Done / Pòtfolyo patnè yo / Gwoup Bank Mondyal / IDA
Pwojè aksesibilite ak rezilyans riral an Ayiti
Tit pibliye: Haiti Rural Accessibility & Resilience Project
An milyon dola ameriken sof si yo di lòt bagay. Ane fiskal ayisyen, soti oktòb rive septanm. FY2026-27 te kòmanse 1 oktòb 2026.
Objektif
The Project Development Objectives are to: (i) increase all-weather road access in selected sub-regions; (ii) improve the resilience of selected segments of the road network; and (iii) to provide immediate and effective response to an eligible crisis or emergency.
Jan Pwojè Bank Mondyal pibliye l, nan lang orijinal li.
Deskripsyon
The objectives of the Rural Accessibility and Resilience Project for Haiti are to: (i) increase all-weather road access in selected sub-regions; and (ii) improve the resilience of selected segments of the road network. The project has five components. (1) Enhancing rural connectivity component will improve all-weather road access to essential services (i.e. obstetrical and emergency health facilities) and markets for the targeted population and build resilience to climate events, primarily in the South, South-East and Nippes departments. (2) Improving resilience of transport connecting infrastructure component will strengthen resilience to climate change and extreme weather events on the primary and secondary road network, by protecting essential/critical points and preventing interruptions in the flow of individuals and goods. (3) Promoting sustainable mobility
plis
development component will strengthen the institutional capacity of the MTPTC, through technical assistance, training, and the provision of goods. (4) Contingent emergency response component will provide immediate response to an eligible emergency, as needed. Such components, which include triggers and conditions for the use of funds, are included in most investment projects in Haiti, in keeping with the recommendations of the 2011 World Development Report (WDR) on Conflict, Security and Development, and with Bank’s operational experience in Haiti when responding to natural catastrophic events (5) Project management component will support the coordination, implementation, management and supervision of the project.
- Patnè
- World Bank Group, IDA
- Sektè
- Transpò
- Etap
- Fèmen depi 30 me 2025
- Apwobasyon
- 31 me 2018
- Fèmen
- 30 me 2025
- Enstriman
- Finansman BIRD/IDA, IDA
- Diferans nan sa ki poko dekese
- 3.9: eta IDA a evalye kredi ki poko dekese an dwa tiraj espesyal yo nan to chanj jodi a
- Anprentè
- The Republic of Haiti
- Ajans egzekisyon
- Unite Centrale d' Execution of the Ministry of Public Works (UCE),Unite Technique d'Execution
- Antre an vigè
- 4 septanm 2018
- Depatman
- Nòdès, Sidès, Sid, Latibonit, Nòdwès, Sant, Nip
- Dènye tranzaksyon
- 31 janvye 2026
- Idantifyan operasyon an
- P163490
Sik lavi5 etap, 14 dat
Istwa etap yo
| Etap | Depi |
|---|---|
| Planifye | 21 jiyè 2017 |
| Apwouve | 31 me 2018 |
| An kou | 31 me 2018 |
| Ap fèmen | 30 me 2025 |
| Fèmen | 30 me 2025 |
Evènman ki gen dat
| Evènman | Dat | Sous |
|---|---|---|
| Revizyon konsèp | 21 jiyè 2017 | Pwojè Bank Mondyal |
| Piblikasyon | 28 out 2017 | Pwojè Bank Mondyal |
| Kòmansman prevwa | 13 mas 2018 | IATI |
| Evalyasyon davans | 5 avril 2018 | Pwojè Bank Mondyal |
| Negosyasyon | 11 avril 2018 | Pwojè Bank Mondyal |
| Kòmansman reyèl | 31 me 2018 | IATI |
| Apwobasyon | 31 me 2018 | Pwojè Bank Mondyal |
| Premye angajman | 31 me 2018 | Tranzaksyon |
| Antre an vigè | 4 septanm 2018 | Pwojè Bank Mondyal |
| Premye dekèsman | 28 fevriye 2019 | Tranzaksyon |
| Dènye dekèsman | 30 avril 2025 | Tranzaksyon |
| Fen reyèl | 30 me 2025 | IATI |
| Dat fèmti | 30 me 2025 | IATI |
| Rapò fen atann | 17 novanm 2025 | Pwojè Bank Mondyal |
Pa dekèse: 0.6 milyon dola ameriken jiska 30 septanm 2026, dat fèmti 30 me 2025. Dekèse nan FY2025-26: −0.1 milyon dola ameriken.
Finansman
Tablo 1.Finansman, milyon dola ameriken
| Finansè | MontanMilyon dola ameriken | Wòl | Sous |
|---|---|---|---|
| IDA Grant | 135.2 | Enstitisyon | Pwojè Bank Mondyal |
Tablo 2.Operasyon ki gen rapò, milyon dola ameriken
| Operasyon | Rapò | Patnè | Etap | AngajmanMilyon dola ameriken |
|---|---|---|---|---|
| AF Haiti Rural Accessibility & Resilience Project | Finansman adisyonèl oswa operasyon pitit | Gwoup Bank Mondyal | Fèmen | 33.0 |
| AF Rural Accessibility & Resilience Project | Finansman adisyonèl oswa operasyon pitit | Gwoup Bank Mondyal | Fèmen | 30.0 |
Tablo 3.Pozisyon nan dat done yo pa sous (stòk), milyon dola ameriken
| Paj sa aMilyon dola ameriken | Sous | IATIMilyon dola ameriken | |
|---|---|---|---|
| Angajman | 135.0 | IDA, eta kredi ak don | 135.1 |
| Dekèse | 130.5 | IDA, eta kredi ak don | 130.5 |
| Pa dekèse | 0.6 | IDA, eta kredi ak don | |
| Pri total | 138.0 | Pwojè Bank Mondyal |
Montan Bank Mondyal. Apwouve: Angajman nèt, montan apwouve mwens anilasyon yo, an US$ nan dat done yo. Dekèse jiska jodi a: Dekèsman deklarasyon IDA a ak API pwojè yo jiska jodi a, an US$. Pa dekèse: Balans ki pa dekèse deklarasyon IDA a pibliye, an US$ nan dat done yo. Kolòn IATI: angajman ak dekèsman patnè a pibliye nan IATI, konvèti an US$. Montan yo dapre sous la
Chanjman nan operasyon an2 pwolongasyon, 3 restriktirasyon, konpozan ijans aktive
- Dat fèmti orijinal
- 30 jen 2023
- Pwolongasyon dat fèmti
- 2
- Pwolonje rive 28 jen 2024 (dokiman 29 me 2025) dokiman restriktirasyon
- Pwolonje rive 30 me 2025 (dokiman 29 me 2025) dokiman restriktirasyon
- Restriktirasyon
- 3
- 29 me 2025, Nivo 2, direksyon an apwouve l (dokiman 29 me 2025) dokiman restriktirasyon
- Konpozan ijans
- Konpozan repons ijans kontenjan aktive 23 out 2021 (dokiman 4 mas 2022) dokiman
Nouvo angajman ak dekèsman pa ane fiskal
Tablo 4.Nouvo angajman ak dekèsman pa ane fiskal (flo), milyon dola ameriken
| FY2017-18Milyon dola ameriken | FY2018-19Milyon dola ameriken | FY2019-20Milyon dola ameriken | FY2020-21Milyon dola ameriken | FY2021-22Milyon dola ameriken | FY2022-23Milyon dola ameriken | FY2023-24Milyon dola ameriken | FY2024-25Milyon dola ameriken | FY2025-26Milyon dola ameriken | |
|---|---|---|---|---|---|---|---|---|---|
| Nouvo angajman | 75.0 | Pa rapòte | 33.0 | Pa rapòte | 30.0 | Pa rapòte | Pa rapòte | −3.0 | Pa rapòte |
| Dekèsman | Pa rapòte | 3.0 | 9.1 | 27.9 | 55.7 | 21.7 | 13.3 | −0.2 | −0.1 |
| Dekèsman kimile | Pa rapòte | 3.0 | 12.1 | 40.0 | 95.7 | 117.5 | 130.8 | 130.6 | 130.5 |
Fich ak dokiman
Tranzaksyon87 liy, 31 me 2018 rive 31 janvye 2026
Tablo 5.Tranzaksyon, milyon dola ameriken
| Dat | Mezi | MontanMilyon dola ameriken | Sous | Metòd |
|---|---|---|---|---|
| 31 me 2018 | Angajman | 75.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 18 jen 2020 | Angajman | 33.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 17 mas 2022 | Angajman | 30.0 | IDA, eta kredi ak don | credit original principal at board approval |
| 31 me 2025 | Angajman | −1.5 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2025 | Angajman | −0.1 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2025 | Angajman | −1.4 | IDA, eta kredi ak don | cancellation: increase in cumulative cancelled amount between snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2019 | Dekèsman | 3.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2019 | Dekèsman | <0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2020 | Dekèsman | 9.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2020 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2020 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2020 | Dekèsman | 1.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2021 | Dekèsman | 2.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2021 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2021 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2021 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2021 | Dekèsman | 2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2021 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2021 | Dekèsman | 1.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2021 | Dekèsman | 2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2021 | Dekèsman | 5.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2021 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2021 | Dekèsman | 2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2021 | Dekèsman | 1.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2021 | Dekèsman | 1.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2021 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2021 | Dekèsman | 7.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2021 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2021 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2021 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2022 | Dekèsman | 1.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2022 | Dekèsman | 4.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2022 | Dekèsman | 23.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2022 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2022 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2022 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2022 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2022 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2022 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2022 | Dekèsman | 1.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2022 | Dekèsman | 2.