Pwogram jesyon dlo nan basen Artibonite la
Tit pibliye: Water Management Program in the Artibonite Basin
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
(1) Increase agricultural production in a sustainable and climate change resilient way (2) Decrease losses due to natural desasters in the Artibonite watershed
Jan Done pwojè BID pibliye l, nan lang orijinal li.
- Etap
- Fèmen depi 4 fevriye 2021
- Apwobasyon
- 27 novanm 2013
- Fèmen
- 4 fevriye 2021
- Enstriman
- Don, Sovereign Guaranteed
- Antre an vigè
- Pa rapòte
- Dènye tranzaksyon
- 31 jiyè 2021
- Idantifyan operasyon an
- HA-L1087
Sik lavi4 etap, 8 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Apwouve | 27 novanm 2013 |
| An kou | 5 fevriye 2014 |
| Ap fèmen | 4 fevriye 2021 |
| Fèmen | 4 fevriye 2021 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Apwobasyon | 27 novanm 2013 | Done pwojè BID |
| Premye angajman | 27 novanm 2013 | Tranzaksyon |
| Siyati | 5 fevriye 2014 | Done pwojè BID |
| Kòmansman prevwa | 13 fevriye 2014 | IATI |
| Kòmansman reyèl | 2 jen 2014 | IATI |
| Premye dekèsman | 30 jen 2014 | Tranzaksyon |
| Dat fèmti | 4 fevriye 2021 | IATI |
| Dènye dekèsman | 28 fevriye 2021 | Tranzaksyon |
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| Local counterpart | 2.5 | Kontrepati | Done pwojè BID |
| IDB | 25.0 | Enstitisyon | Done pwojè BID |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 25.0 | Done pwojè BID | 25.0 |
| Dekèse | 24.8 | IATI | 24.8 |
| Pa dekèse | Pa rapòte | ||
| Pri total | 27.5 | Done pwojè BID |
Chak montan bay jan sous la pibliye l, konvèti an US$. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Paj sa a sèvi ak Done pwojè BID pou angajman an ak IATI pou dekèsman yo.
Chanjman nan operasyon anpa rapòte
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2013-14Milyon dola ameriken | FY2015-16Milyon dola ameriken | FY2016-17Milyon dola ameriken | FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | FY2019-20Milyon dola ameriken | FY2020-21Milyon dola ameriken | |
|---|---|---|---|---|---|---|---|
| Nouvo angajman | 25.0 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte |
| Dekèsman | 4.7 | 4.7 | 2.2 | 3.6 | 3.6 | 4.7 | 1.3 |
| Dekèsman kimile | 4.7 | 9.3 | 11.6 | 15.2 | 18.8 | 23.6 | 24.8 |
Fich ak dokiman
Tranzaksyon13 liy, 27 novanm 2013 rive 31 jiyè 2021
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 27 novanm 2013 | Angajman | 25.0 | Done pwojè BID | commitment at approval date |
| 30 jen 2014 | Dekèsman | 0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 jiyè 2014 | Dekèsman | 4.6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 mas 2016 | Dekèsman | 4.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 28 fevriye 2017 | Dekèsman | 2.2 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2017 | Dekèsman | 3.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 out 2018 | Dekèsman | 0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2018 | Dekèsman | 0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 oktòb 2018 | Dekèsman | 3.6 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 out 2020 | Dekèsman | 4.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 janvye 2021 | Dekèsman | 0.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 28 fevriye 2021 | Dekèsman | 0.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 jiyè 2021 | Dekèsman | −0.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
Kondisyon5 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- 20 Lòt apò ofisyèl, san kredi ekspòtasyon
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 4 Apò miltilateral k ap soti
- Imanitè
- Pa rapòte
Endikatè rezilta48 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Indicator 4.1: Days with water level at Péligre dam above the maximum limit for flood management | Pa rapòte | 75.00 | 0.00 | 31 desanm 2014 |
| Indicator 4.2: Days with water flows released by Péligre dam above 400 m3/sec | Pa rapòte | 18.00 | 0.00 | 31 desanm 2014 |
