Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA
HT: Pwojè ijans rekonstriksyon lekòl
Tit pibliye: HT: Emergency School Reconstruction Project
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The objective of the Project is to assist the Recipient in restoring and improving access to basic education in selected destroyed and/or heavily damaged public primary schools of its territory.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
- Patnè
- World Bank Group, IDA
- Sektè
- Edikasyon
- Etap
- Fèmen depi 31 me 2012
- Apwobasyon
- 5 mas 2009
- Fèmen
- 31 me 2012
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- −0.3: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Antre an vigè
- 25 jen 2009
- Depatman
- Sidès
- Dènye tranzaksyon
- 31 desanm 2012
- Idantifyan operasyon an
- P115261
Sik lavi5 etap, 14 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 13 novanm 2008 |
| Apwouve | 5 mas 2009 |
| An kou | 5 mas 2009 |
| Ap fèmen | 31 me 2012 |
| Fèmen | 31 me 2012 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 13 novanm 2008 | Pwojè Bank Mondyal |
| Evalyasyon davans | 11 fevriye 2009 | Pwojè Bank Mondyal |
| Negosyasyon | 11 fevriye 2009 | Pwojè Bank Mondyal |
| Piblikasyon | 14 fevriye 2009 | Pwojè Bank Mondyal |
| Kòmansman prevwa | 27 fevriye 2009 | IATI |
| Kòmansman reyèl | 5 mas 2009 | IATI |
| Apwobasyon | 5 mas 2009 | Pwojè Bank Mondyal |
| Premye angajman | 5 mas 2009 | Tranzaksyon |
| Antre an vigè | 25 jen 2009 | Pwojè Bank Mondyal |
| Premye dekèsman | 31 me 2011 | Tranzaksyon |
| Fen reyèl | 31 me 2012 | IATI |
| Dat fèmti | 31 me 2012 | IATI |
| Dènye dekèsman | 30 jen 2012 | Tranzaksyon |
| Rapò fen atann | 3 desanm 2012 | Pwojè Bank Mondyal |
Pa dekèse: 0.0 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 31 me 2012.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 5.4 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | |
|---|---|---|
| Angajman | 4.7 | IDA, eta kredi ak don |
| Dekèse | 5.0 | IDA, eta kredi ak don |
| Pa dekèse | 0.0 | IDA, eta kredi ak don |
| Pri total | 5.4 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Montan yo dapre sous la
Chanjman nan operasyon anpa rapòte
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2008-09Milyon dola ameriken | FY2010-11Milyon dola ameriken | FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | |
|---|---|---|---|---|
| Nouvo angajman | 5.0 | Pa rapòte | Pa rapòte | −0.3 |
| Dekèsman | Pa rapòte | 2.2 | 1.4 | Pa rapòte |
| Dekèsman kimile | Pa rapòte | 3.5 | 5.0 | Pa rapòte |
Total kimile a kòmanse ak balans ouvèti 1.4 milyon dola ameriken.
Fich ak dokiman
Tranzaksyon8 liy, 5 mas 2009 rive 31 desanm 2012
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 5 mas 2009 | Angajman | 5.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 31 desanm 2012 | Angajman | −0.3 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2011 | Dekèsman | 1.4 | IDA, eta kredi ak don | cumulative at first snapshot (balans ouvèti) |
| 31 me 2011 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2011 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2011 | Dekèsman | 0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2012 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2012 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon5 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Wi
Kote1 depatman, 2 kote nonmen, 2 kote ki gen kowòdone
| Depatman | Sidès |
| Kote sous la nonmen | DÃÂ(c)partement du Sud-Est, Département du Sud-Est |
| Kote ki gen kowòdone | 2 |
Endikatè rezilta20 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| A NAPSS which will sustain the activities beyond the project life, as it will function as a business plan of the GoH over the medium to long-terms | Pa rapòte | NAPSS prepared, adopted, and presented to donors in 2011. | Draft NAPSS prepared in 2011. | 31 me 2012 |
| Development of training modules on measures to increase safety in all schools | Pa rapòte | 7 training modules prepared | 7 training modules prepared. | 31 me 2012 |
| Increased awareness of the vulnerabilities to disasters and the mitigation measures for the education sector, amongst the stakeholders | Pa rapòte | 2 workshops and 9 consultations with stakeholders carried out | 2 workshops and 10 consultations carried out. | 31 me 2012 |
| Methods for safe school construction are adopted | NA | Methods for safe school construction are adopted i | Methods for safe schools construction are discusse | 4 me 2012 |
| Number of DGS staff trained to become Master Trainers on NAPSS issues | 0.00 | 10.00 | 0.00 | 4 me 2012 |
| Number of general quality assurance supervision missions carried out by the DGS for each school built | 0 | 2 per school built and per year | 1 per school built. | 4 me 2012 |
| Number of schools rebuilt or rehabilitated with satisfactory technical standards | 0.00 | 11.00 | 0.00 | 31 me 2012 |
| Number of schools retrofitted as emergency temporary shelter | 0.00 | 4.00 | 3.00 | 31 me 2012 |
| Percentage of schools rebuilt for which prequalification visits were conducted | 0.00 | 100.00 | 100.00 | 4 me 2012 |
| Occupation rate of rebuilt schools will be maintained at 75% or above following completion of civil works, as measured within six monthsof Project closing. | 0.00 | 100.00 | 0.00 | 31 me 2012 |
| Occupation rate of rebuilt schools will be maintained at 75% or above following completion of civil works, as measured within six monthsof Project closing. | 0.00 | 100.00 | 0.00 | 31 me 2012 |
| Methods for safe school construction are adopted | Pa rapòte | Methods for safe school construction are adopted in 2011 | Methods for safe schools construction are discussed in 2011 and 2012. | 31 me 2012 |
