EN FR HT
République d'Haïti
Bibliothèque de documents
2 507 documents 116 441 pages
Haiti Rural Accessibility and Resilience Project: additional financing (PAD3686)

Haiti Rural Accessibility and Resilience Project: additional financing (PAD3686)

Banque mondiale 2020 57 pages
Description Complete
World Bank appraisal document for additional financing to the Haiti Rural Accessibility and Resilience Project (PAD3686).
Sujets
InfrastructureDisaster Risk
Geographie
National
Mots-cles
accessibilité rurale, routes, résilience, financement additionnel, Banque mondiale
Texte Integral du Document

Texte extrait du document original pour l'indexation.

Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: PAD3686 Public Disclosure Authorized INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED ADDITIONAL GRANT Public Disclosure Authorized IN THE AMOUNT OF SDR 24.2 MILLION (US$33 MILLION EQUIVALENT) TO THE REPUBLIC OF HAITI FOR THE HAITI RURAL ACCESSIBILITY AND RESILIENCE PROJECT Public Disclosure Authorized June 5, 2020 Transport Global Practice Latin America and Caribbean Region This document is being made publicly available prior to Board consideration. This does not imply a presumed outcome. This document may be updated following Board consideration and the updated document will be made publicly available in accordance with the Bank’s policy on Access to Information. CURRENCY EQUIVALENTS (Exchange Rate Effective April 30, 2020}) Currency Unit = Haitian Gourdes (HTG) HTG 102.83 = US$1 US$1 = SDR 0.73185022 FISCAL YEAR October 1 - September 30 Regional Vice President: J. Humberto Lopez (Acting) Country Director: Anabela Abreu Regional Director: Franz R. Drees-Gross Practice Manager: Bianca Bianchi Alves (Acting) Task Team Leader(s): Malaika Becoulet, Pierre Xavier Bonneau ABBREVIATIONS AND ACRONYMS BRH Central Bank (Banque de la Republique d’Haiti) CAL Center Artibonite Loop CBO Community-Based Organization CD Country Director CERC Contingent Emergency Response Component CIAT Inter-Ministerial Committee for Territorial Development (Comité Interministériel d'Aménagement du Territoire) CIAT-es CIAT’s Executive Secretariat CIF Climate Investment Funds CoC Codes of Conduct CPF Country Partnership Framework DFIL Disbursement and Financial Information Letter DRMRP Disaster Risk Management and Reconstruction Project (Projet de Gestion des Risques et des Désastres et Reconstruction) EIRR Economic Internal Rate of Return ESMF Environmental and Social Management Framework ESMP Environmental and Social Management Plan EU European Union FY Fiscal Year GBV Gender-Based Violence GoH Government of Haiti GRM Grievance Redress Mechanism GRS Grievance Redress Service IDB Inter-American Development Bank IDA International Development Association ISR Implementation Status & Results Report M&E Monitoring and Evaluation MEF Ministry of Economy and Finance (Ministère de l’Economie et des Finances) MTPTC Ministry of Public Works, Transportation and Communications (Ministère de Travaux Publics, Transport et Communications) NPV Net Present Value PAD Project Appraisal Document PDO Project Development Objective PIU Project Implementation Unit PPCR Pilot Program for Climate Resilience RAP Resettlement Action Plan RARP Haiti Rural Accessibility & Resilience Project RPF Resettlement Policy Framework SDR Special Drawing Rights SOE Statement of Expenditures TF Trust Fund ToR Terms of Reference UCE-MTPTC Central Execution Unit of MTPTC (Unité Centrale d’Exécution du MTPTC) UNOPS United Nations Office for Project Services UTE-MEF Central Execution Unit of MEF (Unité Technique d’Exécution du MEF) TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................. 4 I. BACKGROUND AND RATIONALE FOR ADDITIONAL FINANCING ........................................ 7 II. DESCRIPTION OF ADDITIONAL FINANCING .................................................................... 11 COMPONENTS AND COSTS .................................................................................................. 11 IMPLEMENTATION ARRANGEMENTS ................................................................................... 13 RESULTS FRAMEWORK ........................................................................................................ 13 DISBURSEMENT CATEGORIES AND ARRANGEMENTS............................................................ 14 DISBURSEMENT ESTIMATES ................................................................................................. 14 CLOSING DATE ..................................................................................................................... 14 III. KEY RISKS ..................................................................................................................... 14 IV. APPRAISAL SUMMARY .................................................................................................. 14 V. WORLD BANK GRIEVANCE REDRESS .............................................................................. 18 VI SUMMARY TABLE OF CHANGES ..................................................................................... 20 VII DETAILED CHANGE(S) .................................................................................................... 21 VIII. RESULTS FRAMEWORK AND MONITORING ................................................................... 29 ANNEX 1: COUNTRY RISK PROFILE TO NATURAL HAZARDS AND CLIMATE CHANGE............... 50 ANNEX 2: REVISED THEORY OF CHANGE (P163490) .............................................................. 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) BASIC INFORMATION – PARENT (Haiti Rural Accessibility & Resilience Project - P163490) Country Product Line Team Leader(s) Haiti IBRD/IDA Malaika Becoulet Project ID Financing Instrument Resp CC Req CC Practice Area (Lead) P163490 Investment Project ILCT1 (9383) LCC8C (5778) Transport Financing Implementing Agency: Unite Centrale d' Execution of the Ministry of Public Works (UCE) ADD_FIN_TBL1 Is this a regionally tagged project? No Bank/IFC Collaboration No Expected Original Environmental Approval Date Closing Date Guarantee Current EA Category Assessment Category Expiration Date 31-May-2018 30-Jun-2023 Partial Assessment (B) Partial Assessment (B) Financing & Implementation Modalities Parent [ ] Multiphase Programmatic Approach [MPA] [✓] Contingent Emergency Response Component (CERC) [ ] Series of Projects (SOP) [ ] Fragile State(s) [ ] Performance-Based Conditions (PBCs) [ ] Small State(s) Jan 08, 2020 Page 1 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) [ ] Financial Intermediaries (FI) [ ] Fragile within a Non-fragile Country [ ] Project-Based Guarantee [ ] Conflict [ ] Deferred Drawdown [ ] Responding to Natural or Man-made disaster [ ] Alternate Procurement Arrangements (APA) Development Objective(s) The Project Development Objectives are to: (i) increase all-weather road access in selected sub-regions; and (ii) improve the resilience of selected segments of the road network. Ratings (from Parent ISR) RATING_DRAFT_NO Latest ISR Implementation 24-Oct-2018 22-Apr-2019 01-Nov-2019 21-May-2020 Progress towards achievement of PDO S S S S Overall Implementation Progress (IP) S S S S Overall Safeguards Rating S S S S Overall Risk S S S S Jan 08, 2020 Page 2 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) BASIC INFORMATION – ADDITIONAL FINANCING (AF Haiti Rural Accessibility & Resilience Project - P173281) ADDFIN_TABLE Urgent Need or Capacity Project ID Project Name Additional Financing Type Constraints P173281 AF Haiti Rural Accessibility Restructuring, Scale Up Yes & Resilience Project Financing instrument Product line Approval Date Investment Project IBRD/IDA 18-Jun-2020 Financing Projected Date of Full Bank/IFC Collaboration Disbursement 31-Oct-2024 No Is this a regionally tagged project? No Financing & Implementation Modalities Child [ ] Series of Projects (SOP) [✓] Fragile State(s) [ ] Performance-Based Conditions (PBCs) [ ] Small State(s) [ ] Financial Intermediaries (FI) [ ] Fragile within a Non-fragile Country [ ] Project-Based Guarantee [ ] Conflict [ ] Deferred Drawdown [ ] Responding to Natural or Man-made disaster [ ] Alternate Procurement Arrangements (APA) [✓] Contingent Emergency Response Component (CERC) Disbursement Summary (from Parent ISR) Jan 08, 2020 Page 3 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Net Source of Funds Total Disbursed Remaining Balance Disbursed Commitments IBRD % IDA 75.00 12.15 58.58 17 % Grants % PROJECT FINANCING DATA – ADDITIONAL FINANCING (AF Haiti Rural Accessibility & Resilience Project - P173281) PROJECT FINANCING DATA (US$, Millions) SUMMARY -NewFi n1 SUMMARY (Total Financing) Proposed Additional Total Proposed Current Financing Financing Financing Total Project Cost 75.00 33.00 108.00 Total Financing 75.00 33.00 108.00 of which IBRD/IDA 75.00 33.00 108.00 Financing Gap 0.00 0.00 0.00 DETAILS - Additional Financing NewFinEnh1 World Bank Group Financing International Development Association (IDA) 33.00 IDA Grant 33.00 Jan 08, 2020 Page 4 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) IDA Resources (in US$, Millions) Credit Amount Grant Amount Guarantee Amount Total Amount Haiti 0.00 33.00 0.00 33.00 National PBA 0.00 33.00 0.00 33.00 Total 0.00 33.00 0.00 33.00 COMPLIANCE Policy Does the project depart from the CPF in content or in other significant respects? [ ] Yes [ ✔ ] No Does the project require any other Policy waiver(s)? [ ] Yes [ ✔ ] No INSTITUTIONAL DATA Practice Area (Lead) Transport Contributing Practice Areas Climate Change and Disaster Screening This operation has been screened for short and long-term climate change and disaster risks Jan 08, 2020 Page 5 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) PROJECT TEAM Bank Staff Name Role Specialization Unit Team Leader (ADM Malaika Becoulet ILCT1 Responsible) Pierre Xavier Bonneau Team Leader IAFDR Procurement Specialist (ADM Mamata Tiendrebeogo ELCRU Responsible) Financial Management Lucas Carrer ELCG1 Specialist (ADM Responsible) Financial Management Emeline Bredy FM OPSFM Specialist Social Specialist (ADM Asli Gurkan Social Development SLCSO Responsible) Environmental Specialist (ADM Kevin McCall SLCEN Responsible) Aboubacar Magassouba Team Member Procurement ELCRU Felipe Jacome Social Specialist Social Development SLCSO Senior Urban transport Franck Taillandier Team Member IAFT3 Specialist Jordy Hinaarii Timyan Chan Team Member Engineer ILCT1 Licette M. Moncayo Team Member ILCT1 Nathalie Picarelli Team Member Urban Development EA2M1 Nicolas Antoine Robert Team Member Health Economist HLCHN Collin Dit De Montesson Paula Genis Team Member Operational quality assurance ILCT1 Xavier Espinet Alegre Team Member SEAU1 Extended Team Name Title Organization Location Jan 08, 2020 Page 6 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) I. BACKGROUND AND RATIONALE FOR ADDITIONAL FINANCING A. Introduction 1. This project paper seeks the approval of the World Bank’s Board of Executive Directors for a proposed additional financing (AF) in the amount of US$33 million for the Haiti Rural Accessibility and Resilience Project (RARP – P163490). The proposed AF would scale up the project scope by integrating the activities transferred from the Haiti Center and Artibonite Regional Development Project (BCA – P133352) to the RARP. This transfer and integration into the RARP were envisioned and approved under the Restructuring of the BCA dated February 25, 2020. The proposed AF will help bring implementation of similar activities under one project to support the common objective of increasing resilience and access to all-weather road network and contribute to the broader goal of portfolio consolidation in Haiti. 2. The proposed AF is aligned with the World Bank Group’s Country Partnership Framework (CPF) of Haiti for the period FY16-21,1 as updated in the Performance and Learning Review (PLR) dated May 31, 2018.2 The proposed Project would contribute to the CPF Area of Focus 2 “Human Capital” and the CPF Area of Focus 3 “Resilience” by: (a) enhancing farmers’ access to markets; (b) improving physical access to schools; (c) improving physical access to available health services for mothers and children; and (d) improving climate resilience of the road network in the project areas. The current Government of Haiti has prioritized road investments and set an ambitious target to build 4,000 km of roads to (i) achieve intercity connectivity and (ii) develop the rural road network3. By focusing on improving the rural connectivity in the CAL sub-region, the proposed project would complement ongoing investments, including investments of the European Union (EU); and the Inter-American Development Bank (IDB), on the primary road network (RN3; RN5; RN7). 3. The Project Development Objective (PDO), environmental assessment category, and safeguard policies would remain unchanged. The activities financed under the AF are consistent with the RARP’s objective of increasing all- weather road access in selected subregions and improving the resilience of selected segments of the road network. They are also similar in size, scope and impact and would therefore be covered under the existing safeguards documents, which have accordingly been updated and re-disclosed on the Bank’s website. RARP’s implementation arrangements would be strengthened by including the Unité Technique d’Exécution of the Ministry of Economy and Finance (UTE- MEF) as an implementing partner and the Executive Secretariat of the Inter-Ministerial Committee for Territorial Development (CIAT-es) as a technical partner. The Results Framework (RF) would be revised to reflect the new activities under the AF. 4. The proposed AF would support Haiti in the COVID-19 response and recovery efforts. It will provide additional means to generate short-term employment through infrastructure works for some of the areas most impacted by the 1 The World Bank Group’s Haiti Country Partnership Framework for the Period FY16-21 (Report No. 98132-HT, dated August 27, 2015) was discussed by the Board of Executive Directors on September 29, 2015. 2 Performance and Learning Review (Report No. 124812-HT, dated May 31, 2018) was discussed by the Board of Executive Directors on June 27, 2018. 3 http://www.sgcm.gouv.ht/feuilles-de-route/ Mar 18, 2020 Page 7 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) economic slowdown. It would also contribute to medium-to-long term recovery, growth, and resilience through improved connectivity and accessibility to markets. B. Country and Sector Context 5. Haiti remains the poorest country in the Western hemisphere and suffers from recurrent episodes of institutional and political instability. The third-largest Caribbean nation by area and population (11 million), Haiti benefits from proximity and access to major markets with favorable trade agreements, a young labor force, a dynamic diaspora, and substantial geographic, historical, and cultural assets. The country possesses untapped markets and potential for the private sector to explore, including agribusiness, light manufacturing, and tourism.4 Despite these opportunities, the country’s GDP per capita was only US$868 in 2018 and 57 percent of the population was considered poor.5 Haiti’s poverty and extreme poverty are significantly higher in rural and remote areas than in urban centers: 75 percent of Haitians are poor and 38 percent extremely poor in rural areas as compared to 12 percent and 5 percent extremely poor in urban areas and in Port-au-Prince, respectively.6 Historically, political and institutional instability have been both a symptom and a driver of fragility in Haiti, impairing its progress in poverty reduction. 6. Haiti is also among the countries in the world with the highest exposure to multiple natural hazards, and risks have increased with climate change. Over 93 percent of its surface and more than 96 percent of its population are exposed to two or more hazards.7 The human and economic impacts of disasters have been extremely severe, given the high vulnerability of infrastructure and institutional fragility.8 Between 1961 and 2012, the damages and losses associated with hydro-meteorological events alone amounted, on average, to the equivalent of almost two percent of annual GDP.9 The 2010 earthquake resulted in the death of about 220,000 people, and destroyed equivalent of 120 percent of GDP. In 2016, Hurricane Matthew affected over 2 million people, displaced 175,000 people and resulted in damages and losses equivalent to around 32 percent of GDP. Climate change is expected to further increase this vulnerability.10 7. The COVID-19 outbreak is expected to have high economic and social impact, further exacerbating the existing challenges. While the confirmed cases of COVID-19 remain relatively low compared to other countries in the region, they are rising rapidly and risk of local transmission remains high (as of May 20, 2020, there were 533 confirmed cases, including 21 deaths). Disruptions in production and supply chains, decline in tourism and remittances (estimated 18 percent decline); and increasing food insecurity (from 3.7m to 4.1m people) could set back gains in development. The Government has declared a national emergency, but the pandemic preparedness efforts have been limited and ad-hoc, and the country’s health care system is not equipped to withstand a large outbreak. 4 World Bank Group’s Country Partnership Framework (CPF) with Haiti for the FY16-21 period. Report No. 98132-HT 5 Haiti has not produced any official poverty data since 2012. Poverty data estimated through a Survey of Well-being via Instant and Frequent Tracking methodology show that changes in poverty between 2012 and 2017 were only marginal: the predicted poverty rate for 2017 is 57 percent against 58.5 percent in 2012. 6 Household Survey and Poverty Assessment (ECVMAS), World Bank, 2012. 7 Primarily hurricanes, floods, earthquakes and landslides, but also tsunamis and drought. Haiti Country Risk Profile, World Bank 2018. 8 Between 1961 and 2012, the country experienced more than 180 disasters causing the death of more than 240,000 people. Source: “Diagnostic on the Economic and Fiscal Impact of Disasters in Haiti”, World Bank 2014. 9 The 2010 earthquake destroyed the equivalent of 120 percent of GDP and Hurricane Matthew resulted in estimated damages and losses equivalent to around 32 percent of GDP. 10 Haiti: Country Risk Profile to Natural Hazards and Climate Change Mar 18, 2020 Page 8 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 8. The poor conditions of the Haitian tertiary and rural road networks contribute to high logistical, economic and social costs. Despite significant investments in the transport sector, 50 percent of the national territory remains poorly connected, rendering entire regions isolated for days following major storms and hurricanes. In 2015, only 39 percent of the population was living within 2km of an all-weather road with most of tertiary and rural networks in very poor condition and barely trafficable.11 Trucking operations in Haiti are expensive and fragmented with multiple small operators. Due to poor condition roads, the price per ton-km transported is US$0.43 for freight, the highest in the Caribbean region and about 3.9 times the average for Central America.12 Because of poor connectivity, up to 30 percent of agricultural production, like mangoes or avocados, is lost due to a lack of access to market and some regions became totally isolated for days at a time during the rainy season and following major storms and hurricanes. 9. The connectivity issues are significant barriers to improving access to services and economic opportunities for women. Poor road access and connectivity particularly harms female traders in Haiti, known as “Madan Sara” (MS), who travel extensively for the livelihoods of their families. While the Centre and Artibonite Departments (Centre- Artibonite Loop, CAL) have high economic and agricultural potential, poverty rates are amongst the highest in the country, and vulnerability to natural hazards and climate change presents major challenges. Despite some efforts to build roads and transport infrastructure, many areas with agricultural potential remain largely inaccessible. Poor road conditions represent one of the main barriers for women to access basic services. According to the Systematic Country Diagnostic (SCD) (2015), maternal mortality is still higher than the regional average (380 deaths per 100,000 life deaths),13 partly due to the large number of deliveries occurring outside health facilities (65 percent). While lack of money is the most common reason for 15 to 49-year-old women to not seek medical care, distance to a health facility is the second most cited reason, particularly by poor rural households (Figure 1). In rural areas, this increases to 62 percent of households and up to 73 percent for extremely poor rural households. Figure 1: Challenges to Accessing Health Care by Women in Haiti 100% 89%91% 82% 80% 73% 66% 60% 48% 40% 25%27% 19% 20% 7% 7% 7% 0% Distance to health Obtaining Money to pay for Not wanting to go facility permission treatment alone National Rural Moderately poor hhs. Rural Extremely poor hhs. Source: WBG 2017 Perge & Touray estimates using EMMUS 2012. Note: poverty estimated using survey- to-survey imputation and the national poverty line.14 11 Rural Access Index, MTPTC, 2015. 12 DTIS, Truck Industry Survey, World Bank, 2014. 13 Singh, Raju Jan and Mary A. Barton-Dock. 2015. Haiti - Toward a New Narrative: Systematic Country Diagnostic (English). Washington, D.C.: World Bank Group, p. 35. 14 Transport and Poverty in Rural Haiti Existing Evidence from Household Surveys, World Bank, December 2017. Mar 18, 2020 Page 9 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) C. Project Background and Progress 10. The RARP was approved on May 31, 2018 and became effective on September 4, 2018. The PDOs are to: (i) increase all-weather road access in selected sub-regions; and (ii) improve the resiliency of selected segments of the road network. The RARP has five components: (i) Enhancing Rural Connectivity; (ii) Improving Resilience of Transport Connecting Infrastructure; (iii) Promoting Sustainable Mobility Development; (iv) Contingent Emergency Response Component; and (v) Project Management. 11. Implementation Status of the RARP. Since project effectiveness, RARP has demonstrated satisfactory implementation progress and the PDOs are likely to be achieved. Despite challenging operational constraints caused by regular episodes of political and civil unrest, the project has disbursed US$12.15 million, or 17 percent of IDA financing, as of May 2020. Furthermore, an additional pipeline of works contracts worth more than US$30 million has been prepared for spot improvements in the Nippes, Sud, and Sud-Est Departments. The Project is implemented by the Ministry of Public Works, Transportation, and Communications (MTPTC), and is in compliance with key legal covenants, including audit and financial management reporting requirements, as well as with all environmental, social and fiduciary safeguard requirements. Implementation progress by component, is summarized below: i. Component 1 – Enhancing Rural Connectivity (US$45 million): This component is supporting all-weather road access to essential services and markets for the targeted population and builds resilience to climate events, primarily in the Sud, Sud-Est, and Nippes Departments. It finances, among other things, rehabilitation works of the tertiary and rural road network (400 kilometers) and complementary facilities and structures along the roads based on local mobility plans being designed and implemented through consultation with the the communities. They would prioritize interventions for local access (to schools and health centers for instance). A US$15.9 million contract was signed with the United Nations Office for Project Services (UNOPS) on December 31, 2019, which is supporting (i) the elaboration of local mobility plans and implementation of associated works; (ii) the update of the Rural Access Index (RAI); (iii) the training of women in reinforcement and masonry; and (iv) the provision of capacity building to Departmental Directions of Public Works and community-based organizations. Moreover, the identification of critical points for spot improvements on the structural road network of the three departments (Nippes, Sud, and Sud-Est) has been completed. ii. Component 2 – Improving Resilience of Transport Connecting Infrastructure (US$22 million): This component strengthens resilience to climate change and extreme weather events on the primary and secondary road network by protecting essential/critical points and preventing interruptions in the movement of individuals and goods. It finances, among other things, the rehabilitation and repair of damaged and vulnerable critical spots/segments and resilient infrastructure along the primary and the secondary road networks, as well as various studies. The terms of reference (ToRs) for the vulnerability study have been finalized. A series of critical points on the national and secondary road network have been identified for improvements and three works contracts are currently under implmentation. iii. Component 3 – Promoting Sustainable Mobility Development (US$3 million): This component aims to strengthen the institutional capacity of the MTPTC. A number of studies are under preparation. The urban mobility study that examines both demand-side and supply-side factors to inform future transport interventions in Cap-Haïtien is progressing well. On the demand-side, origin-destination surveys, as well as a spatial analysis of economic and social activities in the city and detailed analysis of travel volume by mode at Mar 18, 2020 Page 10 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) eight key intersections, are currently being conducted. The results are expected to be available by the end of 2020. On the supply side, the most important 14 routes have been mapped, covering 263 stops and 509 kilometers. The mapping provided detailed information regarding the routes, ridership (number of passengers), frequency, travel time (during different times of the day), and exact location of the stops. iv. Component 4 – Contingent Emergency Response Component (CERC) (US$1 million) has not been triggered. v. Component 5 – Project Management (U$4 million) has progressed at a satisfactory pace with the recruitment of an independent auditor and other key staff including gender and social specialist, financial management and procurement specialist. D. Rationale for the Additional Financing 12. The proposed AF would integrate the activities transferred from BCA and finance the scale up and expansion of RARP scope in the Center Artibonite Loop (CAL) region. It includes civil works for roads and bridges, rehabilitation of local markets, technical assistance, and developing regional knowledge and planning tools, including aspects of climate resilience, to contribute to enhancing rural connectivity. By improving rural and tertiary road segments to basic services and markets, the proposed Project would benefit inhabitants, producers, organizations involved in agriculture and other economic activities through improved and safer connectivity, transportation and logistics. 13. The Government of Haiti (GOH) has requested the proposed AF for the project via letter, dated December 18, 2019. This AF is being processed under Paragraph 12 of the World Bank’s Policy on Investment Project Financing (Projects in Situations of Urgent Need of Assistance or Capacity Constraints), using condensed procedures. Haiti has severe capacity constraints resulting from chronic fragility, and requires a rapid response to strengthen the resilience of the infrastructure network, further stretched in a context of recurrent natural and man-made crises, which threaten already scarce resources necessary to support the transport sector. 14. Lessons learned from implementation of the transport portfolio have been used to adapt the mitigation measures to address operational constraints in Haiti. Part of this mitigation strategy has been implemented since the “peyi lock” (the violent protests and civil unrest that have resulted in several lockdowns since January 2019), and applied to the current COVID-19 health crisis as well. It includes (i) the provision of equipment to project implementation units (PIUs) to facilitate home-based working (for example, through the provision of Internet access, batteries, and laptops); (ii) the recruitment and deployment of individual supervisors to supplement the existing capacity of PIUs in the field; (iii) the reorganization of work sites to promote social distancing and mechanized works wherever possible; and (iv) the expansion of work schedules (night and day) to support appropriate social distancing practices. II. DESCRIPTION OF ADDITIONAL FINANCING Components and Costs 15. The proposed AF would finance US$33 million for restructuring and scaling up of RARP. The proposed changes broken down by component include: Mar 18, 2020 Page 11 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 1) Component 1 – Enhancing Rural Connectivity (US$75 million, including additional financing US$30 million). This component would be scaled up, with two new subcomponents, to improve all-weather road access to essential services and markets for the targeted beneficiaries in selected subregions with consideration of resilience of selected segments of the road network to climate events. It would support the GoH in its response to the post-COVID-19 economic slowdown by generating short-term employment through civil works and boosting medium- and long-term economic growth by improving connectivity and stimulating the regional agricultural sector. i. Subcomponent 1.1: No change. ii. (New) Subcomponent 1.2 – Enhancing Rural Connectivity in the Centre-Artibonite Loop Region (US$23 million). This subcomponent would contribute to increasing all-weather road access and improving the resilience of selected segments of the road network by financing the following activities in selected subregions in the Centre-Artibonite Loop region: (i) the construction of four bridges using weather- resistant construction materials and designed to withstand climate hazards such as flooding, on the Hinche-Maïssade and Saint-Michel-Saint-Raphaël road sections; (ii) spot improvement (culvert, bridges, slope stabilization taking into account climate resilience) on the Titanyen-Saut-d’Eau, Saint Michel-Saint- Raphaël, Dessalines- Saint-Michel, and Hinche-Thomassique road sections, the maintenance and repair of road sections/critical points that will alllow the stabilization of 80 kilometers of rural and nonrural roads making them all-weather (including extreme climate events), and the construction of a culvert on River Bretelle (that can accommodate flooding); (iii) the construction and rehabilitation of two road maintenance centers (Hinche and Saint-Michel) using weather-resistant materials; and (iv) training of 200 people within selected communities on basic rural road maintenance. iii. (New) Subcomponent 1.3 – Improving Rural Access to Selected Markets and Supporting the Development of Regional Knowledge and Planning Tools (US$7 million). This subcomponent would finance: (i) construction or rehabilitation of four markets (Fonds Bruns, Domond, Nan Poste, and Saint-Raphaël) and improvement of their management capacity; (ii) the construction of the Saint-Michel regional market; (iii) climate-informed urban plans in the cities of Saint-Raphaël and Saint-Michel; and (iv) the development of a dashboard tool capturing key development indicators and investments at the regional level (for example, natural hazards data). Constuction and rehabilitation works will be climate-resilient, based on best construction and COVID-19-informed practices, and use weather-resistant and energy efficient materials. This component will also include some specific activities to support an immediate COVID-19 response in the sector, such as: (1) the provision of hand-washing stations in upgraded markets and (2) training on COVID-informed site management practices. 2) Component 2 – Improving Resilience of Transport Connecting Infrastructure (US$22 million). No changes proposed for Component 2. 3) (Revised) Component 3 – Promoting Sustainable Mobility Development (US$4 million, including additional US$1 million reallocated from the CERC) would continue to strengthen the institutional capacity of the MTPTC, through consulting and nonconsulting services, technical assistance, training (including on best practices related to climate-resilient road and related infrastructure), and the provision of goods. Safeguards instruments will be financed along with feasibility study. Mar 18, 2020 Page 12 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 4) (Revised) Component 4 – Contingent Emergency Response Component (US$0.0 million, reduced by US$1 million) would continue to be available for rapid response in the event of an eligible emergency, subject to request from the GoH. However, the original allocation of US$1 million would be reallocated to Component 3 to be used for the provision of additional technical assistance, per the above description. The revision to reduce the CERC component financing is according to best practices and lessons learned from other projects containing the CERC in the Haiti portfolio, where financing is not required to be held in the CERC as long as it remains available to be triggered, as necessary. 5) (Revised) Component 5 – Project management would be scaled up from US$4 million to US$7 million (additional US$3 million) with two subcomponents: i. (Revised) Subcomponent 5.1 – Project Management of UCE-MTPTC (US$6 million, including additional US$2 million). The additional US$2 million would finance the project management costs for the implementation of the overall project by UCE-MTPTC (US$1.3 million) and activities supported technically by CIAT-es pertaining to monitoring and coordination of the Pilot Program for Climate Resilience (PPCR) (US$700,000). ii. (New) Subcomponent 5.2 – Project Management of UTE-MEF (US$1 million). This subcomponent would finance the project management costs delegated from UCE-MTPTC to UTE-MEF for the implementation of Subcomponent 1.3 activities. Implementation Arrangements 16. Overall responsibility for project implementation and coordination would remain with UCE-MTPTC, which would be supported by UTE-MEF for Subcomponent 1.3. UCE-MTPTC would implement all the original activities under the parent project (Subcomponents 1.1 and 5.1. and Components 2,3,4) and the new activities under Subcomponent 1.2. UTE-MEF would implement the new Subcomponent 1.3 to ensure continuity of implementation of the transferred activities. 17. UCE-MTPTC and UTE-MEF have acceptable FM arrangements for the implementation of the proposed AF. For executing their assigned components, UCE-MTPTC and UTE-MEF would use their own FM arrangements in terms of planning, budgeting, accounting, internal control, and funds flows. UCE-MTPTC has financial reporting responsibility for the entire project. UCE-MTPTC would consolidate financial information and submit interim unaudited financial reports (IFRs), as specified in the Disbursement and Financial Information Letter (DFIL), to the World Bank no later than 45 days after the end of the GoH’s fiscal semester (March 31 and September 30). For all components, procurement would be implemented according to the World Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system. 18. Given the fragile and volatile institutional context and security risks in the Artibonite Department, the project would include dedicated implementation support and continuous assessment of whether the changing circumstances in the national and local context call for adjusting project implementation arrangements and/or design (including the use of third parties, ICT-based supervision). Results Framework 19. The proposed AF and restructuring would add intermediate indicators to measure activities in the Centre and Artibonite Departments under Subcomponents 1.2 and 1.3. All new and revised indicators and proposed changes are captured in Section VIII. Mar 18, 2020 Page 13 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Disbursement Categories and Arrangements 20. The Project’s disbursement categories would be revised to reflect the change in implementation arrangements. Specifically, the FM and procurement of Subcomponents 1.1 and 1.2; Components 2, 3, 4; and Subcomponent 5.1 would continue to be managed by UCE-MTPTC. The FM and procurement of a new Subcomponent 1.3 and new Subcomponent 5.2 would be managed by UTE-MEF and, consequently, a new designated account would be opened. The DFIL would, subsequently, be updated. Disbursement Estimates 21. The disbursement estimates have been updated to reflect implementation of the new activities. Closing Date 22. The closing date of RARP would be extended by one year from June 30, 2023, to June 28, 2024, to provide additional flexibility and implementation timeframe for the GoH in light of the COVID-19 global pandemic, the associated economic slow down, and necessary response efforts over the next six months to a year. III. KEY RISKS 23. The overall project risk has been identified as “Substantial” due to the fragile political and governance context. Key risks to achieving results and mitigation measures are discussed below. i. Political and governance risk is rated “Substantial.” Political uncertainty and potential instability in Haiti could create bottlenecks and delays in implementation of the proposed AF. The country experienced serious social unrest in February, June, and September of 2019, which virtually paralyzed economic activity for several weeks. The political and governance risk would be partially mitigated through dialogue and close collaboration with government entities, as well as proactive engagement by the World Bank as issues arise. The task team would provide close implementation support and adjust interventions and implementation strategies, including the use of third parties, as needed. Additionally, to mitigate the risk of delays associated with upsurge in violence across the Centre and Artibonite Departments, measures include ongoing security assessments for work sites and stakeholder engagement to ensure community ownership of construction works, which have become a significant source of income for local communities. ii. Institutional Capacity and Fiduciary risks are downgraded from “substantial” (in the parent project) to “moderate”. Existing and planned mitigation measures include, among others, provision of additional resources (update equipment, recruitment of new personal and training) to project implementation unit. Both Institutional and Fiduciary residual risks are not likely to cause significant or severe shortcomings in PDO achievements. IV. APPRAISAL SUMMARY Mar 18, 2020 Page 14 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) A. Economic and Financial (if applicable) Analysis 24. The project interventions have many nonquantifiable benefits that support human capital development of the CAL region and are aimed at boosting local labor and economy. The project will: (i) improve accessibility by women and their children to social, educational, and medical facilities (including pre- and postnatal health attention for women); (ii) generate direct employment during the construction phase and labor-intensive road maintenance activities; and (iii) raise income of smallholders by increasing farmgate prices, lowering input costs, and decreasing postharvest losses due to poor/and or impassable roads. 