HaitiDocs

Done / Pòtfolyo patnè yo / Gwoup BID / IDB

Pwogram jesyon dlo nan basen Artibonite la

Tit pibliye: Water Management Program in the Artibonite Basin

An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Objektif

(1) Increase agricultural production in a sustainable and climate change resilient way (2) Decrease losses due to natural desasters in the Artibonite watershed

Jan Done pwojè BID pibliye l, nan lang orijinal li.

Patnè
IDB Group, IDB
Sektè
Agrikilti ak sekirite alimantè
Etap
Fèmen depi 4 fevriye 2021
Apwobasyon
27 novanm 2013
Fèmen
4 fevriye 2021
Enstriman
Don, Sovereign Guaranteed
Antre an vigè
Pa rapòte
Dènye tranzaksyon
31 jiyè 2021
Idantifyan operasyon an
HA-L1087
Sik lavi4 etap, 8 dat

Istwa etap yo

EtapDepi
Apwouve27 novanm 2013
An kou5 fevriye 2014
Ap fèmen4 fevriye 2021
Fèmen4 fevriye 2021

Evènman ki gen dat

EvènmanDatSous
Apwobasyon27 novanm 2013Done pwojè BID
Premye angajman27 novanm 2013Tranzaksyon
Siyati5 fevriye 2014Done pwojè BID
Kòmansman prevwa13 fevriye 2014IATI
Kòmansman reyèl2 jen 2014IATI
Premye dekèsman30 jen 2014Tranzaksyon
Dat fèmti4 fevriye 2021IATI
Dènye dekèsman28 fevriye 2021Tranzaksyon

Finansman

Tablo 1.Finansman, milyon dola ameriken

FinansèMontanMilyon dola amerikenWòlSous
Local counterpart2.5KontrepatiDone pwojè BID
IDB25.0EnstitisyonDone pwojè BID

Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSousIATIMilyon dola ameriken
Angajman25.0Done pwojè BID25.0
Dekèse24.8IATI24.8
Pa dekèsePa rapòte
Pri total27.5Done pwojè BID

Chak montan bay jan sous la pibliye l, konvèti an US$. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la

Paj sa a sèvi ak Done pwojè BID pou angajman an ak IATI pou dekèsman yo.

Chanjman nan operasyon anpa rapòte
Dat fèmti orijinal
Pa rapòte
Pwolongasyon dat fèmti
Pa rapòte
Restriktirasyon
Pa rapòte
Konpozan ijans
Pa rapòte

Nouvo angajman ak dekèsman pa ane fiskal

Dekèsman, milyon dola ameriken
FY2013-14, 4.7 milyon dola ameriken513-14FY2015-16, 4.7 milyon dola ameriken515-16FY2016-17, 2.2 milyon dola ameriken216-17FY2017-18, 3.6 milyon dola ameriken417-18FY2018-19, 3.6 milyon dola ameriken418-19FY2019-20, 4.7 milyon dola ameriken519-20FY2020-21, 1.3 milyon dola ameriken120-21FY2013-14, 4.7 milyon dola ameriken513-14FY2015-16, 4.7 milyon dola ameriken515-16FY2016-17, 2.2 milyon dola ameriken216-17FY2017-18, 3.6 milyon dola ameriken417-18FY2018-19, 3.6 milyon dola ameriken418-19FY2019-20, 4.7 milyon dola ameriken519-20FY2020-21, 1.3 milyon dola ameriken120-21

Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken

FY2013-14Milyon dola amerikenFY2015-16Milyon dola amerikenFY2016-17Milyon dola amerikenFY2017-18Milyon dola amerikenFY2018-19Milyon dola amerikenFY2019-20Milyon dola amerikenFY2020-21Milyon dola ameriken
Nouvo angajman25.0Pa rapòtePa rapòtePa rapòtePa rapòtePa rapòtePa rapòte
Dekèsman4.74.72.23.63.64.71.3
Dekèsman kimile4.79.311.615.218.823.624.8

Fich ak dokiman

Tranzaksyon13 liy, 27 novanm 2013 rive 31 jiyè 2021

Tablo 4.Tranzaksyon, milyon dola ameriken

DatMeziMontanMilyon dola amerikenSousMetòd
27 novanm 2013Angajman25.0Done pwojè BIDcommitment at approval date
30 jen 2014Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
31 jiyè 2014Dekèsman4.6IATIIATI disbursement (transaction type 3), paid to another organization
31 mas 2016Dekèsman4.7IATIIATI disbursement (transaction type 3), paid to another organization
28 fevriye 2017Dekèsman2.2IATIIATI disbursement (transaction type 3), paid to another organization
31 desanm 2017Dekèsman3.4IATIIATI disbursement (transaction type 3), paid to another organization
31 out 2018Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
30 septanm 2018Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
31 oktòb 2018Dekèsman3.6IATIIATI disbursement (transaction type 3), paid to another organization
31 out 2020Dekèsman4.7IATIIATI disbursement (transaction type 3), paid to another organization
31 janvye 2021Dekèsman0.7IATIIATI disbursement (transaction type 3), paid to another organization
28 fevriye 2021Dekèsman0.7IATIIATI disbursement (transaction type 3), paid to another organization
31 jiyè 2021Dekèsman−0.1IATIIATI disbursement (transaction type 3), paid to another organization
Kondisyon5 sou 6 rapòte
Kalite finansman
110 Don estanda
Kalite koule
20 Lòt apò ofisyèl, san kredi ekspòtasyon
Kalite èd
C01 Entèvansyon kalite pwojè
Èd mare oswa pa mare
5 Pa mare
Kalite kolaborasyon
4 Apò miltilateral k ap soti
Imanitè
Pa rapòte
Endikatè rezilta48 endikatè
EndikatèValè referansSibDènye valèDat dènye valè
Indicator 4.1: Days with water level at Péligre dam above the maximum limit for flood managementPa rapòte75.000.0031 desanm 2014
Indicator 4.2: Days with water flows released by Péligre dam above 400 m3/secPa rapòte18.000.0031 desanm 2014
Indicator 6.1: Secondary and tertiary canals and drains dredged (manually) by the 3 WUAs in the pilot areaPa rapòte108.0040.6031 desanm 2016
Indicator 6.2: Rate of cost recovery in the 3 WUAs of the pilot areaPa rapòte75.000.0031 desanm 2016
Output 10: ODVA?s procedures manual for operation and maintenance of infrastructure and equipment preparedPa rapòte1.000.0031 desanm 2015
Output 11: CIA-ODVA's staff trainedPa rapòte20.0024.0031 desanm 2017
Output 12: Annual technical and financial plan and annual technical and financial report of operation and maintenance of primary infrastructures under ODVA?s responsibility preparedPa rapòte2.000.0031 desanm 2018
Output 13: CIA-ODVA equipped with a package of operating equipmentPa rapòte1.000.0031 desanm 2014
Output 14: ODVA?s administrative and financial staff trainedPa rapòte10.0010.0031 desanm 2016
Output 15: Accounting software installed at the ODVA?s administrative and financial servicePa rapòte1.000.0031 desanm 2014
Output 16: ODVA�s administrative and financial service equipped with a package of operating equipmentPa rapòte1.000.0031 desanm 2014
Output 17: DGSE-ODVA equipped with a package of operating equipmentPa rapòte1.000.0031 desanm 2014
Output 18: Water Users Associations (WUAs) equipped with office, IT equipment and motorcyclesPa rapòte4.000.0031 desanm 2017
Output 19: DGSE and WUA staff trainedPa rapòte170.0093.0031 desanm 2018
Output 1: Water and sediment containment infrastructures built in gullies in the pilot area of the upper watershedPa rapòte225.00180.0031 desanm 2018
Output 20: Annual technical and financial plan and annual technical and financial report of operation and maintenance of infrastructures under WUAs? responsibility: preparedPa rapòte6.000.0031 desanm 2018
Output 2: Electromechanical system (gates and automatic control) at Canneau dam rehabilitatedPa rapòte1.000.0031 desanm 2015
Output 3: Protection walls preventing the Left and Right Banks Master Canals from collapsing downstream Canneau dam: builtPa rapòte2.000.0031 desanm 2015
Output 4: Secondary and tertiary irrigation and drainage canals built or rehabilitated, and equipped, in the pilot area of the irrigation districtPa rapòte28.4035.9031 desanm 2016
Output 5: Primary irrigation and drainage canals dredged in the irrigation districtPa rapòte30000.001954.0031 desanm 2018
Output 6: Equipment to regulate and measure water flow built/installed on the main canals of the irrigation districtPa rapòte50.000.0031 desanm 2016
Output 7: Meetings of the Péligre Commission taking placePa rapòte6.004.0031 desanm 2018