| Indicator 6.1: Secondary and tertiary canals and drains dredged (manually) by the 3 WUAs in the pilot area | Pa rapòte | 108.00 | 40.60 | 31 desanm 2016 |
| Indicator 6.2: Rate of cost recovery in the 3 WUAs of the pilot area | Pa rapòte | 75.00 | 0.00 | 31 desanm 2016 |
| Output 10: ODVA?s procedures manual for operation and maintenance of infrastructure and equipment prepared | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Output 11: CIA-ODVA's staff trained | Pa rapòte | 20.00 | 24.00 | 31 desanm 2017 |
| Output 12: Annual technical and financial plan and annual technical and financial report of operation and maintenance of primary infrastructures under ODVA?s responsibility prepared | Pa rapòte | 2.00 | 0.00 | 31 desanm 2018 |
| Output 13: CIA-ODVA equipped with a package of operating equipment | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 14: ODVA?s administrative and financial staff trained | Pa rapòte | 10.00 | 10.00 | 31 desanm 2016 |
| Output 15: Accounting software installed at the ODVA?s administrative and financial service | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 16: ODVA�s administrative and financial service equipped with a package of operating equipment | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 17: DGSE-ODVA equipped with a package of operating equipment | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 18: Water Users Associations (WUAs) equipped with office, IT equipment and motorcycles | Pa rapòte | 4.00 | 0.00 | 31 desanm 2017 |
| Output 19: DGSE and WUA staff trained | Pa rapòte | 170.00 | 93.00 | 31 desanm 2018 |
| Output 1: Water and sediment containment infrastructures built in gullies in the pilot area of the upper watershed | Pa rapòte | 225.00 | 180.00 | 31 desanm 2018 |
| Output 20: Annual technical and financial plan and annual technical and financial report of operation and maintenance of infrastructures under WUAs? responsibility: prepared | Pa rapòte | 6.00 | 0.00 | 31 desanm 2018 |
| Output 2: Electromechanical system (gates and automatic control) at Canneau dam rehabilitated | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Output 3: Protection walls preventing the Left and Right Banks Master Canals from collapsing downstream Canneau dam: built | Pa rapòte | 2.00 | 0.00 | 31 desanm 2015 |
| Output 4: Secondary and tertiary irrigation and drainage canals built or rehabilitated, and equipped, in the pilot area of the irrigation district | Pa rapòte | 28.40 | 35.90 | 31 desanm 2016 |
| Output 5: Primary irrigation and drainage canals dredged in the irrigation district | Pa rapòte | 30000.00 | 1954.00 | 31 desanm 2018 |
| Output 6: Equipment to regulate and measure water flow built/installed on the main canals of the irrigation district | Pa rapòte | 50.00 | 0.00 | 31 desanm 2016 |
| Output 7: Meetings of the Péligre Commission taking place | Pa rapòte | 6.00 | 4.00 | 31 desanm 2018 |
| Output 8: Flood management system (composed of water level gauges, flood management software and one computer per dam) operating at the Péligre and Canneau dams | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Output 9: Artibonite Watershed Binational Commission created | Pa rapòte | 1.00 | 0.00 | 31 desanm 2018 |
| Indicator 4.1: Days with water level at Péligre dam above the maximum limit for flood management | Pa rapòte | 75.00 | 0.00 | 31 desanm 2014 |
| Indicator 4.2: Days with water flows released by Péligre dam above 400 m3/sec | Pa rapòte | 18.00 | 0.00 | 31 desanm 2014 |
| Indicator 6.1: Secondary and tertiary canals and drains dredged (manually) by the 3 WUAs in the pilot area | Pa rapòte | 108.00 | 40.60 | 31 desanm 2016 |
| Indicator 6.2: Rate of cost recovery in the 3 WUAs of the pilot area | Pa rapòte | 75.00 | 0.00 | 31 desanm 2016 |
| Output 10: ODVA?s procedures manual for operation and maintenance of infrastructure and equipment prepared | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Output 11: CIA-ODVA's staff trained | Pa rapòte | 20.00 | 24.00 | 31 desanm 2017 |
