(2012) Evalyasyon Enpak Akimile pou Devlopman Rejyonal nan Koridò Urban Cap-Haïtien rive nan Ouanaminthe
Rezime — Evalyasyon konplè sa a analize enpak anviwonmantal ak devlopman akimile gwo pwojè yo nan koridò Cap-Haïtien rive Ouanaminthe nan nò Ayiti a. Etid la egzamine sistèm anviwonmantal ki gen valè yo, danje natirèl yo, bezwen enfrastrikti ak estrateji jesyon pou devlopman rejyonal dirab.
Dekouve Enpotan
- Sis Sistèm Anviwonmantal ki gen Valè yo idantifye kòm enpòtan pou devlopman dirab: sistèm estiwaryen/kòt/marin yo, resous dlo yo, basen dlo mòn yo, kalite lè a, tè/agrikilti, ak zòn kiltirèl yo.
- Popilasyon an pwojekte pou l ogmante anpil nan 2030 anba senaryo referans ak gwo kwasans yo, ki mande envestisman gwo nan enfrastrikti.
- Danje natirèl yo kreye risk enpòtan tankou tranblemanntè, inondasyon, sechrès, ak glise tè, ak chanjman klimatik yo ki ta dwe vin pi mal.
- Gwo demand resous yo idantifye pou transpò, aprovizyon dlo, asènisman, jesyon fatra solid, ak enfrastrikti enèji.
- Enpak akimile yo sou sistèm anviwonmantal yo mande apwòch jesyon entegre ak pwogram sivèy konplè yo.
Deskripsyon Konple
Evalyasyon enpak akimile sa a egzamine efe anviwonmantal ak sosyo-ekonomik ki ka gen nan devlopman rejyonal nan koridò Cap-Haïtien rive Ouanaminthe nan nò Ayiti a. Etid la te fèt pa yon ekip miltidisiplinè epi li konsantre sou sis Sistèm Anviwonmantal ki gen Valè (SAV) yo ki gen ladan sistèm estiwaryen/kòt/marin yo, resous dlo yo, basen dlo mòn yo, kalite lè a, tè ak zòn agrikòl yo, ak zòn ki gen valè kiltirèl yo.
Evalyasyon an analize karakteristik demografik yo kounye a epi li pwojekte senaryo kwasans popilasyon yo rive nan 2030, li egzamine senaryo referans ak senaryo gwo kwasans yo tou. Li evalye danje natirèl yo tankou tranblemanntè, inondasyon, sechrès, glise tè, ak enpak chanjman klimatik yo, pandan l ap evalye kapasite devlopman tè nan rejyon an.
Etid la egzamine demand resous nan sektè yo tankou enfrastrikti transpò, aprovizyon dlo, jesyon asènisman ak dlo sal yo, pwoduksyon fatra solid, ak konsomasyon enèji. Li idantifye enpak akimile yo sou chak sistèm anviwonmantal ki gen valè epi li bay estrateji jesyon ak endikatè swivi yo.
Rapò a fini ak estrikti jesyon yo ki pwopozè ak estrateji konplè yo pou chak sistèm anviwonmantal, mezi pou diminye katstròf yo, ak politik ekonomik yo pou ankouraje aplikasyon dirab pwojè devlopman yo nan koridò a.
Teks Konple Dokiman an
Teks ki soti nan dokiman orijinal la pou endeksasyon.
CUMULATIVE IMPACT ASSESSMENT FOR REGIONAL DEVELOPMENT IN THE
CAP-HAÏTIEN TO OUANAM INTHE URBAN CORRIDOR
FINAL DRAFT
Linda Shi, Alex Bellande, Juan Pablo Bocarejo, Veronique Dorner, Erica Gees, Fritz A.
Jean, Glenn Smucker, Beatriz del Cueto, Agamemnon G. Pantel, Jeff Allen, Kimberly
Miller, Bruce Laird, Michele Adams, Altje Hoekstra, Kate Evasic, Molly Julian, Mike
Hickman, Drury MacKenzie and Scott Sklar
August 26, 2012
CONFIDENTIAL
AIA Legacy
American Institute of Architects
Inter-American Development Bank
ATN/OC-12751-HA
Team Leader - Arcindo Santos
USAID / OTI
Project Coordinator - Nicole Widdershiem
TABLE OF CONTENTS
EXECUTIVE SUMMARY .............................................................................................................................. 1
I. GOALS AND OBJECTIVES ....................................................................................................................... 8
II. SCOPE ...................................................................................................................................................... 8
III. PROCESS AND METHODOLOGY ......................................................................................................... 9
PART 1: PERSPECTIVES DE DEVELOPPEM ENT ÉCONOMIQUE DU NORD ...................................... 11
1.1 Contexte ........................................................................................................................................ 11
1.2 Situation Actuelle de la Région ..................................................................................................... 12
1.3 Les Grands Projets Déclencheurs du Nord et Leurs Effets Induits .............................................. 14
PART 2. DEMOGRAPHIC CH ARACTERISTICS AND DEVELOP MENT SCENARIOS .......................... 24
2.1 Current Population Estimates ....................................................................................................... 24
2.2 Socio-Economic Characteristics ................................................................................................... 26
2.3 Employment Generation ............................................................................................................... 28
2.4 Projected Population ..................................................................................................................... 28
PART 3: VALUED ENVIRONMENTAL SYSTEMS.................................................................................... 31
3.1 VES 1: Estuarine, Coastal and Marine Systems .......................................................................... 32
3.2 VES 2: Surface and Ground Water Resources ............................................................................ 34
3.3 VES 3: Highland Watershed and Riparian Habitat ....................................................................... 37
3.4 VES 4: Air Quality ......................................................................................................................... 39
3.5 VES 5: Soils and Agriculturally Valuable Areas ............................................................................ 40
3.6 VES 6: Culturally Valuable Areas ................................................................................................. 42
PART 4: LAND USE CONSIDERATIONS ................................................................................................. 44
4.1 Natural Hazards and Risks ........................................................................................................... 44
4.1.1 Earthquakes, Tsunamis and Liquefaction Risks ................................................................. 44
4.1.2 Flood Risks .......................................................................................................................... 47
4.1.3 Drought Risks ...................................................................................................................... 49
4.1.4 Landslides, Mud Flows and Erosion Risks .......................................................................... 51
4.1.5 Projected Climate Change Impacts ..................................................................................... 51
4.1.6 Integrated Map of Natural Hazard Risks ............................................................................. 52
4.1.7 Map of Land Development Suitability .................................................................................. 53
4.2 Land Consumption Requirements ................................................................................................ 55
PART 5. SECTORAL RESOURCE DEMANDS AND IMPACTS .............................................................. 59
5.1 Transportation Infrastructure......................................................................................................... 59
5.2 Water Supply ................................................................................................................................ 63
5.3 Sanitation, Wastewater and Stormwater ...................................................................................... 66
5.4 Solid Waste Generation ................................................................................................................ 70
5.5 Energy Consumption .................................................................................................................... 78
PART 6: CUMULATIVE IMPACT ASSESSMENT ..................................................................................... 82
6.1 VES 1: Estuarine, Coastal and Marine Systems .......................................................................... 82
6.2 VES 2: Surface and Ground Water Resources ............................................................................ 83
6.3 VES 3: Highland Watershed and Riparian Habitat ....................................................................... 84
6.4 VES 4: Air Quality ......................................................................................................................... 86
6.5 VES 5: Soils and Agricultural Valuable Areas .............................................................................. 86
6.6 VES 6: Culturally Valuable Areas ................................................................................................. 87
6.7 Matrix of Impacts and Table of Monitoring Indicators ................................................................... 87
PART 7: PROPOSED MANAGEMENT STRUCTURES AND ST RATEGIES ........................................... 92
7.1 Proposed Management Structures ............................................................................................... 93
7.2 Management Strategies for VES 1: Estuarine, Coastal and Marine Systems .............................. 98
7.3 Management Strategies for VES 2: Surface and Ground Water Resources ................................ 99
7.4 Management Strategies for VES 3: Highland Watersheds and Riparian Systems .................... 101
7.5 Management Strategies for VES 4: Air Quality........................................................................... 101
7.6 Management Strategies for VES 5: Soils and Agriculturally Valuable Areas ............................. 102
7.7 Management Strategies for VES 6: Culturally Valuable Areas ................................................... 103
7.8 Disaster Mitigation and Response .............................................................................................. 105
7.9 Economic Policies to Promote Implementation .......................................................................... 105
Annex 1: Summary Analysis of Governance Issues ................................................................................. 116
Annex 2: Actions Prioritaires pour une Intensification de la Production Agricole et pour la
Conservation des Sols et des Eaux .......................................................................................................... 120
Annex 3: Proposed Transportation Plan ................................................................................................... 123
Annex 4: Flood and Stormwater Management Recommendations .......................................................... 127
Annex 5: Water Supply Recommendations .............................................................................................. 131
Annex 6: Sanitation and Wastewater Recommendations ......................................................................... 133
Annex 7: Solid Waste Recommendations ................................................................................................. 135
Annex 8: Recommendations to Extend Access to Energy and Electricity ................................................ 140
Annex 9: Puerto Rico: Case Study for Cultural Patrimony Management ................................................. 142
BIBLIOGRAPHY ....................................................................................................................................... 143
LIST OF TABLES
Table 1 Département du Nord-Est Budget Consolidé 2009-2010 .............................................................. 12
Table 2 Recettes Douanières 2010-2011 en Gds ...................................................................................... 14
Table 3 Summary of Major Projects in the Region ..................................................................................... 17
Table 4 Les Communes du Couloir et les Activités Economiques Induites ................................................ 22
Table 5 Tailles des Ménages Urbains (non-Metropolitaine) en 2007 ......................................................... 24
Table 6 Estimated Population in the Corridor in 2009 by Département ..................................................... 25
