EMMA: The Market System for Construction Labour in Port-au-Prince
Summary — The EMMA study of construction labour in Port-au-Prince, treating skills as a market.
Key Findings
- Finds 40 to 50 percent of construction workers were trained through apprenticeship and on-the-job training, over periods of up to two years.
- Reports estimates that students in formal training were learning only 60 to 70 percent of the skills needed.
- Treats labour and skills as a market system rather than as a capacity gap.
Full Description
The EMMA study of construction labour in Port-au-Prince, treating skills as a market. Reconstruction was about to demand far more trained builders than the city had, and the study quantifies how those builders were actually trained.
Full Document Text
Extracted text from the original document for search indexing.
Emergency Market Mapping & Analysis (EMMA) report
The Market System for Construction Labor in Port au Prince, Haiti
International Rescue Committee (Lead),
American Red Cross, Haitian Red Cross, International Federation of the Red Cross,
Save the Children, Mercy Corps, Oxfam GB, ACDI/VOCA,
World Food Program and FEWS/NET.
Port au Prince, Haiti
February 7-17, 2010
Section 1. Executive summary or brief
This Emergency Market Mapping and Analysis looked at the opportunities for earthquake-
affected populations to gain employment in the construction sector. Prior to the earthquake,
construction had been identified as an area of potential job growth and a priority sector for the
government, however there was a mismatch between skills available in the labor market and
jobs available. Professional, skilled, and semi-skilled workers were all in demand, but this
demand was often filled by foreigners, in particular workers from the Dominican Republic. Now,
as a result of the destruction, labor opportunities in the construction sector are anticipated to
increase ten-fold.
Previously, formal training for the construction sector was provided through universities (of
which four are recognized as providing a high quality education), numerous technical schools,
and a few NGO training centers. However, about 40-50% of workers were trained through
apprenticeships and on the job training, for periods up to two years. Quality of education varied
widely across formal training options, with some estimates indicating that students were learning
only 60-70% of the skills needed. Professionalism and other non-technical competencies, such as
project management, were also regularly noted as being in high demand, but difficult to find.
With all four of the universities known for training engineers and many technical schools
destroyed in the earthquake the options for quickly training professional, skilled, and semi-skilled
workers are severely limited. A rough estimate indicates that 100,000 people will need to be
trained to ensure Haitians have access to new jobs in the construction sector. Universities,
training centers, and informal training mechanisms must be immediately supported to “build
back better” if Haitians are to benefit from the increased employment opportunities in their
country.
Access to heavy equipment, availability of construction credit at the household and business
level, and clarity on government policies will play a large role in how quickly the reconstruction
efforts can truly start and employment benefits be gained. Humanitarian efforts now are
focused on transitional shelters that can be built by three people in one day. However, this
shelter is only designed to last 3-4 years. The trauma of the earthquake has created a window of
opportunity to change building practices and preferences, as people have direct experience of
the importance of appropriate construction practices and good quality construction materials.
Yet the opportunity for change is small compared to the size of the task ahead. Initial damage
estimates indicate that it could take up to 10 years to rebuild to previous levels, before
considering future growth.
Another barrier to employment is the fact that most employment is found through personal
contacts. This means it can be difficult for individuals to get their first position and gain job
experience, lack of job experience then limits job opportunities. One recommendation is to
create a placement agency that can vet potential candidates and verify certifications for
companies and individual engineers wanting to putt together teams.
The recently passed minimum wage does not seem to be an issue for the construction sector, as
market rates for nearly all positions are well above the minimum wage.
Recommendations for responses include options that address both supply and demand
constraints, as well as enabling environment issues:
Demand-side responses:
• Improve communication to the public on government support for rubble removal,
property rights, building permits, zoning, etc.
• Improve access to credit for construction -- with appropriate terms and conditions – for
both households and businesses
• Build Social Housing
Supply-side responses:
• Short-term skills training, including masons, carpenters, electricians, etc. by NGOs
• Physical rehabilitation of training institutions
• Capacity building of management, faculty, and staff of training institutions, including
upgrading skills to address natural hazards (earthquakes, hurricanes)
• Organize apprenticeships and facilitation of trainees entry into the market
Labor Market Matching
• Review of existing construction sector related curricula to include shortened training
cycles and inclusion of measures to mitigate natural hazards.
• Creation of a Placement Agency for all levels of worker in the construction sector
• Creation of a virtual job board for the construction sector to match local companies with
local workers as well as diaspora
• Short-term recruitment of diaspora civil engineers and technicians to promote
responsible recruitment and avoid poaching qualified staff from the local private sector
Laws and Regulations
• Improving and enforcing laws and regulations for property rights and zoning
• Inspection and enforcement of building permits and improved construction norms
Section 2. Emergency context
On January 12, 2010 an earthquake of 7.0 magnitude hit the island of Haiti, approximately 25 km
(16 miles) west of Port au Prince. The earthquake occurred at 16:53 local time. The Haitian
government estimated that up to 230,000 died country-wide in the quake, and another 300,000
were injured. According to the UN approximately 800,000 have been displaced in Port au Prince,
many of whom are living in spontaneous urban camps. Approximately 38% of all buildings in
greater Port au Prince have been damaged or destroyed according to the UN. WFP has
distributed food to more than 2.5 million people in Port au Prince and outlying areas.
Section 3. EMMA methodology
The EMMA is a rapid market analysis designed to be used in the first 2-3 weeks of a sudden onset
crisis. Its rationale is that a better understanding of the most critical markets in an emergency
situation enables decision makers (i.e. donors, NGOs, government, other humanitarian actors) to
consider a broader range of responses. It is not intended to replace existing emergency
assessments, or more thorough household and economic analyses such as the HEA, but instead
should add to the body of knowledge after a crisis.
In Haiti the EMMA team was made up of 18 staff members from 11 organizations including:
International Rescue Committee (Lead), American Red Cross, Haitian Red Cross, International
Federation of the Red Cross, Save the Children, Mercy Corps, Oxfam GB, World Food Program,
ACDI/VOCA, and FEWS/NET. While EMMA is designed to be used by those without economic
training, this team had a mix of those with significant market experience and those with none.
Approximately two days of training was provided, with additional training throughout the course
of the assessment on various aspects of the tool.
Field work primarily took place in Port au Prince, with secondary sources and desk-based
research used to maximize use of available information. Interviews were held with key players in
the market system, as well as support players.
Challenges that were experienced by the EMMA team included: 1) the time it took to move from
one location to another within the city; 2) the lack of security in some areas; 3) field days that fell
during the government-mandated three days of mourning. All of these reduced the amount of
time available for field work. As a result, field teams relied on fewer sources that would have
been ideal, and relied more on secondary information from trusted sources.
Section 4. The target population
The target population for all market chains studied through the EMMA process was earthquake-
affected population of greater Port au Prince. Market chains were selected based on their
applicability to the widest number of affected people.
More than 2 million people in greater Port au Prince were affected by the earthquake. The
impact was spread across wealth groups, although many homes of the wealthiest were
constructed in a manner that prevented significant damage. However, many assets from this
group were lost, which will affect the pace of reconstruction. Middle classes invested much of
their wealth in building their homes over a relatively long period of time, and are unlikely to have
access to funds for immediate rebuilding. The poor and very poor had sub-standard homes and
proportionally fewer investments to lose, but have suffered greatly from the loss of income. The
EMMA team chose not to disaggregate the target population, due to the widespread needs
across the city and all wealth groups.
The seasonal calendar below shows the timing of various activities that relate to food security,
shelter, or income needs and opportunities for the target population.
JAN FEB MARCH APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC
Rains
Road
Conditions OK BAD OK BAD OK
Cyclones
Lean Season
Food Prices highest highest
Education Holidays Education costs
Remittances
increase
Planting Beans Highlands highlands lowlands
Harvest
Corn/Beans
Planting Rice
Harvest Rice small season big season
Christmas/
King's Marriage
Holidays Day Carneval Easter Season
Section 5. Critical market systems
The market systems selected were chosen because they affect large sections of the target
population. Participants were asked prior to the start of the EMMA to identify markets that they
felt would be important to consider. On the second day of the EMMA training, a brainstorming
session began with these initial suggestions, followed by additional suggestions from the
participants. The group looked at market systems that fell into three categories: emergency
needs, income potential, and longer term livelihood support. Six market systems were
shortlisted: beans, rice, water vendors, construction labor, shelter materials, and cooking fuel.
Due to the size of the group it was necessary to select only four markets to analyze. After much
discussion, and with Participants considered the market systems that would be of greatest
interest to their organizations, and after much discussion, two food markets were selected
(beans and rice), one income market (construction labor), and one type of shelter material
(corrugated iron sheeting (CGI)). This report refers to the construction labor market, but the
findings are naturally linked with those of the shelter materials group. The Key Analytical
Question that this report addresses is: What are the opportunities for affected populations to
gain employment in the construction sector?
Section 6. Market-system maps
During this study nearly all actors in the construction labor market reported being at a standstill,
with construction work limited to repairs of structurally sound buildings. Training schools and
institutions, whether formal or informal, have suffered from a loss of their students, professors,
and infrastructure. Large companies are “waiting for the contract” – although they have staff and
equipment that can be used for reconstruction, they too have suffered losses. And average
homeowners do not yet seem ready to think about rebuilding, despite the pressure off the
approaching rainy season; early indications are that people are purchasing materials for repairs,
but not for rebuilding.
The baseline map below shows that even prior to the earthquake there was a shortage of semi-
skilled, skilled, and professional workers. Dotted lines show where the supply of qualified
students is not enough to meet industry demands, whereas the width of the line indicates the
relative volume of the flow of workers. Relative number of workers or businesses in each
category is represented by the size of the boxes. The extremely conservative nature of the
Haitian banking system also meant that very few people took loans for building or purchasing
their homes, although several banks do offer loan products specifically for these activities.
Baseline Market-system Map – Construction Labor Symbol Key
The market environment:
institutions, rules,
Migration Critical issue !
Conflicts of Major disruption
norms & trends
Building Permits
interest in Gov’t
contracts
Lack of skilled &
proffessional ! Land Tenure
Partial disruption
Unskilled Self-Build/Informal
The market chain: Workers 20-60% of mkt Homes,
market actors & their linkages 200-400 gd/day Storage
On the Job
Training
Independent
Engineers
Semi-skilled N=60-100+ Homes, Shops,
NGO Apartments
Training Workers
N= approx 5 1250-2500gd/day
Small Construction
Companies Schools,
Technical N=20-25 Hospitals,
Schools Skilled Universities
N=100 Med Construction
Workers Companies
2250-3250gd/day N=35-42
Universities
Institutions,
N=4+ Professional Large Companies Roads, Ports
Workers N=3-6
$500-5000/mo
Color key
Increased fuel Credit
prices
Roads/Port
(households &
businesses) ! Informal
Availability of Professional
Key infrastructure, inputs infrastructure
and market-support services construction
machinery Mid-level
In the table above, unskilled workers the lowest level workers (ouvrier), who report to a semi-
skilled worker (manouevre) these are, for example: bricklayers, carpenters, tilers, glaziers, or
head painters. Surveyor s, masons, plumbers, electricians, etc., fall into the category of skilled
workers, and engineers and architects are considered to be professionals. An average-sized 2
bedroom house would employ around 60 people for various periods over a four month
timeframe.
As the map above shows all skill levels are needed to make a team, and therefore all skill levels
are represented in the various types of firm, with independent building being the obvious
exception. In the case of independent builds, it is unusual for any professional help to be hired,
due to the cost. Usually engineers assistants or another skilled technical person will be consulted
during the building process, leading to a wide variance in the quality of the build.
The total number of firms represented in the map above is lower than shown in previous value
chain analyses (AMAP/USAID), but is based on conversations with AHEC (Association of Haitian
Construction Enterprises) and key informants in the construction sector. It represents those
business that are considered “established” with a capacity to do significant work, and excludes
those businesses that have limited capacity to undertake contracts or are not operating on a
regular basis.
In the post-earthquake map (current situation), one can see that the greatest changes are the
severe disruption to the supply of trained professional and skilled workers, as a result of the
destruction of many technical schools and all four of the universities with significant engineering
programs. The loss of life in these institutions, as well as at private construction firms will
seriously impact the supply of highly skilled labor available for the reconstruction efforts.
Post-earthquake Market-system Map – Construction Labor Symbol Key
The market environment: Migration Re-zoning of
city
! Critical issue !
institutions, rules,
Conflicts of Major disruption
norms & trends
Building Permits
interest in Gov’t
contracts
Lack of skilled &
proffessional ! Land Tenure
Partial disruption
Unskilled
The market chain: Workers Self-Build/Informal Homes,
market actors & their linkages 200-400 gd/day ??% of mkt Storage
On the Job
Training
Independent
Engineers Homes, Shops,
NGO Semi-skilled
N=45-? Apartments
Training Workers
N= 5 1250-2500gd/day
Small Construction
Companies Schools,
Technical N=20-25? Hospitals,
Schools Skilled Universities
N= Med Construction
Workers Companies
2250-3250gd/day N=35-42?