Output 8: Flood management system (composed of water level gauges, flood management software and one computer per dam) operating at the Péligre and Canneau damsPa rapòte1.000.0031 desanm 2015
Output 9: Artibonite Watershed Binational Commission createdPa rapòte1.000.0031 desanm 2018
Indicator 4.1: Days with water level at Péligre dam above the maximum limit for flood managementPa rapòte75.000.0031 desanm 2014
Indicator 4.2: Days with water flows released by Péligre dam above 400 m3/secPa rapòte18.000.0031 desanm 2014
Indicator 6.1: Secondary and tertiary canals and drains dredged (manually) by the 3 WUAs in the pilot areaPa rapòte108.0040.6031 desanm 2016
Indicator 6.2: Rate of cost recovery in the 3 WUAs of the pilot areaPa rapòte75.000.0031 desanm 2016
Output 10: ODVA?s procedures manual for operation and maintenance of infrastructure and equipment preparedPa rapòte1.000.0031 desanm 2015
Output 11: CIA-ODVA's staff trainedPa rapòte20.0024.0031 desanm 2017
Output 12: Annual technical and financial plan and annual technical and financial report of operation and maintenance of primary infrastructures under ODVA?s responsibility preparedPa rapòte2.000.0031 desanm 2018
Output 13: CIA-ODVA equipped with a package of operating equipmentPa rapòte1.000.0031 desanm 2014
Output 14: ODVA?s administrative and financial staff trainedPa rapòte10.0010.0031 desanm 2016
Output 15: Accounting software installed at the ODVA?s administrative and financial servicePa rapòte1.000.0031 desanm 2014
Output 16: ODVA�s administrative and financial service equipped with a package of operating equipmentPa rapòte1.000.0031 desanm 2014
Output 17: DGSE-ODVA equipped with a package of operating equipmentPa rapòte1.000.0031 desanm 2014
Output 18: Water Users Associations (WUAs) equipped with office, IT equipment and motorcyclesPa rapòte4.000.0031 desanm 2017
Output 19: DGSE and WUA staff trainedPa rapòte170.0093.0031 desanm 2018
Output 1: Water and sediment containment infrastructures built in gullies in the pilot area of the upper watershedPa rapòte225.00180.0031 desanm 2018
Output 20: Annual technical and financial plan and annual technical and financial report of operation and maintenance of infrastructures under WUAs? responsibility: preparedPa rapòte6.000.0031 desanm 2018
Output 2: Electromechanical system (gates and automatic control) at Canneau dam rehabilitatedPa rapòte1.000.0031 desanm 2015
Output 3: Protection walls preventing the Left and Right Banks Master Canals from collapsing downstream Canneau dam: builtPa rapòte2.000.0031 desanm 2015
Output 4: Secondary and tertiary irrigation and drainage canals built or rehabilitated, and equipped, in the pilot area of the irrigation districtPa rapòte28.4035.9031 desanm 2016
Output 5: Primary irrigation and drainage canals dredged in the irrigation districtPa rapòte30000.001954.0031 desanm 2018
Output 6: Equipment to regulate and measure water flow built/installed on the main canals of the irrigation districtPa rapòte50.000.0031 desanm 2016
Output 7: Meetings of the Péligre Commission taking placePa rapòte6.004.0031 desanm 2018
Output 8: Flood management system (composed of water level gauges, flood management software and one computer per dam) operating at the Péligre and Canneau damsPa rapòte1.000.0031 desanm 2015
Output 9: Artibonite Watershed Binational Commission createdPa rapòte1.000.0031 desanm 2018
Lajan ki pase bay lòt13 mouvman
BenefisyèMouvmanDatMilyon dola ameriken
Southport Dredging IncDekèsman28 fevriye 20210.1
Aecom Consultants Inc.Dekèsman28 fevriye 20210.1
Southport Dredging IncDekèsman28 fevriye 20210.4
Southport Dredging IncDekèsman31 janvye 20210.7
Ressources Financement Non RembousableDekèsman31 out 20204.7
Ressources Financement Non RembousableDekèsman31 oktòb 20183.6
Direction du Centre d'ETUDE etDekèsman30 septanm 20180.1
Societe du Canal de Province (SCP)Dekèsman31 out 20180.1
Ressources Financement Non RembousableDekèsman31 desanm 20173.4
Ressources Financement Non RembousableDekèsman28 fevriye 20172.2
Ressources Financement Non RembousableDekèsman31 mas 20164.7
Ressources Financement Non RembousableDekèsman31 jiyè 20144.6
Ressources Financement Non RembousableDekèsman30 jen 20140.1
Idantifyan2 idantifyan
SistèmIdantifyanSous
Idantifyan IATIXI-IATI-IADB-HA-L1087IATI
Operasyon BIDHA-L1087Fich operasyon an
Dokiman patnè a37 dokiman
Avi apèl dòf (16)

Sous

Done jiska 18 oktòb 2026
SousLi nan dat
IATI18 oktòb 2026
IATI18 oktòb 2026
Done pwojè BID18 oktòb 2026