Table 7 Estimated Population in the Corridor in 2009 by Commune .......................................................... 25
Table 8 Total Population in Cap-Haïtien - Ouanaminthe Corridor in 2009 ................................................. 26
Table 9 Caracol Income Profile ................................................................................................................... 27
Table 10 Limonade Income Profile ............................................................................................................. 27
Table 11 Income Profile of Agricultural and Commercial Activities ............................................................ 27
Table 12 National Urban Average Monthly Income en Gds ....................................................................... 28
Table 13 Baseline Scenario Population and Household Growth ................................................................ 30
Table 14 Number of Households in Baseline and High Growth Scenarios ................................................ 30
Table 15 Nord-Est Towns' Degree of Risk to Five Major Natural Hazards ................................................. 52
Table 16 Direction of Growth by Town ........................................................................................................ 53
Table 17 Land Requirements in 2030 under Baseline Scenario ................................................................ 57
Table 18 Land Requirements in 2030 under High Growth Scenarios ........................................................ 57
Table 19 Comparison of Current and Future Land Availability by City ....................................................... 58
Table 20 Projected Future Access to and Demand for Municipal Water .................................................... 65
Table 21 Access to Sanitation in the Corridor ............................................................................................. 68
Table 22 Projected Sanitation Access and Wastewater Generation .......................................................... 69
Table 23 Composition of Municipal Waste in the Region ........................................................................... 71
Table 24 Solid Waste Disposal Strategies in Cap-Haïtien and Surrounding Areas ................................... 72
Table 25 Current and Future Municipal Waste Generation (Baseline Scenario) ........................................ 75
Table 26 Current and Future Total Waste Generation (Baseline Scenario) ............................................... 75
Table 27 Current and Future Municipal Waste Generation (High Growth Scenario) ................................. 76
Table 28 Current and Future Total Waste Generation (High Growth Scenario) ......................................... 76
Table 29 Estimated Air Pollution Generated by Open Burning ................................................................... 77
Table 30 Projected Household Energy Sources ......................................................................................... 79
Table 31 Projected Household Charcoal Consumption .............................................................................. 80
Table 32 Irrigation Needs ............................................................................................................................ 85
Table 33 Matrix of Cumulative Impacts on the Environment (High Growth Scenario without Mitigation) .. 88
Table 34 List of Proposed Key Monitoring and Evaluations Indicators ...................................................... 89
Table 35 Cumulative Environmental Impacts and Mitigation Strategies by VES ..................................... 109
Table 36 Les Programmes du Plan de Transport ..................................................................................... 123
LIST OF FIGURES
Figure 1 General Extent of Urban Corridor of Study ..................................................................................... 9
Figure 2 Map of Existing and Potential Major Investments in the Region .................................................. 16
Figure 3 Population Pyramid for Le Nord and Nord-Est (2005-2006) ........................................................ 25
Figure 4 Growth of Urban Population along the Project Corridor (2009-2030) .......................................... 29
Figure 5 Population Projection Growth Rates in Baseline and High Growth Scenarios ............................. 29
Figure 6 Map of Caribbean Islands Biodiversity Hotspot ............................................................................ 31
Figure 7 Boundaries of the Former Sisal Plantations in the Region (as of 1960) ....................................... 33
Figure 8 Map of the Proposed Parc de Trois Baie ...................................................................................... 34
Figure 9 Rainfall Zones in the Region ......................................................................................................... 35
Figure 10 Water Resources in Le Nord and Nord-Est .............................................................................. 35
Figure 11 Map of the Corridor's Watersheds, Rivers and Lakes ................................................................ 37
Figure 12 Geology of the Region ................................................................................................................ 38
Figure 13 Regional Stream Sediment Sampling Results for Copper ......................................................... 39
Figure 14 Map of Corridor's Soil Potential .................................................................................................. 41
Figure 15 Regional Map of Cultural and Natural Heritage Sites ................................................................. 42
Figure 16 Map of Coastal Septentrional Fault ............................................................................................ 44
Figure 17 Map of Inland Earthquake Faults and Seismic Risk ................................................................... 45
Figure 18 Map of Tsunami Risk in the Region ............................................................................................ 46
Figure 19 Map of Liquefaction Risk in the Region ...................................................................................... 46
Figure 20 Map of Cyclone Paths and Risks ................................................................................................ 47
Figure 21 Map of Maximum Likelihood of Return of 50-Year Hurricanes ................................................... 47
Figure 22 Map of Regional Flood Risk (CNIGS) ......................................................................................... 48
Figure 23 Map of Regional Flood Risk (NATHAT) ...................................................................................... 48
Figure 24 Map of Regional Drought Risk .................................................................................................... 50
Figure 25 Map of Region’s Landslide and Mudflow Risks .......................................................................... 51
Figure 26 Integrated Map of the Region’s Natural Hazard Risks ............................................................... 52
Figure 27 Overlay Map of Best Agricultural Soils and the Parc de 3 Baies ................................................ 54
Figure 28 Overlay Map of Natural Hazard Risks, Best Agricultural Soils and the Parc de 3 Baies ........... 54
Figure 29 Regional Map of Areas Unsuitable for Construction ................................................................... 55
Figure 30 Bathymetry of the Baie de Fort Liberté ....................................................................................... 60
Figure 31 - Distribution Modale des Déplacements Régionaux .................................................................. 61
Figure 32 Access to Drinking Water in Corridor (2005-2006) ..................................................................... 64
Figure 33 Access to Non-Drinking Water in the Corridor (2005-2006) ....................................................... 64
Figure 34 Access to Sanitation in the Corridor (2005-2006) ....................................................................... 67
Figure 35 Likely Open Dumps as Identified in Aerial Photos ...................................................................... 73
Figure 36 National Household Energy Consumption (2003) ...................................................................... 78
Figure 37 Household Energy Sources for Le Nord and Nord-Est ............................................................... 78
Figure 38 Drawing of Mountain Road Section .......................................................................................... 128
Figure 39 Drawing of Highway Section ..........................................................................................
........... 128
Figure 40 Drawing of Town Gateway Section ........................................................................................... 129
Figure 41 Drawing of Urban Street Section .............................................................................................. 129
Figure 42 New Development Street Section ............................................................................................. 129
Figure 43 Drawing of On-Site Water Management ................................................................................... 130
ACRONYMS
AIA American Institute of Architects
ANAP National Agency for Protected Areas
CBC Caribbean Biological Corridor
CIA Cumulative Impact Assessment
CIAT Comité Interministériel d’Aménagement du Territoire
CNIGS Centre National de L’Information Géo-Spatiale
CODEVI Free Trade Zone in Ouanaminthe
DALYs Disability-Adjusted Life Year
DINEPA Direction Nationale de l'Eau Potable et de l'Assainissement
EEEI Enquete de Emploi et Economie Informelle
EDH Électricité d’Haïti
EKAM USAID-funded hou sing site in Caracol
EMMUS-IV Enquete de Mortalite, Morbidite, et Utilisation des Services (2005-2006)
EPA Environmental Prot ection Agency (U.S.)
GAFSP Global Agriculture and Food Security Program
FAO UN Food and Agriculture Organization
FTFCN Feed the Future for the Corridor of Northern Haiti
GEF Global Environment Facility
GOH Government of Haiti
IDB Inter-American Development Bank
LICs Low-Income Countries
LACs Latin American Countries
MARNDR Ministère de l’Agriculture, des Ressources Naturelles et du Développement Rural
MDE Ministère de L’Environnement
MICT Ministère de l'Intérieur et des Collectivités Territoriales
MPCE Ministère de la Planification et de la Coopération Externe
MTPTC Ministère des Travaux Publiques, Transports, Énergie et Communications
NATHAT Analysis of Multiple Natural Hazards in Haiti Report
NGO Non-governmental organization
PAE Plans d’Aménagement et d’Extension
PAP Port-au-Prince
PAR Plan d’Aménagement Régional
PIC Parc Industriel de Caracol
PMDN Programme de Mitigation des Desastres Natureles
SAE-A South Korean Textile Company
TOR Terms of Reference
UE Union Européenne
UNDP United Nations Development Programme
UNEP United Nations Environment Programme
UNICEF United Nations Children's Fund
URHC Université Roi Henry Christophe
USAID United States Agency for International Development
USG U.S. Government
VES Valued environmental systems
WHO World Health Organization
1
EXECUTIVE SUMMARY
In an effort to strengthen northern Haiti as a development zone, the Government of Haiti, together with
international agencies and donor countries, has made or will make significant investments along the
northern coastline from the city of Cap-Haïtien to Ouanaminthe. As detailed in Part 1 of the report on the
economic drivers of the region’s growth (see Table 3), the most important – and potentially controversial –
of these include the Parc Industrial de Caracol (PIC), a port, exploratory mines and 5,000 units of
housing, as well as a new 10,000-student university, an upgraded highway, ongoing solid waste, water
and sanitation master plans and investments, and regional agricultural programs. In trying to improve
local incomes and well being, some major projects may nevertheless endanger the region’s sensitive and
unique ecological, historical and agricultural resources and undermine development gains.
