Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / World Bank
Rebati enfrastrikti enèjetik yo ak aksè a enèji
Tit pibliye: Rebuilding Energy Infrastructure and Access
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The objectives of the Project are to (a) strengthen energy policy and planning capacity, (b) to improve the sustainability and resilience of the electricity sector and to restore and expand access to reliable electricity services, and (c) provide financial assistance to the electricity sector in case of an emergency.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
Deskripsyon
The objectives of the Rebuilding Energy Infrastructure and Access Project for Haiti are to (a) strengthen the recipient's energy policy and planning capacity; (b) improve the sustainability and resilience of the recipients electricity sector and restore and expand access to reliable electricity services; and (c) provide financial assistance in case of an energy sector emergency. The project has three components. (1) Strengthening energy sector institutions and improving energy access. (2) Enhancing Electricite d'Haiti (EDH's) performance and rehabilitating and expanding infrastructure. (3) Energy sector risk and emergency response contingent reserve component will provide support upon occurrence of an energy sector emergency through: (a) the carrying out of emergency recovery and rehabilitation activities; and/or (b) technical assistance to support Ministry of Public
plis
Works, Transport, Energy and Communication (MTPTEC) and EDH in its response to an energy sector emergency.
- Patnè
- World Bank Group, World Bank
- Sektè
- Enèji
- Etap
- Fèmen depi 31 out 2020
- Apwobasyon
- 27 septanm 2012
- Fèmen
- 31 out 2020
- Enstriman
- Finansman BIRD/IDA, Grants
- Diferans nan sa ki poko dekese
- 13.1: fon fidisyè yo pa nan eta IDA a, ki bay montan ki poko dekese pou lajan IDA sèlman; eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Anprentè
- Republic of Haiti
- Ajans egzekisyon
- EDH,MTPTC, UCP Energie
- Antre an vigè
- 6 fevriye 2013
- Depatman
- Lwès, Sant, Sid, Nò, Latibonit
- Dènye tranzaksyon
- 31 jiyè 2022
- Idantifyan operasyon an
- P127203
Sik lavi5 etap, 14 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 7 jiyè 2011 |
| Apwouve | 27 septanm 2012 |
| An kou | 27 septanm 2012 |
| Ap fèmen | 31 out 2020 |
| Fèmen | 31 out 2020 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 7 jiyè 2011 | Pwojè Bank Mondyal |
| Kòmansman prevwa | 29 mas 2012 | IATI |
| Evalyasyon davans | 16 jiyè 2012 | Pwojè Bank Mondyal |
| Negosyasyon | 14 out 2012 | Pwojè Bank Mondyal |
| Kòmansman reyèl | 27 septanm 2012 | IATI |
| Apwobasyon | 27 septanm 2012 | Pwojè Bank Mondyal |
| Premye angajman | 27 septanm 2012 | Tranzaksyon |
| Piblikasyon | 2 oktòb 2012 | Pwojè Bank Mondyal |
| Antre an vigè | 6 fevriye 2013 | Pwojè Bank Mondyal |
| Premye dekèsman | 30 avril 2013 | Tranzaksyon |
| Fen reyèl | 31 out 2020 | IATI |
| Dat fèmti | 31 out 2020 | IATI |
| Dènye dekèsman | 31 mas 2021 | Tranzaksyon |
| Rapò fen atann | 28 jiyè 2021 | Pwojè Bank Mondyal |
Pa dekèse: 0.0 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 31 out 2020.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 90.0 | Enstitisyon | Pwojè Bank Mondyal |
| Clean Technology Fund | 10.0 | Fon fidisyè | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 55.7 | IDA, eta kredi ak don | 49.0 |
| Dekèse | 42.6 | IDA, eta kredi ak don | 42.6 |
| Pa dekèse | 0.0 | IDA, eta kredi ak don | |
| Pri total | 100.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Chanjman nan operasyon an2 pwolongasyon, omwen 4 restriktirasyon
- Dat fèmti orijinal
- 31 desanm 2017
- Pwolongasyon dat fèmti
- 2
- Pwolonje soti 31 desanm 2017 rive 29 novanm 2019 (dokiman 31 janvye 2018)
- Pwolonje soti 29 novanm 2019 rive 31 out 2020 (dokiman 31 desanm 2019)
- Restriktirasyon
- omwen 4
- 19 desanm 2017 (dokiman 19 desanm 2017) dokiman restriktirasyon
- 19 jiyè 2019, Nivo 2, direksyon an apwouve l (dokiman 19 jiyè 2019) dokiman restriktirasyon
- 27 novanm 2019, Nivo 2, direksyon an apwouve l (dokiman 27 novanm 2019) dokiman restriktirasyon
- 27 out 2020, Nivo 2, direksyon an apwouve l (dokiman 27 out 2020) dokiman restriktirasyon
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | FY2013-14Milyon dola ameriken | FY2014-15Milyon dola ameriken | FY2015-16Milyon dola ameriken | FY2016-17Milyon dola ameriken | FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | FY2019-20Milyon dola ameriken | FY2020-21Milyon dola ameriken | FY2021-22Milyon dola ameriken | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Nouvo angajman | 100.0 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | −26.9 | −15.3 | −2.1 | Pa rapòte | −0.0 |
| Dekèsman | Pa rapòte | 0.3 | 2.0 | 6.6 | 8.4 | 5.6 | 7.6 | 6.1 | 4.5 | 1.7 | Pa rapòte |
| Dekèsman kimile | Pa rapòte | 0.3 | 2.2 | 8.8 | 17.2 | 22.8 | 30.4 | 36.5 | 40.9 | 42.6 | Pa rapòte |
