Appui à la réforme de l'éducation en Haïti V (HA-L1102): profil de projet
Resume — Profil de projet de la BID pour la cinquième opération de sa série d'appui à la réforme de l'éducation en Haïti.
Constats Cles
- The fifth operation in a series, so it records what four prior education operations left unfinished.
- Puts 2014 GDP per capita at US$824 in Haiti against about US$6,000 in Latin America.
- Records almost 60 percent of the population below the national poverty line and 28.9 percent in extreme poverty, against under 10 percent in Latin America.
- Notes the Gini coefficient at 0.6, the highest in Latin America, and almost 70 percent of the population under 30.
Description Complete
Profil de projet de la BID pour la cinquième opération de sa série d'appui à la réforme de l'éducation en Haïti. Sa section de justification rassemble les chiffres comparatifs sur lesquels la Banque a fondé son argumentaire, situant le revenu, la pauvreté et les inégalités haïtiens face aux moyennes latino-américaines, ce qui en fait un document utile au-delà de l'opération elle-même.
Texte Integral du Document
Texte extrait du document original pour l'indexation.
PUBLIC
DOCUMENT OF THE INTER-AMERICAN DEVELOPMENT BANK
HAITI
SUPPORT TO THE EDUCATION REFORM IN HAITI V
(HA-L1102)
PROJECT PROFILE
The project team consisting of prepared this document: Anne Sofie Westh Olsen (Team Leader),
Annelle Bellony and Christian Ubertini (EDU/CHA), Gregory Elacqua, Sabine Rieble-Aubourg,
Humberto Santos, Maria-Louisa Iribarren and Juanita Caycedo Duque (SCL/EDU), Kathryn
Britton (SCL/SCL), Marise Salnave Etienne and Lila Dhyana Mallory (FMP/CHA), Cristian
Santelices (CDH/CDH), Elizabeth Graybill Do Nascimento (VPS/ESG), Louis-François Chretien
(LEG/SCO), Maria Fernanda Garcia Rincon (ORP/PTR), Vladimir Mathieu (CDH/CHA).
Under the Access to Information Policy, this document is subject to Public Disclosure.
PROJECT PROFILE
HAITI
I. BASIC DATA
Project Name: Support to the Education Reform in Haiti V
Project Number: HA-L1102
Project Team: Anne Sofie Westh Olsen (Team Leader), Annelle Bellony and
Christian Ubertini (EDU/CHA), Gregory Elacqua, Sabine Rieble-
Aubourg, Humberto Santos, Maria-Louisa Iribarren and Juanita
Caycedo Duque (SCL/EDU), Kathryn Britton (SCL/SCL), Marise
Salnave Etienne and Lila Dhyana Mallory (FMP/CHA), Cristian
Santelices (CDH/CDH), Elizabeth Graybill Do Nascimento
(VPS/ESG), Louis-François Chretien (LEG/SCO), Maria Fernanda
Garcia Rincon (ORP/PTR), Vladimir Mathieu (CDH/CHA).
Borrower: Haiti (HA-HA)
Executing Agency: Ministry of Education and Professional Training (MENFP) and the
Ministry of Finance (MEF)
Financial Plan: IDB (IDB Grant Facility): US$ 28 Million
Local: US$ 250.000
Co-financing from Canada (TBC)
Total: US$ 28.250.000
Safeguards: Policies triggered: B.1 (OP-102), B.1 (OP-704), B.1 (OP-761),
B.2, B.3, B.4, B.5, B.6, B.7, B.10, B.11,
B.14, B.15 and B.17 of the Environmental
and Safeguard Compliance Policy.
Classification: B
II. GENERAL JUSTIFICATION AND OBJECTIVES
A. JUSTIFICATION
2.1 Human capital is one of the most important constraints to sustainable and
inclusive growth in Haiti. Haiti remains the poorest country in the Western
Hemisphere and also one of the most unequal countries in the world. In 2014,
GDP per capita was US$824 in Haiti versus $6,000 in Latin America. Almost
60% of the population lives below the national poverty line and 28.9% live in
extreme poverty (less than $2 a day) versus less than 10% in Latin America.
Access to basic services is limited, particularly in rural areas, with wealth and
economic opportunity concentrated around Port-au-Prince.1 This has translated
into low human development indicators; Haiti ranks 168th out of 187 countries in
the Human Development Index. The country’s young age structure - with almost
70 percent of its population under age 30 and half of the population under 20
years old – is one of Haiti’s main endowments. However, without universal
1
The national, consumption-based poverty line is US$1.98 per day, and the Gini coefficient is the highest
in Latin America at 0.6. (Investing in People to Fight Poverty in Haiti, World Bank 2014).
-2-
acquisition of basic literacy and numeracy, and a skilled and healthy labor force,
this is less likely to create real opportunities to improve the well-being of Haitian
citizens. In the coming years, the main challenge faced by the education system
is to maintain enrollment rates while improving the quality of primary education.
Increasing fiscal constraints and a deteriorating political environment only
magnify this challenge.
2.2 The overall education system lacks quality assurance and remains
inefficient. At all levels of education, the public sector plays a limited role in both
provision, quality assurance and regulation. Public supply of education is
insufficient to meet demand, and private providers have stepped in to fill the gap,
operating over 90 % of preschools and more than 80 % of primary schools. The
majority of families struggle to finance education costs, which represent 24% of
GDP per capita for primary schooling.2 At the same time, learning conditions are
generally deplorable and all providers operate with little oversight or
accountability for ensuring learning outcomes. The 2015 pre-pilot of a fourth
grade language and math assessment3 in both public and private schools found
that students are not learning enough in the classrooms: Scores were far below
the international average in all subject matters; for example only 20% of Haitian
students performed satisfactorily in mathematics comprehension and 50% in
reading, compared to international averages of, respectively, 70% and 90%4. The
system is characterized by students starting school late (2 years on average) and
with high repetition; for example 17% of children in public school repeat the 4th
grade. Therefore, overage is common; already in 1st grade, 47% of students are
overage and by 7th grade, 77% of students are overage. Furthermore, dropout is
the norm; while only 48% reach 6th grade, merely 21% reach 9th grade.
2.3 Education is a priority sector in the current Haiti Country Strategy 2011-
2015 (GN-2646). This operation is the fifth education operation financed by the
IDB after the 2010 earthquake as part of its US$250 million commitment to
support education reform in Haiti. The strategy underlines the Bank’s support to
the Government of Haiti (GoH’s) education reform and its goal of free education
for all. The operation is fully aligned with the IDB Country Strategy, currently in
effect, in which improved access to quality education is one of the priorities. The
operation is also consistent with the Sector Framework Document for Education
(GN-2708) as well as the Strategy on Social Policy for Equity and Productivity
(IDB, 2011). Furthermore, the proposed project will also support the cross-cutting
themes of transparency, accountability, and sustainability in governance, by
focusing on institutional strengthening and citizen engagement. By strengthening
the publicly funded education system, which disproportionally serves the poorest,
and by increasing access to quality education for children in disadvantaged
communities, the project will contribute to promote inclusive growth.
2.4 Improved donor coordination has led to geographical targeting. A dialogue
led by MENFP with all development partners is ongoing to align support
according to geographic areas in order to maximize impact of project activities
while providing more focused support to departmental offices. It is proposed that
2
Investing in People to Fight Poverty in Haiti, World Bank 2014
3
International Association for the Evaluation of Education Achievement: Haiti 2015 Pre-Pilot
Assessment.
4
International Association for the Evaluation of Education Achievement: Haiti 2015 Pre-Pilot
Assessment.
-3-
project activities would focus on a limited number of departments in Northern
Haiti (North, North-East and North-West), since IDB investments in the North and
North-East regions from 2011 to 2018 amount to 530 million USD, mainly around
the Caracol industrial Park, across all sectors. The proposed project will therefore
complement steps towards a comprehensive multi-sector approach for the
Northern region. The World Bank, on the other hand, will focus its interventions in
Southern Haiti. The 5,389 institutions and 748.937 students in the Northern
regions represent approximately 20% of Haiti’s preschool and primary schools
and students. It should also be noted that 20% of the extreme poor in Haiti are
concentrated in Northern Haiti, with extreme poverty exceeding 40% in the North-
East and Nord-West Departments (compared to 4.6% in metropolitan Port-au-
Prince, representing only 5% of the extreme poor in the country).5
B. PROJECT OBJECTIVES
2.5 The project will continue to reinforce the three pillars of access, quality and
governance of MENFP’s Operational Plan (OP) , and will also be aligned with the
forthcoming OP 2016-2020. The objective of the project is to improve access to
quality preschool and primary education. The specific objectives of the project
are to: (i) ensure access to quality education for the poor; (ii) improve learning
conditions in selected public and private primary schools; (iii) strengthen
governance, regulation and planning of the education sector. The project will
build on the results achieved and lessons learned under 2464/GR-HA, 2643/GR-
HA, 2863/GR-HA and 3355/GR-HA at the central level while further supporting
their implementation at the departmental level. The interventions will be focused
in the North of Haiti, and the project is designed to maximize synergies with
partner activities and would exploit opportunities to leverage other available co-
financing in providing continuity to the Haiti education portfolio.
2.6 Component 1: Improving access to quality education (US$15.000.000).
Through the development of a Quality Assurance System (QAS), MENFP will
implement and refine replicable models for supporting public and private schools
in providing free quality preschool and primary education to poor children. The
QAS will focus on measuring and strengthening the following dimensions in
schools: (i) infrastructure standards, (ii) school management, and (iii) student
learning. Instruments to measure school learning conditions based on existing
MENFP regulations (including infrastructure, water and sanitation, leadership,
pedagogy, and others) are being developed along with corresponding standards.
Furthermore, existing tools to assess student learning will be further improved in
order to form an integral part of the QAS, which will provide a means to
consistently track progress according to different indicators across schools in
Haiti, support schools in developing improvement plans, and measure results of
interventions in the sector. The QAS would also serve as the technical foundation
for a renewed school accreditation process. Finally, the role of parents and
community involvement in ensuring oversight will also be strengthened. The
comprehensiveness of support provided to each school would be substantially
increased in comparison with previous operations.
2.6.1 Sub-component 1.1: Public School Improvement Model (US$8.000.000).
This sub-component will help ensure quality preschool and primary education in
public schools. The school improvement model will be applied to selected public
5
World Bank, 2014. p. 2.
-4-
schools located in poor communities in Northern Haiti, including the 27 schools
constructed under previous IDB operations6. The project will expand the use of
the instruments to assess student learning as developed through the ongoing
operations (2643/GR-HA and 3355/GR-HA) in putting in place a broader Quality
Assurance System. The QAS will, among other objectives, encompass teacher
and director training, which is also supported in the Bank’s ongoing operations.
School improvement grants will also include dispositions for school health and
nutrition, according to national policies and building on operational experience
from 2863/GR-HA.
2.6.2 Sub-component 1.2: Results-based financing of non-public schools
(US$7.000.000). In areas where access to public schools is limited, the project
will support access to preschool and primary school, through a per-pupil subsidy,
in a select number of private schools located in poor areas of Northern Haiti.
Based on lessons learned from PSUGO and EPT7, this will be an improved
version of the tuition waiver program supported under all ongoing IDB operations
since 2011. The revised approach will represent a results-based model with an
emphasis on accountability and improvements in learning conditions and
outcomes. It would additionally include access to preschool as recommended in
the EPT process evaluation8. The project, in collaboration with other partners
such as the World Bank, would also support MENFP to develop a systemic
approach for a per-pupil funding formula for the most disadvantaged students in
Haiti. The model will focus on service delivery improvement in terms of learning
conditions and learning outcomes.
2.7 Component 2: Education sector management and planning
(US$10.000.000). This component will help strengthen the management
capability of MENFP at the local and central level based on an overall
modernization and restructuration plan for MENFP. The data produced under
previous operations, notably the school census and the school mapping, have
helped improve the oversight of the system. However, further efforts will be taken
to apply these instruments to improve governance. In particular, under the
proposed project, MENFP would strengthen school planning and oversight by
improving the data and information systems developed as part of the recent
school mapping9. First, the decentralized directions of MENFP, Departmental
Directorates of Education (DDEs), will be strengthened and restructured in order
to play a more important role in data collection and oversight mechanisms and
contribute to improving governance procedures at the central level. Second, the
project will contribute to finance a Ministry building in order to improve the
coordination mechanisms and working environment of the MENFP.
6
The World Bank, in its upcoming project, will also finance the same model in new schools constructed
with IDB financing in Southern Haiti
7
The GoH has financed tuition waivers to non-public providers through the donor-funded Education for
All (Education Pour Tous; EPT) program since 2007 and the Government-funded Universal, Free, and
Obligatory Education Program (Programme de Scolarisation Universelle Gratuite et Obligatoire;
PSUGO) since 2011. At their combined peak between 2011 and 2014, these two programs financed the
school fees of over 60 percent of all primary students in Haiti, with PSUGO representing about
7
20 percent of domestic public spending on education . As a result, the net primary enrollment rate has
risen from about 60 percent in the early 2000s to between 70 and 80 percent in 2012.
8
Process evaluation of tuition waiver program
9
Financed as part of 2464/GR-HA and 2643/GR-HA and available on the MENFP website
(www.menfp.gouv.ht/cartographie-scolaire.html)
-5-
2.7.1 Subcomponent 2.1: Strengthening the management ability of selected
Departmental Directorates of Education (US$5.000.000). To improve sectoral
governance and the quality of primary education service delivery and to support
the implementation of the Quality Assurance System, this component will finance
goods, training, and consultancies to carry out activities to modernize and
strengthen the technical capacity of MENFP’s key units at the decentralized
levels. Taking into consideration demographic data10 while building on the
information in the school mapping, DDE’s will help foster strategic roadmaps at
the school district level in order to ensure access to education for all children in
the long term.
2.7.2 Subcomponent 2.2: Financing of the new MENFP building (US$5.000.000).
This component will complete the financing needed for the construction of the
new building for Ministry of Education in Port-au-Prince. The former building fell
down during the earthquake and the Ministry has since then been functioning out
of containers. While support to the MENFP building was already planned in the
operations following the earthquake (2464/GR-HA, 2863/GR-HA and 3355/GR-
HA), the initially planned amount of US$ 4.6 million no longer corresponds to the
current needs and vision of MENFP. According to the revised project presented
and approved by MENFP in January 2016, the building now amounts to
US$ 11.5 million. Additional funds will be covered by ongoing operations.
2.8 Component 3: Project Management, Monitoring and Evaluation
(US$3.000.000). This component will finance the costs of implementing the
Project, as well as monitoring and evaluation costs. The component will finance
operating costs of the implementing agencies to an extent of USD 800.000.
Technical assistance will be provided to project implementation, to an amount of
USD 1.2 million. The project aims to produce measurable results in terms of both
ensuring access for beneficiary children and improving the learning conditions in
schools. As an integral part of the evaluation approach for the Project, this
component will also finance studies and data collection and impact evaluations.
III. TECHNICAL ISSUES AND SECTOR KNOWLEDGE
3.1 The project builds on lessons learned produced under previous projects
regarding access to and quality of primary education. The project will
continue strengthening achievements made in the sector, and builds on recent
data achieved under the school census (2013-2014), school mapping (2015) and
student assessments (2015 and 2016). For, example, the project introduces
access to preschool for poor and rural children, taking into consideration that a
limited number of poor rural children have access to preschool and fewer poor
rural children (86%) have access to primary school compared to non-poor urban
children (96%). As a consequence, poor rural children generally start school late.
Over 70 percent of poor, rural children from ages 10-14 are two or more years
over age for their grade, compared to 32 percent of their non-poor, urban
counterparts.11
3.2 An institutional assessment will be conducted in order to evaluate the most
appropriate execution mechanism. While UTE-MEF will execute the already
ongoing construction of the MENFP building, an assessment will determine the
10
Next Population Census in Haiti planned for 2017. The last Census dates back to 2000.
11
Investing in People. (World Bank, 2014)
-6-
mechanisms for implementing the SAQ as well as Planning aspects, analyzing
processes of EPT and UCP-MENFP.
IV. ENVIRONMENTAL SAFEGUARDS AND FIDUCIARY SCREENING
4.1 The program’s net social impact is expected to be positive, as communities
will benefit from increased access to quality education. The focus of the
program, and the majority of the financing (65%), is on strengthening the
capacity of the GoH to ensure access to quality preschool and primary education
for the most vulnerable children. However, approximately 15% of the program will
partially finance the construction of a new MENFP building in Port-au-Prince.
Therefore, according to the Bank’s safeguard screening process the Project is
classified as a “B”, given that the potential negative environmental, social and
health and safety (ESHS) impacts of the construction of the MENFP building are
expected to be of small to moderate magnitude, highly localized, and typical of
small to medium scale construction works. These impacts are fairly standard and
can be adequately mitigated with implementation of appropriate ESHS
management systems and procedures, and adequate supervision by the UTE.
V. RESOURCES AND TIMETABLE
5.1 The resources for project preparation amounts to 143.000 USD financed from
administrative and technical cooperation budgets. The proposal for Operational
Development (POD) will be distributed to the Quality and Risk Review (QRR) on
July 15th 2016 and the Draft Grant Proposal will be presented to the Operation
Policy Committee (OPC) on August 25th 2016. The presentation to the Board of
Executive Directors is planned for December 7th, 2016.