Consequently, the GOH, IDB and USAID have asked the American Institute of Architects (AIA) to develop
a Regional Management Plan (PAR) for the Cap-Haïtien to Ouanaminthe urban corridor and Local
Growth Plans (PAEs) for eight towns along National Route 6 (not including Cap-Haïtien or Ouanaminthe)
to help anticipate development needs and mitigate potential environmental and social impacts. As part of
this planning process, the AIA has been asked to develop a cumulative environmental impact assessment
(CIA) to examine the synergies and interactions of these impacts on the region expected from the
economic growth. The goal of the CIA is to inform AIA’s regional and local plans by identifying: cumulative
impacts and interactions of existing and proposed developments, mitigation measures to control, reduce
or avoid such impacts, and management strategies to guide future development in favor of sustainable
outcomes.
To help assess future impacts, the CIA created two development scenarios, elaborated in Part 2 of the
report. The baseline scenario envisions slowing rates of urbanization, with overall urban population rising
by 55% to 599,000 in 2030 (64% of residents in metropolitan Cap-Haïtien and 13% in the towns closest to
the PIC). The high-growth scenario projects elevated rates of urbanization, particularly in the small towns
around the PIC with low existing populations. The high-growth scenario results in populations rising by
115% from 2009 levels, totaling 832,000 by 2030, or a 39% surge above the overall baseline condition
and a 70% increase from the baseline population in the towns closest to the PIC. As these projections
and the sectoral resource demand calculations are not exact, they can only serve to convey the order of
magnitude of future impacts.
Future impacts presented by economic and population growth are evaluated in light of six major valued
environmental systems (VES), presented in Part 3 of the report:
1. Estuarine, Coastal and Marine Resources
2. Surface and Ground Water Resources
3. Highland Watersheds and Riparian Forests
4. Air Quality
5. Soils and Agriculturally Valuable Areas
6. Culturally Valuable Areas
The CIA examines the region’s land use issues in Part 4, including the natural hazard risks, future land
use demands and their spatial implications. Additional physical infrastructure needs to support demands
for transport, water and energy and to manage waste stream creation in terms of air pollution, wastewater
and solid waste are elaborated in Part 5. The cumulative impact assessment and proposed monitoring
indicators are presented in Part 6, and management strategies are summarized in Part 7 of the report and
in the Annexes.
Two comments should be made upfront. First, any assessment of development impacts must recognize
that many of the region’s natural resources are already degraded and that environmental management is
almost entirely absent. Most of the 387,000 residents living in the corridor’s towns and cities lack water,
sanitation, wastewater treatment, affordable energy besides charcoal, and solid waste collection and
disposal systems. As a result, they impose considerable pressures on the region’s resource base.
Present and historic settlements have led to the destruction of mangroves and native forests all along the
coast; overfishing; surface water contamination; significant forest clearance that has left little remaining
natural habitat; rivers clogged with solid and liquid waste; and litter conveyed by rivers and streams to
estuaries and marine environments.
2
Second, demographic pressure on the region will lead to significant urban population growth. Even
without the major investments such as the PIC and the port, the region’s population will increase by
213,000 people by 2030, adding to existing unmet needs for environmental resources and management.
Under any scenario – no growth, natural increase or high growth – immense investments in infrastructure,
human resources and management and governance capacity are needed in the region to transform the
current “vicious” cycle of poverty and environmental degradation into a cycle where human well-being and
ecological sustainability are mutually reinforcing.
The following sections summarize the significant environmental concerns for the six major valued
environmental systems (VES) due to continued urbanization in the Cap-Haïtien-Ouanaminthe corridor,
together with proposed management strategies.
* * * * *
1. Estuarine, Coastal and Marine Resources
The PIC and surrounding urban communities will significantly elevate pollutant loading in the Baie
of Caracol. In the past, the Baie of Caracol was relatively isolated due to the small size of upstream
communities, which afforded the ecosystem some measure of protection. The proposed investments will
make the Caracol-Trou du-Nord-Limonade-Terrier Rouge region a new urban node on the corridor. By
the end of Phase 1 (year 7) alone, the PIC is expected to generate 4,500 m
3
of wastewater per day. In
addition, even though the AIA plans will emphasize accommodating the influx of people to the region
further upstream and away from the Baie’s sensitive environment, the liquid and solid waste of Trou du
Nord, Limonade, Terrier Rouge and EKAM will still eventually drain into the Baie of Caracol. Under the
high-growth scenario, the upstream communities would generate an additional 2 million m
3
of greywater,
6,000 m
3
of sludge, and 24,000 tons of solid waste per year above the baseline scenario in 2030. Mining,
after a decades-long hiatus, is under exploration again in the region, with the Majescor property between
Terrier Rouge and Trou du Nord potentially leading to major impacts in the future.
Consequently, the role that the Caracol estuary and its connected rivers play as a refuge for the entire
northern coastline could suffer increased environmental threats and become endangered. Degradation of
the coastal environmental would also threaten the livelihoods of coastal communities dependent on
fishing and salt basin. Contamination of the salt would have wide-ranging health repercussions for the five
departments where the salt is sold (Nord, Nord-Est, Nord-Ouest, Centre, Artibonite).
The IDB and USAID have repeatedly affirmed that they are committed to treating industrial wastewater to
secondary levels. Experience has shown, however, that wastewater facilities in low-income countries are
often poorly maintained over time. Furthermore, the decisions to date regarding the PIC’s environmental
issues, such as the lack of an environmental assessment prior to final site selection, the lack of
precautions in elevating new factories above the flood line and late modifications to wastewater
management, have detracted from the PIC’s public image and its claims to meet environmental
safeguards. Waste management and potential pollution of the Baie have become among the most
important elements of the critique of the PIC.
Actions recommended: Significant efforts are being made to continue engagement with multiple
stakeholders and to design a wastewater treatment system that offers layers of physical
redundancies, including alternatives to discharging the final wastewater into the Trou du Nord
River. Solid waste, water and sanitation master plans are being developed for towns in the
region, and should be integrated rather than on a town-by-town and project by basis. Funding for
the construction and operation of these systems, as well as development of human resources for
their management and monitoring, should be prioritized for towns of the Baie de Caracol.
The larger coastal ecosystem could become ecologically degraded and fragmented. New
investments all along the coast are beginning to enclose the coastline with industrial and traffic heavy
land uses: the PIC will fully utilize the two roads that currently lead to the larger towns on the coast –
Caracol and Jacquezy; an airport at Madras, should it be built, would utilize the third entrance to the
Caracol marine park; and, a port, should it be built in the Baie de Fort Liberté, would require significant
3
dredging, coral reef cuts and shoreline reconfiguration and introduce heavy traffic of large cargo ships to
this other major ecological and cultural tourism destination. The Baie of Cap-Haïtien is already highly
polluted and impacted through industrial and port uses, an airport and dense urban settlements. This
would leave the Baie of Limonade as the least urbanized and impacted coastal marine system, although
its proximity to Cap-Haïtien suggests increasing development pressures. Taken together, these
developments will have a large cumulative impact on the coastal environment, endangering ecological
functions, fisheries and the livelihood of coastal villagers.
Actions recommended: Draft a regional plan of development that concentrates future
development and public investments in and around urbanized areas, and avoid investments with
significant negative impacts in the Parc de Trois Baies. Give preference to rehabilitating existing
infrastructure such as ports and airports, and securing these from natural disasters before
investing in new infrastructure elsewhere.
2. Surface and Ground Water Resources
Water quality will be a major concern for the region’s surface and groundwater resources. Water
reports done to date cite contradictory conclusions about the relative wealth and limitations of water
resources in northern Haiti. Before the PIC begins to withdraw significant volumes of water, additional
hydrological study may be needed to better understand the behavior of the aquifer in the Trou du Nord
sub-watershed and how it relates to the broader Plaine du Nord aquifer. The proximity of the PIC to the
coastline and its high rate of aquifer pumping pose a potential threat to saltwater intrusion. The impact of
this would be long-term and initially most severely affect coastal communities that currently rely on well
water.
The risks of groundwater contamination is greatest when the depth of the water table is less than 3
meters, groundwater recharge is greater than 25 cm/year, the topographic gradient is less than 2%, the
aquifers consist of irregular limestone or fractured basalt, and the hydraulic conductivity is greater than 80
m3/day/m
2
– conditions that characterize much of the urban corridor. Urban latrines and “septic tanks”
that sit in the water table are widespread and result in contamination. With DINEPA and other partners
emphasizing water supply over sustainable sanitation, the region can expect that demand for water-
flushed sanitation and untreated septage, sludge and greywater will increase. The continued
contamination of surface and groundwater supplies, particularly given recent cholera epidemics in the
region, is a danger to public health. Women and children who do their washing in the river, the poor who
only have access to surface water, and communities dependent on informal shallow and unmonitored
wells are most at risk. An increase in stormwater pollution levels due to proposed oil/energy/gas facilities,
industrial sites and increased impermeable surfaces will also degrade water quality. Free roaming
livestock and increasing agricultural inputs under the Global Agriculture and Food Security (GAFSP), the
Feed the Future (FTFCN), and Programme de Mitigation des Desastres Naturels (PMDN) initiatives,
could potentially also contribute to nonpoint source pollution. Deteriorating water quality affects fish and
riparian species living in rivers, and ultimately, estuaries and marine environments and their productive
assets to local communities.
Actions Recommended: The management strategies proposed in this report highlight the
importance of long-term watershed management and monitoring programs, and of supporting
integrated solid and liquid waste management – currently being studied separately through
different master planning processes. Additional study of groundwater resources is needed,
focusing in particular on saline intrusion. One of DINEPA’s roles is to create and manage a data
observatory, which would be extremely useful to monitoring and managing the region’s water
resources. Regional plan implementers should engage agricultural programs and the MTPTC to
expand riparian habitat and roadway filtration buffers to minimize surface water pollution.
The corridor is located in a high-risk zone that is vulnerable to multiple natural hazards, especially
flooding. According to the Analysis of Multiple Natural Hazards in Haiti project (NATHAT) assessment of
natural hazards in Haiti, the entire corridor has a medium-level earthquake risk. Coastal areas are at
medium to high risk of flooding, tsunamis, storm surges and liquefaction, and mountainous areas face
medium to high risks of landslides. Flooding will be the most frequent natural hazard experienced by the
4
corridor’s urban centers. Climate change could lead to more intense storms and storm surges, and will
certainly raise the sea level with dramatic impacts on marine resources and human settlements.
Increasing impermeability, insufficient drainage, poor grading, drain clogging will further exacerbate
localized flooding. The tendency as cities expand will be for the poorest households to locate on the least
desirable and most risk-prone areas, such as slopes, ravines and low-lying areas, as demonstrated in
Cap-Haïtien. As the past rainy season has demonstrated, PIC, EKAM and University can be inundated
even by minor storms. Cap-Haitien and Petite Anse, with their concentration of people in flood zones and
multi-story buildings that are almost certainly not built to code, are at the highest risk. Natural disasters in
these areas could lead to significant displacement, and a surge in urbanization in surrounding towns in
the corridor.
Actions Recommended: Conducting detailed topographical and drainage studies to establish
flood maps for each of the urban centers in the area is a high priority. Future infrastructure,
economic investments and housing should be located outside of the areas of highest flood risk. At
a minimum, all public institutions should be built to withstand earthquakes and 100-year floods,
and be designed to serve as centers of refuge and disaster relief in times of crisis. Major
businesses, private investments receiving public subsidies, and donor-funded projects should
meet new earthquake-proof building codes and flood avoidance standards. Additional study is
needed to develop an integrated regional flood, drainage, irrigation, storage and aquaculture
system that diverts, slows and absorbs floodwater and wastewater away from cities and sensitive
habitats.
3. Highland Watersheds and Riparian Areas
Mining activities and increased removal of construction materials such as sand, rocks and wood
from rivers and estuaries will damage the region’s hydrology, exacerbate erosion and worsen
water quality. With 127,000 to 177,000 new urban households expected in the corridor by 2030, the
region will have a high demand for construction materials. Current practices of streambed excavation and
mining for materials in ravines and beaches will likely expand and further damage in-stream habitat and
watersheds’ hydrological function. Major exploration efforts underway in the urban corridor, particularly if
they result in full-scale mining extraction, pose a major potential concern to topsoil removal, erosion and
water quality.
Actions Recommended: Local authorities, using a combination of enforcement and
infrastructure investments that incentivize development in safer areas, should aim to restrict
construction within 16 meters of waterways and in areas with slopes greater than 50%. Significant
human and financial resources should be allocated at the national level to the Bureau of Mines
and Energy under the Ministry of Transportation, Public Works and Communication to allow this
entity to conduct local permitting, regulation and monitoring of extraction activities. Under the new
national and regional agricultural programs (GAFSP, FTFCN and PMDN), efforts to stabilize river
and stream banks – particularly those leading to the Baie de Caracol – should be prioritized.
An estimated 65-130% increase in charcoal consumption by 2030 would exert significant
additional pressure on existing wood resources. Given that households using charcoal consume five
times as much wood as those using wood fuel, the migration of rural households to urban settings will
elevate the amount of wood needed to energize the region. Wood products for construction will add to
this demand. Although charcoal and wood production in the region is currently not resulting in
deforestation, with the possible exception of the mangroves, increasing per capita resource demands and
growing urban populations will challenge the region’s current levels of wood harvesting. In mountainous
areas, excessive wood harvesting would worsen erosion and contribute to downstream flooding.
Actions Recommended: It is important to consider planning for this corridor in a broader
watershed context, both ecologically and economically. The coastal plain is closely linked to the
ecology of the larger watershed, with forest cover, silvicultural practices, agricultural activities,
charcoal and wood production, and human settlements having a significant impact on erosion and
flooding, water quality, aquatic systems, and energy and food costs downstream. To counter the
pressures identified above, it will be critical to establish a sustainable land management program,
5
in particularly for the Trou du Nord sub-watershed, and work with the regional agricultural
programs to promote sustainable tree and woody plant harvesting regimes. Alternative energy
systems such as more efficient cook stoves, LPG, kerosene, ethanol and jatropha oil should also
be aggressively promoted.
4. Air Quality
Air quality will deteriorate due to increased urban charcoal consumption, the generation of 40-
54,000 pounds of air pollutants per day from burning solid waste, and high levels of vehicular
exhaust. Air quality concerns would be most severe around Cap-Haïtien, but also in Ouanaminthe,
around the PIC, and possibly near EDH and private power plants. At full-occupancy, the air around the
PIC could be affected by some 800 tap-tap trips per day at each of two entrances, as well as cargo
vehicles and emissions from the heavy fuel oil power plant. Women, who work most with charcoal for
cooking, laundries and bakeries, and children would be most vulnerable to exposure to particular matter
and other pollutants. Should mining extraction proceed, ore processing could lead to the release of heavy
metals to the air. Over time, the mix of point sources and fugitive emissions from traffic, cooking and so
forth, will likely cause air pollution to exceed WHO air quality standards for urban areas.
Actions Recommended: The spatial implications of these impacts suggest the need to design
roads and transport networks to promote a high share of walking and biking to the various new
employment centers; heavily invest in solid waste collection systems for recyclable and inorganic
materials; and expand alternative cook stove programs, currently piloted in Port-au-Prince,
throughout the northern corridor. USAID and IDB may need to conduct additional studies of air
quality in the PIC area and “airshed” together with anticipated elevations of commuter traffic and
domestic and other emissions sources to determine a regional approach to air quality
management. If needed, the PIC may need to mitigate residual air quality impacts through
standard pollution control methods, for instance by raising the stack height of process facilities
discharging significant contributions of pollutants. Similarly, EDH will also need to consider
cumulative impacts on air quality when designing their new facilities.
5. Soils and Agriculturally Valuable Areas
Urbanization in the region could result in the loss of some 750 to 2,660 hectares of prime
agricultural land over the next 20 years. In a baseline population scenario, the corridor would consume
750 to 1,200 hectares of additional land; in the high growth scenario, this would rise to 1,600 to 2,600
hectares of additional land. The tendency to place major public investments on publicly owned lands,
much of which has high quality alluvial soil, has accelerated this trend. More land will be lost to
urbanization around Cap-Haïtien and the Trou-du-Nord/Caracol/Limonade Triangle than around more arid
zones in the corridor. This has major implications for local food security. Furthermore, despite some
compensation, the process of displacing rural farmers and ranchers could worsen rural poverty. As
urbanization expands, increasing conflicts will take place due to the lack of clarity over land ownership.
Actions Recommended: Property mapping in towns and land surveys to clarify public and
private ownership of land is a very high priority, and should be undertaken as soon as possible
before land prices escalate even further. Proposed strategies to address the loss of agricultural
land include concentrating future developments near existing urban centers in order to minimize
land fragmentation, selecting sites with lower quality soils to the extent possible. Principles of
smart growth should be applied in designing and building residential, commercial and industrial
projects that create more vibrant urban environments and consume less land. Rural roads should
be maintained, and projects should provide targeted investments in refrigeration and storage
facilities in rural and urban centers to increase market access. USAID is undertaking a social
assessment and resettlement plan for those displaced by the PIC.
To date, there appears to have been little dialogue between rural and urban development
agencies. As a number of these impacts make clear, there is a strong relationship between
urbanization and impacts on rural livelihoods. There is an opportunity to more clearly link the
6
major agricultural programs, which are embarking on their next cycle of investments, with the
impacts cited in this report.
Dispersed investments are planting the seeds for extensive urbanization patterns that will raise
infrastructure costs and reduce service quality. The PIC, EKAM, university, port, other housing
projects have been sited far from existing sources of labor and infrastructure. The need to provide
physical and social infrastructure at each of these sites, not least to reduce their environmental impact,
will come at a cost to investing in existing communities that have long waited for public investments.
Actions Recommended: Future assessments for siting investments should consider both
environmental and fiscal impacts. Though challenging, efforts should be made to apply strategies
such as land swaps, development right transfers, creative zoning and public private partnerships
to make land available in the appropriate areas.
The region’s total waste generation could rise by 3.8- to 5.4-fold by 2030, totaling 1 to 1.4 million
tons per year. In addition, there could be some 90-95,000 m
3
per year of combined domestic and
industrial sludge. Currently, 50-58% of waste ends up in nature, 25% on vacant land in informal dumps,
and the remainder is burned or landfilled. If these practices continue, drainage systems, riverways,
mangroves, and marine habitats throughout the Caribbean will be significantly endangered. In particular,
the towns closest to the PIC could see an increase of 64 tons of solid waste per day above the baseline
condition – or a total of 156 tons of municipal waste per day.
