HaitiDocs

Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA

Pwojè Devlopman Iben ki Dirije pa Kominote - AF

Tit pibliye: Haiti - Urban Community Driven Development Project - AF

An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Objektif

To improve access to, and satisfaction with: (i) basic and social infrastructure and services, including housing repair, reconstruction and community infrastructure improvements needed as a result of the Emergency; and (ii) income-generating opportunities for residents of selected disadvantaged urban areas.

Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.

Patnè
World Bank Group, IDA
Sektè
Dlo ak asenisman
Etap
Fèmen depi 31 desanm 2016
Apwobasyon
20 jen 2014
Fèmen
31 desanm 2016
Enstriman
Finansman BIRD/IDA, IDA
Antre an vigè
7 novanm 2014
Idantifyan operasyon an
P149116
Sik lavi4 etap, 6 dat

Istwa etap yo

EtapDepi
Apwouve20 jen 2014
An kou7 novanm 2014
Ap fèmen31 desanm 2016
Fèmen31 desanm 2016

Evènman ki gen dat

EvènmanDatSous
Evalyasyon davans14 avril 2014Pwojè Bank Mondyal
Negosyasyon1 me 2014Pwojè Bank Mondyal
Apwobasyon20 jen 2014Pwojè Bank Mondyal
Antre an vigè7 novanm 2014IDA, eta kredi ak don
Dat fèmti31 desanm 2016Pwojè Bank Mondyal
Rapò fen atann31 oktòb 2017Pwojè Bank Mondyal

Finansman

Tablo 1.Finansman, milyon dola ameriken

FinansèMontanMilyon dola amerikenWòlSous
IDA Grant7.5EnstitisyonPwojè Bank Mondyal

Tablo 2.Operasyon ki gen rapò, milyon dola ameriken

OperasyonRapòPatnèEtapAngajmanMilyon dola ameriken
Urban Community Driven Development Project / PRODEPUROperasyon manmanGwoup Bank MondyalFèmen52.9
Housing Reconstruction - Urban Community Driven Development Additional FinancingMenm operasyon manmanGwoup Bank MondyalFèmen30.0

Tablo 3.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSous
Angajman7.5Pwojè Bank Mondyal
DekèsePa rapòte
Pa dekèsePa rapòte
Pri total7.5Pwojè Bank Mondyal

Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Montan yo dapre sous la

Chanjman nan operasyon an1 pwolongasyon
Dat fèmti orijinal
30 jen 2016
Pwolongasyon dat fèmti
1
  • Pwolonje soti 30 jen 2016 rive 31 desanm 2016 (dokiman 31 me 2016)
Restriktirasyon
Pa rapòte
Konpozan ijans
Pa rapòte

Fich ak dokiman

Endikatè rezilta28 endikatè
EndikatèValè referansSibDènye valèDat dènye valè
AF. Cumulative number of housing repair and reconstruction works financed through grants and completed1153Original: 5000Revised: 1204115330 septanm 2013
Cumulative number of housing repair and reconstruction works financed through grants and completed0.001384.001153.0030 septanm 2013
Health facilities constructed, renovated, and/or equipped (number)0.005.003.0021 mas 2014
Number of corridors repaired0.00108.0031.0030 septanm 2013
Number of eligible CBOs joining COPRODEPs0.001173.001119.0021 mas 2014
Number of eligible CBOs joining COPRODEPs.N/AOriginal: 80%Revised: 1000127528 jen 2013
Number of people in urban areas provided with access to Improved Water Sources under the project0.0063650.0047150.0021 mas 2014
Percent of municipal governments successfully proposing and implementing subprojects in coordination with CBOs0.00100.00100.0021 mas 2014
Percent of prioritized projects submitted by women’s CBOs13.0015.0013.0021 mas 2014
Percent of subprojects completed in a timely manner0.0085.0074.0021 mas 2014
Percent of subprojects successfully implemented, operated, and maintained (as per technical audits)0.0070.0070.0021 mas 2014
Percent of women holding membership in COPRODEP’s executive committee24.0030.0024.0021 mas 2014
Roads rehabilitated, Non-rural0.0016.007.4421 mas 2013
Volume of construction debris cleared in Project neighborhoods0.0041747.0013347.0030 septanm 2013
Increased access to rehabilitated street and drainage infrastructure in disadvantaged urban areas that selected such subprojects (i.e., cleared and rehabilitated drainage canals, ditches, etc.)27.8553.0044.0021 mas 2014
Increased access to rehabilitated street and drainage infrastructure in disadvantaged urban areas that selected such subprojects(i.e., cleared and rehabilitated drainage canals, ditches, etc.)27.85%Original: +10%Revised: +10%41.47%28 jen 2013
Increased access to sanitation in disadvantaged urban areas that selected such subprojects (i.e., garbage collection, solid waste disposal, recycling, composting, sanitary blocks, etc.).13.4729.0023.4721 mas 2014
Increased access to sanitation in disadvantaged urban areas that selected such subprojects (i.e., garbage collection, solid wastedisposal, recycling, composting, sanitary blocks, etc.).13.47%Original: +20%Revised: +23.47%23.78%28 jen 2013
Increased access to social infrastructure and services in disadvantaged urban areas that selected such subprojects (daycare centers, primary schools, secondary schools, health clinics, job training24.5151.0041.0021 mas 2014
Increased access to social infrastructure and services in disadvantaged urban areas that selected such subprojects (daycarecenters,primary schools, secondary schools, health clinics, job training, e24.51%Original: +10%Revised: +10%38.8%28 jen 2013
Increased access to water in disadvantaged urban areas that selected such subprojects (i.e., water kiosks, standpipes, community cisterns, rainwater capture, etc.).85.5195.0092.6321 mas 2014
Increased access to water in disadvantaged urban areas that selected such subprojects (i.e., water kiosks, standpipes, communitycisterns, rainwater capture, etc.).85.51%Original: +15%Revised: +7.5%92.63% (+7.12%)28 jen 2013
Number of productive/income generating subprojects fully operational.0.00650.00493.0021 mas 2014
Number of productive/income generating subprojects that are self-sustaining six months after being fully operational.0252528 jen 2013
Percent of beneficiaries for whom the majority of expected subproject results, as defined by beneficiaries at the start of the project, were achieved (as per results from community evaluation forms)0.0085.000.0021 mas 2014
Percent of beneficiaries for whom the majority of expected subproject results, as defined by beneficiaries at the start of theproject, were achieved (as per results from community evaluation forms)085%Pa rapòtePa rapòte
Percentage of productive/income generating subprojects that are self-sustaining six months after being fully operational.0.0080.0015.0021 mas 2014
Residents that have returned to neighborhoods upon completion of housing reconstruction and repair works or receiving a rental grant0.005480.002000.0021 mas 2014
Idantifyan1 idantifyan
SistèmIdantifyanSous
Pwojè Bank mondyalP149116Fich operasyon an

Dokiman patnè a

Sous

Done jiska 18 oktòb 2026
SousLi nan dat
IDA, eta kredi ak don18 oktòb 2026
Pwojè Bank Mondyal18 oktòb 2026
Dokiman Bank Mondyal18 oktòb 2026
Site paj sa a

HaitiDocs. Pwojè Devlopman Iben ki Dirije pa Kominote - AF. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP149116?lang=ht