Ranfòsman jesyon sèvis piblik agrikòl yo (GFRP)
Tit pibliye: Strengthening the Management of Agriculture Public Services (GFRP)
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The project development objective (PDO) is to enable MARNDR to prioritize and target investments according to sector policies, and improve local agriculture support services.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
Deskripsyon
The objective of the Strengthening of Agricultural Public Services Project for Haiti is to enable Ministry of Agriculture, Natural Resources and Rural Development (MARNDR) to prioritize and target investments according to sector policies, and improve local agriculture support services. There are three components to the project, the first component being strengthening MARNDR managerial functions. This component will finance (at the central and local level) two subcomponents: a) sector policies and coordination; and b) enhancing administrative, Human Resources (HR), and fiduciary management. The second component is the strengthening farmer extension and support services. This component will finance the expansion of the provision of improved agriculture support services in pilot areas, the first around the research center of Ferme Levi and the
plis
second one around the research center of Thiotte-Savane Zombi. Finally, the third component is the project coordination and supervision. Project execution will be under the responsibility of the Director General (DG) of MARNDR and this component will finance incremental costs associated with project implementation. A five person team will work jointly in the various aspects of project execution. The project coordinator will be a member of the DG advisory team, while fiduciary responsibility (procurement and financial management) will be with the Directorate of Administrative and Financial Affaires (DAAF). All efforts by the DG will be made to coordinate project implementation across MARNDR units.
- Patnè
- World Bank Group, IDA
- Etap
- Fèmen depi 31 out 2014
- Apwobasyon
- 25 jen 2009
- Fèmen
- 31 out 2014
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- −0.2: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Antre an vigè
- 13 oktòb 2009
- Depatman
- Sidès, Lwès, Sid
- Dènye tranzaksyon
- 30 avril 2015
- Idantifyan operasyon an
- P113623
Sik lavi5 etap, 14 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 12 janvye 2009 |
| Apwouve | 25 jen 2009 |
| An kou | 25 jen 2009 |
| Ap fèmen | 31 out 2014 |
| Fèmen | 31 out 2014 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 12 janvye 2009 | Pwojè Bank Mondyal |
| Piblikasyon | 23 fevriye 2009 | Pwojè Bank Mondyal |
| Kòmansman prevwa | 24 avril 2009 | IATI |
| Evalyasyon davans | 27 avril 2009 | Pwojè Bank Mondyal |
| Negosyasyon | 19 me 2009 | Pwojè Bank Mondyal |
| Kòmansman reyèl | 25 jen 2009 | IATI |
| Apwobasyon | 25 jen 2009 | Pwojè Bank Mondyal |
| Premye angajman | 25 jen 2009 | Tranzaksyon |
| Antre an vigè | 13 oktòb 2009 | Pwojè Bank Mondyal |
| Premye dekèsman | 30 jen 2011 | Tranzaksyon |
| Fen reyèl | 31 out 2014 | IATI |
| Dat fèmti | 31 out 2014 | IATI |
| Dènye dekèsman | 30 septanm 2014 | Tranzaksyon |
| Rapò fen atann | 27 fevriye 2015 | Pwojè Bank Mondyal |
Pa dekèse: 0.0 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 31 out 2014.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 5.0 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | |
|---|---|---|
| Angajman | 4.9 | IDA, eta kredi ak don |
| Dekèse | 5.1 | IDA, eta kredi ak don |
| Pa dekèse | 0.0 | IDA, eta kredi ak don |
| Pri total | 5.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Montan yo dapre sous la
Chanjman nan operasyon anpa rapòte
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2008-09Milyon dola ameriken | FY2010-11Milyon dola ameriken | FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | FY2013-14Milyon dola ameriken | FY2014-15Milyon dola ameriken | |
|---|---|---|---|---|---|---|
| Nouvo angajman | 5.0 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | −0.1 |
| Dekèsman | Pa rapòte | 0.3 | 0.5 | 1.8 | 2.0 | −0.1 |
| Dekèsman kimile | Pa rapòte | 1.0 | 1.4 | 3.2 | 5.2 | 5.1 |
Total kimile a kòmanse ak balans ouvèti 0.6 milyon dola ameriken.