| Output 12: Annual technical and financial plan and annual technical and financial report of operation and maintenance of primary infrastructures under ODVA?s responsibility prepared | Pa rapòte | 2.00 | 0.00 | 31 desanm 2018 |
| Output 13: CIA-ODVA equipped with a package of operating equipment | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 14: ODVA?s administrative and financial staff trained | Pa rapòte | 10.00 | 10.00 | 31 desanm 2016 |
| Output 15: Accounting software installed at the ODVA?s administrative and financial service | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 16: ODVA�s administrative and financial service equipped with a package of operating equipment | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 17: DGSE-ODVA equipped with a package of operating equipment | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Output 18: Water Users Associations (WUAs) equipped with office, IT equipment and motorcycles | Pa rapòte | 4.00 | 0.00 | 31 desanm 2017 |
| Output 19: DGSE and WUA staff trained | Pa rapòte | 170.00 | 93.00 | 31 desanm 2018 |
| Output 1: Water and sediment containment infrastructures built in gullies in the pilot area of the upper watershed | Pa rapòte | 225.00 | 180.00 | 31 desanm 2018 |
| Output 20: Annual technical and financial plan and annual technical and financial report of operation and maintenance of infrastructures under WUAs? responsibility: prepared | Pa rapòte | 6.00 | 0.00 | 31 desanm 2018 |
| Output 2: Electromechanical system (gates and automatic control) at Canneau dam rehabilitated | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Output 3: Protection walls preventing the Left and Right Banks Master Canals from collapsing downstream Canneau dam: built | Pa rapòte | 2.00 | 0.00 | 31 desanm 2015 |
| Output 4: Secondary and tertiary irrigation and drainage canals built or rehabilitated, and equipped, in the pilot area of the irrigation district | Pa rapòte | 28.40 | 35.90 | 31 desanm 2016 |
| Output 5: Primary irrigation and drainage canals dredged in the irrigation district | Pa rapòte | 30000.00 | 1954.00 | 31 desanm 2018 |
| Output 6: Equipment to regulate and measure water flow built/installed on the main canals of the irrigation district | Pa rapòte | 50.00 | 0.00 | 31 desanm 2016 |
| Output 7: Meetings of the Péligre Commission taking place | Pa rapòte | 6.00 | 4.00 | 31 desanm 2018 |
| Output 8: Flood management system (composed of water level gauges, flood management software and one computer per dam) operating at the Péligre and Canneau dams | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Output 9: Artibonite Watershed Binational Commission created | Pa rapòte | 1.00 | 0.00 | 31 desanm 2018 |
Lajan ki pase bay lòt13 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| Southport Dredging Inc | Dekèsman | 28 fevriye 2021 | 0.1 |
| Aecom Consultants Inc. | Dekèsman | 28 fevriye 2021 | 0.1 |
| Southport Dredging Inc | Dekèsman | 28 fevriye 2021 | 0.4 |
| Southport Dredging Inc | Dekèsman | 31 janvye 2021 | 0.7 |
| Ressources Financement Non Rembousable | Dekèsman | 31 out 2020 | 4.7 |
| Ressources Financement Non Rembousable | Dekèsman | 31 oktòb 2018 | 3.6 |
| Direction du Centre d'ETUDE et | Dekèsman | 30 septanm 2018 | 0.1 |
| Societe du Canal de Province (SCP) | Dekèsman | 31 out 2018 | 0.1 |
| Ressources Financement Non Rembousable | Dekèsman | 31 desanm 2017 | 3.4 |
| Ressources Financement Non Rembousable | Dekèsman | 28 fevriye 2017 | 2.2 |
| Ressources Financement Non Rembousable | Dekèsman | 31 mas 2016 | 4.7 |
| Ressources Financement Non Rembousable | Dekèsman | 31 jiyè 2014 | 4.6 |
| Ressources Financement Non Rembousable | Dekèsman | 30 jen 2014 | 0.1 |
Idantifyan2 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | XI-IATI-IADB-HA-L1087 | IATI |
| Operasyon BID | HA-L1087 | Fich operasyon an |
Dokiman patnè a37 dokiman
- Link - Annual Operating Plan HA-L087 38110838.xlsx, iadb.org
- Link - Detailed Budget HA-L1087 38107888.xls, iadb.org
- Link - Economic Analysis HA-L1087 38136444.docx, iadb.org
- Link - Monitoring and Evaluation Plan HA-L1087 38133821.docx, iadb.org
- Analyse EIESPGESARTIBONITEdocx 38689059.DOCX, iadb.org
- Base de donnes Thomonde par Alex Bellande Sept2013 38082849.xls, iadb.org
- Development of a Binational Technical Cooperation Structure in the Artibonite Watershed OXFAM-Qubec 2013 38129348.DOCX, iadb.org
- Devis estimatif - Rhabilitation Berges gauche et droite en aval de Canneau COB 2013 38133483.XLSX, iadb.org
- Estimation des bnfices technico-conomiques esprs du programme dinvestissement et de maintenance - Rapport 38154933.DOCX, iadb.org
- Etude Prliminaire Bassin Versant Artibonite par Alex Bellande - Sept2013 38082840.doc, iadb.org
- Etude de curage des drains critiques - SCP 2013 38092249.PDF, iadb.org
- Etudes dinstrumentation des barrages de Pligre et de Canneau - Besoin dinvestissement - Coyne et Bellier 38111468.PDF, iadb.org
- Evaluation des contreparties de lODVA dans le cadre du projet dassistance technique en vue du transfert de ges 38094218.PDF, iadb.org
- Finalisation de la trame hydraulique du secteur pilote- Rapport 1a i Provisioire SCP 2013 38094164.PDF, iadb.org
- Implmentation dun systme de rgulation des canaux primaires - rapport 1a ii Provisioire - SCP 2013 38094109.PDF, iadb.org
- Mthodologie dassistance technique lODVA - Rapport 2b Provisioire v-2 38094096.PDF, iadb.org
- Projet de protection de la berge gauche du fleuve Artibonite et des canaux maitres rive gauche et rive droite en 38133702.doc, iadb.org
- Rforme du schma institutionnel de la gestion de leau et des infrastructures du primtre irrigu de la valle 38156741.PDF, iadb.org
- TDR de lassistance technique - Accompagnement de la DGSE de lODVA et des AI pour la mise en oeuvre de la rfor 38094139.PDF, iadb.org
- HA-L1087 First period Jan-Jun 2017-Public Report.pdf, iadb.org
- HA-L1087 First period Jan-Jun 2018-Public Report.pdf, iadb.org
- HA-L1087 First period Jan-Jun 2019-Public Report.pdf, iadb.org
- HA-L1087 First period Jan-Jun 2020 - Public Report.pdf, iadb.org
- IDB-PCR-Production-Timeline.pdf, iadb.org
- Water Management Program in the Artibonite Basin - HA-L1087.pdf, iadb.org
- Programme de Gestion de lEau dans le Bassin de lArtibonite - HA-L1087.pdf, iadb.org
- HA-L1087 First period Jan-Jun 2014-Public Report 40181536.PDF, iadb.org
- HA-L1087 First period Jan-Jun 2016-Public Report 40799074.PDF, iadb.org
- HA-L1087 First period Jan-Jun 2021 - Public Report.pdf, iadb.org
- HA-L1087 Second period Jan-Dec 2013-Public Report 40172068.PDF, iadb.org
- HA-L1087 Second period Jan-Dec 2014-Public Report 40185526.PDF, iadb.org
- HA-L1087 Second period Jan-Dec 2015-Public Report 40377348.PDF, iadb.org
- HA-L1087 Second period Jan-Dec 2016-Public Report.pdf, iadb.org
- HA-L1087 Second period Jan-Dec 2017-Public Report.pdf, iadb.org
- HA-L1087 Second period Jan-Dec 2018-Public Report.pdf, iadb.org
- HA-L1087 Second period Jan-Dec 2019-Public Report.pdf, iadb.org
- HA-L1087 Second period Jan-Dec 2020 - Public Report.pdf, iadb.org
Avi apèl dòf (16)
- IDB_Procurement_Notices.xlsx, iadb.org
- HA-L1087 38857517.PDF, iadb.org
- HA-L1087 38990344.PDF, iadb.org
- HA-L1087 38990346.PDF, iadb.org
- HA-L1087 39045392.PDF, iadb.org
- HA-L1087 39115924.PDF, iadb.org
- HA-L1087 39345122.PDF, iadb.org
- HA-L1087 39454120.PDF, iadb.org
- HA-L1087 39519127.PDF, iadb.org
- HA-L1087 39598399.PDF, iadb.org
- HA-L108793882SP.pdf, iadb.org
- HA-L1087P523046SP.pdf, iadb.org
- HA-L1087P534366SP.pdf, iadb.org
- HA-L1087P534566SP.pdf, iadb.org
- HA-L1087P549388SP.pdf, iadb.org
- IDB_Project_Procurement_Contract_Awards_Data.xlsx, iadb.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, BID: kondisyon itilizasyon piblikatè a fikse
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| Done pwojè BID | 18 oktòb 2026 |