Actions Recommended: Solid waste management plans are ongoing for the region. These will
likely propose efforts to compost organic waste, promote recycling, which is a growing business
in the region, and build disposal facilities. The AIA’s town plans should designate sites for solid
waste transfer and disposal, and identify current open dumps that should be cleared. Solid waste
management should be integrated with sludge and septage management. Shared services and
facilities between small towns will likely help reduce costs and management and staff
requirements.
6. Culturally Valuable Areas
New development pressures pose a threat and an opportunity for the region’s built cultural
heritage. The location of the PIC and the port – if located at the Baie de Fort Liberté – would endanger
the two most significant sites of natural (Baie de Caracol) and cultural (town and fort of Fort Liberté)
heritage in the corridor. In addition, the tendency for development to spread along either side of the RN6
highway and the roads leading from the RN6 to the coast will visually impair the region’s landscapes.
Within cities such as Fort Liberté, Limonade and Quartier Morin, development pressure could result in the
demolition of neglected and deteriorating historic residential buildings. All of these forces would dampen
the region’s tourism potential and the strongest economic rationale for heritage preservation.
Actions Recommended: A multi-sectoral preservation strategy is proposed toaddress the visual,
cultural, natural and built heritage of the region, including the implementation of the tourism
master plan, applying existing measures of protection and promoting historic core rehabilitation in
new town plans.
A matrix of cumulative impacts on the environmental systems is shown in Table 33 of the report. It
demonstrates that the interactions of the environmental impacts are most intense for surface water
quality, air quality, valuable agricultural land, and the visual beauty of the region’s landscape. Coastal
estuaries, mangroves, and marine life will also be acutely affected, and large populations and economic
infrastructure are likely to be vulnerability to flooding. Growing populations and urban demands for
resources, the PIC, and mining activities (if fully exploited), and a port at Fort Liberté would impose some
of the most intense and wide-ranging impacts.
With all the present and future impacts layered across space and time, the cumulative assessment paints
a grim picture of the region’s environmental outlook. The challenges are particularly daunting in light of
the limited human, financial and governance resources to address them. At the same time, the
7
assessment also highlights a number of opportunities where investments can have a positive impact on
communities and natural ecosystems across different sectors. With a number of major investments still
under consideration, it is timely to consider adjustments in investments decisions and management
strategies.
It is critical to build the capacity of cities and rural settlements to accommodate current and future
residents. This requires a strategy to leverage existing institutional structures and legal frameworks,
strengthen local municipal governance, and foster new regional planning and management capacity. At
the local level, the legal framework for communes (municipalities) provides them with the authority to
promulgate and implement local development plans, including zoning requirements for construction, land
use and flood control. Urban plans can be issued by municipal arrêté (city ordinance), thereby endowing
local development and zoning plans with the force of law. Communes also have the authority to establish
inter-communal agreements, which could serve as a legal framework for regional planning. Despite
critical weaknesses and deep dependence on the central government, the commune is the most feasible
point of entry for on-the-ground implementation of local and regional plans.
Strengthening commune capacity to provide basic infrastructure, enforce growth management, augment
local revenue streams and conduct public education campaigns about the new regional and local plans
requires additional support from key central agencies. This includes training, funding devolution, and
technical support. The Ministry of Interior could augment FGDCT funding to local communes, and appoint
more departmental and engineers and planners to the Agences Techniques Départementales and
provide them with the resources to do their job. There is also an opportunity to devolve responsibility to
departmental directors of the services techniques déconcentrés. Conducting a local property census,
strengthening tax collection, mapping state and private lands, mapping town and commune boundaries
and strengthening tax collection, and increasing and training a cadre of staff to manage updated
information systems are key first steps to building local financial stability.
Beyond local plan implementation and urbanization management, this CIA points to a number of broader
regional or shared infrastructure needs and management of short and long-term environmental impacts.
These challenges require the technical study, planning, implementation, funding, and monitoring and
evaluation of regional authorities. This could take the shape of central authorities, inter-departmental
entities, or new planning offices. This CIA recommends the creation of a new regional planning office
under the auspices of CIAT to promote and accompany the implementation of the regional and municipal
plans, and to monitor and evaluate development progress and the health of the natural environment.
There is a clear need to harmonize, coordinate and augment investment funding and international
projects in the region to help address the challenges cited in this CIA. The regional planning office could
play a key role in coordinating donor aid, developing a pool of potential priority projects for donor
consideration, and more directly linking local development needs with international funds. For instance, it
could supervise a small grants and technical assistance program that would begin to fund and incentivize
local development priorities. These investment decisions will be more effective than relying primarily on
coercive enforcement measures to achieve development that conforms to regional and local plans.
The management strategies and structures proposed here, which are further detailed in Part 7 (see Table
35) of the report, will be discussed in a September workshop that includes mayors, chambers of
commerce, providers of services techniques déconcentrés, departmental délegations, the Université de
Roi Henri Christophe, ministry representatives, in particular those from the MICT and its Agences
Techniques Départementales, MPCE, MOF and CIAT, and donor organizations. A dialogue among these
diverse stakeholders will help shape a strong and feasible strategy for strengthening local governance
and protecting the region’s natural resources for future generations. Following this discussion, the final
management strategies will be included in the AIA’s regional and local master plans.
8
I. GOALS AND OBJECTIVES
The American Institute of Architects (AIA) has been contracted to develop a Plan d’Aménagement
Régional (PAR) and Plans d’Aménagement et d’Extension (PAEs) of the corridor from Cap-Haïtien to
Ouanaminthe in northern Haiti. The goal of the PAR and PAEs is to create regional and local spatial
development frameworks for the urban corridor along the National Route 6, an area that is receiving a
significant number of major investments. As part of this planning process, the AIA has been charged with
developing a cumulative impact assessment (CIA). These assessments expand beyond project-specific
environmental impact assessments to examine the synergies and cumulative impacts of discrete
incremental changes.
In many ways, the components of a CIA overlap with those needed for planning purposes, which require
a similar understanding of economic development, population dynamics, demand for services and
governance capacity. To effectively use limited team staff and time, the AIA has nested the regional
planning diagnostic and embedded it into a CIA analytical framework.
Given data limitations as well as the ultimate focus of this project on creating a spatial planning
framework, much of the CIA is qualitative. However, in an effort to move beyond past environmental
assessments that have already discussed at length impacts from a qualitative perspective, this CIA
attempts to quantify, where possible, the future demand for basic infrastructure, pollution loads and their
impacts. Given significant uncertainties about future investment decisions and the lack of recent,
disaggregated data, these estimates only serve to convey the order of magnitude of future impacts on the
following valued environmental systems (VES):
1. Estuarine, Coastal and Marine Systems
2. Surface and Ground Water Resources
3. Highland Watersheds and Riparian Forests
4. Air Quality
5. Soils and Agriculturally Valuable Areas
6. Culturally Valuable Areas
The ultimate goal of the CIA is to advise the PAR and PAE in terms of where to place growth, how much
land to allocate, what kinds of land uses to plan for, the levels of infrastructure needed to serve existing
and future populations, and the management and governance considerations of implementing such plans.
II. SCOPE
The PAR takes as its limits of study the east-west regional corridor spanning 60 kilometers between the
cities of Cap-Haïtien and Ouanaminthe within the Departments of Le Nord and Nord-Est. This is primarily
an urban analysis that seeks as an end result an urban growth management plan for the regional corridor
as well as each of the eight towns and cities on the corridor: Quartier Morin and Limonade in Le Nord,
and Sainte Suzanne, Caracol, Trou du Nord, Terrier Rouge, Fort Liberté and Ferrier in Le Nord-Est.
Although Cap-Haïtien and Ouanaminthe are considered within the regional planning context, the AIA has
not been tasked with developing master plans for these cities. The CIA includes them in the analysis of
impacts on the VES, but focuses primarily on the towns along the corridor.
Priority is placed on understanding the spatial implications of efforts to mitigate impacts on valued
ecosystems. Likewise, the identified management strategies emphasize those with impacts on regional
territorial management, and do not attempt to summarize or reiterate much more comprehensive
management plans that already exist or are under development.
A major limitation of this study is that it is limited to environmental impacts; it is expected that social
impacts and calculations for service demands will be addressed through the AIA’s local urban plans.
Much of the information critical to accurate planning and environmental assessments is missing or out of
date, including population and income data, and property and topographical maps. Several important
ongoing studies will be completed after the present regional planning exercise, including: DINEPA water
and sanitation master plans for most of the cities along the corridor; IDB solid waste management plans
9
for the region; earthquake risk mapping for the region; and a master plan for Cap-Haïtien. The regional
corridor plans will likely need to be updated following their completion.
Figure 1 General Extent of Urban Corridor of Study
III. PROCESS AND METHODOLOGY
This assessment process draws on information from existing reports and literature and stakeholder
consultations in communities and among government agencies. The departments of Le Nord and Nord-
Est, Cap-Haïtien, Ouanaminthe, Fort Liberté, Caracol and other communes and communal sections have
witnessed numerous planning initiatives in the past decade. Despite significant changes in Haiti in the last
several years, particularly in the aftermath of the earthquake, many of the plans, priorities and strategies,
which often drew upon public inputs, still stand. The CIA reviews these reports and synthesizes their
findings and proposals to develop a baseline assessment of the present situation. A list of referenced
documents is listed in the bibliography.