Fich ak dokiman
Tranzaksyon74 liy, 27 septanm 2012 rive 31 jiyè 2022
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 27 septanm 2012 | Angajman | 90.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 27 septanm 2012 | Angajman | 10.0 | Pwojè Bank Mondyal | trust funds in the Projects API financier list, not in the IDA statement, at the board approval date |
| 31 janvye 2018 | Angajman | −26.9 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2019 | Angajman | −15.3 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2020 | Angajman | −2.1 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2022 | Angajman | −0.0 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2013 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2013 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2013 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2013 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2013 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2014 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2014 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2014 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2014 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2014 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2014 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2014 | Dekèsman | 1.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2014 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2015 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2015 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2015 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2015 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2015 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2015 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2015 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2015 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2015 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2015 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2015 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2016 | Dekèsman | 2.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2016 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2016 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2016 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2016 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2016 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2016 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2017 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2017 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2017 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2017 | Dekèsman | 1.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2017 | Dekèsman | 1.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2017 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2017 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2017 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2017 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2018 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2018 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2018 | Dekèsman | 1.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2018 | Dekèsman | 2.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2018 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2018 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2018 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2019 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2019 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2019 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2019 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2019 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2019 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2019 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2019 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2019 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2020 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2020 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2020 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2020 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2020 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2020 | Dekèsman | −0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2020 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2021 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2021 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2021 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon5 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Wi
Kote5 depatman, 8 kote nonmen, 14 kote ki gen kowòdone
| Depatman | Lwès, Sant, Sid, Nò, Latibonit |
| Kote sous la nonmen | Cap-Haïtien, DEpartement de l'Artibonite, Drouet, Département de l'Artibonite, Grand Goâve, Mirebalais, Petit Goâve, Port-au-Prince |
| Kote ki gen kowòdone | 14 |
Endikatè rezilta14 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Capacity of Renewable Energy (including Hydropower) constructed or rehabilitated | 2.00 | 4.00 | 3.08 | 31 out 2020 |
| Distribution lines rehabilitated | 0.00 | 148.00 | 186.00 | 31 out 2020 |
| Electricity sector financial model and energy sector database | No model exists for the sector. | Data and financial model updated | The model is utilized to prepare budget proposal, | 31 out 2020 |
| External audits of EDH accounts | No audit conducted since 2006. | External audit of accounts available | Carrying out the External Audit of EDH accounts ov | 31 out 2020 |
| Government entity responsible for the energy sector adequately staffed | No Government entity exists to oversee the energy | Idem as original target | 2 permanent staff allocated to support MTPTC's Ene | 31 out 2020 |
| Offgrid access to electricity for collective uses (street lighting, schools etc.) | 0.00 | 1500.00 | 2038.00 | 31 out 2020 |
| Offgrid connections to electricity | 0.00 | 15000.00 | 19040.00 | 31 out 2020 |
| People provided with new or improved electricity service | 0.00 | 20000.00 | 2501.00 | 31 out 2020 |
| Restored connections | 0.00 | 33000.00 | 16806.00 | 31 out 2020 |
| Technical and non technical losses | 66.00 | 50.00 | 70.00 | 31 out 2020 |
| Cash Recovery Index | 22.00 | 35.00 | 37.80 | 31 out 2020 |
| Direct project beneficiaries | 0.00 | 200000.00 | 151822.00 | 31 out 2020 |
| Strengthening of Government's oversight capacity and transparency in sector financial flows | Oversight capacity is weak in utility EDH, non exi | Oversight capacity strengthened; Energy Cell with | The Energy Cell is fully operational. It is suppor | 31 out 2020 |
| Female beneficiaries | 28000.00 | 0.00 | 81500.00 | 15 jen 2018 |
Nòt17 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | 7 fevriye 2022 |
| IEG borrowcompliance | Not Rated | 7 fevriye 2022 |
| IEG evaltype | ES | 7 fevriye 2022 |
| IEG icrquality | Substantial | 7 fevriye 2022 |
| IEG mequality | Modest | 7 fevriye 2022 |
| IEG outcome | Moderately Unsatisfactory | 7 fevriye 2022 |
| IEG overallbankperf | Moderately Satisfactory | 7 fevriye 2022 |
| ICR bankqualityentry | Not Rated | 28 jiyè 2021 |
| ICR banksupervision | Not Rated | 28 jiyè 2021 |
| ICR outratingind | Moderately Unsatisfactory | 28 jiyè 2021 |
| ICR overallrating | Moderately Satisfactory | 28 jiyè 2021 |
| ISR Financial Management | Moderately Satisfactory | 2 mas 2020 |
| ISR Monitoring and Evaluation | Satisfactory | 2 mas 2020 |
| ISR Overall Implementation Progress (IP) | Moderately Unsatisfactory | 2 mas 2020 |
| ISR Procurement | Moderately Unsatisfactory | 2 mas 2020 |
| ISR Progress towards achievement of PDO | Moderately Unsatisfactory | 2 mas 2020 |
| ISR Project Management | Moderately Unsatisfactory | 2 mas 2020 |
Kontra yo bay2 kontra
| Founisè | Dat | Metòd | Montan |
|---|---|---|---|
| Accounting & Finance Corp. (Acfinco) | 22 fevriye 2021 | QCBS | 10,600 USD |
| Non an pa afiche | 31 desanm 2018 | INDV | 3,190,000 Gourde hatienne |
Lajan ki pase bay lòt73 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| EDH; MTPTC, UCP Energie | Angajman | 31 jiyè 2022 | −0.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 me 2021 | −0.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2021 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 28 fevriye 2021 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2020 | 1.5 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 septanm 2020 | −0.1 |
| EDH; MTPTC, UCP Energie | Angajman | 31 out 2020 | −2.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 me 2020 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 avril 2020 | 0.8 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2020 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 29 fevriye 2020 | 0.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 janvye 2020 | 0.5 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 desanm 2019 | 0.6 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2019 | 0.9 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2019 | 0.7 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 out 2019 | 1.1 |
| EDH; MTPTC, UCP Energie | Angajman | 31 jiyè 2019 | −14.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 jiyè 2019 | 1.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 jen 2019 | 1.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 me 2019 | 0.8 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2019 | 0.9 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 janvye 2019 | 0.6 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 desanm 2018 | 0.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2018 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 septanm 2018 | 0.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 jen 2018 | 2.8 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 me 2018 | 1.9 |