| Methods for safe school construction are adopted | Pa rapòte | Methods for safe school construction are adopted in 2011 | Methods for safe schools construction are discussed in 2011 and 2012. | 31 me 2012 |
| Number of DGS staff trained to become Master Trainers on NAPSS issues | 0.00 | 10.00 | 0.00 | 31 me 2012 |
| Number of DGS staff trained to become Master Trainers on NAPSS issues | 0.00 | 10.00 | 0.00 | 31 me 2012 |
| Number of general quality assurance supervision missions carried out by the DGS for each school built | 0 | 2 per school built and per year | 1 per school built. | 31 me 2012 |
| Number of general quality assurance supervision missions carried out by the DGS for each school built | 0 | 2 per school built and per year | 1 per school built. | 31 me 2012 |
| Percentage of schools rebuilt for which prequalification visits were conducted | 0.00 | 100.00 | 100.00 | 31 me 2012 |
| Percentage of schools rebuilt for which prequalification visits were conducted | 0.00 | 100.00 | 100.00 | 31 me 2012 |
| Occupation rate of rebuilt schools will be maintained at 75% or above following completion of civil works, as measured within six monthsof Project closing. | 0.00 | 100.00 | 0.00 | 4 me 2012 |
Nòt29 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Moderately Satisfactory | 3 avril 2013 |
| IEG borrowcompliance | Moderately Satisfactory | 3 avril 2013 |
| IEG borrowimplementation | Moderately Satisfactory | 3 avril 2013 |
| IEG evaltype | ES | 3 avril 2013 |
| IEG evaluation_riskdo | High | 3 avril 2013 |
| IEG icrquality | Satisfactory | 3 avril 2013 |
| IEG mequality | Negligible | 3 avril 2013 |
| IEG outcome | Moderately Satisfactory | 3 avril 2013 |
| IEG overallbankperf | Moderately Satisfactory | 3 avril 2013 |
| IEG overallborrowperf | Moderately Satisfactory | 3 avril 2013 |
| ICR bankqualityentry | Not Rated | 3 desanm 2012 |
| ICR banksupervision | Substantial | 3 desanm 2012 |
| ICR banksupervision | Not Rated | 3 desanm 2012 |
| ICR banksupervision | Moderately Unsatisfactory | 3 desanm 2012 |
| ICR borrgovt | Substantial | 3 desanm 2012 |
| ICR borrimplegency | Moderately Unsatisfactory | 3 desanm 2012 |
| ICR borroverall | Moderately Satisfactory | 3 desanm 2012 |
| ICR completion_riskdo | High | 3 desanm 2012 |
| ICR completion_riskdo | Substantial | 3 desanm 2012 |
| ICR outratingind | Moderately Satisfactory | 3 desanm 2012 |
| ICR overallrating | Moderately Satisfactory | 3 desanm 2012 |
| ISR Counterpart Funding | Satisfactory | 16 me 2012 |
| ISR Financial Management | Moderately Satisfactory | 16 me 2012 |
| ISR Monitoring and Evaluation | Satisfactory | 16 me 2012 |
| ISR Overall Implementation Progress (IP) | Moderately Satisfactory | 16 me 2012 |
| ISR Overall Safeguards Rating | Satisfactory | 16 me 2012 |
| ISR Procurement | Moderately Satisfactory | 16 me 2012 |
| ISR Progress towards achievement of PDO | Moderately Satisfactory | 16 me 2012 |
| ISR Project Management | Satisfactory | 16 me 2012 |
Idantifyan4 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P115261 | IATI |
| Kredi oswa don IDA | IDAH4600 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-H4600 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P115261 | Fich operasyon an |
Kote sous yo pa dakò2 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Angajman | IDA, eta kredi ak don | 4.7 milyon dola ameriken | ✓ |
| Angajman | Pwojè Bank Mondyal | 5.4 milyon dola ameriken | |
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a18 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - Emergency School Reconstruction Project, 3 avril 2013, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project, 30 novanm 2012, documents.worldbank.org
- Haiti - HT: Emergency School Reconstruction Project : P115261 - Implementation Status Results Report : Sequence 07, 16 me 2012, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project : restructuring (Vol. 2 of 2) : Data sheet, 27 desanm 2011, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project : restructuring (Vol. 1 of 2) : Main report, 14 desanm 2011, documents.worldbank.org
- Haiti - HT: Emergency School Reconstruction Project : P115261 - Implementation Status Results Report : Sequence 06, 11 septanm 2011, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project : restructuring (Vol. 1 of 2) : Main report, 4 me 2011, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project : restructuring (Vol. 2 of 2) : Data sheet, 3 me 2011, documents.worldbank.org
- Haiti - HT: Emergency School Reconstruction Project : P115261 - Implementation Status Results Report : Sequence 05, 23 fevriye 2011, documents.worldbank.org
- Cadre de gestion environnementale et sociale, 1 septanm 2010, documents.worldbank.org
- Cadre de politique de réinstallation, 1 out 2010, documents.worldbank.org
- Haïti - Plan de passation des marchés : plan de passation des marchés, 1 septanm 2009, documents.worldbank.org
- Financing Agreement, Grant H460-HT Conformed, 8 avril 2009, documents.worldbank.org
- Announcement of Five Million US Dollars Grant for Emergency School Reconstruction on March 5, 2009, 5 mas 2009, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project, 17 fevriye 2009, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project, 17 fevriye 2009, documents.worldbank.org
- Haiti - Emergency School Reconstruction Project, 8 desanm 2008, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. HT: Pwojè ijans rekonstriksyon lekòl. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP115261?lang=ht