Objektif
To: (i) improve resilient rural accessibility in selected regions; and (ii) improve road connectivity on selected corridors.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
Deskripsyon
The design of this project aligns with the best practices established by the Haiti Rural Accessibility & Resilience Project (RARP), which has shown that, under certain conditions and with targeted support, it is possible to improve rural connectivity and strengthen the resilience of transport infrastructure amidst political instability and gang violence. The proposed project aims to fulfill its objective through several activities under 5 components including: component 1: enhance resilience rural connectivity by restoring and upgrade bridges and rural road with a focus on climate resilience, component 2: rehabilitation of strategic corridors to enhance road connectivity and reduce impact of flooding, component 3: bridge asset management to ensure effective oversight and assess management, component 4: CERC; and component 5: Project
plis
management. The design and preparation of the proposed project incorporate the following considerations, based on lessons learned from the RARP: (i) Identification of a select number of technically straightforward investments that have minimal environmental and social impacts, can be delivered in the short term, and yield tangible benefits for the local population; (ii) Development of a contingency plan to ensure the provision of continuous implementation support during periods of heightened fragility and insecurity; (iii) Adoption of a flexible framework approach to manage security challenges and adjust activities in response to evolving security conditions; (iv) Reliance on a well-established and experienced Project Implementation Unit (PIU) with low staff turnover, which has a proven track record in executing similar project.
- Patnè
- World Bank Group, IDA
- Sektè
- Transpò
- Etap
- An kou depi 12 novanm 2025
- Apwobasyon
- 12 novanm 2025
- Fèmen
- 30 janvye 2032
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- 0.5: relve IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Anprentè
- Republic of Haiti
- Ajans egzekisyon
- Central Execution Unit,Ministry of Public Works, Transport and Communication
- Antre an vigè
- 2 fevriye 2026
- Depatman
- Sidès, Sid, Nòdès, Grandans, Nò, Nip, Lwès
- Dènye tranzaksyon
- 30 jen 2026
- Idantifyan operasyon an
- P510851
Sik lavi3 etap, 13 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 14 me 2025 |
| Apwouve | 12 novanm 2025 |
| An kou | 12 novanm 2025 |
Dat yo
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 14 me 2025 | Pwojè Bank Mondyal |
| Piblikasyon | 18 me 2025 | Pwojè Bank Mondyal |
| Evalyasyon davans | 19 out 2025 | Pwojè Bank Mondyal |
| Negosyasyon | 15 septanm 2025 | Pwojè Bank Mondyal |
| Kòmansman reyèl | 12 novanm 2025 | IATI |
| Apwobasyon | 12 novanm 2025 | Pwojè Bank Mondyal |
| Premye angajman | 12 novanm 2025 | Tranzaksyon |
| Kòmansman prevwa | 12 novanm 2025 | IATI |
| Antre an vigè | 2 fevriye 2026 | Pwojè Bank Mondyal |
| Premye dekèsman | 30 jen 2026 | Tranzaksyon |
| Dènye dekèsman | 30 jen 2026 | Tranzaksyon |
| Dat fèmti prevwa | 30 janvye 2032 | IATI |
| Rapò fen atann | 30 jiyè 2032 | Pwojè Bank Mondyal |
Pa dekèse: 78.5 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 30 janvye 2032. Dekèse nan FY2025-26: 1.0 milyon dola ameriken.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Sous finansman | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 80.0 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 80.0 | Relve kredi ak don IDA | 80.0 |
| Dekèse | 1.0 | Relve kredi ak don IDA | Pa deklare |
| Pa dekèse | 78.5 | Relve kredi ak don IDA | |
| Pri total | Pa deklare |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman relve IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse relve IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Chanjman nan operasyon an0 pwolongasyon, konpozan ijans prevwa
- Dat fèmti orijinal
- 30 janvye 2032
- Pwolongasyon dat fèmti
- 0
- Restriktirasyon
- Pa deklare
- Konpozan ijans
- Konpozan repons ijans kontenjan prevwa (dokiman 22 oktòb 2025) dokiman
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 3.Nouvo angajman ak dekèsman pa ane fiskal (koule), milyon dola ameriken
Fich ak dokiman
Tranzaksyon2 tranzaksyon, 12 novanm 2025 rive 30 jen 2026
Tablo 4.Tranzaksyon, milyon dola ameriken
Kondisyon4 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa deklare
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Pa deklare
Kote7 depatman, 6 kote nonmen, 10 kote ki gen kowòdone
| Depatman | Sidès, Sid, Nòdès, Grandans, Nò, Nip, Lwès |
| Kote sous la nonmen | Les Cayes, Okap, Ouanaminthe, Port-au-Prince, Saint-Louis du Sud, Thiotte |
| Kote ki gen kowòdone | 10 |
Endikatè rezilta15 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Direct users that benefit from improved access to sustainable transport infrastructure and services | 0 | 550,000 | 0 | Pa deklare |
| People benefiting from improved resilient rural accessibility to basic services | 0 | 220000 | 0 | Pa deklare |
| Bridge Management System upgraded and functional | no | yes | no | Pa deklare |
| Bridges repaired and upgraded to resilient standards | 0 | 3 | 0 | Pa deklare |
| Communities satisfied with the selection of rural roads | 0 | 90 | 0 | Pa deklare |
| Complementary infrastructure build | 0 | 60 | 0 | Pa deklare |
| Emergency bridges purchased | 0 | 660 | 0 | Pa deklare |
| Number of women in communities trained and accredited in male-dominant road works | 0 | 200 | 0 | Pa deklare |
| Percentage of training attendees who demonstrated improved knowledge after GBV training | 0 | 80 | 0 | Pa deklare |
| Person-days of labour intensive works of people from local communities generated | 0 | 300000 | 0 | Pa deklare |
| Road and bridges construction standards updated and approved | no | yes | no | Pa deklare |
| Road corridors rehabilitated with resilient standards | 0 | 60 | 0 | Pa deklare |
| Road corridors with road safety and NMT interventions | 0 | 60 | 0 | Pa deklare |
| Rural roads upgraded and adapted to climate impacts | 0 | 100 | 0 | Pa deklare |
| Rural roads with road safety and NMT interventions | 0 | 100 | 0 | Pa deklare |
Nòt6 nòt
| Nòt | Valè | Dat |
|---|---|---|
| ISR Financial Management | Moderately Satisfactory | 12 out 2026 |
| ISR Monitoring and Evaluation | Satisfactory | 12 out 2026 |
| ISR Overall Implementation Progress (IP) | Satisfactory | 12 out 2026 |
| ISR Procurement | Satisfactory | 12 out 2026 |
| ISR Progress towards achievement of PDO | Satisfactory | 12 out 2026 |
| ISR Project Management | Satisfactory | 12 out 2026 |
Lajan ki transfere bay lòt òganizasyon1 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| Central Execution Unit; Ministry of Public Works, Transport and Communication | Angajman | 30 novanm 2025 | 80.0 |
Idantifyan4 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P510851 | IATI |
| Kredi oswa don IDA | IDAE6070 | Relve kredi ak don IDA |
| Prè Bank mondyal | IDA-E6070 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P510851 | Fich operasyon an |
Dokiman patnè a24 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Revised Labor Management Procedures Resilient Corridors Project (P510851), 1 septanm 2026, documents.worldbank.org
- Revised Stakeholder Engagement Plan (SEP) Resilient Corridors Project (P510851), 1 septanm 2026, documents.worldbank.org
- Revised Environmental and Social Management Framework (ESMF) Resilient Corridors Project (P510851), 1 septanm 2026, documents.worldbank.org
- Revised Resettlement Framework Resilient Corridors Project (P510851), 1 septanm 2026, documents.worldbank.org
- Disclosable Version of the ISR - Resilient Corridors Project - P510851 - Sequence No : 2, 12 out 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P510851- Resilient Corridors Project - Procurement Plan, 21 jiyè 2026, documents.worldbank.org
- Haiti - Projet de Corridors Résilient : Mission d’appui a la Mise en Œuvre - 3 au 10 Juin 2026, 10 jen 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P510851- Resilient Corridors Project - Procurement Plan, 17 avril 2026, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P510851- Resilient Corridors Project - Procurement Plan, 24 fevriye 2026, documents.worldbank.org
- Disclosable Version of the ISR - Resilient Corridors Project - P510851 - Sequence No : 1, 15 fevriye 2026, documents.worldbank.org
- Climate Finance Assessment (P510851), 5 janvye 2026, documents.worldbank.org
- Official Documents- Financing Agreement for Grant E6070-HT.pdf, 11 desanm 2025, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Grant E6070-HT.pdf, 5 desanm 2025, documents.worldbank.org
- Haiti - Resilient Corridors Project, 22 oktòb 2025, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) - Resilient Corridors Project - P510851, 23 out 2025, documents.worldbank.org
- Appraisal Environmental and Social Review Summary (ESRS) - Resilient Corridors Project - P510851, 23 out 2025, documents.worldbank.org
- Environmental and Social Commitment Plan (ESCP) - Resilient Corridors Project - P510851, 23 out 2025, documents.worldbank.org
- Concept Environmental and Social Review Summary (ESRS) - Resilient Corridors Project - P510851, 22 out 2025, documents.worldbank.org
- Appraisal Project Information Document (PID), 19 out 2025, documents.worldbank.org
- Appraisal Environmental and Social Review Summary (ESRS) - Resilient Corridors Project - P510851, 18 out 2025, documents.worldbank.org
- Stakeholder Engagement Plan (SEP) - Resilient Corridors Project - P510851, 18 out 2025, documents.worldbank.org
- Environmental and Social Commitment Plan (ESCP) - Resilient Corridors Project - P510851, 18 out 2025, documents.worldbank.org
- Concept Project Information Document (PID), 18 me 2025, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Dokiman patnè yo: kondisyon itilizasyon piblikatè a fikse
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Konsilte nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| Relve kredi ak don IDA | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |