Données / Portefeuille des partenaires / Groupe BID / IDB
Programme de développement de la pêche artisanale
Titre publié : Artisanal Fisheries Development Program
Millions de dollars US sauf indication contraire. Exercice fiscal haïtien, d’octobre à septembre. L’exercice FY2026-27 a commencé le 1er octobre 2026.
Objectif
The general objective of the project is to improve the income of small fishers in three southern regions of Haiti (South, South-East and Grande Anse), through the sustainable development of artisanal fisheries. The specific objectives are to: (i) strengthen the institutional management of the fisheries sector for resource sustainability, and improved sanitary and food safety conditions for marketing of seafood products; (ii) improve the quality of fish at landing sites, through improved public infrastructure; and (iii) increase artisanal fisheries productivity and reduce economic losses through the establishment of a rights-based fishery management scheme. In order to achieve these objectives, and consistent with the identified challenges, the project will finance three components: (i) institutional strengthening and information system; (ii) public infrastructure; and (iii) stakeholders’ capacity building
Tel que publié par Données des projets de la BID, dans sa langue d’origine.
- Stade
- Clôturée depuis le 31 juillet 2023
- Approbation
- 24 juin 2015
- Clôture
- 31 juillet 2023
- Instrument
- Don, Sovereign Guaranteed
- Entrée en vigueur
- Non déclaré
- Dernière transaction
- 30 avril 2022
- Identifiant de l’opération
- HA-L1096
Cycle de vie4 stades, 8 dates
Historique des stades
| Stade | Depuis le |
|---|---|
| Approuvée | 24 juin 2015 |
| En cours | 21 juillet 2015 |
| En clôture | 31 juillet 2023 |
| Clôturée | 31 juillet 2023 |
Dates
| Événement | Date | Source |
|---|---|---|
| Approbation | 24 juin 2015 | Données des projets de la BID |
| Premier engagement | 24 juin 2015 | Écritures |
| Signature | 21 juillet 2015 | Données des projets de la BID |
| Début prévu | 11 décembre 2015 | IATI |
| Début effectif | 8 février 2016 | IATI |
| Premier décaissement | 29 février 2016 | Écritures |
| Dernier décaissement | 30 avril 2022 | Écritures |
| Date de clôture prévue | 31 juillet 2023 | IATI |
Financement
Tableau 1.Financement, millions de dollars US
| Source de financement | MontantMillions de dollars US | Rôle | Source |
|---|---|---|---|
| Local counterpart | 1,5 | Contrepartie | Données des projets de la BID |
| IDB | 15,0 | Institution | Données des projets de la BID |
Tableau 2.Position à la date des données par source (stocks), millions de dollars US
| Cette pageMillions de dollars US | Source | IATIMillions de dollars US | |
|---|---|---|---|
| Engagement | 15,0 | Données des projets de la BID | 15,0 |
| Décaissé | 15,0 | IATI | 15,0 |
| Non décaissé | Non déclaré | ||
| Coût total | 16,5 | Données des projets de la BID |
Chaque montant est donné tel que la source le publie, converti en $ É.-U. Colonne IATI : les engagements et les décaissements que le partenaire publie dans IATI, convertis en $ É.-U. Les montants selon la source
Cette page retient Données des projets de la BID pour l’engagement et IATI pour les décaissements.
Modifications de l’opérationnon déclaré
- Date de clôture initiale
- Non déclaré
- Prorogations de la date de clôture
- Non déclaré
- Restructurations
- Non déclaré
- Composante d’urgence
- Non déclaré
Nouveaux engagements et décaissements par exercice
Tableau 3.Nouveaux engagements et décaissements par exercice (flux), millions de dollars US
| FY2014-15Millions de dollars US | FY2015-16Millions de dollars US | FY2016-17Millions de dollars US | FY2017-18Millions de dollars US | FY2018-19Millions de dollars US | FY2019-20Millions de dollars US | FY2020-21Millions de dollars US | FY2021-22Millions de dollars US | |
|---|---|---|---|---|---|---|---|---|
| Nouveaux engagements | 15,0 | Non déclaré | Non déclaré | Non déclaré | Non déclaré | Non déclaré | Non déclaré | Non déclaré |
| Décaissements | Non déclaré | 0,5 | 1,1 | 3,3 | 2,0 | 2,6 | 2,8 | 2,8 |
| Décaissements cumulés | Non déclaré | 0,5 | 1,6 | 4,8 | 6,8 | 9,4 | 12,2 | 15,0 |
Fiches et documents
Écritures12 transactions, du 24 juin 2015 au 30 avril 2022
Tableau 4.Écritures, millions de dollars US
| Date | Mesure | MontantMillions de dollars US | Source | Méthode |
|---|---|---|---|---|
| 24 juin 2015 | Engagement | 15,0 | Données des projets de la BID | commitment at approval date |
| 29 février 2016 | Décaissements | 0,5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 décembre 2016 | Décaissements | 0,6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septembre 2017 | Décaissements | 0,5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 décembre 2017 | Décaissements | 0,5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 avril 2018 | Décaissements | 0,8 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septembre 2018 | Décaissements | 2,0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 août 2019 | Décaissements | 2,0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mai 2020 | Décaissements | 0,2 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 juin 2020 | Décaissements | 2,4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 avril 2021 | Décaissements | 2,8 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 avril 2022 | Décaissements | 2,8 | IATI | IATI disbursement (transaction type 3), paid to another organization |
Conditions5 des 6 publiés
- Type de financement
- 110 Don standard
- Type de flux
- 20 Autres apports du secteur public, hors crédits à l’exportation
- Type d’aide
- C01 Interventions de type projet
- Aide liée ou non liée
- 5 Non lié
- Type de collaboration
- 4 Apports multilatéraux sortants
- Humanitaire
- Non déclaré
Localisation1 lieu nommé
| Départements | Non déclaré |
| Lieux nommés par la source | Haiti, ROUTE NATIONALE 1 DAMIEN, PORT AU PRINCE |
| Lieux avec coordonnées | 0 |
Indicateurs de résultats30 indicateurs
| Indicateur | Valeur de référence | Cible | Dernière valeur | Date de la dernière valeur |
|---|---|---|---|---|
| Beneficiaries of improved management and sustainable use of natural and cultural capital | Non déclaré | 4490.00 | 0.00 | 31 décembre 2020 |
| Fishing basins with rights based fishery management established | Non déclaré | 2.00 | 0.00 | 31 décembre 2020 |
| Membership to international conventions on sustainable fishing | Non déclaré | 2.00 | 0.00 | 31 décembre 2020 |
| Output 10: Communal public markets built and equipped with water supply and wastewater disposal system | Non déclaré | 2.00 | 0.00 | 31 décembre 2019 |
| Output 11: Landing sites improved | Non déclaré | 30.00 | 1.00 | 31 décembre 2019 |
| Output 1: Framework law on fisheries revised, based on the results of the right-based fishery pilot experiment | Non déclaré | 1.00 | 0.00 | 31 décembre 2019 |
| Output 2: Fishery directorate offices built and equipped | Non déclaré | 2.00 | 0.00 | 31 décembre 2019 |