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2022 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2022 | Dekèsman | 2.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2022 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2022 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2022 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2022 | Dekèsman | 2.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2022 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2022 | Dekèsman | 0.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2022 | Dekèsman | 0.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2023 | Dekèsman | 2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 28 fevriye 2023 | Dekèsman | 1.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2023 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2023 | Dekèsman | 1.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2023 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2023 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2023 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2023 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2023 | Dekèsman | 2.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2023 | Dekèsman | 1.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2023 | Dekèsman | −6.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2023 | Dekèsman | 9.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2023 | Dekèsman | −2.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2023 | Dekèsman | 5.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2023 | Dekèsman | −3.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2023 | Dekèsman | 1.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2023 | Dekèsman | 1.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 oktòb 2023 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2023 | Dekèsman | 0.9 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 novanm 2023 | Dekèsman | 2.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2023 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 desanm 2023 | Dekèsman | 1.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2024 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2024 | Dekèsman | 0.6 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 29 fevriye 2024 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 mas 2024 | Dekèsman | 1.2 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2024 | Dekèsman | 0.7 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 me 2024 | Dekèsman | 1.8 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2024 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 jiyè 2024 | Dekèsman | 0.1 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 out 2024 | Dekèsman | 0.4 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 avril 2025 | Dekèsman | 0.3 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 jen 2025 | Dekèsman | −0.5 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 30 septanm 2025 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2026 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2026 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
| 31 janvye 2026 | Dekèsman | −0.0 | IDA, eta kredi ak don | difference of cumulative snapshots (non-USD credit: includes exchange revaluation) |
Kondisyon4 sou 6 rapòte
- Kalite finansman
- 110 Don estanda
- Kalite koule
- Pa rapòte
- Kalite èd
- C01 Entèvansyon kalite pwojè
- Èd mare oswa pa mare
- 5 Pa mare
- Kalite kolaborasyon
- 2 Apò miltilateral k ap antre
- Imanitè
- Pa rapòte
Kote7 depatman, 23 kote nonmen, 40 kote ki gen kowòdone
| Depatman | Nòdès, Sidès, Sid, Latibonit, Nòdwès, Sant, Nip |
| Kote sous la nonmen | Aken, Aquin, Arrondissement de Bainet, Arrondissement de BaradEres, Arrondissement de Baradères, Arrondissement de Belle-Anse, Arrondissement de Cerca La Source, Arrondissement de Hinche, Arrondissement de Marmelade, Arrondissement de ValliEres, Arrondissement de Vallières, Arrondissement des ChardonniEres, Arrondissement des Chardonnières, Arrondissement du Môle Saint-Nicolas, Bainet, Baraderes, Belle-Anse, Cotes-de-Fer, Departement de Nippes, Marigot, Sud, Sud-Est, Thiotte |
| Kote ki gen kowòdone | 40 |
Endikatè rezilta29 endikatè
| Endikatè | Valè referans | Sib | Dènye valè | Dat dènye valè |
|---|---|---|---|---|
| Number of women who can access health services with obstetrical facilities within 60 minutes in select project areas | 255,500.00 | 320,000.00 | 327,000.00 | 28 jen 2024 |
| Bridge Management System within MTPTC developed and functional | No | Yes | Yes | 28 jen 2024 |
| Climate Resilient and Sustainable Mobility Roadmap prepared and associated monitoring tool developed | No | Yes | No | 7 novanm 2023 |
| Critical bridges repaired or reconstructed | 0.00 | 7.00 | 2.00 | 7 novanm 2023 |
| Critical spots treated | 0.00 | 60.00 | 37.00 | 7 novanm 2023 |
| Disaggregated by gender, in % of women | 0.00 | 35.00 | Pa rapòte | Pa rapòte |
| Establishment of a road traffic database and monitoring tool | No | Yes | No | 14 jen 2024 |
| Grievances registered related to delivery of project benefits that are addressed (%) | 0.00 | 80.00 | 100 | 28 jen 2024 |
| Number of Road Maintenance Centers build or rehabilitated in the selected sub-regions of the Center of Artibonite Loop Region | 0.00 | 1.00 | 1.00 | 15 me 2025 |
| Number of critical bridges built in the CAL region | 0.00 | 4.00 | 4.00 | 7 novanm 2023 |
| Number of critical bridges rehabilitated or protected on the primary and secondary network | 0.00 | 8 | 8.00 | 14 me 2025 |
| Number of critical spot/segments built or rehabilitated on the primary and secondary road network | 0.00 | 150.00 | 124.00 | 15 me 2025 |
| Number of people trained within selected communities on basic Rural Road Maintenance in the selected sub-regions of the Center of Artibonite Loop Region (disaggregated by gender) | 0.00 | 200.00 | 166.00 | 7 novanm 2023 |
| Number of people who can access regional size markets within 120 minutes in select project areas | 525,000.00 | 660,000.00 | 720,620.00 | 28 jen 2024 |
| Number of territorial mobility plans developed, climate informed and incorporating women´s security needs | 0.00 | 3.00 | 3.00 | 7 novanm 2023 |
| Of which women, to reflect the focus of consultations on gender | 0.00 | 90.00 | 0.00 | 30 jen 2023 |
| Regional development dashboard with open data including spatial analysis encompassing risk and climate data developed with Local officials and local stakeholders in the CAL Region | No | Yes | Yes | 30 jen 2024 |
| Road safety assessments/measures included as part of all technical design and feasability studies | No | Yes | Yes | 28 jen 2024 |
| Roads rehabilitated - non-rural | 0.00 | 50.00 | 0.00 | 10 oktòb 2018 |
| Roads rehabilitated - rural | 0.00 | 430.00 | 0.00 | 10 oktòb 2018 |
| Roads rehablitated | 0.00 | 480.00 | 554 | 28 jen 2024 |
| Share of citizens who consider that design of investments subjected to consultation is responsive to their needs/views (%) | 0.00 | 70.00 | 80.00 | 28 jen 2024 |
| Spot interventions to enhance all-weather and resilient connectivity in the selected sub-regions of the Center of Artibonite Loop Region | 0.00 | 5.00 | 4.00 | 7 novanm 2023 |
| Urban and rural markets rehabilitated/constructed in the selected sub regions of the Center of Artibonite Loop Region | 0.00 | 4 | 4.00 | 15 me 2025 |
| Urban plans developed and consulted with Local officials and local stakeholders in the selected sub-regions of the Center of Artibonite Loop Region | 0.00 | 3.00 | 0.00 | 7 novanm 2023 |
| People with restored access to the road network | 0.00 | 407000.00 | 422337.00 | 7 novanm 2023 |
| Share of rural population in selected sub-regions with access within 2 km to an all-weather road | 36.00 | 55.00 | 63.00 | 28 jen 2024 |
| Total population living in areas serviced by connecting roads upgraded to a climate resilient standard | 0.00 | 450000.00 | 432131.00 | 7 novanm 2023 |
| Number of territorial mobility plans developed, climate informed and incorporating womens security needs | 0.00 | 3.00 | 3.00 | 31 desanm 2021 |
Nòt16 nòt
| Nòt | Valè | Dat |
|---|---|---|
| IEG bankqualityofsupervision | Highly Satisfactory | 30 mas 2026 |
| IEG evaltype | ES | 30 mas 2026 |
| IEG icrquality | High | 30 mas 2026 |
| IEG mequality | Substantial | 30 mas 2026 |
| IEG outcome | Highly Satisfactory | 30 mas 2026 |
| IEG overallbankperf | Highly Satisfactory | 30 mas 2026 |
| ISR Financial Management | Moderately Unsatisfactory | 5 mas 2025 |
| ISR Monitoring and Evaluation | Moderately Satisfactory | 5 mas 2025 |
| ISR Overall Implementation Progress (IP) | Satisfactory | 5 mas 2025 |
| ISR Procurement | Satisfactory | 5 mas 2025 |
| ISR Progress towards achievement of PDO | Satisfactory | 5 mas 2025 |
| ISR Project Management | Satisfactory | 5 mas 2025 |
| ICR outratingind | Highly Satisfactory | Pa rapòte |
| ICR outratingind | Substantial | Pa rapòte |
| ICR overallrating | Substantial | Pa rapòte |
| ICR overallrating | Highly Satisfactory | Pa rapòte |
Kontra yo bay103 kontra
| Founisè | Dat | Metòd | Montan |
|---|---|---|---|
| Non an pa afiche | 7 jiyè 2023 | CDS | 90,000 USD |
| Embellissement Plan Construction (EPC) | 5 me 2023 | RFB | 697,170 USD |
| M & L Construction | 5 me 2023 | RFB | 927,481 USD |
| GAD Construction | 5 me 2023 | RFB | 904,070.8 USD |
| GENIE Consult | 5 me 2023 | RFB | 849,945 USD |
| Kalton Design | 5 me 2023 | RFB | 996,372.4 USD |
| Mahatma Construction et Assainissement | 5 me 2023 | RFB | 1,001,765.7 USD |
| BECOS Plus | 5 me 2023 | RFB | 1,015,645 USD |
| CECOM Consultants S. A. | 20 janvye 2023 | QCBS | 165,812 USD |
| Techniplan SRL | 20 janvye 2023 | QCBS | Pa rapòte |
| Experts Conseils et Associs | 13 desanm 2022 | CDS | 2,171,400 Gourde hatienne |
| Envergure Construction | 2 desanm 2022 | RFB | 1,301,480.4 USD |
| Gecotech | 2 desanm 2022 | RFB | 1,615,000 USD |
| Conscogen Plus | 2 desanm 2022 | RFB | 1,068,121.6 USD |
| Colagene Construction | 2 desanm 2022 | RFB | 963,886 USD |
| SGR Construction | 2 desanm 2022 | RFB | 1,661,275 USD |
| MVF Plus Construction | 2 desanm 2022 | RFB | 1,159,982.84 USD |
| SOGEDCO | 21 novanm 2022 | RFB | 269,923 USD |
| GG-ETEX Construction | 21 novanm 2022 | RFB | 396,630 USD |
| AB Construction | 21 novanm 2022 | RFQ | 555,760 USD |
| Etirha Construction | 21 novanm 2022 | RFB | 305,270 USD |
| GENIE Consult | 21 novanm 2022 | RFQ | 530,773.2 USD |
| ENAMEX | 21 novanm 2022 | RFB | 432,292.2 USD |
| BECAM | 21 novanm 2022 | RFB | 221,000 USD |
| Bureau D Etudes et D Excution D Haiti, BEEH | 21 novanm 2022 | RFB | 368,067 USD |
| Kalton Design | 5 out 2022 | RFB | 776,481.9 USD |
| ALDA Construction & Design S. A. | 5 out 2022 | RFB | 466,781.88 USD |
| Laboratoire National du Batiment et des Travaux Publics (LNBTP) | 17 jiyè 2022 | DIR | 2,562,809.76 HTG |
| Laboratoire National du Batiment et des Travaux Publics (LNBTP) | 17 jiyè 2022 | DIR | 1,610,852.48 HTG |
| CECOM Consultants S. A. | 1 jiyè 2022 | QCBS | 2,744,000 HTG |
| CECOM Consultants S. A. | 1 jiyè 2022 | QCBS | 478,974 USD |
| Techniplan SRL | 1 jiyè 2022 | QCBS | Pa rapòte |