Fich ak dokiman
Tranzaksyon22 liy, 25 jen 2009 rive 30 avril 2015
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 25 jen 2009 | Angajman | 5.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 30 avril 2015 | Angajman | −0.1 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2011 | Dekèsman | 0.6 | IDA, eta kredi ak don | cumulative at first snapshot (balans ouvèti) |
| 30 jen 2011 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2011 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2012 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2012 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2012 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2012 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2012 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2013 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2013 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2013 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2013 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2013 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2013 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2014 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2014 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2014 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2015 | Dekèsman | −0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon4 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Pa rapòte
Kote3 depatman, 7 kote nonmen, 14 kote ki gen kowòdone
| Depatman | Sidès, Lwès, Sid |
| Kote sous la nonmen | Arrondissement de Belle-Anse, Les Cayes, Levy, Port-au-Prince, Republic of Haiti, Savane Zombi, Thiotte |
| Kote ki gen kowòdone | 14 |
Endikatè rezilta40 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| 100% of procurement records over US$100K and managed by MARNDR published on its website before the end of the project | 0.00 | 100.00 | 51.00 | 25 avril 2014 |
| 20 agricultural agents trained and educational material on gender mainstreaming in subsistence agriculture and environmentally friendly agricultural techniques prepared and disseminated in the pilotz | 0.00 | 0.00 | 38.00 | 25 avril 2014 |
| Coverage mechanism against agricultural risks designed in the pilot zones before the end of the project. | N/A | Completed | Pa rapòte | Pa rapòte |
| Establishment of an Environmental Unit within MARNDR | No | Yes | Yes | 25 avril 2014 |
| FIOP transmitted to MPCE for 80% of projects in the PIP (Public Investment Program) before the end of the project. | 0.00 | 0.00 | 100.00 | 25 avril 2014 |
| Farmer Registry established | No | Yes | Yes | 25 avril 2014 |
| Increase in the commitments of the operating budget (outside of salaries) in the DDAs to 70% before | 45.00 | 70.00 | 75.00 | 25 avril 2014 |
| Intranet and email system installed for 300 MARNDR staff before the end of the project | 0.00 | 300.00 | 260.00 | 25 avril 2014 |
| Preparation of manuals of procedures for managing the operation and investment budgets in the MARNDR at the end of the first year of the project | N/A | Pa rapòte | Pa rapòte | Pa rapòte |
| Reduction from 15 to 5 the number of days to issue checks, before the end of the project. | 15.00 | 5.00 | 5.00 | 25 avril 2014 |
| Farmers receiving agriculture support services | 280.00 | 3000.00 | 4565.00 | 30 jen 2014 |
| Farmers receiving agriculture support services | 280.00 | 3,000.00 | 4,565.00 | 30 jen 2014 |
| Prioritization and targeting of budget | No | Yes | Yes | 30 jen 2014 |
| Prioritization and targeting of budget | No | Yes | Yes | 30 jen 2014 |
| Rate of commitments of the operating budget | 80.00 | 95.00 | 75.00 | 30 jen 2014 |
| Rate of commitments of the operating budget | 80.00 | 95.00 | 75.00 | 30 jen 2014 |
| 100% of procurement records over US$100K and managed by MARNDR published on its website before the end of the project | 0.00 | 100.00 | 51.00 | 30 jen 2014 |
| 100% of procurement records over US$100K and managed by MARNDR published on its website before the end of the project | 0.00 | 100.00 | Pa rapòte | Pa rapòte |
| 20 agricultural agents trained and educational material on gender mainstreaming in subsistence agriculture and environmentally friendly agricultural techniques prepared and disseminated in the pilotz | 0.00 | 20.00 | 38.00 | 1 janvye 1900 |
| 20 agricultural agents trained and educational material on gender mainstreaming in subsistence agriculture and environmentally friendly agricultural techniques prepared and disseminated in the pilotz | 0.00 | 20.00 | 38.00 | 1 janvye 1900 |
| At least 2 R&D studies completed in the pilot zones before the end of the project | 0.00 | 2.00 | 1.00 | 30 jen 2014 |
| Coverage mechanism against agricultural risks designed in the pilot zones before the end of the project. | Pa rapòte | Completed | Pa rapòte | Pa rapòte |
| Coverage mechanism against agricultural risks designed in the pilot zones before the end of the project. | Pa rapòte | Completed | Pa rapòte | Pa rapòte |
| Establishment of an Environmental Unit within MARNDR | No | Yes | Yes | 30 jen 2014 |
| Establishment of an Environmental Unit within MARNDR | No | Yes | Yes | 30 jen 2014 |
| FIOP transmitted to MPCE for 80% of projects in the PIP (Public Investment Program) before the end of the project. | 0.00 | 0.00 | 100.00 | 1 janvye 1900 |
| FIOP transmitted to MPCE for 80% of projects in the PIP (Public Investment Program) before the end of the project. | Pa rapòte | Pa rapòte | 100.00 | 1 janvye 1900 |
