Pwogram enfrastrikti pwodiktif II
Tit pibliye: Productive Infrastructure Program II
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The program will contribute to the socioeconomic development of Northern Haiti by creating conditions for the establishment of manufacturing firms in the Caracol Industrial Park (Parc Industriel de Caracol PIC) and thus generating employment opportunities for the Haitian population.
Jan Done pwojè BID pibliye l, nan lang orijinal li.
- Sektè
- Pwoteksyon sosyal
- Etap
- Fèmen depi 31 oktòb 2018
- Apwobasyon
- 16 desanm 2013
- Fèmen
- 31 oktòb 2018
- Enstriman
- Don, Sovereign Guaranteed
- Antre an vigè
- Pa rapòte
- Dènye tranzaksyon
- 30 novanm 2018
- Idantifyan operasyon an
- HA-L1081
Sik lavi4 etap, 8 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Apwouve | 16 desanm 2013 |
| An kou | 18 fevriye 2014 |
| Ap fèmen | 31 oktòb 2018 |
| Fèmen | 31 oktòb 2018 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Apwobasyon | 16 desanm 2013 | Done pwojè BID |
| Premye angajman | 16 desanm 2013 | Tranzaksyon |
| Siyati | 18 fevriye 2014 | Done pwojè BID |
| Kòmansman prevwa | 20 me 2014 | IATI |
| Kòmansman reyèl | 16 jen 2014 | IATI |
| Premye dekèsman | 30 jen 2014 | Tranzaksyon |
| Dat fèmti | 31 oktòb 2018 | IATI |
| Dènye dekèsman | 30 novanm 2018 | Tranzaksyon |
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDB | 40.5 | Enstitisyon | Done pwojè BID |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 40.5 | Done pwojè BID | 40.5 |
| Dekèse | 39.6 | IATI | 39.6 |
| Pa dekèse | Pa rapòte | ||
| Pri total | 40.5 | Done pwojè BID |
Chak montan bay jan sous la pibliye l, konvèti an US$. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Paj sa a sèvi ak Done pwojè BID pou angajman an ak IATI pou dekèsman yo.
Chanjman nan operasyon anpa rapòte
- Dat fèmti orijinal
- Pa rapòte
- Pwolongasyon dat fèmti
- Pa rapòte
- Restriktirasyon
- Pa rapòte
- Konpozan ijans
- Pa rapòte
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2013-14Milyon dola ameriken | FY2014-15Milyon dola ameriken | FY2015-16Milyon dola ameriken | FY2016-17Milyon dola ameriken | FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | |
|---|---|---|---|---|---|---|
| Nouvo angajman | 40.5 | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte | Pa rapòte |
| Dekèsman | 9.2 | 25.2 | 1.5 | 1.5 | 1.7 | 0.5 |
| Dekèsman kimile | 9.2 | 34.4 | 35.9 | 37.4 | 39.1 | 39.6 |
Fich ak dokiman
Tranzaksyon14 liy, 16 desanm 2013 rive 30 novanm 2018
Tablo 4.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 16 desanm 2013 | Angajman | 40.5 | Done pwojè BID | commitment at approval date |
| 30 jen 2014 | Dekèsman | 7.2 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 jiyè 2014 | Dekèsman | 2.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2014 | Dekèsman | 10.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 28 fevriye 2015 | Dekèsman | 0.9 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 avril 2015 | Dekèsman | 2.0 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 jen 2015 | Dekèsman | 3.2 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 jiyè 2015 | Dekèsman | 4.1 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 out 2015 | Dekèsman | 2.4 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 septanm 2015 | Dekèsman | 2.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 avril 2016 | Dekèsman | 1.5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 oktòb 2016 | Dekèsman | 1.5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 31 desanm 2017 | Dekèsman | 1.7 | IATI | IATI disbursement (transaction type 3), paid to another organization |
| 30 novanm 2018 | Dekèsman | 0.5 | IATI | IATI disbursement (transaction type 3), paid to another organization |
Kondisyon5 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- 20 Lòt apò ofisyèl, san kredi ekspòtasyon
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 4 Apò miltilateral k ap soti
- Imanitè
- Pa rapòte
Endikatè rezilta82 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Access road built (10m wide) | Pa rapòte | 260.00 | 184.00 | 31 desanm 2016 |
| Annex buildings (200 s.q.m) built | Pa rapòte | 2.00 | 1.00 | 31 desanm 2016 |
| Bicycle lane from PIC to Caracol built | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Bicycles using the bicycle lane per day | Pa rapòte | 250.00 | 0.00 | 31 desanm 2016 |
| Biodiversity Baseline study completed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Bus depot for PIC built | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Caracol bay preservation projects for site protection, fishermen, and another livelihood type are implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Cumulative Impact Assessment study completed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Domestic waste water treatment plant constructed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Environmental, health and safety system implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Firms operating at the PIC | Pa rapòte | 7.00 | 6.00 | 31 desanm 2016 |
| Garbage from PIC and four surrounding cities is landfilled or recycled in Solid Waste Facility | Pa rapòte | 50.00 | 0.00 | 31 desanm 2016 |
| Gender Plan Implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| General use buildings built (dormitories, canteens, and sanitary facilities) | Pa rapòte | 4.00 | 2.00 | 31 desanm 2016 |
| Haitian women employed by firms operating in the PIC | Pa rapòte | 8930.00 | 7667.00 | 31 desanm 2018 |
| Hydrology, aquifer capacity and flood risk assessment studies completed | Pa rapòte | 1.00 | 1.00 | 31 desanm 2014 |
| Industrial Warehouses (11,700 and 5,000 s.q.m) built | Pa rapòte | 6.00 | 2.00 | 31 desanm 2016 |
| Interior roads built (8m wide) | Pa rapòte | 2315.00 | 2391.00 | 31 desanm 2016 |
| Jobs filled by Haitians employed by firms operating in the PIC | Pa rapòte | 13750.00 | 12569.00 | 31 desanm 2018 |
| Minor transportation infrastructure works completed (Container Yard) | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Multipurpose community infrastructure built | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| PIC monitoring and evaluation system implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Passengers utilizing the transfer station/depot | Pa rapòte | 9550.00 | 0.00 | 31 desanm 2018 |
| Priority urban development projects in the eight municipalities surrounding the PIC finished | Pa rapòte | 6.00 | 0.00 | 31 desanm 2014 |
| Rental payments by international PIC tenant firms | Pa rapòte | 4200000.00 | 978816.40 | 31 desanm 2016 |
| SONAPI staff trained in management of the PIC | Pa rapòte | 10.00 | 0.00 | 31 desanm 2016 |
| Services (transportation, water, sanitation) payments by international PIC tenants firms | Pa rapòte | 490000.00 | 890658.56 | 31 desanm 2016 |
| Social security payments made by PIC firms for Haitian workers | Pa rapòte | 890000.00 | 834618.15 | 31 desanm 2015 |
| Solid Waste Management Facility constructed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Technical assistance and office and IT equipment delivered to eight Municipalities | Pa rapòte | 6.00 | 0.00 | 31 desanm 2014 |
| Three bays National Park management unit established | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Total salaries paid to Haitian workers in PIC | Pa rapòte | 19525000.0 | 29457379.0 | 31 desanm 2018 |
| Total taxes paid by PIC tenants for goods coming in/out of Haiti | Pa rapòte | 10000.00 | 0.00 | 31 desanm 2016 |
| Urban streets paved | Pa rapòte | 500.00 | 0.00 | 31 desanm 2016 |
| Urban transportation study completed | Pa rapòte | 1.00 | 1.00 | 31 desanm 2014 |
| Wastewater collection network expanded, with 300mm-a 42" diameter pipes | Pa rapòte | 2178.00 | 2860.00 | 31 desanm 2014 |
| Water distribution networks expanded with 50mm a 150 mm-diameter pipes installed | Pa rapòte | 3598.00 | 2860.00 | 31 desanm 2014 |
| Women and children who obtain social services provided by the community center | Pa rapòte | 9000.00 | 0.00 | 31 desanm 2016 |
| Women using lactation rooms in PIC | Pa rapòte | 1900.00 | 0.00 | 31 desanm 2018 |
| Workshops conducted to train SONAPI staff in management of the PIC | Pa rapòte | 2.00 | 0.00 | 31 desanm 2016 |
| Access road built (10m wide) | Pa rapòte | 260.00 | 184.00 | 31 desanm 2016 |
| Annex buildings (200 s.q.m) built | Pa rapòte | 2.00 | 1.00 | 31 desanm 2016 |
| Batiments construits du PIC | Pa rapòte | 1.00 | 1.00 | 31 desanm 2013 |
| Bicycle lane from PIC to Caracol built | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Bicycles using the bicycle lane per day | Pa rapòte | 250.00 | 0.00 | 31 desanm 2016 |
| Biodiversity Baseline study completed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Bus depot for PIC built | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Caracol bay preservation projects for site protection, fishermen, and another livelihood type are implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Compensation de desplace pour el Parc Industrielle | Pa rapòte | 300.00 | 411.00 | 31 desanm 2013 |
| Cumulative Impact Assessment study completed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Domestic waste water treatment plant constructed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Environmental, health and safety system implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Firms operating at the PIC | Pa rapòte | 7.00 | 6.00 | 31 desanm 2016 |
| Garbage from PIC and four surrounding cities is landfilled or recycled in Solid Waste Facility | Pa rapòte | 50.00 | 0.00 | 31 desanm 2016 |
| Gender Plan Implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| General use buildings built (dormitories, canteens, and sanitary facilities) | Pa rapòte | 4.00 | 2.00 | 31 desanm 2016 |
| Haitian women employed by firms operating in the PIC | Pa rapòte | 8930.00 | 7667.00 | 31 desanm 2018 |
| Hydrology, aquifer capacity and flood risk assessment studies completed | Pa rapòte | 1.00 | 1.00 | 31 desanm 2014 |
| Industrial Warehouses (11,700 and 5,000 s.q.m) built | Pa rapòte | 6.00 | 2.00 | 31 desanm 2016 |
| Interior roads built (8m wide) | Pa rapòte | 2315.00 | 2391.00 | 31 desanm 2016 |
| Jobs filled by Haitians employed by firms operating in the PIC | Pa rapòte | 13750.00 | 12569.00 | 31 desanm 2018 |
| Minor transportation infrastructure works completed (Container Yard) | Pa rapòte | 1.00 | 0.00 | 31 desanm 2015 |
| Multipurpose community infrastructure built | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| PIC monitoring and evaluation system implemented | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Passengers utilizing the transfer station/depot | Pa rapòte | 9550.00 | 0.00 | 31 desanm 2018 |
| Priority urban development projects in the eight municipalities surrounding the PIC finished | Pa rapòte | 6.00 | 0.00 | 31 desanm 2014 |
| Rental payments by international PIC tenant firms | Pa rapòte | 4200000.00 | 978816.40 | 31 desanm 2016 |
| SONAPI staff trained in management of the PIC | Pa rapòte | 10.00 | 0.00 | 31 desanm 2016 |
| Services (transportation, water, sanitation) payments by international PIC tenants firms | Pa rapòte | 490000.00 | 890658.56 | 31 desanm 2016 |
| Social security payments made by PIC firms for Haitian workers | Pa rapòte | 890000.00 | 834618.15 | 31 desanm 2015 |
| Solid Waste Management Facility constructed | Pa rapòte | 1.00 | 0.00 | 31 desanm 2014 |
| Technical assistance and office and IT equipment delivered to eight Municipalities | Pa rapòte | 6.00 | 0.00 | 31 desanm 2014 |
| Three bays National Park management unit established | Pa rapòte | 1.00 | 0.00 | 31 desanm 2016 |
| Total salaries paid to Haitian workers in PIC | Pa rapòte | 19525000.0 | 29457379.0 | 31 desanm 2018 |
| Total taxes paid by PIC tenants for goods coming in/out of Haiti | Pa rapòte | 10000.00 | 0.00 | 31 desanm 2016 |
| Urban streets paved | Pa rapòte | 500.00 | 0.00 | 31 desanm 2016 |
| Urban transportation study completed | Pa rapòte | 1.00 | 1.00 | 31 desanm 2014 |
| Wastewater collection network expanded, with 300mm-a 42" diameter pipes | Pa rapòte | 2178.00 | 2860.00 | 31 desanm 2014 |
| Water distribution networks expanded with 50mm a 150 mm-diameter pipes installed | Pa rapòte | 3598.00 | 2860.00 | 31 desanm 2014 |
| Women and children who obtain social services provided by the community center | Pa rapòte | 9000.00 | 0.00 | 31 desanm 2016 |
| Women using lactation rooms in PIC | Pa rapòte | 1900.00 | 0.00 | 31 desanm 2018 |
| Workshops conducted to train SONAPI staff in management of the PIC | Pa rapòte | 2.00 | 0.00 | 31 desanm 2016 |
Lajan ki pase bay lòt22 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| Utemefprojet 3132GR-HA. Programme | Dekèsman | 30 novanm 2018 | 0.5 |
| Ingenieria Estrella S.A | Dekèsman | 31 desanm 2017 | 0.8 |
| Ingenieria Estrella S.A | Dekèsman | 31 desanm 2017 | 0.9 |
| Utemefprojet 3132GR-HA. Programme | Dekèsman | 31 oktòb 2016 | 1.5 |
| Ingenieria Estrella S.A | Dekèsman | 30 avril 2016 | 1.5 |
| Ingenieria Estrella S.A | Dekèsman | 30 septanm 2015 | 2.7 |
| Ingenieria Estrella S.A | Dekèsman | 31 out 2015 | 2.4 |
| Utemefprojet 3132GR-HA. Programme | Dekèsman | 31 jiyè 2015 | 2.0 |
| Ingenieria Estrella S.A. | Dekèsman | 31 jiyè 2015 | 2.1 |
| Ingenieria Estrella S.A. | Dekèsman | 30 jen 2015 | 0.8 |
| Ingenieria Estrella S.A. | Dekèsman | 30 jen 2015 | 1.3 |
| Ingenieria Estrella S.A | Dekèsman | 30 jen 2015 | 1.1 |
| Ingenieria Estrella S.A. | Dekèsman | 30 avril 2015 | 2.0 |
| Ingenieria Estrella S.A. | Dekèsman | 28 fevriye 2015 | 0.9 |
| Ingenieria Estrella S.A. | Dekèsman | 31 desanm 2014 | 1.3 |
| Ingenieria Estrella S.A. | Dekèsman | 31 desanm 2014 | 0.6 |
| Ingenieria Estrella S.A. | Dekèsman | 31 desanm 2014 | 1.1 |
| Ingenieria Estrella S.A. | Dekèsman | 31 desanm 2014 | 2.3 |
| Ingenieria Estrella S.A. | Dekèsman | 31 desanm 2014 | 1.1 |
| Ingenieria Estrella S.A. | Dekèsman | 31 desanm 2014 | 3.5 |
| Utemefprojet 3132GR-HA. Programme | Dekèsman | 31 jiyè 2014 | 2.0 |
| Ingenieria Estrella S.A | Dekèsman | 30 jen 2014 | 7.2 |
Idantifyan2 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | XI-IATI-IADB-HA-L1081 | IATI |
| Operasyon BID | HA-L1081 | Fich operasyon an |
Dokiman patnè a30 dokiman
- Environmental and Social Management Report ESMR HA-L1081 37972759.docx, iadb.org
- Evaluation of the Financial and Economic Viability HA-L1081 37951544.doc, iadb.org
- Financial and economic evaluation of the PIC - Appendix 1A 1B and 1CHA-L1081 37948305.xlsm, iadb.org
- HAITI Productive Infraestructure Program II HA-L1081 Proposal for a nonreimbursable financing 38251547.PDF, iadb.org
- Monitoring and Evaluation Arrengements HA-L1081 37950880.docx, iadb.org
- PIC Budget HA-L1081 37950159.xlsx, iadb.org
- PIC Master Plan HA-L1081 37948183.PDF, iadb.org
- Plan of Activity HA-L1081 37942791.XLSX, iadb.org
- HAITI Propuesta de financiamiento no rembolsable para el Programa de Infraestructura Productiva II 38279164.PDF, iadb.org
- Global Report by UTE on the PIC - October 2011 - Maqrch 2013 HA-L1081 37952013.PDF, iadb.org
- Procurement Plan HA-L1081 37950385.xlsx, iadb.org
- HA-L1076 - PCR-PIC HAITI English.pdf, iadb.org
- IDB-PCR-Production-Timeline.pdf, iadb.org
- HA-L1076 - PCR-PIC HAITI French.pdf, iadb.org
- HA-L1081 First period Jan-Jun 2014-Public Report 39823280.PDF, iadb.org
- HA-L1081 First period Jan-Jun 2015-Public Report 40199195.PDF, iadb.org
- HA-L1081 First period Jan-Jun 2017-Public Report.pdf, iadb.org
- HA-L1081 First period Jan-Jun 2018-Public Report.pdf, iadb.org
- HA-L1081 First period Jan-Jun 2019-Public Report.pdf, iadb.org
- HA-L1081 First period Jan-Jun 2020 - Public Report.pdf, iadb.org
- HA-L1081 First period Jan-Jun 2021 - Public Report.pdf, iadb.org
- HA-L1081 Second period Jan-Dec 2014-Public Report 39824152.PDF, iadb.org
- HA-L1081 Second period Jan-Dec 2015-Public Report 40382650.PDF, iadb.org
- HA-L1081 Second period Jan-Dec 2016-Public Report.pdf, iadb.org
- HA-L1081 Second period Jan-Dec 2017-Public Report.pdf, iadb.org
- HA-L1081 Second period Jan-Dec 2018-Public Report.pdf, iadb.org
- HA-L1081 Second period Jan-Dec 2019-Public Report.pdf, iadb.org
- HA-L1081 Second period Jan-Dec 2020 - Public Report.pdf, iadb.org
- HA-L1081 Second period Jan-Dec 2021 - Public Report.PDF, iadb.org
- HA-L1081SecondperiodJan-Dec2013-PublicReport 39813914.PDF, iadb.org
Avi apèl dòf (3)
- IDB_Procurement_Notices.xlsx, iadb.org
- HA-L1081GN.doc, iadb.org
- IDB_Project_Procurement_Contract_Awards_Data.xlsx, iadb.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, BID: kondisyon itilizasyon piblikatè a fikse
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| Done pwojè BID | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Pwogram enfrastrikti pwodiktif II. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/IDB%3AHA-L1081?lang=ht