Model School Network Infrastructure Plan
Summary — An infrastructure plan for a network of model schools in the Central Plateau, based on data collected from about 200 schools.
Key Findings
- Based on information collected from approximately 200 Model School Network schools in the Central Plateau.
- An infrastructure plan grounded in a survey rather than in norms.
- 76 pages, May 2019.
Full Description
An infrastructure plan for a network of model schools in the Central Plateau, based on data collected from about 200 schools. School infrastructure data at that scale is rare in Haiti and is collected here by the organisation that intends to build.
Full Document Text
Extracted text from the original document for search indexing.
Model School Network
Infrastructure Plan
May 2019
Model School Network Infrastructure Plan 1
Acknowledgements
Schools for Children of the World wishes to extend our appreciation to the W.K. Kellogg Foundation for
providing the funding necessary to conduct the assessment of school facilities in the Model School Network.
This work is a critical step in identifying the infrastructure needs and establishing priorities in meeting these
adverse conditions.
School for the Children of the World would also like to thank Patricia Préval and the leadership of the Model
School Network for providing ongoing communications and needed information to make this study possible.
We would also like to extend our appreciation to the school directors and other Model Network personnel for
providing us access to school sites, school statistics and involvement in workshops and meetings.
A special thank you goes to T.J. D’agostino and the University of Notre Dame Alliance for Catholic Education
for his continued involvement in the Model School Network.
Schools for the Children of the World (SCW) received a grant from the W.K. Kellogg Foundation to assist the
Model School Network (MSN) to develop a school infrastructure master plan. SCW has collected the
information on approximately 200 MSN schools in the Central Plateau.
We would like to express our appreciation to the persons that participated in the workshops and provided their
insights regarding school infrastructure needs and how they might be met. We recognize this took a major
commitment of time and travel.
We would also like to thank all the members of the sub-networks of the MSN, including the Catholic Schools,
the EFACAP Schools and the Summit Schools, for their help from far or near and for their valuable
contributions.
We would be remis in not thanking the W.F. Kellogg Foundation for making this all possible.
Dr. William DeJong
Mr. Charles Newman, AIA
MSN Board of Directors
Cassandre Reigner, Présidente, Summit Education
Péralt Tessono, Vice-Président, CEEC
Sara Wolf, Secrétaire / Trésorière, InnovED-UniQ
TJ D’Agostino, Conseiller, UND
Espérance Saintil, EFACAP
Changlas Louimé, EFCAP
Dominique Rose-André, EFACAP
Richard Joseph, BDE
Augustin Thony, CEEC
Benissé Estiverne, BDE
Jean Presler, Summit Education
Marc Prou, InnovED-UniQ
Diquessi Germain, Haiti Government Representative
Volvick Germain Charles, Haiti Government Representative
Aimée Lyons, CRS
Patricia Préval, MSN Executive Director
Model School Network Infrastructure Plan 2
Acronyms:
UniQ: Université Quiskeya
BDE: Bureau Diocésain de l'Éducation
CEEC: Commission Épiscopale de l’Éducation Catholique
EFACAP: Ecole Fondamentale d’Application et Centre d’Appui Pédagogique
CRS: Catholic Relief Services
UND: Université Notre-Dame (Indiana)
University of Notre Dame, the Alliance for Catholic Education [ACE]
Dr. Anthony D'agostino, Associate Director, ACE Consulting
Kellogg Foundation
Alix Cantave, Program Officer
Elizabeth Leuthauser, Program Manager
Schools for Children of the World Project Team (SCW)
Dr. William S. DeJong, SCW Co-Founder, Project Director, School Planner
Charles R. Newman, AIA, SCW Co-Founder, Architect -Newman Architecture
Juan Roberto Asse, SCW Haiti Coordinator
Dan Mader, AIA, REEP, Architect, SCW Board Member
Kerrianne Wolf, REFP, School Planner
Benjamin Leclerc Pierre, Translator, Data collector of SCW
Patrice Michel Durand, Data collector of SCW
Taicha Davius, Data collector of SCW
Charles Kretschmer, Data collector of SCW
Marcelin Saintilien, Data collector of SCW
William Ferestil, Data collector of SCW
Makenson Sanozier, Data collector of SCW
Moises Delia, Data collector of SCW
Gomez Peres, Data collector of SCW
Josue Bias, Data collector of SCW
We would also like to express our appreciation of all of the persons who responded to our invitations and
took part in the workshops and contributed in the results of this study.
Model School Network Infrastructure Plan 3
Table of Contents
Acknowledgements ...................................................................................................................................... 1
Table of Contents ........................................................................................................................................ 3
Overview ....................................................................................................................................................... 4
Facility Assessment ....................................................................................................................................... 7
Overall Information...................................................................................................................................... 9
Facility Condition.......................................................................................................................................... 12
Educational Adequacy.................................................................................................................................. 23
Cost Estimates ............................................................................................................................................... 29
Prioritization .................................................................................................................................................. 33
Funding .......................................................................................................................................................... 43
Implementation ............................................................................................................................................. 48
Management & Oversight ........................................................................................................................... 52
School Maintenance...................................................................................................................................... 55
Appendix 1: MSN School Facility Summary Report - English ID
Appendix 2: MSN School Facility Summary Report - Sorted by School Name
Model School Network Infrastructure 4
Plan
Overview
The Model School Network (MSN) is a coalition of Catholic, Summit, and EFFACP schools in the
Central Plateau of Haiti. MSN was formed for the purpose of combining efforts to create synergy to
help improve the quality of education offered in the region. The organization is focusing on increasing
literacy, school leadership, teacher training and curriculum development. As part of this overall effort,
the MSN network requested Schools of the Children of the World (SCW) to write a concept paper
for addressing the infrastructure needs of the network’s schools. Subsequently the W.F. Kellogg
Foundation agreed to fund this effort.
Many of the approximately 200 MSN schools are in the most remote areas in the Central Plateau.
Many of the schools required off road 4x4 vehicles to access these remote school locations.
Approximately 80 of the schools were only reachable by walking, boat or even dugout canoe. This
attests to the challenges and difficulties there will be to provide adequate infrastructure improvements
in these areas.
The results of the data collection show that there are vast discrepancies between schools with adequate
infrastructure and those that have virtually nothing. The infrastructure of 85 of the schools were
identified to be in critical need of replacement. The infrastructure of many of these schools consists
of sticks and a low-quality metal for roofing, dirt floors, poor furniture, extremely poor sanitary
conditions, and in some cases, no walls, and no doors. These schools are often unsafe and unable to
provide any reasonably acceptable learning environment for children or staff.
On the other end of the spectrum, of the 200 schools, only 17 schools were classified as being in good
condition and only needing general maintenance. Even in these situations, many often lack adequate
space due to overcrowding and/or lack of adequate support spaces.
75% of the schools use pit toilets or have no toilet facilities and were rated as requiring complete
replacement of toilet facilities. 59 schools (31%) reported having no running water. While 56 (29%)
of the schools reported having potable water, we believe the water should be tested to verify it is safe
to drink. We suspect that in many cases the water is not safe to drink. Even though some persons
may find pit toilets acceptable, we found that in most cases, the existing conditions found at the
schools were not acceptable for human use and are being avoided by students and staff.
In summary, the infrastructure needs are vast: replacing buildings in extremely poor condition, adding
space to overcrowded schools, repairing/renovating buildings in need of repair, addressing sanitary
conditions, improving furniture, improving natural light and natural ventilation, and school sites that
are too small, to name a few.
Model School Network Infrastructure 5
Plan
There are also vast inconsistencies in the type and quality of school construction. This is likely a result
of individual circumstances and lack of coordination amongst donors. Going forward, SCW has
drafted MSN Minimum School Facility Design Guidelines we are recommending be used to guide the
planning and construction of MSN school facility projects in the future.
Finally, there is a major problem with the lack of school maintenance. Even in situations where new
schools have been built or improvements have been made, there has been a general lack of
maintenance. As a result, new buildings and construction are in disrepair and much of the investment
in infrastructure has been lost. It is easy to understand this problem when there are few plans to
provide the funds needed to adequately maintain the facilities. This problem must be addressed if
donors are going to continue to invest in these projects in the future. SCW has drafted a suggested
maintenance manual and has included specific recommendations regarding potential maintenance
funding strategies in this report.
Based on existing conditions, identified over-crowding, and the new suggested MSN Minimum School
Facility Design Guidelines (MSFDG), the total cost to address the infrastructure needs of the schools in
the Model School Network is estimated to be over $106,000,000. It is important to recognize that
this cost necessarily only addresses existing conditions and existing over-crowding to achieve the
MSN’s Minimum School Facility Design Guidelines. Architects, School Planners and local communities
planning for future MSN school improvements also need to consider;
• expected increases in student populations,
• the potential realignment of grade levels served at each location,
• spaces desired by the community that are in addition to the MSFDG,
• unique challenges based on the location of the school including expenses related to getting
building materials to the site and needed school security improvements,
• equipment needed to support specific educational programs such as science lab equipment, mobile
information technology equipment including computers, projectors, etc., vocational education
training equipment, office equipment, including computers, copiers, duplication equipment, etc.,
• Expected inflation prior to the completion of construction of improvements.
Once the initial scope of a project has been established considering the above additional items
identified by project architects, school planners and local community members, SCW suggests a
20% contingency be considered to address the potential unforeseen expenses as a project moves into
fund raising. Based on current rates of inflation in Haiti and projections by the IMF, an additional
12% per year increase should also be included in project projections based on the expected period of
construction.
At first glance this appears to be an overwhelming obstacle. Based on conventional ways of addressing
infrastructure improvements, funding more than $106m might appear to be next to impossible. While
SCW doesn’t have pre-defined easy solutions, we do have some suggestions.
Model School Network Infrastructure 6
Plan
It is extremely unlikely any one entity will be able to take this on alone. The Haitian National
Government doesn’t have the resources. Foundations, foreign governments, NGOs, churches nor
school groups will be willing to take this on alone. The local communities surely do not have the
resources. However, collectively and through new forms of collaborative partnerships, this may be
possible. This will likely require a great deal of creativity, the creation of new partnerships, and new
forms of operations and project delivery. Based on the current status of progress and project delivery,
new ideas need to be examined. In the funding section of this report, suggestions for new strategies
are provided.
The goal of this study has been accomplished, to establish baseline infrastructure data and determine
needs of the Model School Network schools in the Central Plateau. This report goes a step further
and makes recommendations regarding prioritization of projects, guidelines for future projects,
suggestions for facility maintenance, and suggestions for future project implementation.
Model School Network Infrastructure Plan 7
Facility Assessment
The Haiti school facility assessment was focused on approximately 200 schools located in the Central Plateau,
Haiti.
Assessment Instrument
A survey form was developed by Schools for the Children of the World (SCW). SCW has conducted similar
school facility assessments in other countries such as Honduras, Nigeria, and Kenya. The forms used for this
assessment were customized to address the schools in Haiti. The assessment instruments were translated into
both English and French. The survey included an interview of the school director/principal, a survey of the
site, and an evaluation of each building and campus. Each building on each site was measured and evaluated
against 30 different criteria. Extensive photos were also taken at each site, school, and building. All data
collected from each form was entered into a database. Summary reports were created for each school that
included selected photos taken at each school. All reports are available in both French and English.
Model School Network Infrastructure Plan 8
Assessment Team
The assessments began in early October 2018 with four teams of four; led by Dr. William DeJong, Mr. Chuck
Newman, and Mr. Dan Mader, (all Association for Learning Environments International Planners of the Year),
and Ms. Kerrianne Wolf (USA National School Planner for 15 years). In November 2018, additional teams
lead by Haitian engineers conducted assessments on the more remote schools. The assessment teams consisted
of planners and architects from the United States as well as Haitian engineers, drivers, and persons
knowledgeable of construction. Team members attended a classroom and field training to gain familiarity with
the forms and technology used. The data collection process consisted primarily of four-person teams visiting
each school site. One person interviewed the director/principal. The second person evaluated each building.
The third and fourth persons measured the site and each building. Data collection included the use of printed
forms, laser measuring tools, and cameras. The training of assessment teams and data collection occurred from
October to December 2018.
Data Analysis and Reports
Schools for the Children of the World developed baseline standards, cost estimates and algorithms to analyze
the data and formulate the final database and this report.
Model School Network Infrastructure Plan 9
Overall Information
A. Over 70% of the schools assessed were in the Catholic school network. Almost 20% were in the
Summit school network and the final 10% were in the EFACAP school network.
Schools Assessed
Network Schools Reviewed Total
Catholic* 154 72%
Sommet 40 19%
EFACAP 20 9%
Total 214 100%
*9 schools were closed
12 schools were duplicate or had two names
Schools Assessed
EFACAP
9%
Sommet Catholic*
19% 72%
Catholic* Sommet EFACAP
Model School Network Infrastructure Plan 10
B. There is also a wide range in the enrollment of the schools in the MSN network. From 20 to over 900
students. Even though one might expect schools in the rural area to have low enrollments, it was not
unusual for schools in very remote areas to have 300 or more students.
Number of Students
Students # of Schools % of Schools
<100 18 10%
100-199 51 27%
200-299 43 23%
300-399 30 16%
400-499 20 11%
500-599 8 4%
600-699 10 5%
700-799 4 2%
800-899 2 1%
900-999 3 2%
Total 189
Number of Students per School
30%
25%
20%
15%
10%
5%
0%
<100 100- 200- 300- 400- 500- 600- 700- 800- 900-
199 299 399 499 599 699 799 899 999
Model School Network Infrastructure Plan 11
C. One of the largest challenges is the remote locations of the schools. Most of the schools do not have
even drivable dirt roads. Many schools are only reachable by motorcycles, walking or even by boat.
This is going to provide great challenges in getting building materials to the school locations.
School Accessibility
Schools Total
Drive* 140 69%
Walk 49 24%
Moto 11 5%
Boat 4 2%
Total 204 100%
Many schools required a combination of Drive, Moto and Walk
*Drive is often off road
School Accessibility
Moto Boat
5% 2%
Walk Drive*
24% 69%
Drive* Walk Moto Boat
Model School Network Infrastructure Plan 12
Facility Condition
A. There is a wide range in conditions that vary from schools in good condition to schools that are in
extremely poor condition.
Poor Condition
Good
Condition
Model School Network Infrastructure Plan 13
Approximately 19% of the 191 schools are in critical condition where the building only consists of a
“lean-to” with sticks and a metal sheet for a roof. Another 14% were found to be in poor condition
which suggests that approximately one third of the schools need to be replaced just based of their
condition.
School Condition
Condition # of Schools % of Schools
Critical Replace 37 19%
Replace 27 14%
Major Renovation 12 6%
Moderate Renovation 38 20%
Minor Renovation 51 27%
General Maintenance 26 14%
Total 191
School Condition
30%
25%
20%
15%
10%
5%
0%
Model School Network Infrastructure Plan 14
B. Lack of adequate sanitary conditions is a major concern which includes schools with no water, lack of
potable water, and toilets which are in extremely poor condition.
Water
# of Schools % of Schools
Yes 132 69%
No 59 31%
Total 191
Water
Yes No
Yes, 69%
No, 31%
Model School Network Infrastructure Plan 15
Potable Water
Even though 69% of the schools have some source of water, in many cases it is not reliable, not potable
or not in working condition. The actual sanitary and hygine conditions in the majority of the schools
is deplorable and unaceptable in any culture. Any future infrastruture improvements at these schools
must address this problem and school personnel must be held accountable for proper maintenance
and cleanliness. It is not uncommon for drinkable water to be hand carried to the site, where all
children drink from a single cup. In most cases there are pit toilets in extremely poor condition, no
water, and no handwashing facilities.
Potable Water
# of Schools % of Schools
Yes 56 29%
No 135 71%
Total 191
Potable Water
Yes No
No
71%
Yes
29%
Model School Network Infrastructure Plan 16
Natural Light and Ventilation
Many classrooms were found to have inadequate natural light and limited natural ventilatition. Even
though many communities had electrical lines, most schools either had no electricity or it was not
dependable.
Providing for maximum natural light, especially in the absesnse of reliable electricity, is relatively
inexpensive. New classroom designs should maximize window openings, consider the use of
translucent roof panels, and considcer other design techniques which will add natural light and
ventilation to occupied spaces.
There are many reasons to improve natural lightling. Some of those include:
• Findings have shown that classrooms with the most daylighting had a 20% better learning rate in
math and 26% improved rate in reading compared to classrooms with little or no daylighting
• Creates a Healthy Learning Environment
o Promotes vitamin D generation and circadian regulation,
o Poor daylighting causes discomfort, which reduces learning and it is detrimental to the physical
and mental health of students,
o Daylighting enhances mental performance, decreases depression, and improves sleep.
• Reduces energy cost
Natural Light Reliable Electricity
# of Buildings % of Buildings # of Schools % of Schools
Adequate 249 56% Yes 8 4%
Inadequate 198 44% No 183 96%
Total 447 Total 191
Natural Light
Adequate Inadequate
Adequate
56%
Inadequate
44%
Reliable Electricity
Yes No
No
96%
Yes
4%
Model School Network Infrastructure Plan 17
Classrooms with minimal natural light
is common in many of the MSN
schools.
Model School Network Infrastructure Plan 18
C. The assessment data also demonstrates there are major issues associated with furniture & equipment.
The equipment for teachers to deliver instruction is usually limited to a single suboptimal chalkboard.
Furniture
Furniture Satisfactory Improvements Replace
# of Buildings % of Buildings Improvements
Satisfactory 63 14% 61%
Improvements 268 60%
Replace
Replace 112 25% 25%
Satisfactory
Total 443 14%
Chalk/Marker Boards
Chalk/Marker Boards Satisfactory Improvements Replace
# of Buildings % of Buildings
Satisfactory 44 10% Improvements
Improvements 175 40% 39% Replace
51%
Replace 224 51%
Satisfactory
Total 443 10%
Model School Network Infrastructure Plan 19
D. Only 4% of the schools had internet access and which was mostly unreliable in those locations.
Internet Access
# of Schools % of Schools
Yes 8 4%
No 183 96%
Total 191
Internet Access
Yes No
No
96%
Yes
4%
Model School Network Infrastructure Plan 20
E. 10% of the schools have no toilets, 85% of the schools had pit toilets, and less than 15% were flush
toilets. Even those schools with flush toilets were highly unreliable and rarely in good working
condition.
Toilets
# of Schools % of Schools
No Toilets 19 10%
Flush 22 12%
Pit 150 79%
Total 191
Toilets
No Toilets Flush Pit
79%
11%
10%
Model School Network Infrastructure Plan 21
F. Toilet condition is a major issue at most school sites. 75% of the toilets are in critical condition and
need immediate attention and should be repaired or replaced.
Toilet Condition
# of Schools % of Schools
Critical or Need to be Replaced 137 75%
Satisfactory 54 28%
Total 191
Toilet Condition
Critical or Need to be Replaced Satisfactory
Critical or Need
to be Replaced
73% Satisfactory
27%
Model School Network Infrastructure Plan 22
G. Over 85% of the schools had no sinks for hand washing. Although almost 15% of the schools had
sinks for hand washing, those were rarely in good working condition.
Sinks for Hand Washing
# of Schools % of Schools
Sinks 24 13%
No Sinks 167 87%
Total 191
Sinks for Hand Washing
Sinks No Sinks
No Sinks
87%
Sinks
13%
Model School Network Infrastructure 23
Plan
Educational Adequacy / Space Requirements
In the case of this report, educational adequacy identifies the space needed to accommodate the existing student
enrollment and associated space needed to support the desired educational programs.
It is important to understand the reason that educational adequacy is based on the existing student enrollment
at each school. No attempt has been made to evaluate the existing total student population surrounding each
school nor the capacity of other schools in each area. That would have required substantial additional time and
effort to accumulate that data which is constantly changing.
Prior to initiating improvements to any school in the MSN, the designated school planners, architects and local
community should assess the potential of future growth for their school. This should be based on the expected
future grade configuration for the school, the expected geographic area that the school will serve now and in
the foreseeable future, expected general population growth in the area, and the desired size of the school. As
discussed in the MSN Minimum School Facility Design Guidelines, student travel distance should have a significant
influence on school planning. It is better to have multiple schools serving a student population within a safe
travel distance for the students that one large school with excessive travel distances. In addition, most schools
should try to include early childhood education. As noted in the Ministry of Education’s Design Norms, the
desired maximum travel distance for early childhood education students is 300 meters from their home to
school. This also suggests that many local community early childhood education centers may be needed to
support fundamental schools that have a maximum travel distance of 2 km.
The MSN School Facility Assessment
The SCW facility assessment identified major inequities and inconsistencies in the size of MSN school sites,
building design, quality of construction, sanitary conditions, size of classrooms, as well as furniture and
equipment. Guidelines were needed to establish minimum standards which must be followed for all future
MSN school construction. Over time, these guidelines will help create a more adequate and equitable school
infrastructure across the MSN.
SCW, with input from representatives from the MSN network, has created a document of MSN Minimum School
Facility Design Guidelines. It is recommended that this document be approved and followed as new infrastructure
projects are implemented. The following are a few highlights of the recommendations in the new infrastructure
guidelines.
School Sites
Some of the greatest challenges are:
• securing school sites which are located near where children live,
• having road access to deliver construction materials,
• topography that enables construction,
• large enough sites to construct a school that can accommodate appropriate spaces for toilets and septic
systems, play areas and expected future growth.
Furthermore, the ownership of property in Haiti can also be challenging. The MSN should establish policies
identifying ownership requirements for future schools in the MSN.
Model School Network Infrastructure 24
Plan
In planning future school locations and/or additions to existing schools, the following guidelines are
recommended.
Recommended Site Size (m2)
Number of
Urban Rural
Students
<100 5,000 8,000
100-200 7,500 11,000
200-300 10,000 14,000
300-400 12,500 17,000
400-500 15,000 20,000
15,000 + 25m2/ 20,000 + 30m2/
Over 500
student student
The table and chart below show that less than 30% of the current school sites are in excess of 5,000 square
meters and 10% are in excess of 10,000 square meters. There are many schools which are overcrowded and
need additional classrooms. Based on the data collected this is going to be problematic since most school sites
are not large enough to accommodate additional construction.
Current Site Sizes
Site Size # of Schools % of Schools
>1,000m2 30 16%
1,000-2,499m2 61 32%
2,500-4,999m2 45 24%
5,000-10,000m2 35 18%
<10,000m2 20 10%
Total 191
Model School Network Infrastructure 25
Plan
Size of Classrooms
There is a great deal of debate as to what are the most effective methods of teaching and learning. Even though
the focus of the infrastructure assessment was not to review academic achievement, it was obvious that most
classrooms were overcrowded with 3-5 children siting at a single bench, and in some cases, students sitting
outside the classroom because there was not enough room for them in the classroom. Instructional materials
were nearly non-existent, and, because of poor lighting, it was nearly impossible to see what the teacher was
writing on the chalkboard from the back of the classroom. The primarily form of teaching appeared to be
lecture based.
