Evalye estrikti ki egziste yo epi devlope yon plan reyabilitasyon
Tit pibliye: The contractor will assess existing structures and infrastructures in Caracol EKAM and develop a remediation plan. The contractor shall also supervise the implementation of this plan and provide construction management.
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Deskripsyon
The objective of this Task Order is to provide urgent A&E construction management services to (1) conduct and inspection of the entire Caracol EKAM project, including civil works and the 750 houses; (2) make A&E recommendations and oversee the completion of remediation of identified and reparable defects in work on the project; and (3) provide support to USAID for the development of related contractual adjustments under the relevant contracts
- Patnè
- United States, USAID
- Sektè
- Imanitè
- Etap
- Fèmen depi 30 septanm 2024
- Kòmansman
- 14 oktòb 2014
- Fèmen
- 10 septanm 2024
- Enstriman
- Delivery order, contracts
- Ajans egzekisyon
- Domestic Awardees (Undisclosed)
- Antre an vigè
- Pa rapòte
- Dènye tranzaksyon
- 11 septanm 2024
- Idantifyan operasyon an
- AID521TO1500001
Sik lavi3 etap, 9 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| An kou | 30 septanm 2008 |
| Ap fèmen | 10 septanm 2024 |
| Fèmen | 30 septanm 2024 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Kòmansman reyèl | 30 septanm 2008 | IATI |
| Premye angajman | 10 oktòb 2014 | Tranzaksyon |
| Siyati | 10 oktòb 2014 | USAspending |
| Apwobasyon | 14 oktòb 2014 | USAspending |
| Kòmansman prevwa | 14 oktòb 2014 | USAspending |
| Premye dekèsman | 31 mas 2015 | Tranzaksyon |
| Dènye dekèsman | 31 mas 2019 | Tranzaksyon |
| Dat fèmti | 10 septanm 2024 | USAspending |
| Fen reyèl | 30 septanm 2024 | IATI |
Finansman
Tablo 1.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 7.3 | USAspending | 7.3 |
| Dekèse | 7.3 | IATI | 7.3 |
| Pa dekèse | Pa rapòte | ||
| Pri total | Pa rapòte |
Montan USAspending. Apwouve: Obligasyon don oswa kontra a, an US$: angajman legal lajan federal la. Dekèse jiska jodi a: Depans reyèl don oswa kontra a, an US$. Pa dekèse: Balans ki pa dekèse fich la bay, lè sous la pibliye youn, an US$. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Paj sa a sèvi ak USAspending pou angajman an ak IATI pou dekèsman yo.
Chanjman nan operasyon an3 restriktirasyon
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- 3
- 28 septanm 2015 (dokiman 28 septanm 2015) Modifikasyon atribisyon an
- 27 septanm 2017 (dokiman 27 septanm 2017) Modifikasyon atribisyon an
- 4 desanm 2017 (dokiman 4 desanm 2017) Modifikasyon atribisyon an
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 2.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2014-15Milyon dola ameriken | FY2015-16Milyon dola ameriken | FY2016-17Milyon dola ameriken | FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | FY2023-24Milyon dola ameriken | |
|---|---|---|---|---|---|---|
| Nouvo angajman | 4.5 | 1.5 | 0.6 | 1.2 | −0.4 | −0.0 |
| Dekèsman | 1.8 | 2.6 | 1.7 | 1.3 | 0.1 | Pa rapòte |
| Dekèsman kimile | 1.8 | 4.4 | 6.0 | 7.3 | 7.3 | Pa rapòte |
Fich ak dokiman
Tranzaksyon30 liy, 10 oktòb 2014 rive 11 septanm 2024
Tablo 3.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 10 oktòb 2014 | Angajman | 3.0 | USAspending | USAspending obligation |
| 13 fevriye 2015 | Angajman | 1.0 | USAspending | USAspending obligation |
| 28 septanm 2015 | Angajman | 0.5 | USAspending | USAspending obligation |
| 29 jiyè 2016 | Angajman | 1.3 | USAspending | USAspending obligation |
| 9 septanm 2016 | Angajman | 0.2 | USAspending | USAspending obligation |
| 30 mas 2017 | Angajman | 0.4 | USAspending | USAspending obligation |
| 27 septanm 2017 | Angajman | 0.2 | USAspending | USAspending obligation |
| 4 desanm 2017 | Angajman | 0.2 | USAspending | USAspending obligation |
| 22 desanm 2017 | Angajman | 1.0 | USAspending | USAspending obligation |
| 26 fevriye 2018 | Angajman | <0.1 | USAspending | USAspending obligation |
| 1 out 2019 | Angajman | −0.4 | USAspending | negative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; USAspending obligation |
| 11 septanm 2024 | Angajman | −0.0 | USAspending | negative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; USAspending obligation |
| 31 mas 2015 | Dekèsman | 0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2015 | Dekèsman | 1.3 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2015 | Dekèsman | 0.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2015 | Dekèsman | 0.5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2016 | Dekèsman | 0.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2016 | Dekèsman | 0.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2016 | Dekèsman | 0.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2016 | Dekèsman | 0.3 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2017 | Dekèsman | 0.6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2017 | Dekèsman | 0.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2017 | Dekèsman | 0.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2017 | Dekèsman | 0.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2018 | Dekèsman | 0.2 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2018 | Dekèsman | 0.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2018 | Dekèsman | 0.3 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2018 | Dekèsman | 0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2019 | Dekèsman | <0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2019 | Dekèsman | −0.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
Kondisyon2 sou 6 rapòte
- Kalite finansman
- Pa rapòte
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- Pa rapòte
- Kalite kolaborasyon
- Pa rapòte
- Imanitè
- Wi
Idantifyan2 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | US-GOV-1-AID-521-TO-15-00001 | IATI |
| Sibvansyon Etazini | AID521TO1500001 | Fich operasyon an |
Kote sous yo pa dakò1 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Estati | USAspending | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a
Pa gen okenn dokiman nan lis pou operasyon sa a.
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- USAspending: kondisyon itilizasyon piblikatè a fikse
- Fich USAspending: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| USAspending | 18 oktòb 2026 |
| USAspending | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Evalye estrikti ki egziste yo epi devlope yon plan reyabilitasyon. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/US%3AAID521TO1500001?lang=ht