The team also conducted a series of site visits, discussions with the mayoral and local leadership, and
focus group discussions with community members on priority development needs and concerns. These
consultations took place from December 13, 2011, to March 4, 2012, in Quartier Morin, Limonade,
Caracol, Trou du Nord, Ste. Suzanne, Terrier Rouge, Fort Liberté, Derac, Acul Samedi and Ferrier. In
Cap-Haïtien and Ouanaminthe, the consultations included meetings with municipal leaders. In addition,
the team consulted a number of departmental and national public agencies, private associations, donor
groups, church groups and nongovernmental organizations.
The cumulative environmental assessment incorporates these streams of data into the following
analytical methodology:
• Assessing drivers of regional growth and compiling a list of major initiatives in the region;
• Projecting two future development scenarios with a time horizon to 2030: a baseline scenario that
assumes anticipated investments do not take place and that urban population growth gradually
declines; and a high growth future in which planned investments do take place, attracting large
inflows of migrants;
10
• Understanding the main Valued Environmental Systems (VES) and creating maps of areas to
protect for their high natural, agricultural and cultural value as well as areas that are important to
avoid due to high natural hazard risks;
• Determining future land consumption needs based on an evaluation of the major economic
development drivers in the region, population projections and existing patterns of land use and
development density;
• Assessing the need for various physical infrastructure services and their impacts on the VES;
• Assessing cumulative environmental impacts by VES, and making recommendations on
management strategies and governance structures for inclusion and development in the regional
and local master plans.
11
PART 1: PERSPECTIVES DE DEVELOPPE MENT ÉCONOMIQUE DU NORD, UNE
REGION A LA VEILLE DE GRA NDES MUTATIONS ÉCONOMIQUES
1.1 Contexte
Le Nord constitue l’un des quatre pôles de croissance retenus par le gouvernement haïtien dans sa
stratégie de développement économique (DSNCRP). Comme conçus par les autorités, ces grands
espaces d’investissements, de par leurs effets d’entrainement, constitueront des engins de croissance
pour le reste de l’économie. Dans cette perspective, quatre grands projets, à des phases différenciées de
mise en œuvre, auront des implications certaines sur la production des biens et services, la circulation
des marchandises, et le financement des entreprises dans la région du nord. Il s’agit du Parc Industriel de
Caracol (Département d’état Américain, BID, la firme coréenne SEA, et le gouvernement Haïtien), de
l’Université Roi Henri Christophe
à Limonade (RD), du projet Tourisme de la BID, et du projet Couloir
Economique du Nord (FTFCN) de l’USAID. Les décideurs politiques haïtiens, et les institutions de
financement internationales, engagés de manière concertée dans ces initiatives, anticipent déjà des
mouvements de populations, de nouvelles formes d’occupation des sols, et l’émergence de nouvelles
entreprises industrielles et commerciales, qui redéfiniront l’espace compris entre Cap-Haïtien et
Ouanaminthe, identifié depuis tantôt comme « Le Couloir Économique du Nord » (see Table 3 for a list
of projects in the region).
Cette mise en place, pour être effective, en termes d’opportunités économiques et de création d’emplois,
doit être supportée par des infrastructures appropriées:
• Port qui puisse répondre aux besoins des transactions internationales du PIC et des
nouvelles entreprises de la région;
• Aéroport qui facilitera les relations du nord avec le reste du monde. Important pour la
diaspora, les touristes étrangers et pour les croisiéristes en cas d’évacuation;
• Routes pour une meilleure circulation des marchandises et des biens;
• Transport public qui permette le déplacement décent de la population, des travailleurs et des
étudiants en particulier;
• Électricité pour faciliter le développement des entreprises, et améliorer les conditions de vie;
• Infrastructures d’Irrigation pour augmenter la productivité du secteur agricole.
Dans ce cadre-là, il est prévu dans le plan du gouvernement, des investissements en infrastructure de
l’ordre de 1,8 milliards de dollars pour les cinq prochaines années pour supporter les secteurs agricoles,
de l’habilement et du textile; des interventions qui laissent anticiper la création de plus de 120,000
emplois.
Cette section du plan régional étaye les perspectives de développement économique au niveau des
secteurs industriel, agricole, touristique, et commercial, en rapport avec la mise en route de ces grands
projets, et définit les mécanismes institutionnels qui puissent soutenir cette transformation de l’économie.
Le gouvernement haïtien, les institutions internationales impliquées dans le processus (BID/USAID/
BM/UE), au travers des mécanismes d’accompagn ement du secteur privé, tels, la formation
professionnelle, l’incubation d’entreprises et leur financement, anticipent une croissance de l’économie
qui déplacera à terme, de manière significative, les frontières de possibilités de production.
La projection, dans ce texte, est amorcée en prenant comme point de départ la situation actuelle de la
grappe de communes se situant dans l’aire d’influence immédiate d’implantation de ces grand projets –
Quartier Morin, Limonade, Caracol, Trou du Nord, Terrier Rouge, Fort Liberté et Ferrier, avec un clin d’œil
sur Sainte Suzanne située dans le bassin versant surplombant les plaines de Limonade et de Trou du
Nord. Cette section synthétise les activités économiques les mieux appropriées à la valorisation des
ressources au niveau de chaque commune en regard de leurs potentialités ; et de fait, priorise une
12
exploitation des potentialités en rapport au caractère identitaire de chaque commune. Il aboutit sur la
projection des taux d’activités régionaux, des projections relatives au marché du travail, et les
mouvements de populations qui découlent nécessairement de cette mouvance et souligne l’ensemble
des mesures budgétaires, fiscales et monétaires permettant d’asseoir sur une base durable ces
transformations anticipées.
1.2 Situation Actuelle de la Région
La région du nord se caractérise actuellement par un secteur agricole à très faible productivité liée aux
contraintes de financement, d’encadrement technique, de carence en outillage moderne, et d’intrants
améliorés. De fait, au niveau national, de 37% du PIB en 1990, la contribution de l’agriculture au PIB réel
a chuté à 28 - 32% en 2008 (FAO, 2008). Il absorbe néanmoins près de 60% de la main d’œuvre active
dans la région nord. Cet état de fait se manifeste en un revenu per capita extrêmement faible par rapport
au reste du monde. En effet, Haïti accuse un revenu per capita de 1,156 dollars/an, tandis que les pays
de l’Amérique Latine et des Caraïbes se situent au niveau de 10,077 dollars/an et le reste du monde à
9,972 dollars/an (OIT, 2010). Le revenu d’Haïti représente un dixième du revenu des pays de l’Amérique
Latine comme le souligne l’OIT. Il en ressort une base taxable très faible et par voie de conséquence, des
revenus insuffisants au niveau de la gouvernance locale pour faire aux exigences de service de la
population.
Table 1 Département du Nord-Est Budget Consolidé 2009-2010
Ouanaminthe Trou du Nord Fort Liberté
Recettes Fiscales 797,240 516,180 1,401,545
Recettes Non fiscales 426,770 25,500 60,583
Recettes ordinaires 8,084,010 9,621,680 9,022,128
Dons 3,550,000 490,125 4,078,217
Subventions 9,375,500 6,950,000 13,450,000
Total des ressources 21,009,510 17, 061, 805 26,550,345
Importations. La faible productivité agricole se traduit par des importations importantes de la République
Dominicaine et du reste du monde, pour combler le déficit en produits alimentaires de base. Un rapport
de 2008 du groupe Ginsa situe les importations à 250 containers de 40 pieds le mois en provenance de
la RD, à 1250 containers le mois, en provenance de Port-au-Prince, et à 250 containers le mois, les
importations qui arrivent au port du Cap-Haïtien (GINSA, 2008). Les informations recueillies lors des
visites de terrain auprès des douaniers et commerçants de Ouanaminthe ont permis de réaliser que ces
données ont grandement évolué au cours de ces 5 dernières années. Avec l’augmentation du pouvoir
d’achat des consommateurs dans la région que charrie le développement du Pole de croissance, la
pression sur l’offre agricole sera plus importante et le trafic des containers provenant du reste du monde
plus intense.
Secteur Agro-Industriel. L’espace défini comme le couloir économique du nord ne comprend
actuellement que quelques entreprises industrielles.
• Habitations Sucrière et Distilleries. L’usine Welsh, dans le temps, absorbait la plus grande
partie de la production de canne à sucre de la région Nord. Avec sa disparition, l’usine Nazon, les
sucreries et petites distilleries du département constituent la principale clientèle de ces
plantations. Les petites unités, pour la plupart artisanales, produisent du sirop et le « clairin »
1
.
D’autres unités s’adonnent à la production du « RAPADOU », un produit qui remplace bien
souvent le sucre dans la consommation au quotidien de la paysannerie (Jean, 2008). Lors de la
préparation du document suscité, l’usine Nazon, la plus grande distillerie du département, et plus
moderne par rapport aux installations de la région, produisait 2,500 gallons le jour, une seule
entreprise de taille moyenne subsistait avec une capacité de 300 gallons/jours, et les autres plus
petites, 100 gallons/jour. Le prix du gallon était lors de 35 gourdes. Actuellement le prix du gallon
1 Clairin : boisson alcoolisée dérivée de la canne à sucre.
13
est de 75 gourdes. Cependant, mis à part les installations modernes de Nazon, pour les plus
petites entreprises avec une machinerie artisanale, les couts de production sont estimés entre
50% et de 65% du prix de revient. Les rencontres avec les propriétaires de ces petites
entreprises artisanales ont permis de bien établir les conditions de production et les interventions
nécessaires à des stratégies de croissance qui pourraient certes apporter des améliorations à la
qualité aussi bien qu’au volume de production.
• Autres unités de transformation: Cassaveries. Les cassaveries se retrouvent dans les zones
bananières où le manioc est cultivé en association avec d’autres cultures. Plusieurs unités de
production sont rencontrées à Quartier Morin et à Limonade. Plusieurs variétés de cassaves sont
disponibles. Elles constituent souvent des spécialités qui se vendent très bien sur les marchés du
Cap-Haïtien. Toutefois, une amélioration des conditions de production et de marketing pourrait
permettre d’élargir le marché, avec des produits standardisés et une présentation plus
hygiénique. La route nationale #6 permet l’écoulement de ces produits en République
Dominicaine. C’est un espace de grands consommateurs de produits dérivés du manioc.
• Autres unités de transformation de manioc, de Banane, et de maïs en farine. Les farines de
manioc, de banane et de maïs (qui sont très utilisées particulièrement dans la préparation de
bouillie pour bébé), et constituent des apports calorifiques et en protéine d’importance dans leur
nutrition. Une ou deux unités de transformation artisanale ont été repérées au niveau de Ferrier
et de Trou du Nord.
• Cointreau: Une très grande ferme d’orangers amères essentiellement utilisés pour la production
d’essence exportée vers l’Europe pour les maisons Grand Marnier et Cointreau. Cointreau
détient aussi bien une grande plantation d’orangers à Limonade. Pour les deux opérations, seul
le zeste de l’orange est retenu. La pulpe est utilisée dans la production de fumier et le jus jeté.
Parfois des habitants de la zone viennent se procurer du jus pour leur consommation et la
production artisanale de vinaigre. Toutefois, cette quantité importante de jus généré par cette
plantation, pourrait facilement être utilisée de manière industrielle pour la mise en boite de jus ou
de vinaigre qui pourrait desservir le marché national.
Le Marché. Somme toute, un marché de 1,328,772 consommateurs (970,495 pour Le Nord et 358,277
pour Le Nord-Est), desservi dans sa grande majorité par les entreprises agricoles et industrielles
dominicaines (IHSI, 2009b). De fait, la stratégie d’affaires des entrepreneurs de la plaine du CIBAO est
en grande partie élaborée en fonction de l’évolution de la demande haïtienne. Que ce soit pour la
consommation de poulets de chair, d’œufs, de certaines légumineuses, et de produits agroindustriels
comme la patte tomate, et spaghetti, les marchés haïtiens regorgent de produits en provenance de cette
plaine. Déjà en regard des anticipations du pôle de croissance Nord, les entreprises dominicaines se
positionnent. Elles sont très présentes dans la construction
2
. Les visites de prospection en provenance
de cette zone sont nombreuses, et les propositions de venture plus fréquentes. Dans cette perspective, le
marché transfrontalier et les infrastructures pour l’accommoder doivent être analysées en regard de cette
nouvelle dynamique.
Par rapport aux transactions observées entre les deux pays, ces recettes ne reflètent que partiellement le
volume réel transigé. Des efforts au niveau de la gouvernance permettront une gestion mieux appropriée
de ces entités.
2 La Firme Estrella au PIC, et en assure actuellement la construction des infrastructures de base.
[... middle sections omitted for long document ...]
143
BIBLIOGRAPHY
AECOM. (2011) Environmental Assessment of the USAID/Haiti North Park Power Project. USAID:
Washington, DC.
Barbut, Monique. (2011) Letter to President Moreno. Washington, DC: Global Environment Facility, April
2011.
Becoulet, Philippe. (2004) La Gestion des Déchets Solides dans la Région de Cap-Haitien, Haïti.
Programme de Gestion Urbaine.
Bédard, Francois, Dubé-Jetté Dominique, Lizotte Martine et Khomsi Reda. (2010) “Les systèmes de
gestion de la destination (SGD) et les organisation de gestion de la destination (OGD). E-
tourisme et stratégie de distribution.”
BirdLife International. (2008). HT-001 : Lagon-aux-Bœufs Site Factsheet. Available online at :
http://www.birdlife.org/datazone/sitefactsheet.php?id=20464
Burningham, Sally, and Natalya Stankevich. (2005) Why road maintenance is important and how to get it
done. World Bank: Washington, DC.
CAR-SPAW-RAC. (2011) Caribbean Biological Corridor. Dec. 2011.
CIRH- CECI. (2011a) Gestion locale des risques et désastres. Port-au-Prince.
______. (2011b) Plan de prévention sismique pour le Nord d’Haïti. Port-au-Prince.
CNIGS. (2009) HAITI : Cartographie de vulnérabilité multirisque. Port-au-Prince.
CNSA / MARNDR – CNIGS. (2009) HAITI : Cartographie de vulnérabilité multirisque. Port-au-Prince.
CoSinus Conseil. (2006) Schéma d’Orientations Stratégiques pour les Interventions du FED dans le Nord
et le Nord-Est, Rapport Final. EU-sponsored study, Fev. 2006.
Dawicki, Shelley. (2005) “Tsunamis in the Caribbean? It’s Possible.” Wood’s Hole Oceanographic
Institute.
Dell’Amore, Christine. (2010) « Deadly Tsunami Swarm Hit Haiti after Quake, Experts Say. » National
Geographic Daily News.
DINEPA. 2010. Rapport Annuel 2009-2010.
DINEPA / MTPTC. (Unknown date) Plan d’action Prioritaires sur l’Assainissement d’Eau. Port–au-Prince.
EauCap / CHS. (2009) Planification Stratégique de Gestion de l’Eau et de l’Assainissement pour la ville
du Cap-Haïtien, Haïti.
Emmanuel, Jean Robert. (2008) Presentation
Environ. (2011) Preliminary Hydrological Assessment for the Development of an Industrial Park in Haiti.
Washington, DC.
______. (2011) Évaluation hydrologique préliminaire pour la création d’un parc industriel en Haïti.
Washington, DC.
______. (2011) Addendum to Preliminary Hydrological Assessment for the Development of an Industrial
Park in Haiti Washington, DC.
ESPA LABCO. (2011). Estudio Acuífero Sitio 15, para Abastecimiento Parque Industrial. Haiti Marzo.
Faculté d’Agronomie et de Médecin Vétérinaire. (2011) Rapport D’Études Analyses d’Eau Souterrain.
Port au Prince: Université d’Etat de Haïti, Mai.
FAO. (2008) Initiative à la Flambée des prix de produits alimentaires.
FAO. 2012. AQUASTAT database, Food and Agriculture Organization of the United Nations (FAO).
Website accessed on [09/04/2012 16:25]
144
Fountain, Henry. (2010) “A Deadly Quake in a Seismic Hot Zone.” New York Times: New York, January
25, 2010.
Foratech Environnement S.A. (2011) Investigation Hydrogeologique par forage de reconnaissance et
piézomètres associes - Pompages d’essai pour la recherché d’eau souterraine en vue de
l’approvisionnement en eau du Parc Industriel du Nord-est – Plaine du Nord – Haïti. MEF-UTE :
Port-au-Prince.
FroProBiM – ReefFix. (2009). Rapid Assessment of the Economic Value of Ecosystem Services Provided
by Mangroves and Coral Reefs and Steps Recommended for the Creation of a Marine Protected
Area Caracol Bay, Haïti..
Gill, Victoria. (2010). « Lessons to be Learned from Haiti’s Tsunami. » BBC News, Feb. 25, 2010.
GINSA. (2008) La situation des importations du Nord.
Gronewoldof, Nathanial. “Environmental Destruction, Chaos Bleeding Across Haitian Border.” Greenwire
published by New York Times, December 14, 2009.
« Haiti’s Rush for Gold Gives Mining Firms a Free Rein over the Riches. » (2012) The Guardian, May 30,
2012.
Haiti GOH. (2010a) Analysis of Multiple Natural Hazards in Haiti (NATHAT), Port-au-Prince.
______. (2010b) Base de Données Inventaire Communal 2010 (excel database).
______. (2010c) Plan d’action pour le Relèvement et le Développement National d’Haïti : Les Grands
Chantiers pour l’Avenir.
Hilaire, Jean Vilmond. (2009) Stratégie de Montage de l’Agence National des Aires Protegees (ANAP) :
Resume du Document.
IDB. (Unknown date). Haiti : Technology Transfer to Small Farmers, Grant Proposal (H-L1059). IDB :
Washington, DC.
______. (2012) TOR : Environmental Assessment (EA) of the Temporary (Construction Period) PIC Solid
Waste Management / Landfill and Sludge Disposal. IDB : Washington, DC.
IHSI. (2006) Enquête sur le Mortalité, Morbidité et Utilisation des Services EMMUS-IV 2005-2006. Port-
au-Prince.
______. (2009a) Objectifs du Millénaire pour le Développement : Etat, Tendances et Perspectives. Port-
au-Prince.
______. (2009b) Population Totale, Population de 18 Ans et Plus, Ménages et Densités Estimes en 2009.
Port-au-Prince.
______. (2010a) Enquête sur l’Emploi et l’Economie Informelle Phase 1. Port-au-Prince.
______. (2010b) Enquête sur l’Emploi et l’Économie Réelle. Port-au-Prince.
Jean, Fritz. (2008) Opportunités d’investissement dans le département du Nord, FDI.