| Farmer Registry established | No | Yes | Yes | 30 jen 2014 |
| Farmer Registry established | No | Yes | Yes | 30 jen 2014 |
| Increase in the commitments of the operating budget (outside of salaries) in the DDAs to 70% before | 45.00 | 70.00 | 0.00 | 30 jen 2014 |
| Increase in the commitments of the operating budget (outside of salaries) in the DDAs to 70% before | 45.00 | 70.00 | 0.00 | 30 jen 2014 |
| Intranet and email system installed for 300 MARNDR staff before the end of the project | 0.00 | 300.00 | 260.00 | 30 jen 2014 |
| Intranet and email system installed for 300 MARNDR staff before the end of the project | 0.00 | 300.00 | 260.00 | 30 jen 2014 |
| Preparation of manuals of procedures for managing the operation and investment budgets in the MARNDR at the end of the first year of the project | Pa rapòte | Completed | Pa rapòte | Pa rapòte |
| Preparation of manuals of procedures for managing the operation and investment budgets in the MARNDR at the end of the first year of the project | Pa rapòte | Completed | Pa rapòte | Pa rapòte |
| Reduction from 15 to 5 the number of days to issue checks, before the end of the project. | 15.00 | 5.00 | 5.00 | 30 jen 2014 |
| Reduction from 15 to 5 the number of days to issue checks, before the end of the project. | 15.00 | 5.00 | 5.00 | 30 jen 2014 |
| Farmers receiving agriculture support services | 280.00 | 3000.00 | 4565.00 | 25 avril 2014 |
| Prioritization and targeting of budget | No | Yes | Yes | 25 avril 2014 |
| Rate of commitments of the operating budget | 80.00 | 95.00 | 75.00 | 25 avril 2014 |
Nòt27 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | 30 jen 2015 |
| IEG borrowcompliance | Moderately Satisfactory | 30 jen 2015 |
| IEG borrowimplementation | Moderately Satisfactory | 30 jen 2015 |
| IEG evaltype | ES | 30 jen 2015 |
| IEG evaluation_riskdo | Significant | 30 jen 2015 |
| IEG icrquality | Satisfactory | 30 jen 2015 |
| IEG mequality | Modest | 30 jen 2015 |
| IEG outcome | Moderately Satisfactory | 30 jen 2015 |
| IEG overallbankperf | Moderately Satisfactory | 30 jen 2015 |
| IEG overallborrowperf | Moderately Satisfactory | 30 jen 2015 |
| ICR bankqualityentry | Not Rated | 27 fevriye 2015 |
| ICR banksupervision | Not Rated | 27 fevriye 2015 |
| ICR banksupervision | Substantial | 27 fevriye 2015 |
| ICR banksupervision | Moderately Satisfactory | 27 fevriye 2015 |
| ICR borrgovt | Moderately Satisfactory | 27 fevriye 2015 |
| ICR borrimplegency | Substantial | 27 fevriye 2015 |
| ICR borroverall | Moderately Satisfactory | 27 fevriye 2015 |
| ICR completion_riskdo | Substantial | 27 fevriye 2015 |
| ICR outratingind | Substantial | 27 fevriye 2015 |
| ICR overallrating | Substantial | 27 fevriye 2015 |
| ISR Counterpart Funding | Satisfactory | 11 out 2014 |
| ISR Financial Management | Moderately Unsatisfactory | 11 out 2014 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | 11 out 2014 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | 11 out 2014 |
| ISR Procurement | Moderately Unsatisfactory | 11 out 2014 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | 11 out 2014 |
| ISR Project Management | Moderately Satisfactory | 11 out 2014 |
Kontra yo bay1 kontra
| Founisè | Dat | Metòd | Montan |
|---|---|---|---|
| Non an pa afiche | 7 septanm 2011 | ICB | Pa rapòte |
Idantifyan4 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P113623 | IATI |
| Kredi oswa don IDA | IDAH5090 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-H5090 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P113623 | Fich operasyon an |
Kote sous yo pa dakò2 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Angajman | IDA, eta kredi ak don | 4.9 milyon dola ameriken | ✓ |
| Angajman | Pwojè Bank Mondyal | 5.0 milyon dola ameriken | |
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a18 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services Project, 30 jen 2015, documents.worldbank.org
- Haiti - Strengthening Agriculture Public Services Project, 20 fevriye 2015, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 11, 11 out 2014, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 10, 9 jen 2014, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 09, 3 desanm 2013, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 08, 24 avril 2013, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 07, 26 septanm 2012, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 06, 28 mas 2012, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 05, 19 jiyè 2011, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) : P113623 - Implementation Status Results Report : Sequence 04, 24 janvye 2011, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) Project : restructuring, 22 avril 2010, documents.worldbank.org
- Financing Agreement for Grant H509-HT Conformed, 27 jiyè 2009, documents.worldbank.org
- Announcement of World Bank Approves Five Million US Dollars for Agriculture Development in Haiti on June 26, 2009, 26 jen 2009, documents.worldbank.org
- Haiti - Strengthening of Agricultural Public Services Project, 1 jen 2009, documents.worldbank.org
- Haiti - Strengthening the Management of Agriculture Public Services (GFRP) Project, 18 me 2009, documents.worldbank.org
- Haiti - Strengthening of Agricultural Public Services Project : environmental assessment : Environmental and social framework, 24 avril 2009, documents.worldbank.org
- Haiti - Modernization of Agriculture Institutions Project, 31 desanm 2008, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |