Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA
Pwojè repons ijans kont kolera
Tit pibliye: Cholera Emergency Response Project
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The objective of the Project is to improve the health and hygiene practices in order to reduce the spread of cholera and strengthen the institutional capacity to respond to outbreaks. The Project is financing two Components: (i) Support to the Government’s Response to Cholera at the Decentralized Level; and (ii) Emergency Response Capacity Building.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
- Patnè
- World Bank Group, IDA
- Sektè
- Sante
- Etap
- Fèmen depi 30 mas 2014
- Apwobasyon
- 18 janvye 2011
- Fèmen
- 30 mas 2014
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- −0.3: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Antre an vigè
- 7 fevriye 2011
- Depatman
- Sidès, Sid, Lwès, Grandans, Sant, Latibonit, Nip
- Dènye tranzaksyon
- 30 septanm 2014
- Idantifyan operasyon an
- P120110
Sik lavi5 etap, 14 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 19 novanm 2010 |
| Apwouve | 18 janvye 2011 |
| An kou | 18 janvye 2011 |
| Ap fèmen | 30 mas 2014 |
| Fèmen | 30 mas 2014 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 19 novanm 2010 | Pwojè Bank Mondyal |
| Evalyasyon davans | 3 desanm 2010 | Pwojè Bank Mondyal |
| Piblikasyon | 16 desanm 2010 | Pwojè Bank Mondyal |
| Negosyasyon | 16 desanm 2010 | Pwojè Bank Mondyal |
| Kòmansman reyèl | 18 janvye 2011 | IATI |
| Apwobasyon | 18 janvye 2011 | Pwojè Bank Mondyal |
| Premye angajman | 18 janvye 2011 | Tranzaksyon |
| Kòmansman prevwa | 18 janvye 2011 | IATI |
| Antre an vigè | 7 fevriye 2011 | Pwojè Bank Mondyal |
| Premye dekèsman | 31 me 2011 | Tranzaksyon |
| Fen reyèl | 30 mas 2014 | IATI |
| Dat fèmti | 30 mas 2014 | IATI |
| Dènye dekèsman | 31 out 2014 | Tranzaksyon |
| Rapò fen atann | 29 septanm 2014 | Pwojè Bank Mondyal |
Pa dekèse: 0.0 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 30 mas 2014.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 15.0 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | |
|---|---|---|
| Angajman | 14.7 | IDA, eta kredi ak don |
| Dekèse | 15.0 | IDA, eta kredi ak don |
| Pa dekèse | 0.0 | IDA, eta kredi ak don |
| Pri total | 15.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Montan yo dapre sous la
Chanjman nan operasyon an2 pwolongasyon
- Dat fèmti orijinal
- 30 jen 2013
- Pwolongasyon dat fèmti
- 2
- Pwolonje soti 30 jen 2013 rive 31 desanm 2013 (dokiman 30 jen 2013)
- Pwolonje soti 31 desanm 2013 rive 30 mas 2014 (dokiman 31 desanm 2013)
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2010-11Milyon dola ameriken | FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | FY2013-14Milyon dola ameriken | |
|---|---|---|---|---|
| Nouvo angajman | 15.0 | Pa rapòte | Pa rapòte | −0.3 |
| Dekèsman | 3.7 | 5.6 | 3.7 | 1.9 |
| Dekèsman kimile | 3.7 | 9.4 | 13.1 | 15.0 |
Fich ak dokiman
Tranzaksyon20 liy, 18 janvye 2011 rive 30 septanm 2014
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 18 janvye 2011 | Angajman | 15.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 30 septanm 2014 | Angajman | −0.3 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2011 | Dekèsman | 3.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2011 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2011 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2011 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2011 | Dekèsman | 2.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2012 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2012 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2012 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2012 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2012 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2013 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2013 | Dekèsman | 2.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2013 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2013 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2014 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2014 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2014 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2014 | Dekèsman | −0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon4 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Pa rapòte
Kote7 depatman, 7 kote nonmen, 14 kote ki gen kowòdone
| Depatman | Sidès, Sid, Lwès, Grandans, Sant, Latibonit, Nip |
| Kote sous la nonmen | Centre, Departement de Nippes, Departement de l'Artibonite, Departement de l'Ouest, Departement de la Grand'Anse, Sud, Sud-Est |
| Kote ki gen kowòdone | 14 |
Endikatè rezilta33 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Departmental Cholera Management Plan developed (by MSPP and DINEPA) for at least five departments | 0.00 | 5.00 | 6.00 | 2 desanm 2013 |
| Establishment and functioning of one national and five regional Cholera and Emergency Response Units | 0.00 | 6.00 | 7.00 | 2 desanm 2013 |
| Good quality quarterly IFRs are submitted to the Bank in a timely manner | 0.00 | 0.00 | 5.00 | 2 desanm 2013 |
| Number of communities that have received targeted health education and/or prevention activities | 0.00 | 2214.00 | 4447.00 | 2 desanm 2013 |
| Number of health centers and posts, treatment and chlorination centers and units, and oral rehydration posts supported with supplies | 0.00 | 223.00 | 255.00 | 2 desanm 2013 |
| Number of people receiving water treatment products and soap | 0.00 | 178400.00 | 856688.00 | 2 desanm 2013 |
| Number of personnel and community workers trained (by type of training) | 0.00 | 2633.00 | 5571.00 | 2 desanm 2013 |
| Quarterly project progress reports submitted to Cholera Coordination Committee and to Bank | 0.00 | 12.00 | 15.00 | 2 desanm 2013 |
| Increased institutional capacity as measured by achievement of at least four out of five of Component 2 indicators on an annual basis | 0.00 | 4.00 | 4.00 | 31 desanm 2013 |
| Increased institutional capacity as measured by achievement of at least four out of five of Component 2 indicators on an annual basis | Pa rapòte | 4.00 | 4.00 | 31 desanm 2013 |
| Percentage of population in project intervention areas who know the cholera early warning symptoms and prevention steps | 64.00 | 69.00 | 82.00 | 31 desanm 2013 |
| Percentage of population in project intervention areas who know the cholera early warning symptoms and prevention steps | 64.00 | 69.00 | 82.00 | 31 desanm 2013 |
| Percentage of population in project intervention areas with access to improved water sources | 78.00 | 78.00 | 79.00 | 31 desanm 2013 |
| Percentage of population in project intervention areas with access to improved water sources | 78.00 | 78.00 | 79.00 | 31 desanm 2013 |
| Departmental Cholera Management Plan developed (by MSPP and DINEPA) for at least five departments | 0.00 | 5.00 | 6.00 | 31 desanm 2013 |
| Departmental Cholera Management Plan developed (by MSPP and DINEPA) for at least five departments | 0.00 | 5.00 | 6.00 | 31 desanm 2013 |
| Establishment and functioning of one national and five regional Cholera and Emergency Response Units | 0.00 | 6.00 | 7.00 | 31 desanm 2013 |
| Establishment and functioning of one national and five regional Cholera and Emergency Response Units | 0.00 | 6.00 | 7.00 | 31 desanm 2013 |
| Good quality quarterly IFRs are submitted to the Bank in a timely manner | 0.00 | 0.00 | 5.00 | 31 desanm 2013 |
| Good quality quarterly IFRs are submitted to the Bank in a timely manner | Pa rapòte | Pa rapòte | 5.00 | 31 desanm 2013 |
| Number of communities that have received targeted health education and/or prevention activities | 0.00 | 2,214.00 | 4,447.00 | 31 desanm 2013 |
| Number of communities that have received targeted health education and/or prevention activities | 0.00 | 2214.00 | 4447.00 | 31 desanm 2013 |
| Number of health centers and posts, treatment and chlorination centers and units, and oral rehydration posts supported with supplies | 0.00 | 223.00 | 255.00 | 31 desanm 2013 |
| Number of health centers and posts, treatment and chlorination centers and units, and oral rehydration posts supported with supplies | 0.00 | 223.00 | 255.00 | 31 desanm 2013 |
| Number of people receiving water treatment products and soap | 0.00 | 178400.00 | 856688.00 | 31 desanm 2013 |
| Number of people receiving water treatment products and soap | 0.00 | 178,400.00 | 856,688.00 | 31 desanm 2013 |
| Number of personnel and community workers trained (by type of training) | 0.00 | 2633.00 | 5571.00 | 31 desanm 2013 |
| Number of personnel and community workers trained (by type of training) | 0.00 | 2,633.00 | 5,571.00 | 31 desanm 2013 |
| Quarterly project progress reports submitted to Cholera Coordination Committee and to Bank | 0.00 | 12.00 | 15.00 | 31 desanm 2013 |
| Quarterly project progress reports submitted to Cholera Coordination Committee and to Bank | 0.00 | 12.00 | 15.00 | 31 desanm 2013 |
| Increased institutional capacity as measured by achievement of at least four out of five of Component 2 indicators on an annual basis | 0.00 | 4.00 | 4.00 | 2 desanm 2013 |
| Percentage of population in project intervention areas who know the cholera early warning symptoms and prevention steps | 64.00 | 69.00 | 82.00 | 2 desanm 2013 |
| Percentage of population in project intervention areas with access to improved water sources | 78.00 | 78.00 | 79.00 | 2 desanm 2013 |
Nòt25 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | 21 janvye 2015 |
| IEG borrowcompliance | Moderately Satisfactory | 21 janvye 2015 |
| IEG borrowimplementation | Moderately Satisfactory | 21 janvye 2015 |
| IEG evaltype | ES | 21 janvye 2015 |
| IEG evaluation_riskdo | Significant | 21 janvye 2015 |
| IEG icrquality | Satisfactory | 21 janvye 2015 |
| IEG mequality | Modest | 21 janvye 2015 |
| IEG outcome | Moderately Satisfactory | 21 janvye 2015 |
| IEG overallbankperf | Moderately Satisfactory | 21 janvye 2015 |
| IEG overallborrowperf | Moderately Satisfactory | 21 janvye 2015 |
| ICR bankqualityentry | Not Rated | 29 septanm 2014 |
| ICR banksupervision | Not Rated | 29 septanm 2014 |
| ICR borrgovt | Moderately Satisfactory | 29 septanm 2014 |
| ICR borrimplegency | Moderately Satisfactory | 29 septanm 2014 |
| ICR borroverall | Moderately Satisfactory | 29 septanm 2014 |
| ICR completion_riskdo | Substantial | 29 septanm 2014 |
| ICR outratingind | Substantial | 29 septanm 2014 |
| ICR overallrating | Moderately Satisfactory | 29 septanm 2014 |
| ISR Counterpart Funding | Satisfactory | 27 desanm 2013 |
| ISR Financial Management | Moderately Unsatisfactory | 27 desanm 2013 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | 27 desanm 2013 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | 27 desanm 2013 |
| ISR Procurement | Moderately Satisfactory | 27 desanm 2013 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | 27 desanm 2013 |
| ISR Project Management | Moderately Satisfactory | 27 desanm 2013 |
Idantifyan4 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P120110 | IATI |
| Kredi oswa don IDA | IDAH6390 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-H6390 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P120110 | Fich operasyon an |
Kote sous yo pa dakò2 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Angajman | IDA, eta kredi ak don | 14.7 milyon dola ameriken | ✓ |
| Angajman | Pwojè Bank Mondyal | 15.0 milyon dola ameriken | |
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a19 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - Cholera Emergency Response Project, 21 janvye 2015, documents.worldbank.org
- Haiti - Cholera Emergency Response Project, 17 septanm 2014, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : P120110 - Implementation Status Results Report : Sequence 06, 27 desanm 2013, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : restructuring, 31 me 2013, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : P120110 - Implementation Status Results Report : Sequence 05, 29 me 2013, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : P120110 - Implementation Status Results Report : Sequence 04, 9 novanm 2012, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : P120110 - Implementation Status Results Report : Sequence 03, 28 mas 2012, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : P120110 - Implementation Status Results Report : Sequence 02, 9 out 2011, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : P120110 - Implementation Status Results Report : Sequence 01, 23 fevriye 2011, documents.worldbank.org
- Cadre de gestion environnementale et sociale, 1 fevriye 2011, documents.worldbank.org
- Financing Agreement for IDA Grant H639-HT Conformed, 20 janvye 2011, documents.worldbank.org
- Haiti - Cholera Emergency Response Project, 22 desanm 2010, documents.worldbank.org
- Haiti - Cholera Emergency Response Project : Haiti - Projet de Reponse D'urgence Au Cholera, 22 desanm 2010, documents.worldbank.org
- Haiti - Cholera Emergency Project, 16 desanm 2010, documents.worldbank.org
- Haïti - Projet de réponse d’urgence au cholera, 16 desanm 2010, documents.worldbank.org
- Haïti : Projet de réponse d’urgence au cholera, 14 desanm 2010, documents.worldbank.org
- Haiti - Cholera Emergency Project, 14 desanm 2010, documents.worldbank.org
- Announcement of Haiti-Cholera : Ten Million US Dollars World Bank Emergency Grant to Step Up Access to Health Services - Program is Part of World Bank Four Hundred Seventy-Nine Million US Dollars on November 24, 2010 , 23 novanm 2010, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Pwojè repons ijans kont kolera. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP120110?lang=ht