1
Annex I –HA-L1102
1
The information contained in this Annex is confidential and will not be disclosed. This is in accordance with the
"Deliberative Information" exception referred to in paragraph 4.1 (g) of the Access to Information Policy
(GN-1831-28) at the Inter-American Development Bank.
Annex II - HA-L1102
Page 1 of 8
Safeguard Policy Filter Report
Operation Information
Operation
HA-L1102 Support to the Education Reform
Environmental and Social Impact Category High Risk Rating
B High Risk
Country Executing Agency
HAITI {Not Set}
Organizational Unit IDB Sector/Subsector
Education PRIMARY EDUCATION
Team Leader ESG Lead Specialist
ANNE SOFIE WESTH OLSEN {Not Set}
Type of Operation Original IDB Amount % Disbursed
Loan Operation $0 0.000 %
Assessment Date Author
4 Apr 2016 ebrito ESG Specialist
Operation Cycle Stage Completion Date
ERM (Estimated) 25 Apr 2016
QRR (Estimated) 17 Jun 2016
Board Approval (Estimated) {Not Set}
Safeguard Performance Rating
{Not Set}
Rationale
{Not Set}
Safeguard Policy Items Identified
B.1 Bank Policies (Access to Information Policy±OP-102)
The Bank will make the relevant project documents available to the public.
B.1 Bank Policies (Disaster Risk Management Policy±OP-704)
The operation is in a geographical area exposed to natural hazards (Type 1 Disaster Risk Scenario). Climate
change may increase the frequency and/or intensity of some hazards.
Safeguard Policy Filter Report
Annex II - HA-L1102
Page 2 of 8
Safeguard Policy Filter Report
B.1 Bank Policies (Gender Equality Policy±OP-761)
The operation offers opportunities to promote gender equality or women's empowerment.
B.10. Hazardous Materials
The operation has the potential to impact the environment and occupational health and safety due to the
production, procurement, use, and/or disposal of hazardous material, including organic and inorganic toxic
substances, pesticides and persistent organic pollutants (POPs).
B.11. Pollution Prevention and Abatement
The operation has the potential to pollute the environment (e.g. air, soil, water, greenhouse gases).
B.14. Multiple Phase and Repeat Loans
The operation is a repeat or second phase loan.
B.15. Co-financing Operations
The operation or any of its components is being co-financed.
B.17. Procurement
Suitable safeguard provisions for the procurement of goods and services in Bank financed operation will be
incorporated into project-specific loan agreements, operating regulations and bidding documents, as
appropriate, to ensure environmentally responsible procurement.
B.2 Country Laws and Regulations
The operation is in compliance with laws and regulations of the country regarding specific women's rights,
the environment, gender and indigenous peoples (including national obligations established under ratified
multilateral environmental agreements).
B.3 Screening and Classification
The operation (including associated facilities) is screened and classified according to its potential
environmental impacts.
B.4 Other Risk Factors
The borrower/executing agency exhibits weak institutional capacity for managing environmental and social
issues.
B.5 Environmental Assessment Requirements
An environmental assessment is required.
B.6 Consultations
Consultations with affected parties will be performed equitably and inclusively with the views of all
stakeholders taken into account, including in particular: (a) equal participation by women and men, (b) socio-
culturally appropriate participation of indigenous peoples and (c) mechanisms for equitable participation by
vulnerable groups.
Safeguard Policy Filter Report
Annex II - HA-L1102
Page 3 of 8
Safeguard Policy Filter Report
B.7 Supervision and Compliance
The Bank will monitor the executing agency/borrower's compliance with all safeguard requirements
stipulated in the loan agreement and project operating or credit regulations.
Potential Safeguard Policy Items
[No potential issues identified]
Recommended Actions
Operation has triggered 1 or more Policy Directives; please refer to appropriate Directive(s).
Complete Project Classification Tool. Submit Safeguard Policy Filter Report, PP (or equivalent)
and Safeguard Screening Form to ESR.
Additional Comments
[No additional comments]
Safeguard Policy Filter Report
Annex II - HA-L1102
Page 4 of 8
Safeguard Screening Form
Operation Information
Operation
HA-L1102 Support to the Education Reform
Environmental and Social Impact Category High Risk Rating
B High Risk
Country Executing Agency
HAITI {Not Set}
Organizational Unit IDB Sector/Subsector
Education PRIMARY EDUCATION
Team Leader ESG Lead Specialist
ANNE SOFIE WESTH OLSEN {Not Set}
Type of Operation Original IDB Amount % Disbursed
Loan Operation $0 0.000 %
Assessment Date Author
4 Apr 2016 ebrito ESG Specialist
Operation Cycle Stage Completion Date
ERM (Estimated) 25 Apr 2016
QRR (Estimated) 17 Jun 2016
Board Approval (Estimated) {Not Set}
Safeguard Performance Rating
{Not Set}
Rationale
{Not Set}
Operation Classification Summary
Overriden Rating Overriden Justification
Comments
Safeguard Screening Form
Annex II - HA-L1102
Page 5 of 8
Safeguard Screening Form
Conditions / Recommendations
Category "B" operations require an environmental analysis (see Environment Policy Guideline:
Directive B.5 for Environmental Analysis requirements)
The Project Team must send to ESR the PP (or equivalent) containing the Environmental and
Social Strategy (the requirements for an ESS are described in the Environment Policy Guideline:
Directive B.3) as well as the Safeguard Policy Filter and Safeguard Screening Form Reports. These
operations will normally require an environmental and/or social impact analysis, according to, and
focusing on, the specific issues identified in the screening process, and an environmental and
social management plan (ESMP). However, these operations should also establish safeguard, or
monitoring requirements to address environmental and other risks (social, disaster, cultural, health
and safety etc.) where necessary.
Summary of Impacts / Risks and Potential Solutions
Generation of solid waste is moderate in volume, does not include hazardous materials and follows
standards recognized by multilateral development banks.
Solid Waste Management: The borrower should monitor and report on waste reduction,
management and disposal and may also need to develop a Waste Management Plan (which could
be included in the ESMP). Effort should be placed on reducing and re-cycling solid wastes.
Specifically (if applicable) in the case that national legislations have no provisions for the disposal
and destruction of hazardous materials, the applicable procedures established within the Rotterdam
Convention, the Stockholm Convention, the Basel Convention, the WHO List on Banned
Pesticides, and the Pollution Prevention and Abatement Handbook (PPAH), should be taken into
consideration.
Likely to have minor to moderate emission or discharges that would negatively affect ambient
environmental conditions.
Safeguard Screening Form
Annex II - HA-L1102
Page 6 of 8
Safeguard Screening Form
Management of Ambient Environmental Conditions: The borrower should be required to
prepare an action plan (and include it in the ESMP) that indicates how risks and impacts to ambient
environmental conditions can be managed and mitigated consistent with relevant national and/or
international standards. The borrower should (a) consider a number of factors, including the finite
assimilative capacity of the environment, existing and future land use, existing ambient conditions,
the project's proximity to ecologically sensitive or protected areas, and the potential for cumulative
impacts with uncertain and irreversible consequences; and (b) promote strategies that avoid or,
where avoidance is not feasible, minimize or reduce the release of pollutants, including strategies
that contribute to the improvement of ambient conditions when the project has the potential to
constitute a significant source of emissions in an already degraded area. The plan should be
subject to review by qualified independent experts. Depending on the financial product, this
information should be referenced in appropriate legal documentation (covenants, conditions of
disbursement, etc.).
Project construction activities are likely to lead to localized and temporary impacts (such as dust,
noise, traffic etc) that will affect local communities and workers but these are minor to moderate in
nature.
Construction: The borrower should demonstrate how the construction impacts will be mitigated.
Appropriate management plans and procedures should be incorporated into the ESMP. Review of
implementation as well as reporting on the plan should be part of the legal documentation
(covenants, conditions of disbursement, etc).
Safety issues associated with structural elements of the project (e.g. dams, public buildings etc), or
road transport activities (heavy vehicle movement, transport of hazardous materials, etc.) exist
which could result in moderate health and safety risks to local communities.
Address Community Health Risks: The borrower should be required to provide a plan for
managing risks which could be part of the ESMP; (including details of grievances and any
independent audits undertaken during the year). Compliance with the plan should be monitored and
reported. Requirements for independent audits should be considered if there are questions over
borrower commitment or potential outstanding community concerns.
The negative impacts from production, procurement and disposal of hazardous materials (excluding
POPs unacceptable under the Stockholm Convention or toxic pesticides) are minor and will comply
with relevant national legislation, IDB requirements on hazardous material and all applicable
International Standards.
Monitor hazardous materials use: The borrower should document risks relating to use of
hazardous materials and prepare a hazardous material management plan that indicates how
hazardous materials will be managed (and community risks mitigated). This plan could be part of
the ESMP.
The project is located in an area prone to hurricanes or other tropical storms and the likely severity
of the impacts to the project is moderate.
Safeguard Screening Form
Annex II - HA-L1102
Page 7 of 8
Safeguard Screening Form
A Disaster Risk Assessment, that includes a Disaster Risk Management Plan (DRMP), may be
necessary, depending on the complexity of the project and in cases where the vulnerability of a
specific project component may compromise the whole operation. The DRMP should propose
measures to manage or mitigate these risks to an acceptable level. The measures should consider
both the risks to the project, and the potential for the project itself to exacerbate risks to people and
the environment during construction and operation. The measures should include risk reduction
(siting and engineering options), disaster risk preparedness and response (contingency planning,
etc.), as well as financial protection (risk transfer, retention) for the project. They should also take
into account the country's disaster alert and prevention system, general design standards and other
related regulations.
The project is located in an area prone to earthquakes and the likely severity of impacts to the
project is moderate.
A Disaster Risk Assessment, that includes a Disaster Risk Management Plan (DRMP), may be
necessary, depending on the complexity of the project and in cases where the vulnerability of a
specific project component may compromise the whole operation. The DRMP should propose
measures to manage or mitigate these risks to an acceptable level. The measures should consider
both the risks to the project, and the potential for the project itself to exacerbate risks to people and
the environment during construction and operation. The measures should include risk reduction
(siting and engineering options), disaster risk preparedness and response (contingency planning,
etc.), as well as financial protection (risk transfer, retention) for the project. They should also take
into account the country's disaster alert and prevention system, general seismic design standards
and other related regulations.
Disaster Risk Summary
Disaster Risk Level
Moderate
Disaster / Recommendations
Safeguard Screening Form
Annex II - HA-L1102
Page 8 of 8
Safeguard Screening Form
The reports of the Safeguard Screening Form (i.e., of the Safeguards Policy Filter and the
Safeguard Classification) constitute the Disaster Risk Profile to be included in the Environmental
and Social Strategy (ESS). The Project Team must send the PP (or equivalent) containing the ESS
to the ESR.<br/ ><br/ >
The Borrower prepares a Disaster Risk Management Summary, based on pertinent information,
focusing on the specific moderate disaster and climate risks associated with the project and the
proposed risk management measures. Operations classified to involve moderate disaster risk do
not require a full Disaster Risk Assessment (see Directive A-2 of the DRM Policy OP-704).<br/
><br/ >
The Project Team examines and adopts the DRM summary. The team remits the project risk
reduction proposals from the DRMP to the engineering review by the sector expert or the
independent engineer during project analysis or due diligence, and the financial protection
proposals to the insurance review (if this is performed). The potential exacerbation of risks for the
environment and population and the proposed risk preparedness or mitigation measures are
included in the Environmental and Social Management Report (ESMR), and are reviewed by the
ESG expert or environmental consultant. The results of these analyses are reflected in the general
risk analysis for the project. Regarding the project implementation, monitoring and evaluation
phases, the project team identifies and supervises the DRM approaches being applied by the
project executing agency.<br/ ><br/ >
Climate change adaptation specialists in INE/CCS may be consulted for information regarding the
influence of climate change on existing and new natural hazard risks. If the project requires
modification or adjustments to increase its resilience to climate change, consider (i) the possibility
of classification as an adaptation project and (ii) additional financing options. Please consult the
INE/CCS adaptation group for guidance.