| Mahatma Construction et Assainissement | 31 me 2022 | RFB | 408,244.8 USD |
| DG-MAT Construction | 31 me 2022 | RFB | 456,927.4 USD |
| Gecotech | 19 janvye 2022 | RFB | 1,330,000 USD |
| Firme de Construction et de Service Agricole (Ficosa) | 28 desanm 2021 | RFB | 1,243,465.81 USD |
| M & L Construction | 28 desanm 2021 | RFB | 1,208,883.15 USD |
| SGR Construction | 28 desanm 2021 | RFB | 946,165 USD |
| Transport et Construction (T & C) | 28 desanm 2021 | RFB | 642,261.9 USD |
| BETA Ingénieurs-Conseils | 12 oktòb 2021 | CQS | 255,880.17 USD |
| CPCS Transcom Limited | 12 oktòb 2021 | CQS | Pa rapòte |
| Integrated Transport Planning (ITP) | 12 oktòb 2021 | CQS | Pa rapòte |
| Encotrans | 6 oktòb 2021 | RFB | 271,328 USD |
| BECAM | 6 oktòb 2021 | RFB | 99,370 USD |
| LICC Construction | 6 oktòb 2021 | RFB | 241,099.25 USD |
| Solution Energie | 4 out 2021 | RFQ | 35,700 USD |
| Sodeco S. A. | 3 out 2021 | RFB | 332,200 USD |
| GENIE Consult | 3 out 2021 | RFB | 394,051 USD |
| Etirha Construction | 3 out 2021 | RFB | 555,425 USD |
| Eccomar S. A. | 3 out 2021 | RFB | 1,240,264.4 USD |
| MULENG | 28 me 2021 | RFQ | 376,359.39 USD |
| United Nations Population Fund (UNFPA) | 28 me 2021 | DIR | 1,019,789 USD |
| M & L Construction | 14 me 2021 | RFQ | 384,465.54 USD |
| Mahatma Construction et Assainissement | 14 me 2021 | RFB | 472,489.74 USD |
| SOGEDCO | 14 me 2021 | RFB | 790,624.3 USD |
| Interloc | 14 me 2021 | RFQ | 349,862.6 USD |
| BUHTRAC | 5 me 2021 | RFQ | 670,975 USD |
| FB GROUP | 4 me 2021 | RFB | 963,550 USD |
| ENCAUSA | 4 me 2021 | RFB | 1,028,523.5 USD |
| Embellissement Plan Construction (EPC) | 4 me 2021 | RFB | 893,145 USD |
| Institut de Formation et de Services (IFOS) | 6 avril 2021 | CQS | 86,046.26 USD |
| Bureau D Etudes et D Exécution D Haiti, BEEH | 24 mas 2021 | RFB | 650,307 USD |
| AB Construction | 24 mas 2021 | RFB | 505,340 USD |
| Innociat-Construction | 24 mas 2021 | RFB | 543,952.78 USD |
| Gecotech | 24 mas 2021 | RFB | 594,000 USD |
| JEBA Better World Design Construction (JEBA) | 24 mas 2021 | RFB | 574,212 USD |
| GG-ETEX Construction | 24 mas 2021 | RFB | 574,218 USD |
| BECOS Plus | 24 mas 2021 | RFB | 653,560 USD |
| INES Ingenieros Consultores S. L | 30 novanm 2020 | CQS | 230,750 EUR |
| AB Construction | 11 novanm 2020 | RFB | 412,895 USD |
| Gecotech | 11 novanm 2020 | RFB | 338,250 USD |
| Laboratoire National du Batiment et des Travaux Publics (LNBTP) | 14 me 2020 | DIR | 1,922,107.32 HTG |
| Archigénie Plus | 27 avril 2020 | RFQ | 660,550 USD |
| Transport et Construction (T & C) | 27 avril 2020 | RFQ | 689,792.49 USD |
| GENIE Consult | 27 avril 2020 | RFQ | 227,065.5 USD |
| BECOS Plus | 27 avril 2020 | RFQ | 142,850 USD |
| AB Construction | 27 avril 2020 | RFQ | 164,500 USD |
| Interloc | 27 avril 2020 | RFQ | 339,829.4 USD |
| SOGEDCO | 20 janvye 2020 | RFQ | 208,002 USD |
| M & L Construction | 20 janvye 2020 | RFQ | 335,460.5 USD |
| Non an pa afiche | 15 janvye 2020 | INDV | 49,070 USD |
| United Nations Office Project Services (UNOPS) | 31 desanm 2019 | DIR | 15,932,700 USD |
| Hinoto S. A. | 20 desanm 2019 | RFQ | 29,600 USD |
| Ficcas (Firme Conseils Architecture de Construction et de Suoervision) | 6 novanm 2019 | RFQ | 6,123,600 HTG |
| Global Communities | 6 novanm 2019 | FBS | 3,795,000 USD |
| BETA Ingnieurs-Conseils | 6 novanm 2019 | QCBS | 11,776,335 HTG |
| Non an pa afiche | 6 novanm 2019 | QCBS | Pa rapòte |
| SETEC International | 31 oktòb 2019 | QCBS | 41,016.36 USD |
| SETEC International | 31 oktòb 2019 | QCBS | 112,348,069.39 HTG |
| BETA Ingénieurs-Conseils | 31 oktòb 2019 | QCBS | Pa rapòte |
| SOCIT d'ETUDE de Construction et d'Amnagement (SECA) | 18 septanm 2019 | RFQ | 22,150,085.5 HTG |
| BECAM | 11 septanm 2019 | RFQ | 217,954.35 USD |
| Transport et Construction (T & C) | 11 septanm 2019 | RFQ | 493,105.24 USD |
| Gecotech | 11 septanm 2019 | RFQ | 587,621.39 USD |
| MVF Plus Construction | 11 septanm 2019 | RFQ | 424,126.98 USD |
| LICC Construction | 11 septanm 2019 | RFQ | 455,335.88 USD |
| Non an pa afiche | 10 septanm 2019 | QCBS | 11,945,480 HTG |
| Matiere SAS | 28 mas 2019 | RFB | 379,072,794.82 HTG |
| Matiere SAS | 28 mas 2019 | RFB | 422,260,430.62 HTG |
| Eccomar S. A. | 28 mas 2019 | RFB | Pa rapòte |
| M & L Construction | 16 novanm 2018 | RFQ | 16,281,998 HTG |
| GENIE Consult | 16 novanm 2018 | RFQ | 14,425,950 HTG |
| Bureau d'Etudes et de Construction Moderne (Becomo) | 16 novanm 2018 | RFQ | 15,600,000 HTG |
Lajan ki pase bay lòt87 mouvman
| Benefisyè | Mouvman | Dat | Milyon dola ameriken |
|---|---|---|---|
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 janvye 2026 | −0.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 janvye 2026 | −0.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 janvye 2026 | −0.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2025 | −0.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2025 | −0.5 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Angajman | 31 me 2025 | −1.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Angajman | 31 me 2025 | −1.5 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Angajman | 31 me 2025 | −0.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2025 | 0.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2024 | 0.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 jiyè 2024 | 0.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2024 | 0.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 me 2024 | 1.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2024 | 0.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2024 | 1.2 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 29 fevriye 2024 | 0.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 29 fevriye 2024 | 0.6 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 janvye 2024 | 0.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2023 | 1.6 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2023 | 0.6 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2023 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2023 | 2.5 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 oktòb 2023 | 0.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 oktòb 2023 | 1.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2023 | 5.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2023 | 1.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2023 | −3.6 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2023 | −6.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2023 | −2.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2023 | 9.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 jiyè 2023 | 1.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2023 | 2.2 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2023 | 0.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 me 2023 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2023 | 0.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2023 | 0.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2023 | 0.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2023 | 1.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 28 fevriye 2023 | 2.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 28 fevriye 2023 | 1.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2022 | 0.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2022 | 1.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2022 | 0.2 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 oktòb 2022 | 0.2 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 oktòb 2022 | 2.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2022 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2022 | 0.2 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2022 | 2.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 jiyè 2022 | 0.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2022 | 2.5 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2022 | 1.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 me 2022 | 1.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 me 2022 | 0.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2022 | 1.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2022 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2022 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Angajman | 31 mas 2022 | 30.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2022 | 1.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 28 fevriye 2022 | 23.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 janvye 2022 | 4.6 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 janvye 2022 | 1.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2021 | 1.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2021 | 1.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2021 | 0.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2021 | 7.2 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 oktòb 2021 | 0.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2021 | 1.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 septanm 2021 | 1.3 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2021 | 2.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 jiyè 2021 | 5.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 jiyè 2021 | 1.7 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2021 | 2.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 jen 2021 | 1.8 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 me 2021 | 1.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 me 2021 | 2.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 avril 2021 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2021 | 1.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 mas 2021 | 1.4 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 28 fevriye 2021 | 2.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2020 | 0.9 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 desanm 2020 | 1.5 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 30 novanm 2020 | 1.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Angajman | 30 jen 2020 | 33.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 29 fevriye 2020 | 9.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 31 out 2019 | <0.1 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Dekèsman | 28 fevriye 2019 | 3.0 |
| Unite Centrale d' Execution of the Ministry of Public Works (UCE); Unite Technique d'Execution | Angajman | 31 me 2018 | 75.0 |
Idantifyan8 idantifyan
| Sistèm | Idantifyan | Sous |
|---|---|---|
| Idantifyan IATI | 44000-P163490 | IATI |
| Kredi oswa don IDA | IDAD3230 | IDA, eta kredi ak don |
| Kredi oswa don IDA | IDAD6690 | IDA, eta kredi ak don |
| Kredi oswa don IDA | IDAD9810 | IDA, eta kredi ak don |
| Prè Bank mondyal | IDA-D3230 | Pwojè Bank Mondyal |
| Prè Bank mondyal | IDA-D6690 | Pwojè Bank Mondyal |
| Prè Bank mondyal | IDA-D9810 | Pwojè Bank Mondyal |
| Pwojè Bank mondyal | P163490 | Fich operasyon an |
Kote sous yo pa dakò1 chan
| Chan | Sous | Valè | Itilize |
|---|---|---|---|
| Estati | Pwojè Bank Mondyal | Fèmen | ✓ |
| Estati | IATI | Aktif |
Dokiman patnè a108 dokiman
- Fich sou projects.worldbank.org, projects.worldbank.org
- Haiti - HT Rural Accessibility Resilience, 30 mas 2026, documents.worldbank.org
- Haiti - Rural Accessibility Resilience Project, 18 novanm 2025, documents.worldbank.org
- Disclosable Restructuring Paper - Haiti Rural Accessibility & Resilience Project - P163490, 29 me 2025, documents.worldbank.org
- Official Documents- Amendment to Financing Agreement for Grants D323-HT, D981-HT and D669-HT Ref. Cancellation.pdf, 29 me 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P163490 - Haiti Rural Accessibility & Resilience Project - Audited Financial Statement, 31 mas 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 26 mas 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P163490 - Haiti Rural Accessibility & Resilience Project - Audited Financial Statement, 18 mas 2025, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility & Resilience Project - P163490 - Sequence No : 13, 6 mas 2025, documents.worldbank.org
- Haiti - Projet d’Accessibilité Rurale et de Résilience (PARR) : Mission d’Appui à la Mise en Œuvre - 3 au 7 Février 2025, 7 fevriye 2025, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 19 desanm 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 2 desanm 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 26 novanm 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 4 septanm 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 20 out 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 12 out 2024, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility & Resilience Project - P163490 - Sequence No : 12, 18 jiyè 2024, documents.worldbank.org
- Haïti - Projet d’Accessibilité Rurale et de Résilience (PARR) : Mission de Supervision - 5 au 13 Juin 2024 , 13 jen 2024, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 11, 9 janvye 2024, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 6 septanm 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 29 out 2023, documents.worldbank.org
- The Rough Road to Services and Livelihood Opportunities in Rural Haiti and the Added Impact of Natural Disasters, 23 out 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P163490 - Haiti Rural Accessibility & Resilience Project - Audited Financial Statement, 21 out 2023, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 10, 22 jen 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P163490 - Haiti Rural Accessibility & Resilience Project - Audited Financial Statement, 25 mas 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 7 mas 2023, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 7 mas 2023, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 09, 22 desanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 7 desanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 7 desanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 19 septanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 2 septanm 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 27 jiyè 2022, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 08, 30 jen 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 20 jen 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 30 me 2022, documents.worldbank.org
- Official Documents- Second Amendment to the Original Financing Agreement for Grant D323-HT, 5 avril 2022, documents.worldbank.org
- Official Documents- Amendment to the First AF Financing Agreement Grant D669-HT, 5 avril 2022, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Second Additional Financing Grant D981-HT, 5 avril 2022, documents.worldbank.org
- Official Documents- Financing Agreement for Second Additional Financing Grant D981-HT, 5 avril 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 8 mas 2022, documents.worldbank.org
- Haiti - Rural Accessibility and Resilience Project : Additional Financing, 4 mas 2022, documents.worldbank.org
- Haiti - Rural Accessibility and Resilience Project : Additional Financing : Haïti - Projet d’Accessibilité et de Résilience Rurale d’Haïti : Financement Supplémentaire, 2 mas 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 24 janvye 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 18 janvye 2022, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 11 janvye 2022, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 07, 24 desanm 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 15 desanm 2021, documents.worldbank.org
- Nature-Based Solutions to Protect Transport Infrastructure Assets in Haiti – Guidance Note, 30 septanm 2021, documents.worldbank.org
- Solutions Fondees Sur La Nature Afain de Proteger Les Infrastructures de Transport en Haiti – Document D’Orientation , 30 septanm 2021, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 06, 24 septanm 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 6 septanm 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 6 septanm 2021, documents.worldbank.org
- Haiti - Rural Accessibility and Resilience Project : Environmental Assessment (Vol. 2 of 2) : Cadre de Gestion Environnementale et Sociale pour Composante d’Intervention d’Urgence, 1 septanm 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 30 jen 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN - P163490 - Haiti Rural Accessibility & Resilience Project - Audited Financial Statement, 11 jen 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 31 me 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 31 me 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 11 me 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 5 me 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 28 avril 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 19 avril 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 8 avril 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 30 mas 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 26 mas 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 12 mas 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 23 fevriye 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 5 fevriye 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 5 fevriye 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 27 janvye 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 19 janvye 2021, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 18 desanm 2020, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 05, 17 desanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 15 desanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 23 novanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 3 novanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 3 novanm 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 7 oktòb 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 7 jiyè 2020, documents.worldbank.org
- Official Documents- Financing Agreement (Additional Financing) for Grant No. D669-HT (Closing Package), 29 jen 2020, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Grant No. D669-HT (Additional Financing) (Closing Package), 29 jen 2020, documents.worldbank.org
- Official Documents- Amendment Letter on Reallocation of Grant Proceeds and Extension of Closing Date for Grant No. D323-HT, 29 jen 2020, documents.worldbank.org
- Minutes of a Virtual Meeting of the Executive Directors of the Bank and IDA and the Boards of Directors of IFC and MIGA on June 23, 2020, 23 jen 2020, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 04, 21 me 2020, documents.worldbank.org
- Haiti - Rural Accessibility and Resilience Project : Environmental Assessment (Vol. 1 of 2) : Cadre de Gestion Environnementale et Sociale, 1 avril 2020, documents.worldbank.org
- Haiti - Rural Accessibility and Resilience Project : Resettlement Plan : Cadre de Politique de Reinstallation, 1 avril 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 21 janvye 2020, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 21 janvye 2020, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 03, 1 novanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 30 oktòb 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 29 oktòb 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 24 oktòb 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 2 septanm 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 10 jiyè 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 9 jiyè 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 30 avril 2019, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 02, 22 avril 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 4 avril 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 12 mas 2019, documents.worldbank.org
- Haiti - LATIN AMERICA AND CARIBBEAN- P163490- Haiti Rural Accessibility and Resilience Project - Procurement Plan, 27 fevriye 2019, documents.worldbank.org
- Disclosable Version of the ISR - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 01, 24 oktòb 2018, documents.worldbank.org
- Official Documents- Disbursement and Financial Information Letter for Grant D323-HT (Closing Package), 6 jen 2018, documents.worldbank.org
- Official Documents- Financing Agreement for Grant D323-HT (Closing Package), 6 jen 2018, documents.worldbank.org
- Minutes of meeting of the Executive Directors of the Bank and IDA and the Boards of Directors of IFC and MIGA, of the Executive Directors of the Bank and IDA held on June 5, 2018 and record of approvals May 25 thru June 5, 5 jen 2018, documents.worldbank.org
- Haiti - Rural Accessibility and Resilience Project, 3 me 2018, documents.worldbank.org
- Project Information Document-Integrated Safeguards Data Sheet - Haiti Rural Accessibility Resilience Project - P163490, 6 avril 2018, documents.worldbank.org
- Concept Project Information Document-Integrated Safeguards Data Sheet - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 00, 2 oktòb 2017, documents.worldbank.org
- Concept Project Information Document-Integrated Safeguards Data Sheet - Haiti Rural Accessibility Resilience Project - P163490 - Sequence No : 00, 2 oktòb 2017, documents.worldbank.org
Avi apèl dòf (2)
- Contract Awards, projects.worldbank.org
- Procurement Notices, projects.worldbank.org
Sous
- Fich IATI (d-portal): kondisyon itilizasyon piblikatè a fikse
- IATI: kondisyon itilizasyon piblikatè a fikse
- Relve kredi ak don IDA (seri done): World Bank data, CC BY 4.0 (https://datacatalog.worldbank.org/public-licenses).
- Tranzaksyon: kondisyon itilizasyon piblikatè a fikse
- Fich operasyon an: kondisyon itilizasyon piblikatè a fikse
- Avi pasasyon mache Bank mondyal: kondisyon itilizasyon piblikatè a fikse
- Paj pwojè a, Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
- Dokiman Bank Mondyal: kondisyon itilizasyon piblikatè a fikse
Done jiska 18 oktòb 2026
| Sous | Li nan dat |
|---|---|
| IATI | 18 oktòb 2026 |
| IATI | 18 oktòb 2026 |
| IDA, eta kredi ak don | 18 oktòb 2026 |
| Avi pasasyon mache Bank mondyal | 18 oktòb 2026 |
| Pwojè Bank Mondyal | 18 oktòb 2026 |
| Dokiman Bank Mondyal | 18 oktòb 2026 |
Site paj sa a
HaitiDocs. Pwojè aksesibilite ak rezilyans riral an Ayiti. Pòtfolyo patnè yo, done jiska 18 oktòb 2026. https://www.haitidocs.org/portfolio/projects/WB%3AP163490?lang=ht