Kammen, D.M. and D.J. Lew. 2005. Review of Technologies for the Production and Use of Charcoal.
Renewable and Appropriate Energy Laboratory Report, 1, March 2005.
KOIOS Associates. (2011) Etude des Impacts Environnementaux et Sociaux (EIES) du Parc Industriel
dans la Région du Nord d’Haïti. Acton, MA.
LGL. (2007a) Étude de réhabilitation des systèmes d’alimentation en eau potable dans le Nord Rapport
final Société d’Expertise - Resume
______. (2007b) Étude de réhabilitation des systèmes d’alimentation en eau potable dans le Nord
Rapport final Société d’Expertise – Partie 1 – Ville de Limonade.
145
______. (2007c) Étude de réhabilitation des systèmes d’alimentation en eau potable dans le Nord
Rapport final Société d’Expertise – Partie 2 – Ville de Caracol.
______. (2007d) Étude de réhabilitation des systèmes d’alimentation en eau potable dans le Nord
Rapport final Société d’Expertise – Partie 3 – Ville de Trou du Nord.
______. (2011) Rapport de Dimensionnement Pour le Captage et le Traitment d’Eau Brute a Usage
Industriel et Domestique Pour le Parc Indusriel Dans la Region Nord d”Haiti.(Caracol) Port-au-
Prince.
Louis Berger Group. (2011a) Estudio De Demanda, Fuente, Tratamiento Y Disposicion De Aguas Para
Parque Industrial En Cap Haïtien – Haiti.
______. (2011b) Alternativas Para El Tratamiento De Aguas Residuales Industriales.
______. (2011c) Alternativas Para El Tratamiento De Aguas Residuales Domesticas.
Louis, Regine. (2003) Présentation synthétique des Études de Vulnérabilité et d’Adaptation Aux
Conditions Climatiques Extrêmes en Haïti et dans la Caraïbe. ME – PANA : Port-au-Prince.
Majescor. (2009) Technical Summary Report SOMINE Property, Northeast Haiti. Ottawa: C.T. Barrie and
Associates, Inc.
MARNDR. (2010) Plan National d’Investissement Agricole.
MARNDR. (2011) Programme de Transfert de Technologies pour les Petits Producteur d’Haiti (HA-
L1059). Etude Environnementale et Social du Projet.
MDE / CNIGS / PANA. (2006) Programme Changements Climatiques - Plan d’Action National
d’Adaptation. Port-au-Prince.
MEF-UTE. Le Nord et le Nord-Est Choisissent Leur Avenir !
MEF-UTE. (2011) Supervision des Travaux de Réalisation d’un Forage et de Deux Piézomètres a
Caracol / Fleury – Rapport Préliminaire. Port au Prince.
MEF-UTE. (2007) Proposition d’un Cadre pour le Développement des Infrastructures dans la Région
Nord d’Haïti.
Mora, Sergio, et al. (2010) Analysis of Multiple Natural Hazards in Haiti (NATHAT). Port-au-Prince :
Government of Haiti, with support from the World Bank, IDB, and United Nations.
Moreau de Saint Mery. (1797) Description Topographique, Civile, Politique et Historique de la Partie
Française de l’Isle Saint Domingue. Philadelphie.
MPCE – Direction Départemental du Nord. (1997a) Livre Blanc du Nord - Éléments De Problématique
Départementale Du Nord, Vol. I + II. PNUD, CNUEH-Habitat, Projet d’Appui en Aménagement du
Territoire (HAI-94-016). Port-au- Prince.
MPCE – Direction Départemental du Nord-est. (1997b) Éléments De Problématique Départementale Du
Nord-est, Vol. I + II. PNUD, CNUEH-Habitat, Projet d’Appui en Aménagement du Territoire (HAI-
94-016). Port-au-Prince.
MTPTC. (2006a) Analyse de la Problématique de la Gestion des Déchets Solides dans la Métropolitaine
de Port au Prince. MTPTC: Port-au-Prince:.
______. (2006b) Enjeux et Défis de la Lutte Contre la Pauvreté : Électricité.
______. (2006c) Enjeux et Défis de la Lutte Contre la Pauvreté : Transport Routier.
______. (2009) Stratégie Nationale de l’Entretien Routier. EU-sponsored.
MTPTC. (2011) “Feuille de Route du Secteur Energetique Haitien: 2011-2014, Ebauche 4.”
MTPTC / AAN / DPO. (Unknown date). Programme de modernisation et de développement du système
de transport aérien. Port-au-Prince.
146
MTPTC / MSPP / MDE. (2006) Pre-acte du Colloque: Journée Mondiale de l’Eau Assainissement en
Haïti: Etat des lieux et Perspectives - 26-27 Mars 2006. Port-au-Prince.
MTPTC / BME / EDH. (2007) Haïti : Plan de Développement du Secteur de l’Energie 2007 – 2017.
MTPTC / UGSE / BME / EDH. (2011). Plan National De Développement Du Secteur De L’énergie Version
Intérimaire (PNDSE-i). Port Au Prince.
Muller-Poitevien, Henri-Claude. (2012) “Haiti’s Battle to Shake off a Bad Reputation.” Huffington Post,
July 8, 2012.
OIT. (2008) Sommet Syndical pour la reconstruction et le développement d’Haïti, St. Domingue.
Parsons. (2006) Haiti North Industrial Park - Power Planning and Expansion Strategy 2011. USTDA.
Prentice, Carol S., Paul Mann, Luis R. Pena, and G. Burr. (2003) “Slip Rate and Earthquake Recurrence
along the Central Septentrional Fault, North American-Caribbean Plate Boundary, Dominican
Republic. Journal of Geophysical Research, Vol. 108.
Ray, R. (2007) TOPEX/Poseidon: Revealing Hidden Tidal Energy, GSFC, NASA
Rowan, 2010 http://scienceblogs.com/highlyallochthonous/2010/02/haitis_seismic_future.php
SAE-A Trading Co. Ltd. (2010) Sae-A Haiti Investment Plan S.H.I.P.
Smucker, G, ed. (2007) Environmental Vulnerability In Haiti Findings & Recommendations Geologie /
Geology. USAID – Chemonics: Washington, DC.
Sylvain, Hervey. (2010) “Les Infrastructures dans la Region Nord.” Excel database for IDB.
Terminal Link. (2010) “Container Transhipment Hub in Republic of Haiti: Selection of the Site.”
Presentation made Dec. 2010.
Toussaint, JR. (2011) The Implementation Of The Industrial Park In The Caracol Bay, North-East/Haiti: In
What Extent And Under What Prerequisite A Win – Win Situation Could Be Envisaged From An
Environmental Point Of View? MDE: Port-au-Prince.
UEH / FAMV. (2011) Rapport D’Etudes Analyses de l’Eau Souterrain et de Surface pour l’Alimentation
des Bâtiments du Parc Industriel. Port-au-Prince.
UNDP. (2007) Plan d’Action Départemental pour l’Environnement et le Développement Durable
(PADEDD) – Département Nord-Est.
______. (2011) Etablissement d’un Système National d’Aires Protégées Financièrement Soutenable
(SNAP). Port-au-Prince. Available online at: http://bit.ly/wurm8E.
UNEP. 2005. Solid Waste Management. UNEP: Nairobi.
UNEP-Caribbean Environment Programme. (2008) Marine Litter in the Wider Caribbean : a Regional
Overview and Action Plan. Kingston, Jamaica.
Unknown. Problématique de la gestion des déchets à Cap-Haïtien. PPT
USAID. (2009) Watershed Management in Haiti: Recommended Revisions to National Policy. USAID.
_____. (2010) Assessment of Haiti Alternative Cooking Technologies Program. USAID: Washington, DC.
U.S. Army Corps of Engineers. (1999) Water Resources Assessment of Haiti. Tech. U.S. Southern
Command.
U.S. EPA. (2011) Emissions Inventory Improvement Program, Vol. 3.16 – Open Burning, January 2001.
UTSIG. (2007) Plan d’Actions Départemental pour l’Environnement et le Développement Durable du
Nord-Est ; Plan communaux de Caracol, Ferrier, Fort Liberté, Terrier Rouge, Trou-du-Nord.
147
Van der Plas, R. (1995) “Burning Charcoal Issues.” Energy Issues, the World Bank FDP Energy Note
No.1.
VCS Mining. Company webpage, available at: http://www.vcsmining.com.
Vermersch, M. (2008) Haiti: Plan Stratégique Sectoriel pour le Secteur de l’Eau Potable et de
l’Assainissement, Rapport Final – Resume. IDB-sponsored study.
Victor, Jean Andre. (1995) Code des Lois Haïtiennes de l’Environnement. UNDP: Port-au-Prince.
WHO. Global Health Repository Data Observatory (GHO), retrieved May 18, 2012.
WHO/UNICEF. (2010) Estimates for the use of Improved Drinking-Water Sources. Joint Monitoring
Program for Water Supply and Sanitation: Port-au-Prince.
______. (2012) Estimates for the use of Improved Sanitation Facilities. Joint Monitoring Programme for
Water Supply and Sanitation: Port-au-Prince.
World Bank. (2007) Haiti: Strategy to Alleviate the Pressure of Fuel Demand on National Woodfuel
Resources. World Bank ESMAP Technical Paper 112/07: Washington, DC.
_______. Little Green Book 2009. Washington, DC: World Bank, 2009.
______. World Bank Development Indicators Database.