25. There is no significant change to the economic and financial analysis carried out for the parent project since the interventions remain the same. The cost of lost access to the road network is substantial, and the benefit of strengthening the most vulnerable points of the network would far exceed the costs. 26. Assumptions of maintained traffic growth rates of at least 6 percent annually are conservative, below national growth forecast (8 percent), and below secondary and primary road traffic growth rates (at 20-50 percent), and would still be valid in the event of a potential economic slowdown. Average costs per kilometer at or below US$200,000 and discount rates ranging between 10 and 12 percent make investments under Subcomponent 1.2 economically viable. The estimate of US$200,000 per kilometer is conservative, as estimated costs of the rehabilitation of tertiary roads in the areas of intervention suggest that investments should be up to US$150,000 per kilometer for very damaged roads, but could be as low as US$5,000 per kilometer. These costs are consistent with the analysis of the cost/kilometer of four individual road segments undertaken under BCA. Investments in these segments are estimated to generate a positive net present value (NPV) and Economic Internal Rate of Return (EIRR) (US$0.35 million NPV with 10-11 percent EIRR), while achieving travel time savings of at least 20 minutes. 27. Main risks for achieving economic sustainability include cost overrun, construction delays, and an external shock. These risks were taken into consideration during project preparation by the inclusion of an institutional strengthening component for climate change readiness and a Contingent Emergency Response Component (Component 4). B. Technical 28. The activities to be financed are expected to be relatively straightforward from a technical perspective and well aligned with the capacity of UCE-MTPTC and UTE-MEF. The design of bridges applies international engineering standards. The works to be financed by the proposed AF and restructuring would build on lessons learned during past and ongoing World Bank-financed operations in Haiti, which have already implemented such types of works. C. Financial Management and Procurement 29. The fiduciary responsibilities of the proposed AF would be managed using existing capacity at UCE-MTPTC and UTE-MEF established under ongoing World Bank-financed projects. Teams in both PIUs are well-established and experienced in carrying out all FM and Procurement, in compliance with World Bank policies and procedures. 30. Overall fiduciary responsibility for the proceeds of the project to finance eligible expenditures would remain with UCE-MTPTC. However, FM arrangements for this AF have included UTE-MEF undertaking FM tasks for activities under Subcomponents 1.3 and 5.2. Further details related to the effective coordination and financial information submission has been included in the project’s updated operational manual, containing the preparation and transfer to UCE-MTPTC of interim financial reports (IFR) and audited financial statements for the respective subcomponents of the proposed Mar 18, 2020 Page 15 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) AF. A new designated account would be opened. For all components, Procurement would be implemented according to the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system. Disbursement and Flow of Funds 31. The main disbursement method used by the project would be the advance of funds. The FM of the new subcomponents, 1.3 and 5.2, would continue to be managed by UTE-MEF, and, consequently, a new designated account would be opened. Project funds would be advanced to two designated dedicated accounts in US dollars at the central bank, the Bank of the Republic of Haiti (Banque de la République d'Haïti, BRH), managed by UCE-MTPTC and UTE-MEF, respectively. Advanced funds would be documented by implementing units to account for grant proceeds and replenish the designated accounts using Statement of Expenditures (SOE), as agreed upon with the World Bank (Figure 1). 32. The reimbursement method, payment disbursements, and special commitments would be available for the project and included in the DFIL. Figure 1. Disbursement Process D. Social & Environmental (including Safeguards) 33. The scaled-up and new activities proposed under the AF do not trigger a change in the environmental category (Category B) nor safeguards policies (Environmental Assessment 4.01, Natural Habitats 4.04, Physical Cultural Resources 4.11, and Involuntary Resettlement 4.12). All scaled-up and new works and activities under the proposed AF are similar in nature to the activities financed under the parent project, where works are small- to medium-scale with a small physical footprint. There are no identified cumulative impacts and proposed activities are not expected to produce any large-scale, significant, and/or irreversible impacts. The associated safeguard documents have already been prepared with safeguards instruments such as Resettlement Action Plans (RAPs) and Environmental and Social Management Plans (ESMPs), and already under implementation. To ensure best practice, the existing Environmental and Social Management Framework (ESMF) and Resettlement Policy Framework (RPF) have been updated to include (i) information on transferred activities from the BCA ESMF and RPF, (ii) COVID-specific provisions, particularly with respect to workers’ and community health and safety, and (iii) a specific section on CERC in line with the CERC Guidance Note , incorporating COVID-relevant provisions. The updated instruments further enhance the existing provisions related to Mar 18, 2020 Page 16 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) the Grievance Redress Mechanism (GRM), Code of Conduct, and the potential risks of child labor, Sexual Exploitation and Abuse (SEA)/Sexual Harassment (SH), discrimination, and provision for the use of security forces during construction. The revised safeguards instruments were disclosed on the World Bank, UTE, and MTPTC’s websites on May 4, 2020. 15 In line with existing ESMF and RPF provisions, ESMPs and, where appropriate, RAPs, would be developed for all activities under the proposed AF. These instruments take into account the potential need for enhanced security provisions to be implemented to address ongoing security risk, based on lessons learned in other operations, including BCA. No work will be commenced prior to the finalization and approval of appropriate safeguard documents. The ESMF has been updated to relfect any potential social and enviromental risk associated with the spread of COVID-19. 34. Gender. The project parent (P163490) is gender-tagged. The beneficial social development impacts previously described are all the more significant in the Artibonite region targeted by the AF where women are disporportionally affected by poor access and connectivity to health facilities and markets. Research has shown that little connectivity and nonresilient roads constitute some of the main barriers for women in Haiti to access to health services. Women in Haiti are also 20 percent more likely than men to be unemployed and 6 percent more likely to be in the informal sector. Female traders (Madan Sara) in the project area represent 80 percent of traders and need to move more than their male counterparts to carry out their economic activties. However, their mobility is constrained by a lack of safety and complementary facilities/infrastructure investments. The proposed project seeks to focus on women’s accessibility to markets, social, and economic facilities as a way to improve overall household well-being by facilitating all-weather road access. Existing studies show that improving women’s economic participation and their productive assets can have positive impacts on entire households, as women typically invest a higher proportion of their earnings in their families and communities than men. The proposed project would pay close attention to the priorities, safety, and needs of women and girls, particularly for women and their security in this process through the development of mobility plans that will trigger investments in complementary facilites and infrastructure. The use of local small and medium-sized enterprises (SMEs) and labor-intensive works (LIW) would be prioritized whenever possible and the recruitment of female staff promoted. Roads will also be prioritized to ensure that they connect to basic and prenatal health facilities, and specialized services in the provincial towns. 35. Gender-based violence (GBV). The ESMF of RARP was designed to account for the management of GBV risks, and the project would ensure such risks cascade into its ESMPs. GBV considerations in stakeholder consultations have already been integrated as part of other ongoing transport projects. A sensitization program has been developed with UNOPS. Various communication material, including posters, are already being prepared by UCE-MTPTC and would be displayed on project sites. These would be streamlined into RARP, which would pay particular attention to raising awareness among local communities and, in particular, neighboring schools. UCE-MTPTC has already introduced and mainstreamed the signature of Codes of Conduct (CoCs) for contracts pertaining to existing activities implemented as part of the transport portfolio, including BCA. This would be continued under the proposed AF to RARP with the aim of introducing CoCs in the contracts of every contractor, supervising firms, or subcontractor personnel working on the project footprint. Training for contractors on GBV-related risks, their assessment, prevention, and management has been provided and is part of ongoing work contracts across the portfolio. These trainings are also expected to be delivered for RARP. Training modules are being developed and adapted to both unskilled and skilled worker categories. 15 https://www.mtptc.gouv.ht/media/upload/doc/publications/PARR_FA_CGES_v2_Avril_2020.pdf; http://documents.worldbank.org/curated/en/789531522705365807/Cadre-de-Gestion-Environnementale-et-Sociale ; Mar 18, 2020 Page 17 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 36. Beneficiaries. The number of indirect beneficiaries is estimated at over 1.2 million (current population of the CAL region). The inhabitants from the 14 municipalities will benefit from improved climate-resilient transportation infrastructure including increased and better quality year-round access to markets, and from improved local governance including transparent and participatory decision-making mechanisms. The direct beneficiary population in the Center- Artibonite sub-region, inhabitants and producers of the selected rural areas, has been estimated to be about 190,000. Some direct beneficiaries also come from larger towns in the CAL region where the Project would rehabilitate or build a market, and where the local authorities as well would benefit from the activities dedicated to strengthen capacity and develop technical knowledge of the territory. 37. Citizen engagement (CE) would continue throughout the implementation of the project to rely on continuous consultations with local authorities and beneficiaries. The three mechanisms and indicators included under the parent project, which met 100 percent of the CE requirements, will be continued under the proposed AF (consultations, community monitoring and grievance redress mechanism, GRM). The feedback received in these consultations would be documented as minutes, and the decisions taken based on this feedback would be communicated to the project beneficiaries and affected people. A first round of consultations presenting the project to the local population would take place once the locations of the works have been identified. A series of recurrent consultations would also allow for inquiries and grievances to be expressed verbally. A GRM with GBV-specific channels and procedures was set up as part of BCA and would be transferred and enhanced as part of RARP. In particular, the GRM would rely strongly on female organization, the local representation of the Ministry of Women’s Affairs and Women’s Rights, and UCE-MTPTC itself as main focal points for GBV reporting and response, in order to ensure efficient and adequate treatment of victims. The proposed project would make use of, and further deepen, earlier initiatives undertaken in Haiti under IDA-funded projects for enhancing project monitoring, transparency, and social accountability. 38. Climate Change Co-Benefits. The climate co-benefits for the parent project were assessed at 55 percent. Resilience continues to be a central feature of design solutions identified for the investments and technical studies to be financed under the proposed AF. Investments and technical assistance will bring significant climate change co- benefits by adapting to and mitigating the consequences of climate change, especially the increased frequency and intensity of adverse hydro-meteorological events. Specifically, under subcomponent 1.2, the construction of bridges will take into account the unique hydrology in these areas (i.e. the intense flooding events and its associated risks such as unstable slopes). As such, the works will contribute to increase climate resilience in the selected areas and support all- weather access. Under subcomponent 1.3, the markets upgrade would include upgraded floors and roofing that would take into account the hydrology and finance mitigations measures to respond to the extreme weather events. The project will finance solar panels in selected markets which would also contribute to the mitigation co-benefits. V. WORLD BANK GRIEVANCE REDRESS 39. Communities and individuals who believe that they are adversely affected by a World Bank (WB) supported project may submit complaints to existing project-level grievance redress mechanisms or the WB’s Grievance Redress Service (GRS). The GRS ensures that complaints received are promptly reviewed in order to address project-related concerns. Project affected communities and individuals may submit their complaint to the WB’s independent Inspection Panel which determines whether harm occurred, or could occur, as a result of WB non-compliance with its policies and procedures. Complaints may be submitted at any time after concerns have been brought directly to the World Bank's attention, and Bank Management has been given an opportunity to respond. For information on how to submit complaints to the World Bank’s corporate Grievance Redress Service (GRS), please visit Mar 18, 2020 Page 18 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) http://www.worldbank.org/en/projects-operations/products-and-services/grievance-redress-service. For information on how to submit complaints to the World Bank Inspection Panel, please visit www.inspectionpanel.org Mar 18, 2020 Page 19 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) VI SUMMARY TABLE OF CHANGES Changed Not Changed Implementing Agency ✔ Results Framework ✔ Components and Cost ✔ Loan Closing Date(s) ✔ Reallocation between Disbursement Categories ✔ Disbursements Arrangements ✔ Project's Development Objectives ✔ Cancellations Proposed ✔ Safeguard Policies Triggered ✔ EA category ✔ Legal Covenants ✔ Financial Management ✔ Procurement ✔ Other Change(s) ✔ Mar 18, 2020 Page 20 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) VII DETAILED CHANGE(S) IMPLEMENTING AGENCY Implementing Agency Name Type Action Unite Centrale d' Execution of the Ministry of Line No Change Public Works (UCE) Ministry/Ministerial Department Unite Technique d'Execution Line New Ministry/Ministerial Department COMPONENTS Current Component Name Current Cost Action Proposed Component Proposed Cost (US$, (US$, millions) Name millions) Enhancing Rural 45.00 Revised Enhancing Rural 75.00 Connectivity Connectivity Improving Resilience of 22.00 Improving Resilience of 22.00 Transport Connecting Transport Connecting Infrastructure Infrastructure Promoting Sustainable 3.00 Revised Promoting Sustainable 4.00 Mobility Development Mobility Development Contingent Emergency 1.00 Revised Contingent Emergency 0.00 Response Response Project Management 4.00 Revised Project Management 7.00 TOTAL 75.00 108.00 LOAN CLOSING DATE(S) Ln/Cr/Tf Status Original Closing Current Proposed Proposed Deadline Closing(s) Closing for Withdrawal Applications IDA-D3230 Effective 30-Jun-2023 30-Jun-2023 28-Jun-2024 28-Oct-2024 Mar 18, 2020 Page 21 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) REALLOCATION BETWEEN DISBURSEMENT CATEGORIES Financing % Current Allocation Actuals + Committed Proposed Allocation (Type Total) Current Proposed REALLOCATION NEW IDA-D3230-001 | Currency: XDR iLap Category Sequence No: 1 Current Expenditure Category: G CW NCS CS T IOC P1235 51,000,000.00 1,180.72 51,200,000.00 100.00 100.00 iLap Category Sequence No: 2 Current Expenditure Category: Emergency Exp P4 600,000.00 0.00 0.00 100.00 100.00 iLap Category Sequence No: Current Expenditure Category: Resettlement Costs 0.00 0.00 400,000.00 100.00 Total 51,600,000.00 1,180.72 51,600,000.00 DISBURSEMENT ARRANGEMENTS Change in Disbursement Arrangements Yes Expected Disbursements (in US$) DISBURSTBL Fiscal Year Annual Cumulative 2018 0.00 0.00 2019 1,597,332.00 1,597,332.00 2020 11,000,000.00 12,597,332.00 2021 30,000,000.00 42,597,332.00 Mar 18, 2020 Page 22 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 2022 30,000,000.00 72,597,332.00 2023 20,000,000.00 92,597,332.00 2024 15,402,668.00 108,000,000.00 2025 0.00 108,000,000.00 2026 0.00 108,000,000.00 2027 0.00 108,000,000.00 SYSTEMATIC OPERATIONS RISK-RATING TOOL (SORT) Risk Category Latest ISR Rating Current Rating Political and Governance ⚫ High ⚫ Substantial Macroeconomic ⚫ Moderate ⚫ Moderate Sector Strategies and Policies ⚫ Moderate ⚫ Moderate Technical Design of Project or Program ⚫ Moderate ⚫ Moderate Institutional Capacity for Implementation and ⚫ Substantial ⚫ Moderate Sustainability Fiduciary ⚫ Substantial ⚫ Moderate Environment and Social ⚫ Moderate ⚫ Moderate Stakeholders ⚫ Moderate ⚫ Moderate Other ⚫ Moderate ⚫ Moderate Overall ⚫ Substantial ⚫ Substantial LEGAL COVENANTS2 LEGAL COVENANTS – AF Haiti Rural Accessibility & Resilience Project (P173281) Sections and Description Schedule 2 Section I A 1, 2, and 3 (Institutional Arrangements) A. Institutional Arrangements Mar 18, 2020 Page 23 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 1. The Recipient shall vest the responsibility for the implementation of Parts 1.1; 1.2; 2; 3 and 5.1 of the Project in UCE and ensure that: (a) UCE shall carry out said Parts of the Project with qualified staff in sufficient number, as well as with adequate funds, facilities, services and other resources; all acceptable to the Association and in accordance with the Project Implementation Manual, the ESMF, RPF and the CER Operations Manual, as applicable. 2. The Recipient shall vest the responsibility for the implementation of Parts 1.3 and 5.2 of the Project in UTE and ensure that: (a) UTE shall carry out said Parts of the Project with qualified staff in sufficient number, as well as with adequate funds, facilities, services and other resources; all acceptable to the Association and in accordance with the Project Implementation Manual, the Safeguard Instruments and the CER Operations Manual, as applicable. 3. The Recipient shall vest the responsibility for the implementation of Part 4 of the Project in the Coordinating Authority and ensure that: (a) the Coordinating Authority shall carry out said Part of the Project with qualified staff in sufficient number, as well as with adequate funds, facilities, services and other resources; all acceptable to the Association and in accordance with the Project Implementation Manual, the Safeguard Instruments and the CER Operations Manual, as applicable. Schedule 2 Section I B 1 and 2 (Operational Manual) 1. The Recipient shall carry out the Project in accordance with a manual (the Project Implementation Manual), satisfactory in form and substance to the Association, which consists of different schedules settingforth rules, methods, guidelines, specific development plans, standard documents and procedures for the carrying out of the Project, including the following: (a) the detailed description of all Project activities, their sequencing and the prospective timetable and benchmarks in relation thereto; (b) the detailed institutional and implementation arrangements, including the responsibilities of UCE, UTE, and the content of the Memorandum of Understanding; (c) the Project administrative, financial, accounting, auditing, reporting and procurement and disbursement procedures, including all relevant standard documents; (d) the plan for capacity building and training activities under the Project; (e) the plan for the monitoring, evaluation and supervision of the Project; (f) the eligibility criteria for the investments under the Project; (g) the Safeguard Instruments for the Project; (h) the CER Operations Manual, as needed; (i) the grievance mechanisms and the code of conduct; and (j) the performance indicators for the Project. 2. The Project Implementation Manual shall only be amended from time to time in consultation with, and after approval of, the Association. In case of any conflict between the terms of the Project Implementation Manual and those of this Agreement, the terms of this Agreement shall prevail. Mar 18, 2020 Page 24 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Schedule 2 Section I C 1, 2 and 3 (Implementation Arrangements for Part 4 of the Project (CERC) 1. In order to ensure the proper implementation of contingent emergency response activities under Part 4 of the Project (“CER Part”), the Recipient shall take the following measures: (a) prepare and furnish to the Association for its review and approval, an operations manual (“CER Operations Manual”) which shall set forth detailed implementation arrangements for the CER Part, including: (i) designation of terms of reference for, and resources to be allocated to, the entity to be responsible for coordinating and implementing the CER Part (“Coordinating Authority”); (ii) specific activities which may be included in the CER Part, Eligible Expenditures required therefore (“Emergency Expenditures”), and any procedures for such inclusion; (iii) financial management arrangements for the CER Part; (iv) procurement methods and procedures for the CER Part; (v) documentation required for withdrawals of Emergency Expenditures; (vi) environmental and social management arrangements and instruments applicable to the CER Part, consistent with the provisions of Section E below; and (vii) any other arrangements necessary to ensure proper coordination and implementation of the CER Part; (b) afford the Association a reasonable opportunity to review the proposed CER Operations Manual; (c) promptly adopt the CER Operations Manual for the CER Part as accepted by the Association and integrate it as an annex to the Project Implementation Manual; (d) ensure that the CER Part is carried out in accordance with the CER Operations Manual; provided, however, that in the event of any inconsistency between the provisions of the CER Operations Manual and this Agreement, the provisions of this Agreement shall prevail; and (e) not amend, suspend, abrogate, repeal or waive any provision of the CER Operations Manual without prior approval by the Association. 2. The Recipient shall, throughout the implementation of the CER Part, maintain the Coordinating Authority, with adequate staff and resources satisfactory to the Association, as further detailed in the CER Operations Manual. 3. The Recipient shall undertake no activities under the CER Part (and no activities shall be included in the CER Part) unless and until the following conditions have been met in respect of said activities: (a) the Recipient has determined that an Eligible Crisis or Emergency has occurred, has furnished to the Association a request to include said activities in the CER Part in order to respond to said Eligible Crisis or Emergency, and the Association has agreed with such determination, accepted said request and notified the Recipient thereof; and (b) the Recipient has prepared and ensured the disclosure of all environmental and social instruments as may be required for said activities, in accordance with the CER Operations Manual and the Safeguard Instruments, the Mar 18, 2020 Page 25 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Association has approved all said instruments, and the Recipient has ensured the implementation of any actions which are required to be taken under said instruments. Schedule 2 Section I E 1, 2, 3, 4 and 5 (Safeguards) 1. The Recipient, through UCE, UTE and/or the Coordinating Authority for their respective Parts of the Project, shall ensure that the Project is carried out in accordance with the Safeguards Instruments, including the guidelines, rules and procedures defined in said Safeguards Instruments. 2. To this end, if an EMP or a RAP is required on the basis of the ESMF or the RPF, the Recipient shall specifically take the following actions, in a manner acceptable to the Association: (a) such EMP, or RAP shall be prepared in accordance with the requirements of the ESMF or the RPF, consulted and disclosed locally and furnished to the Association for approval; and (b) the pertinent Project activity shall be carried out in accordance with such EMP, or RAP as approved by the Association. 3. The Recipient shall include in the Project Reports referred to in Section II of this Schedule, adequate information on the implementation of the ESMF, the RPF, and any EMP or any RAP, giving details of: (a) measures taken in furtherance of the Safeguards Instruments, any EMP or any RAP; (b) conditions, if any, which interfere or threaten to interfere with the smooth implementation of the Safeguards Instruments, any EMP or any RAP; and (c) remedial measures taken or required to be taken to address such conditions and to ensure the continued efficient and effective implementation of the Safeguards Instruments, any EMP or any RAP. 4. The Recipient shall, in a manner satisfactory to the Association, take the following actions: (a) prior to commencement of any works under the Project: (i) prepare, in form and substance satisfactory to the Association, an EMP (based on the ESMF) and/or a RAP (based on the RPF) if required; (ii) thereafter, except as otherwise agreed with the Association, submit the said EMP and/or said RAP (as the case may be), to the Association for review and approval; (iii) subsequently, adopt and disclose, in a manner acceptable to the Association, said EMP and/or said RAP (as the case may be); and (iv) immediately thereafter, implement said EMP and/or RAP (as the case may be), all in accordance with their terms and in a manner acceptable to the Association; and (b) Except as the Association shall otherwise agree in writing, the Recipient shall not amend or waive, or permit to be amended or waived, any provision of any EMP or any RAP. 5. The Recipient through UCE, UTE and/or the Coordinating Authority for their respective Parts of the Project, shall ensure that the terms of reference for any consultancy in respect of any activity under the Project shall: (a) duly incorporate, in the opinion of the Association, the requirements of the applicable Safeguards Policies then in force; and (b) require that the advice conveyed through any such consultancy comply, in the opinion of the Mar 18, 2020 Page 26 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Association, with the requirement of the applicable Safeguards Policies then in force. Schedule 2 Section I F 1 and 2 (Memorandum of Understanding) 1. To facilitate the carrying out of Part 5.1(b) of the Project, the Recipient, through UCE shall sign, no later than three months after the Effective Date and thereafter maintain a Memorandum of Understanding with CIAT-ES during the implementation of the Project, on terms and conditions acceptable to the Association, in order to assist the Recipient to monitor the Pilot Program for Climate Resilience in accordance with the Anti-Corruption Guidelines, the Procurement Regulations, Project Implementation Manual, and the Safeguard Instruments. 2. The Recipient shall exercise its rights or carry out its obligations under the Memorandum of Understanding in such manner as to protect the interests of the Recipient, CIAT and the Association and to accomplish the purposes of the Project. Except as the Association shall otherwise agree, the Recipient shall not assign, amend, abrogate, waive, terminate or fail to enforce the Memorandum of Understanding, or any of its provisions Conditions Type Description Disbursement Conditions of disbursement: Schedule 2 Section III B.1 1. Notwithstanding the provisions of Section III A above, no withdrawal shall be made: (a) for payments made prior to the Signature Date; or (b) under Category (3), for Emergency Expenditures, unless and until the Association is satisfied, and notified the Recipient of its satisfaction, that all of the following conditions have been met in respect of said activities: (i) the Recipient has determined that an Eligible Crisis or Emergency has occurred, has furnished to the Association a request to include said activities in the CER Part in order to respond to said Eligible Crisis or Emergency, and the Association has agreed with such determination, accepted said request and notified the Recipient thereof; (ii) the Recipient has ensured that all environmental and social instruments required for said activities have been prepared and disclosed, and the Recipient has ensured that any actions which are required to be taken under said instruments have been implemented, all in accordance with the provisions of Section I.E of this Schedule 2; (iii) the Recipient’s Coordinating Authority in charge of the implementation of the CER Part has adequate staff and resources, in accordance with the provisions of Section I.C of this Schedule 2, for the purposes of said activities; and (iv) the Recipient has adopted the CER Operations Manual in form, substance Mar 18, 2020 Page 27 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) and manner acceptable to the Association and the provisions of the CER Operations Manual remain - or have been updated in accordance with the provisions of Section I.C of this Schedule 2 so as to be appropriate for the inclusion and implementation of said activities under the CER Part Mar 18, 2020 Page 28 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) VIII. RESULTS FRAMEWORK AND MONITORING Results Framework COUNTRY: Haiti RESULT_NO_PDO AF Haiti Rural Accessibility & Resilience Project Project Development Objective(s) The Project Development Objectives are to: (i) increase all-weather road access in selected sub-regions; and (ii) improve the resilience of selected segments of the road network. Project Development Objective Indicators by Objectives/ Outcomes RESULT_FRAME_TBL_ PD O Indicator Name PBC Baseline Intermediate Targets End Target 1 2 Increase all-weather road access in selected sub-regions Share of rural population in selected sub- regions with access within 2 km to an all- 36.00 40.00 50.00 55.00 weather road (Percentage) Action: This indicator has been Revised Improve the resilience of selected segments of the road network. Mar 18, 2020 Page 29 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ PD O Indicator Name PBC Baseline Intermediate Targets End Target 1 2 Total population living in areas serviced by connecting roads upgraded to a 0.00 200,000.00 450,000.00 700,000.00 climate resilient standard (Number) Rationale: Action: This indicator has been Revised As part of the Restructuring, the intermediate targets have been adjusted PDO Table SPACE Intermediate Results Indicators by Components RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 Component 1: Enhancing Rural Connectivity Roads rehablitated (CRI, 0.00 80.00 200.00 380.00 480.00 Kilometers) Rationale: Action: This indicator has been The Indicator was moved to Component 1 since it was mistakenly under Component 2. The target has been increased by 80 km to reflect the additional Revised works on the rural road network financed by the AF within the Center Artibonite Loop Region. Roads rehabilitated - rural (CRI, 0.00 70.00 180.00 350.00 430.00 Kilometers) April 7, 2020 Page 30 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 Rationale: Action: This indicator has been The target has been increased by 40 km to reflect the additional works on the rural road network financed by the AF within the Center Artibonite Loop Revised region. Roads rehabilitated - non-rural 0.00 10.00 20.00 30.00 50.00 (CRI, Kilometers) Rationale: Action: This indicator has been The target has been increased by 40 km to reflect the additional works on the rural road network financed by the AF within the Center Artibonite Loop Revised region. Number of territorial mobility plans developed, climate informed and 0.00 1.00 2.00 3.00 3.00 incorporating women´s security needs (Number) Rationale: Action: This indicator has been Revised Indicator definition to consolidate subindicator in a unique indicator. Number of which are climate informed and incorporate 0.00 3.00 women's security needs (Number) Rationale: Action: This indicator has been The parent indicator was revised to consolidate with sub-indicator in a unique indicator. Marked for Deletion Share of citizens who consider that design of investments subjected to 0.00 70.00 70.00 70.00 70.00 consultation is responsive to their April 7, 2020 Page 31 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 needs/views (%) (Percentage) Action: This indicator has been Revised Of which women, to reflect the focus of consultations on gender 0.00 90.00 90.00 90.00 90.00 (Percentage) Rationale: Action: This indicator has been intermediate targets were revised Revised Number of people who can access regional size markets within 120 525,000.00 660,000.00 minutes in select project areas (Number) Rationale: Action: This indicator has been Revised No substantial change: the description was updated to include the markets transferred from BCA Number of women who can access health services with obstetrical 255,500.00 260,000.00 300,000.00 310,000.00 320,000.00 facilities within 60 minutes in select project areas (Number) Rationale: Action: This indicator has been No substantial change. The indicator was refined to capture number instead of change in percentage (percentage increase can be derived from the Revised numbers). Number of women who can access health services with 255,500.00 320,000.00 April 7, 2020 Page 32 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 obstetrical facilities within 60 minutes in select project areas (Number) Rationale: Action: This indicator has been No substantial change: Indicator description was updated to precise the selected areas. Marked for Deletion Number of critical bridges built in 0.00 2.00 3.00 4.00 4.00 the CAL region (Number) Rationale: Action: This indicator is New The activities were transferred from the BCA Project. Spot interventions to enhance all- weather and resilient connectivity in the selected sub-regions of the 0.00 3.00 4.00 5.00 5.00 Center of Artibonite Loop Region (Number) Rationale: Action: This indicator is New The activities were transferred from the BCA Project Number of Road Maintenance Centers build or rehabilitated in the selected sub-regions of the Center 0.00 0.00 1.00 2.00 2.00 of Artibonite Loop Region (Number) Rationale: Action: This indicator is New The activities were transferred from the BCA Project April 7, 2020 Page 33 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 Number of people trained within selected communities on basic Rural Road Maintenance in the selected sub-regions of the Center 0.00 60.00 100.00 200.00 200.00 of Artibonite Loop Region (disaggregated by gender) (Number) Rationale: Action: This indicator is New The activities were transferred from the BCA Project. Disaggregated by gender, in % 0.00 35.00 35.00 35.00 35.00 of women (Percentage) Action: This indicator is New Urban and rural markets rehabilitated/constructed in the selected sub regions of the Center 0.00 1.00 3.00 4.00 5.00 of Artibonite Loop Region (Number) Rationale: Action: This indicator is New The indicator was introduced to reflect the activities transferred from the CARDP. Urban plans developed and consulted with Local officials and local stakeholders in the selected 0.00 1.00 2.00 3.00 3.00 sub-regions of the Center of Artibonite Loop Region (Number) April 7, 2020 Page 34 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 Rationale: Action: This indicator is New The indicator was introduced to reflect the activities transferred from the BCA. Regional development dashboard with open data including spatial analysis encompassing risk and No No Yes Yes Yes climate data developed with Local officials and local stakeholders in the CAL Region (Yes/No) Rationale: Action: This indicator is New The indicator was introduced to reflect the activities transferred from the BCA. Grievances registered related to delivery of project benefits that are 0.00 80.00 80.00 80.00 80.00 addressed (%) (Percentage) Rationale: Action: This indicator has been No substantial change: a description of the indicator has been added. Revised Component 2: Improving Resilience of Transport Connecting Infrastructure Number of critical bridges rehabilitated or protected on the 0.00 1.00 4.00 7.00 10.00 primary and secondary network (Number) Rationale: Action: This indicator has been Revised Clarified the indicator by including “on the primary and secondary network” April 7, 2020 Page 35 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 Number of critical spot/segments built or rehabilitated on the 0.00 10.00 75.00 100.00 150.00 primary and secondary road network (Number) Rationale: Action: This indicator has been Revised Clarified the indicator by including “on the primary and secondary network” Bridge Management System within MTPTC developed and functional No No Yes Yes Yes (Yes/No) Rationale: Action: This indicator has been This indicator is part of Component 2. The Indicator was moved to Component 2 since it was mistakenly under Component 3. Revised Component 3: Promoting Sustainable Mobility Development Climate Resilient and Sustainable Mobility Roadmap prepared and No No No Yes Yes associated monitoring tool developed (Yes/No) Action: This indicator has been Revised Establishment of a road traffic database and monitoring tool No No No Yes Yes (Yes/No) Action: This indicator has been Revised April 7, 2020 Page 36 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) RESULT_FRAME_TBL_ IO Indicator Name PBC Baseline Intermediate Targets End Target 1 2 3 Road safety assessments/measures included as part of all technical No Yes Yes Yes Yes design and feasability studies (Yes/No) Rationale: Action: This indicator has been Revised No substantial change: the indicator description was updated to take into account the activities transferred from the BCA. IO Table SPACE Monitoring & Evaluation Plan: PDO Indicators Mapped Methodology for Data Responsibility for Data Indicator Name Definition/Description Frequency Datasource Collection Collection This indicator measures PDO (i). Selected sub- regions include: (i) Spatial Marigot-Belle-Anse- analyses and Spatial analyses and UCE-MTPTC Share of rural population in selected sub- Thiotte; (ii) Bainet-Cotes de Annual Road Road Management and Departemental regions with access within 2 km to an all- fer; and (iii) Barradere- Management System (RMS) Directorate weather road Aquin as well as selected System (RMS) sub-regions in the Center Artibonite Loop Region. Percentage of rural people in the project area who live April 7, 2020 Page 37 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) within 2 kilometers (typically equivalent to a 20-minute walk) of an all- weather road. This indicator is also known as Rural Access Index (RAI). An all-weather road is motorable all year by the prevailing means of rural transport (often a pick-up or a truck which does not have four-wheel drive). Predictable interruptions of short duration during inclement weather (e.g. heavy rainfall) are acceptable, particularly on low volume roads. Please note that this indicator requires supplemental information. Spatial analyses and Spatial analyses and UCE-MTPTC and Total population living in areas serviced Annual Road Road Management Departmental by connecting roads upgraded to a Management System (RMS) Directorate climate resilient standard System (RMS) April 7, 2020 Page 38 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) ME PDO Table SPACE Monitoring & Evaluation Plan: Intermediate Results Indicators Mapped Methodology for Data Responsibility for Data Indicator Name Definition/Description Frequency Datasource Collection Collection Project monitoring by Project UCE-MTPTC Annual monitoring by UCE-MTPTC Roads rehablitated UCE-MTPTC Annual RMS, MTPTC UCE-MTPTC Roads rehabilitated - rural Project Annual monitoring by UCE-MTPTC Roads rehabilitated - non-rural UCE-MTPTC A prioritization exercise for local access improvement and complementary facilities under C1a will be managed at the community Project Number of territorial mobility plans Project monitoring by level through gender- and Annual monitoring by UCE-MTPTC developed, climate informed and UCE-MTPTC climate-informed local UCE-MTPTC incorporating women´s security needs mobility plans. The mobility plans will incorporate ecological and community- based approaches for risk and hazards mapping, and April 7, 2020 Page 39 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) will inform on: (i) access to basic services; (ii) transport time required; and (iii) accessibility during the rainy season considering disaster resilience, engineering assessments, and budget constraints. A particular emphasis will be put on women’s personal security concerns related to infrastructure (which constitute a barrier to their mobility) and other concerns derived from the participatory process. Project Number of which are climate Annual monitoring by Same as main indicator. UCE-MTPTC informed and incorporate women's UCE-MTPTC security needs The survey will be carried Simple surveys will be out in the area of carried out before the intervention for C1 to rehabilitation works, UCE-MTPTC and Share of citizens who consider that design measure satisfaction with Survey to be during the works (mid- Annually Departmental of investments subjected to consultation complementary collected. point) and right after the Directorate is responsive to their needs/views (%) investments and road conclusion of the works. rehabilitation activities The end survey will be under C1. The Project will timed in such a way that additionally deploy 3 main the contractor still has April 7, 2020 Page 40 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Citizen Engagement (CE) an active contract to mechanisms: (i) correct any legitimate Consultations; (ii) shortcomings that Community Monitoring; citizens may raise. and (iii) Grievance Redress Mechanisms. Communication and outreach is intertwined with Citizen Engagement and will be integrated in each phase of the project implementation as a building block for these CE interventions. This will ensure that the local communities are fully informed about the project activities as well as the CE mechanisms, thereby, allowing for an effective and informed beneficiary feedback throughout project implementation. The Project would use an Same as main indicator. Same as “Outreach Strategy” to Same as main Consultations in the Of which women, to reflect the focus main Same as main indicator. ensure that women, attend indicator. form of town-hall of consultations on gender indicator. consultations on roads and meetings and small small facilities selection, group discussions April 7, 2020 Page 41 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) and women’s views are (disaggregated by heard during the gender) would be consultation process. conducted to inform the community stakeholders. This indicator measures results from C1a and C1b interventions in selected sub-regions that include under C1a (i) Marigot- Belle-Anse-Thiotte; (ii) Bainet-Cotes de fer; and Spatial The data will be (iii) Barradere-Aquin and analyses and provided by the under C1b selected sub- Road UTSI statistical office for regions in the Center Management the location of the Number of people who can access Artibonite Loop Region. UCE-MTPTC & Annual System (RMS); regional size regional size markets within 120 minutes (see PDO indicator 1). UTSI/MTPTC UTSI markets and spatial in select project areas Absolute number of people (Statistical analysis will be carried that can access regional Unit) out using the time travel size markets (as defined by distance to markets. CNIGS (National Center for Geo Spatial Information)) within 120 minutes. Regional markets are defined as market servicing several departments/municipalitie s April 7, 2020 Page 42 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) The Supplemental Value is the total number of women in the area of intervention that can The data will be access obstetrical health provided by the services within 60 minutes. Spatial UTSI statistical office for Obstetrical facilities are analyses and UCE-MTPTC and Number of women who can access health the location of the defined as SONU B and Annual Road Departmental services with obstetrical facilities within health clinics and spatial SONU C clinics. This Management Directorate 60 minutes in select project areas analysis will be carried indicator measures results System (RMS) out using the time travel from C1a interventions in distance to clinics. subregions: (i) Marigot- Belle-Anse-Thiotte; (ii) Bainet-Cotes de fer; and (iii) Barradere-Aquin, identified as priority areas The Supplemental Value is the total number of women in the area of intervention that can access obstetrical health Number of women who can access Same as UCE-MTPTC and services within 60 minutes. health services with obstetrical Annual the main Same as main indicator. Departmental Obstetrical facilities are facilities within 60 minutes in select indicator. Directorate defined as SONU B and project areas SONU C clinics. This indicator measures results from C1a interventions in subregions: (i) Marigot- Belle-Anse-Thiotte; (ii) April 7, 2020 Page 43 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) Bainet-Cotes de fer; and (iii) Barradere-Aquin, identified as priority areas This indicator measures the construction of four bridges on the road sections Hinche-Maissade and Saint Michel – Saint Raphaël in the CAL. Bridges are deemed to be “critical” depending on the function of the bridge against the backdrop of the broader road network in terms of Project the linkages it provides Semi- Project monitoring by Number of critical bridges built in the CAL monitoring by UCE between economic poles, Annual UCE-MTPTC region UCE-MTPTC ports and agro-economic corridors, population hubs, important regional facilities (e.g., hospital or universities), trade border points and transnational linkages, etc. 4 key bridges to be constructed between Hinche maissade and Michel-St Rapahel have been identified under the CARDP Spot interventions to enhance all-weather This indicator measures Semi- Project Project monitoring by UCE April 7, 2020 Page 44 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) and resilient connectivity in the selected spot improvements on the Annual monitoring by UCE-MTPTC sub-regions of the Center of Artibonite road sections Titanyen – UCE-MTPTC Loop Region Saut d’Eau, Saint Michel – Saint-Raphaël, Dessalines – Saint-Michel, and Hinche- Thomassique, and the construction of a culvert on River Bretelle in the CAL. This indicator measures the Number of Road Maintenance Centers construction and Project Semi- Project monitoring by build or rehabilitated in the selected sub- rehabilitation of two road monitoring by UCE Annual UCE-MTPTC regions of the Center of Artibonite Loop maintenance centers UCE-MTPTC Region (Hinche and Saint-Michel) in he CAL. Number of people trained within selected This indicator measures the Project communities on basic Rural Road Project monitoring by number of people trained Annual monitoring by UCE Maintenance in the selected sub-regions UCE-MTPTC with selected communities, UCE-MTPTC of the Center of Artibonite Loop Region disaggregated by gender (disaggregated by gender) Disaggregated by gender, in % of women This indicator measures the construction or Urban and rural markets rehabilitation of four Project Semi- Project monitoring by rehabilitated/constructed in the selected markets (Fonds Bruns, progress UTE-MEF Annual UTE-MEF & UCE-MTPTC sub regions of the Center of Artibonite Domond, Nan Poste and report Loop Region Saint-Raphaël) and the construction of the Saint- Michel regional market April 7, 2020 Page 45 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) with indication that they can be either urban or rural. This indicator measures the number of Urban plans Urban plans developed and consulted developed and consulted Project Project monitoring by with Local officials and local stakeholders with Local officials and Annual monitoring by UCE UCE-MTPTC in the selected sub-regions of the Center local stakeholders in the UCE-MTPTC of Artibonite Loop Region selected sub-regions of the Center of Artibonite Loop Region Regional development dashboard with This indicator measure the Project open data including spatial analysis Project monitoring by implementation of the Annual monitoring by UCE encompassing risk and climate data UCE-MTPTC regional development UCE-MTPTC developed with Local officials and local dashboard. stakeholders in the CAL Region A Grievance Redress A focal point at the Mechanism (GRM) will be community level would in place to allow be identified to help the beneficiaries to submit project team implement complaints and ensure GRM reports a short and simple timely feedback and and minutes survey with selected Grievances registered related to delivery Annual UCE-MTPTC resolution. The GRM scope (from members of beneficiary of project benefits that are addressed (%) will go beyond safeguards consultations) communities at critical matters and include issues points of the such as safety, contractor rehabilitation work. The performance, and potential results would be shared violations of code of with the contractors and conduct that the workers the UCE-MTPTC staff. April 7, 2020 Page 46 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) will be required to sign, which will include clauses on gender based violence. The existing GRM that is being used under the ongoing Bank-financed transport projects (IIERP, PRGRD) will be taken as a starting point and further developed to capture the original RARP and the additional and new activities transferred from the BCA. Bridges are deemed to be “critical” depending on the function of the bridge against the backdrop of the broader road network in terms of the linkages it Project Number of critical bridges rehabilitated or provides between Project monitoring by Annual monitoring by UCE-MTPTC protected on the primary and secondary economic poles, ports and UCE-MTPTC UCE-MTPTC network agro-economic corridors, population hubs, important regional facilities (e.g., hospital or universities), trade border points and transnational linkages, etc. These will be specifically April 7, 2020 Page 47 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) identified during implementation. Project Project monitoring by Number of critical spot/segments built or Spot interventions to Annual monitoring by UCE-MTPTC UCE-MTPTC rehabilitated on the primary and enhance all-weather UCE-MTPTC secondary road network accessibility of roads. Bridge Management Project Project monitoring by Bridge Management System within System within MTPTC Annual monitoring by UCE-MTPTC UCE-MTPTC MTPTC developed and functional should be developed, and UCE-MTPTC be functional. Roadmap report and Project Climate Resilient and Sustainable Mobility By end of Project monitoring by monitoring tool to be monitoring by UCE-MTPTC Roadmap prepared and associated Project UCE-MTPTC developed by MTPTC under UCE-MTPTC monitoring tool developed the Project. Road traffic database that Project will be installed at MTPTC Project monitoring by Establishment of a road traffic database Annual monitoring by UCE-MTPTC and its monitoring tool, UCE-MTPTC and monitoring tool UCE-MTPTC developed under the Project. Road safety measures and assessment included in technical designs and Project Road safety assessments/measures Project monitoring by feasibility studies financed Annual monitoring by UCE-MTPTC included as part of all technical design and UCE-MTPTC under the project UCE-MTPTC feasability studies components C1-C2-C3, including the activities transferred from the BCA. April 7, 2020 Page 48 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) ME IO Table SPACE April 7, 2020 Page 49 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) ANNEX 1: Country Risk Profile to Natural Hazards and Climate Change COUNTRY: Haiti Haiti Rural Accessibility & Resilience Project 1. Haiti ranks as one of the countries with the highest exposure to multiple natural hazards. With 96 percent of its population living at risk, the most intense natural hazards are seismic (for example, earthquakes, landslides) and hydrometeorological (for example, cyclones, flooding, droughts).1 Seismic hazards are associated with the interaction of the Caribbean and North American tectonic plates, which converts Haiti into a seismically active zone. Hydrometeorological hazards are related to the precipitation caused by northern polar fronts, tropical cyclones, and waves, the Intertropical Convergence Zone, and convective-orographic activity. El Niño/El Niño-Southern Oscillation episodes have tended to delay the arrival of the rainy season, create drought conditions, and increase the number and intensity of cyclones. Other secondary hazards impacting Haiti include landslides, torrential debris flows, soil liquefaction, and tsunamis. 2. High levels of poverty together with severe environmental degradation and the presence of settlements in low- lying areas and floodplains are key contributing factors toward the country’s vulnerability. According to the 2014 Poverty Assessment, almost 70 percent of Haiti’s population is either poor or vulnerable to falling into poverty, and nearly 75 percent of households are economically impacted by at least one shock each year.2 This translates into precarious living conditions for the majority of the population, drastically decreasing their coping abilities and resilience to the impact of adverse natural events, further enhancing the vicious circle of poverty, environmental degradation, rapid urbanization, and vulnerability. Currently, more than 60 percent of Haiti’s population live in urban areas. The high population density (average up to 35,400/km2 in Haiti, and higher in Port-au-Prince) coupled with unregulated construction, weak social and economic public infrastructure, lack of land-use planning, and unstable governance, further aggravates the extensive social vulnerability. 3. Additionally, Haiti suffers from significant governance issues that further increase its vulnerability to natural hazards. Haiti’s long history of political instability has greatly weakened its institutions and governance mechanisms, which contributes to, among other things, serious fiscal, regulatory, and planning issues. The lack of political stability has a significant impact on the continuity and effectiveness of the National System for Disaster Risk Management (Système National de Gestion des Risques et des Désastres, SNGRD), in particular, its risk management components. Even though the 2001 National Plan for DRM established the SNGRD, Haiti still lacks the necessary legal framework and norms to effectively reduce risk and manage disasters at the national and local levels. The National Plan set up the basis for handling emergency and preparedness operations under the Technical Directorate of the Civil Protection. However, no line ministry is officially responsible for managing risks, such as identifying and reducing risks. Finally, this critical lack of norms, responsibility, and understanding of risks triggers inadequate resource allocations; the very 1Dilley, Maxx, Robert S. Chen, Uwe Deichmann, Arthur L. Lerner-Lam, Margaret Arnold, Jonathan Agwe, Piet Buys, Oddvar Kjevstad, Bradfield Lyon, and Gregory Yetman. 2005. Natural Disaster Hotspots: A Global Risk Analysis (English). Washington, DC: World Bank. http://documents.worldbank.org/curated/en/621711468175150317/Natural-disaster-hotspots-A-global-risk-analysis. 2 World Bank. 2014. Investing in People to Fight Poverty in Haiti : Reflections for Evidence-Based Policy Making (English). Washington, DC: World Bank Group. http://documents.worldbank.org/curated/en/222901468029372321/Reflections-for-evidence-based-policy-making. Apr 7, 2020 Page 50 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) limited resources are allocated only at the national level, leaving the regional and local level without any means to prepare for, or respond to, disasters or to reduce and manage risk. 4. The combined effects of exposure to natural hazards, high vulnerability, institutional fragility, and weaknesses and the lack of adequate resources invested in the sector have often resulted in catastrophic impacts of natural hazards in Haiti. Between 1971 and 2013, Haiti’s economy was subjected to natural disasters almost every year. This had adverse effects on growth. The country has a higher number of disasters per square kilometer than the average smaller Caribbean country (see Table 1A.1). 5. Recent disasters in Haiti confirm an increasing level of vulnerability facing its hard-won development gains. On average, based on the analysis of historical data from 1976 to 2012, annual losses and damages associated with hydrometeorological events are estimated at an amount equivalent to 1.95 percent of the GDP. However, as assets are created and concentrated, losses associated with adverse natural events are increasing. This was demonstrated in August and September of 2008 with the passage of Hurricanes Fay, Gustav, Hanna, and Ike (herein referred to as FGHI) during a three-week period, which resulted in damage and losses equivalent to 15 percent of the country’s GDP. In 2016, Hurricane Matthew hit the southern peninsula causing damages and losses equivalent 32 percent of GDP. Table 1A.1. Frequency and Impact of Natural Disasters, 1971-2014 in Selected Countries Frequency and Impact of Number Disasters/Land Natural of Surface Disasters/Population Deaths/Population Total Disasters/Year Disasters, Natural (thousand (millions) (millions) Damage/GDP 1971-2014 Disasters square km) Country/Group Haiti 137 3.1 5.0 13 23,427 1.78 Haiti (excluding 2010 136 3.1 4.9 13 1,855 0.22 earthquake) Dominican 60 1.4 1.2 6 311 0.05 Republic Jamaica 34 0.8 3.1 13 102 — Nicaragua 66 1.5 0.5 11 2,363 0.33 Honduras 70 1.6 0.6 9 3,298 0.40 El Salvador 51 1.2 2.5 8 687 0.34 Guatemala 82 1.9 0.8 5 1,754 0.12 Costa Rica 58 1.3 1.1 12 72 0.04 Panama 46 1.0 0.6 12 80 0.01 Other Caribbean 129 2.9 0.3 30 86 0.19 States Source: EM-DAT: The OFDA/CRED International Disaster Database 2015. Apr 7, 2020 Page 51 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) 6. Climate change is expected to exacerbate the risk of hydrometeorological hazards by increasing the frequency and/or intensity of extreme events, further increasing Haiti’s vulnerability. Climate projections for the Caribbean estimate that temperatures could rise from 1.2ºC to 2.3ºC by 2100, with a median increase of 2.0°C during the twenty- first century. In addition to claiming human lives, climate-related hazards may also take a heavy toll on all sectors of the Haitian economy and undermine hard-won development gains Apr 7, 2020 Page 52 of 53 The World Bank Haiti Rural Accessibility & Resilience Project (P173281) ANNEX 2: Revised Theory of Change (P163490) - Stable macroeconomic and political environments Critical assumptions - No significant external shock (natural hazard) NEW – small infrastructure NEW -- Selected sub-regions of the in the Center Artibonite Loop Region: investments and training for Spot improvement, maintenance and repair of 80 km of rural and non-rural roads to rural road in rehabilitation make them all-weather roads and maintenance in selected Spot improvements on the road sections Titanyen – Saut d’Eau, Saint Michel – Saint- sub-regions of the in the Raphaël, Dessalines – Saint-Michel, and Hinche-Thomassique, and the construction of a Center Artibonite Loop Region culvert on River Bretelle Constructed and rehabilitated two road maintenance centers Four bridges on selected road sections NEW - Renovating and Trained 200 people within selected communities on basic Rural Road Maintenance building new market facilities and creating [urban] planning tools NEW -- Selected sub-regions of the in the Center Artibonite Loop Region: Constructed or rehabilitated five markets Elaborated climate informed urban plans in two cities d with local stakeholders Infrastructure investments for Developed a dashboard tool capturing key development indicators and investments at upgrading, rehabilitating or the regional level (e.g., natural hazards data) rebuilding critical connecting points of the primary and On the primary and secondary road network: secondary road networks for Rehabilitated/protected critical bridges (1o) and built or rehabilitated critical spots / road climate resilience. segments (15) , incl. drainage structures, retaining walls and erosion control structures all within the existing right of way. National Bridge Management Program, incl. planning & bridge assessment and management system within the MTPTC Contingency Emergency Response Apr 7, 2020 Page 53 of 53