Educational research suggests that
project-based learning, small group Classroom Size
discussions, individual student Classroom Size # of Classrooms% of Classrooms
feedback, and cooperative learning, are <20m 2
376 18%
among the most effective forms of
teaching and learning. Simply building 20-29m2 338 16%
new schools is not going to solve all 30-39m2 423 20%
these issues. Renovating existing 40-49m2 465 22%
schools or building new schools that
have adequately sized classrooms and 50-59m2 237 11%
appropriate furniture will empower >60m2 244 12%
teachers to employ new methods of Total 2083
grouping students and engaging in
successful teaching methods. On the
other hand, continuing to construct
extremely small classrooms will
continue to perpetuate the current state
of education.
The new MSN Minimum School Facility
Design Guidelines recommends a
minimum classroom size of 72m2 be
established for all grade levels. A
classroom of this size allows students to
work in a variety of arrangements,
supporting the new curriculum adopted
by the MSN.
The adjacent table and chart show the
current sizes of classrooms in the MSN.
Nearly all existing classrooms are less
than 72m2. Many classrooms are
extremely overcrowded.
Model School Network Infrastructure 26
Plan
Accomplishing a goal of
all classrooms being a
minimum of 72m2 can
appear overwhelming.
The focus should not be
on attempting to
overcome the problems
of the past, but on
following a new standard
going forward.
Adopting the standard of 72m2 for all new classrooms and adopting new guidelines for furniture allows for a
variety of ways in which classrooms can be arranged to support more effective teaching and learning. It also
offers the advantage of flexibility if grade levels need to be reconfigured to adjust for variations in student
enrollment.
Model School Network Infrastructure 27
Plan
Square Meters per Student
The primary infrastructure of a school consists of classrooms. But depending on the number of students in a
school there are also needs for offices, storage, kitchens, cafeterias, libraries, toilets, and other support areas.
The current infrastructure inventory consists of undersized classrooms, an occasional office, a small kitchen,
and few other educational or support spaces.
As stated before, there is a need for standards to guide the design and construction of future schools. The
proposed MSN Minimum School Facility Design Guidelines have established formulas for the recommended
minimum sizes of future pre-schools, primary schools, and secondary schools based on the number of students
that are to be enrolled in the school and the number and size of support spaces needed.
The following is an example of the suggested guideline for a primary school based on school enrollment. This
table suggests building a primary school will require between 2.0 and 2.88m2 per student, depending on the
student enrollment the school is designed for in those grade levels.
Note: See the MSN Minimum School Facility Design Guidelines for detailed descriptions for each grade level
and type of school spaces.
When considering the reuse of existing classrooms, key considerations should include:
• the condition of the classroom’s construction. Is the classroom worth saving, or would it be more
cost effective to replace the classroom with a new classroom?
• classroom capacity based on the size of the classroom,
• ability to cost effectively achieve adequate natural light and natural ventilation,
• availability of electrical outlets to support mobile computers and a classroom projector to support
information technology training in the classroom,
• condition of classroom equipment such as chalkboards, marker boards and bulletin boards,
Model School Network Infrastructure 28
Plan
• adequate storage space for classroom supplies and student projects,
• adequate space for recommended teacher and student furniture.
Classroom Capacity
When considering existing classroom capacity, in general, a classrooms capacity can be established by dividing
the area of the room by the recommended space per student. The new MSN Minimum School Facility Design
Guidelines specifies in grades 1-13, 2.0m2 is recommended per student. In K-2, K-1 and K, 2.88m2 is
recommended per student.
Therefore, an existing 48m2 classroom would be expected to be adequate for 24 students in grades 1-13, or 16
students in early childhood education. This limitation of classroom attendance and recommended
classroom furniture should be applied to all existing classrooms that are expected to support the
MSN’s desired curriculum.
A potential solution to multiple classrooms being too small might be to open a wall between one or more
classrooms to create a larger classroom. However, consideration must be given to how the space will be used.
A long narrow classroom is often not an effective learning environment for students. Students in the back of
the room or at wide angles to the side may not be able to clearly see the marker board or hear the teacher. Also,
a structural engineer must be consulted to verify that the modified classroom structure still complies with
seismic and hurricane design requirements. Often, the removal of a wall will have a significant harmful impact
on the structural integrity and/or seismic resistivity of the building.
Need for Additional Space
Nearly all schools were found to lack adequate educational space. In most cases this is a result of accepting
more students that the educational spaces can handle, undersized classrooms, the lack of support spaces and
school sites that are too small.
Model School Network Infrastructure 29
Plan
Cost Estimates
There are two major categories of costs when addressing school infrastructure. The first category is
the cost of improving the building’s condition. These costs are the costs needed to repair or replace
existing facility components to achieve a “good” quality appearance and operational condition. The
second category is the cost of achieving educational adequacy. In the case of this report, educational
adequacy identifies the additional space needed to accommodate the existing student enrollment and
associated space needed to support the desired educational programs. (See Section 05 of this report
for an additional discussion of Educational Adequacy.)
Construction Only Cost vs. Total Project Cost
Construction costs in Haiti are usually calculated on a cost per square meter basis. There are a wide
variety of methods used to establish how these costs are determined and communicated. When
comparing construction costs, one company might show the cost of a classroom to be $40,000 while
another company’s estimate may be $70,000. There can be many reasons for these discrepancies. For
example, one company may be calculating construction cost based on a much smaller classroom size,
or they may be using inferior materials, or they could be building to a lesser structural standard than
required to address hurricane or seismic requirements. Or, a company might only include the basic
cost of the building and not include the cost of furniture, sidewalks, site improvements, toilets and
sanitary improvements, etc.
Discussions of construction cost often do not include the TOTAL cost of building a school. There
are many additional costs, such as architecture and engineering fees, soil testing, construction
administration, site preparation, perimeter walls, water and septic systems, furniture and equipment,
etc. that also need to be included as part of the total cost of building or renovating a school.
For the purpose of this study, SCW has used Total Project Cost to calculate the suggested budgets for
improving building conditions, providing additions, and replacing existing buildings and/or
constructing completely new schools. The construction of perimeter walls around the property has
not been included since many existing sites already have site perimeter walls. Also, the cost of a
perimeter wall can vary greatly depending on site conditions.
It should also be clarified that recommended project costs is based on the approved MSN Minimum
School Facility Design Guidelines. As noted in the title, these are Minimum Design Guidelines. Many
school communities will want to create facilities that go beyond the minimum requirements of the
MSN. Those decisions will more than likely add to the total project cost.
Model School Network Infrastructure 30
Plan
Location of Schools: Accessible vs.
Remote Schools
One unique characteristic of the MSN
network is the location of the schools.
Approximately 30% of the schools are not
reachable by roads. This creates a major
obstacle in delivering construction materials
to the site. This suggests the potential for a
substantial escalation in the cost of
construction in these remote areas.
Rather than further escalate the projected
cost of building or remodeling schools in
remote areas, SCW is suggesting new and less
expensive approaches to construction be considered for building schools in remote areas. This idea
will require additional research, but it might consist of using more prefabricated materials, light gage
metals & framing and exploring new ideas for delivering materials to the site. This concept might also
include more extensive use of local labor and simplifying methods for assembling buildings.
SCW created two cost formulas. One formula is based on accessible sites using more traditional
construction methods. The second formula is for remote sites utilizing an alternative form of
construction.
Based on our experience of building schools in Haiti to hurricane and earthquake standards, the base
building cost was established at approximately $600/m2. Added to this base figure is the cost of
canopies, walkways, toilets, perimeter walls and other site improvements, plus the cost of design,
project management, furniture and equipment.
The following costs per square meter were used in this study to establish a TOTAL project cost for
building new schools. For planning purposes $972/m2 (USD) was used to calculate TOTAL project
cost in assessible areas and $650/m2 in remote areas using alternative construction techniques.
Cost per Square Meter
Accessible Remote
Cost/M2 Cost/M2
Base Construction Costs $600 $400 Classrooms, Offices, Kitchen, Library, etc
Net to Gross Factor [30%] $180 $120 Canopies, Walk Ways, Toilets, Site,
Demolition, etc
Soft Costs [25%] $195 $130 Design, Project Management, Furniture &
Equipment, etc.
Total Cost per Net Sq Meter $972 $650
Model School Network Infrastructure 31
Plan
It should also be noted that construction costs are continually changing in Haiti as the demand for
construction materials continues to increase and inflation impacts the cost of construction. This past
year Haiti experienced a 17% rate of inflation. Over the past several years, inflation has averaged
about 12% per year. If these rates of inflation continue, the future cost of construction will increase
substantially.
Total Cost to Build a School in Haiti
Using the total project cost per net square meter, along with the suggested number of square meters
per student [2.67], the approximate cost can be derived for building a school in Haiti.
The following table demonstrates the approximate cost to build a primary school based on various
sizes of enrollment.
Approx. Cost to Build a Primary School in Haiti
(Grades 1-9)
2
M/
2 2
Enrollment Student Total Net M $/M Total Cost
324 2.67 865.08 $972 $840,858
648 2.67 1730.16 $972 $1,681,716
972 2.67 2595.24 $972 $2,522,573
1,296 2.67 3460.32 $972 $3,363,431
Building Condition Cost
The SCW team visited all schools in the MSN network within the Central Plateau of Haiti and
conducted an evaluation of each school’s infrastructure. This evaluation included a review of all
building systems including roofs, walls, ceilings, windows, doors, natural light and ventilation,
plumbing systems including toilets, sinks and septic systems, electrical components, lighting, furniture,
chalkboards, and playgrounds. Each item was rated, and indexes were developed to determine the
approximate cost per school to repair or replace components in poor condition. The estimated cost
to correct existing condition deficiencies was approximately $21 million USD.
Educational Adequacy-New Design Standards
In addition to collecting information on building conditions, the SCW team collected information on
student enrollment and took measurements of each classroom, building, and site. Most classrooms
in the MSN are extremely undersized and overcrowded. Many classes were being held under marginal
structures leaned against an existing building (a “lean-to”) and are difficult to classify as a classroom.
Model School Network Infrastructure 32
Plan
As part of this study, the MSN established MSN Minimum School Facility Design Guidelines for future
MSN school construction. These new standards require 2.88 m2 per student in K-2, K-1 and
Kindergarten classrooms and 2 m2 of classroom space for student in grades 1-13. In addition,
minimum support spaces are also defined in these new MSN design guidelines. The existing school
facility space per student was compared with the new design guidelines to determine the additional
space needed to comply with the new minimum design guidelines. The estimated cost to achieve the
new minimum design guidelines per student across the entire MSN is estimated to be almost $79
million USD.
School Replacement
As SCW evaluated the data, it was determined that making substantial improvements to schools in
poor condition that were also extremely overcrowded was not cost effective. It was determined that
if the cost of improving the condition of a school plus the cost to achieve the new design guideline
minimum area requirements (adequacy) was greater than 75% of the cost of rebuilding the school, it
was more cost effective to rebuild the school. This resulted in an additional overall cost of about $4.8
million USD and resulted in 24 more schools being replaced with all new facilities. The total cost to
replace the 85 schools recommended for replacement is almost $55 million USD.
Overall Cost Summary
Listed below is the approximate budget requirements to address the MSN school infrastructure.
Overall Cost Summary
Number of Approximate
Activity Schools Total Cost
Replace Schools 85 $54,847,000
Building Condition Improvements 105 $12,581,000
Adequacy Improvements to Schools Not Being Replaced 105 $39,334,000
Total Schools 190 $106,762,000
Model School Network Infrastructure 33
Plan
Prioritization
This study has suggested that there is over $106,000,000 in school infrastructure needs in the Model School
Network. This problem cannot be addressed all at once but will need a phased approach over 10 to 20 years.
In the original proposal submitted to the W.K. Kellogg Foundation, SCW agreed to establish priorities for new
construction and renovations.
Following the data collection phase of the project, a workshop was held which included NGOs and service
providers, along with school directors, teachers, parents and other stakeholders.
The following were identified as priorities based on input received at the infrastructure workshop:
1. Increasing early childhood education
2. Adding secondary education (new schools or additions to existing schools)
3. Increasing vocational education opportunities
4. Adding new primary schools in areas that do not have schools
5. Replacing and/or renovating schools in poor condition
6. Properly sizing classrooms to support the desired curriculum and pedagogy
7. Replacing furniture with furniture that supports the desired curriculum and pedagogy
8. Adding classrooms in overcrowded schools
9. Improving natural light and ventilation
10. Providing potable water and improving sanitation and toilet facilities
11. Maintaining schools
Model School Network Infrastructure 34
Plan
The grant with the W. K. Kellogg Foundation included the following four deliverables and an additional fifth
outcome:
1. Identify 30 existing schools that should be completely renovated or replaced.
The infrastructure evaluation identified 86 schools which should be replaced. 37 schools were identified as
being the most critical. These schools have little to no infrastructure and consist of wooden posts holding up
a tin roof with no walls or sheet metal walls and doors and often with dirt floors. Below are examples of these
schools.
Model School Network Infrastructure 35
Plan
Listed below are the 37 schools in Critical need of replacement. (Please see the Appendix for an enlarged copy
of this report.)
Model School Network Infrastructure 36
Plan
The map below identifies the location of the 37 schools that were identified as Critically in need of replacement.
Model School Network Infrastructure 37
Plan
An additional 48 schools were also identified as needing replacement. In these cases, total replacement of these
schools was recommended by the evaluators due to a combination of the poor condition of existing facilities
plus overcrowding. (See the Appendix for an enlarged copy of this report)
Model School Network Infrastructure 38
Plan
2. Identify 10 schools for expanded early childhood education. These schools may include
expansions of existing schools or possibly new education centers.
155 schools in the MSN have preschool (Pre-K 2, Pre-K 1 or Kindergarten) programs. Enrollments at specific
schools range from a total of 7 students to 269 students. There is a wide variety of programs, ages of children
served, and qualifications of staff/teachers. Not all primary schools (Basic 1 and Basic 2) have preschool
programs. In most cases, the number of preschool students served is a fraction of the number of children
which could benefit from these programs. The MSN network should be commended for its commitment to
early childhood education, but this program can and should be expanded.
Typically, there are two approaches to providing preschool educational programs, either by adding preschool
classes at primary schools or creating separate early childhood education centers. In remote rural areas that are
sparsely populated, the most logical approach to adding preschool enrollment is by including early childhood
programs at existing primary schools. In more highly populated areas, Pre-school education centers can work
well. The best configuration is often determined by the safest means by which the young children will get to
school.
The database which was created as part of this study identifies current enrollments for each grade level, at each
school, including preschool enrollments. It is recommended that the database be used in conjunction with GIS
mapping to review each school and target the number of preschool children desired at each location. (This
may be impacted by the capacity of the school facilities the preschool program will feed into.) Based on the
targeted preschool enrollment at each school, the number of additional classrooms needed to support that
enrollment should be established based on the new MSN Minimum School Facility Design Guidelines. (Preschool
enrollment/25 students per classroom.).
Model School Network Infrastructure 39
Plan
3. Identify 10 new Secondary Schools that may be replacements, expansions of existing secondary
schools, or new educational centers.
Enrollment data indicates that there are very few students that attend school beyond 6th grade and even fewer
that attend school beyond 9th grade. Enrollments indicate that the number of students in grade 13 is only 8%
of students enrolled in 1st grade. There is clearly a major need for additional secondary education
capacity.
Currently there are 69 schools that offer educational opportunities beyond the 6th grade and 29 schools which
offer programs beyond the 9th grade. In many cases, upper grades are offered in the morning where primary
classrooms are offered in the afternoon as a second shift. In many of these situations, there are very small
numbers of students that are attending these programs.
In the MSN, there are 13 schools that offer programs for grades 7-13. There are only two schools that serve
only grades 10-13. However, one of those schools also shares a campus with lower grade levels.
The numbers themselves speak to the problem. Informal data would suggest that unemployment rates are in
excess of 75%. Many of the younger generation move to the cities to seek employment. Often young men in
rural areas attempt to accumulate enough money to become moto drivers. In summary, there are very few
secondary education opportunities in the Central Plateau, and even fewer vocational education opportunities.
Schools for the Children of the World has completed a master plan and design, in collaboration with St Louis
King of France Parish in Mirebalais, the University of Notre Dame, and the W. K. Kellogg Foundation, to
build a new Basic 3 + Secondary School + Vocational School (Grades 7-13 plus vocational school) in
Mirebalais. This school is also planned to be a training center for teachers serving the MSN. This school is
Model School Network Infrastructure 40
Plan
greatly needed. It is recommended that this school be considered a top priority for secondary school
improvements.
Due to the wide geographical area, including the lack of roads and public transportation, it is suggested that
new secondary schools be strategically located in proximity to groups of 6-8 primary schools. These primary
schools can be planned to serve as feeders into the secondary schools. If the secondary schools are strategically
located near the primary schools, it will increase the probability that many of the students will be able to walk
to school or commute via motorcycle.
While it is preferred that all MSN schools operate in a single shift, alternatives could be considered for some
part time shifts or even weekend shifts to allow students with jobs to also advance their education. Cristo Rey
has a very successful program operating in several countries that allows students to go to school for ½ day and
work in local businesses the remainder of the day. The businesses pay for the student’s tuition plus pay the
students a reduced rate for their work. The students typically perform very well in school because the practical
experience shows them the importance of their work in school. The businesses benefit because the students
are receiving a good education while they are training for potential fulltime employment in the future. Everyone
benefits from this arrangement.
The following are suggested areas to consider for new secondary schools. Consideration should be given to
the location and capacity of non-MSN secondary schools when locating new MSN secondary schools. Existing
feeder MSN primary (Basic 1 and Basic 2) and Fundamental (Basic 3) schools in each area should be consulted
to help identify the needed capacity and location of new local secondary schools they would feed into.
Secondary Schools
Suggested Locations
General Location Region
1 Mireablalais Mirebalais
2 Lascahobas Mirebalais Note: Mirebalais & Hinche have
3 Belladere Mirebalais enough students to support more
4 Duffalty Mirebalais than one secondary school
5 Haut Saut d'Eau Mirebalais
6 Hinche #1 Hinche
7 Thomonde Hinche
8 Thomassique Hinche
9 Maissade Hinche
4. Identify 5 new schools in areas that have no schools or lack educational opportunities
Within the Central Plateau of Haiti, there are many schools that are public schools, religious schools and schools
operated by independent private entrepreneurs that are not MSN schools. During SCW’s assessment of the
existing MSN schools, we were surprised to find some of the higher density populations in some of the more
rural areas. We expected to find remote mountainous areas to have fewer children. These situations of lower
density do exist, however, we also found rural areas, (even in areas that have no roads), where 200-300 students
Model School Network Infrastructure 41
Plan
attend one school, and less than a mile away there could be another school with another 200-300 students.
This is indeed challenging since accessing these remote areas can be extremely difficult.
As a result of the data collected and the schools reviewed, SCW suggests that rather than establishing a goal of
5 new schools in areas that currently have no schools, that the MSN focus on the first goal of replacing schools
in extremely poor condition. If the planning for these schools is done correctly, we believe likely solutions will
include consolidating schools in certain geographical areas with new buildings and constructing additional
schools in areas that are not being served.
The goal of adding 5 new schools in areas that have no schools or lack educational opportunities remains. The
decision on where these new schools are located could be determined in concurrence with the replacement of
existing schools in extremely poor condition. In this way, we hope to meet multiple objectives with each new
facility.
5. New outcome: Improve sanitary conditions
Correcting sanitary facilities was not originally identified as one of the
major objectives of the WKKF grant. However, after assessing the
existing schools and discussing the topic at both workshops with MSN
stakeholders, correcting the poor condition of sanitary facilities was
identified as a high priority. During the data collection process, it was
determined that the sanitary condition at the vast majority of the MSN
schools is deplorable. One of the problems is that most of the schools
have no source of potable drinking water. Worse yet, many of the schools
have no source of water at all which makes basic hygiene impossible.
Approximately 80% of the schools have pit toilets which usually consist
of a dilapidated structure that hasn’t had regular cleaning, and in many
cases is collapsing. Approximately 10% of the schools have no toilet
facilities. To make matters even worse, SCW repeatedly found that the
doors to many toilets (pit or otherwise) were locked and not accessible by
students. Assessors saw first-hand boys and girls urinating on school
grounds. which gave students no humane option of addressing bodily
needs. It is our opinion that this should not be acceptable for any MSN
school. This was even more inhumane for young girls which also have
needs to address their menstrual cycles. We are sure many girls are
choosing to not go to school rather than face the indignity they experience
at the schools. All of this is plain and simply wrong.
SCW Summary Recommendation
After reviewing the schools in the MSN and discussing objectives with the MSN Board, it became apparent
that multiple objectives noted above can be accomplished with each project. As realignment of grade levels is
considered as suggested by the Ministry of Education, and as facility improvement objectives are identified in
this assessment, it becomes apparent that there is a need to reassess each school’s capacity to serve specific
grade levels within its local community and how that capacity best fits into the overall educational objectives
of the MSN for that region. Ideally, there will be a clear path for students to follow from early childhood
education through Grade 13 to attend MSN schools in each area the MSN serves. As the role of each
Model School Network Infrastructure 42
Plan
school is considered in that overall objective by school administrators and school planners, we think it will
become clear where school improvements are most needed as well as where new schools are needed to provide
a continuum of educational advancement for all students served by the MSN.
SCW Recommends:
1. That SCW work closely with the MSN Board to pre-define an initial set of School Facility improvement
projects (Phase One) that establish a clear path for MSN students in an area to follow, from early
childhood education through Grade 13, in MSN schools. Phase One should include pre-defined projects
that identify school facility improvement projects coupled with new school projects that achieve that
objective in each of the communal sections served by the MSN in the Lower Central Plateau.
2. The Phase One projects should be established to serve as a model for future school improvement projects
in each of the communal sections served by the MSN.
3. The MSN establish and enforce standards for sanitation and cleanliness for all MSN schools.
4. The MSN establish a policy to require all new MSN schools and MSN schools with expansion projects
provide potable water for staff and students from a dependable water source, such as a well, spring,
rainwater collection system or other suitable source of water, and include an appropriate water filtration
system if needed for safe drinking water.
5. That the MSN establish a policy that requires all new MSN schools and MSN schools with expansion
projects provide hand washing facilities within or immediately adjacent to all toilet facilities.
6. The MSN establish a comprehensive program with appropriate classroom training to assist young girls and
prepare them as they enter puberty.
7. The MSN establish a written policy that School Directors be assigned the responsibility of guaranteeing
that staff and students have access to potable water and clean and properly functioning hand washing sinks
and toilet facilities at all times school is in session.
8. That the MSN Partner with an NGO that specializes in water and sanitation systems and creates a plan for
systematically improving water and sanitation at each MSN school.
Model School Network Infrastructure 43
Plan
Funding
Based on the existing conditions and the new suggested guidelines, the total cost to address the infrastructure
needs of the existing schools in the Model School Network is estimated to be $106m. This is a staggering
amount, and, at first glance, appears to be an overwhelming obstacle. Based on conventional ways of addressing
infrastructure improvements, funding $106m might appear to be next to impossible. By no means does SCW
suggest we have the answer, but we do have some suggestions.
The bottom line is that no one entity can afford to do this alone. Local communities surely do not have the
resources. The Haitian government doesn’t have the resources, nor do foundations, foreign governments,
NGOs or churches and school groups in North America or Europe. However, collectively, and through new
forms of partnerships, this may be possible. This will likely require a great deal of creativity, collaboration, and
new forms of operations and project delivery. New ideas need to be examined.
The actual levels of funding available for school construction projects are unknown. For Catholic schools in
Haiti, a significant amount of work is supported by the local Catholic Church, religious orders within the
Catholic Church, supportive NGO’s, and foreign mission teams. The Summit schools are primarily funded by
private donors and several of the newer Summit school facilities were constructed by the Digicel Foundation.
The EFACAP schools in the Central Plateau are a combination of private and public schools. A decision will
need to be made as to whether each of the school networks within the MSN implement their own individual
list of school projects, if this is done jointly, or some other combination of approaches. Potentially, each
organization leverages their partners and collectively the network develops a join plan for planning, designing,
and constructing school projects. (see Implementation Plan).
The Inter-American Development Bank (IDB) has concluded that even though there has been a major push
for school construction following the 2010 earthquake, at the current level of implementation, the needs of the
country will never be met. They have written papers that suggest that rather than the current central
government approach that has been used for the past ten years, a new decentralized method of implementing
school infrastructure projects should be pursued. It could be argued that based on the lack of available public
education in Haiti, the number of public schools should be doubled or tripled. In our opinion, the national
government should consider creating a more viable partnership model with quality private school networks.
The government should also consider moving away from a “control” mentality to more of an “enabling”
mentality where it encourages and reinforces capacity building at the local or regional level.
Model School Network Infrastructure 44
Plan
It is beyond the capacity of any one organization to address the need
to adequately educate all the children in Haiti. It our opinion, it will
require a creative partnership model that takes advantage of every
resource that is available.
Cost of Construction
Cost of School Construction
The cost of school construction is approximately 60% materials and Labor
40% labor. 40%
On any construction project, both skilled and unskilled labor is Materials
needed. It is important that future buildings are constructed to
appropriate local hurricane and earthquake standards, requiring 60%
design and construction expertise and experience. However, there
is also a great deal of unskilled labor needed on every project which
could be part of the local community’s contribution to a project.
When it comes to school infrastructure projects, it appears that most communities are waiting for an outside
organization to build a school for them. This is primarily because of the lack of available local funds and
expertise. SCW suggests that this approach be changed to allow schools to be designed, built and operated in
partnership with the local communities which have direct stakeholder involvement in the project. This
approach has the potential of creating local economic synergies which are desperately needed. Another benefit
is the creation of greater ownership by the local community of the school which should improve the care and
maintenance of the infrastructure and the general sustainability of the school.
Funding Sources
There are many agencies and organizations that fund school infrastructure. When considering funding sources
for the construction of new Catholic schools and renovation projects, the focus is often on the Church. There
is no question that there is a need for the Catholic Church to increase their investment in school infrastructure
in order to address this massive need. However, there is also a need for increased funding from other agencies
and organizations as well as the local communities
themselves.
The following are potential funding sources to support
school construction.
1. Private Donors
2. Catholic Church & Catholic Religious Orders
3. Sister Catholic Churches in Foreign Countries
4. New types of partnerships with the Haitian
Government
5. External Funding Agencies
6. NGO’s
7. Local Communities through Volunteer Labor
Model School Network Infrastructure 45
Plan
Catholic Church
It appears as if most of the Catholic schools that are under construction are being supported by the various
religious orders within the Catholic Church. There may need to be a plan of implementation that allows for
various funding streams, e.g. congregational schools funded by religious orders and the parish and independent
schools following different funding mechanisms. There are approximately fifty existing partnerships between
Catholic schools in the Central Plateau and local Catholic churches in the United States. Efforts should be
made to create church partnerships for every school and to utilize the information in this report to create
infrastructure projects.
Local Community and Local Churches
The local community may be the single largest
untapped resource. Involving the community and
unlocking this potential will require a major cultural
shift.
Labor is a significant portion of the cost of a
project. There is skilled labor that will be required
for items such as carpentry, foundations, structural
systems, plumbing and electrical systems, etc.
However, there is a great deal of unskilled labor that
is needed in the form of mixing cement, stocking
materials on the construction site, cleaning the site,
and painting the buildings. This labor can be
provided by or donated by l coal community
members.
Facility Maintenance
Maintenance is often overlooked. Since many buildings are remotely located, responsibilities and funding
mechanisms should be established for the local maintenance of the buildings. The daily care of the buildings
should be the responsibility of the school director, teachers and students. The community should help with
other items. A broken door, fence, or roof leak is often not corrected even when local community volunteers
have the knowledge to fix them. A good example is the painting of a school. Over 90% of all school buildings
were found in need of paint. A coordinated effort should be made between funding sources and the local
community to address this need. The funding sources could provide funds for paint and supplies while the
local community provides the labor.
For community involvement to be successful, a partnership agreement is needed that clearly spells out the
responsibilities of the local community. Implementing a community involvement plan will not be easy but will
pay many dividends and be a worthwhile challenge.
Model School Network Infrastructure 46
Plan
Non-Profit and Private Sectors
There is a significant presence of non-profit
organizations working in Haiti. Every week
there are numerous volunteer groups from
North America, South America and Europe
arriving on some type of “mission”. These
missions include water projects, church
construction, medical teams, and school
construction. Most of these teams become
involved because they want to help and
make a difference.
There are also NGOs that focus on specific
missions such as: water systems, toilets and
sanitation systems, kitchens and food
preparation, school furniture, playgrounds,
etc. The MSN network should reach out to
these organizations, review the information
in this report, and create partnerships
around specific projects that are in common
with the mission of these NGOs.
Most of these organizations also do not have the resources needed to cover the cost of building a school.
However, if matching grant programs were to be developed between major foundations, external funding
organizations, and the Haitian government, there could be a potential to form partnerships where organizations
join forces to work together.
Haitian Government and External Funding Agencies
Following the January 2010 earthquake, significant amounts of money were committed to assist in the
reconstruction of Haiti which is a critical albeit dwindling source of revenue. Part of the solution might hinge
on the Catholic Church’s ability to work in partnership with the Haitian government and external funding
agencies. There is no question there is a need to expand public education in the country. At the same time,
there is a need to strengthen the private school sector where it is found to be viable such as within the Model
School Network.
In the recent past, a significant portion of the funding for public school construction in Haiti has come from
external funding agencies such as the Inter-American Development Bank (IDB), World Bank, European Union,
and various bilateral agencies from countries such as Japan, Germany, Canada, and the United States. Many
individual projects have been funded by foundations like Digicel. Many church organizations and NGOs have
also constructed projects. All of these organizations are finding it impossible to meet the infrastructure needs
on their own. A new type of public/private model may need to evolve.
Matching Grants
Since it is very difficult for any one organization to address all these needs alone, it is suggested that major
funding sources consider forming matching grants to support infrastructure projects. For the Model School
Network, a matching grant might involve the government, external aid organizations, development banks,
major foundations, NGO’s, community organizations, and churches creating partnerships to underwrite the
cost of these projects.
Model School Network Infrastructure 47
Plan
Recommended Actions
Securing funding to address infrastructure projects will be the greatest challenge. However, along with funding,
other recommendations in this report will need to be implemented for this to be successful.
It is recommended the MSN leadership pursue the following activities.
1. Clearly define priorities and implementation strategies for MSN infrastructure projects. (See
Implementation Strategies)
2. Identify 1-2 major foundations that would be willing to participate in a matching grants program. The
exact formula will need to be developed but it is suggested that this source may need to contribute up to
50% of project costs.
3. Hold discussions and negotiations with the Haitian Government and external funding organizations (e.g.
development banks and international aid organizations) that fund the Haitian Government programs to
establish a pilot program for matching funds for MSN schools in the Central Plateau.
4. Establish a school infrastructure matching grants/partnership program with foreign church and school
organizations. There already exists partnership initiatives between many MSN schools and church
organizations in the United States and these efforts should be expanded.
5. Establish a policy that requires local stakeholder involvement in the planning, design and construction of
local school projects. A formula should be established for community participation by providing volunteer
labor as well as security to the site during construction.
6. Establish a policy clearly defining a person at each school primarily responsible for ongoing maintenance
following the completion of projects (see Maintenance section of this report).
7. Establish a policy requiring a funding mechanism for future school facility maintenance be clearly defined
before a facility improvement project is undertaken.
Model School Network Infrastructure 48
Plan
Implementation
The data suggests there is over $106,000,000 in school infrastructure needs in the Model School Network.
Because of the scope of work that is needed, this problem cannot be addressed all at once. In the opinion of
SCW, there will need to be a phased approach over 10 to 20 years.
Further Planning
The priority section of this report identifies priority project types identified by the MSN, including:
➢ Schools that need to be replaced
➢ Expansion of early childhood education
➢ Expansion of secondary education
The management & oversight section of this report recommends that a core staff be established to assist with
further planning, design and project oversight. Elsewhere in this report is a discussion regarding greater local
stakeholder involvement and partnerships between government agencies, NGOs and other non-government
organizations.
Each future project identified should not be planned in isolation. For what is done in one school may have a
profound impact on neighboring schools and the surrounding community. Even though this master plan
provides basic overall direction, more localized planning will be required as projects are implemented. This
planning is further complicated since there are three sub networks (BDE, Summits, and EFACAP) who at
times are operating schools in the same geographical areas.
The following is an example of a suggested process that will take more time, but the result could be much more
beneficial to all concerned.
➢ Review the list of priorities and select a possible school to be replaced or renovated.
➢ Form a local steering committee of local stakeholders and possible partners.
➢ Involve the other schools in the immediate area. Review enrollments and conditions at each school.
Take into consideration other schools in the area that may not be part of the MSN network.
➢ Explore Options. Based on data that has been collected and other recommendations collected from
other stakeholders, the best solutions might be to:
o Remodel the school to comply with new MSN School Facility Design Guidelines
o Replace the school on the current site
o Replace the school on a new site which is more suitably located
o Alter the grade configuration or student enrollment planned at the existing school and plan to
accept additional students to help alleviate overcrowding conditions at neighboring schools.
Remodel and expand the facilities in compliance with the new MSN School Facility Design Guidelines
o Close the school and construct additions at surrounding schools.
The school facility improvement needs that have been identified are extensive. They range from smaller
projects like painting a school to totally replacing an existing school. The MSN can use help on all fronts, large
and small. There are organizations which have the capacity to help on bigger projects, while other organizations
can be extremely helpful on smaller projects or by playing a lesser role on a large project.
Model School Network Infrastructure 49
Plan
In the Management & Oversight section of this report we are recommending that some type of office be
established to guide the implementation of infrastructure projects. We further recommend that separate
programs be established for larger major projects and for smaller projects.
To address these issues, it is suggested that there might be three programs established:
1. Major Projects. This would involve total school replacements, especially of schools that are in very
poor condition. This might also include additions for schools that are very overcrowded or are adding
secondary and vocational education programs.
It is envisioned that these projects would be funded by larger foundations, the Haitian government,
with supplemental support from smaller NGOs, church groups, and local community voluntary
efforts.
2. Small Projects. This program would be for smaller projects such as water systems, new school
furniture, painting schools, alternative energy projects, etc.
It is envisioned that these projects would be funded by smaller foundations, church & school groups,
smaller NGOs, and local community voluntary efforts.
3. School Maintenance. A school maintenance program must be established that will include staff and
community training, maintenance manuals, and a maintenance accountability system. This should be
developed and required for all new and existing MSN school facilities.
The average school size is approximately 324 students. The approximate cost for a new school for 324 students
is about $778,000. The appendix of this report lists all the MSN schools that were identified by the evaluators
as needing replacement. The MSN leadership will need to determine which schools need to be replaced first.
The report also identifies schools requiring major renovations or additions to address overcrowding. The MSN
leadership will need to prioritize those schools that need substantial renovations and additions and determine
which of those projects have a higher priority over schools identified as requiring complete replacement.
Once major project prioritization is complete, a plan needs to be developed and presented to potential major
donors for support.
This following scenario suggests that in the first year, 4 major projects would proceed through planning and
design. In the following year, those projects would move into construction, while 5 more projects would begin
planning and design. The following year, the first 4 projects would be completed, the second group of 5
projects would proceed into construction, and a third set of 6 projects would begin planning and design. The
process would proceed for at least 12 years, completing 57 projects in the first 12 years.
Funding amounts noted are based on projects averaging about $832,460 in the first year. Inflation has been
factored in at about 7% per year. Haiti’s rate of inflation for the past year has been about 17%, but that appears
to be abnormally high for Haiti. As the table on the next page indicates, inflation will have a significant impact
on future school improvement costs.
Model School Network Infrastructure 50
Plan
This process is intended to “ramp-up” the oversight policies, procedures, and training needed to maintain the
highest quality of construction. With adequate support, this program could continue until all 86 schools
Major Projects
School Approx Costs 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
School #1 $ 832,460 $83,246 $ 665,968 $ 83,246
School #2 $ 832,460 $83,246 $ 665,968 $ 83,246
School #3 $ 832,460 $83,246 $ 665,968 $ 83,246
School #4 $ 832,460 $83,246 $ 665,968 $ 83,246
School #5 $ 890,732 $ 89,073 $ 712,586 $ 89,073
School #6 $ 890,732 $ 89,073 $ 712,586 $ 89,073
School #7 $ 890,732 $ 89,073 $ 712,586 $ 89,073
School #8 $ 890,732 $ 89,073 $ 712,586 $ 89,073
School #9 $ 890,732 $ 89,073 $ 712,586 $ 89,073
School #10 $ 953,083 $ 95,308 $ 762,467 $ 95,308
School #11 $ 953,083 $ 95,308 $ 762,467 $ 95,308
School #12 $ 953,083 $ 95,308 $ 762,467 $ 95,308
School #13 $ 953,083 $ 95,308 $ 762,467 $ 95,308
School #14 $ 953,083 $ 95,308 $ 762,467 $ 95,308
School #15 $ 953,083 $ 95,308 $ 762,467 $ 95,308
School #16 $ 1,019,799 $ 101,980 $ 815,839 $ 101,980
School #17 $ 1,019,799 $ 101,980 $ 815,839 $ 101,980
School #18 $ 1,019,799 $ 101,980 $ 815,839 $ 101,980
School #19 $ 1,019,799 $ 101,980 $ 815,839 $ 101,980
School #20 $ 1,019,799 $ 101,980 $ 815,839 $ 101,980
School #21 $ 1,019,799 $ 101,980 $ 815,839 $ 101,980
School #22 $ 1,091,185 $ 109,119 $ 872,948 $ 109,119
School #23 $ 1,091,185 $ 109,119 $ 872,948 $ 109,119
School #24 $ 1,091,185 $ 109,119 $ 872,948 $ 109,119
School #25 $ 1,091,185 $ 109,119 $ 872,948 $ 109,119
School #26 $ 1,091,185 $ 109,119 $ 872,948 $ 109,119
School #27 $ 1,091,185 $ 109,119 $ 872,948 $ 109,119
School #28 $ 1,167,568 $ 116,757 $ 934,055 $ 116,757
School #29 $ 1,167,568 $ 116,757 $ 934,055 $ 116,757
School #30 $ 1,167,568 $ 116,757 $ 934,055 $ 116,757
School #31 $ 1,167,568 $ 116,757 $ 934,055 $ 116,757
School #32 $ 1,167,568 $ 116,757 $ 934,055 $ 116,757
School #33 $ 1,167,568 $ 116,757 $ 934,055 $ 116,757
School #34 $ 1,249,298 $ 124,930 $ 999,438 $ 124,930
School #35 $ 1,249,298 $ 124,930 $ 999,438 $ 124,930
School #36 $ 1,249,298 $ 124,930 $ 999,438 $ 124,930
School #37 $ 1,249,298 $ 124,930 $ 999,438 $ 124,930
School #38 $ 1,249,298 $ 124,930 $ 999,438 $ 124,930
School #39 $ 1,249,298 $ 124,930 $ 999,438 $ 124,930
School #40 $ 1,336,749 $ 133,675 $ 1,069,399
$ 133,675
School #41 $ 1,336,749 $ 133,675 $ 1,069,399
$ 133,675
School #42 $ 1,336,749 $ 133,675 $ 1,069,399
$ 133,675
School #43 $ 1,336,749 $ 133,675 $ 1,069,399
$ 133,675
School #44 $ 1,336,749 $ 133,675 $ 1,069,399
$ 133,675
School #45 $ 1,336,749 $ 133,675 $ 1,069,399
$ 133,675
School #46 $ 1,430,321 $ 143,032 $ 1,144,257 $ 143,032
School #47 $ 1,430,321 $ 143,032 $ 1,144,257 $ 143,032
School #48 $ 1,430,321 $ 143,032 $ 1,144,257 $ 143,032
School #49 $ 1,430,321 $ 143,032 $ 1,144,257 $ 143,032
School #50 $ 1,430,321 $ 143,032 $ 1,144,257 $ 143,032
School #51 $ 1,430,321 $ 143,032 $ 1,144,257 $ 143,032
School #52 $ 1,530,444 $ 153,044 $ 1,224,355 $ 153,044
School #53 $ 1,530,444 $ 153,044 $ 1,224,355 $ 153,044
School #54 $ 1,530,444 $ 153,044 $ 1,224,355 $ 153,044
School #55 $ 1,530,444 $ 153,044 $ 1,224,355 $ 153,044
School #56 $ 1,530,444 $ 153,044 $ 1,224,355 $ 153,044
School #57 $ 1,530,444 $ 153,044 $ 1,224,355 $ 153,044
Totals $66.5m $.3m $3.1m $4.5m $5.6m $6.1m $6.6m $7.0m $7.5m $8.0m $8.6m $8.2m $.9m
Planning/Design
Construction Example of major projects implementation:
Based on 7% annual escalation.
Model School Network Infrastructure 51
Plan
identified for replacement have been replaced, and all remaining major renovations and additions have been
completed to address the total need identified by the SCW school facility assessment completed in 2018.
The actual cost on each project will vary based on the grade levels served and projected student enrollment
capacities. The numbers below are based on an average of 324 students per school (6 classrooms of 36 students)
which is the approximate current average student enrollment in MSN schools.
Smaller projects might be easier to accomplish since there are more churches, schools, and smaller NGOs that
can partner on projects. There is already a network of 55 partnering churches. Additional potential partnering
organizations should be identified.
Non-governmental Organizations (NGOs) that specialize in water and sanitation, toilets and wastewater
systems, electricity, furniture, playgrounds and other specialties should be contacted for potential partnerships
to help implement smaller projects. Other service organizations are also potential partners such as Rotary
International and other organizations that concentrate on education.
Smaller projects could range in cost from $2,000 to $20,000. With the right staffing to help predefine projects,
create partnerships, coordinate work groups, purchase materials, and provide overall project coordination, it
might be possible to complete a dozen or more projects per year.
Below is an example of financing that would be required to complete approximately 15 to 20 small projects per
year that may vary in size from $2,000-$20,000 depending on the scope of the project and the partner(s).
Small Projects
Nmber of
Total
Projects/yr
2020 5-10 $ 50,000
2021 15-20 $ 150,000
2022 15-20 $ 157,500
2023 15-20 $ 165,375
2024 15-20 $ 173,644
2025 15-20 $ 182,326
2026 15-20 $ 191,442
2027 15-20 $ 201,014
2028 15-20 $ 211,065
2029 15-20 $ 221,618
2030 15-20 $ 232,699
2031 15-20 $ 244,334
Total $ 2,181,018
Model School Network Infrastructure 52
Plan
Management & Oversight
To implement the proposed school infrastructure program the Model School Network (MSN) will
need to work with partnering NGOs which have expertise in school infrastructure or create an Office
for School Infrastructure to oversee MSN school projects.
This organization should:
1. Planning. Work with local communities to define project program requirements, expected
student enrollment, and anticipated school growth, develop site master plans, and determine
cost estimates
2. Sites. Review the adequacy of proposed school sites and assist in obtaining additional
property when needed for anticipated growth.
3. Partnership Agreements. Complete partnership agreements which clearly delineate the
responsibilities of each partner to the project, including all partners and strategies needed to
assure project sustainability.
4. Qualify Design Teams. Identify architects and engineers who are experienced in school
facility design, seismic design and understand construction practices in Haiti. Establish a
training program for potential consultants that clearly establishes expectations for the
services they provide. Make clear the consultant’s personal responsibility for assuring quality
designs that comply with the MSN Minimum School Facility Design Guidelines, accepted regional
seismic design and wind uplift design requirements, and site drainage requirements.
5. Design. Review and ensure the design complies with the MSN Minimum School Facility
Design Guidelines and planning objectives established with the community. The design team
should be expected to develop the design in collaboration with a representative committee
of community members and school leaders and should receive that committee’s acceptance
of the final schematic design. The design should clearly identify steps taken to comply with
local structural seismic and hurricane requirements, as well as other requirements such as
natural light, ventilation, handicapped accessibility, etc. Site specific designs will be required
for each site based on factors such as school enrollment, topography, and other site
characteristics.
In addition, this office or organization should also be responsible for:
1. Qualifying & Selecting Contractors. Contractors will need to be identified who can provide
quality construction workmanship or will need to establish a training program for potential
contractors.
2. Purchasing Materials. It is suggested that this office or organization be responsible for the
purchase of materials to control the cost and to minimize the opportunities for the substitution
of substandard materials.
3. Construction Administration. This office or organization should be responsible for
providing on-site oversite of the construction of the project.
Model School Network Infrastructure 53
Plan
4. Establishing a School Maintenance Program. To protect the investment being made in
school infrastructure there needs to be a corresponding program to maintain and protect this
investment. This office or organization should also be tasked with the responsibility for
developing and implementing a school maintenance program.
5. Accounting & Reporting. This office or organization should be responsible for maintaining
accurate accounting of all costs associated with the project and reporting information to the
MSN leadership and funding partners.
6. Coordinating Volunteer Teams. It is anticipated that with a viable partnership program
with church and school groups from other countries, there will be an interest in teams from
these organizations who will want to be involved in helping with some construction projects.
This office or organization will need to coordinate these team activities.
Currently construction of the MSN schools appears to be coordinated on a school by school basis.
As such there is a wide range in the quality of construction to the point where there are vast inequities.
At times this has resulted in poor construction. Currently there does not appear to be any mechanisms
in place to ensure the investments in school infrastructure will be performed adequately or will be
maintained once completed.
Schools for the Children of the World (SCW) is not lobbying for this assignment; however, we have
learned the hard way how difficult this can be as well as systems that can be successful. Regardless if
the MSN decides to create an internal Office for School Infrastructure or work with another NGO,
the following are some of the characteristics of this office.
Architects & Engineers
While the services of foreign architects and engineers should be considered, any consulting firm,
foreign or domestic, must be vetted to establish that they have a clear understanding of local
construction practices, material availability and unique regional design requirements when designing
for buildings in Haiti. There is a reason many of the buildings were destroyed in the 2010 earthquake
and there is a reason why funders have collaborated with representatives from other countries for
school projects they have completed in the past ten years. It is problematic that even NGOs that have
been constructing schools in Haiti are not constructing schools to adequate seismic and hurricane
standards. Any consulting firms considered must be able to establish experience working in Haiti and
the technical knowledge needed to meet the unique challenges of building in Haiti.
Haiti Office for School Infrastructure
It is suggested that a Haiti office for school infrastructure be created to oversee the MSN projects to
do the proper planning, site adaptations of design, training, construction oversight, and accounting.
The office personnel should be carefully selected to ensure they have the skills needed to do quality
work. It is also suggested that several of the persons can read, write and speak English to facilitate
communication with foreign partners.
Model School Network Infrastructure 54
Plan
The actual staffing is dependent on the number of projects that are being constructed. In the
beginning it is envisioned that there might be two persons (planner and architect) which would have
the responsibility to scope out potential projects and develop site concept designs. As projects are
implemented additional project managers, architects, and planners should be added to the team.
Model School Network Infrastructure 55
Plan
School Maintenance
School Facility Maintenance may well be one of the most important components of a master plan.
The lack of school facility maintenance is a major problem at almost all MSN schools. In many
instances, it doesn’t appear there has been any maintenance, or at least there has been no regular
ongoing maintenance program.
This problem is not limited to MSN schools. In conversations with representatives from the Digicel
Foundation, IDB, and at schools we have visited in in many other countries, they are all experiencing
this problem. This is true even in the United States. The root of the problem is based on the lack of
preplanning to identify a source for funding and to make sure adequate funds are available when
needed. The problem is further exacerbated by the fact that rarely does any one person or group of
people take ownership of the responsibility of maintaining the facilities. For many educators, “I am
an educator. That is not my job.” For local communities, “That is a ____ school. That is not my
responsibility. I have plenty of challenges of my own.”
Buildings built with better-quality materials and construction techniques, and properly maintained, can
be expected to have a life expectancy of 50 or more years. After 1 or 2 years, many of the MSN
buildings appear to be neglected and look much older than their age. Walls are covered with mud,
classrooms have not been cleaned, chalkboards have not been repainted and are difficult to read, trash
is accumulating on the school grounds, and toilet facilities smell and are unclean, and in some cases
are locked because they aren’t working. Even minor repairs have not been undertaken such as: the
removal of debris from roofs, windows or doors that were damaged and remain unrepaired, and even
burnt out lightbulbs that haven’t been replaced. There are examples of new toilet facilities, water
tanks, and faucets that were installed in 2016-2017 that are no longer working. Unfortunately, these
conditions were found at most of the MSN schools.
The lack of maintenance also impacts donors. Organizations that were building schools have stopped.
After visiting schools they had recently completed, they found it necessary to start making repairs to
schools that were just a few years old, and stopped building new schools out of frustration.
This negligence results in vastly reducing the life expectancy of the buildings. In past studies, we have
found that many schools were being abandoned after only 20 years of use because of the poor
condition of the facilities.
The lack of maintenance also effects the students and the surrounding community. Well maintained
school facilities encourage students and community members to keep their homes and community
facilities in good working order and enhances the community’s pride in their community. Many times,
the schools lead the effort by being a shining example for everyone to see. Unfortunately, the schools
can also have the opposite result.
Model School Network Infrastructure 56
Plan
In the future, an ongoing maintenance program must be part of the MSN infrastructure solution. We
understand that academic achievement needs to be the primary mission of schools, but there needs to
be a commitment to school maintenance as well. The condition of school facilities unquestionably
has an impact on student performance. Furthermore, maintenance of school facilities will be critical
to maintaining the support of future donors. Donors don’t want to see their contributions wasted
through neglect. They will quickly stop their support if their contributions are not respected and well
taken care of.
The following programs are strongly recommended:
1. SCW will help the MSN develop a maintenance manual for MSN schools which will identify
what maintenance should be performed on a daily, weekly, monthly and annual basis. This
manual should be immediately implemented at all MSN schools.
2. The MSN should establish policies that clearly identify who is responsible for overseeing
school facility maintenance. We have found that many school directors do not believe that it
is their job or their responsibility. The MSN must establish who is responsible for school
facility maintenance and provide appropriate training to those individuals.
3. All MSN School Directors should be trained on managing school infrastructure. It is clear
that when a school director considers maintenance a priority, their schools are in far better
condition than those directors who do not put an emphasis on maintenance. Their training
should include instruction on how to make the best use of community resources to help with
school maintenance. Local community members may very well be willing to help and provide
donated labor and materials, particularly for some of the smaller projects.
4. Funding: The MSN must establish a funding strategy for each school’s maintenance. Even if
someone is responsible, the job won’t get done if there is not a plan in place to adequately
fund the materials and resources needed to make the repairs. One of the major obstacles to
maintenance is that there are no funds for repairs or even smaller items such as buying parts
for a broken toilet, a light bulb or painting a classroom. One funding idea is to develop a $1
plan that entails setting up a separate account at each school for maintenance and requiring
parents to pay $1 per month that is used exclusively for maintenance.
5. Create a School-Parent association at each school that includes staff and parents that meet on
a regular basis. Their responsibilities would include reviewing the condition of the facilities,
identifying maintenance that is needed, prioritizing maintenance projects, encouraging
volunteerism, and deciding how available resources are to be used.
6. Train teachers, students, and parents on basic custodial maintenance of classrooms, toilets,
and playgrounds, and charge them with specific responsibilities for which they can be
responsible. Make sure trash containers are located throughout the campus to allow students
and staff to help keep the campus in great condition.
7. Create a checklist of maintenance tasks. The checklist must be checked and initialed when
maintenance tasks are completed by the person in charge of maintenance.
8. Create a certificate program for outstanding classrooms and school certification of
maintenance compliance.
Model School Network Infrastructure 57
Plan
This problem cannot be underestimated. MSN must protect these financial investments. Both
for themselves and for the continued support of their donors.
The following are sample school maintenance checklists developed by SCW. (See the new proposed
MSN Maintenance Manual for full details of maintenance recommendations).
Model School Network Infrastructure 58
Plan
Model School Network Infrastructure 59
Plan
Model School Network Infrastructure 60
Plan
Model School Network Infrastructure A-1
Plan aaaa
Appendix aaaA
The following documents have been attached in their original format for improved
readability.
Appendix 1 Database Summary Report
Appendix 2 Schools identified as “Critical Replace”
Appendix 3 Schools identified as “Replace”
Appendix 4 Schools sorted by Communal Section and Total Enrollment.
Documents that are provided separately include:
1. Maintenance Manual
2. MSN Minimum School Facility Design Guidelines
3. Individual School Reports
MSN FACILITY ASSESSMENT SUMMARY - ENGLISH Appendix 1
SCW School Name Total Enrolment: Total Existing Total m2 Adequacy index Existing School Estimated Cost to Achieve Estimated Condition Estimated Cost to Correct Recommended Project Replace existing facilities with New School Closed or
School Classroom needed for AI=0 (Based on Location: New Design Standard Based on Field Existing Condition Budget: School Facilities?? Duplicate School
Code Space (m2) (Calc based on existing (Accessible vs. m2/student: Evaluation: (100% = Deficiencies: Replace if > 75%
Program m2/required m2 Remote) (AI=1.0) Replace)
m2/student) for AI=0)
101 Notre Dame De Lourdes-Marecage 0 Students 0.0 0.0 School Closed
102 Saint Gabriel 0 Students 0.0 0.0 School Closed
103 Saint Sauveur 131 Students 66.2 325.2 0.203 Remote $168,402 USD 100% $43,004 USD $234,000 USD Provide New School Facilities
104 Presbyterale de Reltalus 178 Students 0.0 506.4 0.000 Remote $257,400 USD 100% $0 USD $374,400 USD Provide New School Facilities
105 Presbyterale De St Joseph 0 Students 0.0 0.0 School Closed
106 Presbyterale St Jean Apotre 606 Students 326.7 1,634.4 0.200 Accessible $1,264,075 USD 20% $63,505 USD $1,609,632 USD Provide New School Facilities
107 Presbytérale Notre Dame De 0 Students 0.0 0.0 School Closed
L'Asssomption
108 Notre Dame Du St Esprit 592 Students 592.2 1,542.5 0.384 Accessible $873,760 USD 15% $86,335 USD $960,095 USD
109 Jardin Fleuri Des Maguerittes 184 Students 238.9 546.1 0.437 Accessible $189,569 USD 40% $92,896 USD $282,465 USD
110 Ecole Nationale Chapeile St Vincent De 398 Students 207.2 1,108.5 0.187 Accessible $876,085 USD 100% $201,410 USD $1,119,744 USD Provide New School Facilities
Paul
111 École Notre Dame Très Sainte Trinité 955 Students 878.0 2,591.5 0.339 Remote $1,035,796 USD 15% $85,602 USD $1,121,399 USD
112 École Presbytérale St Jn Baptiste De 64 Students 150.5 145.6 1.034 Accessible $0 USD 100% $146,286 USD $209,952 USD Provide New School Facilities
Beganabé
113 École Sainte Trinité De Mathebonite 300 Students 324.0 838.1 0.387 Accessible $380,713 USD 10% $31,493 USD $412,206 USD
114 Collège St François D'Assise 0 Students 0.0 0.0 See School 178
115 St François D'Assise 264 Students 171.0 779.8 0.219 Accessible $575,740 USD 10% $16,621 USD $769,824 USD Provide New School Facilities
116 Notre Dame d'Altagrace 139 Students 0.0 320.2 0.000 Accessible $312,012 USD 100% $0 USD $349,920 USD Provide New School Facilities
117 Presbytérale Notre Dame Guadaloupe 608 Students 398.5 1,693.5 0.235 Remote $812,269 USD 20% $51,808 USD $1,123,200 USD Provide New School Facilities
118 Le Souci De St Augustin 219 Students 200.3 616.0 0.325 Accessible $386,460 USD 30% $58,401 USD $444,861 USD
119 Presbyterale Notre Dame Des Douleures 325 Students 138.2 975.3 0.142 Remote $544,128 USD 100% $89,817 USD $655,200 USD Provide New School Facilities
120 Presbyterale St Joseph de Guebot 320 Students 160.9 890.6 0.181 Remote $474,305 USD 100% $104,585 USD $608,400 USD Provide New School Facilities
121 Petit Seminaire College Saint Martin De 619 Students 1,026.6 2,021.2 0.508 Accessible $770,981 USD 40% $399,145 USD $1,170,125 USD
Porres
122 Saint Pierre Et College Saint Pierre 475 Students 421.7 1,240.8 0.340 Accessible $653,826 USD 40% $163,961 USD $817,786 USD
123 Bon Pasteur-Tierra Muscady 238 Students 225.0 692.3 0.325 Accessible $404,498 USD 20% $43,740 USD $448,238 USD
124 Petit Seminaire College St Martin 544 Students 809.8 1,559.5 0.519 Accessible $476,514 USD 30% $236,126 USD $712,640 USD
125 College Les Humanistes Jean Paul Sartre 409 Students 198.8 1,292.0 0.154 Accessible $1,046,066 USD 40% $77,293 USD $1,259,712 USD Provide New School Facilities
126 Mixte Jn Louis Fortunee 365 Students 372.9 1,008.7 0.370 Accessible $430,531 USD 20% $72,484 USD $503,015 USD
127 Marie Éducatrice De Dos-Palais 190 Students 702.3 546.4 1.285 Accessible $0 USD 15% $102,390 USD $102,390 USD
128 Presbytérale Immaculé Conception De 503 Students 352.5 1,327.7 0.266 Accessible $940,269 USD 40% $137,067 USD $1,329,696 USD Provide New School Facilities
Hinche
129 Presbyterale Bon Berger de Lamarre 275 Students 425.0 741.7 0.573 Accessible $272,915 USD 30% $123,941 USD $396,855 USD
130 Ecole Notre Dame du Perpetuel Secours 172 Students 339.4 489.6 0.693 Accessible $61,032 USD 30% $98,963 USD $159,995 USD
de Dubvisson
131 Marie Educatrice De Manac 478 Students 559.4 1,310.5 0.427 Remote $477,802 USD 50% $181,818 USD $659,620 USD
132 Présbytérale St-Jean Baptiste De Abricot 222 Students 140.0 656.5 0.213 Remote $335,725 USD 60% $54,600 USD $468,000 USD Provide New School Facilities
133 Collège Notre Dame D'Altagrace De 121 Students 333.2 304.0 1.096 Accessible $0 USD 60% $194,299 USD $194,299 USD
Layaye
134 Centre Proféssionnel Notre Dame 35 Students 62.8 70.0 0.897 Accessible $7,018 USD 40% $24,409 USD $31,427 USD
D'Altagrce Layaye
135 Marie Educatrice De Layaye 468 Students 546.5 1,284.1 0.426 Accessible $580,634 USD 20% $106,236 USD $686,870 USD
136 College Sacre Coeur De Papaye 407 Students 666.8 1,240.3 0.538 Accessible $306,423 USD 20% $129,616 USD $436,039 USD
137 Presbyterale Notre Dame De Fatima 281 Students 371.6 739.8 0.502 Accessible $293,631 USD 20% $72,239 USD $365,871 USD
138 Saint Charlemagne 283 Students 181.1 744.7 0.243 Accessible $547,805 USD 80% $140,808 USD $769,824 USD Provide New School Facilities
139 Notre Dame De La Nativite 818 Students 661.4 2,288.8 0.289 Accessible $1,538,606 USD 20% $128,585 USD $1,667,190 USD
140 Notre Dame Altagrace 238 Students 322.7 701.1 0.460 Accessible $340,348 USD 40% $125,462 USD $465,810 USD
141 College Notre Dame De La Presentation 282 Students 715.2 819.0 0.873 Accessible $100,858 USD 20% $139,042 USD $239,900 USD
142 Presbyterale Notre Dame De La 487 Students 464.9 1,338.6 0.347 Accessible $697,220 USD 20% $90,377 USD $787,597 USD
Presentation
Model School Network - Haiti + Page 1 of 6 Pages 2019-06-02
Schools for the Children of the World
MSN FACILITY ASSESSMENT SUMMARY - ENGLISH
SCW School Name Total Enrolment: Total Existing Total m2 Adequacy index Existing School Estimated Cost to Achieve Estimated Condition Estimated Cost to Correct Recommended Project Replace existing facilities with New School Closed or
School Classroom needed for AI=0 (Based on Location: New Design Standard Based on Field Existing Condition Budget: School Facilities?? Duplicate School
Code Space (m2) (Calc based on existing (Accessible vs. m2/student: Evaluation: (100% = Deficiencies: Replace if > 75%
Program m2/required m2 Remote) (AI=1.0) Replace)
m2/student) for AI=0)
143 Presbyterale Bon Sauveur De Lospalma 0 Students 0.0 0.0 School Closed
144 Presbyterale Notre Dame Du Perpetuel 300 Students 285.0 807.3 0.353 Remote $301,908 USD 30% $55,575 USD $357,483 USD
Secours
145 Presbyterale Coeur De Jesus 716 Students 576.5 1,946.1 0.296 Remote $890,210 USD 25% $93,681 USD $1,310,400 USD Provide New School Facilities
146 Ntre Dame Des Douleurs De Soyil 20 Students 0.0 40.0 0.000 Remote $26,000 USD 100% $0 USD $46,800 USD Provide New School Facilities
147 Com. La Renaissance 459 Students 240.7 1,166.0 0.206 Accessible $791,031 USD 60% $140,402 USD $1,189,728 USD Provide New School Facilities
148 Kindergarten Les Papillons 30 Students 93.7 77.6 1.207 Accessible $0 USD 60% $54,640 USD $54,640 USD
149 Cong Nationale Marie Jeanne 445 Students 435.6 1,175.5 0.371 Accessible $541,559 USD 35% $148,194 USD $689,753 USD
150 College Classique Evix Jolly 0 Students 0.0 0.0 School Closed
151 Ntre Dame De Fatima 81 Students 302.4 162.0 1.867 Accessible $0 USD 20% $58,787 USD $58,787 USD
152 Ntre Dame Du Mt Carmel 0 Students 0.0 0.0 School Closed
153 Coeur De Jesus 0 Students 0.0 0.0 School Closed
154 Notre Dame Des Douleurs 194 Students 629.2 558.0 1.128 Accessible $0 USD 100% $611,582 USD $559,872 USD Provide New School Facilities
155 Saint Thomas D'Aquin 127 Students 211.2 284.8 0.742 Accessible $71,734 USD 40% $82,115 USD $153,848 USD
156 Notre Dame De Fatima 119 Students 321.0 238.0 1.349 Accessible $0 USD 60% $187,207 USD $187,207 USD
157 Ecole Congregaiuste Nationale Notre 630 Students 570.1 1,691.9 0.337 Accessible $1,018,978 USD 35% $193,940 USD $1,212,918 USD
Dame Du Mont Carmel-Saut d'Eau
158 Saint Jude 170 Students 68.8 483.0 0.142 Accessible $390,475 USD 100% $66,844 USD $489,888 USD Provide New School Facilities
159 Sainte Scholastique 271 Students 282.2 732.1 0.385 Remote $271,605 USD 60% $110,058 USD $381,663 USD
160 Notre Dame D'Altagrace 66 Students 308.8 145.2 2.126 Remote $0 USD 100% $200,688 USD $140,400 USD Provide New School Facilities
161 Saint Michel 96 Students 100.5 265.2 0.379 Remote $93,269 USD 100% $65,332 USD $187,200 USD Provide New School Facilities
162 Ecole Miste Presbyterale Saint Benoit 240 Students 495.0 630.6 0.785 Remote $75,114 USD 20% $64,350 USD $139,464 USD
Laboule
163 Presbyterale Christ-Roi-Sapaterre 185 Students 384.9 532.1 0.723 Accessible $17,564 USD 50% $187,076 USD $204,640 USD
164 Presbyterle Pape Jean Xxlll 502 Students 271.1 1,342.6 0.202 Accessible $943,242 USD 40% $105,404 USD $1,329,696 USD Provide New School Facilities
165 Sainte Therese De Papaye 486 Students 739.5 1,337.3 0.553 Accessible $518,125 USD 40% $287,518 USD $805,642 USD
166 College Sainte Famille 166 Students 799.0 373.0 2.142 Accessible $0 USD 40% $310,651 USD $310,651 USD
167 St Michel De Morne Michel 143 Students 309.8 406.4 0.762 Remote $48,988 USD 30% $60,407 USD $109,395 USD
168 Presbyterale Sacre Coeur 150 Students 299.2 426.1 0.702 Accessible $92,304 USD 40% $116,329 USD $208,633 USD
169 St Joseph-Roche Mulatre 118 Students 197.2 258.0 0.764 Remote $39,520 USD 30% $38,454 USD $77,974 USD
170 Marie Educatrice De Terre Cassé 204 Students 676.2 605.1 1.117 Accessible $0 USD 20% $131,453 USD $131,453 USD
171 École St Paul De Carissade 385 Students 372.9 1,071.1 0.348 Accessible $657,172 USD 40% $144,984 USD $1,049,760 USD Provide New School Facilities
172 Centre Technique Secondaire De 155 Students 819.5 310.0 2.644 Accessible $0 USD 20% $159,311 USD $159,311 USD
Hinche(Pandiassous)
173 Fondation L'Enfant De Jesus Crist 97 Students 52.3 194.0 0.270 Accessible $137,734 USD 100% $50,834 USD $209,952 USD Provide New School Facilities
174 Complexe Educatif Du Sacre-Coeur 754 Students 1,089.9 2,055.7 0.530 Accessible $702,204 USD 20% $211,874 USD $914,078 USD
175 Presbyterale Notre Dame De La 128 Students 72.0 286.8 0.251 Remote $139,750 USD 100% $46,800 USD $187,200 USD Provide New School Facilities
Guadeloupe
176 Presbyterale Notre Dame Du Rosaire 207 Students 413.2 613.4 0.674 Remote $51,370 USD 25% $67,148 USD $118,519 USD
177 Presbyterale Mgr Walter F Sullivan 444 Students 442.2 1,253.4 0.353 Accessible $764,099 USD 30% $128,937 USD $893,036 USD
178 Saint Francois D'Assise-Cerca-la-source 356 Students 738.9 980.3 0.754 Accessible $138,360 USD 60% $430,931 USD $569,291 USD
179 Sainte Therese De L'Enfant Jesus 106 Students 38.5 287.6 0.134 Remote $161,941 USD 100% $25,025 USD $187,200 USD Provide New School Facilities
180 Mixte Oeuvre Divine 325 Students 268.4 908.2 0.296 Accessible $612,584 USD 100% $260,895 USD $909,792 USD Provide New School Facilities