Disaster Summary
Details
The project is classified as moderate disaster risk because of the likely impact of at least one of the
natural hazards is average.
Actions
Operation has triggered 1 or more Policy Directives; please refer to appropriate Directive(s).
Complete Project Classification Tool. Submit Safeguard Policy Filter Report, PP (or equivalent) and
Safeguard Screening Form to ESR.
Safeguard Screening Form
Annex III- HA-L1102
Page 1 of 5
ENVIRONMENT AND SOCIAL SAFEGUARDS STRATEGY (ESS)
HA-L1102
I. PROJECT DESCRIPTION
1.1 This operation is the fifth education operation financed by IDB after the 2010 earthquake
as part of its US$250 million commitment to support education reform in Haiti. The
operation builds upon the achievements and lessons learned from previous projects,
aiming at continuing and consolidating the Bank’s experience in the sector while
responding to new realities and priorities of the Government of Haiti (GoH) six years
after the earthquake.
1.2 Specifically, this operation will finance mainly (65%) institutional strengthening and
education planning, management and quality assurance systems and activities of the
Ministry of Education and Professional Training (MENFP). However, approximately 15%
of the program will partially finance the construction of the new MENFP building in Port-
au-Prince (US$ 5.0 million)1. Given that the potential environmental and social impacts
of this component are likely to be localized in an urban area, and of small to moderate
magnitude and significance, the operation is classified as Category B.
1.3 The Project is structured around three (3) components, of which only the second
component includes construction works: Component 1: Improving access to quality
education (US$ 15.0 million): Support for the MENFP in establishing a Quality
Assurance System in schools based on: (i) achievement of infrastructure standards2,
(ii) better school management, and iii) improving student learning. In particular, a school
improved model will be applied to selected public and non-public schools located in poor
communities in Northern Haiti, including the 27 schools constructed under previous
operations3. In school districts lacking a public school, a short- to medium-term strategy
for ensuring access to education will be to support financing of non-public schools under
the same model. This model includes improved water and sanitation solutions that were
developed with support from an IDB consultant specifically hired for that purpose.4
Finally, the role of parents and community involvement in ensuring oversight will also be
introduced; Component 2: Education sector management and planning
(US$ 10.0 million): This component includes US$3.0 million for institutional
strengthening of selected Regional Directorates and US$5 million for the new building of
the MENFP. The decentralized directions of MENFP (Departmental Directorates of
Education – DDEs) will be reinforced and restructured as part of the project in order to
play a more important role in data collection and oversight mechanisms to feed into
improving governance procedures at the central level. MENFP will in particular
strengthen school planning through improving the data and information system and
1
The former building fell down during the earthquake and since then the Ministry has been functioning out of
containers. According to the revised project presented and approved by MENFP in January 2016, the building
amounts to US$ 11.5 million. The initial amount of US$ 4.6 million planned under the previous operations no
longer corresponds to the current needs and vision of MENFP. The additional funds required will be covered by
ongoing operations.
2
As a result of the work of an inter-ministerial commission, the MENFP approved new construction standards for
schools in 2013 and 2014 that are designed to be earthquake and hurricane resilient.
(http://menfp.gouv.ht/normes_en_matière_d_infrastructures.html),
3
The World Bank, in its upcoming project, will also finance the same model as those recently constructed IDB
schools in Southern Haiti.
4
This operation will finance minor improvements to the infrastructure needed for the functioning (operation) of the
schools, such as waste bins, planting of trees to reduce heat levels inside the schools, and other soft elements.
Annex III- HA-L1102
Page 2 of 5
management tools developed as part of the recent school mapping5; and
Component 3: Project Management, Monitoring and Evaluation (US$ 3.0 million): This
component will finance the costs of implementing the Project, as well as monitoring and
evaluation costs, including supervision of the Environmental and Social Management
Plan (ESMP) for construction of the MENFP. As an integral part of the evaluation
approach for the Project, this component will finance studies, data collection and
evaluations of all components. The component will also finance goods, rental space,
training and operating costs of the implementing agency.
1.4 The Executing Units (EU) for this operation will be the Ministry of Education’s Unité de
Coordination du Projet (UCP-MENFP), as well as Education Pour Tous (EPT), whereas
the infrastructure component will be managed by UTE (Unité Technique d’Exécution) of
the Ministry of Finance, which manages the latest operations (2863/GR-HA and
3355/GR-HA).
II. INSTITUTIONAL AND REGULATORY CONTEXT
2.1 The principal legislation on the Haitian legal framework for environmental management
is the National Decree on Environmental Management of October 12, 2005 (Décret sur
la Gestion de l’Environnement et de la Régulation de la Conduite des Citoyens et
Citoyennes pour un Développement Durable) that define the institutional framework and
the policy mechanisms and instruments for environmental management in the country,
including Environmental Impact Assessment (EIA) for all projects likely to have
environmental impacts, as well as public disclosure of its findings. The Decree
N 199/PRG/SGG/89 codifies requirements for conducting an EIA, but it is unclear
whether one will be required for building the MENFP infrastructure, as the decree does
not include a detailed categorization of subprojects that would require an EIA.
Nevertheless, to ensure compliance with Bank policies, the UTE will require an
Environmental Assessment (EA) and ESMP for the new MENFP building6, in
accordance with Operational Directive B.5 of OP-703 (Policy on Environment and
Safeguards Compliance).
2.2 The Haitian National Building Code (CNBH), issued in 2012 by the Ministry of Public
Works, is the reference for all construction in Haiti. The CNBH is based on the most
common norms, in order of importance: American norms (American Society of Civil
Engineers), Canadian norms and Eurocode. Also relevant to the operation is the Haitian
Work Code (Code du Travail) that establishes protections for construction workers.
2.3 The Project will also be compliant with applicable IDB environmental and social policies:
(i) OP-703: B.1 (Bank Policies) considering that the project will follow all
environmental and social Bank policies; B.2 (Country Laws), considering that the
Project will de designed to comply with Haitian local laws; B.3 (Screening and
Classification), taking into account that the Project was screened and classified
as Category B; B.4 (Other Risks), given that the Executing Agency has a specific
environmental unit for implementing the EA and supervision requirements for the
new MENFP building; B.5 (Environmental Assessment), by requesting an EA and
ESMP for the new MENFP building; B.6 (Consultations) considering that
consultations on the ESMP for the construction of the MENFP building will be
held with the surrounding communities prior to starting construction;
5
Financed as part of 2464/GR-HA and 2643/GR-HA and now available on the website MENFP
(www.menfp.gouv.ht/cartographie-scolaire.html)
6
The new3 MENFP building is the only component that involves medium scale construction activities.
Annex III- HA-L1102
Page 3 of 5
B.7 (Supervision and Compliance), with a designated environmental and social
specialist at the Executing Agency responsible for the supervision of the
construction activities (the UTE); B.10 (Hazardous Materials), given that the Bank
will require and enforce an ESMP for the construction of the MENFP building;
B.11 (Pollution Prevention and Abatement), though design and implementation of
specific ESMP for the construction, where all measures required to avoid or
reduce pollution will be specified; B.14 (Multiple Phases and Repeat Loans),
taking into account that any non-conformities within previous operations will be
addressed under the applicable operation, given that they are still being
executed; B.15, given that the portion that is co-financed does not require
environmental assessment processes; and B.17, given that suitable safeguards
provisions will be applied to the procurement of goods and services in the Bank’s
financed operations.
(ii) OP-704 - Disaster Risk Management Policy, through incorporation of the most
prevalent natural disasters risks (earthquakes, hurricanes, landslides, and
flooding) into the EA and ESMP of the MNFP building, adopting appropriate
mitigation measures in its design and construction. In addition, the Executing
Agency will, directly or through competent third parties, ensure it is designed to
withstand the prevalent natural risks and to be climate and energy efficient, to the
extent possible and practical.
(iii) OP-761- Operational Policy on Gender Equality in Development, by promoting,
as much as possible and practical, gender equality and the empowerment on
women through education, while also taking into account specific gender needs
of both men and women, and by disaggregating the project beneficiaries by sex.
(iv) OP-102 – Access to Information Policy, through ensuring that all project
documents are disclosed, in accordance with the Policy requirements.
III. ENVIRONMENTAL AND SOCIAL SETTING AND CONTEXT
3.1 This section highlights only those aspects that are most relevant to the operation. Haiti
occupies the western half of the island of Hispaniola, shared with its eastern neighbor,
the Dominican Republic. Port-au-Prince, the capital of Haiti, is home to approximately
39% of the country’s growing population of 9.8 million. Haiti has the highest hurricane
risk index of the small, developing island states. In 2008, Haiti was impacted by four
successive hurricanes. Haiti is also located in a seismically active zone, with major
earthquakes occurring in 1751, 1771, 1842, 1887, 1904, 1946, and most recently in
2010. Four fault lines capable of producing high magnitude shocks cross its territory.
The recurrence interval is estimated at 150-200 years, with the country’s capital and
biggest town, Port-au-Prince, situated directly on fault lines.
3.2 The MENFP building will be built in the urban area of Port-au-Prince, at the same
location of the old building, which was destroyed by the 2010 earthquake (Figure 1).
Annex III- HA-L1102
Page 4 of 5
Figure 1 - Image of the location of the MENFP where the new edification will be built.
IV. IMPACTS RISKS AND CONTROL MEASURES
4.1 Considering that the majority of the components of the operation will be of an
institutional nature, the principal environmental and social impacts will be largely
positive, mainly on better quality of education and increased access to school for poor
girls and boys.
4.2 Nevertheless, minor to moderate negative environmental, social impacts and health and
safety impacts will be associated with the construction of the new building for the
MENFP. In spite of being located in an urban area intensely occupied, the construction
of medium-size building (3 stories) will have the potential for some moderate impacts, in
particular: potential soil erosion; limited amounts of waste and hazardous wastes, such
as used oil and lubricants, leading to potential contamination of soil and surface and
groundwater; noise and dust affecting surrounding communities; risks of accidents due
to conflicts between pedestrian and vehicular traffics, including heavy load trucks; and
inadequate labour conditions, resulting in work-related accidents.
4.3 These impacts are fairly standard and can be adequately mitigated with implementation
by the construction contractor of appropriate environmental, social, and health and
safety (ESHS) management systems and procedures, and adequate supervision by the
UTE. Since the previous operation, the Bank is supporting the UTE’s Environmental and
Social Unit with an additional environmental and social specialist. In addition, the Bank
has retained an engineer to review geotechnical and seismic resistant structures for the
Bank-financed infrastructures.
V. ENVIRONMENTAL STRATEGY FOR ANALYSIS
5.1 The analysis of the proposed operation will focus on two principal elements: (i) gender
equality opportunities; and (ii) the new MENFP building. The specific activities will
include:
Annex III- HA-L1102
Page 5 of 5
(i) Identify opportunities to promote gender equality, together with an ESG Gender
Specialist.
(ii) Assess project compliance status with the applicable country
(national, provincial, municipal, local) environmental, social, and health and
safety regulatory requirements (e.g. laws, regulations, standards, permits,
authorizations, applicable international treaties/conventions, etc.), project-specific
legal requirements (e.g. concession contract, etc.), and any applicable Bank
environmental and social policy or guideline.
(iii) Prepare a Disaster Risk Assessment (DRA) and review the proposed project for
the MENFP building (if available during analysis mission) to confirm it complies
with local legislation and that the engineering designs adequately address the
risks related to natural disasters. If the DRA is not available, procedures will be
put in place for the Bank to review it prior to the Non Objection for bidding the
construction.
(iv) Review, to the extent it is available7, the EA and ESMP of the MENFP project, to
ensure adequate environmental and social mitigation measures and monitoring,
in terms of their completeness, sufficiency of detail, feasibility, cost, definition of
responsibility, schedule, and quality control. If the EA and ESMP are not
available during the analysis mission, procedures will be put in place for the Bank
to ensure that the UTE requires it and includes the ESMP as part of the bidding
documents for the construction of the building.8
(v) Define key performance ESHS indicators to verify performance of the
construction of the MENFP, and the gender equality opportunities.
(vi) Review the project-related information disclosure and public consultation
activities that have been performed in relation to the MENFP building9 and the
proposed engagement with the surrounding communities during the construction
phase.
(vii) Propose the ESHS procedures that must be incorporated into the Project’s Grant
Agreement as well as its Operational Manual to ensure proper implementation of
ESHS requirements, including monitoring/supervision for the MENFP building.
5.2 The results of the analysis will be consolidated in the Environmental and Social
Management Report (ESMR).
7
The construction of the MENFP building is part of the 2863/GR-HA. The current operation (HA-L1102) will only
complement the amount of resources needed.
8
Considering that the construction of the MENFP building is part of the 2863/GR-HA, and that the current
operation (HA-L1102) will only complement the amount of resources needed, the EA and ESMP were required
as part of the 2863/GR-HA. However, regardless of the operation number, the Bank will verify that the
construction will not be bided out without an EA and ESMP.
9
The disclosure and consultation activities might have been performed under the 2863/GR-HA. The Bank will
verify it.
Annex IV- HA-L1102
Page 1 of 3
INDEX OF COMPLETED AND PROPOSED SECTOR WORK
HA-L1102
Issues Description Dates IDBDOC#
National Evaluation of student learning Complete 40195852
40198298
40198390
Quality Assurance System tools Complete
40198292
40198294
Process Evaluation of tuition waiver program Complete 38864633
IDB post-earthquake education Program in Haiti: Mid-term
Complete 38877864
Evaluation Report.
Technical options and design Early childhood development Policy/ strategy. Complete 38890806
Analysis of situation of Early Childhood Complete 40195844
37845680
ICT proposals for MENFP’s Management Information System. Complete
38878090
School Mapping (terms of reference) http://menfp.gouv.ht/Cartographie-
Complete 40198411
scolaire.html
School planning and diagnostic of public school infrastructure. Preliminary study to
propose a methodology to elaborate pilot local school planning on selected
municipalities with the scope of reinforcing the MENFP at central and departmental September
40215733
levels as well as to assess the infrastructure needs, through the reinforcement of 2016
the engineering units at Departmental level, as complementary data for school
planning and database for future rehabilitation program (Terms of reference).
Analysis of cost and economic
viability Conduct required cost-benefit analysis of the project July 2016
Financial management/fiduciary Assessment of procurement capacity completed August 2016
1
Annex IV- HA-L1102
Page 2 of 3
Issues Description Dates IDBDOC#
issues and control environment
Fiduciary management capacity of DDE’s as well as MENFP and other executing September
agencies 2016
September
Parent Surveys and studies on school choice in Haiti (TC abstract).
2016
Pilot and improvement of QAS along with elaboration of baseline pilot. Beyond the
data provided through the Quality Assurance system, this is based on information
Data collection and analysis for provided via school survey, school mapping, phone surveys, inspectors’ reports September
HA-T1223
reporting on results and other data available combined with qualitative research and field visits. 7 2016
schools are situated in the Nord, 7 in Nord-Est and 13 in Nord-West; this presents a
total of 27 schools.
Baseline of non-public schools participating in the program. This is based on an
September
elaborated methodology including school mapping, EPT data and school results on 40215748
2016
national evaluations and exams (Draft)
Institutional diagnostic in terms of planning and school construction Complete 40195833
Evaluation of institutional capacity of Direction of Administrative Affairs (DAA) Complete 40195833
Audit of Human Resources Direction (DRH) at the central and local level Complete 40196061
Institutional analysis/personnel,
procedures other aspects of Management manual for Departmental Directions (DDE) Complete 40198284
implementation capacity
Capacity building and local governance in the education sector (UNICEF) Complete 40198265
Assessment of technical and institutional capacity in selected DDE’s, including their
connected Zone Inspection Offices (BIZ) and School District Offices (BDS). This
June 2016
would include an assessment of EFACAPs and school network assessment around
selected public schools
Various studies will be required prior to implementing reorganizations in several
important sectors: 1) Ministry’s staffing as well as budget preparation, especially in September
DDE’s, 2) organizational protocol (Manuals and procedures) and 3) organizational 2016
structures of the Ministry’s Headquarters and 10 deconcentrated directions
Social and environmental Social and Environmental Strategy developed by ESG as part of project preparation June 2016 40215765
Annex IV- HA-L1102
Page 3 of 3
Issues Description Dates IDBDOC#
safeguards
Haitian Education Plan 2010-2015 Complete 37093635
Other key issues, such as
donors, gender, Priority Intervention Plan for Education (PIPE) 2013 - 2016; an
sustainability, updated Plan Operationnel for the education sector that was prepared by Global Complete 38878060
country/sector issues Partnership for Education and MENPF
Evaluation of implementation of the Operational Plan (2010-2015) Complete 40195913
3
1
Annex V – HA-L1102
1
The information contained in this Annex is confidential and will not be disclosed. This is in accordance with the
"Deliberative Information" exception referred to in paragraph 4.1 (g) of the Access to Information Policy
(GN-1831-28) at the Inter-American Development Bank.