Universities
Institutions,
N=0 Professional Large Companies Roads, Ports
Workers N=3-6
$500-5000/mo
Color key
Increased Fuel Loss of Assets Credit
Prices
! (households &
businesses) ! Informal
Availability of Professional
Key infrastructure, inputs
and market-support services construction
machinery
! Roads/Port
infrastructure Mid-level
In addition, the lack of heavy machinery (and skilled drivers to use it), the government’s plans for
re-zoning the city, and the conservative terms and conditions of loans currently available for
construction will all have an impact on how quickly reconstruction of Port au Prince can begin.
Without addressing these issues, the construction labor market will not grow quickly, or be able
to provide income to those who have lost their jobs or the 70% of the population that was
unemployed prior to the earthquake.
In an effort to determine the scope and scale of actions that need to be taken by the
international community to create jobs quickly and begin early recovery, the EMMA team has
provided very rough estimations of the number of people required at each skill level to rebuild
Port au Prince. The estimates are based on government figures of Feb 15, which show a total of
131,000 destroyed or damaged buildings. Estimating 18-20sqm needing to be repaired/rebuilt
over a 10 year period, the workforce below would be required. Since many buildings are
significantly larger and more complex than this, we believe this is a conservative estimate.
Future Projected Market-system Map – Symbol Key
Estimated Demand for Construction Labor
The market environment: Migration Re-zoning of
city
! Critical issue !
institutions, rules,
Conflicts of Major disruption
norms & trends
Building Permits
interest in Gov’t
contracts
Lack of skilled &
proffessional ! Land Tenure
Partial disruption
Unskilled
The market chain: Workers 52,400 pax Self-Build/Informal Homes,
market actors & their linkages 200-400 gd/day 60+% of mkt Storage
On the Job
Training
Independent Homes, Shops,
Engineers Apartments
NGO Semi-skilled
39,300 pax 1030/mo
Training Workers
1250-2500gd/day 13,100/year
N= 10+ Small Construction
Companies
Schools,
Technical Hospitals,
Schools Skilled 26,200 pax Med Construction Universities
N= ? Companies
Workers
2250-3250gd/day
Universities
13,100 pax Large Companies Institutions,
N=? Professional
N=10-12 Roads, Ports
Workers
$500-5000/mo
Color key
Loss of Assets Credit
Increased Fuel
Prices ! (households &
businesses) ! Informal
Availability of Mid-level
Key infrastructure, inputs Roads/Port
and market-support services construction
machinery ! infrastructure Professional
As the map shows, the number and/or size of all companies is expected to increase, as is the
number of people who self-build or use informal methods to rebuild. Government regulations,
and more importantly their enforcement, will be essential to ensuring that a disaster of a similar
nature does not happen again.
Section 7. Key findings – results of the gap and market analyses
The gap analysis results
The EMMA process normally provides a “gap analysis” which identifies the “gap” faced by the
targeted population with regards to a particular commodity (need - resources available = gap).
With an income market selected, the gap obviously takes the form of income before as
compared to after the crisis.
We know from FEWS/NET baseline survey of 2009 that the very poorest have an average income
of 9500-12500 Gourdes per month, and that they do participate in casual construction labor.
This is likely to equate with the unskilled workers identified in our market mapping. Poor
households in Port au Prince make 12500-17,500 Gds per month and also participate in casual
construction labor. This is also likely to be represented in our maps in the unskilled labor
category. Middle income households, according to FEWS/NET make 17,500-25,000Gds per
month, and are likely to hold positions categorized as semi-skilled on our maps. While nearly
31% of the Haitian population receives remittances, in fact, the poorest are the least likely to
receive them because they have never been able to afford to educate family members abroad or
send them overseas. Initial estimates show that households are facing is a 60-70% drop in their
income. This gap will obviously continue until household livelihoods can be renewed, which will
depend upon how quickly households are able to rebuild their assets, and the strength of the
market overall. Once the situation has stabilized it will be important to do a full HEA or baseline
study to gather more in depth information on the household income, expenditures, coping
mechanisms, and recovery strategies.
