 novanm 2012 | 0.6 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Dekèsman | 31 oktòb 2012 | 1.0 |
| Unite de Coordination de Projet - Ministry of Interior and Local Authorities; Unite de Coordination et Execution - Ministry of Public Works | Angajman | 31 desanm 2011 | 60.0 |
Idantifyan6 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | XI-IATI-WBTF-P126346 | IATI |
| Kredi oswa don IDA | IDAD2090 | IDA, eta kredi ak don |
| Kredi oswa don IDA | IDAH7460 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-D2090 | Pwojè Bank Mondyal |
| Prè Bank mondyal | IDA-H7460 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P126346 | Fich operasyon an |
Kote sous yo pa dakò3 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Dat fèmti | Pwojè Bank Mondyal | 30 jen 2020 | ✓ |
| Dat fèmti | IATI | 1 fevriye 2021 | |
| Angajman | IDA, eta kredi ak don | 71.8 milyon dola ameriken | ✓ |
| Angajman | Pwojè Bank Mondyal | 60.0 milyon dola ameriken | |
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a82 dokiman
- Agreement, documents.worldbank.org
- Agreement, documents.worldbank.org
- Project Information Document, documents.worldbank.org
- Project Information Document, documents.worldbank.org
- Financing Agreement, documents.worldbank.org
- Financing Agreement, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Completion and Results Report, documents.worldbank.org
- Implementation Completion Report Review, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Implementation Status and Results Report, documents.worldbank.org
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - HT Disaster Risk Mngmt Reconstruction, 30 jen 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P126346 - Disaster Risk Management and Reconstruction - Audited Financial Statement, 31 mas 2021, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project, 14 desanm 2020, documents.worldbank.org
- Haiti P126346 - PRGRD Grant H 7460 and D 2090 Audit Statements as of Sept. 2019.pdf, 7 septanm 2020, documents.worldbank.org
- Disclosable Version of the ISR - Disaster Risk Management and Reconstruction - P126346 - Sequence No : 16, 30 jen 2020, documents.worldbank.org
- Official Documents- Amendment to Financing Agreements for Grants H746-0-HT and D2090-HT, 12 jen 2020, documents.worldbank.org
- Disclosable Restructuring Paper - Disaster Risk Management and Reconstruction - P126346, 5 jen 2020, documents.worldbank.org
- Disclosable Version of the ISR - Disaster Risk Management and Reconstruction - P126346 - Sequence No : 15, 31 desanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 14 novanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 4 novanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 18 septanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 22 jiyè 2019, documents.worldbank.org
- Disclosable Version of the ISR - Disaster Risk Management and Reconstruction - P126346 - Sequence No : 14, 28 jen 2019, documents.worldbank.org
- Disclosable Restructuring Paper - Disaster Risk Management and Reconstruction - P126346, 27 jen 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 5 jen 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 4 jen 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 31 me 2019, documents.worldbank.org
- Haiti P126346 - PRGRD Grant H 7460 Audit Statements as of Sept. 2018, 21 avril 2019, documents.worldbank.org
- Haiti P126346 - PRGRD Grant D 2090 Audit Statements as of Sept. 2018, 21 avril 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 16 avril 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 2 avril 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P126346- Disaster Risk Management and Reconstruction - Procurement Plan, 26 fevriye 2019, documents.worldbank.org
- Disclosable Version of the ISR - Disaster Risk Management and Reconstruction - P126346 - Sequence No : 13, 8 janvye 2019, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project : Resettlement Plan (Vol. 2 of 4) : Plan Succinct de Reinstallation : Reconstruction Du Pont Sur La Rivière Boucan Carré Dans Le Département Du Centre, 1 septanm 2018, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project : Resettlement Plan (Vol. 3 of 4) : Plan Succint de Reinstallation : Curage et Rehabilitation de Dalot 3(2x2) et Protection de la Rn2 Dans la Zone de Valbrune, 1ère Section Boileau, Cavaillon Lot 4, 1 septanm 2018, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project : Resettlement Plan (Vol. 4 of 4) : Plan Succinct de Reinstallation : Protection de la RN2 a Saint Louis du Sud, Zone Grande Riviere, 1 out 2018, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project : Resettlement Plan (Vol. 1 of 4) : Plan Succinct de Reinstallation : Construction D’un Dalot 2(3*1.70) Zone Minor (St Louis Du Sud), 1 out 2018, documents.worldbank.org
- Disclosable Version of the ISR - Disaster Risk Management and Reconstruction - P126346 - Sequence No : 12, 29 jen 2018, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project : environmental assessment : Plan de gestion environnementale et sociale, 29 janvye 2018, documents.worldbank.org
- Disclosable Version of the ISR - Disaster Risk Management and Reconstruction - P126346 - Sequence No : 11, 17 novanm 2017, documents.worldbank.org
- Official Documents- Supplemental Letter Ref. Financial and Economic Data for Grant D2090-HT (Closing Package), 29 jen 2017, documents.worldbank.org
- Official Documents- Disbursement Letter for Grant D2090-HT (Closing Package), 29 jen 2017, documents.worldbank.org
- Official Documents- Financing Agreement for Additioanl Financing Grant D2090-HT (Closing Package), 29 jen 2017, documents.worldbank.org
- Official Documents- Amendment to the Financing Agreement for Grant H746-HT, 14 jen 2017, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 10, 26 me 2017, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 09, 21 oktòb 2016, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 08, 4 janvye 2016, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 07, 26 jen 2015, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 06, 31 desanm 2014, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 05, 7 jiyè 2014, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : environmental assessment (Vol. 1 of 2) : Plan de gestion environnementale et sociale pour travaux de reconstruction du pont sur la rivière Dolin près des Cayes, 1 me 2014, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : environmental assessment (Vol. 2 of 2) : Plan de gestion environnementale et sociale pour travaux de reconstruction du pont sur la rivière Desmarais a Chalon, 1 me 2014, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 04, 21 desanm 2013, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 03, 9 jen 2013, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction, 2 desanm 2012, documents.worldbank.org
- Haiti - Disaster Management and Vulnerability Reduction Project : Haiti - Projet de reconstruction et de gestion des risques et des desastres, 7 novanm 2012, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 02, 8 oktòb 2012, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction : P126346 - Implementation Status Results Report : Sequence 01, 13 mas 2012, documents.worldbank.org
- Official Documents- Disbursement Letter for IDA Grant H746-HT (Closing Package), 11 janvye 2012, documents.worldbank.org
- Official Documents- Financing Agreement for IDA Grant H746-HT (Closing Package), 11 janvye 2012, documents.worldbank.org
- Official Documents- Supplemental Letter Ref. Financial Data for IDA Grant H746-HT (Closing Package), 11 janvye 2012, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project, 3 novanm 2011, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project : Haiti - Projet de Reconstruction et de Gestion des Risques de Catastrophe, 3 novanm 2011, documents.worldbank.org
- Haiti - Disaster Management and Vulnerability Reduction Project, 7 septanm 2011, documents.worldbank.org
- Haiti - Disaster Risk Management and Reconstruction Project, 18 out 2011, documents.worldbank.org
- Haiti - Disaster Management and Vulnerability Reduction Project, 18 out 2011, documents.worldbank.org
- Haiti - Disaster Management and Vulnerability Reduction Project, 7 jen 2011, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Avi pasasyon mache Bank mondyal: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Avi pasasyon mache Bank mondyal | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |