E-Power S.A.

An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Deskripsyon

The Project is the first IFC infrastructure project in Haiti. It is to construct, own, and operate a 30MW Heavy Fuel Oil (“HFO”) diesel power plant on a build-own-and-operate (“BOO”) basis in Port-au-Prince. The project will sell its capacity and electricity to the state-owned utility, Electricité d’Haiti (“EDH”), under a 15-year Power Purchase Agreement (“PPA”). The project benefits from sovereign guarantee and tax and duty exemptions under a Implementation Agreement (“IA”) and a Sovereign Guarantee with the Republic of Haiti. The project will be undertaken on a quasi full-turnkey basis by Hyundai Heavy Industries, Co. Ltd (“HHI”) and its spin-off, DECCO Ltd (“DECCO”) of Korea. The foreign sponsor, the Basic Energy Group (“BEG”), will be the operations and maintenance (“O&M”)

plis

operator. Fuel will be sourced from a large international fuel supplier. Total project costs are about $50 million to be financed on a 75:25 debt to equity basis. Construction period is expected to be about 18 months. The project is the first private-sector generation project in the country, which has been selected on the basis of international tendering processes undertaken with the help of the World Bank. Currently, the country relies largely on another private-sector generator which owns and runs Light Fuel Oil (“LFO”) diesel facilities. Being a HFO diesel facility, the Project will be significantly more cost-competitive than the existing LFO facilities at a total electricity cost of about US¢ 15-17 per kWh as compared with US¢ 22-26 per kWh for the LFO facilities at about a crude oil price of about US$ 60 -80 per bbl. In light of the current dire financial conditions of the state-owned utility, the project is expected to be paid largely through the budgetary transfer from the government, as has been the case for all the other private-sector generation projects. Such budget transfer accounted for about 7-8% of total government expenditures in the recent years. This is expected to remain at about the same level even with the commencement of the Project and other projects currently in the pipeline, assuming no improvement in the cash recovery rate of the state-owned utility and continuing growth of government budgets in line with its recent trend

Patnè
World Bank Group, IFC
Sektè
Sektè pa idantifye
Etap
Fèmen depi 1 jiyè 2009
Apwobasyon
19 desanm 2010
Fèmen
Pa rapòte
Enstriman
Prè, Loan
Antre an vigè
15 desanm 2009
Dènye tranzaksyon
19 desanm 2010
Idantifyan operasyon an
27274
Sik lavi2 etap, 9 dat

Istwa etap yo

EtapDepi
An kou1 jiyè 2009
Fèmen1 jiyè 2009

Evènman ki gen dat

EvènmanDatSous
Piblikasyon28 janvye 2009IFC Finances One
Dènye dekèsman1 jiyè 2009Tranzaksyon
Kòmansman prevwa1 jiyè 2009IATI
Siyati1 jiyè 2009IFC Finances One
Kòmansman reyèl15 desanm 2009IATI
Antre an vigè15 desanm 2009IFC Finances One
Premye dekèsman15 desanm 2009IFC Finances One
Apwobasyon19 desanm 2010IFC Finances One
Premye angajman19 desanm 2010Tranzaksyon

Finansman

Tablo 1.Finansman, milyon dola ameriken

FinansèMontanMilyon dola amerikenWòlSous
IFC loan16.0EnstitisyonIFC Finances One

Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSousIATIMilyon dola ameriken
Angajman16.0IFC Finances One16.0
Dekèse16.0IATI16.0
Pa dekèsePa rapòte
Pri totalPa rapòte

Chak montan bay jan sous la pibliye l, konvèti an US$. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la

Paj sa a sèvi ak IFC Finances One pou angajman an ak IATI pou dekèsman yo.

Chanjman nan operasyon anpa rapòte
Dat fèmti orijinal
Pa rapòte
Pwolongasyon dat fèmti
Pa rapòte
Restriktirasyon
Pa rapòte
Konpozan ijans
Pa rapòte

Nouvo angajman ak dekèsman pa ane fiskal

Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken

FY2008-09Milyon dola amerikenFY2010-11Milyon dola ameriken
Nouvo angajmanPa rapòte16.0
Dekèsman16.0Pa rapòte
Dekèsman kimile16.0Pa rapòte

Fich ak dokiman

Tranzaksyon2 liy, 1 jiyè 2009 rive 19 desanm 2010

Tablo 4.Tranzaksyon, milyon dola ameriken

DatMeziMontanMilyon dola amerikenSousMetòd
19 desanm 2010Angajman16.0IFC Finances Onecommitment at approval date
1 jiyè 2009Dekèsman16.0IATIIATI disbursement (transaction type 3), paid to another organization
Kondisyon5 sou 6 rapòte
Kalite finansman
421 Prè estanda
Kalite koule
35 Apò prive nan kondisyon mache
Kalite èd
C01 Entèvansyon kalite pwojè
Èd mare oswa pa mare
5 Pa mare
Kalite kolaborasyon
6 Finansman prive pou devlopman
Imanitè
Pa rapòte
Kote1 kote nonmen, 1 kote ki gen kowòdone
DepatmanPa rapòte
Kote sous la nonmenThe project area is located within a non-residential and industrial zone on a 50,000 m2 in the outskirts of the capital city, Port-au-Prince within the walled area which is to become the first private-sector owned and managed industrial park in the country. It is only about 3km away from the port and has an adequate access road for transporting equipment from the port to the site.
Kote ki gen kowòdone1
Lajan ki pase bay lòt1 mouvman
BenefisyèMouvmanDatMilyon dola ameriken
E-Power SAAngajman1 jiyè 200916.0
Idantifyan2 idantifyan
SistèmIdantifyanSous
Idantifyan IATIXM-DAC-903-SPI-27274IATI
Pwojè IFC27274Fich operasyon an
Kote sous yo pa dakò1 chan
ChanSousValèItilize
EstatiIFC Finances OneFèmen✓
EstatiIATIAktif

Dokiman patnè a

Sous

Done jiska 18 oktòb 2026
SousLi nan dat
IATI18 oktòb 2026
IATI18 oktòb 2026
IFC Finances One18 oktòb 2026
Site paj sa a

HaitiDocs. E-Power S.A.. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/IFC%3A27274?lang=ht