An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.

Objektif

To: (i) improve resilient rural accessibility in selected regions; and (ii) improve road connectivity on selected corridors.

Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.

Deskripsyon

The design of this project aligns with the best practices established by the Haiti Rural Accessibility & Resilience Project (RARP), which has shown that, under certain conditions and with targeted support, it is possible to improve rural connectivity and strengthen the resilience of transport infrastructure amidst political instability and gang violence. The proposed project aims to fulfill its objective through several activities under 5 components including: component 1: enhance resilience rural connectivity by restoring and upgrade bridges and rural road with a focus on climate resilience, component 2: rehabilitation of strategic corridors to enhance road connectivity and reduce impact of flooding, component 3: bridge asset management to ensure effective oversight and assess management, component 4: CERC; and component 5: Project

plis

management. The design and preparation of the proposed project incorporate the following considerations, based on lessons learned from the RARP: (i) Identification of a select number of technically straightforward investments that have minimal environmental and social impacts, can be delivered in the short term, and yield tangible benefits for the local population; (ii) Development of a contingency plan to ensure the provision of continuous implementation support during periods of heightened fragility and insecurity; (iii) Adoption of a flexible framework approach to manage security challenges and adjust activities in response to evolving security conditions; (iv) Reliance on a well-established and experienced Project Implementation Unit (PIU) with low staff turnover, which has a proven track record in executing similar project.

Patnè
World Bank Group, IDA
Sektè
Transpò
Etap
An kou depi 12 novanm 2025
Apwobasyon
12 novanm 2025
Fèmen
30 janvye 2032
Enstriman
Finansman BIRD/IDA, IDA
Diferans nan sa ki poko dekese
0.5: relve IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
Anprentè
Republic of Haiti
Ajans egzekisyon
Central Execution Unit,Ministry of Public Works, Transport and Communication
Antre an vigè
2 fevriye 2026
Depatman
Sidès, Sid, Nòdès, Grandans, Nò, Nip, Lwès
Dènye tranzaksyon
30 jen 2026
Idantifyan operasyon an
P510851
Sik lavi3 etap, 13 dat

Istwa etap yo

EtapDepi
Planifye14 me 2025
Apwouve12 novanm 2025
An kou12 novanm 2025

Dat yo

EvènmanDatSous
Revizyon konsèp14 me 2025Pwojè Bank Mondyal
Piblikasyon18 me 2025Pwojè Bank Mondyal
Evalyasyon davans19 out 2025Pwojè Bank Mondyal
Negosyasyon15 septanm 2025Pwojè Bank Mondyal
Kòmansman reyèl12 novanm 2025IATI
Apwobasyon12 novanm 2025Pwojè Bank Mondyal
Premye angajman12 novanm 2025Tranzaksyon
Kòmansman prevwa12 novanm 2025IATI
Antre an vigè2 fevriye 2026Pwojè Bank Mondyal
Premye dekèsman30 jen 2026Tranzaksyon
Dènye dekèsman30 jen 2026Tranzaksyon
Dat fèmti prevwa30 janvye 2032IATI
Rapò fen atann30 jiyè 2032Pwojè Bank Mondyal

Pa dekèse: 78.5 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 30 janvye 2032. Dekèse nan FY2025-26: 1.0 milyon dola ameriken.

Finansman

Tablo 1.Finansman, milyon dola ameriken

Sous finansmanMontanMilyon dola amerikenWòlSous
IDA Grant80.0EnstitisyonPwojè Bank Mondyal

Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken

Paj sa aMilyon dola amerikenSousIATIMilyon dola ameriken
Angajman80.0Relve kredi ak don IDA80.0
Dekèse1.0Relve kredi ak don IDAPa deklare
Pa dekèse78.5Relve kredi ak don IDA
Pri totalPa deklare

Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman relve IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse relve IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la

Chanjman nan operasyon an0 pwolongasyon, konpozan ijans prevwa
Dat fèmti orijinal
30 janvye 2032
Pwolongasyon dat fèmti
0
Restriktirasyon
Pa deklare
Konpozan ijans
Konpozan repons ijans kontenjan prevwa (dokiman 22 oktòb 2025) dokiman