| Output 3: Implementation plans for a system of monitoring, control and surveillance of diseases as well as for a health control system for fishing products drafted | Non déclaré | 2.00 | 0.00 | 31 décembre 2019 |
| Output 4: Decentralized Fishery Directorate offices strengthened | Non déclaré | 4.00 | 4.00 | 31 décembre 2020 |
| Output 5: Outreach campaign conducted | Non déclaré | 1.00 | 0.00 | 31 décembre 2020 |
| Output 6: Fisheries information system in place | Non déclaré | 1.00 | 1.00 | 31 décembre 2021 |
| Output 7: Applied research on fisheries improved | Non déclaré | 1.00 | 0.00 | 31 décembre 2020 |
| Output 8: Fish reception/unloading areas with water supply and wastewater disposal systems built | Non déclaré | 2.00 | 0.00 | 31 décembre 2018 |
| Output 9: Fish cleaning areas with water supply and wastewater disposal systems built | Non déclaré | 12.00 | 0.00 | 31 décembre 2019 |
| Beneficiaries of improved management and sustainable use of natural and cultural capital | Non déclaré | 4490.00 | 0.00 | 31 décembre 2020 |
| Fishing basins with rights based fishery management established | Non déclaré | 2.00 | 0.00 | 31 décembre 2020 |
| Membership to international conventions on sustainable fishing | Non déclaré | 2.00 | 0.00 | 31 décembre 2020 |
| Output 10: Communal public markets built and equipped with water supply and wastewater disposal system | Non déclaré | 2.00 | 0.00 | 31 décembre 2019 |
| Output 11: Landing sites improved | Non déclaré | 30.00 | 1.00 | 31 décembre 2019 |
| Output 12: Fishermen and merchants associations strengthened | Non déclaré | 55.00 | 45.00 | 31 décembre 2020 |
| Output 13: Fishers and Merchants associations having access to technologies through matching grant system | Non déclaré | 15.00 | 75.00 | 31 décembre 2020 |
| Output 1: Framework law on fisheries revised, based on the results of the right-based fishery pilot experiment | Non déclaré | 1.00 | 0.00 | 31 décembre 2019 |
| Output 2: Fishery directorate offices built and equipped | Non déclaré | 2.00 | 0.00 | 31 décembre 2019 |
| Output 3: Implementation plans for a system of monitoring, control and surveillance of diseases as well as for a health control system for fishing products drafted | Non déclaré | 2.00 | 0.00 | 31 décembre 2019 |
| Output 4: Decentralized Fishery Directorate offices strengthened | Non déclaré | 4.00 | 4.00 | 31 décembre 2020 |
| Output 5: Outreach campaign conducted | Non déclaré | 1.00 | 0.00 | 31 décembre 2020 |
| Output 6: Fisheries information system in place | Non déclaré | 1.00 | 1.00 | 31 décembre 2021 |
| Output 7: Applied research on fisheries improved | Non déclaré | 1.00 | 0.00 | 31 décembre 2020 |
| Output 8: Fish reception/unloading areas with water supply and wastewater disposal systems built | Non déclaré | 2.00 | 0.00 | 31 décembre 2018 |
| Output 9: Fish cleaning areas with water supply and wastewater disposal systems built | Non déclaré | 12.00 | 0.00 | 31 décembre 2019 |
Fonds transférés à d’autres organisations13 mouvements
| Bénéficiaire | Mouvement | Date | Millions de dollars US |
|---|---|---|---|
| Ministere de L Agriculture des Resources | Décaissement | 30 avril 2022 | 2,8 |
| Ministere de L Agriculture des Resources | Décaissement | 30 avril 2021 | 2,8 |
| RESS Fin Non REMB 3492 GR Ha PECHE | Décaissement | 30 juin 2020 | 2,4 |
| Economic Construction Maritime | Décaissement | 31 mai 2020 | 0,2 |
| Marine Motors S.A | Décaissement | 31 août 2019 | 0,2 |
| Oceanic Developpement | Décaissement | 31 août 2019 | <0,1 |
| RESS Fin Non REMB 3492 GR Ha PECHE | Décaissement | 31 août 2019 | 1,7 |
| RESS Fin Non REMB 3492 GR Ha PECHE ARTI | Décaissement | 30 septembre 2018 | 2,0 |
| RESS Fin Non REMB 3492 GR Ha PECHE ARTI | Décaissement | 30 avril 2018 | 0,8 |
| RESS Fin Non REMB 3492 GR Ha PECHE ARTI | Décaissement | 31 décembre 2017 | 0,5 |
| RESS Fin Non REMB 3492 GR Ha PECHE ARTI | Décaissement | 30 septembre 2017 | 0,5 |
| RESS Fin Non REMB 3492 GR Ha PECHE ARTI | Décaissement | 31 décembre 2016 | 0,6 |
| RESS Fin Non REMB 3492 GR Ha PECHE ARTI | Décaissement | 29 février 2016 | 0,5 |
Identifiants2 identifiants
| Système | Identifiant | Source |
|---|---|---|
| Identifiant IATI | XI-IATI-IADB-HA-L1096 | IATI |
| Opération de la BID | HA-L1096 | Fiche de l’opération |
Documents du partenaire31 documents
- Required Link - PEP HA-L1096 39542908.xlsx, iadb.org
- Required Link 4 - Monitoring and Evaluation Plan HA-L1096 39542996.docx, iadb.org
- Required Link 6 - Environmental and Social Managment Report ESMR HA-L1096 39542894.doc, iadb.org
- Optional Link - Economic Analysis HA-L1096 39542897.docx, iadb.org
- A snapshot view of the fishery associated with Fish Aggregating Devices FADs in selected communes of the Sout 39540185.docx, iadb.org
- Diagnostic of the fishery sector in Haiti Southern regions 39305157.docx, iadb.org
- Micro-study of the Fishery Sector in the South and Grand Anse Departments of Haiti 39541888.docx, iadb.org
- Presentation-Association-Nationale-Pecheurs-Haiti 39592336.doc, iadb.org
- Required Link 5 - Procurement Plan HA-L1096 39542989.xlsx, iadb.org
- IDB-PCR-Production-Timeline.pdf, iadb.org
- PCR - HA-L1096.pdf, iadb.org
- PCR - HA-L1096 aprobado fr.pdf, iadb.org
- HA-L1096 First period Jan-Jun 2015-Public Report 40194421.PDF, iadb.org
- HA-L1096 First period Jan-Jun 2016-Public Report 40799086.PDF, iadb.org
- HA-L1096 First period Jan-Jun 2017-Public Report.pdf, iadb.org
- HA-L1096 First period Jan-Jun 2018-Public Report.pdf, iadb.org
- HA-L1096 First period Jan-Jun 2019-Public Report.pdf, iadb.org
- HA-L1096 First period Jan-Jun 2020 - Public Report.pdf, iadb.org
- HA-L1096 First period Jan-Jun 2021 - Public Report.pdf, iadb.org
- HA-L1096 First period Jan-Jun 2022 - Public Report.PDF, iadb.org
- HA-L1096 First period Jan-Jun 2023 - Public Report.PDF, iadb.org
- HA-L1096 First period Jan-Jun 2024 - Public Report.PDF, iadb.org
- HA-L1096 Second period Jan-Dec 2015-Public Report 40377373.PDF, iadb.org
- HA-L1096 Second period Jan-Dec 2016-Public Report.pdf, iadb.org
- HA-L1096 Second period Jan-Dec 2017-Public Report.pdf, iadb.org
- HA-L1096 Second period Jan-Dec 2018-Public Report.pdf, iadb.org
- HA-L1096 Second period Jan-Dec 2019-Public Report.pdf, iadb.org
- HA-L1096 Second period Jan-Dec 2020 - Public Report.pdf, iadb.org
- HA-L1096 Second period Jan-Dec 2021 - Public Report.PDF, iadb.org
- HA-L1096 Second period Jan-Dec 2022 - Public Report.PDF, iadb.org
- HA-L1096 Second period Jan-Dec 2023 - Public Report.PDF, iadb.org
Avis de marchés (9)
- HA-L1096 18.pdf, iadb.org
- IDB_Procurement_Notices.xlsx, iadb.org
- HA-L1096 1105.pdf, iadb.org
- HA-L1096 3492.pdf, iadb.org
- HA-L1096 40251844.PDF, iadb.org
- HA-L1096 40347395.PDF, iadb.org
- HA-L1096 495.pdf, iadb.org
- HA-L1096 86.pdf, iadb.org
- IDB_Project_Procurement_Contract_Awards_Data.xlsx, iadb.org
Documents sur HaitiDocs
Sources
- Fiche IATI (d-portal): conditions d’utilisation fixées par l’éditeur
- IATI: conditions d’utilisation fixées par l’éditeur
- Page du projet, BID: conditions d’utilisation fixées par l’éditeur
- Écritures: conditions d’utilisation fixées par l’éditeur
- Fiche de l’opération: conditions d’utilisation fixées par l’éditeur
Données au 18 octobre 2026
| Source | Consulté le |
|---|---|
| IATI | 18 octobre 2026 |
| IATI | 18 octobre 2026 |
| Données des projets de la BID | 18 octobre 2026 |
Citer cette page
HaitiDocs. Programme de développement de la pêche artisanale. Portefeuille des partenaires, données au 18 octobre 2026. https://www.haitidocs.org/portfolio/projects/IDB%3AHA-L1096?lang=fr