181 College Saint Francois D'Assise 122 Students 313.6 244.0 1.285 Accessible $0 USD 20% $60,964 USD $60,964 USD
182 Communautaire Amour Celeste Des Bayes 349 Students 345.3 1,047.5 0.330 Accessible $633,268 USD 40% $134,258 USD $767,526 USD
(Ecace
183 Foyer Des Enfants Des Bayes \Efeb\"" 450 Students 541.4 1,181.4 0.458 Accessible $573,078 USD 5% $26,312 USD $599,390 USD
184 Saint Martin De Tour 102 Students 147.0 227.8 0.645 Remote $52,663 USD 100% $95,537 USD $187,200 USD Provide New School Facilities
185 Notre Dame De Lourdes-Goyave 172 Students 203.1 510.5 0.398 Accessible $288,328 USD 100% $197,394 USD $559,872 USD Provide New School Facilities
186 College Mrg Jean Baptist Decost De 191 Students 243.0 580.0 0.419 Accessible $288,198 USD 30% $70,859 USD $359,057 USD
Themonde
Model School Network - Haiti + Page 2 of 6 Pages 2019-06-02
Schools for the Children of the World
MSN FACILITY ASSESSMENT SUMMARY - ENGLISH
SCW School Name Total Enrolment: Total Existing Total m2 Adequacy index Existing School Estimated Cost to Achieve Estimated Condition Estimated Cost to Correct Recommended Project Replace existing facilities with New School Closed or
School Classroom needed for AI=0 (Based on Location: New Design Standard Based on Field Existing Condition Budget: School Facilities?? Duplicate School
Code Space (m2) (Calc based on existing (Accessible vs. m2/student: Evaluation: (100% = Deficiencies: Replace if > 75%
Program m2/required m2 Remote) (AI=1.0) Replace)
m2/student) for AI=0)
187 Ecole Nationale Congreganiste Marie 584 Students 706.0 1,531.3 0.461 Accessible $581,250 USD 30% $205,870 USD $787,119 USD
Auxiliatrice
188 College Mrg Jean Baptist Decost De 116 Students 492.8 328.7 1.499 Accessible $0 USD 35% $167,637 USD $167,637 USD
Themonde
189 Saint Antoine 99 Students 82.6 227.9 0.362 Remote $94,543 USD 100% $53,658 USD $187,200 USD Provide New School Facilities
190 Saint Joseph 265 Students 121.6 796.0 0.153 Accessible $512,641 USD 40% $47,275 USD $559,916 USD
191 Saint Bernard 283 Students 277.8 758.5 0.366 Accessible $425,852 USD 30% $80,994 USD $506,846 USD
192 Ecole Nationale Consreganiste Lucienne 677 Students 637.9 1,802.2 0.354 Accessible $1,073,361 USD 40% $248,016 USD $1,321,377 USD
Estime
193 Saint Louis 326 Students 187.2 906.0 0.207 Accessible $507,190 USD 30% $54,588 USD $561,777 USD
194 College Saint Michel 222 Students 441.0 625.5 0.705 Accessible $154,499 USD 10% $42,865 USD $197,365 USD
195 Cong. Saint Michel 903 Students 874.3 2,467.3 0.354 Accessible $1,164,313 USD 10% $84,982 USD $1,249,295 USD
196 Presbyterale Saint Pierre St. Paul 168 Students 158.1 478.0 0.331 Accessible $291,527 USD 60% $92,230 USD $489,888 USD Provide New School Facilities
197 Bonne Experience 50 Students 140.0 107.9 1.297 Remote $0 USD 100% $91,000 USD $93,600 USD Provide New School Facilities
198 Saint Yves 72 Students 42.8 144.0 0.298 Accessible $98,328 USD 100% $41,640 USD $139,968 USD Provide New School Facilities
199 College Saint Andre(Hinche)-1er 2e et 3e 1138 Students 874.2 3,433.1 0.255 Accessible $2,206,006 USD 30% $254,928 USD $2,460,934 USD
cycle
200 College Saint Andre(Hinche)-1er 2e et 3e 0 Students 0.0 0.0 100% See School 199
cycle
201 College Mgr Leonard Petion Laroche De 191 Students 381.2 550.0 0.693 Accessible $739 USD 60% $222,339 USD $223,078 USD
Maïssade
202 Bon Pasteur-Lahoue 100 Students 132.5 231.7 0.572 Remote $64,657 USD 100% $86,143 USD $187,200 USD Provide New School Facilities
203 Christ-Roi 74 Students 151.3 175.3 0.863 Accessible $24,028 USD 40% $58,818 USD $82,846 USD
204 Saint Francois D'Assise-Trianon 350 Students 250.7 973.7 0.257 Accessible $513,488 USD 20% $48,740 USD $562,228 USD
205 Presbyterale De Chitry 0 Students 0.0 0.0 School Closed
206 Presbyterale Sainte Famille 271 Students 0.0 722.7 0.000 Accessible $702,432 USD 100% $0 USD $769,824 USD Provide New School Facilities
207 College Jacques Roumain de Thommonde 122 Students 80.0 244.0 0.328 Accessible $159,408 USD 100% $77,760 USD $279,936 USD Provide New School Facilities
208 Presbyterale Christ Roi-Vieux cayes 47 Students 120.6 100.2 1.204 Remote $0 USD 100% $78,390 USD $93,600 USD Provide New School Facilities
209 St-Michel Archange-1er et 2e cycle 623 Students 703.4 1,635.8 0.430 Remote $474,216 USD 35% $160,016 USD $634,231 USD
210 St-Michel Archange-3e cycle et secondaire 0 Students 0.0 0.0 See School 209
211 St-Michel De Lagua-Lagua 129 Students 0.0 366.1 0.000 Remote $237,939 USD 100% $0 USD $280,800 USD Provide New School Facilities
212 College Propulseur D Experience Et De 305 Students 0.0 874.7 0.000 Accessible $850,208 USD 100% $0 USD $909,792 USD Provide New School Facilities
Savoir
213 Le Jardin Fleuri 80 Students 107.2 177.6 0.604 Accessible $68,828 USD 100% $104,188 USD $209,952 USD Provide New School Facilities
214 St Antoine De Padoue 317 Students 405.5 845.3 0.480 Accessible $222,114 USD 30% $118,240 USD $340,355 USD
215 Presbyteral Notre Dame d'Altagrace/Bon 253 Students 84.3 680.9 0.124 Remote $387,760 USD 100% $54,795 USD $468,000 USD Provide New School Facilities
Berger
216 Notre Dame Du P.Secours 0 Students 0.0 0.0 See School 323
217 Notre Dame Du Mont-Carmel-Marouge 0 Students 0.0 0.0 School Closed
218 St Jude De Ti Bidon 52 Students 54.0 128.6 0.420 Remote $48,750 USD 100% $35,100 USD $93,600 USD Provide New School Facilities
219 St Thomas D Aquin Lascahobas 355 Students 0.0 946.0 0.000 Accessible $755,073 USD 100% $0 USD $979,776 USD Provide New School Facilities
220 College St Gabriel Lascahobas 205 Students 180.6 820.0 0.220 Accessible $621,520 USD 100% $175,520 USD $839,808 USD Provide New School Facilities
221 College St Michel 762 Students 301.7 1,985.2 0.152 Accessible $1,560,718 USD 100% $293,282 USD $1,959,552 USD Provide New School Facilities
222 Congreganiste St Gabriel Lascahobas 893 Students 810.0 2,317.0 0.350 Accessible $1,333,733 USD 20% $157,464 USD $1,491,197 USD
223 Ecole Mixte Comm. St Michel 350 Students 410.3 933.3 0.440 Accessible $490,512 USD 40% $159,509 USD $650,021 USD
224 Ecomem(Michel Eyquem De Montaigne) 186 Students 147.0 467.0 0.315 Accessible $231,303 USD 45% $64,298 USD $295,601 USD
225 Jacques Bloc De Lascahobas 321 Students 428.4 861.8 0.497 Accessible $207,619 USD 40% $166,562 USD $374,181 USD
226 St Jean Baptiste-1er 2e et 3e cycle 537 Students 614.3 1,371.3 0.448 Accessible $622,048 USD 40% $238,840 USD $860,887 USD
227 St Jean Baptiste-secondaire 0 Students 0.0 0.0 See School 226
228 St Marc de Cannot 140 Students 174.6 322.2 0.542 Remote $96,430 USD 100% $113,520 USD $234,000 USD Provide New School Facilities
Model School Network - Haiti + Page 3 of 6 Pages 2019-06-02
Schools for the Children of the World
MSN FACILITY ASSESSMENT SUMMARY - ENGLISH
SCW School Name Total Enrolment: Total Existing Total m2 Adequacy index Existing School Estimated Cost to Achieve Estimated Condition Estimated Cost to Correct Recommended Project Replace existing facilities with New School Closed or
School Classroom needed for AI=0 (Based on Location: New Design Standard Based on Field Existing Condition Budget: School Facilities?? Duplicate School
Code Space (m2) (Calc based on existing (Accessible vs. m2/student: Evaluation: (100% = Deficiencies: Replace if > 75%
Program m2/required m2 Remote) (AI=1.0) Replace)
m2/student) for AI=0)
229 Presbyterale De Dos Parc 183 Students 219.4 520.6 0.421 Remote $170,649 USD 40% $57,049 USD $227,698 USD
230 Presbyteral De Louime 97 Students 0.0 208.1 0.000 Remote $135,850 USD 100% $0 USD $140,400 USD Provide New School Facilities
231 Presbyteral Pere Thomas J-Quinlan 449 Students 370.2 1,209.1 0.306 Accessible $754,538 USD 20% $71,967 USD $826,505 USD
232 Presbyteral De Mont-Leon 127 Students 123.0 276.9 0.444 Remote $100,100 USD 50% $39,975 USD $140,075 USD
233 Presbyteral De Totoye 170 Students 318.9 483.4 0.660 Accessible $104,347 USD 20% $61,998 USD $166,345 USD
234 Presb. St Pierre 213 Students 130.6 599.0 0.218 Accessible $455,363 USD 100% $126,904 USD $629,856 USD Provide New School Facilities
235 Presb. Los Abeilles 106 Students 60.7 228.7 0.265 Remote $109,382 USD 100% $39,468 USD $187,200 USD Provide New School Facilities
236 Sainte Famille De Maissade 410 Students 367.2 1,138.6 0.323 Remote $360,620 USD 50% $119,340 USD $479,960 USD
237 Ecole Presbyterale Jean Paul 2 195 Students 105.0 560.8 0.187 Remote $296,270 USD 100% $68,250 USD $374,400 USD Provide New School Facilities
238 Institution Mixte Jn-Jacques Rousseau 651 Students 214.5 1,836.4 0.117 Remote $1,003,282 USD 20% $27,888 USD $1,216,800 USD Provide New School Facilities
239 Congreganiste St Thomas D'Aquin-1er et 947 Students 1,138.3 2,605.9 0.437 Accessible $1,106,775 USD 40% $442,575 USD $1,549,350 USD
2e cycle
240 Congreganiste St Thomas D'Aquin-3e cycle 0 Students 264.0 0.0 See School 239
et secondaire
241 Nouvelle Generation Des Freres Unis 300 Students 156.2 810.5 0.193 Remote $415,684 USD 100% $101,543 USD $561,600 USD Provide New School Facilities
242 St Jacques de Sarazin 206 Students 87.4 611.7 0.143 Accessible $509,684 USD 100% $84,914 USD $629,856 USD Provide New School Facilities
243 College Emile Durkheim 154 Students 219.1 308.0 0.711 Accessible $86,391 USD 40% $85,194 USD $171,585 USD
244 College Mgr Remy Augustin 213 Students 293.7 589.5 0.498 Accessible $128,596 USD 20% $57,095 USD $185,691 USD
245 Nd De La Delivrans 195 Students 339.2 580.6 0.584 Accessible $129,028 USD 20% $65,933 USD $194,961 USD
246 Sainte Cecile 57 Students 69.9 153.6 0.455 Accessible $81,726 USD 100% $67,962 USD $209,952 USD Provide New School Facilities
247 Presb. De Botoncy 0 Students 0.0 0.0 See School 251
248 Academie D'Espoir 316 Students 346.8 933.0 0.372 Accessible $493,784 USD 5% $16,854 USD $510,637 USD
249 Notre DameD'Altagrace 111 Students 165.9 237.0 0.700 Accessible $69,082 USD 100% $161,282 USD $279,936 USD Provide New School Facilities
250 Jardin Fleuri De Graadel 397 Students 161.5 1,037.5 0.156 Accessible $823,801 USD 20% $31,395 USD $1,049,760 USD Provide New School Facilities
251 Ste Therese De L'Enfant Jesus 105 Students 0.0 249.6 0.000 Accessible $243,000 USD 100% $0 USD $279,936 USD Provide New School Facilities
252 Notre Dame De Lourdes-Bonabite, , 1ere 92 Students 250.7 194.6 1.289 Remote $0 USD 30% $48,887 USD $48,887 USD
sect juanaria,Hinche
253 Divine Misericorde 151 Students 175.2 429.1 0.408 Accessible $246,830 USD 100% $170,294 USD $419,904 USD Provide New School Facilities
254 Presb. Nat. St Vincent De Paul 0 Students 0.0 0.0 See School 110
301 Annonciation 256 Students 280.8 690.6 0.407 Accessible $288,062 USD 30% $81,881 USD $369,943 USD
302 Ascension de Blanchard 145 Students 259.1 325.2 0.797 Remote $43,467 USD 60% $101,060 USD $144,527 USD
303 Bénoit Batraville 118 Students 85.8 257.1 0.334 Accessible $167,388 USD 100% $83,388 USD $279,936 USD Provide New School Facilities
304 Bon Berger 371 Students 367.2 1,020.3 0.360 Remote $397,445 USD 50% $119,340 USD $516,785 USD
305 Ecole Nationale de Baille Tourible 508 Students 142.9 1,318.0 0.108 Accessible $1,112,882 USD 60% $83,363 USD $1,329,696 USD Provide New School Facilities
306 Bon Berger de Domond 170 Students 390.6 488.8 0.799 Accessible $0 USD 15% $56,949 USD $56,949 USD
307 Bon Berger de Pépin 185 Students 97.4 518.0 0.188 Remote $267,183 USD 100% $63,278 USD $374,400 USD Provide New School Facilities
308 Bon Samaritain-Loncy 317 Students 386.1 788.1 0.490 Accessible $367,251 USD 40% $150,129 USD $517,380 USD
309 Bon Samaritain-Guindette-Sarazin 280 Students 378.0 754.6 0.501 Accessible $208,980 USD 25% $91,854 USD $300,834 USD
310 Bon Samaritain-Savanne Longue 362 Students 323.7 932.1 0.347 Accessible $540,863 USD 20% $62,933 USD $603,796 USD
311 Centre du Savoir de Dalles 170 Students 136.5 483.1 0.283 Remote $209,018 USD 100% $88,725 USD $327,600 USD Provide New School Facilities
312 Christ-Roi 467 Students 200.4 1,226.6 0.163 Remote $667,052 USD 20% $26,052 USD $842,400 USD Provide New School Facilities
313 Ecole Nationale de Marerouge (Basarazin) 210 Students 515.3 590.0 0.873 Accessible $64,405 USD 15% $75,128 USD $139,533 USD
314 de Roche Lapierre 217 Students 378.0 644.7 0.586 Accessible $245,605 USD 35% $128,596 USD $374,201 USD
315 Eben-Ezer 266 Students 174.9 713.6 0.245 Accessible $523,607 USD 100% $170,013 USD $699,840 USD Provide New School Facilities
316 Foyer des enfants 0 Students 0.0 0.0 See School 183
317 Foyer Divin-Lacheteau 317 Students 355.6 848.4 0.419 Accessible $462,698 USD 30% $103,681 USD $566,379 USD
318 Foyer Divin-Platanale 247 Students 112.0 694.8 0.161 Remote $378,820 USD 100% $72,800 USD $468,000 USD Provide New School Facilities
319 Jean Paul II 0 Students 0.0 0.0 See School 237
320 La Ruche 339 Students 114.0 942.5 0.121 Accessible $805,343 USD 100% $110,799 USD $979,776 USD Provide New School Facilities
321 Mixte de Cholette 432 Students 343.0 1,193.3 0.287 Remote $536,432 USD 10% $22,295 USD $558,727 USD
322 Mixte La Perfection 173 Students 106.8 497.5 0.215 Accessible $379,702 USD 100% $103,834 USD $489,888 USD Provide New School Facilities
Model School Network - Haiti + Page 4 of 6 Pages 2019-06-02
Schools for the Children of the World
MSN FACILITY ASSESSMENT SUMMARY - ENGLISH
SCW School Name Total Enrolment: Total Existing Total m2 Adequacy index Existing School Estimated Cost to Achieve Estimated Condition Estimated Cost to Correct Recommended Project Replace existing facilities with New School Closed or
School Classroom needed for AI=0 (Based on Location: New Design Standard Based on Field Existing Condition Budget: School Facilities?? Duplicate School
Code Space (m2) (Calc based on existing (Accessible vs. m2/student: Evaluation: (100% = Deficiencies: Replace if > 75%
Program m2/required m2 Remote) (AI=1.0) Replace)
m2/student) for AI=0)
323 Perpétuel Secours 231 Students 344.7 648.2 0.532 Accessible $295,087 USD 10% $33,500 USD $328,587 USD
324 Rocher d'Horebe 194 Students 0.0 558.0 0.000 Remote $362,671 USD 100% $0 USD $374,400 USD Provide New School Facilities
325 Saint Francois d'Assise 154 Students 367.2 437.6 0.839 Accessible $55,048 USD 10% $35,692 USD $90,739 USD
326 Nouvelle Generation de Moge 288 Students 111.2 759.4 0.146 Accessible $621,924 USD 100% $108,086 USD $769,824 USD Provide New School Facilities
327 Saint Jean 309 Students 213.6 854.4 0.250 Remote $400,697 USD 40% $55,539 USD $561,600 USD Provide New School Facilities
328 Saint Jean Baptiste 347 Students 310.7 940.1 0.330 Remote $391,541 USD 10% $20,192 USD $411,733 USD
329 Mixte Espoir 187 Students 376.4 537.8 0.700 Accessible $127,726 USD 40% $146,325 USD $274,051 USD
330 Saint Marc de Bentho 274 Students 96.0 807.2 0.119 Remote $457,480 USD 100% $62,400 USD $561,600 USD Provide New School Facilities
331 Saint Mathias 199 Students 93.0 591.1 0.157 Remote $309,026 USD 100% $60,450 USD $421,200 USD Provide New School Facilities
332 Ecole Communoutaire La Sagesse De 254 Students 131.9 751.1 0.176 Remote $378,576 USD 100% $85,735 USD $514,800 USD Provide New School Facilities
Delagon
333 Saint Michel 249 Students 399.0 700.9 0.569 Remote $92,950 USD 10% $25,935 USD $118,885 USD
334 Saint Paul 518 Students 427.8 1,344.6 0.318 Accessible $707,665 USD 30% $124,746 USD $832,411 USD
335 Saint Thomas 287 Students 121.4 831.4 0.146 Remote $455,688 USD 100% $78,898 USD $561,600 USD Provide New School Facilities
336 Sainte Croix 249 Students 330.0 735.0 0.449 Remote $259,802 USD 35% $75,075 USD $334,877 USD
337 Saints-Ynnocents 219 Students 120.6 617.5 0.195 Remote $292,598 USD 100% $78,410 USD $421,200 USD Provide New School Facilities
338 St Marc 319 Students 249.6 865.6 0.288 Accessible $563,235 USD 40% $97,029 USD $660,264 USD
339 St Philippe & St Jacques 255 Students 119.3 746.1 0.160 Remote $407,426 USD 100% $77,552 USD $514,800 USD Provide New School Facilities
340 Saint Luc 131 Students 313.3 288.4 1.086 Remote $0 USD 85% $173,093 USD $173,093 USD
401 Jacques 1Er De Sarrazins 671 Students 555.6 1,738.5 0.320 Accessible $802,316 USD 40% $216,006 USD $1,018,322 USD
402 College Mixte Coutilien Coutard (CMCC) 431 Students 255.6 1,189.3 0.215 Accessible $885,016 USD 100% $248,443 USD $1,189,728 USD Provide New School Facilities
403 De Bozio 120 Students 30.8 302.0 0.102 Remote $176,274 USD 100% $20,027 USD $234,000 USD Provide New School Facilities
404 Ecole Congregaiuste Nationale Notre 0 Students 0.0 0.0 See School 157
Dame Du Mont Carmel-Saut d'Eau
405 De Domond Péligre 476 Students 393.9 1,241.1 0.317 Accessible $773,569 USD 50% $191,445 USD $1,259,712 USD Provide New School Facilities
406 0 Students 0.0 0.0 See School 192
407 0 Students 0.0 0.0 See School 193
408 Efa De Mirebalais 492 Students 596.4 1,293.2 0.461 Accessible $410,806 USD 40% $231,865 USD $642,671 USD
409 De Grand Boucan 374 Students 299.7 906.6 0.331 Accessible $443,543 USD 60% $174,773 USD $618,316 USD
410 College Eben-Ezer De L’Eglise De Dieu De 324 Students 251.8 813.6 0.309 Accessible $527,751 USD 60% $146,845 USD $839,808 USD Provide New School Facilities
Mirebalais
411 College Vision Global 794 Students 719.2 2,101.7 0.342 Accessible $1,343,752 USD 60% $419,453 USD $2,099,520 USD Provide New School Facilities
412 College Mixte John Dewey De Pinchinat 232 Students 329.2 615.8 0.535 Accessible $191,270 USD 10% $31,998 USD $223,268 USD
413 De Marché Canard 288 Students 468.6 738.8 0.634 Accessible $201,923 USD 30% $136,638 USD $338,561 USD
414 De Haut Saut D’Eau 293 Students 214.8 737.4 0.291 Accessible $499,778 USD 70% $146,150 USD $769,824 USD Provide New School Facilities
415 College Adventiste Mixte Bethleem De 638 Students 433.3 1,892.1 0.229 Accessible $1,376,355 USD 40% $168,448 USD $1,889,568 USD Provide New School Facilities
Mirebalais
416 0 Students 0.0 0.0 See School 129
417 De Pernier 344 Students 162.1 897.3 0.181 Accessible $704,525 USD 90% $141,774 USD $909,792 USD Provide New School Facilities
418 Mixte Oeuvre Divine De Dufailly 0 Students 0.0 0.0 See School 180
419 Dufailly 262 Students 302.6 632.3 0.479 Accessible $313,464 USD 25% $73,527 USD $386,990 USD
420 Boucan Carré 493 Students 455.0 1,280.7 0.355 Accessible $716,040 USD 40% $176,904 USD $892,944 USD
421 Des Garçons 616 Students 301.0 1,579.7 0.191 Accessible $1,229,557 USD 40% $117,016 USD $1,539,648 USD Provide New School Facilities
Model School Network - Haiti + Page 5 of 6 Pages 2019-06-02
Schools for the Children of the World
MSN FACILITY ASSESSMENT SUMMARY - ENGLISH
SCW School Name Total Enrolment: Total Existing Total m2 Adequacy index Existing School Estimated Cost to Achieve Estimated Condition Estimated Cost to Correct Recommended Project Replace existing facilities with New School Closed or
School Classroom needed for AI=0 (Based on Location: New Design Standard Based on Field Existing Condition Budget: School Facilities?? Duplicate School
Code Space (m2) (Calc based on existing (Accessible vs. m2/student: Evaluation: (100% = Deficiencies: Replace if > 75%
Program m2/required m2 Remote) (AI=1.0) Replace)
m2/student) for AI=0)
TOTAL: 57,927 Students 59,645.1 157,406.5 $78,814,879.68 USD $20,999,144.35 USD $106,762,086.12 USD
Average % of total budget attributable Average Condition % of total budget Average Budget per School: Recommended # of Schools to Replace on Number of Schools
Adequacy Index: to Adequacy (AI): of Schools: attributable to Condition: New or Existing Site: Closed:
0.468 73.8% 55.7% 26.2% $561,906 USD 85 10
44.7%
Total Area of Recommended New School Number of Duplicate
Facilities (m2) Schools:
Applied Design Standards 61,274 15
New Design Standard Area per Student: (m2/Student) 2 Total Cost of Recommended New School
Facilities (USD)
$54,846,720 USD
New Design Standard Area per Classroom: (m2/Classroom) 72 Area of School Facilities that need to be
replaced (m2)
13,767
% of Existing School Facility Area that
needs to be replaced:
23.1%
Model School Network - Haiti + Page 6 of 6 Pages 2019-06-02
Schools for the Children of the World
Appendix 2
Écoles Triées par Remplacement Critique
(Schools Sorted by Critical Replace)
Code Nom de l’école Inscription à Système Scolaire Action Recommandée par Fournir de Nouvelles Installations Scolaires Budget du Projet À Distance ou
de l’école l’Évaluateur Recommandé: Accessible?
l’école
SCW
SCW School Name School School System Assessor's Recommended Action Provide New School Facilities Recommended Remote or GPS-N GPS-W
School Enrollment Project Budget: Accessible?