The Emergency Food Security Assessment (EFSA) of WFP will provide qualitative information on
livelihoods pre and post-earthquake, as well as information about coping mechanisms.
Therefore this information, when available should be used to build on the information provided
by the EMMA.
The market analysis results
Prior to the earthquake, Haiti’s unemployment rate was over 70%, and a disproportionate
number of youth were among the unemployed. Training was seen as essential to addressing this
problem. A workforce analysis done by USAID in 2007 recommended that “a very strong
emphasis should be put on the strengthening of the informal market, where there is apparently
the greatest short term potential”. It went on to say that basic commercial skills and a
professional attitude were in high demand in both the formal in and informal sectors. The study
showed construction to be one of the top three sectors with potential for employment. Many
respondents in this same study commented that within the construction sector there was a need
for practical techniques and skills, rather than specialized and advanced skills.
The construction labor market was selected for the EMMA because of the anticipated potential
growth in that sector given the number of buildings destroyed and the need for reconstruction.
However, it should be noted that with regards to home construction, two factors that pre-
earthquake were very common in home construction: However, it was very common for people
to build their house slowly over time, as they were able to earn money, rather than borrowing
funds to build the house all at once. This practice may be reinforced as people are unwilling to
take loans when they are not certain what will happen next. As one informant put it: “Why
would they take loans? Their house could fall down again and then they wouldn’t have house,
but they would still have a debt.”
The second factor is that prior to the earthquake approximately 60% of the households built
their home “informally” without hiring any professional help in the form of engineers or
construction companies. While it is possible that many households will now seek professional
help in rebuilding to reassure themselves that seismic-resistant measures have been used in
construction, many will not be able to afford to hire professional help. IOM’s shelter plans for
Phase II (starting in May) call for building “transitional shelters” intended to last 1-3 years. While
this provides adequate time to properly rebuild homes, it may delay the opportunities for
increased employment.
The loss of so many training facilities – universities, vocational schools, NGO facilities – means
that both infrastructure as well as individuals must be supported. But in interviews with a variety
of different actors the EMMA team was told that this was an opportunity to change the
educational system so that it could better met the needs of the private sector.
An educational reform was ongoing prior to the earthquake. However, in the last few days a
government-led committee has met to review building norms and standards, a panel of experts
with experience in serious natural disasters has reviewed the curriculum and advised on changes
that need to be made. These changes are expected to be enacted in the next 6 months, and
include: consulting with other earthquake and hurricane affected countries on best building
practice; reviewing the relevant curricula and; reinforcing support for Provincial level structures.
There is no question that there will be increased opportunities in the construction sector for the
next 10 years or more. The challenge is to ensure that Haitians are able to fill the new jobs and
perform them to a high standard. Without outside assistance and technical support, it is clear
that the existing training mechanisms will not be enough to meet the demand for labor in all
categories.
At the moment, people are still very hesitant to begin reconstruction. There are several issues at
the household level that impact their ability to begin rebuilding. First, households do not have
the estimated $5-6000 required to hire the heavy machinery to remove their destroyed home.
Even if they did, fear of repeating natural disasters makes them hesitant to invest. Many still fear
entering buildings. Yet there is a window of opportunity now to “build back better” people
understand with terrible clarity the need for quality building materials and improved building
standards.
However, having lost their assets and sources of income, they have no resources from which to
rebuild. Therefore the exact way that an increased construction labor market will develop is
difficult to predict, given that a number of critical factors determining the environment (e.g.
construction rules and regulations) in which reconstruction will occur remain uncertain for
present. Once there is evidence of momentum in rebuilding, it will be important to re-evaluate
the market -- through a more detailed labor market survey for example – to determine if initial
programming has had a positive or negative impact on the market and the extent to which
Haitians are being engaged in the increased demand for labor.
Section 8. Recommendations and conclusions
Response logic
The responses below are a mix of both direct and indirect activities to support Haitian
participation in the construction labor market. Because the solutions are inter-linked and
mutually supporting, it is recommended that implementers and donors consider a range of
options rather than implementing stand alone activities.
There is tremendous opportunity to create jobs in the construction sector, and if resources are
well-targeted there is an opportunity to support activities that meet immediate needs, as well as
supporting the longer term development of Haiti.
Table 1. Response options and recommendations
Option Implementation Methods Advantages Disadvantages Feasibility & Timing Indicators
Demand-side levers for the
labor market
Improve access to credit for To be determined – Prior experiences in other Banking sector may not be Within 12 months Number of businesses
construction with products/methods will be developing countries willing to change their obtaining credit for
appropriate terms and different for private sector International Finance Corporation practices construction
conditions business and households, etc. a potential supporter of such Households’ aversion to the
policies and programs use of credit for housing
Uncertain demand given
impact of earthquake on
physical assets
Complexity of measures
Costliness
Improve communication to Government People will be able to plan and None Within one month Number of radio
the public on: support for announcements, NGO act; increase (before start of the announcements
rubble removal, property information distribution stability/predictability rainy season) Number of survey
rights, building permits, channels respondents aware of
zoning, etc measures
Build social housing Government or NGO Increase employment Costliness 1-2 years or more Number of social housing
construction Provide resettlement option for Appropriate location units built
urban camp residents Potential to draw people
back to PaP
Supply-side levers for the
labor market
Training
Short-term training (NGOs) Training of masons, Increase in the supply of skilled Potentially unsustainable Immediately Number of individuals trained
carpenters, electricians, etc. and semi-skilled labor responding parallel training with Certification should be in skills in demand by the
by NGOs (VSO for instance; to gap in the market adverse impacts on existing recognized by Govt private sector
Habitat for Humanity Curriculum adapted to training institutions (Min of Ed, INFP, etc) Number of apprentices
International provides circumstances Number of start-up loans
training) Potential to upgrade skills of
Linking training to follow-on informally workers
options (apprenticeship, Could focus on special groups, ie.
small business loans, etc.) Young, older workers
Support to existing training Capacity building by NGOs Build long-term capacity of High cost Start in next three Number of buildings rebuilt
institutions: Collaboration between existing institutions Multi-faceted months, continue 3-6 Number students
1. Rehabilitation and foreign trade organizations, Reinforce local skills implementation years demonstrating competencies
reconstruction of NGOs, the INFP, and local Match supply of skills to demand Long-term and large-scale Requires in upgraded curriculum
facilities educational institutions such investment from donors government’s
2. Capacity building as Les Salésiens and Centre Limited short-term impact involvement thru
for management, pilote. long-term reform of
faculty, and staff of training policies
local institutions (in
relation to changes
in application of
anti-seismic norms)
3. Apprenticeship and
facilitation of
trainees’ entry in
the labor market
Update curriculum for skilled Review/revise current reform Skills match needs Potential to slow down Start immediately Number of curricula updated
and professional training to process for training certification process
take into account impact of institutions
earthquake
Labor market matching
Short term recruitment of NGO recruitment Access to skilled workers having Needs to be carefully immediately Number of diaspora civil
diaspora civil engineers and internationally familiarity with the local context monitored to ensure that engineers and technicians
technicians to avoid drawing Rapid impact local labor market is not involved in NGOresponse
skills out of local private negatively affected
sector Dependent on interest of
diaspora
Virtual job board for the Existing base with Potential irrelevance in the Feasible using existing Number of hits
construction sector to match www.jobpaw.com local context where web site Survey of human resources
local companies with both Low cost personal contacts personal
local workers and diaspora determine recruitment
Dependent upon behavioral
change in recruitment
methods
Placement agency for all Physical sites and virtual sites Existing base with Need trusted vetting system 6-12 months Number of job placements
levels of worker in the www.jobpaw.com or certification recognition
construction sector Virtual placement has low cost
Provides alternative to personal
contacts system for finding jobs
Employers express interest and
willingness to use
Laws and regulations
Improving and applying law Encourage Parliament to Potential to increase available Needs minimum regulations After elections Passing of law on multiple
and regulations for land adopt law allowing separate housing and rational use of space in place ownership rigths
property rights and zoning ownership within one
building (previously in
process) Transparency on procedures People have lost identity Immediate
Coordination by stakeholders documents and title
on how to address unclear documents
land tenure
Inspection and enforcement Government to improve and Increase quality, safety, and Requires change in behavior Medium to long term Norms and regulations are
of building permits and anti- apply existing requirements longevity of buildings and houses, of builders and government clea to companies
seismic construction norms better disaster preparedness officials Public support Number of inspection per
Better urban planning and Increase in building cost providing window of building permit awarded
delivery of public services (water, Increase in land use for opportunity
sanitation, etc.) construction/urban sprawl
Higher demand for technicians and loss of arable land
Use of anti-seismic cyclone-
resistant norms