Done / Pòtfolyo patnè yo / Etazini / USAID
Konstriksyon 156 kay, amenajman sit la ak enfrastrikti ki gen rapò avèk yo
Tit pibliye: Construction of 156 houses and related site development and infrastructure in DLA 1.5 site.
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Deskripsyon
Construction of 156 houses and related site development and infrastructure in DLA 1.5 site.
- Patnè
- United States, USAID
- Sektè
- Imanitè
- Etap
- Fèmen depi 30 septanm 2016
- Kòmansman
- 11 me 2012
- Fèmen
- 30 novanm 2013
- Enstriman
- Definitive contract, contracts
- Ajans egzekisyon
- Cemex Haiti
- Antre an vigè
- Pa rapòte
- Dènye tranzaksyon
- 6 avril 2016
- Idantifyan operasyon an
- AID521C1200005
Sik lavi3 etap, 9 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| An kou | 24 avril 2012 |
| Ap fèmen | 30 novanm 2013 |
| Fèmen | 30 septanm 2016 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Kòmansman reyèl | 24 avril 2012 | IATI |
| Premye angajman | 24 avril 2012 | Tranzaksyon |
| Siyati | 24 avril 2012 | USAspending |
| Apwobasyon | 11 me 2012 | USAspending |
| Kòmansman prevwa | 11 me 2012 | USAspending |
| Premye dekèsman | 31 desanm 2012 | Tranzaksyon |
| Dat fèmti | 30 novanm 2013 | USAspending |
| Dènye dekèsman | 30 jen 2015 | Tranzaksyon |
| Fen reyèl | 30 septanm 2016 | IATI |
Finansman
Tablo 1.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 7.0 | USAspending | 2.2 |
| Dekèse | 6.5 | IATI | 6.5 |
| Pa dekèse | Pa rapòte | ||
| Pri total | Pa rapòte |
Montan USAspending. Apwouve: Obligasyon don oswa kontra a, an US$: angajman legal lajan federal la. Dekèse jiska jodi a: Depans reyèl don oswa kontra a, an US$. Pa dekèse: Balans ki pa dekèse fich la bay, lè sous la pibliye youn, an US$. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Paj sa a sèvi ak USAspending pou angajman an ak IATI pou dekèsman yo.
Chanjman nan operasyon an4 restriktirasyon
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- 4
- 3 me 2013 (dokiman 3 me 2013) Modifikasyon atribisyon an
- 28 jen 2013 (dokiman 28 jen 2013) Modifikasyon atribisyon an
- 11 septanm 2013 (dokiman 11 septanm 2013) Modifikasyon atribisyon an
- 30 oktòb 2013 (dokiman 30 oktòb 2013) Modifikasyon atribisyon an
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 2.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2011-12Milyon dola ameriken | FY2012-13Milyon dola ameriken | FY2013-14Milyon dola ameriken | FY2014-15Milyon dola ameriken | FY2015-16Milyon dola ameriken | |
|---|---|---|---|---|---|
| Nouvo angajman | 6.0 | 0.9 | 0.1 | Pa rapòte | −0.0 |
| Dekèsman | Pa rapòte | 5.7 | 0.6 | 0.2 | Pa rapòte |
| Dekèsman kimile | Pa rapòte | 5.7 | 6.3 | 6.5 | Pa rapòte |
Fich ak dokiman
Tranzaksyon14 liy, 24 avril 2012 rive 6 avril 2016
Tablo 3.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 24 avril 2012 | Angajman | 4.8 | USAspending | USAspending obligation |
| 25 avril 2012 | Angajman | 1.3 | USAspending | USAspending obligation |
| 28 jen 2013 | Angajman | 0.5 | USAspending | USAspending obligation |
| 26 out 2013 | Angajman | 0.1 | USAspending | USAspending obligation |
| 11 septanm 2013 | Angajman | 0.3 | USAspending | USAspending obligation |
| 30 oktòb 2013 | Angajman | 0.1 | USAspending | USAspending obligation |
| 6 avril 2016 | Angajman | −0.0 | USAspending | negative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; USAspending obligation |
| 31 desanm 2012 | Dekèsman | 1.3 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2013 | Dekèsman | 0.8 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2013 | Dekèsman | 1.5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2013 | Dekèsman | 2.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2013 | Dekèsman | 0.6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2015 | Dekèsman | 0.2 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2015 | Dekèsman | <0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
Kondisyon2 sou 6 rapòte
- Kalite finansman
- Pa rapòte
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- Pa rapòte
- Kalite kolaborasyon
- Pa rapòte
- Imanitè
- Wi
Idantifyan2 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | US-GOV-1-AID-521-C-12-00005 | IATI |
| Sibvansyon Etazini | AID521C1200005 | Fich operasyon an |
Kote sous yo pa dakò3 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Dat fèmti | USAspending | 30 novanm 2013 | ✓ |
| Dat fèmti | IATI | 30 septanm 2016 | |
| Angajman | USAspending | 7.0 milyon dola ameriken | ✓ |
| Angajman | IATI | 2.2 milyon dola ameriken | |
| Estati | USAspending | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a
Pa gen okenn dokiman nan lis pou operasyon sa a.
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- USAspending: kondisyon itilizasyon piblikatè a fikse
- Fich USAspending: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| USAspending | 18 oktòb 2026 |
| USAspending | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Konstriksyon 156 kay, amenajman sit la ak enfrastrikti ki gen rapò avèk yo. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/US%3AAID521C1200005?lang=ht