HaitiDocs

Done / Pòtfolyo patnè yo / Fon mondyal / The Global Fund to Fight AIDS, Tuberculosis and Malaria

Envesti pou gen enpak kont tibèkiloz ak VIH

Tit pibliye: Investing for Impact against Tuberculosis and HIV - Haiti (01-Jan-2024-31-Dec-2026)

An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Deskripsyon

Haiti, TB/HIV, World Vision International (WVI Haiti)This program has the following goals: D’ici à l’horizon 2030, le VIH n’est plus une menace de santé publique grâce à la mise en œuvre de stratégies accélérées au bénéfice de toutes les populations y inclus populations vulnérables et populations clés à travers une approche de soins centrée sur la personne et l’implication des communautés/By 2030, HIV is no longer a public health threat through the implementation of accelerated strategies benefiting all populations, including vulnerable and key populations, through a person-centered care approach and community involvement.. Réduire la transmission, la morbidité et la mortalité de la tuberculose au niveau des dix (10) départements géographiques du pays pour arriver à la fin de l'épidémie par

plis

l'obtention de zéro décès et de maladie et de souffrances dus à la tuberculose./ Reduce transmission, morbidity, and mortality of tuberculosis across the ten (10) geographical departments of the country to achieve the end of the epidemic by attaining zero deaths and illness and minimizing suffering due to tuberculosis.. The objectives of this program are: Les nouvelles infections par le VIH sont réduites de 90% dans la population générale et dans les groupes cibles prioritaires d’ici à 2026. / New HIV infections are reduced by 90% in the general population and in priority target groups by 2026.. D’ici à fin 2026, le taux de survie à 12 mois des enfants et adultes traités par ARV atteint 90% / By the end of 2026, the 12-month survival rate for children and adults treated with antiretroviral therapy (ARV) reaches 90%.. Réduction de la mortalité par tuberculose de 75% d'ici 2025 (de sa valeur de 2015) / Reduction of tuberculosis mortality by 75% by 2025 (from its 2015 value).. Réduction du taux d'incidence de tuberculose de 50% d'ici 2025 (de sa valeur de 2015) / Réduction du taux d'incidence de tuberculose de 50% d'ici 2025 (de sa valeur de 2015). 100% des cas suspects de tuberculose dans la population ont accès à un diagnostic précoce soutenu par un programme d’assurance qualité et ont accès à un traitement efficace sans délai. / 100% of suspected tuberculosis cases in the population have access to early diagnosis supported by a quality assurance program and have access to effective treatment without delay.. Les tests de diagnostic et de suivi de traitement sont réalisés à 95% pour les 3 maladies (TB, VIH, Malaria) dans 100% des laboratoires prévus / Diagnostic and treatment monitoring tests are conducted at a rate of 95% for the three diseases (TB, HIV, Malaria) in 100% of the planned laboratories.

Patnè
Global Fund, The Global Fund to Fight AIDS, Tuberculosis and Malaria
Sektè
Sante
Etap
An kou depi 1 janvye 2024
Kòmansman
1 janvye 2024
Fèmen
31 desanm 2026
Antre an vigè
Pa rapòte
Dènye tranzaksyon
1 jiyè 2026
Idantifyan IATI
47045-HTI-C-WV-2
Sik lavi1 etap, 6 dat

Istwa etap yo

EtapDepi
An kou1 janvye 2024

Evènman ki gen dat

EvènmanDatSous
Kòmansman reyèl1 janvye 2024IATI
Kòmansman prevwa1 janvye 2024IATI
Premye angajman10 janvye 2024Tranzaksyon
Premye dekèsman23 janvye 2024Tranzaksyon
Dènye dekèsman1 jiyè 2026Tranzaksyon
Dat fèmti31 desanm 2026IATI

Dekèse nan FY2025-26: 21.1 milyon dola ameriken.

Finansman

Tablo 1.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSous
Angajman76.5IATI
Dekèse64.9IATI
Pa dekèsePa rapòte
Pri totalPa rapòte

Montan IATI. Apwouve: Angajman patnè a pibliye, konvèti an US$. Dekèse jiska jodi a: Dekèsman (tranzaksyon IATI kalite 3, lajan yo peye yon lòt òganizasyon) ak depans (kalite 4, lajan editè a depanse li menm) patnè a pibliye, konvèti an US$. Pa dekèse: Balans ki pa dekèse fich la bay, lè patnè a pibliye youn, an US$. Montan yo dapre sous la

Chanjman nan operasyon anpa rapòte
Dat fèmti orijinal
Pa rapòte
Pwolongasyon dat fèmti
Pa rapòte
Restriktirasyon
Pa rapòte
Konpozan ijans
Pa rapòte

Nouvo angajman ak dekèsman pa ane fiskal

Dekèsman, milyon dola ameriken
FY2023-24, 14.0 milyon dola ameriken1423-24FY2024-25, 29.8 milyon dola ameriken3024-25FY2025-26, 21.1 milyon dola ameriken2125-26FY2023-24, 14.0 milyon dola ameriken1423-24FY2024-25, 29.8 milyon dola ameriken3024-25FY2025-26, 21.1 milyon dola ameriken2125-26

Tablo 2.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken

FY2023-24Milyon dola amerikenFY2024-25Milyon dola amerikenFY2025-26Milyon dola ameriken
Nouvo angajman37.710.828.1
Dekèsman14.029.821.1
Dekèsman kimile14.043.864.9

Fich ak dokiman

Tranzaksyon214 liy, 10 janvye 2024 rive 1 jiyè 2026

Tablo 3.Tranzaksyon, milyon dola ameriken

DatMeziMontanMilyon dola amerikenSousMetòd
10 janvye 2024Angajman30.5IATIIATI commitment (transaction type 2)
16 avril 2024Angajman2.0IATIIATI commitment (transaction type 2)
24 avril 2024Angajman0.3IATIIATI commitment (transaction type 2)
8 me 2024Angajman0.7IATIIATI commitment (transaction type 2)
10 me 2024Angajman2.4IATIIATI commitment (transaction type 2)
3 jiyè 2024Angajman1.2IATIIATI commitment (transaction type 2)
11 jiyè 2024Angajman0.1IATIIATI commitment (transaction type 2)
7 out 2024Angajman0.3IATIIATI commitment (transaction type 2)
29 out 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
25 septanm 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
4 oktòb 2024Angajman0.5IATIIATI commitment (transaction type 2)
8 oktòb 2024Angajman<0.1IATIIATI commitment (transaction type 2)
10 oktòb 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
16 oktòb 2024Angajman<0.1IATIIATI commitment (transaction type 2)
4 novanm 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
16 novanm 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
18 novanm 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
19 novanm 2024Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
11 desanm 2024Angajman<0.1IATIIATI commitment (transaction type 2)
11 janvye 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
21 janvye 2025Angajman0.2IATIIATI commitment (transaction type 2)
11 fevriye 2025Angajman<0.1IATIIATI commitment (transaction type 2)
12 fevriye 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
21 fevriye 2025Angajman0.6IATIIATI commitment (transaction type 2)
26 fevriye 2025Angajman0.3IATIIATI commitment (transaction type 2)
4 mas 2025Angajman1.7IATIIATI commitment (transaction type 2)
6 mas 2025Angajman−0.6IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
11 mas 2025Angajman1.5IATIIATI commitment (transaction type 2)
12 mas 2025Angajman<0.1IATIIATI commitment (transaction type 2)
21 mas 2025Angajman<0.1IATIIATI commitment (transaction type 2)
24 mas 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
26 mas 2025Angajman<0.1IATIIATI commitment (transaction type 2)
1 avril 2025Angajman0.2IATIIATI commitment (transaction type 2)
18 avril 2025Angajman0.5IATIIATI commitment (transaction type 2)
23 avril 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
19 me 2025Angajman0.5IATIIATI commitment (transaction type 2)
26 me 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
13 jen 2025Angajman−0.1IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
15 jen 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
16 jen 2025Angajman−0.1IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
18 jen 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
21 jen 2025Angajman−0.2IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
28 jen 2025Angajman<0.1IATIIATI commitment (transaction type 2)
29 jen 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
30 jen 2025Angajman<0.1IATIIATI commitment (transaction type 2)
3 jiyè 2025Angajman3.4IATIIATI commitment (transaction type 2)
7 jiyè 2025Angajman<0.1IATIIATI commitment (transaction type 2)
10 jiyè 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
23 jiyè 2025Angajman−0.1IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
24 jiyè 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
2 out 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
5 out 2025Angajman0.4IATIIATI commitment (transaction type 2)
10 out 2025Angajman<0.1IATIIATI commitment (transaction type 2)
11 out 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
12 out 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
13 out 2025Angajman<0.1IATIIATI commitment (transaction type 2)
14 out 2025Angajman<0.1IATIIATI commitment (transaction type 2)
15 out 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
16 out 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
17 out 2025Angajman2.6IATIIATI commitment (transaction type 2)
19 out 2025Angajman−0.5IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
21 out 2025Angajman0.4IATIIATI commitment (transaction type 2)
23 out 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
30 out 2025Angajman−0.1IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
2 septanm 2025Angajman<0.1IATIIATI commitment (transaction type 2)
10 septanm 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
13 septanm 2025Angajman−0.1IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
14 septanm 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
15 septanm 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
19 septanm 2025Angajman<0.1IATIIATI commitment (transaction type 2)
30 septanm 2025Angajman−0.5IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
14 oktòb 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
1 novanm 2025Angajman0.1IATIIATI commitment (transaction type 2)
6 novanm 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
10 novanm 2025Angajman0.2IATIIATI commitment (transaction type 2)
14 novanm 2025Angajman0.2IATIIATI commitment (transaction type 2)
19 novanm 2025Angajman0.3IATIIATI commitment (transaction type 2)
21 novanm 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
28 novanm 2025Angajman0.9IATIIATI commitment (transaction type 2)
5 desanm 2025Angajman0.3IATIIATI commitment (transaction type 2)
15 desanm 2025Angajman−0.3IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
16 desanm 2025Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
18 desanm 2025Angajman7.1IATIIATI commitment (transaction type 2)
9 janvye 2026Angajman0.4IATIIATI commitment (transaction type 2)
15 janvye 2026Angajman0.3IATIIATI commitment (transaction type 2)
26 janvye 2026Angajman0.2IATIIATI commitment (transaction type 2)
28 janvye 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
3 fevriye 2026Angajman1.3IATIIATI commitment (transaction type 2)
12 fevriye 2026Angajman<0.1IATIIATI commitment (transaction type 2)
13 fevriye 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
17 fevriye 2026Angajman<0.1IATIIATI commitment (transaction type 2)
24 fevriye 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
6 mas 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
12 mas 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
15 mas 2026Angajman−0.2IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
24 mas 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
30 mas 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
18 avril 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
1 me 2026Angajman13.2IATIIATI commitment (transaction type 2)
3 me 2026Angajman<0.1IATIIATI commitment (transaction type 2)
9 me 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
12 me 2026Angajman0.8IATIIATI commitment (transaction type 2)
30 me 2026Angajman1.8IATIIATI commitment (transaction type 2)
5 jen 2026Angajman0.2IATIIATI commitment (transaction type 2)
9 jen 2026Angajman0.1IATIIATI commitment (transaction type 2)
10 jen 2026Angajman1.0IATIIATI commitment (transaction type 2)
12 jen 2026Angajman0.2IATIIATI commitment (transaction type 2)
19 jen 2026Angajman−0.0IATInegative commitment as reported: a reduction or correction of an earlier commitment, not a cancellation in the source; IATI commitment (transaction type 2)
20 jen 2026Angajman<0.1IATIIATI commitment (transaction type 2)
25 jen 2026Angajman0.1IATIIATI commitment (transaction type 2)
30 jen 2026Angajman0.1IATIIATI commitment (transaction type 2)
23 janvye 2024Dekèsman4.2IATIIATI disbursement (transaction type 3), paid to another organization
30 janvye 2024Dekèsman0.8IATIIATI disbursement (transaction type 3), paid to another organization
23 avril 2024Dekèsman0.7IATIIATI disbursement (transaction type 3), paid to another organization
2 jiyè 2024Dekèsman5.0IATIIATI disbursement (transaction type 3), paid to another organization
4 jiyè 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
11 jiyè 2024Dekèsman0.5IATIIATI disbursement (transaction type 3), paid to another organization
16 jiyè 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
18 jiyè 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
25 jiyè 2024Dekèsman1.3IATIIATI disbursement (transaction type 3), paid to another organization
30 jiyè 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
6 out 2024Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
13 out 2024Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
20 out 2024Dekèsman0.4IATIIATI disbursement (transaction type 3), paid to another organization
3 septanm 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
10 septanm 2024Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
12 septanm 2024Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
17 septanm 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
24 septanm 2024Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
1 oktòb 2024Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
8 oktòb 2024Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
10 oktòb 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
22 oktòb 2024Dekèsman0.6IATIIATI disbursement (transaction type 3), paid to another organization
29 oktòb 2024Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
1 novanm 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
7 novanm 2024Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
12 novanm 2024Dekèsman4.7IATIIATI disbursement (transaction type 3), paid to another organization
19 novanm 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
21 novanm 2024Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
26 novanm 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
28 novanm 2024Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
3 desanm 2024Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
5 desanm 2024Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
12 desanm 2024Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
14 janvye 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
16 janvye 2025Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
28 janvye 2025Dekèsman5.1IATIIATI disbursement (transaction type 3), paid to another organization
30 janvye 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
4 fevriye 2025Dekèsman0.7IATIIATI disbursement (transaction type 3), paid to another organization
4 mas 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
6 mas 2025Dekèsman0.5IATIIATI disbursement (transaction type 3), paid to another organization
18 mas 2025Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
1 avril 2025Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
3 avril 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
8 avril 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
10 avril 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
17 avril 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
22 avril 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
24 avril 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
13 me 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
15 me 2025Dekèsman3.9IATIIATI disbursement (transaction type 3), paid to another organization
27 me 2025Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
3 jen 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
11 jen 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
17 jen 2025Dekèsman0.4IATIIATI disbursement (transaction type 3), paid to another organization
1 jiyè 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
8 jiyè 2025Dekèsman3.0IATIIATI disbursement (transaction type 3), paid to another organization
15 jiyè 2025Dekèsman2.0IATIIATI disbursement (transaction type 3), paid to another organization
29 jiyè 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
5 out 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
19 out 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
22 out 2025Dekèsman1.3IATIIATI disbursement (transaction type 3), paid to another organization
26 out 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
3 septanm 2025Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
9 septanm 2025Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
23 septanm 2025Dekèsman3.9IATIIATI disbursement (transaction type 3), paid to another organization
1 oktòb 2025Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
7 oktòb 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
14 oktòb 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
21 oktòb 2025Dekèsman1.1IATIIATI disbursement (transaction type 3), paid to another organization
28 oktòb 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
4 novanm 2025Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
11 novanm 2025Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
18 novanm 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
25 novanm 2025Dekèsman0.5IATIIATI disbursement (transaction type 3), paid to another organization