Code
1 337 Saints-Ynnocents 219 Etudiants Summits Critical Replace Fournir de nouvelles installations scolaires $421,200 USD Distance N 18.92841574 W 071.95220545
2 104 Presbyterale de Reltalus 178 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $374,400 USD Distance N 19.041197 W 072.119028
3 146 Ntre Dame Des Douleurs De Soyil 20 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $46,800 USD Distance N 18.84172 W 071.74162
4 208 Presbyterale Christ Roi-Vieux cayes 47 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $93,600 USD Distance N 18.93034 W 071.97330
5 218 St Jude De Ti Bidon 52 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $93,600 USD Distance N 18.826878 W 071.989865
6 228 St Marc de Cannot 140 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $234,000 USD Distance N 18.870878 W 071.886831
7 234 Presb. St Pierre 213 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $629,856 USD Accessible N 18.89223 W 071.837166
8 235 Presb. Los Abeilles 106 Etudiants Catholic Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 18.90553 W 72.06617
9 237 Ecole Presbyterale Jean Paul 2 195 Etudiants Catholic, Summits Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $374,400 USD Distance N 18.826873 W 071.989713
10 330 Saint Marc de Bentho 274 Etudiants Summits Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $561,600 USD Distance N 18.96340 W 072.07515
11 335 Saint Thomas 287 Etudiants Summits Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $561,600 USD Distance N 18.89107 W 071.97904
12 339 St Philippe & St Jacques 255 Etudiants Summits Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $514,800 USD Distance N 18.89697 W 071.95743
13 403 De Bozio 120 Etudiants EFACAP Critical Replace on CURRENT Site Fournir de nouvelles installations scolaires $234,000 USD Distance N 18.77188 W 072.03287
14 103 Saint Sauveur 131 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $234,000 USD Distance N 19.02666 W 072.07858
15 110 Ecole Nationale Chapeile St Vincent De Paul 398 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $1,119,744 USD Accessible N 19.152784 W 072.010071
16 116 Notre Dame d'Altagrace 139 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $349,920 USD Accessible N 19.242885 W 071.728347
17 119 Presbyterale Notre Dame Des Douleures 325 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $655,200 USD Distance N 19.137127 W 071.807106
18 154 Notre Dame Des Douleurs 194 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $559,872 USD Accessible N 18.83034 W 071.88352
19 173 Fondation L'Enfant De Jesus Crist 97 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $209,952 USD Accessible N 19.14150 W 072.01541
20 198 Saint Yves 72 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $139,968 USD Accessible N 18.973741 W 071.991908
21 207 College Jacques Roumain de Thommonde 122 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $279,936 USD Accessible N 19.01904 W 071.96886
22 211 St-Michel De Lagua-Lagua 129 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $280,800 USD Distance N 19.201271 W 071.653061
23 215 Presbyteral Notre Dame d'Altagrace/Bon Berger 253 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $468,000 USD Distance N 18.80184 W 071.93883
24 219 St Thomas D Aquin Lascahobas 355 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $979,776 USD Accessible N 18.827731 W 071.93787
25 221 College St Michel 762 Etudiants Catholic, EFACAP Critical Replace on NEW Site Fournir de nouvelles installations scolaires $1,959,552 USD Accessible N 18.831388 W 071.936944
26 241 Nouvelle Generation Des Freres Unis 300 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $561,600 USD Distance N 19.10226 W o72.08206
27 246 Sainte Cecile 57 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $209,952 USD Accessible N 18.88239 W 072.206222
28 251 Ste Therese De L'Enfant Jesus 105 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $279,936 USD Accessible N 18.83216 W 071.80502
29 253 Divine Misericorde 151 Etudiants Catholic Critical Replace on NEW Site Fournir de nouvelles installations scolaires $419,904 USD Accessible N 19.10228 W 072.08207
30 303 Bénoit Batraville 118 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $279,936 USD Accessible N 18.85859134 W 071.96303227
31 307 Bon Berger de Pépin 185 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $374,400 USD Distance N 18.9245185 W 072.16250254
32 311 Centre du Savoir de Dalles 170 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $327,600 USD Distance N 18.954667 W 071.958667
33 318 Foyer Divin-Platanale 247 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $468,000 USD Distance N 18.82761 W 071.87463
34 322 Mixte La Perfection 173 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $489,888 USD Accessible N 19.08014876 W 072.66146014
35 324 Rocher d'Horebe 194 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $374,400 USD Distance N 18.87767 W 072.03884
36 326 Nouvelle Generation de Moge 288 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $769,824 USD Accessible N 18.97728 W 071.98207
37 331 Saint Mathias 199 Etudiants Summits Critical Replace on NEW Site Fournir de nouvelles installations scolaires $421,200 USD Distance N 18.93252 W 072.08839
Appendix 3
Écoles Triées par Remplacement
(Schools Sorted by Replace)
Code Nom de l’école Inscription à Système Scolaire Action Recommandée par Fournir de Nouvelles Installations Scolaires Budget du Projet À Distance ou
de l’école l’Évaluateur Recommandé: Accessible?
l’école
SCW
SCW School Name School School System Assessor's Recommended Action Provide New School Facilities Recommended Remote or GPS-N GPS-W
School Enrollment Project Budget: Accessible?
Code
1 117 Presbytérale Notre Dame Guadaloupe 608 Etudiants Catholic General Maintenance Fournir de nouvelles installations scolaires $1,123,200 USD Distance N 19.13500 W 071.83783
2 106 Presbyterale St Jean Apotre 606 Etudiants Catholic Major Renovation Fournir de nouvelles installations scolaires $1,609,632 USD Accessible N 19.055919 W 071.751118
3 147 Com. La Renaissance 459 Etudiants Catholic Major Renovation Fournir de nouvelles installations scolaires $1,189,728 USD Accessible N 18.860033 W 071.774573
4 185 Notre Dame De Lourdes-Goyave 172 Etudiants Catholic Major Renovation Fournir de nouvelles installations scolaires $559,872 USD Accessible N 19.007343 W 071.994239
5 196 Presbyterale Saint Pierre St. Paul 168 Etudiants Catholic Major Renovation Fournir de nouvelles installations scolaires $489,888 USD Accessible N 19.06387 W 071.986325
6 305 Ecole Nationale de Baille Tourible 508 Etudiants Summits Major Renovation Fournir de nouvelles installations scolaires $1,329,696 USD Accessible N 19.0171148 W 071.9623626
7 417 De Pernier 344 Etudiants EFACAP Major renovation Fournir de nouvelles installations scolaires $909,792 USD Accessible N 18.77403 W 072.18102
8 402 College Mixte Coutilien Coutard (CMCC) 431 Etudiants EFACAP Major Renovation or Replace on Fournir de nouvelles installations scolaires $1,189,728 USD Accessible N 18.77186 W 072.03300
NEW Site
9 115 St François D'Assise 264 Etudiants Catholic Minor Renovation Fournir de nouvelles installations scolaires $769,824 USD Accessible N 19.233448 W 071.684696
10 145 Presbyterale Coeur De Jesus 716 Etudiants Catholic Minor Renovation Fournir de nouvelles installations scolaires $1,310,400 USD Distance N 19.18566 W 071.88900
11 327 Saint Jean 309 Etudiants Summits Minor Renovation Fournir de nouvelles installations scolaires $561,600 USD Distance N 18.86410 W 072.03604
12 405 De Domond Péligre 476 Etudiants EFACAP Minor Renovation Fournir de nouvelles installations scolaires $1,259,712 USD Accessible N 18.9075 W 072.06917
13 415 College Adventiste Mixte Bethleem De Mirebalais 638 Etudiants EFACAP Minor Renovation Fournir de nouvelles installations scolaires $1,889,568 USD Accessible N 18.83083 W 072.10389
14 421 Des Garçons 616 Etudiants EFACAP Minor renovation Fournir de nouvelles installations scolaires $1,539,648 USD Accessible N 18.81578 W 072.20191
15 312 Christ-Roi 467 Etudiants Summits Minor Renovation/ Moderate Fournir de nouvelles installations scolaires $842,400 USD Distance N 18.98503 W 072.08027
Renovation
16 125 College Les Humanistes Jean Paul Sartre 409 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $1,259,712 USD Accessible N 19.140704 W 071.999705
17 128 Presbytérale Immaculé Conception De Hinche 503 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $1,329,696 USD Accessible N 19.139934 W 072.009168
18 132 Présbytérale St-Jean Baptiste De Abricot 222 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $468,000 USD Distance N 19.062199 W 072.083258
19 164 Presbyterle Pape Jean Xxlll 502 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $1,329,696 USD Accessible N 19.117076 W 071.97774
20 171 École St Paul De Carissade 385 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $1,049,760 USD Accessible N 19.133213 W 072.087239
21 238 Institution Mixte Jn-Jacques Rousseau 651 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $1,216,800 USD Distance N 19.079925 W 071.838272
22 250 Jardin Fleuri De Graadel 397 Etudiants Catholic Moderate Renovation Fournir de nouvelles installations scolaires $1,049,760 USD Accessible N 19.12458 W 071.68024
23 410 College Eben-Ezer De L’Eglise De Dieu De Mirebalais 324 Etudiants EFACAP Moderate Renovation Fournir de nouvelles installations scolaires $839,808 USD Accessible N 18.83417 W 072.10306
24 411 College Vision Global 794 Etudiants EFACAP Moderate Renovation Fournir de nouvelles installations scolaires $2,099,520 USD Accessible N 18.85201 W 072.0759
25 112 École Presbytérale St Jn Baptiste De Beganabé 64 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $209,952 USD Accessible N 19.192294 W 072.022619
26 120 Presbyterale St Joseph de Guebot 320 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $608,400 USD Distance N 19.158867 W 071.867112
27 160 Notre Dame D'Altagrace 66 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $140,400 USD Distance N 18.85808 W 072.36153
28 161 Saint Michel 96 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 18.852939 W 072.320178
29 175 Presbyterale Notre Dame De La Guadeloupe 128 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 19.260407 W 072.094982
30 179 Sainte Therese De L'Enfant Jesus 106 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 18.87162 W 072.12142
31 189 Saint Antoine 99 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 18.749971 W 072.061741
32 202 Bon Pasteur-Lahoue 100 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 18.73762 W 072.091452
33 230 Presbyteral De Louime 97 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $140,400 USD Distance N 18.778313 W 071.759905
34 242 St Jacques de Sarazin 206 Etudiants Catholic Replace on CURRENT Site Fournir de nouvelles installations scolaires $629,856 USD Accessible N 18.79826 W 072.00015
35 332 Ecole Communoutaire La Sagesse De Delagon 254 Etudiants Summits Replace on CURRENT Site Fournir de nouvelles installations scolaires $514,800 USD Distance N 18.83741 W 072.12932
36 414 De Haut Saut D’Eau 293 Etudiants EFACAP Replace on CURRENT Site Fournir de nouvelles installations scolaires $769,824 USD Accessible N. 18.82333 W 072.217700
37 158 Saint Jude 170 Etudiants Catholic, EFACAP Replace on NEW Site Fournir de nouvelles installations scolaires $489,888 USD Accessible N 18.815781 W 072.196293
38 180 Mixte Oeuvre Divine 325 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $909,792 USD Accessible N 18.912515 W 072.086442
39 184 Saint Martin De Tour 102 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $187,200 USD Distance N 18.972539 W 072.088637
40 197 Bonne Experience 50 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $93,600 USD Distance N 18.99408 W 072.03219
41 206 Presbyterale Sainte Famille 271 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $769,824 USD Accessible N 19.267311 W 071.939766
42 212 College Propulseur D Experience Et De Savoir 305 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $909,792 USD Accessible N 18.852915 W 071.815212
43 213 Le Jardin Fleuri 80 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $209,952 USD Accessible N 18.855644 W 071.819548
44 220 College St Gabriel Lascahobas 205 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $839,808 USD Accessible N 18.829722 W 071.939722
45 249 Notre DameD'Altagrace 111 Etudiants Catholic Replace on NEW Site Fournir de nouvelles installations scolaires $279,936 USD Accessible N 19.12679 W 071.68337
46 315 Eben-Ezer 266 Etudiants Summits Replace on NEW Site Fournir de nouvelles installations scolaires $699,840 USD Accessible N 18.83369 W 072.1116389
47 320 La Ruche 339 Etudiants Summits Replace on NEW site Fournir de nouvelles installations scolaires $979,776 USD Accessible N 18.8800312 W 072.01462758
48 138 Saint Charlemagne 283 Etudiants Catholic Replace on NEW Site/Minor Fournir de nouvelles installations scolaires $769,824 USD Accessible N 18.744294 W 071.82017
Renovation
RAPPORT DE CLASSEMENT DU PROJET DE L’INSTALLATION SCOLAIRE MSN Appendix 4
Modèle School Network - Outil de Classement de Projet
Écoles Classées par Section Communale - Inscription à l’École Inscription aux Niveaux de Grade Servis
(Schools Sorted by Communal Section - School Enrollment) (Enrollment at Grade Levels Served)
Code de Nom de l’école Inscription à Système Plateau Section Communale Indice Coût estimatif pour Estimée en Estimatif pour Budget du Projet Remplacer les Installations À Distance ou École Fermée ou en Maternelle Basique 1 & 2 Fondamentale Secondaire Professionnelle Adéquation +
l’école l’école Scolaire d’adéquation atteindre la nouvelle fonction de corriger les Recommandé: Existantes par les Nouvelles Accessible? Double école Condition
SCW (basé sur m2 norme de conception l’évaluation sur carences en Installations Scolaires?? (2.00-0.00)
existant/m2 m2/étudiant: le terrain: conditions
requis pour AI = (AI = 1,0) (100% = existantes:
0) remplacer)
10,147 36,428 8,115 3,168 69
SCW School Name School Enrollment School Plateau Communal Section Adequacy index Estimated Cost to Estimated Estimated Cost to Recommended Project Replace existing facilities Remote or School Closed or PreK - K Grades 1-6 Grades 7-9 Grades Vocational Ed Adequacy +
School System (Based on Achieve New Design Condition Based Correct Existing Budget: with New School Facilities?? Accessible? Duplicate School 10-13 Condition
Code existing Standard m2/student: on Field Condition (2.00-0.00)
2 2 (AI=1.0) Evaluation: Deficiencies:
m /required m
for AI=0) (100% = Replace)
123 Bon Pasteur-Tierra Muscady 238 Etudiants Catholic Haut Tierra Mouscady 0.325 $404,498 USD 20% $43,740 USD $448,238 USD Accessible 70 148 20 0 0 0.875
311 Centre du Savoir de Dalles 170 Etudiants Summits Haut Tierra Mouscady 0.283 $209,018 USD 100% $88,725 USD $327,600 USD Fournir de nouvelles Distance 30 140 0 0 0 1.717
installations scolaires
411 College Vision Global 794 Etudiants EFACAP Bas Sarazin 0.342 $1,343,752 USD 60% $419,453 USD $2,099,520 USD Fournir de nouvelles Accessible 117 430 206 32 9 1.258
installations scolaires
401 Jacques 1Er De Sarrazins 671 Etudiants EFACAP Bas Sarazin 0.320 $802,316 USD 40% $216,006 USD $1,018,322 USD Accessible 44 386 241 0 0 1.080
191 Saint Bernard 283 Etudiants Catholic Bas Sarazin 0.366 $425,852 USD 30% $80,994 USD $506,846 USD Accessible 18 265 0 0 0 0.934
309 Bon Samaritain-Guindette-Sarazin 280 Etudiants Summits Bas Sarazin 0.501 $208,980 USD 25% $91,854 USD $300,834 USD Accessible 37 243 0 0 0 0.749
412 College Mixte John Dewey De 232 Etudiants EFACAP Bas Sarazin 0.535 $191,270 USD 10% $31,998 USD $223,268 USD Accessible 39 141 52 0 0 0.565
Pinchinat
323 Perpétuel Secours 231 Etudiants Summits Bas Sarazin 0.532 $295,087 USD 10% $33,500 USD $328,587 USD Accessible 18 213 0 0 0 0.568
313 Ecole Nationale de Marerouge 210 Etudiants Summits Bas Sarazin 0.873 $64,405 USD 15% $75,128 USD $139,533 USD Accessible 25 185 0 0 0 0.277
(Basarazin)
242 St Jacques de Sarazin 206 Etudiants Catholic Bas Sarazin 0.143 $509,684 USD 100% $84,914 USD $629,856 USD Fournir de nouvelles Accessible 69 137 0 0 0 1.857
installations scolaires
325 Saint Francois d'Assise 154 Etudiants Summits Bas Sarazin 0.839 $55,048 USD 10% $35,692 USD $90,739 USD Accessible 27 127 0 0 0 0.261
234 Presb. St Pierre 213 Etudiants Catholic Bas Roy-Sec 0.218 $455,363 USD 100% $126,904 USD $629,856 USD Fournir de nouvelles Accessible 33 180 0 0 0 1.782
installations scolaires
228 St Marc de Cannot 140 Etudiants Catholic Bas Roy-Sec 0.542 $96,430 USD 100% $113,520 USD $234,000 USD Fournir de nouvelles Distance 48 92 0 0 0 1.458
installations scolaires
157 Ecole Congregaiuste Nationale Notre 630 Etudiants Catholic, Bas Riviere Canot 0.337 $1,018,978 USD 35% $193,940 USD $1,212,918 USD Accessible 104 352 174 0 0 1.013
Dame Du Mont Carmel-Saut d'Eau EFACAP
421 Des Garçons 616 Etudiants EFACAP Bas Riviere Canot 0.191 $1,229,557 USD 40% $117,016 USD $1,539,648 USD Fournir de nouvelles Accessible 0 364 252 0 0 1.209
installations scolaires
417 De Pernier 344 Etudiants EFACAP Bas Riviere Canot 0.181 $704,525 USD 90% $141,774 USD $909,792 USD Fournir de nouvelles Accessible 0 314 30 0 0 1.719
installations scolaires
414 De Haut Saut D’Eau 293 Etudiants EFACAP Bas Riviere Canot 0.291 $499,778 USD 70% $146,150 USD $769,824 USD Fournir de nouvelles Accessible 0 173 120 0 0 1.409
installations scolaires
245 Nd De La Delivrans 195 Etudiants Catholic Bas Riviere Canot 0.584 $129,028 USD 20% $65,933 USD $194,961 USD Accessible 69 126 0 0 0 0.616
158 Saint Jude 170 Etudiants Catholic, Bas Riviere Canot 0.142 $390,475 USD 100% $66,844 USD $489,888 USD Fournir de nouvelles Accessible 28 142 0 0 0 1.858
EFACAP installations scolaires
156 Notre Dame De Fatima 119 Etudiants Catholic Bas Riviere Canot 1.349 $0 USD 60% $187,207 USD $187,207 USD Accessible 0 89 30 0 0 0.600
226 St Jean Baptiste-1er 2e et 3e cycle 537 Etudiants Catholic Bas Riaribes 0.448 $622,048 USD 40% $238,840 USD $860,887 USD Accessible 97 283 121 36 0 0.952
318 Foyer Divin-Platanale 247 Etudiants Summits Bas Riaribes 0.161 $378,820 USD 100% $72,800 USD $468,000 USD Fournir de nouvelles Distance 40 207 0 0 0 1.839
installations scolaires
154 Notre Dame Des Douleurs 194 Etudiants Catholic Bas Riaribes 1.128 $0 USD 100% $611,582 USD $559,872 USD Fournir de nouvelles Accessible 45 149 0 0 0 1.000
installations scolaires
232 Presbyteral De Mont-Leon 127 Etudiants Catholic Bas Riaribes 0.444 $100,100 USD 50% $39,975 USD $140,075 USD Distance 26 101 0 0 0 1.056
147 Com. La Renaissance 459 Etudiants Catholic Bas Renthe Mathe 0.206 $791,031 USD 60% $140,402 USD $1,189,728 USD Fournir de nouvelles Accessible 0 372 87 0 0 1.394