| EDH; MTPTC, UCP Energie | Dekèsman | 28 fevriye 2018 | 0.2 |
| EDH; MTPTC, UCP Energie | Angajman | 31 janvye 2018 | −25.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 janvye 2018 | 1.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 desanm 2017 | 0.7 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2017 | 0.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2017 | 0.6 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 septanm 2017 | 1.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 out 2017 | 1.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 jiyè 2017 | 1.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 avril 2017 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2017 | 0.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 28 fevriye 2017 | 1.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2016 | 0.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2016 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 septanm 2016 | 1.0 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 out 2016 | 1.5 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 jiyè 2016 | 0.7 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2016 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 29 fevriye 2016 | 2.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 desanm 2015 | 0.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2015 | 1.5 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2015 | 0.9 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 septanm 2015 | 0.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 out 2015 | 0.7 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 jiyè 2015 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 jen 2015 | 0.4 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 me 2015 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 avril 2015 | 0.9 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2015 | 1.5 |
| EDH; MTPTC, UCP Energie | Dekèsman | 28 fevriye 2015 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 desanm 2014 | 0.6 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2014 | 1.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2014 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 septanm 2014 | 0.7 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 jiyè 2014 | 0.3 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 jen 2014 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 me 2014 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 avril 2014 | 0.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 mas 2014 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 janvye 2014 | 0.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 desanm 2013 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 novanm 2013 | 0.2 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 oktòb 2013 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 31 out 2013 | 0.1 |
| EDH; MTPTC, UCP Energie | Dekèsman | 30 avril 2013 | 0.2 |
| EDH; MTPTC, UCP Energie | Angajman | 30 septanm 2012 | 90.0 |
Idantifyan4 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P127203 | IATI |
| Kredi oswa don IDA | IDAH8060 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-H8060 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P127203 | Fich operasyon an |
Kote sous yo pa dakò2 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Angajman | IDA, eta kredi ak don | 55.7 milyon dola ameriken | ✓ |
| Angajman | IATI | 49.0 milyon dola ameriken | |
| Angajman | Pwojè Bank Mondyal | 100.0 milyon dola ameriken | |
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a47 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - HT Rebuilding Energy Infrastr Access, 7 fevriye 2022, documents.worldbank.org
- Haiti - Projet de Reconstruction de l’Infrastructure Electrique et d’Expansion de l’Acces a l’Energie, 29 jiyè 2021, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project, 29 jiyè 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P127203 - Rebuilding Energy Infrastructure and Access - Audited Financial Statement, 21 jiyè 2021, documents.worldbank.org
- Disclosable Restructuring Paper - Rebuilding Energy Infrastructure and Access - P127203, 27 out 2020, documents.worldbank.org
- Disclosable Version of the ISR - Rebuilding Energy Infrastructure and Access - P127203 - Sequence No : 12, 2 mas 2020, documents.worldbank.org
- Disclosable Restructuring Paper - Rebuilding Energy Infrastructure and Access - P127203, 27 novanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P127203- Rebuilding Energy Infrastructure and Access - Procurement Plan, 17 septanm 2019, documents.worldbank.org
- Disclosable Version of the ISR - Rebuilding Energy Infrastructure and Access - P127203 - Sequence No : 11, 7 out 2019, documents.worldbank.org
- Disclosable Restructuring Paper - Rebuilding Energy Infrastructure and Access - P127203, 19 jiyè 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P127203- Rebuilding Energy Infrastructure and Access - Procurement Plan, 16 me 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P127203- Rebuilding Energy Infrastructure and Access - Procurement Plan, 12 avril 2019, documents.worldbank.org
- Disclosable Version of the ISR - Rebuilding Energy Infrastructure and Access - P127203 - Sequence No : 10, 16 janvye 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P127203- Rebuilding Energy Infrastructure and Access - Procurement Plan, 15 janvye 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P127203- Rebuilding Energy Infrastructure and Access - Procurement Plan, 12 desanm 2018, documents.worldbank.org
- Disclosable Version of the ISR - Rebuilding Energy Infrastructure and Access - P127203 - Sequence No : 09, 29 jen 2018, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : restructuring, 17 janvye 2018, documents.worldbank.org
- Disclosable Version of the ISR - Rebuilding Energy Infrastructure and Access - P127203 - Sequence No : 08, 31 desanm 2017, documents.worldbank.org
- Official Documents- Agreement Providing for the Amendment and Restatement of the Financing Agreement for Grant H806-0-HT, 22 desanm 2017, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : restructuring : Disclosable Restructuring Paper - Rebuilding Energy Infrastructure and Access - P127203, 19 desanm 2017, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 07, 28 jen 2017, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 06, 20 desanm 2016, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 05, 9 mas 2016, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 04, 30 jen 2015, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 03, 12 mas 2014, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 02, 12 out 2013, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access : P127203 - Implementation Status Results Report : Sequence 01, 15 janvye 2013, documents.worldbank.org
- Official Documents- Supplemental Letter ref. Financial Data, Grant H806-HT (Closing Package), 6 novanm 2012, documents.worldbank.org
- Official Documents- Financing Agreement, Grant H806-HT (Closing Package), 6 novanm 2012, documents.worldbank.org
- Official Documents- Letter ref. Disbursement, Grant H806-HT (Closing Package), 6 novanm 2012, documents.worldbank.org
- Project Information Document (Concept Stage) - Rebuilding Energy Infrastructure and Access - P127203, 1 oktòb 2012, documents.worldbank.org
- Official Documents- Disbursement Letter for Advance Q835-HT, 26 septanm 2012, documents.worldbank.org
- Official Documents- Agreement for Advance Q835-HT, 26 septanm 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : Haiti- Projet de reconstruction de linfrastructure électrique et dexpansion de laccès à lélectricité, 27 out 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project, 27 out 2012, documents.worldbank.org
- Integrated Safeguards Data Sheet (Appraisal Stage) - Rebuilding Energy Infrastructure and Access - P127203, 27 jiyè 2012, documents.worldbank.org
- Project Information Document (Appraisal Stage) - Rebuilding Energy Infrastructure and Access - P127203, 25 jiyè 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : framework for environmental and social management (Vol. 4 of 6) : Cadre de Gestion Environnementale et Sociale, 1 jiyè 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : framework for environmental and social management (Vol. 1 of 6) : Plan de gestion environnementale et sociale, 1 jiyè 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : abbreviated resettlement plan (Vol. 1 of 2) : Plan succinct de reinstallation, 1 jen 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : abbreviated resettlement plan (Vol. 2 of 2) : Cadre de Politique de Réinstallation, 1 jen 2012, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project, 21 jiyè 2011, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : framework for environmental and social management (Vol. 3 of 6) : Annexe 8, 30 avril 2007, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : framework for environmental and social management (Vol. 2 of 6) : Annexe 7, 30 avril 2007, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : framework for environmental and social management (Vol. 5 of 6) : Annexe 7, 30 avril 2007, documents.worldbank.org
- Haiti - Rebuilding Energy Infrastructure and Access Project : framework for environmental and social management (Vol. 6 of 6) : Annexe 8, 30 avril 2007, documents.worldbank.org
Avi apèl dòf (2)
- Procurement Notices, projects.worldbank.org
- Contract Awards, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Avi pasasyon mache Bank mondyal: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Avi pasasyon mache Bank mondyal | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Rebati enfrastrikti enèjetik yo ak aksè a enèji. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP127203?lang=ht