Nouvo angajman ak dekèsman pa ane fiskal

Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (koule), milyon dola ameriken

FY2025-26Milyon dola ameriken
Nouvo angajman80.0
Dekèsman1.0
Dekèsman kimile1.0

Fich ak dokiman

Tranzaksyon2 tranzaksyon, 12 novanm 2025 rive 30 jen 2026

Tablo 4.Tranzaksyon, milyon dola ameriken

DatMeziMontanMilyon dola amerikenSousMetòd
12 novanm 2025Angajman80.0Relve kredi ak don IDAcredit original principal at board approval
30 jen 2026Dekèsman1.0Relve kredi ak don IDAdifference of cumulative snapshots (non-USD credit: includes exchange revaluation)
Kondisyon4 sou 6 rapòte
Kalite finansman
110 Don estanda
Kalite koule
Pa deklare
Kalite èd
C01 Entèvansyon kalite pwojè
Èd mare oswa pa mare
5 Pa mare
Kalite kolaborasyon
2 Apò miltilateral k ap antre
Imanitè
Pa deklare
Kote7 depatman, 6 kote nonmen, 10 kote ki gen kowòdone
DepatmanSidès, Sid, Nòdès, Grandans, Nò, Nip, Lwès
Kote sous la nonmenLes Cayes, Okap, Ouanaminthe, Port-au-Prince, Saint-Louis du Sud, Thiotte
Kote ki gen kowòdone10
Endikatè rezilta15 endikatè
EndikatèValè referansSibDènye valèDat dènye valè
Direct users that benefit from improved access to sustainable transport infrastructure and services0550,0000Pa deklare
People benefiting from improved resilient rural accessibility to basic services02200000Pa deklare
Bridge Management System upgraded and functionalnoyesnoPa deklare
Bridges repaired and upgraded to resilient standards030Pa deklare
Communities satisfied with the selection of rural roads0900Pa deklare
Complementary infrastructure build0600Pa deklare
Emergency bridges purchased06600Pa deklare
Number of women in communities trained and accredited in male-dominant road works02000Pa deklare
Percentage of training attendees who demonstrated improved knowledge after GBV training0800Pa deklare
Person-days of labour intensive works of people from local communities generated03000000Pa deklare
Road and bridges construction standards updated and approvednoyesnoPa deklare
Road corridors rehabilitated with resilient standards0600Pa deklare
Road corridors with road safety and NMT interventions0600Pa deklare
Rural roads upgraded and adapted to climate impacts01000Pa deklare
Rural roads with road safety and NMT interventions01000Pa deklare
Nòt6 nòt
NòtValèDat
ISR Financial ManagementModerately Satisfactory12 out 2026
ISR Monitoring and EvaluationSatisfactory12 out 2026
ISR Overall Implementation Progress (IP)Satisfactory12 out 2026
ISR ProcurementSatisfactory12 out 2026
ISR Progress towards achievement of PDOSatisfactory12 out 2026
ISR Project ManagementSatisfactory12 out 2026
Lajan ki transfere bay lòt òganizasyon1 mouvman
BenefisyèMouvmanDatMilyon dola ameriken
Central Execution Unit; Ministry of Public Works, Transport and CommunicationAngajman30 novanm 202580.0
Idantifyan4 idantifyan
SistèmIdantifyanSous
Idantifyan IATI44000-P510851IATI
Kredi oswa don IDAIDAE6070Relve kredi ak don IDA
Prè Bank mondyalIDA-E6070Pwojè Bank Mondyal
Pwojè Bank mondyalP510851Fich operasyon an
Dokiman patnè a24 dokiman
Avi apèl dòf (2)

Sous

Done jiska 18 oktòb 2026
SousKonsilte nan dat
IATI18 oktòb 2026
IATI18 oktòb 2026
Relve kredi ak don IDA18 oktòb 2026
Pwojè Bank Mondyal18 oktòb 2026
Dokiman Bank Mondyal18 oktòb 2026
Site paj sa a

HaitiDocs. Pwojè koridò rezilyan yo. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP510851?lang=ht