2 desanm 2025Dekèsman1.1IATIIATI disbursement (transaction type 3), paid to another organization
10 desanm 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
16 desanm 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
18 desanm 2025Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
13 janvye 2026Dekèsman7.2IATIIATI disbursement (transaction type 3), paid to another organization
20 janvye 2026Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
27 janvye 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
3 fevriye 2026Dekèsman0.4IATIIATI disbursement (transaction type 3), paid to another organization
10 fevriye 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
17 fevriye 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
24 fevriye 2026Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
3 mas 2026Dekèsman0.4IATIIATI disbursement (transaction type 3), paid to another organization
10 mas 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
11 mas 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
18 mas 2026Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
1 avril 2026Dekèsman0.3IATIIATI disbursement (transaction type 3), paid to another organization
8 avril 2026Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
15 avril 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
21 avril 2026Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
28 avril 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
5 me 2026Dekèsman1.5IATIIATI disbursement (transaction type 3), paid to another organization
12 me 2026Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
19 me 2026Dekèsman0.1IATIIATI disbursement (transaction type 3), paid to another organization
26 me 2026Dekèsman0.2IATIIATI disbursement (transaction type 3), paid to another organization
3 jen 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
9 jen 2026Dekèsman4.1IATIIATI disbursement (transaction type 3), paid to another organization
16 jen 2026Dekèsman1.0IATIIATI disbursement (transaction type 3), paid to another organization
23 jen 2026Dekèsman0.8IATIIATI disbursement (transaction type 3), paid to another organization
1 jiyè 2026Dekèsman<0.1IATIIATI disbursement (transaction type 3), paid to another organization
Kondisyon6 sou 6 rapòte
Kalite finansman
110 Don estanda
Kalite koule
10 Èd piblik pou devlopman
Kalite èd
C01 Entèvansyon kalite pwojè
Èd mare oswa pa mare
5 Pa mare
Kalite kolaborasyon
1 Bilateral
Imanitè
Non
Endikatè rezilta29 endikatè
EndikatèValè referansSibDènye valèDat dènye valè
Contact investigation coverage: Proportion of contacts of people with bacteriologically confirmed TB evaluated for TB among those eligiblePa rapòtePa rapòte48.3831 desanm 2025
HTS-3e Other 3: Number of community-based mobile clinics providing HIV-TB prevention, testing and linkage to care services integrated to PHC services for IDPs and reporting for HIV/TB servicesPa rapòtePa rapòte100.0031 desanm 2025
KP1-e Other 1: Number of other vulnerable populations reached with HIV preventions programs - defined package of servicesPa rapòtePa rapòte108.5331 desanm 2025
KP1-e Other 2: Number of blood units safely processed to prevent the transmission of HIV and other transfusion-transmissible diseases to other vulnerable populations.Pa rapòtePa rapòte74.6831 desanm 2025
Number of MSM who received any PrEP product at least once during the reporting periodPa rapòtePa rapòtePa rapòtePa rapòte
Number of patients with of all forms of TB notified (i.e., bacteriologically confirmed + clinically diagnosed); *includes only those with new and relapse TBPa rapòtePa rapòtePa rapòtePa rapòte
Number of people in contact with TB patients who began preventive therapyPa rapòtePa rapòtePa rapòtePa rapòte
Number of people with TB (all forms) notified among prisoners; *includes only those with new and relapse TBPa rapòtePa rapòtePa rapòtePa rapòte
Number of people with confirmed RR-TB and/or MDR-TB notifiedPa rapòtePa rapòtePa rapòtePa rapòte
Number of sex workers who received any PrEP product at least once during the reporting periodPa rapòtePa rapòtePa rapòtePa rapòte
Number of transgender people who received any PrEP product at least once during the reporting periodPa rapòtePa rapòtePa rapòtePa rapòte
Percentage of HIV-positive new and relapse TB patients on ART during TB treatmentPa rapòtePa rapòte031 desanm 2025
Percentage of MSM that have received an HIV test during the reporting period in KP-specific programs and know their resultsPa rapòtePa rapòte23.9431 desanm 2025
Percentage of TG that have received an HIV test during the reporting period in KP-specific programs and know their resultsPa rapòtePa rapòte031 desanm 2025
Percentage of adults (15 and above) on ART among all adults living with HIV at the end of the reporting periodPa rapòtePa rapòte83.8531 desanm 2025
Percentage of children (under 15) on ART among all children living with HIV at the end of the reporting periodPa rapòtePa rapòte47.4931 desanm 2025
Percentage of laboratories successfully participating in external quality assurance (EQA) or proficiency testing (PT) schemesPa rapòtePa rapòte0.0031 desanm 2025
Percentage of men who have sex with men reached with HIV prevention programsPa rapòtePa rapòte1336831 desanm 2025
Percentage of new and relapse TB patients tested using WHO recommended rapid diagnostic tests at the time of diagnosisPa rapòtePa rapòte32.2531 desanm 2025
Percentage of people living with HIV currently enrolled on antiretroviral therapy who started TB preventive treatment (TPT) during the reporting periodPa rapòtePa rapòte7.9131 desanm 2025
Percentage of people newly diagnosed with HIV initiated on ARTPa rapòtePa rapòte36.2331 desanm 2025
Percentage of people with confirmed RR-TB and/or MDR-TB that began second-line treatmentPa rapòtePa rapòte4031 desanm 2025
Percentage of pregnant women living with HIV who received antiretroviral medicine to reduce the risk of vertical transmission of HIVPa rapòtePa rapòte27.1531 desanm 2025
Percentage of pregnant women who know their HIV statusPa rapòtePa rapòte257231 desanm 2025
Percentage of sex workers reached with HIV prevention programsPa rapòtePa rapòte94131 desanm 2025
Percentage of sex workers that have received an HIV test during the reporting period in KP-specific programs and know their resultsPa rapòtePa rapòte963331 desanm 2025
Percentage of transgender people reached with HIV prevention programs - defined package of servicesPa rapòtePa rapòte54.9931 desanm 2025
Treatment success rate of RR-TB and/or MDR-TB: Percentage of patients with RR and/or MDR-TB successfully treatedPa rapòtePa rapòte96.4331 desanm 2025
Treatment success rate- all forms: Percentage of patients with all forms of TB, bacteriologically confirmed plus clinically diagnosed, successfully treated (cured plus treatment completed) among all TB patients notified during a specified period; *includes only those with new and relapse TBPa rapòtePa rapòte93.9331 desanm 2025
Lajan ki pase bay lòt518 mouvman
BenefisyèMouvmanDatMilyon dola ameriken
World Vision InternationalDekèsman1 jiyè 2026<0.1
World Vision InternationalAngajman30 jen 2026−4.5
World Vision InternationalAngajman30 jen 20264.6
World Vision InternationalAngajman25 jen 20261.6
World Vision InternationalAngajman25 jen 2026−1.6
World Vision InternationalDekèsman23 jen 20260.8
World Vision InternationalDekèsman23 jen 2026<0.1
World Vision InternationalDekèsman23 jen 2026<0.1
World Vision InternationalAngajman20 jen 20261.6
World Vision InternationalAngajman20 jen 2026−1.6
World Vision InternationalAngajman19 jen 2026−0.0
World Vision InternationalDekèsman16 jen 2026<0.1
World Vision InternationalDekèsman16 jen 2026<0.1
World Vision InternationalDekèsman16 jen 20260.9
World Vision InternationalAngajman12 jen 2026−5.2
World Vision InternationalAngajman12 jen 20265.5
World Vision InternationalAngajman10 jen 2026−0.6
World Vision InternationalAngajman10 jen 20261.6
World Vision InternationalDekèsman9 jen 20264.1
World Vision InternationalDekèsman9 jen 2026<0.1
World Vision InternationalAngajman9 jen 20260.6
World Vision InternationalAngajman9 jen 2026−0.4
World Vision InternationalAngajman5 jen 2026−0.2
World Vision InternationalAngajman5 jen 20260.4
World Vision InternationalDekèsman3 jen 2026<0.1
World Vision InternationalAngajman30 me 20265.3
World Vision InternationalAngajman30 me 2026−3.5
World Vision InternationalDekèsman26 me 20260.2
World Vision InternationalDekèsman19 me 2026<0.1
World Vision InternationalDekèsman19 me 2026<0.1
World Vision InternationalDekèsman19 me 2026<0.1
World Vision InternationalDekèsman19 me 2026<0.1
World Vision InternationalDekèsman19 me 2026<0.1
World Vision InternationalDekèsman19 me 2026<0.1
World Vision InternationalAngajman12 me 2026−2.8
World Vision InternationalAngajman12 me 20263.6
World Vision InternationalDekèsman12 me 2026<0.1
World Vision InternationalDekèsman12 me 20260.1
World Vision InternationalAngajman9 me 2026−0.4
World Vision InternationalAngajman9 me 20260.4
World Vision InternationalDekèsman5 me 20261.5
World Vision InternationalDekèsman5 me 2026<0.1
World Vision InternationalDekèsman5 me 2026<0.1
World Vision InternationalAngajman3 me 2026−2.8
World Vision InternationalAngajman3 me 20262.8
World Vision InternationalAngajman1 me 202613.2
World Vision InternationalDekèsman28 avril 2026<0.1
World Vision InternationalDekèsman28 avril 2026<0.1
World Vision InternationalDekèsman28 avril 2026<0.1
World Vision InternationalDekèsman28 avril 2026<0.1
World Vision InternationalDekèsman21 avril 2026<0.1
World Vision InternationalDekèsman21 avril 2026<0.1
World Vision InternationalDekèsman21 avril 2026<0.1
World Vision InternationalDekèsman21 avril 20260.1
World Vision InternationalDekèsman21 avril 2026<0.1
World Vision InternationalAngajman18 avril 2026−0.6
World Vision InternationalAngajman18 avril 20260.6
World Vision InternationalDekèsman15 avril 2026<0.1
World Vision InternationalDekèsman8 avril 2026<0.1
World Vision InternationalDekèsman8 avril 20260.1
World Vision InternationalDekèsman1 avril 20260.1
World Vision InternationalDekèsman1 avril 2026<0.1
World Vision InternationalDekèsman1 avril 2026<0.1
World Vision InternationalDekèsman1 avril 2026<0.1
World Vision InternationalDekèsman1 avril 20260.1
World Vision InternationalDekèsman1 avril 2026<0.1
World Vision InternationalDekèsman1 avril 2026<0.1
World Vision InternationalAngajman30 mas 20260.8
World Vision InternationalAngajman30 mas 2026−0.8
World Vision InternationalAngajman24 mas 20260.9
World Vision InternationalAngajman24 mas 2026−0.9
World Vision InternationalDekèsman18 mas 20260.1
World Vision InternationalDekèsman18 mas 20260.1
World Vision InternationalAngajman15 mas 20263.0
World Vision InternationalAngajman15 mas 2026−3.2
World Vision InternationalAngajman12 mas 2026−0.0
World Vision InternationalDekèsman11 mas 2026<0.1
World Vision InternationalDekèsman10 mas 2026<0.1
World Vision InternationalDekèsman10 mas 2026<0.1
World Vision InternationalDekèsman10 mas 2026<0.1
World Vision InternationalDekèsman10 mas 2026<0.1
World Vision InternationalAngajman6 mas 2026−3.3
World Vision InternationalAngajman6 mas 20263.3
World Vision InternationalDekèsman3 mas 2026<0.1
World Vision InternationalDekèsman3 mas 2026<0.1
World Vision InternationalDekèsman3 mas 2026<0.1
World Vision InternationalDekèsman3 mas 20260.2
World Vision InternationalDekèsman3 mas 20260.1
World Vision InternationalDekèsman3 mas 2026<0.1
World Vision InternationalDekèsman3 mas 2026<0.1
World Vision InternationalAngajman24 fevriye 20261.4
World Vision InternationalAngajman24 fevriye 2026−1.4
World Vision InternationalDekèsman24 fevriye 20260.2
World Vision InternationalDekèsman24 fevriye 2026<0.1
World Vision InternationalDekèsman24 fevriye 2026<0.1
World Vision InternationalAngajman17 fevriye 2026−1.4
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalDekèsman17 fevriye 2026<0.1
World Vision InternationalAngajman17 fevriye 20261.4
World Vision InternationalAngajman13 fevriye 2026−1.4
World Vision InternationalAngajman13 fevriye 20261.4
World Vision InternationalAngajman12 fevriye 2026−1.4
World Vision InternationalAngajman12 fevriye 20261.4
World Vision InternationalDekèsman10 fevriye 2026<0.1
World Vision InternationalDekèsman10 fevriye 2026<0.1
World Vision InternationalAngajman3 fevriye 20263.7
World Vision InternationalAngajman3 fevriye 2026−2.4
World Vision InternationalDekèsman3 fevriye 20260.2
World Vision InternationalDekèsman3 fevriye 2026<0.1
World Vision InternationalDekèsman3 fevriye 2026<0.1
World Vision InternationalDekèsman3 fevriye 20260.1
World Vision InternationalAngajman28 janvye 20261.5
World Vision InternationalAngajman28 janvye 2026−1.5
World Vision InternationalDekèsman27 janvye 2026<0.1
World Vision InternationalAngajman26 janvye 20260.2
World Vision InternationalDekèsman20 janvye 20260.2
World Vision InternationalDekèsman20 janvye 2026<0.1
World Vision InternationalDekèsman20 janvye 20260.1
World Vision InternationalAngajman15 janvye 20262.7
World Vision InternationalAngajman15 janvye 20261.5
World Vision InternationalAngajman15 janvye 2026−2.6
World Vision InternationalAngajman15 janvye 2026−1.4
World Vision InternationalDekèsman13 janvye 2026<0.1
World Vision InternationalDekèsman13 janvye 2026<0.1
World Vision InternationalDekèsman13 janvye 2026<0.1
World Vision InternationalDekèsman13 janvye 2026<0.1
World Vision InternationalDekèsman13 janvye 20267.1
World Vision InternationalAngajman9 janvye 20261.4
World Vision InternationalAngajman9 janvye 2026−1.1
World Vision InternationalAngajman18 desanm 20257.1
World Vision InternationalDekèsman18 desanm 2025<0.1
World Vision InternationalAngajman16 desanm 2025−0.0
World Vision InternationalDekèsman16 desanm 2025<0.1
World Vision InternationalDekèsman16 desanm 2025<0.1
World Vision InternationalAngajman16 desanm 20251.1
World Vision InternationalAngajman16 desanm 2025−1.1
World Vision InternationalAngajman15 desanm 20251.1
World Vision InternationalAngajman15 desanm 2025−1.2
World Vision InternationalAngajman15 desanm 2025−2.8
World Vision InternationalAngajman15 desanm 20252.6
World Vision InternationalDekèsman10 desanm 2025<0.1
World Vision InternationalDekèsman10 desanm 2025<0.1
World Vision InternationalAngajman5 desanm 20252.8
World Vision InternationalAngajman5 desanm 2025−2.5
World Vision InternationalDekèsman2 desanm 20251.1
World Vision InternationalAngajman28 novanm 2025−0.2
World Vision InternationalAngajman28 novanm 20251.1
World Vision InternationalDekèsman25 novanm 2025<0.1
World Vision InternationalDekèsman25 novanm 2025<0.1
World Vision InternationalDekèsman25 novanm 20250.5
World Vision InternationalDekèsman25 novanm 2025<0.1
World Vision InternationalAngajman21 novanm 20252.5
World Vision InternationalAngajman21 novanm 2025−2.5
World Vision InternationalAngajman19 novanm 20251.2
World Vision InternationalAngajman19 novanm 2025−0.9
World Vision InternationalDekèsman18 novanm 2025<0.1
World Vision InternationalDekèsman18 novanm 2025<0.1
World Vision InternationalAngajman14 novanm 20250.9
World Vision InternationalAngajman14 novanm 2025−0.8
World Vision InternationalDekèsman11 novanm 2025<0.1
World Vision InternationalDekèsman11 novanm 20250.1
World Vision InternationalDekèsman11 novanm 20250.2
World Vision InternationalAngajman10 novanm 20250.2
World Vision InternationalAngajman6 novanm 2025−0.8
World Vision InternationalAngajman6 novanm 20250.8
World Vision InternationalDekèsman4 novanm 20250.1
World Vision InternationalDekèsman4 novanm 20250.2
World Vision InternationalAngajman1 novanm 20250.8
World Vision InternationalAngajman1 novanm 2025−0.7
World Vision InternationalDekèsman28 oktòb 2025<0.1
World Vision InternationalDekèsman21 oktòb 2025<0.1
World Vision InternationalDekèsman21 oktòb 20251.1
World Vision InternationalDekèsman14 oktòb 2025<0.1
World Vision InternationalAngajman14 oktòb 20253.8
World Vision InternationalAngajman14 oktòb 2025−3.8
World Vision InternationalAngajman14 oktòb 2025−0.0
World Vision InternationalDekèsman7 oktòb 2025<0.1
World Vision InternationalDekèsman1 oktòb 20250.2
World Vision InternationalDekèsman1 oktòb 20250.1
World Vision InternationalAngajman30 septanm 2025−1.2
World Vision InternationalAngajman30 septanm 20250.8
World Vision InternationalDekèsman23 septanm 2025<0.1
World Vision InternationalDekèsman23 septanm 2025<0.1
World Vision InternationalDekèsman23 septanm 20253.7
World Vision InternationalDekèsman23 septanm 20250.1
World Vision InternationalDekèsman23 septanm 2025<0.1
World Vision InternationalAngajman19 septanm 20251.4
World Vision InternationalAngajman19 septanm 2025−1.4
World Vision InternationalAngajman15 septanm 2025−0.0
World Vision InternationalAngajman14 septanm 2025−0.3
World Vision InternationalAngajman14 septanm 20251.5
World Vision InternationalAngajman14 septanm 2025−1.3
World Vision InternationalAngajman13 septanm 20251.3
World Vision InternationalAngajman13 septanm 2025−1.4
World Vision InternationalAngajman10 septanm 2025−0.0
World Vision InternationalDekèsman9 septanm 2025<0.1
World Vision InternationalDekèsman9 septanm 2025<0.1
World Vision InternationalDekèsman9 septanm 2025<0.1
World Vision InternationalDekèsman9 septanm 2025<0.1
World Vision InternationalDekèsman9 septanm 2025<0.1
World Vision InternationalDekèsman3 septanm 2025<0.1
World Vision InternationalDekèsman3 septanm 20250.2
World Vision InternationalDekèsman3 septanm 2025<0.1
World Vision InternationalDekèsman3 septanm 2025<0.1
World Vision InternationalDekèsman3 septanm 2025<0.1
World Vision InternationalAngajman2 septanm 2025−1.4
World Vision InternationalAngajman2 septanm 20251.4
World Vision InternationalAngajman30 out 2025−3.9
World Vision InternationalAngajman30 out 20253.9
World Vision InternationalAngajman30 out 2025−1.4
World Vision InternationalAngajman30 out 20251.4
World Vision InternationalDekèsman26 out 2025<0.1
World Vision InternationalAngajman23 out 2025−4.0
World Vision InternationalAngajman23 out 20254.0
World Vision InternationalDekèsman22 out 20251.0
World Vision InternationalDekèsman22 out 20250.3
World Vision InternationalAngajman21 out 2025−3.5
World Vision InternationalAngajman21 out 20254.0
World Vision InternationalAngajman19 out 20251.7
World Vision InternationalAngajman19 out 2025−4.0
World Vision InternationalDekèsman19 out 2025<0.1
World Vision InternationalAngajman19 out 20253.5
World Vision InternationalAngajman19 out 2025−1.7
World Vision InternationalAngajman17 out 2025−1.4
World Vision InternationalAngajman17 out 20254.1
World Vision InternationalAngajman16 out 20251.4
World Vision InternationalAngajman16 out 2025−1.4
World Vision InternationalAngajman16 out 2025−0.0
World Vision InternationalAngajman15 out 2025−1.4
World Vision InternationalAngajman15 out 2025−0.0
World Vision InternationalAngajman15 out 20251.4
World Vision InternationalAngajman14 out 2025−0.0
World Vision InternationalAngajman14 out 2025−1.4
World Vision InternationalAngajman14 out 20251.4
World Vision InternationalAngajman13 out 2025−1.4
World Vision InternationalAngajman13 out 2025−0.0
World Vision InternationalAngajman13 out 20251.4
World Vision InternationalAngajman12 out 20251.4
World Vision InternationalAngajman12 out 2025−1.4
World Vision InternationalAngajman12 out 2025−0.0
World Vision InternationalAngajman11 out 20251.7
World Vision InternationalAngajman11 out 2025−1.7
World Vision InternationalAngajman10 out 2025−0.0
World Vision InternationalAngajman10 out 2025−1.4
World Vision InternationalAngajman10 out 20251.4
World Vision InternationalDekèsman5 out 2025<0.1
World Vision InternationalDekèsman5 out 2025<0.1
World Vision InternationalDekèsman5 out 20250.1
World Vision InternationalAngajman5 out 2025−1.2
World Vision InternationalDekèsman5 out 2025<0.1
World Vision InternationalAngajman5 out 20251.7
World Vision InternationalAngajman2 out 20251.2
World Vision InternationalAngajman2 out 2025−1.3
World Vision InternationalDekèsman29 jiyè 2025<0.1
World Vision InternationalAngajman24 jiyè 2025−1.6
World Vision InternationalAngajman24 jiyè 20251.6
World Vision InternationalAngajman23 jiyè 2025−1.3
World Vision InternationalAngajman23 jiyè 20251.3
World Vision InternationalDekèsman15 jiyè 2025<0.1
World Vision InternationalDekèsman15 jiyè 20250.1
World Vision InternationalDekèsman15 jiyè 2025<0.1
World Vision InternationalDekèsman15 jiyè 2025<0.1
World Vision InternationalDekèsman15 jiyè 20251.8
World Vision InternationalDekèsman15 jiyè 2025<0.1
World Vision InternationalAngajman10 jiyè 2025−1.8
World Vision InternationalAngajman10 jiyè 20251.8
World Vision InternationalDekèsman8 jiyè 2025<0.1
World Vision InternationalDekèsman8 jiyè 20250.3
World Vision InternationalDekèsman8 jiyè 2025<0.1
World Vision InternationalDekèsman8 jiyè 2025<0.1
World Vision InternationalDekèsman8 jiyè 20251.9
World Vision InternationalDekèsman8 jiyè 20250.8
World Vision InternationalAngajman7 jiyè 2025−0.0
World Vision InternationalAngajman7 jiyè 20251.8
World Vision InternationalAngajman7 jiyè 2025−1.8
World Vision InternationalAngajman3 jiyè 20258.3
World Vision InternationalAngajman3 jiyè 2025−4.9
World Vision InternationalDekèsman1 jiyè 2025<0.1
World Vision InternationalDekèsman1 jiyè 2025<0.1
World Vision InternationalAngajman30 jen 2025−0.0
World Vision InternationalAngajman30 jen 20252.7
World Vision InternationalAngajman30 jen 2025−2.7
World Vision InternationalAngajman29 jen 20252.7
World Vision InternationalAngajman29 jen 2025−2.7
World Vision InternationalAngajman29 jen 2025−0.0
World Vision InternationalAngajman28 jen 20253.2
World Vision InternationalAngajman28 jen 2025−3.1
World Vision InternationalAngajman21 jen 20253.1
World Vision InternationalAngajman21 jen 2025−3.3
World Vision InternationalAngajman18 jen 2025−3.3
World Vision InternationalAngajman18 jen 20253.3
World Vision InternationalDekèsman17 jen 2025<0.1
World Vision InternationalDekèsman17 jen 2025<0.1
World Vision InternationalDekèsman17 jen 2025<0.1
World Vision InternationalDekèsman17 jen 2025<0.1
World Vision InternationalDekèsman17 jen 20250.1
World Vision InternationalDekèsman17 jen 20250.3
World Vision InternationalAngajman16 jen 20253.3
World Vision InternationalAngajman16 jen 2025−3.4
World Vision InternationalAngajman15 jen 20252.7
World Vision InternationalAngajman15 jen 2025−2.7
World Vision InternationalAngajman13 jen 2025−0.1
World Vision InternationalDekèsman11 jen 2025<0.1
World Vision InternationalDekèsman11 jen 2025<0.1
World Vision InternationalDekèsman11 jen 2025<0.1
World Vision InternationalDekèsman11 jen 20250.1
World Vision InternationalDekèsman3 jen 2025<0.1
World Vision InternationalDekèsman3 jen 2025<0.1
World Vision InternationalDekèsman3 jen 2025<0.1
World Vision InternationalDekèsman3 jen 2025<0.1
World Vision InternationalDekèsman3 jen 2025<0.1
World Vision InternationalDekèsman3 jen 2025<0.1
World Vision InternationalDekèsman27 me 2025<0.1
World Vision InternationalDekèsman27 me 2025<0.1
World Vision InternationalDekèsman27 me 2025<0.1
World Vision InternationalDekèsman27 me 2025<0.1
World Vision InternationalDekèsman27 me 2025<0.1
World Vision InternationalDekèsman27 me 20250.3
World Vision InternationalAngajman26 me 2025−0.0
World Vision InternationalAngajman19 me 2025−2.3
World Vision InternationalAngajman19 me 20252.9
World Vision InternationalDekèsman15 me 2025<0.1
World Vision InternationalDekèsman15 me 20250.9
World Vision InternationalDekèsman15 me 20252.4
World Vision InternationalDekèsman15 me 20250.6
World Vision InternationalDekèsman13 me 2025<0.1
World Vision InternationalDekèsman24 avril 20250.1
World Vision InternationalAngajman23 avril 20254.8
World Vision InternationalAngajman23 avril 2025−4.8
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalDekèsman22 avril 20250.1
World Vision InternationalDekèsman22 avril 2025<0.1
World Vision InternationalAngajman18 avril 20254.8
World Vision InternationalAngajman18 avril 2025−4.4
World Vision InternationalDekèsman17 avril 2025<0.1
World Vision InternationalDekèsman10 avril 2025<0.1
World Vision InternationalDekèsman8 avril 2025<0.1
World Vision InternationalDekèsman8 avril 2025<0.1
World Vision InternationalDekèsman8 avril 2025<0.1
World Vision InternationalDekèsman8 avril 2025<0.1
World Vision InternationalDekèsman3 avril 2025<0.1
World Vision InternationalDekèsman1 avril 2025<0.1
World Vision InternationalAngajman1 avril 20254.4
World Vision InternationalDekèsman1 avril 20250.2
World Vision InternationalAngajman1 avril 2025−4.2
World Vision InternationalDekèsman1 avril 2025<0.1
World Vision InternationalDekèsman1 avril 2025<0.1
World Vision InternationalAngajman26 mas 2025−0.1
World Vision InternationalAngajman26 mas 2025−4.1
World Vision InternationalAngajman26 mas 20254.3
World Vision InternationalAngajman24 mas 20254.1
World Vision InternationalAngajman24 mas 2025−4.1
World Vision InternationalAngajman21 mas 20254.1
World Vision InternationalAngajman21 mas 2025−4.1
World Vision InternationalDekèsman18 mas 2025<0.1
World Vision InternationalDekèsman18 mas 20250.2
World Vision InternationalAngajman12 mas 2025−4.1
World Vision InternationalAngajman12 mas 20254.1
World Vision InternationalAngajman11 mas 20254.1
World Vision InternationalAngajman11 mas 2025−2.6
World Vision InternationalAngajman6 mas 20250.2
World Vision InternationalAngajman6 mas 2025−0.8
World Vision InternationalDekèsman6 mas 20250.1
World Vision InternationalDekèsman6 mas 20250.4
World Vision InternationalDekèsman4 mas 20250.1
World Vision InternationalAngajman4 mas 2025−0.9
World Vision InternationalAngajman4 mas 20252.6
World Vision InternationalAngajman26 fevriye 20253.1
World Vision InternationalAngajman26 fevriye 2025−2.8
World Vision InternationalAngajman21 fevriye 20250.8
World Vision InternationalAngajman21 fevriye 20252.8
World Vision InternationalAngajman21 fevriye 2025−0.2
World Vision InternationalAngajman21 fevriye 2025−2.7
World Vision InternationalAngajman12 fevriye 20250.9
World Vision InternationalAngajman12 fevriye 2025−0.9
World Vision InternationalAngajman12 fevriye 2025−0.0
World Vision InternationalAngajman11 fevriye 2025−0.9
World Vision InternationalAngajman11 fevriye 20250.9
World Vision InternationalAngajman11 fevriye 2025−0.0
World Vision InternationalDekèsman4 fevriye 20250.7
World Vision InternationalDekèsman30 janvye 2025<0.1
World Vision InternationalDekèsman28 janvye 20255.1
World Vision InternationalAngajman21 janvye 2025−0.7
World Vision InternationalAngajman21 janvye 20250.9
World Vision InternationalDekèsman16 janvye 20250.2
World Vision InternationalDekèsman14 janvye 2025<0.1
World Vision InternationalAngajman11 janvye 20250.7
World Vision InternationalAngajman11 janvye 2025−0.7
World Vision InternationalDekèsman12 desanm 20240.1
World Vision InternationalAngajman11 desanm 2024−2.8
World Vision InternationalAngajman11 desanm 20242.8
World Vision InternationalDekèsman5 desanm 20240.1
World Vision InternationalDekèsman3 desanm 2024<0.1
World Vision InternationalDekèsman3 desanm 20240.3
World Vision InternationalDekèsman28 novanm 2024<0.1
World Vision InternationalDekèsman26 novanm 2024<0.1
World Vision InternationalDekèsman26 novanm 2024<0.1
World Vision InternationalDekèsman21 novanm 20240.3
World Vision InternationalDekèsman19 novanm 2024<0.1
World Vision InternationalAngajman19 novanm 2024−0.5
World Vision InternationalAngajman19 novanm 20240.5
World Vision InternationalDekèsman19 novanm 2024<0.1
World Vision InternationalDekèsman19 novanm 2024<0.1
World Vision InternationalAngajman18 novanm 20242.8
World Vision InternationalAngajman18 novanm 2024−2.8
World Vision InternationalAngajman16 novanm 20241.0
World Vision InternationalAngajman16 novanm 2024−0.9
World Vision InternationalAngajman16 novanm 2024−0.0
World Vision InternationalDekèsman12 novanm 20244.7
World Vision InternationalDekèsman12 novanm 2024<0.1
World Vision InternationalDekèsman7 novanm 20240.1
World Vision InternationalAngajman4 novanm 2024−2.8
World Vision InternationalAngajman4 novanm 20242.8
World Vision InternationalDekèsman1 novanm 2024<0.1
World Vision InternationalDekèsman1 novanm 2024<0.1
World Vision InternationalDekèsman1 novanm 2024<0.1
World Vision InternationalDekèsman29 oktòb 2024<0.1
World Vision InternationalDekèsman29 oktòb 2024<0.1
World Vision InternationalDekèsman29 oktòb 2024<0.1
World Vision InternationalDekèsman29 oktòb 20240.2
World Vision InternationalDekèsman22 oktòb 20240.1
World Vision InternationalDekèsman22 oktòb 2024<0.1
World Vision InternationalDekèsman22 oktòb 20240.1
World Vision InternationalDekèsman22 oktòb 20240.1
World Vision InternationalDekèsman22 oktòb 20240.1
World Vision InternationalDekèsman22 oktòb 2024<0.1
World Vision InternationalDekèsman22 oktòb 20240.1
World Vision InternationalAngajman18 oktòb 20241.3
World Vision InternationalAngajman18 oktòb 2024−1.3
World Vision InternationalAngajman16 oktòb 20241.8
World Vision InternationalAngajman16 oktòb 2024−1.3
World Vision InternationalAngajman16 oktòb 2024−0.5
World Vision InternationalDekèsman10 oktòb 2024<0.1
World Vision InternationalAngajman10 oktòb 2024−0.2
World Vision InternationalAngajman10 oktòb 2024−1.2
World Vision InternationalAngajman10 oktòb 20241.3
World Vision InternationalDekèsman8 oktòb 20240.1
World Vision InternationalAngajman8 oktòb 20242.8
World Vision InternationalAngajman8 oktòb 2024−2.8
World Vision InternationalAngajman4 oktòb 20242.9
World Vision InternationalAngajman4 oktòb 2024−2.4
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalDekèsman1 oktòb 2024<0.1
World Vision InternationalAngajman25 septanm 2024−1.4
World Vision InternationalAngajman25 septanm 20241.4
World Vision InternationalAngajman25 septanm 2024−0.0
World Vision InternationalDekèsman24 septanm 20240.2
World Vision InternationalDekèsman17 septanm 2024<0.1
World Vision InternationalDekèsman17 septanm 2024<0.1
World Vision InternationalDekèsman12 septanm 20240.1
World Vision InternationalDekèsman12 septanm 2024<0.1
World Vision InternationalDekèsman10 septanm 2024<0.1
World Vision InternationalDekèsman10 septanm 20240.2
World Vision InternationalDekèsman3 septanm 2024<0.1
World Vision InternationalDekèsman3 septanm 2024<0.1
World Vision InternationalDekèsman3 septanm 2024<0.1
World Vision InternationalAngajman29 out 2024−0.0
World Vision InternationalAngajman29 out 2024−1.5
World Vision InternationalAngajman29 out 20241.5
World Vision InternationalDekèsman20 out 20240.4
World Vision InternationalDekèsman13 out 20240.1
World Vision InternationalAngajman7 out 2024−0.2
World Vision InternationalAngajman7 out 20240.5
World Vision InternationalDekèsman6 out 20240.2
World Vision InternationalDekèsman6 out 2024<0.1
World Vision InternationalDekèsman30 jiyè 2024<0.1
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 2024<0.1
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman25 jiyè 20240.2
World Vision InternationalDekèsman18 jiyè 2024<0.1
World Vision InternationalDekèsman18 jiyè 2024<0.1
World Vision InternationalDekèsman16 jiyè 2024<0.1
World Vision InternationalDekèsman16 jiyè 2024<0.1
World Vision InternationalAngajman11 jiyè 20243.2
World Vision InternationalAngajman11 jiyè 2024−3.1
World Vision InternationalDekèsman11 jiyè 20240.5
World Vision InternationalDekèsman4 jiyè 2024<0.1
World Vision InternationalAngajman3 jiyè 2024−2.8
World Vision InternationalAngajman3 jiyè 2024−2.5
World Vision InternationalAngajman3 jiyè 20243.1
World Vision InternationalAngajman3 jiyè 20243.5
World Vision InternationalDekèsman2 jiyè 20245.0
World Vision InternationalAngajman10 me 20242.5
World Vision InternationalAngajman10 me 2024−0.1
World Vision InternationalAngajman8 me 20242.8
World Vision InternationalAngajman8 me 2024−2.0
World Vision InternationalAngajman24 avril 20240.2
World Vision InternationalAngajman24 avril 20240.1
World Vision InternationalDekèsman23 avril 20240.7
World Vision InternationalAngajman16 avril 20242.0
World Vision InternationalDekèsman30 janvye 20240.8
World Vision InternationalDekèsman23 janvye 20244.2
World Vision InternationalAngajman10 janvye 202430.5
Idantifyan2 idantifyan
SistèmIdantifyanSous
Idantifyan IATI47045-HTI-C-WV-2IATI
Nimewo entèn aktivite a kay piblikatè aHTI-C-WVP02IATI

Dokiman patnè a

Sous

Done jiska 18 oktòb 2026
SousLi nan dat
IATI18 oktòb 2026
IATI18 oktòb 2026
Site paj sa a

HaitiDocs. Envesti pou gen enpak kont tibèkiloz ak VIH. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/IATI%3A47045-HTI-C-WV-2?lang=ht