installations scolaires
231 Presbyteral Pere Thomas J-Quinlan 449 Etudiants Catholic Bas Renthe Mathe 0.306 $754,538 USD 20% $71,967 USD $826,505 USD Accessible 98 302 49 0 0 0.894
149 Cong Nationale Marie Jeanne 445 Etudiants Catholic Bas Renthe Mathe 0.371 $541,559 USD 35% $148,194 USD $689,753 USD Accessible 70 298 77 0 0 0.979
214 St Antoine De Padoue 317 Etudiants Catholic Bas Renthe Mathe 0.480 $222,114 USD 30% $118,240 USD $340,355 USD Accessible 0 317 0 0 0 0.820
212 College Propulseur D Experience Et 305 Etudiants Catholic Bas Renthe Mathe 0.000 $850,208 USD 100% $0 USD $909,792 USD Fournir de nouvelles Accessible 85 39 68 113 0 2.000
De Savoir installations scolaires
233 Presbyteral De Totoye 170 Etudiants Catholic Bas Renthe Mathe 0.660 $104,347 USD 20% $61,998 USD $166,345 USD Accessible 37 133 0 0 0 0.540
251 Ste Therese De L'Enfant Jesus 105 Etudiants Catholic Bas Renthe Mathe 0.000 $243,000 USD 100% $0 USD $279,936 USD Fournir de nouvelles Accessible 45 60 0 0 0 2.000
installations scolaires
230 Presbyteral De Louime 97 Etudiants Catholic Bas Renthe Mathe 0.000 $135,850 USD 100% $0 USD $140,400 USD Fournir de nouvelles Distance 16 81 0 0 0 2.000
installations scolaires
151 Ntre Dame De Fatima 81 Etudiants Catholic Bas Renthe Mathe 1.867 $0 USD 20% $58,787 USD $58,787 USD Accessible 0 81 0 0 0 0.200
213 Le Jardin Fleuri 80 Etudiants Catholic Bas Renthe Mathe 0.604 $68,828 USD 100% $104,188 USD $209,952 USD Fournir de nouvelles Accessible 20 60 0 0 0 1.396
installations scolaires
Model School Network Haiti +
Schools for the Children of the World Page 1 of 6 Pages 2019-06-03
RAPPORT DE CLASSEMENT DU PROJET DE L’INSTALLATION SCOLAIRE MSN
Code de Nom de l’école Inscription à Système Plateau Section Communale Indice Coût estimatif pour Estimée en Estimatif pour Budget du Projet Remplacer les Installations À Distance ou École Fermée ou en Maternelle Basique 1 & 2 Fondamentale Secondaire Professionnelle Adéquation +
l’école l’école Scolaire d’adéquation atteindre la nouvelle fonction de corriger les Recommandé: Existantes par les Nouvelles Accessible? Double école Condition
SCW (basé sur m2 norme de conception l’évaluation sur carences en Installations Scolaires?? (2.00-0.00)
existant/m2 m2/étudiant: le terrain: conditions
requis pour AI = (AI = 1,0) (100% = existantes:
0) remplacer)
10,147 36,428 8,115 3,168 69
SCW School Name School Enrollment School Plateau Communal Section Adequacy index Estimated Cost to Estimated Estimated Cost to Recommended Project Replace existing facilities Remote or School Closed or PreK - K Grades 1-6 Grades 7-9 Grades Vocational Ed Adequacy +
School System (Based on Achieve New Design Condition Based Correct Existing Budget: with New School Facilities?? Accessible? Duplicate School 10-13 Condition
Code existing Standard m2/student: on Field Condition (2.00-0.00)
2 2 (AI=1.0) Evaluation: Deficiencies:
m /required m
for AI=0) (100% = Replace)
148 Kindergarten Les Papillons 30 Etudiants Catholic Bas Renthe Mathe 1.207 $0 USD 60% $54,640 USD $54,640 USD Accessible 20 10 0 0 0 0.600
146 Ntre Dame Des Douleurs De Soyil 20 Etudiants Catholic Bas Renthe Mathe 0.000 $26,000 USD 100% $0 USD $46,800 USD Fournir de nouvelles Distance 0 20 0 0 0 2.000
installations scolaires
206 Presbyterale Sainte Famille 271 Etudiants Catholic Haut Rang 0.000 $702,432 USD 100% $0 USD $769,824 USD Fournir de nouvelles Accessible 0 271 0 0 0 2.000
installations scolaires
166 College Sainte Famille 166 Etudiants Catholic Haut Rang 2.142 $0 USD 40% $310,651 USD $310,651 USD Accessible 0 0 84 82 0 0.400
243 College Emile Durkheim 154 Etudiants Catholic Haut Rang 0.711 $86,391 USD 40% $85,194 USD $171,585 USD Accessible 0 0 128 26 0 0.689
320 La Ruche 339 Etudiants Summits Bas Petit Fond 0.121 $805,343 USD 100% $110,799 USD $979,776 USD Fournir de nouvelles Accessible 85 254 0 0 0 1.879
installations scolaires
338 St Marc 319 Etudiants Summits Bas Petit Fond 0.288 $563,235 USD 40% $97,029 USD $660,264 USD Accessible 50 207 62 0 0 1.112
308 Bon Samaritain-Loncy 317 Etudiants Summits Bas Petit Fond 0.490 $367,251 USD 40% $150,129 USD $517,380 USD Accessible 23 153 141 0 0 0.910
327 Saint Jean 309 Etudiants Summits Bas Petit Fond 0.250 $400,697 USD 40% $55,539 USD $561,600 USD Fournir de nouvelles Distance 53 256 0 0 0 1.150
installations scolaires
335 Saint Thomas 287 Etudiants Summits Bas Petit Fond 0.146 $455,688 USD 100% $78,898 USD $561,600 USD Fournir de nouvelles Distance 87 200 0 0 0 1.854
installations scolaires
333 Saint Michel 249 Etudiants Summits Bas Petit Fond 0.569 $92,950 USD 10% $25,935 USD $118,885 USD Distance 50 161 38 0 0 0.531
314 de Roche Lapierre 217 Etudiants Summits Bas Petit Fond 0.586 $245,605 USD 35% $128,596 USD $374,201 USD Accessible 57 160 0 0 0 0.764
237 Ecole Presbyterale Jean Paul 2 195 Etudiants Catholic, Bas Petit Fond 0.187 $296,270 USD 100% $68,250 USD $374,400 USD Fournir de nouvelles Distance 35 160 0 0 0 1.813
Summits installations scolaires
324 Rocher d'Horebe 194 Etudiants Summits Bas Petit Fond 0.000 $362,671 USD 100% $0 USD $374,400 USD Fournir de nouvelles Distance 41 153 0 0 0 2.000
installations scolaires
168 Presbyterale Sacre Coeur 150 Etudiants Catholic Bas Petit Fond 0.702 $92,304 USD 40% $116,329 USD $208,633 USD Accessible 23 127 0 0 0 0.698
167 St Michel De Morne Michel 143 Etudiants Catholic Bas Petit Fond 0.762 $48,988 USD 30% $60,407 USD $109,395 USD Distance 27 116 0 0 0 0.538
303 Bénoit Batraville 118 Etudiants Summits Bas Petit Fond 0.334 $167,388 USD 100% $83,388 USD $279,936 USD Fournir de nouvelles Accessible 24 94 0 0 0 1.666
installations scolaires
218 St Jude De Ti Bidon 52 Etudiants Catholic Bas Petit Fond 0.420 $48,750 USD 100% $35,100 USD $93,600 USD Fournir de nouvelles Distance 28 24 0 0 0 1.580
installations scolaires
159 Sainte Scholastique 271 Etudiants Catholic Bas Montagne Terrible 0.385 $271,605 USD 60% $110,058 USD $381,663 USD Distance 44 227 0 0 0 1.215
162 Ecole Miste Presbyterale Saint 240 Etudiants Catholic Bas Montagne Terrible 0.785 $75,114 USD 20% $64,350 USD $139,464 USD Distance 12 160 68 0 0 0.415
Benoit Laboule
161 Saint Michel 96 Etudiants Catholic Bas Montagne Terrible 0.379 $93,269 USD 100% $65,332 USD $187,200 USD Fournir de nouvelles Distance 59 37 0 0 0 1.621
installations scolaires
160 Notre Dame D'Altagrace 66 Etudiants Catholic Bas Montagne Terrible 2.126 $0 USD 100% $200,688 USD $140,400 USD Fournir de nouvelles Distance 15 51 0 0 0 1.000
installations scolaires
117 Presbytérale Notre Dame 608 Etudiants Catholic Haut Matelgate 0.235 $812,269 USD 20% $51,808 USD $1,123,200 USD Fournir de nouvelles Distance 144 464 0 0 0 0.965
Guadaloupe installations scolaires
164 Presbyterle Pape Jean Xxlll 502 Etudiants Catholic Haut Marmont 0.202 $943,242 USD 40% $105,404 USD $1,329,696 USD Fournir de nouvelles Accessible 105 341 56 0 0 1.198
installations scolaires
310 Bon Samaritain-Savanne Longue 362 Etudiants Summits Haut Marmont 0.347 $540,863 USD 20% $62,933 USD $603,796 USD Accessible 44 254 64 0 0 0.853
176 Presbyterale Notre Dame Du Rosaire 207 Etudiants Catholic Haut Marmont 0.674 $51,370 USD 25% $67,148 USD $118,519 USD Distance 50 157 0 0 0 0.576
163 Presbyterale Christ-Roi-Sapaterre 185 Etudiants Catholic Haut Marmont 0.723 $17,564 USD 50% $187,076 USD $204,640 USD Accessible 37 148 0 0 0 0.777
196 Presbyterale Saint Pierre St. Paul 168 Etudiants Catholic Haut Marmont 0.331 $291,527 USD 60% $92,230 USD $489,888 USD Fournir de nouvelles Accessible 42 126 0 0 0 1.269
installations scolaires
239 Congreganiste St Thomas D'Aquin- 947 Etudiants Catholic Haut Lociane 0.437 $1,106,775 USD 40% $442,575 USD $1,549,350 USD Accessible 269 430 154 94 0 0.963
1er et 2e cycle
238 Institution Mixte Jn-Jacques 651 Etudiants Catholic Haut Lociane 0.117 $1,003,282 USD 20% $27,888 USD $1,216,800 USD Fournir de nouvelles Distance 180 227 123 121 0 1.083
Rousseau installations scolaires
106 Presbyterale St Jean Apotre 606 Etudiants Catholic Haut Lociane 0.200 $1,264,075 USD 20% $63,505 USD $1,609,632 USD Fournir de nouvelles Accessible 110 347 149 0 0 1.000
installations scolaires
248 Academie D'Espoir 316 Etudiants Catholic Haut Lociane 0.372 $493,784 USD 5% $16,854 USD $510,637 USD Accessible 131 185 0 0 0 0.678
129 Presbyterale Bon Berger de Lamarre 275 Etudiants Catholic Bas La Selle 0.573 $272,915 USD 30% $123,941 USD $396,855 USD Accessible 39 236 0 0 0 0.727
130 Ecole Notre Dame du Perpetuel 172 Etudiants Catholic Bas La Selle 0.693 $61,032 USD 30% $98,963 USD $159,995 USD Accessible 49 123 0 0 0 0.607
Secours de Dubvisson
246 Sainte Cecile 57 Etudiants Catholic Bas La Selle 0.455 $81,726 USD 100% $67,962 USD $209,952 USD Fournir de nouvelles Accessible 45 12 0 0 0 1.545
installations scolaires
115 St François D'Assise 264 Etudiants Catholic Haut La Mielle 0.219 $575,740 USD 10% $16,621 USD $769,824 USD Fournir de nouvelles Accessible 85 179 0 0 0 0.881
installations scolaires
116 Notre Dame d'Altagrace 139 Etudiants Catholic Haut La Mielle 0.000 $312,012 USD 100% $0 USD $349,920 USD Fournir de nouvelles Accessible 48 91 0 0 0 2.000
installations scolaires
Model School Network Haiti +
Schools for the Children of the World Page 2 of 6 Pages 2019-06-03
RAPPORT DE CLASSEMENT DU PROJET DE L’INSTALLATION SCOLAIRE MSN
Code de Nom de l’école Inscription à Système Plateau Section Communale Indice Coût estimatif pour Estimée en Estimatif pour Budget du Projet Remplacer les Installations À Distance ou École Fermée ou en Maternelle Basique 1 & 2 Fondamentale Secondaire Professionnelle Adéquation +
l’école l’école Scolaire d’adéquation atteindre la nouvelle fonction de corriger les Recommandé: Existantes par les Nouvelles Accessible? Double école Condition
SCW (basé sur m2 norme de conception l’évaluation sur carences en Installations Scolaires?? (2.00-0.00)
existant/m2 m2/étudiant: le terrain: conditions
requis pour AI = (AI = 1,0) (100% = existantes:
0) remplacer)
10,147 36,428 8,115 3,168 69
SCW School Name School Enrollment School Plateau Communal Section Adequacy index Estimated Cost to Estimated Estimated Cost to Recommended Project Replace existing facilities Remote or School Closed or PreK - K Grades 1-6 Grades 7-9 Grades Vocational Ed Adequacy +
School System (Based on Achieve New Design Condition Based Correct Existing Budget: with New School Facilities?? Accessible? Duplicate School 10-13 Condition
Code existing Standard m2/student: on Field Condition (2.00-0.00)
2 2 (AI=1.0) Evaluation: Deficiencies:
m /required m
for AI=0) (100% = Replace)
211 St-Michel De Lagua-Lagua 129 Etudiants Catholic Haut La Mielle 0.000 $237,939 USD 100% $0 USD $280,800 USD Fournir de nouvelles Distance 12 117 0 0 0 2.000
installations scolaires
122 Saint Pierre Et College Saint Pierre 475 Etudiants Catholic Bas La Hoye 0.340 $653,826 USD 40% $163,961 USD $817,786 USD Accessible 90 285 100 0 0 1.060
339 St Philippe & St Jacques 255 Etudiants Summits Bas La Hoye 0.160 $407,426 USD 100% $77,552 USD $514,800 USD Fournir de nouvelles Distance 73 182 0 0 0 1.840
installations scolaires
336 Sainte Croix 249 Etudiants Summits Bas La Hoye 0.449 $259,802 USD 35% $75,075 USD $334,877 USD Distance 78 171 0 0 0 0.901
337 Saints-Ynnocents 219 Etudiants Summits Bas La Hoye 0.195 $292,598 USD 100% $78,410 USD $421,200 USD Fournir de nouvelles Distance 50 141 28 0 0 1.805
installations scolaires
329 Mixte Espoir 187 Etudiants Summits Bas La Hoye 0.700 $127,726 USD 40% $146,325 USD $274,051 USD Accessible 42 145 0 0 0 0.700
302 Ascension de Blanchard 145 Etudiants Summits Bas La Hoye 0.797 $43,467 USD 60% $101,060 USD $144,527 USD Distance 40 105 0 0 0 0.803
340 Saint Luc 131 Etudiants Summits Bas La Hoye 1.086 $0 USD 85% $173,093 USD $173,093 USD Distance 30 101 0 0 0 0.850
169 St Joseph-Roche Mulatre 118 Etudiants Catholic Bas La Hoye 0.764 $39,520 USD 30% $38,454 USD $77,974 USD Distance 25 93 0 0 0 0.536
208 Presbyterale Christ Roi-Vieux cayes 47 Etudiants Catholic Bas La Hoye 1.204 $0 USD 100% $78,390 USD $93,600 USD Fournir de nouvelles Distance 7 40 0 0 0 1.000
installations scolaires
139 Notre Dame De La Nativite 818 Etudiants Catholic Bas La Haye 0.289 $1,538,606 USD 20% $128,585 USD $1,667,190 USD Accessible 237 581 0 0 0 0.911
138 Saint Charlemagne 283 Etudiants Catholic Bas La Haye 0.243 $547,805 USD 80% $140,808 USD $769,824 USD Fournir de nouvelles Accessible 33 171 79 0 0 1.557
installations scolaires
140 Notre Dame Altagrace 238 Etudiants Catholic Bas La Haye 0.460 $340,348 USD 40% $125,462 USD $465,810 USD Accessible 118 120 0 0 0 0.940
229 Presbyterale De Dos Parc 183 Etudiants Catholic Bas La Haye 0.421 $170,649 USD 40% $57,049 USD $227,698 USD Distance 46 137 0 0 0 0.979
199 College Saint Andre(Hinche)-1er 2e 1138 Etudiants Catholic Haut Juanaria 0.255 $2,206,006 USD 30% $254,928 USD $2,460,934 USD Accessible 125 251 341 421 0 1.045
et 3e cycle
174 Complexe Educatif Du Sacre-Coeur 754 Etudiants Catholic Haut Juanaria 0.530 $702,204 USD 20% $211,874 USD $914,078 USD Accessible 264 378 112 0 0 0.670
121 Petit Seminaire College Saint Martin 619 Etudiants Catholic Haut Juanaria 0.508 $770,981 USD 40% $399,145 USD $1,170,125 USD Accessible 0 0 213 406 0 0.892
De Porres
108 Notre Dame Du St Esprit 592 Etudiants Catholic Haut Juanaria 0.384 $873,760 USD 15% $86,335 USD $960,095 USD Accessible 154 279 108 51 0 0.766
124 Petit Seminaire College St Martin 544 Etudiants Catholic Haut Juanaria 0.519 $476,514 USD 30% $236,126 USD $712,640 USD Accessible 240 304 0 0 0 0.781
128 Presbytérale Immaculé Conception 503 Etudiants Catholic Haut Juanaria 0.266 $940,269 USD 40% $137,067 USD $1,329,696 USD Fournir de nouvelles Accessible 92 328 83 0 0 1.134
De Hinche installations scolaires
131 Marie Educatrice De Manac 478 Etudiants Catholic Haut Juanaria 0.427 $477,802 USD 50% $181,818 USD $659,620 USD Distance 79 399 0 0 0 1.073
135 Marie Educatrice De Layaye 468 Etudiants Catholic Haut Juanaria 0.426 $580,634 USD 20% $106,236 USD $686,870 USD Accessible 63 405 0 0 0 0.774
171 École St Paul De Carissade 385 Etudiants Catholic Haut Juanaria 0.348 $657,172 USD 40% $144,984 USD $1,049,760 USD Fournir de nouvelles Accessible 98 287 0 0 0 1.052
installations scolaires
126 Mixte Jn Louis Fortunee 365 Etudiants Catholic Haut Juanaria 0.370 $430,531 USD 20% $72,484 USD $503,015 USD Accessible 78 287 0 0 0 0.830
241 Nouvelle Generation Des Freres Unis 300 Etudiants Catholic Haut Juanaria 0.193 $415,684 USD 100% $101,543 USD $561,600 USD Fournir de nouvelles Distance 49 251 0 0 0 1.807
installations scolaires
132 Présbytérale St-Jean Baptiste De 222 Etudiants Catholic Haut Juanaria 0.213 $335,725 USD 60% $54,600 USD $468,000 USD Fournir de nouvelles Distance 50 172 0 0 0 1.387
Abricot installations scolaires
170 Marie Educatrice De Terre Cassé 204 Etudiants Catholic Haut Juanaria 1.117 $0 USD 20% $131,453 USD $131,453 USD Accessible 51 153 0 0 0 0.200
127 Marie Éducatrice De Dos-Palais 190 Etudiants Catholic Haut Juanaria 1.285 $0 USD 15% $102,390 USD $102,390 USD Accessible 35 155 0 0 0 0.150
109 Jardin Fleuri Des Maguerittes 184 Etudiants Catholic Haut Juanaria 0.437 $189,569 USD 40% $92,896 USD $282,465 USD Accessible 61 123 0 0 0 0.963
104 Presbyterale de Reltalus 178 Etudiants Catholic Haut Juanaria 0.000 $257,400 USD 100% $0 USD $374,400 USD Fournir de nouvelles Distance 45 133 0 0 0 2.000
installations scolaires
172 Centre Technique Secondaire De 155 Etudiants Catholic Haut Juanaria 2.644 $0 USD 20% $159,311 USD $159,311 USD Accessible 0 0 87 68 0 0.200
Hinche(Pandiassous)
253 Divine Misericorde 151 Etudiants Catholic Haut Juanaria 0.408 $246,830 USD 100% $170,294 USD $419,904 USD Fournir de nouvelles Accessible 28 123 0 0 0 1.592
installations scolaires
133 Collège Notre Dame D'Altagrace De 121 Etudiants Catholic Haut Juanaria 1.096 $0 USD 60% $194,299 USD $194,299 USD Accessible 50 0 71 0 0 0.600
Layaye
173 Fondation L'Enfant De Jesus Crist 97 Etudiants Catholic Haut Juanaria 0.270 $137,734 USD 100% $50,834 USD $209,952 USD Fournir de nouvelles Accessible 0 97 0 0 0 1.730
installations scolaires
252 Notre Dame De Lourdes-Bonabite, , 92 Etudiants Catholic Haut Juanaria 1.289 $0 USD 30% $48,887 USD $48,887 USD Distance 12 80 0 0 0 0.300
1ere sect juanaria,Hinche
134 Centre Proféssionnel Notre Dame 35 Etudiants Catholic Haut Juanaria 0.897 $7,018 USD 40% $24,409 USD $31,427 USD Accessible 0 0 0 0 35 0.503
D'Altagrce Layaye
222 Congreganiste St Gabriel Lascahobas 893 Etudiants Catholic Bas Juampas 0.350 $1,333,733 USD 20% $157,464 USD $1,491,197 USD Accessible 63 493 298 39 0 0.850
221 College St Michel 762 Etudiants Catholic, Bas Juampas 0.152 $1,560,718 USD 100% $293,282 USD $1,959,552 USD Fournir de nouvelles Accessible 113 354 253 42 0 1.848
EFACAP installations scolaires
304 Bon Berger 371 Etudiants Summits Bas Juampas 0.360 $397,445 USD 50% $119,340 USD $516,785 USD Distance 54 317 0 0 0 1.140
Model School Network Haiti +
Schools for the Children of the World Page 3 of 6 Pages 2019-06-03
RAPPORT DE CLASSEMENT DU PROJET DE L’INSTALLATION SCOLAIRE MSN
Code de Nom de l’école Inscription à Système Plateau Section Communale Indice Coût estimatif pour Estimée en Estimatif pour Budget du Projet Remplacer les Installations À Distance ou École Fermée ou en Maternelle Basique 1 & 2 Fondamentale Secondaire Professionnelle Adéquation +
l’école l’école Scolaire d’adéquation atteindre la nouvelle fonction de corriger les Recommandé: Existantes par les Nouvelles Accessible? Double école Condition
SCW (basé sur m2 norme de conception l’évaluation sur carences en Installations Scolaires?? (2.00-0.00)
existant/m2 m2/étudiant: le terrain: conditions
requis pour AI = (AI = 1,0) (100% = existantes:
0) remplacer)
10,147 36,428 8,115 3,168 69
SCW School Name School Enrollment School Plateau Communal Section Adequacy index Estimated Cost to Estimated Estimated Cost to Recommended Project Replace existing facilities Remote or School Closed or PreK - K Grades 1-6 Grades 7-9 Grades Vocational Ed Adequacy +
School System (Based on Achieve New Design Condition Based Correct Existing Budget: with New School Facilities?? Accessible? Duplicate School 10-13 Condition
Code existing Standard m2/student: on Field Condition (2.00-0.00)
2 2 (AI=1.0) Evaluation: Deficiencies:
m /required m
for AI=0) (100% = Replace)
219 St Thomas D Aquin Lascahobas 355 Etudiants Catholic Bas Juampas 0.000 $755,073 USD 100% $0 USD $979,776 USD Fournir de nouvelles Accessible 0 195 160 0 0 2.000
installations scolaires
223 Ecole Mixte Comm. St Michel 350 Etudiants Catholic Bas Juampas 0.440 $490,512 USD 40% $159,509 USD $650,021 USD Accessible 0 350 0 0 0 0.960
225 Jacques Bloc De Lascahobas 321 Etudiants Catholic Bas Juampas 0.497 $207,619 USD 40% $166,562 USD $374,181 USD Accessible 0 158 163 0 0 0.903
215 Presbyteral Notre Dame 253 Etudiants Catholic Bas Juampas 0.124 $387,760 USD 100% $54,795 USD $468,000 USD Fournir de nouvelles Distance 29 224 0 0 0 1.876
d'Altagrace/Bon Berger installations scolaires
220 College St Gabriel Lascahobas 205 Etudiants Catholic Bas Juampas 0.220 $621,520 USD 100% $175,520 USD $839,808 USD Fournir de nouvelles Accessible 0 0 0 205 0 1.780
installations scolaires
224 Ecomem(Michel Eyquem De 186 Etudiants Catholic Bas Juampas 0.315 $231,303 USD 45% $64,298 USD $295,601 USD Accessible 0 114 72 0 0 1.135
Montaigne)
236 Sainte Famille De Maissade 410 Etudiants Catholic Haut Grande Savane 0.323 $360,620 USD 50% $119,340 USD $479,960 USD Distance 115 295 0 0 0 1.177
201 College Mgr Leonard Petion Laroche 191 Etudiants Catholic Haut Grande Savane 0.693 $739 USD 60% $222,339 USD $223,078 USD Accessible 0 0 79 112 0 0.907
De Maïssade
409 De Grand Boucan 374 Etudiants EFACAP Bas Grand Boucan 0.331 $443,543 USD 60% $174,773 USD $618,316 USD Accessible 9 226 139 0 0 1.269
204 Saint Francois D'Assise-Trianon 350 Etudiants Catholic Bas Grand Boucan 0.257 $513,488 USD 20% $48,740 USD $562,228 USD Accessible 89 261 0 0 0 0.943
193 Saint Louis 326 Etudiants Catholic Bas Grand Boucan 0.207 $507,190 USD 30% $54,588 USD $561,777 USD Accessible 64 262 0 0 0 1.093
315 Eben-Ezer 266 Etudiants Summits Bas Grand Boucan 0.245 $523,607 USD 100% $170,013 USD $699,840 USD Fournir de nouvelles Accessible 20 246 0 0 0 1.755
installations scolaires
332 Ecole Communoutaire La Sagesse De 254 Etudiants Summits Bas Grand Boucan 0.176 $378,576 USD 100% $85,735 USD $514,800 USD Fournir de nouvelles Distance 85 169 0 0 0 1.824
Delagon installations scolaires
203 Christ-Roi 74 Etudiants Catholic Bas Grand Boucan 0.863 $24,028 USD 40% $58,818 USD $82,846 USD Accessible 31 43 0 0 0 0.537
402 College Mixte Coutilien Coutard 431 Etudiants EFACAP Bas Gascogne 0.215 $885,016 USD 100% $248,443 USD $1,189,728 USD Fournir de nouvelles Accessible 83 201 147 0 0 1.785
(CMCC) installations scolaires
413 De Marché Canard 288 Etudiants EFACAP Bas Gascogne 0.634 $201,923 USD 30% $136,638 USD $338,561 USD Accessible 15 187 86 0 0 0.666
190 Saint Joseph 265 Etudiants Catholic Bas Gascogne 0.153 $512,641 USD 40% $47,275 USD $559,916 USD Accessible 135 130 0 0 0 1.247
403 De Bozio 120 Etudiants EFACAP Bas Gascogne 0.102 $176,274 USD 100% $20,027 USD $234,000 USD Fournir de nouvelles Distance 50 70 0 0 0 1.898
installations scolaires
189 Saint Antoine 99 Etudiants Catholic Bas Gascogne 0.362 $94,543 USD 100% $53,658 USD $187,200 USD Fournir de nouvelles Distance 34 65 0 0 0 1.638
installations scolaires
405 De Domond Péligre 476 Etudiants EFACAP Bas Des Bayes 0.317 $773,569 USD 50% $191,445 USD $1,259,712 USD Fournir de nouvelles Accessible 10 284 182 0 0 1.183
installations scolaires
183 Foyer Des Enfants Des Bayes 450 Etudiants Catholic Bas Des Bayes 0.458 $573,078 USD 5% $26,312 USD $599,390 USD Accessible 81 286 83 0 0 0.592
\Efeb\""
182 Communautaire Amour Celeste Des 349 Etudiants Catholic Bas Des Bayes 0.330 $633,268 USD 40% $134,258 USD $767,526 USD Accessible 180 169 0 0 0 1.070
Bayes (Ecace
180 Mixte Oeuvre Divine 325 Etudiants Catholic Bas Des Bayes 0.296 $612,584 USD 100% $260,895 USD $909,792 USD Fournir de nouvelles Accessible 104 185 36 0 0 1.704
installations scolaires
317 Foyer Divin-Lacheteau 317 Etudiants Summits Bas Des Bayes 0.419 $462,698 USD 30% $103,681 USD $566,379 USD Accessible 53 223 41 0 0 0.881
419 Dufailly 262 Etudiants EFACAP Bas Des Bayes 0.479 $313,464 USD 25% $73,527 USD $386,990 USD Accessible 0 130 132 0 0 0.771
331 Saint Mathias 199 Etudiants Summits Bas Des Bayes 0.157 $309,026 USD 100% $60,450 USD $421,200 USD Fournir de nouvelles Distance 52 147 0 0 0 1.843
installations scolaires
306 Bon Berger de Domond 170 Etudiants Summits Bas Des Bayes 0.799 $0 USD 15% $56,949 USD $56,949 USD Accessible 14 156 0 0 0 0.351
181 College Saint Francois D'Assise 122 Etudiants Catholic Bas Des Bayes 1.285 $0 USD 20% $60,964 USD $60,964 USD Accessible 0 0 78 44 0 0.200
235 Presb. Los Abeilles 106 Etudiants Catholic Bas Des Bayes 0.265 $109,382 USD 100% $39,468 USD $187,200 USD Fournir de nouvelles Distance 19 87 0 0 0 1.735
installations scolaires
179 Sainte Therese De L'Enfant Jesus 106 Etudiants Catholic Bas Des Bayes 0.134 $161,941 USD 100% $25,025 USD $187,200 USD Fournir de nouvelles Distance 61 45 0 0 0 1.866
installations scolaires
184 Saint Martin De Tour 102 Etudiants Catholic Bas Des Bayes 0.645 $52,663 USD 100% $95,537 USD $187,200 USD Fournir de nouvelles Distance 27 75 0 0 0 1.355
installations scolaires
192 Ecole Nationale Consreganiste 677 Etudiants Catholic, Bas Crete Brulee 0.354 $1,073,361 USD 40% $248,016 USD $1,321,377 USD Accessible 136 434 107 0 0 1.046
Lucienne Estime EFACAP
415 College Adventiste Mixte Bethleem 638 Etudiants EFACAP Bas Crete Brulee 0.229 $1,376,355 USD 40% $168,448 USD $1,889,568 USD Fournir de nouvelles Accessible 62 187 233 156 0 1.171
De Mirebalais installations scolaires
408 Efa De Mirebalais 492 Etudiants EFACAP Bas Crete Brulee 0.461 $410,806 USD 40% $231,865 USD $642,671 USD Accessible 39 290 163 0 0 0.939
321 Mixte de Cholette 432 Etudiants Summits Bas Crete Brulee 0.287 $536,432 USD 10% $22,295 USD $558,727 USD Distance 72 360 0 0 0 0.813
410 College Eben-Ezer De L’Eglise De 324 Etudiants EFACAP Bas Crete Brulee 0.309 $527,751 USD 60% $146,845 USD $839,808 USD Fournir de nouvelles Accessible 43 146 82 38 15 1.291
Dieu De Mirebalais installations scolaires
202 Bon Pasteur-Lahoue 100 Etudiants Catholic Bas Crete Brulee 0.572 $64,657 USD 100% $86,143 USD $187,200 USD Fournir de nouvelles Distance 36 64 0 0 0 1.428
installations scolaires
Model School Network Haiti +
Schools for the Children of the World Page 4 of 6 Pages 2019-06-03
RAPPORT DE CLASSEMENT DU PROJET DE L’INSTALLATION SCOLAIRE MSN
Code de Nom de l’école Inscription à Système Plateau Section Communale Indice Coût estimatif pour Estimée en Estimatif pour Budget du Projet Remplacer les Installations À Distance ou École Fermée ou en Maternelle Basique 1 & 2 Fondamentale Secondaire Professionnelle Adéquation +
l’école l’école Scolaire d’adéquation atteindre la nouvelle fonction de corriger les Recommandé: Existantes par les Nouvelles Accessible? Double école Condition
SCW (basé sur m2 norme de conception l’évaluation sur carences en Installations Scolaires?? (2.00-0.00)
existant/m2 m2/étudiant: le terrain: conditions
requis pour AI = (AI = 1,0) (100% = existantes:
0) remplacer)
10,147 36,428 8,115 3,168 69
SCW School Name School Enrollment School Plateau Communal Section Adequacy index Estimated Cost to Estimated Estimated Cost to Recommended Project Replace existing facilities Remote or School Closed or PreK - K Grades 1-6 Grades 7-9 Grades Vocational Ed Adequacy +
School System (Based on Achieve New Design Condition Based Correct Existing Budget: with New School Facilities?? Accessible? Duplicate School 10-13 Condition
Code existing Standard m2/student: on Field Condition (2.00-0.00)
2 2 (AI=1.0) Evaluation: Deficiencies:
m /required m
for AI=0) (100% = Replace)
155 Saint Thomas D'Aquin 127 Etudiants Catholic Bas Coupe Mardi Gras 0.742 $71,734 USD 40% $82,115 USD $153,848 USD Accessible 35 92 0 0 0 0.658
187 Ecole Nationale Congreganiste Marie 584 Etudiants Catholic Haut Cabral 0.461 $581,250 USD 30% $205,870 USD $787,119 USD Accessible 75 419 90 0 0 0.839
Auxiliatrice
334 Saint Paul 518 Etudiants Summits Haut Cabral 0.318 $707,665 USD 30% $124,746 USD $832,411 USD Accessible 65 342 111 0 0 0.982
305 Ecole Nationale de Baille Tourible 508 Etudiants Summits Haut Cabral 0.108 $1,112,882 USD 60% $83,363 USD $1,329,696 USD Fournir de nouvelles Accessible 0 453 55 0 0 1.492
installations scolaires
328 Saint Jean Baptiste 347 Etudiants Summits Haut Cabral 0.330 $391,541 USD 10% $20,192 USD $411,733 USD Distance 72 196 36 43 0 0.770
326 Nouvelle Generation de Moge 288 Etudiants Summits Haut Cabral 0.146 $621,924 USD 100% $108,086 USD $769,824 USD Fournir de nouvelles Accessible 33 193 49 13 0 1.854
installations scolaires
330 Saint Marc de Bentho 274 Etudiants Summits Haut Cabral 0.119 $457,480 USD 100% $62,400 USD $561,600 USD Fournir de nouvelles Distance 105 169 0 0 0 1.881
installations scolaires
301 Annonciation 256 Etudiants Summits Haut Cabral 0.407 $288,062 USD 30% $81,881 USD $369,943 USD Accessible 37 219 0 0 0 0.893
244 College Mgr Remy Augustin 213 Etudiants Catholic Haut Cabral 0.498 $128,596 USD 20% $57,095 USD $185,691 USD Accessible 0 0 104 109 0 0.702
186 College Mrg Jean Baptist Decost De 191 Etudiants Catholic Haut Cabral 0.419 $288,198 USD 30% $70,859 USD $359,057 USD Accessible 0 0 59 132 0 0.881
Themonde
185 Notre Dame De Lourdes-Goyave 172 Etudiants Catholic Haut Cabral 0.398 $288,328 USD 100% $197,394 USD $559,872 USD Fournir de nouvelles Accessible 57 115 0 0 0 1.602
installations scolaires
207 College Jacques Roumain de 122 Etudiants Catholic Haut Cabral 0.328 $159,408 USD 100% $77,760 USD $279,936 USD Fournir de nouvelles Accessible 0 49 45 28 0 1.672
Thommonde installations scolaires
188 College Mrg Jean Baptist Decost De 116 Etudiants Catholic Haut Cabral 1.499 $0 USD 35% $167,637 USD $167,637 USD Accessible 0 116 0 0 0 0.350
Themonde
198 Saint Yves 72 Etudiants Catholic Haut Cabral 0.298 $98,328 USD 100% $41,640 USD $139,968 USD Fournir de nouvelles Accessible 0 72 0 0 0 1.703
installations scolaires
195 Cong. Saint Michel 903 Etudiants Catholic Bas Boucan Carre 0.354 $1,164,313 USD 10% $84,982 USD $1,249,295 USD Accessible 191 671 31 0 10 0.746
420 Boucan Carré 493 Etudiants EFACAP Bas Boucan Carre 0.355 $716,040 USD 40% $176,904 USD $892,944 USD Accessible 0 289 204 0 0 1.045
194 College Saint Michel 222 Etudiants Catholic Bas Boucan Carre 0.705 $154,499 USD 10% $42,865 USD $197,365 USD Accessible 0 0 101 121 0 0.395
307 Bon Berger de Pépin 185 Etudiants Summits Bas Boucan Carre 0.188 $267,183 USD 100% $63,278 USD $374,400 USD Fournir de nouvelles Distance 0 185 0 0 0 1.812
installations scolaires
312 Christ-Roi 467 Etudiants Summits Haut Baille Tourrible 0.163 $667,052 USD 20% $26,052 USD $842,400 USD Fournir de nouvelles Distance 105 272 90 0 0 1.037
installations scolaires
103 Saint Sauveur 131 Etudiants Catholic Haut Baille Tourrible 0.203 $168,402 USD 100% $43,004 USD $234,000 USD Fournir de nouvelles Distance 51 80 0 0 0 1.797
installations scolaires
111 École Notre Dame Très Sainte Trinité 955 Etudiants Catholic Haut Aguahedionde(Riv g) 0.339 $1,035,796 USD 15% $85,602 USD $1,121,399 USD Distance 114 841 0 0 0 0.811
177 Presbyterale Mgr Walter F Sullivan 444 Etudiants Catholic Haut Aguahedionde(Riv g) 0.353 $764,099 USD 30% $128,937 USD $893,036 USD Accessible 153 291 0 0 0 0.947
110 Ecole Nationale Chapeile St Vincent 398 Etudiants Catholic Haut Aguahedionde(Riv g) 0.187 $876,085 USD 100% $201,410 USD $1,119,744 USD Fournir de nouvelles Accessible 120 278 0 0 0 1.813
De Paul installations scolaires
113 École Sainte Trinité De Mathebonite 300 Etudiants Catholic Haut Aguahedionde(Riv g) 0.387 $380,713 USD 10% $31,493 USD $412,206 USD Accessible 84 216 0 0 0 0.713
137 Presbyterale Notre Dame De Fatima 281 Etudiants Catholic Haut Aguahedionde(Riv g) 0.502 $293,631 USD 20% $72,239 USD $365,871 USD Accessible 23 197 61 0 0 0.698
175 Presbyterale Notre Dame De La 128 Etudiants Catholic Haut Aguahedionde(Riv g) 0.251 $139,750 USD 100% $46,800 USD $187,200 USD Fournir de nouvelles Distance 35 93 0 0 0 1.749
Guadeloupe installations scolaires
112 École Presbytérale St Jn Baptiste De 64 Etudiants Catholic Haut Aguahedionde(Riv g) 1.034 $0 USD 100% $146,286 USD $209,952 USD Fournir de nouvelles Accessible 20 44 0 0 0 1.000
Beganabé installations scolaires
145 Presbyterale Coeur De Jesus 716 Etudiants Catholic Haut Aguahedionde(Riv d) 0.296 $890,210 USD 25% $93,681 USD $1,310,400 USD Fournir de nouvelles Distance 81 635 0 0 0 0.954
installations scolaires
142 Presbyterale Notre Dame De La 487 Etudiants Catholic Haut Aguahedionde(Riv d) 0.347 $697,220 USD 20% $90,377 USD $787,597 USD Accessible 88 399 0 0 0 0.853
Presentation
165 Sainte Therese De Papaye 486 Etudiants Catholic Haut Aguahedionde(Riv d) 0.553 $518,125 USD 40% $287,518 USD $805,642 USD Accessible 105 381 0 0 0 0.847
125 College Les Humanistes Jean Paul 409 Etudiants Catholic Haut Aguahedionde(Riv d) 0.154 $1,046,066 USD 40% $77,293 USD $1,259,712 USD Fournir de nouvelles Accessible 0 0 178 231 0 1.246
Sartre installations scolaires
136 College Sacre Coeur De Papaye 407 Etudiants Catholic Haut Aguahedionde(Riv d) 0.538 $306,423 USD 20% $129,616 USD $436,039 USD Accessible 0 0 231 176 0 0.662
120 Presbyterale St Joseph de Guebot 320 Etudiants Catholic Haut Aguahedionde(Riv d) 0.181 $474,305 USD 100% $104,585 USD $608,400 USD Fournir de nouvelles Distance 65 255 0 0 0 1.819
installations scolaires
144 Presbyterale Notre Dame Du 300 Etudiants Catholic Haut Aguahedionde(Riv d) 0.353 $301,908 USD 30% $55,575 USD $357,483 USD Distance 34 266 0 0 0 0.947
Perpetuel Secours
Model School Network Haiti +
Schools for the Children of the World Page 5 of 6 Pages 2019-06-03
RAPPORT DE CLASSEMENT DU PROJET DE L’INSTALLATION SCOLAIRE MSN
Code de Nom de l’école Inscription à Système Plateau Section Communale Indice Coût estimatif pour Estimée en Estimatif pour Budget du Projet Remplacer les Installations À Distance ou École Fermée ou en Maternelle Basique 1 & 2 Fondamentale Secondaire Professionnelle Adéquation +
l’école l’école Scolaire d’adéquation atteindre la nouvelle fonction de corriger les Recommandé: Existantes par les Nouvelles Accessible? Double école Condition
SCW (basé sur m2 norme de conception l’évaluation sur carences en Installations Scolaires?? (2.00-0.00)
existant/m2 m2/étudiant: le terrain: conditions
requis pour AI = (AI = 1,0) (100% = existantes:
0) remplacer)
10,147 36,428 8,115 3,168 69
SCW School Name School Enrollment School Plateau Communal Section Adequacy index Estimated Cost to Estimated Estimated Cost to Recommended Project Replace existing facilities Remote or School Closed or PreK - K Grades 1-6 Grades 7-9 Grades Vocational Ed Adequacy +
School System (Based on Achieve New Design Condition Based Correct Existing Budget: with New School Facilities?? Accessible? Duplicate School 10-13 Condition
Code existing Standard m2/student: on Field Condition (2.00-0.00)
2 2 (AI=1.0) Evaluation: Deficiencies:
m /required m
for AI=0) (100% = Replace)
141 College Notre Dame De La 282 Etudiants Catholic Haut Aguahedionde(Riv d) 0.873 $100,858 USD 20% $139,042 USD $239,900 USD Accessible 0 0 168 114 0 0.327
Presentation
118 Le Souci De St Augustin 219 Etudiants Catholic Haut Aguahedionde(Riv d) 0.325 $386,460 USD 30% $58,401 USD $444,861 USD Accessible 35 184 0 0 0 0.975
178 Saint Francois D'Assise-Cerca-la- 356 Etudiants Catholic Haut Acajou Brule No 2 0.754 $138,360 USD 60% $430,931 USD $569,291 USD Accessible 54 302 0 0 0 0.846
source
209 St-Michel Archange-1er et 2e cycle 623 Etudiants Catholic Haut Acajou Brule No 1 0.430 $474,216 USD 35% $160,016 USD $634,231 USD Distance 107 341 77 98 0 0.920
250 Jardin Fleuri De Graadel 397 Etudiants Catholic Haut Acajou Brule No 1 0.156 $823,801 USD 20% $31,395 USD $1,049,760 USD Fournir de nouvelles Accessible 70 235 75 17 0 1.044
installations scolaires
119 Presbyterale Notre Dame Des 325 Etudiants Catholic Haut Acajou Brule No 1 0.142 $544,128 USD 100% $89,817 USD $655,200 USD Fournir de nouvelles Distance 190 135 0 0 0 1.858
Douleures installations scolaires
249 Notre DameD'Altagrace 111 Etudiants Catholic Haut Acajou Brule No 1 0.700 $69,082 USD 100% $161,282 USD $279,936 USD Fournir de nouvelles Accessible 17 94 0 0 0 1.300
installations scolaires
322 Mixte La Perfection 173 Etudiants Summits 0.215 $379,702 USD 100% $103,834 USD $489,888 USD Fournir de nouvelles Accessible 18 155 0 0 0 1.785
installations scolaires
197 Bonne Experience 50 Etudiants Catholic 1.297 $0 USD 100% $91,000 USD $93,600 USD Fournir de nouvelles Distance 9 41 0 0 0 1.000
installations scolaires
254 Presb. Nat. St Vincent De Paul 0 Etudiants Catholic Haut Aguahedionde(Riv g) 0% Double École - Voir 0 0 0 0 0
l’école 110
416 0 Etudiants EFACAP 0% Double École - Voir 0 0 0 0 0
l’école 129
404 Ecole Congregaiuste Nationale Notre 0 Etudiants Catholic, Bas Riviere Canot 0% Double École - Voir 0 0 0 0 0
Dame Du Mont Carmel-Saut d'Eau EFACAP l’école 157
114 Collège St François D'Assise 0 Etudiants Catholic Haut Acajou Brule No 2 0% Double École - Voir 0 0 0 0 0
l’école 178
418 Mixte Oeuvre Divine De Dufailly 0 Etudiants EFACAP Bas Des Bayes 0% Double École - Voir 0 0 0 0 0
l’école 180
316 Foyer des enfants 0 Etudiants Summits Bas Des Bayes 0% Double École - Voir 0 0 0 0 0
l’école 183
406 0 Etudiants EFACAP 0% Double École - Voir 0 0 0 0 0
l’école 192
407 0 Etudiants EFACAP 0% Double École - Voir 0 0 0 0 0
l’école 193
200 College Saint Andre(Hinche)-1er 2e 0 Etudiants Catholic Haut Juanaria 100% Accessible Double École - Voir 0 0 0 0 0 1.000
et 3e cycle l’école 199
210 St-Michel Archange-3e cycle et 0 Etudiants Catholic Haut Acajou Brule No 1 0% Double École - Voir 0 0 0 0 0
secondaire l’école 209
227 St Jean Baptiste-secondaire 0 Etudiants Catholic Bas Riaribes 0% Double École - Voir 0 0 0 0 0
l’école 226
319 Jean Paul II 0 Etudiants Summits Bas Petit Fond 0% Double École - Voir 0 0 0 0 0
l’école 237
240 Congreganiste St Thomas D'Aquin-3e 0 Etudiants Catholic Haut Lociane 0% Double École - Voir 0 0 0 0 0
cycle et secondaire l’école 239
247 Presb. De Botoncy 0 Etudiants Catholic Bas Renthe Mathe 0% Double École - Voir 0 0 0 0 0
l’école 251
216 Notre Dame Du P.Secours 0 Etudiants Catholic Bas Juampas 0% Double École - Voir 0 0 0 0 0
l’école 323
152 Ntre Dame Du Mt Carmel 0 Etudiants Catholic Bas Renthe Mathe 0% École Fermée 0 0 0 0 0
150 College Classique Evix Jolly 0 Etudiants Catholic Bas Renthe Mathe 0% École Fermée 0 0 0 0 0
107 Presbytérale Notre Dame De 0 Etudiants Catholic Haut Lociane 0% École Fermée 0 0 0 0 0
L'Asssomption
105 Presbyterale De St Joseph 0 Etudiants Catholic Haut Lociane 0% École Fermée 0 0 0 0 0
217 Notre Dame Du Mont-Carmel- 0 Etudiants Catholic Bas Juampas 0% École Fermée 0 0 0 0 0
Marouge
153 Coeur De Jesus 0 Etudiants Catholic Bas Juampas 0% École Fermée 0 0 0 0 0
205 Presbyterale De Chitry 0 Etudiants Catholic Bas Grand Boucan 0% École Fermée 0 0 0 0 0
102 Saint Gabriel 0 Etudiants Catholic Bas Des Bayes 0% École Fermée 0 0 0 0 0
101 Notre Dame De Lourdes-Marecage 0 Etudiants Catholic Haut Baille Tourrible 0% École Fermée 0 0 0 0 0
143 Presbyterale Bon Sauveur De 0 Etudiants Catholic Haut Aguahedionde(Riv d) 0% École Fermée 0 0 0 0 0
Lospalma
Model School Network Haiti +